# Boeing Alert Requirements Bulletin 737-53A1388 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2021-0609; AD 2021-26-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 737-53A1388 RB](https://openairdocs.org/service-documents/boeing/737-53a1388-rb.md)
- Title as filed: RB-737-53A1388 RB-00-- BOEING
- Pages: 113
- PDF: https://openairdocs.org/files/sha256/95/d4/95d4b345e210c2e2f218c5d8491770b7fc41cbda5136434456d6b58f8d1213c7
- Page: https://openairdocs.org/service-documents/boeing/737-53a1388-rb/file/95d4b345e210

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1388 RB
Original Issue: October 27, 2020
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - STA 360 to STA 520 and STA 727A to STA
907, between Stringer S-13 and Stringer S-14, Frame Splice Inspections
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: October 27, 2020
737-53A1388 RB
1 of 113
3.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
2 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
FIGURE 1: GVI - FRAME SPLICE BETWEEN S-13L AND S-14L - LEFT SIDE [Group 1] . . . . . . . 34
FIGURE 2: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE [Group 1] . . . 37
FIGURE 3: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH
DOUBLER) - LEFT SIDE [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
FIGURE 4: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE [Group 1] . . . . . 45
FIGURE 5: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE [Group 1] . . 48
FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE  [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
FIGURE 7: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE [Group 2] . . . . . . 57
FIGURE 8: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE [Group 2] . . . 60
FIGURE 9: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (AT STA
500C) - LEFT SIDE [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
FIGURE 10: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH
DOUBLER) - LEFT SIDE [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68
FIGURE 11: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE [Group 2] . . . . . 72
FIGURE 12: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE [Group 2] . . 75
FIGURE 13: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (AT STA
500C) - RIGHT SIDE [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
FIGURE 14: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (AT STA
847) - RIGHT SIDE [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
FIGURE 15: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITH
DOUBLER OTHER THAN STA 500C AND STA 847) - RIGHT SIDE [Group 2] . . . . . . 87
FIGURE 16: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE [Group 3] . . . . . . 91
FIGURE 17: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE [Group 3] . . . 94
FIGURE 18: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH
DOUBLER) - LEFT SIDE [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 98
FIGURE 19: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE [Group 3] . . . . 102
FIGURE 20: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE [Group 3] . 105
FIGURE 21: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITH
DOUBLER) - RIGHT SIDE  [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
3 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
4 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1388 RB
Original Issue: October 27, 2020
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - STA 360 to STA 520 and STA 727A to STA
907, between Stringer S-13 and Stringer S-14, Frame Splice Inspections
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 737-300, 737-400, 737-500 Airplane(s), line number(s) 2566-3132 in
3 Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane
applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through
9 inclusive.
DESCRIPTIONCONFIGURATIONGROUP
737-300 Airplanes.- 1
737-400 Airplanes.- 2
737-500 Airplanes.- 3
Airplane Models:
737-300, 737-400, 737-500
GroupVariable Number
2PJ553 - PJ561
2PJ601 - PJ615
2PJ811
GroupVariable Number
2PJ816 - PJ817
1PM548 - PM550
1PP518 - PP520
GroupVariable Number
1PP876 - PP877
1PQ297 - PQ299
1PQ345 - PQ348
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
5 of 113

### Page 6

GroupVariable Number
1PQ370 - PQ373
1PQ391 - PQ395
1PQ409 - PQ410
1PQ414 - PQ418
1PQ431 - PQ438
1PQ447 - PQ448
1PQ451
1PQ454
1PQ474 - PQ475
1PQ772
1PQ933 - PQ935
1PQ951
1PQ971 - PQ997
1PR001 - PR017
1PR021 - PR034
1PR041 - PR045
1PR061 - PR072
1PR077 - PR082
1PR091 - PR092
1PR096
1PR101
1PR121 - PR122
1PR131 - PR132
1PR141 - PR143
1PR161 - PR172
1PR181
1PS617 - PS630
1PS704 - PS706
1PS763 - PS799
1PS811
GroupVariable Number
1PS836 - PS837
1PS841 - PS846
1PS851 - PS852
1PS856
1PS861 - PS863
1PS866 - PS868
1PS871 - PS874
1PS896 - PS897
1PS901 - PS941
1PS956 - PS957
1PS961 - PS963
1PS971 - PS978
3PT012 - PT015
3PT029 - PT031
3PT126 - PT138
3PT188
3PT307 - PT309
3PT513 - PT517
3PT585 - PT586
3PT643 - PT644
3PT656
3PT681 - PT685
3PT716 - PT717
3PT721 - PT725
3PT801 - PT834
3PT851 - PT854
3PT871 - PT886
3PT901 - PT930
3PT971 - PT973
3PT981 - PT985
GroupVariable Number
3PT996
3PU301
3PU311 - PU313
2PV204 - PV209
2PV226 - PV229
2PV284 - PV287
2PV296
2PV301 - PV302
2PV351
2PV356 - PV357
2PW086 - PW088
2PW168 - PW171
2PW246 - PW252
2PW262 - PW264
2PW271 - PW276
2PW285 - PW292
2PW401 - PW408
2PW411 - PW418
2PW421 - PW424
2PW431 - PW435
2PW441 - PW450
2PW521 - PW522
2PW524 - PW525
2PW527 - PW530
2PW547 - PW550
2PW621 - PW622
2PW635 - PW637
2PW831
2PW851 - PW856
--
B. Spares Affected
None.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
6 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 7

