# Boeing Alert Requirements Bulletin 737-53A1369 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2018-0415; AD 2018-21-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 737-53A1369 RB](https://openairdocs.org/service-documents/boeing/737-53a1369-rb.md)
- Title as filed: RB 737-53A1369-00--
- Pages: 22
- PDF: https://openairdocs.org/files/sha256/90/2a/902a085d1f264c4023de416e4be4df124f972e3e0a3181fed020a2b9c732a9b1
- Page: https://openairdocs.org/service-documents/boeing/737-53a1369-rb/file/902a085d1f26

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1369 RB
Original Issue: October 12, 2017
ATA System: 5311
SUBJECT: FUSELAGE - Body Station 259.5 - Frame Inspection From the First Stiffener Above
Stringer 10 to Stringer 13, Left and Right Side.
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2017 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: October 12, 2017
737-53A1369 RB
1 of 22
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
2 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
FIGURE 1: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT
(LFEC) INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST
STIFFENER ABOVE S-10 TO S-13, LEFT SIDE  [Group 2-3] . . . . . . . . . . . . . . . . 17
FIGURE 2: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT
(LFEC) INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST
STIFFENER ABOVE S-10 TO S-13, RIGHT SIDE  [Group 2-3] . . . . . . . . . . . . . . . 20
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
3 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
4 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1369 RB
Original Issue: October 12, 2017
ATA System: 5311
SUBJECT: FUSELAGE - Body Station 259.5 - Frame Inspection From the First Stiffener Above
Stringer 10 to Stringer 13, Left and Right Side.
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. EFFECTIVITY
A. Airplanes
This bulletin is applicable to all 737-100/-200/-200C/-300/-400/-500 Airplanes, line numbers 1 through
3132.
DESCRIPTIONCONFIGURATIONGROUP
737-100/-200/-200C airplanes. Line numbers 1-291.-1
737-200/-200C airplanes with 0.040 inch or 0.050 inch thick skins
forward of STA 259.5.
-2
737-200/-200C/-300/-400/-500 airplanes with 0.063 inch or 0.071
inch thick skins forward of STA 259.5.
-3
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
5 of 22

### Page 6

3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 737-53A1369 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 737-53A1369 RB mandatory.
Accomplish the required action(s), based on the applicable conditions in Tables 1 and 2, in accordance
with the Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Group 1:
The Boeing Company endorses the FAA rules related to Limit of Validity (LOV) and recommends immediate
and permanent removal from service of any airplanes upon reaching the LOV, whether or not it is operated
under FAA jurisdiction. As such, The Boeing Company no longer provides maintenance instructions for
airplanes that have accumulated flight cycles beyond the LOV. Airplanes in Group 1 (line number 1-291)
have accumulated flight cycles beyond the LOV of the maintenance program. 14 CFR 121.1115 and 129.115
prohibit operation of an airplane beyond its LOV.
Group 2:
Table 1: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1369 RB.
Before 9,000 to-
tal flight cycles.
Do High Frequency Eddy
Current (HFEC) and Low
Frequency Eddy Current
(LFEC) inspections of the
STA 259.5 bulkhead
frame web from the first
stiffener above S-10 to S-
13 left and right side for
any crack. (a)
All airplanes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
6 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 7

Group 2:
Table 1: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before further flight.CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND.
16,000 flight cy-
cles.
-CONDITION 1 (ACTION
2): Repeat High Frequen-
cy Eddy Current (HFEC)
and Low Frequency Eddy
Current (LFEC) inspec-
tions of the STA 259.5
bulkhead frame web from
the first stiffener above S-
10 to S-13 left and right
side for any crack. (a)
16,000 flight cy-
cles.
-Repeat High Frequency
Eddy Current (HFEC) and
Low Frequency Eddy
Current (LFEC) inspec-
tions of the STA 259.5
bulkhead frame web from
the first stiffener above S-
10 to S-13 left and right
side for any crack. (a)
CONDITION 2: NO
CRACK FOUND.
(a) It is not required to do the inspections in accordance with Requirements Bulletin 737-53A1369 RB in areas
where an existing repair covers the inspection area and meets the following criteria:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1369
RB.
AND
2. The repair was approved by the Boeing Organization Designation Authorization (ODA) via an
FAA Form 8100-9.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
7 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 8

