# Boeing Alert Service Bulletin 747-53A2427: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0425; AD 2014-07-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-53A2427](https://openairdocs.org/service-documents/boeing/747-53a2427.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 118
- PDF: https://openairdocs.org/files/sha256/d6/31/d631c7ba0d9a3cc52f5154fee398948d779a86753fc39d18a0e06719946c1570
- Page: https://openairdocs.org/service-documents/boeing/747-53a2427/file/d631c7ba0d9a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-53A2427
Original Issue: December 17, 1998
Revision 6: July 14, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Tail Section - Body Station 2598 Bulkhead Inner Chord and Web
Inspection
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 1998 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
1 of 118
2.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
2 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 2 2
B. Concurrent Requirements ...................................... 2 2
C. Reason ................................................ 2 3
D. Description .............................................. 2 3
E. Compliance .............................................. 2 4
F. Approval ............................................... 3 5
G. Manpower .............................................. 3 5
H. Weight and Balance Changes .................................... 3 6
I. Electrical Load Data ......................................... 3 6
J. References .............................................. 3 6
1. Existing Data: ......................................... 3 6
2. Data supplied with this Service Bulletin: ........................... 3 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 3 7
K. Publications Affected ........................................ 3 7
L. Interchangeability and Intermixability of Parts ........................... 3 8
2. MATERIAL INFORMATION ........................................ 3 9
A. Material - Price and Availability ................................... 3 9
B. Industry Support Information .................................... 3 9
C. Parts Necessary For Each Airplane ................................. 3 9
1. Kits/Parts: ........................................... 3 9
2. Parts and Materials Supplied by the Operator: ........................ 3 9
3. Parts Modified and Reidentified: ............................... 3 9
4. Parts Removed and Not Replaced: .............................. 3 9
D. Parts Necessary to Change Spares ................................. 3 9
E. Special Tooling - Price and Availability ............................... 3 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 1
A. GENERAL INFORMATION ..................................... 4 1
B. WORK INSTRUCTIONS ....................................... 4 2
FIGURE 1: DELETED ............................................ 4 7
FIGURE 2: INSPECTION .......................................... 4 8
FIGURE 3: DELETED ............................................ 5 5
FIGURE 4: WEB CRACK REMOVAL ................................... 5 6
FIGURE 5: INSPECTION - POST REPAIR / INTERIM MODIFICATION - REPAIRED/MODIFIED AREA
.................................................. 5 9
FIGURE 6: INSPECTION - POST REPAIR / INTERIM MODIFICATION - FORWARD SIDE ...... 6 8
FIGURE 7: WEB REPAIR OR INTERIM MODIFICATION - NO EXISTING INNER CHORD REPAIR OR
INTERIM MODIFICATION [Group 1, Configuration 1] .................... 7 2
FIGURE 8: WEB REPAIR OR INTERIM MODIFICATION - NO EXISTING INNER CHORD REPAIR OR
INTERIM MODIFICATION [Group 2-3, Configuration 1] ................... 8 2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
3 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 4

FIGURE 9: UPPER WEB REPAIR - EXISTING INNER CHORD REPAIR OR INTERIM MODIFICATION
[Group 1, Configuration 2] ................................... 9 2
FIGURE 10: UPPER WEB REPAIR - EXISTING INNER CHORD REPAIR OR INTERIM MODIFICATION
[Group 2-3, Configuration 2] ................................. 1 0 4
APPENDIX A: SERVICE HISTORY ..................................... 1 1 6
APPENDIX B: PREVIOUS REVISION CHANGE INFORMATION ..................... 1 1 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
4 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 5

Commercial 
Airplanes
747
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 747-53A2427Original Issue: December 17, 1998
Revision 6: July 14, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Tail Section - Body Station 2598 Bulkhead Inner Chord and Web
Inspection
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes changed in accordance with the original issue and Revisions 1 thru 5 of
this service bulletin. Open hole and surface high-frequency eddy current (HFEC) inspections for cracks in the
bulkhead upper and lower web panels are to be accomplished in accordance with this revision.
The effectivity groups are changed with this revision. Airplanes with line numbers 1-1241 (group 1 airplanes
before this revision) are now divided into group 1 (line number 1-695 airplanes) and group 2 (line number
696-1241 airplanes). The group 1 airplanes have a bonded doubler on the bulkhead web which has an affect
on the web repair added with this revision. Airplanes with line numbers 1242-1307 (group 2 airplanes before
this revision) are now group 3 airplanes. The interim modification given in this service bulletin is applicable to
group 1 and group 2 airplanes only.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-14-07 is related to this service bulletin.
AD 2010-14-07 supersedes AD 2006-05-06 which superseded AD 2001-15-03.
REASON FOR REVISION
After the release of Revision 5 of this service bulletin, several operators found cracks in the bulkhead upper and
lower web panels near the inner chord to shear deck connection. Open hole and surface HFEC inspections for
such cracks (plus web repairs and post-repair inspections) have been added with this revision as a result of
these crack findings.
These sections of the service bulletin have been changed:
1. Summary: updated the Background, Action and Manpower paragraphs and graphic to address added web
inspections.
2. Planning Information
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
5 of 118

### Page 6

a. Paragraph 1.A.1., Group Configuration table: revised airplane groups to account for differences in the
bulkhead web configurations.
b. Paragraph 1.C., Reason and Paragraph 1.D., Description: added information about bulkhead web
cracks and associated inspections/repairs.
c. Paragraph 1.E., Compliance: revised compliance tables to give new web inspection and repair data.
Moved the interim modification data into Table 1 and moved the post-repair/modification data to Table
3.
d. Paragraph 1.G., Manpower: revised manpower data to account for added web inspection.
3. Accomplishment Instructions:
Part 1: added instruction for web inspections and repairs and changed to a table format to give the
inspection/repair/modification alternatives.
Part 3: created new Part 3 to give the post-repair/modification work.
Part 4: created new Part 4 to give upper web repair work.
4. Figure 2: added upper and lower web inspection.
5. Figure 4: changed this figure to give the web crack removal work and removed the interim repair instruction
which now appears in figures 7 and 8.
6. Figure 5: added post-repair/modification inspection of the upper web and added new post-repair configuration
for the upper web repair.
7. Figure 7, 8: added these figures to give upper web repair for group 1 and group 2,3 airplanes respectively.
These figures also give the instruction for the interim modification which is changed in configuration to be
equivalent to the upper web repair minus the web trim out and the associated filler(s).
8. Figure 9, 10: added these figures to give upper web repair for airplanes that have an existing inner chord
repair or interim modification.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
December 17, 1998Original Issue:
October 28, 1999Revision 1:
October 05, 2000Revision 2:
September 27, 2001Revision 3:
March 06, 2008Revision 4:
October 01, 2009Revision 5:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
6 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 7

July 14, 2011Revision 6:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
7 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 8

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
8 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
747
Service Bulletin
ALERT
SummaryNumber: 747-53A2427Original Issue: December 17, 1998
Revision 6: July 14, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Tail Section - Body Station 2598 Bulkhead Inner Chord and Web
Inspection
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of the inspections given in this service bulletin will make sure that cracks in the splice fitting,
frame support, floor support, forward and aft inner chords, and upper and lower web panels of the Body Station
(STA) 2598 bulkhead are found and repaired before the crack damage can have an affect on flight safety. The
horizontal stabilizer hinge fittings are attached to the STA 2598 bulkhead. Cracks in the bulkhead splice fittings,
frame supports, web, or inner chords that are not found and repaired could extend with continued use of the
airplane and adversely affect the structural integrity of the bulkhead and the horizontal stabilizer support structure.
Eleven operators have told Boeing about cracks that were found in the aft inner chord of the STA 2598 bulkhead
on 14 airplanes. In addition, three operators have also told Boeing about cracks that were found in the forward
inner chord of the STA 2598 bulkhead on three airplanes. These cracks were all found near the upper corners
of the cutout for the horizontal stabilizer rear spar. Refer to Appendix A for more information about service history.
NOTE: Refer to Appendix B for Revision 1, 2, 3, 4 and 5 change information previously described in this Service
Bulletin.
After the release of Revision 5 of this service bulletin, several operators reported cracks in the bulkhead upper
and lower web panels near the inner chord to shear deck connection. Cracks found in the upper bulkhead web
were 0.55 inch to 0.80 inches in length and cracks found in the lower bulkhead web were 0.20 inch to 1.30
inches in length. Two operators have reported web cracks on airplanes with 8,435 and 8,940 total flight-cycles
while other reports were for web cracks found on airplanes with greater than 20,000 total flight cycles.
Boeing Structural Item Interim Advisory (SIIA) 747-167 is related to this Service Bulletin.
Boeing Service Related Problem (SRP) 747/747OP-SRP-53-0106; 747/747OP-SRP-53-0316 and
747-SRP-53-0343 are related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
9 of 118

