# Boeing Alert Service Bulletin 747-53A2088: Revision 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-1023; AD 2014-05-24 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-53A2088](https://openairdocs.org/service-documents/boeing/747-53a2088.md)
- Title as filed: U.S. DOT/FAA - SB-747-53A2088-04-
- Pages: 62
- PDF: https://openairdocs.org/files/sha256/86/d9/86d9a976942a820cd18a1ae7d3982bd0d3c35a01d7dd599abb2fdf85745066a4
- Page: https://openairdocs.org/service-documents/boeing/747-53a2088/file/86d9a976942a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-53A2088
Original Issue: March 08, 1974
Revision 4: January 11, 2013
ATA System: 5300
SUBJECT: FUSELAGE - Body Station 760 or 780 - Frame to Tension Tie Joint - Inspection /
Modification
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 1989 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
1 of 62
5.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
2 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 5
B. Concurrent Requirements ...................................... 1 5
C. Reason ................................................ 1 5
D. Description .............................................. 1 7
E. Compliance .............................................. 1 8
F. Approval ............................................... 2 1
G. Manpower .............................................. 2 1
H. Weight and Balance Changes .................................... 2 2
I. Electrical Load Data ......................................... 2 2
J. References .............................................. 2 2
1. Existing Data: ......................................... 2 2
2. Data Supplied with this Service Bulletin: ........................... 2 3
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 3
K. Publications Affected ........................................ 2 3
L. Interchangeability and Intermixability of Parts ........................... 2 3
M. Software Accomplishment Summary ................................ 2 3
2. MATERIAL INFORMATION ........................................ 2 5
A. Material - Price and Availability ................................... 2 5
B. Industry Support Information .................................... 2 5
C. Parts Necessary for Each Airplane ................................. 2 5
1. Kits/Parts ............................................ 2 5
2. Parts and Materials Supplied by the Operator ........................ 2 6
3. Parts Modified and Reidentified ................................ 2 7
4. Parts Removed and Not Replaced .............................. 2 7
D. Parts Necessary to Change Spares ................................. 2 7
E. Special Tooling - Price and Availability ............................... 2 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 9
A. GENERAL INFORMATION ..................................... 2 9
B. WORK INSTRUCTIONS ....................................... 3 0
FIGURE 1: UNMODIFIED TENSION TIE INSPECTION ......................... 3 3
FIGURE 2: MODIFIED TENSION TIE INSPECTION ........................... 3 6
FIGURE 3: FRAME TENSION TIE MODIFICATION ........................... 3 8
FIGURE 4: THIS FIGURE IS DELETED (REVISION 4) ......................... 4 3
FIGURE 5: THIS FIGURE IS DELETED (REVISION 4) ......................... 4 4
FIGURE 6: THIS FIGURE IS DELETED (REVISION 4) ......................... 4 5
FIGURE 7: ALTERNATIVE MODIFICATION [Group 1] .......................... 4 6
FIGURE 8: ALTERNATIVE MODIFICATION [Group 2] .......................... 5 1
FIGURE 9: ALTERNATIVE MODIFICATION [Group 3] .......................... 5 6
APPENDIX A: ADDENDUM - FLIGHT SAFETY SECTION .......................... 6 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
3 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
4 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
747
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 747-53A2088Original Issue: March 08, 1974
Revision 4: January 11, 2013
ATA System: 5300
SUBJECT: FUSELAGE - Body Station 760 or 780 - Frame to Tension Tie Joint - Inspection /
Modification
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on all airplanes that have not been modified in accordance with the original issue,
Revision 1, Revision 2 or Revision 3 of this service bulletin. Do a surface High Frequency Eddy Current (HFEC)
inspection of the radius common to the aft channel of the tension tie at the next inspection that is scheduled to
be done in accordance with Paragraph 1.E., Compliance and accomplish the tension tie modification at the time
given in Paragraph 1.E., Compliance.
Federal Aviation Administration (FAA) Airworthiness Directive AD 84-19-01 is related to this service bulletin.
REASON FOR REVISION
This revision is sent to add a surface High Frequency Eddy Current (HFEC) inspection of the upper and lower
radius common to the aft channel of the tension tie and to add a compliance time for the accomplishment of the
tension tie modification.
These sections were changed:
1. Summary Section: Added new Background information related to the revision. Updated Action section
to reflect new requirements. Added Federal Aviation Administration (FAA) Airworthiness Directive
information to the compliance section. Added new industry support information. Revised Summary
illustration text to reflect changed actions.
2. In Paragraph 1.C., Reason: Added new background information related to the revision.
3. In Paragraph 1.D., Description: Updated the action descriptions to reflect new requirements, added
"More work" statement and added maintenance zone tables.
4. In Paragraph 1.E., Compliance: Updated compliance times and added new compliance tables.
5. In Paragraph 1.F., Approval: Is updated and a new approval statement added.
6. In Paragraph 1.G., Manpower: Updated manpower estimate.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
5 of 62

### Page 6

7. In Paragraph 1.H., Weight and Balance Changes: Updated weight and balance and added new weight
and balance tables.
8. In Paragraph 1.J., References: Added new references related to this revision.
9. In Paragraph 1.K., Publications Affected: Added statement for damage tolerance inspections.
10. In Paragraph 2.B., Industry Support Information: Added new industry support information.
11. In Paragraph 3.A., General Information: Updated general notes to current requirements.
12. In Paragraph 3.B., Work Instructions, PART I - Flight Safety Inspection Program: Added a new surface
High Frequency Eddy Current (HFEC) inspection of tension ties. Removed compliance times and
removed the reference to report any discrepancies in the Flight Safety Addendum.
13. Figure 1: Added a new detailed inspection and surface High Frequency Eddy Current (HFEC) inspection
of tension ties.
14. Figure 2: Updated the AMM reference for ceiling panel removal. Removed the word optional from the
view A-A illustration. Changed close visual inspection to a detailed inspection.
15. Figure 3: Added a new section view to the illustration.
16. Figure 4, Figure 5 and Figure 6 logic diagrams have been deleted. The flight safety and economic
based inspection program information can be found in Paragraph 1.E., Compliance.
17. Figure 7, Figure 8 and Figure 9: Added and removed typical measurements from the illustrations.
18. APPENDIX A: In table 1 the inspection method and repeat inspection threshold times have been
updated.
19. ADDENDUM: Removed the evaluation form from the addendum section.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
March 08, 1974Original Issue:
May 01, 1974Revision 1:
August 26, 1983Revision 2:
September 08, 1994Revision 3:
January 11, 2013Revision 4:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
6 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 7

