# Boeing Alert Service Bulletin 737-28A1212: U.S.DOT/FAA - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0421; AD 2013-25-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-28A1212](https://openairdocs.org/service-documents/boeing/737-28a1212.md)
- Title as filed: U.S.DOT/FAA - Service Bulletin
- Pages: 123
- PDF: https://openairdocs.org/files/sha256/97/5d/975d1a1f47b89f846144ff149b6517e31fe4510dcebfc743c86e9a4f6ddf3e2f
- Page: https://openairdocs.org/service-documents/boeing/737-28a1212/file/975d1a1f47b8

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1212
Original Issue: July 23, 2009
Revision 2: October 18, 2012
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2009 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
1 of 123
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
2 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
S u m m a r y ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A . E f f e c t i v i t y  ............................................... 1 3
1. Airplanes ............................................ 1 3
2 . S p a r e s  A f f e c t e d  ........................................ 2 9
B. Concurrent Requirements ...................................... 2 9
C. Reason ................................................ 2 9
D. Description .............................................. 3 1
E. Compliance .............................................. 3 4
F . A p p r o v a l  ............................................... 3 4
G. Manpower .............................................. 3 5
H. Weight and Balance Changes .................................... 4 0
I. Electrical Load Data ......................................... 4 0
J . R e f e r e n c e s  .............................................. 4 1
1. Existing Data: ......................................... 4 1
2. Data Supplied with this Service Bulletin: ........................... 4 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 4 2
K. Publications Affected ........................................ 4 2
L. Interchangeability and Intermixability of Parts ........................... 4 2
M. Software Accomplishment Summary ................................ 4 3
2. MATERIAL INFORMATION ........................................ 4 5
A. Material - Price and Availability ................................... 4 5
B. Industry Support Information .................................... 4 6
C. Parts Necessary for Each Airplane ................................. 4 6
1 . K i t s / P a r t s :  ........................................... 4 6
2. Parts and Materials Supplied by the Operator: ........................ 4 9
3. Parts Modified and Reidentified: ............................... 5 1
4. Parts Removed and Not Replaced: .............................. 5 1
D. Parts Necessary to Change Spares ................................. 5 1
E. Special Tooling - Price and Availability ............................... 5 1
F. Special Tooling Necessary to do this Service Bulletin ....................... 5 2
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 5 3
A. GENERAL INFORMATION ..................................... 5 3
B. WORK INSTRUCTIONS ....................................... 5 4
FIGURE 1: M181, M182, M183 RELAY MODULE ASSEMBLY - REPLACEMENT [Group 1, 8] .... 5 8
FIGURE 2: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT  [Group 2, Configuration
1 ]  ................................................ 5 9
FIGURE 3: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT  [Group 3, 10-13,
Configuration 1] ......................................... 6 1
FIGURE 4: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT [Group 4, Configuration
1 ]  ................................................ 6 3
FIGURE 5: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT [Group 5, Configuration
1 ]  ................................................ 6 5
FIGURE 6: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT [Group 6, Configuration
1 ]  ................................................ 7 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
3 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 4

FIGURE 7: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT [Group 7, 9, Configuration
1 ]  ................................................ 7 6
FIGURE 8: W0044 WIRE BUNDLE - LOCATION  [Group 2-3, 6-7, 9-13, Configuration 1] ....... 8 2
FIGURE 9: WIRE BUNDLE W0044 - WIRING CHANGES [Group 2, Configuration 1] ......... 8 3
FIGURE 10: WIRE BUNDLE W0044 - WIRING CHANGES [Group 3, 12, Configuration 1] ....... 8 5
FIGURE 11: WIRE BUNDLE W0044 - WIRING CHANGES [Group 6-7, 9, Configuration 1] ....... 8 7
FIGURE 12: WIRE BUNDLE W0044 - WIRING CHANGES [Group 10, Configuration 1] ......... 8 8
FIGURE 13: WIRE BUNDLE W0044 - WIRING CHANGES [Group 11, 13, Configuration 1] ....... 8 9
FIGURE 14: FUEL BOOST PUMP CONNECTOR - WIRE LOCATION [Group 8] ............ 9 1
FIGURE 15: FUEL BOOST PUMP GROUNDS - WIRE LOCATION [Group 8] .............. 9 2
F I G U R E  1 6 : F U E L  B O O S T  P U M P  C O N N E C T O R  -  W I R I N G  C H A N G E S  [ G r o u p  8 ]  ........... 9 3
FIGURE 17: FUEL BOOST PUMP CONNECTOR - WIRE LOCATION [Group 8] ............ 9 4
FIGURE 18: FUEL BOOST PUMP GROUNDS - WIRE LOCATION [Group 8] .............. 9 5
F I G U R E  1 9 : F U E L  B O O S T  P U M P  C O N N E C T O R  -  W I R I N G  C H A N G E S  [ G r o u p  8 ]  ........... 9 6
FIGURE 20: FUEL BOOST PUMP CONTROL GROUND FAULT INTERRUPTER (GFI) CONTROL RELAY
- REFERENCE [Group 2-7, 9-13, Configuration 1] ...................... 9 7
FIGURE 21: WIRE BUNDLE W0044 - WIRING CHANGES [Group 1, 8] ................. 9 8
FIGURE 22: P6-2 RELAY PANEL - GROUND STUDS AND BONDING JUMPER - INSTALLATION [Group
2-4; Group 5, Configuration 1-2; Group 6, Configuration 1-2; Group 7, Configuration 1-2; Group
9, Configuration 1-2; Group 10-13] .............................. 9 9
FIGURE 23: P6-2 RELAY PANEL - FUEL PUMP POWER GFI RELAY - TURN [Group 5, Configuration 2-3]
................................................. 1 0 3
FIGURE 24: P6-2 RELAY PANEL - FUEL PUMP POWER GFI RELAY - TURN [Group 6, Configuration 2-3]
................................................. 1 0 8
FIGURE 25: P6-2 RELAY PANEL - FUEL PUMP POWER GFI RELAY - TURN [Group 7, Configuration 2-3;
Group 9, Configuration 2-3] .................................. 1 1 3
Appendix A: ELECTRICAL BONDING ................................... 1 1 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
4 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 5

Commercial
Airplanes
737
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 737-28A1212Original Issue: July 23, 2009
Revision 2: October 18, 2012
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-12-09 is related to this service bulletin.
More work is necessary for Group 5, 6, 7 and 9 airplanes that have been changed in accordance with the Original
Issue or Revision 1 of this service bulletin:-
– For airplanes that have incorporated the Original Issue of this service bulletin, but not Revision 1, it is
necessary to change the position of two Ground Fault Interrupt (GFI) relays, on the P6-2 relay panel, install
a bonding jumper between the P6-2 relay panel and P6 Load Control Center structure, do a bonding check
of the GFI relays and do a GFI operational test. This work is identified as Configuration 2 for these groups.
– For airplanes that have incorporated Revision 1 of this service bulletin, it is necessary to change the position
of two GFI relays on the P6-2 relay panel, do a bonding check and a GFI operational test, for related fuel
boost pumps. This work is identified as Configuration 3 for these groups.
More work is necessary for Group 2-4 and Group 10-13 airplanes that have been changed in accordance with
the Original Issue of this service bulletin. It is necessary to install a bonding jumper between the P6-2 relay panel
and P6 Load Control Center structure, then do a GFI operational test of the fuel boost pumps. This work is
identified as Configuration 2 for these groups.
No more work is necessary for Group 2-4 and Group 10-13 airplanes that have been changed in accordance
with Revision 1 of this service bulletin.
The Alternative Method Of Compliance (AMOC) to the requirements of paragraph (g), (h), (i), (j) and (k) of AD
2011-12-09, for Revision 2 of this bulletin, does not apply to Group 1 and 8 airplanes (line numbers 1 thru 291),
operators should contact the Boeing company for more instructions to do this change.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
5 of 123

