# Boeing Alert Service Bulletin 747-21A2523: U.S. DOT/FAA - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-0678; AD 2012-24-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-21A2523](https://openairdocs.org/service-documents/boeing/747-21a2523.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin
- Pages: 150
- PDF: https://openairdocs.org/files/sha256/ac/9e/ac9e6d81c93a847d6cc14ee679f21b5626d833a46f92fcd8e4f7b2b1d5bf7587
- Page: https://openairdocs.org/service-documents/boeing/747-21a2523/file/ac9e6d81c93a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-21A2523
Original Issue: August 27, 2010
Revision 1: October 03, 2011
ATA System: 2121
SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling
Three-Way Logic Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2010 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
1 of 150
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
2 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 6
B. Concurrent Requirements ...................................... 1 6
C. Reason ................................................ 1 7
D. Description .............................................. 1 8
E. Compliance .............................................. 1 9
F. Approval ............................................... 1 9
G. Manpower .............................................. 1 9
H. Weight and Balance Changes .................................... 2 5
I. Electrical Load Data ......................................... 2 6
J. References .............................................. 2 6
1. Existing Data .......................................... 2 6
2. Data supplied with this Service Bulletin ............................ 2 6
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 2 6
K. Publications Affected ........................................ 2 7
L. Interchangeability and Intermixability of Parts ........................... 2 7
2. MATERIAL INFORMATION ........................................ 2 9
A. Material - Price and Availability ................................... 2 9
B. Industry Support Information .................................... 3 0
C. Parts Necessary For Each Airplane ................................. 3 0
1. Kits/Parts ............................................ 3 0
2. Parts and Materials Supplied by the Operator ........................ 3 3
3. Parts Modified and Reidentified ................................ 3 3
4. Parts Removed and Not Replaced .............................. 3 4
D. Parts Necessary to Change Spares ................................. 3 4
E. Special Tooling - Price and Availability ............................... 3 4
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 4
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 6
FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL [Group
1-5, 10-18] ........................................... 4 5
FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL [Group 6-9] . . 50
FIGURE 3: AIR CONDITIONING EQUIPMENT BAY  - INSULATED DUCT ASSEMBLY - INSTALLATION
[Group 1-5] ........................................... 5 5
FIGURE 4: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - INSTALLATION [Group 6-9]
.................................................. 6 1
FIGURE 5: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - INSTALLATION
[Group 10-18] .......................................... 6 7
FIGURE 6: P414 PANEL - WIRE BUNDLE W3844 - WIRING CHANGE  [Group 1, 3, 6-7] ....... 7 3
FIGURE 7: P414 PANEL - WIRE BUNDLE W3844 - WIRING CHANGE [Group 2, 4-5, 8-9] ...... 7 5
FIGURE 8: P414 PANEL - WIRE BUNDLE W3844 - ROUTING [Group 1-9] .............. 7 7
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
3 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 4

FIGURE 9: P414 PANEL TO MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE BUNDLE W4753 - WIRING
CHANGE  [Group 1, 3, 6-7] .................................. 8 2
FIGURE 10: P414 PANEL TO MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE BUNDLE W4753 - WIRING
CHANGE [Group 2, 4-5, 8-9] .................................. 8 4
FIGURE 11: P414 PANEL TO MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE BUNDLE W4753 -
ROUTING [Group 1-9] ..................................... 8 6
FIGURE 12: MAIN EQUIPMENT CENTER, E2-4 SHELF - WIRE WRAP WIRING CHANGE  [Group 1-9]
.................................................. 9 4
FIGURE 13: P414 PANEL - WIRE BUNDLE W3842 - WIRING CHANGE [Group 10] .......... 9 8
FIGURE 14: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE  [Group
11] ............................................... 1 0 0
FIGURE 15: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE  [Group
12] ............................................... 1 0 2
FIGURE 16: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE  [Group
13] ............................................... 1 0 4
FIGURE 17: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE  [Group
14] ............................................... 1 0 6
FIGURE 18: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group
15] ............................................... 1 0 8
FIGURE 19: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE  [Group
16-17] ............................................. 1 1 0
FIGURE 20: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - WIRING CHANGE [Group
18] ............................................... 1 1 2
FIGURE 21: P414 PANEL - WIRE BUNDLE W3842 - ROUTING  [Group 10] .............. 1 1 4
FIGURE 22: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - WIRING
CHANGE [Group 10, 14] ................................... 1 1 9
FIGURE 23: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - WIRING
CHANGE [Group 15] ..................................... 1 2 1
FIGURE 24: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - WIRING
CHANGE [Group 11-13, 16-18] ............................... 1 2 3
FIGURE 25: P414 PANEL TO M7603 CARD FILE TO E2-4 SHELF - WIRE BUNDLE W4489 - ROUTING
[Group 10-18] ......................................... 1 2 5
FIGURE 26: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - ROUTING [Group 11-12]
................................................. 1 3 6
FIGURE 27: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - ROUTING [Group 13]
................................................. 1 4 1
FIGURE 28: P414 PANEL - WIRE BUNDLE W3842 AND WIRE BUNDLE W3844 - ROUTING [Group 14-18]
................................................. 1 4 6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
4 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 5

Commercial 
Airplanes
747
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 747-21A2523Original Issue: August 27, 2010
Revision 1: October 03, 2011
ATA System: 2121
SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling
Three-Way Logic Change
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed in accordance with the original issue of this service bulletin.
Airplane variable number RT508 is added to Group 17 of this service bulletin effectivity.
REASON FOR REVISION
This revision is sent to incorporate corrections and improvements to the Original Issue of this service bulletin,
as a result of comments received from operators and validation of the change on a Group 5 airplane. Airplane
variable number RT508 is added to Group 17 of this service bulletin effectivity, because it was accidentally
omitted from the Original Issue. Wiring and routing information related to the Boeing Converted Freighter (BCF)
configuration (Group 10 thru 18), not covered by the validation, has been corrected. The service bulletin format
standards have been updated where applicable.
As a result of the validation, the duct replacement, given in Figures 1 thru 5 and applicable to all groups, has
been changed. Seals, P/N's: BACP11K5, MS29512-07, 728627-2, omitted from the top kits in the Original Issue,
have been added. The duct bonding clamp, P/N B34A-2, and related items, P/N's: BACJ40A20-8, BACN10JC3CD,
BACS12HN3-8, NAS1149D0316H have been removed from the top kits, because they were not used during
the validation, and can be removed, kept and installed when the duct assembly is replaced. Duct Tape, P/N
BMS5-157, and Lockwire, P/N MS20995N32, have been added to Operator Supplied Parts, because they were
found to be necessary during the validation. Drain Tube, P/N 65B41222-74, and a connector to the Flow
Regulating Valve (FRV), DV542, need to be disconnected from the existing duct assembly and reconnected
when the new duct assembly is installed. Sensors, T1611 and T1614, Switch, S521 and Plug, P/N BACP20AU5D,
also need to be removed from the original duct assembly and fitted on the new duct assembly. All of these items
have been added to Figures 1 thru 5, as necessary.
As a result of checks on wire changes and routing for Groups 10 thru 18, not covered by the validation, Figures
16, 21 and 25 have been revised and Figures 26 thru 28 added to show the correct routing data for wire bundles
W3842, W3844 and W4489 as applicable. Also, wire routing Figures 8 and 11, for Groups 1 thru 9, have been
corrected.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
5 of 150

