# Boeing Alert Requirements Bulletin 737-53A1384 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0788; AD 2022-11-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 737-53A1384 RB](https://openairdocs.org/service-documents/boeing/737-53a1384-rb.md)
- Title as filed: RB-737-53A1384-00 RB---BOEING
- Pages: 87
- PDF: https://openairdocs.org/files/sha256/a2/53/a25353f0d497514e30ddb62ef13050b7965dea6121c7e2a15502fdc9781bc5ed
- Page: https://openairdocs.org/service-documents/boeing/737-53a1384-rb/file/a25353f0d497

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1384 RB
Original Issue: September 10, 2020
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 727 Bulkhead - Fastener Inspection
and Repair
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: September 10, 2020
737-53A1384 RB
1 of 87
5.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
2 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION . . . . . . . . . 40
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
FIGURE 4: STA 727 BULKHEAD - FASTENER COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - OPEN HOLE HIGH FREQUENCY EDDY
CURRENT (HFEC) INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
FIGURE 5: STA 727 BULKHEAD - OUTER CHORD, UPPER CHORD AND LOWER CHORD - HIGH
FREQUENCY EDDY CURRENT INSPECTIONS AFTER NEW FASTENER INSTALLATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66
FIGURE 6: STA 727 BULKHEAD - INNER SKIN AT S-23 LAP SPLICE - HIGH FREQUENCY EDDY
CURRENT (HFEC) AND LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTIONS AFTER
NEW FASTENER INSTALLATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 72
FIGURE 7: STA 727 BULKHEAD - HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTIONS OF THE
SKIN, FOR ANY CRACK AFTER NEW FASTENER INSTALLATION . . . . . . . . . . . . 77
FIGURE 8: STA 727 BULKHEAD - FAIL-SAFE CHORD - HIGH FREQUENCY EDDY CURRENT (HFEC)
INSPECTIONS FOR ANY CRACK AFTER NEW FASTENER INSTALLATION. . . . . . . 83
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
3 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
4 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1384 RB
Original Issue: September 10, 2020
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - Body Station 727 Bulkhead - Fastener Inspection
and Repair
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 737-700, 737-800, 737-900ER Airplane(s), line number(s) 6077-6103,
6105-6113, 6115-6131, 6133-6153, 6155-6159, 6161-6187, 6190-6215, 6217-6221, 6223-6243,
6245-6249, 6251-6271, 6274-6289, 6291-6299, 6301-6307, 6309-6325, 6327, 6329, 6331-6343,
6345-6352, 6359, 6389 in 3 Group(s). Where the effectivity is presented with hyphens between
line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9
means line numbers 1 through 9 inclusive.
DESCRIPTIONCONFIGURATIONGROUP
737-700 airplanes.- 1
737-900ER airplanes.- 2
737-800 airplanes.- 3
Airplane Models:
737-700, 737-800, 737-900ER
GroupVariable Number
2YH684
2YH866 - YH876
GroupVariable Number
1YN758
3YQ363 - YQ365
GroupVariable Number
3YR050
3YR210 - YR211
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
5 of 87

### Page 6

GroupVariable Number
3YS370
3YS378
3YS465
3YS517
3YS542
3YS897
3YS945 - YS947
3YS953 - YS955
3YS966 - YS967
3YS973 - YS974
3YT120 - YT121
3YT133
3YT184 - YT185
3YT291 - YT299
3YT347 - YT354
3YT371
3YT477
3YT565
3YT575 - YT576
3YT781
3YT841 - YT843
3YT938 - YT961
GroupVariable Number
2YU055 - YU060
2YU215 - YU216
2YU302 - YU306
3YV004
3YV012
3YV021 - YV023
3YV030 - YV031
3YV052
3YV098
3YV129 - YV140
3YV251
3YV256
3YV307 - YV312
3YV363 - YV365
3YV386 - YV388
3YV391 - YV394
3YV401
3YV411
3YV441 - YV443
3YV446
3YV503
3YV579 - YV580
GroupVariable Number
3YV657 - YV661
3YV730 - YV731
3YV751 - YV755
3YV784
3YV805 - YV809
3YV904 - YV907
3YV973 - YV977
3YW051 - YW084
3YW086
3YW234 - YW238
3YW245
3YW267 - YW274
3YW283
3YW357 - YW358
3YW362
3YW372 - YW384
3YW451 - YW452
3YW471 - YW472
3YW891 - YW893
3YW907
3YW916 - YW918
3YW971 - YW973
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 737-53A1384 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 737-53A1384 RB mandatory..
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
6 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 7

For airplanes which have incorporated Boeing Business Jet (BBJ) Lower Cabin Altitude Supplemental Type
Certificate (STC) ST01697SE (6500 feet maximum cabin altitude in lieu of 8000 feet) as referenced in
Boeing SB 737-21-1149, the flight cycle related compliance times are different from those specified in
Requirements Bulletin 737-53A1384 RB as follows:
– For Table 1 through Table 3 the initial compliance times (thresholds) specified in flight cycles must be
reduced to half of those specified in Requirements Bulletin 737-53A1384 RB
– For Table 4 through Table 7 the initial compliance times (thresholds) is 28,000 Total Flight Cycles. All
repeat interval compliance times specified in flight cycles must be reduced to one-quarter of those
specified in Requirements Bulletin 737-53A1384 RB.
Accomplish the required actions, based on the applicable conditions in Tables 1 through 7, in accordance
with Paragraph 3. Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Group 1:
Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 34,000
total flight cycles.
Do a detailed inspection of the
STA 727 bulkhead, for any incor-
rectly installed fastener.
All airplanes.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 34,000
total flight cycles.
Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 1:
ANY INCORRECTL Y
INSTALLED FASTEN-
ER FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
7 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 8

