# Boeing Alert Service Bulletin 737-53A1279: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1162; AD 2011-23-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-53A1279](https://openairdocs.org/service-documents/boeing/737-53a1279.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 227
- PDF: https://openairdocs.org/files/sha256/33/f8/33f8cce2fb292abfed6a72d8ef5641487dee50c37c02fe378fcbeadb48092b3b
- Page: https://openairdocs.org/service-documents/boeing/737-53a1279/file/33f8cce2fb29

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-53A1279
Original Issue: December 18, 2007
Revision 1: September 02, 2011
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Forward Cargo Bay Stringer 19 to Stringer 21
- Frames and Frame Reinforcements - Inspection, Repair and Preventative Modification
at Wire Penetration Hole
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2007 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
1 of 159
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
2 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 7
B. Concurrent Requirements ...................................... 1 7
C. Reason ................................................ 1 8
D. Description .............................................. 1 9
E. Compliance .............................................. 2 0
F. Approval ............................................... 2 4
G. Manpower .............................................. 2 5
H. Weight and Balance Changes .................................... 2 6
I. Electrical Load Data ......................................... 2 7
J. References .............................................. 2 7
1. Existing Data: ......................................... 2 7
2. Data supplied with this Service Bulletin: ........................... 2 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 7
K. Publications Affected ........................................ 2 8
L. Interchangeability and Intermixability of Parts ........................... 2 8
2. MATERIAL INFORMATION ........................................ 2 9
A. Material - Price and Availability ................................... 2 9
B. Industry Support Information .................................... 2 9
C. Parts Necessary For Each Airplane ................................. 2 9
1. Kits/Parts: ........................................... 2 9
2. Parts and Materials Supplied by the Operator: ........................ 2 9
3. Parts Modified and Reidentified: ............................... 2 9
4. Parts Removed and Not Replaced: .............................. 2 9
D. Parts Necessary to Change Spares ................................. 2 9
E. Special Tooling - Price and Availability ............................... 2 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 0
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 1
A. GENERAL INFORMATION ..................................... 3 1
B. WORK INSTRUCTIONS ....................................... 3 1
FIGURE 1: FORWARD CARGO BAY - STATION 500A TO STATION 500D - WIRE SHROUD - REMOVAL
[Group 1] ............................................ 4 1
FIGURE 2: FORWARD CARGO BAY - STATION 460 TO STATION 482B - WIRE SHROUD - REMOVAL
[Group 3] ............................................ 4 5
FIGURE 3: FORWARD CARGO BAY - AFT BULKHEAD PANELS - REMOVAL ............ 4 9
FIGURE 4: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE [Group 1]
.................................................. 5 1
FIGURE 5: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE [Group 2]
.................................................. 5 6
FIGURE 6: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE [Group 3]
.................................................. 6 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
3 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 4

FIGURE 7: FORWARD CARGO BAY - STATION 500B TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) SURFACE INSPECTION [Group 1] ................... 6 6
FIGURE 8: FORWARD CARGO BAY - STATION 500B TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) SURFACE INSPECTION [Group 2] ................... 7 3
FIGURE 9: FORWARD CARGO BAY - STATION 482 TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) SURFACE INSPECTION [Group 3] ................... 8 0
FIGURE 10: FORWARD CARGO BAY - STATION 500B TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) HOLE/EDGE INSPECTION [Group 1] .................. 8 7
FIGURE 11: FORWARD CARGO BAY - STATION 500B TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) HOLE/EDGE INSPECTION [Group 2] .................. 9 5
FIGURE 12: FORWARD CARGO BAY - STATION 482 TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) HOLE/EDGE INSPECTION [Group 3] ................. 1 0 3
FIGURE 13: FORWARD CARGO BAY - STATION 500B TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) HOLE/EDGE INSPECTION [Group 1] ................. 1 1 1
FIGURE 14: FORWARD CARGO BAY - STATION 500B TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) HOLE/EDGE INSPECTION [Group 2] ................. 1 1 9
FIGURE 15: FORWARD CARGO BAY - STATION 482 TO 520 FRAMES - HIGH FREQUENCY EDDY
CURRENT (HFEC) HOLE/EDGE INSPECTION [Group 3] ................. 1 2 7
FIGURE 16: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - INSTALL [Group
1 ]  ................................................ 1 3 5
FIGURE 17: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - INSTALL [Group
2 ]  ................................................ 1 4 0
FIGURE 18: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - INSTALL [Group
3 ]  ................................................ 1 4 5
FIGURE 19: FORWARD CARGO BAY - AFT BULKHEAD PANELS - INSTALL ............ 1 5 0
FIGURE 20: FORWARD CARGO BAY - STATION 500A TO STATION 500D - WIRE SHROUD - INSTALL
[Group 1] ............................................ 1 5 2
FIGURE 21: FORWARD CARGO BAY - STATION 460 TO STATION 482B - WIRE SHROUD - INSTALL
[Group 3] ............................................ 1 5 6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
4 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 5

Commercial 
Airplanes
737
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 737-53A1279Original Issue: December 18, 2007
Revision 1: September 02, 2011
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Forward Cargo Bay Stringer 19 to Stringer 21
- Frames and Frame Reinforcements - Inspection, Repair and Preventative Modification
at Wire Penetration Hole
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-02-06 R1 is related to this service bulletin.
No More work is necessary on the airplanes changed in accordance with the original issue of this service bulletin.
REASON FOR REVISION
This revision is sent to update Paragraph 1.E.Compliance with new inspection thresholds and separate compliance
tables by airplane group. More background information is added and other references are updated throughout.
These sections were changed:
1. Paragraph 1.C.Reason - added background information
2. Paragraph 1.D.Description - added request for information from operators
3. Paragraph 1.E.Compliance - updated and added new table, added DTI information
4. Paragraph 1.F.Approval - added AD information
5. Paragraph 1.J.References - added AD and SRP information
6. Paragraph 1.K.Publications Affected - added DTI statement
7. Minor text updates throughout
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
5 of 159

### Page 6

REVISION HISTORY
December 18, 2007Original Issue:
September 02, 2011Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
6 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 7

Commercial 
Airplanes
737
Service Bulletin
ALERT
SummaryNumber: 737-53A1279Original Issue: December 18, 2007
Revision 1: September 02, 2011
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Forward Cargo Bay Stringer 19 to Stringer 21
- Frames and Frame Reinforcements - Inspection, Repair and Preventative Modification
at Wire Penetration Hole
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to inspect a wire penetration hole for cracking in the forward cargo
compartment frames and frame reinforcements, between Stringer S-20 and S-21, on both left and right sides
of the airplane. It also provides repair instructions for cracking at the wire penetration hole and instructions for
a preventative modification. Undetected cracking in fuselage frames at the wire penetration hole intended for
wire routing will reduce the frames structural capability below fail-safe load limits. Undetected cracking in the
frames could lead to cracking in the skin and could result in rapid depressurization of the airplane.
Boeing has received reports of cracking in the frame, or in the frame and frame reinforcement, common to the
1.04 inch nominal diameter wire penetration hole intended for wire routing, between S-20 and S-21, on both left
and right sides of the airplane. The cracked frames are located between Station (STA) 500B and STA 520 on
737-300/400 airplanes and STA 482 and STA 520 on 737-500 airplanes.
Cracking is occurring at the 1.04 inch nominal diameter wire penetration hole due to the effect of operating loads
in combination with the stress concentration at the 1.04 inch nominal hole.
Boeing received a report of frame cracking from an operator at the 1.04 inch nominal diameter wire penetration
hole on a 737-400 airplane. The airplane had one cracked frame. Boeing has since received reports of more
than fifty cracked frames at the 1.04 inch nominal diameter wire penetration hole on more than twenty airplanes,
all either 737-300 or 737-500 airplanes. The airplanes had accumulated between 35,832 and 66,694 flight cycles.
The cracking initiated at the 1.04 inch nominal diameter wire penetration hole and grew towards the inner chord.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
7 of 159

