# Boeing Alert Service Bulletin 737-31A1332: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0487; AD 2015-16-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-31A1332](https://openairdocs.org/service-documents/boeing/737-31a1332.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 306
- PDF: https://openairdocs.org/files/sha256/3d/cc/3dcc59424b351d82982f10109f5c8d32a52d264a85e8fda8c1e9488443af184d
- Page: https://openairdocs.org/service-documents/boeing/737-31a1332/file/3dcc59424b35

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-31A1332
Original Issue: January 07, 2010
Revision 4: October 31, 2013
ATA System: 3100
SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the
Cabin Altitude Warning System and Takeoff Configuration Warning System Lights
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2010 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
1 of 306
7.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
2 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 7
Summary ..................................................... 1 1
1. PLANNING INFORMATION ........................................ 1 7
A. Effectivity ............................................... 1 7
1. Airplanes ............................................ 1 7
2. Spares Affected ........................................ 3 3
B. Concurrent Requirements ...................................... 3 3
C. Reason ................................................ 3 4
D. Description .............................................. 3 5
E. Compliance .............................................. 3 8
F. Approval ............................................... 3 9
G. Manpower .............................................. 3 9
H. Weight and Balance Changes .................................... 6 3
I. Electrical Load Data ......................................... 6 4
J. References .............................................. 6 4
1. Existing Data: ......................................... 6 4
2. Data Supplied with this Service Bulletin: ........................... 6 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 6 5
K. Publications Affected ........................................ 6 5
L. Interchangeability and Intermixability of Parts ........................... 6 6
M. Software Accomplishment Summary ................................ 6 6
2. MATERIAL INFORMATION ........................................ 6 7
A. Material - Price and Availability ................................... 6 7
B. Industry Support Information .................................... 7 5
C. Parts Necessary for Each Airplane ................................. 7 5
1. Kits/Parts ............................................ 7 5
2. Parts and Materials Supplied by the Operator ........................ 9 0
3. Parts Modified and Reidentified ................................ 9 1
4. Parts Removed and Not Replaced .............................. 9 4
D. Parts Necessary to Change Spares ................................. 9 4
E. Special Tooling - Price and Availability ............................... 9 4
F. Special Tooling Necessary to do this Service Bulletin ....................... 9 4
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 9 5
A. GENERAL INFORMATION ..................................... 9 5
B. WORK INSTRUCTIONS ....................................... 9 6
FIGURE 1: FLIGHT COMPARTMENT - P1-3 PANEL MODIFICATION [Group 1-6, 8-12, 16-18, 20, 22-33]
................................................. 1 3 0
FIGURE 2: FLIGHT COMPARTMENT - P3-1 PANEL MODIFICATION [Group 1-6, 8-12, 16-18, 20, 22-33]
................................................. 1 3 2
FIGURE 3: FLIGHT COMPARTMENT - P1-3 AND P3-1 PANELS - PANELS MODIFICATION AND INOP
MARKERS REMOVAL [Group 7, 13-15, 19, 21] ...................... 1 3 4
FIGURE 4: FLIGHT COMPARTMENT - P6-2 CIRCUIT BREAKER PANEL - C01698 CIRCUIT BREAKER
INSTALLATION ........................................ 1 3 6
FIGURE 5: P1-3 AND P3-1 PANELS - W0001 AND W0003 WIRE BUNDLES ROUTING [Group 1-6, 8-12,
16-18, 20, 22-33] ....................................... 1 3 8
FIGURE 6: CHANGES TO THE W0001 WIRE BUNDLE [Group 1-3, 5-6, 8-12, 16-18, 20, 22-33] . . 139
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
3 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 4

FIGURE 7: CHANGES TO THE W0001 WIRE BUNDLE [Group 4] ................... 1 4 1
FIGURE 8: CHANGES TO THE W0003 WIRE BUNDLE [Group 1-6, 8-12, 16-18, 20, 22-33] ..... 1 4 3
FIGURE 9: W2508, W5156 AND W5514 WIRE BUNDLES ROUTING [Group 1-6, 22-29] ...... 1 4 5
FIGURE 10: CHANGES TO THE W2508 WIRE BUNDLE [Group 5, 28] ................. 1 5 5
FIGURE 11: CHANGES TO THE W2508 WIRE BUNDLE [Group 1-4, 6, 22-27, 29] .......... 1 5 7
FIGURE 12: CHANGES TO THE W5156 WIRE BUNDLE [Group 1, 5-6, 22-23] ............ 1 5 9
FIGURE 13: CHANGES TO THE W5156 WIRE BUNDLE [Group 3] ................... 1 6 3
FIGURE 14: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 4] ........... 1 6 7
FIGURE 15: CHANGES TO THE W5514 WIRE BUNDLE [Group 1-6, 22-29] .............. 1 7 2
FIGURE 16: W0040 AND W0054 WIRE BUNDLES ROUTING [Group 1-5, 7-10, 12-28, 30-31, 33] . . 174
FIGURE 17: CHANGES TO THE W0040 WIRE BUNDLE [Group 1-5, 7-10, 12-28, 30-31, 33] ..... 1 7 8
FIGURE 18: W0040 AND W0054 WIRE BUNDLES ROUTING [Group 6, 11, 29, 32] .......... 1 8 0
FIGURE 19: CHANGES TO THE W0040 WIRE BUNDLE [Group 6, 11, 29, 32] ............ 1 8 4
FIGURE 20: CHANGES TO THE W0054 WIRE BUNDLE ........................ 1 8 6
FIGURE 21: E1-1 ELECTRONICS SHELF - W0111 WIRE BUNDLE ROUTING ............ 1 8 8
FIGURE 22: CHANGES TO THE W0111 WIRE BUNDLE [Group 1-25, 27-33] ............. 1 8 9
FIGURE 23: W2103 WIRE BUNDLE ROUTING .............................. 1 9 1
FIGURE 24: CHANGES TO THE W2103 WIRE BUNDLE ........................ 1 9 6
FIGURE 25: CHANGES TO THE W5156 WIRE BUNDLE [Group 7] ................... 1 9 8
FIGURE 26: CHANGES TO THE W5514 WIRE BUNDLE [Group 7] ................... 2 0 2
FIGURE 27: FORWARD ELECTRONICS COMPARTMENT CEILING - CABIN ALTITUDE WARNING - CABIN
HIGH ALTITUDE WARNING SWITCH (12,650 SET POINT) INSTALLATION [Group 8-9, 11,
13-14, 16-18, 30-32] ..................................... 2 0 3
FIGURE 28: FORWARD ELECTRONICS COMPARTMENT CEILING - CABIN ALTITUDE WARNING - CABIN
HIGH ALTITUDE WARNING SWITCH (14,000 SET POINT) INSTALLATION [Group 10, 20]
................................................. 2 0 6
FIGURE 29: P5-16 CABIN ALTITUDE AND RATE OF CLIMB MODULE - REMOVAL [Group 8-20, 30-33]
................................................. 2 0 9
FIGURE 30: P5-16 CABIN ALTITUDE AND RATE OF CLIMB MODULE - INSTALLATION [Group 8-20, 30-33]
................................................. 2 1 1
FIGURE 31: P5-10 AIR CONDITIONING PANEL - REPLACEMENT [Group 8, 10-11, 13, 16-17, 20, 31-32]
................................................. 2 1 3
FIGURE 32: P5-10 AIR CONDITIONING PANEL - REPLACEMENT [Group 9, 14, 18, 30] ....... 2 1 5
FIGURE 33: W2508, W5156 AND W5514 WIRE BUNDLES ROUTING [Group 8-21, 30-33] ...... 2 1 7
FIGURE 34: CHANGES TO THE W2508 WIRE BUNDLE [Group 8-11, 16, 30-32] ........... 2 2 8
FIGURE 35: CHANGES TO THE W2508 WIRE BUNDLE [Group 12, 33] ................ 2 3 2
FIGURE 36: CHANGES TO THE W2508 WIRE BUNDLE [Group 13-14] ................ 2 3 4
FIGURE 37: CHANGES TO THE W2508 WIRE BUNDLE [Group 15, 19, 21] .............. 2 3 8
FIGURE 38: CHANGES TO THE W5156 WIRE BUNDLE [Group 8-12, 20] ............... 2 4 0
FIGURE 39: CHANGES TO THE W5156 WIRE BUNDLE [Group 13-15, 21] .............. 2 4 4
FIGURE 40: CHANGES TO THE W5514 WIRE BUNDLE [Group 8-9, 11, 16, 30-32] .......... 2 4 8
FIGURE 41: CHANGES TO THE W5514 WIRE BUNDLE [Group 12, 33] ................ 2 5 0
FIGURE 42: CHANGES TO THE W5514 WIRE BUNDLE [Group 13-14] ................ 2 5 2
FIGURE 43: CHANGES TO THE W5514 WIRE BUNDLE [Group 15, 19, 21] .............. 2 5 4
FIGURE 44: CHANGES TO THE W2508 WIRE BUNDLE [Group 17-18, 20] .............. 2 5 5
FIGURE 45: CHANGES TO THE W5514 WIRE BUNDLE [Group 17-18] ................ 2 5 9
FIGURE 46: CHANGES TO THE W5156 WIRE BUNDLE [Group 19] .................. 2 6 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
4 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 5