### Page 6

REASON FOR REVISION
This revision is sent to update the installation of new GFI relays because the GFI system might not function
correctly after their installation on Groups 5, 6, 7 and 9 airplanes. Boeing received a report from one operator
that told of incorrect operation of new 9524G-10674 GFI relays. A subsequent investigation and test found that
Electromagnetic Interference (EMI), between the new 9524G-10674 relays and adjacent KCG-X4L-001 relays
could cause problems with the function of new relays and thus the operation of GFI system. The instructions
have therefore been updated to change the position of the GFI relays. Other groups are not affected by this
problem because of differences in the P6-2 relay panel layout. This revision is a final solution to the problem
described in 737-28A1212 IN 02 and requires no new parts to be supplied or kit changes. Operators of airplanes
in Groups 5, 6 and 7 can now continue to incorporate this service bulletin at this revision.
In addition, instructions to change airplane line numbers 1-291, in Groups 1 and 8, are removed. Operators with
these airplanes should contact The Boeing Company to get engineering and accomplishment instructions for
this change.
As a result of Boeing checks on the Group Configuration, the airplanes that follow are moved between groups
of the service bulletin effectivity.
1. Airplanes line numbers 263 thru 267 and 269 thru 291 are moved from Group 2 to Group 1.
2. Airplanes variable numbers PQ951, PR077-PR080 and PT681-PT685 are moved from Group 4 to
Group 5.
3. Airplanes variable numbers PW511-PW512 are moved from Group 6 to Group 7.
4. Airplane variable number PW702, and thus Group 9, is changed to be applicable to Figure 7 and not
Figure 3.
These sections are changed:
1. In Summary, Concurrent Requirements: Removed data for withdrawn Groups 1 and 8. Added none.
2. In Summary, Background: Added reference to Boeing Fleet Team Digest 737 FTD 28-04005 and
Boeing Service Letter 737-SL-28-070.
3. In Summary, Action: Added Part descriptions, new group configurations and Part 3 for withdrawn
Groups 1 and 8. Added more work in Parts 1, 2 and new Part 4. Added Part 1, Step 6.
4. In Summary, Compliance: Added FAA AD 2011-12-09. Added statement for withdrawn Groups 1 and
8. Updated statement for other groups based on more work required and revision.
5. In Summary, Illustration: Added more work for Configuration 2 and 3 and updated Configuration 1
description.
6. In Paragraph 1.A., Effectivity: Added Configuration 3 for Groups 5, 6, 7 and 9. Updated the Group
Configuration table descriptions. Corrected the Group of airplanes given above. Removed Configurations
for Groups 1 and 8.
7. In Paragraph 1.B., Concurrent Requirements: Removed data for withdrawn Groups 1 and 8. Added
none.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
6 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 7

8. In Paragraph 1.C., Reason: Added reference to Boeing Fleet Team Digest 737 FTD 28-04005 and
Boeing Service Letter 737-SL-28-070.
9. In Paragraph 1.D., Description: Added Part descriptions, new group configurations and Part 3 for
withdrawn Groups 1 and 8. Added more work in Parts 1, 2 and new Part 4. Added Part 1, Step 6.
10. In Paragraph 1.E., Compliance: Added FAA AD 2011-12-09. Added statement for withdrawn Groups
1 and 8. Updated statement for other groups based on more work required and revision.
11. In Paragraph 1.F., Approval: Added Alternative Method of Compliance statement with reference to
FAA Airworthiness Directive AD 2011-12-09.
12. In Paragraph 1.G., Manpower: Added Part descriptions, new group configurations and Part 3 for
withdrawn Groups 1 and 8. Added Figures and estimates for more work in Parts 1, 2 and new Part 4.
Changed Group 9 applicability.
13. In Paragraph 1.K., Publications Affected: Added Equipment List to Wiring Diagram Manual sections.
14. In Paragraph 1.I., Electrical Load Data: Added note for withdrawn Groups 1 and 8. Applied Group
Configurations. Corrected DC Load Table - added Group 13 and moved Group 9.
15. Added Paragraph 1.M., Software Accomplishment Summary: New service bulletin section - not affected.
16. In Paragraph 1.J., References: Updated to include items added at Revision 2 and not added at Revision
1.
17. In Paragraph 2.A., Material - Price and Availability: Updated tables and new Pricing and ROLT. Separated
tables for new group configurations and Kit applicability. Added note for withdrawn Groups 1 and 8.
18. In Paragraph 2.C.1., Kits/Parts: Added note for withdrawn Groups 1 and 8. Applied new group
configurations to tables. Added missing footnote (a) reference and note for Configuration 3.
19. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Added note for withdrawn Groups
1 and 8 and removed related part numbers from tables. Added new table for consumable materials,
added at Revision 1. Separated part tables by Group / Configuration and added existing parts column,
with instructions. Changed parts applicable to Group 9.
20. In .Paragraph 2.C.3., Parts Modified and Reidentified: Added note for withdrawn Groups 1 and 8 and
removed related table. Added note for other groups.
21. In Paragraph 3.B., Work Instructions: Added note for withdrawn Groups 1 and 8.
22. In Paragraph 3.B., Work Instructions, Part 1: Updated title. Removed Groups 1 and 8 and renumbered
all steps. Moved Group 9 applicability. Added more work in Steps 10 thru 12. Corrected Steps 5, 18
and 21. Added Step 25.
23. In Paragraph 3.B., Work Instructions, Part 2: Updated title and Step 5. Added more work for Configuration
2, applicable to Groups 5-7 and 9 in Step 4. Added test detail in Step 6.
24. In Paragraph 3.B., Work Instructions, Part 3: Deleted - applicable to withdrawn Groups 1 and 8.
25. Added Paragraph 3.B., Work Instructions, Part 4: To give Configuration 3 work instructions for Groups
5-7 and 9.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
7 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 8

26. Figure 1: Deleted - applicable to withdrawn Groups 1 and 8.
27. In Figures 2, 3 and 4: Updated titles, Alodine naming and related more data and cleaning step quantity
to agree with other figures.
28. In Figure 3: Removed Group 9 applicability.
29. In Figures 5, 6 and 7: Changed Illustrations and Step Tables to add more work for Configuration 1 and
update formats. Added Steps 3, 4, 8, 9, 10 and 13 and footnotes (d) thru (i). Updated titles, cleaning
step quantity, Alodine naming and related more data.
30. In Figure 7: Added Group 9 applicability.
31. In Figure 8: Updated title.
32. Figures 14 thru 19: Deleted - applicable to withdrawn Group 8.
33. Figure 21: Deleted - applicable to withdrawn Groups 1 and 8.
34. In Figure 22: Updated title, Alodine naming, and Applicability. Corrected Sheet 3 illustration.
35. Added Figures 23, 24 and 25: To give more work for Groups 5-7 and 9, Configuration 2 and 3.
36. In Appendix A: Added titles for Figure 1 and Figure 2. Corrected Paragraphs 1.a.(3), 1.a.(4), 2.a.(4),
2.a.(7) and 5.a.(1).(a).
The data given in Information Notices 737-28A1212 IN 01 and 737-28A1212 IN 02 is included in this revision,
as applicable.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
July 23, 2009Original Issue:
August 27, 2010Revision 1:
October 18, 2012Revision 2:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
8 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 9

Commercial
Airplanes
737
Service Bulletin
ALERT
SummaryNumber: 737-28A1212Original Issue: July 23, 2009
Revision 2: October 18, 2012
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives the instructions to replace the power control relays for the fuel boost pumps. The
relays are located in the P6 circuit breaker panel in the flight compartment. The new relays include a Ground
Fault Interrupt (GFI) feature. The GFI relay feature will protect the fuel pumps from damage caused by electrical
arcing because the electrical power will be removed from the pump if a ground fault is detected. Electrical arcing
could create a possible source of ignition of flammable fuel vapors in the fuel tanks. Ignition of flammable fuel
vapors could cause a fire or explosion which could put the airplane in an unsafe condition.
This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88, "Fuel Tank
System Fault Tolerance Evaluation Requirements".
This change affects section 9 of the Maintenance Planning Data (MPD) Document. The Airworthiness Limitations
(AWL) "28-AWL-23" (737-100/200/200C airplanes) and "28-AWL-22" (737-300/400/500 airplanes) are related
to this service bulletin.
Boeing Fleet Team Digest 737 FTD 28-04005 is related to this service bulletin.
Boeing Service Letter 737-SL-28-070 is related to this service bulletin.
ACTION (PRR 35440-10RS)
Group 2-7, 9-13, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
1. Get access to the flight compartment.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
9 of 123

### Page 10

2. At the P6 Load Control Center install two ground studs and a ground bonding jumper.
3. Measure the electrical bonding between the P6-2 relay panel and P6 Load Control Center structure.
4. Replace relays on the P6-2 relay panel with new Ground Fault Interrupt (GFI) relays as follows:
a. Group 2, 4, Configuration 1:
Replace six relays.
b. Group 3, 10-13, Configuration 1:
Replace eight relays.
c. Group 5, Configuration 1:
Replace six relays, with R18 and R19 turned 180 degrees.
d. Group 6-7, 9, Configuration 1:
Replace eight relays, with R146 and R147 turned 180 degrees.
5. Measure the electrical bonding between each of the new GFI relays and the P6-2 relay panel and repair
the bond if necessary.
6. Group 2-3, 6-7, 9-13, Configuration 1:
Change the W0044 wire bundle.
7. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel boost
pumps.
Group 2-7, 9-13, Configuration 2:
PART 2 - MORE WORK - GROUND STUDS AND BONDING JUMPER INSTALLATION AND GFI RELAY
POSITION CHANGE
1. Get access to the flight compartment.
2. At the P6 Load Control Center install two ground studs and a ground bonding jumper.
3. Measure the electrical bonding between the P6-2 relay panel and P6 Load Control Center structure.
4. Group 5-7, 9, Configuration 2:
Remove and keep two GFI relays on the P6-2 relay panel, turn the relay sockets 180 degrees, then
install the kept relays in the new position.
5. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel boost
pumps.
Group 1, 8:
PART 3 - THIS PART IS DELETED
1. Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get engineering
and accomplishment instructions for this change and do the instructions.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
10 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 11

