# Boeing Special Attention Requirements Bulletin 737-35-1211 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-1697; AD 2024-13-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Special Attention Requirements Bulletin 737-35-1211 RB](https://openairdocs.org/service-documents/boeing/737-35-1211-rb.md)
- Title as filed: RB_737-35-1211 RB
- Pages: 68
- PDF: https://openairdocs.org/files/sha256/fa/eb/faeb881891fec4d04ef5363316d8a82e3bb3c82ffa0d3140d853c1883136d79c
- Page: https://openairdocs.org/service-documents/boeing/737-35-1211-rb/file/faeb881891fe

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Requirements Bulletin
SPECIAL ATTENTION
Number: 737-35-1211 RB
Original Issue:
June 17, 2024
ATA System: 3522 2523
SUBJECT: OXYGEN - Passenger Oxygen System - Oxygen Generator and Thermal Pad Inspection
and Replacement
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2024 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: June 17, 2024
737-35-1211 RB
1 of 68
3.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
2 of 68
REQUIREMENTS BULLETIN 737-35-1211
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
FIGURE 1: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION [Group 1-2, Configuration 1]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
FIGURE 2: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION [Group 1-2, Configuration 2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27
FIGURE 3: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION [Group 1-2, Configuration 1] . . . . . . . . . . . . . . . . . . . 30
FIGURE 4: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION [Group 1-2, Configuration 2] . . . . . . . . . . . . . . . . . . . 33
FIGURE 5: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT [Group 1-2, Configuration 1] . . . . . . . . . . . . . . . 36
FIGURE 6: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT [Group 1-2, Configuration 2] . . . . . . . . . . . . . . . 39
FIGURE 7: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
THERMAL PAD REPLACEMENT [Group 1-2, Configuration 1] . . . . . . . . . . . . . . . 42
FIGURE 8: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
THERMAL PAD REPLACEMENT [Group 1-2, Configuration 2] . . . . . . . . . . . . . . . 45
FIGURE 9: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION [Group 2, Configuration 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
FIGURE 10: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION [Group 2, Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . 51
FIGURE 11: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT [Group 2, Configuration 1] . . . . . 54
FIGURE 12: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT [Group 2, Configuration 2] . . . . . 57
FIGURE 13: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
POSITION INSPECTION [Group 2, Configuration 1] . . . . . . . . . . . . . . . . . . . . . 60
FIGURE 14: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
POSITION INSPECTION [Group 2, Configuration 2] . . . . . . . . . . . . . . . . . . . . . 63
APPENDIX D: EXPENDED PSU OXYGEN GENERATOR . . . . . . . . . . . . . . . . . . . . . . . . . . 66
APPENDIX E: NOT EXPENDED PSU OXYGEN GENERATOR . . . . . . . . . . . . . . . . . . . . . . . 67
APPENDIX H: SPACING REQUIREMENT OF LESS THAN 0.1-INCH BETWEEN THE PSU OXYGEN
GENERATOR AND THE OXYGEN MASK BOX [Group 2] . . . . . . . . . . . . . . . . . . 68
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
3 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 4

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
4 of 68
REQUIREMENTS BULLETIN 737-35-1211
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Requirements Bulletin
SPECIAL ATTENTION
Number: 737-35-1211 RB
Original Issue:
June 17, 2024
ATA System: 3522 2523
SUBJECT: OXYGEN - Passenger Oxygen System - Oxygen Generator and Thermal Pad Inspection
and Replacement
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT IMMEDIATELY. THIS IS
AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE
THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE
INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION
IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH THE SB REFERS
TO AS THE RELATED DOCUMENT.
1.
Effectivity
A. Airplanes
This bulletin is applicable to 737-700, 737-800, 737-900ER Airplane(s), line number(s) 56, 58, 63,
65, 74, 76, 79, 81, 84, 88, 134, 153, 159, 162, 165, 168, 171, 184, 190, 196, 207, 231, 240, 254,
262-263, 267, 271, 281, 287, 289, 293, 296, 300, 304, 316, 322, 328, 332, 334, 342, 344, 353,
363, 367, 374, 378, 383, 386, 391, 394-395, 398, 402-403, 405, 409, 411, 413, 431, 434-435, 438,
440-441, 443, 453, 462, 473, 488, 503, 509, 527, 531, 553, 559, 575, 579, 581, 591, 606, 608,
612, 615-616, 618, 624, 627, 629, 635, 644-645, 647, 649-650, 655-656, 660, 667, 671, 679, 686,
692, 699, 704, 706, 708, 720, 726, 741, 745, 762, 764, 788, 797, 801, 818, 822, 825, 834, 837,
854, 860, 862-863, 883, 886, 897, 901, 906, 910, 915-916, 928, 930, 937, 939, 941, 957, 966,
970-971, 977, 982, 987, 992, 1001, 1012, 1022, 1062, 1077, 1079, 1099, 1390, 1411, 1423, 1425,
1440, 1456, 1475, 1506, 1509, 1516, 1540, 1542, 1567, 1611, 1622, 1743, 1762, 1779, 1787,
1791, 1813, 1821, 1936, 1994, 2017, 2023, 2035, 2048, 2065, 2205, 2467, 2474, 2487, 2490,
2503, 2514, 2516, 2523, 2528, 2533, 2541, 2547, 2553, 2565, 2569, 2577, 2579, 2594, 2598,
2602, 2614, 2619, 2645, 2651, 2655, 2657, 2676, 2680, 2707, 2713, 2718, 2723, 2737, 2750,
2768, 2774, 2787, 2817, 2838, 2842, 2846, 2870, 2876, 2891, 2899, 2907, 2915-2916, 2935,
2945, 2947, 2954, 2959, 2964, 2971-2972, 2982, 2990, 2995-2996, 3004, 3013-3014, 3027-3028,
3035, 3042, 3050, 3056, 3063, 3070, 3077, 3085, 3094, 3102, 3107, 3112, 3118, 3125, 3137-3138,
3149, 3156, 3158, 3169-3170, 3175, 3178, 3185, 3193, 3200, 3209, 3216-3217, 3224, 3228, 3236,
3244, 3252-3253, 3260, 3268, 3276, 3282, 3289, 3291, 3298, 3305, 3307, 3328, 3334, 3340,
3347, 3356, 3361, 3367, 3373, 3380, 3390-3391, 3393, 3396, 3404, 3412, 3417, 3421-3422, 3427,
3434, 3440, 3452, 3456, 3458, 3460, 3462, 3464, 3468, 3475, 3480-3482, 3485-3488, 3490, 3493,
3495, 3497, 3499, 3507, 3509, 3521, 3530, 3532, 3537, 3540, 3545, 3548-3549, 3553-3554, 3557,
3562, 3565, 3567, 3572, 3576-3577, 3581-3583, 3586, 3588, 3591-3592, 3595, 3601, 3608, 3611,
3615, 3618-3620, 3623, 3627, 3630-3631, 3633-3635, 3639-3642, 3645-3646, 3648, 3650-3651,
3653, 3655, 3659-3660, 3663-3671, 3673, 3678, 3680-3681, 3685-3686, 3688-3689, 3693-3695,
3699-3700, 3704, 3706-3707, 3709-3711, 3717-3718, 3720, 3722-3723, 3725, 3729-3733, 3735,
3737-3740, 3745-3746, 3748-3751, 3753, 3756-3758, 3760-3761, 3763-3766, 3768, 3771, 3773,
3775-3777, 3781-3785, 3790, 3793-3794, 3798-3799, 3801-3803, 3805-3810, 3812-3813,
3815-3818, 3820, 3823-3824, 3826-3827, 3831-3833, 3835-3839, 3843-3859, 3861-3862,
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
5 of 68