Commercial 
Airplanes
747
Service Bulletin
ALERT
SummaryNumber: 747-53A2088Original Issue: March 08, 1974
Revision 4: January 11, 2013
ATA System: 5300
SUBJECT: FUSELAGE - Body Station 760 or 780 - Frame to Tension Tie Joint - Inspection /
Modification
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of the inspection program detailed in this bulletin will make sure the structural integrity of the
Body Station 760 or 780 (as applicable) tension tie throughout the operational life of the airplane. Undetected
tension tie cracking could eventually result in in-flight depressurization of the airplane and the inability to withstand
current regulatory failsafe loads.
Inspection of the fatigue test airplane after the equivalent of 12,000 flight-cycles revealed a crack in the BS 760
tension tie as a result of bending due to cabin pressurization.
Structural reassessment of the 747 airplane has been conducted under the requirements of Federal Aviation
Administration (FAA) Advisory Circular 91-56, in accordance with Federal Aviation Regulation (FAR) 25.571 as
amended in 1978, to ensure the safe operation of 747 airplanes throughout their operational life. As a result of
this reassessment, the BS 760 or 780 (as applicable) tension tie has been determined to be structurally significant
in that it is critical to the structural integrity of the airplane. Tension tie cracking not detected prior to it reaching
critical crack length may result in in-flight depressurization of the airplane and the inability to withstand current
regulatory failsafe loads.
Therefore, a flight-safety inspection program which will continue throughout the operational life of the airplane
is defined in this service bulletin.
The upper deck tension ties have been determined to be structure that is susceptible to Widespread Fatigue
Damage (WFD).
For more information about WFD, refer to Boeing Service Letter 747-SL-53-088.
Boeing Fleet Team Digest (FTD) 747 FTD 53-03005 is related to this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
7 of 62

### Page 8

Boeing Service Related Problem (SRP) 747-SRP-53-0403 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., ComplianceYesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-120RS)
This bulletin contains a flight safety inspection, an economics based inspection, and a modification. The flight
safety inspection is the minimum inspection program to maintain the structural integrity of the affected area of
the airplane. The economics based inspection, applicable to airplanes on which the modification described
herein has not been incorporated, may be used in lieu of the flight safety inspection, at operator's option, until
the modification is incorporated. The modification described herein will improve the resistance to cracking of
the tension tie but does not alter the structural environment of the tension tie such that a flight safety inspection
is not required. It does enable the initiation of the flight safety inspection to be deferred and increases the
reinspection interval.
Flight Safety Inspection Program - Do a detailed inspection and a surface High Frequency Eddy Current (HFEC)
inspection for cracking in the outboard ends of each affected tension tie. If any cracking is found within specified
limits, do the modification. If any cracking is found out of specified limits, contact Boeing for repair instructions
and do the work instructed by Boeing. If no cracking is found, repeat the inspections until the tension tie is
repaired or modified.
Do the tension tie modification at the time in accordance with Paragraph 1.E., Compliance. The modification
consists of replacing the existing tension tie doubler with a longer doubler.
At tension tie locations that have been repaired or modified, do a detailed inspection for any cracking. If any
cracking is found in a repaired or modified tension tie, contact Boeing for repair instructions and do the work
instructed by Boeing. If no cracking is found, repeat the inspections at the times in accordance with Paragraph
1.E., Compliance.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
8 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 9

Economic Inspection Program - The economics based inspections (detailed and surface HFEC inspections at
operator's option) are used to detect cracking at an earlier stage. If any cracking is found within specified limits
do the modification. If cracking is found out of specified limits, contact Boeing for repair instructions and do the
work instructed by Boeing. If no cracking is found, repeat the inspections until the tension tie is repaired or
modified.
EFFECTIVITY
747-100, 747-200B, 747-200F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
COMPLIANCE
Refer to Paragraph 1.E., Compliance.
Federal Aviation Administration (FAA) Airworthiness Directive AD 84-19-01 is related to this service bulletin.
INDUSTRY SUPPORT INFORMATION
This service bulletin was first released before October of 1994. Thus industry support for affected airplanes
depends upon whether the operator previously filed a warranty claim with Boeing on this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
2.505.00Inspection
16.0032.00Modification
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
9 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 10

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
10 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 11 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
DO A DETAILED INSPECTION AND A HIGH
FREQUENCY EDDY CURRENT (HFEC) INSPECTION OF
THE TENSION TIE FOR ANY CRACKING. IF ANY
CRACKING IS FOUND WITHIN SPECIFIED LIMITS,
DO THE MODIFICATION. IF CRACKING IS FOUND
OUT OF SPECIFIED LIMITS, CONTACT BOEING FOR
REPAIR INSTRUCTIONS AND DO THE WORK
STA 760 (GROUP 1 AND 2)  INSTRUCTED BY BOEING. IF NO CRACKING IS
STA 780 (GROUP 3)  FOUND, DO THE TENSION TIE MODIFICATION IN
FRAME  ACCORDANCE WITH PARAGRAPH 1.E.,COMPLIANCE
FATIGUE TEST
CRACK \
+++++++  + T
SUP
INSPECTION
AREA  INBD <
VIEW A-A
EXISTING CONFIGURATION
DO A POST MODIFICATION DETAILED INSPECTION OF THE
TENSION TIE FOR ANY CRACKING. IF ANY CRACKING IS FOUND
CONTACT BOEING FOR REPAIR INSTRUCTIONS AND DO THE WORK
INSTRUCTED BY BOEING. IF NO CRACKING IS FOUND, REPEAT
THE INSPECTIONS IN ACCORDANCE WITH PARAGRAPH 1.E.,
COMPLIANCE.
INSPECTION AREA
ADD NEW.  VIEW A-A
DOUBLER
MODIFIED CONFIGURATION
R09726
Original Issue: March 08, 1974
Revision 4: January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2088
Work - See page 1 for details.  11 of 62

### Page 12

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
12 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT
BLANK PAGE

### Page 13

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-53A2088
Original Issue: March 08, 1974
Revision 4: January 11, 2013
ATA System: 5300
SUBJECT: FUSELAGE - Body Station 760 or 780 - Frame to Tension Tie Joint - Inspection /
Modification
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplane(s) shown below. Refer to PRR85901-120RS for data about
this change.
Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
NOTE:
Airplanes that follow that have been modified by Boeing to the Special Freighter
configuration are not affected by this service bulletin.
1.
2. Airplanes that follow that have been modified by Boeing to the Extended Upper
Deck configuration are not affected by this service bulletin.
3. Airplanes that follow that have been modified as shown in Boeing Service Bulletin
747-25-2692, "Equipment/Furnishings - Upper Deck Passenger Compartment
Conversion - Upper Deck Extension Station 710 - Station 780 Modification," are
not affected by this service bulletin.
DESCRIPTIONCONFIGURATIONGROUP
747-100 and 747-200B Passenger airplanes with a different Tension
tie lay out to Group 2 and Group 3 airplanes.
-1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
13 of 62

