# Boeing Alert Service Bulletin 747-53A2473: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0425; AD 2014-07-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-53A2473](https://openairdocs.org/service-documents/boeing/747-53a2473.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 250
- PDF: https://openairdocs.org/files/sha256/6c/7a/6c7ad8329392be6bba30ee77f477049ea95cf6b1bdef0421341231a038d79d5d
- Page: https://openairdocs.org/service-documents/boeing/747-53a2473/file/6c7ad8329392

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
Number: 747-53A2473
Original Issue: March 24, 2005
Revision 4: December 01, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Section 48 - Body Station 2598 Bulkhead - Horizontal Stabilizer Hinge
Support Frame Cracking - Modification and Repair
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2005 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
1 of 250
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
2 of 250
BOEING SERVICE BULLETIN 747-53A2473
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 7
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 5
A. Effectivity ............................................... 1 5
1. Airplanes ............................................ 1 5
2. Spares Affected ........................................ 2 6
B. Concurrent Requirements ...................................... 2 6
C. Reason ................................................ 2 6
D. Description .............................................. 2 8
E. Compliance .............................................. 3 1
F. Approval ............................................... 4 6
G. Manpower .............................................. 4 7
H. Weight and Balance Changes .................................... 4 9
I. Electrical Load Data ......................................... 5 2
J. References .............................................. 5 2
1. Existing Data: ......................................... 5 2
2. Data supplied with this Service Bulletin: ........................... 5 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 5 3
K. Publications Affected ........................................ 5 3
L. Interchangeability and Intermixability of Parts ........................... 5 3
2. MATERIAL INFORMATION ........................................ 5 5
A. Material - Price and Availability ................................... 5 5
B. Industry Support Information .................................... 5 6
C. Parts Necessary For Each Airplane ................................. 5 6
1. Kits/Parts: ........................................... 5 6
2. Parts and Materials Supplied by the Operator: ........................ 7 4
3. Parts Modified and Reidentified: ............................... 7 5
4. Parts Removed and Not Replaced: .............................. 7 5
D. Parts Necessary to Change Spares ................................. 7 5
E. Special Tooling - Price and Availability ............................... 7 5
F. Special Tooling Necessary to do this Service Bulletin ....................... 7 6
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 7 7
A. GENERAL INFORMATION ..................................... 7 7
B. WORK INSTRUCTIONS ....................................... 7 8
FIGURE 1: ACCESS ............................................ 9 6
FIGURE 2: INSPECTION ......................................... 1 0 0
FIGURE 3: SUPPORT FRAME MODIFICATION ............................. 1 0 5
FIGURE 4: DELETED ........................................... 1 1 4
FIGURE 5: DELETED ........................................... 1 1 5
FIGURE 6: AFT INNER CHORD REPAIR OR INTERIM-MODIFICATION - PARTS AND FASTENER
REMOVAL ........................................... 1 1 6
FIGURE 7: UPPER FORWARD INNER CHORD AND FRAME SUPPORT FITTING - INSPECTION . 121
FIGURE 8: UPPER FORWARD INNER CHORD AND FRAME SUPPORT FITTING - FASTENER
INSTALLATION ........................................ 1 2 5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
3 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 4

FIGURE 9: POST-MODIFICATION INSPECTION PART 1 - SUPPORT FRAME AND ACCESS CUT-OUT
DETAILED INSPECTION ................................... 1 3 0
FIGURE 10: POST-MODIFICATION INSPECTION PART 1 - LOWER FLOOR SUPPORT CHORD SURFACE
HFEC INSPECTION ..................................... 1 3 2
FIGURE 11: POST-MODIFICATION INSPECTION PART 1 - OUTER CHORD LFEC INSPECTION . 137
FIGURE 12: POST-MODIFICATION INSPECTION PART 1 - OUTER CHORD SURFACE AND OPEN HOLE
HFEC INSPECTION ..................................... 1 3 9
FIGURE 13: POST-MODIFICATION INSPECTION PART 1 - SUPPORT FRAME OUTER CHORD AND
FRAME SUPPORT FITTING ULTRASONIC (UT) INSPECTION .............. 1 4 2
FIGURE 14: POST-MODIFICATION INSPECTION PART 2 - HINGE SUPPORT OPEN HOLE HFEC
INSPECTION ......................................... 1 4 4
FIGURE 15: POST-MODIFICATION INSPECTION PART 3 - SUPPORT FRAME INSPECTIONS . . 151
FIGURE 16: POST-MODIFICATION INSPECTION PART 3 - SUPPORT FRAME INSPECTIONS . . 155
FIGURE 17: POST-MODIFICATION INSPECTION PART 3 - SUPPORT FRAME INSPECTIONS . . 157
FIGURE 18: POST-MODIFICATION INSPECTION PART 3 - SUPPORT FRAME INSPECTIONS . . 159
FIGURE 19: AFT INNER CHORD - INSPECTION FOR UPPER AND LOWER CORNER REPAIRS . 162
FIGURE 20: LEFT SIDE UPPER CORNER WEB CRACK REPAIR (CONCURRENT WITH MODIFICATION)
[Group 1, 4, Configuration 1] ................................. 1 6 6
FIGURE 21: RIGHT SIDE UPPER CORNER WEB CRACK REPAIR (CONCURRENT WITH MODIFICATION)
[Group 1, 4, Configuration 1] ................................. 1 7 0
FIGURE 22: LEFT SIDE UPPER CORNER WEB CRACK REPAIR (CONCURRENT WITH MODIFICATION)
[Group 2, Configuration 1, 3; Group 3, Configuration 1, 3; Group 5] ............ 1 7 4
FIGURE 23: RIGHT SIDE UPPER CORNER WEB CRACK REPAIR (CONCURRENT WITH MODIFICATION)
[Group 2, Configuration 1, 3; Group 3, Configuration 1, 3; Group 5] ............ 1 7 7
FIGURE 24: LEFT SIDE LOWER CORNER WEB CRACK REPAIR (CONCURRENT WITH MODIFICATION)
[Group 1, Configuration 1-2; Group 2, Configuration 1-4; Group 3, Configuration 1-4; Group 4,
Configuration 1-2] ....................................... 1 8 0
FIGURE 25: EXISTING LEFT SIDE UPPER CORNER WEB REPAIR (REPAIRED IN ACCORDANCE WITH
SERVICE BULLETIN 747-53A2427) [Group 1, 4, Configuration 2] ............. 1 8 4
FIGURE 26: EXISTING RIGHT SIDE UPPER CORNER WEB REPAIR (REPAIRED IN ACCORDANCE WITH
SERVICE BULLETIN 747-53A2427) [Group 1, 4, Configuration 2] ............. 1 8 8
FIGURE 27: EXISTING LEFT SIDE UPPER CORNER WEB REPAIR (REPAIRED IN ACCORDANCE WITH
SERVICE BULLETIN 747-53A2427) [Group 2, Configuration 2, 4; Group 3, Configuration 2, 4]
................................................. 1 9 2
FIGURE 28: EXISTING RIGHT SIDE UPPER CORNER WEB REPAIR (REPAIRED IN ACCORDANCE WITH
SERVICE BULLETIN 747-53A2427) [Group 2, Configuration 2, 4; Group 3, Configuration 2, 4]
................................................. 1 9 6
FIGURE 29: POST-MODIFICATION INSPECTION PART 4 - LEFT SIDE UPPER CORNER WEB
POST-REPAIR INSPECTIONS ............................... 2 0 0
FIGURE 30: POST-MODIFICATION INSPECTION PART 4 - RIGHT SIDE UPPER CORNER WEB
POST-REPAIR INSPECTIONS ............................... 2 0 5
FIGURE 31: POST-MODIFICATION INSPECTION PART 4 - LEFT SIDE LOWER CORNER WEB
POST-REPAIR INSPECTIONS ............................... 2 1 0
FIGURE 32: LEFT SIDE UPPER CORNER WEB CRACK INSPECTION AND REPAIR (POST-MODIFIED
AIRPLANES) [Group 1, 4, Configuration 3] ......................... 2 1 3
FIGURE 33: RIGHT SIDE UPPER CORNER WEB CRACK INSPECTION AND REPAIR (POST-MODIFIED
AIRPLANES) [Group 1, 4, Configuration 3] ......................... 2 1 7
FIGURE 34: LEFT SIDE UPPER CORNER WEB CRACK INSPECTION AND REPAIR (POST-MODIFIED
AIRPLANES) [Group 2-3, Configuration 5; Group 5] .................... 2 2 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
4 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 5

FIGURE 35: RIGHT SIDE UPPER CORNER WEB CRACK INSPECTION AND REPAIR (POST-MODIFIED
AIRPLANES) [Group 2-3, Configuration 5; Group 5] .................... 2 2 5
FIGURE 36: LEFT SIDE LOWER CORNER WEB CRACK INSPECTION AND REPAIR (POST-MODIFIED
AIRPLANES) [Group 1, Configuration 3; Group 2-3, Configuration 5; Group 4, Configuration 3;
Group 5] ............................................ 2 2 9
FIGURE 37: POST-MODIFICATION INSPECTION PART 1 - LEFT SIDE UPPER CORNER WEB . . 234
FIGURE 38: POST-MODIFICATION INSPECTION PART 1 - RIGHT SIDE UPPER CORNER WEB . 237
FIGURE 39: POST-MODIFICATION INSPECTION PART 1 - LEFT SIDE LOWER CORNER WEB . . 240
Appendix A: SERVICE BULLETIN REVISION 1 REFERENCE CHANGE INFORMATION ....... 2 4 2
APPENDIX B: SERVICE BULLETIN REVISION 2 REFERENCE CHANGE INFORMATION ....... 2 4 7
APPENDIX C: OPERATOR SUPPLIED MATERIALS ............................ 2 4 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
5 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 6

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
6 of 250
BOEING SERVICE BULLETIN 747-53A2473
BLANK PAGE

### Page 7

Commercial 
Airplanes
747
Service Bulletin
Revision Transmittal SheetNumber: 747-53A2473Original Issue: March 24, 2005
Revision 4: December 01, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Section 48 - Body Station 2598 Bulkhead - Horizontal Stabilizer Hinge
Support Frame Cracking - Modification and Repair
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplane(s) changed in accordance with Revision 3 of this service bulletin, but only
if a post-modification inspection was accomplished in accordance with paragraph 3.B.8, Part 1, step a.6. of
Revision 3 of this service bulletin and an additional condition specified in this revision applies.
If both the above noted conditions apply, a one time surface high-frequency eddy current (HFEC) inspection of
the support frame outer chord for cracks is to be accomplished at one fastener location on each side of the
bulkhead.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-14-07 is related to this service bulletin.
REASON FOR REVISION
This revision is sent to give a revised sheet 7 (DCN B) of drawing 624U0061 which adds one fastener location
(each side) to the support frame outer chord crack inspection. The added fastener location was inadvertantly
omitted from the drawing sheet provided with the previous release of this service bulletin. The revised sheet 7
of drawing 624U0061 also includes a changed/corrected use of flagnote 2.
This revision is also sent to change the group applicability assigned to Figures 10, 12 and 13 and to Table 6 of
Paragraph 1.E., Compliance. In the previous release of this service bulletin, these group applicabilities were not
complete and therefore, for some groups, more than the data extracted according to the group applicability
would be needed to accomplish the work instruction.
These sections were changed:
1. Paragraph 1.E., Compliance: Changed group applicability assigned to Table 6 from Group 1, 3 to Group
1-3. Also, added compliance Table 11 for the more work requirement associated with this revision.
2. Paragraph 1.J.2., References, Data supplied with this Service Bulletin: Changed revision level for drawing
624U0061, sheet 7 from DCN A to DCN B.
3. Accomplishment Instruction 3.B.8., Part 1: Added instruction for a one time inspection which is the more
work requirement associated with this revision.
4. Figure 10: Changed the group applicability assigned to the figure from Group 1-3 to Group 1-5.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
7 of 250