FIGURE 47: CHANGES TO THE W5514 WIRE BUNDLE [Group 10, 20] ................ 2 6 5
FIGURE 48: CHANGES TO THE W2218 WIRE BUNDLE [Group 1, 3, 5-15, 19-21, 26] ........ 2 6 7
FIGURE 49: CHANGES TO THE W2218 AND W2135 WIRE BUNDLES [Group 22] .......... 2 6 9
FIGURE 50: CHANGES TO THE W2218 AND W2589 WIRE BUNDLES [Group 23] .......... 2 7 1
FIGURE 51: W5156 AND W5514 WIRE BUNDLES ROUTING [Group 7] ................ 2 7 3
FIGURE 52: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 2, 24-25, 28-29] . . . 284
FIGURE 53: CHANGES TO THE W5156 WIRE BUNDLE [Group 26] .................. 2 8 9
FIGURE 54: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 27] .......... 2 9 3
FIGURE 55: CHANGES TO THE W5156 AND W2114 WIRE BUNDLES [Group 16-18, 30-33] .... 2 9 8
FIGURE 56: CHANGES TO THE W0111 WIRE BUNDLE [Group 26] .................. 3 0 2
APPENDIX A: P1-3, P3-1, P5-10 AND P5-16 PANELS - PART NUMBERS ................ 3 0 4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
5 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 6

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
6 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT
BLANK PAGE

### Page 7

Commercial 
Airplanes
737
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 737-31A1332Original Issue: January 07, 2010
Revision 4: October 31, 2013
ATA System: 3100
SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the
Cabin Altitude Warning System and Takeoff Configuration Warning System Lights
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-02-05 is related to this service bulletin.
No more work is necessary on the airplane(s) changed in accordance with Revision 1, Revision 2 and Revision
3 of this service bulletin.
Airplanes YA091-YA097 were added to Group 1 of this service bulletin effectivity.
REASON FOR REVISION
This revision is sent to advise operators of several changes to the service bulletin. Airplanes YA091-YA097
were added to Group 1 of this service bulletin effectivity because they were incorrectly removed from Revision
3. The airplane YG001 has been moved from Group 2 to Group 31. Manpower estimates have changed to
include an additional time for the removal of the drip shield, the airstair assembly and the airstair door for airplanes
that have airstairs installed. A new BAE Systems component service bulletin 233A2222-31-06 has been added.
For Group 15, 19 and 21 airplanes, FIGURE 37 and FIGURE 43 have been changed because these airplanes
do not need to install the R1044 and the associated wiring. FIGURE 34, 36 and 44 have been changed to add
the W2508-0032-22 wire. Also, the FAA Airworthiness Directive AD 2013-02-05 has been added to the service
bulletin.
These sections were changed:
1. In Summary, Action and Paragraph 1.D., Description, added a separate set of instructions for Group
2, 4, 16-18, 24-25, 27-33 airplanes.
2. In Summary, Background, added a summary evaluation table.
3. In Summary, Compliance and Paragraph 1.E., Compliance, added the AD 2013-02-05.
4. In Summary, Manpower and in Paragraph 1.G., Manpower, changed a note to add a new BAE Systems
SB 233A2222-31-06.
5. In Summary, Manpower and in Paragraph 1.G., Manpower, changed Group 16 information.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
7 of 306

### Page 8

6. In Paragraph 1.A., Effectivity, added airplanes YA091-YA097 because they were incorrectly removed
from Revision 3. Also, the airplane YG001 has been moved from Group 2 to Group 31.
7. In Paragraph 1.F., Approval, added AMOC paragraph.
8. In Paragraph 1.G., Manpower, Group 26 table, added FIGURE 48.
9. In Paragraph 1.G., Manpower, added a table for airplanes that have airstairs installed.
10. In Paragraph 1.J.1., Existing Data, added AMM, AD references and BAE Systems SB 233A2222-31-06.
Also, changed SWPM references.
11. In Paragraph 1.K., Publications Affected, changed CMM reference.
12. In Paragraph 2.A., Material - Price and Availability, Group 5, 28 airplanes table, changed note (c).
13. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, added BAE Systems SB
233A2222-31-06 and the SWPM reference.
14. In Paragraph 2.C.2., Parts and Materials Supplied by the Operator, changed (e), (f) and (i) notes.
15. In Paragraph 2.C.3., Parts Modified and Reidentified and APPENDIX A, added BAE Systems SB
233A2222-31-06.
16. In Paragraph 3.A., General Information, added notes.
17. In Paragraph 3.B., Work Instructions, step 9, changed a note and added the Group 26 applicability.
18. In Paragraph 3.B., Work Instructions, step 1 (high altitude configuration), added a note with open access
instructions.
19. In Paragraph 3.B., Work Instructions, added step 15 (basic configuration) for Group 28 airplanes.
20. In Paragraph 3.B., Work Instructions, steps 19 (Group 8-9, 11), 21 (Group 10) and 29 (Group 20),
changed the figure reference for the W5156 wire bundle from FIGURE 12 to FIGURE 38.
21. In Paragraph 3.B., Work Instructions, steps 20 (Group 30-32), 26 (Group 16) and 27 (Group 17-18),
changed the figure reference for the W5156 wire bundle from FIGURE 52 to FIGURE 55.
22. In Paragraph 3.B., Work Instructions, step 23 (Group 13-14), changed the figure reference for the
W5156 wire bundle from FIGURE 25 to FIGURE 39.
23. In Paragraph 3.B., Work Instructions, steps 20, 21 (basic configuration) and 14, 15 (high altitude
configuration), added a note to say that the removal of the forward galley might be necessary to get
access to the wiring shown in FIGURE 16 and FIGURE 18.
24. In Paragraph 3.B., Work Instructions, steps 12-19, 25 (basic configuration) and 19-29 (high altitude
configuration), added a note to say that for airplanes that have airstairs installed, it is necessary to
remove the drip shield, the airstair assembly and the airstair door to get access to the wiring shown in
FIGURE 9, FIGURE 51 and FIGURE 33.
25. In Paragraph 3.B., Work Instructions, steps 29.i (basic configuration) and 32.i (high altitude configuration),
changed the text.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
8 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 9