### Page 6

3864-3865, 3867-3868, 3870-3871, 3873, 3875-3878, 3880-3881, 3883, 3885, 3887-3901,
3903-3904, 3907, 3909-3915, 3917-3919, 3921-3925, 3927, 3929-3930, 3933-3937, 3939-3944,
3946-3952, 3954-3957, 3959-3968, 3970-3973, 3975-3982, 3984-3985, 3987-3991, 3993-4001,
4004-4010, 4012-4013, 4015-4016, 4018-4034, 4036-4047, 4049-4054, 4056-4061, 4063-4071,
4073, 4075-4086, 4088-4090, 4092-4094, 4096, 4098, 4100, 4102-4103, 4105-4121, 4123-4129,
4131-4132, 4134-4135, 4137-4140, 4142-4147, 4149-4150, 4153-4165, 4167-4168, 4170-4173,
4175-4176, 4178-4180, 4182-4189, 4191-4203, 4205-4210, 4212-4218, 4221-4226, 4229-4239,
4241-4248, 4250-4255, 4257, 4259-4260, 4262-4266, 4269-4279, 4281, 4283-4292, 4295-4302,
4304-4312, 4314-4320, 4322-4324, 4326-4330, 4332-4333, 4335-4348, 4351-4363, 4365,
4367-4375, 4378-4392, 4394, 4396-4398, 4400-4417, 4419-4425, 4427-4428, 4430-4444,
4446-4448, 4450-4464, 4466-4468, 4470-4480, 4482, 4484-4498, 4500-4518, 4520-4544, 4546,
4548-4560, 4562-4576, 4578-4585, 4587-4592, 4594-4596, 4598-4607, 4610-4619, 4622-4633,
4635-4640, 4642-4652, 4654-4672, 4674-4676, 4678-4701, 4703-4727, 4729, 4731-4767, 4769,
4771-4787, 4789-4805, 4807-4812, 4814-4850, 4852-4854, 4856-4858, 4860-4884, 4886-4897,
4899-4903, 4905, 4907-4921, 4923-4936, 4939, 4941-4952, 4954-4969, 4971-4977, 4979-4984,
4987-4999, 5001-5019, 5021-5024, 5026-5049, 5051-5057, 5059-5071, 5073-5078, 5080-5089,
5091-5097, 5100, 5102, 5104-5105, 5107-5110, 5112-5120, 5122-5123, 5125-5137, 5139-5146,
5148-5157, 5159-5177, 5179-5187, 5189-5215, 5217, 5219-5237, 5239-5247, 5249-5256,
5258-5261, 5263-5271, 5273-5288, 5290-5295, 5297, 5299-5300, 5302-5305, 5307-5315,
5317-5329, 5331-5337, 5339-5340, 5342-5343, 5345-5351, 5353-5355, 5357-5366, 5369-5373,
5375-5392, 5394-5397, 5399-5400, 5403-5427, 5430-5433, 5435-5439, 5441-5443, 5445-5447,
5449-5457, 5459-5473, 5475, 5477, 5479-5509, 5512-5528, 5530-5541, 5543-5561, 5563-5566,
5569-5586, 5588-5601, 5603-5604, 5606-5608, 5610-5617, 5619-5622, 5624, 5626-5628,
5630-5637, 5639-5641, 5643-5649, 5651-5652, 5654-5655, 5657-5659, 5661-5664, 5666-5667,
5669-5676, 5678-5679, 5682, 5684-5704, 5706-5711, 5713-5716, 5718-5723, 5725-5727,
5729-5739, 5741-5764, 5767-5784, 5786-5787, 5789-5795, 5797-5822, 5824-5835, 5837-5850,
5853-5861, 5863-5879, 5881-5901, 5904-5935, 5937-5947, 5949-5962, 5964-5976, 5978-5981,
5983-5991, 5994-6019, 6021-6033, 6035-6047, 6049-6059, 6061-6065, 6067-6073, 6075,
6077-6098, 6100-6103, 6105-6113, 6115-6122, 6124-6131, 6133-6153, 6155-6159, 6161-6186,
6190-6202, 6204-6215, 6217-6221, 6223-6243, 6245-6249, 6251-6271, 6274-6289, 6291-6299,
6301-6307, 6309-6325, 6327, 6329-6343, 6345-6355, 6357-6359, 6361-6371, 6373-6383,
6386-6395, 6397-6407, 6409-6411, 6413-6419, 6421-6429, 6431-6439, 6442-6447, 6449,
6451-6455, 6457-6463, 6465-6467, 6469-6471, 6473-6480, 6482-6483, 6485-6489, 6491,
6493-6498, 6500-6507, 6509-6514, 6516-6520, 6522-6527, 6529-6531, 6533-6534, 6536-6541,
6543-6547, 6549-6554, 6556-6559, 6561, 6563-6568, 6570-6574, 6576-6581, 6583-6588,
6590-6593, 6596-6597, 6599-6602, 6604-6606, 6608-6611, 6613-6615, 6617-6620, 6622, 6624,
6626-6629, 6631-6633, 6635-6638, 6640-6642, 6644-6647, 6649-6651, 6653-6656, 6659-6660,
6662-6664, 6667-6668, 6670-6671, 6673-6676, 6678-6680, 6682-6685, 6688-6689, 6691-6693,
6696-6698, 6700-6703, 6705-6707, 6709-6712, 6714-6716, 6718-6719, 6721, 6723-6725,
6727-6730, 6732-6734, 6736-6739, 6741-6743, 6745-6748, 6751-6752, 6754, 6756-6757,
6759-6761, 6763-6766, 6768-6770, 6772, 6774-6775, 6777-6779, 6781-6782, 6786-6788,
6790-6791, 6793, 6795, 6799-6802, 6804, 6806, 6808-6809, 6811, 6813, 6815, 6817-6818, 6820,
6822-6824, 6826-6827, 6829, 6831-6833, 6836, 6838, 6840, 6842, 6844-6845, 6847, 6849, 6851,
6853-6854, 6856-6858, 6860, 6862-6863, 6865, 6867, 6869-6871, 6873-6874, 6878-6880,
6882-6883, 6885, 6887-6889, 6891-6892, 6894, 6896, 6898, 6900-6903, 6905, 6907, 6910,
6912-6914, 6916, 6919, 6921, 6923-6925, 6927-6928, 6930, 6932-6934, 6936-6937, 6939, 6943,
6945-6948, 6950, 6952, 6954-6955, 6957-6959, 6961-6962, 6964, 6966-6967, 6969, 6971-6972,
6977, 6979, 6981-6982, 6984, 6986-6987, 6989, 6992, 6994, 6996-6997, 6999, 7001-7002, 7007,
7009, 7012, 7014, 7016-7017, 7019, 7021-7022, 7024, 7026, 7029, 7031-7032, 7034, 7036-7037,
7039, 7041, 7046-7047, 7049, 7051-7052, 7054, 7056-7057, 7059, 7061, 7063, 7066-7067, 7069,
7071-7072, 7076, 7078, 7081-7082, 7084, 7086-7087, 7089, 7091-7092, 7094, 7097, 7099,
7101-7102, 7104, 7106-7107, 7109, 7112, 7116-7117, 7119, 7121-7122, 7124, 7126-7127, 7129,
7131, 7134, 7136-7137, 7139, 7141-7142, 7146, 7149, 7151-7152, 7154, 7156-7157, 7159,
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
6 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 7