### Page 8

5. Figure 12: Added flagnote 19 to identify the more work inspection location and changed the group applicability
assigned to the figure from Group 4-5 to Group 1-5.
6. Figure 13: Changed the group applicability assigned to the figure from Group 4-5 to Group 1-5.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
March 24, 2005Original Issue:
February 20, 2007Revision 1:
August 28, 2009Revision 2:
July 14, 2011Revision 3:
December 01, 2011Revision 4:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
8 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 9

Commercial 
Airplanes
747
Service Bulletin
SummaryNumber: 747-53A2473Original Issue: March 24, 2005
Revision 4: December 01, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Section 48 - Body Station 2598 Bulkhead - Horizontal Stabilizer Hinge
Support Frame Cracking - Modification and Repair
CONCURRENT REQUIREMENTS
None
BACKGROUND
This service bulletin gives instruction for a modification to the support frame at body station 2598. This modification
makes the support frame more resistant to fatigue cracks in the areas that must be inspected to satisfy
requirements given in the FAA Airworthiness Directives and Boeing service bulletins identified in the table below.
This modification can be done to permanently satisfy requirements related to these Airworthiness Directives
and service bulletins as shown below.
NoteFAA Airworthiness DirectiveBoeing Service Bulletin
(a)2001-15-03, Amendment 39-12337,
superseded by 2010-14-07,
Amendment 39-16352.
747-53A2427
(a)2001-14-07, Amendment 39-12318,
superseded by 2010-14-07,
Amendment 39-16352.
747-53A2449
(b)2003-19-08, Amendment 39-13311,
superseded by 2010-14-07,
Amendment 39-16352.
747-53A2467
(c), (d)2010-14-07, Amendment 39-16352747-53-2473
747-53A2473
(a) All inspection requirements terminated - no more work necessary after the modification.
(b) Inspection of the support frame aft inner chord per Boeing service bulletin 747-53A2467
is not necessary after the modification; however, inspection of the upper aft outer chords,
and the diagonal brace attachment fittings, flanges, and rods per service bulletin 747-
53A2467 is necessary after the modification.
(c) This AD supersedes 2001-15-03, Amendment 39-12337; 2001-14-07, Amendment 39-
12318; 2003-19-08, Amendment 39-13311; and 2006-05-06, Amendment 39-14503
except for the inspection requirements stated in note (b) above.
(d) Post-modification inspection is required as given in the requirements of this AD.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
9 of 250

### Page 10

NOTE: Refer to Appendix A and B for the change information previously described in Revision 1 and Revision
2 of this service bulletin.
Since the release of Revision 2 of this service bulletin, several operators have reported finding cracks in the
support frame upper and lower corner web at the aft inner chord to upper floor chord joint. Cracks in the upper
web have been reported to be between approximately 0.80 inch to 0.55 inch long, and between 0.20 inch to
1.30 inch long in the lower web. Two operators have reported web cracks on airplanes with 8,435 and 8,940
total flight cycles. Other reports have described web cracks found on airplanes with greater than 20,000 total
flight cycles.
Revision 3 is being sent to add a new high-frequency eddy current (HFEC) inspection for cracks in the support
frame left and right side upper corner web, and left side lower corner web at the aft inner chord to upper and
lower floor support joint. Instructions and parts for a local web repair is provided for any crack that is found within
specified limits during the initial support frame modification inspection or during post-modification inspections.
Boeing Service Related Problem (SRP) 747-SRP-53-0343 is related to this service bulletin.
ACTION (PRR 85901-103RS)
MODIFICATION
Two web doublers, new upper and lower hinge back-up fittings, and a new inner chord are to be installed on
the aft side of the support frame on each side of the airplane. Lift and hold the horizontal stabilizer using external
supports, or an optional special tool that Boeing can supply, while the modification work is done. This is necessary
to permit removal of the stabilizer hinge back up structure from the aft side of the support frame. Inspection of
specified areas/locations of the support frame with surface high-frequency eddy current (HFEC) and open hole
HFEC is to be done before the new parts are installed. Oversize fasteners are to be installed at specified locations
where insurance cuts are required to remove material that could contain an undetected crack. This mixture of
inspection work, insurance cuts, structural reinforcement and new parts is necessary to terminate the inspection
requirements identified above.
In addition, a surface HFEC inspection for cracks in the support frame left and right side upper corner web, and
left side lower corner web is required before modification work is done. If no cracks are found then repeat HFEC
inspections will be necessary during post-modification inspections. If any crack is found within defined web trim
out limits, local repairs are provided in this service bulletin that can be done concurrently with the modification
work. Any crack that is found to extend outside of defined web trim out limits will require contacting Boeing for
repair data.
POST-MODIFICATION
Do a one-time General Visual Inspection (GVI) of the upper forward inner chord, frame support fitting and splice
fitting for the installation of BACB30NX10K*, BACB30NX10K*X (1/64 oversize) or BACB30NX10K*Y (1/32
oversize) fasteners, and if installed do a one-time review of airplane maintenance records to verify that during
the initial modification installation an open hole high frequency eddy current (HFEC) inspection was accomplished
and holes were zero-timed. If an open hole HFEC inspection was accomplished and holes were zero-timed
during the initial modification installation, no further action is required at these fastener locations. If the
accomplishment of an open hole HFEC inspection and zero-time of holes can not be verified, additional
modification work is necessary. If .247/.250, .263/.266 (1/64 oversize) or 278/.281 (1/32 oversize) inch diameter
fasteners are installed, remove fasteners and do an open hole HFEC inspection. If no cracks are found, zero-time
holes and install BACB30NX10K* fasteners.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
10 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 11

Do a one-time GVI of the frame web and upper shear deck (floor support) chord aft side for (2) fasteners that
were installed as part of an aft inner chord repair removal. If a repair was not installed or if bolts are installed at
the (2) fastener locations specified , no further action is required at these fastener locations. If a repair removal
was accomplished and 7/32 inch diameter rivets are installed, additional work is required. If a repair removal
was accomplished and 3/16 inch diameter rivets are installed, remove rivets and do an open hole HFEC inspection.
If no cracks are found, install new bolts.
Do a one-time GVI for repair(s) installed on the left and right side aft inner chords. If a repair was not installed,
no further action is required for this inspection. If any repair is installed, more work is required.
For all airplanes modified in accordance with this service bulletin, post-modification inspections have been
added. See Paragraph 1.E., Compliance.
In addition, a surface HFEC inspection for cracks in the support frame left and right side upper corner web, and
left side lower corner web is required on a modified support frame. If no cracks are found then repeat HFEC
inspections will be necessary during post-modification inspections. If any crack is found within defined web trim
out limits on a modified support frame, repairs are provided in this service bulletin that can be installed in addition
to the existing modification. Any crack that is found to extend outside of defined web trim out limits will require
contacting Boeing for repair data.
EFFECTIVITY
747-100/-100B/-100B SUD/-200B/-200C/-200F/-300/-400/-400D/-400F/SP/SR airplanes. Refer to Paragraph
1.A.1, Airplanes, for the list of affected airplanes.
COMPLIANCE
See Service Bulletin Paragraph 1.E. for compliance information.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2006-05-06 was superseded by AD 2010-14-07,
which is related to this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection procedures or the modification and repair given
in this service bulletin.
MANPOWER
Support Frame Modification
Elapsed HoursTotal Task HoursAirplanes
104.50305.00All (no web crack re-
pair installed)
107.00315.00All (with web crack
repair installed)
Support Frame Upper Corner Fastener Inspection/Rework
Elapsed HoursTotal Task HoursAirplanes
7.7515.50All
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
11 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 12

Support Frame Post-Modification Inspections
Elapsed HoursTotal Task HoursAirplanes
87.00200.00All - Part 1, 2, 3 & 4
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
12 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 13 (OCR)

BOEING SERVICE BULLETIN 747-53A2473
STA
2598
STA
2598
UPPER FORWARD
OUTER CHORD
FRAME
SUPPORT
AFT INNER CHORD
FRAME SUPPORT
MODIFICATION
DO HFEC INSPECTION (SURFACE AND
OPEN HOLE AT SPECIFIED LOCATIONS
AND INSTALL TWO WEB DOUBLERS, NEW  HORIZONTAL
HINGE BACK-UP FITTINGS AND A NEW  STABILIZER
INNER CHORD ON THE AFT SIDE OF THE  UP
BULKHEAD ON BOTH SIDES OF THE AIRPLANE.  LOWER FORWARD
POST-MODIFICATION  OUTER CHORD
DO DETAILED, LFEC/HFEC AND ULTRASONIC  V85165
INSPECTIONS OF A MODIFIED BULKHEAD.
Original Issue: March 24, 2005
Revision 4: December 01, 2011  747-53A2473
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  13 of 250

### Page 14

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
14 of 250
BOEING SERVICE BULLETIN 747-53A2473
BLANK PAGE

### Page 15

Commercial 
Airplanes
747
Service Bulletin
Number: 747-53A2473
Original Issue: March 24, 2005
Revision 4: December 01, 2011
ATA System: 5313
SUBJECT: FUSELAGE - Section 48 - Body Station 2598 Bulkhead - Horizontal Stabilizer Hinge
Support Frame Cracking - Modification and Repair
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 85428 for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
747-100/-100B/-100BSUD/-200B/-200C/-200F/-300/SR airplanes
with line numbers 1-695.
-1
Line numbers 1-695 and no interim modification or existing upper
corner web crack repair(s) installed in accordance with Boeing Service
Bulletin 747-53A2427.
1
Line numbers 1-695 and does have an interim modification or existing
upper corner web crack repair(s) installed in accordance with Boeing
Service Bulletin 747-53A2427.
2
Line numbers 1-695 with a support frame modified in accordance
with this service bulletin and no upper or lower corner web crack
repair(s) installed.
3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
15 of 250