Group 3:
Table 2: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1369 RB.
Before 14,000
total flight cy-
cles.
Do High Frequency Eddy
Current (HFEC) and Low
Frequency Eddy Current
(LFEC) inspections of the
STA 259.5 bulkhead
frame web from the first
stiffener above S-10 to S-
13 left and right side for
any crack. (a)
All airplanes.
-Before further flight.CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND.
24,000 flight cy-
cles.
-CONDITION 1 (ACTION
2): Repeat High Frequen-
cy Eddy Current (HFEC)
and Low Frequency Eddy
Current (LFEC) inspec-
tions of the STA 259.5
bulkhead frame web from
the first stiffener above S-
10 to S-13 left and right
side for any crack. (a)
24,000 flight cy-
cles.
-Repeat High Frequency
Eddy Current (HFEC) and
Low Frequency Eddy
Current (LFEC) inspec-
tions of the STA 259.5
bulkhead frame web from
the first stiffener above S-
10 to S-13 left and right
side for any crack. (a)
CONDITION 2: NO
CRACK FOUND.
(a) It is not required to do the inspections in accordance with Requirements Bulletin 737-53A1369 RB in areas
where an existing repair covers the inspection area and meets the following criteria:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1369
RB.
AND
2. The repair was approved by the Boeing Organization Designation Authorization (ODA) via an
FAA Form 8100-9.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
8 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 9

4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This document and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
9 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 10

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
10 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT
BLANK PAGE

### Page 11

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
– Values for structural fasteners are given in 737 Structural Repair Manual,
Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 737
Aircraft Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 737
Aircraft Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the
applicable installation step.
2. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
3. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
4. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
5. The necessary conditions for selection of clamp type and size are included in SWPM
20-10-12. If any wire bundle support clamp specified in this service bulletin does not
make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted
procedure to select a clamp that fits correctly.
6. Boeing Service Letter 737-SL-51-042, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
7. The instructions in the WORK INSTRUCTIONS and the figures can include operation
of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool
and Equipment Manual, and the Special Tool and Ground Handling Drawing Index
contain data on versions of the tools or test equipment that you can use. It is permitted
to use replaced tools. It is not permitted to use superseded tools.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
11 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 12

8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an
OPTION number, do all of the ACTION numbers for that CONDITION number or
OPTION number.
11. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
12. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
13. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
B. WORK INSTRUCTIONS
Actions Required for Compliance:
1. Requirements
Group 1:
The Boeing Company endorses the FAA rules related to Limit of Validity (LOV) and recommends
immediate and permanent removal from service of any airplanes upon reaching the LOV, whether
or not it is operated under FAA jurisdiction. As such, The Boeing Company no longer provides
maintenance instructions for airplanes that have accumulated flight cycles beyond the LOV.
Airplanes in Group 1 (line number 1-291) have accumulated flight cycles beyond the LOV of the
maintenance program. 14 CFR 121.1115 and 129.115 prohibit operation of an airplane beyond
its LOV.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
12 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 13

Group 2:
Table 1: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Refer to the listed proce-
dures in SB 737-53A1369
Original Issue or later
approved revisions as an
accepted procedure
Method of ComplianceActionCondition
Access: PART 1: GET
ACCESS TO THE STA
259.5 BULKHEAD FRAME
WEB FROM THE FIRST
STIFFENER ABOVE S-10
TO S-13, LEFT AND
RIGHT SIDE.
-Do High Frequency Eddy
Current (HFEC) and Low
Frequency Eddy Current
(LFEC) inspections of the
STA 259.5 bulkhead frame
web from the first stiffener
above S-10 to S-13 left
and right side for any
crack. (a)
All Airplanes.
-FIGURE 1 and FIGURE 2.
Restoration: PART 2:
CLOSE ACCESS TO THE
STA 259.5 BULKHEAD
FRAME WEB FROM THE
FIRST STIFFENER
ABOVE S-10 TO S-13,
LEFT AND RIGHT SIDE.
-CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 1: ANY
CRACK FOUND.
Access: PART 1: GET
ACCESS TO THE STA
259.5 BULKHEAD FRAME
WEB FROM THE FIRST
STIFFENER ABOVE S-10
TO S-13, LEFT AND
RIGHT SIDE.
-CONDITION 1 (ACTION
2): Repeat High Frequency
Eddy Current (HFEC) and
Low Frequency Eddy Cur-
rent (LFEC) inspections of
the STA 259.5 bulkhead
frame web from the first
stiffener above S-10 to S-
13 left and right side for
any crack. (a)
-FIGURE 1 and FIGURE 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
13 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 14