### Page 6

As a part of a service bulletin validation program, this change was completed on airplane RM888, by service
bulletin 747-21A2523, Original Issue, before the release of Revision 1 of this service bulletin. The change
completed on airplane RM888 by Service Bulletin 747-21A2523, Original Issue, is equivalent to the release of
Revision 1 of this service bulletin. Airplane RM888 has the configuration of a Group 5 airplane.
These sections are changed:
1. Summary - Background: Corrected text. Added Boeing Fleet Team Digest (FTD) 747-400 FTD 31-08001
and validation statement.
2. Summary - Action: Updated the removed and installed parts and added the test details.
3. Summary - Manpower: Added reference to Paragraph 1.G., Manpower and removed existing table.
4. Summary - Illustration: View "A" corrected.
5. Paragraph 1.A., Effectivity: Added airplane variable number RT508 to Group 17 of the service bulletin
effectivity.
6. Paragraph 1.C., Reason: Corrected text. Added Boeing Fleet Team Digest (FTD) 747-400 FTD 31-08001
and validation statement.
7. Paragraph 1.D., Description: Updated the removed and installed parts and added the test details.
8. Paragraph 1.G., Manpower: Added reference to Accomplishment Instruction Parts. Changed Functional
test hours and titles. Corrected Figure references then Task Hours and Elapsed Hours totals. Combined
group tables with the same totals and figure applicability.
9. Paragraph 1.J.1., Existing Data: References updated.
10. Paragraph 1.K., Publications Affected: Added System Schematic Manual, Chapter 21-58 and Flight Crew
Operations Manual, section 2.20 and Aircraft Maintenance Manual (AMM), Chapter 21-62.
11. Paragraph 2.A., Material - Price and Availability: Updated kit tables including ROLT.
12. Paragraph 2.C.1., Kits/Parts: Added new seal, gasket and packing. Removed clamp, bonding and related
parts.
13. Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Added duct tape and lockwire.
14. Paragraph 3.A., General Information: Added new general notes.
15. Paragraph 3.B., Work Instructions PART1: Corrected Boeing service bulletin references.
16. Paragraph 3.B., Work Instructions PART2: Added steps 1, 2, 9, 26, 27, 28, 33-35, 37, 40 and 41. Corrected
steps 3, 25 and 39. Changed test name and revised step 36. Changed test name for step 38, revised layout
and corrected sub step 38.h. and 38.j.
17. Figures 1 and 2: Overview, illustrations and step table corrected. AMM references added to step tables and
nut, P/N BACN10JC3, corrected.
18. Figures 3 thru 5: Overview, illustrations, step table and tool number MS90387-1 corrected, where applicable.
AMM references added to step tables.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
6 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 7

19. Figures 6 and 7: Changed wire lengths.
20. Figure 8: Updated routing illustrations.
21. Figure 9: - Removed Flag Notes 3 and 4 from Flag Note Table (not in Figure) - parts now installed in Figure
12. Changed wire length.
22. Figure 10: - Removed Flag Notes 3 and 4 from Flag Note Table (not in Figure) - parts now installed in Figure
12. Changed wire length.
23. Figure 11: Updated routing illustrations.
24. Figure 12: - Changed Title. Added new Flag Note Table taken from Figures 9 and 10. Wire routing corrected.
Table headers and notes corrected.
25. Figure 13: Added wire kit note.
26. Figure 14: - Corrected wire bundle number in illustration. Removed unnecessary wire bundles and corrected
gage color code in table. Added wire kit note.
27. Figure 15: - Removed unnecessary wire bundles and corrected gage color code in table. Added wire kit
note.
28. Figure 16: - Corrected splice number in illustration. Removed unnecessary wire bundles and corrected gage
color code in table. Added wire kit note.
29. Figures 17 thru 20: Removed unnecessary wire bundles and corrected gage color code in table. Added
wire kit note.
30. Figure 21: Figure made applicable to Group 10 only. Illustrations and step table corrected to show routing
for wire bundle W3842 only.
31. Figure 25: - Corrected wire bundle W4489 routing in all illustrations.
32. Figure 26: New figure applicable to Group 11 and 12 only. Added to show routing for wire bundles W3842
and W3844.
33. Figure 27: New figure applicable to Group 13 only. Added to show routing for wire bundles W3842 and
W3844.
34. Figure 28: New figure applicable to Groups 14-18 only. Added to show routing for wire bundles W3842 and
W3844.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
August 27, 2010Original Issue:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
7 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 8

October 03, 2011Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
8 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 9

Commercial 
Airplanes
747
Service Bulletin
ALERT
SummaryNumber: 747-21A2523Original Issue: August 27, 2010
Revision 1: October 03, 2011
ATA System: 2121
SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling
Three-Way Logic Change
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
Do this change to remove moisture in the Flight Deck Cooling supply air. During flight, moisture could cause
the Integrated Display Unit (IDU) to blink, lose focus, or display in monochrome and the Mode Control Panel
(MCP) to go blank. If this service bulletin is not done, the IDU could blink, lose focus, or display in monochrome
and the MCP go blank, which could reduce the ability of the flightcrew to maintain the safe flight and landing of
the airplane.
Boeing has received reports of display malfunctions and MCP malfunctions on 747-400 Freighter type aircraft.
The reports range from a single display malfunction to all six primary display units going blank with an MCP
malfunction, during various flight phases.
This change includes Integrated Display System (IDS) software that gives crews an Alert Engine Indication and
Crew Alerting System (EICAS) message when the pack temperature sensor calibrations drift to unacceptable
levels; replacement of the duct assemblies with the pack temperature sensors in a new location; and Electronic
Equipment (EE) cooling wire bundle changes to change the function of the equipment cooling three-way valve
to remove temperature transients that can cause condensation on flight deck equipment.
As a part of a service bulletin validation program, this change was completed on airplane RM888, by service
bulletin 747-21A2523, Original Issue, before the release of Revision 1 of this service bulletin. The change
completed on airplane RM888 by Service Bulletin 747-21A2523, Original Issue, is equivalent to the release of
Revision 1 of this service bulletin. Airplane RM888 has the configuration of a Group 5 airplane.
Boeing Fleet Team Digest (FTD) 747-400 FTD 31-08001 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-SRP-21-0177 is related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
9 of 150

### Page 10

ACTION (PRR 85901-101RS)
1. Install IDS 508 Software in accordance with Boeing service bulletin 747-31-2426, 747-31-2427 or
747-31-2428.
2. Get access to the Air Conditioning Equipment Bay and replace an existing Pack 3 duct assembly with a
new Pack 3 duct assembly. Remove the temperature sensors, over temperature switch, drain tube union,
plug and insulation (if applicable) from the existing pack 3 duct assembly and install them on the new Pack
3 duct assembly.
3. Get access to the P414 panel, in the left power distribution center, the E2-4 shelf, in the right main equipment
center and the M7603 card file, if applicable. Change and route the control wiring for the equipment cooling
three-way valve.
4. Get access to the equipment cooling three-way valve, V555, in the forward cargo compartment, and test
the new control wiring and logic operation. On the flight deck, test the Pack 3 discharge temperature sensors.
EFFECTIVITY
747-400 and 747-400F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends the installation of IDS 508 software in accordance with Section 3.B. Part 1, Accomplishment
Instructions, within 12 months after the original issue date of this service bulletin. Also, Boeing recommends
changing the control wiring to the EE-Cooling three-way valve and replacing the Pack 3 outlet duct assembly
in accordance with Section 3.B. Part 2 Accomplishment Instructions within 60 months after the original issue
date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of November 13, 2008. Please refer to
Paragraph 2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
10 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 11 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
CHANGE AND ROUTE THE
CONTROL WIRING FOR THE  PACK 3 GROUND
EQUIPMENT COOLING THREE  SERVICE CONNECTOR
WAY VALVE.
REPLACE THE EXISTING DUCT
ASSEMBLY WITH A NEW DUCT
ASSEMBLY.
AIR CONDITIONING EQUIPMENT BAY  1924233
Original Issue: August 27, 2010
Revision 1: October 03, 2011  747-21A2523
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  • 11 of 150

### Page 12

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
12 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
BLANK PAGE

### Page 13

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-21A2523
Original Issue: August 27, 2010
Revision 1: October 03, 2011
ATA System: 2121
SUBJECT: AIR CONDITIONING - Main Distribution Manifold - Temperature Sensor and EE Cooling
Three-Way Logic Change
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-30300, Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR 85901-101RS for data about
this change.
DESCRIPTIONCONFIGURATIONGROUP
747-400F airplanes with GE engines, insulation on the existing duct,
and wiring changes.
-1
747-400F airplanes with GE engines, insulation on the existing duct,
and wiring changes.
-2
747-400F airplanes with P&W engines, insulation on the existing
duct, and wiring changes.
-3
747-400F airplanes with P&W engines, insulation on the existing
duct, and wiring changes.
-4
747-400F airplanes with Rolls-Royce engines, insulation on the
existing duct, and wiring changes.
-5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
13 of 150

