# Boeing Alert Service Bulletin 737-28A1228: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1068; AD 2016-18-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-28A1228](https://openairdocs.org/service-documents/boeing/737-28a1228.md)
- Title as filed: SB-737-28A1228-01--BOEING
- Pages: 344
- PDF: https://openairdocs.org/files/sha256/23/28/23281f081f2488a9fca64fdcaefc6d66a100fd2ea5458b8421af9bdc3595ee49
- Page: https://openairdocs.org/service-documents/boeing/737-28a1228/file/23281f081f24

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1228
Original Issue: August 02, 2010
Revision 1: June 28, 2012
ATA System: 2822
SUBJECT: FUEL - Distribution - Installation of the Auto Shutoff Protection for the Center and
Auxiliary Fuel Tank Boost Pumps
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2010 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
1 of 344
5.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
2 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 7
S u m m a r y..................................................... 1 1
1. PLANNING INFORMATION ........................................ 1 7
A . E f f e c t i v i t y  ............................................... 1 7
1. Airplanes ............................................ 1 7
2 . S p a r e s  A f f e c t e d  ........................................ 2 7
B. Concurrent Requirements ...................................... 2 7
C. Reason ................................................ 2 8
D. Description .............................................. 2 9
E. Compliance .............................................. 3 2
F . A p p r o v a l  ............................................... 3 2
G. Manpower .............................................. 3 3
H. Weight and Balance Changes .................................... 6 8
I. Electrical Load Data ......................................... 6 8
J . R e f e r e n c e s  .............................................. 6 9
1. Existing Data: ......................................... 6 9
2. Data Supplied with this Service Bulletin: ........................... 6 9
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 6 9
K. Publications Affected ........................................ 7 0
L. Interchangeability and Intermixability of Parts ........................... 7 0
M. Software Accomplishment Summary ................................ 7 0
2. MATERIAL INFORMATION ........................................ 7 1
A. Material - Price and Availability ................................... 7 1
B. Industry Support Information .................................... 7 3
C. Parts Necessary for Each Airplane ................................. 7 3
1 . K i t s / P a r t s :  ........................................... 7 3
2. Parts and Materials Supplied by the Operator: ........................ 9 6
3. Parts Modified and Reidentified: ............................... 9 7
4. Parts Removed and Not Replaced: .............................. 9 7
D. Parts Necessary to Change Spares ................................. 9 7
E. Special Tooling - Price and Availability ............................... 9 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 9 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 9 9
A. GENERAL INFORMATION ..................................... 9 9
B. WORK INSTRUCTIONS ...................................... 1 0 0
FIGURE 1: REMOVAL OF THE J2802 BOX ASSEMBLY COVER [Group 4-6, 11] .......... 1 2 1
FIGURE 2: REMOVAL OF THE J2802 BOX ASSEMBLY COVER [Group 12-16] ........... 1 2 2
FIGURE 3: WIRE BUNDLES W1760/W1770 INSTALLATION IN THE J2802 BOX ASSEMBLY [Group 2-11]
................................................. 1 2 3
FIGURE 4: CONNECTION OF THE WIRE BUNDLE W1760 [Group 2-11, 17-19] ........... 1 2 6
FIGURE 5: CONNECTION OF THE WIRE BUNDLE W1770 [Group 2-11, 17-19] ........... 1 2 9
FIGURE 6: WIRE BUNDLES W1760/W1770 INSTALLATION IN THE J2802 BOX ASSEMBLY [Group 12-16]
................................................. 1 3 2
FIGURE 7: CONNECTION OF THE WIRE BUNDLE W1760 [Group 12-16] .............. 1 3 5
FIGURE 8: CONNECTION OF THE WIRE BUNDLE W1760 [Group 12-16] .............. 1 3 7
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
3 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 4

FIGURE 9: CONNECTION OF THE WIRE BUNDLE W1770 [Group 12-16] .............. 1 4 0
FIGURE 10: CONNECTION OF THE WIRE BUNDLE W1770 [Group 12-16] .............. 1 4 2
FIGURE 11: INSTALLATION OF THE J2802 BOX ASSEMBLY COVER [Group 4-6, 11] ........ 1 4 5
FIGURE 12: ATTACHMENT OF THE J2802 BOX ASSEMBLY [Group 4-6, 11] ............. 1 4 6
F I G U R E  1 3 : T H I S  F I G U R E  I S  D E L E T E D ................................. 1 4 9
FIGURE 14: DRILLING OF HOLES ON THE J2802 BOX ASSEMBLY AND E2 SUPPORT POST [Group 4-6,
1 1 ]............................................... 1 5 0
FIGURE 15: PREPARE THE J2802 BOX ASSEMBLY AND E2 AND E3 SUPPORT POSTS [Group 4-6, 11]
................................................. 1 5 3
FIGURE 16: INSTALLATION OF THE J2802 BOX ASSEMBLY, E2 AND E3 SUPPORT POSTS [Group 4-6,
1 1 ]............................................... 1 5 5
F I G U R E  1 7 : T H I S  F I G U R E  I S  D E L E T E D ................................. 1 5 7
FIGURE 18: INSTALLATION THE BONDING JUMPER AND CLAMPS [Group 4-6, 11] ........ 1 5 8
FIGURE 19: REMOVAL OF THE RELAYS FROM THE P6 PANEL [Group 2-11, 17-19] ........ 1 6 1
FIGURE 20: INSTALLATION OF THE P5 PANEL WIRE BUNDLE W036 [Group 2-11, 17-19] ..... 1 6 3
FIGURE 21: CONNECTION OF THE WIRE BUNDLE W036 [Group 2, 10-11, 17] ........... 1 6 4
FIGURE 22: CONNECTION OF WIRE BUNDLE W036 [Group 8-9] ................... 1 6 7
FIGURE 23: CONNECTION OF THE WIRE BUNDLE W036 [Group 3] ................. 1 7 0
FIGURE 24: CONNECTION OF THE WIRE BUNDLE W036 [Group 4, 18] ............... 1 7 3
FIGURE 25: CONNECTION OF THE WIRE BUNDLE W036 [Group 5] ................. 1 7 6
FIGURE 26: CONNECTION OF THE WIRE BUNDLE W036 [Group 6, 19] ............... 1 7 9
FIGURE 27: CONNECTION OF THE WIRE BUNDLE W036 [Group 7] ................. 1 8 2
FIGURE 28: REMOVAL OF THE RELAYS, P6 PANEL [Group 12-16] .................. 1 8 5
FIGURE 29: INSTALLATION OF THE P5 PANEL WIRE BUNDLE W036 [Group 12-16] ........ 1 8 7
FIGURE 30: CONNECTION OF THE WIRE BUNDLE W036 [Group 12-13, 15] ............. 1 8 8
FIGURE 31: CONNECTION OF THE WIRE BUNDLE W036 [Group 12-13, 15] ............. 1 9 1
FIGURE 32: CONNECTION OF THE WIRE BUNDLE W036 [Group 12-13, 15] ............. 1 9 3
FIGURE 33: CONNECTION OF THE WIRE BUNDLE W036 [Group 14, 16] .............. 1 9 5
FIGURE 34: CONNECTION OF THE WIRE BUNDLE W036 [Group 14, 16] .............. 1 9 8
FIGURE 35: CONNECTION OF THE WIRE BUNDLE W036 [Group 14, 16] .............. 2 0 0
FIGURE 36: INSTALLATION OF THE P6 PANEL WIRE BUNDLE W044 [Group 2-11, 17-19] ..... 2 0 2
FIGURE 37: CONNECTION OF WIRE BUNDLE W044 [Group 2] .................... 2 0 3
FIGURE 38: CONNECTION OF WIRE BUNDLE W044 [Group 3, 8-11, 17, Configuration 1] ...... 2 0 6
FIGURE 39: CONNECTION OF THE WIRE BUNDLE W044 [Group 3, 8-11, 17, Configuration 2] . . . 209
FIGURE 40: CONNECTION OF THE WIRE BUNDLE W044 [Group 4, 18, Configuration 1] ...... 2 1 2
FIGURE 41: CONNECTION OF THE WIRE BUNDLE W044 [Group 4, 18, Configuration 2] ...... 2 1 5
FIGURE 42: CONNECTION OF THE WIRE BUNDLE W044 [Group 5-6, 19, Configuration 1] ..... 2 1 8
FIGURE 43: CONNECTION OF THE WIRE BUNDLE W044 [Group 5-6, 19, Configuration 2] ..... 2 2 0
FIGURE 44: CONNECTION OF THE WIRE BUNDLE W044 [Group 7, Configuration 1] ........ 2 2 2
FIGURE 45: CONNECTION OF THE WIRE BUNDLE W044 [Group 7, Configuration 2] ........ 2 2 4
FIGURE 46: INSTALLATION OF THE P6 PANEL WIRE BUNDLE W044 [Group 12-16] ........ 2 2 6
FIGURE 47: CONNECTION OF THE WIRE BUNDLE W044 [Group 13] ................ 2 2 7
FIGURE 48: CONNECTION OF THE WIRE BUNDLE W044 [Group 13, Configuration 1] ....... 2 3 0
FIGURE 49: CONNECTION OF THE WIRE BUNDLE W044 [Group 13, Configuration 2] ....... 2 3 3
FIGURE 50: CONNECTION OF THE WIRE BUNDLE W044 [Group 12, 14-16, Configuration 1] . . . 236
FIGURE 51: CONNECTION OF THE WIRE BUNDLE W044 [Group 12, 14-16, Configuration 2] . . . 239
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
4 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 5

