# Boeing Alert Service Bulletin 737-28A1227: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1068; AD 2016-18-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-28A1227](https://openairdocs.org/service-documents/boeing/737-28a1227.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 202
- PDF: https://openairdocs.org/files/sha256/a1/a6/a1a67d1fb686695926026a700f1c4e0bc720aa38935ae64a1429a25be5ea7b1d
- Page: https://openairdocs.org/service-documents/boeing/737-28a1227/file/a1a67d1fb686

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1227
Original Issue: August 02, 2010
Revision 1: July 18, 2011
ATA System: 2822
SUBJECT: FUEL - Distribution - Center and Auxiliary Tank Boost Pumps Fuel Control System
Un-Commanded On Relay Installation and Related Wiring Changes
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2010 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
1 of 202
6.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
2 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 2 7
B. Concurrent Requirements ...................................... 2 7
C. Reason ................................................ 2 7
D. Description .............................................. 2 8
E. Compliance .............................................. 3 0
F. Approval ............................................... 3 0
G. Manpower .............................................. 3 0
H. Weight and Balance Changes .................................... 3 4
I. Electrical Load Data ......................................... 3 4
J. References .............................................. 3 5
1. Existing Data: ......................................... 3 5
2. Data supplied with this Service Bulletin: ........................... 3 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 3 6
K. Publications Affected ........................................ 3 6
L. Interchangeability and Intermixability of Parts ........................... 3 6
2. MATERIAL INFORMATION ........................................ 3 7
A. Material - Price and Availability ................................... 3 7
B. Industry Support Information .................................... 3 9
C. Parts Necessary For Each Airplane ................................. 3 9
1. Kits/Parts: ........................................... 3 9
2. Parts and Materials Supplied by the Operator: ........................ 4 7
3. Parts Modified and Reidentified: ............................... 4 8
4. Parts Removed and Not Replaced: .............................. 4 8
D. Parts Necessary to Change Spares ................................. 4 8
E. Special Tooling - Price and Availability ............................... 4 8
F. Special Tooling Necessary to do this Service Bulletin ....................... 4 8
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 9
A. GENERAL INFORMATION ..................................... 4 9
B. WORK INSTRUCTIONS ....................................... 5 0
FIGURE 1: J2802 BOX ASSEMBLY - RELAYS AND SWITCHES INSTALLATION [Group 2-4; Group 5-8,
Configuration 1] ......................................... 8 4
FIGURE 2: WIRE BUNDLE W1760 AND W1770 IN THE J2802 BOX ASSEMBLY - INSTALLATION [Group
2-4; Group 5-8, Configuration 1] ................................ 8 9
FIGURE 3: WIRE BUNDLE W1760 THE J2802 BOX ASSEMBLY - CONNECTION [Group 2-4; Group 5-8,
Configuration 1] ......................................... 9 0
FIGURE 4: WIRE BUNDLE W1770 THE J2802 BOX ASSEMBLY - CONNECTION [Group 2-4; Group 5-8,
Configuration 1] ......................................... 9 3
FIGURE 5: J2802 BOX ASSEMBLY - RELAYS AND SWITCHES INSTALLATION [Group 5-8, Configuration
2 ]  ................................................ 9 6
FIGURE 6: WIRE BUNDLE W1760 AND W1770 IN THE J2802 BOX ASSEMBLY - INSTALLATION [Group
5-8, Configuration 2] ..................................... 1 0 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
3 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 4

FIGURE 7: WIRE BUNDLE W1760 THE J2802 BOX ASSEMBLY - CONNECTION [Group 5-8, Configuration
2 ]  ................................................ 1 0 2
FIGURE 8: WIRE BUNDLE W1770 THE J2802 BOX ASSEMBLY - CONNECTION [Group 5-8, Configuration
2 ]  ................................................ 1 0 6
FIGURE 9: WIRE BUNDLE W0368, W0386, W1764 AND W1774 FROM P6 DISCONNECT PANELS TO
J2802 BOX ASSEMBLY - ROUTING [Group 2; Group 7-8, Configuration 1] ....... 1 1 0
FIGURE 10: WIRE BUNDLE W0368 AND W1764 FROM P6 DISCONNECT PANELS TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 2; Group 7-8, Configuration 1] ......... 1 1 5
FIGURE 11: WIRE BUNDLE W0386 AND W1774 FROM P6 DISCONNECT PANELS TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 2; Group 7-8, Configuration 1] ......... 1 1 8
FIGURE 12: WIRE BUNDLE W0368, W0386, W1764 AND W1774 FROM P6 DISCONNECT PANELS TO
J2802 BOX ASSEMBLY - ROUTING [Group 3; Group 5-6, Configuration 1] ....... 1 2 1
FIGURE 13: WIRE BUNDLE W0368 AND W1764 FROM DISCONNECT PANEL A TO J2802 BOX ASSEMBLY
- WIRING CHANGES [Group 3; Group 5-6, Configuration 1] ................ 1 2 6
FIGURE 14: WIRE BUNDLE W0386 AND W1774 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGES [Group 3; Group 5-6, Configuration 1] ......... 1 2 9
FIGURE 15: WIRE BUNDLE W0368, W0386, W1764 AND W1774 FROM P6 DISCONNECT PANELS TO
J2802 BOX ASSEMBLY - ROUTING [Group 4] ....................... 1 3 2
FIGURE 16: WIRE BUNDLE W0368 AND W1764 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 4] ......................... 1 3 7
FIGURE 17: WIRE BUNDLE W0386 AND W1774 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 4] ......................... 1 4 0
FIGURE 18: WIRE BUNDLE W0368, W0386, W1034, W1046, W1764 AND W1774 FROM P6 DISCONNECT
PANELS TO J2802 BOX ASSEMBLY - ROUTING [Group 5, Configuration 2] ...... 1 4 2
FIGURE 19: WIRE BUNDLE W0368, W1046 AND W1764 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 5, Configuration 2] ................ 1 4 7
FIGURE 20: WIRE BUNDLE W0386, W1034 AND W1774 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 5, Configuration 2] ................ 1 5 2
FIGURE 21: WIRE BUNDLE W0368, W0386, W1034, W1046, W1764 AND W1774 FROM P6 DISCONNECT
PANELS TO J2802 BOX ASSEMBLY - ROUTING [Group 6, Configuration 2] ...... 1 5 7
FIGURE 22: WIRE BUNDLE W0368, W1046 AND W1764 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 6, Configuration 2] ................ 1 6 5
FIGURE 23: WIRE BUNDLE W0386, W1034 AND W1774 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 6, Configuration 2] ................ 1 7 0
FIGURE 24: WIRE BUNDLE W0368, W0386, W1034, W1046, W1764 AND W1774 FROM P6 DISCONNECT
PANELS TO J2802 BOX ASSEMBLY - ROUTING [Group 7, Configuration 2] ...... 1 7 5
FIGURE 25: WIRE BUNDLE W0368, W1046 AND W1764 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 7, Configuration 2] ................ 1 8 0
FIGURE 26: WIRE BUNDLE W0386, W1034 AND W1774 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 7, Configuration 2] ................ 1 8 4
FIGURE 27: WIRE BUNDLE W0368, W0386, W1034, W1046, W1764 AND W1774 FROM P6 DISCONNECT
PANELS TO J2802 BOX ASSEMBLY - ROUTING [Group 8, Configuration 2] ...... 1 8 8
FIGURE 28: WIRE BUNDLE W0368, W1046 AND W1764 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 8, Configuration 2] ................ 1 9 3
FIGURE 29: WIRE BUNDLE W0386, W1034 AND W1774 FROM P6 DISCONNECT PANEL TO J2802 BOX
ASSEMBLY - WIRING CHANGE [Group 8, Configuration 2] ................ 1 9 7
FIGURE 30: J2802 BOX ASSEMBLY - CLOSE ACCESS [Group 2-8] .................. 2 0 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
4 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 5

Commercial 
Airplanes
737
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 737-28A1227Original Issue: August 02, 2010
Revision 1: July 18, 2011
ATA System: 2822
SUBJECT: FUEL - Distribution - Center and Auxiliary Tank Boost Pumps Fuel Control System
Un-Commanded On Relay Installation and Related Wiring Changes
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on the airplane(s) changed in accordance with the original issue of this service
bulletin and also if the relay cutouts in the J2802 Panel Assembly have been made larger, as applicable, to fit
the body of relays R3334, R3336, R3338, R3340, and the screws BACS12HN08-10 were used for the installation
of the relays, as described in Information Notice 737-28A1227 IN 05. However, during the regular maintenance,
operators have to install the markers that identify the function of the switches installed on the J2802 box, in
accordance with Figure 1 or Figure 5, as applicable.
REASON FOR REVISION
This revision is sent to give group configurations that describe the possible current status of auxiliary tanks for
applicable airplanes in this service bulletin. Since the development of this service bulletin, operators could have
removed or deactivated their auxiliary tank. This revision also tells operators that the J2802 Panel Assembly,
part number 65C38484-12, which is included in the kits of concurrent Boeing service bulletins 737-28A1216 (for
737-300/400/500 airplanes) and 737-28A1228 (for 737-100/200/200C airplanes), is made with nutplates incorrectly
positioned. These nutplates are related to the installation of relays R3334, R3336, R3338 and R3340. Because
of their incorrect position, the related relays cannot be installed in accordance with Figures 1 and 5 of this service
bulletin at the original issue. These related relays can be installed if their cutouts in the J2802 Panel Assembly
are made larger to fit the body of the relays through them. Operators should make the changes shown in this
service bulletin revision 01 to keep the installation of the relays the same as the design intent. Also, new fastener
kits will be available from Boeing spares, 65C38537-6 (airplanes without auxiliary tank) and 65C38537-7 (airplanes
with auxiliary tanks). The fasteners supplied in these kits were omitted from the 65C38537-1, -2 and -3 Top Kits
listed in Paragraph 2.C.1., Kits/Parts. Only the missing screws and washers to install the relays are in these
kits, no other parts are included. Figures 1, 2, 5, and 6 are changed to give correct ground block locations for
GDY001 and GDY002, and Figure 7 is changed to correct Thermofit Sleeve part number 61-74485-2008 to part
number 61-74482-2007. Also Figures 3, 4, 7, and 8 are changed to give correct test switch nomenclature. This
revision is also adding markers on the J2802 Box that identify the function of each of the switch installed.
These sections are changed:
1. Summary:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
5 of 202

