# Boeing Alert Requirements Bulletin 747-38A2146 RB: No revision named, part 1 of 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-2408; AD 2025-03-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 747-38A2146 RB](https://openairdocs.org/service-documents/boeing/747-38a2146-rb.md)
- Title as filed: 747-38A2146-00-- RB_Part1
- Pages: 62
- PDF: https://openairdocs.org/files/sha256/16/3d/163d0d87f5802880995be0bedb654eb17ff08dd7ee6fdc7bae32e2c9075ac3e7
- Page: https://openairdocs.org/service-documents/boeing/747-38a2146-rb/file/163d0d87f580

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Requirements Bulletin
ALERT
Number: 747-38A2146 RB
Original Issue: August 07, 2024
ATA System: 3811 2158
SUBJECT: WATER/WASTE - Storage And Distribution - Water Spray Shrouding Installation
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2024 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: August 07, 2024
747-38A2146 RB
1 of 155
5.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
2 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 1, 3] . . . . . . . . . . . . . . . . . . . 26
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 2, 4-5, 11] . . . . . . . . . . . . . . . . 32
FIGURE 8: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION [Group 2] . . 39
FIGURE 10: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION [Group 4, 7, 10]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION [Group 5] . . 48
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 6] . . . . . . . . . . . . . . . . . . . . . 55
FIGURE 13: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION [Group 6-7] . 61
FIGURE 14: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 7] . . . . . . . . . . . . . . . . . . . . . 66
FIGURE 15: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 8, 10] . . . . . . . . . . . . . . . . . . 73
FIGURE 16: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY AND SLITTED SHIELD
INSTALLATION [Group 8] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
FIGURE 17: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 9] . . . . . . . . . . . . . . . . . . . . . 91
FIGURE 18: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION [Group 9] . . 96
FIGURE 19: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION [Group 10] . 101
FIGURE 20: FORWARD LOWER LOBE COMPARTMENT, LEFT SIDE - POTABLE WATER SYSTEM -
WATER SPRAY SHIELD INSTALLATION [Group 9-10] . . . . . . . . . . . . . . . . . . 108
FIGURE 21: LEFT SIDE FORWARD CARGO COMPARTMENT - EQUIPMENT COOLING SYSTEM,
COOLING SUPPLY AIR INLET DUCT - WATER SPRAY DEFLECTOR INSTALLATION [Group
9-10] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
FIGURE 22: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY AND SLITTED SHIELD
INSTALLATION [Group 11] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 122
FIGURE 23: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION [Group 12] . . . . . . . . . . . . . . . . . . . 130
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
3 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 4

FIGURE 24: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE SHROUD INSTALLATION [Group 13] . . . . . . . . . . . . . . . . . . . 137
FIGURE 25: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE SHROUD INSTALLATION [Group 14] . . . . . . . . . . . . . . . . . . . 146
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
4 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 5

Commercial 
Airplanes
747
Requirements Bulletin
ALERT
Number: 747-38A2146 RB
Original Issue: August 07, 2024
ATA System: 3811 2158
SUBJECT: WATER/WASTE - Storage And Distribution - Water Spray Shrouding Installation
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 747-8, 747-8F, 747-400, 747-400F Airplane(s), line number(s) 722,
738, 740, 743, 745, 751, 755, 760, 762, 764, 769, 775, 777, 791-793, 798, 805, 809, 811-812,
816, 819-820, 823, 831, 833, 838-840, 846, 852-853, 861-862, 865-870, 872, 874, 880-881,
883-885, 890, 892, 902, 918, 921-922, 926, 928-929, 931, 939-940, 942-944, 946-947, 950-951,
953-954, 956, 961, 966-968, 973-974, 979-981, 984, 986, 994, 999, 1002, 1004, 1006, 1008-1009,
1016, 1021, 1023-1024, 1026, 1031, 1034, 1036, 1041-1042, 1044, 1051-1054, 1063-1065, 1069,
1072, 1074, 1086-1087, 1089, 1093-1096, 1100-1102, 1107, 1112, 1115, 1120-1121, 1123,
1125-1126, 1131, 1133, 1139, 1142-1143, 1146-1149, 1152-1153, 1155, 1159-1166, 1168-1174,
1176-1177, 1179-1180, 1184-1189, 1191-1192, 1202-1205, 1207-1210, 1213-1214, 1217-1218,
1220-1222, 1224-1225, 1227-1228, 1231, 1234-1237, 1239-1246, 1248, 1250-1265, 1267-1272,
1274-1277, 1279-1295, 1297-1300, 1303-1319, 1321, 1323-1324, 1326-1329, 1331-1369,
1371-1392, 1394-1429, 1431-1445, 1447, 1449-1451, 1453-1462, 1464-1481, 1483-1500,
1502-1504, 1506-1519, 1521-1535, 1537-1539, 1542-1550, 1552-1574 in 14 Group(s). Where
the effectivity is presented with hyphens between line numbers, the airplane applicability means
"through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
DESCRIPTIONCONFIGURATIONGROUP
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 580 and 650 with no water line
fittings between STA 580 and 650.
-1
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
5 of 155

### Page 6

DESCRIPTIONCONFIGURATIONGROUP
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 580 and 650 with a water line fitting
but no connected hose at STA 655.
-2
747-400 and 747-400F airplanes with a potable water supply line on
the left side of the FWD cargo bay between STA 580 and 650 and
possibly with a water line fitting at STA 655
-3
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 580 and 650 with a water line fitting
and a connected hose at STA 655.
-4
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 580 and 650 with a water line fitting
and 3 connected hoses at STA 655.
-5
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 575 and 650 with a water line fitting
but no connected hose at STA 575.
-6
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 575 and 650 with water line fittings
at STA 575 and 655 and a connected hose at STA 655.
-7
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 595 and 650 with water line fittings
at STA 595 and 655 with connected hoses at STA 595 and 655.
-8
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 595 and 650 with a water line fitting
with a connected hose at STA 590 and a heater at STA 595.
-9
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 595 and 650 with water line fittings
at STA 590 and 655 with connected hoses at STA 590 and 655 and
a heater at STA 595.
-10
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 580 and 650 with a water line
fitting, 3 connected hoses and a heater at STA 655.
-11
747-400 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 580 and 650 and possibly with a
water line fitting at STA 655
-12
747-8 airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 550 and 680.
-13
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
6 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 7