### Page 16

DESCRIPTIONCONFIGURATIONGROUP
747-400/-400D/-400F airplanes with line numbers 696-1307 with no
horizontal stabilizer fuel tank.
-2
Line numbers 696-1241 and no interim modification or existing upper
corner web crack repair(s) installed in accordance with Boeing Service
Bulletin 747-53A2427.
1
Line numbers 696-1241 and does have an interim modification or
existing upper corner web crack repair(s) installed in accordance with
Boeing Service Bulletin 747-53A2427.
2
Line numbers 1242-1307 and no existing upper corner web crack
repair(s) installed in accordance with Boeing Service Bulletin
747-53A2427.
3
Line numbers 1242-1307 and does have existing upper corner web
crack repair(s) installed in accordance with Boeing Service Bulletin
747-53A2427.
4
Line numbers 696-1307 with a support frame modified in accordance
with this service bulletin and no upper or lower corner web crack
repair(s) installed.
5
747 airplanes with line numbers 696-1307 with a horizontal stabilizer
fuel tank.
-3
Line numbers 696-1241 and no interim modification or existing upper
corner web crack repair(s) installed in accordance with Boeing Service
Bulletin 747-53A2427.
1
Line numbers 696-1241 and does have an interim modification or
existing upper corner web crack repair(s) installed in accordance with
Boeing Service Bulletin 747-53A2427.
2
Line numbers 1242-1307 and no existing upper corner web crack
repair(s) installed in accordance with Boeing Service Bulletin
747-53A2427.
3
Line numbers 1242-1307 and does have existing upper corner web
crack repair(s) installed in accordance with Boeing Service Bulletin
747-53A2427.
4
Line numbers 696-1307 with a support frame modified in accordance
with this service bulletin and no upper or lower corner web crack
repair(s) installed.
5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
16 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 17

DESCRIPTIONCONFIGURATIONGROUP
747SP airplanes.-4
747SP and no interim modification or existing upper corner web crack
repair(s) installed in accordance with Boeing Service Bulletin
747-53A2427.
1
747SP and does have an interim modification or existing upper corner
web crack repair(s) installed in accordance with Boeing Service
Bulletin 747-53A2427.
2
747SP airplanes with a support frame modified in accordance with
this service bulletin and no upper or lower corner web crack repair(s)
installed.
3
747-LCF (Large Cargo Freighter) airplanes with line numbers 766,
778, 904 and 932.
-5
Airplane Models:
747-100, 747-100B, 747-100B SUD, 747-200B, 747-200C, 747-200F, 747-300, 747-400,
747-400D, 747-400F, 747SP, 747SR
GroupVariable Number
1RA001 - RA034
1RA101 - RA115
1RA161 - RA164
1RA201 - RA203
1RA216 - RA217
1RA245 - RA246
1RA251 - RA266
1RA301 - RA318
1RA351 - RA360
1RA369 - RA373
1RA401 - RA418
1RA501 - RA502
1RA521 - RA528
1RA532 - RA548
1RA551 - RA552
1RA559 - RA561
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
17 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 18

GroupVariable Number
1RA581 - RA582
1RA585
1RA601 - RA602
1RA631 - RA635
1RA651 - RA652
1RA671 - RA677
1RA701 - RA702
1RA721 - RA731
1RA741 - RA745
1RA749 - RA750
1RA761 - RA762
1RA781 - RA784
1RA901 - RA916
1RB001 - RB016
1RB041 - RB044
1RB071 - RB075
1RB101 - RB102
1RB411 - RB412
2RB413
2RB421
1RB601 - RB607
1RB681 - RB697
1RB711
1RB721 - RB723
1RB741 - RB748
1RD001 - RD004
1RD021 - RD022
1RD041 - RD059
1RD071 - RD072
1RD081 - RD083
1RD091 - RD092
1RD101 - RD104
1RD121 - RD127
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
18 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 19

GroupVariable Number
1RD131 - RD144
1RD166 - RD167
1RD171 - RD172
1RD181 - RD183
1RD201 - RD204
1RD221 - RD227
1RD231 - RD234
2RD235
1RD241 - RD243
1RD251 - RD262
1RD271 - RD272
1RD291 - RD292
1RD301 - RD302
1RD311
1RD351 - RD358
1RD361 - RD366
1RD381 - RD383
1RD411 - RD414
1RD421 - RD426
1RD431 - RD435
1RD441 - RD442
1RD451 - RD456
1RD461
1RD471 - RD475
1RD513 - RD519
1RD531 - RD533
1RD551
1RD561
1RD571
1RD581 - RD583
1RD591 - RD593
1RD601 - RD607
1RD621 - RD623
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
19 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 20

GroupVariable Number
1RD641 - RD649
1RD651 - RD659
1RD661
1RD671
1RD681 - RD682
1RD691 - RD692
1RD701 - RD702
1RD721 - RD722
1RD741 - RD742
1RD751 - RD755
1RD761
1RD771 - RD775
1RD781 - RD783
1RD791
2RD792
1RE001
4RG001 - RG009
4RG091
4RG095
4RG101 - RG104
4RG121 - RG126
4RG141 - RG142
4RG161 - RG164
4RG171 - RG174
4RG191 - RG193
4RG211 - RG213
4RG221 - RG222
4RH101 - RH102
4RH111 - RH112
4RH121 - RH122
1RJ131 - RJ133
1RJ151 - RJ152
1RJ301 - RJ303
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
20 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 21

GroupVariable Number
1RJ321
2RJ322
1RJ331 - RJ333
2RL401 - RL402
2RL411 - RL419
2RL651 - RL654
2RL751
2RM001 - RM007
3RM010 - RM013
3RM021 - RM024
3RM026 - RM029
3RM036 - RM045
3RM051 - RM052
3RM071
3RM081 - RM084
3RM091
3RM096 - RM097
3RM116 - RM117
2RM126 - RM132
3RM136 - RM147
3RM156 - RM158
3RM166 - RM177
3RM191 - RM192
3RM231 - RM233
3RM241 - RM246
3RM261 - RM264
2RM316 - RM318
3RM331 - RM333
3RM341
3RM351 - RM355
3RM366 - RM367
3RM801 - RM803
2RM811 - RM813
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
21 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 22

GroupVariable Number
2RM851 - RM858
2RM861 - RM862
2RM871 - RM876
2RM881 - RM886
2RM891 - RM899
2RM901 - RM905
2RM911
1RR001 - RR005
1RR021 - RR023
2RR024 - RR025
1RR031
1RR201 - RR205
2RR206
1RR221 - RR226
1RR261 - RR267
1RR301 - RR306
2RR307 - RR309
3RR310
1RR331 - RR332
1RR336
1RR341 - RR345
1RR361 - RR362
1RR421 - RR422
1RR431 - RR432
1RR441
2RR442
2RR451
1RR501 - RR504
1RR521
2RR522
2RR526
1RR531
1RR551 - RR554
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
22 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 23

GroupVariable Number
2RR555 - RR556
1RR561
2RR566
2RR701
2RR721 - RR724
2RR746 - RR748
2RR851 - RR856
2RR861 - RR862
2RR951 - RR952
1RS001 - RS002
1RS201
1RS211 - RS212
1RS221 - RS222
1RS231 - RS241
1RS251 - RS259
2RS263
1RS265 - RS268
1RS271 - RS276
1RS291 - RS292
1RS301 - RS305
2RS306
1RS311 - RS320
2RS331 - RS333
1RS341 - RS342
1RS699
1RS701 - RS703
1RS711 - RS713
1RS721 - RS722
2RS731 - RS732
1RS741 - RS743
1RS751 - RS752
1RS761
2RS762
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
23 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 24

GroupVariable Number
1RS771
2RS781 - RS782
2RS786
3RT001 - RT014
3RT021 - RT022
2RT031 - RT035
2RT041 - RT042
3RT043 - RT047
3RT061
3RT071 - RT073
2RT074 - RT075
3RT101 - RT103
3RT121
3RT131 - RT137
3RT151 - RT152
3RT161 - RT168
3RT401 - RT412
3RT431 - RT447
3RT451 - RT455
2RT456
3RT457 - RT469
3RT471 - RT499
2RT501
3RT502 - RT507
2RT508 - RT510
3RT511 - RT512
2RT513
3RT514 - RT519
2RT520
3RT521 - RT530
2RT531 - RT535
3RT551 - RT568
3RT571
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
24 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 25

GroupVariable Number
2RT572 - RT576
3RT577 - RT591
3RT601 - RT630
5RT631 - RT632
3RT633 - RT650
2RT651 - RT657
3RT671 - RT673
2RT681 - RT682
3RT691 - RT699
3RT701 - RT704
2RT711 - RT717
3RT741 - RT742
5RT743
3RT744 - RT755
2RT756 - RT757
3RT776 - RT777
2RT781 - RT782
3RT783 - RT784
3RT801 - RT803
3RT811 - RT814
3RT831 - RT837
3RT861 - RT864
5RT876
2RT877 - RT880
3RT931 - RT932
3RT945 - RT949
3RT951 - RT955
2RT966 - RT967
2RU001 - RU006
3RU016 - RU017
3RU031 - RU032
3RU051 - RU052
3RU059 - RU062
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
25 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 26

GroupVariable Number
3RU081 - RU083
3RU101 - RU102
3RU121
2RU122 - RU125
3RU126 - RU132
2RU801 - RU809
2RU831 - RU841
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
The modification specified in this service bulletin will make the support frame at body station 2598 more
resistant to fatigue cracks in the areas that must be inspected to satisfy requirements in the FAA
Airworthiness Directives and Boeing service bulletins identified in the table below. This modification
can be done to permanently satisfy requirements related to these Airworthiness Directives and service
bulletins as shown below.
NoteFAA Airworthiness DirectiveBoeing Service Bulletin
(a)2001-15-03, Amendment 39-12337,
superseded by 2010-14-07,
Amendment 39-16352.
747-53A2427
(a)2001-14-07, Amendment 39-12318,
superseded by 2010-14-07,
Amendment 39-16352.
747-53A2449
(b)2003-19-08, Amendment 39-13311,
superseded by 2010-14-07,
Amendment 39-16352.
747-53A2467
(c), (d)2010-14-07, Amendment 39-16352747-53-2473
747-53A2473
(a) All inspection requirements terminated - no more work necessary after the modification.
(b) Inspection of the support frame aft inner chord per Boeing service bulletin 747-53A2467
is not necessary after the modification; however, inspection of the upper aft outer chords,
and the diagonal brace attachment fittings, flanges, and rods per service bulletin 747-
53A2467 is necessary after the modification.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
26 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 27

