# Boeing Alert Requirements Bulletin 737-53A1414 RB: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-0028; AD 2025-07-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 737-53A1414 RB](https://openairdocs.org/service-documents/boeing/737-53a1414-rb.md)
- Title as filed: 737-53A1414 RB-01
- Pages: 118
- PDF: https://openairdocs.org/files/sha256/fd/14/fd14f37384e8a973248e82986ff12e7e217f1db056efad12d4d3561d06f7f3dd
- Page: https://openairdocs.org/service-documents/boeing/737-53a1414-rb/file/fd14f37384e8

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1414 RB
Original Issue: October 14, 2022
Revision 1: November 20, 2023
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - STA 663.75 Frame Fitting and Failsafe Strap
- Inspection
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2023 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
1 of 118
3.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
2 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64
FIGURE 1: INTERNAL DETAILED INSPECTION OF THE STA 663.75 FRAME FITTING AND FAILSAFE
STRAP - LEFT SIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
FIGURE 2: INTERNAL DETAILED INSPECTION OF THE STA 663.75 FRAME FITTING AND FAILSAFE
STRAP - RIGHT SIDE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
FIGURE 3: EXTERNAL DETAILED INSPECTION AND OPTION 1 ULTRASONIC INSPECTION OF THE
STA 663.75 FAILSAFE STRAP - LEFT SIDE . . . . . . . . . . . . . . . . . . . . . . . . 103
FIGURE 4: EXTERNAL DETAILED INSPECTION AND OPTION 1 ULTRASONIC INSPECTION OF THE
STA 663.75 FAILSAFE STRAP - RIGHT SIDE . . . . . . . . . . . . . . . . . . . . . . . 107
FIGURE 5: EXTERNAL DETAILED INSPECTION AND OPTION 2 ULTRASONIC INSPECTION OF THE
STA 663.75 FAILSAFE STRAP - LEFT SIDE . . . . . . . . . . . . . . . . . . . . . . . . 111
FIGURE 6: EXTERNAL DETAILED INSPECTION AND OPTION 2 ULTRASONIC INSPECTION OF THE
STA 663.75 FAILSAFE STRAP - RIGHT SIDE . . . . . . . . . . . . . . . . . . . . . . . 115
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
3 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
4 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Revision Transmittal SheetNumber: 737-53A1414 RBOriginal Issue: October 14, 2022
Revision 1: November 20, 2023
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - STA 663.75 Frame Fitting and Failsafe Strap
- Inspection
This revision includes all pages of the requirements bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2021-09-06 is related to this bulletin. The
effective date of AD 2021-09-06 is June 08, 2021.
The Federal Aviation Administration (FAA) will possibly release an additional Airworthiness Directive related to
Requirements Bulletin 737-53A1414 RB. The Airworthiness Directive will make the compliance tasks and times
given in Requirements Bulletin 737-53A1414 RB mandatory.
Effects of this Revision on airplanes on which the Original Issue of this bulletin was previously done:
None. However, Boeing recommends that operators review and update their existing maintenance program for
the next repeat interval inspection requirement because the size of the internal Detailed Inspection area has
been increased.
REASON FOR REVISION
This revision is sent to change the inspection area requirement for the internal Detailed Inspection to include
the radiused edge on the frame fitting and failsafe strap.
These sections were changed:
– In Compliance, updated Group 1 and Group 2 compliance tables.
– In Approval, updated AMOC paragraph.
– In General Information, updated Note 1 and added Note 11.
– In Work Instructions, updated Actions Required for Compliance tables.
– In Figures, updated Figures 1-6.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity and format changes,
to show the location of all content changes.
Pages with no vertical lines have no changes.
The data given in Information Notice 737-53A1414 IN 01 is included in this revision.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
5 of 118

### Page 6

REVISION HISTORY
Service BulletinService BulletinRequirement BulletinRequirement Bulletin
737-53A1414737-53A1414737-53A1414 RB737-53A1414 RB
Issue DateIssue Date
October 14, 2022Original Issue:October 14, 2022Original Issue:
November 20, 2023Revision 1:November 20, 2023Revision 1:
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
6 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 7