FIGURE 52: CONNECTION OF THE WIRE BUNDLE W044 [Group 12, 14-16, Configuration 1] . . . 242
FIGURE 53: CONNECTION OF THE WIRE BUNDLE W044 [Group 12, 14-16, Configuration 2] . . . 245
FIGURE 54: INSTALLATION OF WIRE BUNDLE W368, W386, W1764 AND W1774 [Group 2-16] . . 248
FIGURE 55: CONNECTION OF WIRE BUNDLE W368 AND W1764 [Group 2, 4-5, 11, 17-18] .... 2 5 2
FIGURE 56: CONNECTION OF THE WIRE BUNDLE W368 AND WIRE BUNDLE W1764 [Group 8] . 255
FIGURE 57: CONNECTION OF THE WIRE BUNDLE W368 AND WIRE BUNDLE W1764 [Group 9] . 257
FIGURE 58: CONNECTION OF WIRE BUNDLE W368 AND W1764 [Group 10] ............ 2 5 9
FIGURE 59: CONNECTION OF WIRE BUNDLE W368 / W1764 [Group 3, 6-7, 19] .......... 2 6 1
FIGURE 60: CONNECTION OF WIRE BUNDLE W368 AND W1764 [Group 12-16] .......... 2 6 4
FIGURE 61: CONNECTION OF WIRE BUNDLE W386 AND W1774 [Group 2, 4-5, 7-11, 17-18] . . . 267
FIGURE 62: CONNECTION OF WIRE BUNDLE W386 / W1774 [Group 3, 6, 19] ............ 2 7 0
FIGURE 63: CONNECTION OF WIRE BUNDLE W386 AND W1774 [Group 12-16] .......... 2 7 3
FIGURE 64: INSTALLATION OF THE RELAYS AND STRAPS ON THE J2802 BOX ASSEMBLY [Group 4-6,
1 1 ]............................................... 2 7 6
F I G U R E  6 5 : T H I S  F I G U R E  I S  D E L E T E D ................................. 2 7 9
FIGURE 66: INSTALLATION OF THE RELAYS IN THE P6 PANEL [Group 2-11, 17-19] ........ 2 8 0
FIGURE 67: INSTALLATION OF THE RELAYS, P6 PANEL [Group 12-16] ............... 2 8 2
FIGURE 68: CHANGE OF THE J2802 BOX ASSEMBLY FOR AIRPLANES WITH AIRSTAIRS AND NO
AUXILIARY TANK [Group 2-3, 7-10, 17-19] ......................... 2 8 4
FIGURE 69: CHANGE OF THE J2802 BOX ASSEMBLY FOR AIRPLANES WITH AIRSTAIRS AND
AUXILIARY TANK [Group 12-16] .............................. 2 8 7
FIGURE 70: ASSEMBLE THE J2802 BOX ASSEMBLY FOR AIRPLANES WITH AIRSTAIRS AND NO
AUXILIARY TANK [Group 2-3, 7-10, 17-19] ......................... 2 9 1
FIGURE 71: ASSEMBLE THE J2802 BOX ASSEMBLY FOR AIRPLANES WITH AIRSTAIR AND AUXILIARY
TANK [Group 12-16] ..................................... 2 9 7
FIGURE 72: WIRE BUNDLES W1760/W1770 INSTALLATION IN THE J2802 BOX ASSEMBLY FOR
AIRPLANES WITH AIRSTAIRS AND NO AUXILIARY TANK [Group 2-3, 7-10, 17-19] . . 303
FIGURE 73: WIRE BUNDLES W1760/W1770 INSTALLATION IN THE J2802 BOX ASSEMBLY FOR
AIRPLANES WITH AIRSTAIRS AND AUXILIARY TANK [Group 12-16] .......... 3 0 7
FIGURE 74: DRILLING OF HOLES ON THE J2802 BOX ASSEMBLY AND E3 SUPPORT POST [Group 2-3,
7 - 1 0 ,  1 7 - 1 9 ]  .......................................... 3 1 1
FIGURE 75: DRILLING OF HOLES ON THE J2802 BOX ASSEMBLY AND E3 SUPPORT POST [Group
1 2 - 1 6 ]............................................. 3 1 6
FIGURE 76: PREPARATION OF THE J2802 BOX ASSEMBLY, E2 AND E3 SUPPORT POSTS [Group 2-3,
7 - 1 0 ,  1 7 - 1 9 ]  .......................................... 3 2 1
FIGURE 77: PREPARATION OF THE J2802 BOX ASSEMBLY, E2 AND E3 SUPPORT POSTS [Group
1 2 - 1 6 ]............................................. 3 2 3
FIGURE 78: INSTALLATION THE J2802 BOX ASSEMBLY ON THE E2 AND E3 SUPPORT POSTS [Group
2 - 3 ,  7 - 1 0 ,  1 7 - 1 9 ]  ....................................... 3 2 5
FIGURE 79: INSTALLATION THE J2802 BOX ASSEMBLY ON THE E2 AND E3 SUPPORT POSTS [Group
1 2 - 1 6 ]............................................. 3 2 7
FIGURE 80: INSTALLATION THE BONDING JUMPER AND CLAMPS [Group 2-3, 7-10, 12-19] . . . 329
FIGURE 81: INSTALLATION OF WIRE BUNDLE W368, W386, W1764 AND W1774 [Group 2-3, 7-10, 17-19]
................................................. 3 3 5
FIGURE 82: INSTALLATION OF THE RELAYS ON THE J2802 BOX ASSEMBLY [Group 2-3, 7-10, 17-19]
................................................. 3 4 1
FIGURE 83: INSTALLATION OF THE RELAYS ON THE J2802 BOX ASSEMBLY [Group 12-16] . . . 343
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
5 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 6