Group 5-7, 9, Configuration 3:
PART 4 - MORE WORK - GFI RELAY POSITION CHANGE
1. Get access to the flight compartment.
2. Remove and keep two GFI relays on the P6-2 relay panel, turn the relay sockets 180 degrees, then
install the kept relays in the new position.
3. Measure the electrical bonding between each of the changed GFI relays and the P6-2 relay panel and
repair the bond if necessary.
4. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the related fuel
boost pumps.
EFFECTIVITY
737-100/-200/-200C/-300/-400/-500 Airplanes. Refer to Paragraph 1.A., Effectivity for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-12-09 is related to this service bulletin.
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get engineering and
accomplishment instructions for this change and do the instructions within 60 months after the effective date of
Revision 01 of this service bulletin.
Group 2-4, 10-13:
Boeing recommends that operators make the changes shown in this service bulletin within 60 months after the
effective date of Revision 01 of this service bulletin.
Group 5-7, 9:
Boeing recommends that operators make the changes shown in this service bulletin within 60 months after the
effective date of Revision 02 of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
11 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 12 (OCR)

BOEING SERVICE BULLETIN 737-28A1212
ALERT  ALERT
I GROUPS 2-7, 9-13, CONFIGURATION 1:
P6 LOAD CONTROL CENTER:
REPLACE 6 OR 8 RELAYS WITH
GFI RELAYS.
GROUPS 2-3, 6-7, 9-13, CONFIGURATION 1:
CHANGE BOOST PUMP WIRE TERMINATIONS ON
THE WOO44 WIRE BUNDLE.
GROUPS 2-7, 9-13, CONFIGURATION 1-2:
P6 LOAD CONTROL CENTER:
INSTALL A GROUND BONDING JUMPER.
GROUP 5-7, 9, CONFIGURATION 1-3:
REMOVE 2 GFI RELAYS AND INSTALL
TURNED BY 180 DEGREES, IN THE SAME
LOCATION.  J83240
Original Issue: July 23, 2009
Revision 2: October 18, 2012  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-28A1212
Work - See page 1 for details.  12 of 123

### Page 13

Commercial
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1212
Original Issue: July 23, 2009
Revision 2: October 18, 2012
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Fuel Pump Control Ground Fault Interrupter (GFI)
Relay Installation
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-19567 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR35440-10RS for data about
this change.
DESCRIPTIONCONFIGURATIONGROUP
737-100/200/200C Airplanes, line numbers 42 thru 291. Operators
should contact The Boeing Company to get engineering and
accomplishment instructions for this change and do the instructions.
-1
737-100/200/200C/300/400 Airplanes, line numbers 292 thru 3132,
that require replacement of 6 Relays, without spacers, on the P6-2
panel, and changes to the W0044 Wire Bundle.
-2
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
13 of 123

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
737-200 Airplanes, line numbers 292 thru 985, delivered equipped
for Auxiliary Fuel Tanks, that require replacement of 8 Relays, without
spacers, on the P6-2 panel and changes to the W0044 Wire Bundle.
-3
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
737-200/300/400/500 Airplanes, line numbers 1494 thru 3132, that
require replacement of 6 Relays, with spacers, on the P6-2 panel.
-4
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
737-300/400/500 Airplanes, line numbers 1663 thru 3132, that require
replacement of 2 Relays without spacers and 4 Relays with spacers,
on the P6-2 panel.
-5
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Airplanes that have accomplished Revision 1 of this service bulletin.3
737-400 Airplanes, line numbers 1707 thru 3132, delivered equipped
for Auxiliary Fuel Tanks, that require replacement of 4 Relays without
spacers and 4 Relays with spacers, on the P6-2 panel, and changes
to the W0044 Wire Bundle.
-6
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Airplanes, equipped with Auxiliary Fuel Tanks, that have accomplished
Revision 1 of this service bulletin.
3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
14 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 15

DESCRIPTIONCONFIGURATIONGROUP
737-400 Airplanes, line numbers 1687, 1697 and 2043, delivered
equipped for Auxiliary Fuel Tanks, that require replacement of 2
Relays without spacers and 6 Relays with spacers, on the P6-2 panel,
and changes to the W0044 Wire Bundle.
-7
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Airplanes, equipped with Auxiliary Fuel Tanks, that have accomplished
Revision 1 of this service bulletin.
3
737-100/200 Airplanes, line numbers 1 thru 41, that have different
service bulletin effectivities. Operators should contact The Boeing
Company to get engineering and accomplishment instructions for
this change and do the instructions.
-8
737-400 Airplane, line number 2432, delivered equipped for Auxiliary
Fuel Tanks, that require replacement of 2 Relays without spacers
and 6 Relays with spacers, on the P6-2 panel, and changes to the
W0044 Wire Bundle.
-9
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Airplanes, equipped with Auxiliary Fuel Tanks, that have accomplished
Revision 1 of this service bulletin.
3
737-200 Airplane, line number 1585, delivered equipped for Auxiliary
Fuel Tanks, that require replacement of 8 Relays, without spacers,
on the P6-2 panel and different changes to the W0044 Wire Bundle.
-10
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
15 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 16

DESCRIPTIONCONFIGURATIONGROUP
737-300 Airplanes, line numbers 1124 thru 1385, delivered equipped
for Auxiliary Fuel Tanks, that require replacement of 8 Relays, without
spacers, on the P6-2 panel and different changes to the W0044 Wire
Bundle.
-11
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
737-200 Airplanes, line numbers 458 thru 987, delivered with
provisional wires for Auxiliary Tanks, that require replacement of 8
Relays (or 6 without auxiliary tanks), without spacers, on the P6-2
panel and changes to the W0044 Wire Bundle.
-12
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
737-300 Airplanes, line numbers 1111 thru 3132, delivered with
provisional wires for Auxiliary Tanks, that require replacement of 8
Relays (or 6 without auxiliary tanks), without spacers, on the P6-2
panel and different changes to the W0044 Wire Bundle.
-13
Airplanes that have not accomplished this service bulletin.1
Airplanes that have accomplished the Original Issue, but not Revision
1 of this service bulletin.
2
Airplane Models:
737-100, 737-200, 737-200C, 737-300, 737-400, 737-500
GroupVariable Number
8PA001 - PA014
1PA015 - PA022
8PA099
1PA231 - PA232
1PC001 - PC005
8PG001 - PG017
1PG018 - PG075
8PG199
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
16 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 17

GroupVariable Number
8PG201 - PG202
1PG203 - PG230
1PG251 - PG255
8PG271 - PG273
1PG274 - PG279
8PG301 - PG302
1PG303 - PG314
8PG331
1PG332
1PG351 - PG356
1PG375
1PG401 - PG403
1PG431 - PG442
1PG471 - PG475
1PG501 - PG505
1PG571 - PG583
2PG584 - PG586
1PG621 - PG630
1PG651 - PG652
1PG704 - PG705
2PH001
2PH011 - PH013
2PH021 - PH024
1PH701 - PH715
1PH731 - PH732
1PH741 - PH742
2PH743
1PJ001 - PJ002
2PJ003 - PJ006
3PJ007 - PJ009
1PJ031 - PJ032
1PJ071 - PJ072
1PJ101 - PJ104
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
17 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 18

GroupVariable Number
2PJ105 - PJ119
3PJ201 - PJ219
4PJ301 - PJ302
4PJ551 - PJ561
4PJ601 - PJ615
6PJ811
5PJ816 - PJ817
2PK026 - PK029
2PK041 - PK053
2PK061 - PK067
3PK068 - PK070
2PK081 - PK082
2PK091 - PK099
2PK101 - PK103
2PK111 - PK120
2PK141 - PK146
2PK201 - PK204
2PK211 - PK223
2PK231 - PK241
2PK251 - PK256
12PK257
2PK258
2PK271 - PK274
2PK281 - PK289
2PK291
2PK301 - PK318
2PK341
2PK351 - PK355
3PK356 - PK359
12PK360
2PK361
2PK391
2PK431 - PK433
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
18 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 19

GroupVariable Number
2PK451 - PK452
2PK461 - PK469
2PK495
2PK501
12PK502 - PK504
2PK511 - PK515
2PK519
2PK521 - PK528
2PK541 - PK565
2PK581
2PK591 - PK599
2PK601 - PK606
3PK607 - PK610
2PK611 - PK617
2PK621 - PK637
2PK641 - PK642
3PK661
2PK662 - PK666
2PK671 - PK681
2PK691 - PK697
2PK711 - PK716
2PK731 - PK765
2PK771 - PK779
2PK801 - PK804
2PK819 - PK827
2PK830
2PK861 - PK863
12PK871 - PK872
3PK873
12PK874
2PK881 - PK884
2PK901 - PK938
2PK971 - PK974
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
19 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 20

