# Boeing Alert Service Bulletin 737-53A1293: U.S. DOT/FAA - Boeing Service Bulletin 737-53A1293

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1254; AD 2012-12-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 737-53A1293](https://openairdocs.org/service-documents/boeing/737-53a1293.md)
- Title as filed: U.S. DOT/FAA - Boeing Service Bulletin 737-53A1293
- Pages: 105
- PDF: https://openairdocs.org/files/sha256/19/7a/197a64a52da079483e4e5657e9b859d9f5d328242868b0b2e98a0d6a5f0c0f9c
- Page: https://openairdocs.org/service-documents/boeing/737-53a1293/file/197a64a52da0

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Service Bulletin
Number: 737-53A1293
Original Issue: August 13, 2008
Revision 2: August 10, 2011
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Stringer S-1 and Stringer S-2R, Station 400 to Station 460
Inspection and Repair
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2008 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
1 of 105
4.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
2 of 105
BOEING SERVICE BULLETIN 737-53A1293
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 8
B. Concurrent Requirements ...................................... 1 8
C. Reason ................................................ 1 9
D. Description .............................................. 2 0
E. Compliance .............................................. 2 1
F. Approval ............................................... 4 3
G. Manpower .............................................. 4 3
H. Weight and Balance Changes .................................... 4 4
I. Electrical Load Data ......................................... 4 5
J. References .............................................. 4 5
1. Existing Data .......................................... 4 5
2. Data supplied with this Service Bulletin ............................ 4 6
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 4 6
K. Publications Affected ........................................ 4 6
L. Interchangeability and Intermixability of Parts ........................... 4 6
2. MATERIAL INFORMATION ........................................ 4 7
A. Material - Price and Availability ................................... 4 7
B. Industry Support Information .................................... 4 7
C. Parts Necessary For Each Airplane ................................. 4 7
1. Kits/Parts ............................................ 4 7
2. Parts and Materials Supplied by the Operator ........................ 4 7
3. Parts Modified and Reidentified ................................ 4 8
4. Parts Removed and Not Replaced .............................. 4 9
D. Parts Necessary to Change Spares ................................. 4 9
E. Special Tooling - Price and Availability ............................... 4 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 4 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 5 1
A. GENERAL INFORMATION ..................................... 5 1
B. WORK INSTRUCTIONS ....................................... 5 2
FIGURE 1: THIS FIGURE DELETED AT REVISION 1 [Group 1] ..................... 5 9
FIGURE 2: EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION - STRINGERS S-1 AND S-2R, STA
400 - STA 460 [Group 1] .................................... 6 0
FIGURE 3: THIS FIGURE DELETED AT REVISION 1 [Group 2] ..................... 6 2
FIGURE 4: EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION - STRINGERS S-1 AND S-2R, STA
400 - STA 460 [Group 2] .................................... 6 3
FIGURE 5: FUSELAGE SKIN - CRACK REMOVAL [Group 1] ...................... 6 5
FIGURE 6: 737-300,737-400 SERIES AIRPLANE - REPAIR DOUBLER FABRICATION AND INSTALLATION
[Group 1] ............................................ 6 8
FIGURE 7: EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION AFTER REPAIR - STRINGERS S-1
AND S-2R, STA 400 - STA 460 [Group 1] .......................... 7 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
3 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 4

FIGURE 8: 737-500 SERIES AIRPLANES - REPAIR DOUBLER FABRICATION AND INSTALLATION
[Group 1] ............................................ 8 0
FIGURE 9: EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION AFTER REPAIR - STRINGERS S-1
AND S-2R, STA 400 - STA 460 [Group 2] .......................... 9 1
FIGURE 10: FUSELAGE SKIN - CRACK REMOVAL [Group 2] ...................... 9 3
FIGURE 11: REPAIR DOUBLER FABRICATION AND INSTALLATION [Group 2] ............ 9 6
FIGURE 12: POST REPAIR - CRITICAL FASTENER ROW INSPECTION [Group 2] .......... 1 0 2
APPENDIX A: CHEM-MILL STEP CRACK DAMAGE CUT-OUT AND REPORT ............. 1 0 4
APPENDIX B: CHEM-MILL STEP CRACK DAMAGE REPORT ...................... 1 0 5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
4 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 5

Commercial 
Airplanes
737
Service Bulletin
Revision Transmittal SheetNumber: 737-53A1293Original Issue: August 13, 2008
Revision 2: August 10, 2011
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Stringer S-1 and Stringer S-2R, Station 400 to Station 460
Inspection and Repair
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on the airplanes changed in accordance with Revision 1 of this service bulletin.
REASON FOR REVISION
This revision is sent to revise the group 1 repair figures and add the group 2 repair instructions and post repair
inspection.
These sections were changed:
1. Summary Background information Revised.
2. Summary Action Group 1 and Group 2 information revised.
3. Summary Industry Support Information, warranty statement revised.
4. Summary Material Information revised.
5. Paragraph 1.A.1., Airplanes, paragraph added.
6. Paragraph 1.C., Reason, information revised and revision 2 reason added.
7. Paragraph 1.D., Description, Group 1 and Group 2 repair instructions revised.
8. Paragraph 1.E., Compliance, Table 1, Table 2 and Table 3 Condition column revised and note (c) added.
Table 4 Action column revised. Table 5 Condition column revised and repair compliance details, note (a)
was revised and note (c) added. Table 6 added.
9. Paragraph 1.F., Approval, AMOC statement revised.
10. Paragraph 1.G., Manpower, Group 2 table revised to add repair and post repair inspection information.
11. Paragraph 1.H., Weight and Balance Changes, Table replaced with equating statement.
12. Paragraph 1.J.1., Existing Data, book references revised.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
5 of 105

### Page 6

13. Paragraph 2.A., Material - Price and Availability, paragraph added.
14. Paragraph 2.B., Industry Support Information, warranty statement revised.
15. Paragraph 2.C.2., Parts and Materials Supplied by the Operator, Group 2 table added.
16. Paragraph 3.A., General information, notes revised.
17. Paragraph 3.B., Work instructions, changed as follows:
a. PART 1 - step 5.d. and 6.d. added.
b. PART 2 - step 3 revised.
c. PART 3 - step 4.d. and 5.d. added.
d. PART 5 - caution deleted. Step 5 revised and step 6 added.
e. PART 6 - step 4 revised and step 5 added.
f. PART 7 and PART 8 added.
18. Figure 5 revised to show crack removal information only. View A and B deleted. Flag note table deleted.
View C, now view A, revised to show crack information only. Step 1 and 2 deleted. New step 2 added. Foot
notes (a), (b), (c), and (d) deleted. New foot notes (a) and (d) revised.
19. Figure 6, new illustration added, new step 1 and footnotes (g) thru (j) added.
20. Figure 8, new illustration added, new step 1 and footnotes (g) thru (j)added.
21. Figure 10, Figure 11 and Figure 12 added.
22. Appendix A, Group reference deleted.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
August 13, 2008Original Issue:
July 07, 2010Revision 1:
August 10, 2011Revision 2:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
6 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 7

Commercial 
Airplanes
737
Service Bulletin
SummaryNumber: 737-53A1293Original Issue: August 13, 2008
Revision 2: August 10, 2011
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Stringer S-1 and Stringer S-2R, Station 400 to Station 460
Inspection and Repair
CONCURRENT REQUIREMENTS
None
BACKGROUND
Accomplishment of the inspections in this service bulletin will make sure that fuselage skin cracks at stringers
S-1 and S-2R, between Body Stations STA 400 and STA 460 are found and repaired. An Air Traffic Control
(ATC) antenna was installed at this location at delivery on the affected airplanes. All airplanes listed in this
service bulletin require inspection even if the ATC antenna has been removed. This action is necessary to find
and repair fatigue cracks of the skin panels at the chem-mill steps. Continued operation with undetected skin
cracks could cause unscheduled down time for repairs or possibly a decompression of the airplane.
Boeing has received several reports from multiple operators regarding fuselage skin cracks adjacent to the ATC
antenna.
A total of 60 cracks have been found on Group 1 airplanes (10 inch tear strap bays); cracks have been found
at both S-1 and S-2R; the affected airplanes had accumulated between 40,080 and 67,032 total flight cycles.
A total of 3 cracks have been found on Group 2 airplanes (20 inch tear strap bays); cracks have only been found
at S-1, but similar cracking is possible at S-2R; the affected airplanes had accumulated between 43,565 and
44,700 total flight cycles.
Analysis by Boeing indicates that the cracks are caused by fatigue due to high tension stresses and local bending
at the edge of the chem-mill pockets of the bonded skin. The cracks initiate at the inner surface of the skin and
typically originate at multiple sites along the chem-mill step. Multiple site originations can result in several adjacent
partial-thickness cracks. These adjacent partial-thickness cracks can be subsequently linked together before
propagating through the full-thickness of the skin.
Accomplishment of the work given in this service bulletin will make sure that cracks in the fuselage skin at
stringers S-1 and S-2R, between STA 400 and STA 460 are detected and repaired.
Boeing Service Related Problem (SRP) 737-SRP-53-0334 is related to this service bulletin.
Multi-Operator Message (MOM) MOM-MOM-09-0807-01B (R1) is related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
7 of 105