### Page 8

Boeing received a report of four cracked frames at BS 500B, BS 500C, BS 500D and BS 520 in the forward
cargo compartment between S-20L and S-21L on a 737-300 airplane. The cracks at BS 500B and BS 500C
were completely through the frame and fail-safe chord. The BS 500B frame was also cracked on the right hand
side. The airplane had 44,535 flight cycles and 44,876 flight hours. Though the airplane was above the AD and
service bulletin threshold of 32,000 flight cycles, the cracking was discovered before the airplane had reached
the compliance time of the AD and of the original issue of this service bulletin.
In total, Boeing has received more than 50 reports of frame cracking at the 1.04 inch nominal diameter wire
penetration hole on 24 airplanes. Details of the cracking are as follows:
— The cracking occurred at three frame stations on 737-300 airplanes, on four frame stations on 737-500
airplanes, and at one frame station on one 737-400 airplane.
— Sixteen airplanes had cracking on multiple frames.
— 10 frames had cracking at adjacent frames.
— 43 frames had cracking only at the inboard side of the 1.04 inch nominal diameter wire penetration hole in
the frame inner chord or in the frame and frame reinforcement inner chord.
— 3 frames had cracking at the outboard side of the 1.04 inch nominal diameter wire penetration hole in the
frame and the frame reinforcement. 2 of these frames were severed.
— Some frames had additional cracking at either the standoff/tooling holes or at the 0.50 inch diameter hole
positioned below the 1.04 inch nominal diameter wire penetration hole.
This service bulletin gives instructions to inspect the 1.04 inch nominal diameter wire penetration hole for cracking
in the frame and frame reinforcement, between S-20 and S-21, on both left and right sides of the airplane. It
also provides repair instructions for cracking at the wire penetration hole and instructions for a preventative
modification. An Inspection for cracking of the area and any necessary repair will assure the structural integrity
of the fuselage.
Boeing Service Related Problem (SRP) 737-SRP-53-0289 is related to this service bulletin.
Boeing Service Related Problem (SRP) 737-SRP-53-0377 is related to this service bulletin.
ACTION
Get access to the forward cargo bay. Remove the cargo handling system, if installed. Remove the wire shrouds,
sidewall linings, aft bulkhead panels and insulation blankets, on both sides of the airplane to get access to frames
STA 500B - STA 520 on 737-300 and -400 airplanes and STA 482 - STA 520 on 737-500 airplanes. Unscrew
the power feeder cable guides as required, and move them away from the hole. Do a High Frequency Eddy
Current (HFEC) inspection of the frame and frame reinforcement between S-20 and S-21 for cracking. If cracking
is found at the 1.04 inch nominal diameter wire penetration hole, do additional HFEC inspections for cracking
at the 0.50 inch diameter hole between S-20 and S-21 and all standoff/tooling hole locations between S-19 and
S-22. If no additional cracking is found at the 0.50 inch or standoff/tooling holes, repair cracking at the wire
penetration hole as given in this Service Bulletin. If additional cracking is found at the 0.50 inch or standoff/tooling
holes, contact Boeing for repair instructions. Repair all cracking damage. If no cracking is found at the 1.04 inch
nominal diameter wire penetration hole, either accomplish the preventative modification as given in this service
bulletin, or restore access, put the airplane back to a serviceable condition and do repeat inspections at the
intervals given in Paragraph 1.E., Compliance .
EFFECTIVITY
737-300/400/500 Series Airplanes. Refer to Paragraph 1.A.1 Airplanes, for the list of affected airplanes.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
8 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 9

COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-02-06 R1 is related to this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
See Service Bulletin Paragraph 1.E., for compliance information.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this service
bulletin.
MANPOWER
See Service Bulletin Paragraph 1.G., for manpower information.
MATERIAL INFORMATION
Operator Supplied Parts/Materials. Refer to Paragraph 2.A., Material - Price and Availability .
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
9 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 10 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
SEE
S-19R
TYPICAL CRACKING AT OUTBOARD AND
INBOARD SIDE OF 1.04 INCH NOMINAL
DIAMETER WIRE PENETRATION HOLE.
IF NO CRACKING IS FOUND AT THE
1.04 INCH NOMINAL DIAMETER WIRE
PENETRATION HOLE IS FOUND, EITHER
DO REPEAT INSPECTIONS AS GIVEN IN
PARAGRAPH I.E. COMPLIANCE, OR
ACCOMPLISH THE PREVENTATIVE
MODIFICATION AS GIVEN IN THIS
SERVICE BULLETIN.
INSPECT THE 1.04 INCH
NOMINAL DIAMETER WIRE
PENETRATION HOLE FOR
CRACKING.
S-22R
S-20R
IF CRACKING AT THE 1.04 INCH
NOMINAL DIAMETER WIRE
PENETRATION HOLE IS FOUND,
INSPECT THE 0.50 INCH DIAMETER
HOLE AND ALL STANDOFF/TOOLING
HOLES BETWEEN STRINGER 19 AND
STRINGER 22. IF NO CRACKING IS
S-21R  FOUND AT THE 0.50 INCH OR
STANDOFF/TOOLING HOLES, REPAIR
CRACKING AT THE WIRE
PENETRATION HOLE AS GIVEN IN
UP  THIS SERVICE BULLETIN. IF
ADDITIONAL CRACKING IS FOUND
INBD <  AT THE 0.50 INCH OR
STANDOFF/TOOLING HOLES,
CONTACT BOEING FOR REPAIR
INSTRUCTIONS.
VIEW LOOKING FORWARD
(TYPICAL FRAME SECTION)
RIGHT SIDE SHOWN  1339121
LEFT SIDE OPPOSITE
Original Issue: December 18, 2007
Revision 1: September 02, 2011  737-53A1279
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  10 of 159

### Page 11

Commercial 
Airplanes
737
Service Bulletin
ALERT
Number: 737-53A1279
Original Issue: December 18, 2007
Revision 1: September 02, 2011
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Forward Cargo Bay Stringer 19 to Stringer 21
- Frames and Frame Reinforcements - Inspection, Repair and Preventative Modification
at Wire Penetration Hole
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
737-300 Series Airplanes, Line numbers 1001-3130.-1
737-400 Series Airplanes, Line numbers 1487-3132.-2
737-500 Series Airplanes, Line numbers 1718-3116.-3
Airplane Models:
737-300, 737-400, 737-500
GroupVariable Number
2PJ301 - PJ302
2PJ551 - PJ561
2PJ601 - PJ615
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
11 of 159

### Page 12

GroupVariable Number
2PJ811
2PJ816 - PJ817
1PM381 - PM399
1PM401 - PM417
1PM541 - PM550
2PM551 - PM564
1PP001 - PP054
1PP101 - PP169
1PP181 - PP199
1PP201 - PP205
1PP221
1PP231 - PP243
1PP281 - PP286
1PP301 - PP305
1PP351 - PP353
1PP376 - PP384
1PP391 - PP393
1PP401 - PP440
1PP471 - PP475
1PP501 - PP522
1PP631 - PP634
1PP651 - PP652
1PP671 - PP699
1PP701 - PP733
1PP771 - PP779
1PP801 - PP808
1PP821 - PP827
1PP831 - PP848
1PP851 - PP852
1PP861 - PP877
1PP891 - PP899
1PP901 - PP936
1PP946 - PP948
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
12 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 13

GroupVariable Number
1PP951 - PP952
1PP961 - PP967
1PP981 - PP991
1PP993
1PQ001 - PQ016
1PQ026 - PQ041
1PQ051 - PQ092
1PQ101 - PQ199
1PQ201 - PQ202
1PQ221 - PQ237
1PQ241 - PQ243
1PQ251 - PQ267
1PQ281 - PQ299
1PQ301 - PQ307
1PQ331 - PQ332
1PQ341 - PQ348
1PQ361 - PQ373
1PQ391 - PQ395
1PQ401 - PQ418
1PQ421
1PQ431 - PQ438
1PQ447 - PQ448
1PQ451
1PQ454
1PQ471 - PQ475
1PQ479 - PQ481
1PQ486 - PQ487
1PQ491 - PQ493
1PQ771 - PQ772
1PQ791 - PQ793
1PQ801 - PQ805
1PQ931 - PQ935
1PQ951
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
13 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 14