26. In FIGURE 2, added BAE Systems SB 233A2222-31-06.
27. In FIGURE 34, 36 and 44, changed the illustration and flag note table to add the W2508-0032-22 wire.
This is because all airplanes that get the High Altitude configuration, must have the warning lights
connected to the pin 9 of the P5-16 panel.
28. In FIGURE 37, changed the illustration and deleted the flag note 5.
29. In FIGURE 40, 42, 45 and 47, changed the illustrations.
30. In FIGURE 43, changed the illustration and deleted the flag note 1.
31. In FIGURE 53, added a note.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
January 07, 2010Original Issue:
June 24, 2010Revision 1:
August 18, 2011Revision 2:
March 28, 2012Revision 3:
October 31, 2013Revision 4:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
9 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 10

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
10 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT
BLANK PAGE

### Page 11

Commercial 
Airplanes
737
Service Bulletin
ALERT
SummaryNumber: 737-31A1332Original Issue: January 07, 2010
Revision 4: October 31, 2013
ATA System: 3100
SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the
Cabin Altitude Warning System and Takeoff Configuration Warning System Lights
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
This service bulletin gives instructions to remove and replace the P1-3 and P3-1 instrument panels in the flight
compartment with panels that include two warning level indicator lights. These indicator lights read "TAKEOFF
CONFIG" and "CABIN ALTITUDE". The installation of these lights will provide a visual indication to the flight
crew in addition to the existing aural warning horn for cabin altitude and takeoff configuration alerts. The visual
warning lights are intended to provide an additional indication to crews to prepare a correct takeoff configuration,
respond to excessive cabin altitude and avoid confusion between the takeoff configuration and cabin altitude
alerts. An unrecognized incorrect takeoff configuration or excessive cabin altitude could prevent a continued
safe flight and landing.
Fleet Team Digest (FTD) 737NG-FTD-31-06004 is related to this service bulletin.
Boeing Service Related Problem (SRP) 737-SRP-31-0042 is related to this service bulletin.
NOTE: Operators may wish to incorporate service bulletin 737-21-1165 concurrently with this service bulletin
due to common access requirements.
As a part of a service bulletin validation program, this change was completed on airplane YA010 by Service
Bulletin 737-31A1332 Original Issue before the release of Revision 1 of this service bulletin. The change
completed on airplane YA010 by Service Bulletin 737-31A1332 Original Issue is equivalent to the release of
Revision 1 of this service bulletin. Airplane YA010 has the configuration of a Group 1 airplane.
As a part of a service bulletin validation program, this change was completed on airplane YG035 by Service
Bulletin 737-31A1332 Revision 1 before the release of Revision 2 of this service bulletin. The change completed
on airplane YG035 by Service Bulletin 737-31A1332 Revision 1 is equivalent to the release of Revision 2 of this
service bulletin. Airplane YG035 has the configuration of a Group 8 airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
11 of 306

### Page 12

This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedYesSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedYesAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 38275-118S)
Group 1, 3, 5-6, 8-12, 20, 26:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the "TAKEOFF
CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and W0003 wire bundles.
Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit breaker C01698. Change the
W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics
shelf, change the W0111 wire bundle. Change the W2103 wire bundle. Change the W2218 wire bundle.
Group 8-11, 16-18, 20, 30-32:
In the flight compartment, replace the existing P5-16 and P5-10 panels. At the lower forward fuselage, open the
Forward Access Door 112A to get access into the area forward of the nose landing gear wheel well. On the
ceiling of the forward electronics compartment, install the cabin high altitude warning switch S1172.
Group 12, 33:
In the flight compartment, replace the existing P5-16 panel.
Group 7, 13-15, 19, 21:
Get access to the flight compartment. Remove the INOP markers from the "TAKEOFF CONFIG" and "CABIN
ALTITUDE" indicator lights and replace the "TAKEOFF CONFIG" lights on the P1 and P3 panels. On the P6-2
panel, install a new circuit breaker C01698. Change the W5156 and W5514 wire bundles. Change the W0040
and W0054 wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103
wire bundle. Change the W2218 wire bundle.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
12 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 13

Group 13-14:
In the flight compartment, replace the existing P5-16 and P5-10 panels. At the lower forward fuselage, open the
Forward Access Door 112A to get access into the area forward of the nose landing gear wheel well. On the
ceiling of the forward electronics compartment, install the cabin high altitude warning switch S1172. Change the
W2508 wire bundle.
Group 15, 19:
In the flight compartment, replace the existing P5-16 panel. Change the W2508 wire bundle.
Group 22:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the "TAKEOFF
CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and W0003 wire bundles.
Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit breaker C01698. Change the
W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics
shelf, change the W0111 wire bundle. Change the W2103 wire bundle. Change the W2218 and W2135 wire
bundles.
Group 23:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the "TAKEOFF
CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and W0003 wire bundles.
Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit breaker C01698. Change the
W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics
shelf, change the W0111 wire bundle. Change the W2103 wire bundle. Change the W2218 and W2589 wire
bundles.
Group 2, 4, 16-18, 24-25, 27-33:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the "TAKEOFF
CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and W0003 wire bundles.
Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit breaker C01698. Change the
W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics
shelf, change the W0111 wire bundle. Change the W2103 wire bundle.
Do a test of the "TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights.
EFFECTIVITY
737-600/-700/-700C/-800/-900/-900ER Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected
airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-02-05 is related to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 36 months after the effective
date of AD 2013-02-05.
INDUSTRY SUPPORT INFORMATION
Group 1-6, 8-12, 16-18, 20, 22-33:
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
13 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 14