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
6 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT
BLANK PAGE

### Page 7

Commercial
Airplanes
737
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 737-28A1228Original Issue: August 02, 2010
Revision 1: June 28, 2012
ATA System: 2822
SUBJECT: FUEL - Distribution - Installation of the Auto Shutoff Protection for the Center and
Auxiliary Fuel Tank Boost Pumps
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2010-NM-189-AD, is related to
this service bulletin.
More work is necessary on the airplane(s) changed in accordance with the original issue of this service bulletin.
Operators that incorporated the original issue of this SB have to change the labels and wire termination in the
J2802 relay box assembly in accordance with Figures 3, 4, 5, 6, 7, 8, 9, or 10 as applicable, and do a functional
test within the compliance time specified in paragraph 1. E.
REASON FOR REVISION
This revision is sent to tell the operators that for airplanes with Airstairs the J2802 Box provided in the original
release can not be installed in the main equipment compartment on the E2 and E3 support posts in accordance
with Figure 12 or Figure 13. When J2802 Box is installed in accordance with Figure 12 or 13, the forward face
of the box interferes with the Airstairs and the Airstairs support structure. Also there is no good access to the
Airstairs relays, and to the wires connected to the Airstairs relays. A new J2802 Box Assembly was designed
and added to this revision that can be installed on airplanes with Airstairs with no interference with Airstairs and
the Airstairs support structure. The airplanes with Airstairs were moved from the existing groups into new groups
based on the wires configuration and Auxiliary Tank installation. Figures 68 through 83 were added for airplanes
with Airstairs.
This revision is also sent to tell the Operators that the switches S03318 and S03321 installed on J2802 box
have two positions (for each switch) identified as "POS 1" and "POS 2". POS 1 of the test switch S03318 is for
Left Fuel Boost Pump of the Center Tank. POS 1 of the test switch S03321 is for Right Fuel Boost Pump of the
Center Tank. POS 2 of the test switches S03318 and S03321 are only used for airplanes with Auxiliary Tanks.
POS 2 of the test switch S03318 is for Aft Fuel Boost Pump of the Auxiliary Tank. POS 2 of the test switch
S03321 is for Fwd Fuel Boost Pump of the Auxiliary Tank. The wires terminated at switches S03318 and S03321
were incorrectly terminated in Figures 4, 5, 7, 8, 9, 10. The wire terminations at switches S03318 and S03321
are changed in order for the switches to function as indicated.
New steps are added to Figure 3 that instruct the operators to install markers on the J2802 Box that will identify
S03318 and S003321 as "TEST SWITCHES". Also instructions are added to install markers that will identify the
function of the switch S03318 POS 1 as "CTR-L", and the function of the switch S03321 POS 1 as "CTR-R".
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
7 of 344

### Page 8

New steps are added to Figure 6 that instruct the operators to install markers on the J2802 Box that will identify
S03318 and S003321 as "TEST SWITCHES". Also instructions are added to install markers that will identify the
functions of the switch S03318 as follows: POS 1 as "CTR-L",and POS 2 as "AUX-AFT". Also instructions are
added to install markers that will identify the functions of the switch S03321 as follows: POS 1 as "CTR-R", and
POS 2 as "AUX-FWD".
This revision moves airplanes with airstairs from existing groups 4, 6 and 11 to new groups, 17, 18, 19. All
airplanes in Groups 2, 3, 7, 8, 9, 10, 12, 13, 14, 15, 16, 17, 18 and 19 have airstairs. All airplanes in Groups 4,
5, 6 and 11 do not have airstairs.
These sections were changed:
1. Summary:
a. Background: Updated Part 1, Part 2, Part 3 and Part 4 for airplanes with Airstairs. Added Part 5
and Part 6 for airplanes with Airstairs. Added Part 7, Part 8 and Part 9 for airplanes with more
work.
b. Material Information paragraph added Operator Supplied Parts/Materials.
c. Summary Illustration updated to include airplanes with Airstairs.
2. Planning Information:
a. Paragraph 1.A Effectivity: Changed the Group Configuration Table. Created new groups for
airplanes with Airstairs
b. Paragraph 1.C Reason: Added the reason for Revision 1
c. Paragraph 1.D. Description: Changed PART 2, PART 3 and PART 4 for airplanes with Airstairs.
Added PART 5, and PART 6 for airplanes with Airstairs
d. Paragraph 1.G. Manpower: Changed Manpower Tables for Groups 2, 3, 7, 8, 9, 10, 12, 13, 14,
15, 16. Added Manpower tables for Groups 17, 18 and 19
e. Paragraph 1.H. Weight and Balance Changes: Added Groups 17, 18 and 19 to Weight and Balance
table
f. Paragraph 1.J.1. References, Existing Data: Updated the reference list
g. Paragraph 1.J.3. Installation Drawings Used in the Preparation of this Service Bulletin: Updated
the Drawings list
h. Paragraph 1.K.1. Publications: Updated the publication list.
3. Material Information:
a. Paragraph 2.A. Material - Price and Availability: Notes are added, kit pricing data is updated, and
new top kits and supplemental kits are added
b. Paragraph 2.C.1. Parts Necessary For Each Airplane: Parts for the new top kits and supplemental
kits and new footnotes are added
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
8 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 9

c. Paragraph 2.C.2. Part and Materials Supplied by the Operator: New materials are added
d. Paragraph 2.C.3. Parts Modified and Reidentified: New data is added for airplanes with airstairs
4. Paragraph 3.B. Work Instructions: Changed Part 2, Part 3 and Part 4. Added Part 5, Part 6, Part 7,
Part 8 and Part 9
5. Changed Figures 1-67: Group effectivities are updated
6. Figures 68-83: Added for airplane with airstairs.
The data given in Information Notice 737-28A1228 IN 01, 737-28A1228 IN 02 and 737-28A1228 IN 03 are
included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
August 02, 2010Original Issue:
June 28, 2012Revision 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
9 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 10

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
10 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT
BLANK PAGE