DESCRIPTIONCONFIGURATIONGROUP
747-8F airplanes with a potable water supply line on the left side of
the FWD cargo bay between STA 550 and 680.
-14
Airplane Models:
747-400, 747-400F, 747-8, 747-8F
GroupVariable Number
13RC001 - RC003
13RC005 - RC009
13RC021 - RC040
13RC051 - RC060
13RC066 - RC072
13RC076 - RC077
14RC501 - RC514
14RC521 - RC528
14RC531 - RC541
14RC546 - RC563
14RC565 - RC566
14RC571 - RC582
14RC608
14RC610
14RC641 - RC644
14RC651
14RC661
14RC672
14RC674
14RC681 - RC696
14RC701 - RC704
1RF001 - RF002
1RF004
1RF006
3RL401 - RL403
3RL412 - RL430
GroupVariable Number
3RL432 - RL436
3RL451 - RL456
3RL461 - RL462
3RL471 - RL481
3RL491 - RL492
3RL501 - RL502
3RL511 - RL516
3RL521 - RL522
3RL531 - RL534
3RL551
3RL561
3RL563 - RL568
3RL571 - RL572
3RL576 - RL577
3RL579
3RL581 - RL586
3RL651 - RL655
3RL671 - RL675
3RL681 - RL684
3RL751 - RL752
1RM001 - RM007
1RM010 - RM013
1RM022 - RM023
1RM026 - RM027
1RM030
10RM036
GroupVariable Number
10RM038
10RM040
4RM041
4RM043 - RM045
4RM051 - RM053
2RM071
4RM082
4RM084
4RM096
1RM117
4RM126 - RM127
3RM128
1RM129 - RM132
4RM136 - RM137
4RM140
5RM146 - RM147
1RM158
7RM166 - RM167
6RM168
6RM172 - RM173
6RM175 - RM177
4RM191 - RM192
1RM232 - RM233
1RM245 - RM246
1RM316 - RM318
2RM333
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
7 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 8

GroupVariable Number
2RM341
1RM351 - RM355
1RM402 - RM403
1RM426
1RM431
1RM441 - RM443
1RM445
9RM801 - RM802
3RM851 - RM859
3RM861 - RM862
3RM871 - RM899
3RM901 - RM906
3RR701
3RR721 - RR724
3RR746 - RR748
3RR851 - RR855
3RR861 - RR862
3RR952
9RT013
3RT021 - RT022
3RT031 - RT033
1RT045
3RT061
3RT071 - RT072
2RT101 - RT103
2RT131 - RT137
3RT161
2RT163
3RT164
2RT165 - RT166
GroupVariable Number
1RT447
4RT496
8RT502
8RT504
3RT506 - RT507
12RT508
3RT509 - RT510
3RT513
8RT515
3RT516
3RT519
3RT524
5RT553 - RT554
5RT562
5RT564
3RT575 - RT576
3RT578 - RT579
1RT581
4RT602
4RT604
4RT606
7RT607 - RT611
7RT616 - RT621
7RT626 - RT627
7RT629
1RT633 - RT634
1RT636
3RT642
4RT647
3RT654
GroupVariable Number
12RT655
3RT656 - RT657
4RT681 - RT682
3RT691 - RT692
1RT693 - RT694
1RT696
4RT701
2RT717
10RT745
10RT747
10RT750
3RT751 - RT752
2RT753 - RT757
12RT782
5RT783
1RT811
1RT813
4RT831 - RT832
3RT837
11RT862
11RT864
2RT877
2RT879 - RT880
4RT948
2RT951 - RT952
4RT966
3RT967
4RU003 - RU006
4RU126
4RU809
B. Spares Affected
None.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
8 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 9

2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 747-38A2146 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 747-38A2146 RB mandatory.
Accomplish the required action(s), based on the applicable condition(s) in Table(s) 1 through 14, in
accordance with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Group 1:
Table 1 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
Install conduits on ex-
posed potable water sup-
ply lines between STA
580 and STA 650.
All Airplanes
Group 2:
Table 2 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 650 and
STA 660.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
9 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 10

Group 3:
Table 3 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
Install conduits on ex-
posed potable water sup-
ply lines between STA
580 and STA 650.
All Airplanes
Group 4:
Table 4 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 650 and
STA 660.
Group 5:
Table 5 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 640 and
STA 660.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
10 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 11

Group 6:
Table 6 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 575 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 570 and
STA 580.
Group 7:
Table 7: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 575 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 570 and
STA 580 and between
STA 650 and STA 660.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
11 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 12

Group 8:
Table 8: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit, Envelope and Slitted Spray Shield Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 595 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 580 and
STA 600 and between
STA 650 and STA 660.
-ACTION 3: Install a slitted
spray shield.
Group 9:
Table 9: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit, Envelope, Spray Shield and Deflector Shield Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 595 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 580 and
STA 600.
-ACTION 3: Install spray
shield.
-ACTION 4: Install a 2-
piece deflector shield
around the ECS air inlet
STA 610.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
12 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 13

Group 10:
Table 10: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit, Envelope, Spray Shield and Deflector Shield Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 595 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 580 and
STA 600 and between
STA 650 and STA 660.
-ACTION 3: Install spray
shield.
-ACTION 4: Install a 2-
piece deflector shield
around the ECS air inlet
STA 610.
Group 11:
Table 11: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit, Envelope and Slitted Spray Shield Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 640 and
STA 660.
-ACTION 3: Install a slitted
spray shield.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
13 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 14

Group 12:
Table 12 - Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
Install conduits on ex-
posed potable water sup-
ply lines between STA
580 and STA 650.
All Airplanes
Group 13:
Table 13 - Potable Water System - Water Supply Line Shrouding Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
Install a shroud on ex-
posed potable water sup-
ply line between STA 550
and STA 680.
All Airplanes
Group 14:
Table 14 - Potable Water System - Water Supply Line Shrouding Installation
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 36 months after
the Original Issue date of
Requirements Bulletin
747-38A2146 RB.
Install a shroud on ex-
posed potable water sup-
ply line between STA 550
and STA 680.
All Airplanes
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
14 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 15

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. In the RB, the "Refer to the listed procedures..." column of the
table(s) in the Work Instructions is for reference only. The procedures in that column
are not required by the AD and are for guidance only. For the related SB, some
locations are marked RC Start and RC End to identify the requirements that are
restated from the RB. For the related SB, the areas between RC Start and RC End,
including sub-steps and any figures identified between RC Start and RC End, must
be done to comply with the AD. Therefore, an Alternative Method of Compliance
(AMOC) is required for any deviations to steps between RC Start and RC End,
including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance
with the operator's maintenance or inspection program without obtaining approval
of an AMOC; this is provided that the steps between RC Start and RC End, including
sub-steps and identified figures, can still be done as specified, and the airplane can
be put back in an airworthy condition. Figures not required for compliance are omitted
from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for airframe maintenance tasks are included in Chapter 20 of 747-400
or 747-8 Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
15 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 16

6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
11. The instructions in Work Instructions and the figures can include operation of tools
or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and
Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain
data on versions of the tools or test equipment that you can use. It is permitted to
use replaced tools. It is not permitted to use superseded tools.
12. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
13. It is permitted to use different tape width if the overlap requirements are met.
14. Supports are defined as straps, clamps and standoffs.
15. Tee fittings on the upper or lower drain line may not be shown or may be located at
different locations other than shown on the illustrations.
16. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements:
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
16 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 17