### Page 8

ACTION
1. Get external access to the area around the ATC antenna at stringers S-1 and S-2R, between STA 400 and
STA 460.
2. Do external Detailed Inspection (DI) for cracks in the fuselage skin along the chem-mill steps at stringers
S-1 and S-2R, between STA 400 and STA 460.
3. Do external Non Destructive Inspections (NDI) for cracks in the fuselage skin along the chem-mill steps at
stringers S-1 and S-2R, between STA 400 and STA 460. The NDI's that can be used are Medium Frequency
Eddy Current (MFEC), Magneto Optical Imaging (MOI), C-Scan or Ultrasonic Phased Array (UTPA).
4. If no crack is found, do repeat external DI and NDI for cracks in the fuselage skin along the chem-mill steps
at stringers S-1 and S-2R, between STA 400 and STA 460 at intervals in accordance with Paragraph 1.E.,
Compliance.
5. Group 1:
If any of the following is found as a result of the external DI and NDI, contact Boeing for repair instructions,
do the repair and do external DI and NDI of the fuselage skin chem-mill steps (not covered by a repair) for
cracks in accordance with Paragraph 1.E., Compliance
a. Crack(s) found before 35,000 total flight cycles.
b. Crack(s) found in four or more tear strap bays.
c. Crack(s) found longer than 5 inches.
d. Crack(s) found are not contained within the skin cut-out.
If all of the following is found as a result of the external DI and NDI, do the repair, the critical fastener row
inspection and repeat external DI and NDI for cracks in the fuselage skin along the chem-mill steps not
covered by a repair at intervals specified in Paragraph 1.E., Compliance.
a. Crack(s) found at or after 35,000 total flight cycles.
b. Crack(s) found in three or less strap bays.
c. Crack(s) found 5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out.
6. Group 2:
If any of the following is found as a result of the external DI and NDI, contact Boeing for repair instructions,
do the repair and do external DI and NDI of the fuselage skin chem-mill steps (not covered by a repair) for
cracks in accordance with Paragraph 1.E., Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
8 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 9

a. Crack(s) found before 33,000 total flight cycles.
b. Crack(s) found between STA 400 and STA 420.
c. Crack(s) found between STA 440 and STA 460.
d. Crack(s) found longer than 12.5 inches.
e. Crack(s) found are not contained within the skin cut-out.
If all of the following are found as a result of the external DI and NDI, do the repair, the critical fastener row
inspection and repeat external DI and NDI for cracks in the fuselage skin along the chem-mill steps not
covered by a repair, at intervals specified in Paragraph 1.E., Compliance.
a. Crack(s) found at or after 33,000 total flight cycles.
b. Crack(s) found between STA 420 and STA 440.
c. Crack(s) found 12.5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out.
EFFECTIVITY
737-300/-400/-500 Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2008-19-03 is related to this service bulletin.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection,and repair procedures given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
9 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 10 (OCR)

BOEING SERVICE BULLETIN 737-53A1293
STA
460
... .  STA
400
1000
DO DETAILED INSPECTION AND DO MFEC INSPECTION
OR MOI INSPECTION OR C-SCAN OR ULTRASONIC
PHASE ARRAY INSPECTION FOR CRACKS IN THE
FUSELAGE SKIN ALONG THE CHEM-MILL STEPS.
TYPICAL CRACKS
- S-1
[LAi  TER  -=→ S-2R
STA  STA  STA  STA  STA  STA  STA
460  450  440  430  420  410  400
ATC ANTENNA
INSPECTION AREA
10 INCH TEAR STRAP BAY CONFIGURATION SHOWN  1579184
20 INCH TEAR STRAP BAY CONFIGURATION SIMILAF
Original Issue: August 13, 2008
Revision 2: August 10, 2011  BOEING PROPRIETARY -  737-53A1293
Copyright © Unpublished Work - See page 1 for details.  10 of 105

### Page 11

Commercial 
Airplanes
737
Service Bulletin
Number: 737-53A1293
Original Issue: August 13, 2008
Revision 2: August 10, 2011
ATA System: 5331
SUBJECT: FUSELAGE - Skin - Stringer S-1 and Stringer S-2R, Station 400 to Station 460
Inspection and Repair
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-19567 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
737 - 300/-400/-500 Airplanes, line numbers 1001 thru 2552, which
had an ATC antenna installed at STA 430 at delivery, with 10 inch
tear strap bays.
-1
Airplanes not inspected in accordance with the original issue of this
service bulletin.
1
Airplanes inspected in accordance with the original issue of this
service bulletin and the last inspection was a Detailed Inspection
procedure.
2
Airplanes inspected in accordance with the original issue of this
service bulletin and the last inspection was a MFEC or MOI or C-Scan
Non-Destructive Inspection procedure.
3
Airplanes inspected in accordance with Boeing
Multi-Operator-Message MOM-MOM-09-0807-01B (R1), dated
15-Dec-2009 and the last inspection was a Detailed Inspection
procedure.
4
Airplanes inspected in accordance with Boeing
Multi-Operator-Message MOM-MOM-09-0807-01B (R1), dated
15-Dec-2009 and the last inspection was a MFEC or MOI or C-Scan
Non-Destructive Inspection procedure.
5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
11 of 105

### Page 12

DESCRIPTIONCONFIGURATIONGROUP
737 - 300/-400/-500 Airplanes, line numbers 2553 thru 3132, all of
which had an ATC antenna installed at STA 430 at delivery, with 20
inch tear strap bays.
-2
Airplane Models:
737-300, 737-400, 737-500
GroupVariable Number
1PJ301 - PJ302
1PJ551
2PJ552 - PJ561
2PJ601 - PJ615
2PJ811
2PJ816 - PJ817
1PM389 - PM399
1PM401 - PM417
1PM541 - PM542
2PM543 - PM550
1PM551 - PM564
1PP048 - PP054
1PP140 - PP160
1PP198 - PP199
1PP221
1PP508 - PP517
2PP518 - PP520
1PP805 - PP808
1PP874 - PP875
2PP876 - PP877
1PP910 - PP930
1PP951 - PP952
1PP966 - PP967
1PP984 - PP990
1PP993
1PQ013 - PQ016
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
12 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 13

GroupVariable Number
1PQ038 - PQ041
1PQ069 - PQ085
1PQ101 - PQ199
1PQ201 - PQ202
1PQ230
1PQ237
1PQ251 - PQ267
1PQ281 - PQ296
2PQ297 - PQ299
1PQ301 - PQ307
1PQ331 - PQ332
1PQ341 - PQ344
2PQ345 - PQ348
1PQ361 - PQ369
2PQ370 - PQ373
2PQ391 - PQ395
1PQ401 - PQ407
2PQ408 - PQ410
1PQ411 - PQ413
2PQ414 - PQ418
1PQ421
2PQ431 - PQ438
2PQ447 - PQ448
2PQ451
2PQ454
1PQ471 - PQ472
2PQ473 - PQ475
1PQ481
1PQ486 - PQ487
1PQ491 - PQ493
1PQ771
2PQ772
1PQ791 - PQ793
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
13 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 14

GroupVariable Number
1PQ801 - PQ805
1PQ931 - PQ932
2PQ933 - PQ935
2PQ951
2PQ971 - PQ997
2PR001 - PR017
2PR021 - PR034
2PR041 - PR045
2PR061 - PR072
2PR077 - PR082
2PR091 - PR092
2PR096
2PR101
2PR121 - PR122
2PR131 - PR132
2PR141 - PR143
2PR161 - PR172
2PR181
1PS601 - PS616
2PS617 - PS630
1PS631
1PS636 - PS638
1PS641 - PS644
1PS651 - PS657
1PS666 - PS669
1PS691 - PS692
1PS701 - PS703
2PS704 - PS706
1PS751 - PS762
2PS763 - PS799
2PS811
2PS836 - PS837
2PS841 - PS846
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
14 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 15