### Page 11

Commercial
Airplanes
737
Service Bulletin
ALERT
SummaryNumber: 737-28A1228Original Issue: August 02, 2010
Revision 1: June 28, 2012
ATA System: 2822
SUBJECT: FUEL - Distribution - Installation of the Auto Shutoff Protection for the Center and
Auxiliary Fuel Tank Boost Pumps
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
This service bulletin is the result of the safety analysis done by Boeing under SFAR 88, "Fuel Tank System Fault
Tolerance Evaluation Requirements." Initial results from the fuel system safety analysis shows that fuel boost
pumps that run dry could cause an overheat condition external of the fuel pump explosion resistance area that
is open to the fuel pump inlet. An overheat condition in this area could possibly cause an unwanted ignition
source for the fuel vapors in the fuel tank and could cause a fire or explosion.
This service bulletin gives the instructions and a kit of parts to install an automatic (auto) shut-off system for the
fuel boost pumps. The fuel boost pumps are installed in the center fuel tank and if equipped, also in the auxiliary
fuel tank. Time delay relays are installed in the new J2802 box assembly that will shut off the fuel boost pumps
if the pumps operate with continuous low pressure for 15 seconds. The 15 second time delay relay prevents
extended dry operation of the fuel boost pumps and allows for sufficient time for fuel pump inlet reprime to
prevent nuisance automatic shutoffs. The flight crew stays in primary control, with the auto shut off system as
a backup, to stop the fuel boost pumps after a low pressure indication.
The change installs an automatic shut off system that gives fuel boost pump inlet protection in the fuel tank
against sparks possibly caused by friction overheat damage.
This change affects the Fuel Systems Airworthiness Limitations section of Boeing document
"737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and Certification Maintenance Requirements
(CMRs), D6-38278-CMR," New AWL"28-AWL-21" will be added to include an operational check of the boost
pump automatic shutoff system for the center fuel tank. AWL "28-AWL-22" will be added to include an operational
check of the fuel boost pump automatic shutoff system for the auxiliary fuel tank, if installed by Boeing. This
change also affects Section 1 and Section 3 of the FAA approved Airplane Flight Manual (AFM).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
11 of 344

### Page 12

ACTION (PRR 35442-RS)
The work instructions are divided into 19 airplane groups, 6 parts.
Part 1, Part 2, Part 3, Part 4, and Part 5 work instructions are divided into 3 work packages because of the
different wire bundle changes and airplanes without and with Airstairs
Part 6 work instructions are for Operators that already ordered the kit from the original release, and want tor
e-work the kit for airplanes with Airstairs.
Part 7, Part 8 and Part 9 work instructions are for Operators that already ordered the kit from the original release
and have more work.
NOTE: When submitting a Publication Change Request (PCR) to Boeing to incorporate this service bulletin in
the affected manuals, please notify Boeing if Auxiliary Tanks are installed on these airplanes. If Boeing
is not notified about the Auxiliary Tanks, Boeing will assume that the airplanes in these groups do not
have Auxiliary (AUX) tanks and no AUX Tank changes to the affected manuals will be done.
Group 1:
Operators should tell Boeing about this modification to get the engineering and accomplishment instructions.
Group 4-6, 11:
1. Work Package 1:
In the J2802 box assembly, install the wire bundles W1760 and W1770.
2. Work Package 2:
Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install
the J2802 box assembly.
3. Work Package 3:
In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.
Above the P5 overhead panel, make a change to the wire bundles W036, W368 and W386. Between
the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire
bundle W044. For the airplanes that have an auxiliary fuel tank, between the P6 disconnect panel and
the fuel boost pump relays R146 and R147, make a change to the wire bundle W044.
4. In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box
assembly, install the new wire bundles W1764 and W1774.
5. In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318
and R3321. For the airplanes that have auxiliary fuel tank, at the J2802 box assembly, install the time
delay relays R3327 and R3329.
6. Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.
Group 2-3, 7-10, 12-13, 15-19:
1. Operators do these to change the airplane:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
12 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 13

NOTE: Airplanes in group 15 and 16 were delivered, or modified by other Boeing change, to have
only Auxiliary Fuel Tank wire provisions installed on airplane. Operators that installed AUX
tanks with Fuel Boost Pumps on these airplanes need to install an Auto Shutoff system. FAA
may release an AD to require that all airplanes that have AUX tanks with Fuel Boost Pumps
should install an Auto Shutoff system.
NOTE: When submitting a Publication Change Request (PCR) to Boeing to incorporate this service
bulletin in the affected manuals, please notify Boeing if Auxiliary Tanks are installed on these
airplanes. If Boeing is not notified about the Auxiliary Tanks, Boeing will assume that the
airplanes in these groups do not have Auxiliary (AUX) tanks and no AUX Tank changes to
the affected manuals will be done.
2. Work Package 1:
Change J2802 Box Assy if/as necessary.
In the J2802 box assembly, install the wire bundles W1760 and W1770.
3. Work Package 2:
Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install
the J2802 box assembly.
4. Work Package 3:
In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.
Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between
the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire
bundle W44.
In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box
assembly, install the new wire bundles W1764 and W1774.
In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318
and R3321.
Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.
Group 14:
1. Work Package 1:
Change J2802 Box Assy if/as necessary.
In the J2802 box assembly, install the wire bundles W1760 and W1770.
2. Work Package 2:
Get access into the main electronics compartment. Between the E2 and E3 rack support posts, install
the J2802 box assembly.
3. Work Package 3:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
13 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 14

In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.
Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between
the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire
bundle W44. Between the P6 disconnect panel and the fuel boost pump relays R146 and R147, make
a change to the wire bundle W44.
In the flight and main electronics compartments, between the P6 disconnect panel and the J2802 box
assembly, install the new wire bundles W1764 and W1774.
In the main electronics compartment, at the J2802 box assembly, install the time delay relays R3318
and R3321. At the J2802 box assembly, install the time delay relays R3327 and R3329.
Do a functional test of the fuel boost pumps to make sure the changed control system operates correctly.
Revision 1: More work is necessary on the airplane(s) changed in accordance with the original issue of this
service bulletin. Operators that incorporated the original issue of this SB, have to change the labels and wire
termination in the J2802 relay box assembly.
EFFECTIVITY
All 737-100/200/200C airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
NOTE: Airplanes in group 15 and 16 were delivered, or modified by other Boeing change, to have only Auxiliary
Fuel Tank wire provisions installed on airplane. Operators that installed AUX tanks with Fuel Boost
Pumps on these airplanes need to install an Auto Shutoff system. FAA may release an AD to require
that all airplanes that have AUX tanks with Fuel Boost Pumps should install an Auto Shutoff system.
COMPLIANCE
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2010-NM-189-AD, is related to
this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Group 1:
Operators should tell Boeing about this modification to get the engineering and accomplishment instructions.
Group 2-19:
Boeing recommends that the change given in this service bulletin be done within 36 months after the Revision
1 date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
14 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 15 (OCR)

BOEING SERVICE BULLETIN 737-28A1228
ALERT  ALERT
MATERIAL INFORMATION
Boeing Supplied Kits/Parts. Refer to Paragraph 2.A., Material - Price and Availability.
CHANGE WIRE BUNDLES
W036/W368/W386
CHANGE WIRE BUNDLE WO44
INSTALL WIRE BUNDLES
W1764/W1774
P6 RELAY
PANEL
INSTALL WIRE BUNDLES W1760/W1770
INSTALL J2802 BOX ASSEMBLY
INSTALL RELAYS
AIRPLANES WITH NO AIRSTAIRS
CHANGE WIRE BUNDLES
CHANGE WIRE BUNDLE WO44  W036/W368/W386
INSTALL WIRE BUNDLES
W1764/W1774
P6 RELAY
PANEL
INSTALL WIRE BUNDLES W1760/W1770
INSTALL J2802 BOX ASSEMBLY
INSTALL RELAYS
AIRPLANES WITH AIRSTAIRS  D35641
Original Issue: August 02, 2010
Revision 1: June 28, 2012  Export Controlled ECCN: 9E991 - BOEING  737-28A1228
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  15 of 344

### Page 16

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
16 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT
BLANK PAGE

### Page 17

Commercial
Airplanes
737
Service Bulletin
ALERT
Number: 737-28A1228
Original Issue: August 02, 2010
Revision 1: June 28, 2012
ATA System: 2822
SUBJECT: FUEL - Distribution - Installation of the Auto Shutoff Protection for the Center and
Auxiliary Fuel Tank Boost Pumps
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 35442-RS for data about this change.
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes from line numbers 1 through 291.-1
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-3
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
17 of 344

