# Boeing Alert Service Bulletin 747-28A2262: Boeing Service Bulletin (2)

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2009-0454; AD 2010-14-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-28A2262](https://openairdocs.org/service-documents/boeing/747-28a2262.md)
- Title as filed: Boeing Service Bulletin (2)
- Pages: 91
- PDF: https://openairdocs.org/files/sha256/55/7d/557d97b8ea8da34cf404a08206637e79061826dd6fea13a045528f5eb27c532d
- Page: https://openairdocs.org/service-documents/boeing/747-28a2262/file/557d97b8ea8d

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 91
 
 
 
Commercial
Airplanes
747
Service Bulletin
Number: 747-28A2262
Original Issue: March 15, 2007
Revision 2: August 13, 2009
ATA System: 2817
SUBJECT: FUEL - Horizontal Stabilizer Tank Fuel Transfer System - Automatic Pump Shutoff 
Change
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2007 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.  For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, BOEING BUSINESS JET, DC-8, DC-9, DC-10, MD-10, 
MD-11, MD-80, MD-90, the Boeing logo and the Boeing livery are among the trademarks owned by Boeing or 
its subsidiaries. No intellectual property license (express or implied) is granted in connection with this document 
or otherwise.

### Page 2

BLANK PAGE
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
BLANK PAGE

### Page 3

Table of Contents
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  18
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  21
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  22
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  22
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  23
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  23
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  23
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  23
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  23
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  24
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  25
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  27
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   30
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
FIGURE  1: Change the E-8 Aft Equipment Center   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  38
FIGURE  2: E-8 Wiring Changes .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  41
FIGURE  3: Relay Installation, E-8 Aft Equipment Center  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  45
FIGURE  4: Ship’s Wiring Installation.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  48
FIGURE  5: Ship’s Wiring Changes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  50
FIGURE  6: P414 Panel Wiring Changes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  52
FIGURE  7: P415 Panel Wiring Changes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  54
FIGURE  8: MAWEA Card File Wiring Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  56
FIGURE  9: E2-6 Shelf Wiring Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  57
FIGURE  10: E2-6 Shelf Wire Integration Unit Wiring Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  59
FIGURE  11: E2-6 Shelf Wiring Changes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  64

### Page 4

Table of Contents
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  12: E2-6 Shelf Wire Integration Unit Wiring Changes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 66
FIGURE  13: E2-6 Shelf Wiring Changes .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 71
FIGURE  14: E2-6 Shelf Wiring Changes .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 73
FIGURE  15: E2-6 Shelf Wire Integration Unit Wiring Changes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 75
FIGURE  16: E2-6 Shelf Wire Integration Unit Wiring Changes.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 81
FIGURE  17: Relay Bracket Installation .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 86
FIGURE  18: Relay Installation, E-8 Aft Equipment Center .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 89
FIGURE  19: P414 Panel Wiring Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  . 91

### Page 5

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 91
 
 
 
Commercial
Airplanes
747
Service Bulletin
Number: 747-28A2262 Revision Transmittal Sheet
Original Issue: March 15, 2007
Revision 2: August 13, 2009
ATA System: 2817
SUBJECT: FUEL - Horizontal Stabilizer Tank Fuel Transfer System - Automatic Pump Shutoff 
Change
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed as shown in the original issue or Revision 1 of this service 
bulletin.
Federal Aviation Administration (FAA) Airworthiness Directive 2007-13-04 is related to this service bulletin.
REASON FOR REVISION
This revision is sent to address comments received from operators since the original issue and Revision 1 of 
the service bulletin.
Airplane RT671 was moved from Group 7 to new Group 8.
Airplane RT703 was moved from Group 1 to new Group 9.
Boeing found the Work Instructions B.4, B.5 and B.7 through B.16 in Revision 1, did not agree with the figure 
numbers given in the service bulletin.  After investigating, Boeing found that during the preparation of Revision 
1, the Figure 2 was inadvertently moved to a different part of the service bulletin.  This caused the figures to 
renumber according to their order of placement in the service bulletin.  This revision restores the Figure 2 into 
its correct location in the document.  This restores the correct figure number assigned to the Figure.  The figure 
numbers 1 through 16 in Revision 2 agree with the figure numbers in the original issue of service bulletin 747-
28A2262.
The following sections of the service bulletin were changed:
1. Groups 8 and 9 were added to Group and Configuration tables in Section 1, Manpower table, Weight and 
Balance table and Material Information Section 2 where applicable.
2. Compliance and Approval section, removed reference to Airworthiness Directive 2002-24-51 and 
Airworthiness Directive 2002-24-52 which are superseded by Airworthiness Directive 2007-13-04.
3. Compliance statements in the Summary and Planning sections were revised with the wording "original 
issue date".

### Page 6

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
4. Material Information Section 2, Parts and Material Supplied by Operator, Added, contact BACC47CP3S as 
operator supplied for airplanes RT043-RT047 and RT433-RT477 only.
5. Accomplishment Instruction Section 3:
— added Step B.9, for new Groups 8 and 9.
— added Group 8 to Work Instruction Steps B.3-B.4, B.6-B.7, B.9-B.11, B.17-B.18.
— added Group 9 to Work Instruction Steps B.2, B.4-B.5, B.7, B.9-B.13.
6. Revised Figures numbers 2 through 14:
— Figure 2, restored to Figure 3.
— Figure 3, restored to Figure 4.
— Figure 4, restored to Figure 5.
— Figure 5, restored to Figure 6.
— Figure 6, restored to Figure 7.
— Figure 7, restored to Figure 8.
— Figure 8, restored to Figure 9.
— Figure 9, restored to Figure 10.
— Figure 10, restored to Figure 11.
— Figure 11, restored to Figure 12.
— Figure 12, restored to Figure 13.
— Figure 13, restored to Figure 14.
— Figure 14, restored to Figure 2.
7. Figures 2, 4-5, 7-8, 14-15, 17-19 added Group 8 applicability.
8. Figures 1-5, 7-10 and 19 added Group 9 applicability.
9. Figures 2, revised Flag Note 3, contact part number should be BACC47CP3S for connector D40106J.
10. Figures 6 and 7, added information note for ground block if existing ground block is full.
11. Added new Figure 19, to show wire W3846-595-20 connected to GDX2-DC.  Added information note for 
ground block if existing ground block is full.
The data given in Information Notice 767-28-2262 IN 04 is included in this revision.  The information Notice IN 
03 was corrected in IN 04
Paragraph 1.A., Effectivity, shows changes of airplane operators.  Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
Original Issue: March 15, 2007
Revision 1: May 8, 2008
Revision 2: August 13, 2009

### Page 7

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 91
 
 
 
Commercial
Airplanes
747
Service Bulletin
Number: 747-28A2262 Summary
Original Issue: March 15, 2007
Revision 2: August 13, 2009
ATA System: 2817
SUBJECT: FUEL - Horizontal Stabilizer Tank Fuel Transfer System - Automatic Pump Shutoff 
Change
CONCURRENT REQUIREMENTS
Boeing service bulletin 747-31-2376 Original Issue for General Electric powered airplanes, 747-31-2377 
Original Issue for Pratt and Whitney powered airplanes or 747-31-2378 Original Issue for Rolls Royce powered 
airplanes, are necessary to be accomplished prior to or concurrent with this service bulletin. The service 
bulletins will install updated Integrated Display System (IDS) software on the affected airplanes.
BACKGROUND
This service bulletin installs an automatic shut off system for the Horizontal Stabilizer Tank (HST) fuel pumps.  
Installation of the automatic system will prevent a potential ignition source in the tank by making sure the pumps 
do not run dry for an extended period of time when the fuel level is below the pump inlet.  The dry running of the 
pumps could result in fire/explosion of the fuel tank.
Currently the flight crew turns off the pumps when a low pressure indication is displayed on Engine Indication 
and Crew Alerting System (EICAS) and the "PRESS" lights for the pumps are ON.  The automatic shut off 
system installed by this service bulletin will make sure the pumps will not run for more than 14 seconds with 
continuous low fuel pressure and if the flight crew does not respond to the indication sooner.  The flight crew 
remains in primary control, with this automatic shut off system as a backup, to turn the pumps off after a low 
pressure indication.
This change affects section 9 of the Maintenance Planning Data (MPD) Document.  New Airworthiness 
Limitations (AWL) "28-AWL-24" will be added to section 9 of the MPD to include a functional check of the 
horizontal stabilizer fuel boost pump Automatic Shutoff System.  This change also affects Section 1 of the FAA 
Approved Airplane Flight Manual.
This service bulletin is the result of the safety assessments conducted by Boeing under Special Federal Aviation 
Regulation (SFAR) 88, "Fuel Tank System Fault Tolerance Evaluation Requirements".
As a part of a service bulletin validation program, this change was completed on airplane RT672 by Service 
Bulletin 747-28A2262 and before the release of Revision 1 of this service bulletin.  The change completed on 
airplane RT672 by Service Bulletin 747-28A2262 is equivalent to Revision 1 of this service bulletin.   Airplane 
RT672 has the configuration of a Group 3 airplane.