### Page 6

a. Background first and fourth paragraphs are updated.
b. Material Information paragraph added Operator Supplied Parts/Materials.
2. Planning Information:
a. Paragraph 1.C Reason: First and fourth paragraphs are updated. Added a paragraph that list the main
changes.
b. Paragraph 1.D. Description: Maintenance zone tables are added.
c. Paragraph 1.G. Manpower: Group effectivities and tables are updated.
d. Paragraph 1.H. Weight and Balance Changes: Group effectivities are updated.
e. Paragraph 1.I.1. Direct Current (DC) Loads: Group effectivities are updated.
3. Material Information:
a. Paragraph 2.A. Material - Price and Availability: Notes are added, kit pricing data is updated, and new
top kits are added.
b. Paragraph 2.C.1. Parts Necessary For Each Airplane: New top kits and footnotes are added.
c. Paragraph 2.C.2. Part and Materials Supplied by the Operator: New materials are added.
d. Paragraph 2.C.3. Parts Modified and Reidentified: New table is added
4. Paragraph 3.B. Work Instructions: Group effectivities and test switch nomenclature are updated.
5. Figures 1-14, and 18-29: Group effectivities are updated.
6. Figure 1, sheets 1, 2, and Step table are updated, new sheet 3 is added.
7. Figures 2 and 6, sheet 1 is updated.
8. Figures 3 and 4, sheet 1 and Step table are updated.
9. Figure 5, sheets 1, 2, and Step table are updated, new sheet 3 is added.
10. Figure 7, sheets 1, 2, and Step table are updated.
11. Figure 8, sheets 1 and 2 are updated
12. Figures 10, 11, 13, and 14, Step tables are updated.
The data given in Information Notice 737-28A1227 IN 01, IN 02, and IN 05 are included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
6 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 7

REVISION HISTORY
August 02, 2010Original Issue:
July 18, 2011Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
7 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 8

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
8 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
737
Service Bulletin
ALERT
SummaryNumber: 737-28A1227Original Issue: August 02, 2010
Revision 1: July 18, 2011
ATA System: 2822
SUBJECT: FUEL - Distribution - Center and Auxiliary Tank Boost Pumps Fuel Control System
Un-Commanded On Relay Installation and Related Wiring Changes
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
This service bulletin affects the 737-200/-200C/-300/-400/-500 airplanes with line numbers 292 thru 3132 that
have center tanks, and center and auxiliary fuel tanks. Operators with 737-100/-200/-200C airplanes with line
numbers 1 thru 291 should contact Boeing to obtain engineering and accomplishment instructions for this
modification. This service bulletin is sent to give 'un-commanded on' protection for the fuel pump control system.
Instructions are given to add one more relay, as a fail safe, for each fuel pump in the center and auxiliary fuel
tanks. If this service bulletin is not done, the fuel pumps could run dry, which increases the pumps temperature
and could cause an ignition source for fuel vapor in the fuel tank. Ignition of the flammable fuel vapors in the
fuel tanks, could cause a fire or explosion which will put the airplane in an unsafe condition.
The Boeing system safety assessment necessary for Special Federal Aviation Regulation (SFAR) 88, showed
that electrical faults within the fuel tank pump system can cause a fuel pump to operate when the fuel pump
switch is in the 'OFF' position. Boeing has developed a new system to prevent extended operation of the fuel
tank boost pumps in this condition. This new system has a second relay to prevent the operation of a pump
when its switch is in the 'OFF' position. The auto shutdown relay currently installed for each pump gives the
same solution as the new additional relay, but is known to have caused in-service problems because its contacts
have 'welded' closed and continued to let power be supplied. This condition is referred to as 'un-commanded
on' (UCO) pump operation. This new second relay added to the existing fuel control circuit and interfaced with
the P5-2 fuel control module, prevents UCO operation of the fuel boost pumps. The system senses if there is a
voltage remaining in the fuel boost pump circuit and activates the UCO relay to remove the power. In the flight
deck, the pump low pressure light in the P5-2 fuel systems module, and master caution light come on when the
fuel pump is at low pressure. No additional indication is provided for dry running pumps.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
9 of 202

### Page 10

Accomplishment of this service bulletin installs new UCO relays and toggle switches in the J2802 box assembly
located in the Electronic Equipment Bay (E/E bay). This service bulletin also changes and adds new wire bundles
that route from the J2802 box assembly to the P5 Forward Overhead Panel and the P6 Disconnect Panels.
Installation of the new UCO relays for each pump will prevent "dry running" of the fuel pumps and reduce the
risk of fuel tank fire or explosion.
The Airworthiness Limitations (AWL) 28-AWL-24 (Center Tank) and 28-AWL-25 (Auxiliary Fuel Tank) for
737-100/200/200C airplanes, and AWL 28-AWL-23 (Center Tank) and 28-AWL-24 (Auxiliary Fuel Tank) for
737-300/400/500 airplanes listed in 737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and
Certification Maintenance Requirements (CMRs), D6-38278-CMR, are related to this service bulletin.
Boeing Fleet Team Digest (FTD) 737 FTD 28-04004 is related to this service bulletin.
ACTION (PRR 35443-RS)
Remove equipment as necessary to get access the J2802 box assembly on the E2 and E3 support posts in the
E/E bay, P6 Load Control Center in the flight compartment/control cabin, and P6 disconnect panels. Remove
the cover from the J2802 box assembly and install wire bundles W1760 and W1770 and relays. Change wire
bundles W036, W368, W386, W1034, W1046, W1764 and W1774, as applicable, between the P6 disconnect
panels and J2802 box assembly. Check the continuity of all the new and changed wires and do a functional test
to make sure the changed fuel control system operates correctly.
Operators with Group 1 airplanes should contact Boeing to obtain engineering and accomplishment instructions
for this modification and do the instructions.
EFFECTIVITY
737-100/200/200C/300/400/500 Airplanes. Refer to Paragraph 1.A., Effectivity for the list of affected airplanes.
COMPLIANCE
Boeing recommends that the change given in this service bulletin be done within 60 months after the original
issue date of this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Operators with Group 1 airplanes should contact Boeing to obtain engineering and accomplishment instructions
for this modification and do the instructions.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
10 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 11 (OCR)

BOEING SERVICE BULLETIN 737-28A1227
ALERT  ALERT
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
CHANGE WIRE BUNDLES  CHANGE WIRE BUNDLES
W0368/W0386  W1764/W1774
CHANGE WIRE BUNDLES
W0386/W1034/W1046/W1764/W1774
INSTALL NEW TOGGLE
SWITCHES, RELAYS AND WIRE
BUNDLES W1760 AND W1770 IN  THE J2802 BOX ASSEMBLY  1308568
Original Issue: August 02, 2010
Revision 1: July 18, 2011  737-28A1227
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  11 of 202

### Page 12

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
12 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT
BLANK PAGE

### Page 13

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1227
Original Issue: August 02, 2010
Revision 1: July 18, 2011
ATA System: 2822
SUBJECT: FUEL - Distribution - Center and Auxiliary Tank Boost Pumps Fuel Control System
Un-Commanded On Relay Installation and Related Wiring Changes
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR 35443-RS for data about this
change.
DESCRIPTIONCONFIGURATIONGROUP
737-100/200/200C airplanes, that have a center tank but do not have
a auxiliary tank, with a unique wiring configuration.
-1
737-200/200C airplanes, that have a center tank but do not have an
auxiliary tank, with a unique wiring configuration.
-2
737-300/400/500 airplanes, that have a center tank but do not have
an auxiliary tank.
-3
737-200/200C airplanes, that have a center tank but do not have an
auxiliary tank, with a unique wiring configuration.
-4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
13 of 202

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
737-300 airplanes, which were delivered with a center tank and an
active auxiliary tank or delivered with a center tank and wiring
provision for an auxiliary tank.
-5
Airplanes that, since delivery have removed or deactivated the
auxiliary tank, or have wiring provision for an auxiliary tank only.
1
Airplanes that, since delivery, have kept the auxiliary tank active or
have completed the wiring provision, installed and activated the
auxiliary tank.
2
737-400 airplanes, which were delivered with a center tank and an
active auxiliary tank or delivered with a center tank and wiring
provision for an auxiliary tank.
-6
Airplanes that, since delivery have removed or deactivated the
auxiliary tank, or have wiring provision for an auxiliary tank only.
1
Airplanes that, since delivery, have kept the auxiliary tank active or
have completed the wiring provision, installed and activated the
auxiliary tank.
2
737-200 airplanes, which were delivered with a center tank and an
active auxiliary tank or delivered with a center tank and wiring
provision for an auxiliary tank, with a unique wiring configuration.
-7
Airplanes that, since delivery have removed or deactivated the
auxiliary tank, or have wiring provision for an auxiliary tank only.
1
Airplanes that, since delivery, have kept the auxiliary tank active or
have completed the wiring provision, installed and activated the
auxiliary tank.
2
737-200 airplanes, which were delivered with a center tank and an
active auxiliary tank or delivered with a center tank and wiring
provision for an auxiliary tank, with a unique wiring configuration.
-8
Airplanes that, since delivery have removed or deactivated the
auxiliary tank, or have wiring provision for an auxiliary tank only.
1
Airplanes that, since delivery, have kept the auxiliary tank active or
have completed the wiring provision, installed and activated the
auxiliary tank.
2
Airplane Models:
737-100, 737-200, 737-200C, 737-300, 737-400, 737-500
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
14 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 15

GroupVariable Number
1PA001 - PA022
1PA099
1PA231 - PA232
1PC001 - PC005
1PG001 - PG075
1PG199
1PG201 - PG230
1PG251 - PG255
1PG271 - PG279
1PG301 - PG314
1PG331 - PG332
1PG351 - PG356
1PG375
1PG401 - PG403
1PG431 - PG442
1PG471 - PG475
1PG501 - PG505
1PG571 - PG583
2PG584 - PG586
1PG621 - PG630
1PG651 - PG652
1PG701 - PG705
2PH001
2PH011 - PH013
2PH021 - PH024
1PH701 - PH715
1PH731 - PH732
1PH741 - PH742
2PH743
1PJ001 - PJ002
2PJ003 - PJ006
7PJ007 - PJ009
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
15 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 16

GroupVariable Number
1PJ031 - PJ032
1PJ071 - PJ072
1PJ101 - PJ104
4PJ105 - PJ119
7PJ201 - PJ219
3PJ301 - PJ302
3PJ551 - PJ561
3PJ601 - PJ615
6PJ811
3PJ816 - PJ817
2PK026 - PK029
2PK041 - PK053
2PK061 - PK067
7PK068 - PK070
2PK081 - PK082
2PK091 - PK099
2PK101 - PK103
2PK111 - PK120
2PK141 - PK146
2PK201 - PK204
2PK211 - PK223
2PK231 - PK241
2PK251 - PK256
7PK257
2PK258
2PK271 - PK274
2PK281 - PK289
2PK291
2PK301 - PK318
2PK341
2PK351 - PK355
7PK356 - PK360
2PK361
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
16 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 17

GroupVariable Number
2PK391
2PK431 - PK433
2PK451 - PK452
2PK461 - PK469
2PK495
2PK501
7PK502 - PK504
2PK511 - PK515
2PK519
2PK521 - PK528
2PK541 - PK565
2PK581
2PK591 - PK599
4PK601 - PK606
7PK607 - PK610
2PK611 - PK617
2PK621 - PK637
2PK641 - PK642
7PK661
2PK662 - PK666
2PK671 - PK681
2PK691 - PK697
2PK711 - PK716
2PK731 - PK765
2PK771 - PK779
2PK801 - PK804
4PK819 - PK827
4PK830
2PK861 - PK863
7PK871 - PK874
2PK881 - PK884
2PK901 - PK938
2PK971 - PK974
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
17 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 18