GroupVariable Number
1PQ971 - PQ997
1PR001 - PR017
1PR021 - PR034
1PR041 - PR045
1PR061 - PR072
1PR077 - PR082
1PR091 - PR092
1PR096
1PR101
1PR121 - PR122
1PR131 - PR132
1PR141 - PR143
1PR161 - PR172
1PR181
1PS601 - PS631
1PS636 - PS638
1PS641 - PS644
1PS651 - PS657
1PS666 - PS669
1PS691 - PS692
1PS701 - PS706
1PS751 - PS799
1PS811
1PS836 - PS837
1PS841 - PS846
1PS851 - PS852
1PS856
1PS861 - PS863
1PS866 - PS868
1PS871 - PS874
1PS896 - PS897
1PS901 - PS941
1PS956 - PS957
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
14 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 15

GroupVariable Number
1PS961 - PS963
1PS971 - PS978
3PT001 - PT015
3PT021 - PT031
3PT041 - PT064
3PT101 - PT105
3PT121 - PT138
3PT146 - PT148
3PT161 - PT170
3PT181 - PT188
3PT211 - PT220
3PT295
3PT301 - PT309
3PT331 - PT360
3PT381 - PT399
3PT401 - PT438
3PT501 - PT517
3PT561 - PT565
3PT581 - PT586
3PT611 - PT621
3PT641 - PT644
3PT651 - PT656
3PT671 - PT672
3PT681 - PT685
3PT701 - PT703
3PT716 - PT717
3PT721 - PT725
3PT801 - PT834
3PT851 - PT854
3PT871 - PT886
3PT901 - PT930
3PT971 - PT973
3PT981 - PT985
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
15 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 16

GroupVariable Number
3PT996
3PU001 - PU025
3PU301
3PU311 - PU313
2PV001 - PV055
2PV201 - PV209
2PV226 - PV229
2PV231 - PV237
2PV271 - PV272
2PV281 - PV287
2PV296
2PV301 - PV302
2PV351
2PV356 - PV357
2PW001 - PW054
2PW061 - PW068
2PW072
2PW086 - PW088
2PW091 - PW094
2PW101 - PW102
2PW106
2PW111 - PW120
2PW156 - PW157
2PW161 - PW171
2PW201 - PW252
2PW261 - PW268
2PW271 - PW276
2PW278
2PW281 - PW293
2PW296
2PW301 - PW327
2PW401 - PW408
2PW411 - PW418
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
16 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 17

GroupVariable Number
2PW421 - PW424
2PW431 - PW435
2PW441 - PW450
2PW461 - PW467
2PW501 - PW504
2PW511 - PW522
2PW524 - PW550
2PW556 - PW557
2PW561 - PW564
2PW571 - PW576
2PW591 - PW596
2PW611 - PW622
2PW631 - PW637
2PW661 - PW662
2PW681 - PW683
2PW701 - PW702
2PW711 - PW717
2PW741 - PW742
2PW761
2PW771
2PW831
2PW851 - PW856
2. Spares Affected
None.
B. Concurrent Requirements
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
17 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 18

C. Reason
This service bulletin gives instructions to inspect a wire penetration hole for cracking in the forward
cargo compartment frames and frame reinforcements, between Stringer S-20 and S-21, on both left
and right sides of the airplane. It also provides repair instructions for cracking at the wire penetration
hole and instructions for a preventative modification. Undetected cracking in fuselage frames at the
wire penetration hole intended for wire routing will reduce the frames structural capability below fail-safe
load limits. Undetected cracking in the frames could lead to cracking in the skin and could result in
rapid depressurization of the airplane.
Boeing has received reports of cracking in the frame, or in the frame and frame reinforcement, common
to the 1.04 inch nominal diameter wire penetration hole intended for wire routing, between S-20 and
S-21, on both left and right sides of the airplane. The cracked frames are located between Station
(STA) 500B and STA 520 on 737-300/400 airplanes and STA 482 and STA 520 on 737-500 airplanes.
Cracking is occurring at the 1.04 inch nominal diameter wire penetration hole due to the effect of
operating loads in combination with the stress concentration at the 1.04 inch nominal hole.
Boeing received a report of frame cracking from an operator at the 1.04 inch nominal diameter wire
penetration hole on a 737-400 airplane. The airplane had one cracked frame. Boeing has since received
reports of more than fifty cracked frames at the 1.04 inch nominal diameter wire penetration hole on
more than twenty airplanes, all either 737-300 or 737-500 airplanes. The airplanes had accumulated
between 35,832 and 66,694 flight cycles. The cracking initiated at the 1.04 inch nominal diameter wire
penetration hole and grew towards the inner chord.
Boeing received a report of four cracked frames at BS 500B, BS 500C, BS 500D and BS 520 in the
forward cargo compartment between S-20L and S-21L on a 737-300 airplane. The cracks at BS 500B
and BS 500C were completely through the frame and fail-safe chord. The BS 500B frame was also
cracked on the right hand side. The airplane had 44,535 flight cycles and 44,876 flight hours. Though
the airplane was above the AD and service bulletin threshold of 32,000 flight cycles, the cracking was
discovered before the airplane had reached the compliance time of the AD and of the original issue of
this service bulletin.
In total, Boeing has received more than 50 reports of frame cracking at the 1.04 inch nominal diameter
wire penetration hole on 24 airplanes. Details of the cracking are as follows:
— The cracking occurred at three frame stations on 737-300 airplanes, on four frame stations on
737-500 airplanes, and at one frame station on one 737-400 airplane.
— Sixteen airplanes had cracking on multiple frames.
— 10 frames had cracking at adjacent frames.
— 43 frames had cracking only at the inboard side of the 1.04 inch nominal diameter wire penetration
hole in the frame inner chord or in the frame and frame reinforcement inner chord.
— 3 frames had cracking at the outboard side of the 1.04 inch nominal diameter wire penetration
hole in the frame and the frame reinforcement. 2 of these frames were severed.
— Some frames had additional cracking at either the standoff/tooling holes or at the 0.50 inch diameter
hole positioned below the 1.04 inch nominal diameter wire penetration hole.
This service bulletin gives instructions to inspect the 1.04 inch nominal diameter wire penetration hole
for cracking in the frame and frame reinforcement, between S-20 and S-21, on both left and right sides
of the airplane. It also provides repair instructions for cracking at the wire penetration hole and
instructions for a preventative modification. An Inspection for cracking of the area and any necessary
repair will assure the structural integrity of the fuselage.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
18 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 19