Group 7, 13-15, 19, 21:
Boeing warranty remedies are available for airplanes in warranty as of February 28, 2008. Please refer to
Paragraph 2.B., Industry Support Information.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
38.8566.00Group 1, 3, 22 and 23
36.0563.20Group 4
36.3063.70Group 2
39.0066.30Group 5
36.1566.10Group 6
20.6033.30Group 7
48.5583.15Groups 8, 9, 10, 11
42.2572.30Group 12
30.2048.00Groups 13 and 14
24.1537.00Group 15
46.7082.25Group 16
46.4078.85Groups 17, 18 and 20
27.9541.70Group 19
23.6536.50Group 21
37.7566.60Group 24, 25, 27
37.8066.70Group 26
37.8566.70Group 28, 29
46.4581.75Group 30, 31
46.5581.85Group 32
39.3069.20Group 33
4.00(a)8.00(a)Airplanes with airstairs
(a) Add estimates given to the total time shown for each Group to calcu-
late the revised total time required.
The time to change the P1-3 instrument panel as given in Service Bulletins BAE Systems SB 233A2221-31-01,
BAE Systems SB 233A2221-31-02, BAE Systems SB 233A2221-31-03 and BAE Systems SB 233A2221-31-05,
and the P3-1 instrument panel as given in Service Bulletins BAE Systems SB 233A2222-31-01, BAE Systems
SB 233A2222-31-02, BAE Systems SB 233A2222-31-03, BAE Systems SB 233A2222-31-05 and BAE Systems
SB 233A2222-31-06 is not included.
Group 21, Configuration 2:
The time to replace the P5-16 panel as given in Boeing Service Bulletin 737-21-1171 is not included.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
14 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 15

The time to change the P5-16 and P5-10 panels as given in Service Bulletins BAE Systems SB 233A3213-21-01
and BAE Systems SB 69-37319-31-05 is not included.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
15 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 16 (OCR)

BOEING SERVICE BULLETIN 737-31A1332
ALERT  ALERT
GROUP 7, 13, 14, 15, 19:
- REMOVÉ THE INOP MARKERS
FROM THE "TAKEOFF CONFIG" AND
"CABIN ALTITUDE" INDICATOR LIGHTS
- REPLACE THE "TAKEOFF CONFIG" LIGHTS
GROUPS 1-6, 8-12, 16-18, 20, 22-33:
P1-3 PANEL:
- CHANGE THE PANEL TO INSTALL
THE "TAKEOFF CONFIG" AND
"CABIN ALTITUDE" LIGHTS
- CHANGE WIRE BUNDLE W0003
GROUPS 8-20, 31-33:
- REPLACE P5-16 PANEL
GROUPS 8-11, 13-14, 16-18, 20, 31-32:
- REPLACE P5-10 PANEL
GROUPS 1-6, 8-12, 16-18, 20, 22-33:
P3-1 PANEL
- CHANGE THE PANEL TO
INSTALL THE "TAKEOFF CONFIG"
AND "CABIN ALTITUDE" LIGHTS
- CHANGE WIRE BUNDLE W0001
P6-2 PANEL:
INSTALL A NEW CIRCUIT
BREAKER C01698  CONDUIT:
CHANGE WIRE BUNDLES  CHANGE WIRE BUNDLES
WO040, W0054  W2508, W5156, W5514
AP0600B DISCONNECT  P5 AFT OVERHEAD PANEL:
BRACKET:  CHANGE WIRE BUNDLES
- CHANGE WIRE  W2508, W5156, W5514
BUNDLE W2103.
M2061  E1-1 ELECTRONICS
PROXIMITY SWITCH  SHELF:
ELECTRONIC UNIT  - CHANGE WIRE
BUNDLE W0111
AP0900A DISCONNECT
BRACKET:
- CHANGE WIRE BUNDLES
W5156, W5514  AE0101B DISCONNECT
BRACKET
GROUPS 8-11, 13-14, 16-18,
20, 31-32:
- INSTALL THE HIGH ALTITUDE
WARNING SWITCH S1172  GROUPS 8-11, 13-14, 16-18,
- CHANGE WIRE BUNDLE W5514  20, 31-32:  1798114
Original Issue: January 07, 2010
Revision 4: October 31, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  737-31A1332
Work - See page 1 for details.  16 of 306

### Page 17

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-31A1332
Original Issue: January 07, 2010
Revision 4: October 31, 2013
ATA System: 3100
SUBJECT: INDICATING / RECORDING SYSTEMS - Aural Warning System - Installation of the
Cabin Altitude Warning System and Takeoff Configuration Warning System Lights
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 38275-118S for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes with different wire configuration.-1
BBJ airplanes.-2
BBJ airplanes with an operative HGS Annunciator Panel.1
BBJ airplanes with an inoperative HGS Annunciator Panel.2
Airplanes with different wire configuration.-3
Airplanes with different wire configuration.-4
Airplanes with different wire configuration.-5
Airplanes with different wire configuration.-6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
17 of 306

### Page 18

DESCRIPTIONCONFIGURATIONGROUP
Airplanes with different wire configuration.-7
737-700 airplanes with the high altitude landing option and different
wire configuration.
-8
737-800/-900 airplanes with the high altitude landing option and
different wire configuration.
-9
737-700 airplanes with the high altitude landing option and different
wire configuration.
-10
737-700 airplanes with the high altitude landing option and different
wire configuration.
-11
Airplanes with the high altitude landing option and different wire
configuration.
-12
737-700 airplanes with the high altitude landing option and different
wire configuration.
-13
737-800/-900 airplanes with the high altitude landing option and
different wire configuration.
-14
Airplanes with the high altitude landing option and different wire
configuration.
-15
737-700 airplanes with the high altitude landing option and different
wire configuration.
-16
737-700 airplanes with the high altitude landing option and different
wire configuration.
-17
737-800 airplanes with the high altitude landing option and different
wire configuration.
-18
Airplanes with the high altitude landing option and different wire
configuration.
-19
Airplanes with the high altitude landing option and different wire
configuration.
-20
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
18 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 19

DESCRIPTIONCONFIGURATIONGROUP
Airplanes with the high altitude landing option and different wire
configuration.
-21
Airplanes that have accomplished the concurrent service bulletin
737-21-1171.
1
Airplanes that have not accomplished the concurrent service bulletin
737-21-1171.
2
Airplanes with different wire configuration.-22
Airplanes with different wire configuration.-23
Airplanes with different wire configuration within line number 1-740
range.
-24
Airplanes with different wire configuration within line number 1-740
range.
-25
Airplanes with different wire configuration within line number 1-740
range.
-26
Airplanes with different wire configuration within line number 1-740
range.
-27
Airplanes with different wire configuration within line number 1-740
range.
-28
Airplanes with different wire configuration within line number 1-740
range.
-29
Airplanes with different wire configuration within line number 1-740
range.
-30
Airplanes with different wire configuration within line number 1-740
range.
-31
Airplanes with different wire configuration within line number 1-740
range.
-32
Airplanes with different wire configuration within line number 1-740
range.
-33
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900, 737-900ER
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
19 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 20

GroupVariable Number
4YA001 - YA008
24YA009 - YA090
1YA091 - YA099
1YA101 - YA199
27YA201 - YA202
24YA203 - YA208
1YA209 - YA211
1YA221
27YA231 - YA235
24YA236 - YA242
3YA251
24YA252 - YA254
1YA255 - YA256
24YA271 - YA272
24YA291
27YA301
24YA302
24YA311 - YA314
24YA321 - YA323
1YA336 - YA345
1YA351
1YA356 - YA357
1YA366 - YA367
1YA371 - YA377
16YA501 - YA536
24YA541 - YA548
1YA549 - YA552
23YA571 - YA572
24YA573 - YA578
24YA601 - YA612
1YA613 - YA615
24YA621 - YA622
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
20 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 21