GroupVariable Number
2PL001 - PL028
2PL061
2PL081
2PL101 - PL113
2PL151
2PL171 - PL172
2PL201 - PL203
2PL221
2PL401 - PL408
3PL409 - PL410
2PL411
3PL412
2PL413 - PL417
12PL421
2PL441
2PL451 - PL456
2PL471
2PL491
3PL501
12PL502 - PL503
3PL504 - PL506
2PL551 - PL562
2PL581
3PL601 - PL603
2PL611
2PL621 - PL626
3PL631 - PL632
1PL711 - PL712
1PL716
2PL717 - PL747
2PL756
2PL758
2PL761 - PL770
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
20 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 21

GroupVariable Number
2PL781 - PL788
2PL793
1PL801 - PL803
2PM001 - PM006
2PM016 - PM017
2PM021 - PM023
2PM051 - PM066
3PM101 - PM107
12PM108 - PM119
12PM141 - PM142
2PM171
2PM181
2PM251 - PM255
2PM281 - PM283
2PM381 - PM399
2PM401 - PM417
2PM541 - PM550
4PM551 - PM564
3PN001 - PN002
2PN021 - PN043
2PN081 - PN086
2PN101 - PN117
2PN131 - PN163
2PN401 - PN420
2PN431 - PN433
2PN451 - PN456
2PN471 - PN474
2PN481
2PN491 - PN493
2PN501
4PN502
2PN511
4PN512
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
21 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 22

GroupVariable Number
10PN521
2PP001 - PP054
2PP101 - PP169
2PP181 - PP187
4PP188 - PP199
2PP201 - PP205
2PP221
2PP231 - PP243
2PP281 - PP286
2PP301 - PP305
2PP351 - PP353
2PP376 - PP384
2PP391 - PP393
2PP401 - PP440
11PP471 - PP475
13PP501 - PP520
2PP521 - PP522
2PP631 - PP634
2PP651 - PP652
2PP671 - PP689
11PP690 - PP694
2PP695 - PP699
2PP701 - PP706
11PP707 - PP716
2PP717 - PP733
2PP771 - PP779
2PP801 - PP808
2PP821 - PP827
2PP831 - PP848
2PP851 - PP852
2PP861 - PP877
2PP891 - PP899
2PP901 - PP936
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
22 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 23

GroupVariable Number
2PP946 - PP948
2PP951 - PP952
2PP961 - PP965
4PP966 - PP967
2PP981 - PP982
4PP983 - PP990
2PP991
4PP993
2PQ001 - PQ016
2PQ026 - PQ041
2PQ051 - PQ092
2PQ101 - PQ199
2PQ201 - PQ202
4PQ221 - PQ230
2PQ231 - PQ232
4PQ233 - PQ237
2PQ241 - PQ242
4PQ243
4PQ251 - PQ267
4PQ281 - PQ299
4PQ301 - PQ307
4PQ331 - PQ332
4PQ341 - PQ348
4PQ361 - PQ373
4PQ391 - PQ395
4PQ401 - PQ418
4PQ421
4PQ431 - PQ438
4PQ447 - PQ448
4PQ451
4PQ454
4PQ471 - PQ475
4PQ479 - PQ481
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
23 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 24

GroupVariable Number
4PQ486 - PQ487
4PQ491 - PQ493
4PQ771 - PQ772
4PQ791 - PQ793
4PQ801 - PQ805
5PQ931 - PQ935
5PQ951
4PQ971 - PQ997
4PR001 - PR017
4PR021 - PR034
5PR041 - PR045
5PR061 - PR072
5PR077 - PR082
4PR091 - PR092
4PR096
4PR101
4PR121 - PR122
4PR131 - PR132
4PR141 - PR143
4PR161 - PR172
4PR181
2PS601 - PS631
2PS636 - PS638
2PS641 - PS644
4PS651 - PS657
4PS666 - PS669
4PS691 - PS692
2PS701 - PS706
2PS751 - PS799
4PS811
4PS836 - PS837
2PS841 - PS846
2PS851 - PS852
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
24 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 25

GroupVariable Number
2PS856
13PS861 - PS863
13PS866 - PS868
2PS871 - PS874
2PS896 - PS897
2PS901 - PS941
13PS956 - PS957
4PS961 - PS963
4PS971 - PS978
4PT001 - PT015
4PT021 - PT031
4PT041 - PT064
4PT101 - PT105
5PT121 - PT138
4PT146 - PT148
4PT161 - PT170
5PT181 - PT188
4PT211 - PT220
5PT295
4PT301 - PT309
5PT331 - PT360
4PT381 - PT399
4PT401 - PT438
4PT501 - PT517
4PT561 - PT565
4PT581 - PT586
4PT611 - PT621
4PT641 - PT644
4PT651 - PT656
4PT671 - PT672
5PT681 - PT685
4PT701 - PT703
4PT716 - PT717
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
25 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 26

GroupVariable Number
4PT721 - PT725
4PT801 - PT834
4PT851 - PT854
5PT871 - PT886
4PT901 - PT930
4PT971 - PT973
4PT981 - PT985
4PT996
4PU001 - PU025
4PU301
4PU311 - PU313
2PV001
4PV002 - PV055
4PV201 - PV209
4PV226 - PV229
5PV231 - PV237
4PV271 - PV272
5PV281 - PV287
4PV296
4PV301 - PV302
5PV351
4PV356 - PV357
4PW001 - PW054
4PW061 - PW068
4PW072
4PW086 - PW088
4PW091 - PW094
4PW101 - PW102
4PW106
4PW111 - PW120
4PW156 - PW157
4PW161 - PW171
4PW201 - PW252
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
26 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 27

GroupVariable Number
4PW261 - PW268
4PW271 - PW276
4PW278
4PW281 - PW293
4PW296
5PW301 - PW327
4PW401 - PW408
4PW411 - PW418
4PW421 - PW424
4PW431 - PW435
5PW441 - PW450
5PW461 - PW467
5PW501 - PW504
7PW511 - PW512
6PW513 - PW522
6PW524
5PW525 - PW529
6PW530
4PW531 - PW550
4PW556 - PW557
5PW561 - PW564
5PW571 - PW576
4PW591 - PW596
4PW611 - PW622
4PW631 - PW637
4PW661 - PW662
4PW681 - PW683
7PW701
9PW702
5PW711 - PW717
4PW741 - PW742
4PW761
4PW771
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
27 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 28

GroupVariable Number
4PW831
4PW851 - PW856
1PX071
1PX701
1PY001 - PY008
1PY021
2PY022
1PY031
2PY036 - PY037
2PY046 - PY048
2PY051 - PY053
2PY056 - PY057
2PY101 - PY103
2PY111 - PY113
2PY131 - PY135
2PY141 - PY143
2PY151 - PY154
2PY156 - PY157
2PY161 - PY162
2PY166
2PY191
2PY201
2PY221 - PY222
2PY231
2PY241 - PY244
2PY270 - PY275
2PY281
2PY286
1PY301 - PY304
1PY321 - PY323
1PY341 - PY346
1PY361 - PY362
1PY381
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
28 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 29

GroupVariable Number
2PY401
2PY409 - PY411
2PY421 - PY422
2PY441
2PY451
2PY461 - PY463
2PY591 - PY595
2PY611 - PY612
2PY621
2PY631
2PY651
2PY671 - PY672
2PY721
2PY741
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives the instructions to replace the power control relays for the fuel boost pumps.
The relays are located in the P6 circuit breaker panel in the flight compartment. The new relays include
a ground fault interrupt (GFI) feature. The GFI relay feature will protect the fuel pumps from damage
caused by electrical arcing because the electrical power will be removed from the pump if a ground
fault is detected. Electrical arcing could create a possible source of ignition of flammable fuel vapors
in the fuel tanks. Ignition of flammable fuel vapors could cause a fire or explosion which could put the
airplane in an unsafe condition.
This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88, "Fuel
Tank System Fault Tolerance Evaluation Requirements".
This change affects section 9 of the Maintenance Planning Data (MPD) Document. The Airworthiness
Limitations (AWL) "28-AWL-23" (737-100/200/200C airplanes) and "28-AWL-22" (737-300/400/500
airplanes) are related to this service bulletin.
Boeing Fleet Team Digest 737 FTD 28-04005 is related to this service bulletin.
Boeing Service Letter 737-SL-28-070 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
29 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 30