Commercial 
Airplanes
737
Requirements Bulletin
ALERT
Number: 737-53A1414 RB
Original Issue: October 14, 2022
Revision 1: November 20, 2023
ATA System: 5311
SUBJECT: FUSELAGE - Frames and Bulkheads - STA 663.75 Frame Fitting and Failsafe Strap
- Inspection
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 737-600, 737-700, 737-700C, 737-800, 737-900, 737-900ER
Airplane(s), line number(s) 1-2598, 2600-2721, 2723-2813, 2815-2930, 2932-3068, 3070-3323,
3325-3425, 3427-3521, 3523-3611, 3613-3701, 3703-3791, 3793-3878, 3880-3915, 3917-3968,
3970-4013, 4015-4054, 4056-4098, 4100-4140, 4142-4180, 4182-4218, 4220-4255, 4257-4293,
4295-4330, 4332-4365, 4367-4398, 4400-4444, 4446-4480, 4482-4546, 4548-4608, 4610-4672,
4674-4727, 4729-4767, 4769-4812, 4814-4858, 4860-4897, 4899-4937, 4939-4977, 4979-5019,
5021-5057, 5059-5097, 5099-5137, 5139-5177, 5179-5217, 5219-5261, 5263-5297, 5299-5337,
5339-5367, 5369-5397, 5399-5427, 5429-5457, 5459-5477, 5479-5509, 5511-5541, 5543-5566,
5568-5586, 5588-5601, 5603-5622, 5624-5655, 5657-5667, 5669-5679, 5681-5711, 5713-5727,
5729-5739, 5741-5764, 5766-5787, 5789-5795, 5797-5822, 5824-5850, 5853-5879, 5881-5901,
5904-5935, 5937-5947, 5949-5962, 5964-5991, 5994-6019, 6021-6033, 6035-6047, 6049-6073,
6075, 6077-6103, 6105-6113, 6115-6131, 6133-6153, 6155-6159, 6161-6187, 6190-6215,
6217-6221, 6223-6243, 6245-6249, 6251-6271, 6274-6289, 6291-6299, 6301-6307, 6309-6325,
6327, 6329-6343, 6345-6355, 6357-6359, 6361-6371, 6373-6383, 6386-6395, 6397-6407,
6409-6411, 6413-6419, 6421-6429, 6431-6439, 6442-6447, 6449-6455, 6457-6463, 6465-6467,
6469-6471, 6473-6480, 6482-6489, 6491, 6493-6498, 6500-6507, 6509-6514, 6516-6520,
6522-6527, 6529-6531, 6533-6534, 6536-6541, 6543-6547, 6549-6554, 6556-6559, 6561,
6563-6568, 6570-6574, 6576-6581, 6583-6588, 6590-6593, 6596-6597, 6599-6602, 6604-6606,
6608-6611, 6613-6615, 6617-6620, 6622, 6624, 6626-6629, 6631-6633, 6635-6638, 6640-6642,
6644-6647, 6649-6651, 6653-6656, 6659-6660, 6662-6665, 6667-6671, 6673-6676, 6678-6680,
6682-6685, 6688-6689, 6691-6694, 6696-6698, 6700-6703, 6705-6707, 6709-6712, 6714-6716,
6718-6719, 6721, 6723-6725, 6727-6730, 6732-6734, 6736-6739, 6741-6743, 6745-6748,
6751-6752, 6754-6757, 6759-6761, 6763-6766, 6768-6770, 6772-6775, 6777-6779, 6781-6782,
6786-6788, 6790-6791, 6793, 6795, 6797, 6799-6802, 6804, 6806, 6808-6809, 6811, 6813, 6815,
6817-6818, 6820, 6822-6824, 6826-6827, 6829, 6831-6833, 6835-6836, 6838, 6840, 6842,
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
7 of 118

### Page 8

6844-6845, 6847, 6849, 6851, 6853-6854, 6856-6858, 6860, 6862-6863, 6865, 6867, 6869-6871,
6873-6874, 6878-6880, 6882-6883, 6885, 6887-6889, 6891-6892, 6894, 6896, 6898, 6900-6903,
6905, 6907, 6910, 6912-6914, 6916, 6918-6919, 6921, 6923-6925, 6927-6928, 6930, 6932-6934,
6936-6937, 6939, 6943, 6945-6948, 6950, 6952, 6954-6955, 6957-6959, 6961-6962, 6964,
6966-6967, 6969, 6971-6972, 6977, 6979, 6981-6982, 6984, 6986-6987, 6989, 6992, 6994,
6996-6997, 6999, 7001-7002, 7007, 7009, 7011-7012, 7014, 7016-7017, 7019, 7021-7022, 7024,
7026, 7029, 7031-7032, 7034, 7036-7037, 7039, 7041, 7046-7047, 7049, 7051-7052, 7054,
7056-7057, 7059, 7061, 7063, 7066-7067, 7069, 7071-7072, 7076, 7078, 7081-7082, 7084,
7086-7087, 7089, 7091-7092, 7094, 7097, 7099, 7101-7102, 7104, 7106-7107, 7109, 7112,
7116-7117, 7119, 7121-7122, 7124, 7126-7127, 7129, 7131, 7134, 7136-7137, 7139, 7141-7142,
7146, 7149, 7151-7152, 7154, 7156-7157, 7159, 7161-7162, 7164, 7167, 7169, 7171-7172, 7174,
7176-7177, 7179, 7182, 7187, 7189, 7191, 7194, 7197, 7199, 7202, 7204, 7206, 7209, 7212,
7214, 7217, 7221, 7224, 7227, 7229, 7232, 7234-7235, 7239, 7242, 7244, 7247, 7249, 7251,
7257, 7259, 7262, 7264, 7266, 7269, 7272, 7274, 7277, 7279-7280, 7284, 7287, 7292, 7294,
7297, 7299, 7302, 7304, 7307, 7309, 7312, 7314, 7317, 7319, 7322, 7327, 7329, 7332, 7334,
7337, 7339, 7342, 7344, 7347, 7349, 7352, 7354, 7357, 7362, 7364, 7367, 7369, 7372, 7374,
7377, 7379, 7382, 7387, 7397, 7402, 7407, 7412, 7417, 7422, 7432, 7437, 7442, 7447, 7452,
7457, 7467, 7472, 7477, 7482, 7487, 7492, 7502, 7507, 7512, 7517, 7522, 7527, 7537, 7547,
7552, 7557, 7562, 7572, 7577, 7582, 7587, 7592, 7597, 8592, 9103, 9274, 9430-99999 in 2
Group(s). Where the effectivity is presented with hyphens between line numbers, the airplane
applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through
9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
NOTE: The Variable Number table below includes affected airplanes available as of the issue
date of this bulletin. Affected airplane Variable Numbers added to MyBoeingFleet.com
after the issue date of this bulletin will be shown using the Maintenance Performance
Toolbox EFFECTIVITY search function result.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
8 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 9