Group 1:
Table 1: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-Install conduits on ex-
posed potable water sup-
ply lines between STA
580 and STA 650.
All Airplanes
-FIGURE 6
PART 2 - CLOSE
ACCESS
-
Group 2:
Table 2: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-FIGURE 7
-FIGURE 8ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 650 and
STA 660.
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
17 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 18

Group 3:
Table 3: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-Install conduits on ex-
posed potable water sup-
ply lines between STA
580 and STA 650.
All Airplanes
-FIGURE 6
PART 2 - CLOSE
ACCESS
-
Group 4:
Table 4: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-FIGURE 7
-FIGURE 10ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 650 and
STA 660.
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
18 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 19

Group 5:
Table 5: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-FIGURE 7
APPENDIX A -
PROCESS TO
REWORK
CUTS/SLITS IN
COVER MATERI-
AL BMS 8-380 OR
BMS 8-377
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 640 and
STA 660.
-FIGURE 11
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
19 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 20

Group 6:
Table 6: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 575 and STA
650.
All Airplanes
-FIGURE 12
-FIGURE 13ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 570 and
STA 580.
PART 2 - CLOSE
ACCESS
-
Group 7:
Table 7: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 575 and STA
650.
All Airplanes
-FIGURE 14
-FIGURE 10, FIGURE 13ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 570 and
STA 580 and between
STA 650 and STA 660.
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
20 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 21

Group 8:
Table 8: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 595 and STA
650.
All Airplanes
-FIGURE 15
APPENDIX A -
PROCESS TO
REWORK
CUTS/SLITS IN
COVER MATERI-
AL BMS 8-380 OR
BMS 8-377
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 580 and
STA 600 and between
STA 650 and STA 660. -FIGURE 16
-FIGURE 16ACTION 3: Install a slitted
spray shield. PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
21 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 22

Group 9:
Table 9: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit, Envelope, Spray Shield and Deflector Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 595 and STA
650.
All Airplanes
-FIGURE 17
-FIGURE 18ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 580 and
STA 600.
-FIGURE 20ACTION 3: Install spray
shield.
-FIGURE 21ACTION 4: Install a 2-
piece deflector shield
around the ECS air inlet
STA 610.
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
22 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 23

Group 10:
Table 10: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit, Envelope, Spray Shield and Deflector Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 595 and STA
650.
All Airplanes
-FIGURE 15
-FIGURE 10, FIGURE 19ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 580 and
STA 600 and between
STA 650 and STA 660.
-FIGURE 20ACTION 3: Install spray
shield.
-FIGURE 21ACTION 4: Install a 2-
piece deflector shield
around the ECS air inlet
STA 610.
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
23 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 24

Group 11:
Table 11: Forward Lower Lobe Compartment Section 42 Left Side - Potable Water System Plumbing
- Water Supply Line Conduit and Envelope Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-ACTION 1: Install con-
duits on exposed potable
water supply lines be-
tween STA 580 and STA
650.
All Airplanes
-FIGURE 7
APPENDIX A -
PROCESS TO
REWORK
CUTS/SLITS IN
COVER MATERI-
AL BMS 8-380 OR
BMS 8-377
-ACTION 2: Install enve-
lope assemblies over all
exposed potable water
line fittings and exposed
potable water supply lines
between STA 640 and
STA 660.
-FIGURE 22
-FIGURE 22ACTION 3: Install a slitted
spray shield. PART 2 - CLOSE
ACCESS
-
Group 12:
Table 12: Potable Water System - Water Supply Line Shrouding Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-Install conduits on ex-
posed potable water sup-
ply lines between STA
580 and STA 650.
All Airplanes
-FIGURE 23
PART 2 - CLOSE
ACCESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
24 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 25

Group 13:
Table 13: Potable Water System - Water Supply Line Shrouding Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-Install a shroud on ex-
posed potable water sup-
ply line between STA 550
and STA 680.
All Airplanes
-FIGURE 24
PART 2 - TEST
AND CLOSE AC-
CESS
-
Group 14:
Table 14: Potable Water System - Water Supply Line Shrouding Installation
Refer to the listed
procedures in SB
747-38A2146
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1 - OPEN
ACCESS
-Install a shroud on ex-
posed potable water sup-
ply line between STA 550
and STA 680.
All Airplanes
-FIGURE 25
PART 2 - TEST
AND CLOSE AC-
CESS
-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
25 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 26 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
This Figure applies only to: Group 1, 3.
STA
660 STA
580
FORWARD CARGO
COMPARTMENT
LOWER SURFACE
OF FLOOR BEAMS  WATER DRAIN
LINE
STA  STA  STA  STA  STA  STA
660  650  640  620  600  580
F
G
H
WATER SUPPLY  WATER DRAIN
LINE  LINE
EQUIPMENT COOLING
SUPPLY AIR INLET
FWD
NOTE 1:  TYPICAL
THIS ILLUSTRATION IS FOR  (VIEW LOOKING OUTBOARD)
ILLUSTRATIVE PURPOSES. THE  A-A
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.
NOTE 2:
POSITION OF THE WATER SUPPLY LINE  3028926
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 1 OF 6)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  26 of 155

### Page 27 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
- WATER SUPPLY LINE
0.50
0.50
(MIN)  (MIN)
SLIT
(MIN)  0.50  0.50
(MIN)
TYPICAL
INBD  (STRAP NOT SHOWN)
VIEW LOOKING FORWARD
B-B
3.00  0.50  12.00 (MAX)  D234€
WATER SUPPLY LINE
AFT END OF
CONDUIT
*YPICAI
(VIEW LOOKING OUTBOARD)
(FORWARD END OF CONDUIT SIMILAR)  (AFT END OF CONDUIT SHOWN)  3028936
C-C
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 2 OF 6)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  27 of 155

### Page 28 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER SUPPLY LINE  DRAIN SLOPE  2.5°
(MIN)
• A DIP WHERE
WATER COLLECTS
FWD
0.375
(MAX)  AN EXAMPLE OF A LOCAL WATER TRAP THAT
CAN OCCUR IN THE WATER SUPPLY LINE
(CONDUITS NOT SHOWN)
(VIEW LOOKING OUTBOARD)
WATER SUPPLY LINE  D-D
WITH CONDUITS
8) STRAP
8 TAPE
TAPE 8
WATER DRAIN
LINES
STRAP (8)
•WATER DRAIN
LINE
3 STRAP
WATER SUPPLY  (8) SPACER
NBD  LINE WITH
CONDUITS
ALTERNATIVE
(VIEW LOOKING FORWARD)
E-E  WATER DRAIN
NOTE 2:  LINE
POSITION OF THE WATER SUPPLY LINE
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.  INBD
NOTE 3:
THIS SUPPORT CONFIGURATION IS FOR  ILLUSTRATIVE PURPOSES. THE  (VIEW LOOKING FORWARD)  ALTERNATIVE
SUPPORT CONFIGURATION ON YOUR  F-F
AIRPLANE MIGHT BE DIFFERENT THAN  3045894
SHOWN OR THERE IS NO SUPPORT IN
YOUR CONFIGURATION.
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 3 OF 6)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  28 of 155