GroupVariable Number
24YA626
1YA627 - YA629
12YA630
1YA631
1YA635 - YA636
1YA641 - YA642
1YA645 - YA650
1YA656 - YA659
1YA666 - YA667
1YA671 - YA672
29YA681 - YA683
6YA684 - YA687
1YA688 - YA691
24YA701 - YA706
1YA707 - YA710
24YA721 - YA722
24YA731 - YA733
1YA734
24YA751 - YA754
31YA755 - YA756
24YA801 - YA803
1YA809
33YA811 - YA814
24YA831 - YA834
1YA835
24YA841 - YA853
1YA854 - YA862
24YA881 - YA882
24YA891 - YA892
31YA961
17YA962 - YA963
31YA964 - YA966
8YA967 - YA978
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
21 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 22

GroupVariable Number
24YB001 - YB006
24YB101 - YB103
1YB104 - YB132
24YB151 - YB153
1YB156 - YB158
1YB161 - YB164
1YB171 - YB172
12YB181 - YB184
24YB201
1YB202 - YB208
1YB271
1YB276
1YB301 - YB310
1YB371 - YB392
6YB501 - YB502
1YB521 - YB526
1YB541 - YB544
1YB551
1YB561 - YB570
12YB571 - YB580
1YB581 - YB598
1YB601 - YB632
1YB651
1YB656
1YB671 - YB672
1YB851 - YB863
1YB871 - YB874
1YB881 - YB893
1YB901 - YB903
1YB911
1YB961 - YB967
7YB968 - YB974
7YB986 - YB987
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
22 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 23

GroupVariable Number
27YC001 - YC003
24YC004 - YC022
1YC023 - YC030
24YC051 - YC064
1YC065 - YC070
24YC071 - YC080
1YC081 - YC084
1YC091 - YC094
24YC101 - YC103
1YC104
24YC111 - YC112
1YC113
24YC121
24YC126 - YC127
24YC136 - YC141
24YC146
1YC147
1YC151 - YC156
1YC166 - YC171
1YC176 - YC178
7YC179
1YC186 - YC190
1YC201 - YC203
1YC206 - YC207
24YC301 - YC303
1YC304 - YC305
18YC321 - YC325
30YC326 - YC363
18YC364 - YC366
30YC367
18YC368 - YC373
30YC374 - YC378
9YC379 - YC380
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
23 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 24

GroupVariable Number
24YC381 - YC382
1YC383 - YC387
24YC391
1YC392 - YC394
24YC396
24YC401 - YC410
1YC411 - YC417
1YC421 - YC422
1YC426 - YC428
1YC436 - YC439
24YC441 - YC445
1YC446 - YC448
24YC451 - YC455
1YC459
24YC461 - YC466
1YC467
24YC471 - YC483
1YC484 - YC499
24YC501 - YC522
1YC523 - YC526
24YC571 - YC581
1YC582 - YC583
24YC587
1YC588 - YC589
24YC591 - YC593
24YC601 - YC624
1YC625 - YC655
24YC681 - YC696
24YC701 - YC711
1YC712 - YC715
24YC720 - YC721
1YC722 - YC725
1YC727 - YC730
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
24 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 25

GroupVariable Number
24YC731 - YC736
1YC737 - YC749
7YC750
24YC751 - YC752
24YC761 - YC770
24YC781 - YC793
25YC801 - YC851
22YC852 - YC892
24YC901 - YC903
1YC904 - YC905
24YC906
1YC907
1YC921 - YC922
24YC931 - YC932
24YC941 - YC947
1YC948 - YC951
24YC971 - YC973
1YC974 - YC978
24YC981 - YC983
24YD001 - YD005
1YD006 - YD007
24YD021 - YD024
1YD025
24YD041 - YD050
1YD051 - YD057
24YD081 - YD083
1YD084
24YD101 - YD104
1YD105 - YD110
24YD121 - YD123
1YD124 - YD126
1YD151 - YD159
1YD171 - YD172
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
25 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 26

GroupVariable Number
1YD201 - YD203
1YD206 - YD209
1YD216 - YD219
1YD251 - YD254
1YD256 - YD257
1YD261
26YD301 - YD334
1YD391
9YD401 - YD410
9YD412 - YD414
15YD415
1YD481 - YD485
1YD491 - YD499
24YD501 - YD502
1YD503 - YD512
1YD531 - YD535
1YD541 - YD547
1YD561 - YD564
1YD571 - YD572
1YD591 - YD595
9YD601 - YD612
1YD651 - YD655
24YE001 - YE020
24YE051
24YE101 - YE109
24YE151 - YE156
1YE157
24YE171 - YE172
1YE201 - YE206
1YE301 - YE305
1YE321 - YE326
1YE371 - YE383
7YF001
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
26 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 27

GroupVariable Number
7YF021 - YF026
7YF051 - YF052
7YF086
7YF106 - YF107
7YF111
7YF176 - YF178
31YG001
2YG002 - YG018
31YG019
2YG020 - YG023
31YG024 - YG038
8YG039 - YG044
31YG061 - YG064
31YG066 - YG073
32YG074
31YG075
8YG076 - YG080
11YG081
8YG082 - YG083
11YG084
8YG085 - YG089
8YG091 - YG093
10YG094
8YG095 - YG099
20YG101 - YG103
8YG111 - YG112
13YG113 - YG114
8YG116 - YG117
13YG118 - YG120
8YG201 - YG205
8YG211 - YG214
1YG251 - YG252
28YG501 - YG503
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
27 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 28

GroupVariable Number
5YG504 - YG509
5YG601 - YG602
15YG701
7YG711
1YH001 - YH004
7YH005 - YH012
7YH051 - YH054
14YH101 - YH113
21YH114 - YH115
7YH201 - YH202
7YH206 - YH207
14YH301
1YJ001 - YJ002
12YJ003 - YJ008
15YJ009 - YJ010
1YJ011 - YJ013
1YJ021
1YJ471 - YJ480
9YJ501 - YJ517
9YJ531 - YJ558
14YJ559 - YJ565
21YJ566 - YJ568
9YJ591 - YJ594
14YJ595 - YJ597
1YJ631 - YJ632
1YJ671 - YJ694
1YJ801 - YJ867
1YJ871 - YJ872
7YJ873 - YJ875
1YJ901 - YJ903
7YJ904
7YJ908
1YJ911 - YJ928
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
28 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 29

GroupVariable Number
7YJ929
1YJ931 - YJ936
7YJ937
1YJ941 - YJ951
7YJ952 - YJ956
1YJ976 - YJ977
1YK001 - YK007
1YK101 - YK104
1YK111 - YK112
1YK121 - YK122
1YK131 - YK132
7YK133
1YK136 - YK139
1YK141 - YK142
1YK146 - YK148
1YK151 - YK154
1YK161 - YK166
7YK167
7YK171
7YK176
1YK301 - YK307
7YK308 - YK309
1YK321 - YK334
7YK335 - YK339
1YK361 - YK371
7YK372 - YK375
1YK401 - YK406
1YK426 - YK427
1YK431 - YK450
1YK456 - YK460
1YK476
1YK480 - YK484
7YK485
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
29 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 30