DESCRIPTIONCONFIGURATIONGROUP
737-600, 737-700, 737-700C, 737-800, 737-900 Airplanes.-1
All airplanes that have not done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have not done the external detailed
and ultrasonic inspections in accordance with
MOM-MOM-21-0369-01B or the original issue of Requirements
Bulletin 737-53-A1414 RB.
1
All airplanes that have done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have done external detailed and
ultrasonic inspections in accordance with MOM-MOM-21-0369-01B
or the original issue of Requirements Bulletin 737-53A1414 RB.
2
All airplanes that have done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have not done external detailed and
ultrasonic inspections in accordance with MOM-MOM-21-0369-01B
or the original issue of Requirements Bulletin 737-53A1414 RB.
3
All airplanes that have not done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B.
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have done external detailed and
ultrasonic inspections in accordance with MOM-MOM-21-0369-01B
or the original issue of Requirements Bulletin 737-53A1414 RB.
4
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
9 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 10

DESCRIPTIONCONFIGURATIONGROUP
737-900ER Airplanes.-2
All airplanes that have not done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have not done the external detailed
and ultrasonic inspections in accordance with
MOM-MOM-21-0369-01B or the original issue of Requirements
Bulletin 737-53A1414 RB.
1
All airplanes that have done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have done external detailed and
ultrasonic inspections in accordance with MOM-MOM-21-0369-01B
or the original issue of Requirements Bulletin 737-53A1414 RB.
2
All airplanes that have done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have not done external detailed and
ultrasonic inspections in accordance with MOM-MOM-21-0369-01B
or the original issue of Requirements Bulletin 737-53A1414 RB.
3
All airplanes that have not done the internal detailed inspection in
accordance with MOM-MOM-19-0623-01B,
MOM-MOM-20-0443-01B(R1), or the original issue of Requirements
Bulletin 737-53A1414 RB and have done external detailed and
ultrasonic inspections in accordance with MOM-MOM-21-0369-01B
or the original issue of Requirements Bulletin 737-53A1414 RB.
4
Airplane Models:
737-600, 737-700, 737-700C, 737-800, 737-900, 737-900ER
GroupVariable Number
1YA001 - YA099
1YA101 - YA199
1YA201 - YA211
1YA221
1YA231 - YA242
1YA251 - YA256
1YA271 - YA272
GroupVariable Number
1YA291
1YA301 - YA302
1YA311 - YA314
1YA321 - YA323
1YA336 - YA345
1YA351
1YA356 - YA357
GroupVariable Number
1YA366 - YA367
1YA371 - YA377
1YA501 - YA536
1YA541 - YA552
1YA571 - YA578
1YA601 - YA615
1YA621 - YA622
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
10 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 11

GroupVariable Number
1YA626 - YA631
1YA635 - YA636
1YA641 - YA642
1YA645 - YA650
1YA656 - YA659
1YA666 - YA667
1YA671 - YA672
1YA681 - YA691
1YA701 - YA710
1YA721 - YA722
1YA731 - YA734
1YA751 - YA756
1YA801 - YA803
1YA809
1YA811 - YA814
1YA831 - YA835
1YA841 - YA862
1YA881 - YA882
1YA891 - YA892
1YA961 - YA978
1YB001 - YB006
1YB101 - YB132
1YB151 - YB153
1YB156 - YB158
1YB161 - YB164
1YB171 - YB172
1YB181 - YB184
1YB201 - YB208
1YB271
1YB276
1YB301 - YB310
1YB371 - YB392
1YB501 - YB502
GroupVariable Number
1YB521 - YB526
1YB541 - YB544
1YB551
1YB561 - YB598
1YB601 - YB636
1YB651
1YB656
1YB671 - YB672
1YB851 - YB863
1YB871 - YB874
1YB881 - YB893
1YB901 - YB903
1YB911
1YB961 - YB975
1YB981
1YB986 - YB998
1YC001 - YC030
1YC051 - YC084
1YC091 - YC095
1YC101 - YC104
1YC111 - YC113
1YC121
1YC126 - YC127
1YC136 - YC141
1YC146 - YC147
1YC151 - YC156
1YC166 - YC171
1YC176 - YC179
1YC186 - YC190
1YC201 - YC203
1YC206 - YC207
1YC301 - YC305
1YC321 - YC387
GroupVariable Number
1YC391 - YC394
1YC396
1YC401 - YC417
1YC421 - YC422
1YC426 - YC428
1YC436 - YC439
1YC441 - YC448
1YC451 - YC455
1YC459
1YC461 - YC467
1YC471 - YC499
1YC501 - YC526
1YC571 - YC583
1YC587 - YC589
1YC591 - YC593
1YC601 - YC655
1YC681 - YC696
1YC701 - YC715
1YC720 - YC725
1YC727 - YC752
1YC761 - YC770
1YC781 - YC793
1YC801 - YC892
1YC901 - YC907
1YC921 - YC922
1YC931 - YC932
1YC941 - YC951
1YC971 - YC978
1YC981 - YC983
1YD001 - YD007
1YD021 - YD025
1YD041 - YD057
1YD081 - YD084
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
11 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 12