Group 1:
Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 34,000
total flight cycles.
CONDITION 1.1 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and applicable on-condi-
tion action(s). (a)
CONDITION 1.1:
ANY REPAIR FOUND.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 34,000
total flight cycles.
CONDITION 1.1 (ACTION 2):
Do an open hole High Frequen-
cy Eddy Current (HFEC) inspec-
tion at each incorrectly installed
fastener location at the unre-
paired areas, for any crack.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.1.1:
ANY CRACK FOUND.
-Before further flight.Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.1.2:
NO CRACK FOUND.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 34,000
total flight cycles.
Do an open hole HFEC inspec-
tion at each incorrectly installed
fastener location, for any crack.
CONDITION 1.2:
NO REPAIR FOUND.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.2.1:
ANY CRACK FOUND.
-Before further flight.Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.2.2:
NO CRACK FOUND.
-Before 36,000 total flight cycles.Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 2:
NO INCORRECTL Y
INSTALLED FASTEN-
ER FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
8 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 9

Group 1:
Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before 36,000 total flight cycles.Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and applicable on-condi-
tion action(s). (a)
CONDITION 2.1:
ANY REPAIR FOUND.
--No further action required by
Requirements Bulletin 737-
53A1384 RB.
CONDITION 2.2:
NO REPAIR FOUND.
(a) It is not required to contact The Boeing Company if the repair that covers the affected inspection zone
provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.
Group 2:
Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 26,000
total flight cycles.
Do a detailed inspection of the
STA 727 bulkhead, for any incor-
rectly installed fastener.
All airplanes.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 26,000
total flight cycles.
Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 1:
ANY INCORRECTL Y
INSTALLED FASTEN-
ER FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
9 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 10

Group 2:
Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 26,000
total flight cycles.
CONDITION 1.1 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tion action(s). (a)
CONDITION 1.1:
ANY REPAIR FOUND.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 26,000
total flight cycles.
CONDITION 1.1 (ACTION 2):
Do an open hole High Frequen-
cy Eddy Current (HFEC) inspec-
tion at each incorrectly installed
fastener location at the unre-
paired areas, for any crack.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.1.1:
ANY CRACK FOUND.
-Before further flight.Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.1.2:
NO CRACK FOUND.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 26,000
total flight cycles.
Do an open hole HFEC inspec-
tion at each incorrectly installed
fastener location, for any crack.
CONDITION 1.2:
NO REPAIR FOUND.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.2.1:
ANY CRACK FOUND.
-Before further flight.Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed location. (b)
CONDITION 1.2.2:
NO CRACK FOUND.
-Before 36,000 total flight cycles.Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 2:
NO INCORRECTL Y
INSTALLED FASTEN-
ER FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
10 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 11

Group 2:
Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before 36,000 total flight cycles.Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tion action(s). (a)
CONDITION 2.1:
ANY REPAIR FOUND.
--No further action required by
Requirements Bulletin 737-
53A1384 RB.
CONDITION 2.2:
NO REPAIR FOUND.
(a) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.
Group 3:
Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 36,000
total flight cycles.
Do a detailed inspection of the
STA 727 bulkhead, for any incor-
rectly installed fastener.
All airplanes.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 36,000
total flight cycles.
Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 1:
ANY INCORRECTL Y
INSTALLED FASTEN-
ER FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
11 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 12

Group 3:
Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 36,000
total flight cycles.
CONDITION 1.1 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and applicable on condi-
tion action(s). (a)
CONDITION 1.1:
ANY REPAIR FOUND.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 36,000
total flight cycles.
CONDITION 1.1 (ACTION 2):
Do an open hole High Frequen-
cy Eddy Current (HFEC) inspec-
tion at each incorrectly installed
fastener location at the unre-
paired areas, for any crack.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.1.1:
ANY CRACK FOUND.
-Before further flight.Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.1.2:
NO CRACK FOUND.
-Within 3,000
flight cycles after
the Original Is-
sue date of Re-
quirements Bul-
letin 737-
53A1384 RB.
Before 36,000
total flight cycles.
Do an open hole HFEC inspec-
tion at each incorrectly installed
fastener location, for any crack.
CONDITION 1.2:
NO REPAIR FOUND.
-Before further flight.Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.2.1:
ANY CRACK FOUND.
-Before further flight.Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.2.2:
NO CRACK FOUND.
-Before 36,000 total flight cycles.Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 2:
NO INCORRECTL Y
INSTALLED FASTEN-
ER FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
12 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 13

Group 3:
Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Repeat Interval
(Not to Ex-
ceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before 36,000 total flight cycles.Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tion action(s). (a)
CONDITION 2.1:
ANY REPAIR FOUND.
--No further action required by
Requirements Bulletin 737-
53A1384 RB.
CONDITION 2.2:
NO REPAIR FOUND.
(a) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA) via a
FAA Form 8100-9.
(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.
Table 4: High Frequency Eddy Current (HFEC) Inspections of the Skin, For Any Crack After New Fastener
Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 50,000 total flight cy-
cles.
Do an external general visual
inspection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the
incorrectly installed fas-
tener location at the
STA 727 bulkhead dur-
ing an initial inspection
specified in Table 1, 2,
or 3.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
13 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 14