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
747-100 and 747-200B Passenger airplanes with a different Tension
tie lay out to Group 1 and Group 3 airplanes.
-2
747-200F airplanes with a different Tension tie lay out to Group 1
and Group 2 airplanes.
-3
Airplane Models:
747-100, 747-200B, 747-200F
GroupVariable Number
1RA001 - RA025
1RA027 - RA028
1RA030 - RA032
1RA034
1RA104 - RA110
1RA113 - RA115
2RA164
1RA201 - RA203
1RA216
2RA217
1RA251 - RA255
2RA256 - RA261
2RA309
2RA311
1RA351 - RA360
1RA369 - RA371
2RA372 - RA373
1RA404
2RA413
1RA501 - RA502
1RA521 - RA523
2RA525 - RA527
1RA532 - RA534
2RA535 - RA540
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
14 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 15

GroupVariable Number
1RA551 - RA552
1RA559 - RA560
2RA561
1RA581 - RA582
2RA585
1RA601 - RA602
1RA631
1RA633
1RA651 - RA652
2RA676
1RA701
2RA702
1RA721
1RA741
1RA761
1RA781
1RA903 - RA909
1RA914
2RB071 - RB075
1RB101 - RB102
3RR201
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of the inspection program detailed in this bulletin will make sure the structural integrity
of the Body Station 760 or 780 (as applicable) tension tie throughout the operational life of the airplane.
Undetected tension tie cracking could eventually result in in-flight depressurization of the airplane and
the inability to withstand current regulatory failsafe loads.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
15 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 16

Body tension ties are located in the upper body just aft of the upper deck floor structure to reduce body
flexure caused by pressurization cycles. On the fatigue test airplane, the tension tie at BS 760 was
found cracked after the equivalent of 12,000 flights. Cracking occurred near the inboard end of the
splice doubler at the juncture of the tension tie and the BS 760 frame. Cracking is attributed to bending
loads induced by frame flexure during cabin pressurization.
Structural reassessment of the 747 airplane has been conducted under the requirements of Federal
Aviation Administration (FAA) Advisory Circular 91-56, in accordance with Federal Aviation Regulation
(FAR) 25.571 as amended in 1978, to ensure the safe operation of 747 airplanes throughout their
operational life. As a result of this reassessment, the affected tension tie has been determined to be
structurally significant in that it is critical to the structural integrity of the airplane. Tension tie cracking
not detected prior to it reaching critical crack length may result in in-flight depressurization of the
airplane.
Therefore, a flight-safety inspection program which will continue throughout the operational life of the
airplane is defined in this service bulletin.
Revision 1 added previously omitted airplanes to Group 1 of the effectivity and incorporated Notice of
Status Change dated 5 April, 1974 which corrected a typographical error in the note under Paragraph
I .A.1.
Revision 2 added the flight safety and economics based inspection program definitions, where applicable,
throughout the service bulletin. In addition, a flight safety addendum is added to the bulletin as a
summary of the inspections required to ensure the structural integrity of the applicable area and to
provide the format for reporting inspection results to Boeing. Notices of Status Change dated 16 October,
1975 and 4 April, 1980 are incorporated to revise subkit nomenclature and to note that airplanes
converted to the Special Freighter configuration are not affected by this bulletin. Also, the effectivity is
updated to reflect current airplane ownership.
Revision 3 is sent to add an alternative tension tie modification. This is shown in new Figures 7, 8, and
9. Revision 3 is also sent to add reference to Boeing Service Bulletin 747-25-2692,
"Equipment/Furnishings - Upper Deck Passenger Compartment Conversion - Upper Deck Extension
Station 710 - Station 780 Modification." As part of the change in Service Bulletin 747-25-2692, the
tension tie at STA 760 is removed and replaced with a floor beam. The work shown in this service
bulletin is not necessary after the change in Service Bulletin 747-25-2692 has been installed. The
airplanes that follow have been removed from Paragraph I.A.1, Effectivity. These airplanes were
changed by Boeing to the Special Freighter or Extended Upper Deck configuration:
RA029, RA033, RA101-RA103, RA111-RA112, RA161-RA163, RA245-RA246, RA301-RA306,
RA307-RA308, RA310, RA312, RA524, RA632, RA634-RA635, RA671-RA675, RA677, RA722-RA724,
RA742-RA743, RA901-RA902, RA910-RA913, RA915-RA916, RB041, RB043.
As part of the change to the Special Freighter or Extended Upper Deck configuration, the tension tie
at STA 760 was removed and replaced with a floor beam. Airplane RB013 has also been removed
from Paragraph I.A.1, Effectivity. On this airplane, a floor beam was installed at BS 760 in production.
All affected airplanes, unmodified or modified per previous issues of this bulletin require flight safety
inspection as noted herein.
The upper deck tension ties have been determined to be structure that is susceptible to Widespread
Fatigue Damage (WFD).
For more information about WFD, refer to Boeing Service Letter 747-SL-53-088.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
16 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 17

Boeing Fleet Team Digest (FTD) 747 FTD 53-03005 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-SRP-53-0403 is related to this service bulletin.
Revision 4 is sent to add a surface High Frequency Eddy Current (HFEC) inspection of the upper and
lower radius common to the aft channel of the tension tie and to add a compliance time for the
accomplishment of the tension tie modification.
D. Description
This bulletin contains a flight safety inspection, an economics based inspection, and a modification.
The flight safety inspection is the minimum inspection program to maintain the structural integrity of
the affected area of the airplane. The economics based inspection, applicable to airplanes on which
the modification described herein has not been incorporated, may be used in lieu of the flight safety
inspection, at operator's option, until the modification is incorporated. The modification described herein
will improve the resistance to cracking of the tension tie but does not alter the structural environment
of the tension tie such that a flight safety inspection is not required. It does enable the initiation of the
flight safety inspection to be deferred and increases the reinspection interval.
Flight Safety Inspection Program - Do a detailed inspection and a surface High Frequency Eddy Current
(HFEC) inspection for cracking in the outboard ends of each affected tension tie. If any cracking is
found within specified limits, do the modification. If any cracking is found out of specified limits, contact
Boeing for repair instructions and do the work instructed by Boeing. If no cracking is found, repeat the
inspections until the tension tie is repaired or modified.
Do the tension tie modification at the time in accordance with Paragraph 1.E., Compliance. The
modification consists of replacing the existing tension tie doubler with a longer doubler.
At tension tie locations that have been repaired or modified, do a detailed inspection for any cracking.
If any cracking is found in a repaired or modified tension tie, contact Boeing for repair instructions and
do the work instructed by Boeing. If no cracking is found, repeat the inspections at the times in
accordance with Paragraph 1.E., Compliance.
Economic Inspection Program - The economics based inspections (detailed and surface HFEC
inspections at operator's option) are used to detect cracking at an earlier stage. If any cracking is found
within specified limits do the modification. If cracking is found out of specified limits, contact Boeing for
repair instructions and do the work instructed by Boeing. If no cracking is found, repeat the inspections
until the tension tie is repaired or modified.
Revision 3 - No more work is necessary on airplanes changed by the initial release, Revision 1, or
Revision 2 of this service bulletin as a result of Revision 3.
The effectivity is divided into three groups because of differences in inspection and modification area.
PLEASE REPORT ADVERSE INSPECTION RESULTS TO BOEING USING THE REPORT SYSTEM
DESCRIBED IN APPENDIX A OF THIS SERVICE BULLETIN.
NOTE: Contact Boeing for instructions if any damaged areas exceed the specified limits. To expedite
Boeing response, be specific when defining and locating the damage. Circumstances leading
up to the damage and any secondary effects, when known, should be included in the
communication and followed up by sketches and photographs when appropriate.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
17 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 18