GroupVariable Number
1YD101 - YD117
1YD121 - YD126
1YD151 - YD159
1YD171 - YD172
1YD201 - YD203
1YD206 - YD209
1YD216 - YD219
1YD251 - YD254
1YD256 - YD257
1YD261
1YD301 - YD334
1YD391
1YD401 - YD410
1YD412 - YD424
1YD481 - YD485
1YD491 - YD499
1YD501 - YD512
1YD531 - YD535
1YD541 - YD547
1YD561 - YD564
1YD571 - YD572
1YD591 - YD595
1YD601 - YD612
1YD651 - YD655
1YE001 - YE020
1YE051
1YE101 - YE109
1YE151 - YE157
1YE171 - YE172
1YE201 - YE206
1YE301 - YE305
1YE321 - YE326
1YE371 - YE383
GroupVariable Number
1YF001 - YF011
1YF021 - YF049
1YF051 - YF080
1YF086 - YF087
1YF106 - YF107
1YF111 - YF114
1YF116 - YF119
1YF121 - YF132
1YF176 - YF178
1YF191 - YF192
1YF201 - YF276
1YF401 - YF402
1YF431 - YF432
1YF436 - YF437
1YF441 - YF442
1YF451 - YF460
1YF501 - YF599
1YF601 - YF685
1YF691 - YF695
1YF701 - YF707
1YF801 - YF805
1YF831 - YF832
1YF836 - YF838
1YF871 - YF872
1YF901 - YF905
1YF921 - YF928
1YF951 - YF954
1YG001 - YG044
1YG061 - YG064
1YG066 - YG089
1YG091 - YG099
1YG101 - YG104
1YG111 - YG114
GroupVariable Number
1YG116 - YG149
1YG151 - YG152
1YG201 - YG205
1YG211 - YG214
1YG221 - YG224
1YG251 - YG252
1YG501 - YG517
1YG601 - YG602
1YG701
1YG711
1YG721 - YG722
2YH001 - YH012
2YH031 - YH055
2YH071 - YH080
2YH101 - YH132
2YH201 - YH202
2YH206 - YH207
2YH301 - YH307
2YH321 - YH322
2YH501 - YH542
2YH551 - YH594
2YH601 - YH606
2YH611 - YH620
2YH631 - YH632
2YH636 - YH637
2YH641
2YH681 - YH686
2YH701 - YH755
2YH801 - YH899
2YH901 - YH908
2YH911 - YH915
2YH951 - YH952
1YJ001 - YJ013
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
12 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 13

GroupVariable Number
1YJ021
1YJ471 - YJ480
1YJ501 - YJ517
1YJ531 - YJ579
1YJ591 - YJ599
1YJ631 - YJ632
1YJ671 - YJ694
1YJ801 - YJ867
1YJ871 - YJ880
1YJ901 - YJ904
1YJ908 - YJ929
1YJ931 - YJ937
1YJ941 - YJ956
1YJ961
1YJ976 - YJ977
1YK001 - YK007
1YK101 - YK104
1YK111 - YK112
1YK121 - YK122
1YK131 - YK133
1YK136 - YK139
1YK141 - YK142
1YK146 - YK148
1YK151 - YK154
1YK161 - YK167
1YK171
1YK176 - YK177
1YK186
1YK191
1YK196
1YK201 - YK202
1YK301 - YK314
1YK321 - YK340
GroupVariable Number
1YK361 - YK378
1YK401 - YK406
1YK426 - YK427
1YK431 - YK450
1YK456 - YK467
1YK471 - YK473
1YK476
1YK478
1YK480 - YK487
1YK491 - YK493
1YK495 - YK499
1YK511 - YK516
1YK521 - YK530
1YK551 - YK571
1YK576 - YK577
1YK580 - YK585
1YK601 - YK602
1YK606 - YK607
1YK611 - YK616
1YK621 - YK634
1YK641 - YK644
1YK651 - YK665
1YK671 - YK672
1YK676 - YK677
1YK681 - YK686
1YK691
1YK695 - YK699
1YK701 - YK713
1YK716 - YK719
1YK721 - YK741
1YK751 - YK770
1YK776 - YK778
1YK781 - YK785
GroupVariable Number
1YK791 - YK792
1YK796 - YK797
1YK801 - YK899
1YK901 - YK912
1YK918 - YK919
1YK921 - YK929
1YK941 - YK999
1YL001 - YL005
1YL011 - YL016
1YL021 - YL024
1YL051 - YL052
1YL056 - YL057
1YL061
1YL066 - YL069
1YL076 - YL077
1YL101 - YL137
1YL201 - YL237
1YL241 - YL242
1YL271 - YL272
1YL281 - YL284
1YL301 - YL303
1YL311 - YL314
1YL316 - YL321
1YL351 - YL353
1YL371 - YL374
1YL401
1YL421 - YL429
1YL431 - YL444
1YL461 - YL478
1YL501 - YL509
1YL531 - YL534
1YL541 - YL551
1YL561 - YL579
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
13 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 14