Table 4: High Frequency Eddy Current (HFEC) Inspections of the Skin, For Any Crack After New Fastener
Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 50,000 total flight cy-
cles.
CONDITION 3 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and any applicable on-
condition action(s). (a)(c)
CONDITION 3:
ANY REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before 50,000 total flight cy-
cles.
CONDITION 3 (ACTION 2):
Do the HFEC inspections of the
skin from the wheel well, in the
unrepaired areas, for any crack.
-Before further flight.CONDITION 3.1 (ACTION 1):CONDITION 3.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
10,000 flight cycles-CONDITION 3.1 (ACTION 2):
Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack. (b)
10,000 flight cycles-Repeat the HFEC inspections
for the skin, from the wheel well,
for any crack. (b)
CONDITION 3.2:
NO CRACK FOUND.
-Before 50,000 total flight cy-
cles.
Do the HFEC inspections of the
skin from the wheel well, for any
crack.
CONDITION 4:
NO REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before further flight.CONDITION 4.1 (ACTION 1):CONDITION 4.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
10,000 flight cycles-CONDITION 4.1 (ACTION 2):
Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack. (b)
10,000 flight cycles-Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack. (b)
CONDITION 4.2:
NO CRACK FOUND.
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
14 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 15

Table 4: High Frequency Eddy Current (HFEC) Inspections of the Skin, For Any Crack After New Fastener
Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(b) It is not required to do the HFEC inspections in areas where a repair covers the affected inspection zone
provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Table 5: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the Inner Skin at S-23 Lap Splice, For Any Crack After New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 50,000 total flight cy-
cles.
Do an external general visual
inspection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the
incorrectly installed fas-
tener location at the
STA 727 bulkhead dur-
ing an initial inspection
specified in Table 1, 2,
or 3.
-Before 50,000 total flight cy-
cles.
CONDITION 5 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and any applicable on-
condition action(s). (a)(c)
CONDITION 5:
ANY REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before 50,000 total flight cy-
cles.
CONDITION 5 (ACTION 2):
Do HFEC and LFEC inspections
of the inner skin from the wheel
well, in the unrepaired areas, for
any crack.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
15 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 16

Table 5: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the Inner Skin at S-23 Lap Splice, For Any Crack After New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.CONDITION 5.1 (ACTION 1):CONDITION 5.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
10,000 flight cycles-CONDITION 5.1 (ACTION 2):
Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b)
10,000 flight cycles-Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b)
CONDITION 5.2:
NO CRACK FOUND.
-Before 50,000 total flight cy-
cles.
Do HFEC and LFEC inspections
of the inner skin from the wheel
well, for any crack.
CONDITION 6:
NO REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before further flight.CONDITION 6.1 (ACTION 1):CONDITION 6.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
10,000 flight cycles-CONDITION 6.1 (ACTION 2):
Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b)
10,000 flight cycles-Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b)
CONDITION 6.2:
NO CRACK FOUND.
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
(b) It is not required to do the HFEC and LFEC inspections in areas where the repair covers the affected in-
spection zone provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
16 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 17

Table 5: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Inspections of
the Inner Skin at S-23 Lap Splice, For Any Crack After New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Table 6: High Frequency Eddy Current (HFEC) Inspections of the Outer Chord, Upper Chord and Lower,
Chord, For Any Crack After New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 50,000 total flight cy-
cles.
Do an external general visual
inspection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the
incorrectly installed fas-
tener location at the
STA 727 bulkhead dur-
ing an initial inspection
specified in Table 1, 2,
or 3.
-Before 50,000 total flight cy-
cles.
CONDITION 7 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and any applicable on-
condition actions. (a)(c)
CONDITION 7:
ANY REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before 50,000 total flight cy-
cles.
CONDITION 7 (ACTION 2): Do
the HFEC inspections of the
outer chord, upper chord and
lower chord from the wheel well,
in the unrepaired areas, for any
crack.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
17 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 18

Table 6: High Frequency Eddy Current (HFEC) Inspections of the Outer Chord, Upper Chord and Lower,
Chord, For Any Crack After New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.CONDITION 7.1 (ACTION 1):CONDITION 7.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
10,000 flight cycles-CONDITION 7.1 (ACTION 2):
Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord from the wheel
well, for any crack. (b)
10,000 flight cycles-Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord, from the wheel
well, for any crack. (b)
CONDITION 7.2:
NO CRACK FOUND.
-Before 50,000 total flight cy-
cles.
Do the HFEC inspections of the
outer chord, upper chord and
lower chord from the wheel well,
for any crack.
CONDITION 8:
NO REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before further flight.CONDITION 8.1 (ACTION 1):CONDITION 8.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
10,000 flight cycles-CONDITION 8.1 (ACTION 2):
Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord, from the wheel
well, for any crack. (b)
10,000 flight cycles-Repeat the HFEC inspections
of outer chord, upper chord, and
lower chord, from the wheel
well, for any crack. (b)
CONDITION 8.2:
NO CRACK FOUND.
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
(b) It is not required to do the HFEC inspections in areas where the repair covers the affected inspection
zone provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
18 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 19

Table 6: High Frequency Eddy Current (HFEC) Inspections of the Outer Chord, Upper Chord and Lower,
Chord, For Any Crack After New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Table 7: High Frequency Eddy Current (HFEC) Inspections of the Fail-Safe Chord, For Any Crack After
New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 50,000 total flight cy-
cles.
Do an internal general visual in-
spection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the
incorrectly installed fas-
tener location at the
STA 727 bulkhead dur-
ing an initial inspection
specified in Table 1, 2,
or 3.
-Before 50,000 total flight cy-
cles.
CONDITION 9 (ACTION 1):
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and any applicable on-
condition actions. (a)(c)
CONDITION 9:
ANY REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before 50,000 total flight cy-
cles.
CONDITION 9 (ACTION 2):
Do the HFEC inspections of the
fail-safe chord from the cargo
compartment, in the unrepaired
areas, for any crack.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
19 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 20