### Page 18

DESCRIPTIONCONFIGURATIONGROUP
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels.
-4
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels.
-5
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels.
-6
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-7
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-8
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-9
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
18 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 19

DESCRIPTIONCONFIGURATIONGROUP
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-10
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels.
-11
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.2
737 airplanes with line numbers higher than 291 that have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-12
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-13
Airplanes from line numbers higher than 291 that have the auxiliary
fuel tanks, have different wire connection configurations at the P5
and P6 panels, and did not incorporate the SB 737-28A1212 R00.
1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-14
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
19 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 20

DESCRIPTIONCONFIGURATIONGROUP
737 airplanes with line numbers higher than 291 that have only
Auxiliary Fuel Tank wire provisions installed on airplane and have
different wire configurations at the P5 and P6 panels, and with airstairs
or airstair provisions.
-15
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that have only
Auxiliary Fuel Tank wire provisions installed on airplane and have
different wire configurations at the P5 and P6 panels, and with airstairs
or airstair provisions.
-16
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-17
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-18
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
737 airplanes with line numbers higher than 291 that do not have the
auxiliary fuel tanks and have different wire configurations at the P5
and P6 panels, and with airstairs or airstair provisions.
-19
737 airplanes with SB 737-28A1212 R0 or R1 not incorporated.1
737 airplanes with SB 737-28A1212 R0 or R1 incorporated.2
Airplane Models:
737-100, 737-200, 737-200C
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
20 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 21

GroupVariable Number
1PA001 - PA022
1PA099
1PA231 - PA232
1PC001 - PC005
1PG001 - PG075
1PG199
1PG201 - PG230
1PG251 - PG255
1PG271 - PG279
1PG301 - PG314
1PG331 - PG332
1PG351 - PG356
1PG375
1PG401 - PG403
1PG431 - PG442
1PG471 - PG475
1PG501 - PG505
1PG571 - PG583
17PG584 - PG586
1PG621 - PG630
1PG651 - PG652
1PG701 - PG705
17PH001
17PH011 - PH013
17PH021 - PH024
1PH701 - PH715
1PH731 - PH732
1PH741 - PH742
17PH743
1PJ001 - PJ002
17PJ003 - PJ006
12PJ007 - PJ009
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
21 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 22

GroupVariable Number
1PJ031 - PJ032
1PJ071 - PJ072
1PJ101 - PJ104
8PJ105 - PJ119
14PJ201 - PJ219
17PK026 - PK029
4PK041 - PK046
18PK047
4PK048 - PK050
18PK051
4PK052 - PK053
17PK061 - PK067
14PK068 - PK070
17PK081 - PK082
17PK091 - PK099
17PK101 - PK103
17PK111 - PK120
18PK141 - PK146
17PK201 - PK204
17PK211 - PK223
17PK231 - PK241
17PK251 - PK256
16PK257
17PK258
17PK271 - PK274
17PK281 - PK289
17PK291
18PK301 - PK310
3PK311 - PK318
3PK341
17PK351 - PK355
12PK356 - PK359
15PK360
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
22 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 23

GroupVariable Number
17PK361
17PK391
4PK431 - PK433
18PK451 - PK452
18PK461 - PK469
18PK495
17PK501
15PK502 - PK504
17PK511 - PK515
17PK519
17PK521 - PK528
17PK541 - PK565
17PK581
17PK591 - PK599
9PK601 - PK604
17PK605 - PK606
12PK607 - PK610
17PK611 - PK617
17PK621 - PK637
17PK641 - PK642
14PK661
17PK662 - PK666
17PK671 - PK681
17PK691 - PK697
17PK711 - PK716
17PK731 - PK765
17PK771 - PK779
10PK801 - PK804
8PK819 - PK827
8PK830
17PK861 - PK863
15PK871 - PK872
12PK873
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
23 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 24

GroupVariable Number
15PK874
17PK881 - PK884
18PK901 - PK910
4PK911 - PK938
4PK971 - PK974
17PL001 - PL028
17PL061
17PL081
5PL101 - PL113
17PL151
17PL171 - PL172
17PL201 - PL203
17PL221
17PL401 - PL408
12PL409 - PL410
17PL411
12PL412
17PL413 - PL417
15PL421
17PL441
17PL451 - PL456
17PL471
17PL491
12PL501
15PL502 - PL503
12PL504 - PL506
18PL551 - PL562
17PL581
12PL601 - PL603
17PL611
17PL621 - PL626
12PL631 - PL632
1PL711 - PL712
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
24 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 25

GroupVariable Number
1PL716
17PL717 - PL725
7PL726 - PL728
19PL729 - PL730
3PL731 - PL735
11PL736 - PL747
17PL756
11PL758
17PL761 - PL770
17PL781 - PL788
17PL793
1PL801 - PL803
17PM001 - PM006
17PM016 - PM017
18PM021 - PM023
17PM051 - PM066
12PM101 - PM107
15PM108 - PM119
15PM141 - PM142
17PM171
17PM181
17PM251 - PM255
17PM281 - PM283
12PN001 - PN002
17PN021 - PN043
18PN081 - PN086
18PN101 - PN117
17PN131 - PN163
11PN401 - PN420
17PN431 - PN433
17PN451 - PN456
17PN471 - PN474
17PN481
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
25 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 26

GroupVariable Number
17PN491 - PN493
17PN501
2PN502
17PN511
2PN512
13PN521
1PX071
1PX701
1PY001 - PY008
1PY021
11PY022
1PY031
6PY036 - PY037
11PY046 - PY048
17PY051 - PY053
11PY056 - PY057
17PY101 - PY103
11PY111 - PY113
11PY131 - PY135
4PY141 - PY143
11PY151 - PY154
11PY156 - PY157
17PY161
11PY162
11PY166
11PY191
11PY201
17PY221 - PY222
17PY231
11PY241 - PY244
11PY270 - PY275
17PY281
17PY286
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
26 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 27

GroupVariable Number
1PY301 - PY304
1PY321 - PY323
1PY341 - PY346
1PY361 - PY362
1PY381
11PY401
11PY409 - PY410
17PY411
11PY421 - PY422
17PY441
11PY451
11PY461 - PY463
11PY591 - PY595
17PY611 - PY612
17PY621
17PY631
17PY651
11PY671 - PY672
11PY721
17PY741
2. Spares Affected
None.
B. Concurrent Requirements
Group 1:
Operators should tell Boeing about this modification to get the engineering and accomplishment
instructions.
Group 2-19:
The service bulletin(s) listed below must be done before or at the same time as this service bulletin:
DescriptionService BulletinCompany
Gives instruction to replace the P5-2 fuel
system module assembly to supply Low
fuel pressure master caution Annunciation.
737-28A1210, Revision 1, dated Feb 05/2011Boeing
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
27 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 28