GroupVariable Number
2PS851 - PS852
2PS856
2PS861 - PS863
2PS866 - PS868
2PS871 - PS874
2PS896 - PS897
2PS901 - PS941
2PS956 - PS957
2PS961 - PS963
2PS971 - PS978
1PT001 - PT011
2PT012 - PT015
1PT021 - PT028
2PT029 - PT031
1PT041 - PT063
2PT064
1PT101 - PT105
1PT121 - PT125
2PT126 - PT138
1PT146 - PT148
1PT161 - PT170
1PT181 - PT187
2PT188
1PT211 - PT220
1PT295
1PT301 - PT306
2PT307 - PT309
1PT331 - PT360
1PT381 - PT399
1PT401 - PT438
1PT501 - PT512
2PT513 - PT517
1PT561 - PT565
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
15 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 16

GroupVariable Number
1PT581 - PT584
2PT585 - PT586
1PT611 - PT621
1PT641 - PT642
2PT643 - PT644
1PT651 - PT655
2PT656
1PT671 - PT672
2PT681 - PT685
1PT701 - PT703
2PT716 - PT717
2PT721 - PT725
2PT801 - PT834
2PT851 - PT854
2PT871 - PT886
2PT901 - PT930
2PT971 - PT973
2PT981 - PT985
2PT996
1PU001 - PU025
2PU301
2PU311 - PU313
1PV021 - PV055
1PV201 - PV203
2PV204 - PV209
2PV226 - PV229
1PV231 - PV237
1PV271 - PV272
1PV281 - PV283
2PV284 - PV287
2PV296
2PV301 - PV302
2PV351
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
16 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 17

GroupVariable Number
2PV356 - PV357
1PW027 - PW054
1PW061 - PW068
1PW072
2PW086 - PW088
1PW091 - PW094
1PW101 - PW102
1PW106
1PW111 - PW120
1PW156 - PW157
1PW161 - PW167
2PW168 - PW171
1PW201 - PW244
2PW245 - PW252
1PW261
2PW262 - PW264
1PW265 - PW268
2PW271 - PW276
1PW278
1PW281
2PW282 - PW292
1PW293
1PW296
1PW301 - PW327
2PW401 - PW408
2PW411 - PW418
2PW421 - PW424
2PW431 - PW435
2PW441 - PW450
1PW461 - PW467
1PW501 - PW502
1PW504
1PW511 - PW520
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
17 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 18

GroupVariable Number
2PW521 - PW522
2PW524 - PW525
1PW526
2PW527 - PW530
1PW531 - PW546
2PW547 - PW550
1PW556 - PW557
1PW561 - PW564
1PW571 - PW576
1PW591 - PW596
1PW611 - PW620
2PW621 - PW622
1PW631 - PW634
2PW635 - PW637
1PW661 - PW662
1PW681 - PW683
1PW701 - PW702
1PW711 - PW717
1PW741 - PW742
1PW761
1PW771
2PW831
2PW851 - PW856
2. Spares Affected
None.
B. Concurrent Requirements
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
18 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 19

C. Reason
Accomplishment of the inspections in this service bulletin will make sure that fuselage skin cracks at
stringers S-1 and S-2R, between Body Stations STA 400 and STA 460 are found and repaired. An Air
Traffic Control (ATC) antenna was installed at this location at delivery on the affected airplanes. All
airplanes listed in this service bulletin require inspection even if the ATC antenna has been removed.
This action is necessary to find and repair fatigue cracks of the skin panels at the chem-mill steps.
Continued operation with undetected skin cracks could cause unscheduled down time for repairs or
possibly a decompression of the airplane.
Boeing has received several reports from multiple operators regarding fuselage skin cracks adjacent
to the ATC antenna.
A total of 60 cracks have been found on Group 1 airplanes (10 inch tear strap bays); cracks have been
found at both S-1 and S-2R; the affected airplanes had accumulated between 40,080 and 67,032 total
flight cycles.
A total of 3 cracks have been found on Group 2 airplanes (20 inch tear strap bays); cracks have only
been found at S-1, but similar cracking is possible at S-2R; the affected airplanes had accumulated
between 43,565 and 44,700 total flight cycles.
Analysis by Boeing indicates that the cracks are caused by fatigue due to high tension stresses and
local bending at the edge of the chem-mill pockets of the bonded skin. The cracks initiate at the inner
surface of the skin and typically originate at multiple sites along the chem-mill step. Multiple site
originations can result in several adjacent partial-thickness cracks. These adjacent partial-thickness
cracks can be subsequently linked together before propagating through the full-thickness of the skin.
Accomplishment of the work given in this service bulletin will make sure that cracks in the fuselage
skin at stringers S-1 and S-2R, between STA 400 and STA 460 are detected and repaired.
Boeing Service Related Problem (SRP) 737-SRP-53-0334 is related to this service bulletin.
Multi-Operator Message (MOM) MOM-MOM-09-0807-01B (R1) is related to this service bulletin.
Revision 1 was sent to add more inspection areas, Ultrasonic Phased Array (UTPA) inspection
procedure, post repair inspection and change compliance. The option to use a Detailed Inspection (DI)
only has been removed. This revision requires that a Non Destructive Inspection (NDI) and a DI be
accomplished.
For Group 1 only, remove airplanes from the effectivity and add a repair.
Revision 2 is sent to revise the group 1 repair figures and add the group 2 repair instructions and post
repair inspection.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
19 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 20

D. Description
1. Get external access to the area around the ATC antenna at stringers S-1 and S-2R, between STA
400 and STA 460.
2. Do external Detailed Inspection (DI) for cracks in the fuselage skin along the chem-mill steps at
stringers S-1 and S-2R, between STA 400 and STA 460.
3. Do external Non Destructive Inspections (NDI) for cracks in the fuselage skin along the chem-mill
steps at stringers S-1 and S-2R, between STA 400 and STA 460. The NDI's that can be used are
Medium Frequency Eddy Current (MFEC), Magneto Optical Imaging (MOI), C-Scan or Ultrasonic
Phased Array (UTPA).
4. If no crack is found, do repeat external DI and NDI for cracks in the fuselage skin along the chem-mill
steps at stringers S-1 and S-2R, between STA 400 and STA 460 at intervals in accordance with
Paragraph 1.E., Compliance.
5. Group 1:
If any of the following is found as a result of the external DI and NDI, contact Boeing for repair
instructions, do the repair and do external DI and NDI of the fuselage skin chem-mill steps (not
covered by a repair) for cracks in accordance with Paragraph 1.E., Compliance.
a. Crack(s) found before 35,000 total flight cycles.
b. Crack(s) found in four or more tear strap bays.
c. Crack(s) found longer than 5 inches.
d. Crack(s) found are not contained within the skin cut-out.
If all of the following is found as a result of the external DI and NDI, do the repair, the critical
fastener row inspection and repeat external DI and NDI for cracks in the fuselage skin along the
chem-mill steps not covered by a repair at intervals specified in Paragraph 1.E., Compliance.
a. Crack(s) found at or after 35,000 total flight cycles.
b. Crack(s) found in three or less strap bays.
c. Crack(s) found 5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out.
6. Group 2:
If any of the following is found as a result of the external DI and NDI, contact Boeing for repair
instructions, do the repair and do external DI and NDI of the fuselage skin chem-mill steps (not
covered by a repair) for cracks in accordance with Paragraph 1.E., Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
20 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 21

a. Crack(s) found before 33,000 total flight cycles.
b. Crack(s) found between STA 400 and STA 420.
c. Crack(s) found between STA 440 and STA 460.
d. Crack(s) found longer than 12.5 inches.
e. Crack(s) found are not contained within the skin cut-out.
If all of the following is found as a result of the external DI and NDI, do the repair, the critical
fastener row inspection and repeat external DI and NDI for cracks in the fuselage skin along the
chem-mill steps not covered by a repair, at intervals specified in Paragraph 1.E., Compliance.
a. Crack(s) found at or after 33,000 total flight cycles.
b. Crack(s) found between STA 420 and STA 440.
c. Crack(s) found 12.5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out.
Revision 1 - More work is necessary on airplanes inspected as shown in the original issue of this service
bulletin. Additional areas have been identified to be inspected for chem-mill line cracking, the Detailed
Inspection must be done with a Non Destructive Inspection method, and the compliance times shown
in Paragraph 1.E., Compliance have been reduced.
Revision 2 - No more work is necessary on the airplanes changed in accordance with Revision 1 of
this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
107737-300, 737-400, 737-500
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2008-19-03 is related to this service
bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
21 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 22