2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 737-53A1388 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 737-53A1388 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Accomplish the required action(s), based on the applicable condition(s) in Table(s) 1 and 2, in accordance
with the Accomplishment Instructions.
Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
Do a GVI of the frame
splices between S-13 and
S-14, from STA 360 to
STA 520 and STA 727A
to STA 907 for any repair.
All airplanes
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
ACTION 1:
Contact The Boeing Com-
pany for alternative inspec-
tion(s) to the Require-
ments Bulletin 737-
53A1388 RB for the re-
paired areas, and do the
inspection(s) at the re-
paired areas and applica-
ble on-condition action(s).
(a)
CONDITION 1:
ANY REPAIR FOUND
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
ACTION 2:
Do HFEC surface inspec-
tions of the frame splices
(upper frame and doubler)
between S-13 and S-14,
from STA 360 to STA 520
and STA 727A to STA 907
for any crack at the unre-
paired areas.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
7 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 8

Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Before further flight.ACTION 1:CONDITION 1.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
-Before further flight.ACTION 1:CONDITION 1.2:
Remove the cracked dou-
bler.
ANY CRACK FOUND IN
THE DOUBLER
-Before further flight.ACTION 2:
At the frame where the
cracked doubler was re-
moved, do an open hole
HFEC inspection at all
fastener hole locations
where a fastener was re-
moved for any crack.
-Before further flight.ACTION 1:CONDITION 1.2.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
-Before further flight.ACTION 2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
6,000-ACTION 3:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
8 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 9

Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Before further flight.ACTION 1:CONDITION 1.2.2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
NO CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
6,000-Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
CONDITION 1.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND DOUBLER
flight cycles.
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
Do HFEC surface inspec-
tions of the frame splices
(upper frame and doubler)
between S-13 and S-14,
from STA 360 to STA 520
and STA 727A to STA 907
for any crack.
CONDITION 2:
NO REPAIR FOUND
-Before further flight.ACTION 1:CONDITION 2.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
9 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 10

Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Before further flight.ACTION 1:CONDITION 2.2:
Remove the cracked dou-
bler.
ANY CRACK FOUND IN
THE DOUBLER
-Before further flight.ACTION 2:
At the frame where the
cracked doubler was re-
moved, do an open hole
HFEC inspection at all
fastener hole locations
where a fastener was re-
moved for any crack.
-Before further flight.ACTION 1:CONDITION 2.2.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
-Before further flight.ACTION 2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
6,000-ACTION 3:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
-Before further flight.ACTION 1:CONDITION 2.2.2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
NO CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
10 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 11

Table 1: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
6,000-Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
CONDITION 2.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND THE DOUBLER
flight cycles.
(a) It is not required to contact The Boeing Company if a repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair is installed after the Original Issue date of Requirements Bulletin 737-53A1388 RB,
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) It is not required to do the HFEC surface inspection in areas where a repair covers the affected inspection
area if the repair meets the conditions that follow:
1. The repair is the corrective action to the crack condition identified in Requirements Bulletin 737-
53A1388 RB and installed after the Original Issue date of Requirements Bulletin 737-53A1388
RB, AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
Do a GVI of the frame
splices between S-13 and
S-14, from STA 360 to
STA 520 and STA 727A
to STA 907 for any repair.
All airplanes
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
11 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 12

Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
ACTION 1:
Contact The Boeing Com-
pany for alternative inspec-
tion(s) to the Require-
ments Bulletin 737-
53A1388 RB for the re-
paired areas, and do the
inspection(s) at the re-
paired areas and applica-
ble on-condition action(s).
(a)
CONDITION 1:
ANY REPAIR FOUND
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
ACTION 2:
Do HFEC surface inspec-
tions of the frame splices
(upper frame and doubler)
between S-13 and S-14,
from STA 360 to STA 520
and STA 727A to STA 907
for any crack at the unre-
paired areas.
-Before further flight.ACTION 1:CONDITION 1.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
12 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 13

Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Before further flight.ACTION 1:CONDITION 1.2:
Remove the cracked dou-
bler.
ANY CRACK FOUND IN
THE DOUBLER
-Before further flight.ACTION 2:
At the frame where the
cracked doubler was re-
moved, do an open hole
HFEC inspection at all
fastener hole locations
where a fastener was re-
moved for any crack.
-Before further flight.ACTION 1:CONDITION 1.2.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
-Before further flight.ACTION 2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
6,000-ACTION 3:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
-Before further flight.ACTION 1:CONDITION 1.2.2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
NO CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
13 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 14

Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
6,000-Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
CONDITION 1.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND DOUBLER
flight cycles.
-Within 5,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 737-
53A1388 RB.
Before 40,000
total flight cycles.
Do HFEC surface inspec-
tions of the frame splices
(upper frame and doubler)
between S-13 and S-14,
from STA 360 to STA 520
and STA 727A to STA 907
for any crack.
CONDITION 2:
NO REPAIR FOUND
-Before further flight.ACTION 1:CONDITION 2.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND IN
THE UPPER FRAME
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
-Before further flight.ACTION 1:CONDITION 2.2:
Remove the cracked dou-
bler.
ANY CRACK FOUND IN
THE DOUBLER
-Before further flight.ACTION 2:
At the frame where the
cracked doubler was re-
moved, do an open hole
HFEC inspection at all
fastener hole locations
where a fastener was re-
moved for any crack.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
14 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 15

Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
-Before further flight.ACTION 1:CONDITION 2.2.1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
-Before further flight.ACTION 2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
6,000-ACTION 3:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
-Before further flight.ACTION 1:CONDITION 2.2.2:
Install a replacement dou-
bler where a cracked dou-
bler was removed.
NO CRACK FOUND
DURING OPEN HOLE
HFEC INSPECTION
6,000-ACTION 2:
flight cycles.Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
6,000-Repeat HFEC surface in-
spections of the frame
splices (upper frame and
doubler) between S-13
and S-14, from STA 360
to STA 520 and STA 727A
to STA 907 for any crack.
(b)
CONDITION 2.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND THE DOUBLER
flight cycles.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
15 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 16

Table 2: General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) surface inspection and
open hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Repeat Interval
(Not to Exceed)
Compliance Time
(Whichever Occurs Later )
ActionCondition
(a) It is not required to contact The Boeing Company if a repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair is installed after the Original Issue date of Requirements Bulletin 737-53A1388 RB,
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) It is not required to do the HFEC surface inspection in areas where a repair covers the affected inspection
area if the repair meets the conditions that follow:
1. The repair is the corrective action to the crack condition identified in Requirements Bulletin 737-
53A1388 RB and installed after the Original Issue date of Requirements Bulletin 737-53A1388
RB, AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
16 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 17

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Boeing Service Letter 737-SL-51-042, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 737 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 737
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 737
Aircraft Maintenance Manual (AMM).
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
17 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 18

— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance, unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked. Basic cleaning may be
required to ensure appropriate visibility.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
B. WORK INSTRUCTIONS
1. Requirements:
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
18 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 19

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
Do PART 1: Open
Access
-Do a GVI of the frame splices
between S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any re-
pair.
All airplanes
-Group 1:
FIGURE 1
-Group 2:
FIGURE 7
-Group 3:
FIGURE 16
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
19 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 20

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
--ACTION 1:CONDITION 1:
Contact The Boeing Company
for alternative inspection(s) to
the Requirements Bulletin
737-53A1388 RB for the re-
paired areas, and do the in-
spection(s) at the repaired ar-
eas and applicable on-condi-
tion action(s). (a)
ANY REPAIR FOUND
-Group 1:ACTION 2:
FIGURE 2Do HFEC surface inspections
of the frame splices (upper
frame and doubler) between
S-13 and S-14, from STA 360
to STA 520 and STA 727A to
STA 907 for any crack at the
unrepaired areas.
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
--ACTION 1:CONDITION 1.1:
ANY CRACK FOUND
IN THE UPPER
FRAME
Contact The Boeing Company
for repair instructions and do
the repair.
Do PART 3: Close
Access
-
Do PART 1: Open
Access
-ACTION 2:
Repeat HFEC surface inspec-
tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
20 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 21