C. Reason
This service bulletin is the result of the safety analysis done by Boeing under SFAR 88, "Fuel Tank
System Fault Tolerance Evaluation Requirements." Initial results from the fuel system safety analysis
shows that fuel boost pumps that run dry could cause an overheat condition external of the fuel pump
explosion resistance area that is open to the fuel pump inlet. An overheat condition in this area could
possibly cause an unwanted ignition source for the fuel vapors in the fuel tank and could cause a fire
or explosion.
This service bulletin gives the instructions and a kit of parts to install an automatic (auto) shut-off system
for the fuel boost pumps. The fuel boost pumps are installed in the center fuel tank and if equipped,
also in the auxiliary fuel tank. Time delay relays are installed in the new J2802 box assembly that will
shut off the fuel boost pumps if the pumps operate with continuous low pressure for 15 seconds. The
15 second time delay relay prevents extended dry operation of the fuel boost pumps and allows for
sufficient time for fuel pump inlet reprime to prevent nuisance automatic shutoffs. The flight crew stays
in primary control, with the auto shut off system as a backup, to stop the fuel boost pumps after a low
pressure indication.
The change installs an automatic shut off system that gives fuel boost pump inlet protection in the fuel
tank against sparks possibly caused by friction overheat damage.
This change affects the Fuel Systems Airworthiness Limitations section of Boeing document
"737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and Certification Maintenance
Requirements (CMRs), D6-38278-CMR," New AWL"28-AWL-21" will be added to include an operational
check of the boost pump automatic shutoff system for the center fuel tank. AWL "28-AWL-22" will be
added to include an operational check of the fuel boost pump automatic shutoff system for the auxiliary
fuel tank, if installed by Boeing. This change also affects Section 1 and Section 3 of the FAA approved
Airplane Flight Manual (AFM).
Other related airplane service bulletins are Service Bulletin 737-28A1216 for the 737-300/400/500
airplanes and Service Bulletin 737-28A1206 for the 737-600/700/800/900 airplanes.
This revision is sent to tell the operators that for airplanes with Airstairs the J2802 Box provided in the
original release can not be installed in the main equipment compartment on the E2 and E3 support
posts in accordance with Figure 12 or Figure 13. When J2802 Box is installed in accordance with Figure
12 or 13, the forward face of the box interferes with the Airstairs and the Airstairs support structure.
Also there is no good access to the Airstairs relays, and to the wires connected to the Airstairs relays.
A new J2802 Box Assembly was designed and added to this revision that can be installed on airplanes
with Airstairs with no interference with Airstairs and the Airstairs support structure. The airplanes with
airstairs were moved from the existing groups into new groups based on the wires configuration and
Auxiliary Tank installation. Figures 68 through 83 were added for airplanes with Airstairs.
This revision is also sent to tell the Operators that the switches S03318 and S03321 installed on J2802
box have two positions (for each switch) identified as "POS 1" and "POS 2". POS 1 of the test switch
S03318 is for Left Fuel Boost Pump of the Center Tank. POS 1 of the test switch S03321 is for Right
Fuel Boost Pump of the Center Tank. POS 2 of the test switches S03318 and S03321 are only used
for airplanes with Auxiliary Tanks. POS 2 of the test switch S03318 is for Aft Fuel Boost Pump of the
Auxiliary Tank. POS 2 of the test switch S03321 is for Fwd Fuel Boost Pump of the Auxiliary Tank. The
wires terminated at switches S03318 and S03321 were incorrectly terminated in Figures 4, 5, 7, 8, 9,
10. The wire terminations at switches S03318 and S03321 are changed in order for the switches to
function as indicated.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
28 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 29

New steps are added to Figure 3 that instruct the operators to install markers on the J2802 Box that
will identify S03318 and S003321 as "TEST SWITCHES". Also instructions are added to install markers
that will identify the function of the switch S03318 POS 1 as "CTR-L", and the function of the switch
S03321 POS 1 as "CTR-R".
New steps are added to Figure 6 that instruct the operators to install markers on the J2802 Box that
will identify S03318 and S003321 as "TEST SWITCHES". Also instructions are added to install markers
that will identify the functions of the switch S03318 as follows: POS 1 as "CTR-L",and POS 2 as
"AUX-AFT". Also instructions are added to install markers that will identify the functions of the switch
S03321 as follows: POS 1 as "CTR-R", and POS 2 as "AUX-FWD".
Airplanes in Groups 2, 3, 7, 8, 9, 10, 12 through 19 have airstairs.
This revision moves airplanes with airstairs from existing Groups 4, 6 and 11 to new groups, Groups
17 through 19.
D. Description
Group 1:
Operators should tell Boeing about this modification to get the engineering and accomplishment
instructions.
Group 4-6, 11:
1. Work Package 1:
In the J2802 box assembly, install the wire bundles W1760 and W1770.
2. Work Package 2:
Get access into the main electronics compartment. Between the E2 and E3 rack support posts,
install the J2802 box assembly.
3. Work Package 3:
In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.
Above the P5 overhead panel, make a change to the wire bundles W036, W368 and W386.
Between the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change
to the wire bundle W044. For the airplanes that have an auxiliary fuel tank, between the P6
disconnect panel and the fuel boost pump relays R146 and R147, make a change to the wire
bundle W044.
4. In the flight and main electronics compartments, between the P6 disconnect panel and the J2802
box assembly, install the new wire bundles W1764 and W1774.
5. In the main electronics compartment, at the J2802 box assembly, install the time delay relays
R3318 and R3321. For the airplanes that have auxiliary fuel tank, at the J2802 box assembly,
install the time delay relays R3327 and R3329.
6. Do a functional test of the fuel boost pumps to make sure the changed control system operates
correctly.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
29 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 30

Group 2-3, 7-10, 12-13, 15-19:
1. Operators do these to change the airplane:
NOTE: Airplanes in group 15 and 16 were delivered, or modified by other Boeing change, to
have only Auxiliary Fuel Tank wire provisions installed on airplane. Operators that installed
AUX tanks with Fuel Boost Pumps on these airplanes need to install an Auto Shutoff
system. FAA may release an AD to require that all airplanes that have AUX tanks with
Fuel Boost Pumps should install an Auto Shutoff system.
NOTE: When submitting a Publication Change Request (PCR) to Boeing to incorporate this
service bulletin in the affected manuals, please notify Boeing if Auxiliary Tanks are installed
on these airplanes. If Boeing is not notified about the Auxiliary Tanks, Boeing will assume
that the airplanes in these groups do not have Auxiliary (AUX) tanks and no AUX Tank
changes to the affected manuals will be done.
2. Work Package 1:
Change J2802 Box Assy if/as necessary.
In the J2802 box assembly, install the wire bundles W1760 and W1770.
3. Work Package 2:
Get access into the main electronics compartment. Between the E2 and E3 rack support posts,
install the J2802 box assembly.
4. Work Package 3:
In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.
Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between
the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire
bundle W44.
In the flight and main electronics compartments, between the P6 disconnect panel and the J2802
box assembly, install the new wire bundles W1764 and W1774.
In the main electronics compartment, at the J2802 box assembly, install the time delay relays
R3318 and R3321.
Do a functional test of the fuel boost pumps to make sure the changed control system operates
correctly.
Group 14:
1. Work Package 1:
Change J2802 Box Assy if/as necessary.
In the J2802 box assembly, install the wire bundles W1760 and W1770.
2. Work Package 2:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
30 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 31