GroupVariable Number
2PL001 - PL028
2PL061
2PL081
2PL101 - PL113
2PL151
2PL171 - PL172
2PL201 - PL203
2PL221
2PL401 - PL408
7PL409 - PL410
2PL411
7PL412
2PL413 - PL417
7PL421
2PL441
2PL451 - PL456
2PL471
2PL491
8PL501 - PL506
2PL551 - PL562
2PL581
7PL601 - PL603
2PL611
2PL621 - PL626
7PL631 - PL632
1PL711 - PL712
1PL716
2PL717 - PL747
2PL756
2PL758
2PL761 - PL770
2PL781 - PL788
2PL793
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
18 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 19

GroupVariable Number
1PL801 - PL803
2PM001 - PM006
2PM016 - PM017
2PM021 - PM023
2PM051 - PM066
7PM101 - PM119
7PM141 - PM142
2PM171
2PM181
2PM251 - PM255
2PM281 - PM283
3PM381 - PM399
3PM401 - PM417
3PM541 - PM564
7PN001 - PN002
2PN021 - PN043
2PN081 - PN086
2PN101 - PN117
2PN131 - PN163
2PN401 - PN420
2PN431 - PN433
2PN451 - PN456
2PN471 - PN474
2PN481
2PN491 - PN493
2PN501 - PN502
2PN511 - PN512
7PN521
3PP001 - PP054
3PP101 - PP169
3PP181 - PP199
3PP201 - PP205
3PP221
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
19 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 20

GroupVariable Number
3PP231 - PP243
3PP281 - PP286
3PP301 - PP305
3PP351 - PP353
3PP376 - PP384
3PP391 - PP393
3PP401 - PP440
5PP471 - PP475
5PP501 - PP520
3PP521 - PP522
3PP631 - PP634
3PP651 - PP652
3PP671 - PP689
5PP690 - PP694
3PP695 - PP699
3PP701 - PP706
5PP707 - PP716
3PP717 - PP733
3PP771 - PP779
3PP801 - PP808
3PP821 - PP827
3PP831 - PP848
3PP851 - PP852
3PP861 - PP877
3PP891 - PP899
3PP901 - PP936
3PP946 - PP948
3PP951 - PP952
3PP961 - PP967
3PP981 - PP991
3PP993
3PQ001 - PQ016
3PQ026 - PQ041
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
20 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 21

GroupVariable Number
3PQ051 - PQ092
3PQ101 - PQ199
3PQ201 - PQ202
3PQ221 - PQ237
3PQ241 - PQ243
3PQ251 - PQ267
3PQ281 - PQ299
3PQ301 - PQ307
3PQ331 - PQ332
3PQ341 - PQ348
3PQ361 - PQ373
3PQ391 - PQ395
3PQ401 - PQ418
3PQ421
3PQ431 - PQ438
3PQ447 - PQ448
3PQ451
3PQ454
3PQ471 - PQ475
3PQ479 - PQ481
3PQ486 - PQ487
3PQ491 - PQ493
3PQ771 - PQ772
3PQ791 - PQ793
3PQ801 - PQ805
3PQ931 - PQ935
3PQ951
3PQ971 - PQ997
3PR001 - PR017
3PR021 - PR034
3PR041 - PR045
3PR061 - PR072
3PR077 - PR082
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
21 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 22

GroupVariable Number
3PR091 - PR092
3PR096
3PR101
3PR121 - PR122
3PR131 - PR132
3PR141 - PR143
3PR161 - PR172
3PR181
3PS601 - PS631
3PS636 - PS638
3PS641 - PS644
3PS651 - PS657
3PS666 - PS669
3PS691 - PS692
3PS701 - PS706
3PS751 - PS799
3PS811
3PS836 - PS837
3PS841 - PS846
3PS851 - PS852
3PS856
5PS861 - PS863
5PS866 - PS868
3PS871 - PS874
3PS896 - PS897
3PS901 - PS941
5PS956 - PS957
3PS961 - PS963
3PS971 - PS978
3PT001 - PT015
3PT021 - PT031
3PT041 - PT064
3PT101 - PT105
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
22 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 23

GroupVariable Number
3PT121 - PT138
3PT146 - PT148
3PT161 - PT170
3PT181 - PT188
3PT211 - PT220
3PT295
3PT301 - PT309
3PT331 - PT360
3PT381 - PT399
3PT401 - PT438
3PT501 - PT517
3PT561 - PT565
3PT581 - PT586
3PT611 - PT621
3PT641 - PT644
3PT651 - PT656
3PT671 - PT672
3PT681 - PT685
3PT701 - PT703
3PT716 - PT717
3PT721 - PT725
3PT801 - PT834
3PT851 - PT854
3PT871 - PT886
3PT901 - PT930
3PT971 - PT973
3PT981 - PT985
3PT996
3PU001 - PU025
3PU301
3PU311 - PU313
3PV001 - PV055
3PV201 - PV209
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
23 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 24

GroupVariable Number
3PV226 - PV229
3PV231 - PV237
3PV271 - PV272
3PV281 - PV287
3PV296
3PV301 - PV302
3PV351
3PV356 - PV357
3PW001 - PW054
3PW061 - PW068
3PW072
3PW086 - PW088
3PW091 - PW094
3PW101 - PW102
3PW106
3PW111 - PW120
3PW156 - PW157
3PW161 - PW171
3PW201 - PW252
3PW261 - PW268
3PW271 - PW276
3PW278
3PW281 - PW293
3PW296
3PW301 - PW327
3PW401 - PW408
3PW411 - PW418
3PW421 - PW424
3PW431 - PW435
3PW441 - PW450
3PW461 - PW467
3PW501 - PW504
6PW511 - PW522
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
24 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 25

GroupVariable Number
6PW524
3PW525 - PW529
6PW530
3PW531 - PW550
3PW556 - PW557
3PW561 - PW564
3PW571 - PW576
3PW591 - PW596
3PW611 - PW622
3PW631 - PW637
3PW661 - PW662
3PW681 - PW683
6PW701 - PW702
3PW711 - PW717
3PW741 - PW742
3PW761
3PW771
3PW831
3PW851 - PW856
1PX071
1PX701
1PY001 - PY008
1PY021
2PY022
1PY031
2PY036 - PY037
2PY046 - PY048
2PY051 - PY053
2PY056 - PY057
2PY101 - PY103
2PY111 - PY113
2PY131 - PY135
2PY141 - PY143
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
25 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 26

GroupVariable Number
2PY151 - PY154
2PY156 - PY157
2PY161 - PY162
2PY166
2PY191
2PY201
2PY221 - PY222
2PY231
2PY241 - PY244
2PY270 - PY275
2PY281
2PY286
1PY301 - PY304
1PY321 - PY323
1PY341 - PY346
1PY361 - PY362
1PY381
2PY401
2PY409 - PY411
2PY421 - PY422
2PY441
2PY451
2PY461 - PY463
2PY591 - PY595
2PY611 - PY612
2PY621
2PY631
2PY651
2PY671 - PY672
2PY721
2PY741
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
26 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 27

2. Spares Affected
None.
B. Concurrent Requirements
The service bulletin(s) listed below must be done before or at the same time as this service bulletin:
Group 1:
Operators should contact Boeing to obtain engineering and accomplishment instructions for this
modification and do the instructions.
Group 2-8:
DescriptionService BulletinCompany
Replacement of the P5-2 Fuel System
Module to Supply Low Fuel Pressure Mas-
ter Caution Annunciation.
737-28A1210 Revision 1Boeing
Group 3, 5-6:
DescriptionService BulletinCompany
Installation of the Auto Shutoff Protection
for the Center and Auxiliary Fuel Tank
Boost Pumps.
737-28A1216 Original IssueBoeing
Group 2, 4, 7-8:
DescriptionService BulletinCompany
Installation of the Auto Shutoff Protection
for the Center and Auxiliary Fuel Tank
Boost Pumps.
737-28A1228 Original IssueBoeing
C. Reason
This service bulletin affects the 737-200/-200C/-300/-400/-500 airplanes with line numbers 292 thru
3132 that have center tanks, and center and auxiliary fuel tanks. Operators with 737-100/-200/-200C
airplanes with line numbers 1 thru 291 should contact Boeing to obtain engineering and accomplishment
instructions for this modification. This service bulletin is sent to give 'un-commanded on' protection for
the fuel pump control system. Instructions are given to add one more relay, as a fail safe, for each fuel
pump in the center and auxiliary fuel tanks. If this service bulletin is not done, the fuel pumps could run
dry, which increases the pumps temperature and could cause an ignition source for fuel vapor in the
fuel tank. Ignition of the flammable fuel vapors in the fuel tanks, could cause a fire or explosion which
will put the airplane in an unsafe condition.
The Boeing system safety assessment necessary for Special Federal Aviation Regulation (SFAR) 88,
showed that electrical faults within the fuel tank pump system can cause a fuel pump to operate when
the fuel pump switch is in the 'OFF' position. Boeing has developed a new system to prevent extended
operation of the fuel tank boost pumps in this condition. This new system has a second relay to prevent
the operation of a pump when its switch is in the 'OFF' position. The auto shutdown relay currently
installed for each pump gives the same solution as the new additional relay, but is known to have
caused in-service problems because its contacts have 'welded' closed and continued to let power be
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
27 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 28