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
--ACTION 1:CONDITION 1.2:
Remove the cracked doubler.ANY CRACK FOUND
IN THE DOUBLER -737 NDT Manual PART 6, 51-
00-00 Procedure 16
ACTION 2:
At the frame where the
cracked doubler was removed,
do an open hole HFEC inspec-
tion at all fastener hole loca-
tions where a fastener was
removed for any crack.
--ACTION 1:CONDITION 1.2.1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION Refer to APPENDIX
C.
-ACTION 2:
Install a replacement doubler
where a cracked doubler was
removed. Do PART 3: CloseAccess-
Do PART 1: Open
Access
-ACTION 3:
Repeat HFEC surface inspec-
tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
21 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 22

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
Refer to APPENDIX
C
-ACTION 1:
Install a replacement doubler
at each STA location where a
cracked doubler was removed.
CONDITION 1.2.2:
NO CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION
Do PART 3: Close
Access
-
Do PART 1: Open
Access
-ACTION 2:
Repeat HFEC surface inspec-
tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Do PART 3: Close
Access
--CONDITION 1.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND DOUBLER Do PART 1: OpenAccess-Repeat HFEC surface inspec-tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
22 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 23

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
-Group 1:Do HFEC surface inspections
of the frame splices (upper
frame and doubler) between
S-13 and S-14, from STA 360
to STA 520 and STA 727A to
STA 907 for any crack.
CONDITION 2:
NO REPAIR FOUND FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
--ACTION 1:CONDITION 2.1:
ANY CRACK FOUND
IN THE UPPER
FRAME
Contact The Boeing Company
for repair instructions and do
the repair.
Do PART 3: Close
Access
-
Do PART 1: Open
Access
-ACTION 2:
Repeat the HFEC surface in-
spections of the frame splices
(upper frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
--ACTION 1:CONDITION 2.2:
Remove the cracked doubler.ANY CRACK FOUND
IN THE DOUBLER -737 NDT Manual PART 6, 51-
00-00, Procedure 16
ACTION 2
At the frame where the
cracked doubler was removed,
do an open hole HFEC inspec-
tion at all fastener hole loca-
tions where a fastener was
removed for any crack.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
23 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 24

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
--ACTION 1:CONDITION 2.2.1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION Refer to APPENDIX
C
-ACTION 2:
Install a replacement doubler
where a cracked doubler was
removed. Do PART 3: CloseAccess-
Do PART 1: Open
Access
-ACTION 3:
Repeat HFEC surface inspec-
tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
24 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 25

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
Refer to APPENDIX
C
-ACTION 1:
Install a replacement doubler
where a cracked doubler was
removed.
CONDITION 2.2.2:
NO CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION
Do PART 3: Close
Access
-
Do PART 1: Open
Access
-ACTION 2:
Repeat HFEC surface inspec-
tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
-Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Do PART 3: Close
Access
--CONDITION 2.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND THE DOUBLER Do PART 1: OpenAccess-Repeat HFEC surface inspec-tions of the frame splices (up-
per frame and doubler) be-
tween S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any
crack. (b)
Group 1:
FIGURE 2
FIGURE 3
-Group 2:
FIGURE 8
FIGURE 9
FIGURE 10
-Group 3:
FIGURE 17
FIGURE 18
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
25 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 26

Table 1 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Left Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
(a) It is not required to contact The Boeing Company if a repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair is installed after the Original Issue date of Requirements Bulletin 737-53A1388 RB,
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) It is not required to do the HFEC surface inspection in areas where a repair covers the affected inspection
area if the repair meets the conditions that follow:
1. The repair is the corrective action to the crack condition identified in Requirements Bulletin 737-
53A1388 RB and installed after the Original Issue date of Requirements Bulletin 737-53A1388
RB, AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
Do PART 2: Open
Access
-Do a GVI of the frame splices
between S-13 and S-14, from
STA 360 to STA 520 and STA
727A to STA 907 for any repair.
All airplanes
-Group 1:
FIGURE 4
-Group 2:
FIGURE 11
-Group 3:
FIGURE 19
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
26 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 27