GroupVariable Number
1YL591 - YL598
1YL601 - YL606
1YL611 - YL612
1YL616 - YL617
1YL621
1YL626
1YL631 - YL634
1YL636 - YL637
1YL661 - YL664
1YL676 - YL691
1YL696 - YL697
1YL701 - YL707
1YL731
1YL751 - YL752
1YL756 - YL757
1YL761 - YL780
1YL796 - YL797
1YL801 - YL815
1YL901 - YL910
1YL921 - YL940
1YL951 - YL968
1YM101 - YM103
1YM201 - YM244
1YM251 - YM299
1YM301 - YM399
1YM401 - YM415
1YM471
1YM481 - YM484
1YM501 - YM515
1YM521 - YM522
1YM541
1YM551 - YM553
1YM571 - YM572
GroupVariable Number
1YM581 - YM582
1YM591 - YM599
1YM631 - YM634
1YM641 - YM652
1YM671 - YM674
1YM691 - YM699
1YM701 - YM710
1YM761 - YM765
1YM771 - YM779
1YN001 - YN016
1YN021 - YN024
1YN061
1YN071 - YN082
1YN091 - YN092
1YN101 - YN112
1YN121
1YN126
1YN201 - YN202
1YN211 - YN219
1YN231 - YN236
1YN261
1YN501
1YN531 - YN534
1YN551 - YN566
1YN581 - YN585
1YN591 - YN593
1YN601 - YN606
1YN651 - YN653
1YN661 - YN663
1YN666 - YN667
1YN671 - YN674
1YN701 - YN702
1YN741 - YN746
GroupVariable Number
1YN756 - YN758
1YQ001 - YQ003
1YQ011 - YQ021
1YQ026 - YQ029
1YQ036 - YQ045
1YQ201 - YQ207
1YQ231
1YQ241 - YQ251
1YQ281 - YQ284
1YQ291 - YQ296
1YQ301 - YQ302
1YQ321 - YQ324
1YQ331 - YQ334
1YQ346 - YQ347
1YQ351 - YQ367
1YQ371
1YQ401 - YQ403
1YQ451 - YQ454
1YQ456
1YQ461
1YQ471
1YQ501 - YQ520
1YQ601 - YQ606
1YQ610 - YQ614
1YR001 - YR098
1YR101 - YR105
1YR111 - YR124
1YR126 - YR144
1YR166 - YR182
1YR186 - YR198
1YR201 - YR215
1YR231 - YR294
1YR296 - YR297
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
14 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 15

GroupVariable Number
1YR301 - YR334
1YR338 - YR341
1YR361 - YR366
1YR371 - YR373
1YR376 - YR377
1YR381 - YR382
1YR386 - YR388
1YR391
1YR396 - YR399
1YR401 - YR405
1YR411 - YR413
1YR416 - YR418
1YR421 - YR424
1YR426 - YR455
1YR457 - YR499
1YR501 - YR506
1YR511 - YR520
1YR526 - YR544
1YR546 - YR551
1YR556 - YR562
1YR571 - YR582
1YR591 - YR592
1YR601 - YR605
1YR616 - YR658
1YR661 - YR663
1YR671 - YR673
1YR676 - YR678
1YR681 - YR682
1YR701 - YR769
1YR771 - YR799
1YR801 - YR827
1YR831 - YR838
1YR841 - YR899
GroupVariable Number
1YR901 - YR903
1YR931 - YR934
1YR938 - YR944
1YR951 - YR998
1YS001 - YS002
1YS006 - YS009
1YS031 - YS032
1YS051 - YS073
1YS101 - YS120
1YS126 - YS142
1YS146 - YS160
1YS166 - YS194
1YS196 - YS197
1YS201 - YS209
1YS221 - YS225
1YS231 - YS236
1YS271 - YS288
1YS295 - YS296
1YS301 - YS348
1YS351 - YS378
1YS381 - YS386
1YS393 - YS395
1YS401
1YS451
1YS456 - YS457
1YS462 - YS465
1YS467
1YS501 - YS502
1YS506
1YS511 - YS518
1YS531
1YS536 - YS538
1YS541 - YS542
GroupVariable Number
1YS546
1YS551 - YS556
1YS561 - YS578
1YS581 - YS595
1YS601 - YS690
1YS701 - YS716
1YS721 - YS762
1YS771 - YS780
1YS806 - YS810
1YS816 - YS818
1YS823 - YS825
1YS851 - YS863
1YS876
1YS881 - YS884
1YS891 - YS894
1YS896 - YS897
1YS901 - YS909
1YS911 - YS957
1YS961 - YS974
1YS976 - YS977
1YS981 - YS987
1YS991 - YS998
1YT001 - YT004
1YT006
1YT026 - YT027
1YT031 - YT032
1YT036 - YT038
1YT061 - YT068
1YT101 - YT138
1YT176 - YT185
1YT191
1YT196 - YT199
1YT201
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
15 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 16