NoteFAA Airworthiness DirectiveBoeing Service Bulletin
(c) This AD supersedes 2001-15-03, Amendment 39-12337; 2001-14-07, Amendment 39-
12318; 2003-19-08, Amendment 39-13311; and 2006-05-06, Amendment 39-14503
except for the inspection requirements stated in note (b) above.
(d) Post-modification inspection is required as given in the requirements of this AD.
NOTE: Refer to Appendix A and B for the change information previously described in Revision 1 and
Revision 2 of this service bulletin.
Since the release of Revision 1 of this service bulletin, an operator has reported that a crack was found
in the support frame upper forward inner chord 2,521 flight cycles after modification work was
accomplished in accordance with Revision 1 of this service bulletin. Boeing investigation has revealed
missing fastener symbols on the original issue and Revision A of service bulletin retrofit drawing sheet
3. The missing symbols may result in the omission of an open hole high frequency eddy current (HFEC)
inspection and the installation of incorrect diameter fasteners at (20) total fastener locations, left and
right side, common to the upper forward inner chord, frame support fitting and splice fitting. If the holes
common to the forward upper inner chord, frame support fitting and splice fitting are not HFEC inspected
for a crack free condition and then oversized in accordance with the intended service bulletin instructions,
an active crack tip may not be detected and continue to propagate. Continued cracking of the support
frame inner chord, frame support fitting or splice fitting can lead to large cracks that may result in the
inability of the structure to carry horizontal stabilizer flight loads.
Revision 2 is being sent to do a one-time General Visual Inspection (GVI) of the upper forward inner
chord, frame support fitting and splice fitting is required to determine if the correct modification fasteners
are installed and if applicable, a one-time airplane maintenance record review is required to verify
fastener holes were open hole high frequency eddy current (HFEC) inspected and zero-timed in
accordance with modification instructions. If the accomplishment of an open hole HFEC inspection and
zero-time of holes can not be verified, or if incorrect fasteners are found installed, additional modification
work is necessary.
If an airplane was modified in accordance with Revision 1 of this service bulletin, a one-time GVI is
required to determine if rivets were installed as part of an aft inner chord repair removal. If a repair was
not installed or if bolts are installed, no further action is required at these fastener locations. If rivets
are installed, additional work is required.
If an airplane was modified in accordance with the original issue of this service bulletin, a one-time GVI
is required to determine if an aft inner chord upper and/or lower corner repair was installed. If a repair
was not installed, no further action is required for this inspection. If any repair is installed, more work
is required.
Boeing has developed the inspection requirements necessary to be accomplished on a modified support
frame, and those inspections are included in this revision.
Boeing has validated the modification work in accordance with this service bulletin. Included in this
revision are post-validation changes that clarify and revise notes, add more open hole HFEC inspections
and add more notes to accomplish the modification.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
27 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 28

Since the release of Revision 2 of this service bulletin, several operators have reported finding cracks
in the support frame upper and lower corner web at the aft inner chord to floor chord joint. Cracks in
the upper web have been reported to be between approximately 0.80 inch to 0.55 inch long, and
between 0.20 inch to 1.30 inch long in the lower web. Two operators have reported web cracks on
airplanes with 8,435 and 8,940 total flight cycles. Other reports have described web cracks found on
airplanes with greater than 20,000 total flight cycles.
Revision 3 is being sent to add a new high-frequency eddy current (HFEC) inspection for cracks in the
support frame left and right side upper corner web, and left side lower corner web at the aft inner chord
to upper and lower floor support joint. Instructions and parts for a local web repair is provided for any
crack that is found within specified limits during the initial support frame modification inspection or
during post-modification inspections.
Revision 4 is sent to to give a revised sheet 7 (DCN B) of drawing 624U0061 to add one fastener
location (each side) to the outer chord crack inspection. The added fastener location was inadvertantly
omitted from the drawing sheet provided with the previous release of this service bulletin. Also, Revision
4 is sent to change the group applicability assigned to Figures 10, 12 and 13 and Table 6 of Paragraph
1.E., Compliance. In the previous release of this service bulletin, these group applicabilities were not
complete.
Boeing Service Related Problem (SRP) 747-SRP-53-0343 is related to this service bulletin.
D. Description
The support frame modification includes two web doublers, new upper and lower hinge back-up fittings,
and a new inner chord - all to be installed on the aft side of the support frame on each side of the
airplane. Inspection of specified areas/locations with surface HFEC and open hole HFEC is to be done
before the new parts are installed. Oversize fasteners are to be installed at specified locations where
insurance cuts are required to remove material that could contain an undetected crack.
The instruction given in this service bulletin refers to drawing sheets that show which parts are to be
removed, where open hole inspections are to be done, and how the new parts are to be installed.
Before parts are removed from the support frame, the load from the weight of the horizontal stabilizer
must be removed from the hinge fittings attached to the support frame. To do this the upper and lower
diagonal braces are to be removed from each side of the support frame and a special tool supplied by
Boeing is to be installed between the upper/lower diagonal brace attachment fittings. This tool is used
to lift and hold the horizontal stabilizer to remove the load from the hinges attached to the support
frame.
Revision 1 - More work is necessary on airplanes changed as shown in the original issue of this service
bulletin. It is necessary to remove an existing aft inner chord that has been repaired prior to the
modification given in this service bulletin. If the modification given in the original issue of this service
bulletin is installed with a repaired aft inner chord in place, the repaired aft inner chord must be replaced
with a new aft inner chord and the modification must be reinstalled. Contact Boeing for the instructions.
NOTE: A zero-timed hole is the removal of small cracks and fatigue damaged material from an existing
hole by performing an open-hole high frequency eddy current (HFEC) inspection and if crack
free, oversizing the hole 1/16 inch diameter.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
28 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 29

Revision 2 - More work is required if an airplane was modified in accordance with the original issue or
Revision 1 of this service bulletin. A one-time General Visual Inspection (GVI) of the upper forward
inner chord, frame support fitting and splice fitting is required to determine if the correct modification
fasteners are installed and if applicable, a one-time airplane maintenance record review is required to
verify fastener holes were open hole high frequency eddy current (HFEC) inspected and zero-timed in
accordance with modification instructions. If the accomplishment of an open hole HFEC inspection and
zero-time of holes can not be verified, or if incorrect fasteners are found installed, additional modification
work is necessary.
More work is required if an airplane was modified in accordance with Revision 1 of this service bulletin.
A one-time GVI is required to determine if rivets were installed as part of an aft inner chord repair
removal. If a repair was not installed or if bolts are installed, no further action is required at these
fastener locations. If rivets are installed, additional work is required.
More work is required if an airplane was modified in accordance with the original issue of this service
bulletin. A one-time GVI is required to determine if an aft inner chord upper and/or lower corner repair
was installed. If a repair was not installed, no further action is required for this inspection. If any repair
is installed, more work is required.
Boeing has developed the inspection requirements necessary to be accomplished on a modified support
frame, and those inspections are included in this revision.
Boeing has validated the modification work in accordance with this service bulletin. Included in this
revision are post-validation changes that clarify and revise notes, add more open hole HFEC inspections
and add more notes to accomplish the modification.
Do a one-time General Visual Inspection (GVI) of the upper forward inner chord, frame support fitting
and splice fitting for the installation of BACB30NX10K*, BACB30NX10K*X (1/64 oversize) or
BACB30NX10K*Y (1/32 oversize) fasteners, and if installed do a one-time review of airplane maintenance
records to verify that during the initial modification installation an open hole high frequency eddy current
(HFEC) inspection was accomplished and holes were zero-timed. If an open hole HFEC inspection
was accomplished and holes were zero-timed during the initial modification installation, no further action
is required at these fastener locations. If the accomplishment of an open hole HFEC inspection and
zero-time of holes can not be verified, additional modification work is necessary. If .247/.250, .263/.266
(1/64 oversize) or 278/.281 (1/32 oversize) inch diameter fasteners are installed, remove fasteners and
do an open hole HFEC inspection. If no cracks are found, zero-time holes and install BACB30NX10K*
fasteners.
Do a one-time GVI of the frame web and upper shear deck (floor support) chord aft side for (2) fasteners
that were installed as part of an aft inner chord repair removal. If a repair was not installed or if bolts
are installed at the (2) fastener locations specified , no further action is required at these fastener
locations. If a repair removal was accomplished and 7/32 inch diameter rivets are installed, additional
work is required. If a repair removal was accomplished and 3/16 inch diameter rivets are installed,
remove rivets and do an open hole HFEC inspection. If no cracks are found, install new bolts.
Do a one-time GVI for repair(s) installed on the left and right side aft inner chords. If a repair was not
installed, no further action is required for this inspection. If any repair is installed, more work is required.
For all airplanes modified in accordance with this service bulletin, post-modification inspections have
been added. See Paragraph 1.E., Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
29 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 30

Revision 3 - A surface HFEC inspection for cracks in the support frame left and right side upper corner
web, and left side lower corner web is required before modification work is done. If no cracks are found
then repeat HFEC inspections will be necessary during post-modification inspections. If any crack is
found within defined web trim out limits, local repairs are provided in this service bulletin that can be
done concurrently with the modification work. Any crack that is found to extend outside of defined web
trim out limits will require contacting Boeing for repair data
More work is required if an airplane was modified in accordance with the original issue, Revision 2 or
Revision 3 of this service bulletin. A surface HFEC inspection for cracks in the support frame left and
right side upper corner web, and left side lower corner web is required on a modified support frame. If
no cracks are found then repeat HFEC inspections will be necessary during post-modification inspections.
If any crack is found within defined web trim out limits on a modified support frame, repairs are provided
in this service bulletin that can be installed in addition to the existing modification. Any crack that is
found to extend outside of defined web trim out limits will require contacting Boeing for repair data.
Revision 4: More work is necessary on airplane(s) changed in accordance with Revision 3 of this service
bulletin, but only if a post-modification inspection was accomplished in accordance with Accomplishment
Instruction Paragraph 3.B.8., Part 1, step a(6) of Revision 3 of this service bulletin. In such a case, a
surface HFEC inspection for cracks in the support frame outer chord is to be accomplished at one
fastener location each side. Inspection at this location was inadvertantly omitted from the instruction
given in Revision 3 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
315, 316747-100, 747-100B, 747-100B
SUD, 747-200B, 747-200C,
747-200F, 747-300, 747SR
Group 2:
Affected Maintenance Zones
ZoneModel
315, 316747-200B, 747-200C, 747-200F,
747-300, 747-400, 747-400D,
747-400F
Group 3:
Affected Maintenance Zones
ZoneModel
315, 316747-200F, 747-400
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
30 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 31

Group 4:
Affected Maintenance Zones
ZoneModel
315, 316747SP
Group 5:
Affected Maintenance Zones
ZoneModel
315, 316747-400
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directives 2004-07-22 R1 is related to this service
bulletin.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2006-05-06 was superseded by AD
2010-14-07, which is related to this service bulletin.
Table 1: Compliance Table Index
Support Frame Modifi-
cation Installed In Ac-
cordance With Origi-
nal Issue
Support Frame Modifi-
cation Installed In Ac-
cordance With Revi-
sion 1
Support Frame Modifi-
cation Installed In Ac-
cordance With Revi-
sion 2
No Support Frame
Modification Installed
Airplane
See Tables 5, 6, 7, 10See Tables 4, 5, 6, 7See Tables 6, 7See Tables 2, 6, 7Group 1-3
See Tables 5, 8, 9, 10See Tables 4, 5, 8, 9See Tables 8, 9See Tables 3, 8, 9Group 4-5
In addition to the applicable tables identified above, Table 11 is applicable if the two conditions given
in paragraph 3.B.8, Part 1 for the more work requirement associated with Revision 4 apply. The action
given in Table 11 is the more work requirement associated with Revision 4 of this service bulletin.
Group 1-3:
Table 2: Station 2598 - Support Frame Modification
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
-Before 20,000 total flight cycles or within 18
months after the effective date of AD 2010-
14-07, whichever occurs later.
Do the support frame
inspections and
modification in accor-
dance with Revision
3 of this service bul-
letin Accomplishment
Instructions 3.B.1
through 3.B.6.
All airplanes with no
support frame modifi-
cation installed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
31 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 32