### Page 8

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
ACTION (PRR 85539-4)
Group  1-9: In the E-8 rack, install two new relays and make wiring changes.  Install new wiring between the E-
8 rack and the P414 and P415 panels.  Make wiring changes in the P414 and P415 panels.  Make wiring 
changes to the E2-6 shelf and E2-6 shelf wire integration unit.  Make wiring changes at the Modularized Avionics 
and Warning Electronics Assembly (MAWEA) card file.  Do a functional test.  Change your scheduled 
maintenance program to include periodic functional checks of the Horizontal Stabilizer Fuel Boost Pump 
Automatic Shutoff System as given in 747-400 Maintenance Planning Data (MPD) document, Section 9, 
Airworthiness Limitation (AWL) Number 28-AWL-24.
EFFECTIVITY
747-400 airplanes.  See Service Bulletin Paragraph 1.A.1 for effectivity.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive 2007-13-04 is related to this service bulletin.
Boeing recommends operator’s incorporate this change within 36 months after the original issue date of this 
service bulletin.  In addition, operators should change their scheduled maintenance program to include periodic 
functional checks of the Horizontal Stabilizer Fuel Boost Pump Automatic Shutoff System as given in 747-400 
Maintenance Planning Data (MPD) document, Section 9, Airworthiness Limitation (AWL) Number 28-AWL-24.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Airplanes Total Task Hours Elapsed Hours
Groups 1-9 117 30

### Page 9

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
WIRE INTEGRATION UNIT M4260
AT THE E2-6 SHELF AND
MAKE WIRING CHANGES
AT THE MAWEA CARDFILE
MAKE WIRING CHANGES
P415 PANEL
CHANGES AT THE
MAKE WIRING
P414 PANEL
CHANGES AT THE
MAKE WIRING
BUNDLE W4588
ADD NEW WIRE TO
EXISTING WIRE
ADD NEW WIRE TO
EXISTING WIRE
BUNDLE W4437
INSTALL TWO NEW RELAYS
AND CHANGE THE WIRING
AT THE E-8 AFT
EQUIPMENT CENTER
AC1402
AC1401
1000
STA
1480
STA
520
STA
379746

### Page 10

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
BLANK PAGE

### Page 11

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 91
 
 
 
Commercial
Airplanes
747
Service Bulletin
Number: 747-28A2262
Original Issue: March 15, 2007
Revision 2: August 13, 2009
ATA System: 2817
SUBJECT: FUEL - Horizontal Stabilizer Tank Fuel Transfer System - Automatic Pump Shutoff 
Change
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.  An equivalent change is on subsequent 
production airplanes.  Refer to PRR 85539-4 for data about this change.
GROUP CONFIGURATION DESCRIPTION
1 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf.
2 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf.
3 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf.
4 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf and have 
different AP2301 disconnect on E-8 rack.
5 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf and have 
different AP2301 disconnect on E-8 rack.
6 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf and have 
different AP2301 disconnect on E-8 rack.

### Page 12

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
Airplane models:
747-400
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AEROLINEAS ARGENTINAS  (ARG)
1 RT704
2 RT701–RT702
AIR ATLANTA ICELANDIC  (AID)
1 RT515
6 RT751
AIR CARGO GERMANY  (CGU)
1 RT633
AIR CHINA  (BEJ)
1R M 3 4 1
AIR CHINA CARGO  (CGC)
1 RT101 RT103
AIR FRANCE  (AFA)
1 RM401–RM402 RT071–RT073 RT121
4 RT591
AIR NEW ZEALAND  (ANZ)
1 RM082 RM191–RM192 RT673 RT932
3 RT672
8 RT671
9 RT703
AIR PACIFIC  (APC)
7 RT502 RT504
7 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf and have 
different AP2301 disconnect on E-8 rack.
8 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf and have 
different AP2301 disconnect on E-8 rack and 
uses GDX2-DC for P414 panel.
9 - 747-400 Airplanes with Horizontal Stabilizer 
Fuel Tank Active.  Grouping based on wiring 
configuration differences in E2-6 shelf and have 
different AP2301 disconnect on E-8 rack and 
uses GDX2-DC for P414 panel.
GROUP CONFIGURATION DESCRIPTION

### Page 13

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
AIR PULLMANTUR  (PUL)
1 RT523 RT525 RT749
ALL NIPPON AIRWAYS  (ANA)
1 RT753–RT755 RT777
2 RT776
ASIANA AIRLINES  (AAR)
1 RM071 RT131–RT136 RU032
ATLAS AIR  (TLS)
2 RT752
AVION AIRCRAFT TRADING H.F.  (VNG)
1 RT634
BAHRAIN ROYAL FLIGHT  (BHR)
1R M 4 2 6
BRITISH AIRWAYS  (BAB)
1 RM096–RM097 RM136–RM145 RM261–RM264 RT488–RT499
RU121 RU126–RU132
3 RT485–RT487
7 RT471–RT484
CATHAY PACIFIC AIRWAYS  (CAT)
1 RT457–RT469 RT511–RT512 RT514 RT517–RT518
RT522 RT528–RT529 RT782 RT837
2 RT781
3 RT455–RT456 RT508
7 RT451–RT454
CHINA AIRLINES  (CHI)
1 RM021–RM024 RT636–RT640
CORSAIR  (COR)
1 RT613–RT614 RT616 RT618–RT619 RT621
DRAGONAIR  (DRG)
1 RT510 RT513 RT516 RT519
RT524
DUBAI AIR WING  (DAW)
1 RM167–RM168 RT102
EL AL ISRAEL AIRLINES  (ELA)
1 RM091 RT527 RU081–RU083
EVA AIR  (EVA)
1 RM116–RM117 RT162–RT163 RT165–RT168 RT951–RT955

### Page 14

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
EVERGREEN INTERNATIONAL A/L  (EVR)
1 RT743
7 RT631–RT632
EXPORT RESTRICTED AIRPLANES  (YWV)
1 RT620
3 RT606
7 RT602
GARUDA INDONESIA  (GIA)
1 RT931 RU061–RU062
GECAS  (GEF)
1 RT412 RT615 RT622
GREAT WALL AIRLINES  (GWL)
1 RT520
HIS MAJESTY THE SULTAN'S FLIGHT  (BWN)
1 RT440
JAL INTERNATIONAL  (JAL)
1 RT861–RT864
2 RT648–RT650
6 RT641–RT647
KALITTA AIR  (KAC)
6 RT021–RT022
KLM - ROYAL DUTCH AIRLINES  (KLM)
1 RM801–RM803 RT006–RT014
6 RT001–RT005
KOREAN AIR  (KAL)
1 RM011–RM013 RT575–RT588 RT590 RT811–RT814
3 RT574
6 RT061
7 RT571–RT573
KUWAIT AIRWAYS  (KUW)
1 RT151
LION AIR  (MLI)
7 RT503 RT505
LUFTHANSA GERMAN AIRLINES  (DLH)
1 RT045–RT047 RT437–RT439 RT441–RT447
4 RT431–RT436
6 RT043–RT044
MALAYSIA AIRLINES  (MAS)
1 RM036–RM040 RM366–RM367 RT744 RT746
RT748 RT750 RU016–RU017

### Page 15

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
MARTINAIR HOLLAND  (MTH)
3 RT509
7 RT501 RT506–RT507
NORTHWEST AIRLINES  (NWA)
1 RM241–RM246
7 RT401–RT410
OMAN ROYAL FLIGHT  (RFO)
1R M 0 1 0
PHILIPPINE AIRLINES  (PAL)
1 RT152 RU051–RU052 RU059–RU060
PRESIDENTIAL FLIGHT  (ABD)
1 RM084 RT137
QANTAS  (QAN)
1 RF001–RF006 RM331–RM333 RT559–RT568 RT742
RU031
5 RT551–RT558
6 RT741
SAUDI ARABIAN AIRLINES  (SVA)
1 RM156–RM157 RU101–RU102
SAUDI ROYAL FLIGHT  (SRF)
1R M 1 5 8
SINGAPORE AIRLINES  (SIA)
1 RM041–RM045 RT521 RT526 RT530
RT831–RT835
SONAIR  (SON)
1 RM231–RM233
SOUTH AFRICAN AIRWAYS  (SAA)
1 RM081 RM083 RM147
THAI AIRWAYS INTERNATIONAL  (TII)
1 RM026–RM030 RM431 RT694–RT699 RT801–RT803
2 RT693
6 RT691–RT692
TRANSAERO AIRLINES  (TRX)
1 RM146 RT783–RT784
UNITED AIR LINES  (UAL)
1 RM166 RM169–RM177 RT411 RT609–RT612
RT617 RT623–RT630
3 RT607–RT608
7 RT601 RT603–RT605