GroupVariable Number
1YT206 - YT207
1YT211 - YT213
1YT251 - YT299
1YT301 - YT307
1YT311 - YT312
1YT321 - YT355
1YT371 - YT372
1YT381
1YT391 - YT396
1YT401 - YT403
1YT411 - YT417
1YT427
1YT461 - YT477
1YT491 - YT492
1YT501 - YT521
1YT551 - YT552
1YT556 - YT563
1YT565
1YT571 - YT578
1YT601 - YT606
1YT701 - YT708
1YT723 - YT726
1YT761 - YT781
1YT791 - YT794
1YT796 - YT797
1YT801 - YT804
1YT811 - YT813
1YT826 - YT827
1YT831 - YT832
1YT841 - YT852
1YT856 - YT863
1YT885 - YT887
1YT891 - YT895
GroupVariable Number
1YT901 - YT998
2YU001 - YU060
2YU201 - YU218
2YU301 - YU329
2YU901 - YU931
1YV001 - YV012
1YV021 - YV023
1YV030 - YV034
1YV037 - YV042
1YV045 - YV047
1YV051 - YV059
1YV081
1YV083 - YV084
1YV097 - YV099
1YV101 - YV154
1YV201 - YV203
1YV251 - YV252
1YV256 - YV257
1YV301 - YV312
1YV351 - YV368
1YV381 - YV388
1YV391 - YV394
1YV401
1YV411 - YV413
1YV431 - YV433
1YV441 - YV454
1YV461 - YV464
1YV467 - YV470
1YV501 - YV512
1YV521
1YV571 - YV586
1YV596
1YV601 - YV605
GroupVariable Number
1YV651 - YV674
1YV676
1YV695 - YV696
1YV701 - YV702
1YV711
1YV722 - YV731
1YV741 - YV794
1YV801 - YV820
1YV831 - YV848
1YV881 - YV883
1YV901 - YV915
1YV923 - YV926
1YV971 - YV983
1YW001
1YW011 - YW099
1YW101 - YW164
1YW201 - YW212
1YW226 - YW240
1YW245 - YW261
1YW263
1YW267 - YW281
1YW283 - YW285
1YW292 - YW299
1YW351
1YW356 - YW358
1YW361 - YW366
1YW371 - YW399
1YW401 - YW430
1YW441 - YW445
1YW451 - YW452
1YW471 - YW472
1YW491 - YW498
1YW531 - YW536
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
16 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 17

GroupVariable Number
1YW541 - YW545
1YW551 - YW580
1YW585 - YW591
1YW595 - YW596
1YW601
1YW610 - YW613
1YW616 - YW623
1YW666
GroupVariable Number
1YW696 - YW699
1YW701 - YW715
1YW726 - YW731
1YW766 - YW775
1YW801 - YW803
1YW811 - YW813
1YW821
1YW831
GroupVariable Number
1YW881
1YW891 - YW893
1YW906 - YW910
1YW916 - YW918
1YW921 - YW925
1YW971 - YW976
--
--
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2021-09-06 is related to this bulletin. The
effective date of AD 2021-09-06 is June 08, 2021.
The Federal Aviation Administration (FAA) will possibly release an additional Airworthiness Directive related
to Requirements Bulletin 737-53A1414 RB. The Airworthiness Directive will make the compliance tasks
and times given in Requirements Bulletin 737-53A1414 RB mandatory.
For airplanes which have incorporated Boeing Business Jet (BBJ) Lower Cabin Altitude Supplemental Type
Certificate (STC) ST01697SE (6500 feet maximum cabin altitude in lieu of 8000 feet) as referenced in
Boeing SB 737-21-1149, the flight cycle related compliance times are different from those specified in
Requirements Bulletin 737-53A1414 RB. All initial compliance times (thresholds) specified in flight cycles
must be reduced to half of those specified in Requirements Bulletin 737-53A1414 RB. All repeat interval
compliance times specified in flight cycles must be reduced to one-quarter of those specified in Requirements
Bulletin 737-53A1414 RB.
Accomplish the required actions, based on the applicable conditions in Tables 1 through 8, in accordance
with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
17 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 18

Group 1, Configuration 1:
Table 1: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Before 22,600 to-
tal flight cycles.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles after
the original issue
date of Require-
ments Bulletin
737-53A1414
RB.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Before 22,600 to-
tal flight cycles.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles after
the original issue
date of Require-
ments Bulletin
737-53A1414
RB.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
18 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 19

Group 1, Configuration 1:
Table 1: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 17,000 to-
tal flight cycles.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 17,000 to-
tal flight cycles.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Before 17,000 to-
tal flight cycles.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
19 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 20

Group 1, Configuration 1:
Table 1: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 17,000 to-
tal flight cycles.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Before further flight.Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
20 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 21

Group 1, Configuration 1:
Table 1: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ul-
trasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-13) of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2):
Do the external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
21 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 22

Group 1, Configuration 1:
Table 1: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2):
Do the external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT
Manual Part 4, 53-10-16)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given for
the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
22 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 23

Group 1, Configuration 2:
Table 2: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
23 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 24

Group 1, Configuration 2:
Table 2: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
24 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 25

Group 1, Configuration 2:
Table 2: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
25 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 26

Group 1, Configuration 2:
Table 2: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
-Before further flight.Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
26 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 27

Group 1, Configuration 2:
Table 2: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ul-
trasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-13) of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
27 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 28

Group 1, Configuration 2:
Table 2: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT
Manual Part 4, 53-10-16)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given for
the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
28 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 29

Group 1, Configuration 3:
Table 3: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles after
the original issue
date of Require-
ments Bulletin
737-53A1414
RB.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles after
the original issue
date of Require-
ments Bulletin
737-53A1414
RB.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
29 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 30

Group 1, Configuration 3:
Table 3: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 17,000 to-
tal flight cycles.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or MOM-
MOM-20-0443-01B(R1) or the
original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Before 17,000 to-
tal flight cycles.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
30 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 31