GroupVariable Number
7YK495
1YK511 - YK514
7YK515 - YK516
7YK521 - YK523
1YK551 - YK565
7YK566 - YK570
1YK571
1YK576 - YK577
1YK580 - YK584
7YK585
1YK601 - YK602
1YK606 - YK607
1YK611 - YK614
7YK615 - YK616
1YK621 - YK625
7YK626 - YK627
1YK631 - YK633
7YK634
1YK641 - YK642
7YK643 - YK644
1YK651 - YK657
7YK658 - YK661
7YK671
1YK701 - YK707
7YK708 - YK712
1YK716 - YK717
7YK718 - YK719
1YK721 - YK734
7YK735 - YK741
7YK751 - YK761
1YK791 - YK792
1YK796 - YK797
1YK801 - YK848
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
30 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 31

GroupVariable Number
7YK849 - YK887
1YK901 - YK910
7YK911
7YK918
1YK921
7YK922 - YK927
1YK941 - YK947
7YK948 - YK953
1YK961 - YK968
7YK969 - YK971
1YK981 - YK982
7YK983 - YK985
1YL001 - YL005
1YL011 - YL015
7YL016
1YL021 - YL023
7YL024
1YL051 - YL052
1YL056 - YL057
1YL061
1YL066
7YL067 - YL069
7YL076 - YL077
1YL101
7YL102 - YL117
1YL201 - YL202
7YL203 - YL209
1YL271 - YL272
14YL281
7YL282
1YL301 - YL303
1YL311 - YL312
7YL316 - YL319
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
31 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 32

GroupVariable Number
7YL351
7YL371 - YL373
1YL421 - YL423
7YL424 - YL426
1YL431 - YL433
7YL434 - YL437
1YL461 - YL468
7YL469 - YL473
1YL501 - YL503
7YL504 - YL505
7YL531 - YL534
7YL561 - YL565
7YL591 - YL592
7YL601 - YL606
7YL611
7YL616
7YL621
7YL661 - YL664
7YL901 - YL908
7YL931 - YL933
7YL951 - YL952
1YM101
12YM102 - YM103
1YM201 - YM230
7YM231 - YM238
1YM251 - YM299
1YM301 - YM329
7YM330 - YM374
1YM471
1YM481 - YM484
1YM501 - YM512
7YM513 - YM515
1YM521 - YM522
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
32 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 33

GroupVariable Number
1YM541
1YM551 - YM553
1YM571 - YM572
1YM581 - YM582
12YM591 - YM593
1YM631 - YM634
1YM641 - YM644
7YM645 - YM651
1YM671
7YM672
7YM691 - YM693
21YM701 - YM702
1YN001 - YN011
7YN012 - YN016
12YN021
15YN022 - YN024
1YN061
1YN071 - YN077
7YN078 - YN079
19YN091 - YN092
1YN101 - YN112
19YN121
1YN201
7YN211 - YN216
7YN231 - YN232
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
B. Concurrent Requirements
Group 1-20; Group 21, Configuration 1; Group 22-33:
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
33 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 34

Group 21, Configuration 2:
The service bulletin listed below must be done before or at the same time as this service bulletin:
Group 21, Configuration 2:
DescriptionService BulletinCompany
Replaces the basic P5-16 panel with a high
altitude landing P5-16 panel.
737-21-1171 Original IssueBoeing
C. Reason
This service bulletin gives instructions to remove and replace the P1-3 and P3-1 instrument panels in
the flight compartment with panels that include two warning level indicator lights. These indicator lights
read "TAKEOFF CONFIG" and "CABIN ALTITUDE". The installation of these lights will provide a visual
indication to the flight crew in addition to the existing aural warning horn for cabin altitude and takeoff
configuration alerts. The visual warning lights are intended to provide an additional indication to crews
to prepare a correct takeoff configuration, respond to excessive cabin altitude and avoid confusion
between the takeoff configuration and cabin altitude alerts. An unrecognized incorrect takeoff
configuration or excessive cabin altitude could prevent a continued safe flight and landing.
Fleet Team Digest (FTD) 737NG-FTD-31-06004 is related to this service bulletin.
Boeing Service Related Problem (SRP) 737-SRP-31-0042 is related to this service bulletin.
NOTE: Operators may wish to incorporate service bulletin 737-21-1165 concurrently with this service
bulletin due to common access requirements.
Revision 1 is sent to tell operators that airplanes with the high altitude landing configuration of the Cabin
Altitude Warning System are added to this service bulletin effectivity. New Groups 8 through 21 have
been created.
As a part of a service bulletin validation program, this change was completed on airplane YA010 by
Service Bulletin 737-31A1332 Original Issue before the release of Revision 1 of this service bulletin.
The change completed on airplane YA010 by Service Bulletin 737-31A1332 Original Issue is equivalent
to the release of Revision 1 of this service bulletin. Airplane YA010 has the configuration of a Group 1
airplane.
Revision 2 is sent to add the airplanes YJ802-YJ866 to Group 1 of the service bulletin effectivity. Also,
this revision will add new BAE Systems component service bulletins and correct errors that were found
by operators during the incorporation of Revision 1 of this service bulletin. YC801-YC892 airplanes are
moved from Group 1 to a new Group 22. YA571-YA572 airplanes are moved from Group 1 to a new
Group 23.
As a part of a service bulletin validation program, this change was completed on airplane YG035 by
Service Bulletin 737-31A1332 Revision 1 before the release of Revision 2 of this service bulletin. The
change completed on airplane YG035 by Service Bulletin 737-31A1332 Revision 1 is equivalent to the
release of Revision 2 of this service bulletin. Airplane YG035 has the configuration of a Group 8 airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
34 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 35

Revision 3 is sent to advise operators of several changes to the service bulletin. Because the change
given in Figures 48-50 affect wiring changes previously accomplished in Service Bulletin 737-24A1141,
Figures 15-17, airplane line numbers 1-740 are moved to new groups 24-25 and 27-33. New Figures
52- 55 and new sets of work instructions have been created for airplane line numbers 1-740 (existing
Group 2, 4, 16-18 and new Group 24-25, 27-33). Airplanes YD301-YD334 are moved to a new Group
26 because of a different wire configuration. A new Figure 56 is created for Group 26 airplanes. YA630
is moved from Group 1 to Group 12 because this airplane was modified by the MR to a High Altitude
cabin pressure warning configuration.
Also, Weight and Balance information is clarified for Group 4 and Group 7 airplanes. CMM references
for BAE panel assemblies have changed. Group 7 airplanes are added to work instruction steps and
a new wire routing Figure 51 is added for Group 7 airplanes. References list has been changed. Also,
a note in Figure 11 of the service bulletin has changed to remove an incorrect wire number reference.
Revision 4 is sent to advise operators of several changes to the service bulletin. Airplanes YA091-YA097
were added to Group 1 of this service bulletin effectivity because they were incorrectly removed from
Revision 3. The airplane YG001 has been moved from Group 2 to Group 31. Manpower estimates
have changed to include an additional time for the removal of the forward galley, and the removal of
the drip shield, the airstair assembly and the airstair door for airplanes that have airstairs installed. A
new BAE Systems component service bulletin 233A2222-31-06 has been added. For Group 15, 19
and 21 airplanes, FIGURE 37 and FIGURE 43 have been changed because these airplanes do not
need to install the R1044 and the associated wiring. FIGURE 34, 36 and 44 have been changed to
add the W2508-0032-22 wire. Also, the FAA Airworthiness Directive AD 2013-02-05 has been added
to the service bulletin.
D. Description
Group 1, 3, 5-6, 8-12, 20, 26:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the
"TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and
W0003 wire bundles. Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit
breaker C01698. Change the W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054
wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103 wire
bundle. Change the W2218 wire bundle.
Group 8-11, 16-18, 20, 30-32:
In the flight compartment, replace the existing P5-16 and P5-10 panels. At the lower forward fuselage,
open the Forward Access Door 112A to get access into the area forward of the nose landing gear
wheel well. On the ceiling of the forward electronics compartment, install the cabin high altitude warning
switch S1172.
Group 12, 33:
In the flight compartment, replace the existing P5-16 panel.
Group 7, 13-15, 19, 21:
Get access to the flight compartment. Remove the INOP markers from the "TAKEOFF CONFIG" and
"CABIN ALTITUDE" indicator lights and replace the "TAKEOFF CONFIG" lights on the P1 and P3
panels. On the P6-2 panel, install a new circuit breaker C01698. Change the W5156 and W5514 wire
bundles. Change the W0040 and W0054 wire bundles. On the E1-1 electronics shelf, change the
W0111 wire bundle. Change the W2103 wire bundle. Change the W2218 wire bundle.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
35 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 36