SEND TO: BOEING COMMERCIAL AIRPLANE GROUP ATTENTION: MANAGER, AIRLINE
SUPPORT
Revision 4 - More work is necessary on all airplanes that have not been modified in accordance with
the original issue, Revision 1, Revision 2 or Revision 3 of this service bulletin. Do a surface High
Frequency Eddy Current (HFEC) inspection of the radius common to the aft channel of the tension tie
at the next inspection that is scheduled to be done in accordance with Paragraph 1.E., Compliance
and accomplish the tension tie modification at the time given in Paragraph 1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-2:
Affected Maintenance Zones
ZoneModel
233, 234747-100, 747-200B
Group 3:
Affected Maintenance Zones
ZoneModel
233, 234747-200F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 84-19-01 is related to this service
bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
18 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 19

Table 1: Tension Tie Inspection and Modification (Flight Safety Inspection Program)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
3,700 flight cy-
cles.(a)
Within 500 flight
cycles after the
effective date of
AD 84-19-01.
Before 8,000 to-
tal flight cycles.
Do a detailed inspection
of the tension tie at BS
760 (Group 1 and 2 air-
planes) or BS 780 (Group
3 airplanes) for any
cracking in accordance
with Paragraph 3.B.,
Work Instructions Part I.
Airplanes that have not ac-
complished the modifica-
tion to the tension tie at BS
760 (Group 1 and 2) or BS
780 (Group 3) in accor-
dance with this service bul-
letin.
Within 3,700
flight cycles af-
ter the Revision
4 date of this
service bulletin.
Before 8,000 to-
tal flight cycles.
Do a detailed inspection
and a surface High Fre-
quency Eddy Current
(HFEC) inspection of the
tension tie at BS 760
(Group 1 and 2 airplanes)
or BS 780 (Group 3 air-
planes) for any cracking
in accordance with Para-
graph 3.B., Work Instruc-
tions Part I.
-Before further flight.Do the modification in ac-
cordance with Paragraph
3.B., Work Instructions
Part III.
If cracking is found within
limits.
(a)
-Before further flight.Contact Boeing for repair
instructions and do the
work instructed by Boe-
ing.
If cracking is found in the
tension tie out of limits.
-Within 2,000
flight cycles af-
ter the Revision
4 date of this
service bulletin.
Before 16,000
total flight cy-
cles.
Do the modification in ac-
cordance with Paragraph
3.B., Work Instructions
Part III.
(a)
If no cracking is found.
(a) Accomplishment of the modification terminates the repeat inspection requirement. Refer to Table 2 for
post modification inspections.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
19 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 20

Table 2: Post Modification Inspection (Flight Safety Inspection Program)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
8,000 flight cycles.
(a)
Within 1,000
flight cycles af-
ter the effective
date of AD 84-
19-01. (a)
Within 10,000
flight cycles af-
ter the accom-
plishment of the
modification. (a)
Do a detailed inspection
of the tension tie at BS
760 (Group 1 and 2 air-
planes) or BS 780 (Group
3 airplanes) for any
cracking in accordance
with Paragraph 3.B.,
Work Instructions Part I.
Airplanes that have accom-
plished the Modification to
the tension tie at BS 760
(Group 1 and 2 airplanes)
or BS 780 (Group 3 air-
planes) in accordance with
this service bulletin.
-Before further flight.Contact Boeing for repair
instructions and do the
work instructed by Boe-
ing.
If any crack is found in a
modified tension tie.
(a) Additional post modification inspections are given in Boeing service bulletin 747-53A2502.
Table 3: Tension Tie Inspection and Modification (Economic Based Inspection Program)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
1,000 flight cy-
cles.(a)
Before 7,000 total flight cycles.Do a detailed inspection
and a surface High Fre-
quency Eddy Current
(HFEC) inspection of the
tension tie at BS 760
(Group 1 and 2 airplanes)
or BS 780 (Group 3 air-
planes) for any cracking
in accordance with Para-
graph 3.B., Work Instruc-
tions Part II.
Airplanes that have not ac-
complished the modifica-
tion to the tension tie at BS
760 (Group 1 and 2) or BS
780 (Group 3) in accor-
dance with this service bul-
letin.
-Before further flight.Do the modification in ac-
cordance with Paragraph
3.B., Work Instructions
Part III.
If cracking is found within
limits.
(a)
-Before further flight.Contact Boeing for repair
instructions and do the
work instructed by Boe-
ing.
If cracking is found in the
tension tie out of limits.
-Within 2,000
flight cycles af-
ter the Revision
4 date of this
service bulletin.
Before 16,000
total flight cy-
cles.
Do the modification in ac-
cordance with Paragraph
3.B., Work Instructions
Part III.
(a)
If no cracking is found.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
20 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 21

Table 3: Tension Tie Inspection and Modification (Economic Based Inspection Program)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
(a) Accomplishment of the modification terminates the repeat inspection requirement. Refer to Table 2 for
post modification inspections.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the
accomplishment of the inspection, modification and post modification inspections with the corresponding
compliance times given in Service Bulletin 747-53A2088, Revision 4, as an alternative method of
compliance to the inspection, optional modification, and post modification inspection requirements with
corresponding compliance times required by paragraphs (A) and (B) of AD 84-19-01. Where this SB
states to contact Boeing for repair instructions, these instructions must be approved as an AMOC per
the instructions in paragraph (C) of AD 84-19-01. All provisions of AD 84-19-01 that are not specifically
referenced in this paragraph remain fully applicable and must be complied with accordingly.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection and modification
for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Elapsed HoursTask HoursNumber of PersonsTask
0.501.002Open Access
1.503.002Inspection
(a)(a)(a)Repair
15.0030.002Modification
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
21 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 22