Table 7: High Frequency Eddy Current (HFEC) Inspections of the Fail-Safe Chord, For Any Crack After
New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.CONDITION 9.1 (ACTION 1):CONDITION 9.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
24,000 flight cycles-CONDITION 9.1 (ACTION 2):
Repeat the HFEC inspections
of the fail-safe chord, from the
cargo compartment, for any
crack. (b)
24,000 flight cycles-Repeat the HFEC inspections
of the fail-safe chord, from the
cargo compartment, for any
crack. (b)
CONDITION 9.2:
NO CRACK FOUND.
-Before 50,000 total flight cy-
cles.
Do the HFEC inspections of the
fail-safe chord from the cargo
compartment, for any crack.
CONDITION 10:
NO REPAIR IN-
STALLED AFTER THE
INITIAL INSPECTION.
-Before further flight.CONDITION 10.1 (ACTION 1):CONDITION 10.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND.
24,000 flight cycles-CONDITION 10.1 (ACTION 2):
Repeat the HFEC inspections
of the fail-safe chord, from the
cargo compartment, for any
crack. (b)
24,000 flight cycles-Repeat the HFEC inspections
of the fail-safe chord, from the
cargo compartment, for any
crack. (b)
CONDITION 10.2:
NO CRACK FOUND.
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
(b) It is not required to do the HFEC inspections in areas where the repair covers the affected inspection
zone provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
20 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 21

Table 7: High Frequency Eddy Current (HFEC) Inspections of the Fail-Safe Chord, For Any Crack After
New Fastener Installation
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
This Requirements Bulletin is also approved for airplanes having FAA Aviation Partners Boeing (APB)
Supplemental Type Certificate (STC) number ST00830SE installed (not including any areas affected by
the split scimitar winglet configuration).
This Requirements Bulletin is also approved for airplanes converted into 737-800BCF under project number
TS14-0042 that have incorporated Boeing drawing 800A0003 specified in Type Certificate Data Sheet
(TCDS).
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
21 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 22

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
22 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT
BLANK PAGE

### Page 23

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Boeing Service Letter 737-SL-51-042, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions.The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 737 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 737
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 737
Aircraft Maintenance Manual (AMM).
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
23 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 24

— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation or assembly to detect damage, failure or irregularity. This could include
tactile assessment in which a component or assembly can be checked for
tightness/security. Available lighting is normally supplemented with a direct source
of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors
and magnifying lenses may be necessary. Surface cleaning and elaborate access
procedures may be required.
10. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance, unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked. Basic cleaning may be
required to ensure appropriate visibility.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
24 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 25

Group 1:
Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
DO PART 1:-Do a detailed inspection of the
STA 727 bulkhead for any incor-
rectly installed fastener.
All airplanes.
GET ACCESS.
-FIGURE 1
DO PART 2: GET
ACCESS
-Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 1:
ANY INCORRECTL Y IN-
STALLED FASTENER
FOUND. -FIGURE 2 and FIGURE 3
--CONDITION 1.1 (ACTION 1):CONDITION 1.1:
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tions action(s). (a)
ANY REPAIR FOUND.
-FIGURE 4CONDITION 1.1 (ACTION 2):
Do an open hole (HFEC) inspec-
tion at each incorrectly installed
fastener location at the unre-
paired areas, for any crack.
--Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.1.1:
ANY CRACK FOUND. DO PART 3:
CLOSE ACCESS.
-
And
DO PART 4:
CLOSE ACCESS.
-737-700 SRM 51-40-02Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.1.2:
NO CRACK FOUND. DO PART 3:
CLOSE ACCESS.
And
-
DO PART 4:
CLOSE ACCESS.
-FIGURE 4Do an open hole (HFEC) inspec-
tion at each incorrectly installed
fastener location, for any crack.
CONDITION 1.2:
NO REPAIR FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
25 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 26

Group 1:
Table 1: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
--Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.2.1:
ANY CRACK FOUND. DO PART 3:
CLOSE ACCESS.
-
And
DO PART 4:
CLOSE ACCESS.
-737-700 SRM 51-40-02Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.2.2:
NO CRACK FOUND. DO PART 3:
CLOSE ACCESS.
And
-
DO PART 4:
CLOSE ACCESS.
DO PART 2: GET
ACCESS
-Do an external and internal
general inspection of the STA
727 bulkhead, for any repair.
CONDITION 2:
NO INCORRECTL Y IN-
STALLED FASTENER
FOUND. -FIGURE 2 and FIGURE 3
--Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tions action(s). (a)
CONDITION 2.1:
ANY REPAIR FOUND. DO PART 3:
CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
-
DO PART 3:-No further action required by
Requirements Bulletin 737-
53A1384 RB.
CONDITION 2.2:
NO REPAIR FOUND. CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
(a) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
26 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 27