NOTE: If any repair in the Accomplishment Instructions, Paragraph 3.B., Work Instructions, is not
applicable, contact Boeing for repair instructions and do the repair before further flight.
Group 1, Configuration 1:
Table 1: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,800
flight cycles
after the date
of Revision 1
on this ser-
vice bulletin.
Before
35,000 total
flight cycles.
Option 1:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instruction, Paragraph 3.B.,
PART 1.
Airplanes not inspected
in accordance with the
original issue of this
service bulletin.
AND
Do external Non Destructive Inspec-
tions (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 1 using one of
the following procedures:
1. Medium Frequency Eddy Current
(MFEC)
or
2. Magneto Optical Imaging (MOI)
or
3. C-Scan
(a) (c)
OR
Within 1,800
flight cycles
after the date
of Revision 1
on this ser-
vice bulletin.
Before
35,000 total
flight cycles.
Option 2:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instruction, Paragraph 3.B.,
PART 1.
AND
Do external Non Destructive Inspec-
tions (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 1 using the
Ultrasonic Phased Array (UTPA) pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
22 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 23

Group 1, Configuration 1:
Table 1: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Do external DI and NDI of the fuse-
lage skin chem-mill steps for cracks
in accordance with Accomplishment
Instructions, Paragraph 3.B., PART
1.
No crack found in the
fuselage skin.
AND
Option 1 used.
(b)(b)
OR (a) (c)
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
No crack found in the
fuselage skin.
(b)(b)AND
Option 2 used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
23 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 24

Group 1, Configuration 1:
Table 1: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Contact Boeing for repair instructions
in accordance with Accomplishment
Instructions, Paragraph 3.B., PART 1
and do the repair.
Crack(s) found before
35,000 total flight cy-
cles.
OR
Cracks found in four or
more tear strap bays. AND (do Option 1 or Option 2 )
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Option 1:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
(not covered by a repair) for cracks in
accordance with Accomplishment In-
structions, Paragraph 3.B., PART 3.
OR
Crack(s) longer than 5
inches.
OR
Crack(s) found are not
contained within the
skin cut-out.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
Option 2:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
(not covered by a repair) for cracks in
accordance with Accomplishment In-
structions, Paragraph 3.B., PART 3.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
24 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 25

Group 1, Configuration 1:
Table 1: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Do the repair in accordance with Ac-
complishment Instructions, Paragraph
3.B., PART 2.
Crack(s) found at or af-
ter 35,000 total flight
cycles.
AND
Cracks(s) found in
three or fewer tear
strap bays.
AND (do Option 1 or Option 2 )
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Option 1:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
(not covered by a repair) for cracks in
accordance with Accomplishment In-
structions, Paragraph 3.B., PART 3.
AND
Crack(s) found 5 inches
or shorter.
AND
Crack(s) found are
contained within the
skin cut-out.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
Option 2:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
(not covered by a repair) for cracks in
accordance with Accomplishment In-
structions, Paragraph 3.B., PART 3.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
25 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 26

Group 1, Configuration 1:
Table 1: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
(a) It is not necessary to inspect the chem-mill steps under an external repair doubler provided all of the following
apply:
1. The repair was installed in accordance with this service bulletin, or approved by the FAA, or approved
by a Boeing company authorized representative who was authorized by the FAA to make such findings.
2. The repair extends a minimum of three rows of fasteners on each side of the chem-mill line in the
circumferential direction.
Installation of an external repair that meets the requirements of items 1 and 2 above is terminating action for
repeat inspections under the repair area only.
(b) It is acceptable to change inspection procedures from Option 1 to Option 2 or from Option 2 to Option 1 if
you do as follows:
1. If the inspection procedure is being changed from Option 1 to Option 2, the first two Option 2 inspections
must be done within 1,800 flight cycle repeat intervals. Then Option 2 inspections that follow must
be done within 2,400 flight cycle repeat intervals.
2. If the inspection procedure is being changed from Option 2 to Option 1, the first Option 1 inspection
must be done within 2,400 flight cycles after the Option 2 inspection. Then Option 1 inspections that
follow must be done within 1,800 flight cycle repeat intervals.
(c) Magneto Optical Imaging (MOI) and C-Scan NDI inspection options cannot be used within 4 inches of an
existing repair doubler edge. Within 4 inches of an existing repair doubler edge, the Medium Frequency Eddy
Current (MFEC) or Ultrasonic Phased Array (UTPA) NDI inspection options must be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
26 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 27

Group 1, Configuration 2, 4:
Table 2: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 900
flight cycles
after the date
of Revision 1
on this ser-
vice bulletin.
Before
35,000 total
flight cycles.
Option 1:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 1.
Airplanes inspected in
accordance with the
original issue of this
service bulletin and the
last inspection was De-
tailed Inspection (DI)
procedure.
OR
Airplanes inspected in
accordance with Boeing
Multi-Operator Mes-
sage MOM-MOM-09-
0807-01B (R1) and the
last inspection was De-
tailed Inspection (DI)
procedure.
AND
Do external Non Destructive Inspec-
tions (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 1 using one of
the following procedures:
1. Medium Frequency Eddy Current
(MFEC)
or
2. Magneto Optical Imaging (MOI)
or
3. C-Scan
(a) (c)
OR
-Within 900
flight cycles
after the date
of Revision 1
on this ser-
vice bulletin.
Before
35,000 total
flight cycles.
Option 2:
Do external Detailed Inspection (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 1.
AND
Do external Non Destructive Inspec-
tions (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 1 using the
Ultrasonic Phased Array (UTPA) pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
27 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 28

Group 1, Configuration 2, 4:
Table 2: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Do repeat external DI and NDI of the
fuselage skin chem-mill steps for
cracks in accordance with Accomplish-
ment Instructions, Paragraph 3.B.,
PART 1.
No crack found in the
fuselage skin.
AND
Option 1 used.
(b)(b)
OR (a) (c)
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
No crack found in the
fuselage skin.
(b)(b)AND
Option 2 used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
28 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 29

Group 1, Configuration 2, 4:
Table 2: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Contact Boeing for repair instructions
in accordance with Accomplishment
Instructions, Paragraph 3.B., PART 1
and do the repair
Crack(s) found before
35,000 total flight cy-
cles.
OR
Cracks found in four or
more tear strap bays. AND (do Option 1 or Option 2)
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Option 1:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
OR
Crack(s) found longer
than 5 inches.
OR
Crack(s) found are not
contained within the
skin cut-out.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
Option 2:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
29 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 30

Group 1, Configuration 2, 4:
Table 2: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Do the repair in accordance with Ac-
complishment Instructions, Paragraph
3.B., PART 2.
Crack(s) found at or af-
ter 35,000 total flight
cycles.
AND
Cracks(s) found in
three or fewer tear
strap bays.
AND (do Option 1 or Option 2)
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Option 1:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
AND
Crack(s) found 5 inches
or shorter.
AND
Crack(s) found are
contained within the
skin cut-out.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
Option 2:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
30 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 31

Group 1, Configuration 2, 4:
Table 2: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
(a) It is not necessary to inspect the chem-mill steps under an external repair doubler provided all of the following
apply:
1. The repair was installed in accordance with this service bulletin, or approved by the FAA, or approved
by a Boeing company authorized representative who was authorized by the FAA to make such findings.
2. The repair extends a minimum of three rows of fasteners on each side of the chem-mill line in the
circumferential direction.
Installation of an external repair that meets the requirements of items 1 and 2 above is terminating action for
repeat inspections under the repair area only.
(b) It is acceptable to change inspection procedures from Option 1 to Option 2 or from Option 2 to Option 1 if
you do as follows:
1. If the inspection procedure is being changed from Option 1 to Option 2, the first two Option 2 inspections
must be done within 1,800 flight cycle repeat intervals. Then Option 2 inspections that follow must
be done within 2,400 flight cycle repeat intervals.
2. If the inspection procedure is being changed from Option 2 to Option 1, the first Option 1 inspection
must be done within 2,400 flight cycles after the Option 2 inspection. Then Option 1 inspections that
follows must be done within 1,800 flight cycle repeat intervals.
(c) Magneto Optical Imaging (MOI) and C-Scan NDI inspection options cannot be used within 4 inches of an
existing repair doubler edge. Within 4 inches of an existing repair doubler edge, the Medium Frequency Eddy
Current (MFEC) or Ultrasonic Phased Array (UTPA) NDI inspection options must be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
31 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 32