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
747-400F airplanes with GE engines, no insulation on the existing
duct, and wiring changes.
-6
747-400F airplanes with P&W engines, no insulation on the existing
duct, and wiring changes.
-7
747-400F airplanes with P&W engines, no insulation on the existing
duct, and wiring changes.
-8
747-400F airplanes with Rolls-Royce engines, no insulation on the
existing duct, and wiring changes.
-9
747-400 airplanes with a converted freighter configuration, P&W
engines and wiring changes.
-10
747-400 airplanes with a converted freighter configuration, P&W
engines and wiring changes.
-11
747-400 airplanes with a converted freighter configuration, GE
engines and wiring changes.
-12
747-400 airplanes with a converted freighter configuration, GE
engines and wiring changes.
-13
747-400 airplanes with a converted freighter configuration,
Rolls-Royce engines and wiring changes.
-14
747-400 airplanes with a converted freighter configuration, P&W
engines and wiring changes.
-15
747-400 airplanes with a converted freighter configuration, GE
engines and wiring changes.
-16
747-400 airplanes with a converted freighter configuration, P&W
engines and wiring changes.
-17
747-400 airplanes with a converted freighter configuration,
Rolls-Royce engines and wiring changes.
-18
Airplane Models:
747-400, 747-400F
GroupVariable Number
1RL401 - RL403
1RL411 - RL430
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
14 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 15

GroupVariable Number
3RL431 - RL436
4RL451 - RL456
1RL461 - RL462
1RL471 - RL481
3RL491 - RL492
4RL501 - RL502
2RL511 - RL516
2RL521 - RL522
1RL531 - RL534
5RL551
2RL561 - RL568
2RL571 - RL572
1RL576 - RL577
1RL579
4RL581 - RL586
1RL651 - RL655
2RL671 - RL675
1RL681 - RL684
4RL751 - RL752
16RM128
3RM851 - RM855
5RM856 - RM859
2RM861 - RM863
4RM871 - RM880
5RM881 - RM890
1RM891 - RM899
1RM901 - RM906
1RM911
6RR701
6RR721 - RR724
6RR746 - RR748
7RR851 - RR856
8RR861 - RR862
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
15 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 16

GroupVariable Number
9RR951 - RR952
12RT021 - RT022
11RT031 - RT033
16RT071 - RT072
16RT075
16RT161
16RT164
18RT456
18RT461
10RT501
11RT506 - RT507
17RT508
15RT509 - RT510
15RT513
15RT516
15RT518 - RT520
15RT524
15RT526
15RT528
15RT530
11RT572 - RT573
17RT574 - RT579
12RT642
16RT655 - RT657
13RT751 - RT752
14RT781 - RT782
15RT837
16RT967
2. Spares Affected
None.
B. Concurrent Requirements
The service bulletin(s) listed below must be done before or at the same time as this service bulletin:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
16 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 17

Group 5, 9, 14, 18:
DescriptionService BulletinCompany
Install the IDS-508 software for Rolls-
Royce engines.
747-31-2426, Original IssueThe Boeing Company
Group 1-2, 6, 12-13, 16:
DescriptionService BulletinCompany
Install the IDS-508 software for GE En-
gines.
747-31-2427, Original IssueThe Boeing Company
Group 3-4, 7-8, 10-11, 15, 17:
DescriptionService BulletinCompany
Install the IDS-508 software for Pratt &
Whitney (P&W) Engines.
747-31-2428, Original IssueThe Boeing Company
C. Reason
Do this change to remove moisture in the Flight Deck Cooling supply air. During flight, moisture could
cause the Integrated Display Unit (IDU) to blink, lose focus, or display in monochrome and the Mode
Control Panel (MCP) to go blank. If this service bulletin is not done, the IDU could blink, lose focus, or
display in monochrome and the MCP go blank, which could reduce the ability of the flightcrew to
maintain the safe flight and landing of the airplane.
Boeing has received reports of display malfunctions and MCP malfunctions on 747-400 Freighter type
aircraft. The reports range from a single display malfunction to all six primary display units going blank
with an MCP malfunction, during various flight phases.
This change includes Integrated Display System (IDS) software that gives crews an Alert Engine
Indication and Crew Alerting System (EICAS) message when the pack temperature sensor calibrations
drift to unacceptable levels; replacement of the duct assemblies with the pack temperature sensors in
a new location; and Electronic Equipment (EE) cooling wire bundle changes to change the function of
the equipment cooling three-way valve to remove temperature transients that can cause condensation
on flight deck equipment.
Boeing Fleet Team Digest (FTD) 747-400 FTD 31-08001 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-SRP-21-0177 is related to this service bulletin.
Revision 1 is sent to incorporate corrections and improvements to the Original Issue of this service
bulletin, as a result of comments received from operators and validation of the change on a Group 5
airplane. Airplane variable number RT508 is added to Group 17 of this service bulletin effectivity,
because it was accidentally omitted from the Original Issue. Wiring and routing information related to
the Boeing Converted Freighter (BCF) configuration (Group 10 thru 18), not covered by the validation,
has been corrected. The service bulletin format standards have been updated where applicable.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
17 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 18

As a result of the validation, the duct replacement, given in Figures 1 thru 5 and applicable to all groups,
has been changed. Seals, P/N's: BACP11K5, MS29512-07, 728627-2, omitted from the top kits in the
Original Issue, have been added. The duct bonding clamp, P/N B34A-2, and related items, P/N's:
BACJ40A20-8, BACN10JC3CD, BACS12HN3-8, NAS1149D0316H have been removed from the top
kits, because they were not used during the validation, and can be removed, kept and installed when
the duct assembly is replaced. Duct Tape, P/N BMS5-157, and Lockwire, P/N MS20995N32, have
been added to Operator Supplied Parts, because they were found to be necessary during the validation.
Drain Tube, P/N 65B41222-74, and a connector to the Flow Regulating Valve (FRV), DV542, need to
be disconnected from the existing duct assembly and reconnected when the new duct assembly is
installed. Sensors, T1611 and T1614, Switch, S521 and Plug, P/N BACP20AU5D, also need to be
removed from the original duct assembly and fitted on the new duct assembly. All of these items have
been added to Figures 1 thru 5, as necessary.
As a result of checks on wire changes and routing for Groups 10 thru 18, not covered by the validation,
Figures 16, 21 and 25 have been revised and Figures 26 thru 28 added to show the correct routing
data for wire bundles W3842, W3844 and W4489 as applicable. Also, wire routing Figures 8 and 11,
for Groups 1 thru 9, have been corrected.
As a part of a service bulletin validation program, this change was completed on airplane RM888, by
service bulletin 747-21A2523, Original Issue, before the release of Revision 1 of this service bulletin.
The change completed on airplane RM888 by Service Bulletin 747-21A2523, Original Issue, is equivalent
to the release of Revision 1 of this service bulletin. Airplane RM888 has the configuration of a Group
5 airplane.
D. Description
1. Install IDS 508 Software in accordance with Boeing service bulletin 747-31-2426, 747-31-2427 or
747-31-2428.
2. Get access to the Air Conditioning Equipment Bay and replace an existing Pack 3 duct assembly
with a new Pack 3 duct assembly. Remove the temperature sensors, over temperature switch,
drain tube union, plug and insulation (if applicable) from the existing pack 3 duct assembly and
install them on the new Pack 3 duct assembly.
3. Get access to the P414 panel, in the left power distribution center, the E2-4 shelf, in the right main
equipment center and the M7603 card file, if applicable. Change and route the control wiring for
the equipment cooling three-way valve.
4. Get access to the equipment cooling three-way valve, V555, in the forward cargo compartment,
and test the new control wiring and logic operation. On the flight deck, test the Pack 3 discharge
temperature sensors.
Revision 1 - No more work is necessary on airplanes changed in accordance with the original issue of
this service bulletin. Airplane variable number RT508 is added to Group 17 of this service bulletin
effectivity.
The work in this service bulletin is done in the maintenance zone(s) given below.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
18 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 19