Group 13-14:
In the flight compartment, replace the existing P5-16 and P5-10 panels. At the lower forward fuselage,
open the Forward Access Door 112A to get access into the area forward of the nose landing gear
wheel well. On the ceiling of the forward electronics compartment, install the cabin high altitude warning
switch S1172. Change the W2508 wire bundle.
Group 15, 19:
In the flight compartment, replace the existing P5-16 panel. Change the W2508 wire bundle.
Group 22:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the
"TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and
W0003 wire bundles. Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit
breaker C01698. Change the W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054
wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103 wire
bundle. Change the W2218 and W2135 wire bundles.
Group 23:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the
"TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and
W0003 wire bundles. Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit
breaker C01698. Change the W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054
wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103 wire
bundle. Change the W2218 and W2589 wire bundles.
Group 2, 4, 16-18, 24-25, 27-33:
Get access to the flight compartment. Remove the P1-3 and P3-1 instrument panels to install the
"TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights on the panels. Change the W0001 and
W0003 wire bundles. Install the changed P1-3 and P3-1 panels. On the P6-2 panel, install a new circuit
breaker C01698. Change the W2508, W5156 and W5514 wire bundles. Change the W0040 and W0054
wire bundles. On the E1-1 electronics shelf, change the W0111 wire bundle. Change the W2103 wire
bundle.
Do a test of the "TAKEOFF CONFIG" and "CABIN ALTITUDE" indicator lights.
Revision 1 - No more work is necessary on airplanes changed in accordance with the original issue of
this service bulletin.
Revision 2 - No more work is necessary on the airplane(s) changed in accordance with Revision 1 of
this service bulletin.
NOTE: Wire bundle W5156 in FIGURE 12 through FIGURE 14, FIGURE 25, FIGURE 38, FIGURE
39 and FIGURE 46, is changed to show the A17/B17 positions on the TB501Y terminal block
instead of the A25/B25 positions for the installation of the R1999. If an operator previously
accomplished one of these wire bundle W5156 figures, no more work is necessary.
Revision 3 - No more work is necessary on airplanes changed in accordance with Revision 1 or Revision
2 of this service bulletin.
Revision 4 - No more work is necessary on airplanes changed in accordance with Revision 1, Revision
2 or Revision 3 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
36 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 37

Group 1:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-600, 737-700, 737-800,
737-900, 737-900ER
Group 2-4, 6, 8, 10-11, 13, 16-17, 19-20, 23, 29, 31-33:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-700
Group 5, 28:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-700C
Group 7:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-700, 737-700C, 737-800,
737-900ER
Group 9:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-800, 737-900
Group 12, 27:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-700, 737-800
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
37 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 38

Group 14:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-800, 737-900ER
Group 15:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-700, 737-700C, 737-800
Group 18, 22, 25-26, 30:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-800
Group 21:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-700, 737-800, 737-900ER
Group 24:
Affected Maintenance Zones
ZoneModel
112, 113, 114, 117, 118, 211, 212, 222737-600, 737-700, 737-800,
737-900
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2013-02-05 is related to this service
bulletin.
Boeing recommends that the change given in this service bulletin be done within 36 months after the
effective date of AD 2013-02-05.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
38 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 39

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the action (i.e. inspection
or modification) defined in this service bulletin as an alternative method of compliance to the requirements
of paragraph (g) of AD 2013-02-05. All provisions of AD 2013-02-05 that are not specifically referenced
in the above statement remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 12
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
39 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 40

Group 1:
Elapsed HoursTask HoursNumber of PersonsTask
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 48
1.002.002Close Access
3.006.002Test
38.8566.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 2:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 52
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
1.002.002Close Access
3.256.502Test
36.3063.70TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 3:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
40 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 41

Group 3:
Elapsed HoursTask HoursNumber of PersonsTask
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 13
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 48
1.002.002Close Access
3.006.002Test
38.8566.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 4:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 7
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 14
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
41 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 42

Group 4:
Elapsed HoursTask HoursNumber of PersonsTask
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
1.002.002Close Access
3.006.002Test
36.0563.20TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 5:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.607.202FIGURE 9 and FIGURE 10
6.3012.602FIGURE 9 and FIGURE 12
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 48
1.002.002Close Access
3.006.002Test
39.0066.30TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
42 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 43

Group 6:
Elapsed HoursTask HoursNumber of PersonsTask
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 12
5.0010.002FIGURE 9 and FIGURE 15
0.750.751FIGURE 18 and FIGURE 19
1.751.751FIGURE 18 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 48
1.002.002Close Access
3.006.002Test
38.9566.10TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 7:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
0.500.501FIGURE 3
0.250.251FIGURE 4
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
4.809.602FIGURE 51 and FIGURE 25
0.200.201FIGURE 51 and FIGURE 26
2.802.801FIGURE 48
1.002.002Close Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
43 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 44

Group 7:
Elapsed HoursTask HoursNumber of PersonsTask
3.006.002Test
20.6033.30TOTAL FOR EACH AIRPLANE
Group 8:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 31
8.3016.602FIGURE 33 and FIGURE 34
7.0514.102FIGURE 33 and FIGURE 38
6.1012.202FIGURE 33 and FIGURE 40
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
48.5583.15TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
44 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 45

Group 9:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 32
8.3016.602FIGURE 33 and FIGURE 34
7.0514.102FIGURE 33 and FIGURE 38
6.1012.202FIGURE 33 and FIGURE 40
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
48.5583.15TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 10:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
45 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 46

Group 10:
Elapsed HoursTask HoursNumber of PersonsTask
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 28
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 31
8.3016.602FIGURE 33 and FIGURE 34
7.0514.102FIGURE 33 and FIGURE 38
6.1012.202FIGURE 33 and FIGURE 47
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
48.5583.15TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 11:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
46 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 47

Group 11:
Elapsed HoursTask HoursNumber of PersonsTask
0.650.651FIGURE 18 and FIGURE 19
1.751.751FIGURE 18 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 31
8.3016.602FIGURE 33 and FIGURE 34
7.0514.102FIGURE 33 and FIGURE 38
6.1012.202FIGURE 33 and FIGURE 40
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
48.5583.15TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 12:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
47 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 48