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
--ACTION 1:CONDITION 1:
Contact The Boeing Company
for alternative inspection(s) to
the Requirements Bulletin 737-
53A1388 RB for the repaired
areas, and do the inspection(s)
at the repaired areas and appli-
cable on-condition action(s). (a)
ANY REPAIR FOUND
-Group 1:ACTION 2:
FIGURE 5Do HFEC surface inspections
of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack at the unre-
paired areas.
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
--ACTION 1:CONDITION 1.1:
ANY CRACK FOUND
IN THE UPPER
FRAME
Contact The Boeing Company
for repair instructions and do the
repair.
Do PART 4: Close
Access
-
Do PART 2: Open
Access
-ACTION 2:
Repeat HFEC surface inspec-
tions of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
27 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 28

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
--ACTION 1:CONDITION 1.2:
Remove the cracked doubler.ANY CRACK FOUND
IN THE DOUBLER -737 NDT Manual PART 6,
51-00-00, Procedure 16
ACTION 2:
At the frame where the cracked
doubler was removed, do an
open hole HFEC inspection at
all fastener hole locations where
a fastener was removed for any
crack.
--ACTION 1:CONDITION 1.2.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION Refer to APPENDIX
D
-ACTION 2:
Install a replacement doubler
where a cracked doubler was
removed. Do PART 4: CloseAccess-
Do PART 2: Open
Access
-ACTION 3:
Repeat HFEC surface inspec-
tions of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
28 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 29

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
Refer to APPENDIX
D
-ACTION 1:
Install a replacement doubler
where a cracked doubler was
removed.
CONDITION 1.2.2:
NO CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION
Do PART 4: Close
Access
-
Do PART 2: Open
Access
-ACTION 2:
Repeat HFEC surface inspec-
tions of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Do PART 4: Close
Access
--CONDITION 1.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND DOUBLER Do PART 2: OpenAccess-Repeat HFEC surface inspec-tions of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
29 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 30

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
-Group 1:Do HFEC surface inspections
of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack.
CONDITION 2:
NO REPAIR FOUND FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
--ACTION 1:CONDITION 2.1:
ANY CRACK FOUND
IN THE UPPER
FRAME
Contact The Boeing Company
for repair instructions and do the
repair.
Do PART 4: Close
Access
-
Do PART 2: Open
Access
-ACTION 2:
Repeat the HFEC surface in-
spections of the frame splices
(upper frame and doubler) be-
tween S-13 and S-14, from STA
360 to STA 520 and STA 727A
to STA 907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
30 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 31

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
--ACTION 1:CONDITION 2.2:
Remove the cracked doubler.ANY CRACK FOUND
IN THE DOUBLER -737 NDT Manual PART 6,
51-00-00, Procedure 16
ACTION 2
At the frame where the cracked
doubler was removed, do an
open hole HFEC inspection at
all fastener hole locations where
a fastener was removed for any
crack.
--ACTION 1:CONDITION 2.2.1:
Contact The Boeing Company
for repair instructions and do the
repair.
ANY CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION Refer to APPENDIX
D
-ACTION 2:
Install a replacement doubler
where a cracked doubler was
removed. Do PART 4: CloseAccess
Do PART 2: Open
Access
-ACTION 3:
Repeat the HFEC surface in-
spections of the frame splices
(upper frame and doubler) be-
tween S-13 and S-14, from STA
360 to STA 520 and STA 727A
to STA 907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
31 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 32

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
Refer to APPENDIX
D
-ACTION 1:
Install a replacement doubler
where a cracked doubler was
removed.
CONDITION 2.2.2:
NO CRACK FOUND
DURING THE OPEN
HOLE HFEC INSPEC-
TION
Do PART 4: Close
Access
-
Do PART 2: Open
Access
-ACTION 2:
Repeat HFEC surface inspec-
tions of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Do PART 4: Close
Access
--CONDITION 2.3:
NO CRACK FOUND IN
THE UPPER FRAME
AND THE DOUBLER Do PART 2: OpenAccess-Repeat HFEC surface inspec-tions of the frame splices (upper
frame and doubler) between S-
13 and S-14, from STA 360 to
STA 520 and STA 727A to STA
907 for any crack. (b)
-Group 1:
FIGURE 5
FIGURE 6
-Group 2:
FIGURE 12
FIGURE 13
FIGURE 14
FIGURE 15
-Group 3:
FIGURE 20
FIGURE 21
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
32 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 33