### Page 16

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
UPS  (UPS)
1 RT161 RT164
VIRGIN ATLANTIC AIRWAYS  (VAA)
1 RM051–RM053 RM351–RM355 RT945–RT949
WORLD AIRWAYS, INC.  (WLD)
1 RT745 RT747
IDENTIFICATION BY VARIABLE NUMBER
Variable  Group
RF001–RF006 1
RM010–RM013 1
RM021–RM024 1
RM026–RM030 1
RM036–RM045 1
RM051–RM053 1
RM071 1
RM081–RM084 1
RM091 1
RM096–RM097 1
RM116–RM117 1
RM136–RM147 1
RM156–RM158 1
RM166–RM177 1
RM191–RM192 1
RM231–RM233 1
RM241–RM246 1
RM261–RM264 1
RM331–RM333 1
RM341 1
RM351–RM355 1
RM366–RM367 1
RM401–RM402 1
RM426 1
RM431 1
RM801–RM803 1
RT001–RT005 6
RT006–RT014 1
RT021–RT022 6
RT043–RT044 6

### Page 17

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
RT045–RT047 1
RT061 6
RT071–RT073 1
RT101–RT103 1
RT121 1
RT131–RT137 1
RT151–RT152 1
RT161–RT168 1
RT401–RT410 7
RT411–RT412 1
RT431–RT436 4
RT437–RT447 1
RT451–RT454 7
RT455–RT456 3
RT457–RT469 1
RT471–RT484 7
RT485–RT487 3
RT488–RT499 1
RT501–RT507 7
RT508–RT509 3
RT510–RT530 1
RT551–RT558 5
RT559–RT568 1
RT571–RT573 7
RT574 3
RT575–RT590 1
RT591 4
RT601–RT605 7
RT606–RT608 3
RT609–RT630 1
RT631–RT632 7
RT633–RT640 1
RT641–RT647 6
RT648–RT650 2
RT671 8
RT672 3
RT673 1
RT691–RT692 6
RT693 2
Variable  Group

### Page 18

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
2. Spares Affected
None.
B. Concurrent Requirements
Boeing service bulletin 747-31-2376 Original Issue for General Electric powered airplanes, 747-31-
2377 Original Issue for Pratt and Whitney powered airplanes or 747-31-2378 Original Issue for Rolls 
Royce powered airplanes, is necessary to be accomplished prior to or concurrent with this service 
bulletin. The service bulletins will install updated Integrated Display System (IDS) software on the 
affected airplanes.
RT694–RT699 1
RT701–RT702 2
RT703 9
RT704 1
RT741 6
RT742–RT750 1
RT751 6
RT752 2
RT753–RT755 1
RT776 2
RT777 1
RT781 2
RT782–RT784 1
RT801–RT803 1
RT811–RT814 1
RT831–RT837 1
RT861–RT864 1
RT931–RT932 1
RT945–RT949 1
RT951–RT955 1
RU016–RU017 1
RU031–RU032 1
RU051–RU052 1
RU059–RU062 1
RU081–RU083 1
RU101–RU102 1
RU121 1
RU126–RU132 1
Variable  Group

### Page 19

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
C. Reason
This service bulletin installs an automatic shut off system for the Horizontal Stabilizer Tank fuel  
pumps.  Installation of the automatic system will prevent a potential ignition source in the tank by 
making sure the pumps do not run dry for an extended period of time when the fuel level is below the 
pump inlet.  The dry running of the pumps could result in fire/explosion of the fuel tank.
Currently the flight crew turns off the pumps when a low pressure indication is displayed on Engine 
Indication and Crew Alerting System (EICAS) and the "PRESS" lights for the pumps are ON.  The 
automatic shut off system installed by this service bulletin will make sure the pumps will not run for 
more than 14 seconds with continuous low fuel pressure and if the flight crew does not respond to the 
indication sooner.  The flight crew remains in primary control, with this automatic shut off system as a 
backup, to turn the pumps off after a low pressure indication.
This change affects section 9 of the Maintenance Planning Data (MPD) Document.  New 
Airworthiness Limitations (AWL) "28-AWL-24" will be added to section 9 of the MPD to include a 
functional check of the horizontal stabilizer fuel boost pump Automatic Shutoff System.  This change 
also affects Section 1 of the FAA Approved Airplane Flight Manual.
This service bulletin is the result of the safety assessments conducted by Boeing under Special 
Federal Aviation Regulation (SFAR) 88, "Fuel Tank System Fault Tolerance Evaluation 
Requirements".
Revision 1 is sent to address comments received from operators since the initial release of the service 
bulletin.  It was found that certain airplanes have a different configuration on the E-8 rack then what is 
shown in figures 1 and 3.  This revision also includes changes identified during the validation of the 
service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane RT672 by 
Service Bulletin 747-28A2262 before the release of Revision 1 of this service bulletin.  The change 
was completed on airplane RT672 by Service Bulletin 747-28A2262 is equivalent to Revision 1 of this 
service bulletin.   Airplane RT672 has the configuration of a Group 3 airplane.
The following sections of the service bulletin were changed:
1. Planning Information Section 1, Effectivity, airplane grouping was revised to add new airplane 
groups.  The following airplanes have been removed from figures 1 and 3 and added to the new 
figures 17 and 18.
— Airplanes RT551-RT558 were deleted from Group 1 and moved to the new Group 5.
— Airplanes RT001-RT005, RT021-RT022, RT043-RT044, RT061, RT641-RT647, RT691-
RT692, RT741 and RT751 were deleted from Group 2 and moved to the new Group 6.
— Airplanes RT401-RT410, RT451-RT454, RT471-RT484, RT501-RT507, RT571-RT573, 
RT601-RT605, RT631-RT632 and RT671 were deleted from Group 3 and moved to the new 
Group 7.
2. Approval Section 1, Added new AD to Approval statement, AD 2007-13-04.
3. Accomplishment Instructions Section 3, Work Instruction B.15 and B.17  were revised to correct 
the Group applicability.
4. Accomplishment Instructions Section 3, Work Instruction B.20, Functional Test, was revised to 
clarify the steps.

### Page 20

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
5. Accomplishment Instructions Section 3, Work Instruction B.11 and B.12, Group applicability was 
revised to add Group 5.
6. Accomplishment Instructions Section 3, Work Instruction B.13 and B.14, Group applicability was 
revised to add Group 6.
7. Accomplishment Instructions Section 3, Work Instruction B.16 and B.17, Group applicability was 
revised to add Group 7.
8. Figures 12, 15 and 16 were updated to be in accordance with the wire wrap requirements shown 
in Chapter 20 of the Standard Wire Practices Manual (SWPM).
9. Figures 1 and 3 revised to remove Group 4 airplanes.
10. Figures 9-16 updated the Group applicability.
11. Figures 17 and 18 added new figures for Group 4, 5, 6 and 7 airplanes.
12. Figure 11 corrected typographical error for flag note 2.
The data given in Information Notice 767-28-2262 IN 01 and 767-28A2262 IN 02 is included in this 
revision
Revision 2 is sent to address comments received from operators since the original issue and Revision 
1 of the service bulletin.
Airplane RT671 was moved from Group 7 to new Group 8.
Airplane RT703 was moved from Group 1 to new Group 9.
Boeing found the Work Instructions B.4, B.5 and B.7 through B.16 in Revision 1, did not agree with 
the figure numbers given in the service bulletin.  After investigating, Boeing found that during the 
preparation of Revision 1, the Figure 2 was inadvertently moved to a different part of the service 
bulletin.  This caused the figures to renumber according to their order of placement in the service 
bulletin.  This revision restores the Figure 2 into its correct location in the document.  This restores the 
correct figure number assigned to the Figure.  The figure numbers 1 through 16 in Revision 2 agree 
with the figure numbers in the original issue of service bulletin 747-28A2262.
The following sections of the service bulletin were changed:
1. Groups 8 and 9 were added to Group and Configuration tables in Section 1, Manpower table, 
Weight and Balance table and Material Information Section 2 where applicable.
2. Compliance and Approval section, removed reference to Airworthiness Directive 2002-24-51 and 
Airworthiness Directive 2002-24-52 which are superseded by Airworthiness Directive 2007-13-
04.
3. Compliance statements in the Summary and Planning sections were revised with the wording 
"original issue date".
4. Material Information Section 2, Parts and Material Supplied by Operator, Added, contact 
BACC47CP3S as operator supplied for airplanes RT043-RT047 and RT433-RT477 only.

### Page 21

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
5. Accomplishment Instruction Section 3:
— added Step B.9, for new Groups 8 and 9.
— added Group 8 to Work Instruction Steps B.3-B.4, B.6-B.7, B.9-B.11, B.17-B.18.
— added Group 9 to Work Instruction Steps B.2, B.4-B.5, B.7, B.9-B.13.
6. Revised Figures numbers 2 through 14:
— Figure 2, restored to Figure 3.
— Figure 3, restored to Figure 4.
— Figure 4, restored to Figure 5.
— Figure 5, restored to Figure 6.
— Figure 6, restored to Figure 7.
— Figure 7, restored to Figure 8.
— Figure 8, restored to Figure 9.
— Figure 9, restored to Figure 10.
— Figure 10, restored to Figure 11.
— Figure 11, restored to Figure 12.
— Figure 12, restored to Figure 13.
— Figure 13, restored to Figure 14.
— Figure 14, restored to Figure 2.
7. Figures 2, 4-5, 7-8, 14-15, 17-19 added Group 8 applicability.
8. Figures 1-5, 7-10 and 19 added Group 9 applicability.
9. Figures 2, revised Flag Note 3, contact part number should be BACC47CP3S for connector 
D40106J.
10. Figures 6 and 7, added information note for ground block if existing ground block is full.
11. Added new Figure 19, to show wire W3846-595-20 connected to GDX2-DC.  Added information 
note for ground block if existing ground block is full.
The data given in Information Notice 767-28-2262 IN 04 is included in this revision.  The information 
Notice IN 03 was corrected in IN 04
D. Description
Group  1-9: In the E-8 rack, two new relays are installed and wiring changes are made.  New wiring is 
installed between the E-8 rack and the P414 and P415 panels.  Wiring changes are made in the P414 
and P415 panels.  Wiring changes are made to the E2-6 shelf and E2-6 shelf wire integration unit.  
Wiring changes are made at the Modularized Avionics and Warning Electronics Assembly (MAWEA) 
card file.  A functional test is done.
Revision 2 - No more work is necessary on airplanes changed as shown in the original issue or 
Revision 1 of this service bulletin.
Revision 1 - No more work is necessary on airplanes changed as shown in the original issue of this 
service bulletin.
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive 2007-13-04 is related to this service 
bulletin.