Group 12:
Elapsed HoursTask HoursNumber of PersonsTask
1.751.751FIGURE 23 and FIGURE 24
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
4.859.702FIGURE 33 and FIGURE 35
7.0514.102FIGURE 33 and FIGURE 38
5.0010.002FIGURE 33 and FIGURE 41
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
42.2572.30TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 13:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
0.500.501FIGURE 3
0.250.251FIGURE 4
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(a)0.25(a)1FIGURE 30
1.25(b)1.25(b)1FIGURE 31
4.959.902FIGURE 33 and FIGURE 36
4.208.402FIGURE 33 and FIGURE 39
2.452.451FIGURE 33 and FIGURE 42
2.802.801FIGURE 48
1.252.502Close Access
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
48 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 49

Group 13:
Elapsed HoursTask HoursNumber of PersonsTask
3.256.502Test
30.2048.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 14:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
0.500.501FIGURE 3
0.250.251FIGURE 4
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(a)0.25(a)1FIGURE 30
1.25(b)1.25(b)1FIGURE 32
4.959.902FIGURE 33 and FIGURE 36
4.208.402FIGURE 33 and FIGURE 39
2.452.451FIGURE 33 and FIGURE 42
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
30.2048.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
49 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 50

Group 15:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
0.500.501FIGURE 3
0.250.251FIGURE 4
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.250.251FIGURE 29
0.25(a)0.25(a)1FIGURE 30
2.902.902FIGURE 33 and FIGURE 37
4.208.402FIGURE 33 and FIGURE 39
0.200.201FIGURE 33 and FIGURE 43
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
24.1537.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 16:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
50 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 51

Group 16:
Elapsed HoursTask HoursNumber of PersonsTask
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 31
8.3016.602FIGURE 33 and FIGURE 34
8.0016.002FIGURE 33 and FIGURE 55
6.1012.202FIGURE 33 and FIGURE 40
1.252.502Close Access
3.256.502Test
46.7082.25TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 17:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 31
6.9013.802FIGURE 33 and FIGURE 44
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
51 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 52

Group 17:
Elapsed HoursTask HoursNumber of PersonsTask
6.3012.602FIGURE 33 and FIGURE 55
6.1012.202FIGURE 33 and FIGURE 45
1.252.502Close Access
3.256.502Test
43.6076.05TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 18:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 32
6.9013.802FIGURE 33 and FIGURE 44
6.3012.602FIGURE 33 and FIGURE 55
6.1012.202FIGURE 33 and FIGURE 45
1.252.502Close Access
3.256.502Test
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
52 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 53

Group 18:
Elapsed HoursTask HoursNumber of PersonsTask
43.6076.05TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 19:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
0.500.501FIGURE 3
0.250.251FIGURE 4
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.250.251FIGURE 29
0.25(a)0.25(a)1FIGURE 30
2.902.901FIGURE 33 and FIGURE 37
5.1010.202FIGURE 33 and FIGURE 46
3.103.101FIGURE 33 and FIGURE 43
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
27.9541.70TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 20:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
53 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 54

Group 20:
Elapsed HoursTask HoursNumber of PersonsTask
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 28
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 31
6.9013.802FIGURE 33 and FIGURE 44
6.3012.602FIGURE 33 and FIGURE 38
6.1012.202FIGURE 33 and FIGURE 47
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
46.4078.85TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 21:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
0.500.501FIGURE 3
0.250.251FIGURE 4
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
54 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 55

Group 21:
Elapsed HoursTask HoursNumber of PersonsTask
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.902.902FIGURE 33 and FIGURE 37
4.208.402FIGURE 33 and FIGURE 39
0.200.201FIGURE 33 and FIGURE 43
2.802.801FIGURE 48
1.252.502Close Access
3.256.502Test
23.6536.50TOTAL FOR EACH AIRPLANE
Group 22:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 12
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 49
1.002.002Close Access
3.006.002Test
38.8566.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
55 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 56

Group 23:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
6.3012.602FIGURE 9 and FIGURE 12
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 50
1.002.002Close Access
3.006.002Test
38.8566.00TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 24-25:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
8.0016.002FIGURE 9 and FIGURE 52
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
56 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 57

Group 24-25:
Elapsed HoursTask HoursNumber of PersonsTask
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
1.002.002Close Access
3.006.002Test
37.7566.60TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 26:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
8.0016.002FIGURE 9 and FIGURE 53
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.955.902FIGURE 21 and FIGURE 56
1.751.751FIGURE 23 and FIGURE 24
2.802.801FIGURE 48
1.002.002Close Access
3.006.002Test
40.6069.50TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
57 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 58

Group 27:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
8.0016.002FIGURE 9 and FIGURE 54
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
1.002.002Close Access
3.006.002Test
37.7566.60TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 28:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.607.202FIGURE 9 and FIGURE 10
8.0016.002FIGURE 9 and FIGURE 52
5.0010.002FIGURE 9 and FIGURE 15
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
58 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 59

Group 28:
Elapsed HoursTask HoursNumber of PersonsTask
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
1.002.002Close Access
3.006.002Test
37.8566.70TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 29:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
3.456.902FIGURE 9 and FIGURE 11
8.0016.002FIGURE 9 and FIGURE 52
5.0010.002FIGURE 9 and FIGURE 15
0.750.751FIGURE 18 and FIGURE 19
1.751.751FIGURE 18 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
1.002.002Close Access
3.006.002Test
37.8566.70TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
Group 30:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
59 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

### Page 60

Group 30:
Elapsed HoursTask HoursNumber of PersonsTask
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
0.650.651FIGURE 16 and FIGURE 17
1.751.751FIGURE 16 and FIGURE 20
2.905.802FIGURE 21 and FIGURE 22
1.751.751FIGURE 23 and FIGURE 24
0.500.501FIGURE 27
0.250.251FIGURE 29
0.25(b)0.25(b)1FIGURE 30
1.25(c)1.25(c)1FIGURE 32
8.3016.602FIGURE 33 and FIGURE 34
8.0016.002FIGURE 33 and FIGURE 55
6.1012.202FIGURE 33 and FIGURE 40
1.252.502Close Access
3.256.502Test
46.4581.75TOTAL FOR EACH AIRPLANE
(a) Estimate assumes that the P1-3 and P3-1 panels are replaced with new parts. Refer to a vendor
service bulletin for instructions and time required to rework panels.
(b) Estimate assumes that the P5-16 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
(c) Estimate assumes that the P5-10 panel is replaced with a new part. Refer to a vendor service
bulletin for instructions and time required to rework panels.
Group 31:
Elapsed HoursTask HoursNumber of PersonsTask
1.252.502Open Access
2.25 (a)2.25 (a)1FIGURE 1
2.25 (a)2.25 (a)1FIGURE 2
0.250.251FIGURE 4
2.254.502FIGURE 5 and FIGURE 6
2.254.502FIGURE 5 and FIGURE 8
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 07, 2010
737-31A1332Revision 4: October 31, 2013
60 of 306
BOEING SERVICE BULLETIN 737-31A1332
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/737-31a1332/file/3dcc59424b35.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