supplied. This condition is referred to as 'un-commanded on' (UCO) pump operation. This new second
relay added to the existing fuel control circuit and interfaced with the P5-2 fuel control module, prevents
UCO operation of the fuel boost pumps. The system senses if there is a voltage remaining in the fuel
boost pump circuit and activates the UCO relay to remove the power. In the flight deck the pump low
pressure light in the P5-2 fuel control systems module, and master caution light come on when the fuel
pump is at low pressure. No additional indication is provided for dry running pumps.
Accomplishment of this service bulletin installs new UCO relays and toggle switches in the J2802 box
assembly located in the Electronic Equipment Bay (E/E bay). This service bulletin also changes and
adds new wire bundles that route from the J2802 box assembly to the P5 Forward Overhead Panel
and the P6 Disconnect Panels. Installation of the new UCO relays for each pump will prevent "dry
running" of the fuel pumps and reduce the risk of fuel tank fire or explosion.
The Airworthiness Limitations (AWL) 28-AWL-24 (Center Tank) and 28-AWL-25 (Auxiliary Fuel Tank)
for 737-100/200/200C airplanes, and AWL 28-AWL-23 (Center Tank) and 28-AWL-24 (Auxiliary Fuel
Tank) for 737-300/400/500 airplanes listed in 737-100/200/200C/300/400/500 Airworthiness Limitations
(AWLs) and Certification Maintenance Requirements (CMRs), D6-38278-CMR, are related to this
service bulletin.
Revision 01 is sent to give group configurations that describe the possible current status of auxiliary
tanks for applicable airplanes in this service bulletin. Since the development of this service bulletin,
operators could have removed or deactivated their auxiliary tank. This revision also tells operators that
the J2802 Panel Assembly, part number 65C38484-12, which is included in the kits of concurrent
Boeing service bulletins 737-28A1216 (for 737-300/400/500 airplanes) and 737-28A1228 (for
737-100/200/200C airplanes), is made with nutplates incorrectly positioned. These nutplates are related
to the installation of relays R3334, R3336, R3338 and R3340. Because of their incorrect position, the
related relays cannot be installed in accordance with Figures 1 and 5 of this service bulletin at the
original issue. These related relays can be installed if their cutouts in the J2802 Panel Assembly are
made larger to fit the body of the relays through them. Operators should make the changes shown in
this service bulletin revision 01 to keep the installation of the relays the same as the design intent. Also,
new fastener kits will be available from Boeing spares, 65C38537-6 (airplanes without auxiliary tank)
and 65C38537-7 (airplanes with auxiliary tanks). The fasteners supplied in these kits were omitted
from the 65C38537-1, -2 and -3 Top Kits listed in Paragraph 2.C.1., Kits/Parts. Only the missing screws
and washers to install the relays are in these kits, no other parts are included. Figures 1, 2, 5, and 6
are changed to give correct ground block locations for GDY001 and GDY002, and Figure 7 is changed
to correct Thermofit Sleeve part number 61-74485-2008 to part number 61-74482-2007. Also Figures
3, 4, 7, and 8 are changed to give correct test switch nomenclature. This revision is also adding markers
on the J2802 Box that identify the function of each of the switch installed.
The data given in Information Notice 737-28A1227 IN 01, IN 02, and IN 05 are included in this revision.
Boeing Fleet Team Digest (FTD) 737 FTD 28-04004 is related to this service bulletin.
D. Description
Remove equipment as necessary to get access the J2802 box assembly on the E2 and E3 support
posts in the E/E bay, P6 Load Control Center in the flight compartment/control cabin, and P6 disconnect
panels. Remove the cover from the J2802 box assembly and install wire bundles W1760 and W1770
and relays. Change wire bundles W036, W368, W386, W1034, W1046, W1764 and W1774, as
applicable, between the P6 disconnect panels and J2802 box assembly. Check the continuity of all the
new and changed wires and do a functional test to make sure the changed fuel control system operates
correctly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
28 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 29

Operators with Group 1 airplanes should contact Boeing to obtain engineering and accomplishment
instructions for this modification and do the instructions.
Revision 01 - No more work is necessary on the airplane(s) changed in accordance with the original
issue of this service bulletin and also if the relay cutouts in the J2802 Panel Assembly have been made
larger, as applicable, to fit the body of relays R3334, R3336, R3338, R3340, and the screws
BACS12HN08-10 were used for the installation of the relays, as described in Information Notice
737-28A1227 IN 05. However, during the regular maintenance, operators have to install the markers
that identify the function of the switches installed on the J2802 box, in accordance with Figure 1 or
Figure 5, as applicable.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
1-1, 1-2, 2-5737-100, 737-200, 737-200C
Group 2:
Affected Maintenance Zones
ZoneModel
1-1, 1-2, 2-5737-200, 737-200C
Group 3:
Affected Maintenance Zones
ZoneModel
101, 102, 205737-300, 737-400, 737-500
Group 4, 7-8:
Affected Maintenance Zones
ZoneModel
1-1, 1-2, 2-5737-200
Group 5:
Affected Maintenance Zones
ZoneModel
101, 102, 205737-300
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
29 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 30

Group 6:
Affected Maintenance Zones
ZoneModel
101, 102, 205737-400
E. Compliance
Boeing recommends that the change given in this service bulletin be done within 60 months after the
original issue date of this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Operators with Group 1 airplanes should contact Boeing to obtain engineering and accomplishment
instructions for this modification and do the instructions.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task-hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1:
Operators should contact Boeing to obtain engineering and accomplishment instructions for this
modification and do the instructions.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
30 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 31

Group 2; Group 7-8, Configuration 1:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
1.751.751FIGURE 1
---FIGURE 2 (Wire Routing only)
4.008.002FIGURE 3
4.008.002FIGURE 4
---FIGURE 9 (Wire Routing only)
3.406.802FIGURE 10
3.406.802FIGURE 11
0.250.251FIGURE 30
0.500.501Test
1.503.002Close Access
20.3038.10TOTAL FOR EACH AIRPLANE
Group 3; Group 5-6, Configuration 1:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
1.751.751FIGURE 1
---FIGURE 2 (Wire Routing only)
4.008.002FIGURE 3
4.008.002FIGURE 4
---FIGURE 12 (Wire Routing only)
3.406.802FIGURE 13
3.406.802FIGURE 14
0.250.251FIGURE 30
0.500.501Test
1.503.002Close Access
20.3038.10TOTAL FOR EACH AIRPLANE
Group 4:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
1.751.751FIGURE 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
31 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 32

Group 4:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
---FIGURE 2 (Wire Routing only)
4.008.002FIGURE 3
4.008.002FIGURE 4
---FIGURE 15 (Wire Routing only)
3.406.802FIGURE 16
3.406.802FIGURE 17
0.250.251FIGURE 30
0.500.501Test
1.503.002Close Access
20.3038.10TOTAL FOR EACH AIRPLANE
Group 5, Configuration 2:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
3.003.001FIGURE 5
---FIGURE 6 (Wire Routing only)
8.0016.002FIGURE 7
8.0016.002FIGURE 8
---FIGURE 18 (Wire Routing only)
5.5011.002FIGURE 19
5.5011.002FIGURE 20
0.250.251FIGURE 30
1.001.001Test
1.503.002Close Access
34.2564.25TOTAL FOR EACH AIRPLANE
Group 6, Configuration 2:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
3.003.001FIGURE 5
---FIGURE 6 (Wire Routing only)
8.0016.002FIGURE 7
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
32 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 33

Group 6, Configuration 2:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
8.0016.002FIGURE 8
---FIGURE 21 (Wire Routing only)
5.5011.002FIGURE 22
5.5011.002FIGURE 23
0.250.251FIGURE 30
1.101.101Test
1.503.002Open Access
34.3564.35TOTAL FOR EACH AIRPLANE
Group 7, Configuration 2:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
3.003.001FIGURE 5
---FIGURE 6 (Wire Routing only)
8.0016.002FIGURE 7
8.0016.002FIGURE 8
---FIGURE 24 (Wire Routing only)
5.5011.002FIGURE 25
5.5011.002FIGURE 26
0.250.251FIGURE 30
1.101.101Test
1.503.002Close Access
34.3564.35TOTAL FOR EACH AIRPLANE
Group 8, Configuration 2:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.503.002Open Access
3.003.001FIGURE 5
---FIGURE 6 (Wire Routing only)
8.0016.002FIGURE 7
8.0016.002FIGURE 8
---FIGURE 27 (Wire Routing only)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
33 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 34

Group 8, Configuration 2:
Elapsed
Hours
Task-HoursNumber of
Persons
Task
5.5011.002FIGURE 28
5.5011.002FIGURE 29
0.250.251FIGURE 30
0.500.501Test
1.503.002Close Access
33.7563.75TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Group 1:
Operators should contact Boeing to obtain engineering and accomplishment instructions for this
modification and do the instructions.
Group 2-4; Group 5-8, Configuration 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+2,100+7737-100
+1,850+7737-200
+1,540+7737-300
+1,040+7737-400
+1,920+7737-500
Group 5-8, Configuration 2:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+2,640+10737-200
+2,200+10737-300
+1,480+10737-400
I. Electrical Load Data
1. Direct Current (DC) Loads
Group 1:
Operators should contact Boeing to obtain engineering and accomplishment instructions for this
modification and do the instructions.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
34 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 35

Group 2-4; Group 5-8, Configuration 1:
BusAmperesCircuit Breaker
28V DC Bus 1+0.25C64
28V DC Bus 2+0.25C65
Group 5-8, Configuration 2:
BusAmperesCircuit Breaker
28V DC Bus 1+0.50C64
28V DC Bus 2+0.50C65
2. Alternating Current (AC) Loads
No Change.
3. Type
Continuous.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 35443-RS
b. Boeing Service Bulletin 737-28A1210, 737-28A1216, 737-28A1228
c. Standard Overhaul Practices Manual (SOPM) 20-41-02, 20-50-05, 20-50-10
d. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-15, 20-10-18, 20-10-19,
20-20-11, 20-30-11, 20-30-12, 20-30-17, 20-30-22, 20-60-08, 20-60-09, 20-61-11, 20-81-19
e. 737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and Certification Maintenance
Requirements (CMRs), D6-38278-CMR
f. 737 Fleet Team Digest (FTD) 28-04004
g. 737-100/200 Wiring Diagram 28-23-01, 28-23-02
h. 737-300/400/500 Wiring Diagram 28-23-01, 28-23-02
i. 737-100/200 Aircraft Maintenance Manual (AMM) 12-31-11, 24-22-0, 24-31-11, 25-11-0,
25-16-11, 25-31-11, 25-31-51, 25-51-01, 32-00-01, 52-48-41, 52-61-0, 52-61-100
j. 737-300/400/500 Aircraft Maintenance Manual (AMM) 12-31-11, 24-22-00, 24-31-11, 25-10-00,
25-11-21, 25-31-11, 25-51-01, 32-00-01, 52-48-41, 52-61-00, 52-61-10
2. Data supplied with this Service Bulletin:
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
35 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 36

3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
KIT - EQUIPMENT / WIRE INSTALLATION, J2802 PANEL65C38484
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes, and is not supplied with this service bulletin. This drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
28-22737 Aircraft Maintenance Manual
28-23737 Wiring Diagram Manual
28-23737 Illustrated Parts Catalog
28-23737 Schematic Diagram Manual
Section C., Fuel Systems
Airworthiness Limitations
737-100/200/200C300/400/500 Airworthiness Limitations
(AWLs) and Certification Maintenance Requirements
(CMRs), D6-38278-CMR
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
36 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 37

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
NOTE: Airplanes in Group 5-6 Configuration 1, that are going to activate the auxiliary tank
at a later date, need to purchase Top Kits 65C38537-2 and 65C38537-7.
1.
2. Airplanes in Group 7-8 Configuration 1, that are going to activate the auxiliary tank
at a later date, need to purchase Top Kits 65C38537-3 and 65C38537-7.
Group 1:
Operators should contact Boeing to obtain engineering and accomplishment instructions for this
modification and do the instructions.
Group 2-4; Group 5-8, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 01
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 01 date
of this Service
Bulletin (Calendar
Days)
QTYDateNameKit Number
$3,715.00(b)1Jul 13, 2010Boost Pump, Fuel Uncom-
manded On - Top Kit, Cen-
ter Tank
737/100/200/300/400/500
65C38537-1
(a) 100Aug 13, 2010
100Aug 20, 2010
100Aug 27, 2010
100Sep 03, 2010
100Sep 13, 2010
100Sep 20, 2010
100Sep 27, 2010
(a) Operators that have already received Top Kit 65C38537-1 at the original issue of this service bulletin but
have not accomplished this service bulletin must procure Top Kit 65C38537-6 which has the necessary
parts to install relays R3334 and R3336 in accordance with revision 01 of this service bulletin.
(b) Contact Boeing Spares.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
37 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 38