### Page 22

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
Boeing recommends operators incorporate this service bulletin within 36 months after the original 
issue date of this service bulletin.  In addition, operators should change their scheduled maintenance 
program to include periodic functional checks of the Horizontal Stabilizer Fuel Boost Pump Automatic 
Shutoff System as given in 747-400 Maintenance Planning Data (MPD) document, Section 9, 
Airworthiness Limitation (AWL) Number 28-AWL-24.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity.  This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
This service bulletin has been approved by the FAA.  In addition, the Manager of the FAA Seattle 
Aircraft Certification Office approves the installation of the horizonal stabilizer tank automatic shutoff 
system, as described in this service bulletin, as an alternative method of compliance to the 
requirements of paragraph (h), (l) and (m), fueling and use of the Horizontal Stabilizer Tank (HST) of 
AD 2007-13-04.  All provisions of AD 2007-13-04 that are not specifically referenced in the above 
statement remain fully applicable and must be complied with.  Compliance with the conditions of this 
AMOC approval requires concurrent incorporation of the associated revisions to the Airplane Flight 
Manual Section 1 and incorporation of the related Airworthiness Limitations (AWL) in Section 9 of the 
MPD into the operator’s maintenance documentation.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this modification for each 
airplane.  This estimate is for direct labor only, done by an experienced crew.  Adjust the estimate with 
operator task-hour data if necessary.  The estimate does not include lost time.  These are some 
examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group  1-9: 
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 4 30 7.5
Change 4 44 11
Close Access 4 40 10
Test 2 3 1.5
TOTAL FOR EACH AIRPLANE 117 30

### Page 23

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
This estimate does not include the task-hour data given in the service bulletins in Paragraph 1.B., 
Concurrent Requirements.
H. Weight and Balance Changes
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85539-4
b. 747-400 Aircraft Maintenance Manual (AMM)  12-11-01, 20-41-02, 20-41-03, 24-22-00, 
45-10-00
c. 747-400 Structural Repair Manual (SRM)  51-40-02
d. 747-400 Maintenance Planning Data (MPD) Section 9
e. 747-400 Wiring Diagrams  28-21-26, 28-21-27, 28-21-28, 28-21-29, 28-21-30, 28-21-31, 
28-42-15, 30-41-21, 30-41-31 
f. Boeing Service Bulletin 747-31-2376
g. Boeing Service Bulletin 747-31-2377
h. Boeing Service Bulletin 747-31-2378
i. Federal Aviation Administration (FAA) Airworthiness Directive 2007-13-04
j. Standard Overhaul Practices Manual (SOPM)  20-50-05
k. Standard Wiring Practices Manual (SWPM)  20-10-11, 20-10-12, 20-10-19, 20-20-00, 
20-20-11, 20-30-11, 20-30-12, 20-30-16, 20-60-00, 20-61-11, 20-71-14, 20-72-17, 
20-72-18, 20-81-12, 20-81-19
2. Data supplied with this Service Bulletin:
None.
Group  1-9: 
Airplane
Change in Weight 
(Pounds)
Change in Moment 
(Pound-Inches)
Groups 1-9 +2.4 +2304.0

### Page 24

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin.  These drawings are not necessary 
to make the specified changes, and are not supplied with this service bulletin.  These drawings 
may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications
Drawing Number Title
288U4147 Wire Bundle Installation, Lower Sidewall LH, STA 403 Thru STA 
523
288U4148 Wire Bundle Installation, Lower Sidewall RH, STA 403 Thru STA 
523
288U4150 Wire Bundle Installation, Main Deck Floor Beams RH, STA 403 
Thru 523 and Aft 400 Bulkhead RH
288U4151 Wire Bundle Installation, Main Deck Floor Beams LH, STA 403 
Thru 523 and Aft 400 Bulkhead LH
288U4156 Wire Bundle Installation, Main Deck Floor Beams, STA 403 Thru 
523, LBL 50 to RBL 50
288U4210 Wire Bundle Installation, Main Deck Floor Beams RH, STA 523 
Thru 723
288U4211 Wire Bundle Installation, Main Deck Floor Beams LH, STA 523 
Thru 723
288U4230 Wire Bundle Installation, Main Deck Floor Beams RH, STA 723 
Thru 997
288U4231 Wire Bundle Installation, Main Deck Floor Beams LH, STA 723 
Thru 997
288U4410 Wire Bundle Installation, Pressure Deck and Main Deck FLR 
Beams RH, STA 997 Thru 1243
288U4411 Wire Bundle Installation, Pressure Deck and Main Deck FLR 
Beams LH, STA 997 Thru 1243
288U4430 Wire Bundle Installation, Pressure Deck and Main Deck FLR 
Beams RH, STA 1243 Thru 1483
288U4431 Wire Bundle Installation, Pressure Deck and Main Deck FLR 
Beams LH, STA 1243 Thru 1483
288U4610 Wire Bundle Installation, Passenger Floor Beams, 46 SEC (FWD) 
R.H. STA 1500 - 1720
288U4611 Wire Bundle Installation, Main Deck Floor Beams LH, STA 1483 
Thru 1723
Publication Chapter-Section
747 FAA Approved Airplane Flight Manual Section 1
747-400 Operations Manual 12.20, 12.30, NNC.12, NP .20
747-400 Maintenance Manual 28-17, 28-22

### Page 25

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue 
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the 
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not 
necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
747-400 Wiring Diagram Manual 28-21, 28-42, 30-41
747-400 Weight and Balance Manual 1-22
747-400 Illustrated Parts Catalog 11-11, 28-21
747-400 System Schematic Manual 28-21, 28-42, 30-41
747-400 Maintenance Planning Data 
(MPD) Document
Section 9
Publication Chapter-Section

### Page 26

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
BLANK PAGE

### Page 27

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kit shown in Paragraph 2.C., Parts Necessary For Each Airplane as shown 
below.  If there is a limit to the quantity (QTY) of available kits, a supply sequence is given by Spares.  
More kits become available as shown in the Reorder Lead Time (ROLT).  ROLT is calculated from the 
date Boeing gets the purchase order.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Group  1-9: 
Kit Number Name Date QTY
ROLT 
(Weeks)
Unit Price thru
Dec 31, 2007
015U1765-1 Top KIt, Automatic HST 
Pump Shutoff Addition
Available 45 22 $4,112.00

### Page 28

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
NOTE:  One top kit is necessary for each airplane.
Group  1-9: 
Kit 015U1765
New Part Number QTY Name
Existing Part 
Number Notes
015U1765-1 -- Top Kit, Automatic 
HST Pump Shutoff 
Addition
-- --
289U1214-1 1 Wire Kit -- --
65B48634-39 1 Relay Bracket -- --
BAC27EEL28836 1 Marker -- (a)
BAC27EEL28837 1 Marker -- (a)
BACR15DR4PAC2 3 Rivet -- (b)
BACS38K10 50 Strap -- (a)
BACS38K7C 150 Strap -- (a)
TDH-1852-1402 2 Relay -- (a) (c)
(a)  This part is used in production.
(b)  If grip length shown is not available at Boeing, fasteners supplied in kits 
may be one grip length longer than indicated. Also, if any fasteners part 
numbers listed are not available or have been superseded, substitute 
fasteners may be supplied in kits. Boeing Document D-590 and Boeing 
Drawing 012W6100  are used to determine the part numbers used as 
substitutes.
(c)  Leach Corp (58657), 6900 Orangethorpe Avenue, P.O. Box 5032, Buena 
Park, California  90622-5032
Group  1-9: 
Kit 289U1214
New Part 
Number
QTY
Name
Existing Part 
Number Notes-105 -104 -103 -102 -101 -1
2 8 9 U 1 2 1 4 - 1 ..... - - W i r e  K i t - - ( b )
2 8 9 U 1 2 1 4 - 1 0 1 .... - - 1 S u b k i t ,  W 3 8 5 1 - - ( b )
289U1214-102 . . . -- . 1 Subkit, W3842, 
W3846, W4437, 
W4478
-- (b)
289U1214-103 . . -- . . 1 Subkit, W3942, 
W3944, W4488, 
W4588
-- (b)
289U1214-104 . -- . . . 1 Subkit, W4260, 
W4261, W4262, 
W4263
-- (b)
2 8 9 U 1 2 1 4 - 1 0 5 - - .... 1 S u b k i t ,  W 4 7 5 8 - - ( b )
2 8 9 U 1 2 1 4 - 1 0 1 0 1 .... 1 . I . D .  T a p e - - - -