7161-7162, 7164, 7167, 7169, 7171-7172, 7174, 7176-7177, 7179, 7182, 7187, 7189, 7191, 7194,
7197, 7199, 7202, 7204, 7206, 7209, 7212, 7214, 7217, 7221, 7224, 7227, 7229, 7232, 7234-7235,
7239, 7242, 7244, 7247, 7249, 7251, 7257, 7259, 7262, 7264, 7266, 7269, 7272, 7274, 7277,
7279-7280, 7284, 7287, 7292, 7294, 7297, 7299, 7302, 7304, 7307, 7309, 7312, 7314, 7317,
7319, 7322, 7327, 7329, 7332, 7334, 7337, 7339, 7342, 7344, 7347, 7349, 7352, 7354, 7357,
7362, 7364, 7367, 7369, 7372, 7374, 7377, 7379, 7382, 7387, 7397, 7402, 7407, 7412, 7417,
7422, 7432, 7437, 7442, 7447, 7452, 7457, 7467, 7472, 7482, 7487, 7492, 7502, 7507, 7512,
7517, 7522, 7527, 7537, 7547, 7552, 7557, 7562, 7572, 7577, 7582, 7592, 7597, 8592 in 2
Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane
applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through
9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
DESCRIPTIONCONFIGURATIONGROUP
737-800/-900ER airplanes with Boeing Sky Interior (BSI) that could
have Passenger Service Unit (PSU) Oxygen Generators with Pressure
Sensitive Adhesive (PSA) thermal pads installed and require a
different compliance time. These airplanes were manufactured during
a period when PSA thermal pads were used as an alternate
configuration.
- 1
Airplanes that have 12-minute PSU Oxygen Generators installed.1
Airplanes that have 22-minute PSU Oxygen Generators installed.2
737-700/-800/-900ER airplanes with BSI that could have PSU Oxygen
Generators with PSA thermal pads installed and require a different
compliance time. These airplanes were not manufactured during a
period when PSA thermal pads were used as an alternate
configuration. The PSUs that used PSA thermal pads may have
replaced the delivered PSUs during spares or post-delivery
modification.
- 2
Airplanes that have 12-minute PSU Oxygen Generators installed.1
Airplanes that have 22-minute PSU Oxygen Generators installed.2
Airplane Models:
737-700, 737-800, 737-900ER
GroupVariable Number
1YC321 - YC380
1YC801 - YC875
1YC877
GroupVariable Number
2YD421 - YD424
2YF201 - YF276
1YF804 - YF805
GroupVariable Number
2YG142 - YG148
1YH101 - YH132
2YH307
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
7 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 8

GroupVariable Number
2YH501 - YH542
2YH551 - YH594
2YH601 - YH606
2YH611 - YH620
2YH631 - YH632
2YH636 - YH637
2YH641
2YH681 - YH686
2YH701 - YH755
2YH801 - YH899
2YH901 - YH908
2YH911 - YH915
2YH951 - YH952
1YJ501 - YJ517
1YJ531 - YJ579
1YJ945
1YK921 - YK929
2YN501
2YN591 - YN593
2YN601 - YN606
2YN651 - YN653
2YN661 - YN663
2YN666 - YN667
2YN701 - YN702
1YQ346 - YQ347
2YQ601 - YQ606
2YQ610 - YQ614
2YR001 - YR004
2YR006 - YR098
2YR101 - YR105
2YR111 - YR124
2YR126 - YR144
2YR166 - YR182
GroupVariable Number
2YR186 - YR198
2YR201 - YR215
2YR231 - YR294
2YR296 - YR297
2YR301 - YR334
2YR338 - YR341
2YR361 - YR366
2YR371 - YR373
2YR376 - YR377
2YR381 - YR382
2YR386 - YR388
2YR391
2YR396 - YR399
2YR401 - YR405
2YR411 - YR413
2YR416 - YR418
2YR421 - YR424
2YR426 - YR455
2YR457 - YR499
2YR501 - YR506
2YR511 - YR520
2YR526 - YR544
2YR546 - YR551
2YR556 - YR562
2YR571 - YR582
2YR591 - YR592
2YR601 - YR605
2YR616 - YR658
2YR661 - YR663
2YR671 - YR673
2YR676 - YR678
2YR681 - YR682
2YR701 - YR769
GroupVariable Number
2YR771 - YR799
2YR801 - YR827
2YR831 - YR838
2YR841 - YR899
2YR901 - YR903
2YR931 - YR934
2YR938 - YR944
2YR951 - YR988
2YR990 - YR998
2YS001 - YS002
2YS006 - YS009
2YS031 - YS032
2YS051 - YS073
2YS101 - YS120
2YS126 - YS142
2YS146 - YS160
2YS166 - YS194
2YS196 - YS197
2YS201 - YS209
2YS221 - YS225
2YS231 - YS236
2YS271 - YS288
2YS295 - YS296
2YS301 - YS315
2YS317 - YS348
2YS351 - YS378
2YS381 - YS386
2YS393 - YS395
2YS401
2YS451
2YS456 - YS457
2YS462 - YS465
2YS467
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
8 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 9

GroupVariable Number
2YS501 - YS502
2YS506
2YS511 - YS518
2YS531
2YS536 - YS538
2YS541 - YS542
2YS546
2YS551 - YS556
2YS561 - YS578
2YS581 - YS595
2YS601 - YS690
2YS701 - YS716
2YS721 - YS762
2YS771 - YS780
2YS806 - YS810
2YS816 - YS818
2YS823 - YS825
2YS851 - YS863
2YS876
2YS881 - YS884
2YS891 - YS894
2YS896 - YS897
2YS901 - YS909
2YS911 - YS957
2YS961 - YS974
2YS976 - YS977
2YS981 - YS987
2YS991 - YS998
2YT001 - YT004
2YT006
2YT026 - YT027
2YT031 - YT032
2YT036 - YT038
GroupVariable Number
2YT061 - YT068
2YT101 - YT138
2YT176 - YT185
2YT191
2YT196 - YT199
2YT201
2YT206 - YT207
2YT211 - YT213
2YT251 - YT299
2YT301 - YT307
2YT311 - YT312
2YT321 - YT355
2YT371 - YT372
2YT381
2YT391 - YT396
2YT401 - YT403
2YT411 - YT417
2YT427
2YT461 - YT477
2YT491 - YT492
2YT501 - YT521
2YT551 - YT552
2YT556 - YT563
2YT565
2YT571 - YT578
2YT601 - YT606
2YT701 - YT708
2YT723 - YT726
2YT761 - YT781
2YT791 - YT794
2YT796 - YT797
2YT801 - YT804
2YT811 - YT813
GroupVariable Number
2YT826 - YT827
2YT831 - YT832
2YT841 - YT852
2YT856 - YT863
2YT885 - YT887
2YT891 - YT895
2YT901 - YT998
2YU001 - YU060
2YU201 - YU218
2YU301 - YU329
2YU901 - YU931
2YV001 - YV012
2YV021 - YV023
2YV030 - YV034
2YV037 - YV042
2YV045 - YV047
2YV051 - YV059
2YV081
2YV083 - YV084
2YV097 - YV099
2YV101 - YV154
2YV201 - YV203
2YV251 - YV252
2YV256 - YV257
2YV301 - YV312
2YV351 - YV368
2YV381 - YV388
2YV391 - YV394
2YV401
2YV411 - YV413
2YV431 - YV433
2YV441 - YV454
2YV461 - YV464
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
9 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 10