Elapsed HoursTask HoursNumber of PersonsTask
0.501.002Restoration
TOTAL FOR EACH AIRPLANE
1.503.00Inspection
(a)(a)Repair
1632Modification
(a) For some tension tie cracks, the modification can be used as a repair. For
unmodified airplanes with cracks other than as described in Paragraph 3.B.,
Work Instructions, repair time will depend on extent of cracking.
H. Weight and Balance Changes
Group 1-2:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+ 585.2+ 0.8Tension Tie Modification
+ 390.7+ 0.5Alternative Modification
Group 3:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+ 627.8+ 0.8Tension Tie Modification
+ 401.0+ 0.5Alternative Modification
I. Electrical Load Data
Not applicable.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-120RS
b. Boeing Service Bulletin 747-25-2692, 747-53A2502
c. Boeing Service Letter 747-SL-51-048, 747-SL-53-088
d. Boeing Service Related Problem (SRP) 747-SRP-53-0403
e. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 84-19-01
f. Service Bulletin Index D6-30300
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
22 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 23

g. 747 Fleet Team Digest (FTD) 53-03005
h. 747 Non-Destructive Testing (NDT) Manual Part 6, 51-00-00 Procedure 1, Procedure 4,
Procedure 11, Procedure 16, Procedure 23
i. 747-100/200/300 Aircraft Maintenance Manual (AMM) 25-22-01
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Tension Tie Installation - STA 760 to STA 94065B09631
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
53-10747 Structural Repair Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
23 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 24

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
24 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT
BLANK PAGE

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 03
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 03 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$672.00280KIT, FRAME TO TENSION TIE JOINT
MODIFICATION - BODY STATION 760
63B12132-1
B. Industry Support Information
This service bulletin was first released before October of 1994. Thus industry support for affected
airplanes depends upon whether the operator previously filed a warranty claim with Boeing on this
service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: Top kit assembly is divided into subkits for convenience of installation. One top kit and
the items shown in Paragraph 2.C.2., Parts and Materials Supplied by the Operator, are
necessary for each airplane.
63B12132 - FRAME TO TENSION TIE JOINT MODIFICATION - BODY STATION 760
Kit 63B12132-1
NameQTYNew Part Number
-1-2-3
Top Kit Assembly-..63B12132-1
Kit Assembly, Left Side1-.63B12132-2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
25 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 26

63B12132 - FRAME TO TENSION TIE JOINT MODIFICATION - BODY STATION 760
Kit 63B12132-1
NameQTYNew Part Number
-1-2-3
Kit Assembly, Right Side1.-63B12132-3
Doubler.1.65B42544-1
Doubler..165B42544-2
Bolt.66BACB30KK6-3
Bolt.1212BACB30KK6-4
Bolt.1515BACB30KK6-5
Bolt.33BACB30KK8-6
Bolt.55BACB30KK8-7
Bolt.55BACB30KK8-8
Collar.3333BACC30R6
Collar.1313BACC30R8
Rivet.22BACR15BA6D10
2. Parts and Materials Supplied by the Operator
NOTE: The parts and materials shown in the table that follows are necessary to install the
alternative modification shown in Figures 7, 8, or 9.
NotesNameGroup 1
QTY
Group 2
QTY
Group 3
QTY
Part Number /
Specification
(a)Strap2..A
(b)Strap.2.B
(c)Strap..2C
(e)Bolt114BACB30MY6K4X
(e)Bolt663BACB30MY6K5X
(e)Bolt11.BACB30MY6K6X
(e)Bolt32.BACB30MY6K7X
(e)Bolt..5BACB30MY6K8X
(e)Bolt..5BACB30MY6K9X
(e)Bolt668BACB30MY6K4Y
(e)Bolt222BACB30MY8K4
(e)Bolt1..BACB30MY8K7X
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
26 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 27

NotesNameGroup 1
QTY
Group 2
QTY
Group 3
QTY
Part Number /
Specification
(e)Bolt53.BACB30MY8K8X
(e)Bolt.3.BACB30MY8K9X
-Collar10915BACC30M6
-Collar882BACC30M8
-Collar668BACC30R6
(d)Sealant4 Ounces4 Ounces4 OuncesBMS 5-95
-Paint4 Ounces4 Ounces4 OuncesBMS 10-11, Type I
(a) Make as shown in FIGURE 7.
(b) Make as shown in FIGURE 8.
(c) Make as shown in FIGURE 9.
(d) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
(e) Refer to 747 Structural Repair Manual Chapter 51 for alternate fasteners.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
27 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 28

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
28 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT
BLANK PAGE

### Page 29

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References , for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. Boeing Service Letter 747-SL-51-048 Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
9. Refer to Appendix A for Addendum on flight safety.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
29 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 30

10. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
B. WORK INSTRUCTIONS
PART I - FLIGHT SAFETY INSPECTION PROGRAM
1. On airplanes on which Part III - Modification has not been incorporated accomplish the following:
a. Do a detailed inspection and a surface High Frequency Eddy Current (HFEC) inspection of
the tension tie at BS 760 (Group 1 and 2 airplanes) or BS 780 (Group 3 airplanes) for any
cracking in accordance with FIGURE 1.
b. If no cracking is found, repeat the tension tie inspections in accordance with FIGURE 1 at the
time given in Paragraph 1.E., Compliance or alternatively, accomplish Part III - Modification
and do the tension tie inspection in accordance with Part I, Step 2.
c. If any cracking is found in one channel of the tension tie at the most inboard row of fasteners
common to the tension tie channels and the existing steel joint doubler or in the aft channel
in the area of the channel trim out, do the Part III - Modification as a repair and do the
inspections in accordance with Part I, Step 2. If any cracking is found other than as described
above, contact Boeing for repair instructions and do the work instructed by Boeing.
d. Restore access and return the airplane to a serviceable condition.
2. On airplanes on which Part III - Modification has been incorporated accomplish the following:
a. Do a detailed inspection of the tension tie at BS 760 (Group 1 and 2 airplanes) or BS 780
(Group 3 airplanes) for any cracking in accordance with FIGURE 2 at the time given in
Paragraph 1.E., Compliance.
b. If no cracking is found, repeat the inspections in accordance with FIGURE 2 at the time given
in Paragraph 1.E., Compliance.
c. If any cracking is found, contact Boeing for repair instructions and do the work instructed by
Boeing.
d. Restore access and return the airplane to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
30 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 31