### Page 29 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER SUPPLY LINE
WITH CONDUITS  WATER SUPPLY LINE
•WITH CONDUITS
TAPE 8
TAPE (8  SPACER (8
WATER DRAIN  WATER DRAIN LINE›
LINE
STRAP
STRAP (8  STRAP 8
INBD  INBD
ALTERNATIVE  ALTERNATIVE
(VIEW LOOKING FORWARD)  (VIEW LOOKING FORWARD)
G-G  H-H
STANCHION  WATER DRAIN
LINE
MOUNTING
SUPPORT
WATER SUPPLY
LINE WITH
CONDUITS
NOTE 2:
POSITION OF THE WATER SUPPLY LINE  8) STRAP
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.  WATER DRAIN
LINE
NOTE 3:  BRACKET
THIS SUPPORT CONFIGURATION IS FOR  INBD
ILLUSTRATIVE PURPOSES. THE
SUPPORT CONFIGURATION ON YOUR  ALTERNATIVE
AIRPLANE MIGHT BE DIFFERENT THAN  (VIEW LOOKING AFT)  3028934
SHOWN OR THERE IS NO SUPPORT IN
YOUR CONFIGURATION.
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 4 OF 6)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  29 of 155

### Page 30

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
(a)1417U2912-14CONDUITPut / Hold1
(a)1417U2912-14CONDUITPut / Hold2
(b)2417U2912-14CONDUITMeasure3
Cut at marks.2417U2912-14CONDUITCut
-1417U2912-14CONDUITInstall (New)4
-1417U2912-14CONDUITInstall (New)5
Apply at slits. (c)-BMS5-146 TYPE 1,
CLASS 1, GRADE A,
1.50 INCH MINIMUM
WIDTH
FIBERGLASS TAPEApply6
(d)-BACS38K2STRAPInstall (New)7
Make sure conduit
assy from steps 4-7
are oriented per
view B-B. (d)(e)
-BACS38K2STRAPInstall (New)8
This part is also re-
ferred to as a 'spac-
er' and its installation
is optional. (f)
-CR4HCONNECTOR RINGInstall (New)
(g)2417U2912-14CONDUITAdjust
(h)-BMS5-146 TYPE 1,
CLASS 1, GRADE A,
1.00 INCH MINIMUM
WIDTH
FIBERGLASS TAPEApply
(g)2417U2912-14CONDUITAdjust9
(a) Make sure the FWD end of the conduits is a minimum 2.60 inches FWD of the AFT edge of stanchion at
STA 580.
(b) Mark conduits a minimum of 10.00 inches AFT of the forward edge of stanchion at STA 640. Acceptable
to have excess length FWD of STA 580 and/or AFT of STA 650.
(c) Apply tape in one continuous strip longitudinally. Tape segments can be used provided there is a minimum
of 0.50 inch overlap at all tape seams.
(d) Install strap 0.50 - 3.00 inches from both ends of the conduit. Make sure conduit is supported between
end straps a maximum of every 12.00 inches with combination of straps and any existing supports.
(e) Use the straps to attach the water supply line with the conduits to the adjacent water drain line, with
preference to the upper drain line. As an alternative, it is permitted to use straps to attach the water supply
line with the conduits to the mounting supports and the water drain line.
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
30 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 31

More DataQtyIdentificationNameTaskStep
(f) Use an optional spacer between the water supply line with conduits and drain line to prevent a riding
condition and water traps, and to keep a minimum 2.50 degree drain slope.
(g) Make sure that the conduits are straight, keep a minimum 2.50 degree drain slope and do not have any
localized dip in the water supply line not covered by the conduits that could prevent water from draining.
Maximum allowable dip is 0.375 inch. A depth of the dip that is larger than 0.375 inches can cause a
water trap and is not permitted. Additional straps and/or supports beyond the conduit ends may be loosened
or replaced to adjust supply line. It can be necessary to remove additional sidewall liners up to STA 540
and STA 700.
(h) Apply two layers of tape around the straps. Make sure tape is centered around the straps. Tape is not
necessary at locations where the original mounting supports were kept.
FIGURE 6: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
31 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 32 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
This Figure applies only to: Group 2, 4-5, 11.
STA
LINE END FITTING  WATER SUPPLY  660  • STA
SLEEVE  580
_1.00
(MAX)
FORWARD CARGO
COMPARTMENT
FITTING  234€  WATER DRAIN  LOWER SURFACE
LINE  OF FLOOR BEAMS
STA  STA  STA  STA  STA  WATER DRAIN  STA
660  650  640  620  600  LINE  580
WATER SUPPLY  EQUIPMENT COOLING  WATER DRAIN
LINE  FWD  SUPPLY AIR INLET  LINE
NOTE 1:  TYPICAL
THIS ILLUSTRATION IS FOR  (VIEW LOOKING OUTBOARD)
ILLUSTRATIVE PURPOSES. THE  A-A
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.
NOTE 2:
POSITION OF THE WATER SUPPLY LINE  3029169
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 1 OF 7)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  32 of 155

### Page 33 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
- WATER SUPPLY LINE
0.50
0.50
(MIN)  (MIN)
SLIT
(MIN)  0.50  0.50
(MIN)
TYPICAL
INBD  (STRAP NOT SHOWN)
VIEW LOOKING FORWARD
B-B
3.00  0.50  12.00 (MAX)  D234€
WATER SUPPLY LINE
AFT END OF •
CONDUIT
-YPICAI
(VIEW LOOKING OUTBOARD)
(FORWARD END OF CONDUIT SIMILAR)  (AFT END OF CONDUIT SHOWN)  3029298
C-C
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 2 OF 7)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  33 of 155