### Page 29

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
2. Parts and Materials Supplied by the Operator:
3. Parts Modified and Reidentified:
None.
2 8 9 U 1 2 1 4 - 1 0 1 0 2 .... 1 . I . D .  T a p e - - - -
2 8 9 U 1 2 1 4 - 1 0 1 0 3 .... 1 . I . D .  T a p e - - - -
2 8 9 U 1 2 1 4 - 1 0 1 0 4 .... 1 . I . D .  T a p e - - - -
2 8 9 U 1 2 1 4 - 1 0 1 W .... 1 . W i r e - - - -
289U1214-102W . . . 1 . . Wire -- --
289U1214-103W . . 1 . . . Wire -- --
2 8 9 U 1 2 1 4 - 1 0 4 W . 1 .... W i r e - - - -
BACC47CN1S . . 2 3 5 . Contact -- --
BACC47CN3S . . 1 . . . Contact -- --
BACC47CP1S . . 3 2 3 . Contact -- --
BACC47CP3S . . 1 . . . Contact -- --
BACC47DE1A . . 2 2 3 . Contact -- --
BACC47DJ1 . . 3 3 . . Contact -- --
B A C C 4 7 E F 1 . 4 .... C o n t a c t - - - -
B A C C 4 7 E G 2 . 4 .... C o n t a c t - - - -
B A C C 4 7 E R 1 .... 1 2 . C o n t a c t - - - -
B A C S 1 6 A H 1 .... 2 . R e l a y  S o c k e t - - - -
B A C T 1 2 A R 2 0 2 .... 1 0 . T e r m i n a l  L u g - - - -
BMS13-
46T03C01G024
.1. . . W i r e - - ( a )
D 4 3 6 - 3 7 .... 3 . S p l i c e - - - -
324484 5 . 2 . . Terminal, End Cap -- --
(a)  Length is 36 inches
(b)  There are more parts than are necessary.
Part Number / 
Specification QTY Name Notes
BACC47CP3S 1 Contact Required for airplanes 
RT043-RT047 and RT433-
RT447 only.
Group  1-9: 
Kit 289U1214
New Part 
Number
QTY
Name
Existing Part 
Number Notes-105 -104 -103 -102 -101 -1

### Page 30

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin.  But, 
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be 
necessary.  Examine operator tool supply to make sure all necessary tools are available.

### Page 31

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS.  UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES.  DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. Manual titles are referred to by acronyms.  Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Hole dimensions for standard solid rivets are given in 747-400 Structural Repair 
Manual, Chapter 51
4. For approved fastener and process material substitutions, refer to 747-400 Structural 
Repair Manual, Chapter 51,  Alternate fasteners are given in 747-400 Structural Repair 
Manual Chapter 51 and Boeing Drawing 012W6100.
5. Refer to the Boeing Standard Wiring Practices Manuals 20-10-11 and 20-10-12 for the 
wire installation procedures and 20-10-19 for the wire separation requirements.
6. If the length of fasteners specified in this service bulletin do not meet the installation 
standards, fasteners of the same specification, or an approved substitute, one grip 
length longer or shorter may be used.
7. These work instructions refer to procedures included on other Boeing documents.  
When the words "refer to" are used and the operator has an accepted alternative 
procedure, the accepted alternative procedure can be used.  When the words "as given 
in" are included in the instruction, the procedure in the Boeing document must be used
B. WORK INSTRUCTIONS
1. Remove electrical power from the airplane as given in 747-400 AMM 24-22-00.
2. Group  1-3, 9: Install a new relay bracket as necessary in the E-8 Aft Equipment Center as given 
in Figure 1.
3. Group  4-8: Install a new relay bracket as necessary in the E-8 Aft Equipment Center as given in 
Figure 17.
4. Group  1-9: Change the wiring in the E-8 Aft Equipment Center as given in Figure 2.

### Page 32

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
5. Group  1-3, 9: Install new relays in the E-8 Aft Equipment Center as given in Figure 3.
6. Group  4-8: Install new relays in the E-8 Aft Equipment Center as given in Figure 18.
7. Group  1-9: Install new wiring to existing ship’s wiring as given in Figure 4 and Figure 5.
8. Group  1-7: Change the wiring in the P414 panel as given in Figure 6.
9. Group  8-9: Change the wiring in the P414 panel as given in Figure 19.
10. Group  1-9: Change the wiring in the P415 panel as given in Figure 7.
11. Group  1-9: Change the wiring in the MAWEA card file as given in Figure 8.
12. Group  1, 5, 9: Change the wiring on the E2-6 shelf as given in Figure 9.
13. Group  1, 5, 9: Change the wiring in the E2-6 shelf wire integration unit as given in Figure 10.
14. Group  2, 6: Change the wiring on the E2-6 shelf as given in Figure 11.
15. Group  2, 6: Change the wiring in the E2-6 shelf wire integration unit as given in Figure 12.
16. Group  4: Change the wiring on the E2-6 shelf as given in Figure 13.
17. Group  3, 7-8: Change the wiring in the E2-6 shelf wire integration unit as given in Figure 14.
18. Group  3, 7-8: Change the wiring on the E2-6 shelf as given in Figure 15.
19. Group  4: Change the wiring in the E2-6 shelf wire integration unit as given in Figure 16.
20. Restore electrical power to the airplane as given in 747-400 AMM 24-22-00.
21. Do the following functional test:
a. Open the fueling station door to get access to the P42 panel.
b. Load a minimum 2000 pounds of fuel in the Horizontal Stabilizer Tank as given in 747-400 
AMM 12-11-01.
c. Set the Stabilizer Trim to approximately 3 trim units.
d. For the Left Horizontal Stabilizer Fuel Pump
(1) Make sure circuit breaker C3141 (Horiz STAB Xfer/Jett Pump Left) on the P85 panel is 
closed.
(2) Make sure the following circuit breakers on the P414 panel are closed:
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power

### Page 33

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
(3) On the P42 panel, open switch S1879 (Horiz-Stab ISLN Con VLV).
(4) On the M154 panel, set the L STAB Pump switch to "ON".
(5) Make sure the left Horizontal Stabilizer Fuel Pump is running.
(6) Open circuit breaker C3141 (Horiz STAB Xfer/Jett Pump Left) on the P85 panel.
(7) In the E-8 Equipment Center, make sure relay R7401 (HSTAB Pump Cont Left) is 
energized for more than 20 seconds.  Use Ohm meter to make sure there is continuity 
between pins A1 and A2.
(8) On the M154 panel, set the L STAB Pump switch to "OFF".
(9) On the P42 panel, close switch S1879 (Horiz-Stab ISLN Con VLV).
(10) Open the following circuit breakers on the P414 panel:
(11) On the E-8 Equipment Center at connector D40108P, disconnect wire W4478-002-20 
at pin 2 (de-pin).  Protect removed pin from coming in contact with other surfaces and 
from contamination by installing a protective cover such as a plastic bag.
(12) Close circuit breaker C3141 (Horiz STAB Xfer/Jett Pump Left) on the P85 panel.
(13) Close the following circuit breakers on the P414 panel:
(14) On the P42 panel, open switch S1879 (Horiz-Stab ISLN Con VLV).
(15) On the M154 panel, set the L STAB Pump switch to "ON".
(16) Make sure the left Horizontal Stabilizer Fuel Pump is running.
(17) Open circuit breaker C3141 (Horiz STAB Xfer/Jett Pump Left) on the P85 panel.  At the 
same time, start timing using a stopwatch.
(18) After 14 seconds, make sure relay R7401 (HSTAB Pump Cont Left) is not energized.  
Use Ohm meter to make sure there is no continuity between pins A1 and A2.
(19) Make sure that the Left Pump Low Pressure light is illuminated.
(20) On the M154 panel, set the L STAB Pump switch to "OFF".
(21) Make sure that the Left Pump Low Pressure light is not illuminated.
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power