Revision 1 was sent to change the sections that follow:
1. Airplanes PM541-PM548 are added to the service bulletin effectivity. Added new airplane
configurations to the group configuration table.
2. Group 12 and Group 13 had been added to the configuration table. Airplanes delivered with Auxiliary
Tank wire provisions have been moved to Group 12 and Group 13. Group/Configuration information
has been added to define those airplanes that have already accomplished initial release of the
service bulletin.
3. Changed the concurrent requirements reference from original issue of BAE Component Service
Bulletin 65-49808-24-01 to Revision 1 of the BAE Component Service Bulletin 65-49808-24-01.
4. Removed the reference to the Fault Isolation Manual and changed the IPC reference in Paragraph
1.K., Publications affected. The 737-100/-200/-300/-400/-500 airplane models do not have a Fault
Isolation Manual.
5. Task hour tables had been added for each airplane group configuration. The task hour estimates
were changed to include the removal and installation of the galley number one.
6. Three kits, availability, and price information was added to paragraph 2.A. Material Information.
7. The work instructions were changed to include:
a. The removal and installation of the galley number one to get access to the work location.
b. The installation of a bonding jumper.
c. To prepare/clean the contact surfaces of the relays and mounting panel to obtain the required
electrical bonding.
d. To measure the bonding resistance between the GFI relays and mounting panel.
e. To measure the bonding resistance between the mounting panel and P6 Load Control Center
structure.
f. Added Part 2 and Part 3 for airplanes that incorporated original issue of the service bulletin.
8. Terminology has been changed in the Work Instructions to agree with the terminology defined in
Paragraph 3.A. General Information - Notes.
9. Figure 1 was changed to change the reference to Revision 1 of the BAE Component Service
Bulletin 65-49808-24-01. Step was added to measure the electrical bonding resistance between
Relay Module Assemblies M181, M182, and M183 and the P6 Load Control Center structure.
10. Figure 2, 3, 4, 5, 6, 7 have been changed to prepare/clean the contact surfaces of the relays and
mounting panel in order to obtain the required electrical bonding.
11. Figure 22 has been added. this figure provides instructions to add a bonding jumper between relay
mounting panel and P6 Load Control Center structure and measure the bonding resistance between
the relay mounting panel and P6 Load Control Center structure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
30 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 31

12. Appendix A that provides information for electrical bonding was added to Paragraph 3.A., Work
Instructions.
Revision 2 is sent to update the installation of new GFI relays because the GFI system might not
function correctly after their installation on Groups 5, 6, 7 and 9 airplanes. Boeing received a report
from one operator that told of incorrect operation of new 9524G-10674 GFI relays. A subsequent
investigation and test found that Electromagnetic Interference (EMI), between the new 9524G-10674
relays and adjacent KCG-X4L-001 relays could cause problems with the function of new relays and
thus the operation of GFI system. The instructions have therefore been updated to change the position
of the GFI relays. Other groups are not affected by this problem because of differences in the P6-2
relay panel layout. This revision is a final solution to the problem described in 737-28A1212 IN 02 and
requires no new parts to be supplied or kit changes. Operators of airplanes in Groups 5, 6 and 7 can
now continue to incorporate this service bulletin at this revision.
In addition, at revision 2, instructions to change airplane line numbers 1-291, in Groups 1 and 8, are
removed. Operators with these airplanes should contact The Boeing Company to get engineering and
accomplishment instructions for this change.
D. Description
Group 2-7, 9-13, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
1. Get access to the flight compartment.
2. At the P6 Load Control Center install two ground studs and a ground bonding jumper.
3. Measure the electrical bonding between the P6-2 relay panel and P6 Load Control Center structure.
4. Replace relays on the P6-2 relay panel with new Ground Fault Interrupt (GFI) relays as follows:
a. Group 2, 4, Configuration 1:
Replace six relays.
b. Group 3, 10-13, Configuration 1:
Replace eight relays.
c. Group 5, Configuration 1:
Replace six relays, with R18 and R19 turned 180 degrees.
d. Group 6-7, 9, Configuration 1:
Replace eight relays, with R146 and R147 turned 180 degrees.
5. Measure the electrical bonding between each of the new GFI relays and the P6-2 relay panel and
repair the bond if necessary.
6. Group 2-3, 6-7, 9-13, Configuration 1:
Change the W0044 wire bundle.
7. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel
boost pumps.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
31 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 32

Group 2-7, 9-13, Configuration 2:
PART 2 - MORE WORK - GROUND STUDS AND BONDING JUMPER INSTALLATION AND GFI
RELAY POSITION CHANGE
1. Get access to the flight compartment.
2. At the P6 Load Control Center install two ground studs and a ground bonding jumper.
3. Measure the electrical bonding between the P6-2 relay panel and P6 Load Control Center structure.
4. Group 5-7, 9, Configuration 2:
Remove and keep two GFI relays on the P6-2 relay panel, turn the relay sockets 180 degrees,
then install the kept relays in the new position.
5. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the fuel
boost pumps.
Group 1, 8:
PART 3 - THIS PART IS DELETED
1. Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get
engineering and accomplishment instructions for this change and do the instructions.
Group 5-7, 9, Configuration 3:
PART 4 - MORE WORK - GFI RELAY POSITION CHANGE
1. Get access to the flight compartment.
2. Remove and keep two GFI relays on the P6-2 relay panel, turn the relay sockets 180 degrees,
then install the kept relays in the new position.
3. Measure the electrical bonding between each of the changed GFI relays and the P6-2 relay panel
and repair the bond if necessary.
4. Do a Ground Fault Interrupter (GFI) - Operational Test of the GFI relay installation for the related
fuel boost pumps.
Revision 1 - More work is necessary on airplanes changed in accordance with the original issue of this
service bulletin. Group 2 through 7 Airplanes and Group 9 through 11 airplanes that incorporated
original issue of this service bulletin have to incorporate Accomplishment Instructions, Work instructions,
Part 2 that provides work instructions to install a Bonding Jumper between the relay mounting panel
and P6 Load Control Center structure, and measure the electrical bonding resistance between the GFI
relays and the relay mounting panel. Group 1 and Group 8 airplanes that incorporated original issue
of this service bulletin have to incorporate Accomplishment Instructions, Work instructions, Part 3 that
provides work instructions to measure the electrical bonding resistance between the GFI relays and
the Relay Module Assemblies M181, M182, and M183 in accordance with Revision 1 of BAE Service
Bulletin 65-49808-24-01, and to measure the electrical bonding resistance between the Relay Module
Assemblies M181, M182, and M183 and the P6 Load Control Center structure.
Revision 2 - More work is necessary for Group 5, 6, 7 and 9 airplanes that have been changed in
accordance with the Original Issue or Revision 1 of this service bulletin:-
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
32 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 33

– For airplanes that have incorporated the Original Issue of this service bulletin, but not Revision 1,
it is necessary to change the position of two Ground Fault Interrupt (GFI) relays, on the P6-2 relay
panel, install a bonding jumper between the P6-2 relay panel and P6 Load Control Center structure,
do a bonding check of the GFI relays and do a GFI operational test. This work is identified as
Configuration 2 for these groups.
– For airplanes that have incorporated Revision 1 of this service bulletin, it is necessary to change
the position of two GFI relays on the P6-2 relay panel, do a bonding check and a GFI operational
test, for related fuel boost pumps. This work is identified as Configuration 3 for these groups.
Revision 2 - More work is necessary for Group 2-4 and Group 10-13 airplanes that have been changed
in accordance with the Original Issue of this service bulletin. It is necessary to install a bonding jumper
between the P6-2 relay panel and P6 Load Control Center structure, then do a GFI operational test of
the fuel boost pumps. This work is identified as Configuration 2 for these groups.
Revision 2 - No more work is necessary for Group 2-4 and Group 10-13 airplanes that have been
changed in accordance with Revision 1 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
1-2737-100, 737-200, 737-200C
Group 2:
Affected Maintenance Zones
ZoneModel
1-2737-200, 737-200C
Group 2:
Affected Maintenance Zones
ZoneModel
102737-300, 737-400
Group 3-4, 10, 12:
Affected Maintenance Zones
ZoneModel
1-2737-200
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
33 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 34

Group 4-5:
Affected Maintenance Zones
ZoneModel
102737-300, 737-400, 737-500
Group 6-7, 9:
Affected Maintenance Zones
ZoneModel
102737-400
Group 8:
Affected Maintenance Zones
ZoneModel
1-2, 3-5, 4-5737-100, 737-200
Group 11, 13:
Affected Maintenance Zones
ZoneModel
102737-300
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-12-09 is related to this service
bulletin.
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get engineering
and accomplishment instructions for this change and do the instructions within 60 months after the
effective date of Revision 01 of this service bulletin. .
Group 2-7, 9-13:
Boeing recommends that operators make the changes shown in this service bulletin within 60 months
after the effective date of Revision 02 of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
34 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 35

If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the action (i.e. inspection
or modification) defined in this service bulletin as an alternative method of compliance to the requirements
of paragraph (g), (h), (i), (j) and (k) of AD 2011-12-09 for airplanes line numbers 292 through 3132. All
provisions of AD 2011-12-09 that are not specifically referenced in the above statement remain fully
applicable and must be complied with.
The AMOC for Revision 2 of this bulletin does not apply to Group 1 and 8 airplanes (line numbers 1
thru 291), operators should contact the Boeing company for more instructions to do this change.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 2, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
3.503.501FIGURE 2
0.400.401FIGURE 9
1.001.001FIGURE 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
15.1528.40TOTAL FOR EACH AIRPLANE - PART 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
35 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 36

Group 3, 12, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501FIGURE 3
1.601.601FIGURE 10
1.001.001FIGURE 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
17.3530.60TOTAL FOR EACH AIRPLANE - PART 1
Group 4, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
3.503.501FIGURE 4
1.001.001FIGURE 22
0.500.501Close Access
1.252.502Test
6.758.00TOTAL FOR EACH AIRPLANE - PART 1
Group 5, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
5.005.001FIGURE 5
1.001.001FIGURE 22
0.500.501Close Access
1.252.502Test
8.259.50TOTAL FOR EACH AIRPLANE - PART 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
36 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 37