### Page 34 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER SUPPLY LINE  DRAIN SLOPE  2.5°
(MIN)
• A DIP WHERE
WATER COLLECTS
FWD
0.375
(MAX)  AN EXAMPLE OF A LOCAL WATER TRAP THAT
CAN OCCUR IN THE WATER SUPPLY LINE
(CONDUITS NOT SHOWN)
(VIEW LOOKING OUTBOARD)
D-D
WATER SUPPLY LINE
WITH CONDUITS
TAPE (8  WATER SUPPLY LINE  WITH CONDUITS
WATER DRAIN
LINE
TAPE (8
SPACER 8
STRAP  WATER DRAIN LINE
INB D
STRAP
ALTERNATIVE
(VIEW LOOKING FORWARD)
E-E
NOTE 2:  STRAP (8)
POSITION OF THE WATER SUPPLY LINE  ON YOUR AIRPLANE MIGHT BE  INBD
DIFFERENT THAN SHOWN.
ALTERNATIVE
NOTE 3:  (VIEW LOOKING FORWARD)
THIS SUPPORT CONFIGURATION IS FOR  F-F
ILLUSTRATIVE PURPOSES. THE
SUPPORT CONFIGURATION ON YOUR
AIRPLANE MIGHT BE DIFFERENT THAN  3029299
SHOWN OR THERE IS NO SUPPORT IN
YOUR CONFIGURATION.
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 3 OF 7)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  34 of 155

### Page 35 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER SUPPLY LINE
WITH CONDUITS
® STRAP
® TAPE
WATER DRAIN  ALINES
TAPE 8
INBD
ALTERNATIVE  STRAP 3
(VIEW LOOKING FORWARD)
G-G  •WATER DRAIN
LINE
(8) STRAP
WATER SUPPLY  (8) SPACER
LINE WITH
CONDUITS
WATER DRAIN
LINE
NOTE 2:  INBD
POSITION OF THE WATER SUPPLY LINE
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.  ALTERNATIVE
(VIEW LOOKING FORWARD)
NOTE 3:  H-H
THIS SUPPORT CONFIGURATION IS FOR
ILLUSTRATIVE PURPOSES. THE
SUPPORT CONFIGURATION ON YOUR
AIRPLANE MIGHT BE DIFFERENT THAN  SHOWN OR THERE IS NO SUPPORT IN  3046461
YOUR CONFIGURATION.
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 4 OF 7)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  35 of 155

### Page 36 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
STANCHION  WATER DRAIN
LINE
MOUNTING
SUPPORT
WATER SUPPLY  LINE WITH
CONDUITS
(8) STRAP
WATER DRAIN
LINE
BRACKET
INBD
ALTERNATIVE
(VIEW LOOKING AFT)
NOTE 2:
POSITION OF THE WATER SUPPLY LINE
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.
NOTE 3:
THIS SUPPORT CONFIGURATION IS FOR
ILLUSTRATIVE PURPOSES. THE
SUPPORT CONFIGURATION ON YOUR
AIRPLANE MIGHT BE DIFFERENT THAN  2314966 3046049
SHOWN OR THERE IS NO SUPPORT IN
YOUR CONFIGURATION.
THIS TASK DOES NOT HAVE AN ILLUSTRATION
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 5 OF 7)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  36 of 155

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
(a)1417U2912-14CONDUITPut / Hold1
(a)1417U2912-14CONDUITPut / Hold2
(b)2417U2912-14CONDUITMeasure3
Cut at marks.2417U2912-14CONDUITCut
-1417U2912-14CONDUITInstall (New)4
-1417U2912-14CONDUITInstall (New)5
Apply at slits. (c)-BMS5-146 TYPE 1,
CLASS 1, GRADE A,
1.50 INCH MINIMUM
WIDTH
FIBERGLASS TAPEApply6
(d)-BACS38K2STRAPInstall (New)7
Make sure conduit
assy from steps 4-7
are oriented per
view B-B. (d)(e)
-BACS38K2STRAPInstall (New)8
This part is also re-
ferred to as a 'spac-
er' and its installation
is optional. (f)
-CR4HCONNECTOR RINGInstall (New)
(g)2417U2912-14CONDUITAdjust
(h)-BMS5-146 TYPE 1,
CLASS 1, GRADE A,
1.00 INCH MINIMUM
WIDTH
FIBERGLASS TAPEApply
(g)2417U2912-14CONDUITAdjust9
(a) Make sure the AFT end of the conduits are a maximum of 1.00 inch FWD of the water supply line end
fitting sleeve located AFT of STA 640 stanchion.
(b) Mark the FWD end of the conduits a minimum of 2.60 inches FWD of the AFT edge of stanchion at STA
580. Acceptable to have excess length FWD of STA 580.
(c) Apply tape in one continuous strip longitudinally. Tape segments can be used provided there is a minimum
of 0.50 inch overlap at all tape seams.
(d) Install strap 0.50 - 3.00 inches from both ends of the conduit. Make sure conduit is supported between
end straps a maximum of every 12.00 inches with combination of straps and any existing supports.
(e) Use the straps to attach the water supply line with the conduits to the adjacent water drain line, with
preference to the upper drain line. As an alternative, it is permitted to use straps to attach the water supply
line with the conduits to the mounting supports and the water drain line.
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
37 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 38

More DataQtyIdentificationNameTaskStep
(f) Use an optional spacer between the water supply line with conduits and drain line to prevent a riding
condition and water traps, and to keep a minimum 2.50 degree drain slope.
(g) Make sure that the conduits are straight, keep a minimum 2.50 degree drain slope and do not have any
localized dip in the water supply line not covered by the conduits that could prevent water from draining.
Maximum allowable dip is 0.375 inch. A depth of the dip that is larger than 0.375 inches can cause a
water trap and is not permitted. Additional straps and/or supports beyond the conduit ends may be loosened
or replaced to adjust supply line. It can be necessary to remove additional sidewall liners up to STA 540
and STA 700.
(h) Apply two layers of tape around each strap. Make sure tape is centered around the strap. Tape is not
necessary at locations where the original mounting supports were kept.
FIGURE 7: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
38 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 39 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
This Figure applies only to: Group 2.
STA
660 STA
600
N
FORWARD CARGO
COMPARTMENT
LOWER SURFACE
STA  660  STA  650  640 WATER DRAIN LINE  STA  620  OF FLOOR BEAMS  STA  600
WATER SUPPLY LINE  WATER
WITH CONDUITS  FWD  DRAIN
LINE
EQUIPMENT COOLING
TYPICAL  SUPPLY AIR INLET
(VIEW LOOKING OUTBOARD)
A-A
NOTE 1:
THIS ILLUSTRATION IS FOR
ILLUSTRATIVE PURPOSES. THE  3029304
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.
FIGURE 8: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER SUPPLY
LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 1 OF 4)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  39 of 155

### Page 40 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
STA
660
2.00
(MIN)
AFT END OF  B  WATER DRAIN  LINE
CONDUITS
WATER SUPPLY
LINE WITH
CONDUITS
WATER DRAIN
LINE
FWD
TYPICAL
(VIEW LOOKING OUTBOARD)
0.50
(MAX)
TYPICAL
NOTE 1:  (FASTENERS NOT SHOWN)
THIS ILLUSTRATION IS FOR
ILLUSTRATIVE PURPOSES. THE  3029335
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.
FIGURE 8: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER SUPPLY
LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 2 OF 4)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  40 of 155