GroupVariable Number
2YV467 - YV470
2YV501 - YV512
2YV521
2YV571 - YV586
2YV596
2YV601 - YV605
2YV651 - YV674
1YV676
2YV695 - YV696
2YV701 - YV702
2YV711
2YV722 - YV731
2YV741 - YV794
2YV801 - YV820
2YV831 - YV848
2YV881 - YV883
2YV901 - YV915
2YV923 - YV926
2YV971 - YV983
2YW001
GroupVariable Number
2YW011 - YW099
2YW101 - YW164
2YW201 - YW212
2YW226 - YW240
2YW245 - YW261
2YW263
2YW267 - YW281
2YW283 - YW285
2YW292 - YW299
2YW351
2YW356 - YW358
2YW362 - YW366
2YW371 - YW399
2YW401 - YW430
2YW451 - YW452
2YW471 - YW472
2YW491 - YW498
2YW531 - YW536
2YW541 - YW545
2YW551 - YW580
GroupVariable Number
2YW585 - YW591
2YW595 - YW596
2YW601
2YW610 - YW613
2YW616 - YW623
2YW666
2YW696 - YW699
2YW701 - YW715
2YW726 - YW731
2YW766 - YW775
2YW801 - YW803
2YW811 - YW813
2YW821
2YW831
2YW881
2YW891 - YW893
2YW906 - YW910
2YW916 - YW918
2YW921 - YW925
2YW971 - YW976
B.
Spares Affected
Examine your spares supply for the parts or components identified below. If any parts or components
are found, refer to Paragraph 3.B., Work Instructions for the recommended action.
Group 1-2, Configuration 1:
Part Number
53010
E71740-00 OR S417T401-44
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
10 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 11

Group 1-2, Configuration 2:
Part Number
73667
E72280-00 OR S417T401-63
2.
CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 737-35-1211 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 737-35-1211 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Tables 1 and 2, in accordance with
Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Group 1:
Table 1: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
Original Issue date of Re-
quirements Bulletin 737-
35-1211 RB.
Do a General Visual In-
spection (GVI) of the Pas-
senger Service Unit (PSU)
Oxygen Generator to de-
termine retention straps
thermal pads configura-
tion.
All Airplanes
--No further action is re-
quired.
CONDITION 1: ANY PSU
OXYGEN GENERATOR
WITHOUT PRESSURE
SENSITIVE ADHESIVE
(PSA) RETENTION
STRAPS THERMAL
PADS FOUND
-Before further flight.Do a GVI of the affected
PSU Oxygen Generator
to determine if expended.
CONDITION 2: ANY PSU
OXYGEN GENERATOR
WITH PSA RETENTION
STRAPS THERMAL
PADS FOUND
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
11 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 12

Group 1:
Table 1: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Replace with new or ser-
viceable PSU Oxygen
Generator and replace
PSA retention strap ther-
mal pads with non-PSA
retention strap thermal
pads. (a)
CONDITION 2.1: AFFECT-
ED PSU OXYGEN GEN-
ERATOR EXPENDED
-Before further flight.Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.2: AFFECT-
ED PSU OXYGEN GEN-
ERATOR NOT EXPEND-
ED
(a) A serviceable PSU Oxygen Generator is defined as a PSU Oxygen Generator that has not been expended
and has not expired (i.e., the PSU Oxygen Generator does not exceed the life limit established for that
generator by the manufacturer).
Group 2:
Table 2: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 120 days after the
Original Issue date of Re-
quirements Bulletin 737-
35-1211 RB.
Do a General Visual In-
spection (GVI) of the Pas-
senger Service Unit (PSU)
Oxygen Generator to de-
termine retention straps
thermal pads configura-
tion.
All Airplanes
--No further action is re-
quired.
CONDITION 1: ANY PSU
OXYGEN GENERATOR
WITHOUT PRESSURE
SENSITIVE ADHESIVE
(PSA) RETENTION
STRAPS THERMAL
PADS FOUND
-Within 150 days after the
Original Issue date of Re-
quirements Bulletin 737-
35-1211 RB.
Do a GVI of the affected
PSU Oxygen Generator
to determine if expended
and installation migration.
CONDITION 2: ANY PSU
OXYGEN GENERATOR
WITH PSA RETENTION
STRAPS THERMAL
PADS FOUND
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
12 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 13

Group 2:
Table 2: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.(OPTION 1): Replace
PSA retention strap ther-
mal pads with non-PSA
retention strap thermal
pads and reposition affect-
ed PSU Oxygen Genera-
tor.
CONDITION 2.1: AFFECT-
ED PSU OXYGEN GEN-
ERATOR MIGRATION
FOUND AND NOT EX-
PENDED
-Before further flight.(OPTION 2) (ACTION 1):
Reposition affected PSU
Oxygen Generator.
-Within 150 days after the
Original Issue date of Re-
quirements Bulletin 737-
35-1211 RB.
(OPTION 2) (ACTION 2):
Make sure affected PSU
Oxygen Generator migra-
tion is not found and has
not been expended.
-Before further flight after
making sure affected PSU
Oxygen Generator migra-
tion is not found and has
not been expended.
Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.1.1: AF-
FECTED PSU OXYGEN
GENERATOR MIGRA-
TION IS NOT FOUND
AND HAS NOT BEEN
FOUND EXPENDED
DURING (OPTION 2)
(ACTION 2)
-Before further flight after
determining affected PSU
Oxygen Generator migrat-
ed.
CONDITION 2.1.2 (AC-
TION 1): Reposition affect-
ed PSU Oxygen Genera-
tor.
CONDITION 2.1.2: AF-
FECTED PSU OXYGEN
GENERATOR MIGRA-
TION IS FOUND AND
HAS NOT BEEN FOUND
EXPENDED DURING
(OPTION 2) (ACTION 2)
CONDITION 2.1.2 (AC-
TION 2): Replace PSA re-
tention strap thermal pads
with non-PSA retention
strap thermal pads.
-Before further flight after
determining affected PSU
Oxygen Generator has
been expended.
CONDITION 2.1.3 (AC-
TION 1): Replace with
new or serviceable PSU
Oxygen Generator. (a)
CONDITION 2.1.3: AF-
FECTED PSU OXYGEN
GENERATOR HAS BEEN
FOUND EXPENDED
DURING (OPTION 2)
(ACTION 2) CONDITION 2.1.3 (AC-TION 2): Replace PSA re-
tention strap thermal pads
with non-PSA retention
strap thermal pads.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
13 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 14

Group 2:
Table 2: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 2.2 (ACTION
1): Replace with new or
serviceable PSU Oxygen
Generator. (a)
CONDITION 2.2: AFFECT-
ED PSU OXYGEN GEN-
ERATOR HAS BEEN EX-
PENDED
CONDITION 2.2 (ACTION
2): Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
-Within 150 days after the
Original Issue date of Re-
quirements Bulletin 737-
35-1211 RB.
Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.3: AFFECT-
ED PSU OXYGEN GEN-
ERATOR NOT EXPEND-
ED AND NO MIGRATION
FOUND
(a) A serviceable PSU Oxygen Generator is defined as a PSU Oxygen Generator that has not been expended
and has not expired (i.e., the PSU Oxygen Generator does not exceed the life limit established for that
generator by the manufacturer).
4.
APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
14 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 15

5.    ACCOMPLISHMENT INSTRUCTIONS
A.
GENERAL INFORMATION
OBEY THE MANUFACTURER'S PROCEDURES WHEN YOU DO TASKS THAT
ARE RELATED TO AIRWORTHINESS LIMITATIONS (AWL). IF YOU DO NOT
OBEY THE PROCEDURES, IT CAN INCREASE THE RISK OF A SOURCE OF
IGNITION. INJURIES TO PERSONNEL, AND DAMAGE TO EQUIPMENT CAN
OCCUR IF THERE IS A FIRE OR EXPLOSION.
WARNING
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. In the RB, the "Refer to the listed procedures..." column of the
table(s) in the Work Instructions is for reference only. The procedures in that column
are not required by the AD and are for guidance only. For the related SB, some
locations are marked RC Start and RC End to identify the requirements that are
restated from the RB. For the related SB, the areas between RC Start and RC End,
including sub-steps and any figures identified between RC Start and RC End, must
be done to comply with the AD. Therefore, an Alternative Method of Compliance
(AMOC) is required for any deviations to steps between RC Start and RC End,
including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance
with the operator's maintenance or inspection program without obtaining approval
of an AMOC; this is provided that the steps between RC Start and RC End, including
sub-steps and identified figures, can still be done as specified, and the airplane can
be put back in an airworthy condition. Figures not required for compliance are omitted
from the RB.
2.
This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 737 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 737
Aircraft Maintenance Manual (AMM).
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
15 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 16

— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
—
Values for engine maintenance tasks are included in Chapter 70 of 737
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. A General Visual Inspection (GVI) is defined as: A visual examination of an interior
or exterior area, installation or assembly to detect obvious damage, failure or
irregularity. This level of inspection is made from within touching distance, unless
otherwise specified. A mirror may be necessary to enhance visual access to all
exposed surfaces in the inspection area. This level of inspection is made under
normally available lighting conditions such as daylight, hangar lighting, flashlight or
drop-light and may require removal or opening of access panels or doors. Stands,
ladders or platforms may be required to gain proximity to the area being checked.
Basic cleaning may be required to ensure appropriate visibility.
9. An "Expended" Passenger Service Unit (PSU) Oxygen Generator is defined as an
oxygen generator which has been discharged and can no longer provide supplemental
oxygen. It is indicated as "Expended" when the temperature sensitive indicator has
changed color from white/yellow ("Not Expended") to black/brown ("Expended").
10. Refer to APPENDIX D for an example of an Expended PSU Oxygen Generator.
11. Refer to APPENDIX E as an example of a Not Expended PSU Oxygen Generator.
12. Refer to APPENDIX H for the spacing requirement of less than 0.1-inch between
the PSU Oxygen Generator and the Oxygen Mask Box.
13. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
16 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 17

Group 1, Configuration 1:
Table 1: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
PART 1: PASSENGER
COMPARTMENT AND
PSU ACCESS
-Do a General Visual In-
spection (GVI) of the Pas-
senger Service Unit (PSU)
Oxygen Generator to de-
termine retention straps
thermal pads configura-
tion.
All Airplanes
-FIGURE 1
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-No further action is re-
quired.
CONDITION 1: ANY PSU
OXYGEN GENERATOR
WITHOUT PRESSURE
SENSITIVE ADHESIVE
(PSA) RETENTION
STRAPS THERMAL
PADS FOUND
PART 3: RESTORATION-
-FIGURE 3Do a GVI of the affected
PSU Oxygen Generator
to determine if expended.
CONDITION 2: ANY PSU
OXYGEN GENERATOR
WITH PSA RETENTION
STRAPS THERMAL
PADS FOUND
-FIGURE 5Replace with new or ser-
viceable PSU Oxygen
Generator and replace
PSA retention strap ther-
mal pads with non-PSA
retention strap thermal
pads. (a)
CONDITION 2.1: AFFECT-
ED PSU OXYGEN GEN-
ERATOR EXPENDED PART 2: PASSENGERCOMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 7Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.2: AFFECT-
ED PSU OXYGEN GEN-
ERATOR NOT EXPEND-
ED
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
(a) A serviceable PSU Oxygen Generator is defined as a PSU Oxygen Generator that has not been expended
and has not expired (i.e., the PSU Oxygen Generator does not exceed the life limit established for that
generator by the manufacturer).
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
17 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 18

Group 2, Configuration 1:
Table 2: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
PART 1: PASSENGER
COMPARTMENT AND
PSU ACCESS
-Do a General Visual In-
spection (GVI) of the Pas-
senger Service Unit (PSU)
Oxygen Generator to de-
termine retention straps
thermal pads configura-
tion.
All Airplanes
-FIGURE 1
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-No further action is re-
quired.
CONDITION 1: ANY PSU
OXYGEN GENERATOR
WITHOUT PRESSURE
SENSITIVE ADHESIVE
(PSA) RETENTION
STRAPS THERMAL
PADS FOUND
PART 3: RESTORATION-
-FIGURE 3Do a GVI of the affected
PSU Oxygen Generator
to determine if expended
and installation migration.
CONDITION 2: ANY PSU
OXYGEN GENERATOR
WITH PSA RETENTION
STRAPS THERMAL
PADS FOUND
FIGURE 13
-FIGURE 7(OPTION 1): Replace
PSA retention strap ther-
mal pads with non-PSA
retention strap thermal
pads and reposition affect-
ed PSU Oxygen Genera-
tor.
CONDITION 2.1: AFFECT-
ED PSU OXYGEN GEN-
ERATOR MIGRATION
FOUND AND NOT EX-
PENDED
FIGURE 9
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 9(OPTION 2) (ACTION 1):
Reposition affected PSU
Oxygen Generator. PART 2: PASSENGERCOMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
PART 1: PASSENGER
COMPARTMENT AND
PSU ACCESS
-(OPTION 2) (ACTION 2):
Make sure affected PSU
Oxygen Generator migra-
tion is not found and has
not been expended. -FIGURE 3FIGURE 13
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
18 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 19

Group 2, Configuration 1:
Table 2: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
-FIGURE 7Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.1.1: AF-
FECTED PSU OXYGEN
GENERATOR MIGRA-
TION IS NOT FOUND
AND HAS NOT BEEN
FOUND EXPENDED
DURING (OPTION 2)
(ACTION 2)
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 11CONDITION 2.1.2 (AC-
TION 1): Reposition affect-
ed PSU Oxygen Genera-
tor.
CONDITION 2.1.2: AF-
FECTED PSU OXYGEN
GENERATOR MIGRA-
TION IS FOUND AND
HAS NOT BEEN FOUND
EXPENDED DURING
(OPTION 2) (ACTION 2)
-FIGURE 11CONDITION 2.1.2 (AC-
TION 2): Replace PSA re-
tention strap thermal pads
with non-PSA retention
strap thermal pads.
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 5CONDITION 2.1.3 (AC-
TION 1): Replace with
new or serviceable PSU
Oxygen Generator. (a)
CONDITION 2.1.3: AF-
FECTED PSU OXYGEN
GENERATOR HAS BEEN
FOUND EXPENDED
DURING (OPTION 2)
(ACTION 2) -FIGURE 5CONDITION 2.1.3 (AC-TION 2): Replace PSA re-
tention strap thermal pads
with non-PSA retention
strap thermal pads.
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 5CONDITION 2.2 (ACTION
1): Replace with new or
serviceable PSU Oxygen
Generator. (a)
CONDITION 2.2: AFFECT-
ED PSU OXYGEN GEN-
ERATOR HAS BEEN EX-
PENDED
-FIGURE 5CONDITION 2.2 (ACTION
2): Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
19 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 20

Group 2, Configuration 1:
Table 2: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
-FIGURE 7Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.3: AFFECT-
ED PSU OXYGEN GEN-
ERATOR NOT EXPEND-
ED AND NO MIGRATION
FOUND
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
(a) A serviceable PSU Oxygen Generator is defined as a PSU Oxygen Generator that has not been expended
and has not expired (i.e., the PSU Oxygen Generator does not exceed the life limit established for that
generator by the manufacturer).
Group 1, Configuration 2:
Table 3: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
PART 1: PASSENGER
COMPARTMENT AND
PSU ACCESS
-Do a General Visual In-
spection (GVI) of the Pas-
senger Service Unit (PSU)
Oxygen Generator to de-
termine retention straps
thermal pads configura-
tion.
All Airplanes
-FIGURE 2
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-No further action is re-
quired.
CONDITION 1: ANY PSU
OXYGEN GENERATOR
WITHOUT PRESSURE
SENSITIVE ADHESIVE
(PSA) RETENTION
STRAPS THERMAL
PADS FOUND
PART 3: RESTORATION-
-FIGURE 4Do a GVI of the affected
PSU Oxygen Generator
to determine if expended.
CONDITION 2: ANY PSU
OXYGEN GENERATOR
WITH PSA RETENTION
STRAPS THERMAL
PADS FOUND
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
20 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 21