Group 2:
Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
DO PART 1:-Do a detailed inspection of the
STA 727 bulkhead, for any incor-
rectly installed fastener.
All airplanes.
GET ACCESS.
-FIGURE 1
DO PART 2: GET
ACCESS
-Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 1:
ANY INCORRECTL Y IN-
STALLED FASTENER
FOUND. -FIGURE 2 and FIGURE 3
--CONDITION 1.1 (ACTION 1):CONDITION 1.1:
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tions action(s). (a)
ANY REPAIR FOUND.
-FIGURE 4CONDITION 1.1 (ACTION 2):
Do an open hole High Frequen-
cy Eddy Current (HFEC) inspec-
tion at each incorrectly installed
fastener location at the unre-
paired area, for any crack.
--Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.1.1:
ANY CRACK FOUND. DO PART 3:
CLOSE ACCESS.
-
And
DO PART 4:
CLOSE ACCESS.
-737-900ER SRM 51-40-02Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.1.2:
NO CRACK FOUND. DO PART 3:
CLOSE ACCESS.
And
-
DO PART 4:
CLOSE ACCESS.
-FIGURE 4Do an open hole HFEC inspec-
tion at each incorrectly installed
fastener location, for any crack.
CONDITION 1.2:
NO REPAIR FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
27 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 28

Group 2:
Table 2: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
--Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.2.1:
ANY CRACK FOUND. DO PART 3:
CLOSE ACCESS.
-
And
DO PART 4:
CLOSE ACCESS.
-737-900ER SRM 51-40-02Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.2.2:
NO CRACK FOUND. DO PART 3:
CLOSE ACCESS.
And
-
DO PART 4:
CLOSE ACCESS.
DO PART 2: GET
ACCESS
-Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 2:
NO INCORRECTL Y IN-
STALLED FASTENER
FOUND. -FIGURE 2 and FIGURE 3
--Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB, do the inspec-
tion(s) and applicable on-condi-
tion action(s). (a)
CONDITION 2.1:
ANY REPAIR FOUND. DO PART 3:
CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
-
DO PART 3:-No further action required by
Requirements Bulletin 737-
53A1384 RB.
CONDITION 2.2:
NO REPAIR FOUND. CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
(a) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
28 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 29

Group 3:
Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
DO PART 1:-Do a detailed inspection of the
STA 727 bulkhead, for any incor-
rectly installed fastener.
All airplanes.
GET ACCESS
-FIGURE 1
DO PART 2:-Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 1:
ANY INCORRECTL Y IN-
STALLED FASTENER
FOUND.
GET ACCESS
-FIGURE 2 and FIGURE 3
--CONDITION 1.1 (ACTION 1):CONDITION 1.1:
Contact The Boeing Company
for alternative inspection(s) in
repaired area, to the Require-
ments Bulletin 737-53A1384
RB, do the inspection(s) and
applicable on-conditions ac-
tion(s). (a)
ANY REPAIR FOUND.
-FIGURE 4CONDITION 1.1 (ACTION 2):
Do an open hole HFEC inspec-
tion at each incorrectly installed
fastener location at the unre-
paired areas, for any crack.
--Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.1.1:
ANY CRACK FOUND. DO PART 3:
CLOSE ACCESS.
-
And
DO PART 4:
CLOSE ACCESS.
-737-800 SRM 51-40-02 or
737-800BCF SRM 51-40-02
as applicable
Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.1.2:
NO CRACK FOUND.
DO PART 3:-
CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
-FIGURE 4Do an open hole HFEC inspec-
tion at each incorrectly installed
fastener location, for any crack.
CONDITION 1.2:
NO REPAIR FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
29 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 30

Group 3:
Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
--Contact The Boeing Company
for repair instructions and do the
repair.
CONDITION 1.2.1:
ANY CRACK FOUND. DO PART 3:
CLOSE ACCESS.
-
And
DO PART 4:
CLOSE ACCESS.
-737-800 SRM 51-40-02 or
737-800BCF SRM 51-40-02
as applicable
Install new fastener in accor-
dance with Structural Repair
Manual (SRM) at each incorrect-
ly installed fastener location. (b)
CONDITION 1.2.2:
NO CRACK FOUND.
DO PART 3:-
CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
DO PART 2: GET
ACCESS
-Do an external and internal
general visual inspection of the
STA 727 bulkhead, for any re-
pair.
CONDITION 2:
NO INCORRECTL Y IN-
STALLED FASTENER
FOUND. -FIGURE 2 and FIGURE 3
--Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and applicable on-condi-
tions action(s). (a)
CONDITION 2.1:
ANY REPAIR FOUND DO PART 3:
CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
-
DO PART 3:-No further action required by
Requirements Bulletin 737-
53A1384 RB.
CONDITION 2.2:
NO REPAIR FOUND. CLOSE ACCESS.
And
DO PART 4:
CLOSE ACCESS.
(a) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
30 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 31

Group 3:
Table 3: Do a Detailed Inspection of the STA 727 Bulkhead, For Any Incorrectly Installed Fastener
Refer to the listed
procedures in SB
737-53A1384
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
(b) For new installed fastener, see subsequent inspections specified in Table 4 through Table 7.
Table 4: High Frequency Eddy Current (HFEC) Inspections of the Skin, For Any Crack After New Fastener
Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
DO PART 1:-Do an external general visual
inspection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any
new fastener in-
stalled at the incor-
rectly installed fas-
tener location at the
STA 727 bulkhead
during an initial in-
spection specified in
Table 1, 2, or 3.
GET ACCESS.
-FIGURE 2
--CONDITION 3 (ACTION 1):CONDITION 3:
ANY REPAIR IN-
STALLED AFTER
THE INITIAL IN-
SPECTION.
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin and do the
inspection(s) and any applicable
on-condition action(s). (a)(c)
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 3 (ACTION 2):
GET ACCESS.Do the High Frequency Eddy
Current (HFEC) inspections of
the skin from the wheel well, in
the unrepaired areas, for any
crack.
-FIGURE 7
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
31 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 32