Group 6, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
5.505.501FIGURE 6
0.400.401FIGURE 11
1.001.001FIGURE 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
17.1530.40TOTAL FOR EACH AIRPLANE - PART 1
Group 7, 9, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
6.006.001FIGURE 7
0.400.401FIGURE 11
1.001.001FIGURE 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
17.6530.90TOTAL FOR EACH AIRPLANE - PART 1
Group 10, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501FIGURE 3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
37 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 38

Group 10, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.400.401FIGURE 12
1.001.001FIGURE 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
16.1529.40TOTAL FOR EACH AIRPLANE - PART 1
Group 11, 13, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
4.008.002Removal of the Galley number one
4.504.501FIGURE 3
1.601.601FIGURE 13
1.001.001FIGURE 22
0.500.501Close Access
4.0012.003Installation of the Galley number
one
1.252.502Test
17.3530.60TOTAL FOR EACH AIRPLANE - PART 1
Group 2-4, 10-13, Configuration 2:
PART 2 - MORE WORK - GROUND STUDS AND BONDING JUMPER INSTALLATION
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.001.001FIGURE 22
0.500.501Close Access
1.252.502Test
3.254.50TOTAL FOR EACH AIRPLANE - PART 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
38 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 39

Group 5, Configuration 2:
PART 2 - MORE WORK - GROUND STUDS AND BONDING JUMPER INSTALLATION AND GFI
RELAY POSITION CHANGE
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.001.001FIGURE 22
1.501.501FIGURE 23
0.500.501Close Access
1.252.502Test
4.756.00TOTAL FOR EACH AIRPLANE - PART 2
Group 6, Configuration 2:
PART 2 - MORE WORK - GROUND STUDS AND BONDING JUMPER INSTALLATION AND GFI
RELAY POSITION CHANGE
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.001.001FIGURE 22
1.501.501FIGURE 24
0.500.501Close Access
1.252.502Test
4.756.00TOTAL FOR EACH AIRPLANE - PART 2
Group 7, 9, Configuration 2:
PART 2 - MORE WORK - GROUND STUDS AND BONDING JUMPER INSTALLATION AND GFI
RELAY POSITION CHANGE
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.001.001FIGURE 22
1.501.501FIGURE 25
0.500.501Close Access
1.252.502Test
4.756.00TOTAL FOR EACH AIRPLANE - PART 2
Group 1, 8:
PART 3 - THIS PART IS DELETED
1. Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get
engineering and accomplishment instructions for this change and do the instructions.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
39 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 40

Group 5, Configuration 3:
PART 4 - MORE WORK - GFI RELAY POSITION CHANGE
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.501.501FIGURE 23
0.500.501Close Access
0.751.502Test
3.254.00TOTAL FOR EACH AIRPLANE - PART 4
Group 6, Configuration 3:
PART 4 - MORE WORK - GFI RELAY POSITION CHANGE
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.501.50FIGURE 24
0.500.501Close Access
0.751.502Test
3.254.00TOTAL FOR EACH AIRPLANE - PART 4
Group 7, 9, Configuration 3:
PART 4 - MORE WORK - GFI RELAY POSITION CHANGE
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
1.501.501FIGURE 25
0.500.501Close Access
0.751.502Test
3.254.00TOTAL FOR EACH AIRPLANE - PART 4
H. Weight and Balance Changes
None.
I. Electrical Load Data
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get engineering
and accomplishment instructions for this change and do the instructions.
1. Direct Current (DC) Loads
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
40 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 41

BusAmperesAirplanes
DC Bus 1- 0.71Group 2
DC Bus 2- 0.71
DC Bus 1- 0.95Groups 3, 10, 11, 12 and 13
DC Bus 2- 0.95
DC Bus 1+ 0.03Group 4
DC Bus 2+ 0.03
DC Bus 1- 0.22Group 5
DC Bus 2- 0.22
DC Bus 1- 0.46Group 6
DC Bus 2- 0.46
DC Bus 1- 0.21Group 7, 9
DC Bus 2- 0.21
2. Type
Continuous.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 35440-10RS.
b. Boeing Service Bulletin 737-24-1145.
c. Boeing Service Letter 737-SL-28-070.
d. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2011-12-09.
e. Service Bulletin Index D6-19567.
f. Standard Overhaul Practices Manual (SOPM) 20-11-03, 20-41-02, 20-43-03, 20-60-02.
g. Standard Wiring Practices Manual (SWPM) 20-00-11, 20-10-11, 20-10-12, 20-10-19, 20-20-00,
20-30-12, 20-60-00, 20-81-11, 20-81-22.
h. 737 Fleet Team Digest (FTD) 28-04005.
i. 737-100/200 Aircraft Maintenance Manual (AMM) 24-22-00, 25-11-0, 25-11-11, 25-16-11,
25-31-11, 28-22-18, 28-22-41.
j. 737-100/200 Structural Repair Manual (SRM) 51-30-02, 51-30-05.
k. 737-100/200 Wiring Diagram Manual (WDM) 28-23-01, 28-23-02.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
41 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 42

l. 737-300/400/500 Aircraft Maintenance Manual (AMM) 24-22-00, 25-11-11, 25-11-21, 25-31-11,
28-22-18, 28-22-41.
m. 737-300/400/500 Wiring Diagram Manual (WDM) 28-23-01, 28-23-02.
n. 737-300 Structural Repair Manual (SRM) 51-40-05.
o. 737-400 Structural Repair Manual (SRM) 51-40-05.
p. 737-500 Structural Repair Manual (SRM) 51-40-05.
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
RELAY ASSY - LOAD CONTROL CENTER69-73627-( )
LOAD CONTROL CENTER (STRUCTURE) P-6 PANEL65-49815
LOAD CONTROL CENTER INSTL - P6 PANEL65C25703
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
28-22737 Maintenance Manual
28-23, Equipment List737 Wiring Diagram Manual
24-50, 28-20737-100/200 Illustrated Parts Catalog
28-22, 28-23737-300/400/500 Illustrated Parts Catalog
28-20737 Schematic Diagram
Section 9737 Maintenance Planning Document
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
42 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 43

M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
43 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 44

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
44 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT
BLANK PAGE

### Page 45

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get engineering
and accomplishment instructions for this change and do the instructions.
Group 2, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 02
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 02 date
of this Service
Bulletin (Calendar
Days)
QTYDateNameKit Number
$326.0018926209/07/10KIT - RETROFIT GFI
RELAYS IN P6 - NON-
AUX CONFIGURA-
TION
65C37854-12
Group 3, 6-7, 9-13, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 02
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 02 date
of this Service
Bulletin (Calendar
Days)
QTYDateNameKit Number
$354.001892409/07/10KIT - RETROFIT GFI
RELAYS IN P6 - AUX
OR AUX PROVISIONS
CONFIGURATION
65C37854-13 (a)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
45 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 46

Group 3, 6-7, 9-13, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 02
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 02 date
of this Service
Bulletin (Calendar
Days)
QTYDateNameKit Number
(a) Airplanes in Group 12 and 13 have been delivered with wire provisions for Auxiliary Tank installation. If
Auxiliary Tanks have been installed on these airplanes operators need to order this kit. If Auxiliary Tanks
have not been installed on these airplanes there are more parts than necessary in this kit. Operators need
to order only the necessary parts to incorporate this service bulletin. The necessary parts can be ordered
as end item parts. Contact Boeing Spares for ordering the necessary end item parts from kit 65C37854-
13.
Group 2-3, Configuration 2; Group 4; Group 5, Configuration 1-2; Group 6-7, 9-13, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 02
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 02 date
of this Service
Bulletin (Calendar
Days)
QTYDateNameKit Number
$4.501893309/07/10KIT - RETROFIT
BONDING JUMPER
65C37854-14
Group 5-7, 9, Configuration 3:
None.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get
engineering and accomplishment instructions for this change and do the instructions.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
46 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 47

Group 2-3, 6-7, 9-13, Configuration 1:
Kit 65C37854
NotesExisting Part
Number
NameQTYNew Part Number
-13-12
KIT - RETROFIT,
GFI RELAYS IN P6
- NON-AUX CON-
FIGURATION
.-65C37854-12
KIT - RETROFIT,
GFI RELAYS IN P6
- AUX OR AUX
PROVISIONS
CONFIGURATION
-.65C37854-13
KIT - RETROFIT
BONDING
JUMPER
1165C37854-14
TOP KIT - GFI RE-
LAYS IN P6 -
NON-AUX CON-
FIGURATION
.161-74479-1
TOP KIT - GFI RE-
LAYS IN P6 - AUX
OR AUX PROVI-
SIONS CONFIGU-
RATION
1.61-74479-2
Group 2-4; Group 5, Configuration 1-2; Group 6, Configuration 1-2; Group 7, Configuration
1-2; Group 9, Configuration 1-2; Group 10-13:
Kit 65C37854
NotesExisting Part
Number
NameQTYNew Part Number
-14
KIT - RETROFIT
BONDING
JUMPER
-65C37854-14
BONDING
JUMPER
1BACJ40K5A5A6
NUT2BACN10YR3CD
(a)SCREW2BACS12GU3K10
WASHER6NAS1149D0316H
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
47 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 48