PART II - ECONOMICS BASED INSPECTION PROGRAM - OPERATOR'S OPTION
1. Do a detailed inspection and a surface High Frequency Eddy Current (HFEC) inspection of the
tension tie at BS 760 (Group 1 and 2 airplanes) or BS 780 (Group 3 airplanes) for any cracking in
accordance with FIGURE 1.
NOTE:
1. This inspection may be used in lieu of Part I - Flight Safety Inspection Program,
at operator's option, until Part III - Modification is accomplished.
2. This inspection applies only to airplanes on which Part III - Modification has not
been accomplished.
2. If no cracking is found, repeat the tension tie inspection in accordance with FIGURE 1 at the time
given in Paragraph 1.E., Compliance or alternatively, do the modification in accordance with Part
III - Modification and do tension tie modification inspections in accordance with Part I, Step 2.
3. If any cracking is found in one channel of the tension tie at the most inboard row of fasteners
common to the tension tie channels and the existing steel joint doubler or in the aft channel in the
area of the channel trim out, do the Part III - Modification as a repair and initiate re-inspections in
accordance with Part I, Step 2. If any cracking is found other than as described above, contact
Boeing for repair instructions and do the work instructed by Boeing.
4. Restore access and return the airplane to a serviceable condition.
PART III - MODIFICATION
1. Get access to the tension tie ends at BS 760 (Group 1 and 2 airplanes) or BS 780 (Group 3
airplanes) by removing ceiling panels 231HL and 231HR (if installed). Refer to 747-100/200/300
AMM 25-22-01 or operator's comparable procedure.
NOTE: This modification may be used as an alternative to repeat inspections in accordance with
Part II, as a means of deferring initial or repeat inspections in accordance with Part I, or
as a repair for cracks as shown in the notes that follow. The modification does not terminate
Part I inspection requirements.
2. Replace existing tension tie end doublers with longer doublers in accordance with FIGURE 3. As
an alternative, modify the tension tie in accordance with FIGURE 7, FIGURE 8 or FIGURE 9.
NOTE:
1. The modification in accordance with FIGURE 3 may be used as a repair for a
crack in one channel of the tension tie at the most inboard row of fasteners
common to the tension tie channels and the existing steel joint doubler on
unmodified airplanes.
2. The modification in accordance with FIGURE 7, FIGURE 8 or FIGURE 9 can
also be used as a repair for cracks in the aft channel of the tension tie. This
repair can only be used if the trim in accordance with FIGURE 7, FIGURE 8 or
FIGURE 9 completely removes all cracks in the aft channel. If the trim does not
completely remove all cracks from the aft channel, or if other cracks are found,
contact Boeing for repair instructions and do the work instructed by Boeing.
3. Reinstall access panels and return the airplane to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
31 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 32

4. Do inspections of the modified tension ties in accordance with Part I. Step 2, at the times given in
Paragraph 1.E., Compliance.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4: January 11, 2013
32 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 33 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
STA
780
STA  TENSION
760  TIE
STA
780
TENSION TIE
CHANNEL
• DOUBLER
UP  INBD  2 FWD
LEFT SIDE SHOWN
→ FWD  RIGHT SIDE OPPOSITE
FRAME
VIEW B-B
STA 760 (GROUP 1 AND 2)
STA 780 (GROUP 3)
FRAME
FATIGUE TEST
CRACK
++++++
++++
UP
> B
DOUBLER  INSPECTION AREA
INBD <
VIEW A-A  R09575
FIGURE 1: UNMODIFIED TENSION TIE INSPECTION
(SHEET 1 OF 3)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2088
Work - See page 1 for details.  33 of 62

### Page 34 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
S-12
STA 760 (GROUP 1 AND 2)
STA 780 (GROUP 3)
FRAME
AFT CHANNEL
FORWARD
CHANNEL
TYPICAL
CRACKS
VIEW C-C
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
UP
> INBD
2169045
FIGURE 1: UNMODIFIED TENSION TIE INSPECTION
(SHEET 2 OF 3)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  34 of 62

### Page 35

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)--Ceiling PanelsRemove / Keep1
(b)--Tension TieInspect2
(c) (d)--Tension TieInspect3
(c) (d)--Tension TieInspect4
(a) Get access to the tension tie ends at BS 760 (Group 1 and 2 airplanes) or BS 780 (Group 3 airplanes)
by removing ceiling panels 231HL and 231HR (if installed). Refer to 747-100/200/300 AMM 25-22-01 or
operator's comparable procedure.
(b) Do a detailed inspection of the indicated tension tie area on the left and right side for any cracking.
(c) Do a detailed inspection of the edge of the radius of the tension tie aft channel on the left and right side
for any cracking.
(d) Do a surface High Frequency Eddy Current (HFEC) inspection on the edge of the radius of the tension
tie aft channel on the left and right side for any cracking. Do the inspection in accordance with 747 NDT
Part 6, 51-00-00, Procedure 4 or Procedure 23.
FIGURE 1: UNMODIFIED TENSION TIE INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
35 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 36 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
STA  TENSION
760  TIE
STA
780
TENSION TIE
CHANNEL
DOUBLER
UP
INBD <  →FWD
→ FWD  LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
FRAME
VIEW B-B
STA 760  (GROUP 1 AND 2)
STA 780  (GROUP 3)
FRAME
DOUBLER
TENSION TIE  • B
++++
= + +
30.00  > B  UP
INSPECTION AREA
INBD  R09580
VIEW A-A
FIGURE 2: MODIFIED TENSION TIE INSPECTION
(SHEET 1 OF 2)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  36 of 62

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
More DataQtyIdentificationNameTaskStep
(a)--Ceiling PanelsRemove / Keep1
(b)--Tension TieInspect2
(a) Get access to the tension tie ends at BS 760 (Group 1 and 2 airplanes) or BS 780 (Group 3 airplanes)
by removing ceiling panels 231HL and 231HR (if installed). Refer to 747-100/200/300 AMM 25-22-01 or
operator's comparable procedure.
(b) Do a detailed inspection of the indicated tension tie area on the left and right side for any cracking.
FIGURE 2: MODIFIED TENSION TIE INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
37 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 38 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
~ STA
780
GROUP 3  GRO STA AND 2  760  AFT UPPER DECK
STA  FRAME  FLOOR BEAM (REF)
780
FRAME
DOOR #2 LIFE
RAFT SUPPORT
(REF)  UP  PSU DUCT
LEFT SIDE SHOWN  RIGHT SIDE OPPOSITE  INBD  AFWD  R09594
FIGURE 3: FRAME TENSION TIE MODIFICATION
(SHEET 1 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  38 of 62