Boeing Service Related Problem (SRP) 737-SRP-53-0289 is related to this service bulletin.
Boeing Service Related Problem (SRP) 737-SRP-53-0377 is related to this service bulletin.
Revision 1 is sent to update Paragraph 1.E.Compliance with new inspection thresholds and separate
compliance tables by airplane group. More background information is added and other references are
updated throughout.
D. Description
Get access to the forward cargo bay. Remove the cargo handling system, if installed. Remove the wire
shrouds, sidewall linings, aft bulkhead panels and insulation blankets, on both sides of the airplane to
get access to frames STA 500B - STA 520 on 737-300 and -400 airplanes and STA 482 - STA 520 on
737-500 airplanes. Unscrew the power feeder cable guides as required, and move them away from
the hole. Do a High Frequency Eddy Current (HFEC) inspection of the frame and frame reinforcement
between S-20 and S-21 for cracking. If cracking is found at the 1.04 inch nominal diameter wire
penetration hole, do additional HFEC inspections for cracking at the 0.50 inch diameter hole between
S-20 and S-21 and all standoff/tooling hole locations between S-19 and S-22. If no additional cracking
is found at the 0.50 inch or standoff/tooling holes, repair cracking at the wire penetration hole as given
in this Service Bulletin. If additional cracking is found at the 0.50 inch or standoff/tooling holes, contact
Boeing for repair instructions. Repair all cracking damage.
WHEN CONTACTING BOEING FOR THE REPAIR PLAN, PLEASE INCLUDE THE FOLLOWING
INFORMATION TO FACILITATE REPAIR PLAN DEVELOPMENT:
1. INSPECTION METHOD USED AND NOTCH CALIBRATION SIZE.
2. LOCATIONS OF ALL CRACKS FOUND.
3. WHETHER ANY CRACK FOUND IS IN THE FRAME, THE FRAME REINFORCEMENT, OR
BOTH.
4. THE LENGTH OF ALL CRACKS FOUND.
5. IDENTIFY ALL LOCATIONS OF STANDOFF HOLES BETWEEN S-19 AND S-22 ON A DRAWING.
INCLUDE SPACING BETWEEN THE STANDOFF HOLE AND IT'S NEAREST FASTENER.
Send your report to: BOEING COMMERCIAL AIRPLANES GROUP ATTENTION: MANAGER, AIRLINE
SUPPORT
Boeing would like to gather information on cracking found by the service bulletin inspections.
Report crack inspection results to Boeing. In the report, identify the following:
– Operator
– Airplane ID (series and line number or variable number)
– Flight cycles and flight hours when service bulletin inspection was accomplished
– Results of inspections (crack findings or no crack findings)
– Inspection method used and notch calibration size
– If cracking is found, provide: frame location (BS LH or RH), parts cracked (frame web, reinforcement
angle, and/or fail safe chord), location of crack (1.04 inch wire penetration hole, 1/2 inch hole, or
other) and length of cracks.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
19 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 20

Retain all trimmed out frame sections (frame, frame reinforcement, and/or fail safe chord). Mark the
frame station (BS and LH or RH) and the aircraft identification including the airplane cycles and hours,
on each trimmed out section. Forward the samples to the following address:
Spares Distribution Center
Warranty and Overhaul Area, SSA 111
THE BOEING COMPANY
Attention: Airline Support Manager / Cheri Tanner
Mail Code 2L-78
2201 S 142nd ST
PO BOX 3707 98124-2207
SEATAC WA 98168-3713
USA
Forward to Post Production Fuselage Stress for engineering evaluation. Include a tag with the airplane
information and Boeing Message Number (Service Request I.D.) along with a tracking number for the
shipment.
If no cracking is found at the 1.04 inch nominal diameter wire penetration hole, either accomplish the
preventative modification as given in this service bulletin, or restore access, put the airplane back to a
serviceable condition and do repeat inspections at the intervals given in Paragraph 1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
208737-300
Group 2:
Affected Maintenance Zones
ZoneModel
208737-400
Group 3:
Affected Maintenance Zones
ZoneModel
208737-500
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2009-02-06 R1 is related to this
service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
20 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 21

The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the inspections given in this service bulletin be done at the times specified
in the tables below.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
21 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 22

Group 1:
Table 1: Forward Cargo Bay - Inspection of Frames and Frame Reinforcements between S-19 and S-22
Repeat
Interval
(Not to
Exceed)
Compliance TimeActionCondition
-Before 30,000 total flight cy-
cles
(a) Do a HFEC Inspection for cracking
at the 1.04 inch nominal diameter wire
penetration hole in the forward cargo
bay frames and frame reinforcements
between S-20 and S-21 as given in Ac-
complishment Instruction Paragraph
3.B.2. Part 2.
Airplanes with less than
40,000 total flight cycles at
the date on Revision 1 of this
service bulletin
OR
Within 90 days from the date
of revision 1 of this service
bulletin
(whichever occurs later)
-For Group 1 (737-300) air-
planes line number 1001-
2565, within 30 days from
the date of revision 1 of this
service bulletin
(a) Do a HFEC Inspection for cracking
at the 1.04 inch nominal diameter wire
penetration hole in the forward cargo
bay frames and frame reinforcements
between S-20 and S-21 as given in Ac-
complishment Instruction Paragraph
3.B.2. Part 2.
Airplanes with 40,000 or
more total flight cycles at the
date of revision 1 of this ser-
vice bulletin
For Group 1 (737-300) air-
planes line number 2567-
3130, within 90 days from
the date of revision 1 of this
service bulletin
-Before Further FlightDo a HFEC Inspection for cracking at
the 0.50 inch diameter hole between S-
20 and S-21 and all standoff/tooling
holes between S-19 and S-22 as given
in Accomplishment Instruction Para-
graph 3.B.3. Part 3. Install repair as giv-
en in Accomplishment Instruction Para-
graph 3.B.3. Part 3.
After accomplishment of the
Paragraph 3.B.2. Part 2 Ini-
tial Inspection, and cracking
is found at 1.04 inch nominal
diameter wire penetration
hole in the frame or in the
frame reinforcement.
4,500
flight cy-
cles (b)
Within 4,500 flight cycles or
90 days from the date of revi-
sion 1 of this service bulletin,
whichever occurs later
(a) Do a HFEC Inspection for cracking
at the 1.04 inch nominal diameter wire
penetration hole in the forward cargo
bay frames and frame reinforcements
between S-20 and S-21 as given in Ac-
complishment Instruction Paragraph
3.B.4. Part 4.
After accomplishment of the
Paragraph 3.B.2. Part 2 -
Initial Inspection or Para-
graph 3.B.4. Part 4 - Repeat
Inspection and no cracking
is found.
-Before Further FlightDo a HFEC Inspection for cracking at
the 0.50 inch diameter hole between S-
20 and S-21 and all standoff/tooling
holes between S-19 and S-22 as given
in Accomplishment Instruction Para-
graph 3.B.3. Part 3. Install repair as giv-
en in Accomplishment Instruction Para-
graph 3.B.3. Part 3.
After accomplishment of the
Paragraph 3.B.4. Part 4 Re-
peat Inspection, and crack-
ing is found at 1.04 inch
nominal diameter wire pene-
tration hole in the frame or
in the frame reinforcement.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
22 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 23

Group 1:
Table 1: Forward Cargo Bay - Inspection of Frames and Frame Reinforcements between S-19 and S-22
Repeat
Interval
(Not to
Exceed)
Compliance TimeActionCondition
(a) Inspections are not necessary at locations that have been repaired as given by a Boeing Company autho-
rized representative approved frame repair or repaired as given in Accomplishment Instruction Paragraph
3.B.3 Part 3.
(b) Accomplishment of repair or preventative modification on a frame prior to further flight after the initial or
any repeat inspection terminates the repeat inspections as given in this service bulletin for that frame only.
Group 2-3:
Table 2: Forward Cargo Bay - Inspection of Frames and Frame Reinforcements between S-19 and S-22
Repeat
Interval
(Not to
Exceed)
Compliance TimeActionCondition
-Before 30,000 total flight cy-
cles
(a) Do a HFEC Inspection for cracking
at the 1.04 inch nominal diameter wire
penetration hole in the forward cargo
bay frames and frame reinforcements
between S-20 and S-21 as given in Ac-
complishment Instruction Paragraph
3.B.2. Part 2.
All airplanes
OR
Within 90 days from the date
of revision 1 of this service
bulletin
(whichever occurs later)
-Before Further FlightDo a HFEC Inspection for cracking at
the 0.50 inch diameter hole between S-
20 and S-21 and all standoff/tooling
holes between S-19 and S-22 as given
in Accomplishment Instruction Para-
graph 3.B.3. Part 3. Install repair as giv-
en in Accomplishment Instruction Para-
graph 3.B.3. Part 3.
After accomplishment of the
Paragraph 3.B.2. Part 2 Ini-
tial Inspection, and cracking
is found at 1.04 inch nominal
diameter wire penetration
hole in the frame or in the
frame reinforcement.
4,500
flight cy-
cles (b)
Within 4,500 flight cycles or
90 days from the date of revi-
sion 1 of this service bulletin,
whichever occurs later
(a) Do a HFEC Inspection for cracking
at the 1.04 inch nominal diameter wire
penetration hole in the forward cargo
bay frames and frame reinforcements
between S-20 and S-21 as given in Ac-
complishment Instruction Paragraph
3.B.4. Part 4.
After accomplishment of the
Paragraph 3.B.2. Part 2 -
Initial Inspection or Para-
graph 3.B.4. Part 4 - Repeat
Inspection and no cracking
is found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
23 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 24