Group 1, Configuration 2:
Table 3: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
-FIGURE 6Replace with new or ser-
viceable PSU Oxygen
Generator and replace
PSA retention strap ther-
mal pads with non-PSA
retention strap thermal
pads. (a)
CONDITION 2.1: AFFECT-
ED PSU OXYGEN GEN-
ERATOR EXPENDED PART 2: PASSENGERCOMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 8Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.2: AFFECT-
ED PSU OXYGEN GEN-
ERATOR NOT EXPEND-
ED
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
(a) A serviceable PSU Oxygen Generator is defined as a PSU Oxygen Generator that has not been expended
and has not expired (i.e., the PSU Oxygen Generator does not exceed the life limit established for that
generator by the manufacturer).
Group 2, Configuration 2:
Table 4: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
PART 1: PASSENGER
COMPARTMENT AND
PSU ACCESS
-Do a General Visual In-
spection (GVI) of the Pas-
senger Service Unit (PSU)
Oxygen Generator to de-
termine retention straps
thermal pads configura-
tion.
All Airplanes
-FIGURE 2
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-No further action is re-
quired.
CONDITION 1: ANY PSU
OXYGEN GENERATOR
WITHOUT PRESSURE
SENSITIVE ADHESIVE
(PSA) RETENTION
STRAPS THERMAL
PADS FOUND
PART 3: RESTORATION-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
21 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 22

Group 2, Configuration 2:
Table 4: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
-FIGURE 4Do a GVI of the affected
PSU Oxygen Generator
to determine if expended
and installation migration.
CONDITION 2: ANY PSU
OXYGEN GENERATOR
WITH PSA RETENTION
STRAPS THERMAL
PADS FOUND
FIGURE 14
-FIGURE 8(OPTION 1): Replace
PSA retention strap ther-
mal pads with non-PSA
retention strap thermal
pads and reposition affect-
ed PSU Oxygen Genera-
tor.
CONDITION 2.1: AFFECT-
ED PSU OXYGEN GEN-
ERATOR MIGRATION
FOUND AND NOT EX-
PENDED
FIGURE 10
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 10(OPTION 2) (ACTION 1):
Reposition affected PSU
Oxygen Generator. PART 2: PASSENGERCOMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
PART 1: PASSENGER
COMPARTMENT AND
PSU ACCESS
-(OPTION 2) (ACTION 2):
Make sure affected PSU
Oxygen Generator migra-
tion is not found and has
not been expended. -FIGURE 4FIGURE 14
-FIGURE 8Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.1.1: AF-
FECTED PSU OXYGEN
GENERATOR MIGRA-
TION IS NOT FOUND
AND HAS NOT BEEN
FOUND EXPENDED
DURING (OPTION 2)
(ACTION 2)
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
22 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 23

Group 2, Configuration 2:
Table 4: Passenger Service Unit (PSU) Oxygen Generator and Thermal Pad Inspection and Replacement
Refer to the listed proce-
dures in SB 737-35-1211
Original Issue or later
approved revisions as
an accepted procedure.
Method of ComplianceActionCondition
-FIGURE 12CONDITION 2.1.2 (AC-
TION 1): Reposition affect-
ed PSU Oxygen Genera-
tor.
CONDITION 2.1.2: AF-
FECTED PSU OXYGEN
GENERATOR MIGRA-
TION IS FOUND AND
HAS NOT BEEN FOUND
EXPENDED DURING
(OPTION 2) (ACTION 2)
-FIGURE 12CONDITION 2.1.2 (AC-
TION 2): Replace PSA re-
tention strap thermal pads
with non-PSA retention
strap thermal pads.
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 6CONDITION 2.1.3 (AC-
TION 1): Replace with
new or serviceable PSU
Oxygen Generator. (a)
CONDITION 2.1.3: AF-
FECTED PSU OXYGEN
GENERATOR HAS BEEN
FOUND EXPENDED
DURING (OPTION 2)
(ACTION 2) -FIGURE 6CONDITION 2.1.3 (AC-TION 2): Replace PSA re-
tention strap thermal pads
with non-PSA retention
strap thermal pads.
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 6CONDITION 2.2 (ACTION
1): Replace with new or
serviceable PSU Oxygen
Generator. (a)
CONDITION 2.2: AFFECT-
ED PSU OXYGEN GEN-
ERATOR HAS BEEN EX-
PENDED
-FIGURE 6CONDITION 2.2 (ACTION
2): Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
-FIGURE 8Replace PSA retention
strap thermal pads with
non-PSA retention strap
thermal pads.
CONDITION 2.3: AFFECT-
ED PSU OXYGEN GEN-
ERATOR NOT EXPEND-
ED AND NO MIGRATION
FOUND
PART 2: PASSENGER
COMPARTMENT AND
PSU CLOSE ACCESS
-
PART 3: RESTORATION-
(a) A serviceable PSU Oxygen Generator is defined as a PSU Oxygen Generator that has not been expended
and has not expired (i.e., the PSU Oxygen Generator does not exceed the life limit established for that
generator by the manufacturer).
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
23 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 24 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3066119
FIGURE 1: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  24 of 68

### Page 25 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
OXYGEN
GENERATOR
PASSENGER
SERVICE  TEND
UNIT (PSU)
EXAMPLE - CORRECT STRAP AND THERMAL PAD INSTALLATION
OXYGEN
GENERATOR
PASSENGER
SERVICE
UNIT (PSU)
EXAMPLE - INCORRECT STRAP AND THERMAL PAD INSTALLATION
3066120
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 1: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION
(SHEET 2 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  25 of 68

### Page 26

More DataQtyIdentificationNameTaskStep
(a) 253010 OR 69848THERMAL PADInspect1
(a)
Do a General Visual Inspection (GVI) of the PSU Oxygen Generator thermal pad to determine the type
of thermal pad installed under the retention strap.
FIGURE 1: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
26 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 27 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 2.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE
3066121
FIGURE 2: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  27 of 68

### Page 28 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
OXYGEN
GENERATOR
PASSENGER
SERVICE
UNIT (PSU)
EXAMPLE - CORRECT STRAP AND THERMAL PAD INSTALLATION
OXYGEN
GENERATOR
PASSENGER
SERVICE
UNIT (PSU)
EXAMPLE - INCORRECT STRAP AND THERMAL PAD INSTALLATION
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 2: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION
(SHEET 2 OF 3)
Original issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  28 of 68

### Page 29

More DataQtyIdentificationNameTaskStep
(a) 273667 OR 69762THERMAL PADInspect1
(a)
Do a General Visual Inspection (GVI) of the PSU Oxygen Generator thermal pad to determine the type
of thermal pad installed under the retention strap.
FIGURE 2: PASSENGER COMPARTMENT - THERMAL PAD INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
29 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 30 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3066630
FIGURE 3: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  30 of 68

### Page 31 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
OXYGEN
GENERATOR
PASSENGER
SERVICE
UNIT (PSU)
3066628
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 3: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION
(SHEET 2 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  31 of 68

### Page 32

More DataQtyIdentificationNameTaskStep
(a) 1E71740-00 OR
S417T401-44
OXYGEN GENERA-
TOR (12-MIN.)
Inspect1
(a)
Do a General Visual Inspection (GVI) of the affected PSU Oxygen Generator to determine if expended
as shown in APPENDIX D and APPENDIX E.
FIGURE 3: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
32 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 33 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 2.
•PASSENGER
SERVICE
UNIT (PSU)
PASSENGER COMPARTMENT
(EXAMPLE
3066631
FIGURE 4: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  33 of 68

### Page 34 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
OXYGEN
GENERATOR
PASSENGER
SERVICE
UNIT (PSU)
3066629
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 4: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION
(SHEET 2 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  34 of 68