### Page 41 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER DRAIN -
LINE  • WATER SUPPLY
LINE
WATER DRAIN •  BRACKET
LINE
INBD
NOTE 1:  TYPICAL
THIS ILLUSTRATION IS FOR  (VIEW LOOKING AFT)
ILLUSTRATIVE PURPOSES. THE  B-B  3029347
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.
FIGURE 8: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER SUPPLY
LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 3 OF 4)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  41 of 155

### Page 42

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
If installed. (a)--SCREWRemove / Keep1
If installed. (a)--NUTRemove / Keep
If installed. (a)--WASHERRemove / Keep
If installed. (a)--CLAMPRemove / Keep
(b)1417U2603-1015ENVELOPE ASSYInstall (New)2
(c)1417U2603-1015ENVELOPE ASSYCut3
(d)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply
If removed. (a)--CLAMPInstall (Kept)4
If removed. (a)--WASHERInstall (Kept)
If removed. (a)--SCREWInstall (Kept)
If removed. (a)--NUTInstall (Kept)
(b)1417U2603-1016ENVELOPE ASSYInstall (New)5
(e)1417U2603-1016ENVELOPE ASSYAdjust6
(e)1417U2603-1016ENVELOPE ASSYAdjust
(f)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply7
(a) No part identification or quantity given. The identification and quantity of parts used can be different between
the configurations.
(b) It is permitted to locally compress the envelope assembly to make sure that it aligns better with the adjacent
surfaces or parts.
(c) Not to exceed 0.50 inch in length in any direction.
(d) Apply tape to the cut edges and/or damaged surfaces of the envelope assembly. Refer to APPENDIX A
as an accepted procedure.
(e) Make sure that all fittings and connections are completely inside the envelope assemblies.
(f) Apply tape to the inboard and outboard sides of the mating envelope assemblies to close any gaps.
FIGURE 8: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER SUPPLY
LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
42 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 43 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
This Figure applies only to: Group 4, 7, 10.
STA
660 STA
600
N
FORWARD CARGO
COMPARTMENT
LOWER SURFACE
OF FLOOR BEAMS
STA  STA  STA  STA
660  650  WATER DRAIN  620  WATER SUPPLY LINE  600
LINE  WITH CONDUITS
WATER DRAIN  EQUIPMENT
LINE  COOLING SUPPLY
AIR INLET
NOTE 1:
THIS ILLUSTRATION IS FOR  TYPICAL
ILLUSTRATIVE PURPOSES. THE  (VIEW LOOKING OUTBOARD)  3029562
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.  A-A
FIGURE 10: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 1 OF 5)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  43 of 155

### Page 44 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
STA
660
2.00
(MIN
AFT END OF  B
CONDUITS  WATER SUPPLY
LINE WITH
CONDUITS
WATER DRAIN
LINES
25€0
1.00  3.00
(MIN)  (MIN)
0.50
(MAX)
ADDITIONAL
SUPPLY HOSE
TYPICAL
FWD  (FASTENERS NOT SHOWN)
TYPICAL
(VIEW LOOKING OUTBOARD)
TAPE APPLICATION AREA  3029563
FIGURE 10: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 2 OF 5)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  44 of 155

### Page 45 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
5€
WATER
• SUPPLY LINE
BRACKET
‚ADDITIONAL
I SUPPLY HOSE
INBD
TYPICAL
(VIEW LOOKING AFT)  3029565
B-B
FIGURE 10: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 3 OF 5)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  45 of 155

### Page 46

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
(a)--SCREWRemove / Keep1
(a)--NUTRemove / Keep
(a)--WASHERRemove / Keep
(a)--CLAMPRemove / Keep
(b)1417U2603-1015ENVELOPE ASSYInstall (New)2
(c)1417U2603-1015ENVELOPE ASSYCut3
(d)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply
(a)--CLAMPInstall (Kept)4
(a)--WASHERInstall (Kept)
(a)--SCREWInstall (Kept)
(a)--NUTInstall (Kept)
(b)1417U2603-1016ENVELOPE ASSYInstall (New)5
(e)1417U2603-1015ENVELOPE ASSYAdjust6
(e)1417U2603-1016ENVELOPE ASSYAdjust
(b)1417U2603-1015ENVELOPE ASSYInstall (New)7
(b)1417U2603-1016ENVELOPE ASSYInstall (New)8
(f)(g)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply9
(a) No part identification or quantity given. The identification and quantity of parts used can be different between
the configurations.
(b) It is permitted to locally compress the envelope assembly to make sure that it aligns better with the adjacent
surfaces or parts.
(c) Not to exceed 0.50 inch in length in any direction.
(d) Apply tape to the cut edges and/or damaged surfaces of the envelope assembly. Refer to APPENDIX A
as an accepted procedure.
(e) Make sure that all fittings and connections are completely inside the envelope assemblies.
(f) Apply tape to the inboard and outboard sides of the mating envelope assemblies to close any gaps.
FIGURE 10: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
46 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 47

More DataQtyIdentificationNameTaskStep
(g) Overlap the tape by a minimum of 1.00 inch on to each adjacent envelope assembly.
FIGURE 10: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
47 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 48 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
This Figure applies only to: Group 5.
STA
660 STA
600
N
FORWARD CARGO
COMPARTMENT
OWER SURFAC
F FLOOR BEAM
STA  660  STA  645  STA  640  STA  620  WATER SUPPLY LINE STA  WITH CONDUITS  600
WATER DRAIN  EQUIPMENT
LINE  COOLING SUPPLY
AIR INLET
VD
NOTE 1:  (VIEW LOOKING OUTBOARD)  TYPICAL
THIS ILLUSTRATION IS FOR  CONFIGURATION ON YOUR AIRPLANE  ILLUSTRATIVE PURPOSES. THE  A-A  3029641
MIGHT BE DIFFERENT THAN SHOWN.
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 1 OF 7)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  48 of 155

### Page 49 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
1.00
STA  (APPROXIMATELY)  LOWER SURFACE  OF FLOOR BEAMS
660  - 1.00  STA
ADDITIONAL  (APPROXIMATELY)  640
SUPPLY HOSE-  ADDITIONAL
SUPPLY HOSE
11) 12)
AND
AND
WATER SUPPLY
LINE WITH
CONDUITS
1.00
(MIN)
WATER DRAIN
LINE
AFT END OF
CONDUITS
2.00
(MIN)
1.00
(MIN)
T) 8) 14
0.50
(MAX)
1.00
ADDITIONAL  (MIN)  - 1.00  (MIN)
SUPPLY HOSE
(VIEW LOOKING OUTBOARD)  TYPICAL  (FASTENERS NOT SHOWN)  TYPICAL
TAPE APPLICATION AREA  3029642
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 2 OF 7)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  49 of 155