Group 2-3:
Table 2: Forward Cargo Bay - Inspection of Frames and Frame Reinforcements between S-19 and S-22
Repeat
Interval
(Not to
Exceed)
Compliance TimeActionCondition
-Before Further FlightDo a HFEC Inspection for cracking at
the 0.50 inch diameter hole between S-
20 and S-21 and all standoff/tooling
holes between S-19 and S-22 as given
in Accomplishment Instruction Para-
graph 3.B.3. Part 3. Install repair as giv-
en in Accomplishment Instruction Para-
graph 3.B.3. Part 3.
After accomplishment of the
Paragraph 3.B.4. Part 4 Re-
peat Inspection, and crack-
ing is found at 1.04 inch
nominal diameter wire pene-
tration hole in the frame or
in the frame reinforcement.
(a) Inspections are not necessary at locations that have been repaired as given by a Boeing Company autho-
rized representative approved frame repair or repaired as given in Accomplishment Instruction Paragraph
3.B.3 Part 3.
(b) Accomplishment of repair or preventative modification on a frame prior to further flight after the initial or
any repeat inspection terminates the repeat inspections as given in this service bulletin for that frame only.
NOTE: Damage Tolerance Post Repair Inspection:
Damage tolerance post repair inspections for the SRM repairs referenced in this service
bulletin are specified within each of the SRM repairs.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the inspections, repairs and modifications defined in this service bulletin
as an alternative method of compliance to the requirements of paragraphs (g) and (h) of AD 2009-02-06
or to the requirements of paragraphs (h) and (i) of AD 2009-02-06 R1. Where this service bulletin
specifies contacting Boeing for instructions for removing damage and repairing cracking: before further
flight, remove the damage or repair the cracking using a method approved in accordance with the
procedures specified in paragraph (i) of AD 2009-02-06 or paragraph (j) of AD 2009-02-06 R1. All
provisions of AD 2009-02-06 or AD 2009-02-06 R1 that are not specifically referenced in the above
statement remain fully applicable and must be complied with accordingly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
24 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 25

G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1:
Elapsed HoursTask HoursNumber of
Persons
Task
1.252.502Open Sidewalls
and Blankets
Open Access
0.750.751Figure 1
0.500.501Figure 3
0.300.301Figure 4
2.502.501Figure 7 (a)Inspect
2.002.001Figure 10 (b)
1.501.501Figure 13 (a)
0.300.301Figure 16Close Access
0.500.501Figure 19
0.750.751Figure 20
1.252.502Close Sidewalls
and Blankets
8.1010.60TOTAL FOR EACH AIRPLANE
(a) The FIGURE 13 inspection is optional to the FIGURE 7 inspection and is not included
in the total.
(b) This inspection is only necessary if cracking is found and is not included in the total.
Group 2:
Elapsed HoursTask HoursNumber of
Persons
Task
2.755.502Open Sidewalls
and Blankets
Open Access
0.500.501Figure 3
0.300.301Figure 5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
25 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 26

Group 2:
Elapsed HoursTask HoursNumber of
Persons
Task
3.503.501Figure 8 (a)Inspect
3.003.001Figure 11 (b)
1.501.501Figure 14 (a)
0.300.301Figure 17Close Access
0.500.501Figure 19
2.755.502Close Sidewalls
and Blankets
13.3516.10TOTAL FOR EACH AIRPLANE
(a) The FIGURE 14 inspection is optional to the FIGURE 8 inspection and is not included in
the total.
(b) This inspection is only necessary if cracking is found and is not included in the total.
Group 3:
Elapsed HoursTask HoursNumber of
Persons
Task
0.751.502Open Sidewalls
and Blankets
Open Access
0.750.751Figure 2
0.500.501Figure 3
0.300.301Figure 6
2.502.501Figure 9 (a)Inspect
2.002.001Figure 12 (b)
1.501.501Figure 15 (a)
0.300.301Figure 18Close Access
0.500.501Figure 19
0.750.751Figure 21
0.751.502Close Sidewalls
and Blankets
7.108.60TOTAL FOR EACH AIRPLANE
(a) The FIGURE 15 inspection is optional to the FIGURE 9 inspection and is not included in
the total.
(b) This inspection is only necessary if cracking is found and is not included in the total.
H. Weight and Balance Changes
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
26 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 27

I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. 737-300 Structural Repair Manual (SRM) 53-00-07 .
b. 737-300/400/500 Aircraft Maintenance Manual (AMM) 25-52-73 , 25-52-91 .
c. 737-400 Structural Repair Manual (SRM) 53-00-07 .
d. 737-500 Structural Repair Manual (SRM) 53-00-07 .
e. 737 Non-Destructive Testing (NDT) Manual, Part 6, 51-00-00 , Figure 4, Figure 16 and Figure
23.
f. Boeing Drawing 65-88700.
g. Boeing Parts Standards Document D-590.
h. Service Related Problem (SRP) 737-SRP-53-289, 737-SRP-53-0377.
i. FAA Airworthiness Directive AD 2009-02-06 R1
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
FRAME INSTALLATION - BODY STATION 52065-46534
FRAME INSTALLATION - BODY STATION 500B65C22908
FRAME INSTALLATION - BODY STATION 500C65C22909
FRAME INSTALLATION - BODY STATION 500D65C22910
SHROUD INSTALLATION - WIRE FORWARD CARGO AREA65C28198
FRAME INSTALLATION - BODY STATION 500E65C32351
FRAME INSTALLATION - BODY STATION 500F65C32352
FRAME INSTALLATION - BODY STATION 500G65C32353
FRAME INSTALLATION - BODY STA 48265C34355
FRAME INSTALLATION - BODY STA 482A65C34356
FRAME INSTALLATION - BODY STA 482B65C34357
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
27 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 28

These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
28 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 29

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this
service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specification
(a)CARGO LINER JOINT SEALING TAPE36 YardsBMS 5-146 Optional P212HD
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
Accomplishment of High Frequency Eddy Current edge inspections may be facilitated by using a probe
which has a 90 degree zero drop. When ordering the probe, specify the type of connector, frequency
range and the eddy current instrument model the probe will be used on.
Part number of a probe with a 90 degree zero drop: PAB-90-60.03 FX
The probe vendor contact is:
— EC/NDT
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
29 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 30

1020 SOUTH 344th STREET SUITE 214 FEDERAL WAY, WA 98003 USA Phone Number (253)
815-0797 Fax (253) 815-0827
F. Special Tooling Necessary to do this Service Bulletin
High Frequency Eddy Current inspection tools are necessary to do the change given in this service
bulletin. To get the High Frequency Eddy Current inspection tools, refer to Paragraph 2.E., Special
Tooling - Price and Availability .
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
30 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 31