### Page 10

ACTION (PRR 85901-103RS)
Do open hole and surface high frequency eddy current (HFEC) inspections for cracks in the left and right side
splice fitting, frame support, forward and aft inner chords and floor support. In addition, do open hole and surface
HFEC inspections for cracks in the bulkhead upper web (left and right sides) and lower web (left side only) near
the aft inner chord to shear deck connection.
If no crack(s) are found, repeat the open hole and surface HFEC inspections, or alternatively, accomplish a
modification in accordance with Service Bulletin 747-53A2473. No further action is required by this service
bulletin after modification in accordance with Service Bulletin 747-53A2473.
If crack(s) are found in the aft inner chord only, accomplish the upper chord repair given in this service bulletin,
or alternatively, accomplish a modification in accordance with Service Bulletin 747-53A2473.
If a crack is found in the splice fitting, frame support, forward inner chord, or floor support, contact Boeing for
repair data and do the repair.
If a crack is found in the bulkhead upper web panel, accomplish the upper web repair given in this Service
Bulletin, or alternatively, accomplish a bulkhead (Support Frame) modification in accordance with Service Bulletin
747-53A2473.
If a crack is found in the bulkhead lower web, accomplish the bulkhead modification or contact Boeing for repair
data and do the repair.
For Group 1 and group 2 airplanes, an interim modification is to be accomplished by the time given in Paragraph
1.E., Compliance if the modification given in Service Bulletin 747-53A2473 is not accomplished by that time.
EFFECTIVITY
747-100/-100B/-100B SUD/-200B/-200C/-200F/-300/-400/-400D/-400F/SP/SR Airplanes. Refer to Paragraph
1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
See Paragraph 1.E., Compliance for compliance information.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-14-07 is related to this service bulletin.
AD 2010-14-07 supersedes AD 2006-05-06 which superseded AD 2001-15-03.
Also, Federal Aviation Administration (FAA) Airworthiness Directive AD 2004-07-22 R1 is related to this service
bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection and/or repair procedures given in this service
bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
10 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 11 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
MATERIAL INFORMATION
None.
STA  ACCOMPLISH OPEN HOLE AND SURFACE
2598  HFEC INSPECTIONS FOR CRACKS IN
THE FORWARD AND AFT INNER CHORDS,
FRAME SUPPORT FITTING, SPLICE
FITTINGS AND UPPER WEB PANEL.
ACCOMPLISH REPAIRS AS NECESSARY
AND REGULAR REPEAT INSPECTIONS,
STA  OR ALTERNATIVELY, ACCOMPLISH A
2598  BULKHEAD (SUPPORT FRAME)
MODIFICATION.
HORIZONTAL
STABILIZER
FRAME
SUPPORT
AFT INNER CHORD
ACCOMPLISH OPEN HOLE HFEC
INSPECTION FOR CRACKS IN THE
LOWER WEB PANEL.
ACCOMPLISH REGULAR REPEAT
INSPECTIONS. IF CRACKS ARE FOUND
ACCOMPLISH A BULKHEAD (SUPPORT
UP
FRAME) MODIFICATION, OR CONTACT
BOEING FOR REPAIR DATA AND DO
THE REPAIR.
Original Issue: December 17, 1998
Revision 6: July 14, 2011  747-53A2427
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  11 of 118

### Page 12

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
12 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT
BLANK PAGE

### Page 13

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-53A2427
Original Issue: December 17, 1998
Revision 6: July 14, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Tail Section - Body Station 2598 Bulkhead Inner Chord and Web
Inspection
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below.
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes Line Number 1 to 695-1
Airplanes that do not have the interim modification or aft inner chord
SRM repair
1
Airplanes that have the interim modification or aft inner chord SRM
repair installed.
2
Airplanes Line Number 696 to 1241-2
Airplanes that do not have the interim modification or aft inner chord
SRM repair
1
Airplanes that have the interim modification or aft inner chord SRM
repair
2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
13 of 118

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
Airplanes Line Number 1242 to 1307-3
Airplanes that do not have an aft inner chord SRM repair1
Airplanes that have an aft inner chord SRM repair2
Airplane Models:
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400,
747-400D, 747-400F, 747SP, 747SR
GroupVariable Number
1RA001 - RA034
1RA101 - RA115
1RA161 - RA164
1RA201 - RA203
1RA216 - RA217
1RA245 - RA246
1RA251 - RA266
1RA301 - RA318
1RA351 - RA360
1RA369 - RA373
1RA401 - RA418
1RA501 - RA502
1RA521 - RA528
1RA532 - RA548
1RA551 - RA552
1RA559 - RA561
1RA581 - RA582
1RA585
1RA601 - RA602
1RA631 - RA635
1RA651 - RA652
1RA671 - RA677
1RA701 - RA702
1RA721 - RA731
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
14 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 15

GroupVariable Number
1RA741 - RA745
1RA749 - RA750
1RA761 - RA762
1RA781 - RA784
1RA901 - RA916
1RB001 - RB016
1RB041 - RB044
1RB071 - RB075
1RB101 - RB102
1RB411 - RB412
2RB413
2RB421
1RB601 - RB607
1RB681 - RB697
1RB711
1RB721 - RB723
1RB741 - RB748
1RD001 - RD004
1RD021 - RD022
1RD041 - RD059
1RD071 - RD072
1RD081 - RD083
1RD091 - RD092
1RD101 - RD104
1RD121 - RD127
1RD131 - RD144
1RD166 - RD167
1RD171 - RD172
1RD181 - RD183
1RD201 - RD204
1RD221 - RD227
1RD231 - RD234
2RD235
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
15 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 16

GroupVariable Number
1RD241 - RD243
1RD251 - RD262
1RD271 - RD272
1RD291 - RD292
1RD301 - RD302
1RD311
1RD351 - RD358
1RD361 - RD366
1RD381 - RD383
1RD411 - RD414
1RD421 - RD426
1RD431 - RD435
1RD441 - RD442
1RD451 - RD456
1RD461
1RD471 - RD475
1RD513 - RD519
1RD531 - RD533
1RD551
1RD561
1RD571
1RD581 - RD583
1RD591 - RD593
1RD601 - RD607
1RD621 - RD623
1RD641 - RD649
1RD651 - RD659
1RD661
1RD671
1RD681 - RD682
1RD691 - RD692
1RD701 - RD702
1RD721 - RD722
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
16 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 17

GroupVariable Number
1RD741 - RD742
1RD751 - RD755
1RD761
1RD771 - RD775
1RD781 - RD783
1RD791
2RD792
1RE001
1RG001 - RG009
1RG091
1RG095
1RG101 - RG104
1RG121 - RG126
1RG141 - RG142
1RG161 - RG164
1RG171 - RG174
1RG191 - RG193
1RG211 - RG213
1RG221 - RG222
1RH101 - RH102
1RH111 - RH112
1RH121 - RH122
1RJ131 - RJ133
1RJ151 - RJ152
1RJ301 - RJ303
1RJ321
2RJ322
1RJ331 - RJ333
3RL401 - RL402
3RL411 - RL419
3RL651 - RL654
3RL751
2RM001 - RM003
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
17 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 18

GroupVariable Number
3RM004 - RM007
3RM010
2RM011 - RM012
3RM013
2RM021 - RM024
2RM026 - RM027
3RM028 - RM029
2RM036 - RM038
3RM039 - RM040
2RM041
3RM042 - RM045
2RM051
3RM052
2RM071
2RM081 - RM084
2RM091
2RM096 - RM097
2RM116 - RM117
2RM126 - RM131
3RM132
2RM136 - RM147
2RM156 - RM157
3RM158
2RM166 - RM176
3RM177
2RM191 - RM192
2RM231 - RM232
3RM233
2RM241 - RM244
3RM245 - RM246
2RM261 - RM264
2RM316
3RM317 - RM318
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
18 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 19