### Page 50 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
ADDITIONAL
SUPPLY HOSE
BRACKET
WATER SUPPLY
LINE
ADDITIONAL
SUPPLY HOSE
NBD
NOTE 1:
THIS ILLUSTRATION IS FOR  ILLUSTRATIVE PURPOSES. THE  CONFIGURATION ON YOUR AIRPLANE  (VIEW LOOKING AFT)  TYPICAL  3029643
MIGHT BE DIFFERENT THAN SHOWN.  B-B
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 3 OF 7)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  50 of 155

### Page 51 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
ADDITIONAL
ADDITIONAL  SUPPLY HOSE
SUPPLY HOSE  11 TAPE
ENVELOPE
ASSEMBLY
CLAMP, STANDOFF
TIE WRAP, OR OTHER
OBSTRUCTION
12 13) STRAP
CUT/ACCESS
SLIT
ENVELOPE  TAPE U
ASSEMBLY
12.00 (MAX)
EXAMPLE
(TYPICAL CUT/ACCESS SLIT IN
AN ENVELOPE ASSEMBLY)
12 13) STRAP
3.00  0.50  4.00 (MIN)
ENVELOPE
ASSEMBLY
TYPICAL
(ONE OF THE TWO ENDS SHOWN)
CUT/ACCESS
SLIT
HOOK/LOOP  TAPE  ENVELOPE ASSEMBLY  SHOWN UNFOLDED  HOOK/LOOP  TAPE
TAPE APPLICATION AREA  3046576
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 4 OF 7)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  51 of 155

### Page 52

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
(a)--SCREWRemove / Keep1
(a)--NUTRemove / Keep
(a)--WASHERRemove / Keep
(a)--CLAMPRemove / Keep
(b)1417U2603-1015ENVELOPE ASSYInstall (New)2
(c)1417U2603-1015ENVELOPE ASSYCut3
(d)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply
(a)--CLAMPInstall (Kept)4
(a)--WASHERInstall (Kept)
(a)--SCREWInstall (Kept)
(a)--NUTInstall (Kept)
(b)1417U2603-1016ENVELOPE ASSYInstall (New)5
(e)1417U2603-1015ENVELOPE ASSYAdjust6
(e)1417U2603-1016ENVELOPE ASSYAdjust
(b)2417U2603-1015ENVELOPE ASSYInstall (New)7
(b)2417U2603-1016ENVELOPE ASSYInstall (New)8
Do this task only if
the additional supply
hose is installed at
this location. (f)
1417U2603-1021ENVELOPE ASSEM-
BLY
Put / Hold9
Do this task only if
the additional supply
hose is installed at
this location. (g)
1417U2603-1021ENVELOPE ASSEM-
BLY
Put / Hold10
(h)-417U2603-1021ENVELOPE ASSEM-
BLY
Cut11
(d)(i)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 5 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
52 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 53

More DataQtyIdentificationNameTaskStep
Do this task only if
the additional supply
hose is installed at
this location. (j)(b)
1417U2603-1021ENVELOPE ASSEM-
BLY
Install (New)12
Do this task only if
the additional supply
hose is installed at
this location. (j)
-BACS38K2STRAPInstall (New)
Do this task only if
the additional supply
hose is installed at
this location. (j)(b)
1417U2603-1021Envelope AssyInstall (New)13
Do this task only if
the additional supply
hose is installed at
this location. (j)
-BACS38K2STRAPInstall (New)
(k)(l)-BMS 5-157, TYPE I,
CLASS 2, FORM 1,
GRADE C, COMPOSI-
TION MPEEK
TAPEApply14
(a) No part identification or quantity given. The identification and quantity of parts used can be different between
the configurations.
(b) It is permitted to locally compress the envelope assembly to make sure that it aligns better with the adjacent
surfaces or parts.
(c) Not to exceed 0.50 inch in length in any direction.
(d) Apply tape to the cut edges and/or damaged surfaces of the envelope assembly. Refer to APPENDIX A
as an accepted procedure.
(e) Make sure that all fittings and connections are completely inside the envelope assemblies.
(f) Put the envelope assembly around the additional water supply hose and engage the hook tape with the
loop tape of the envelope assembly. It is acceptable to trim the -1021 envelope to the underside of the
floor.
(g) Put the envelope assembly around the additional water supply hose and engage the hook tape with the
loop tape of the envelope assembly. It is acceptable to trim the -1021 envelope to a minimum length of
25.00 inches.
(h) Cut an access slit in the envelope assembly in the areas where installed components, for example clamps
and straps, systems or structure do not let hook and loop tape be engaged fully. Make sure a minimum
of 4.00 inch edge margin of the uncut area of the envelope assembly is kept.
(i) For each side of any cut/access slit, apply tape around the envelope assembly two times. Make sure each
layer of tape is wound concentrically with the layer below.
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
53 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 54

More DataQtyIdentificationNameTaskStep
(j) Install strap 0.50 - 3.00 inches from both ends of the envelope. Make sure envelope is supported between
end straps a maximum 12.00 inches between straps.
(k) Apply tape to the inboard and outboard sides of the mating envelope assemblies to close any gaps.
(l) Overlap the tape by a minimum of 1.00 inch on to each adjacent envelope assembly.
FIGURE 11: LEFT SIDE FORWARD CARGO COMPARTMENT, POTABLE WATER SYSTEM - WATER
SUPPLY LINE - WATER SPRAY ENVELOPE ASSEMBLY INSTALLATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
54 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 55 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
This Figure applies only to: Group 6.
STA
660 STA
560
FORWARD CARGO
COMPARTMENT
LOWER SURFACE
OF FLOOR BEAMS  WATER DRAIN
LINE
STA  STA  STA  STA  STA  STA  STA
660  650  640  620  600  580  560
B
WATER SUPPLY  WATER DRAIN  EQUIPMENT COOLING
LINE  LINE  FWD  SUPPLY AIR INLET
WATER DRAIN LINE  FITTING
TYPICAL
(VIEW LOOKING OUTBOARD)  -1.00
(MAX)
A-A
NOTE 1:
THIS ILLUSTRATION IS FOR
ILLUSTRATIVE PURPOSES. THE
CONFIGURATION ON YOUR AIRPLANE
MIGHT BE DIFFERENT THAN SHOWN.
WATER SUPPLY LINE
NOTE 2:  END FITTING SLEEVE
POSITION OF THE WATER SUPPLY  LINE ON YOUR AIRPLANE MIGHT BE  WATER DRAIN LINE  3029644
DIFFERENT THAN SHOWN.
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 1 OF 6)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  55 of 155