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References , for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches.
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet the
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used.
6. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "as
given in" are included in the instruction, the procedure in the Boeing document must
be used.
B. WORK INSTRUCTIONS
1. PART 1 - ACCESS
a. Get access to the forward cargo bay.
b. Remove and keep the forward cargo bay handling system if installed.
c. Group 1:
Remove and keep the wire shroud. Refer to FIGURE 1 as an accepted procedure.
d. Group 3:
Remove and keep the wire shroud. Refer to FIGURE 2 as an accepted procedure.
e. Remove and keep the aft bulkhead access panels. Refer to FIGURE 3 as an accepted
procedure.
NOTE: As an option, it is acceptable to remove air conditioning equipment at Station (STA)
520 if additional access is required to accomplish the inspection as given in this
service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
31 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 32

f. Group 1:
Remove and keep sidewall panels 1314X and 1321X between STA 500 and STA 500D. Refer
to 737-300/400/500 AMM 25-52-73 as an accepted procedure.
g. Group 2:
Remove and keep sidewall panels 1316Y, 1317Y, 1318Y, 1325Y, 1326Y and 1327Y between
STA 500 and STA 500G. Refer to 737-300/400/500 AMM 25-52-73 as an accepted procedure.
h. Group 3:
Remove and keep sidewall panels 1309Z and 1315Z between STA 460 and STA 482B. Refer
to 737-300/400/500 AMM 25-52-73 as an accepted procedure.
i. Group 1-2:
Remove and keep or move the insulation blankets as required between STA 500A to STA
540 and Stringer (S)-19 to S-22, left and right sides. Refer to 737-300/400/500 AMM 25-52-91
as an accepted procedure.
j. Group 3:
Remove and keep or move the insulation blankets as required between STA 460 to STA 540
and Stringer (S)-19 to S-22, left and right sides. Refer to 737-300/400/500 AMM 25-52-91 as
an accepted procedure.
k. Group 1:
Move the guide assembly for the power feeder cable away from the frame as given in FIGURE
4.
l. Group 2:
Move the guide assembly for the power feeder cable away from the frame as given in FIGURE
5.
m. Group 3:
Move the guide assembly for the power feeder cable away from the frame as given in FIGURE
6.
2. PART 2 - INITIAL INSPECTION
NOTE: Inspections are not necessary at locations that have been repaired as given by a Boeing
Company authorized representative approved frame repair or repaired as given in PART
3 - REPAIR of this service bulletin.
a. Group 1:
STA 500B, STA 500C, STA 500D and STA 520 - Do one of the inspection options that follow:
(1) Option 1: Do a High Frequency Eddy Current (HFEC) Surface Inspection of the 1.04 inch
nominal diameter wire penetration hole in the frame and frame reinforcement between
S-20 and S-21 for cracking as given in FIGURE 7.
(a) At each Station, left or right, if any crack is found, do PART 3 - REPAIR at the section
of frame where cracking is found.
(b) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or
repeat inspections as given in the steps that follow:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
32 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 33

1) Install the guide assemblies for the power feeder cable as given in FIGURE 16.
2) Do PART 6 - CLOSE ACCESS.
3) Do PART 4 - REPEAT INSPECTION at the interval given in Paragraph 1.E.,
Compliance.
(2) Option 2: Do a HFEC Hole/Edge Inspection of the 1.04 inch nominal diameter wire
penetration hole in the frame and frame reinforcement between S-20 and S-21 for cracking
as given in FIGURE 13.
(a) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the
section of frame where cracking is found.
(b) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or
repeat inspections as given in the steps that follow:
1) Install the guide assemblies for the power feeder cable as given in FIGURE 16.
2) Do PART 6 - CLOSE ACCESS.
3) Do PART 4 - REPEAT INSPECTION at the interval given in Paragraph 1.E.,
Compliance.
b. Group 2:
STA 500B, STA 500C, STA 500D, STA 500E, STA 500F, STA 500G and STA 520 - Do one
of the inspection options that follow:
(1) Option1: Do a High Frequency Eddy Current (HFEC) Surface Inspection of the 1.04 inch
nominal diameter wire penetration hole in the frame and frame reinforcement between
S-20 and S-21 for cracking as given in FIGURE 8.
(a) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the
section of frame where cracking is found.
(b) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or
repeat inspections as given in the steps that follow:
1) Install the guide assemblies for the power feeder cable as given in FIGURE 17.
2) Do PART 6 - CLOSE ACCESS.
3) Do PART 4 - REPEAT INSPECTION at the interval given in Paragraph 1.E.,
Compliance.
(2) Option 2: Do a HFEC Hole/Edge Inspection of the 1.04 inch nominal diameter wire
penetration hole in the frame and frame reinforcement between S-20 and S-21 for cracking
as given in FIGURE 14.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
33 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 34

(a) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the
section of frame where cracking is found.
(b) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or
repeat inspections as given in the steps that follow:
1) Install the guide assemblies for the power feeder cable as given in FIGURE 17.
2) Do PART 6 - CLOSE ACCESS.
3) Do PART 4 - REPEAT INSPECTION at the interval given in Paragraph 1.E.,
Compliance.
c. Group 3:
STA 482, STA 482A, STA 482B and STA 520 - Do one of the inspection options that follow:
(1) Option 1: Do a High Frequency Eddy Current (HFEC) Surface Inspection of the 1.04 inch
nominal diameter wire penetration hole in the frame and frame reinforcement between
S-20 and S-21 for cracking as given in FIGURE 9.
(a) At each Station, left or right, if any crack is found, do PART 3 - REPAIR at the section
of frame where cracking is found.
(b) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or
repeat inspections as given in the steps that follow:
1) Install the guide assemblies for the power feeder cable as given in FIGURE 18.
2) Do PART 6 - CLOSE ACCESS.
3) Do PART 4 - REPEAT INSPECTION at the interval given in Paragraph 1.E.,
Compliance.
(2) Option 2: Do a HFEC Hole/Edge Inspection of the 1.04 inch nominal diameter wire
penetration hole in the frame and frame reinforcement between S-20 and S-21 for cracking
as given in FIGURE 15.
(a) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the
section of frame where cracking is found.
(b) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or
repeat inspections as given in the steps that follow:
1) Install the guide assemblies for the power feeder cable as given in FIGURE 18.
2) Do PART 6 - CLOSE ACCESS.
3) Do PART 4 - REPEAT INSPECTION at the interval given in Paragraph 1.E.,
Compliance.
3. PART 3 - REPAIR
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
34 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 35

a. Group 1:
(1) At each Station, left or right, where cracking is found at the wire penetration hole:
(a) Do a HFEC Inspection for cracking in the 0.50 inch diameter hole between S-20 and
S-21 and all standoff/tooling holes in the frame and frame reinforcement, between
S-19 and S-22 as given in FIGURE 10.
1) If the 0.50 inch hole and the standoff/tooling holes have no crack indications:
a) Do a 0.03 inch insurance cut. Maintain a 63Ra or better surface finish.
b) Repair the frame as given in 737-300 SRM 53-00-07 Repair 13.
2) If cracking is found in the 0.50 inch hole and/or the standoff/tooling holes, repair
all cracking in the frame. Contact Boeing for damage removal and repair
instructions and do the repair. When requesting repair instructions, include a
description of the location and extent of damage. Refer to Paragraph 1.D.,
Description for information about reporting the damage to Boeing.
(2) Do PART 6 - CLOSE ACCESS.
NOTE: Accomplishment of the repair as given in PART 3 terminates the Part 4 repeat
inspections.
b. Group 2:
(1) At each Station, left or right, where cracking is found at the wire penetration hole:
(a) Do a HFEC Inspection for cracking in the 0.50 inch diameter hole between S-20 and
S-21 and all standoff/tooling holes in the frame and frame reinforcement, between
S-19 and S-22 as given in FIGURE 11.
1) If the 0.50 inch hole and the standoff/tooling holes have no crack indications:
a) Do a 0.03 inch insurance cut. Maintain a 63Ra or better surface finish.
b) Repair the frame as given in 737-400 SRM 53-00-07 Repair 13.
2) If cracking is found in the 0.50 inch hole and/or the standoff/tooling holes, repair
all cracking in the frame. Contact Boeing for damage removal and repair
instructions and do the repair. When requesting repair instructions, include a
description of the location and extent of damage. Refer to Paragraph 1.D.,
Description for information about reporting the damage to Boeing.
(2) Do PART 6 - CLOSE ACCESS.
NOTE: Accomplishment of the repair as given in PART 3 terminates the Part 4 repeat
inspections.
c. Group 3:
(1) At each Station, left or right, where cracking is found at the wire penetration hole:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
35 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 36