Group 1, Configuration 3:
Table 3: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
-Before further flight.Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
31 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 32

Group 1, Configuration 3:
Table 3: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ul-
trasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-13) of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
32 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 33

Group 1, Configuration 3:
Table 3: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT
Manual Part 4, 53-10-16)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given for
the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
33 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 34

Group 1, Configuration 4:
Table 4: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Before 22,600 to-
tal flight cycles.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Before 22,600 to-
tal flight cycles.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
34 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 35

Group 1, Configuration 4:
Table 4: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
35 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 36

Group 1, Configuration 4:
Table 4: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 17,000 to-
tal flight cycles.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Before 17,000 to-
tal flight cycles.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
36 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 37

Group 1, Configuration 4:
Table 4: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles after
the last inspec-
tion in accor-
dance with MOM-
MOM-21-0369-
01B or Option 1
of the original is-
sue of Require-
ments Bulletin
737-53A1414
RB, whichever
occurs later.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Before further flight.Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
37 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 38

Group 1, Configuration 4:
Table 4: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ul-
trasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-13) of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
38 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 39

Group 1, Configuration 4:
Table 4: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT
Manual Part 4, 53-10-16)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given for
the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
39 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 40

Group 2, Configuration 1:
Table 5: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 30 days after the Revision
1 date of Requirements Bulletin
737-53A1414 RB.
OPTION 1 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB.
OPTION 1 (ACTION 2): Do
an external Detailed Inspec-
tion and Ultrasonic (UT) in-
spection (737 NDT Manual
Part 4, 53-10-13) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Within 30 days after the Revision
1 date of Requirements Bulletin
737-53A1414 RB.
OPTION 2 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB.
OPTION 2 (ACTION 2): Do
an external detailed and
Ultrasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-16) of the failsafe
strap at STA 663.75 left
and right side for any crack.
(a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
40 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 41

Group 2, Configuration 1:
Table 5: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,000
flight cycles af-
ter June 08,
2021 (the effec-
tive date of AD
2021-09-06) or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 14,000
total flight cy-
cles.
OPTION 1 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 14,000
total flight cy-
cles.
OPTION 1 (ACTION 2): Do
an external Detailed Inspec-
tion and Ultrasonic (UT) in-
spection (737 NDT Manual
Part 4, 53-10-13) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Within 1,000
flight cycles af-
ter June 08,
2021 (the effec-
tive date of AD
2021-09-06) or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 14,000
total flight cy-
cles.
OPTION 2 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
41 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 42

Group 2, Configuration 1:
Table 5: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 14,000
total flight cy-
cles.
OPTION 2 (ACTION 2): Do
an external detailed and
Ultrasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-16) of the failsafe
strap at STA 663.75 left
and right side for any crack.
(a)
-Before further flight.Contact The Boeing Com-
pany for repair instructions
and do the repair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
42 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 43

Group 2, Configuration 1:
Table 5: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visible
portion of the failsafe strap
at STA 663.75 left and right
side for any crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ultra-
sonic (UT) inspection (737
NDT Manual Part 4, 53-10-
13) of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1): Do
the internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2): Do
an external detailed and
Ultrasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-16) of the failsafe
strap at STA 663.75 left
and right side for any crack.
(a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
43 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 44

Group 2, Configuration 1:
Table 5: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1): Do
the internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2): Do
an external Detailed Inspec-
tion and Ultrasonic (UT) in-
spection (737 NDT Manual
Part 4, 53-10-13) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visible
portion of the failsafe strap
at STA 663.75 left and right
side for any crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given for
the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
44 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 45

Group 2, Configuration 2:
Table 6: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
45 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 46

Group 2, Configuration 2:
Table 6: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
46 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 47

Group 2, Configuration 2:
Table 6: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
47 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 48

Group 2, Configuration 2:
Table 6: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
-Before further flight.Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
48 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 49

Group 2, Configuration 2:
Table 6: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ul-
trasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-13) of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
49 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 50

Group 2, Configuration 2:
Table 6: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT
Manual Part 4, 53-10-16)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given
for the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
50 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 51

Group 2, Configuration 3:
Table 7: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB.
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
51 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 52

Group 2, Configuration 3:
Table 7: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 1 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 14,000
total flight cy-
cles.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
last inspection in accordance with
MOM-MOM-19-0623-01B or
MOM-MOM-20-0443-01B(R1) or
the original issue of Requirements
Bulletin 737-53A1414 RB,
whichever occurs later.
OPTION 2 (ACTION 1):
Do an internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Before 14,000
total flight cy-
cles.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
52 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 53

Group 2, Configuration 3:
Table 7: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 1,000
flight cycles af-
ter the original
issue date of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
-Before further flight.Contact The Boeing
Company for repair in-
structions and do the re-
pair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
53 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 54

Group 2, Configuration 3:
Table 7: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ul-
trasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-13) of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2):
Do an external detailed
and Ultrasonic (UT) in-
spection (737 NDT Manu-
al Part 4, 53-10-16) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
54 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 55