Table 2 - General Visual Inspection (GVI), High Frequency Eddy Current (HFEC) Surface Inspection and
Open Hole HFEC inspection of the frame splices between S-13 and S-14, from STA 360 to STA 520 and
STA 727A to STA 907 - Right Side
Refer to the listed
procedures in SB
737-53A1388 Origi-
nal Issue or later ap-
proved revisions as
an accepted proce-
dure.
Method of ComplianceActionCondition
(a) It is not required to contact The Boeing Company if a repair covers the affected inspection zone provided
all of the following conditions are met:
1. The repair is installed after the Original Issue date of Requirements Bulletin 737-53A1388 RB,
AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
(b) It is not required to do the HFEC surface inspection in areas where a repair covers the affected inspection
area if the repair meets the conditions that follow:
1. The repair is the corrective action to the crack condition identified in Requirements Bulletin 737-
53A1388 RB and installed after the Original Issue date of Requirements Bulletin 737-53A1388
RB, AND
2. The installed repair was approved by the Boeing Organization Designation Authorization (ODA)
via a FAA Form 8100-9.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
33 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 34 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 1.
STA
STA  907
360  STA
727A
STA
520
737-300
S-13L~S-14L
S-10L-
S-11L
S-13L  * S-13L
S-14L  - S-14L
S-10L-
S-11L-
S-13L-  - S-13L
S-14L-  • S-14L
2916878
FIGURE 1: GVI - FRAME SPLICE BETWEEN S-13L AND S-14L - LEFT SIDE
(SHEET 1 OF 3)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  34 of 113

### Page 35 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
STRINGER
CLIP
S-13L -
UPPER
SKIN
S-14L -
SIDE FRAME-
- LOWER
SKIN
(TYPICAL)
INSPECTION ZONE  2916879
FIGURE 1: GVI - FRAME SPLICE BETWEEN S-13L AND S-14L - LEFT SIDE
(SHEET 2 OF 3)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1388 RB
Work - See page 1 for details.  35 of 113

### Page 36

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 27-FRAME SPLICEInspect1
(a) At each of the frame locations shown, do a GVI of the frame splice between S-13L and S-14L for any repair.
FIGURE 1: GVI - FRAME SPLICE BETWEEN S-13L AND S-14L - LEFT SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
36 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 37 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 1.
STA
STA  907
360  STA
727A
STA
520
737-300
S-13L-S-14L
TA STA STA STA STA
S-10L-
S-11L-
S-13L
S-14L  1-14
S-10L-
S-11L-
S-13L-  S-13L
S-14L  •S-14L
FIGURE 2: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE
(SHEET 1 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  37 of 113

### Page 38 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
STRINGER
CLIP
S-13L ~
UPPER
SKIN
S-14L  •TYPICAL CRACK  LOCATION
SIDE FRAME
- LOWER
FAIL-SAFE  SKIN
CHORD
UPPER
SKIN
SHEAR TIE
UPPER FRAME
SIDE FRAME
A-A
HFEC INSPECTION ZONE
FIGURE 2: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE
(SHEET 2 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  38 of 113

### Page 39 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
STRINGER
CLIP
S-13L -
UPPER
SKIN
B
S-14L ~  •TYPICAL CRACK  LOCATION
SIDE FRAME •
• LOWER
SKIN
FAIL-SAFE
CHORD
UPPER
SKIN
SHEAR TIE
UPPER FRAME
DOUBLER
SIDE FRAME
SHEAR TIE
NBD
B-B
HFEC INSPECTION ZONE
FIGURE 2: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE
(SHEET 3 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  39 of 113

### Page 40

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 8-UPPER FRAMEInspect1
(a) At each of the frame locations shown, do a HFEC surface inspection from the forward side of the upper
frame around the uppermost fastener common to the frame splice for any crack in accordance with 737
NDT Manual Part 6, 51-00-00, Procedure 4 or Procedure 23.
FIGURE 2: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
40 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 41 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 1.
STA
STA  907
360  STA
727A
STA
520
737-300
S-13L-S-14L
STA STA
S-10L-
S-11L-
S-13L  - S-13L
S-14L
S-10L-
S-11L-
S-13L-  •S-13L
S-14L-  •S-14L
FIGURE 3: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH DOUBLER)
- LEFT SIDE
(SHEET 1 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  41 of 113

### Page 42 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
B
S-13L ~
UPPER
SKIN
STRINGER-
CLIP
DOUBLER-
S-14L •  • TYPICAL CRACK
LOCATION
SIDE FRAME•  - LOWER
FAIL-SAFE  SKIN
CHORD
UPPER
SKIN •
SHEAR TIE
UPPER FRAME
DOUBLER
SHEAR TIE
SIDE FRAME
HFEC INSPECTION ZONE  A-A  2912386
FIGURE 3: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH DOUBLER)
- LEFT SIDE
(SHEET 2 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  42 of 113