Group 1-9:
Affected Maintenance Zones
ZoneModel
117, 118, 134747-400F
Group 10-18:
Affected Maintenance Zones
ZoneModel
117, 118, 134747-400
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends the installation of IDS 508 software in accordance with Section 3.B. Part 1,
Accomplishment Instructions, within 12 months after the original issue date of this service bulletin. Also,
Boeing recommends changing the control wiring to the EE-Cooling three-way valve and replacing the
Pack 3 outlet duct assembly in accordance with Section 3.B. Part 2 Accomplishment Instructions within
60 months after the original issue date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
PART 1: This estimate does not include the task hour data given in the service bulletin(s) in Paragraph
1.B., Concurrent Requirements.
PART 2: Refer to the table that follows.
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
19 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 20

 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Group 1, 3:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 3
3.303.301FIGURE 6
3.703.701FIGURE 9
1.401.401FIGURE 12
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
17.9021.40TOTAL FOR EACH AIRPLANE
Group 2, 4-5:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 3
3.303.301FIGURE 7
3.703.701FIGURE 10
1.401.401FIGURE 12
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
20 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 21

Group 2, 4-5:
Elapsed HoursTask HoursNumber of PersonsTask
17.9021.40TOTAL FOR EACH AIRPLANE
Group 6-7:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
1.751.751FIGURE 2
2.502.501FIGURE 4
3.303.301FIGURE 6
3.703.701FIGURE 9
1.401.401FIGURE 12
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
16.6520.15TOTAL FOR EACH AIRPLANE
Group 8-9:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
1.751.751FIGURE 2
2.502.501FIGURE 4
3.303.301FIGURE 7
3.703.701FIGURE 10
1.401.401FIGURE 12
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
16.6520.15TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
21 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 22

Group 10:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
3.006.002FIGURE 13
6.6513.302FIGURE 22
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
19.1532.30TOTAL FOR EACH AIRPLANE
Group 11:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
6.9013.802FIGURE 14
6.6513.302FIGURE 24
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
Group 12:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
22 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 23

Group 12:
Elapsed HoursTask HoursNumber of PersonsTask
6.9013.802FIGURE 15
6.6513.302FIGURE 24
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
Group 13:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
6.9013.802FIGURE 16
6.6513.302FIGURE 24
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
Group 14:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
6.9013.802FIGURE 17
6.6513.302FIGURE 22
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
23 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 24

Group 14:
Elapsed HoursTask HoursNumber of PersonsTask
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
Group 15:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
6.9013.802FIGURE 18
6.6513.302FIGURE 23
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
Group 16-17:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
6.9013.802FIGURE 19
6.6513.302FIGURE 24
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
24 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 25

Group 16-17:
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
Group 18:
Elapsed HoursTask HoursNumber of PersonsTask
1.002.002Open Access
2.502.501FIGURE 1
3.003.001FIGURE 5
6.9013.802FIGURE 20
6.6513.302FIGURE 24
1.503.002Equipment Cooling
Three-Way Valve
Logic Test
0.500.501Pack 3 Discharge
Temperature Sensor
Test
1.002.002Close Access
23.0540.10TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Group 1-5:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+4368.0 lb.-in.+1.3 lb.Groups 1-5
Group 6-9:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+4368.0 lb.-in.+1.3 lb.Groups 6-9
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
25 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 26

Group 10-18:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+4368.0 lb.-in.+1.3 lb.Groups 10-18
I. Electrical Load Data
Not changed.
J. References
1. Existing Data
a. Engineering Change Memo PRR85901-101RS.
b. Boeing Service Bulletin 747-31-2426, 747-31-2427, 747-31-2428.
c. Boeing Service Related Problem (SRP) 747-SRP-21-0177.
d. Service Bulletin Index D6-30300.
e. Standard Overhaul Practices Manual (SOPM) 20-11-03.
f. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19, 20-20-00 , 20-72-18.
g. 747-400 Aircraft Maintenance Manual (AMM) 06-09-02, 06-09-03, 20-11-28, 21-00-00,
21-23-02, 21-51-08, 21-58-04, 21-62-07, 24-22-00, 25-52-01, 32-09-02, 36-00-00, 52-34-00.
h. 747-400 Fleet Team Digest (FTD) 31-08001.
i. 747-400 System Schematic Manual (SSM) 21-58-03, 21-61-04.
j. 747-400 Wiring Diagram Manual (WDM) 21-58-13, 21-58-14, 21-61-92.
k. 747-400F Structural Repair Manual (SRM) 51.
2. Data supplied with this Service Bulletin
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
TitleDrawing Number
Water Separator Instl - Air Conditioning Pack - Three65B40015
Duct Instl - Conditioned Air Supply, Fwd Cargo Compart214U6017
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
26 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 27

K. Publications Affected
1. Publications:
Chapter-SectionPublication
21-58, 21-61747-400 Wiring Diagram Manual
21-21747-400 Illustrated Parts Catalog
21-58, 21-62747-400 Aircraft Maintenance Manual
21-58747-400 System Schematic Manual
2.20747-400 Flight Crew Operations Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
27 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 28

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
28 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT
BLANK PAGE

### Page 29

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Group 6-9:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 1 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 1 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$19,909.00302207/18/11TOP KIT - AIR DUCT
WITH SENSOR AS-
SEMBLY REPLACE-
MENT
015U1892-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
29 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 30

Group 1-5:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 1 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 1 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$19,912.00302507/18/11TOP KIT - INSULATED
AIR DUCT WITH SEN-
SOR ASSEMBLY RE-
PLACEMENT
015U1892-2
508/15/11
509/13/11
410/11/11
Group 10-18:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 1 date of this
Service Bulletin (US
Dollars)
ROLT as of the Revi-
sion 1 date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$20,113.00302506/10/11TOP KIT - INSULATED
AIR DUCT WITH SEN-
SOR ASSEMBLY RE-
PLACEMENT
015U1894-1
507/11/11
B. Industry Support Information
Boeing warranty remedies are available for 747 airplanes in warranty as of November 13, 2008. For
task hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Commercial Airplanes Group - Warranties. The kits for airplanes in warranty as of that date will be
supplied at no charge. Send a purchase order for the kits to Boeing Spares. Please refer to this service
bulletin number and reference the airplane variable numbers in your purchase order.
C. Parts Necessary For Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane. The Top Kit is divided into Figure kits for
each installation figure shown in the table below.
Figure Kit
543Top Kit
-1-015U1892-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
30 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 31

Figure Kit
543Top Kit
--1015U1892-2
1--015U1894-1
Top Kit
015U1894-1015U1892-2015U1892-1Wire Kit
-11289U1235-
101
1--289U1237-
101
Group 6-9:
KIT 015U1892-1
NOTES
Existing Part
NumberName
Figure
New Part Number
4
QTY
65B41197-46,
65B41197-53
DUCT ASSY165B41197-57
691-19-900SEAL ASSY3691-19-900
728627-2GASKET2728627-2
BACP11K5PACKING2BACP11K5
MS29512-07PACKING, PRE-
FORMED
1MS29512-07
Group 1-5:
KIT 015U1892-2
NOTES
Existing Part
NumberName
Figure
New Part Number
3
QTY
65B41197-46,
65B41197-53
DUCT ASSY165B41197-57
691-19-900SEAL ASSY3691-19-900
728627-2GASKET2728627-2
BACP11K5PACKING2BACP11K5
BACS38K6STRAP12BACS38K6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
31 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 32