Group 2:
Table 1: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Refer to the listed proce-
dures in SB 737-53A1369
Original Issue or later
approved revisions as an
accepted procedure
Method of ComplianceActionCondition
Restoration: PART 2:
CLOSE ACCESS TO THE
STA 259.5 BULKHEAD
FRAME WEB FROM THE
FIRST STIFFENER
ABOVE S-10 TO S-13,
LEFT AND RIGHT SIDE.
--CONDITION 2: NO
CRACK FOUND.
Access: PART 1: GET
ACCESS TO THE STA
259.5 BULKHEAD FRAME
WEB FROM THE FIRST
STIFFENER ABOVE S-10
TO S-13, LEFT AND
RIGHT SIDE.
-Repeat High Frequency
Eddy Current (HFEC) and
Low Frequency Eddy Cur-
rent (LFEC) inspections of
the STA 259.5 bulkhead
frame web from the first
stiffener above S-10 to S-
13 left and right side for
any crack. (a) -FIGURE 1 and FIGURE 2.
(a) It is not required to do the inspections in accordance with Requirements Bulletin 737-53A1369 RB in areas
where an existing repair covers the inspection area and meets the following criteria:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1369 RB.
AND
2. The repair was approved by the Boeing Organization Designation Authorization (ODA) via an
FAA Form 8100-9.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
14 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 15

Group 3:
Table 2: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Refer to the listed proce-
dures in SB 737-53A1369
Original Issue or later
approved revisions as an
accepted procedure
Method of ComplianceActionCondition
Access: PART 1: GET
ACCESS TO THE STA
259.5 BULKHEAD FRAME
WEB FROM THE FIRST
STIFFENER ABOVE S-10
TO S-13, LEFT AND
RIGHT SIDE.
-Do High Frequency Eddy
Current (HFEC) and Low
Frequency Eddy Current
(LFEC) inspections of the
STA 259.5 bulkhead frame
web from the first stiffener
above S-10 to S-13 left
and right side for any
crack. (a)
All airplanes.
-FIGURE 1 and FIGURE 2.
Restoration: PART 2:
CLOSE ACCESS TO THE
STA 259.5 BULKHEAD
FRAME WEB FROM THE
FIRST STIFFENER
ABOVE S-10 TO S-13,
LEFT AND RIGHT SIDE.
-CONDITION 1 (ACTION
1): Contact The Boeing
Company for repair instruc-
tions and do the repair.
CONDITION 1: ANY
CRACK FOUND.
Access: PART 1: GET
ACCESS TO THE STA
259.5 BULKHEAD FRAME
WEB FROM THE FIRST
STIFFENER ABOVE S-10
TO S-13, LEFT AND
RIGHT SIDE
-CONDITION 1 (ACTION
2): Repeat High Frequency
Eddy Current (HFEC) and
Low Frequency Eddy Cur-
rent (LFEC) inspections of
the STA 259.5 bulkhead
frame web from the first
stiffener above S-10 to S-
13 left and right side for
any crack. (a)
-FIGURE 1 and FIGURE 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
15 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 16

Group 3:
Table 2: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the STA 259.5 Bulkhead Frame Web, Left and Right Side, for Any Crack.
Refer to the listed proce-
dures in SB 737-53A1369
Original Issue or later
approved revisions as an
accepted procedure
Method of ComplianceActionCondition
Restoration: PART 2:
CLOSE ACCESS TO THE
STA 259.5 BULKHEAD
FRAME WEB FROM THE
FIRST STIFFENER
ABOVE S-10 TO S-13,
LEFT AND RIGHT SIDE.
--CONDITION 2: NO
CRACK FOUND.
Access: PART 1: GET
ACCESS TO THE STA
259.5 BULKHEAD FRAME
WEB FROM THE FIRST
STIFFENER ABOVE S-10
TO S-13, LEFT AND
RIGHT SIDE.
-Repeat High Frequency
Eddy Current (HFEC) and
Low Frequency Eddy Cur-
rent (LFEC) inspections of
the STA 259.5 bulkhead
frame web from the first
stiffener above S-10 to S-
13 left and right side for
any crack. (a) -FIGURE 1 and FIGURE 2.
(a) It is not required to do the inspections in accordance with Requirements Bulletin 737-53A1369 RB in areas
where an existing repair covers the inspection area and meets the following criteria:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1369 RB.
AND
2. The repair was approved by the Boeing Organization Designation Authorization (ODA) via an
FAA Form 8100-9.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
16 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 17 (OCR)