Group 1, Configuration 3, 5:
Table 3: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,800
flight cycles
after the date
of Revision 1
on this ser-
vice bulletin.
Before
35,000 total
flight cycles.
Option 1:
Do external Detailed Inspections (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 1.
Airplanes inspected in
accordance with the
original issue of this
service bulletin and the
last inspection was a
Non Destructive Inspec-
tion (NDI) procedure. AND
OR Do external Non Destructive Inspec-
tion (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 1 using one of
the following procedures:
Airplanes inspected in
accordance with Boeing
Multi-Operator Mes-
sage MOM-MOM-09-
0807-01B (R1) and the
last inspection was a
Non Destructive Inspec-
tion (NDI) procedure.
1. Medium Frequency Eddy Current
(MFEC)
or
2. Magneto Optical Imaging (MOI)
or
3. C-Scan
(a) (c)
OR
Within 1,800
flight cycles
after the date
of Revision 1
on this ser-
vice bulletin.
Before
35,000 total
flight cycles.
Option 2:
Do external Detailed Inspections (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 1.
AND
Do external Non Destructive Inspec-
tion (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 1 using the
Ultrasonic Phased Array (UTPA) pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
32 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 33

Group 1, Configuration 3, 5:
Table 3: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Do repeat external DI and NDI of the
fuselage skin chem-mill steps for
cracks in accordance with Accomplish-
ment Instructions, Paragraph 3.B.,
PART 1.
No crack found in the
fuselage skin.
AND
Option 1 used.
(b)(b)
OR (a) (c)
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
No crack found in the
fuselage skin.
(b)(b)AND
Option 2 used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
33 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 34

Group 1, Configuration 3, 5:
Table 3: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Contact Boeing for repair instructions
in accordance with Accomplishment
Instructions, Paragraph 3.B., PART 1
and do the repair.
Crack(s) found before
35,000 total flight cy-
cles.
OR
Crack(s) found in four
or more tear strap bays. AND (do Option 1 or Option 2)
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Option1:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
OR
Crack(s) found longer
than 5 inches.
OR
Crack(s) found are not
contained within the
skin cut-out.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
Option 2:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
34 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 35

Group 1, Configuration 3, 5:
Table 3: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Do the repair in accordance with Ac-
complishment Instructions, Paragraph
3.B., PART 2.
Crack(s) found at or af-
ter 35,000 total flight
cycles.
AND
Cracks(s) found in
three or fewer tear
strap bays.
AND (do Option 1 or Option 2)
1,800 flight cy-
cles.
Within 1,800 flight cycles af-
ter the last NDI.
Option1:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
AND
Crack(s) found 5 inches
or shorter.
AND
Crack(s) found are
contained within the
skin cut-out.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
2,400 flight cy-
cles.
Within 2,400 flight cycles af-
ter the last NDI.
Option 2:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 3 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
35 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 36

Group 1, Configuration 3, 5:
Table 3: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
(a) It is not necessary to inspect the chem-mill steps under an external repair doubler provided all of the following
apply:
1. The repair was installed in accordance with this service bulletin, or approved by the FAA, or approved
by a Boeing company authorized representative who was authorized by the FAA to make such findings.
2. The repair extends a minimum of three rows of fasteners on each side of the chem-mill line in the
circumferential direction.
Installation of an external repair that meets the requirements of items 1 and 2 above is terminating action for
repeat inspections under the repair area only.
(b) It is acceptable to change inspection procedures from Option 1 to Option 2 or from Option 2 to Option 1 if
you do as follows:
1. If the inspection procedure is being changed from Option 1 to Option 2, the first two Option 2 inspections
must be done within 1,800 flight cycle repeat intervals. The Option 2 inspections that follow must be
done within 2,400 flight cycle repeat intervals.
2. If the inspection procedure is being changed from Option 2 to Option 1, the first Option 1 inspection
must be done within 2,400 flight cycles after the Option 2 inspection. The Option 1 inspections that
follows must be done within 1,800 flight cycle repeat intervals.
(c) Magneto Optical Imaging (MOI) and C-Scan NDI inspection options cannot be used within 4 inches of an
existing repair doubler edge. Within 4 inches of an existing repair doubler edge, the Medium Frequency Eddy
Current (MFEC) or Ultrasonic Phased Array (UTPA) NDI inspection options must be used.
Group 1:
Table 4: Post Repair - Critical Fastener Row Inspection
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 60,000 flight cycles
from the time the repair was
installed
Do Detailed Inspections (DI) or Non
Destructive Inspections (NDI) of the
skin at the critical row of fasteners in
the repair for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 4.
Airplanes with a repair
installed in accordance
with this service bul-
letin.
In accordance
with Repair As-
sessment Guide-
lines D6-38669
Revision C Fig-
ure 2-9.
In accordance with Repair
Assessment Guidelines D6-
38669 Revision C Figure 2-
9.
Do repeat DI or NDI of the skin at the
critical row of fasteners in the repair
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 4.
No crack found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
36 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 37

Group 1:
Table 4: Post Repair - Critical Fastener Row Inspection
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Contact Boeing for repair instructions
in accordance with Accomplishment
Instructions, Paragraph 3.B., PART 4
and do the repair.
Any crack found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
37 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 38

Group 2:
Table 5: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 500
flight cycles
after the re-
lease date of
Revision 1 on
this service
bulletin.
Before
33,000 total
flight cycles.
Option 1:
Do external Detailed Inspections (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 5.
AND
All Airplanes
Do external Non Destructive Inspec-
tions (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 5 using one of
the following procedures:
1. Medium Frequency Eddy Current
(MFEC)
or
2. Magneto Optical Imaging (MOI)
or
3. C-Scan
(a) (c)
OR
-Within 500
flight cycles
after the re-
lease date of
Revision 1 on
this service
bulletin.
Before
33,000 total
flight cycles.
Option 2:
Do external Detailed Inspections (DI)
of the fuselage skin chem-mill steps
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., PART 5.
AND
Do external Non Destructive Inspec-
tions (NDI) of the fuselage skin chem-
mill steps for cracks in accordance
with Accomplishment Instructions,
Paragraph 3.B., PART 5 using the
Ultrasonic Phased Array (UTPA) pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
38 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 39

Group 2:
Table 5: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
500 flight cycles.Within 500 flight cycles after
the last NDI.
Do repeat external NDI of the fuselage
skin chem-mill steps for cracks in ac-
cordance with Accomplishment Instruc-
tions, Paragraph 3.B., PART 5.
No crack found in the
fuselage skin.
AND
Option 1 used.
(b)
(b)
(a) (c)OR
1,000 flight cy-
cles.
Within 1,000 flight cycles af-
ter the last NDI.
No crack found in the
fuselage skin.
(b)(b)AND
Option 2 used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
39 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 40

Group 2:
Table 5: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Contact Boeing for repair instructions
in accordance with Accomplishment
Instructions, Paragraph 3.B., PART 5
and do the repair.
Crack(s) found before
33,000 total flight cy-
cles.
OR
Crack(s) found between
STA 400 and STA 420. AND (do Option 1 or Option 2)
500 flight cycles.Within 500 flight cycles after
the last NDI.
Option 1:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6.
OR
Crack(s) found between
STA 440 and STA 460.
OR
Crack(s) found longer
than 12.5 inches.
OR
(b)
(b)
AND
Crack(s) found are not
contained within the
skin cut-out.
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
1,000 flight cy-
cles.
Within 1,000 flight cycles af-
ter the last NDI.
Option 2:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
40 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 41

Group 2:
Table 5: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Before further flight.Do the repair in accordance with Ac-
complishment Instructions, Paragraph
3.B., PART 7.
Crack(s) found at or af-
ter 33,000 total flight
cycles.
AND
Crack(s) found between
STA 420 and STA 440.
AND (do Option 1 or Option 2)
500 flight cycles.Within 500 flight cycles after
the last NDI.
Option 1:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6.
AND
Crack(s) found 12.5
inches or shorter.
AND
Crack(s) found are
contained within the
skin cut-out.
(b)
(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6 using one of the
following procedures:
1. MFEC
or
2. MOI
or
3. C-Scan
(a) (c)
OR
1,000 flight cy-
cles.
Within 1,000 flight cycles af-
ter the last NDI.
Option 2:
Do external DI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6.
(b)(b)
AND
Do external NDI of the fuselage skin
chem-mill steps (not covered by a re-
pair) for cracks in accordance with
Accomplishment Instructions, Para-
graph 3.B., PART 6 using UTPA pro-
cedure.
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
41 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 42