Group 2-4; Group 5, Configuration 1-2; Group 6, Configuration 1-2; Group 7, Configuration
1-2; Group 9, Configuration 1-2; Group 10-13:
Kit 65C37854
NotesExisting Part
Number
NameQTYNew Part Number
-14
(a) If grip length shown is not available at Boeing, fasteners supplied in kits
may be one grip length longer than indicated. Also, if any fasteners part
numbers listed are not available or have been superseded, substitute
fasteners may be supplied in kits.
Group 2-3, 6-7, 9-13, Configuration 1:
Kit 61-74479
NotesNameNew Part Number -1-2-101-102
(a)Top Kit, GFI Relays in P6 - Non- Aux Configuration-...61-74479-1
(b)Top Kit, GFI Relays in P6 - Aux or Aux Provisions
Configuration
.-..61-74479-2
Wire Kit, W0044 Wire Bundle1...61-74479-101
Wire Kit, W0044 Wire Bundle.1..61-74479-102
(a)Lacing Tape, White11..61-74479-2001
(b)Filler Wire11..61-74479-2002
Connector Identification Tape, Imprinted "D01606
M/W R00055 CTR R B/P"
..1161-74478-10301
Connector Identification Tape, Imprinted "D01608
M/W R00054 CTR L B/P"
..1161-74478-10302
Connector Identification Tape, Imprinted "D01818
M/W R00146 AFT AUX FWD BOOST PUMP"
...161-74478-10401
Connector Identification Tape, Imprinted "D01820
M/W R00147 AFT AUX AFT BOOST PUMP"
...161-74478-10402
Connector Identification Tape, Imprinted "D01602
M/W R00020 AFT B/P 2"
..1161-74479-10101
Connector Identification Tape, Imprinted "D01604
M/W R00021 FWD B/P 2"
..1161-74479-10102
Connector Identification Tape, Imprinted "D01610
M/W R00019 FWD B/P 1"
..1161-74479-10103
Connector Identification Tape, Imprinted "D01612
M/W R00018 AFT B/P 1"
..1161-74479-10104
Contact..1418BACC47CP2T
(a) Make from BMS 13-54, Type 3, Class 1, length as required.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
48 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 49

Group 2-3, 6-7, 9-13, Configuration 1:
Kit 61-74479
NotesNameNew Part Number -1-2-101-102
(b) Make from BMS 13-48 Type 10, Class 1, AWG 18, length as required.
Group 5-7, 9, Configuration 3:
None.
2. Parts and Materials Supplied by the Operator:
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get
engineering and accomplishment instructions for this change and do the instructions.
Group 2-4, 9-13:
NotesNameQTYPart Number / Specification
(a)Chemical Conversion CoatingAs NecessaryALODINE
(b)Epoxy PrimerAs NecessaryBMS 10-11, TYPE 1
(a) Refer to SOPM 20-43-03 for application procedure, specification and material sources of Chemical
Conversion Coating.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
Group 5-7, 9:
NotesNameQTYPart Number / Specification
(a)Chemical Conversion CoatingAs NecessaryALODINE
(b)Epoxy PrimerAs NecessaryBMS 10-11, TYPE 1
Replaces BMS 3-2.
(b)
Naphtha, AliphaticAs NecessaryTT-N-95 or equivalent
Tape6 inchesDymo 358 (3M 425 optional)
(a) Refer to SOPM 20-43-03 for application procedure, specification and material sources of Chemical
Conversion Coating.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
49 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 50

Group 2, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specification
(a)10-60450-1 (b)Ground Fault Interrupter (GFI)
Relay
6S283A004-1 (LEACH P/N
9524G-10674)
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145.
(b) Keep the existing part if there are other uses for it.
Group 3, 10-13, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specification
(a) (b)10-60450-6 (c)Ground Fault Interrupter (GFI)
Relay
8S283A004-1 (LEACH P/N
9524G-10674)
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145.
(b) Airplanes in Group 12 and 13 have been delivered with wire provisions for Auxiliary Tank installation.
If Auxiliary Tanks have not been installed on these airplanes there are more parts than necessary
given in this table. Operators only need to obtain the necessary parts to incorporate this service bulletin.
(c) Keep the existing part if there are other uses for it.
Group 4, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specification
(a)KCD4N (b)Ground Fault Interrupter (GFI)
Relay
6S283A004-6 (LEACH P/N KCG-
X4L-001)
(a)-Relay Installation Kit6002-9667-001-000
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145
(b) Keep the existing part if there are other uses for it.
Group 5, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specification
(a)10-60450-6 (b)Ground Fault Interrupter (GFI)
Relay
2S283A004-1 (LEACH P/N
9524G-10674)
(a)KCD4N (b)Ground Fault Interrupter (GFI)
Relay
4S283A004-6 (LEACH P/N KCG-
X4L-001)
(a)-Relay Installation Kit4002-9667-001-000
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145
(b) Keep the existing part if there are other uses for it.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
50 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 51

Group 6, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specification
(a)10-60450-6 (b)Ground Fault Interrupter (GFI)
Relay
4S283A004-1 (LEACH P/N
9524G-10674)
(a)KCD4N (b)Ground Fault Interrupter (GFI)
Relay
4S283A004-6 (LEACH P/N KCG-
X4L-001)
(a)-Relay Installation Kit4002-9667-001-000
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145
(b) Keep the existing part if there are other uses for it.
Group 7, 9, Configuration 1:
NotesExisting Part NumberNameQTYPart Number / Specification
(a)10-60450-6 (b)Ground Fault Interrupter (GFI)
Relay
2S283A004-1 (LEACH P/N
9524G-10674)
(a)KCD4N (b)Ground Fault Interrupter (GFI)
Relay
6S283A004-6 (LEACH P/N KCG-
X4L-001)
(a)-Relay Installation Kit6002-9667-001-000
(a) Leach International North America (V58657) 6900 Orangethorpe Avenue, P.O. Box 5032 Buena Park,
CA 90622-5032 Phone: (714) 739-0770, FAX: (714) 670-1145
(b) Keep the existing part if there are other uses for it.
3. Parts Modified and Reidentified:
Group 1, 8:
Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get
engineering and accomplishment instructions for this change and do the instructions.
Group 2-7, 9-13:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
51 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 52

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
52 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 53

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in Structural Repair Manual (SRM)
51
– Torque limits to tighten nuts and bolts are in SRM 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
53 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 54

10. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
11. This service bulletin includes functional test procedures for the systems changed or
modified by this service bulletin. More functional tests can possibly be necessary in
accordance with standard maintenance practices because of interruption to other
airplane systems.
B. WORK INSTRUCTIONS
Group 2-7, 9-13, Configuration 1:
PART 1 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND FUEL BOOST PUMP
RELAYS REPLACEMENT
1. Remove the electrical power from the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
2. Get access to the flight compartment.
3. In the flight compartment, move the First Officer's seat forward to create room in front of P6 Load
Control Panel. Refer to 737-100/200 AMM 25-11-0 or 737-300/400/500 AMM 25-11-11 as an
accepted procedure. If necessary remove the First Officer's seat. Refer to 737-100/200 AMM
25-11-11 or 737-300/400/500 AMM 25-11-11 as an accepted procedure.
4. In the flight compartment, remove and keep the adjacent lining panels outboard of the P6-2 circuit
breaker panel. Refer to 737-100/200 AMM 25-16-11 or 737-300/400/500 AMM 25-11-21 as an
accepted procedure.
5. Open and lower the P6-1 (65C25704-( ) ) and P6-2 (65C25704-( ) ) panels.
6. Group 2-7, 9-13, Configuration 1:
Install Ground Studs and Bonding Jumper and measure the electrical bonding resistance between
P6-2 relay panel and the P6 side panel in accordance with FIGURE 22.
7. Group 2, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, and R55 and measure the electrical
bonding between each new relay and P6-2 relay panel in accordance with FIGURE 2.
8. Group 3, 10-13, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, R55, R146, and R147 and measure
the electrical bonding between each new relay and P6-2 relay panel in accordance with FIGURE
3.
9. Group 4, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, and R55 and measure the electrical
bonding between each new relay and P6-2 relay panel in accordance with FIGURE 4.
10. Group 5, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, and R55, install R18 and R19
turned 180 degrees from their original position, then measure the electrical bonding between each
new relay and P6-2 relay panel in accordance with FIGURE 5.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
54 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 55