Group 5-6, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 01 date of
this Service Bulletin
(US Dollars)
ROLT as of the Revi-
sion 01 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$3,936.00(b)1Jul 15, 2010Boost Pump, Fuel
Uncommanded On
- Top Kit, Center &
Auxiliary Tanks
65C38537-2
(a) 10Aug 13, 2010
(a) Operators that have already received Top Kit 65C38537-2 at the original issue of this service bulletin but
have not accomplished this service bulletin must procure Top Kit 65C38537-7 which has the necessary
parts to install relays R3334, R3336, R3338, and R3340 in accordance with revision 01 of this service
bulletin.
(b) Contact Boeing Spares.
Group 7-8, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 01 date of
this Service Bulletin
(US Dollars)
ROLT as of the Revi-
sion 01 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$4,066.00(b)20Aug 13, 2010Boost Pump, Fuel
Uncommanded On
- Top Kit, Center &
Auxiliary Tanks
65C38537-3
(a)
(a) Operators that have already received Top Kit 65C38537-3 at the original issue of this service bulletin but
have not accomplished this service bulletin must procure Top Kit 65C38537-7 which has the necessary
parts to install relays R3334, R3336, R3338, and R3340 in accordance with revision 01 of this service
bulletin.
(b) Contact Boeing Spares.
Group 2-4; Group 5-8, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 01 date of
this Service Bulletin
(US Dollars)
ROLT as of the Revision
01 date of this Service
Bulletin (Calendar Days)
NameKit Number
$15.00(a)Boost Pump, Fuel Uncommanded On - Top
Kit, Center Tank Without Aux Tank
65C38537-6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
38 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 39

Group 2-4; Group 5-8, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 01 date of
this Service Bulletin
(US Dollars)
ROLT as of the Revision
01 date of this Service
Bulletin (Calendar Days)
NameKit Number
(a) At the time of the release of the service bulletin the ROLT and Price were not available. Contact Boeing
Spares.
Group 5-8, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 01 date of
this Service Bulletin
(US Dollars)
ROLT as of the Revision
01 date of this Service
Bulletin (Calendar Days)
NameKit Number
$30.00(a)Boost Pump, Fuel Uncommanded On - Top
Kit, Center & Auxiliary Tanks
65C38537-7
(a) At the time of the release of the service bulletin the ROLT and Price were not available. Contact Boeing
Spares.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: Two top kits and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 65C38537
NotesNameQTYNew Part Number
-7-6-3-2-1
BOOST PUMP, FUEL UNCOMMANDED ON
- TOP KIT, CENTER TANK
737/100/200/300/400/500
....-65C38537-1
BOOST PUMP, FUEL UNCOMMANDED ON
- TOP KIT, CENTER & AUXILIARY TANKS
...-.65C38537-2
BOOST PUMP, FUEL UNCOMMANDED ON
- TOP KIT, CENTER & AUXILIARY TANKS
..-..65C38537-3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
39 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 40

Kit 65C38537
NotesNameQTYNew Part Number
-7-6-3-2-1
BOOST PUMP, FUEL UNCOMMANDED ON
- TOP KIT, CENTER TANK WITHOUT AUX
TANK
.-...65C38537-6
BOOST PUMP, FUEL UNCOMMANDED ON
- TOP KIT, CENTER & AUXILIARY TANKS
-....65C38537-7
WIRE KIT - UNCOMMANDED ON RELAYS -
NO AUX TANK CONFIGURATION
....161-74482-1
WIRE KIT - UNCOMMANDED ON RELAYS -
AUX TANK CONFIGURATION - 737-300/-400/-
500
...1.61-74482-2
WIRE KIT - UNCOMMANDED ON RELAYS -
AUX TANK CONFIGURATION - 737-100/-200
..1..61-74482-3
WIRE BUNDLE INSTALLATION FOR AIR-
PLANES WITHOUT AUX TANK - PUMP UN-
COMMANDED ON
....165C38510-1
WIRE BUNDLE INSTALLATION FOR AIR-
PLANES WITH AUX TANK - PUMP UNCOM-
MANDED ON
..11.65C38510-2
(a) (b)SCREW168...BACS12HN08-10
(b)WASHER, PLAIN168...NAS1149DN816H
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be up to two grip length
longer than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Use the approved fastener substitutions in accordance with
SRM Chapter 51.
(b) The operator can also supply these parts as shown in "Parts and Materials Supplied by the Operators"
table.
Kit 65C38510
NotesNameQTYNew Part Number
-1-2
WIRE BUNDLE INSTALLATION FOR AIRPLANES WITHOUT
AUX TANK - PUMP UNCOMMANDED ON
-.65C38510-1
WIRE BUNDLE INSTALLATION FOR AIRPLANES WITH AUX
TANK - PUMP UNCOMMANDED ON
.-65C38510-2
TOGGLE SWITCH - LOCKED IN CENTER POSITION2264AT23-7E
(a)RELAY249324-7424 (MS27418-
2B optional)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
40 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 41

Kit 65C38510
NotesNameQTYNew Part Number
-1-2
(a) There are more parts than are necessary for Operators in Group 5-8 Configuration 1 that have kit 65C38510-
2.
Kit 61-74482
NotesNameQTYNew Part Number
-1
WIRE KIT - UNCOMMANDED ON RELAYS - NO AUX TANK CONFIGU-
RATION
-61-74482-1
ASSY - W1760161-74482-103
ASSY - W1770161-74482-105
ASSY - W368, W1764161-74482-107
ASSY - W386, W1774161-74482-110
LACING TAPE - WHITE161-74482-2001
THERMOFIT SLEEVE - 0.093 IN. I.D.161-74482-2006
THERMOFIT SLEEVE - YELLOW, .375 IN I.D.161-74482-2009
EXPANDABLE SLEEVE - 0.25 IN. I.D.161-74482-2010
THERMOFIT SLEEVE - YELLOW, .125 IN I.D.161-74482-2014
THERMOFIT SLEEVE - YELLOW, .187 IN I.D.161-74482-2015
Kit 61-74482
NotesNameQTYNew Part Number
-2
WIRE KIT - UNCOMMANDED ON RELAYS - AUX TANK CONFIGURA-
TION - 737-300/-400/-500
-61-74482-2
ASSY - W1760161-74482-104
ASSY - W1770161-74482-106
ASSY - W368, W1046, W1764161-74482-108
ASSY - W386, W1034, W1774161-74482-111
LACING TAPE - WHITE161-74482-2001
(a)THERMOFIT SLEEVE - 0.093 IN. I.D.161-74482-2007
(a)THERMOFIT SLEEVE - 0.25 IN. I.D.161-74482-2008
THERMOFIT SLEEVE - YELLOW, .375 IN I.D.161-74482-2009
(a)EXPANDABLE SLEEVE - 0.25 IN. I.D.161-74482-2011
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
41 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 42

Kit 61-74482
NotesNameQTYNew Part Number
-2
(a)EXPANDABLE SLEEVE - 0.5 IN. I.D.161-74482-2012
THERMOFIT SLEEVE - YELLOW, .125 IN I.D.161-74482-2014
THERMOFIT SLEEVE - YELLOW, .187 IN I.D.161-74482-2015
(a) Operators in Group 5-6 Configuration 1 that have Top Kit 65C38537-2, this part is not used.
Kit 61-74482
NotesNameQTYNew Part Number
-3
WIRE KIT - UNCOMMANDED ON RELAYS - AUX TANK CONFIGURA-
TION - 737-200
-61-74482-3
ASSY - W1760161-74482-104
ASSY - W1770161-74482-106
ASSY - W368, W1046, W1764161-74482-109
ASSY - W386, W1034, W1774161-74482-112
LACING TAPE - WHITE161-74482-2001
(a)THERMOFIT SLEEVE - 0.093 IN. I.D.161-74482-2007
THERMOFIT SLEEVE - YELLOW, .375 IN I.D.161-74482-2009
(a)EXPANDABLE SLEEVE - 0.25 IN. I.D.161-74482-2011
(a)EXPANDABLE SLEEVE - 0.5 IN. I.D.161-74482-2013
THERMOFIT SLEEVE - YELLOW, .125 IN I.D.161-74482-2014
THERMOFIT SLEEVE - YELLOW, .187 IN I.D.161-74482-2015
(a) Operators in Group 7-8 Configuration 1 that have Top Kit 65C38537-3, this part is not used.
Kit 61-74482
NotesNameQTYNew Part Number
-103-104-105-106-107-108
ASSY - W1760-.....61-74482-103
ASSY - W1760.-....61-74482-104
ASSY - W1770..-...61-74482-105
ASSY - W1770...-..61-74482-106
ASSY - W368, W1764....-.61-74482-107
ASSY - W368, W1046, W1764.....-61-74482-108
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
42 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 43

Kit 61-74482
NotesNameQTYNew Part Number
-103-104-105-106-107-108
(a)CONTACTS3535..60789-2 (640024-1
optional)
WIRE LIST1.....61-74482-103W
WIRE LIST.1....61-74482-104W
WIRE LIST..1...61-74482-105W
WIRE LIST...1..61-74482-106W
WIRE LIST....1.61-74482-107W
(b)WIRE LIST.....161-74482-108W
CONNECTOR I.D. TAPE - D05208J11....61-74478-10502
CONNECTOR I.D. TAPE - D1096611....61-74478-10503
(c)CONNECTOR I.D. TAPE - D10970.1....61-74478-10601
CONNECTOR I.D. TAPE - D05210J..11..61-74478-10702
CONNECTOR I.D. TAPE - D10968..11..61-74478-10703
(c)CONNECTOR I.D. TAPE - D10972...1..61-74478-10801
CONNECTOR I.D. TAPE - D05208P....1161-74478-10904
CONNECTOR I.D. TAPE - D04202J....1.61-74482-10701
CONNECTOR I.D. TAPE - D04202J....1161-74482-10702
SPLICE I.D. SLEEVE - SP4514....1161-74482-10703
SPLICE I.D. SLEEVE - SP4516....1161-74482-10704
SPLICE I.D. SLEEVE - SP4522....1161-74482-10705
(c)CONNECTOR I.D. TAPE - D04900P.....161-74482-10801
(c)CONNECTOR I.D. TAPE - D04900P.....161-74482-10802
(c)SPLICE I.D. SLEEVE - SP4536.....161-74482-10803
(c)SPLICE I.D. SLEEVE - SP4538.....161-74482-10804
(c)SPLICE I.D. SLEEVE - SP4540.....161-74482-10805
(c)WIRE I.D. TAPE - W1764-301B,2R,3Y-
18
.....261-74482-10806
(c)WIRE I.D. TAPE - W1764-304B,5R,6Y-
18
.....261-74482-10807
(a)CONTACT, PIN714714.4BACC47CN2
(a)CONTACT....1017BACC47CP2T
(a)CONTACT2323..BACC47DE7A
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
43 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 44