Group 1-3:
Table 2: Station 2598 - Support Frame Modification
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
-In accordance with Table 6 and 7.Do post-modification
inspections. Proceed
to Table 6 and 7.
Support frame modifi-
cation installed and
no upper or lower
corner web crack re-
pair(s) installed, or
web crack repair(s)
installed.
Group 4-5:
Table 3: Station 2598 - Support Frame Modification (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 12,000 total flight cycles or
within 18 months after the effec-
tive date of AD 2010-14-07,
whichever occurs later.
Do the support frame in-
spections, repairs if nec-
essary and modification
in accordance with Revi-
sion 3 of this service bul-
letin Accomplishment In-
structions 3.B.1 through
3.B.6.
All airplanes with no sup-
port frame modification in-
stalled.
-In accordance with Table 8 and 9.Do post-modification in-
spections. Proceed to
Table 8 and 9.
Support frame modification
installed and no upper or
lower corner web crack re-
pair(s) installed, or web
crack repair(s) installed.
Group 1-5:
Table 4: Support Frame Upper Corner Fastener Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 1,500 flight cycles af-
ter modification installation
or within 1,000 flight cycles
after the date on Revision 2
of this service bulletin,
whichever occurs later.
Station 2598, LBL and RBL 35,
WL 320, in accordance with Ac-
complishment Instructions
3.B.7.c., do a one-time General
Visual Inspection (GVI) of the
frame web and upper shear deck
(floor support) chord aft side for
(2) fasteners that were installed
as part of an aft inner chord repair
removal.
All airplanes with a sup-
port frame modification
installed in accordance
with Revision 1 of this
service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
32 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 33

Group 1-5:
Table 4: Support Frame Upper Corner Fastener Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-In accordance with Table 5.Proceed to Table 5.Condition 1: A repair was
not installed or bolts are
installed.
-Before further flight.Contact Boeing for rework data
and do the rework.
Condition 2: A repair re-
moval was accomplished
and 7/32 inch diameter,
or greater, rivets are in-
stalled.
See note (a).
-Before further flight.Remove rivets and do an open
hole high frequency eddy current
(HFEC) inspection for cracks in
the frame web and shear deck
(floor support) chord in accor-
dance with Accomplishment In-
structions 3.B.7.c.(3).(a).
Condition 3: A repair re-
moval was accomplished
and 3/16 inch diameter
rivets are installed.
-Before further flight.Do a web crack inspection/repair
(post-modified airplanes) in accor-
dance with this service bulletin
Accomplishment Instructions
3.B.12 as applicable
Any cracks found during
Condition 3 inspection.
Or
Contact Boeing for repair data
and do the repair.
See note (a).
-Before further flight.Install new bolts in accordance
with Accomplishment Instructions
3.B.7.c.(3).(a).2).
No cracks found during
Condition 3 inspection.
See note (a).
(a) After rework or repairs are complete, proceed to Table 5.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
33 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 34

Group 1-5:
Table 5: Forward Upper Inner Chord, Frame Support Fitting and Upper Splice Fitting Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 1,500 flight cycles after
modification installation or
within 1,000 flight cycles after
the date on Revision 2 of this
service bulletin, whichever oc-
curs later.
Station 2598, LBL and RBL 38,
WL 315 - 323, do a one time
General Visual Inspection (GVI)
of the upper forward inner chord,
frame support fitting and splice
fitting for the installation of
BACB30NX10K( ),
BACB30NX10K( )X (1/64 over-
size) or BACB30NX10K( )Y (1/32
oversize) fasteners in accordance
with Accomplishment Instructions
3.B.7.d.
All airplanes with a
support frame modifica-
tion installed in accor-
dance with the original
issue date or Revision
1 of this service bul-
letin.
In accordance with Accomplish-
ment Instructions 3.B.7.d.(1), re-
view airplane maintenance
records to verify that during the
initial modification installation an
open hole high frequency eddy
current (HFEC) inspection was
accomplished and holes were
zero-timed.
Condition 1:
BACB30NX10K( ),
BACB30NX10K( )X or
BACB30NX10K( )Y
fasteners are installed.
-In accordance with Tables 6
and 7 or 8 and 9 as applicable.
Do post-modification inspections.
Proceed to Tables 6 and 7 or 8
and 9 as applicable.
BACB30NX10K( ),
BACB30NX10K( )X or
BACB30NX10K( )Y
fasteners are installed,
and an open hole
HFEC inspection was
accomplished and
holes were zero-timed
during the initial modifi-
cation installation.
-Before further flight.Condition 1, Option 1: Do a one-
time surface HFEC inspection
around existing fasteners for
cracks in the upper forward inner
chord, frame support fitting and
splice fitting in accordance with
Accomplishment Instructions
3.B.7.d.(1).(b).
BACB30NX10K( ),
BACB30NX10K( )X or
BACB30NX10K( )Y
fasteners are installed
and an open hole
HFEC inspection and
zero-timing of holes can
not be verified.
See note (a).
Condition 1, Option 2: Contact
Boeing for modification rework
data, and do the rework.
See note (a).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
34 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 35

Group 1-5:
Table 5: Forward Upper Inner Chord, Frame Support Fitting and Upper Splice Fitting Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Contact Boeing for repair and
modification rework data, and do
the repair and rework.
Any cracks found dur-
ing Condition 1, Option
1 inspection.
See note (a).
-Within 1,500 flight cycles after
the one-time surface HFEC
inspection.
Contact Boeing for modification
rework data, and do the rework.
See note (a).
No cracks found during
Condition 1, Option 1
inspection.
-Before further flight.Condition 2, Option 1: Remove
existing fasteners and do an open
hole HFEC inspection for cracks
in the upper forward inner chord,
frame support fitting and splice
fitting in accordance with Accom-
plishment Instructions
3.B.7.d.(2).(a).
Condition 2: If any
.247/.250, .263/.266
(1/64 oversize) or
.278/.281 (1/32 over-
size) inch diameter fas-
teners are installed.
Condition 2, Option 2: Do a one-
time surface HFEC inspection
around existing fasteners for
cracks in the upper forward inner
chord, frame support fitting and
splice fitting in accordance with
Accomplishment Instructions
3.B.7.d.(2).(b).
-Before further flight.Contact Boeing for repair data,
and do the repair.
Any cracks found dur-
ing Condition 2, Option
1 or 2 inspection. See note (a).
-Before further flight.Zero-time holes and install
BACB30NX10K( ) fasteners in
accordance with Accomplishment
Instructions 3.B.7.d.(2).(a).2.
No cracks found during
Condition 2, Option 1
open hole HFEC inspec-
tion.
See note (a).
-Within 1,500 flight cycles after
the one-time surface HFEC
inspection.
Remove existing fasteners and
do an open hole HFEC inspection
for cracks in the upper forward
inner chord, frame support fitting
and splice fitting in accordance
with Accomplishment Instructions
3.B.7.d.(2).(b).2.
No cracks found during
Condition 2, Option 2
surface HFEC inspec-
tion.
See note (a).
-Before further flight.Contact Boeing for repair data,
and do the repair.
Any cracks found dur-
ing Condition 2, Option
2 open hole HFEC in-
spection.
See note (a).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
35 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 36

Group 1-5:
Table 5: Forward Upper Inner Chord, Frame Support Fitting and Upper Splice Fitting Inspection
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Zero-time holes and install
BACB30NX10K( ) fasteners in
accordance with Accomplishment
Instructions 3.B.7.d.(2).(b).2.b.
No cracks found during
Condition 2, Option 2
open hole HFEC inspec-
tion.
See note (a).
(a) After rework or repairs are complete, support frame post-modification inspections are required. Group 1,
Group 2 and Group 3 airplanes proceed in accordance with Table 6 and 7. Group 4 and Group 5 airplanes
proceed in accordance with Table 8 and 9.
Group 1-3:
Table 6: Support Frame Post-Modification Inspections - Part 1
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
-Within 3,000 flight cycles after modification
installation in accordance with Accomplish-
ment Instructions 3.B.1 through 3.B.6, or
within 1,500 flight cycles after the date on
Revision 2 of this service bulletin, whichever
occurs later.
Do Support Frame
Post-Modification In-
spection in accor-
dance with Accom-
plishment Instruc-
tions 3.B.8., Part 1,
a.(3).
All airplanes.
-Before 20,000 total flight cycles, or within
3,000 flight cycles after modification instal-
lation in accordance with Accomplishment
Instructions 3.B.1 through 3.B.6, or within
1,500 flight cycles after the date on Revision
2 of this service bulletin, whichever occurs
later.
Do Support Frame
Post-Modification In-
spections in accor-
dance with Accom-
plishment Instruc-
tions 3.B.8., Part 1,
a.(4), (5), (6) and (7).
-Within 6,000 flight cycles after modification
installation in accordance with Accomplish-
ment Instructions 3.B.1 through 3.B.6, or
within 1,500 flight cycles after the date on
Revision 3 of this service bulletin, whichever
occurs later.
Do Support Frame
Post-Modification In-
spections in accor-
dance with Accom-
plishment Instruc-
tions 3.B.8., Part 1,
a.(8), (9) and (10).
1,500 flight cyclesWithin 1,500 flight cycles after the last in-
spection.
Do Support Frame
Post-Modification In-
spection in accor-
dance with Accom-
plishment Instruction
3.B.8., Part 1, a.(4).
No cracks found dur-
ing 3.B.8., Part 1,
a.(4) inspection.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
36 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 37

Group 1-3:
Table 6: Support Frame Post-Modification Inspections - Part 1
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
3,000 flight cyclesWithin 3,000 flight cycles after the last in-
spection.
Do Support Frame
Post-Modification In-
spection in accor-
dance with Accom-
plishment Instruction
3.B.8., Part 1, a.(3)
and (7).
No cracks found dur-
ing 3.B.8., Part 1,
a.(3) or (7) inspec-
tion.
See note (a).
1,500 flight cyclesWithin 1,500 flight cycles after the last LFEC
inspection.
At locations where a
low frequency eddy
current (LFEC) in-
spection was accom-
plished, do Support
Frame Post-Modifica-
tion LFEC inspec-
tions in accordance
with Accomplishment
Instruction 3.B.8.,
Part 1, a.(5).
No cracks found dur-
ing 3.B.8., Part 1,
a.(5) inspection.
See note (b).
6,000 flight cyclesWithin 6,000 flight cycles after the last open
hole HFEC inspection.
At specific locations
where an alternate
open hole high fre-
quency eddy current
(HFEC) inspection
was accomplished,
do Support Frame
Post-Modification
open hole HFEC in-
spections in accor-
dance with Accom-
plishment Instruction
3.B.8., Part 1, a.(5).
See note (b).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
37 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 38