### Page 34

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
(22) On the M154 panel, set the L STAB Pump switch to "ON".
(23) Make sure relay R7401 (HSTAB Pump Cont Left) is energized.   Use Ohm meter to 
make sure there is continuity between pins A1 and A2.
(24) After 14 seconds, make sure relay R7401 (HSTAB Pump Cont Left) is not energized.  
Use Ohm meter to make sure there is no continuity between pins A1 and A2.
(25) On the M154 panel, set the L STAB Pump switch to "OFF".
(26) Open the following circuit breakers on the P414 panel:
(27) On the P42 panel, close switch S1879 (Horiz-Stab ISLN Con VLV).
(28) On the E-8 Equipment Center at connector D40108P, remove protective cover and 
connect wire W4478-002-20 at pin 2 (reinstall pin).
(29) Close circuit breaker C3141 (Horiz STAB Xfer/Jett Pump Left) on the P85 panel.
(30) Close the following circuit breakers on the P414 panel:
(31) On the P42 panel, open switch S1879 (Horiz-Stab ISLN Con VLV).
(32) On the M154 panel, set the L STAB Pump switch to "ON".
(33) Make sure relay R7401 (HSTAB Pump Cont Left) is energized for more than 20 
seconds.   Use Ohm meter to make sure there is continuity between pins A1 and A2.
(34) On the M154 panel, set the L STAB Pump switch to "OFF".
(35) On the P42 panel, close switch S1879 (Horiz-Stab ISLN Con VLV).
e. For the Right Horizontal Stabilizer Fuel Pump
(1) Make sure circuit breaker C3142 (Horiz STAB Xfer/Jett Pump Right) on the P85 panel 
is closed.
(2) Make sure the following circuit breakers on the P414 panel are closed:
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power

### Page 35

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
(3) On the P42 panel, open switch S1879 (Horiz-Stab ISLN Con VLV).
(4) On the M154 panel, set the R STAB Pump switch to "ON".
(5) Make sure the right Horizontal Stabilizer Fuel Pump is running.
(6) Open circuit breaker C3142 (Horiz STAB Xfer/Jett Pump Right) on the P85 panel.
(7) Make sure relay R7402 (HSTAB Pump Cont Right) is energized for more than 20 
seconds.  Use Ohm meter to make sure there is continuity between pins A1 and A2.
(8) On the M154 panel, set the R STAB Pump switch to "OFF".
(9) On the P42 panel, close switch S1879 (Horiz-Stab ISLN Con VLV).
(10) Open the following circuit breakers on the P414 panel:
(11) On the E-8 Equipment Center at connector D40103P, disconnect wire W4488-070-22 
at pin 36 (de-pin).  Protect removed pin from coming in contact with other surfaces and 
from contamination by installing a protective cover such as a plastic bag.
(12) Close circuit breaker C3142 (Horiz STAB Xfer/Jett Pump Right) on the P85 panel.
(13) Close the following circuit breakers on the P414 panel:
(14) On the P42 panel, open switch S1879 (Horiz-Stab ISLN Con VLV).
(15) On the M154 panel, set the R STAB Pump switch to "ON".
(16) Make sure the right Horizontal Stabilizer Fuel Pump is running.
(17) Open circuit breaker C3142 (Horiz STAB Xfer/Jett Pump Right) on the P85 panel.  At 
the same time, start timing using a stopwatch. 
(18) After 14 seconds, make sure relay R7402 (HSTAB Pump Cont Right) is not energized.  
Use Ohm meter to make sure there is no continuity between pins A1 and A2.
(19) Make sure that the Right Pump Low Pressure light is illuminated.
(20) On the M154 panel, set the R STAB Pump switch to "OFF".
(21) Make sure that the Right Pump Low Pressure light is not illuminated.
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power

### Page 36

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
(22) On the M154 panel, set the R STAB Pump switch to "ON".
(23) Make sure relay R7402 (HSTAB Pump Cont Right) is energized.  Use Ohm meter to 
make sure there is continuity between pins A1 and A2. 
(24) After 14 seconds, make sure relay R7402 (HSTAB Pump Cont Right) is not energized. 
Use Ohm meter to make sure there is no continuity between pins A1 and A2.
(25) On the M154 panel, set the R STAB Pump switch to "OFF".
(26) Open the following circuit breakers on the P414 panel:
(27) On the P42 panel, close switch S1879 (Horiz-Stab ISLN Con VLV).
(28) On the E-8 Equipment Center at connector D40103P, remove protective cover and 
connect wire W4488-070-22 at pin 36 (reinstall pin).
(29) Close circuit breaker C3142 (Horiz STAB Xfer/Jett Pump Right) on the P85 panel.
(30) Close the following circuit breakers on the P414 panel:
(31) On the P42 panel, open switch S1879 (Horiz-Stab ISLN Con VLV).
(32) On the M154 panel, set the R STAB Pump switch to "ON".
(33) Make sure relay R7402 (HSTAB Pump Cont Right) is energized for more than 20 
seconds.  Use Ohm meter to make sure there is continuity between pins A1 and A2.
(34) On the M154 panel, set the R STAB Pump switch to "OFF".
(35) On the P42 panel, close switch S1879 (Horiz-Stab ISLN Con VLV).
f. Close the fueling station door.
g. Do the following check using Central Maintenance Computer (CMC) input monitoring as 
given in 747-400 AMM 45-10-00:
(1) Select the "<CMC" Main Menu on the Multipurpose Control Display Unit (MCDU).
(2) Go to Page 2 by selecting the "NEXT PAGE" button.
(3) Select "<INPUT MONITORING" to show an empty Input Monitoring page on the 
MCDU.
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power
C/B Number Grid Location Name
C90 F17 Fueling Valve
C1142 F22 Fueling power

### Page 37

Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
(4) Use the MCDU keyboard and type the following into the MCDU scratchpad:  C/26/3/00.
(5) Select the top left key (LSK1L) of the MCDU.
(6) Make sure that Bit 19 is "1" (Indicates that  the IDS Auto Shutoff program pin is SET).
(7) Select "<INPUT MONITORING" to show an empty Input Monitoring page on the 
MCDU.
(8) Use the MCDU keyboard and type the following into the MCDU scratchpad:  C/26/4/00.
(9) Select the top left key (LSK1L) of the MCDU.
(10) Make sure that Bit 27 is "0" (Indicates that the IDS 502 Fuel Message Reversion 
program pin is NOT SET).
(11) Make sure the following circuit breakers are closed in the P6 panel.
(12) Select "<INPUT MONITORING" to show an empty Input Monitoring page on the 
MCDU.
(13) On the MCDU keyboard, type the following into the MCDU scratchpad: E/034/272/00.
(14) Select the top left key (LSK1L) of the MCDU.
(15) Make sure that Bits 14, 15, 16, and 17 are "0".
22. Put the airplane back to a serviceable condition.
23. Change your scheduled maintenance program to include periodic functional checks of the 
Horizontal Stabilizer Fuel Boost Pump Automatic Shutoff System as given in 747-400 
Maintenance Planning Data (MPD) document, Section 9, Airworthiness Limitation (AWL) 
Number 28-AWL-24.
C/B Number Grid Location Name
C68 E28 Window Heat 2L & 
3R PWR
C69 E30 Window Heat 2R 
& 3L PWR
C10104 E31 Window Heat 2R 
& 3L IND
C10105 E29 Window Heat 2L & 
3R IND

### Page 38

FIGURE 1: Change the E-8 Aft Equipment Center
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  1: Change the E-8 Aft Equipment Center
AFT E/E EQUIPMENT CENTER
ENTRY DOOR
NO. 5L
MAIN
E8 RACK
AFT EQUIPMENT CENTER - E8
FWDINBD
FWD
UP ASEE
356692
(SHEET 1 OF 3)

### Page 39

FIGURE 1: Change the E-8 Aft Equipment Center
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
This Figure applies to Group  1-3, 9: 
A-A
5.10
A
A
UP
INBD
2
2
UP
FWD
A
2 3
1
357070
(SHEET 2 OF 3)

### Page 40

FIGURE 1: Change the E-8 Aft Equipment Center
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for each airplane.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Inspect Disconnect 
Bracket
-- -- Inspect for open relay 
positions 69 and 71.
NOTE:  Steps 2 and 3 are only necessary for airplanes that  have existing relays at positions 69 
and 71.  For airplanes that have open spaces at positions 69 and 71, Steps 2 and 3 are 
optional.
2
Install Relay Bracket 65B48634-39 1 Prepare surface for fay 
surface bond as given in 
SWPM 20-20-00.  Refer 
to SWPM 20-20-00 and 
747-400 SRM 51-40-02 
as an accepted 
procedure for Rivet 
installation.  Rivet hole 
diameter is 0.129 - 0.132 
inch.
Rivet BACR15DR4PAC2 3
NOTE:  The relay bracket may be installed at any location in the area indicated to avoid 
interference with the identification markers of existing relays.
3
Repair or Replace Marker -- -- Repair or replace any 
relay identification 
markers covered by the 
installation of the new 
relay bracket.  Refer to 
SOPM 20-50-05 as an 
accepted procedure.
(SHEET 3 OF 3)

### Page 41

FIGURE 2: E-8 Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  2: E-8 Wiring Changes
28-21-28
28-42-15
28-42-15
28-42-15
R7401 RLY-
HIGH STAGE
PUMP CONT-LEFT
14
NC
13
NC
X2
11
X1
12
T
D
3
TIME DELAY-LEFT
R10155 RLY-
AUTO SHUTOFF
4
5
2
7
8
5
1
7
2 3
4
9
6
SM11
(4 LOCATIONS)
188-20
182-20
GDX1-DC
184-20
DR10155
2
9
D40108J
E8-EQUIPMENT CENTER - AFT LEFT
(2 LOCATIONS)
W3851
059-20
183-20
P
PD40107J
W4478
POS 14
AP2301
176-20
185-20
059-20
058-20
GDX1-DC
058-20
POS 16
AP2301
DR10155
(5 LOCATIONS)
2
360314
(SHEET 1 OF 4)