### Page 35

More DataQtyIdentificationNameTaskStep
(a) 1E72280-00 OR
S417T401-63
OXYGEN GENERA-
TOR (22-MIN.)
Inspect1
(a)
Do a General Visual Inspection (GVI) of the affected PSU Oxygen Generator to determine if expended
as shown in APPENDIX D and APPENDIX E.
FIGURE 4: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
EXPENDED INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
35 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 36 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3067291
FIGURE 5: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  36 of 68

### Page 37 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER
SERVICE
UNIT (PSU)
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 5: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT
(SHEET 2 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  37 of 68

### Page 38

IF THE CHEMICAL OXYGEN GENERATOR ACCIDENTALLY OPERATES, IT IS MANDATORY
THAT YOU REPLACE IT. AN EXPENDED OXYGEN GENERATOR GETS VERY HOT (450
DEG. FAHRENHEIT/232 DEG. CELSIUS) OR HIGHER AND CAN BURN YOU IF YOU TOUCH
IT. YOU MUST NOT TOUCH THE OXYGEN GENERATOR UNTIL IT BECOMES COOL.WARNING
More DataQtyIdentificationNameTaskStep
(a)(c)(g)2NAS1301-6-10SCREWRemove / Keep1
(a)(b)(c)(g)253010THERMAL PADRemove2
(d) 1E71740-00 OR
S417T401-44
OXYGEN GENERA-
TOR (12-MIN.)
Remove
(d) 1E71740-00 OR
S417T401-44
OXYGEN GENERA-
TOR (12-MIN.)
Install (New)3
(e)(f)(g)269848THERMAL PADInstall (New)
(g) 2NAS1301-6-10SCREWInstall (Kept)4
(h) 2NAS1301-6-10SCREWTorque5
(a) Remove one screw and one retention strap at a time. Make sure that when one screw and one retention
strap are removed, the other screw and retention strap are securing the PSU Oxygen Generator.
(b)
Clean the retention strap.
(c) After first screw and retention strap are removed, remove the second screw and retention strap. This is
required when the PSU Oxygen Generator has been expended.
(d) If the PSU Oxygen Generator has been expended, replace the PSU Oxygen Generator with a new or
serviceable PSU Oxygen Generator. Refer to 737-600/700/800/900 AMM 35-22-11 as an accepted pro-
cedure.
(e) Install the non-PSA thermal pad onto the retention strap.
Note: The open portion of the thermal pad will face away from the PSU Oxygen Generator.
(f) Install the retention strap and thermal pad back onto the PSU.
(g) Repeat for the second retention strap if required.
(h) Torque screw 8-10 in-lbs.
FIGURE 5: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
38 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 39 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 2.
•PASSENGER
SERVICE
UNIT (PSU)
PASSENGER COMPARTMENT
(EXAMPLE)
FIGURE 6: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT
(SHEET 1 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  39 of 68

### Page 40 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER
SERVICE
UNIT (PSU)
3067294
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 6: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT
(SHEET 2 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  40 of 68

### Page 41

IF THE CHEMICAL OXYGEN GENERATOR ACCIDENTALLY OPERATES, IT IS MANDATORY
THAT YOU REPLACE IT. AN EXPENDED OXYGEN GENERATOR GETS VERY HOT (450
DEG. FAHRENHEIT/232 DEG. CELSIUS) OR HIGHER AND CAN BURN YOU IF YOU TOUCH
IT. YOU MUST NOT TOUCH THE OXYGEN GENERATOR UNTIL IT BECOMES COOL.WARNING
More DataQtyIdentificationNameTaskStep
(a)(c)(g)2NAS1301-6-10SCREWRemove / Keep1
(a)(b)(c)(g)273667THERMAL PADRemove2
(d) 1E72280-00 OR
S417T401-63
OXYGEN GENERA-
TOR (22-MIN.)
Remove
(d) 1E72280-00 OR
S417T401-63
OXYGEN GENERA-
TOR (22-MIN.)
Install (New)3
(e)(f)(g)269762THERMAL PADInstall (New)
(g) 2NAS1301-6-10SCREWInstall (Kept)4
(h) 2NAS1301-6-10SCREWTorque5
(a) Remove one screw and one retention strap at a time. Make sure that when one screw and one retention
strap are removed, the other screw and retention strap are securing the PSU Oxygen Generator.
(b)
Clean the retention strap.
(c) After first screw and retention strap are removed, remove the second screw and retention strap. This is
required when the PSU Oxygen Generator has been expended.
(d) If the PSU Oxygen Generator has been expended, replace the PSU Oxygen Generator with a new or
serviceable PSU Oxygen Generator. Refer to 737-600/700/800/900 AMM 35-22-11 as an accepted pro-
cedure.
(e) Install the non-PSA thermal pad onto the retention strap.
Note: The open portion of the thermal pad will face away from the PSU Oxygen Generator.
(f) Install the retention strap and thermal pad back onto the PSU.
(g) Repeat for the second retention strap if required.
(h) Torque screw 8-10 in-lbs.
FIGURE 6: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR AND
THERMAL PAD REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
41 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 42 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3067675
FIGURE 7: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR THERMAL
PAD REPLACEMENT
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  42 of 68

### Page 43 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER
SERVICE
UNIT (PSU)
3067677
FIGURE 7: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR THERMAL
PAD REPLACEMENT
(SHEET 2 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  43 of 68

### Page 44

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)(e)2NAS1301-6-10SCREWRemove / Keep1
(a)(b)(e)253010THERMAL PADRemove
(c)(d)(e)269848THERMAL PADInstall (New)2
(e) 2NAS1301-6-10SCREWInstall (Kept)
(f) 2NAS1301-6-10SCREWTorque3
(a) Remove one screw and one retention strap at a time. Make sure that when one screw and one retention
strap are removed, the other screw and retention strap are securing the PSU Oxygen Generator.
(b)
Clean the retention strap.
(c) Install the non-PSA thermal pad onto the retention strap.
Note: The open portion of the thermal pad will face away from the PSU Oxygen Generator.
(d) Install the retention strap and thermal pad back onto the PSU.
(e) Repeat for the second retention strap if required.
(f) Torque screw 8-10 in-lbs.
FIGURE 7: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR THERMAL
PAD REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
44 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 45 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 1-2, Configuration 2.
•PASSENGER
SERVICE
UNIT (PSU)
PASSENGER COMPARTMENT
(EXAMPLE
3067679
FIGURE 8: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR THERMAL
PAD REPLACEMENT
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  45 of 68

### Page 46 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER
SERVICE
UNIT (PSU)  FY
3067681
FIGURE 8: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR THERMAL
PAD REPLACEMENT
(SHEET 2 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  46 of 68

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)(e)2NAS1301-6-10SCREWRemove / Keep1
(a)(b)(e)273667THERMAL PADRemove
(c)(d)(e)269762THERMAL PADInstall (New)2
(f) 2NAS1301-6-10SCREWInstall (Kept)
(a) Remove one screw and one retention strap at a time. Make sure that when one screw and one retention
strap are removed, the other screw and retention strap are securing the PSU Oxygen Generator.
(b)
Clean the retention strap.
(c) Install the non-PSA thermal pad onto the retention strap.
Note: The open portion of the thermal pad will face away from the PSU Oxygen Generator.
(d) Install the retention strap and thermal pad back onto the PSU.
(e) Repeat for the second retention strap if required.
(f) Torque screw 8-10 in-lbs.
FIGURE 8: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR THERMAL
PAD REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
47 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 48 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3067683
FIGURE 9: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  48 of 68

### Page 49 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
PASSENGER
SERVICE
UNIT (PSU)
3067685
FIGURE 9: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION
(SHEET 2 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  49 of 68