GroupVariable Number
2RM331 - RM333
3RM341
3RM351 - RM355
3RM366 - RM367
2RM801
3RM802 - RM803
2RM811 - RM813
2RM851 - RM852
3RM853 - RM858
2RM861
3RM862
2RM871
3RM872 - RM876
2RM881 - RM885
3RM886
2RM891 - RM899
2RM901
3RM902 - RM905
2RM911
1RR001 - RR005
1RR021 - RR023
2RR024 - RR025
1RR031
1RR201 - RR205
2RR206
1RR221 - RR226
1RR261 - RR267
1RR301 - RR306
2RR307 - RR310
1RR331 - RR332
1RR336
1RR341 - RR345
1RR361 - RR362
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
19 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 20

GroupVariable Number
1RR421 - RR422
1RR431 - RR432
1RR441
2RR442
2RR451
1RR501 - RR504
1RR521
2RR522
2RR526
1RR531
1RR551 - RR554
2RR555 - RR556
1RR561
2RR566
2RR701
2RR721 - RR724
2RR746 - RR748
2RR851 - RR856
2RR861 - RR862
2RR951 - RR952
1RS001 - RS002
1RS201
1RS211 - RS212
1RS221 - RS222
1RS231 - RS241
1RS251 - RS259
2RS263
1RS265 - RS268
1RS271 - RS276
1RS291 - RS292
1RS301 - RS305
2RS306
1RS311 - RS320
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
20 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 21

GroupVariable Number
2RS331 - RS333
1RS341 - RS342
1RS699
1RS701 - RS703
1RS711 - RS713
1RS721 - RS722
2RS731 - RS732
1RS741 - RS743
1RS751 - RS752
1RS761
2RS762
1RS771
2RS781 - RS782
2RS786
2RT001 - RT014
2RT021 - RT022
2RT031 - RT035
2RT041 - RT047
2RT061
2RT071 - RT075
2RT101 - RT103
2RT121
2RT131 - RT137
2RT151 - RT152
2RT161 - RT168
2RT401 - RT412
2RT431 - RT447
2RT451 - RT469
2RT471 - RT499
2RT501 - RT535
2RT551 - RT568
2RT571 - RT591
2RT601 - RT657
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
21 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 22

GroupVariable Number
2RT671 - RT673
2RT681 - RT682
2RT691 - RT699
2RT701 - RT704
2RT711 - RT717
2RT741 - RT757
2RT776 - RT777
2RT781 - RT784
2RT801 - RT803
2RT811 - RT814
2RT831 - RT837
2RT861 - RT864
2RT876 - RT880
2RT931 - RT932
2RT945 - RT949
2RT951 - RT955
2RT966 - RT967
2RU001 - RU006
2RU016 - RU017
2RU031 - RU032
2RU051 - RU052
2RU059 - RU062
2RU081 - RU083
2RU101 - RU102
2RU121 - RU132
2RU801 - RU809
2RU831 - RU841
2. Spares Affected
None.
B. Concurrent Requirements
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
22 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 23

C. Reason
Accomplishment of the inspections given in this service bulletin will make sure that cracks in the splice
fitting, frame support, floor support, forward and aft inner chords, and upper and lower web panels of
the Body Station (STA) 2598 bulkhead are found and repaired before the crack damage can have an
affect on flight safety. The horizontal stabilizer hinge fittings are attached to the STA 2598 bulkhead.
Cracks in the bulkhead splice fittings, frame supports, web, or inner chords that are not found and
repaired could extend with continued use of the airplane and adversely affect the structural integrity of
the bulkhead and the horizontal stabilizer support structure.
Eleven operators have told Boeing about cracks that were found in the aft inner chord of the STA 2598
bulkhead on 14 airplanes. In addition, three operators have also told Boeing about cracks that were
found in the forward inner chord of the STA 2598 bulkhead on three airplanes. These cracks were all
found near the upper corners of the cutout for the horizontal stabilizer rear spar. Refer to Appendix A
for more information about service history.
NOTE: Refer to Appendix B for Revision 1, 2, 3, 4 and 5 change information previously described in
this Service Bulletin.
After the release of Revision 5 of this service bulletin, several operators reported cracks in the bulkhead
upper and lower web panels near the inner chord to shear deck connection. Cracks found in the upper
bulkhead web were 0.55 inch to 0.80 inches in length and cracks found in the lower bulkhead web
were 0.20 inch to 1.30 inches in length. Two operators have reported web cracks on airplanes with
8,435 and 8,940 total flight-cycles while other reports were for web cracks found on airplanes with
greater than 20,000 total flight cycles.
Boeing Structural Item Interim Advisory (SIIA) 747-167 is related to this Service Bulletin.
Boeing Service Related Problem (SRP) 747/747OP-SRP-53-0106, 747/747OP-SRP-53-0316, and
747-SRP-53-0343 are related to this service bulletin.
Revision 6 is sent to give instruction for open hole and surface HFEC inspections for cracks in the
bulkhead upper and lower web panels and to give associated repair data.
D. Description
Do open hole and surface high frequency eddy current (HFEC) inspections for cracks in the left and
right side splice fitting, frame support, forward and aft inner chords and floor support. In addition, do
open hole and surface HFEC inspections for cracks in the bulkhead upper web (left and right sides)
and lower web (left side only) near the aft inner chord to shear deck connection.
If no crack(s) are found, repeat the open hole and surface HFEC inspections, or alternatively, accomplish
a bulkhead (Support Frame) modification in accordance with Service Bulletin 747-53A2473. No further
action is required by this service bulletin after modification in accordance with Service Bulletin
747-53A2473.
If crack(s) are found in the aft inner chord only, accomplish the chord repair given in this service bulletin,
or alternatively, accomplish a modification in accordance with Service Bulletin 747-53A2473.
If a crack is found in the splice fitting, frame support, forward inner chord, or floor support, contact
Boeing for repair data and do the repair.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
23 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 24

If a crack is found in the bulkhead upper web panel, accomplish the upper web repair given in this
Service Bulletin, or alternatively, accomplish a modification in accordance with Service Bulletin
747-53A2473.
If a crack is found in the bulkhead lower web, accomplish the modification or contact Boeing for repair
data and do the repair.
For Group 1 and group 2 airplanes, an interim modification is to be accomplished by the time given in
Paragraph 1.E., Compliance if the modification given in Service Bulletin 747-53A2473 is not
accomplished by that time.
NOTE: Refer to Appendix B for Revision 1, 2, 3, 4 and 5 change information previously described in
this Service Bulletin.
Revision 6 - More work is necessary on airplanes changed as shown in the original issue and revisions
1 thru 5 of this service bulletin. Open hole and surface high-frequency eddy current (HFEC) inspections
for cracks in the bulkhead upper and lower web panels are to be accomplished in accordance with this
revision.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
315, 316747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C,
747-200F, 747-300, 747SP,
747SR
Group 2:
Affected Maintenance Zones
ZoneModel
315, 316747-200B, 747-200C, 747-200F,
747-300, 747-400, 747-400D,
747-400F
Group 3:
Affected Maintenance Zones
ZoneModel
315, 316747-400, 747-400F
E. Compliance
Refer to the tables below to find the applicable compliance times.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
24 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 25

Applicable Compliance Ta-
bles
Airplanes
1, 3Group 1,2
2, 3Group 3
Group 1-2:
Table 1: Bulkhead Inspection, Repair and Modification - Group 1, 2 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--The work given in this
service bulletin is not
necessary.
Bulkhead (Support Frame)
modification given in Boe-
ing service bulletin 747-
53A2473 or 747-53-2473
has been accomplished.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
25 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 26

Group 1-2:
Table 1: Bulkhead Inspection, Repair and Modification - Group 1, 2 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 6,000 total
flight cycles or
within 500 flight cy-
cles after the date
on Revision 2 of
this service bul-
letin, whichever
occurs later.
Do a surface high frequen-
cy eddy current (HFEC)
inspection for cracks at
specified locations in the
bulkhead splice fitting,
frame support, and for-
ward and aft inner chords
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 1.
Bulkhead (Support Frame)
modification given in Boe-
ing service bulletin 747-
53A2473 or 747-53-2473
has not been accom-
plished.
See note (b).
-Before 6,000 total
flight cycles or
within 1,500 flight
cycles after the
date on Revision 4
of this service bul-
letin, whichever
occurs later.
Do an open hole and sur-
face HFEC inspection for
cracks at specified loca-
tions in the bulkhead
splice fitting, frame sup-
port, forward and aft inner
chords, and floor support
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 1.
-Before 6,000 total
flight cycles or
within 1,500 flight
cycles after the
date on Revision 6
of this Service Bul-
letin, whichever
occurs later.
Do a surface HFEC in-
spection for cracks in the
bulkhead upper web in
accordance with Accom-
plishment Instructions
3.B., Part 1.
-Before 6,000 total
flight cycles or
within 3,000 flight
cycles after the
date on Revision 6
of this service bul-
letin, whichever
occurs later.
Do an open hole and sur-
face HFEC inspection for
cracks in the bulkhead
lower web in accordance
with Accomplishment In-
structions 3.B., Part 1.
-Before further
flight.
Accomplish the modifica-
tion given in Boeing ser-
vice bulletin 747-53A2473
Lower web has a crack.
Or
Contact Boeing for repair
data and do the repair.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
26 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 27