### Page 42

FIGURE 2: E-8 Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
28-21-31
28-42-15
28-42-15
28-42-15
14
NC
13
NC
X2
11
X1
12
T
D
3
4
5
2
7
R7402 RLY-
HIGH STAGE
PUMP CONT-RIGHT
R10156 RLY-
AUTO SHUTOFF
TIME DELAY-RIGHT
AP2301
33
056-20
P D40103J
POS 15
36
056-20
057-20
057-20
189-20
187-20
186-20
PD40106J
6
POS 11
AP2301
177-20
DR10156
DR10156
SM12
(4 LOCATIONS)
180-20
E8-EQUIPMENT CENTER - AFT LEFT
(2 LOCATIONS)
W3851
181-20
GDX1-DC
(5 LOCATIONS)
W4488
5
1
2 3
4
6
107
11
GDX1-DC
361668
(SHEET 2 OF 4)

### Page 43

FIGURE 2: E-8 Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
This Figure applies to Group  1-9: 
REFERENCE: 747-400 WIRING DIAGRAM 28-21-28, 28-21-31, 28-42-15
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the wire and parts from wire kit 289U1214-101 and contact BACC47CP3S is supplied in wire kit
289U1214-103 for all airplanes except RT043-RT047 and RT433-RT447 which is operator supplied.
Route new wires with the same existing bundle (Separation Code N2, tie color White), use straps
supplied in Top Kit 015U1765-1.  
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Contact BACC47DE1A 2 Refer to SWPM 20-20-11 as an 
accepted procedure.
2 Contact BACC47CN1S 4 Refer to SWPM 20-61-11 as an 
accepted procedure.
3 Contact BACC47CP1S 1 For connector D40107J.  Refer 
to SWPM 20-61-11 as an 
accepted procedure.
Contact BACC47CP3S 1 For connector D40106J.  Refer 
to SWPM 20-61-11.
Refer to SWPM 20-60-00 as 
an accepted procedure, (fold 
back method) for instructions 
to use AWG 20 wire in this 
contact.
4 Splice D-436-37 2 Refer to SWPM 20-30-12 as 
an accepted procedure.
5 Terminal Lug BACT12AR202 8 Refer to SWPM 20-30-11 as an 
accepted procedure.
6 Contact BACC47ER1 10 Refer to SWPM 20-81-19 as 
an accepted procedure.
7 Relay Socket BACS16AH1 2 Refer to SWPM 20-81-19 as 
an accepted procedure.
8 Identification Tape 289U1214-10101 1 Tape ID DR10155.  Refer to 
SWPM 20-10-11 as an 
accepted procedure.
989752
ADDED WIRE OR NEW ROUTING
EXISTING WIRE
DELETED WIRE OR FORMER ROUTING
(SHEET 3 OF 4)

### Page 44

FIGURE 2: E-8 Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
9 Identification Tape 289U1214-10102 1 Tape ID R7401.  Refer to 
SWPM 20-10-11 as an 
accepted procedure.
10 Identification Tape 289U1214-10103 1 Tape ID DR10156.  Refer to 
SWPM 20-10-11 as an 
accepted procedure.
11 Identification Tape 289U1214-10104 1 Tape ID R7402.  Refer to 
SWPM 20-10-11 as an 
accepted procedure.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
(SHEET 4 OF 4)

### Page 45

FIGURE 3: Relay Installation, E-8 Aft Equipment Center
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  3: Relay Installation, E-8 Aft Equipment Center
AFT E/E EQUIPMENT CENTER
ENTRY DOOR
NO. 5L
MAIN
E8 RACK
AFT EQUIPMENT CENTER - E8
FWDINBD
FWD
UP ASEE
364268
(SHEET 1 OF 3)

### Page 46

FIGURE 3: Relay Installation, E-8 Aft Equipment Center
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
This Figure applies to Group  1-3, 9: 
OPTIONAL
INSTALLATION
A
UP
FWD
3
3
2
2
1
1
364449
(SHEET 2 OF 3)

### Page 47

FIGURE 3: Relay Installation, E-8 Aft Equipment Center
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.  The QTY 
numbers shown below are the number of parts necessary for each airplane.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1 Install Relay TDH-1852-1402 2 --
2 Install Marker BAC27EEL28836 1 Refer to SOPM 20-50-05 as an accepted procedure.
3 Install Marker BAC27EEL28837 1 Refer to SOPM 20-50-05 as an accepted procedure.
(SHEET 3 OF 3)

### Page 48

FIGURE 4: Ship’s Wiring Installation
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  4: Ship’s Wiring Installation
This Figure applies to Group  1-9: 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
NOTE: The wires added in this Figure connect to existing spare wires that run from disconnect panels AC1401
and AC1402 to the E-8 Aft Equipment Center.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Install Wire W4588-520-20 --
Strap BACS38K7C --
Add new wire to existing wire bundle W4588.  Follow existing routing from AC1401 to P415 
panel.  Refer to drawings 288U4611, 288U4431, 288U4411, 288U4231, 288U4211, 
288U4151, 288U4156, 288U4150, and 288U4148.  Refer to SWPM 20-10-11 and SWPM 
20-10-12 as an accepted procedure for the wire installation.  Refer to SWPM 20-10-19 as an 
accepted procedure for the wire bundle separation requirements.  Wire bundle W4588 is 
Separation Code 32 and tie color red. 
AC1402
AC1401
P414
PANEL
PANEL
P415
520
STA
1000
STA
1480
STA
2
1
2
1
364691
(SHEET 1 OF 2)

### Page 49

FIGURE 4: Ship’s Wiring Installation
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 49 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
2
Install Wire W4437-543-20 --
Strap BACS38K7C --
Add new wire to existing wire bundle W4437.  Follow existing routing from AC1402 to P414 
panel.  Refer to Wire Bundle Installation drawings 288U4610, 288U4430, 288U4410, 
288U4230, 288U4210, 288U4150, 288U4156, 288U4151, and 288U4147.  Refer to SWPM 
20-10-11 and SWPM 20-10-12 as an accepted procedure for the wire installation.  Refer to 
SWPM 20-10-19 as an accepted procedure for the wire bundle separation requirements.  Wire 
Bundle W4437 is Separation Code 32 and tie color red.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 2 OF 2)

### Page 50

FIGURE 5: Ship’s Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 50 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  5: Ship’s Wiring Changes
This Figure applies to Group  1-9: 
W3942
OR
OR
W3842
W3846
2W4478-002-20
13
REFERENCE: 747-400 WIRE DIAGRAM 28-21-27, 28-21-28, 28-21-30, 28-21-31
AC1401
30
J D43827P
POS 10
D40406P
CENTER-RIGHT
P415 PNL-PWR
W4488-070-22
D40103P
W385136
W394421
AE0418
POS 14
W4588-070-20
AE0410
W4588-520-20
J
DISTRIBUTION
POS 15
AP2301
J
E8 EQPT- CTR
AFT- LEFT
D43634J P
AC1402
J
POS 5
D43705P
W4437-543-20
AE0417
POS 10
D40345P J
P414 PNL-PWR
DISTRIBUTION
CENTER-LEFT
23
AP2301
POS 14
W3851
D40108P J
E8 EQPT- CTR
AFT- LEFT
29
9
5
8
7
3
4
2 6
1
ADDED WIRE OR NEW ROUTING
EXISTING WIRE
DELETED WIRE OR FORMER ROUTING
364786
(SHEET 1 OF 2)

### Page 51

FIGURE 5: Ship’s Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 51 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the wire and parts from wire kit 289U1214-102 and 289U1214-103.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Spare Wire -- -- W4478-002-20 is an existing spare wire.
2 Contact BACC47CN1S 1 Refer to SWPM 20-61-11 as an accepted 
procedure.
3 Contact BACC47CP1S 1 Refer to SWPM 20-61-11 as an accepted 
procedure.
4 Spare Wire -- -- W4488-070-22 is an existing spare wire.
5 End Cap 324484 1 Refer to SWPM 20-30-16 as an accepted 
procedure.
6 Contact BACC47CN1S or 
BACC47CP1S
1 Refer to SWPM 20-61-11 as an accepted 
procedure.  BACC47CP1S for airplanes 
RF001-RF006, RM096-RM097, RM136-
RM145, RM261-RM264, RM331-RM333, 
RT471-RT499, RU121, and RU126-
RU132 only.
7 Contact BACC47CP1S or 
BACC47CP3S
1 Refer to SWPM 20-61-11 as an accepted 
procedure.  BACC47CP3S for airplanes 
RT043-RT047 and RT433-RT447 only. 
Refer to SWPM 20-60-00 as an accepted 
procedure, (fold back method) for 
instructions to use AWG 20 wire in this 
contact.
8 Pin Number -- -- Pin 21 is pin 4 for airplanes RM136-
RM137, RM156-RM158, RT043-RT047, 
RT431-RT447, RT471-RT499, RT641-
RT645, RU101-RU102, RU121, and 
RU126-RU132 only.
Pin 21 is pin 10 for airplanes RM191-
RM192 and RT551-RT555 only.
Pin 21 is pin 17 for airplanes RM096-
RM097 only.
Pin 21 is pin 20 for airplanes RM801-
RM803, RT001-RT014, RT021-RT022, 
RT061, RT071-RT073, RT101-RT103, 
RT121, RT131-RT137, RT701-RT704, 
RT776-RT777, and RT953-RT954 only.
Pin 21 is pin 28 for airplanes RT781-
RT784 only.
Pin 21 is pin 29 for airplanes RM010, 
RM146-RM147 and RM426 only.
9 Spare Wire -- -- W4588-070-20 is an existing spare wire.
(SHEET 2 OF 2)