11. Group 6, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, R55, R146, and R147, install R146
and R147 turned 180 degrees from their original position, then measure the electrical bonding
between each new relay and P6-2 relay panel in accordance with FIGURE 6.
12. Group 7, 9, Configuration 1:
Replace the fuel pump power relays R18, R19, R20, R21, R54, R55, R146, and R147, install R146
and R147 turned 180 degrees from their original position, then measure the electrical bonding
between each new relay and P6-2 relay panel in accordance with FIGURE 7.
13. Group 2-3, 6-7, 9-13, Configuration 1:
Remove the galley number one to get access to the W0044 wire bundle in the P6 panel. Refer to
737-100/200 AMM 25-31-11 or 737-300/400/500 AMM 25-31-11 as an accepted procedure.
14. Group 2, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 9, and FIGURE 20.
15. Group 3, 12, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 10, and FIGURE 20.
16. Group 6-7, 9, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 11, and FIGURE 20.
17. Group 10, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 12, and FIGURE 20.
18. Group 11, 13, Configuration 1:
Change the W0044 wire bundle in accordance with FIGURE 8, FIGURE 13, and FIGURE 20.
19. Group 2-3, 6-7, 9-13, Configuration 1:
Install the galley number one. Refer to 737-100/200 AMM 25-31-11 or 737-300/400/500 AMM
25-31-11 as an accepted procedure.
20. In the flight compartment, install the adjacent lining panels outboard of the P6-2 circuit breaker
panel. Refer to 737-100/200 AMM 25-16-11 or 737-300/400/500 AMM 25-11-21 as an accepted
procedure.
21. Close the P6-1 (65C25704-( ) ) and P6-2 (65C25704-( ) ) panels.
22. Restore the position of the First Officer's seat if it was moved forward to create room in front of P6
Load Control Panel. Refer to 737-100/200 AMM 25-11-0 or 737-300/400/500 AMM 25-11-11 as
an accepted procedure. If the First Officer's seat was removed, install the First Officer's seat. Refer
to 737-100/200 AMM 25-11-11 or 737-300/400/500 AMM 25-11-11 as an accepted procedure.
23. Supply electrical power to the airplane. Refer to 737-100/200 AMM 24-22-00 or 737-300/400/500
AMM 24-22-00 as an accepted procedure.
24. Do the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST". Refer, as applicable,
to 737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as an accepted procedure.
25. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
55 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 56

Group 2-7, 9-13, Configuration 2:
PART 2 - GROUND STUDS AND BONDING JUMPER INSTALLATION AND GFI RELAY POSITION
CHANGE - MORE WORK FOR AIRPLANES THAT HAVE BEEN CHANGED IN ACCORDANCE
WITH THE ORIGINAL ISSUE OF THIS SERVICE BULLETIN.
1. Remove the electrical power from the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
2. Get access to the flight compartment.
3. Install Ground Studs and Bonding Jumper in accordance with FIGURE 22.
4. Group 5-7, 9, Configuration 2:
Remove and keep two GFI relays on the P6-2 relay panel, turn the relay sockets 180 degrees
then install the kept relays in the new position as follows:
a. Group 5, Configuration 2:
R18 and R19 in accordance with FIGURE 23.
b. Group 6, Configuration 2:
R146 and R147 in accordance with FIGURE 24.
c. Group 7, 9, Configuration 2:
R146 and R147 in accordance with FIGURE 25.
5. Supply electrical power to the airplane. Refer to 737-100/200 AMM 24-22-00 or 737-300/400/500
AMM 24-22-00 as an accepted procedure.
6. Do the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST" on all GFI relays. Refer
to 737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as an accepted procedure.
a. If any of the GFI relays fail the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL
TEST", make sure that the bonding resistance between the GFI relay flange and the mounting
panel is 0.0025 Ohms (2.5 milliohms) or less, in accordance with APPENDIX A, Paragraph
5.b.
(1) If the resistance measurement is greater than 0.0025 Ohms (2.5 milliohms), then remove
the relay, clean the faying surfaces, install the relay again and measure the bonding
resistance, in accordance with APPENDIX A.
(2) If the resistance measurement is 0.0025 Ohms (2.5 milliohms) or less replace the GFI
relay. Refer to 737-100/200 AMM 28-22-18 or 737-300/400/500 AMM 28-22-18 as an
accepted procedure.
(3) Repeat the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST". Refer to
737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as an accepted procedure.
7. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
56 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 57

Group 1, 8:
PART 3 - THIS PART IS DELETED
1. Operators with Group 1 and Group 8 airplanes should contact The Boeing Company to get
engineering and accomplishment instructions for this change and do the instructions.
Group 5-7, 9, Configuration 3:
PART 4 - GFI RELAY POSITION CHANGE - MORE WORK FOR AIRPLANES THAT HAVE BEEN
CHANGED IN ACCORDANCE WITH REVISION 1 OF THIS SERVICE BULLETIN
1. Remove the electrical power from the airplane. Refer to 737-100/200 AMM 24-22-00 or
737-300/400/500 AMM 24-22-00 as an accepted procedure.
2. Get access to the flight compartment.
3. Remove and keep two GFI relays on the P6-2 relay panel, turn the relay sockets 180 degrees
then install the kept relays in the new position as follows:
a. Group 5, Configuration 3:
R18 and R19 in accordance with FIGURE 23.
b. Group 6, Configuration 3:
R146 and R147 in accordance with FIGURE 24.
c. Group 7, 9, Configuration 3:
R146 and R147 in accordance with FIGURE 25.
4. Supply electrical power to the airplane. Refer to 737-100/200 AMM 24-22-00 or 737-300/400/500
AMM 24-22-00 as an accepted procedure.
5. Do the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST" on all GFI relays. Refer
to 737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as an accepted procedure.
a. If any of the GFI relays fail the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL
TEST", make sure that the bonding resistance between the GFI relay flange and the mounting
panel is 0.0025 Ohms (2.5 milliohms) or less, in accordance with APPENDIX A, Paragraph
5.b.
(1) If the resistance measurement is greater than 0.0025 Ohms (2.5 milliohms), then remove
the relay, clean the faying surfaces, install the relay again and measure the bonding
resistance, in accordance with APPENDIX A.
(2) If the resistance measurement is 0.0025 Ohms (2.5 milliohms) or less replace the GFI
relay. Refer to 737-100/200 AMM 28-22-18 or 737-300/400/500 AMM 28-22-18 as an
accepted procedure.
(3) Repeat the "GROUND FAULT INTERRUPTER (GFI) - OPERATIONAL TEST". Refer to
737-100/200 AMM 28-22-41 or 737-300/400/500 AMM 28-22-41 as an accepted procedure.
6. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2: October 18, 2012
57 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 58

This Figure applies only to: Group 1, 8.
FIGURE 1: M181, M182, M183 RELAY MODULE ASSEMBLY - REPLACEMENT
(SHEET 1 OF 1)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2 October 18, 2012
58 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

### Page 59 (OCR)

BOEING SERVICE BULLETIN 737-28A1212
ALERT  ALERT
This Figure applies only to: Group 2, Configuration 1.
LINING PANEL
P6-1 CIRCUIT
BREAKER PANEL
P6-2 CIRCUIT
BREAKER PANEL
RELAY PANEL
234
6 RELAYS
A-A  J82801
FIGURE 2: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT
(SHEET 1 OF 2)
Original Issue: July 23, 2009
Revision 2 October 18, 2012  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-28A1212
Work - See page 1 for details.  59 of 123

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
R18, R19, R20, R21,
R54, and R55.
610-60450-1Fuel Pump Power RelayRemove1
Remove the paint
around the relay
cutout, from the side
of the panel that will
be in contact with the
relay. (a)
--SurfaceClean2
On the bare surfaces.
Refer to SOPM 20-43-
03 as an accepted
procedure.
-ALODINEChemical Conversion CoatingApply3
The contact surfaces
of the relay and the
panel to remove con-
tamination. (b)
--SurfaceClean4
R18, R19, R20, R21,
R54, and R55. Refer
to SWPM 20-81-22 as
an accepted proce-
dure for installation of
similar LEACH relays.
6S283A004-1
(LEACH P/N
9524G-10674)
Fuel Pump Power (GFI) RelayInstall /
New
5
Between the flange of
the relay and the
mounting panel. (c)
60.0025 OHMS (2.5
MILLIOHMS)
ResistanceMeasure6
On any bare metal
around the relays. Re-
fer to SOPM 20-41-02
as an accepted proce-
dure.
-BMS 10-11, TYPE
1
Epoxy PrimerApply7
(a) Abrasive clean by Hand or with a rotary brush in accordance with APPENDIX A, Paragraph 2.a.
(b) Use Solvent to clean the contact surfaces in accordance with APPENDIX A, Paragraph 2.b.
(c) Make sure that the resistance is 2.5 milliohms or less in accordance with APPENDIX A, Paragraph
5.b. If the resistance measurement is greater than 0.0025 Ohms (2.5 milliohms), then remove the
relay, clean the faying surfaces, install the relay and measure the bonding resistance again.
FIGURE 2: P6-2 RELAY PANEL - FUEL PUMP POWER RELAY - REPLACEMENT
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 23, 2009
737-28A1212Revision 2 October 18, 2012
60 of 123
BOEING SERVICE BULLETIN 737-28A1212
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/737-28a1212/file/975d1a1f47b8.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.