Group 1-2:
Table 1: Bulkhead Inspection, Repair and Modification - Group 1, 2 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
3,000 flight cyclesWithin 3,000 flight-
cycles after the ini-
tial inspection.
Repeat the open hole and
surface HFEC inspec-
tions for cracks in the
bulkhead lower web in
accordance with Accom-
plishment Instructions
3.B., Part 1.
Lower web doesn't have a
crack.
See note (a), (b).
--Repair in accordance in
accordance with Accom-
plishment Instructions
3.B., Part 1 and do post-
repair inspections in ac-
cordance with Table 3.
Crack in the aft inner chord
and/or a crack in the upper
web that is contained within
the allowed trim out area.
Continue lower web in-
spections in accordance
with this table
Or
Accomplish the modifica-
tion given in Boeing ser-
vice bulletin 747-
53A2473.
-Before further
flight.
Contact Boeing for repair
data and do the repair.
Crack(s) found in the splice
fitting, frame support, for-
ward inner chord, or floor
support
Or
Crack in the upper web that
extends outside the al-
lowed trim area.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
27 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 28

Group 1-2:
Table 1: Bulkhead Inspection, Repair and Modification - Group 1, 2 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
1,500 flight cyclesWithin 1,500 flight-
cycles after the ini-
tial inspection.
Repeat the forward and
aft side open hole and
surface HFEC inspec-
tions for cracks in the
bulkhead splice fitting,
frame support, forward
and aft inner chords and
the bulkhead upper web
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 1.
No cracks found in the
bulkhead splice fitting,
frame support, forward and
aft inner chords, upper
web, or floor support.
See note (a), (b), (c).
3,000 flight cyclesWithin 3,000 flight-
cycles after the ini-
tial inspection.
Repeat the open hole and
surface HFEC inspec-
tions for cracks in the
bulkhead lower web in
accordance with Accom-
plishment Instructions
3.B., Part 1.
See note (a), (b).
-Before 12,000 total
flight cycles or
within 1,500 flight
cycles after the
date on Revision 4
of this service bul-
letin, whichever
occurs later.
Install interim modification
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 2.
See note (a), (b), (d).
Do post-modification in-
spections in accordance
with Table 3.
Interim modification in-
stalled
Continue lower web in-
spections in accordance
with this table
See note (a), (b).
(a) As an alternative to repeat inspections, accomplish the modification given in Boeing service
bulletin 747-53A2473. No further action is required by this service bulletin after modification
in accordance with Boeing service bulletin 747-53A2473.
(b) Federal Aviation Administration (FAA) Airworthiness Directive 2010-14-07 requires that
the modification given in Boeing service bulletin 747-53A2473 be accomplished before
20,000 total flight cycles, or within 18 months after the effective date of the AD, whichever
occurs later.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
28 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 29

Group 1-2:
Table 1: Bulkhead Inspection, Repair and Modification - Group 1, 2 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(c) As an alternative to repeat inspections at the given intervals, accomplish the interim
modification and do post-modification inspections in accordance with Table 3.
(d) If the aft inner chord repair or upper web repair has been accomplished in accordance
with this service bulletin, it is not necessary to accomplish the interim modification on the
side of the airplane that has the repair.
Group 3:
Table 2: Bulkhead Inspection, Repair and Modification - Group 3 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--The work given in this
service bulletin is not
necessary.
Bulkhead (Support Frame)
modification given in Boe-
ing service bulletin 747-
53A2473 or 747-53-2473
has been accomplished.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
29 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 30

Group 3:
Table 2: Bulkhead Inspection, Repair and Modification - Group 3 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 16,000 total
flight cycles or
within 500 flight cy-
cles after the date
on Revision 2 of
this service bul-
letin, whichever
occurs later.
Do a surface high frequen-
cy eddy current (HFEC)
inspection for cracks at
specified locations in the
bulkhead splice fitting,
frame support, and for-
ward and aft inner chords
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 1.
Bulkhead (Support Frame)
modification given in Boe-
ing service bulletin 747-
53A2473 or 747-53-2473
has not been accom-
plished.
See note (b).
-Before 16,000 total
flight cycles or
within 1,500 flight
cycles after the
date on Revision 4
of this service bul-
letin, whichever
occurs later.
Do an open hole and sur-
face HFEC inspection for
cracks at specified loca-
tions in the bulkhead
splice fitting, frame sup-
port, forward and aft inner
chords, and floor support
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 1.
-Before 16,000 total
flight cycles or
within 1,500 flight
cycles after the
date on Revision 6
of this Service Bul-
letin, whichever
occurs later.
Do a surface HFEC in-
spection for cracks in the
bulkhead upper web in
accordance with Accom-
plishment Instructions
3.B., Part 1.
-Before 16,000
flight cycles or
within 3,000 flight
cycles after the
date on Revision 6
of this service bul-
letin, whichever
occurs later.
Do an open hole and sur-
face HFEC inspection for
cracks in the bulkhead
lower web in accordance
with Accomplishment In-
structions 3.B., Part 1.
-Before further
flight.
Accomplish the modifica-
tion given in Boeing ser-
vice bulletin 747-53A2473
Lower web has a crack.
Or
Contact Boeing for repair
data and do the repair.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
30 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 31

Group 3:
Table 2: Bulkhead Inspection, Repair and Modification - Group 3 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
3,000 flight cyclesWithin 3,000 flight-
cycles after the ini-
tial inspection.
Repeat the open hole and
surface HFEC inspec-
tions for cracks in the
bulkhead lower web in
accordance with Accom-
plishment Instructions
3.B., Part 1.
Lower web doesn't have a
crack.
See note (a), (b).
--Repair in accordance in
accordance with Accom-
plishment Instructions
3.B., Part 1 and do post-
repair inspections in ac-
cordance with Table 3.
Crack in the aft inner chord
and/or a crack in the upper
web that is contained within
the allowed trim out area.
Continue lower web in-
spections in accordance
with this table
Or
Accomplish the modifica-
tion given in Boeing ser-
vice bulletin 747-
53A2473.
-Before further
flight.
Contact Boeing for repair
data and do the repair.
Crack(s) found in the splice
fitting, frame support, for-
ward inner chord, or floor
support
Or
Crack in the upper web that
extends outside the al-
lowed trim area.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
31 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 32

Group 3:
Table 2: Bulkhead Inspection, Repair and Modification - Group 3 Airplanes
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
1,500 flight cyclesWithin 1,500 flight-
cycles after the ini-
tial inspection.
Repeat the forward and
aft side open hole and
surface HFEC inspec-
tions for cracks in the
bulkhead splice fitting,
frame support, forward
and aft inner chords and
the bulkhead upper web
in accordance with Ac-
complishment Instruc-
tions 3.B., Part 1.
No cracks found in the
bulkhead splice fitting,
frame support, forward and
aft inner chords, upper
web, or floor support.
See note (a), (b).
3,000 flight cyclesWithin 3,000 flight-
cycles after the ini-
tial inspection.
Repeat the open hole and
surface HFEC inspec-
tions for cracks in the
bulkhead lower web in
accordance with Accom-
plishment Instructions
3.B., Part 1.
See note (a), (b).
(a) As an alternative to repeat inspections, accomplish the modification given in Boeing service
bulletin 747-53A2473. No further action is required by this service bulletin after modification
in accordance with Boeing service bulletin 747-53A2473.
(b) Federal Aviation Administration (FAA) Airworthiness Directive 2010-14-07 requires that
the modification given in Boeing service bulletin 747-53A2473 be accomplished before
20,000 total flight cycles, or within 18 months after the effective date of the AD, whichever
occurs later.
NOTE: In addition to the post-repair/modification inspection given in Table 3 below, inspection of the
lower web is to continue in accordance with Table 1 until a bulkhead (Support Frame)
modification is accomplished.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
32 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 33