Get access into the main electronics compartment. Between the E2 and E3 rack support posts,
install the J2802 box assembly.
3. Work Package 3:
In the flight compartment, get access to the P5 overhead panel, P6 relay panel or P6 relay modules.
Above the P5 overhead panel, make a change to the wire bundles W36, W368 and W386. Between
the P6 disconnect panel and the fuel boost pump relays R54 and R55, make a change to the wire
bundle W44. Between the P6 disconnect panel and the fuel boost pump relays R146 and R147,
make a change to the wire bundle W44.
In the flight and main electronics compartments, between the P6 disconnect panel and the J2802
box assembly, install the new wire bundles W1764 and W1774.
In the main electronics compartment, at the J2802 box assembly, install the time delay relays
R3318 and R3321. At the J2802 box assembly, install the time delay relays R3327 and R3329.
Do a functional test of the fuel boost pumps to make sure the changed control system operates
correctly.
Revision 1: More work is necessary on the airplane(s) changed in accordance with the original issue
of this service bulletin. Operators that incorporated the original issue of this SB, have to change the
labels and wire termination in the J2802 relay box assembly for Figures 3, 4, 5, 6, 7, 8, 9, and 10.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
1-2, 2-2, 2-5737-100, 737-200, 737-200C
Group 2-3, 5, 7-10, 12-16, 18-19:
Affected Maintenance Zones
ZoneModel
1-2, 2-2, 2-5737-200
Group 4, 11, 17:
Affected Maintenance Zones
ZoneModel
1-2, 2-2, 2-5737-200, 737-200C
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
31 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 32

Group 6:
Affected Maintenance Zones
ZoneModel
1-2, 2-2, 2-5737-200C
E. Compliance
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2010-NM-189-AD, is
related to this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Group 1:
Boeing recommends that the change given in this service bulletin be done within 36 months after the
Revision 1 date of this service bulletin. Operators should tell Boeing about this modification to get the
engineering and accomplishment instructions.
Group 2-19:
Boeing recommends that the change given in this service bulletin be done within 36 months after the
Revision 1 date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
This SB has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft Certification
Office approves the installation of the automatic shutoff system for the center tank fuel pumps in
accordance with this service bulletin and the installation of a modified P5-2 Fuel System Module in
accordance with Service Bulletin 737-28A1210, Revision 1, as an alternative method of compliance
(AMOC) with the requirements of paragraph (a) of AD 2001-08-24. Compliance with the conditions of
this AMOC approval requires concurrent incorporation of the associated revisions to Airplane Flight
Manual Sections 1 and 3, and incorporation of Airworthiness Limitations (AWL) 28-AWL-21 in Boeing
document "737-100/200/200C/300/400/500 Airworthiness Limitations (AWLs) and Certification
Maintenance Requirements (CMRs), D6-38278-CMR," into the operator's maintenance documentation.
In order to operate a mixed fleet of airplanes, some having automatic shutoff installed and others without
automatic shutoff, it will be necessary to install a placard in the flight deck of airplanes that do not have
automatic shutoff installed to alert the crew that the procedures required by paragraph (a) of AD
2001-08-24 must be followed on that airplane. The placard should read as follows (alternative placard
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
32 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 33

wording may be used if approved by an appropriate FAA Principal Operations Inspector): "AD 2001-08-24
fuel usage restrictions required". If an operator would like to use a different method of placarding their
airplanes for operation as a mixed fleet, a request for approval of an AMOC should be submitted to
the Seattle Aircraft Certification Office. All provisions of AD 2001-08-24 that are not specifically referenced
in the above statement remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
— Time to cure the materials
— Time to find the tools.
Group 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
0.150.152Figure 72
1.201.201Figure 74
0.500.501Figure 76
0.600.601Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 21
--1Figure 36 (a)
3.803.801Figure 37
--2FIGURE 81(a)
8.2016.402Figure 55
7.6015.202Figure 61
2.302.301Figure 80
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
33 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 34

Group 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 3, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
0.150.152Figure 72
1.201.201Figure 74
0.500.501Figure 76
0.600.601Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 23
--1Figure 36 (a)
3.803.801Figure 38
--2Figure 81 (a)
8.2016.402Figure 59
7.6015.202Figure 62
2.302.301Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
34 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 35

Group 3, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 3, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
0.150.152Figure 72
1.201.201Figure 74
0.500.501Figure 76
0.600.601Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 23
--1Figure 36 (a)
3.803.801Figure 39
--2Figure 81 (a)
8.2016.402Figure 59
7.6015.202Figure 62
2.302.301Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
35 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 36

Group 3, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
(b) This figure shows label installation only.
Group 4, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 24
--1Figure 36 (a)
3.803.801Figure 40
--2Figure 54 (a)
8.2016.402Figure 55
7.6015.202Figure 61
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
36 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 37

Group 4, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 24
--1Figure 36 (a)
3.803.801Figure 41
--2Figure 54 (a)
8.2016.402Figure 55
7.6015.202Figure 61
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 5, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
37 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 38

Group 5, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 25
--1Figure 36 (a)
3.803.801Figure 42
--2Figure 54 (a)
8.2016.402Figure 55
7.6015.202Figure 61
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.35592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 5, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
38 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 39

Group 5, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 25
--1Figure 36 (a)
3.803.801Figure 43
--2Figure 54 (a)
8.2016.402Figure 55
7.6015.202Figure 61
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 6, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
39 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 40

Group 6, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 26
--1Figure 36 (a)
3.803.801Figure 42
--2Figure 54 (a)
8.2016.402Figure 59
7.6015.202Figure 62
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 6, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
40 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 41

Group 6, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
--2Figure 20 (a)
2.755.502Figure 26
--1Figure 36 (a)
3.803.801Figure 43
--2Figure 54 (a)
8.2016.402Figure 59
7.6015.202Figure 62
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 7, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
0.150.152Figure 72
1.201.201Figure 74
0.500.501Figure 76
0.600.601Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 27
--1Figure 36 (a)
3.803.801Figure 44
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
41 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 42

Group 7, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
--2Figure 81 (a)
8.2016.402Figure 59
7.6015.202Figure 61
2.302.301Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 7, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
0.150.152Figure 72
1.201.201Figure 74
0.500.501Figure 76
0.600.601Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 27
--1Figure 36 (a)
3.803.801Figure 45
--2Figure 81 (a)
8.2016.402Figure 59
7.6015.202Figure 61
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
42 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 43

Group 7, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.302.301Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 8, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
0.150.152Figure 72
1.201.201Figure 74
0.500.501Figure 76
0.600.601Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 22
--1Figure 36 (a)
3.803.801Figure 38
--2Figure 81 (a)
8.2016.402Figure 56
7.6015.202Figure 61
2.302.301Figure 80
0.650.651Figure 82
1.501.501Figure 66
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
43 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 44

Group 8, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 8, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
7.6015.202Figure 72
1.601.601Figure 74
1.001.001Figure 76
0.500.501Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 22
--1Figure 36 (a)
3.803.801Figure 39
--2Figure 81 (a)
8.2016.402Figure 56
7.6015.202Figure 61
1.751.751Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
44 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 45

Group 8, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 9, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
7.6015.202Figure 72
1.601.601Figure 74
1.001.001Figure 76
0.500.501Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 22
--1Figure 36 (a)
3.803.801Figure 38
--2Figure 81 (a)
8.2016.402Figure 57
7.6015.202Figure 61
1.751.751Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
45 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 46

Group 9, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
7.6015.202Figure 72
1.601.601Figure 74
1.001.001Figure 76
0.500.501Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 22
--1Figure 36 (a)
3.803.801Figure 39
--2Figure 81 (a)
8.2016.402Figure 57
7.6015.202Figure 61
1.751.751Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 10, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
46 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 47