### Page 50

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
IF THE CHEMICAL OXYGEN GENERATOR ACCIDENTALLY OPERATES, IT IS MANDATORY
THAT YOU REPLACE IT. AN EXPENDED OXYGEN GENERATOR GETS VERY HOT (450
DEG. FAHRENHEIT/232 DEG. CELSIUS) OR HIGHER AND CAN BURN YOU IF YOU TOUCH
IT. YOU MUST NOT TOUCH THE OXYGEN GENERATOR UNTIL IT BECOMES COOL.WARNING
More DataQtyIdentificationNameTaskStep
(a)(b)2NAS1301-6-10SCREWLoosen1
(b) 1E71740-00 OR
S417T401-44
OXYGEN GENERA-
TOR (12-MIN.)
Move2
(c) 2NAS1301-6-10SCREWTorque3
(a)
Loosen but do not remove the 2 screws.
(b) Loosen screws to reposition the PSU Oxygen Generator by moving it into contact with the oxygen mask
box. Refer to APPENDIX H for guidance.
(c) Torque screw 8-10 in-lbs.
FIGURE 9: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
50 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 51 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 2, Configuration 2.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE
3067690
FIGURE 10: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  51 of 68

### Page 52 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
PASSENGER
SERVICE
UNIT (PSU)
3067689
FIGURE 10: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION
(SHEET 2 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  52 of 68

### Page 53

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
IF THE CHEMICAL OXYGEN GENERATOR ACCIDENTALLY OPERATES, IT IS MANDATORY
THAT YOU REPLACE IT. AN EXPENDED OXYGEN GENERATOR GETS VERY HOT (450
DEG. FAHRENHEIT/232 DEG. CELSIUS) OR HIGHER AND CAN BURN YOU IF YOU TOUCH
IT. YOU MUST NOT TOUCH THE OXYGEN GENERATOR UNTIL IT BECOMES COOL.WARNING
More DataQtyIdentificationNameTaskStep
(a)(b)2NAS1301-6-10SCREWLoosen1
(b) 1E72280-00 OR
S417T401-63
OXYGEN GENERA-
TOR (22-MIN.)
Move2
(c) 2NAS1301-6-10SCREWTorque3
(a)
Loosen but do not remove the 2 screws.
(b) Loosen screws to reposition the PSU Oxygen Generator by moving it into contact with the oxygen mask
box. Refer to APPENDIX H for guidance.
(c) Torque screw 8-10 in-lbs.
FIGURE 10: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
53 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 54 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3067692
FIGURE 11: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT
(SHEET 1 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  54 of 68

### Page 55 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
134
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER
SERVICE
UNIT (PSU)
3067694
FIGURE 11: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT
(SHEET 2 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  55 of 68

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
IF THE CHEMICAL OXYGEN GENERATOR ACCIDENTALLY OPERATES, IT IS MANDATORY
THAT YOU REPLACE IT. AN EXPENDED OXYGEN GENERATOR GETS VERY HOT (450
DEG. FAHRENHEIT/232 DEG. CELSIUS) OR HIGHER AND CAN BURN YOU IF YOU TOUCH
IT. YOU MUST NOT TOUCH THE OXYGEN GENERATOR UNTIL IT BECOMES COOL.WARNING
More DataQtyIdentificationNameTaskStep
(a)(b)2NAS1301-6-10SCREWLoosen1
(b) 1E71740-00 OR
S417T401-44
OXYGEN GENERA-
TOR (12-MIN.)
Move2
2NAS1301-6-10SCREWTighten3
(c)(g) 2NAS1301-6-10SCREWRemove / Keep4
(c)(d)(g)253010THERMAL PADRemove
(e)(f)(g)269848THERMAL PADInstall (New)5
(g) 2NAS1301-6-10SCREWInstall (Kept)
(h) 2NAS1301-6-10SCREWTorque6
(a)
Loosen but do not remove the 2 screws.
(b) Loosen screws to reposition the PSU Oxygen Generator by moving it into contact with the oxygen mask
box. Refer to APPENDIX H for guidance.
(c) Remove one screw and one retention strap at a time. Make sure that when one screw and one retention
strap are removed, the other screw and retention strap are securing the PSU Oxygen Generator.
(d) Clean the retention strap.
(e) Install the non-PSA thermal pad onto the retention strap.
Note: The open portion of the thermal pad will face away from the PSU Oxygen Generator.
(f) Install the retention strap and thermal pad back onto the PSU.
(g) Repeat for the second retention strap if required.
(h) Torque screw 8-10 in-lbs.
FIGURE 11: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
56 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 57 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 2, Configuration 2.
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER COMPARTMENT
(EXAMPLE)
FIGURE 12: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT
(SHEET 1 OF 3)
Original Issue: June 17, 2024
Export Controlled ECCN: 9E991  737-35-1211 RB
See page 1 for details  57 of 68

### Page 58 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
1) 3)4
PASSENGER
SERVICE
UNIT (PSU)
PASSENGER
SERVICE
UNIT (PSU)  FV
3067698
FIGURE 12: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT
(SHEET 2 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  58 of 68

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
IF THE CHEMICAL OXYGEN GENERATOR ACCIDENTALLY OPERATES, IT IS MANDATORY
THAT YOU REPLACE IT. AN EXPENDED OXYGEN GENERATOR GETS VERY HOT (450
DEG. FAHRENHEIT/232 DEG. CELSIUS) OR HIGHER AND CAN BURN YOU IF YOU TOUCH
IT. YOU MUST NOT TOUCH THE OXYGEN GENERATOR UNTIL IT BECOMES COOL.WARNING
More DataQtyIdentificationNameTaskStep
(a)(b)2NAS1301-6-10SCREWLoosen1
(b) 1E72280-00 OR
S417T401-63
OXYGEN GENERA-
TOR (22-MIN.)
Move2
2NAS1301-6-10SCREWTighten3
(c)(g) 2NAS1301-6-10SCREWRemove / Keep4
(c)(d)(g)273667THERMAL PADRemove
(e)(f)(g)269762THERMAL PADInstall (New)5
(g) 2NAS1301-6-10SCREWInstall (Kept)
(h) 2NAS1301-6-10SCREWTorque6
(a)
Loosen but do not remove the 2 screws.
(b) Loosen screws to reposition the PSU Oxygen Generator by moving it into contact with the oxygen mask
box. Refer to APPENDIX H for guidance.
(c) Remove one screw and one retention strap at a time. Make sure that when one screw and one retention
strap are removed, the other screw and retention strap are securing the PSU Oxygen Generator.
(d) Clean the retention strap.
(e) Install the non-PSA thermal pad onto the retention strap.
Note: The open portion of the thermal pad will face away from the PSU Oxygen Generator.
(f) Install the retention strap and thermal pad back onto the PSU.
(g) Repeat for the second retention strap if required.
(h) Torque screw 8-10 in-lbs.
FIGURE 12: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR
REPOSITION AND THERMAL PAD REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 17, 2024
737-35-1211 RB
59 of 68
REQUIREMENTS BULLETIN 737-35-1211

### Page 60 (OCR)

REQUIREMENTS BULLETIN 737-35-1211
This Figure applies only to: Group 2, Configuration 1.
PASSENGER
SERVICE
UNIT (PSU)
FWD
PASSENGER COMPARTMENT
(EXAMPLE)
3067700
FIGURE 13: PASSENGER COMPARTMENT - PASSENGER SERVICE UNIT OXYGEN GENERATOR POSITION
INSPECTION
(SHEET 1 OF 3)
Original Issue: June 17, 2024
737-35-1211 RB
Export Controlled ECCN: 9E991
See page 1 for details  60 of 68

The text continues at https://openairdocs.org/service-documents/boeing/737-35-1211-rb/file/faeb881891fe.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.