Table 3: Post-Repair Inspection or Post-Interim Modification Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
1,500 flight cyclesWithin 1,500 flight cycles after the
last forward side surface HFEC
inspection.
Do forward side surface
high frequency eddy cur-
rent (HFEC) post-repair
inspection for cracks in
accordance with Accom-
plishment Instructions
3.B., Part 3.
Existing Interim modifica-
tion or aft inner chord re-
pair.
No upper web repair.
See note (a), (b), (c).
1,500 flight cyclesWithin 6,000 flight cycles after ac-
complishment of the chord and/or
web repair.
Do surface and open hole
HFEC post-repair inspec-
tions for cracks in the re-
paired area of the bulk-
head in accordance with
Accomplishment Instruc-
tions 3.B., Part 3.
See note (a), (b).
1,500 flight cyclesWithin 1,500 flight cycles after the
last forward side surface HFEC
inspection.
Do forward side surface
high frequency eddy cur-
rent (HFEC) post-repair
inspection for cracks in
accordance with Accom-
plishment Instructions
3.B., Part 3.
Existing upper web repair.
See note (d).
See note (a), (b), (c).
1,500 flight cyclesWithin 3,000 flight cycles after ac-
complishment of the chord and/or
web repair.
Do surface and open hole
HFEC post-repair inspec-
tions for cracks in the re-
paired area of the bulk-
head in accordance with
Accomplishment Instruc-
tions 3.B., Part 3.
See note (a), (b).
-Before further flight.Accomplish the modifica-
tion given in Boeing ser-
vice bulletin 747-53A2473
Crack found in the aft inner
chord with chord post-re-
pair inspection or post-inter-
im modification inspection. See note (b)
Or
Contact Boeing for repair
data and do the repair.
-Before further flight.Contact Boeing for repair
data and do the repair.
Crack found in the upper
web and crack extends
outside the allowed trim out
area.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
33 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 34

Table 3: Post-Repair Inspection or Post-Interim Modification Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Remove the existing re-
pair/modification parts
and accomplish an upper
web repair in accordance
with Accomplishment In-
structions 3.B., Part 4.
Continue post-repair in-
spections as given above
in this table.
Crack found in the upper
web and crack is contained
within the allowed trim out
area.
See note (a), (b).
Or
Accomplish the modifica-
tion given in Boeing ser-
vice bulletin 747-53A2473
See note (b)
Or
Contact Boeing for repair
data and do the repair.
-Before further flight.Contact Boeing for repair
data and do the repair.
Crack found in the splice
fitting, frame support, for-
ward inner chord, or floor
support with post-repair in-
spection.
(a) As an alternative to a repair and post-repair inspections, accomplish the modification given in Boeing
service bulletin 747-53A2473. No further action is required by this service bulletin after modification in
accordance with Boeing service bulletin.
(b) Federal Aviation Administration (FAA) Airworthiness Directive 2010-14-07 requires the modification given
in Boeing service bulletin 747-53A2473 be accomplished before 20,000 total flight cycles, or within 18
months after the effective date of the AD, whichever occurs later.
(c) The SRM refers to this Service Bulletin for continued (post-repair) inspection in 'the non-repaired areas."
This inspection of the forward side of the bulkhead is the inspection in the non-repaired areas.
(d) This condition is for an upper web repair installed as a stand alone repair, or as a replacement for a
previously installed inner chord repair or a previously installed Interim Modification. For the condition
where the upper web repair is a replacement repair, the given compliance times refer to when the replace-
ment web repair was accomplished.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-14-07 is related to this service
bulletin. AD 2010-14-07 supersedes AD 2006-05-06 which superseded AD 2001-15-03.
Also, Federal Aviation Administration (FAA) Airworthiness Directive AD 2004-07-22 R1 is related to
this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
34 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 35

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
The Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the inspections, repairs
and interim modification with the corresponding compliance times specified in Tables 1, 2 and 3, under
paragraph 1.E., "Compliance," of SB 747-53A2427, Revision 6 as an AMOC to the inspections, repairs
and interim modification at the STA 2598 bulkhead required by paragraphs (i), (j), (o), (s), (t), (u) and
(v) of AD 2010-14-07. This AMOC is valid only for areas where inspections, repairs or interim modification
are done in accordance with this SB. When this SB specifies contacting Boeing for repair data, the
repair data must be approved by the FAA in accordance with paragraph (x) of the AD. All provisions
of AD 2010-14-07 that are not specifically referenced in this paragraph remain fully applicable and
must be complied with.
In addition, the Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the inspections,
repairs and interim modification with the corresponding compliance times specified in Tables 1, 2 and
3, under paragraph 1.E., "Compliance," of SB 747-53A2427, Revision 6 as an AMOC to the inspections,
repairs and interim modification at the STA 2598 required by paragraphs (h), (i), and (j) of AD 2004-07-22
R1 for the areas inspected by Boeing 747 Supplemental Structural Inspection Document (SSID)
D6-35022, Revision G, Significant Structural Items F-49B, F-49C, and F-49J. This AMOC only applies
to the areas that are inspected as given in this service bulletin. When this service bulletin specifies
contacting Boeing for repair, rework, or modification data, the data must be approved by the FAA in
accordance with paragraph (l) of the AD. All provisions of AD 2004-07-22 R1 that are not specifically
referenced in this paragraph remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
35 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 36

Group 1 Airplanes
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.750.751Open Access
9.2518.52Inspect
1.753.502Interim Modification
0.750.751Close Access
12.523.5TOTAL FOR EACH AIRPLANE
Note: More time will be required if cracks are found and repair(s) installed.
H. Weight and Balance Changes
NOTE: Weight and balance changes reflect an interim modification installation on the left and right
side of the airplane.
Group 1
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+ 22180.0+ 1.0747SP/SR
Group 2, 3
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
++ 1.0747-100 / -100B / -
100BSUD / -200B /
200C / -300 / -400 /
-400D
++ 1.0747-200F / -400F
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-103RS
b. Service Related Problem (SRP) 747/747OP-SRP-53-0106
c. Service Related Problem (SRP) 747/747OP-SRP-53-0316
d. Service Related Problem (SRP) 747-SRP-53-0343
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
36 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 37

e. 747 Structural Item Interim Advisory 747-167
f. Boeing Parts Standards Document D-590
g. Boeing Service Bulletin 747-53-2473, 747-53A2473
h. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2001-15-03, 2004-07-22,
2006-05-06, 2010-14-07
i. Standard Overhaul Practices Manual (SOPM) 20-10-03, 20-20-02, 20-41-02, 20-43-01,
20-43-03
j. 747 Non-Destructive Testing (NDT) Manual Part 6, 51-00-00
k. 747-100/200/300 Aircraft Maintenance Manual (AMM) 27-41-02
l. 747-400 Aircraft Maintenance Manual (AMM) 27-41-02
m. 747-100/200/300 Structural Repair Manual (SRM) 53-10-04
n. 747-400 Structural Repair Manual (SRM) 53-80-08
o. 747-SP Structural Repair Manual (SRM) 53-19-02
p. 747-400F SRM 53-80-08
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
BULKHEAD INSTL - UPPER LOBE, STA 259865B02502
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
37 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 38

L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
38 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 39

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes, inspection and/or repairs
given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
The parts and fasteners needed to accomplish the interim modification on a group 1 airplane are
identified in the step and fastener tables of FIGURE 7.
The parts and fasteners needed to accomplish the interim modification on a group 2 or group 3
airplane are identified in the step and fastener tables of FIGURE 8.
See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
NOTE: Boeing plans to provide kit data in an Information Notice or a future revision to this service
bulletin.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
39 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 40

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
40 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT
BLANK PAGE

### Page 41

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions identified in Paragraph 3.B., Work Instructions and the Figure(s)
give the recommended sequence of steps. The sequence of steps to do this service
bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are given in 747 SRM, Chapter 51
– Torque limits to tighten nuts and bolts are given in 747 SRM, Chapter 51
5. For approved fastener and process material substitutions, refer to 747 SRM, Chapter
51. Alternate fasteners are given in 747 SRM Chapter 51 and Boeing Drawing 747,
021W6100.
6. If the length of any fastener specified in this service bulletin does not meet the
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
41 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 42