Group 10, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
7.6015.202Figure 72
1.601.601Figure 74
1.001.001Figure 76
0.500.501Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 21
--1Figure 36 (a)
3.803.801Figure 38
--2Figure 81 (a)
8.2016.402Figure 58
7.6015.202Figure 61
1.751.751Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 10, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.500.501FIGURE 3 (b)
2.752.751FIGURE 68
2.802.801FIGURE 70
3.607.202Figure 4
3.607.202Figure 5
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
47 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 48

Group 10, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
7.6015.202Figure 72
1.601.601Figure 74
1.001.001Figure 76
0.500.501Figure 78
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 21
--1Figure 36 (a)
3.803.801Figure 39
--2Figure 81 (a)
8.2016.402Figure 58
7.6015.202Figure 61
1.751.751Figure 80
0.650.651Figure 82
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
53.0095.75TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 11, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
48 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 49

Group 11, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
--2Figure 20 (a)
2.755.502Figure 21
--1Figure 36 (a)
3.803.801Figure 38
--2Figure 54 (a)
8.2016.402Figure 55
7.6015.202Figure 61
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 11, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.150.151Figure 1
0.500.501Figure 3 (b)
3.607.202Figure 4
3.607.202Figure 5
0.150.151Figure 11
1.001.001Figure 12
1.001.001Figure 14
2.002.001Figure 15
0.500.501Figure 16
1.001.001Figure 18
1.501.501Figure 19
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
49 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 50

Group 11, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
--2Figure 20 (a)
2.755.502Figure 21
--1Figure 36 (a)
3.803.801Figure 39
--2Figure 54 (a)
8.2016.402Figure 55
7.6015.202Figure 61
1.501.501Figure 64
1.501.501Figure 66
4.0012.003Close Access
1.002.002Test
49.3592.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 12, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
3.607.202Figure 9
3.607.202Figure 10
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
50 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 51

Group 12, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.755.502Figure 30
2.304.602Figure 31
2.304.602Figure 32
--1Figure 46 (a)
3.803.801Figure 50
3.803.801Figure 52
--1FIGURE 81(a)
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
84.65154.80TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
Group 12, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
3.607.202Figure 9
3.607.202Figure 10
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
51 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 52

Group 12, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
--2Figure 29 (a)
2.755.502Figure 30
2.304.602Figure 31
2.304.602Figure 32
--1Figure 46 (a)
3.803.801Figure 51
3.803.801Figure 53
--1FIGURE 81 (a)
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
84.65154.80TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
Group 13:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
3.607.202Figure 9
3.607.202Figure 10
01.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
52 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 53

Group 13:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 30
2.304.602Figure 31
2.304.602Figure 32
--1Figure 46 (a)
3.803.801Figure 47
--1FIGURE 81
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
80.95151.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 13, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.082.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
3.607.202Figure 9
3.607.202Figure 10
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
53 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 54

Group 13, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 30
2.304.602Figure 31
2.304.602Figure 32
--1Figure 46 (a)
3.803.801Figure 48
--2FIGURE 81 (a)
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
80.95151.10TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label instal-
lation only.
Group 13, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
3.607.202Figure 9
3.607.202Figure 10
1.201.201FIGURE 76
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
54 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 55

Group 13, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 30
2.304.602Figure 31
2.304.602Figure 32
--1Figure 46 (a)
3.803.801Figure 49
--1FIGURE 81
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
74.45144.70TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 14, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
3.607.202Figure 9
3.607.202Figure 10
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
55 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 56

Group 14, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 33
2.304.602Figure 34
2.304.602Figure 35
--1Figure 46 (a)
3.803.801Figure 50
3.803.801Figure 52
--1FIGURE 81 (a)
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
84.65154.80TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 14, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7
3.607.202Figure 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
56 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 57

Group 14, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
3.607.202Figure 9
3.607.202Figure 10
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 33
2.304.602Figure 34
2.304.602Figure 35
--1Figure 46 (a)
3.803.801Figure 51
3.803.801Figure 53
--1FIGURE 81 (a)
16.3032.602Figure 60
15.1030.202Figure 63
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
84.65154.80TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
Group 15, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (b)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
57 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 58

Group 15, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
3.607.202Figure 7 (e)
3.607.202Figure 8
3.607.202Figure 9 (e)
3.607.202Figure 10
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 30
2.304.602Figure 31(b)
2.304.602Figure 32 (e)
--1Figure 46 (e)
3.803.801Figure 50
3.803.801Figure 52 (e)
--1FIGURE 81 (a)
16.3032.602Figure 60 (c)
15.1030.202Figure 63 (d)
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
84.65154.80TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) This figure shows label installation only.
(c) It is necessary to install wires W1764-004-20, W1764-005-20, and W1764-006-20 given
in this figure only if Auxiliary Fuel Tanks with Fuel Boost pumps are installed on the air-
plane.
(d) It is necessary to install wires W1774-004-20, W1774-005-20, and W1774-006-20 given
in this figure only if Auxiliary Fuel Tanks with Fuel Boost pumps are installed on the air-
plane.
(e) It is necessary to do the change given in this figure only if Auxiliary Fuel Tanks with Fuel
Boost pumps are installed on the airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
58 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 59

Group 15, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (e)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7 (b)
3.607.202Figure 8
3.607.202Figure 9 (b)
3.607.202Figure 10
1.201.201FIGURE 75
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 30
2.304.602Figure 31 (b)
2.304.602Figure 32 (b)
--1Figure 46 (a)
3.803.801Figure 51
3.803.801Figure 53 (b)
--1FIGURE 81 (a)
16.3032.602Figure 60 (c)
15.1030.202Figure 63 (d)
0.750.751FIGURE 83
1.501.501Figure 67
4.0012.003Close Access
1.002.002Test
84.65154.80TOTAL FOR EACH AIRPLANE
(a) This figure shows wire routes only. See the related wire connection figure for task hours.
(b) It is necessary to do the change given in this figure only if Auxiliary Fuel Tanks with Fuel
Boost pumps are installed on the airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
59 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

### Page 60

Group 15, Configuration 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
(c) It is necessary to install wires W1764-004-20, W1764-005-20, and W1764-006-20 given
in this figure only if Auxiliary Fuel Tanks with Fuel Boost pumps are installed on the airplane.
(d) It is necessary to install wires W1774-004-20, W1774-005-20, and W1774-006-20 given
in this figure only if Auxiliary Fuel Tanks with Fuel Boost pumps are installed on the airplane.
(e) This figure shows label installation only.
Group 16, Configuration 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
4.0012.003Open Access
0.600.601FIGURE 6 (e)
3.003.001FIGURE 69
2.802.801FIGURE 71
0.150.151FIGURE 73
3.607.202Figure 7 (b)
3.607.202Figure 8
3.607.202Figure 9 (b)
1.201.201FIGURE 76
0.500.501FIGURE 77
0.600.601FIGURE 79
2.302.301FIGURE 80
1.501.501Figure 28
--2Figure 29 (a)
2.755.502Figure 33
2.304.602Figure 34 (b)
2.304.602Figure 35 (b)
--1Figure 46 (a)
3.803.801Figure 50
3.803.801Figure 52 (b)
--1FIGURE 81 (a)
16.3032.602Figure 60 (c)
15.1030.202Figure 63 (c)
0.750.751FIGURE 83
1.501.501Figure 67
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: August 02, 2010
737-28A1228Revision 1: June 28, 2012
60 of 344
BOEING SERVICE BULLETIN 737-28A1228
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/737-28a1228/file/23281f081f24.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