Group 1-3:
Table 6: Support Frame Post-Modification Inspections - Part 1
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
3,000 flight cyclesWithin 3,000 flight cycles after the last in-
spection.
Repeat post-modifica-
tion inspection in ac-
cordance with Accom-
plishment Instruction
3.B.8., Part 1, a.(6).
No cracks found dur-
ing 3.B.8., Part 1,
a.(6) inspection.
See note (c).
6,000 flight cyclesWithin 6,000 flight cycles after the last open
hole HFEC inspection.
At specific locations
where an alternate
open hole high fre-
quency eddy current
(HFEC) inspection
was accomplished in
accordance with Ac-
complishment Instruc-
tion 3.B.8., Part 1,
a.(5), repeat post-
modification inspec-
tion in accordance
with Accomplishment
Instruction 3.B.8.,
Part 1, a.(6).
See note (c).
-Before further flight.Contact Boeing for
repair data, and do
the repair.
Any cracks found
during 3.B.8., Part 1,
a.(3), (4), (5), (6) or
(7) inspection.
3,000 flight cyclesWithin 3,000 flight cycles after the last in-
spection.
Do Support Frame
Post-Modification In-
spections in accor-
dance with Accom-
plishment Instruc-
tions 3.B.8., Part 1,
a.(8), (9) and (10).
No cracks found dur-
ing 3.B.8., Part 1,
a.(8), (9) or (10) in-
spection.
-Before further flight.Remove modification
parts and do a sur-
face high frequency
eddy current (HFEC)
inspection to deter-
mine if total crack
length is within de-
fined trim out limits in
accordance with Ac-
complishment Instruc-
tions 3.B.12.
Any cracks found
during post-modifica-
tion 3.B.8., Part 1,
a.(8), (9) or (10) in-
spection.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
38 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 39

Group 1-3:
Table 6: Support Frame Post-Modification Inspections - Part 1
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
-Before further flight.Contact Boeing for
repair data, and do
the repair.
If total crack length
extends outside the
defined trim out lim-
its.
-Before further flight.Do an upper or lower
corner post-modifica-
tion web crack repair
as applicable in ac-
cordance with Accom-
plishment Instruc-
tions 3.B.12.
If total crack length is
within the defined
trim out limits.
3,000 flight cyclesWithin 6,000 flight cycles after repair instal-
lation.
Do Support Frame
Post-Repair Inspec-
tion in accordance
with Accomplishment
Instructions 3.B.8.,
Part 4, a., b., or c. as
applicable.
Upper or lower cor-
ner post-modification
web crack repair in-
stalled.
(a) The post-modification inspection in Accomplishment Instruction 3.B.8., Part 1, a.(3) of this service bulletin
satisfies the requirements described in the Flight Safety Inspection Program for a modified support frame
(bulkhead) access cutout inspection in accordance with service bulletin 747-53A2332 R3.
(b) Accomplishment Instruction 3.B.8., Part 1, paragraph a.(5) gives instruction for an LFEC (and an alternative
open hole HFEC) inspection of the support frame outer chord. The compliance time for the repeat inspection
is different if the alternative open hole HFEC inspection is accomplished.
(c) Accomplishment Instruction 3.B.8., Part 1, a.(6) gives instruction for an open hole HFEC inspection of the
support frame outer chord and frame support fitting and a surface HFEC inspection of the support frame outer
chord and the splice fittings.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
39 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 40

Group 1-3:
Table 7: Support Frame Post-Modification Inspections - Part 2 & 3
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 20,000 flight cycles after
modification installation in accor-
dance with Accomplishment Instruc-
tions 3.B.1 through 3.B.6.
Do an open hole high fre-
quency eddy current
(HFEC) inspection for
cracks in the hinge sup-
port in accordance with
Accomplishment Instruc-
tions 3.B.8., Part 2.
All airplanes.
Do support frame post-
modification inspections
for cracks in accordance
with Accomplishment In-
structions 3.B.8., Part 3,
a.(1) and (2).
-Before further flight.Contact Boeing for repair
data, and do the repair.
Any cracks found.
6,000 flight cycles-Do an open hole HFEC
inspection for cracks in
the hinge support in accor-
dance with Accomplish-
ment Instructions 3.B.8.,
Part 2.
No cracks found.
3,000 flight cycles-Do support frame post-
modification inspections
for cracks in accordance
with Accomplishment In-
structions 3.B.8., Part 3,
a.(1).
1,500 flight cycles-Do support frame post-
modification inspections
for cracks in accordance
with Accomplishment In-
structions 3.B.8., Part 3,
a.(2).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
40 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 41

Group 4-5:
Table 8: Support Frame Post-Modification Inspections - Part 1 (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 3,000 flight cycles after
modification installation in accor-
dance with Accomplishment Instruc-
tions 3.B.1 through 3.B.6, or within
1,500 flight cycles after the date on
Revision 2 of this service bulletin,
whichever occurs later.
Do Support Frame Post-
Modification Inspection in
accordance with Accom-
plishment Instructions
3.B.8., Part 1, a.(3).
All airplanes.
-Before 12,000 total flight cycles, or
within 1,500 flight cycles after
modification installation in accor-
dance with Accomplishment Instruc-
tions 3.B.1 through 3.B.6, or within
1,500 flight cycles after the date on
Revision 2 of this service bulletin,
whichever occurs later.
Do Support Frame Post-
Modification Inspections
in accordance with Ac-
complishment Instruc-
tions 3.B.8., Part 1, a.(4),
(5), (6) and (7).
-Within 4,000 flight cycles after
modification installation in accor-
dance with Accomplishment Instruc-
tions 3.B.1 through 3.B.6, or within
1,500 flight cycles after the date on
Revision 3 of this service bulletin,
whichever occurs later.
Do Support Frame Post-
Modification Inspections
in accordance with Ac-
complishment Instruc-
tions 3.B.8., Part 1, a.(8),
(9) and (10).
3,000 flight cyclesWithin 3,000 flight cycles after the
last inspection.
Do Support Frame Post-
Modification Inspections
in accordance with Ac-
complishment Instruc-
tions 3.B.8., Part 1, a.(3).
No cracks found during
3.B.8., Part 1, a.(3) inspec-
tion.
1,000 flight cyclesWithin 1,000 flight cycles after the
last inspection.
Do Support Frame Post-
Modification Inspections
in accordance with Ac-
complishment Instruc-
tions 3.B.8., Part 1, a.(4).
No cracks found during
3.B.8., Part 1, a.(4) inspec-
tion.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
41 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 42

Group 4-5:
Table 8: Support Frame Post-Modification Inspections - Part 1 (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
1,000 flight cyclesWithin 1,000 flight cycles after the
last inspection.
At locations where a low
frequency eddy current
(LFEC) inspection was
accomplished, do Sup-
port Frame Post-Modifica-
tion LFEC inspections in
accordance with Accom-
plishment Instruction
3.B.8., Part 1, a.(5).
No cracks found during
3.B.8., Part 1, a.(5) inspec-
tion.
See note (a).
4,000 flight cyclesWithin 4,000 flight cycles after the
last open hole HFEC inspection.
At specific locations
where an alternate open
hole high frequency eddy
current (HFEC) inspec-
tion was accomplished,
do Support Frame Post-
Modification open hole
HFEC inspections in ac-
cordance with Accom-
plishment Instruction
3.B.8., Part 1, a.(5).
See note (a).
1,500 flight cyclesWithin 1,500 flight cycles after the
last inspection.
Repeat post-modification
inspection in accordance
with Accomplishment In-
struction 3.B.8., Part 1,
a.(6).
No cracks found during
3.B.8., Part 1, a.(6) inspec-
tion.
See note (b).
4,000 flight cyclesWithin 4,000 flight cycles after the
last open hole HFEC inspection.
At specific locations
where an alternate open
hole high frequency eddy
current (HFEC) inspec-
tion was accomplished in
accordance with Accom-
plishment Instruction
3.B.8., Part 1, a.(5), re-
peat post-modification in-
spection in accordance
with Accomplishment In-
struction 3.B.8., Part 1,
a.(6).
See note (b).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
42 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 43

Group 4-5:
Table 8: Support Frame Post-Modification Inspections - Part 1 (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
1,500 flight cyclesWithin 1,500 flight cycles after the
last inspection.
Do Support Frame Post-
Modification Inspections
in accordance with Ac-
complishment Instruc-
tions 3.B.8., Part 1, a.(7).
No cracks found during
3.B.8., Part 1, a.(7) inspec-
tion.
-Before further flight.Contact Boeing for repair
data, and do the repair.
Any cracks found during
3.B.8., Part 1, a.(3), (4),
(5), (6) or (7) inspection.
2,000 flight cycles.Within 2,000 flight cycles after the
last inspection.
Do Support Frame Post-
Modification Inspections
in accordance with Ac-
complishment Instruc-
tions 3.B.8., Part 1, a.(8),
(9) and (10).
No cracks found during
3.B.8., Part 1, a.(8), (9) or
(10) inspection.
-Before further flight.Remove modification
parts and do a surface
high frequency eddy cur-
rent (HFEC) inspection to
determine if total crack
length is within defined
trim out limits in accor-
dance with Accomplish-
ment Instructions 3.B.12.
Any cracks found during
post-modification 3.B.8.,
Part 1, a.(8), (9) or (10) in-
spection.
-Before further flight.Contact Boeing for repair
data, and do the repair.
If total crack length extends
outside the defined trim out
limits.
-Before further flight.Do an upper or lower
corner post-modification
web crack repair as appli-
cable in accordance with
Accomplishment Instruc-
tions 3.B.12.
If total crack length is within
the defined trim out limits.
2,000 flight cyclesWithin 4,000 flight cycles after re-
pair installation.
Do Support Frame Post-
Repair Inspection in ac-
cordance with Accom-
plishment Instructions
3.B.8., Part 4, a., b., or c.
as applicable.
Upper or lower corner post-
modification web crack re-
pair installed.
(a) Accomplishment Instruction 3.B.8., Part 1, paragraph a.(5) gives instruction for an LFEC (and an alternative
open hole HFEC) inspection of the support frame outer chord. The compliance time for the repeat inspection
is different if the alternative open hole HFEC inspection is accomplished.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
43 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 44

Group 4-5:
Table 8: Support Frame Post-Modification Inspections - Part 1 (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(b) Accomplishment Instruction 3.B.8., Part 1, a.(6) gives instruction for an open hole HFEC inspection of the
support frame outer chord and frame support fitting and a surface HFEC inspection of the support frame outer
chord and the splice fittings.
(c) This is the more work requirement associated with Revision 4 of this service bulletin.
Group 4-5:
Table 9: Support Frame Post-Modification Inspections - Part 2 & 3 (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 12,000 flight cycles after
modification installation in accor-
dance with Accomplishment Instruc-
tions 3.B.1 through 3.B.6.
Do an open hole high fre-
quency eddy current
(HFEC) inspection for
cracks in the hinge sup-
port in accordance with
Accomplishment Instruc-
tions 3.B.8., Part 2.
All airplanes.
Do support frame post-
modification inspections
for cracks in accordance
with Accomplishment In-
structions 3.B.8., Part 3,
a.(2), (3) and (4).
-Before further flight.Contact Boeing for repair
data, and do the repair.
Any cracks found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
44 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 45