Group 1-5:
KIT 015U1892-2
NOTES
Existing Part
NumberName
Figure
New Part Number
3
QTY
MS29512-07PACKING, PRE-
FORMED
1MS29512-07
Group 10-18:
KIT 015U1894-1
NOTES
Existing Part
NumberName
Figure
New Part Number
5
QTY
65B41197-46,
65B41197-53
DUCT ASSY165B41197-57
691-19-900SEAL ASSY3691-19-900
728627-2GASKET2728627-2
BACP11K5PACKING2BACP11K5
BACS38K6STRAP12BACS38K6
MS29512-07PACKING, PRE-
FORMED
1MS29512-07
Group 1-9:
KIT 289U1235-101
NotesNameQTYNew Part Number
INSULATION SLEEVING, HEAT
SHRINKABLE, DWP-125, BLACK, IN
DIA 3/16, CLASS 1
2289U1235-10101
WIRE CUT & CODE1289U1235-101W
CONTACT, PIN3BACC47CN1S
CONTACT, SOCKET1BACC47CP1S
CONTACT, SOCKET1BACC47DJ1
CONTACT, SOCKET1BACC47EG2
CONTACT, SOCKET2BACC47ER1
SLEEVE, HEAT SHRINK2BACT63D1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
32 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 33

Group 1-9:
KIT 289U1235-101
NotesNameQTYNew Part Number
WIRE1BMS13-
46T04C01G024
CONTACT, PIN, CRIMP REMOVABLE,
PER MIL-C-39029/11
1M39029/11-145
Group 10-18:
KIT 289U1237-101
NotesNameQTYNew Part Number
WIRE CUT & CODE1289U1237-101W
ID SLEEVE 1/8 - SM000111829B9000-11
CONTACT, PIN5BACC47CN1S
CONTACT, SOCKET2BACC47CP1S
CONTACT, ELECTRICAL1BACC47DE3A
CONTACT, SOCKET3BACC47EG2
CONTACT, SOCKET6BACC47ER1
SPLICE SEALED CRIMP1D-436-36
CONTACT, PIN, CRIMP REMOVABLE,
PER MIL-C-39029/11
2M39029/11-145
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number / Specification
(a)LACING TAPE (WHITE)15 feetBMS 13-54, GRADE B, CLASS
1, TYPE 1, FINISH C (WHITE)
(a)DUCT TAPE-BMS 5-157, REV F, TYPE 1
CLASS 1
LOCKWIRE-MS20995N32 (MS20995NC32
optional)
(a) See the Qualified Products List at the end of the Boeing Material Specification
(BMS) for supplier data.
3. Parts Modified and Reidentified
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
33 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 34

4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
34 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Torque limits to tighten nuts and bolts are in 747-400F SRM 51.
4. Use the approved fastener and process material substitutions in accordance with
747-400F SRM 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. If the length of any fastener specified in this service bulletin does not meet the
installation standards in 747-400F SRM 51, then a fastener of the same specification,
or an approved substitute, with a length which meets the installation standards in
747-400F SRM 51 may be used.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
35 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 36

9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
11. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
B. WORK INSTRUCTIONS
PART 1 - INSTALL IDS 508 SOFTWARE
1. Group 5, 9, 14, 18:
Install IDS 508 Software in accordance with Boeing service bulletin 747-31-2426.
2. Group 1-2, 6, 12-13, 16:
Install IDS 508 Software in accordance with Boeing service bulletin 747-31-2427.
3. Group 3-4, 7-8, 10-11, 15, 17:
Install IDS 508 Software in accordance with Boeing service bulletin 747-31-2428.
PART 2 - CHANGE AND ROUTE THE CONTROL WIRING TO THE EQUIPMENT COOLING
THREE-WAY VALVE AND REPLACE THE EXISTING DUCT ASSEMBLY WITH A NEW DUCT
ASSEMBLY
1. Get access to the flight deck. On the P5 Overhead Panel, make sure that all three PACK switches
are set to OFF and attach safety tags.
2. Remove electrical power from the airplane, refer to 747-400 AMM 24-22-00 as an accepted
procedure, or do the step that follows:
a. OPEN the circuit breakers specified in the table below and attach safety tags:-
Location -
Row / Column
PanelNomenclatureCircuit Breaker
Number
E36P6A/C CONT CARGO FWD LWRC10785
F28P6ZONE TEMP CONTROL - ACC10222
F29P6ZONE TEMP CONTROL - DCC10219
F35P6PACK TEMP CONTROL AC10217
F36P6PACK TEMP CONTROL BC10218
K27P415PACK TEMP CONTROL A - ACC03182
C38P415PACK TEMP CONTROL B - ACC03183
L28P415LWR FWD CGO FRV FSOC10851
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
36 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 37

Location -
Row / Column
PanelNomenclatureCircuit Breaker
Number
J2P180PACK 1 PROTECTIONC10204
F2P180PACK 2 PROTECTIONC10205
J17P180PACK 3 PROTECTIONC10206
3. Get access to the Air Conditioning Equipment Bay, right side, through access doors 192H, 192J,
192L, 192M, and 192N, as necessary, refer to 747-400 AMM 06-09-03 for access door locations.
4. Group 1-5, 10-18:
Remove the existing insulated duct assembly in accordance with FIGURE 1.
5. Group 6-9:
Remove the existing duct assembly in accordance with FIGURE 2.
6. Group 1-5:
Install the new insulated duct assembly in accordance with FIGURE 3.
7. Group 6-9:
Install the new duct assembly in accordance with FIGURE 4.
8. Group 10-18:
Install the new insulated duct assembly in accordance with FIGURE 5.
9. Remove electrical power from the airplane, if not done in step 2. Refer to 747-400 AMM 24-22-00
as an accepted procedure.
10. Group 1, 3, 6-7:
Do the wiring changes in the P414 panel in accordance with FIGURE 6.
11. Group 2, 4-5, 8-9:
Do the wiring changes in the P414 panel in accordance with FIGURE 7.
12. Group 1-9:
Route the wire in accordance with FIGURE 8.
13. Group 1, 3, 6-7:
Do the wiring changes in the main equipment centre, E2-4 shelf, in accordance with FIGURE 9.
14. Group 2, 4-5, 8-9:
Do the wiring changes in the main equipment centre, E2-4 shelf, in accordance with FIGURE 10.
15. Group 1-9:
Route the wire in accordance with FIGURE 11.
16. Group 1-9:
Do the wire wrap changes in accordance with FIGURE 12.
17. Group 10:
Do the wiring changes in the P414 panel in accordance with FIGURE 13.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
37 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 38

18. Group 11:
Do the wiring changes in the P414 panel in accordance with FIGURE 14.
19. Group 12:
Do the wiring changes in the P414 panel in accordance with FIGURE 15.
20. Group 13:
Do the wiring changes in the P414 panel in accordance with FIGURE 16.
21. Group 14:
Do the wiring changes in the P414 panel in accordance with FIGURE 17.
22. Group 15:
Do the wiring changes in the P414 panel in accordance with FIGURE 18.
23. Group 16-17:
Do the wiring changes in the P414 panel in accordance with FIGURE 19.
24. Group 18:
Do the wiring changes in the P414 panel in accordance with FIGURE 20.
25. Group 10:
Route wire bundle W3842, in the P414 panel, in accordance with FIGURE 21.
26. Group 11-12:
Route wire bundle W3842 and wire bundle W3844, in the P414 panel, in accordance with FIGURE
26.
27. Group 13:
Route wire bundle W3842 and wire bundle W3844, in the P414 panel, in accordance with FIGURE
27.
28. Group 14-18:
Route wire bundle W3842 and wire bundle W3844, in the P414 panel, in accordance with FIGURE
28.
29. Group 10, 14:
Do the wiring changes in the main equipment centre in accordance with in accordance with FIGURE
22.
30. Group 15:
Do the wiring changes in the main equipment centre in accordance with FIGURE 23.
31. Group 11-13, 16-18:
Do the wiring changes in the main equipment centre in accordance with FIGURE 24.
32. Group 10-18:
Route the wire in accordance with FIGURE 25.
33. Supply Conditioned air. Refer to 747-400 AMM 21-00-00 as an accepted procedure.
34. Do a pneumatic leak test on all duct joints and sensor seals that were removed and changed or
put back.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
38 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 39