Group 2:
Table 5: External Fuselage Skin Chem-Mill Inspection - Stringers S-1 and S-2R, STA 400 - STA 460
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
(a) It is not necessary to inspect the chem-mill steps under an external repair doubler provided all of the following
apply:
1. The repair was installed in accordance with this service bulletin, or approved by the FAA, or approved
by a Boeing company authorized representative who was authorized by the FAA to make such findings.
2. The repair extends a minimum of three rows of fasteners on each side of the chem-mill line in the
circumferential direction.
Installation of an external repair that meets the requirements of items 1 and 2 above is terminating action for
repeat inspections under the repair area only.
(b) It is acceptable to change inspection procedures from Option 1 to Option 2 or from Option 2 to Option 1 if
you do as follows:
1. If the inspection procedure is being changed from Option 1 to Option 2, the first two Option 2 inspections
must be done within 500 flight cycle repeat intervals. The Option 2 inspections that follow must be
done within 1000 flight cycle repeat intervals.
2. If the inspection procedure is being changed from Option 2 to Option 1, the first Option 1 inspection
must be done within 1000 flight cycles after the Option 2 inspection. The Option 1 inspections that
follow must be done within 500 flight cycle repeat intervals.
(c) Magneto Optical Imaging (MOI) and C-Scan NDI inspection options cannot be used within 4 inches of an
existing repair doubler edge. Within 4 inches of an existing repair doubler edge, the Medium Frequency Eddy
Current (MFEC) or Ultrasonic Phased Array (UTPA) NDI inspection options must be used.
Group 2:
Table 6: Post Repair - Critical Fastener Row Inspection
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 60,000 flight cycles
from the time the repair was
installed.
Do a Non Destructive inspection (NDI)
of the skin at the critical row of fasten-
ers in the repair for cracks in accor-
dance with Accomplishment Instruc-
tions, Paragraph 3.B., Part 8.
Airplanes with a repair
installed in accordance
with this service bul-
letin.
6,000 flight cy-
cles.
Within 6,000 flight cycles af-
ter the last NDI.
Do a repeat NDI of the skin at the
critical row of fasteners in the repair
for cracks in accordance with Accom-
plishment Instructions, Paragraph
3.B., Part 8.
No crack found.
-Before further flight.Contact Boeing for repair instructions
in accordance with Accomplishment
Instructions, Paragraph 3.B., Part 8
and do the repair.
Any crack found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
42 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 43

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition the Manager of the FAA Seattle Aircraft Certification Office approves the inspection methods
and corrective actions in Tables 1, 2, 3 and 5 under Paragraph 1.E., Compliance of this service bulletin,
as an alternative method of compliance to the inspection methods and corrective actions specified in
Table 1 and 2, under Paragraph 1.E., Compliance of the Original Issue of this service bulletin, dated
August 13, 2008, required by paragraphs (f) and (g) of AD 2008-19-03. The compliance times remain
unchanged from those defined in AD 2008-19-03. When this service bulletin specifies contacting Boeing
for repair instructions, the repair instructions must be approved by the FAA in accordance with paragraph
(h) of AD 2008-19-03. All provisions of AD 2008-19-03 that are not specifically referenced in this
paragraph remain fully applicable and must be complied with accordingly.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Group 1:
Table 1 - Skin Panel Inspection and Repair.
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.250.251Get Access
2.755.502FIGURE 2
or
FIGURE 7
(a)--FIGURE 5
(a)--FIGURE 6
or
FIGURE 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
43 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 44

Group 1:
Table 1 - Skin Panel Inspection and Repair.
Elapsed HoursTask HoursNumber of Per-
sons
Task
4.25 (b)8.50 (b)2Inspection
0.250.251Close Access
5.7514.50TOTAL FOR EACH AIRPLANE
(a) The time to make any repair is not included. More time is required for repairs
if any damage is found.
(b) Includes time to access interior and inspect interior and exterior of one typical
repair location for the critical fastener row.
Group 2:
Table 2 - Skin Panel Inspection and Repair.
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.250.251Get Access
3.006.002FIGURE 4
or
FIGURE 9
(a)--FIGURE 10
(a)--FIGURE 11
1.50 (b)3.002FIGURE 12
0.250.251Close Access
5.009.50TOTAL FOR EACH AIRPLANE
(a) The time to make any repair is not included. More time is required for repairs
if any damage is found.
(b) Includes time to access interior and inspect interior and exterior of one typical
repair location for the critical fastener row.
H. Weight and Balance Changes
All airplanes:
1. Calculate the change in weight for each repair installation as follows:
a. Calculate the gross area of each repair doubler in square inches (Length x Width).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
44 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 45

Example for FIGURE 6: Length = approximately 20 inches and Width = approximately 12
inches. Area = 240 square inches. (Calculation ignores the curvature of the fuselage, holes
and rounding of corners).
b. To calculate the weight for each repair doubler installed, including fasteners, paint and sealant,
multiply the repair doubler area (from step 1.a) by 0.006 lb per sq in.
Example for FIGURE 6: Change in Weight = 240 x 0.006 = 1.4 pounds rounded to nearest
1/10 pound.
2. Calculate the change in moment for each repair installation as follows:
a. Record the station of the geometric center of each repair doubler.
Example for FIGURE 6: By inspection, station = 435.
b. To calculate the change in moment for each repair doubler, use the formula for each model
as follows:
– For Model 737-300: change in weight from step 1.b. x (station from step 2.a. - 80) =
Change in Moment.
– For Model 737-400: change in weight from step 1.b. x (station from step 2.a. - 152) =
Change in Moment.
– For Model 737-500: change in weight from step 1.b. x (station from step 2.a. - 26) =
Change in Moment.
Example for FIGURE 6, Model 737-300: 1.4 x (435 - 80) = 500 Pound-Inches rounded to
nearest 10 pound-inch.
3. If multiple repair doublers are installed, treat each one individually and then sum the weights and
moments.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data
a. Boeing Service Letter 737-SL-51-042
b. Boeing Service Related Problem (SRP) 737-SRP-53-0334
c. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2008-19-03
d. Standard Overhaul Practices Manual (SOPM) 20-43-03, 20-44-03 , 20-44-04
e. 737 Non-Destructive Testing (NDT) Manual Part 4, 53-30-07, Part 6, 51-00-00, Figure 16,
Part 6, 51-00-00 Figure 23 , Part 6, 51-00-00 Figure 4, Part 6, 53-30-00, Figure 5, Part 6,
53-30-00, Figure 6, Part 6, 53-30-09, Part 6, 53-30-18, Part 6, 53-30-19, Part 6, 53-30-25
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
45 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 46

f. 737-300/400/500 Aircraft Maintenance Manual (AMM) 25-21-39, 25-21-45, 25-21-46, 25-22-00,
25-23-61, 25-24-31, 34-53-11, 51-21-00
g. 737-300 Structural Repair Manual (SRM) 51-10-01, 51-20-01 , 51-20-05, 51-30-01, 51-40,
51-40-08
h. 737-400 Structural Repair Manual (SRM) 51-10-01, 51-20-01 , 51-20-05, 51-30-01, 51-40,
51-40-08
i. 737-500 Structural Repair Manual (SRM) 51-10-01, 51-20-01 , 51-20-05, 51-30-01, 51-40,
51-40-08
j. Multi-Operator Message (MOM) MOM-MOM-09-0807-01B (R1)
k. Airplane Flight Manual Appendix 53
l. Repair Assessment Guidelines - Model 737-100 to -500 Document Number D6-38669 Rev
C
m. Service Bulletin Index Document D6-19567 Part 3
2. Data supplied with this Service Bulletin
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin
TitleDrawing Number
SKIN PANEL INSTALLATION - S-10L TO S-10R STA 360 - STA 54065-45765
SKIN INSTALLATION - S-10L TO S-10R, STA 360 TO STA 54065C35765
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
46 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 47