### Page 52

FIGURE 6: P414 Panel Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 52 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  6: P414 Panel Wiring Changes
This Figure applies to Group  1-7: 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the wire and parts from wire kit 289U1214-102.  Straps are part of Top Kit 015U1765-1.  For the
wire installed in ground block GDX3-DC; if the ground block is full, use an adjacent or nearby ground
block with open contact cavities that the wire will reach.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Contact BACC47DE1A 1 Refer to SWPM 20-20-11 as an 
accepted procedure.
2 Contact BACC47DJ1 2 Refer to SWPM 20-81-12 as 
an accepted procedure.
REFERENCE: 747-400 WIRE DIAGRAM
NORM
JTSN
NC
NC
W3846
W3842
OR
595-20
594-20
W4437
GDX3-DC
23
D40345JP
POS 10
AE0417
(2 LOCATIONS)
DR7393
OVERRIDE - LEFT
R7393 RLY- JTSN
B3
B1
B2
A3
A1
P414 PNL- PWR DISTRIBUTION CENTER - LEFT
28-21-26
A2
X2
X1
4
1
2
3
365120
EXISTING WIRE
ADDED WIRE OR NEW ROUTING
(SHEET 1 OF 2)

### Page 53

FIGURE 6: P414 Panel Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 53 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
3 Contact BACC47CP1S or 
BACC47CN1S
1 Refer to SWPM 20-61-11 as an 
accepted procedure. 
BACC47CN1S for airplanes 
RF001-RF006, RM096-
RM097, RM136-RM145, 
RM261-RM264, RM331-
RM333, RT471-RT499, 
RU121, and RU126-RU132 
only.
4 Bundle Number -- -- W3842 for airplanes RT402-
RT403 and RT501 only.  All 
other airplanes are W3846.  
Make sure correct coded wires 
from kit are used.  Route new 
wires with existing bundles.  
Separation code is N2, tie color 
is white.  
Strap BACS38K10 --
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
(SHEET 2 OF 2)

### Page 54

FIGURE 7: P415 Panel Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 54 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  7: P415 Panel Wiring Changes
This Figure applies to Group  1-9: 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the wire and parts from wire kit 289U1214-103, straps are part of Top Kit 015U1765-1.  For the
wire installed in ground block GDX1-DC; if the ground block is full, use an adjacent or nearby ground
block with open contact cavities that the wire will reach.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Contact BACC47DE1A 1 Refer to SWPM 20-20-11 as an 
accepted procedure.
2 Contact BACC47DJ1 2 Refer to SWPM 20-81-12 as 
an accepted procedure.
3 Contact BACC47CN1S or 
BACC47CN3S
1 Refer to SWPM 20-61-11 
BACC47CN3S for airplanes 
RT043-RT047 and RT433-
RT447 only.  Refer to SWPM 
20-60-00 as an accepted 
procedure for (fold back 
method) instructions to use 
AWG 20 wire in this contact.
REFERENCE: 747-400 WIRE DIAGRAM
NORM
JTSN
NC
NC
B3
B1
B2
A3
A1
A2
X2
X1
W3944
OR
W3942
P415 PNL- PWR DISTRIBUTION CENTER - RIGHT
OVERRIDE - RIGHT
R7394 RLY- JTSN
DR7394
1AB-20
1AC-20
GDX1-DC
21W4588
D40406J
POS 14
AE0418
28-21-29
(2 LOCATIONS)
P
5
4
3
2
1
365101
ADDED WIRE OR NEW ROUTING
EXISTING WIRE
(SHEET 1 OF 2)

### Page 55

FIGURE 7: P415 Panel Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 55 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
4 Pin Number -- -- Pin 21 is pin 4 for airplanes 
RM136-RM137, RM156-
RM158, RT043-RT047, 
RT431-RT447, RT471-RT499, 
RT641-RT645, RU101-RU102, 
RU121, and RU126-RU132 
only.
Pin 21 is pin 10 for airplanes 
RM191-RM192 and RT551-
RT555 only.
Pin 21 is pin 17 for airplanes 
RM096-RM097 only.
Pin 21 is pin 20 for airplanes 
RM801-RM803, RT001-
RT014, RT021-RT022, RT061, 
RT071-RT073, RT101-RT103, 
RT121, RT131-RT137, RT701-
RT704, RT776-RT777, and 
RT953-RT954 only.
Pin 21 is pin 28 for airplanes 
RT781-RT784 only.
Pin 21 is pin 29 for airplanes 
RM010, RM146-RM147 and 
RM426 only.
5 Bundle Number -- -- W3942 for airplanes RT402-
RT403 and RT501 only.  All 
other airplanes are W3944.  
Make sure correct coded wires 
from kit are used.  Route new 
wires with existing bundles.  
Separation code is N2, tie color 
is white.
Strap BACS38K10 --
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
(SHEET 2 OF 2)

### Page 56

FIGURE 8: MAWEA Card File Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 56 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  8: MAWEA Card File Wiring Changes
This Figure applies to Group  1-9: 
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
NOTE: Use the parts from wire kit 289U1214-105.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 End Cap 324484 4 Refer to SWPM 20-30-16 as 
an accepted procedure.
(4 LOCATIONS)
DW3417C
C8 W4758- 633-24
M7952 MAWEA CARD FILE
STA 328
WL 153
RBL 25
W4758- 634-24C9
W4758- 632-24C7
W4758- 631-24C6
REFERENCE: WIRE DIAGRAM 30-41-21, 30-41-31
1
365108
ADDED WIRE OR NEW ROUTING
EXISTING WIRE
DELETED WIRE OR FORMER ROUTING
(SHEET 1 OF 1)

### Page 57

FIGURE 9: E2-6 Shelf Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 57 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  9: E2-6 Shelf Wiring Changes
This Figure applies to Group  1, 5, 9: 
CAUTION: USE THE PRECAUTIONS FOR ELECTROSTATIC DISCHARGE AS SPECIFIED IN 747-400
AMM 20-41-02 AND 747-400 AMM 20-41-03.  ELECTROSTATIC DISCHARGE CAN DAMAGE
COMPONENTS.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
(3 LOCATIONS)
(3 LOCATIONS)
E2-6 EQPT CENTER- MAIN RIGHT-SHELF 6
AR0426
M7353 EIU-L
M7352 EIU-C
M7351 EIU-R
DM7353BA
DM7352BA
DM7351BA
G6
G6
G6
M4260 WIU
D2
D2
D2
DW2611A
DW2631A
DW2651A
W4261-01K-24
W4262-01K-24
W4263-01K-24
REFERENCE: 747-400 WIRING DIAGRAM 28-42-15
1
2
379748ADDED WIRE OR NEW ROUTING
(SHEET 1 OF 2)

### Page 58

FIGURE 9: E2-6 Shelf Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 58 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
NOTE: Use the wire and parts from wire kit 289U1214-104.  Use straps from top kit 015U1765-1 and route new
wire with existing bundle.  Wire bundle is Separation Code N2, Color White.
FLAG 
NOTE NAME IDENTIFICATION QTY MORE DATA
1 Contact BACC47EF1 3 Refer to SWPM 20-71-14 as 
an accepted procedure.
2 Contact BACC47EG2 3 Refer to SWPM 20-72-17 as 
an accepted procedure.
(SHEET 2 OF 2)

### Page 59

FIGURE 10: E2-6 Shelf Wire Integration Unit Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 59 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
FIGURE  10: E2-6 Shelf Wire Integration Unit Wiring Changes
MAIN EQUIPMENT CENTER
M4260 WIU
E2-6 SHELF
1 THROUGH 3
SEE DETAILS
FWD
380296
(SHEET 1 OF 5)

### Page 60

FIGURE 10: E2-6 Shelf Wire Integration Unit Wiring Changes
Original Issue: March 15, 2007
Revision 2:  August 13, 2009 747-28A2262
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 60 of 91
BOEING SERVICE BULLETIN 747-28A2262
 
 
This Figure applies to Group  1, 5, 9: 
E2-6 EQPT CENTER- MAIN RIGHT-SHELF 6
M4260 WIU
DQ2611
GDY1-17D2
DW2611A
D2
DW2631A DQ2631
DQ2651
D2
DW2651A
AR0426 W4260
GDY5-17
GDY3-17
REFERENCE: 747-400 WIRE DIAGRAM 28-42-15
380339ADDED WIRE OR NEW ROUTING
EXISTING WIRE
(SHEET 2 OF 5)

The text continues at https://openairdocs.org/service-documents/boeing/747-28a2262/file/557d97b8ea8d.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