Group 4-5:
Table 9: Support Frame Post-Modification Inspections - Part 2 & 3 (LCF/SP)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
6,000 flight cycles-Do an open hole HFEC
inspection for cracks in
the hinge support in accor-
dance with Accomplish-
ment Instructions 3.B.8.,
Part 2.
No cracks found.
3,000 flight cycles-Do support frame post-
modification inspections
for cracks in accordance
with Accomplishment In-
structions 3.B.8., Part 3,
a.(3).
1,500 flight cycles-Do support frame post-
modification inspections
for cracks in accordance
with Accomplishment In-
structions 3.B.8., Part 3,
a.(2) and (4).
Group 1-5:
Table 10: Support Frame Aft Inner Chords - Inspection for Upper and Lower Corner Repairs
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 1,500 flight cycles after
modification installation in accor-
dance with Accomplishment Instruc-
tions 3.B.1 through 3.B.6. or 1,000
flight cycles after the date on Revi-
sion 2 of this service bulletin, which
ever occurs later.
Do a one-time General
Visual Inspection (GVI)
for repair(s) installed on
the left and right side aft
inner chords in accor-
dance with Accomplish-
ment Instructions 3.B.9.
All airplanes with a support
frame modification installed
in accordance with the
Original Issue of this ser-
vice bulletin.
-In accordance with Tables 6 and 7
or 8 and 9 as applicable.
Do post-modification in-
spections. Proceed to
Tables 6 and 7 or 8 and
9 as applicable.
No aft inner chord repair(s)
installed.
-Before further flight.Remove repair parts and
the repaired aft inner
chord, then contact Boe-
ing for rework data and
do the rework. (a)
Any aft inner chord repair
installed.
(a) After rework or repairs are complete, support frame post-modification inspections are required. Group 1,
Group 2 and Group 3 airplanes proceed in accordance with Table 6 and 7. Group 4 and Group 5 airplanes
proceed in accordance with Table 8 and 9.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
45 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 46

Table 11: One Time Inspection at Location Added with Revision 4
Repeat Interval (Not
to Exceed)
Compliance TimeActionCondition
-Within 3,000 flight
cycles after modifica-
tion installation in ac-
cordance with Accom-
plishment Instruc-
tions 3.B.1 through
3.B.6, or within 1,500
flight cycles after the
date on Revision 4 of
this service bulletin,
whichever occurs lat-
er.
Do a one time sur-
face HFEC inspec-
tion of the support
frame outer chord for
cracks in accordance
with Accomplishment
Instruction 3.B.8.,
Part 1.
(a)
Airplanes that had
post-modification in-
spection accom-
plished in accor-
dance with Accom-
plishment Instruction
3.B.8., Part 1, of Re-
vision 3 of this ser-
vice bulletin.
-Before further flight.Contact Boeing for
repair data, and do
the repair.
Crack found during
the one time surface
HFEC inspection of
the outer chord.
(a) This action is the more work requirement associated with Revision 4 of this service bulletin and it is iden-
tified as such in Accomplishment Instruction 3.B.8., Part 1. This action is not necessary if the instruction
given in Accomplishment Instruction 3.B.8., Part 1 states that it is not necessary.
AD 2010-14-07 requires the modification specified in this service bulletin be made before the
accumulation of 20,000 total flight cycles, or within 18 months after the effective date of the AD,
whichever occurs later.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
The Manager of the FAA Seattle Aircraft Certification Office (ACO) approves the inspections, repairs
and modification with the corresponding compliance times specified in Tables 1 through 11 under
paragraph 1.E., "Compliance," of SB 747-53A2473, Revision 4 as an AMOC to the inspections, repairs
and modification at the STA 2598 support frame required by paragraphs (i), (j), (k)(1), (m), (n), (o), (p),
(q), (r), (s), (t), (u) and (v) of AD 2010-14-07. When this SB specifies contacting Boeing for repair
instructions, the repair instructions must be approved by the FAA in accordance with paragraph (x) of
the AD. All provisions of AD 2010-14-07 that are not specifically referenced in this paragraph remain
fully applicable and must be complied with.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
46 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 47

In addition, the Manager of the FAA Seattle ACO approves the inspections, repairs and modification
with the corresponding compliance times specified in Table 6 and 7 under paragraph 1.E., "Compliance,"
of SB 747-53A2473, Revision 4 as an AMOC to the inspections and repairs at the STA 2598 support
frame required by paragraphs (h), (i), and (j) of AD 2004-07-22 R1, for the inspection of Structural
Significant Items (SSIs) F-49A, F-49B, F-49C, F-49D, F-49E, F-49F, F-49G, F-49H, F-49I, and F-49J
of 747 Supplemental Structural Inspection Document (SSID) D6-35022, Revision G. This AMOC only
applies to the areas that are modified as given in this service bulletin. When this SB specifies contacting
Boeing for repair instructions, the repair instructions must be approved by the FAA in accordance with
paragraph (l) of the AD. All provisions of AD 2004-07-22 R1 that are not specifically referenced in this
paragraph remain fully applicable and must be complied with.
In addition, the Manager of the FAA Seattle ACO approves the inspections, repairs and modification
with the corresponding compliance times specified in Table 8 and 9 under paragraph 1.E., "Compliance,"
of SB 747-53A2473, Revision 4 as an AMOC to the inspections and repairs at the STA 2598 support
frame required by paragraphs (h), (i), and (j) of AD 2004-07-22 R1, for the inspection of SSI F-49KK,
F-49LL, F-49MM, F-49NN, and F-49PP of 747-400 LCF SSID Appendix A, D6-35022-1. This AMOC
only applies to the areas that are modified as given in this service bulletin. When this SB specifies
contacting Boeing for repair instructions, the repair instructions must be approved by the FAA in
accordance with paragraph (l) of the AD. All provisions of AD 2004-07-22 R1 that are not specifically
referenced in this paragraph remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do the modification and repair for
each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Support Frame Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
6.0012.002Open Access/Install Support Tool
(a)(a)
14.7529.502Inspection
1.503.002Crack/Repair Removal
(b)(b)
24.0096.004Modification and no web crack repair
installed
6.0012.002Close Access/Remove Support Tool
52.25152.50TOTAL FOR EACH SIDE OF AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
47 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 48

Support Frame Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
25.25101.004Modification with web crack repair in-
stalled at the same time. (c), (d) (c), (d)
53.50157.50TOTAL FOR EACH SIDE OF AIRPLANE
(a) More or less time may be necessary due to the type of support installed.
(b) More time will be necessary if cracks are found in the frame support fitting, hinge support fitting,
or outer chord.
(c) Modification with a typical upper or lower web repair installation. More time will be necessary
if more than one repair is installed.
(d) Includes Open Access/Install Support Tool; Inspection; Crack/Repair Removal; and Close
Access/Remove Support Tool hours above.
Support Frame Upper Corner Fastener Inspection/Rework
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.503.002Fastener Inspection
1.503.002Surface HFEC Inspection
1.503.002Remove Fasteners
0.752.002Open Hole HFEC Inspection
0.751.502Zero-time Holes
1.503.002Fastener Installation
7.7515.50TOTAL FOR EACH AIRPLANE
Support Frame Post-Modification Inspections
Elapsed HoursTask-HoursNumber of Per-
sons
Task
PART 1
16.0064.004Detailed Inspection
2.755.502HFEC Inspection (Floor Chord)
1.251.251LFEC Inspection
3.256.502Surface HFEC Inspection
3.256.502Open Hole HFEC Inspection
2.505.002Ultrasonic (UT) Inspection
3.757.502Post-Modification Inspection
32.7596.25PART 1 - TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
48 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 49

Support Frame Post-Modification Inspections
Elapsed HoursTask-HoursNumber of Per-
sons
Task
PART 2
2.505.002Access/Install Tool
(a)(a)
22.5045.002Open Hole HFEC Inspection
2.505.002Close Access/Remove Tool
27.5055.00PART 2 - TOTAL FOR EACH AIRPLANE
(b)(b)
PART 3
6.0012.002Detailed Inspection
8.0016.002Surface HFEC Inspection
4.008.002LFEC Inspection
4.008.002Ultrasonic (UT) Inspection
22.0044.00PART 3 - TOTAL FOR EACH AIRPLANE
(b)(b)
PART 4
4.754.75Post-Repair Inspection
4.754.75PART 4 - TOTAL FOR EACH AIRPLANE
87.00200.00PART 1, 2, 3 & 4 - TOTAL FOR EACH AIRPLANE
(b)(b)
(a) Less time will be required if an internal stabilizer jack is not installed.
(b) More time will be required if cracks are found and repairs are installed.
H. Weight and Balance Changes
NOTE: 1. Data for -100/-200/-400/SR (Short Range), and data for SP (Special Performance)
and LCF (Large Cargo Freighter) model airplanes is given in different tables below.
747-100/-200/-300/-400/SR
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Kits Used to Make
Modification
+30916.00+119.10148U0001-13/-14/-
15
+313838.40+120.80148U0001-13/-14/-
15 with one support
frame upper corner
web repair.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
49 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 50

747-100/-200/-300/-400/SR
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Kits Used to Make
Modification
+318514.8+122.60148U0001-13/-14/-
15 with two support
frame upper corner
web repairs.
+312279.6+120.20148U0001-13/-14/-
15 with support
frame lower corner
web repair.
+316956.0+122.00148U0001-13/-14/-
15 with one support
frame upper corner
web repair and a
lower corner web
repair.
+321632.4+123.80148U0001-13/-14/-
15 with two support
frame upper corner
web repairs and a
lower web repair.
747SP
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Kits Used to Make
Modification
+263823.0+119.00148U0001-13/-14/-
15
+268035.3+120.90148U0001-13/-14/-
15 with one support
frame upper corner
web repair.
+272247.6+122.80148U0001-13/-14/-
15 with two support
frame upper corner
web repairs.
+266483.4+120.20148U0001-13/-14/-
15 with support
frame lower corner
web repair.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
50 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 51

747SP
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Kits Used to Make
Modification
+270695.7+122.10148U0001-13/-14/-
15 with one support
frame upper corner
web repair and a
lower corner web
repair.
+274908.0+124.00148U0001-13/-14/-
15 with two support
frame upper corner
web repairs and a
lower corner web
repair.
747LCF (Large Cargo Freighter)
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Kits Used to Make
Modification
+323442.0+119.00148U0001-13/-14/-
15
+328606.2+120.90148U0001-13/-14/-
15 with one support
frame upper corner
web repair.
+333770.4+122.80148U0001-13/-14/-
15 with two support
frame upper corner
web repairs.
+326703.6+120.20148U0001-13/-14/-
15 with support
frame lower corner
web repair.
+331867.8+122.10148U0001-13/-14/-
15 with one support
frame upper corner
web repair and a
lower corner web
repair.
+337032.0+124.00148U0001-13/-14/-
15 with two support
frame upper corner
web repairs and a
lower corner web
repair.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
51 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 52