Kit 61-74482
NotesNameQTYNew Part Number
-103-104-105-106-107-108
(a)CONTACT, SOCKET3535..BACC47ER1
(a) (c)STRAP.....2BACS38K5
(a)TERMINAL, LUG3535..BACT12AC2
(a)TERMINAL, LUG714714..BACT12AC49
(a)TERMINAL, LUG2323..BACT12AC53
(a)SPLICE....47D-436-37
(a) There are more parts than are necessary.
(b) Operators in Group 5-6 Configuration 1 that have Top Kit 65C38537-2, wires W1764-301-18B, W1764-
302-18R, W1764-303-18Y, W1764-304-18B, W1764-305-18R, and W1764-306-18Y are not used.
(c) Operators in Group 5-6 Configuration 1 that have Top Kit 65C38537-2, this part is not used.
Kit 61-74482
NotesNameQTYNew Part Number
-109-110-111-112-2001-2006
ASSY - W368, W1046, W1764-.....61-74482-109
ASSY - W386, W1774.-....61-74482-110
ASSY - W386, W1034, W1774..-...61-74482-111
ASSY - W386, W1034, W1774...-..61-74482-112
LACING TAPE - WHITE....-.61-74482-2001
THERMOFIT SLEEVE - 0.093 IN. I.D......-61-74482-2006
(b)WIRE LIST1.....61-74482-109W
WIRE LIST.1....61-74482-110W
(c)WIRE LIST..1...61-74482-111W
(d)WIRE LIST...1..61-74482-112W
CONNECTOR I.D. TAPE - D05208P1.....61-74478-10904
CONNECTOR I.D. TAPE - D05210P.111..61-74478-11104
CONNECTOR I.D. TAPE - D04202J1.....61-74482-10701
SPLICE I.D. SLEEVE - SP45141.....61-74482-10703
SPLICE I.D. SLEEVE - SP45161.....61-74482-10704
SPLICE I.D. SLEEVE - SP45221.....61-74482-10705
(e)SPLICE I.D. SLEEVE - SP45361.....61-74482-10803
(e)SPLICE I.D. SLEEVE - SP45381.....61-74482-10804
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
44 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 45

Kit 61-74482
NotesNameQTYNew Part Number
-109-110-111-112-2001-2006
(e)SPLICE I.D. SLEEVE - SP45401.....61-74482-10805
(e)CONNECTOR I.D. TAPE - D04900P1.....61-74482-10901
CONNECTOR I.D. TAPE - D04084J.1....61-74482-11002
CONNECTOR I.D. TAPE - D04208P.1.1..61-74482-11003
CONNECTOR I.D. TAPE - D04208P.11...61-74482-11004
SPLICE I.D. SLEEVE - SP4524.111..61-74482-11005
SPLICE I.D. SLEEVE - SP4526.111..61-74482-11006
SPLICE I.D. SLEEVE - SP4528.111..61-74482-11007
(f)CONNECTOR I.D. TAPE - D04898P..1...61-74482-11101
(f)CONNECTOR I.D. TAPE - D04898P..1...61-74482-11102
(e) (f)SPLICE I.D. SLEEVE - SP4530..11..61-74482-11103
(e) (f)SPLICE I.D. SLEEVE - SP4532..11..61-74482-11104
(e) (f)SPLICE I.D. SLEEVE - SP4534..11..61-74482-11105
(e) (f)WIRE I.D. TAPE - W1774-301B,2R,3Y-
18
..2...61-74482-11106
(e) (f)WIRE I.D. TAPE - W1774-304B,5R,6Y-
18
..2...61-74482-11107
(e)CONNECTOR I.D. TAPE - D04898P...1..61-74482-11201
(a)CONTACT, PIN4474..BACC47CN2
(a)CONTACT17101417..BACC47CP2T
(a) (e)
(f)
STRAP2.22..BACS38K5
(a)SPLICE7477..D-436-37
INSULATION SLEEVING, HEAT
SHRINKABLE, POLYOLEFIN, FLEXI-
BLE, X-LINKED
.....1M23053/5-103-4
BMS 13-54....1.NA374H2
(a) There are more parts than are necessary.
(b) Operators in Group 7-8 Configuration 1 that have Top Kit 65C38537-3, wires W1764-015-18, W1764-016-
18, W1764-017-18, W1764-018-18, W1764-019-18, and W1764-020-18 are not used.
(c) Operators in Group 5-6 Configuration 1 that have Top Kit 65C38537-2, wires W1774-301-18B, W1774-
302-18R, W1774-303-18Y, W1774-304-18B, W1774-305-18R, and W1774-306-18Y are not used.
(d) Operators in Group 7-8 Configuration 1 that have Top Kit 65C38537-3, wires W1774-015-18, W1774-016-
18, W1774-017-18, W1774-018-18, W1774-019-18, and W1774-020-18 are not used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
45 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 46

Kit 61-74482
NotesNameQTYNew Part Number
-109-110-111-112-2001-2006
(e) Operators in Group 7-8 Configuration 1 that have Top Kit 65C38537-3, this part is not used.
(f) Operators in Group 5-6 Configuration 1 that have Top Kit 65C38537-2, this part is not used.
Kit 61-74482
NotesNameQTYNew Part Number
-2007-2008-2009-2010-2011-2012
THERMOFIT SLEEVE - 0.093 IN.
I.D.
-.....61-74482-2007
THERMOFIT SLEEVE - 0.25 IN.
I.D.
.-....61-74482-2008
THERMOFIT SLEEVE - YELLOW,
.375 IN I.D.
..-...61-74482-2009
EXPANDABLE SLEEVE - 0.25 IN.
I.D.
...-..61-74482-2010
EXPANDABLE SLEEVE - 0.25 IN.
I.D.
....-.61-74482-2011
EXPANDABLE SLEEVE - 0.5 IN.
I.D.
.....-61-74482-2012
INSULATION SLEEVING, HEAT
SHRINKABLE, POLYOLEFIN,
FLEXIBLE, X-LINKED
1.....M23053/5-103-4
POLYOLEFIN HEAT SHRINKABLE
SLEEVE RAW MATERIAL
.1....M23053/5-106-4
INSULATION SLEEVING, HEAT
SHRINKABLE, POLYOLEFIN,
FLEXIBLE, X-LINKED
..1...M23053/5-107-4
BMS 13-52 EXPANDABLE S...111NA728R99
Kit 61-74482
NotesNameQTYNew Part Number
-2013-2014-2015
EXPANDABLE SLEEVE - 0.5 IN. I.D.-..61-74482-2013
THERMOFIT SLEEVE - YELLOW, .125 IN I.D..-.61-74482-2014
THERMOFIT SLEEVE - YELLOW, .187 IN I.D...-61-74482-2015
INSULATION SLEEVING, HEAT SHRINKABLE, POLY-
OLEFIN, FLEXIBLE, X-LINKED
.1.M23053/5-104-4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
46 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 47

Kit 61-74482
NotesNameQTYNew Part Number
-2013-2014-2015
INSULATION SLEEVING, HEAT SHRINKABLE, POLY-
OLEFIN, FLEXIBLE, X-LINKED
..1M23053/5-105-4
BMS 13-52 EXPANDABLE S1..NA728R99
Kit 65C38639
NotesNameQTYNew Part Number
-115
THREAD LOCK COMPOUND-65C38639-115
LOCTITE;222 KIT1NK442N
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specification
(a) (b)TAPE - 0.5 INCH WIDTH161-74482-2004 (Permacel P421)
(f)Screw, Hex Head with Cross Recess(d)BACS12HN08-10
(e)NAS1149DN816H
(g)PRIMER12 OuncesBMS10-11, TYPE 1
(c) (g)BRADY LABEL4BACT19J2
(g)Plastic Film For Markers1 Square
Foot
BMS10-26, Type I, Grade A or Grade B
or
BMS10-26, Type III, Grade A or Grade
B
(g)TOP COAT1 OunceBAC5710, TYPE 41
(a) Permacel (99742), One Tower Center BLVD. 14th Floor, New Brunswick NJ 08903.
(b) Required for Groups 5 thru 8.
(c) As an option operators can use Vinyl Marker BMS10-26, Type I Grade A or Grade B, or Type III Grade A
or Grade B, or other equivalent materials. Refer to SOPM 20-50-05 as an accepted procedure.
(d) Groups 2-4 and Groups 5-8 Configuration 1 need (8) screws. Groups 5-8 Configuration 2 need (16) screws.
(e) Groups 2-4 and Groups 5-8 Configuration 1 need (8) washers. Groups 5-8 Configuration 2 need (16)
washers.
(f) If grip length shown is not available fasteners may be up to two grip length longer than indicated. Also, if
any fasteners part numbers listed are not available or have been superseded, substitute fasteners may
be used. Use the approved fastener substitutions in accordance with SRM Chapter 51
(g) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
47 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 48

3. Parts Modified and Reidentified:
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
NotesNew Part NumberNameQTYExisting Part
Number
(a) (b)-J2802 PANEL ASSEMBLY165C38484-12
(a) Make the change in accordance with this service bulletin.
(b) There is no equivalent Boeing part number for the changed part. Apply on the part "SB
737-28A1227 R1 is Incorporated" to identify that the change is done in accordance with
this service bulletin.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
48 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 49

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Torque limits to tighten nuts and bolts are in SRM Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
10. It is necessary to use a low input impedance voltmeter to check voltages at all relay
contact terminals. A recommended low input impedance voltmeter is a Simpson 260
VOM (Volt-Ohm meter) or an alternative is a Megger Model 8 mK7 analogue
multimeter.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
49 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 50

B. WORK INSTRUCTIONS
Group 1:
1. Operators should contact Boeing to obtain engineering and accomplishment instructions for this
modification and do the instructions.
Group 2; Group 7-8, Configuration 1:
1. At the lower forward fuselage, below the E/E bay, open the access door to get access to the work
area. Refer to 737-100/200 AMM 52-48-41 as an accepted procedure.
2. Do the steps below as applicable:
a. For airplanes with airstairs, do the forward airstairs extension to give better access to the work
area. Refer to 737-100/200 AMM 52-61-0 or 737-100/200 AMM 52-61-100 as an accepted
procedure.
b. For airplanes with airstairs, in the E/E bay, remove and keep the drip pan to get better access
to the work area. Refer to 737-100/200 AMM 25-51-01 as an accepted procedure.
c. For airplanes without airstairs, in the E/E bay, remove and keep the moisture shroud from
above the access door to get better access to the work area. Refer to 737-100/200 AMM
25-51-01 as an accepted procedure.
3. Remove electrical power from the airplane. Refer to 737-100/200 AMM 24-22-0 as an accepted
procedure.
4. In the E/E bay, remove and keep the moisture shroud from above the E3 rack to get access to the
work area. Refer 737-100/200 AMM 25-51-01 as an accepted procedure.
5. In the E/E bay, disconnect the battery power cables from the battery. Refer to 737-100/200 AMM
24-31-11 as an accepted procedure.
6. Install the Nose Landing Gear (NLG) ground lock. Refer to 737-100/200 AMM 32-00-01 as an
accepted procedure.
7. In the NLG wheel well, remove and keep the right side access panels, 3103R and 3105R to get
access to the work area. Refer to 737-100/200 AMM 12-31-11 for panel locations.
8. In the flight compartment, move the first officer's seat to the forward position to get better access
to the work area. Refer to 737-100/200 AMM 25-11-0 as an accepted procedure.
9. In the flight compartment, remove and keep aft and mid center ceiling linings and the ceiling linings
adjacent and forward of the P6 Load Control Center to get access to the work area. Refer to
737-100/200 AMM 25-16-11 as an accepted procedure.
10. In the passenger compartment, as applicable, loosen and move the forward galley (galley no.1)
in an aft direction to get access to the wire routing of the P6 Load Control Center. Refer to
737-100/200 AMM 25-31-11 or 737-100/200 AMM 25-31-51 as an accepted procedure.
11. At the E2 and E3 support post in the E/E bay, remove the cover from the J2802 box assembly and
install new toggle switches and relays in accordance with FIGURE 1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
50 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 51