Group 2, Configuration 3:
Table 7: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,500 flight cycles after the
most recent OPTION 2 (ACTION
1) inspection was done.
OPTION 1 (ACTION 1):
Do the internal Detailed
Inspection of the frame
fitting and the visible por-
tion of the failsafe strap
at STA 663.75 left and
right side for any crack.
(a)
CONDITION 3: NO
CRACK FOUND DURING
OPTION 2 INSPECTIONS.
-Within 2,000 flight cycles after the
most recent OPTION 2 (ACTION
2) inspection was done.
OPTION 1 (ACTION 2):
Do an external Detailed
Inspection and Ultrasonic
(UT) inspection (737 NDT
Manual Part 4, 53-10-13)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
1,500 flight cycles.-OPTION 2 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visi-
ble portion of the failsafe
strap at STA 663.75 left
and right side for any
crack. (a)
2,000 flight cycles.-OPTION 2 (ACTION 2):
Repeat the external de-
tailed and Ultrasonic (UT)
inspection (737 NDT
Manual Part 4, 53-10-16)
of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
(a) After the accomplishment of this OPTION, it is acceptable to change the repeat action from this OPTION
to any other OPTION under this CONDITION. Operators must comply with the compliance time given
for the chosen OPTION under this CONDITION.
(b) For airplanes on which a replacement of the left and right side STA 663.75 frame fitting assembly was
accomplished using Boeing provided instructions that are Boeing Company Organization Designation
Authorization (ODA) approved via FAA Form 8100-9, it is not required to do the inspections given in this
bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
55 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 56

Group 2, Configuration 4:
Table 8: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 30 days after the Revision
1 date of Requirements Bulletin
737-53A1414 RB.
OPTION 1 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
All airplanes with greater
than or equal to 21,600 to-
tal flight cycles as of the
original issue date of Re-
quirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
OPTION 1 (ACTION 2): Do
an external Detailed Inspec-
tion and Ultrasonic (UT) in-
spection (737 NDT Manual
Part 4, 53-10-13) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Within 30 days after the Revision
1 date of Requirements Bulletin
737-53A1414 RB.
OPTION 2 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-OPTION 2 (ACTION 2): Do
an external detailed and
Ultrasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-16) of the failsafe
strap at STA 663.75 left
and right side for any crack.
(a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
56 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 57

Group 2, Configuration 4:
Table 8: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
57 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 58

Group 2, Configuration 4:
Table 8: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
-Within 1,000
flight cycles af-
ter June 08,
2021 (the effec-
tive date of AD
2021-09-06) or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Before 14,000
total flight cy-
cles.
OPTION 1 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Airplanes with less than
21,600 total flight cycles as
of the original issue date of
Requirements Bulletin 737-
53A1414 RB.(b)
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
OPTION 1 (ACTION 2): Do
an external Detailed Inspec-
tion and Ultrasonic (UT) in-
spection (737 NDT Manual
Part 4, 53-10-13) of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Before 14,000
total flight cy-
cles.
OPTION 2 (ACTION 1): Do
an internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
58 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 59

Group 2, Configuration 4:
Table 8: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
Within 1,000
flight cycles af-
ter June 08,
2021 (the effec-
tive date of AD
2021-09-06) or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
-Within 2,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
Option 2 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB or
within 30 days
after the Revi-
sion 1 date of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
Within 3,000
flight cycles af-
ter the last in-
spection in ac-
cordance with
MOM-MOM-21-
0369-01B or
Option 1 of the
original issue of
Requirements
Bulletin 737-
53A1414 RB,
whichever oc-
curs later.
OPTION 2 (ACTION 2): Do
an external detailed and
Ultrasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-16) of the failsafe
strap at STA 663.75 left
and right side for any crack.
(a)
-Before further flight.Contact The Boeing Com-
pany for repair instructions
and do the repair.
CONDITION 1: ANY
CRACK FOUND DURING
OPTION 1 OR OPTION 2
INSPECTIONS.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
59 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

### Page 60

Group 2, Configuration 4:
Table 8: Inspection of the Frame Fitting and the Failsafe Strap at STA 663.75, Left and Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
(Whichever Occurs Later)
ActionCondition
1,500 flight cycles.-OPTION 1 (ACTION 1):
Repeat the internal De-
tailed Inspection of the
frame fitting and the visible
portion of the failsafe strap
at STA 663.75 left and right
side for any crack. (a)
CONDITION 2: NO
CRACK FOUND DURING
OPTION 1 INSPECTIONS.
3,000 flight cycles.-OPTION 1 (ACTION 2):
Repeat the external De-
tailed Inspection and Ultra-
sonic (UT) inspection (737
NDT Manual Part 4, 53-10-
13) of the failsafe strap at
STA 663.75 left and right
side for any crack. (a)
-Within 1,500 flight cycles after the
most recent OPTION 1 (ACTION
1) inspection was done.
OPTION 2 (ACTION 1): Do
the internal Detailed Inspec-
tion of the frame fitting and
the visible portion of the
failsafe strap at STA
663.75 left and right side
for any crack. (a)
-Within 3,000 flight cycles after the
most recent OPTION 1 (ACTION
2) inspection was done.
OPTION 2 (ACTION 2): Do
an external detailed and
Ultrasonic (UT) inspection
(737 NDT Manual Part 4,
53-10-16) of the failsafe
strap at STA 663.75 left
and right side for any crack.
(a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: October 14, 2022
737-53A1414 RBRevision 1: November 20, 2023
60 of 118
REQUIREMENTS BULLETIN 737-53A1414
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/737-53a1414-rb/file/fd14f37384e8.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