Table 4: High Frequency Eddy Current (HFEC) Inspections of the Skin, For Any Crack After New Fastener
Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
--CONDITION 3.1 (ACTION 1):CONDITION 3.1:
ANY CRACK
FOUND.
Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 3.1 (ACTION 2):
GET ACCESS.Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack.(b) -FIGURE 7
DO PART 3:
CLOSE ACCESS.
-Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack. (b)
CONDITION 3.2:
NO CRACK
FOUND. DO PART 1: GET
ACCESS.
-
-FIGURE 7
-FIGURE 7Do the HFEC inspections of the
skin from the wheel well, for any
crack.
CONDITION 4:
NO REPAIR IN-
STALLED AFTER
THE INITIAL IN-
SPECTION.
--CONDITION 4.1 (ACTION 1):CONDITION 4.1:
ANY CRACK
FOUND.
Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 4.1 (ACTION 2):
GET ACCESS.Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack. (b) -FIGURE 7
DO PART 3:-Repeat the HFEC inspections
of the skin, from the wheel well,
for any crack. (b)
CONDITION 4.2:
NO CRACK
FOUND.
CLOSE ACCESS.
DO PART 1: GET
ACCESS.
-
-FIGURE 7
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
32 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 33

Table 4: High Frequency Eddy Current (HFEC) Inspections of the Skin, For Any Crack After New Fastener
Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
(b) It is not required to do the HFEC inspections in areas where the repair covers the affected inspection
zone provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384
RB AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384
RB AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
33 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 34

Table 5: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Surface Inspec-
tions of the Inner Skin at S-23 Lap Splice, For Any Crack After New Fastener Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
DO PART 1:-Do an external general visual
inspection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the in-
correctly installed fastener
location at the STA 727
bulkhead during an initial
inspection specified in Ta-
ble 1, 2, or 3.
GET ACCESS.
-FIGURE 2
--CONDITION 5 (ACTION 1):CONDITION 5:
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin and do the
inspection(s) and any applicable
on-condition action(s). (a)(c)
ANY REPAIR INSTALLED
AFTER THE INITIAL IN-
SPECTION.
-FIGURE 6CONDITION 5 (ACTION 2):
Do HFEC and LFEC inspections
of the inner skin from the wheel
well, in the unrepaired areas, for
any crack.
--CONDITION 5.1 (ACTION 1):CONDITION 5.1:
ANY CRACK FOUND. Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 5.1 (ACTION 2):
GET ACCESS.Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b) -FIGURE 6
DO PART 3:-Repeat the HFEC and LFEC in-
spections of the inner skin from
the wheel well, for any crack. (b)
CONDITION 5.2:
NO CRACK FOUND. CLOSE ACCESS.
DO PART 1:-
GET ACCESS
-FIGURE 6
-FIGURE 6Do HFEC and LFEC inspections
of the inner skin from the wheel
well, for any crack.
CONDITION 6:
NO REPAIR INSTALLED
AFTER THE INITIAL IN-
SPECTION.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
34 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 35

Table 5: High Frequency Eddy Current (HFEC) and Low Frequency Eddy Current (LFEC) Surface Inspec-
tions of the Inner Skin at S-23 Lap Splice, For Any Crack After New Fastener Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
--CONDITION 6.1 (ACTION 1):CONDITION 6.1:
ANY CRACK FOUND. Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 6.1 (ACTION 2):
GET ACCESS.Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b) -FIGURE 6
DO PART 3:-Repeat the HFEC and LFEC in-
spections of the inner skin, from
the wheel well, for any crack. (b)
CONDITION 6.2:
NO CRACK FOUND. CLOSE ACCESS.
DO PART 1: GET
ACCESS
-
-FIGURE 6
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
(b) It is not required to do the HFEC and LFEC inspections in areas where the repair covers the affected in-
spection zone provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
35 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 36

Table 6: High Frequency Eddy Current (HFEC) Inspections of the Outer Chord, Upper Chord and Lower,
Chord, For Any Crack After New Fastener Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
DO PART 1:-Do an external general visual
inspection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the in-
correctly installed fastener
location at the STA 727
bulkhead during an initial
inspection specified in Ta-
ble 1, 2, or 3.
GET ACCESS.
-FIGURE 2
--CONDITION 7 (ACTION 1):CONDITION 7:
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and any applicable on-
condition action(s). (a)(c)
ANY REPAIR INSTALLED
AFTER THE INITIAL IN-
SPECTION.
-FIGURE 5CONDITION 7 (ACTION 2):
Do the HFEC inspections of the
outer chord, upper chord and
lower chord from the wheel well,
in the unrepaired areas, for any
crack.
--CONDITION 7.1 (ACTION 1):CONDITION 7.1:
ANY CRACK FOUND. Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 7.1 (ACTION 2):
GET ACCESS.Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord from the wheel
well, for any crack. (b)
-FIGURE 5
DO PART 3:-Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord from the wheel
well, for any crack. (b)
CONDITION 7.2:
NO CRACK FOUND. CLOSE ACCESS.
DO PART 1:
GET ACCESS.
-
-FIGURE 5
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
36 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 37