### Page 43 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
STRINGER
CLIP
S-13L-
I DOUBLER
TYPICAL CRACK
LOCATION
UPPER
SKIN
SHEAR TIE
SIDE FRAME
S-14L-
FAIL-SAFE
LOWER  CHORD
SKIN
INBD
VIEW LOOKING FORWARD
B-B
HFEC INSPECTION ZONE
2912387
FIGURE 3: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH DOUBLER)
- LEFT SIDE
(SHEET 3 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  43 of 113

### Page 44

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 19-UPPER FRAMEInspect1
(b) 19-DOUBLERInspect2
(a) At each of the frame locations shown, do a HFEC surface inspection from the forward side of the upper
frame around the uppermost fastener common to the frame splice between S-13L and S-14L for any
crack, in accordance with 737 NDT Manual Part 6, 51-00-00, Procedure 4 or Procedure 23.
(b) At each of the frame locations shown, do a HFEC surface inspection of the doubler radius, from the aft
side, from the stringer cutout to the stringer clip at S-13L for any crack, in accordance with 737 NDT
Manual Part 6, 51-00-00, Procedure 4 or Procedure 23.
FIGURE 3: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITH DOUBLER)
- LEFT SIDE
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
44 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 45 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 1.
STA
907  STA
STA  360
727A
STA
520
737-300
S-14R S-13R
STA  STA STA
500 500A 500B 500C 500D 520
-S-10R
- S-11R
S-13R  S-14R  S- 13R  • S-14R
847 867
- S-10R
-S-11R
S-13R  1-S-13R
S-14R  -S-14R
FIGURE 4: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE
(SHEET 1 OF 3)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  45 of 113

### Page 46 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
STRINGER UPPER FRAME  CLIP
— S-13R
UPPER
SKIN
- S-14R
~ SIDE FRAME
LOWER-
SKIN
(TYPICAL)
INSPECTION ZONE  2923403
FIGURE 4: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE
(SHEET 2 OF 3)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  46 of 113

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 27-FRAME SPLICEInspect1
(a) At each of the frame locations shown, do a GVI of the frame splice between S-13R and S-14R for any
repair.
FIGURE 4: GVI - FRAME SPLICES BETWEEN S-13R AND S-14R - RIGHT SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
47 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 48 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 1.
STA
STA  360
727A
STA
520
...
737-300
S-14R S-13R
STA  STA  STA STA
500A 500B 500C 500D 520
- S-10R
-S-11R
S-13R -  6-131
S-14R-  S-14
- S-10R
• -S-11R
S-13R  -S-13R
S-14R  - S-14R
2923404
FIGURE 5: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE
(SHEET 1 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  48 of 113

### Page 49 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
— S-13R
UPPER
SKIN
STRINGER
CLIP
TYPICAL CRACK
LOCATION  - S-14R
LOWER
SKIN  * SIDE FRAME
FAIL-SAFE
CHORD
UPPER
- SKIN
SHEAR TIE
UPPER FRAME
SIDE FRAME
INBD
B-B
HFEC INSPECTION ZONE  2923405
FIGURE 5: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE
(SHEET 2 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  49 of 113

### Page 50 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
S-13R
UPPER
SKIN
STRINGER
CLIP
TYPICAL CRACK -
LOCATION  S-14R
LOWER
SKIN  SIDE FRAME
FAIL-SAFE
CHORD
UPPER
• SKIN
SHEAR TIE
UPPER FRAME
DOUBLER
SHEAR TIE
SIDE FRAME
C-C  INBD
HFEC INSPECTION ZONE  2945856
FIGURE 5: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE
(SHEET 3 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  50 of 113

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 9-UPPER FRAMEInspect1
(a) At each of the frame locations shown, do a HFEC surface inspection from the forward side of the upper
frame around the uppermost fastener common to the frame splice for any crack, in accordance with 737
NDT Manual Part 6, 51-00-00, Procedure 4 or Procedure 23.
FIGURE 5: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - RIGHT SIDE
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
51 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 52 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 1.
STA
STA  360
727A
STA
520
737-300
S-14R S-13R
500A 5008 500C 500D 520  STA  STA  STA  STA
IS-10R
:-S-11R
-13F  0-14R  ›-131  1-14
- S-10R
-S-11R
S-13R  S-14R  1-S-18H  - S-14F
2923409
FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE
(SHEET 1 OF 5)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1388 RB
Work - See page 1 for details.  52 of 113