a. Light pneumatic leakage is permitted.
b. Strong pneumatic leakage is not permitted.
(1) If strong pneumatic leakage is found, make sure the duct joints and sensors that leak are
aligned correctly and the clamps and fixtures are tight.
(2) Repeat the pneumatic leak test on all duct joints and sensor seals that were found to
leak.
35. Remove Conditioned air. Refer to 747-400 AMM 21-00-00 as an accepted procedure.
36. Do an Equipment Cooling Three-Way Valve Logic Test as follows:
a. Supply electrical power to the airplane. Refer to 747-400 AMM 24-22-00 as an accepted
procedure.
(1) If necessary, remove safety tags and CLOSE the circuit breakers specified in the table
below:
Location -
Row / Column
PanelNomenclatureCircuit Breaker
Number
E36P6A/C CONT CARGO FWD LWRC10785
F28P6ZONE TEMP CONTROL - ACC10222
F29P6ZONE TEMP CONTROL - DCC10219
F35P6PACK TEMP CONTROL AC10217
F36P6PACK TEMP CONTROL BC10218
K27P415PACK TEMP CONTROL A - ACC03182
C38P415PACK TEMP CONTROL B - ACC03183
L28P415LWR FWD CGO FRV FSOC10851
J2P180PACK 1 PROTECTIONC10204
F2P180PACK 2 PROTECTIONC10205
J17P180PACK 3 PROTECTIONC10206
b. Get access to the equipment cooling three-way valve, V555:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
39 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 40

WARNING: OBEY THE INSTRUCTIONS IN THE PROCEDURE TO OPEN OR CLOSE THE
CARGO DOOR. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO
PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
(1) Open the forward cargo compartment door, 821R. Refer to 747-400 AMM 52-34-00 as
an accepted procedure. Refer to 747-400 AMM 06-09-02 for access door locations.
(2) Remove the left sidewall lining, 121GW, across from the forward cargo doorway near
STA590, and adjacent panels if necessary. Refer to 747-400 AMM 25-52-01 as an
accepted procedure.
c. Get access to the flight deck. On the P7 Overhead Panel make sure that the Air/Ground Relay
system is in the Ground Mode. Do the step that follows, refer to 747-400 AMM 32-09-02 as
an accepted procedure.
(1) Make sure that the GROUND SAFETY RELAY circuit breaker specified in the table below
is CLOSED:
Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
H8P7GROUND SAFETY RELAYC10003
d. Pressurize the pneumatic system, refer to 747-400 AMM 36-00-00 as an accepted procedure.
e. Get access to the flight deck. On the P5 Overhead Panel set each PACK (1, 2, and 3) selector
to the NORM position, on the cabin temperature control module, M7329.
f. On the P5 Overhead Panel, make sure that the EQUIPMENT COOLING mode selector is set
to the NORM position, on the cabin temperature control module, M7329.
g. Make sure that the equipment cooling three-way valve, V555, is in the CLOSED, C-B, position.
h. Prepare Safety Sensitive Systems for Air Mode Simulation. Refer to 747-400 AMM 32-09-02
as an accepted procedure.
i. Put the Air/Ground Relay System in the Air Mode. Refer to 747-400 AMM 32-09-02 as an
accepted procedure.
j. On the P7 Overhead Panel, make sure that the GROUND SAFETY RELAY circuit breaker
specified in the table below is OPEN:
Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
H8P7GROUND SAFETY RELAYC10003
k. Make sure that the equipment cooling three-way valve, V555, is in the CLOSED, C-B, position.
l. Do the steps that follow to simulate airplane altitude above 25,000 feet:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
40 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 41

(1) Get access to the ECS Miscellaneous Card, YMLA013, in the Forward Electrical Systems
Card File, M7603.
(2) Remove the wire from pin C5 of the electrical connector DW3114C, at the Forward
Electrical Systems Card File, M7603, and connect the wire to ground.
NOTE: For more data about access to pin C5 above, refer to 747-400 SSM 21-58-03,
747-400 SSM 21-61-04, 747-400 WDM 21-58-14 and 747-400 WDM 21-61-92.
m. Make sure that the equipment cooling three-way valve, V555, moves to the OPEN, A-B,
position.
n. Do the step that follows to simulate cooling pack conditioned air temperature above 104
degrees F, or 40 degrees C.
(1) Disconnect electrical connector, DS2311, from temperature control switch, S2311, aft of
the equipment cooling three-way valve, V555. Refer to 747-400 AMM 21-58-04 as an
accepted procedure.
o. Make sure that the equipment cooling three-way valve, V555, is in the CLOSED, C-B, position.
p. Do the step that follows to simulate cooling pack conditioned air temperature below 104
degrees F, or 40 degrees C.
(1) Connect electrical connector, DS2311, to the temperature control switch, S2311, aft of
the equipment cooling three-way valve, V555. Refer to 747-400 AMM 21-58-04 as an
accepted procedure.
q. Make sure that the equipment cooling three-way valve, V555, moves to the OPEN, A-B,
position.
CAUTION: DO NOT KEEP THE EQUIPMENT COOLING SWITCH IN THE OVRD POSITION
FOR MORE THAN FIVE MINUTES. WITHOUT COOLING AIRFLOW DAMAGE TO
EQUIPMENT CAN OCCUR.
r. On the P5 Overhead Panel, set the EQUIPMENT COOLING mode selector switch to OVRD,
on the cabin temperature control module, M7329.
s. Make sure that the equipment cooling three-way valve, V555, moves to the CLOSED, C-B,
position.
t. On the P5 Overhead Panel, set the EQUIPMENT COOLING mode selector switch to NORM,
on the cabin temperature control module, M7329.
u. Make sure that the equipment cooling three-way valve, V555, moves to the OPEN, A-B,
position.
v. Do the steps that follow to simulate airplane altitude below 25,000 feet:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
41 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 42

(1) On the ECS Miscellaneous Card, YMLA013, disconnect the wire, put to ground in step
30.m.2., and install the wire back into pin C5 of the electrical connector DW3114C, at the
Forward Electrical Systems Card File, M7603.
(2) Close access to the ECS Miscellaneous Card, YMLA013, in the Forward Electrical Systems
Card File, M7603.
NOTE: For more data about access to pin C5 above, refer to 747-400 SSM 21-58-03,
747-400 SSM 21-61-04, 747-400 WDM 21-58-14 and 747-400 WDM 21-61-92.
w. Make sure that the equipment cooling three-way valve, V555, moves to the CLOSED, C-B,
position.
x. Put the Air/Ground Relay System back in the Ground Mode. Refer to 747-400 AMM 32-09-02
as an accepted procedure.
y. Put Safety Sensitive Systems back to the condition before Air Mode Simulation. Refer to
747-400 AMM 32-09-02 as an accepted procedure.
z. On the P7 Overhead Panel, make sure that the GROUND SAFETY RELAY specified in the
table below is CLOSED:
Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
H8P7GROUND SAFETY RELAYC10003
aa. Make sure that the equipment cooling three-way valve, V555, is in the CLOSED, C-B, position.
ab. On the P5 Overhead Panel, set each PACK (1, 2, and 3) selector to OFF position, on the
cabin temperature control module, M7329.
ac. Depressurize the pneumatic system, refer to 747-400 AMM 36-00-00 as an accepted procedure.
ad. Close access to the equipment cooling three-way valve (V555):
(1) Replace the left sidewall lining, 121GW, across from the forward cargo doorway near
STA590, and adjacent panels if removed. Refer to 747-400 AMM 25-52-01 as an accepted
procedure.
(2) Close the forward cargo compartment door, 821R. Refer to 747-400 AMM 52-34-00 as
an accepted procedure. Refer to 747-400 AMM 06-09-02 for access door locations.
37. Do a Pack Discharge Overheat Switch Test on the PACK 3 over temperature switch, S521. Refer
to 747-400 AMM 21-51-08 as an accepted procedure.
38. Do a Pack 3 Discharge Temperature Sensor Test as follows:
a. Get access to the flight deck. On the P6 panel, OPEN the circuit breaker specified in the table
below:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
42 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 43

Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
F36P6PACK TEMP CONT - BC10218
b. On the EICAS ECS MAINTENANCE PAGE, make sure that PTC CHANNEL IN CONTROL
reads A for all packs.
c. On the Central Maintenance Computer (CMC), make sure that none of the messages that
follow are shown in CHAPTER 21 EXISTING FAULTS:-
21134 PACK 3 OUTLET TEMP SENSOR FAIL (PTC A).
21193 PACK 3 DISCHARGE OVERHEAT (>185 F).
d. On the EICAS ECS MAINTENANCE PAGE, record the PACK OUTLET TEMP for PACK 3.
e. On the P6 panel, CLOSE the circuit breaker specified in the table below:
Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
F36P6PACK TEMP CONT - BC10218
f. On the P6 panel, OPEN the circuit breaker specified in the table below:
Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
F35P6PACK TEMP CONT - AC10217
g. On the EICAS ECS MAINTENANCE PAGE, make sure that PTC CHANNEL IN CONTROL
reads B for all packs.
h. On the CMC, make sure that none of the messages that follow are shown in CHAPTER 21
EXISTING FAULTS:-
21174 PACK 3 OUTLET TEMP SENSOR FAIL (PTC B).
21193 PACK 3 DISCHARGE OVERHEAT (>185 F).
i. On the EICAS ECS MAINTENANCE PAGE, record the PACK OUTLET TEMP for PACK 3.
j. Make sure that the PACK 3 OUTLET TEMP value recorded in step 38. i. is the same as the
PACK 3 OUTLET TEMP value recorded in step 38. d., plus or minus 5 degrees F or 3 degrees
C.
k. On the P6 panel, CLOSE the circuit breaker specified in the table below:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
43 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 44

Location -
Row / Column
PanelNomenclatureCircuit Breaker Number
F35P6PACK TEMP CONT - AC10217
39. Close access to the Air Conditioning Equipment Bay, right side. Shut access doors 192H, 192J
192L, 192M, and 192N, refer to 747-400 AMM 06-09-03 for access door locations.
40. On the P5 Overhead Panel, remove safety tags and set all three PACK switches to NORM, if
necessary.
41. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1: October 03, 2011
44 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 45 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
This Figure applies only to: Group 1-5, 10-18.
AIR CONDITIONING EQUIPMENT BAY  1924336
FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL
(SHEET 1 OF 5)
Original Issue: August 27, 2010
Revision 1 October 03, 2011  BOEING PROPRIETARY -  747-21A2523
Copyright © Unpublished Work - See page 1 for details.  45 of 150

### Page 46

FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL
(SHEET 2 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
46 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 47 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
SUPPORT
CLAMP
BOLT
WASHER
NUT
(3 LOCATIONS)
STRAP
(3)  BOLT
(2 LOCATIONS)
WASHER
(6 LOCATIONS)
NUT
(2 LOCATIONS)
BONDING
CLAMP
BONDING CLAMP  1924369
AND STRAP
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL
(SHEET 3 OF 5)
Original Issue: August 27, 2010
Revision 1 October 03, 2011  BOEING PROPRIETARY -  747-21A2523
Copyright © Unpublished Work - See page 1 for details.  47 of 150

### Page 48

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
1DT1611ELECTRICAL CON-
NECTOR
Disconnect1
1DT1614ELECTRICAL CON-
NECTOR
Disconnect
1DS521ELECTRICAL CON-
NECTOR
Disconnect
1DV542ELECTRICAL CON-
NECTOR
Disconnect
165B41222-74DRAIN TUBEDisconnect
and keep the related
nuts, bolts, washers
and band clamp.
3-WIRE BUNDLE
CLAMP
Remove / Keep
1BACC10FD090DFGFESUPPORT CLAMPRemove / Keep2
3BACB30NR4K9BOLTRemove / Keep
3NAS1149D0463JWASHERRemove / Keep
3BACN10YR4CDNUTRemove / Keep
Refer to SOPM 20-
11-03 as an accept-
ed procedure.
1B34A2  (3037AK2 op-
tional)
BONDING CLAMPRemove / Keep3
1BACJ40A20-8STRAPRemove / Keep
2BACS12CB3-8BOLTRemove / Keep
6NAS1149D0316HWASHERRemove / Keep
2BACN10JC3NUTRemove / Keep
34341AA900
(43106AA900 or
43106AF optional)
COUPLINGSRemove / Keep4
3691-19-900SEAL ASSEMBLYRemove5
make sure that the
three wire bundles
and the drain tube
are not attached to
the duct, before it is
removed.
165B41197-46
(65B41197-53 optional)
DUCTRemove6
12BACS38K6STRAPRemove7
165B41471-49DUCT INSULATIONRemove / Keep
165B41471-43DUCT INSULATIONRemove / Keep
FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
48 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 49

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)1T1611TEMPERATURE SEN-
SOR
Remove / Keep8
(a)1728627-2GASKETRemove
(a)-T1614TEMPERATURE SEN-
SOR
Remove / Keep9
(a)1728627-2GASKETRemove
remove lockwire be-
fore the switch is re-
moved. (b)
1S521OVER TEMPERA-
TURE SWITCH
Remove / Keep10
(b)1BACP11K5PACKINGRemove
12-01237DRAIN TUBE UNIONRemove / Keep11
1MS29512-07PACKING, PRE-
FORMED
Remove
remove lockwire be-
fore the plug is re-
moved.
1BACP20AU5DPLUGRemove / Keep12
1BACP11K5PACKINGRemove
(a) Refer to 747-400 AMM 21-62-07 as an accepted procedure.
(b) Refer to 747-400 AMM 21-51-08 as an accepted procedure.
FIGURE 1: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - REMOVAL
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
49 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 50 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
This Figure applies only to: Group 6-9.
AIR CONDITIONING EQUIPMENT BAY  1925115
FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL
(SHEET 1 OF 5)
Original Issue: August 27, 2010
Revision 1 October 03, 2011  747-21A2523
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  50 of 150

### Page 51

FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL
(SHEET 2 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
51 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 52 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
SUPPORT
CLAMP
BOLT
WASHER
NUT
(3 LOCATIONS)
STRAP
BOLT
(2 LOCATIONS)
WASHER
(6 LOCATIONS)
NUT
(2 LOCATIONS)
BONDING
CLAMP
BONDING CLAMP  1924715
AND STRAP
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL
(SHEET 3 OF 5)
Original Issue: August 27, 2010
Revision 1 October 03, 2011  BOEING PROPRIETARY -  747-21A2523
Copyright © Unpublished Work - See page 1 for details.  52 of 150

### Page 53

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
1DT1611ELECTRICAL CON-
NECTOR
Disconnect1
1DT1614ELECTRICAL CON-
NECTOR
Disconnect
1DS521ELECTRICAL CON-
NECTOR
Disconnect
1DV542ELECTRICAL CON-
NECTOR
Disconnect
165B41222-74DRAIN TUBEDisconnect
and keep the related
nuts, bolts, washers
and band clamp.
3-WIRE BUNDLE
CLAMP
Remove / Keep
1BACC10FD090DFGFESUPPORT CLAMPRemove / Keep2
3BACB30NR4K9BOLTRemove / Keep
3NAS1149D0463JWASHERRemove / Keep
3BACN10YR4CDNUTRemove / Keep
Refer to SOPM 20-
11-03 as an accept-
ed procedure.
1B34A2  (3037AK2 op-
tional)
BONDING CLAMPRemove / Keep3
1BACJ40A20-8STRAPRemove / Keep
2BACS12CB3-8BOLTRemove / Keep
6NAS1149D0316HWASHERRemove / Keep
2BACN10JC3NUTRemove / Keep
34341AA900
(43106AA900 or
43106AF optional)
COUPLINGSRemove / Keep4
(a)3691-19-900SEAL ASSEMBLYRemove5
make sure that the
three wire bundles
and the drain tube
are not attached to
the duct, before it is
removed.
165B41197-46
(65B41197-53 optional)
DUCTRemove6
(a)1T1611TEMPERATURE SEN-
SOR
Remove / Keep7
(a)1728627-2GASKETRemove
FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
53 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 54