### Page 39 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
(GROUP 1 AND 2)  3)
(GROUP  STA 760  FRAME
STA 760  780
STA  GROUP 1 ONLY
SEE DETAIL I FOR GROUP 1  SEE DETAIL II FOR GROUP 3  INBD C
•  GROUP 2 SHOWN
VIEW A-A  EXISTING CONFIGURATION  VIEW A-A  NEW CONFIGURATION
R09600
FIGURE 3: FRAME TENSION TIE MODIFICATION
(SHEET 2 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2088
Work - See page 1 for details.  39 of 62

### Page 40 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
TENSION TIE  TENSION TIE
CHANNEL  CHANNEL
EXISTING  NEW
- DOUBLER  - DOUBLER
UP  UP
FRAME  FRAME
→ FWD  → FWD
SECTION B-B  SECTION C-C
RETAIN  RETAIN
FILLER  FILLER
DETAIL I  DETAIL II
(GROUP 1)  (GROUP 3)
R09601
FIGURE 3: FRAME TENSION TIE MODIFICATION
(SHEET 3 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  40 of 62

### Page 41

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this Figure.
More DataQtyIdentificationNameTaskStep
Group 1.40-FastenersRemove1
Group 2 and 3.39-FastenersRemove
--65B09614-27
(65B09614-19 or
65B09614-21 optional)
DoublerRemove2
Group 2 only.2-HoleCountersink3
Left side.165B42544-1DoublerInstall (New)4
Right side.165B42544-2DoublerInstall (New)
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below are the
number of fasteners necessary for this figure.
More DataHole DiaQtyIdentificationNameCode
Install with BMS 5-95
sealant.
0.216 - 0.219-BACB30KK6-( )BoltA
---BACC30R6Collar
Install with BMS 5-95
sealant
0.278 - 0.281-BACB30KK8-( )BoltB
---BACC30R8Collar
FIGURE 3: FRAME TENSION TIE MODIFICATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
41 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 42

More DataHole DiaQtyIdentificationNameCode
100 degree countersink
0.33 inch diameter for-
ward side only.
--BACR15BA6D10RivetC
FIGURE 3: FRAME TENSION TIE MODIFICATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
42 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 43 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
THIS FIGURE IS DELETED.
D38438
FIGURE 4: THIS FIGURE IS DELETED (REVISION 4)
(SHEET 1 OF 1)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2088
Work - See page 1 for details.  43 of 62

### Page 44 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
THIS FIGURE IS DELETED.
D38438
FIGURE 5: THIS FIGURE IS DELETED (REVISION 4)
(SHEET 1 OF 1)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  44 of 62

### Page 45 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
THIS FIGURE IS DELETED.
D38438
FIGURE 6: THIS FIGURE IS DELETED (REVISION 4)
(SHEET 1 OF 1)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2088
Work - See page 1 for details.  45 of 62

### Page 46 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
This Figure applies only to: Group 1.
STA
760
STA  TENSION
760  TIE
STA
780
UP
S-12  • INBD‹  →FWD
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
22 LOCATIONS  AFT CHANNEL
0.50R
(TYPICAL)
+8  +s 95 5
E†s  5 6 75 45
FORWARD
-0.38 (TYPICAL)  CHANNEL
VIEW A-A
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
UP
FOR OPTIONAL TRIM  SEE DETAIL I  → INBD  R09648
FIGURE 7: ALTERNATIVE MODIFICATION
(SHEET 1 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  46 of 62

### Page 47 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
S-12
FORWARD
TYPICAL (1  7)  CHANNEL
0.50R  AFT CHANNEL
(TYPICAL)
5 ‡¾
+ +
B
0.38 (TYPICAL)
UF
DETAIL I
OPTIONAL TRIM
• INBD
AFT CHANNEL
FUSELAGE
FRAME
VIEW B-B
LEFT SIDE SHOWN  FORWARD CHANNEL
RIGHT SIDE OPPOSITE
FIGURE 7: ALTERNATIVE MODIFICATION
(SHEET 2 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  747-53A2088  47 of 62

### Page 48 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
_ AFT CHANNEL
0.19
_ FORWARD CHANNEL
AFT
0.43 MIN
(TYPICAL)
→uP
2.06
SECTION C-C
0.19R
(TYPICAL)
• 11.20
2.06
12.25.
REPAIR STRAP A
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
FIGURE 7: ALTERNATIVE MODIFICATION
(SHEET 3 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  48 of 62

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
NOTE:
The figure shows two alternate aft channel trims. Any trim line that is between those shown
in the figure is acceptable. At least five fasteners in each row are necessary common to the
aft channel, forward channel and repair strap inboard of the trim line.
1.
2. Install all parts with BMS 5-95 sealant.
3. All trimmed edges and repair parts should be finished to 125 microinches or better.
More DataQtyIdentificationNameTaskStep
---FastenersRemove1
-1-PlateRemove / Keep2
-1-Aft ChannelCut3
-1-Trimmed SectionRemove4
To aft channel to
match adjacent
structure.
--PaintApply5
0.071 thick 2024-T3.1ARepair StrapMake6
One coat BMS 10-
11, Type I.
--PaintApply
Trim as necessary.1ARepair StrapInstall (New)
-1-PlateInstall (Kept)7
FIGURE 7: ALTERNATIVE MODIFICATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
49 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 50

The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below are the
number of fasteners necessary for this figure.
More DataHole DiaQtyIdentificationNameCode
Install with BMS 5-95
sealant.
0.2026 -
0.2036
-BACB30MY6K( )XBoltD
---BACC30M6Collar
Install with BMS 5-95
sealant.
0.2651 -
0.2661
-BACB30MY8K( )XBoltE
---BACC30M8Collar
Install with BMS 5-95
sealant.
0.216 - 0.219-BACB30MY6K4YBoltF
---BACC30R6Collar
Install with BMS 5-95
sealant.
0.2495 -
0.2505 (a)
-BACB30MY8K4BoltG
---BACC30M8Collar
(a) Before the hole is made larger, do an open hole HFEC inspection at these locations in accordance with
747 NDT Part 6, 51-00-00, Procedure 1 or Procedure 11 or Procedure 16. If no cracking is found, make
the fastener holes the size shown.
FIGURE 7: ALTERNATIVE MODIFICATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
50 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 51 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
This Figure applies only to: Group 2.
SIA
760
STA  TENSION
760  TIE
STA
780
UP
INBD  FWD
S-11
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
5)  FORWARD
TYPICAL (1  0.50R  20  CHANNEL
(TYPICAL)
AFT CHANNEL
P5 + 4
S-12  48 F8  767557144
0.38 (TYPICAL)
VIEW A-A
LEFT SIDE SHOWN
UP
RIGHT SIDE OPPOSITE
—INBD
FOR OPTIONAL TRIM  SEE DETAIL I  R09702
FIGURE 8: ALTERNATIVE MODIFICATION
(SHEET 1 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2088
Work - See page 1 for details.  51 of 62