(a) Do a HFEC Inspection for cracking in the 0.50 inch diameter hole between S-20 and
S-21 and all standoff/tooling holes in the frame and frame reinforcement, between
S-19 and S-22 as given in FIGURE 12.
1) If the 0.50 inch hole and the standoff/tooling holes have no crack indications:
a) Do a 0.03 inch insurance cut. Maintain a 63Ra or better surface finish.
b) Repair the frame as given in 737-500 SRM 53-00-07 Repair 13.
2) If cracking is found in the 0.50 inch hole and/or the standoff/tooling holes, repair
all cracking in the frame. Contact Boeing for damage removal and repair
instructions and do the repair. When requesting repair instructions, include a
description of the location and extent of damage. Refer to Paragraph 1.D.,
Description for information about reporting the damage to Boeing.
(2) Do PART 6 - CLOSE ACCESS.
NOTE: Accomplishment of the repair as given in PART 3 terminates the Part 4 repeat
inspections.
4. PART 4 - REPEAT INSPECTION
NOTE: Inspections are not necessary at locations that have been repaired as given by a Boeing
Company authorized representative approved frame repair or repaired as given in PART
3 - REPAIR of this service bulletin.
a. Group 1:
STA 500B, STA 500C, STA 500D and STA 520 - Do a HFEC Hole/Edge Inspection of the
1.04 inch nominal diameter wire penetration hole in the frame and frame reinforcement between
S-20 and S-21 for cracking as given in FIGURE 13.
(1) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the section
of frame where cracking is found.
(2) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or do the
steps that follow:
(a) Install the guide assemblies for the power feeder cable as given in FIGURE 16.
(b) Do PART 6 - CLOSE ACCESS.
(c) Repeat the Part 4 inspection at the interval given in Paragraph 1.E., Compliance.
b. Group 2:
STA 500B, STA 500C, STA 500D, STA 500E, STA 500F, STA 500G and STA 520 - Do a
HFEC Hole/Edge Inspection of the 1.04 inch nominal diameter wire penetration hole in the
frame and frame reinforcement between S-20 and S-21 for cracking as given in FIGURE 14.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
36 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 37

(1) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the section
of frame where cracking is found.
(2) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or do the
steps that follow:
(a) Install the guide assemblies for the power feeder cable as given in FIGURE 17.
(b) Do PART 6 - CLOSE ACCESS.
(c) Repeat the Part 4 inspection at the interval given in Paragraph 1.E., Compliance.
c. Group 3:
STA 482, STA 482A, STA 482B and STA 520 - Do a HFEC Hole/Edge Inspection of the 1.04
inch nominal diameter wire penetration hole in the frame and frame reinforcement between
S-20 and S-21 for cracking as given in FIGURE 15.
(1) At each Station, left or right, if any cracking is found, do PART 3 - REPAIR at the section
of frame where cracking is found.
(2) If no cracking is found, do either PART 5 - PREVENTATIVE MODIFICATION, or do the
steps that follow:
(a) Install the guide assemblies for the power feeder cable as given in FIGURE 18.
(b) Do PART 6 - CLOSE ACCESS.
(c) Repeat the Part 4 inspection at the interval given in Paragraph 1.E., Compliance.
5. PART 5 - PREVENTATIVE MODIFICATION
The preventative modification is applicable to frames for which either the PART 2 - INITIAL
INSPECTION or the PART 4 - REPEAT INSPECTION has been accomplished, and the 1.04 inch
nominal diameter wire penetration hole is crack free.
a. Group 1:
STA 500B, STA 500C, STA 500D and STA 520
(1) Inspect the 0.50 inch and standoff/tooling holes as given in FIGURE 10.
(a) If no cracking is found at the 0.50 inch or the standoff/tooling holes, do a 0.03 inch
insurance cut. Maintain a 63Ra or better surface finish.
(b) If cracking is found, contact Boeing for repair instructions and do the repair. When
requesting repair instructions, include a description of the location and extent of
damage. Refer to Paragraph 1.D., Description for information about reporting the
damage to Boeing.
(2) Do an insurance cut at the wire penetration hole:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
37 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 38

(a) If the surface inspection was accomplished as given in FIGURE 7, do a 0.10 inch
insurance cut. Maintain a 32Ra or better surface finish.
(b) If the hole/edge inspection was accomplished as given in FIGURE 13, do a 0.04 inch
insurance cut. Maintain a 32Ra or better surface finish.
(3) Do the repair as given in 737-300 SRM 53-00-07 Repair 13, except omit the steps in the
Damage Removal Procedure. Layout the repair angles using Detail I of Figure 203 in
Repair 13.
NOTE: Accomplishment of the Preventative Modification as given in this section
terminates the PART 4 - REPEAT INSPECTION.
b. Group 2:
STA 500B, STA 500C, STA 500D, STA 500E, STA 500F, STA 500G and STA 520
(1) Inspect the 0.50 inch and standoff/tooling holes as given in FIGURE 11.
(a) If no cracking is found at the 0.50 inch or the standoff/tooling holes, do a 0.03 inch
insurance cut. Maintain a 63Ra or better surface finish.
(b) If cracking is found, contact Boeing for repair instructions and do the repair. When
requesting repair instructions, include a description of the location and extent of
damage. Refer to Paragraph 1.D., Description for information about reporting the
damage to Boeing.
(2) Do an insurance cut at the wire penetration hole:
(a) If the surface inspection was accomplished as given in FIGURE 8, do a 0.10 inch
insurance cut. Maintain a 32Ra or better surface finish.
(b) If the hole/edge inspection was accomplished as given in FIGURE 14, do a 0.04 inch
insurance cut. Maintain a 32Ra or better surface finish.
(3) Do the repair as given in 737-400 SRM 53-00-07 Repair 13, except omit the steps in the
Damage Removal Procedure. Layout the repair angles using Detail I of Figure 203 in
Repair 13.
NOTE: Accomplishment of the Preventative Modification as given in this section
terminates the PART 4 - REPEAT INSPECTION.
c. Group 3:
STA 482, STA 482A, STA 482B and STA 520
(1) Inspect the 0.50 inch and standoff/tooling holes as given in FIGURE 12.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
38 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 39

(a) If no cracking is found at the 0.50 inch or the standoff/tooling holes, do a 0.03 inch
insurance cut. Maintain a 63Ra or better surface finish.
(b) If cracking is found, contact Boeing for repair instructions and do the repair. When
requesting repair instructions, include a description of the location and extent of
damage. Refer to Paragraph 1.D., Description for information about reporting the
damage to Boeing.
(2) Do an insurance cut at the wire penetration hole:
(a) If the surface inspection was accomplished as given in FIGURE 9, do a 0.10 inch
insurance cut. Maintain a 32Ra or better surface finish.
(b) If the hole/edge inspection was accomplished as given in FIGURE 15, do a 0.04 inch
insurance cut. Maintain a 32Ra or better surface finish.
(3) Do the repair as given in 737-500 SRM 53-00-07 Repair 13, except omit the steps in the
Damage Removal Procedure. Layout the repair angles using Detail I of Figure 203 in
Repair 13.
NOTE: Accomplishment of the Preventative Modification as given in this section
terminates the PART 4 - REPEAT INSPECTION.
6. PART 6 - CLOSE ACCESS
a. Group 1-2:
Install removed insulation blankets between STA 500A to STA 540 and Stringer S-19 to S-22
left and right. Refer to 737-300/400/500 AMM 25-52-91 as an accepted procedure.
b. Group 3:
Install removed insulation blankets as between STA 460 to STA 540 and Stringer S-19 to
S-22 left and right. Refer to 737-300/400/500 AMM 25-52-91 as an accepted procedure.
c. Group 1:
Install sidewall panels 1314X and 1321X between STA 500 and STA 500D. Refer to
737-300/400/500 AMM 25-52-73 as an accepted procedure.
d. Group 2:
Install sidewall panels 1316Y, 1317Y, 1318Y, 1325Y, 1326Y and 1327Y between STA 500
and STA 500G. Refer to 737-300/400/500 AMM 25-52-73 as an accepted procedure.
e. Group 3:
Install sidewall panels 1309Z and 1315Z between STA 460 and STA 482B. Refer to
737-300/400/500 AMM 25-52-73 as an accepted procedure.
f. Install all air conditioning equipment that was removed for additional access and do the
applicable function tests.
g. Install the aft bulkhead access panels. Refer to FIGURE 19 as an accepted procedure.
h. Group 1:
Install the wire shroud. Refer to FIGURE 20 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
39 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 40

i. Group 3:
Install the wire shroud. Refer to FIGURE 21 as an accepted procedure.
j. Install the forward cargo bay handling system, if removed.
k. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1: September 02, 2011
40 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 41 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
This Figure applies only to: Group 1.
FORWARD CARGO
COMPARTMENT
SEE A
SEE  SEE
FWD
FORWARD CARGO COMPARTMENT
FIGURE 1: FORWARD CARGO BAY - STATION 500A TO STATION 500D - WIRE SHROUD - REMOVAL
(SHEET 1 OF 4)
Original Issue: December 18, 2007
Revision 1 September 02,  2011  6LZIV£S-LEL
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.