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane . As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection,and repair procedures given in this
service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
Group 1:
Table 1
NotesNameQTYPart Number /
Specification
(a) (b) (c) (d)RIVET-BACR15BB5D
(a) (b) (c) (d)RIVET-BACR15BB6AD
(a) (b) (c) (d)RIVET-BACR15BB6D
(a) (b) (c) (d)RIVET-BACR15CE5D
(b) (c)ORGANIC CORROSION INHIBIT-
ING COMPOUND
-BMS 3-23 TYPE II
(b) (c)SEALANT-BMS 5-95
(b) (c)REPAIR DOUBLER MATERIAL-2024-T3 CLAD
Sheet X 0.050
thick
(b) (c)TEAR STRAP DOUBLER MATERI-
AL
-2024-T3 CLAD
Sheet X 0.040
thick
(a) Refer to 737-300/-400/-500 Structural Repair Manual Chapter 51 for alternate fasteners.
(b) Quantities to be determined by the size of the repair.
(c) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
(d) Fastener grip length to be determined on assembly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
47 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 48

Group 2:
Table 2
NotesNameQTYPart Number /
Specification
(a)2024-T3 Clad Sheet x 0.050 inches
thick.
40
inches
x 30
inches
AMS QQ-A-250/5
(b)2024-T3 Clad Sheet x 0.040 inches
thick.
24
inches
x 5
inches
AMS QQ-A-250/5
(c) (d)Rivet16BACR15BB6D5C
(c) (d)Rivet32BACR15BB6D6C
(c) (d)Rivet124BACR15GF5D4
(c) (d)Rivet166BACR15GF5D5
(c) (d)Rivet51BACR15GF5D6
(c) (d)Rivet68BACR15BB6AD5C
(e)Chemical Conversion Coating2
ounces
TYPE 2, CLASS A
(f)Primer3
ounces
BMS 10-79, TYPE
III
(f)Sealant5
ounces
BMS 5-95, TYPE I,
CLASS B-1/2 OR
B-2
(f)Organic Corrosion Inhibiting Com-
pound
2
ounces
BMS 3-23, TYPE II
(a) Use to make the external repair doubler in accordance with FIGURE 11.
(b) Use to make tear strap doublers in accordance with FIGURE 11.
(c) Refer to 737-300/-400/-500 Structural Repair Manual Chapter 51 for alternate fasteners.
(d) Fastener grip length to be determined on assembly.
(e) Refer to SOPM 20-43-03 for material sources.
(f) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
3. Parts Modified and Reidentified
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
48 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 49

4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
49 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 50

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
50 of 105
BOEING SERVICE BULLETIN 737-53A1293
BLANK PAGE

### Page 51

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in 737-300/-400/-500 SRM Chapter
51.
4. Maintain a 2D minimum edge margin on all parts unless otherwise stated.
5. All machined surfaces must have a finish of 125 micro-inch Ra or better. Refer to
Figure 1 of 737-300 SRM 51-10-01, 737-400 SRM 51-10-01, 737-500 SRM 51-10-01
as an accepted procedure.
6. Clean repair parts and mating surfaces. Refer to 737-300 SRM 51-20-05, 737-400
SRM 51-20-05, and 737-500 SRM 51-20-05 as an accepted procedure.
7. For fastener installation refer to 737-300 SRM 51-40, 737-400 SRM 51-40 or 737-500
SRM 51-40 as an accepted procedure.
8. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
9. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
10. Boeing Service Letter 737-SL-51-042, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
51 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 52

11. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate access procedures may be required.
12. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
13. If chem-mill step crack damage is found and the damage is within the SB damage
limits and the airplane is above the SB threshold, Boeing would still like to obtain the
information relative to the damage in order to develop more refined inspection
requirements. Report crack damage in accordance with APPENDIX B.
14. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
15. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
B. WORK INSTRUCTIONS
Group 1:
PART 1 - EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION - STRINGERS S-1 AND S-2R,
STA 400 - STA 460
1. Get external access to the area around the ATC antenna at stringers S-1 and S-2R, between STA
400 and STA 460.
2. Do external Detailed Inspection (DI) for cracks in the fuselage skin along the chem-mill steps at
stringers S-1 and S-2R, between STA 400 and STA 460 in accordance with FIGURE 2.
3. Do external Non Destructive Inspection (NDI) using one of the following options/procedures for
cracks in the fuselage skin along the chem-mill steps at stringers S-1 and S-2R, between STA 400
and STA 460 in accordance with FIGURE 2.
a. Option 1: Medium Frequency Eddy Current (MFEC) or Magneto Optical Imaging (MOI) or
C-Scan.
b. Option 2: Ultrasonic Phased Array (UTPA).
4. If no crack is found, do repeat external DI and NDI in accordance with PART 1 at intervals in
accordance with Paragraph 1.E., Compliance.
5. If any of the following is found as a result of the external DI and NDI, contact Boeing for repair
instructions in accordance with APPENDIX A, do the repair and do the inspection of the fuselage
skin not covered by a repair in accordance with PART 3 at intervals in accordance with Paragraph
1.E., Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
52 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 53

a. Crack(s) found before 35,000 total flight cycles.
b. Crack(s) found in four or more tear strap bays.
c. Crack(s) found longer than 5 inches.
d. Crack(s) found are not contained within the skin cut-out shown in FIGURE 5.
6. If all of the following are found as result of the external DI and NDI, do the skin repair in accordance
with PART 2 and do the inspection of the fuselage skin not covered by a repair in accordance with
PART 3 at intervals in accordance with Paragraph 1.E., Compliance.
a. Crack(s) found at or after 35,000 total flight cycles.
b. Crack(s) found in three or fewer tear strap bays.
c. Crack(s) found 5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out shown in FIGURE 5.
7. Put the airplane back to a serviceable condition.
Group 1:
PART 2 - SKIN REPAIR
1. In the passenger cabin, remove and keep the equipment listed in the table below to access the
area of repair. Refer to the listed Aircraft Maintenance Manual (AMM) as an accepted procedure.
AMM Chapter/Section/SubjectEquipment
737-300/400/500 AMM 25-22-00Passenger Seats
737-300/400/500 AMM 25-21-46Sidewall Lining
737-300/400/500 AMM 25-21-39Sidewall insulation
737-300/400/500 AMM 25-24-31Overhead Stowage Bins
737-300/400/500 AMM 25-23-61Passenger Service Units
737-300/400/500 AMM 25-21-45Ceiling Panels
2. Remove and keep ATC antenna if required, refer to 737-300/400/500 AMM 34-53-11 as an accepted
procedure.
3. Remove the crack in accordance with FIGURE 5 .
4. Make and install the repair doubler and tear strap doublers in accordance with figure listed below:
FigureAirplanes Series
FIGURE 6737-300, 737-400
FIGURE 8737-500
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
53 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 54

5. If ATC antenna was removed to do the repair, install kept ATC antenna on top of repair doubler.
Refer to 737-300/400/500 AMM 34-53-11 as an accepted procedure.
6. Install kept equipment in the passenger cabin that was removed for access.
7. Accomplish the Part 4 - Post Repair inspections at the times specified in Table 4 of Paragraph
1.E., Compliance.
8. Put airplane back in a serviceable condition.
Group 1:
PART 3 - EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION AFTER REPAIR - STRINGERS
S-1 AND S-2R, STA 400 - STA 460
1. Get external access to skin repair area at stringers S-1 and S-2R, between STA 400 and STA
460.
2. Do external Detailed Inspection (DI) for cracks in the fuselage skin along the chem-mill steps at
stringers S-1 and S-2R, between STA 400 and STA 460 not covered by a repair in accordance
with FIGURE 7.
3. Do external Non Destructive Inspection (NDI) using one of the following options/procedures for
cracks in the fuselage skin along the chem-mill steps at stringers S-1 and S-2R, between STA 400
and STA 460 not covered by a repair in accordance with FIGURE 7.
a. Option 1: Medium Frequency Eddy Current (MFEC) or Magneto Optical Imaging (MOI) or
C-Scan.
b. Option 2: Ultrasonic Phased Array (UTPA).
4. If any of the following is found as a result of the external DI and NDI, contact Boeing for repair
instructions in accordance with APPENDIX A and do the repair:
a. Crack(s) found before 35,000 total flight cycles.
b. Crack(s) found in four or more tear strap bays.
c. Crack(s) found longer than 5 inches.
d. Crack(s) found are not contained within the skin cut-out shown in FIGURE 5.
5. If all of the following are found as result of the external DI and NDI, do the skin repair in accordance
with PART 2.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
54 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 55