Table 6: High Frequency Eddy Current (HFEC) Inspections of the Outer Chord, Upper Chord and Lower,
Chord, For Any Crack After New Fastener Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
-FIGURE 5Do the HFEC inspections of the
outer chord, upper chord and
lower chord from the wheel well,
for any crack.
CONDITION 8:
NO REPAIR INSTALLED
AFTER THE INITIAL IN-
SPECTION.
--CONDITION 8.1 (ACTION 1):CONDITION 8.1:
ANY CRACK FOUND. Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 3:
CLOSE ACCESS.
-
DO PART 1:-CONDITION 8.1 (ACTION 2):
GET ACCESS.Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord from the wheel
well, for any crack. (b)
-FIGURE 5
DO PART 3:-Repeat the HFEC inspections
of the outer chord, upper chord
and lower chord from the wheel
well, for any crack. (b)
CONDITION 8.2:
NO CRACK FOUND. CLOSE ACCESS.
DO PART 1:
GET ACCESS.
-
-FIGURE 5
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
(b) It is not required to do the HFEC inspections in areas where the repair covers the affected inspection zone
provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
37 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 38

Table 7: High Frequency Eddy Current (HFEC) Inspection - STA 727 bulkhead- Fail-Safe Chord- For Any
Crack After New Fastener Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
DO PART 2:-Do an internal general visual in-
spection of the STA 727 bulk-
head for any repair installed af-
ter initial inspection of the incor-
rect fastener.
Airplanes with any new
fastener installed at the in-
correctly installed fastener
location at the STA 727
bulkhead during an initial
inspection specified in Ta-
ble 1, 2, or 3.
GET ACCESS.
-FIGURE 3
--CONDITION 9 (ACTION 1):CONDITION 9:
Contact The Boeing Company
for alternative inspection(s) in
the repaired area, to the Re-
quirements Bulletin 737-
53A1384 RB and do the inspec-
tion(s) and any applicable on-
condition action(s). (a)(c)
ANY REPAIR INSTALLED
AFTER THE INITIAL IN-
SPECTION.
-FIGURE 8CONDITION 9 (ACTION 2): Do
the HFEC inspections of the fail-
safe chord from the cargo com-
partment, in the unrepaired ar-
eas, for any crack.
--CONDITION 9.1 (ACTION 1):CONDITION 9.1:
ANY CRACK FOUND. Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 4:
CLOSE ACCESS.
-
DO PART 2:-CONDITION 9.1 (ACTION 2):
GET ACCESS.Repeat the HFEC inspections
of the fail-safe chord from the
cargo compartment, for any
crack. (b)
-FIGURE 8
DO PART 4:-Repeat the HFEC inspections
of the fail-safe chord from the
cargo compartment, for any
crack. (b)
CONDITION 9.2:
NO CRACK FOUND. CLOSE ACCESS.
DO PART 2:
GET ACCESS.
-
-FIGURE 8
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
38 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 39

Table 7: High Frequency Eddy Current (HFEC) Inspection - STA 727 bulkhead- Fail-Safe Chord- For Any
Crack After New Fastener Installation
Refer to the list-
ed procedures in
SB 737-53A1384
Original Issue or
later approved
revisions as an
accepted proce-
dure
Method of ComplianceActionCondition
-FIGURE 8Do the HFEC inspections of the
fail-safe chord from the cargo
compartment, for any crack.
CONDITION 10:
NO REPAIR INSTALLED
AFTER THE INITIAL IN-
SPECTION.
--CONDITION 10.1 (ACTION 1):CONDITION 10.1:
ANY CRACK FOUND. Contact The Boeing Company
for repair instructions and do the
repair.
DO PART 4:
CLOSE ACCESS.
-
DO PART 2:-CONDITION 10.1 (ACTION 2):
GET ACCESS.Repeat the HFEC inspections
of the fail-safe chord from the
cargo compartment, for any
crack. (b)
-FIGURE 8
DO PART 4:-Repeat the HFEC inspections
of the fail-safe chord from the
cargo compartment, for any
crack. (b)
CONDITION 10.2:
NO CRACK FOUND. CLOSE ACCESS.
DO PART 2:
GET ACCESS.
-
-FIGURE 8
(a) It is not required to contact The Boeing Company if the repair is the replacement of the incorrectly installed
fastener that was done in accordance with the SRM specified in Table 1 or Table 2 or Table 3.
(b) It is not required to do the HFEC inspections in areas where the repair covers the affected inspection zone
provided all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(c) It is not required to contact The Boeing Company if the repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair was installed after the Original Issue date of Requirements Bulletin 737-53A1384 RB
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
39 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 40 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
S-22L  S-22R  E
S-23L  S-23R
S-24L  S-24R
S-25L B S-26L  S-25R
BL-O  S-26R
DA 5-27L  S-27R  EL
STA 727
(VIEW LOOKING FORWARD)  2848627
A-A
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION
(SHEET 1 OF 6)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  40 of 87

### Page 41 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-22L
S-23L -
S-24L -
S-25L
FWD
VIEW LOOKING INBOARD
B-B
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION
(SHEET 2 OF 6)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  41 of 87

### Page 42 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-25L
S-26L -
S-27L
FWD
(VIEW LOOKING INBOARD)
• C-C  2849220
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION
(SHEET 3 OF 6)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  42 of 87

### Page 43 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-27L-
S-27R
S-26R
S-25R -
VIEW LOOKING INBOARD
D-D
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION
(SHEET 4 OF 6)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  43 of 87

### Page 44 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-25R -
S-24R -
S-23R -
S-22R -
FWD
(VIEW LOOKING INBOARD)  E-E  2849222
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION
(SHEET 5 OF 6)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1384 RB
Work - See page 1 for details.  44 of 87