8. Unless otherwise noted, all fasteners to be installed with head on the near side at
fastener symbol locations.
9. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
10. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2010-14-07
supersedes AD 2006-05-06 and requires the support frame modification as given in
Boeing service bulletin 747-53A2473 be accomplished before the accumulation of
20,000 total flight cycles or within 18 months after the effective date of the AD,
whichever occurs later.
B. WORK INSTRUCTIONS
PART 1: INSPECTION AND REPAIR
1. Remove electrical and hydraulic power. Refer to 747-100/200/300 AMM 27-41-02 or 747-400 AMM
27-41-02 as an accepted procedure.
2. For access to the aft side of the of the STA 2598 bulkhead, open APU Battery Access Door 315A.
Open Horizontal Stabilizer Jackscrew Access Door 312A to get access to the forward side of the
STA 2598 bulkhead through the access holes in the bulkheads at STA 2484, 2502, and 2517.
CAUTION: DO NOT USE THE JACK POINT AT BODY STATION 2596 (PRIMARY TAIL JACK
POINT III) DURING OPEN HOLE HFEC INSPECTIONS OR INSTALLATION OF
REPAIRS.
3. Accomplish open hole and surface high frequency eddy current (HFEC) inspections for cracks in
the forward and aft inner chords, frame supports, splice fittings, floor supports, and upper and
lower web panels in accordance with FIGURE 2 and Paragraph 1.E., Compliance.
4. If a crack is indicated at a fastener hole with the open hole inspection, an attempt can be made to
remove the crack by increasing the fastener hole diameter in accordance with FIGURE 2. Repeat
the open hole inspection in accordance with FIGURE 2 after the hole is oversized.
If the inspections given in FIGURE 2 are accomplished with no crack indications (following hole
oversize and reinspection if/where necessary), go to step 5 of Part 1 below.
If a crack is indicated by an inspection given in FIGURE 2, make a repair or modification in
accordance with the table below and Paragraph 1.E., Compliance.
Repair/Modification AlternativesCrack Description/Location
Bulkhead (Support Frame) modification (a)Aft inner chord crack only.
Chord repair (b)
Bulkhead (Support Frame) modification (a)Upper web crack only and crack is contained
within the maximum allowed trim out area. Upper web repair (c)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
42 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 43

Repair/Modification AlternativesCrack Description/Location
Bulkhead (Support Frame) modification (a)Aft inner chord crack plus upper web crack, and
web crack is contained within the maximum al-
lowed trim out area.
Chord trim plus upper web repair (f)
Special Repair (d)
Bulkhead (Support Frame) modification (e)Lower web crack.
Special Repair (d)
Special repair (d)Crack in the Splice fitting, frame support, forward
inner chord, floor support, or upper web crack
that extends outside the maximum allowed trim
area.
(a) Accomplish a bulkhead (Support Frame) modification in accordance with 747-53A2473. No
further action is required by this service bulletin after the modification is accomplished. Federal
Aviation Administration (FAA) Airworthiness Directive 2010-14-07 requires the modification
given in Boeing service bulletin 747-53A2473.
(b) If a crack is found in the aft inner chord only (no cracks found in other components), accomplish
a repair in accordance with 747-100/200/300 SRM 53-10-04 Figure 72, 747-SP SRM 53-19-
02 or 747-400 SRM 53-80-08, Repair 11 as applicable and Paragraph 1.E., Compliance. Do
post-repair inspections in accordance with Paragraph 3.B., Work Instructions, Part 3.
(c) Accomplish the upper web repair in accordance with Paragraph 3.B., Work Instructions, Part
4 and Paragraph 1.E., Compliance. Do post-repair inspections in accordance with Paragraph
3.B., Work Instructions, Part 3.
(d) Contact Boeing for repair data and do the repair.
(e) A lower web crack repair can be accomplished with bulkhead (Support Frame) modification
in accordance with 747-53A2473.
(f) Remove the crack from the aft inner chord and inspect the chord to make sure that the crack
is removed in accordance with 747-100/200/300 SRM 53-10-04 Figure 72, 747-SP SRM 53-
19-02 or 747-400 SRM 53-80-08, Repair 11 as applicable. After trim of the chord, accomplish
a web repair in accordance with Paragraph 3.B., Work Instructions, Part 4 and Paragraph
1.E., Compliance. Do post-repair inspections in accordance with Paragraph 3.B., Work Instruc-
tions, Part 3.
5. If the inspections given in FIGURE 2 are accomplished with no crack indications (following hole
oversize and reinspection if/where necessary), install fasteners at the open hole inspection locations
in accordance with FIGURE 2. Repeat the surface and open hole HFEC inspections in accordance
with Paragraph 1.E., Compliance.
As an alternative to repeat inspections, accomplish bulkhead (Support Frame) modification in
accordance with 747-53A2473. No further action is required by this service bulletin after the
bulkhead modification is accomplished.
6. For Group 1, 2 airplanes that do not have the bulkhead modification, accomplish the interim
modification in accordance with Paragraph 3.B., Work Instructions, Part 2 by the time given in
Paragraph 1.E., Compliance. It is not necessary to accomplish this interim modification on the side
of the bulkhead where a chord repair or an upper web repair has been accomplished in accordance
with this service bulletin. After accomplishment of the interim modification, do post-modification
inspections in accordance with Paragraph 3.B., Work Instructions, Part 3.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
43 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 44

Group 1-2:
PART 2: INTERIM MODIFICATION
CAUTION: DO NOT USE THE JACK POINT AT BODY STATION 2596 (PRIMARY TAIL JACK
POINT III) DURING INSTALLATION OF INTERIM MODIFICATION.
1. Accomplish the interim modification where necessary in accordance with Paragraph 1.E.,
Compliance and FIGURE 7 (Group 1 airplanes) or FIGURE 8 (Group 2, 3 airplanes) as applicable.
Accomplish post-modification inspections in accordance with Paragraph 1.E., Compliance and
Paragraph 3.B., Work Instructions, Part 3.
PART 3: POST-REPAIR OR POST-INTERIM MODIFICATION INSPECTION
1. After a repair is accomplished in accordance with Part 1 or an interim modification is accomplished
in accordance with Part 2, do forward side surface HFEC inspections for cracks in the bulkhead
forward inner chord, splice fitting and frame support in accordance with FIGURE 6 and Paragraph
1.E., Compliance.
After a repair is accomplished in accordance with Part 1 or an interim modification is accomplished
in accordance with Part 2, do open hole and surface high frequency eddy current (HFEC) inspections
for cracks in the modified area of the bulkhead in accordance with FIGURE 5 and Paragraph 1.E.,
Compliance.
Continue inspections of the lower web in accordance with FIGURE 2 and Paragraph 1.E.,
Compliance.
As an alternative to the above inspections, accomplish a bulkhead (Support Frame) modification
in accordance with 747-53A2473. No further action is required by this service bulletin after the
bulkhead modification is accomplished.
2. If/where a crack is indicated with the above post-repair/interim modification inspections, accomplish
a repair or modification in accordance with the table below and Paragraph 1.E., Compliance.
Repair/Modification AlternativesCrack Description/Location
Bulkhead (Support Frame) modification (a)Aft inner chord crack or lower web crack.
Special repair (c)
Special repair (c)Crack in the Splice fitting, frame support, forward
inner chord, floor support.
Bulkhead (Support Frame) modification(a)Upper web crack that is within the maximum al-
lowed trim out area. Upper web repair (b)
Special repair (c)
Special repair (c)Upper web crack that is outside of the maximum
allowed trim out area.
(a) Accomplish bulkhead (Support Frame) modification in accordance with 747-53A2473. No
further action is required by this service bulletin after the modification is accomplished. Federal
Aviation Administration (FAA) Airworthiness Directive 2010-14-07 requires the modification
given in Boeing service bulletin 747-53A2473.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
44 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 45