I. Electrical Load Data
Not applicable.
J. References
1. Existing Data:
a. 747-100/200/300 Aircraft Maintenance Manual (AMM) 27-41-02
b. 747-400 Aircraft Maintenance Manual (AMM) 27-41-02, 28-17-00, 28-26-00
c. 747 Non-Destructive Testing (NDT) Manual, Part 4, 53-10-10, Part 6, 51-00-00, Part 6,
53-30-00.
d. 747 Nondestructive Test (NDT) Manual D6-7170, Part 6, Subject 51-00-00, Figures 1, 4, 11,
16 or 23.
e. Boeing service bulletin 747-53A2427, FUSELAGE - Tail Section - Body Station 2598 Bulkhead
Forward and Aft Inner Chord Inspection
f. Boeing service bulletin 747-53A2467, FUSELAGE - Tail Section - Body Station 2598 Bulkhead
Inner Chord, Outer Chord and Diagonal Brace Inspection
g. Boeing Service Bulletins 747-53A2449, FUSELAGE - Tail Section - Body Station 2598 Bulkhead
Frame Support Inspection Under the Horizontal Stabilizer Hinge Support Fittings
h. FAA Airworthiness Directive 2001-14-07, Amendment 39-12318
i. FAA Airworthiness Directive 2001-15-03, Amendment 39-12337
j. FAA Airworthiness Directive 2003-19-08, Amendment 39-13311
k. FAA Airworthiness Directive 2006-05-06, Amendment 39-14503
l. FAA Airworthiness Directive 2010-14-07, Amendment 39-16352
m. Service Related Problem (SRP) 747OP-SRP-53-0106; 747-SRP-53-0118; 747-SRP-53-0145;
747-SRP-0341.
n. Standard Overhaul Practices Manual (SOPM) 20-41-02, 20-43-03, 20-50-19
2. Data supplied with this Service Bulletin:
a. Drawings:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
52 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 53

ADCNDCN/REVSheetTitleDrawing No
-E1BULKHEAD REINFORCEMENT STA 2598624U0061
-C2
-C3
-D4
--6
-B7
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Bulkhead Instl - Upper Lobe, Sta 259865B02502
Bulkhead Instl - Lower Lobe, Sta 259865B02505
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS and new DTI requirements for the structure
affected are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
53 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 54

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
54 of 250
BOEING SERVICE BULLETIN 747-53A2473
BLANK PAGE

### Page 55

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST
RESPONDER AT FR@BOEING.COM FOR THE LATEST QUANTITY INFORMATION.
Unit Price as of the Revi-
sion date of this Service
Bulletin (US Dollars)
ROLT as of the Revi-
sion date of this Ser-
vice Bulletin (Calendar
Days)
NameKit Number
$63,882.00550Top Kit - Modification148U0001-15
$146.00228Supplemental Kit - Bolt148U0001-12
$20,939.00244Top Kit - Chord, LS148U0001-13
$20,939.00244Top Kit - Chord, RS148U0001-14
$4,079.00550Kit - Local Upper Repair,
STA 2598, Left Side
148U0001-35
(a)
$4,460.00550Kit - Local Upper Repair,
STA 2598, Right Side
148U0001-36
(a)
$4,317.00550Kit - Local Upper Repair,
STA 2598, Left Side
148U0001-37
(b)
$4,319.00550Kit - Local Upper Repair,
STA 2598, Right Side
148U0001-38
(b)
$3,593.00550Kit - Local Upper Repair,
STA 2598, Left Side
148U0001-39
(c)
$3,593.00550Kit - Local Upper Repair,
STA 2598, Right Side
148U0001-40
(c)
$3,586.00550Kit - Local Upper Repair,
STA 2598, Left Side
148U0001-41
(d)
$3,586.00550Kit - Local Upper Repair,
STA 2598, Right Side
148U0001-42
(d)
$3,881.00550Kit - Local Upper Repair,
STA 2598, Left Side
148U0001-43
(e)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
55 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 56

Unit Price as of the Revi-
sion date of this Service
Bulletin (US Dollars)
ROLT as of the Revi-
sion date of this Ser-
vice Bulletin (Calendar
Days)
NameKit Number
$3,881.00550Kit - Local Upper Repair,
STA 2598, Right Side
148U0001-44
(e)
$3,741.00550Kit - Local Upper Repair,
STA 2598, Left Side
148U0001-45
(f)
$3,741.00550Kit - Local Upper Repair,
STA 2598, Right Side
148U0001-46
(f)
$3,870.00550Kit - Local Lower Repair,
STA 2598, Left Side
148U0001-48
(g)
$2,553.00550Kit - Local Lower Repair,
STA 2598, Left Side
148U0001-49
(h)
(a) Group 1, 4, Configuration 3
(b) Group 2-3, Configuration 5; Group 5
(c) Group 1, 4, Configuration 2
(d) Group 2, Configuration 2, 4; Group 3, Configuration 2, 4
(e) Group 1, 4, Configuration 1
(f) Group 2, Configuration 1, 3; Group 3, Configuration 1, 3; Group 5
(g) Group 1, Configuration 3; Group 2-3, Configuration 5; Group 4, Configuration3; Group 5
(h) Group 1, Configuration 1-2; Group 2, Configuration 1-4; Group 3, Configuration1-4; Group 4, Configuration1-
2
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes, inspection and/or repair
procedures given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-1-10-11-12-15-2-7
Kit- Reinforce-
ment
-...1..148U0001-1
Kit- Fasten.-.-.1.148U0001-10
(f)Kit- Bolt1.-..1.148U0001-11
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
56 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 57

Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-1-10-11-12-15-2-7
(f)Supplemental
Kit - Bolt
...-1..148U0001-12
Top Kit...--..148U0001-15
Kit- Reinforce-
ment
...1-.148U0001-2
Kit- Parts1....-148U0001-7
Kit- Parts....1.148U0001-8
Kit- Fasten1.....148U0001-9
(e)Doubler.....1148U0011-1
Filler.....1148U0011-3
Doubler.....1148U0011-5
Filler.....1148U0011-7
Bolt..6...BACB30LT5K11
Bolt..1...BACB30NM8K15
Bolt..1...BACB30NM8K16
Bolt.1....BACB30NW6K10Y
Bolt.5....BACB30NW6K8Y
Bolt.2....BACB30NX10K10
Bolt.2....BACB30NX10K11
Bolt.2....BACB30NX10K12
Bolt.8....BACB30NX10K13
Bolt.8....BACB30NX10K13X
Bolt.3....BACB30NX10K14
Bolt.2....BACB30NX10K14X
Bolt.10....BACB30NX10K7
Bolt.4....BACB30NX10K8
Bolt.2....BACB30NX12K13
Bolt.4....BACB30NX12K14
Bolt.6....BACB30NX12K14X
Bolt.2....BACB30NX12K15
Bolt.1....BACB30NX12K16
Bolt.12....BACB30NX6K10X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
57 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 58

Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-1-10-11-12-15-2-7
Bolt.2....BACB30NX6K11X
Bolt.1....BACB30NX6K13X
Bolt.8....BACB30NX6K3X
Bolt.5....BACB30NX6K7Y
Bolt.1....BACB30NX6K8Y
Bolt.23....BACB30NX6K9X
Bolt.5....BACB30NX8K10
Bolt.29....BACB30NX8K10X
Bolt.4....BACB30NX8K11
Bolt.23....BACB30NX8K11X
Bolt.10....BACB30NX8K12X
Bolt.2....BACB30NX8K13
Bolt.21....BACB30NX8K13X
Bolt.16....BACB30NX8K14X
Bolt.1....BACB30NX8K15X
Bolt.9....BACB30NX8K16X
Bolt.5....BACB30NX8K17X
Bolt.52....BACB30NX8K5
Bolt.25....BACB30NX8K6
Bolt.29....BACB30NX8K7
Bolt.36....BACB30NX8K8
Bolt.8....BACB30NX8K8X
Bolt.28....BACB30NX8K9
Bolt.36....BACB30NX8K9X
Bolt..6...BACB30US4K14
Bolt..6...BACB30US4K15
Bolt..2...BACB30US8K34
Bolt..2...BACB30US8K37
Bolt..2...BACB30US9K34
Bolt..2...BACB30US9K37
Bolt..4...BACB30US9K38
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
58 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 59

Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-1-10-11-12-15-2-7
Bolt...6...BACB30UU5K13
Bolt..2...BACB30UU5K15
Bolt..4...BACB30UU5K16
Bolt..2...BACB30UU5K17
Bolt..4...BACB30UU7K15
Bolt..4...BACB30UU7K16
Bolt..2...BACB30UU8K15
Bolt..2...BACB30UU8K16
Collar.6....BACC30AC6
Collar.31....BACC30BH10
Collar.15....BACC30BH12
Collar.46....BACC30BH6
Collar.339....BACC30BH8
Collar.6....BACC30R6
Nut..12...BACN10HR4CD
Nut..8...BACN10HR9CD
Nut..8...BACN10JC5CD
Nut..8...BACN10JC7CD
Nut..4...BACN10JC8CD
Nut...6...BACN10YR5CD
Rivet.8....BACR15BB6D5C
Rivet.6....BACR15GF3D5
Shim.....1BACS40R011D036F
Shim.....1BACS40R011D040F
Shim.....1BACS40R012D037F
Shim.....1BACS40R012D041F
65B02872-3Shim.....2BACS40R036B065F
Washer..2...BACW10AT28AS
Washer..2...BACW10AT48AS
Washer...6...BACW10BN5AC
Washer..12...BACW10BP4CK
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
59 of 250
BOEING SERVICE BULLETIN 747-53A2473

### Page 60

Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-1-10-11-12-15-2-7
Washer..12...BACW10BP4PK
Washer..8...BACW10BP9CK
Washer..8...BACW10BP9PK
Washer..14...NAS1149D0516J
Washer...12...NAS1149D0563J
Washer..8...NAS1149D0716J
Washer..4...NAS1149D0816J
Nut..3...NAS1805-5
Nut..2...NAS1805-8
(a)65B02875-13Fitting.....165B02875U13
(b)65B02875-15Fitting.....165B02875U15
(c)65B02875-17Fitting.....165B02875U17
(d)65B02875-19.Fitting.....165B02875U19
(a) 65B02875U27 is an acceptable substitute for the 65B02875U13.
(b) 65B02875U29 is an acceptable substitute for the 65B02875U15.
(c) 65B02875U31 is an acceptable substitute for the 65B02875U17.
(d) 65B02875U33 is an acceptable substitute for the 65B02875U19.
(e) 148U0011-15 is an acceptable substitute for the 148U0011-1.
(f) 148U0001-12 is a required supplemental kit with the 148U0001-11 bolt kit.
Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-13-14
Top Kit, Kit- Chord-.148U0001-13
Top Kit, Kit- Chord.-148U0001-14
65B02505-49Chord1.65B02505U49
65B02505-50Chord.165B02505U50
Kit 148U0001
Existing PartNameQTYNew Part Number
NotesNumber-8-9
Kit- Parts-.148U0001-8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2005
747-53A2473Revision 4: December 01, 2011
60 of 250
BOEING SERVICE BULLETIN 747-53A2473

The text continues at https://openairdocs.org/service-documents/boeing/747-53a2473/file/6c7ad8329392.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