### Page 52 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
S-11
0.50R
(TYPICAL)
S-12
78 48 49
B
0.38 (TYPICAL)
UP
DETAIL I
OPTIONAL TRIM  > INBD
AFT CHANNEL
FUSELAGE
FRAME
VIEW B-B
LEFT SIDE SHOWN  FORWARD CHANNEL
RIGHT SIDE OPPOSITE
FIGURE 8: ALTERNATIVE MODIFICATION
(SHEET 2 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  52 of 62

### Page 53 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
AFT CHANNEL
0.19  FORWARD CHANNEL
AFT
0.43 MIN
(TYPICAL)
- 2.06
SECTION C-C
12.30  • 0.19R
(TYPICAL)
11.50
1.30
2.06
11.25
REPAIR STRAP B
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE  R09708
FIGURE 8: ALTERNATIVE MODIFICATION
(SHEET 3 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  747-53A2088  53 of 62

### Page 54

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
NOTE:
The figure shows two alternate aft channel trims. Any trim line that is between those shown
in the figure is acceptable. At least five fasteners in each row are necessary common to the
aft channel, forward channel and repair strap inboard of the trim line.
1.
2. Install all parts with BMS 5-95 sealant.
3. All trimmed edges and repair parts should be finished to 125 microinches or better.
More DataQtyIdentificationNameTaskStep
---FastenersRemove1
-1-PlateRemove / Keep2
-1-Aft ChannelCut3
-1-Trimmed SectionRemove4
To aft channel to
match adjacent
structure.
1-PaintApply5
0.071 thick 2024-T3.1BRepair StrapMake6
One coat BMS 10-
11, Type I.
--PaintApply
Trim as necessary-BRepair StrapInstall (New)
-1-PlateInstall (Kept)7
FIGURE 8: ALTERNATIVE MODIFICATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
54 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 55

The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below are the
number of fasteners necessary for this figure.
More DataHole DiaQtyIdentificationNameCode
Install with BMS 5-95
sealant.
0.2026 -
0.2036
-BACB30MY6K( )XBoltD
---BACC30M6Collar
Install with BMS 5-95
sealant.
0.2651 -
0.2661
-BACB30MY8K( )XBoltE
---BACC30M8Collar
Install with BMS 5-95
sealant.
0.216 - 0.219-BACB30MY6K4YBoltF
---BACC30R6Collar
Install with BMS 5-95
sealant.
0.2495 -
0.2505 (a)
-BACB30MY8K4BoltG
---BACC30M8Collar
(a) Before the hole is made larger, do an open hole HFEC inspection at these locations in accordance with
747 NDT Part 6, 51-00-00, Procedure 1 or Procedure 11 or Procedure 16. If no cracking is found, make
the fastener holes the size shown.
FIGURE 8: ALTERNATIVE MODIFICATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
55 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 56 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
This Figure applies only to: Group 3.
STA
780
STA  TENSION
780  TIE
UP
INBD <  →FWD
S-11  LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
3)5  FORWARD
TYPICAL Q  0.50R  20  CHANNEL
(TYPICAL)  AFT CHANNEL
S-12  + 44
0.38 (TYPICAL)
VIEW A-A
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
UP
SEE DETAIL I
FOR OPTIONAL TRIM  —→ INBD  R09714
FIGURE 9: ALTERNATIVE MODIFICATION
(SHEET 1 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  56 of 62

### Page 57 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
S-11
0.50R  X7
(TYPICAL)
48 78 9 99  44 47
S-12  7898 to o to  744: 4444
- 0.38 (TYPICAL)
DETAIL I  UP
OPTIONAL TRIM
—→ INBD
AFT CHANNEL
FUSELAGE
FRAME
VIEW B-B
FORWARD CHANNEL
LEFT SIDE SHOWN
2X7  RIGHT SIDE OPPOSITE
R09716
FIGURE 9: ALTERNATIVE MODIFICATION
(SHEET 2 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  747-53A2088  57 of 62

### Page 58 (OCR)

BOEING SERVICE BULLETIN 747-53A2088
ALERT  ALERT
AFT CHANNEL
0.19  FORWARD CHANNEL
27
AFT
0.43 MIN
(TYPICAL)
2.06
SECTION C-C
- 12.70  - 0.19R
(TYPICAL)
- 11.75
1.40
2.06
- 11.75
REPAIR STRAP C
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
FIGURE 9: ALTERNATIVE MODIFICATION
(SHEET 3 OF 5)
Original Issue: March 08, 1974
Revision 4 January 11, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2088
Work - See page 1 for details.  58 of 62

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
More DataQtyIdentificationNameTaskStep
---FastenersRemove1
-1-PlateRemove / Keep2
-1-Aft ChannelCut3
-1-Trimmed SectionRemove4
To aft channel to
match adjacent
structure.
1-PaintApply5
0.071 thick 2024-T3.1CRepair StrapMake6
One coat BMS 10-
11, Type I.
1-PaintApply
Trim as necessary.-CRepair StrapInstall (New)
-1-PlateInstall (Kept)7
FIGURE 9: ALTERNATIVE MODIFICATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
59 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

### Page 60

The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below are the
number of fasteners necessary for this figure.
More DataHole DiaQtyIdentificationNameCode
Install with BMS 5-95
sealant.
0.2026 -
0.2036
-BACB30MY6K( )XBoltD
---BACC30M6Collar
Install with BMS 5-95
sealant.
0.2651 -
0.2661
-BACB30MY8K( )XBoltE
---BACC30M8Collar
Install with BMS 5-95
sealant.
0.216 - 0.219-BACB30MY6K4YBoltF
---BACC30R6Collar
Install with BMS 5-95
sealant.
0.2495 -
0.2505 (a)
-BACB30MY8K4BoltG
---BACC30M8Collar
(a) Before the hole is made larger, do an open hole HFEC inspection at these locations in accordance with
747 NDT Part 6, 51-00-00, Procedure 1 or Procedure 11 or Procedure 16. If no cracking is found, make
the fastener holes the size shown.
FIGURE 9: ALTERNATIVE MODIFICATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 08, 1974
747-53A2088Revision 4 January 11, 2013
60 of 62
BOEING SERVICE BULLETIN 747-53A2088
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/747-53a2088/file/86d9a976942a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