Repair/Modification AlternativesCrack Description/Location
(b) Remove the existing repair/modification parts and accomplish an upper web repair in accor-
dance with Paragraph 3.B., Work Instructions, Part 4. Continue post-repair inspections as
given above in this table.
(c) Contact Boeing for repair data and do the repair.
PART 4: UPPER WEB REPAIR
1. Accomplish an upper web repair if necessary/applicable as given below:
Group 1, Configuration 1:
Remove the crack from the upper web in accordance with FIGURE 4. The upper web repair is
applicable only if the web crack is contained within the maximum allowed trim out area. After the
web is trimmed and inspected in accordance with FIGURE 4, complete the upper web repair in
accordance with FIGURE 7. Following the upper web repair, do post-repair open hole and surface
high frequency eddy current (HFEC) inspections in accordance with Paragraph 3.B., Work
Instructions, Part 3, and Paragraph 1.E., Compliance.
If the web crack extends outside the maximum allowed trim out area, contact Boeing for repair
data and do the repair.
Group 1, Configuration 2:
Remove the existing repair/modification parts and remove the crack from the upper web in
accordance with FIGURE 4. The upper web repair is applicable only if the web crack is contained
within the maximum allowed trim out area. After the web is trimmed and inspected in accordance
with FIGURE 4, complete the upper web repair in accordance with FIGURE 9. Following the upper
web repair, do post-repair open hole and surface high frequency eddy current (HFEC) inspections
in accordance with Paragraph 3.B., Work Instructions, Part 3, and Paragraph 1.E., Compliance.
If the web crack extends outside the maximum allowed trim out area, contact Boeing for repair
data and do the repair.
Group 2-3, Configuration 1:
Remove the crack from the upper web in accordance with FIGURE 4. The upper web repair is
applicable only if the web crack is contained within the maximum allowed trim out area. After the
web is trimmed and inspected in accordance with FIGURE 4, complete the upper web repair in
accordance with FIGURE 8. Following the upper web repair, do post-repair open hole and surface
high frequency eddy current (HFEC) inspections in accordance with Paragraph 3.B., Work
Instructions, Part 3, and Paragraph 1.E., Compliance.
If the web crack extends outside the maximum allowed trim out area, contact Boeing for repair
data and do the repair.
Group 2-3, Configuration 2:
Remove the existing repair/modification parts and remove the crack from the upper web in
accordance with FIGURE 4. The upper web repair is applicable only if the web crack is contained
within the maximum allowed trim out area. After the web is trimmed and inspected in accordance
with FIGURE 4, complete the upper web repair in accordance with FIGURE 10. Following the
upper web repair, do post-repair open hole and surface high frequency eddy current (HFEC)
inspections in accordance with Paragraph 3.B., Work Instructions, Part 3, and Paragraph 1.E.,
Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
45 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 46

If the web crack extends outside the maximum allowed trim out area, contact Boeing for repair
data and do the repair.
PART 5: RESTORATION
1. Close all access doors that were opened for access to the STA 2598 bulkhead.
2. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6: July 14, 2011
46 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 47 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
THIS FIGURE IS DELETED.
INFORMATION IS NOW CONTAINED IN
PARAGRAPH 1.E., COMPLIANCE.
1423714
FIGURE 1: DELETED
(SHEET 1 OF 1)
riginal Issue: December 11, 100
evision 6 July 14, 201  747-53A2427
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  47 of 118

### Page 48 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
STA
2598
FORWARD SIDE
INSPECTION  STA
SEE A  2598
AFT SIDE
INSPECTION
SEE
HORIZONTAL
STABILIZER
FRAME
SUPPORT
LOWER WEB
INSPECTION
SEE O
AFT INNER CHORD
UP
→ FWD
S64517
FIGURE 2: INSPECTION
(SHEET 1 OF 7)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  LEAVES LAL
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  48 of 118

### Page 49 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
FORWARD  BULKHEAD
FORWARD
INNER CHORD  WEB  INNER  BULKHEAD
WEB
CHORD
INSPECTION
AREA  SPLICE
TYPICAL  FITTING
CRACK
TYPICAL
• SHEAR  CRACK
AFT INNER
DECK  UP
CHORD  SPLICE
FITTING
UP  FWD<
SEE ®  DECK  SHEAR
FRONT VIEW  A-A
INBD '  FWD  (LEFT SIDE SHOWN  SHEAR
FRAME
RIGHT SIDE OPPOSITE)  DECK  SUPPORT
INSPECTION
AREA  (4) SPLICE
FITTING
STA
2598  FORWARD INNER
CHORD
SHEAR DECK
UP
TYPICAL FRAME
> FWD  SUPPORT CRACK  FWD
SPLICE  FRONT VIEW
FITTING  (LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE)
B—B  FRAME SUPPORT  S64578
FIGURE 2: INSPECTION
(SHEET 2 OF 7)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  BOEING PROPRIETARY -  747-53A2427
Copyright © Unpublished Work - See page 1 for details.  49 of 118

### Page 50 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
FORWARD INNER CHORD
•AFT INNER CHORD
BULKHEAD
UPPER
WEB
• BULKHEAD
UPPER WEB
1/8/13/14  3.8  FLOOR
SUPPORT
2.00
14
SPLICE
FITTING  TYPICAL
WEB
CRACK
191314
AFT  CHORD INSPECTION
INNER  S AREA
CHORD
UP
7 WEB INSPECTION AREA
INBD  1 (AFT SIDE)
FRAME  REAR VIEW
SUPPORT  (LEFT SIDE SHOWN  WEB INSPECTION AREA
(FORWARD SIDE) AND
RIGHT SIDE OPPOSITE)  CHORD INSPECTION  (AFT SIDE)  1474320
FIGURE 2: INSPECTION
(SHEET 3 OF 7)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  BOEING PROPRIETARY -  747-53A2427
Copyright © Unpublished Work - See page 1 for details.  50 of 118

### Page 51 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
AFT INNER
TYPICAL CRACK  CHORD
10BL
13) 14
STA 2598
BULKHEAD
SPLICE
FITTING
2D MINIMUM
(TYPICAL)
BULKHEAD
THIS WORK APPLICABLE  LOWER WEB
→ INBD  LEFT SIDE ONLY
WEB INSPECTION  2017960
AREA
FIGURE 2: INSPECTION
(SHEET 4 OF 7)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  747-53A2427
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  51 of 118

### Page 52

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
-10-FastenersRemove1
(a)--Forward Inner ChordInspect2
(a)--Aft Inner ChordInspect3
(a)--Splice FittingInspect4
(a)--Frame SupportInspect5
(a) (c)--Aft Inner ChordInspect6
(a) (d)--Web (aft side)Inspect7
--Web (forward side)Inspect
(b) (c) (e)--Aft Inner ChordInspect8
Forward Inner Chord
Splice Fitting
(b) (e)--Aft Inner ChordInspect9
Frame Support
Splice Fitting
FIGURE 2: INSPECTION
(SHEET 5 OF 7)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6 July 14, 2011
52 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 53

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(b) (c) (e)--Aft Inner ChordInspect10
Web
Floor Support
(b) (e)--Aft Inner ChordInspect11
Web
Forward Inner Chord
Splice Fitting
(b) (d) (e)--Aft Inner ChordInspect12
Web and Doubler
Floor Support
(g) See fastener
code table for hole
sizes.
10 (g)-Fastener HoleDrill/Ream13 (f)
-10 (g)FastenerInstall14
(a) Do a surface high frequency eddy current (HFEC) inspection for cracks in accordance with
747 NDT, Part 6, 51-00-00 Figure 4 or 23. The inspection area is shown shaded in the figure.
(b) Do an open hole high frequency eddy current (HFEC) inspection for cracks at the identified
fastener hole in accordance with 747 NDT, Part 6, 51-00-00 Figure 1, 11 or 16.
(c) The inspection given in this step has a compliance time related to the date on Revision 4 of
this service bulletin.
(d) The inspection given in this step has a compliance time related to the date on Revision 6 of
this service bulletin.
(e) If a crack is indicated, the hole diameter can be increased up to a maximum 1/32 inch oversize
to remove the crack. After the hole diameter is increased, repeat the open hole HFEC inspec-
tion (in accordance with 747 NDT, Part 6, 51-00-00 Figure 1, 11 or 16). If a crack indication
remains after a 1/32 oversize, more repair work is necessary. Do not install fasteners.
(f) The work given in this step is to be done one time only with the initial open hole inspection.
This work will make it easier to remove the fasteners for repeat inspections. If this work has
been accomplished, this step is not applicable.
(g) Do not drill/ream and install fasteners at the three fastener holes common to the inboard leg
of the aft inner chord and the upper web in this step if the interim-modification is to be accom-
plished before the next flight. Fasteners will be installed with the interim modification parts
at these locations.
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener. The QTY numbers shown below are the
number of fasteners necessary for this figure.
If the grip length shown is not available, fasteners may be one grip length longer than indicated. Also, if any of
the fastener part numbers are not available or have been superseded, Boeing Document D590 and Boeing
drawing 012W6100 may be used to determine the part numbers used as substitutes.
FIGURE 2: INSPECTION
(SHEET 6 OF 7)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6 July 14, 2011
53 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 54