12. Install and connect the W1760 and W1770 wire bundles in the J2802 box assembly in accordance
with FIGURE 2, FIGURE 3, and FIGURE 4.
13. Between the P6 disconnect panels and the J2802 box assembly, make changes to wire bundles
W0368, W0386, W1764 and W1774 in accordance with FIGURE 9, FIGURE 10, and FIGURE 11.
14. Do a continuity check between the P6 disconnect panel 'E', 'A' and the J2802 box assembly to
make sure that the wiring connections are made correctly.
15. At the E2 and E3 support post in the E/E bay, install the cover on the J2802 box assembly in
accordance with FIGURE 30.
16. In the passenger compartment, as applicable, move the forward galley (galley no.1) back to its
position. Refer to 737-100/200 AMM 25-31-11 or 737-100/200 AMM 25-31-51 as an accepted
procedure.
17. In the flight compartment, install the kept aft and mid center ceiling linings and the ceiling linings
adjacent and forward of the P6 Load Control Center. Refer to 737-100/200 AMM 25-16-11 as an
accepted procedure.
18. In the flight compartment, put the first officer's seat back to its usual position. Refer to 737-100/200
AMM 25-11-0 as an accepted procedure.
19. In the NLG wheel well, install the kept right side access panels, 3103R and 3105R. Refer to
737-100/200 AMM 12-31-11 for panel locations.
20. In the E/E bay, install the kept moisture shroud above the E3 rack. Refer 737-100/200 AMM
25-51-01 as an accepted procedure.
21. Do the steps below as applicable:
a. For airplanes with airstairs, in the E/E bay, install the kept drip pan. Refer to 737-100/200
AMM 25-51-01 as an accepted procedure.
b. For airplanes without airstairs, in the E/E bay, install the kept moisture shroud above the
access door. Refer to 737-100/200 AMM 25-51-01 as an accepted procedure.
c. For airplanes with airstairs, do the forward airstairs retraction. Refer to 737-100/200 AMM
52-61-0 or 737-100/200 AMM 52-61-100 as an accepted procedure.
22. In the E/E bay, connect the battery power cables to the battery. Refer to 737-100/200 AMM 24-31-11
as an accepted procedure.
23. Restore electrical power to the airplane. Refer to 737-100/200 AMM 24-22-0 as an accepted
procedure.
24. Do the Fuel Control System Functional Test that follows to make sure the changed fuel control
system operates correctly:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
51 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 52

FUEL CONTROL SYSTEM FUNCTIONAL TEST (CENTER TANKS)
a. Make sure the center fuel tank has a minimum of 1000 - 1200 pounds (450 - 540 kilograms)
of fuel.
b. At the J2802 junction box in the E/E bay, open the circuit breakers that follow and attach
DO-NOT-CLOSE tags:
Circuit BreakerNamePanel Loca-
tion/Position
C3318FUEL CONTROL AUTO SHUTOFF CENTER
TANK LEFT
J2802
C3320FUEL CONTROL AUTO SHUTOFF CENTER
TANK RIGHT
J2802
c. At the P5-2 panel, put the Center Tank Left and Center Tank Right pump switches to the ON
position.
d. At the P5-2 panel, make sure that the Center Tank Left and Center Tank Right pump Low
Pressure Lights come on and then go out.
e. At the J2802 junction box in the E/E bay, push and hold the Pump Un-Commanded On Test
Switch (S3324) to CTR-L (Center Left) position.
f. At the P5-2 panel, make sure that the Center Left Low Pressure Light comes on.
g. At the J2802 junction box in the E/E bay, release the Pump Un-Commanded On Test Switch
(S3324).
h. At the P5-2 panel, make sure that the Center Left Low Pressure Light goes out.
i. At the J2802 junction box in the E/E bay, push and hold the Pump Un-Commanded On Test
Switch (S3326) to CTR-R (Center Right) position.
j. At the P5-2 panel, make sure that the Center Right Low Pressure Light comes on.
k. At the J2802 junction box in the E/E bay, release the Pump Un-Commanded On Test Switch
(S3326).
l. At the P5-2 panel, make sure that the Center Right Low Pressure Light goes out.
m. At the P5-2 panel, put the Center Tank Left and Center Tank Right pump switches to the OFF
position.
n. At the P5-2 panel, make sure that the Center Tank Left and Center Tank Right pump Low
Pressure Lights are off.
o. At the J2802 junction box in the E/E bay, check the voltage at the relay terminals that follow:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
52 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 53

VoltagePositionRelay
Less than 10 Volts ACA2 to groundR3334
Less than 10 Volts ACB2 to ground
Less than 10 Volts ACC2 to ground
Less than 10 Volts ACA2 to groundR3336
Less than 10 Volts ACB2 to ground
Less than 10 Volts ACC2 to ground
p. At the J2802 junction box in the E/E bay, check the resistance between the relay terminals
that follow:
ResistancePositionRelay
Greater than 1 megohmA2 to A1R3334
Greater than 1 megohmB2 to B1
Greater than 1 megohmC2 to C1
Greater than 1 megohmA2 to A1R3336
Greater than 1 megohmB2 to B1
Greater than 1 megohmC2 to C1
q. At the J2802 junction box in the E/E bay, remove the DO-NOT-CLOSE tags and close the
circuit breakers that follow:
Circuit BreakerNamePanel Loca-
tion/Position
C3318FUEL CONTROL AUTO SHUTOFF CENTER
TANK LEFT
J2802
C3320FUEL CONTROL AUTO SHUTOFF CENTER
TANK RIGHT
J2802
25. At the lower forward fuselage, below the E/E bay, close the access door. Refer to 737-100/200
AMM 52-48-41 as an accepted procedure.
26. Put the airplane back to a serviceable condition.
Group 3; Group 5-6, Configuration 1:
1. At the lower forward fuselage, below the E/E bay, open the access door to get access to the work
area. Refer to 737-300/400/500 AMM 52-48-41 as an accepted procedure.
2. Do the steps below as applicable:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
53 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 54

a. For airplanes with airstairs, do the forward airstairs extension to give better access to the work
area. Refer to 737-300/400/500 AMM 52-61-10 as an accepted procedure.
b. For airplanes with airstairs, in the E/E bay, remove and keep the drip pan to get better access
to the work area. Refer to 737-300/400/500 AMM 25-51-01 as an accepted procedure.
c. For airplanes without airstairs, in the E/E bay, remove and keep the moisture shroud from
above the access door to get better access to the work area. Refer to 737-300/400/500 AMM
25-51-01 as an accepted procedure.
3. Remove electrical power from the airplane. Refer to 737-300/400/500 AMM 24-22-00 as an
accepted procedure.
4. In the E/E bay, remove and keep the moisture shroud from above the E3 rack to get access to the
work area. Refer 737-300/400/500 AMM 25-51-01 as an accepted procedure.
5. In the E/E bay, disconnect the battery power cables from the battery. Refer to 737-300/400/500
AMM 24-31-11 as an accepted procedure.
6. Install the Nose Landing Gear (NLG) ground lock. Refer to 737-300/400/500 AMM 32-00-01 as
an accepted procedure.
7. In the NLG wheel well, remove and keep the right side access panels, 3103R and 3105R to get
access to the work area. Refer to 737-300/400/500 AMM 12-31-11 for panel locations.
8. In the flight compartment, move the first officer's seat to the forward position to get better access
to the work area. Refer to 737-300/400/500 AMM 25-10-00 as an accepted procedure.
9. In the flight compartment, remove and keep aft and mid center ceiling linings and the ceiling linings
adjacent and forward of the P6 Load Control Center to get access to the work area. Refer to
737-300/400/500 AMM 25-11-21 as an accepted procedure.
10. In the passenger compartment, as applicable, loosen and move the forward galley (galley no.1)
in an aft direction to get access to the wire routing of the P6 Load Control Center. Refer to
737-300/400/500 AMM 25-31-11 as an accepted procedure.
11. At the E2 and E3 support post in the E/E bay, remove the cover from the J2802 box assembly and
install new toggle switches and relays in accordance with FIGURE 1.
12. Install and connect the W1760 and W1770 wire bundles in the J2802 box assembly in accordance
with FIGURE 2, FIGURE 3, and FIGURE 4.
13. Between the P6 disconnect panels and the J2802 box assembly, make changes to wire bundles
W0368, W0386, W1764 and W1774 in accordance with FIGURE 12, FIGURE 13, ana FIGURE
14.
14. Do a continuity check between the P6 disconnect panels 'AP0600B', 'AP1800A' and the J2802
box assembly to make sure that the wiring connections are made correctly.
15. At the E2 and E3 support post in the E/E bay, install the cover on the J2802 box assembly in
accordance with FIGURE 30.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
54 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 55

16. In the passenger compartment, as applicable, move the forward galley (galley no.1) back to its
position. Refer to 737-300/400/500 AMM 25-31-11 as an accepted procedure.
17. In the flight compartment, install the kept aft and mid center ceiling linings and the ceiling linings
adjacent and forward of the P6 Load Control Center. Refer to 737-300/400/500 AMM 25-11-21 as
an accepted procedure.
18. In the flight compartment, put the first officer's seat back to its usual position. Refer to
737-300/400/500 AMM 25-10-00 as an accepted procedure.
19. In the NLG wheel well, install the kept right side access panels, 3103R and 3105R. Refer to
737-300/400/500 AMM 12-31-11 for panel locations.
20. In the E/E bay, install the kept moisture shroud above the E3 rack. Refer 737-300/400/500 AMM
25-51-01 as an accepted procedure.
21. Do the steps below as applicable:
a. For airplanes with airstairs, in the E/E bay, install the kept drip pan. Refer to 737-300/400/500
AMM 25-51-01 as an accepted procedure.
b. For airplanes without airstairs, in the E/E bay, install the kept moisture shroud above the
access door. Refer to 737-300/400/500 AMM 25-51-01 as an accepted procedure.
c. For airplanes with airstairs, do the forward airstairs retraction. Refer to 737-300/400/500 AMM
52-61-10 as an accepted procedure.
22. In the E/E bay, connect the battery power cables to the battery. Refer to 737-300/400/500 AMM
24-31-11 as an accepted procedure.
23. Restore electrical power to the airplane. Refer to 737-300/400/500 AMM 24-22-00 as an accepted
procedure.
24. Do the Fuel Control System Functional Test that follows to make sure the changed fuel control
system operates correctly:
FUEL CONTROL SYSTEM FUNCTIONAL TEST (CENTER TANKS)
a. Make sure the center fuel tank has a minimum of 1000 - 1200 pounds (450 - 540 kilograms)
of fuel.
b. At the J2802 junction box in the E/E bay, open the circuit breakers that follow and attach
DO-NOT-CLOSE tags:
Circuit BreakerNamePanel Loca-
tion/Position
C3318FUEL CONTROL AUTO SHUTOFF CENTER
TANK LEFT
J2802
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
55 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 56