### Page 42

FIGURE 1: FORWARD CARGO BAY - STATION 500A TO STATION 500D - WIRE SHROUD - REMOVAL
(SHEET 2 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
42 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
To get access to the screws.--TapeRemove1
6BACS12FA3K12ScrewRemove/Keep2
6BACW10P106AWasher
6NAS43DD3-19Spacer
FIGURE 1: FORWARD CARGO BAY - STATION 500A TO STATION 500D - WIRE SHROUD - REMOVAL
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
43 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 44

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
2BACS12FA( )K( )ScrewRemove/Keep3
2BACW10P43ALWasher
169-72995-3Wire ShroudRemove/Keep4
To get access to the screws.--TapeRemove5
6BACS12FA3K12ScrewRemove/Keep6
6BACW10P106AWasher
6NAS43DD3-19Spacer
2BACS12FA( )K( )ScrewRemove/Keep7
2BACW10P43ALWasher
169-72995-4Wire ShroudRemove/Keep8
FIGURE 1: FORWARD CARGO BAY - STATION 500A TO STATION 500D - WIRE SHROUD - REMOVAL
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
44 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 45 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
This Figure applies only to: Group 3.
FORWARD CARGO
COMPARTMENT
SEE A
SEE  SEE
FWD
FORWARD CARGO COMPARTMENT
FIGURE 2: FORWARD CARGO BAY - STATION 460 TO STATION 482B - WIRE SHROUD - REMOVAL
(SHEET 1 OF 4)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  45 of 159

### Page 46

FIGURE 2: FORWARD CARGO BAY - STATION 460 TO STATION 482B - WIRE SHROUD - REMOVAL
(SHEET 2 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
46 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
To get access to the screws.--TapeRemove1
6BACS12FA3K12ScrewRemove/Keep2
6BACW10P106AWasher
6NAS43DD3-19Spacer
FIGURE 2: FORWARD CARGO BAY - STATION 460 TO STATION 482B - WIRE SHROUD - REMOVAL
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
47 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 48

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
2BACS12FA( )K( )ScrewRemove/Keep3
2BACW10P43ALWasher
169-72995-7Wire ShroudRemove/Keep4
To get access to the screws.--TapeRemove5
6BACS12FA3K12ScrewRemove/Keep6
6BACW10P106AWasher
6NAS43DD3-19Spacer
2BACS12FA( )K( )ScrewRemove/Keep7
2BACW10P43ALWasher
169-72995-8Wire ShroudRemove/Keep8
FIGURE 2: FORWARD CARGO BAY - STATION 460 TO STATION 482B - WIRE SHROUD - REMOVAL
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
48 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 49 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
FORWARD CARGO
COMPARTMENT
SEE
FORWARD CARGO COMPARTMENT  1337041
FIGURE 3: FORWARD CARGO BAY - AFT BULKHEAD PANELS - REMOVAL
(SHEET 1 OF 2)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  49 of 159

### Page 50

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Left Side11327Aft Bulkhead Ac-
cess Panel
Remove/Keep1
Center11330Aft Bulkhead Ac-
cess Panel
Remove/Keep2
Right Side11331Aft Bulkhead Ac-
cess Panel
Remove/Keep3
FIGURE 3: FORWARD CARGO BAY - AFT BULKHEAD PANELS - REMOVAL
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
50 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 51

This Figure applies only to: Group 1.
FIGURE 4: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 1 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
51 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 52 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
STA
500
STA
500A
STA
500B
STA
500C
STA
500D
STA
520
S-18R
S-19R
S-20R
s-21R
S-22R
FWD <  s-23R
INBD K  5-24R
S-25R
1338130
FIGURE 4: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 2 OF 5)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  52 of 159

### Page 53 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
STA
500
STA
500A
STA
500B
STA
500C
STA
500D
STA
520
S-18L
S-19L
S-2OL
S-21L
S-22L
S-23L  @FWD
S-241-  D INBD
S-25L
B  1338135
FIGURE 4: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 3 OF 5)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  53 of 159

### Page 54 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
GUIDE
ASSEMBLY
POWER CABLES
S-20
1.04 INCH NOMINAL
DIAMETER WIRE
PENETRATION HOLE
0.50 INCH DIAMETER
HOLE (REFERENCE)
UP
INBD T
S-21
A-A
VIEW LOOKING FORWARD
(TYPICAL FRAME SECTION)  1338144
STA 500B, STA 500C, STA 500D
FIGURE 4: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 4 OF 5)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  Copyright © Unpublished Work - See page 1 for details.  BOEING PROPRIETARY -  737-53A1279  54 of 159

### Page 55

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)669-73089-3Guide AssemblyTurn1
(b)669-73089-3Guide AssemblyMove2
(a) Turn the forward side of the guide assembly while holding the aft side until the assembly is in two
pieces.
(b) Move the two guide assembly pieces along the power feeder cable away from the frame to get access
to the wire penetration hole.
FIGURE 4: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
55 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 56

This Figure applies only to: Group 2.
FIGURE 5: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 1 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
56 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

### Page 57 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
STA
500
STA
500A
STA
500B
STA
500C
STA
500D
STA
500E
STA
500F
STA
500G
STA
520
5-18R
S-19R
s-20R
S-21R
S-22R
5-23R
INBD  5-24R
S-25R
1338186
FIGURE 5: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 2 OF 5)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  57 of 159

### Page 58 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
STA
500
STA
500A
STA
500B
STA
500C
STA
500D
STA
500E
STA
500F
STA
500G
STA
520
S-18L
S-19L -
S-20L-
S-21L  → FWD
S-22L  V INBD
5-231
5-24L
S-25L
®  1338192
FIGURE 5: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 3 OF 5)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  58 of 159

### Page 59 (OCR)

BOEING SERVICE BULLETIN 737-53A1279
ALERT  ALERT
GUIDE
ASSEMBLY
POWER CABLES
S-20
1.04 INCH NOMINAL
DIAMETER WIRE
PENETRATION HOLE  ХЯ B
0.50 INCH DIAMETER
HOLE (REFERENCE)
UP
INBD C
S-21
A-A
VIEW LOOKING FORWARD
STA 500E, STA 500F, STA 500G  (TYPICAL FRAME SECTION)  1338152
FIGURE 5: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 4 OF 5)
Original Issue: December 18, 2007
Revision 1 September 02, 2011  BOEING PROPRIETARY -  737-53A1279
Copyright © Unpublished Work - See page 1 for details.  59 of 159

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)669-73089-3Guide AssemblyTurn1
(b)669-73089-3Guide AssemblyMove2
(a) Turn the forward side of the guide assembly while holding the aft side until the assembly is in two
pieces.
(b) Move the two guide assembly pieces along the power feeder cable away from the frame to get access
to the wire penetration hole.
FIGURE 5: FORWARD CARGO BAY - POWER FEEDER CABLE GUIDE ASSEMBLY - MOVE
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 18, 2007
737-53A1279Revision 1 September 02, 2011
60 of 159
BOEING SERVICE BULLETIN 737-53A1279
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/737-53a1279/file/33f8cce2fb29.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