REQUIREMENTS BULLETIN 737-53A1369
ALERT  ALERT
This Figure applies only to: Group 2-3.
STA
259.5
STIFFENER
S-10L -
OUTER CHORD
S-111
TYPICAL CRACK  WEB
INNER CHORD
S-12L
STIFFENER
S-13L -
NBD
HFEC INSPECTION AREA  A-A  2583501
FIGURE 1: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST STIFFENER ABOVE S-10
TO S-13, LEFT SIDE
(SHEET 1 OF 3)
Original Issue: October 12, 2017
Export Controlled ECCN: 9E991 - BOEING  737-53A1369 RB
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  17 of 22

### Page 18

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) (d)165-45804-3Bulkhead Frame WebInspect1
(b) (d)165-45804-3Bulkhead Frame WebInspect2
(c) (d)165-45804-3Bulkhead Frame WebInspect3
FIGURE 1: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST STIFFENER ABOVE S-10
TO S-13, LEFT SIDE
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
18 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 19

More DataQtyIdentificationNameTaskStep
(a) Do an HFEC inspection of the bulkhead frame web around the fasteners for any crack in accordance with
737 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the aft side of
the bulkhead frame.
(b) Do an LFEC inspection of the bulkhead frame web around the fasteners through the stiffener for any
crack in accordance with 737 NDT Manual Part 6, 51-00-26. Do the inspection from the aft side of the
bulkhead frame.
(c) Do an HFEC inspection of the bulkhead frame web along the edge of the bulkhead frame web stiffener
from the outboard end to the third fastener in the indicated area, for any crack in accordance with 737
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the aft side of the
bulkhead frame.
(d) It is not required to do the inspections in accordance with Requirements Bulletin 737-53A1369 RB in areas
where an existing repair covers the inspection area and meets the following criteria:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1369 RB.
AND
2. The repair was approved by the Boeing Organization Designation Authorization (ODA) via an
FAA Form 8100-9.
FIGURE 1: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST STIFFENER ABOVE S-10
TO S-13, LEFT SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
19 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 20 (OCR)

REQUIREMENTS BULLETIN 737-53A1369
ALERT  ALERT
This Figure applies only to: Group 2-3.
STA
259.5
STIFFENER
~ S-10R
+ 77 +  OUTER CHORD
• S-11R
WEB '  TYPICAL CRACK
INNER CHORD *
• S-12R
STIFFENER
+
+  +  +  - S-13R
HFEC INSPECTION AREA  INBD  A-A  2583345
FIGURE 2: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST STIFFENER ABOVE S-10
TO S-13, RIGHT SIDE
(SHEET 1 OF 3)
Original Issue: October 12, 2017
Export Controlled ECCN: 9E991 - BOEING  737-53A1369 RB
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  20 of 22

### Page 21

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) (d)165-45804-4Bulkhead Frame WebInspect1
(b) (d)165-45804-4Bulkhead Frame WebInspect2
(c) (d)165-45804-4Bulkhead Frame WebInspect3
(a) Do an HFEC inspection of the bulkhead frame web around the fasteners for any crack in accordance with
737 NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the aft side of
the bulkhead frame.
FIGURE 2: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST STIFFENER ABOVE S-10
TO S-13, RIGHT SIDE
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
21 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

### Page 22

More DataQtyIdentificationNameTaskStep
(b) Do an LFEC inspection of the bulkhead frame web around the fasteners through the stiffener for any
crack in accordance with 737 NDT Manual Part 6, 51-00-26. Do the inspection from the aft side of the
bulkhead frame.
(c) Do an HFEC inspection of the bulkhead frame web along the edge of the bulkhead frame web stiffener
from the outboard end to the third fastener in the indicated area, for any crack in accordance with 737
NDT Manual Part 6, 51-00-00 Procedure 4 or Procedure 23. Do the inspection from the aft side of the
bulkhead frame.
(d) It is not required to do the inspections in accordance with Requirements Bulletin 737-53A1369 RB in areas
where an existing repair covers the inspection area and meets the following criteria:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1369 RB.
AND
2. The repair was approved by the Boeing Organization Designation Authorization (ODA) via an
FAA Form 8100-9.
FIGURE 2: HIGH FREQUENCY EDDY CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC)
INSPECTIONS OF THE STA 259.5 BULKHEAD FRAME WEB FROM THE FIRST STIFFENER ABOVE S-10
TO S-13, RIGHT SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 12, 2017
737-53A1369 RB
22 of 22
REQUIREMENTS BULLETIN 737-53A1369
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