Circuit BreakerNamePanel Loca-
tion/Position
C3320FUEL CONTROL AUTO SHUTOFF CENTER
TANK RIGHT
J2802
c. At the P5-2 panel, put the Center Tank Left and Center Tank Right pump switches to the ON
position.
d. At the P5-2 panel, make sure that the Center Tank Left and Center Tank Right pump Low
Pressure Lights come on and then go out.
e. At the J2802 junction box in the E/E bay, push and hold the Pump Un-Commanded On Test
Switch (S3324) to CTR-L (Center Left) position.
f. At the P5-2 panel, make sure that the Center Left Low Pressure Light comes on.
g. At the J2802 junction box in the E/E bay, release the Pump Un-Commanded On Test Switch
(S3324).
h. At the P5-2 panel, make sure that the Center Left Low Pressure Light goes out.
i. At the J2802 junction box in the E/E bay, push and hold the Pump Un-Commanded On Test
Switch (S3326) to CTR-R (Center Right) position.
j. At the P5-2 panel, make sure that the Center Right Low Pressure Light comes on.
k. At the J2802 junction box in the E/E bay, release the Pump Un-Commanded On Test Switch
(S3326).
l. At the P5-2 panel, make sure that the Center Right Low Pressure Light goes out.
m. At the P5-2 panel, put the Center Tank Left and Center Tank Right pump switches to the OFF
position.
n. At the P5-2 panel, make sure that the Center Tank Left and Center Tank Right pump Low
Pressure Lights are off.
o. At the J2802 junction box in the E/E bay, check the voltage at the relay terminals that follow:
VoltagePositionRelay
Less than 10 Volts ACA2 to groundR3334
Less than 10 Volts ACB2 to ground
Less than 10 Volts ACC2 to ground
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
56 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 57

VoltagePositionRelay
Less than 10 Volts ACA2 to groundR3336
Less than 10 Volts ACB2 to ground
Less than 10 Volts ACC2 to ground
p. At the J2802 junction box in the E/E bay, check the resistance between the relay terminals
that follow:
ResistancePositionRelay
Greater than 1 megohmA2 to A1R3334
Greater than 1 megohmB2 to B1
Greater than 1 megohmC2 to C1
Greater than 1 megohmA2 to A1R3336
Greater than 1 megohmB2 to B1
Greater than 1 megohmC2 to C1
q. At the J2802 junction box in the E/E bay, remove the DO-NOT-CLOSE tags and close the
circuit breakers that follow:
Circuit BreakerNamePanel Loca-
tion/Position
C3318FUEL CONTROL AUTO SHUTOFF CENTER
TANK LEFT
J2802
C3320FUEL CONTROL AUTO SHUTOFF CENTER
TANK RIGHT
J2802
25. At the lower forward fuselage, below the E/E bay, close the access door. Refer to 737-300/400/500
AMM 52-48-41 as an accepted procedure.
26. Put the airplane back to a serviceable condition.
Group 4:
1. At the lower forward fuselage, below the E/E bay, open the access door to get access to the work
area. Refer to 737-100/200 AMM 52-48-41 as an accepted procedure.
2. Do the steps below as applicable:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
57 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 58

a. For airplanes with airstairs, do the forward airstairs extension to give better access to the work
area. Refer to 737-100/200 AMM 52-61-0 or 737-100/200 AMM 52-61-100 as an accepted
procedure.
b. For airplanes with airstairs, in the E/E bay, remove and keep the drip pan to get better access
to the work area. Refer to 737-100/200 AMM 25-51-01 as an accepted procedure.
c. For airplanes without airstairs, in the E/E bay, remove and keep the moisture shroud from
above the access door to get better access to the work area. Refer to 737-100/200 AMM
25-51-01 as an accepted procedure.
3. Remove electrical power from the airplane. Refer to 737-100/200 AMM 24-22-0 as an accepted
procedure.
4. In the E/E bay, remove and keep the moisture shroud from above the E3 rack to get access to the
work area. Refer 737-100/200 AMM 25-51-01 as an accepted procedure.
5. In the E/E bay, disconnect the battery power cables from the battery. Refer to 737-100/200 AMM
24-31-11 as an accepted procedure.
6. Install the Nose Landing Gear (NLG) ground lock. Refer to 737-100/200 AMM 32-00-01 as an
accepted procedure.
7. In the NLG wheel well, remove and keep the right side access panels, 3103R and 3105R to get
access to the work area. Refer to 737-100/200 AMM 12-31-11 for panel locations.
8. In the flight compartment, move the first officer's seat to the forward position to get better access
to the work area. Refer to 737-100/200 AMM 25-11-0 as an accepted procedure.
9. In the flight compartment, remove and keep aft and mid center ceiling linings and the ceiling linings
adjacent and forward of the P6 Load Control Center to get access to the work area. Refer to
737-100/200 AMM 25-16-11 as an accepted procedure.
10. In the passenger compartment, as applicable, loosen and move the forward galley (galley no.1)
in an aft direction to get access to the wire routing of the P6 Load Control Center. Refer to
737-100/200 AMM 25-31-11 or 737-100/200 AMM 25-31-51 as an accepted procedure.
11. At the E2 and E3 support post in the E/E bay, remove the cover from the J2802 box assembly and
install new toggle switches and relays in accordance with FIGURE 1.
12. Install and connect the W1760 and W1770 wire bundles in the J2802 box assembly in accordance
with FIGURE 2, FIGURE 3, and FIGURE 4.
13. Between the P6 disconnect panels and the J2802 box assembly, make changes to wire bundles
W0368, W0386, W1764 and W1774 in accordance with FIGURE 15, FIGURE 16, and FIGURE
17.
14. Do a continuity check between the P6 disconnect panels panel 'E', 'A' and the J2802 box assembly
to make sure that the wiring connections are made correctly.
15. At the E2 and E3 support post in the E/E bay, install the cover on the J2802 box assembly in
accordance with FIGURE 30.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
58 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 59

16. In the passenger compartment, as applicable, move the forward galley (galley no.1) back to its
position. Refer to 737-100/200 AMM 25-31-11 or 737-100/200 AMM 25-31-51 as an accepted
procedure.
17. In the flight compartment, install the kept aft and mid center ceiling linings and the ceiling linings
adjacent and forward of the P6 Load Control Center. Refer to 737-100/200 AMM 25-16-11 as an
accepted procedure.
18. In the flight compartment, put the first officer's seat back to its usual position. Refer to 737-100/200
AMM 25-11-0 as an accepted procedure.
19. In the NLG wheel well, install the kept right side access panels, 3103R and 3105R. Refer to
737-100/200 AMM 12-31-11 for panel locations.
20. In the E/E bay, install the kept moisture shroud above the E3 rack. Refer 737-100/200 AMM
25-51-01 as an accepted procedure.
21. Do the steps below as applicable:
a. For airplanes with airstairs, in the E/E bay, install the kept drip pan. Refer to 737-100/200
AMM 25-51-01 as an accepted procedure.
b. For airplanes without airstairs, in the E/E bay, install the kept moisture shroud above the
access door. Refer to 737-100/200 AMM 25-51-01 as an accepted procedure.
c. For airplanes with airstairs, do the forward airstairs retraction. Refer to 737-100/200 AMM
52-61-0 or 737-100/200 AMM 52-61-100 as an accepted procedure.
22. In the E/E bay, connect the battery power cables to the battery. Refer to 737-100/200 AMM 24-31-11
as an accepted procedure.
23. Restore electrical power to the airplane. Refer to 737-100/200 AMM 24-22-0 as an accepted
procedure.
24. Do the Fuel Control System Functional Test that follows to make sure the changed fuel control
system operates correctly:
FUEL CONTROL SYSTEM FUNCTIONAL TEST (CENTER TANKS)
a. Make sure the center fuel tank has a minimum of 1000 - 1200 pounds (450 - 540 kilograms)
of fuel.
b. At the J2802 junction box in the E/E bay, open the circuit breakers that follow and attach
DO-NOT-CLOSE tags:
Circuit BreakerNamePanel Loca-
tion/Position
C3318FUEL CONTROL AUTO SHUTOFF CENTER
TANK LEFT
J2802
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
59 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

### Page 60

Circuit BreakerNamePanel Loca-
tion/Position
C3320FUEL CONTROL AUTO SHUTOFF CENTER
TANK RIGHT
J2802
c. At the P5-2 panel, put the Center Tank Left and Center Tank Right pump switches to the ON
position.
d. At the P5-2 panel, make sure that the Center Tank Left and Center Tank Right pump Low
Pressure Lights come on and then go out.
e. At the J2802 junction box in the E/E bay, push and hold the Pump Un-Commanded On Test
Switch (S3324) to CTR-L (Center Left) position.
f. At the P5-2 panel, make sure that the Center Left Low Pressure Light comes on.
g. At the J2802 junction box in the E/E bay, release the Pump Un-Commanded On Test Switch
(S3324).
h. At the P5-2 panel, make sure that the Center Left Low Pressure Light goes out.
i. At the J2802 junction box in the E/E bay, push and hold the Pump Un-Commanded On Test
Switch (S3326) to CTR-R (Center Right) position.
j. At the P5-2 panel, make sure that the Center Right Low Pressure Light comes on.
k. At the J2802 junction box in the E/E bay, release the Pump Un-Commanded On Test Switch
(S3326).
l. At the P5-2 panel, make sure that the Center Right Low Pressure Light goes out.
m. At the P5-2 panel, put the Center Tank Left and Center Tank Right pump switches to the OFF
position.
n. At the P5-2 panel, make sure that the Center Tank Left and Center Tank Right pump Low
Pressure Lights are off.
o. At the J2802 junction box in the E/E bay, check the voltage at the relay terminals that follow:
VoltagePositionRelay
Less than 10 Volts ACA2 to groundR3334
Less than 10 Volts ACB2 to ground
Less than 10 Volts ACC2 to ground
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1227Revision 1: July 18, 2011
60 of 202
BOEING SERVICE BULLETIN 737-28A1227
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/737-28a1227/file/a1a67d1fb686.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