### Page 56 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
D
—WATER SUPPLY LINE
0.50
0.50
(MIN)  (MIN)
SLIT
0.50
(MIN)  0.50
(MIN)
TYPICAL
INBD  (STRAP NOT SHOWN)
VIEW LOOKING FORWARD
B-B
3.00  0.50  • 12.00 (MAX)  D2346
WATER SUPPLY LINE
AFT END OF
CONDUIT
TYPICAI
(VIEW LOOKING OUTBOARD)
(AFT END OF CONDUIT SHOWN)
(FORWARD END OF CONDUIT SIMILAR)
C-C
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 2 OF 6)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  56 of 155

### Page 57 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER SUPPLY LINE  DRAIN SLOPE  2.5°
(MIN)
• A DIP WHERE
WATER COLLECTS
FWD
0.375
(MAX)  AN EXAMPLE OF A LOCAL WATER TRAP THAT
CAN OCCUR IN THE WATER SUPPLY LINE
(CONDUITS NOT SHOWN)
(VIEW LOOKING OUTBOARD)
WATER SUPPLY LINE  D-D
WITH CONDUITS
(8) STRAP
® TAPE
TAPE ®
WATER DRAIN
LINES
STRAP 8
WATER DRAIN
LINE
® STRAP
WATER SUPPLY  (8) SPACER
LINE WITH
CONDUITS
ALTERNATIVE
(VIEW LOOKING FORWARD)
NOTE 2:  E-E  LINTER DRAIN
POSITION OF THE WATER SUPPLY LINE
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.  INBD
NOTE 3:
THIS SUPPORT CONFIGURATION IS FOR  ILLUSTRATIVE PURPOSES. THE  (VIEW LOOKING FORWARD)  ALTERNATIVE
SUPPORT CONFIGURATION ON YOUR  F-F
AIRPLANE MIGHT BE DIFFERENT THAN  3029647
SHOWN OR THERE IS NO SUPPORT IN
YOUR CONFIGURATION.
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 3 OF 6)
Original Issue: August 07, 2024
Export Controlled ECCN: 9E991  747-38A2146 RB
See page 1 for details  57 of 155

### Page 58 (OCR)

REQUIREMENTS BULLETIN 747-38A2146
ALERT  ALERT
WATER SUPPLY LINE
WITH CONDUITS  WATER SUPPLY LINE
WITH CONDUITS
TAPE (8
TAPE (8  SPACER 8
WATER DRAIN  WATER DRAIN LINE
LINE
STRAP
STRAP (8)  STRAP 8
INBD  INBD
ALTERNATIVE  ALTERNATIVE
(VIEW LOOKING FORWARD)  (VIEW LOOKING FORWARD)
G-G  H-H
STANCHION  WATER DRAIN
LINE
MOUNTING
SUPPORT
WATER SUPPLY
LINE WITH
CONDUITS
L
NOTE 2:
POSITION OF THE WATER SUPPLY LINE  8) STRAP
ON YOUR AIRPLANE MIGHT BE
DIFFERENT THAN SHOWN.  WATER DRAIN
LINE
NOTE 3:  BRACKET
THIS SUPPORT CONFIGURATION IS FOR  NBD
ILLUSTRATIVE PURPOSES. THE
SUPPORT CONFIGURATION ON YOUR  ALTERNATIVE
AIRPLANE MIGHT BE DIFFERENT THAN  (VIEW LOOKING AFT)  3046312
SHOWN OR THERE IS NO SUPPORT IN
YOUR CONFIGURATION.
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 4 OF 6)
Original Issue: August 07, 2024
747-38A2146 RB
Export Controlled ECCN: 9E991
See page 1 for details  58 of 155

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
(a)1417U2912-14CONDUITPut / Hold1
(a)1417U2912-14CONDUITPut / Hold2
(b)2417U2912-14CONDUITMeasure3
Cut at marks.2417U2912-14CONDUITCut
-1417U2912-14CONDUITInstall (New)4
-1417U2912-14CONDUITInstall (New)5
Apply at slits.(c)-BMS5-146 TYPE 1,
CLASS 1, GRADE A,
1.50 INCH MINIMUM
WIDTH
FIBERGLASS TAPEApply6
(d)-BACS38K2STRAPInstall (New)7
Make sure conduit
assy from steps 4-7
are oriented per
view B-B. (d)(e)
-BACS38K2STRAPInstall (New)8
This part is also re-
ferred to as a 'spac-
er' and its installation
is optional. (f)
-CR4HCONNECTOR RINGInstall (New)
(g)2417U2912-14CONDUITAdjust
(h)-BMS5-146 TYPE 1,
CLASS 1, GRADE A,
1.00 INCH MINIMUM
WIDTH
FIBERGLASS TAPEApply
(g)2417U2912-14CONDUITAdjust9
(a) Make sure the FWD end of the conduits are a maximum of 1.00 inch AFT of the water supply line end
fitting sleeve located FWD of STA 580 stanchion.
(b) Mark the AFT end of the conduits a minimum of 10.00 inches AFT of the FWD edge of stanchion at STA
640. Acceptable to have excess length AFT of STA 650.
(c) Apply tape in one continuous strip longitudinally. Tape segments can be used provided there is a minimum
of 0.50 inch overlap at all tape seams.
(d) Install strap 0.50 - 3.00 inches from both ends of the conduit. Make sure conduit is supported between
end straps a maximum of every 12.00 inches with combination of straps and any existing supports.
(e) Use the straps to attach the water supply line with the conduits to the adjacent water drain line, with
preference to the upper drain line. As an alternative, it is permitted to use straps to attach the water supply
line with the conduits to the mounting supports and the water drain line.
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 5 OF 6)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
59 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

### Page 60

More DataQtyIdentificationNameTaskStep
(f) Use an optional spacer between the water supply line with conduits and drain line to prevent a riding
condition and water traps, and to keep a minimum 2.50 degree drain slope.
(g) Make sure that the conduits are straight, keep a minimum 2.50 degree drain slope and do not have any
localized dip in the water supply line not covered by the conduits that could prevent water from draining.
Maximum allowable dip is 0.375 inch. A depth of the dip that is larger than 0.375 inches can cause a
water trap and is not permitted. Additional straps and/or supports beyond the conduit ends may be loosened
or replaced to adjust supply line. It can be necessary to remove additional sidewall liners up to STA 540
and STA 700.
(h) Apply two layers of tape around each strap. Make sure tape is centered around the strap. Tape is not
necessary at locations where the original mounting supports were kept.
FIGURE 12: LEFT SIDE FORWARD CARGO COMPARTMENT - POTABLE WATER SYSTEM - WATER
SUPPLY LINE CONDUIT INSTALLATION
(SHEET 6 OF 6)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 07, 2024
747-38A2146 RB
60 of 155
REQUIREMENTS BULLETIN 747-38A2146
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/747-38a2146-rb/file/163d0d87f580.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.