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) --SEALANTRemove1
(b) -STA 727 BULKHEADFASTENERSInspect2
(a) Remove any fillet seal around the fastener head.
(b) Do a detailed inspection of the two rows of the fasteners at the STA 727 bulkhead, for any incorrectly in-
stalled fasteners. Inspect for a gap under the fastener head using an inspection shim in accordance with
737-700 SRM 51-40-02 or 737-800 SRM 51-40-02 or 737-800BCF SRM 51-40-02 or 737-900ER SRM
51-40-02. An incorrectly installed fastener is a fastener that has a gap of more than 0.005 inches for a
6/32 inch diameter Hi-lok or a gap of more than 0.006 inches for a 8/32 inch diameter Hi-lok between the
fastener head and the skin or the L chord.
FIGURE 1: STA 727 BULKHEAD - FASTENERS COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - DETAILED INSPECTION
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
45 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 46 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
S-22L  S-22R  E
S-23L  S-23R
S-24L  S-24R
S-25L B S-26L  S-25R
BL-O  S-26R
DA 5-27L  S-27R
STA 727
(VIEW LOOKING FORWARD)  2864793
A-A
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 1 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  46 of 87

### Page 47 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA
727
S-22L
S-23L -
S-24L-
S-25L -
FWD
VIEW LOOKING INBOARD
B-B  2864800
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 2 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  47 of 87

### Page 48 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-25L
S-26L -
S-27L -
FWD
(VIEW LOOKING INBOARD)
2864803
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 3 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  48 of 87

### Page 49 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-27L-
S-27R -
S-26R -
S-25R -
VIEW LOOKING INBOARD
D-D
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 4 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  49 of 87

### Page 50 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  7274
S-25R -
S-24R -
S-23R -
S-22R -
FWD
(VIEW LOOKING INBOARD)
SE-E
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 5 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  50 of 87

### Page 51 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA
727
_WEB
FAIL-SAFE
CHORD
SKIN  OUTER
CHORD
L CHORD
FWD
TYPICAL
F-F
_ GENERAL VISUAL INSPECTION AREA  2864849
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 6 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  51 of 87

### Page 52

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) -STA 727 BULKHEADOUTER CHORDInspect1
(a) -STA 727 BULKHEADL CHORDInspect
(a) -STA 727 BULKHEADSKINInspect
(a) Do a general visual inspection of the STA 727 bulkhead outer chord, L chord and skin, for any repair.
FIGURE 2: STA 727 BULKHEAD - OUTER CHORD, L CHORD AND SKIN - EXTERNAL GENERAL VISUAL
INSPECTION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
52 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 53 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
S-22L  S-22R
S-23L  S-23R
S-24L  S-24R
5-20L BS. S.26L  BL-O  S-26R  S-25R
S-27R
4C
STA 727
(VIEW LOOKING FORWARD)
A-A
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 1 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1384 RB
Work - See page 1 for details.  53 0f 87

### Page 54 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-22L -
S-23L -
S-24L
S-25L -
FWD
VIEW LOOKING INBOARD
B-B  2907367
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 2 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  54 of 87

### Page 55 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  SIA
727  727A
S-25L
S-26L -
S-27L -
FWD
(VIEW LOOKING INBOARD)
C-C  2907366
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 3 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1384 RB
Work - See page 1 for details.  55 of 87

### Page 56 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-27L
S-27R -
S-26R -
S-25R -
VIEW LOOKING INBOARD
D-D  2907365
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 4 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.  28 10 99

### Page 57 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA  STA
727  727A
S-25R
S-24R
S-23R
S-22R -
FWD
(VIEW LOOKING INBOARD)
E-E
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 5 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1384 RB
Work - See page 1 for details.  57 0f 87

### Page 58 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
STA
727
_WEB
FAIL-SAFE
CHORD
SKIN  OUTER
CHORD
L CHORD
FWD
V
TYPICAL
F-F
GENERAL VISUAL INSPECTION AREA  2907362
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 6 OF 7)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  58 of 87

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) -STA 727 BULKHEADFAIL-SAFE CHORDInspect1
(a) Do a general visual inspection of the STA 727 bulkhead fail-safe chord, for any repair.
FIGURE 3: STA 727 BULKHEAD - FAIL-SAFE CHORD - INTERNAL GENERAL VISUAL INSPECTION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 10, 2020
737-53A1384 RB
59 of 87
REQUIREMENTS BULLETIN 737-53A1384
ALERTALERT

### Page 60 (OCR)

REQUIREMENTS BULLETIN 737-53A1384
ALERT  ALERT
S-22L  S-22R  E
S-23L  S-23R
S-24L  S-24R
S-25L B S-26L  S-25R  10
BL-O  S-26R
DA S-27L  S-27R
EL
STA 727
(VIEW LOOKING FORWARD)  2855236
A-A
FIGURE 4: STA 727 BULKHEAD - FASTENER COMMON TO THE OUTER CHORD, FAIL-SAFE CHORD,
SKIN, LOWER CHORD AND UPPER CHORD - OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC)
INSPECTION
(SHEET 1 OF 6)
Original Issue: September 10, 2020
Export Controlled ECCN: 9E991  737-53A1384 RB
Copyright © Unpublished
Work - See page 1 for details.  60 of 87

The text continues at https://openairdocs.org/service-documents/boeing/737-53a1384-rb/file/a25353f0d497.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.