### Page 53 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
B  —S-13R
UPPER
SKIN
STRINGER
CLIP
DOUBLER
LA
LOCATION  TYPICAL CRACK  - S-14R
LOWER  • SIDE FRAME
SKIN  FAIL-SAFE
CHORD
we in  UPPER
→ SKIN
SHEAR TIE
UPPER FRAME
DOUBLER
SHEAR TIE
SIDE FRAME
INBD
HFEC INSPECTION ZONE  A-A
FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE
(SHEET 2 OF 5)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  53 of 113

### Page 54 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
D
—S-13R
UPPER
SKIN
STRINGER
CLIP
- DOUBLER
TYPICAL CRACK  — S-14R
LOCATION
LOWER
SKIN
•SIDE FRAME
FAIL-SAFE
CHORD
UPPER
SKIN
SHEAR TIE  UPPER FRAME
SHEAR TIE  SIDE FRAME
DOUBLER  NBD
C-C  2945632
HFEC INSPECTION ZONE
FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE
(SHEET 3 OF 5)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  54 of 113

### Page 55 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME  UPPER FRAME
STRINGER
STRINGER  CLIP
CLIP
S-13R
S-13R
DOUBLER•  DOUBLER
SIDE
FRAME
TYPICAL
CRACK
TYPICAL  LOCATION
CRACK
LOCATION
UPPER
SKIN
SHEAR
• SHEAR  TIE
TIE
SIDE
FRAME
S-14R
S-14R
FAIL-SAFE  • LOWER
FAIL-SAFE  LOWER  CHORD  SKIN
CHORD  SKIN
INBD
INBD
VIEW LOOKING FORWARD  VIEW LOOKING FORWARD
B-B  D-D
HFEC INSPECTION ZONE  2923414
FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE
(SHEET 4 OF 5)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  55 of 113

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 18-UPPER FRAMEInspect1
(b) 18-DOUBLERInspect2
(a) At each of the frame locations shown, do a HFEC surface inspection from the forward side of the upper
frame around the uppermost fastener common to the frame splice for any crack, in accordance with 737
NDT Manual Part 6, 51-00-00, Procedure 4 or Procedure 23.
(b) At each of the frame locations shown, do a HFEC surface inspection of the doubler radius, from the aft
side, from the stringer cutout to the stringer clip at S-13R for any crack, in accordance with 737 NDT
Manual Part 6, 51-00-00, Procedure 4 or Procedure 23.
FIGURE 6: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13R AND S-14R - (WITH
DOUBLER) - RIGHT SIDE
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
56 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 57 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 2.
STA
907
STA  STA
360  727A
STA
520
S-13L S-14L  737-400
S-10L-
S-11L-
S-13L
S-14L
S-10L-=
S-11L-
S-13L-  - S-13
S-14L  - S-14l
FIGURE 7: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE
(SHEET 1 OF 3)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  57 of 113

### Page 58 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
UPPER FRAME
STRINGER
CLIP
S-13L -
UPPER
SKIN
S-14L
SIDE FRAME -
• LOWER
SKIN
(TYPICAL)
C
INSPECTION ZONE  2923491
FIGURE 7: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE
(SHEET 2 OF 3)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  737-53A1388 RB
Copyright © Unpublished
Work - See page 1 for details.  58 of 113

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
(a) 32-FRAME SPLICEInspect1
(a) At each of the frame locations shown, do a GVI of the frame splice between S-13L and S-14L for any repair.
FIGURE 7: GVI - FRAME SPLICES BETWEEN S-13L AND S-14L - LEFT SIDE
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 27, 2020
737-53A1388 RB
59 of 113
REQUIREMENTS BULLETIN 737-53A1388
ALERTALERT

### Page 60 (OCR)

REQUIREMENTS BULLETIN 737-53A1388
ALERT  ALERT
This Figure applies only to: Group 2.
STA
907
STA  STA
360  727A
STA
520
S-13L S-14L  737-400
STA STA
S-10L-
S-11L-
S-13L
S-14L
S-10L-:
S-11L-
S-13L-  - S-131
S-14L  - S-14|
2923492
FIGURE 8: HFEC SURFACE INSPECTION - FRAME SPLICES BETWEEN S-13L AND S-14L (WITHOUT
DOUBLER OR WITH DOUBLER ENDING AT SIDE FRAME) - LEFT SIDE
(SHEET 1 OF 4)
Original Issue: October 27, 2020
Export Controlled ECCN: 9E991  Copyright © Unpublished  737-53A1388 RB
Work - See page 1 for details.  60 of 113

The text continues at https://openairdocs.org/service-documents/boeing/737-53a1388-rb/file/95d4b345e210.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