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)-T1614TEMPERATURE SEN-
SOR
Remove / Keep8
(a)1728627-2GASKETRemove
remove lockwire be-
fore the switch is re-
moved. (b)
1S521OVER TEMPERA-
TURE SWITCH
Remove / Keep9
(b)1BACP11K5PACKINGRemove
12-01237DRAIN TUBE UNIONRemove / Keep10
1MS29512-07PACKING, PRE-
FORMED
Remove
remove lockwire be-
fore the plug is re-
moved.
1BACP20AU5DPLUGRemove / Keep11
1BACP11K5PACKINGRemove
(a) Refer to 747-400 AMM 21-62-07 as an accepted procedure.
(b) Refer to 747-400 AMM 21-51-08 as an accepted procedure.
FIGURE 2: AIR CONDITIONING EQUIPMENT BAY - DUCT ASSEMBLY - REMOVAL
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
54 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 55 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
This Figure applies only to: Group 1-5.
AIR CONDITIONING EQUIPMENT BAY  1924716
• FIGURE 3: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - INSTALLATION
(SHEET 1 OF 6)
Original Issue: August 27, 2010
Revision 1 October 03, 2011  BOEING PROPRIETARY -  747-21A2523
Copyright © Unpublished Work - See page 1 for details.  55 of 150

### Page 56

FIGURE 3: AIR CONDITIONING EQUIPMENT BAY  - INSULATED DUCT ASSEMBLY - INSTALLATION
(SHEET 2 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
56 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 57 (OCR)

BOEING SERVICE BULLETIN 747-21A2523
ALERT  ALERT
SUPPORT  1 PLUG
CLAMP
BOLT
WASHER
NUT
(3 LOCATIONS)
STRAP
10)  BOLT
(2 LOCATIONS)
(10)  (10
WASHER
(6 LOCATIONS)
NUT
(2 LOCATIONS)
BONDING
CLAMP
BONDING CLAMP  1924854
AND STRAP
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 3: AIR CONDITIONING EQUIPMENT BAY - INSULATED DUCT ASSEMBLY - INSTALLATION
(SHEET 3 OF 6)
Original Issue: August 27, 2010
Revision 1 October 03, 2011  BOEING PROPRIETARY -  747-21A2523
Copyright © Unpublished Work - See page 1 for details.  57 of 150

### Page 58

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
165B41197-57DUCT ASSYGet1
1BACP20AU5DPLUGInstall (Kept)
below the plug.1BACP11K5PACKINGInstall (New)
on the plug. Refer to
747-400 AMM 20-
11-28 as an accept-
ed procedure.
-MS20995N32
(MS20995NC32 option-
al)
LOCKWIREInstall (New)
12-01237DRAIN TUBE UNIONInstall (Kept)2
1MS29512-07PACKING, PRE-
FORMED
Install (New)
(a)1S521OVER TEMPERA-
TURE SWITCH
Install (Kept)3
(a)1BACP11K5PACKINGInstall (New)
refer to 747-400
AMM 20-11-28 as
an accepted proce-
dure.
-MS20995N32
(MS20995NC32 option-
al)
LOCKWIREInstall (New)
(b)-T1614TEMPERATURE SEN-
SOR
Install (Kept)4
1728627-2GASKETInstall (New)
(b)1T1611TEMPERATURE SEN-
SOR
Install (Kept)5
1728627-2GASKETInstall (New)
165B41471-43DUCT INSULATIONInstall (Kept)6
trim and repair the
duct insulation as
necessary. Refer to
747-400 AMM 21-
23-02 as an accept-
ed procedure. (m)
165B41471-49DUCT INSULATIONInstall (Kept)
to attach the edges
of the duct insulation
around the duct.
-BMS 5-157, REV F,
TYPE 1 CLASS 1
DUCT TAPEApply
to hold the duct insu-
lation in position. (c)
(d) (e)
12BACS38K6STRAPInstall (New)
165B41197-57DUCT ASSYLocate7
165B41197-57DUCT ASSYInstall (New)
FIGURE 3: AIR CONDITIONING EQUIPMENT BAY  - INSULATED DUCT ASSEMBLY - INSTALLATION
(SHEET 4 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
58 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 59

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
3691-19-900SEAL ASSYInstall (New)8
34341AA900
(43106AA900 or
43106AF optional)
COUPLINGSInstall (Kept)9
to 60-80 inch
pounds.
14341AA900
(43106AA900 or
43106AF optional)
COUPLINGSTorque
(f) (g)1B34A2  (3037AK2 op-
tional)
BONDING CLAMPInstall (Kept)10
(f)1BACJ40A20-8STRAPInstall (Kept)
(f)2BACS12CB3-8BOLTInstall (Kept)
(f)6NAS1149D0316HWASHERInstall (Kept)
(f)2BACN10JC3NUTInstall (Kept)
between each strap
or flange coupling
and the primary
structure. Make sure
the total resistance
is not more than
0.010 ohms. (h)
--RESISTANCEMeasure
1BACC10FD090DFGFESUPPORT CLAMPInstall (Kept)11
3BACB30NR4K9BOLTInstall (Kept)
3NAS1149D0463JWASHERInstall (Kept)
3BACN10YR4CDNUTInstall (Kept)
to 5-15 inch pounds.3BACN10YR4CDNUTTorque
165B41222-74DRAIN TUBEConnect12
and related band
clamp.
3-WIRE BUNDLE
CLAMP
Install (Kept)13
--WIRE BUNDLERoute
--WIRE BUNDLEAdjust
3-WIRE BUNDLE
CLAMP
Tighten
-BMS 13-54, GRADE B,
CLASS 1, TYPE 1,
FINISH C (WHITE)
LACING TAPEInstall (New)
FIGURE 3: AIR CONDITIONING EQUIPMENT BAY  - INSULATED DUCT ASSEMBLY - INSTALLATION
(SHEET 5 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
59 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

### Page 60

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
1DT1611ELECTRICAL CON-
NECTOR
Connect14
(i) (j)1DT1614ELECTRICAL CON-
NECTOR
Connect
1DS521ELECTRICAL CON-
NECTOR
Connect
1DV542ELECTRICAL CON-
NECTOR
Connect
(a) Refer to 747-400 AMM 21-51-08 as an accepted procedure.
(b) Refer to 747-400 AMM 21-62-07 as an accepted procedure.
(c) Install one strap in the middle of the duct assembly bend, then one each side at less than 30 degrees.
Install one strap on each side between 30 and 45 degrees and then one each side at more than 45 degrees.
(d) Install a strap one inch from each of the three ends of the duct insulation. If possible, place straps approx-
imately 10 inches apart on the straight section of the duct assembly.
(e) Use tool MS90387-1, with a tension setting of 6 to 8, or equivalent.
(f) Refer to SOPM 20-11-03 as an accepted procedure.
(g) Make sure that any tape covering the bonding area on the duct assembly is removed before the bonding
clamp is installed.
(h) Refer to SWPM 20-20-00 as an accepted procedure.
(i) The new duct assembly has T1614 in a location 40 degrees clockwise from its original position, when
you look aft at the forward end of the installed duct.
(j) Adjust the clock position of the DT1614 backshell, if necessary, to reduce strain on the related wire bundle.
FIGURE 3: AIR CONDITIONING EQUIPMENT BAY  - INSULATED DUCT ASSEMBLY - INSTALLATION
(SHEET 6 OF 6)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 27, 2010
747-21A2523Revision 1 October 03, 2011
60 of 150
BOEING SERVICE BULLETIN 747-21A2523
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/747-21a2523/file/ac9e6d81c93a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