a. Crack(s) found at or after 35,000 total flight cycles.
b. Crack(s) found in three or fewer tear strap bays.
c. Crack(s) found 5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out shown in FIGURE 5.
6. Repeat external DI and NDI in accordance with PART 3 at intervals in accordance with Paragraph
1.E., Compliance.
7. Put the airplane back to a serviceable condition.
Group 1:
PART 4 - POST REPAIR - CRITICAL FASTENER ROW INSPECTION
1. Get access to skin repair at stringers S-1 and S-2R, between STA 400 and STA 460.
2. Do Non Destructive Inspection (NDI) or Detailed Inspection (DI) of the skin at the critical row of
fasteners in the repair for cracks in accordance with Repair Assessment Guidelines D6-38669
Revision C Figure 2-9.
NOTE: The NDI procedures given in the Options column of Figure 2-9 in D6-38669 Revision C
should be changed as follows:
1. Use 737 NDT Part 6, 53-30-00, Figure 6 in place of 53-30-3 Figure 6.
2. Use 737 NDT Part 6, 53-30-00, Figure 5 in place of 53-30-3 Figure 5.
3. If crack is found contact Boeing for repair instructions and do the repair.
4. Repeat post repair inspection in accordance with PART 4 at intervals in accordance with Paragraph
1.E., Compliance.
5. Put the airplane back to a serviceable condition.
Group 2:
PART 5 - EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION - STRINGERS S-1 AND S-2R,
STA 400 - STA 460
1. Get external access to the area around the ATC antenna at stringers S-1 and S-2R, between STA
400 and STA 460.
2. Do external Detail Inspection (DI) for cracks in the fuselage skin along the chem-mill steps at
stringers S-1 and S-2R, between STA 400 and STA 460 in accordance with FIGURE 4.
3. Do external Non Destructive Inspection (NDI) using one of the following options/procedures for
cracks in the fuselage skin along the chem-mill steps at stringers S-1 and S-2R, between STA 400
and STA 460 in accordance with FIGURE 4.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
55 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 56

a. Option 1: Medium Frequency Eddy Current (MFEC), or Magneto Optical Imaging (MOI) or
C-Scan
b. Option 2: Ultrasonic Phased Array (UTPA).
4. If no crack is found, repeat external DI and NDI in accordance with PART 5 at intervals in
accordance with Paragraph 1.E., Compliance.
5. If any of the following is found as a result of the external DI and NDI, contact Boeing for repair
instructions in accordance with APPENDIX A, do the repair and do the inspection of the fuselage
skin not covered by a repair in accordance with PART 6 at intervals in accordance with Paragraph
1.E., Compliance.
a. Crack(s) found before 33,000 total flight cycles.
b. Crack(s) found between STA 400 and STA 420.
c. Crack(s) found between STA 440 and STA 460.
d. Crack(s) found longer than 12.5 inches.
e. Crack(s) found are not contained within the skin cut-out shown in FIGURE 10.
6. If all of the following are found as result of the external DI and NDI, do the skin repair in accordance
with PART 7 and do the inspection of the fuselage skin not covered by a repair in accordance with
PART 6 at intervals in accordance with Paragraph 1.E., Compliance.
a. Crack(s) found at or after 33,000 total flight cycles.
b. Crack(s) found between STA 420 and STA 440.
c. Crack(s) found 12.5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out shown in FIGURE 10.
7. Put the airplane back to a serviceable condition.
Group 2:
PART 6 - EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION AFTER REPAIR - STRINGERS
S-1 AND S-2R, STA 400 - STA 460
1. Get external access to skin repair area at stringers S-1 and S-2R, between STA 400 and STA
460.
2. Do external Detailed Inspection (DI) for cracks in the fuselage skin along the chem-mill steps at
stringers S-1 and S-2R, between STA 400 and STA 460 not covered by a repair in accordance
with FIGURE 9.
3. Do external Non Destructive Inspection (NDI) using one of the following options/procedures for
cracks in the fuselage skin along the chem-mill steps at stringers S-1 and S-2R, between STA 400
and STA 460 not covered by a repair in accordance with FIGURE 9.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
56 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 57

a. Option 1: Medium Frequency Eddy Current (MFEC) or Magneto Optical Imaging (MOI) or
C-Scan.
b. Option 2: Ultrasonic Phased Array (UTPA).
4. If any of the following is found as a result of the external DI and NDI, contact Boeing for repair
instructions in accordance with APPENDIX A, and do the repair.
a. Crack(s) found before 33,000 total flight cycles.
b. Crack(s) found between STA 400 and STA 420.
c. Crack(s) found between STA 440 and STA 460.
d. Crack(s) found longer than 12.5 inches.
e. Crack(s) found are not contained within the skin cut-out shown in FIGURE 10.
5. If all of the following are found as result of the external DI and NDI, do the skin repair in accordance
with PART 7.
a. Crack(s) found at or after 33,000 total flight cycles.
b. Crack(s) found between STA 420 and STA 440.
c. Crack(s) found 12.5 inches or shorter.
d. Crack(s) found are contained within the skin cut-out shown in FIGURE 10.
6. Repeat external DI and NDI in accordance with PART 6 at intervals in accordance with Paragraph
1.E., Compliance.
7. Put the airplane back to a serviceable condition.
Group 2:
PART 7 - SKIN REPAIR
1. In the passenger cabin, remove and keep the equipment listed in the table below to access the
area of repair. Refer to the listed Aircraft Maintenance Manual (AMM) as an accepted procedure.
AMM Chapter/Section/SubjectEquipment
737-300/400/500 AMM 25-22-00Passenger Seats
737-300/400/500 AMM 25-21-46Sidewall Lining
737-300/400/500 AMM 25-21-39Sidewall insulation
737-300/400/500 AMM 25-24-31Overhead Stowage Bins
737-300/400/500 AMM 25-23-61Passenger Service Units
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
57 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 58

AMM Chapter/Section/SubjectEquipment
737-300/400/500 AMM 25-21-45Ceiling Panels
2. Remove and keep the ATC antenna, refer to 737-300/400/500 AMM 34-53-11 as an accepted
procedure.
3. Remove the crack in accordance with FIGURE 10.
4. Make and install the repair doubler and tear strap doublers in accordance with FIGURE 11.
5. Install the kept ATC antenna on top of the repair doubler. Refer to 737-300/400/500 AMM 34-53-11
as an accepted procedure.
NOTE: Longer ATC antenna mounting screws may be necessary as a result of installing the
repair doubler.
6. Install kept equipment in the passenger cabin that was removed for access.
7. Accomplish the Part 8 - Post Repair inspections at the times specified in Table 6 of Paragraph
1.E., Compliance.
8. Put airplane back in a serviceable condition.
Group 2:
PART 8 - POST REPAIR - CRITICAL FASTENER ROW INSPECTION
1. Get external access to the skin repair at stringers S-1 and S-2R, between STA 400 and STA 460.
2. Do an external Non Destructive Inspection (NDI) in accordance with FIGURE 12 for cracks in the
fuselage skin, at the critical row of fasteners in the repair.
a. If any crack is found contact Boeing for repair instructions and do the repair.
3. Repeat post repair inspection in accordance with PART 8 at intervals in accordance with Paragraph
1.E., Compliance.
4. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 13, 2008
737-53A1293Revision 2: August 10, 2011
58 of 105
BOEING SERVICE BULLETIN 737-53A1293

### Page 59 (OCR)

BOEING SERVICE BULLETIN 737-53A1293
This Figure applies only to: Group 1.
THIS FIGURE IS DELETED.
1553909
GURE 1: THIS FIGURE DELETED AT REVISION
SHEET T OF '
Revision 2 : As 10, 20110  |. 201*  737-53A1293
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  59 of 105

### Page 60 (OCR)

BOEING SERVICE BULLETIN 737-53A1293
This Figure applies only to: Group 1.
STA
460
STA
400
0000
TYPICAL CRACKS
- S-2R
STA  STA  STA  STA  STA  STA  STA
460  450  440  430  420  410  400
ATC ANTENNA
INSPECTION AREA
FIGURE 2: EXTERNAL FUSELAGE SKIN CHEM-MILL INSPECTION - STRINGERS S-1 AND S-2R, STA 400
- STA 460
(SHEET 1 OF 2)
Original Issue: August 13, 2008
Revision 2 August 10, 2011  737-53A1293
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  60 of 105

The text continues at https://openairdocs.org/service-documents/boeing/737-53a1293/file/197a64a52da0.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