MORE DATAHOLE DIAQTYIDENTIFICA-
TION
NAMECODE
(a) (b) (d) (e) (f)Close Ream
0.2495/0.2505
6BACB30MY8K( )BOLTJ
6BACC30M8COLLAR
(a) (c) (g) (h) (i)Close Ream
0.3120/0.3130
4BACB30MY10K12BOLTK
4BACC30M10COLLAR
(a) Close ream holes are specified to facilitate subsequent open hole HFEC inspections and prevent contin-
uous oversizing.
(b) If necessary, up to 1/32 oversize is allowed. For 1/64 oversize use BACB30MY8K( )X and BACC30M8 in
0.2661/0.2651 close diameter hole. For 1/32 oversize use BACB30MY8K( )Y and BACC30R8 in
0.2817/0.2807 diameter hole.
(c) If necessary, up to 1/32 oversize is allowed. For 1/64 oversize use BACB30MY10K( )X and BACC30M10
in 0.3286/0.3276 close diameter hole, and 1/32 oversize use BACB30MY10K( )Y and BACC30R10 in
0.3442/0.3432 diameter hole.
(d) Alternate fastener: For standard size use BACB30NT4K( ) BOLT, BACW10BP4CD WASHER under head,
BACW10BP4DP WASHER under nut and BACN10JC4CD NUT. Torque nut 63 - 67 inch/pounds.
(e) Alternate fastener: For 1/64 oversize use BACB30LK4K( )X BOLT, BACW10BP41CD WASHER under
head, BACW10BP41DP WASHER under nut and BACN10JC4CD NUT. Torque nut 63 - 67 inch/pounds.
(f) Alternate fastener: For 1/32 oversize use BACB30LK4K( )Y BOLT, BACW10BP42CD WASHER under
head, BACW10BP42DP WASHER under nut and BACN10JC4CD NUT. Torque nut 63 - 67 inch/pounds.
(g) Alternate fastener: For standard size use BACB30NT5K( ) BOLT, BACW10BP5CD WASHER under head,
BACW10BP5DP WASHER under nut and BACN10JC5CD NUT. Torque nut 120 - 130 inch/pounds (target
is 125).
(h) Alternate fastener: For 1/64 oversize use BACB30LK5K( )X BOLT, BACW10BP51CD WASHER under
head, BACW10BP51DP WASHER under nut and BACN10JC5CD NUT. Torque nut 120 - 130 inch/pounds
(target is 125).
(i) Alternate fastener: For 1/32 oversize use BACB30LK5K( )Y BOLT, BACW10BP52CD WASHER under
head, BACW10BP52DP WASHER under nut and BACN10JC5CD NUT. Torque nut 120 - 130 inch/pounds
(target is 125).
FIGURE 2: INSPECTION
(SHEET 7 OF 7)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6 July 14, 2011
54 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 55 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
THIS FIGURE IS DELETED.
INFORMATION IS NOW CONTAINED IN
PARAGRAPH 1.E., COMPLIANCE.
1423730
FIGURE 3: DELETED
(SHEET 1 OF 1)
riginal Issue: December 11, 100
evision 6 July 14, 201  747-53A2427
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  55 of 118

### Page 56 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
STA
2598
STA
2598
SEE A
HORIZONTAL
STABILIZER
1 10
›FWD
1474137
FIGURE 4: WEB CRACK REMOVAL
(SHEET 1 OF 3)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  LEAVES LAL
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  811099

### Page 57 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
FORWARD INNER CHORD
STA 2598  BULKHEAD
BULKHEAD
UPPER WEB
FLOOR
-REFERENCE  SUPPORT
EDGE OF
REMOVED  TYPICAL
CRACK
CHORD
TYPICAL
TRIM OUT
LINE
1.7D MINIMUM
1.7D MINIMUM
(IF APPLICABLE)
MAXIMUM TRIM-OUT AREA
AND WEB INSPECTION AREA
LOCATION WHERE FASTENER COMMON TO
THE INNER CHORD WILL BE INSTALLED
LATER WITH THE REPAIR PARTS.
SPLICE  REAR VIEW
FITTING  UP
LEFT SIDE SHOWN  → INBD  1474141
RIGHT SIDE OPPOSITE
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for a web crack repair on one side of the bulkhead.
FIGURE 4: WEB CRACK REMOVAL
(SHEET 2 OF 3)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  BOEING PROPRIETARY -  747-53A2427
Copyright © Unpublished Work - See page 1 for details.  57 of 118

### Page 58

NOTE: After the work given in this figure is accomplished, the web repair is to be completed in accordance
with FIGURE 7 or FIGURE 9 (group 1 airplanes) or FIGURE 8 or FIGURE 10 (group 2, 3 airplanes).
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
2-Strut AssemblyRemove/Keep1
2-Back-Up FittingRemove/Keep2
1-Aft Inner ChordRemove/Keep3
(a)10-FastenerRemove4
(b)--WebTrim5
(c)--WebInspect6
(d) (e)--FinishApply7
(f)1-Aft Inner ChordInstall/Kept8
-2-Back-Up FittingInstall/Kept9
-2-Strut AssemblyInstall/Kept10
(a) To permit separation of the web and the floor support, remove the fasteners common to these
parts at the 10 locations shown in the figure.
(b) Install a temporary/protective shim between the web and floor support, or use other means, to
prevent damage to the floor support when the web is trimmed. Trim material from the web as
necessary to remove crack damage. The inside radius on the trim out is to be not less than
0.50 inch, and the web surface finish is to be 125 micro-inches or better. The trim out can extend
to the maximum limits shown if necessary to remove the crack.
(c) Do a surface high frequency eddy current (HFEC) inspection of the web and all web trimmed
edges for cracks in accordance with 747 NDT Part 6, 51-00-00 Figure 4 or 23 to make sure
that there is no indication from a remaining crack.
(d) Apply a chemical conversion coating to all bare aluminum surfaces. Refer to SOPM 20-43-03,
Type 2, Class A.
(e) Apply BMS 10-11, Type 1 primer. Refer to SOPM 20-41-02.
(f) Do not install fasteners common to the aft inner chord at the locations identified in the figure.
These fasteners will be installed later with the repair/modification parts.
FIGURE 4: WEB CRACK REMOVAL
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 17, 1998
747-53A2427Revision 6 July 14, 2011
58 of 118
BOEING SERVICE BULLETIN 747-53A2427
ALERTALERT

### Page 59 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
STA
2598
STA
2598
WHICHEVER SHOWS
THE ACTUAL REPAIR
OR MODIFICATION
CONFIGURATION
SEE TA
HORIZONTAL
STABILIZER
FRAME SUPPORT
AFT INNER CHORD
→ FWD
LEFT SIDE SHOWN  1474285
RIGHT SIDE OPPOSITE
FIGURE 5: INSPECTION - POST REPAIR / INTERIM MODIFICATION - REPAIRED/MODIFIED AREA
(SHEET 1 OF 9)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  747-53A2427
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  59 of 118

### Page 60 (OCR)

BOEING SERVICE BULLETIN 747-53A2427
ALERT  ALERT
FORWARD INNER CHORD
•AFT INNER CHORD
BULKHEAD
UPPER
WEB  FILLER
13
1514  BULKHEAD
10  - FLOOR  (13)  UPPER WEB
(2) 14  SUPPORT
SPLICE  1414  2.00
FITTING
SEE  FOR POST-
CHORD REPAIR
AFT  INSPECTION
INNER  THIS AREA
CHORD
AFT SIDE
FRAME  INSPECTION
SUPPORT  OUTER  AREA
ANGLE  FORWARD
UP  SIDE
JINBD  REAR VIEW  INNER  INSPECTION  AREA
ANGLE
INTERIM MODIFICATION INSTALLED IN ACCORDANCE  2016911
WITH REVISION 4 OR 5 OF THIS SERVICE BULLETIN
FIGURE 5: INSPECTION - POST REPAIR / INTERIM MODIFICATION - REPAIRED/MODIFIED AREA
(SHEET 2 OF 9)
Original Issue: December 17, 1998
Revision 6 July 14, 2011  BOEING PROPRIETARY -  747-53A2427
Copyright © Unpublished Work - See page 1 for details.  60 of 118

The text continues at https://openairdocs.org/service-documents/boeing/747-53a2427/file/d631c7ba0d9a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
