# Boeing Alert Service Bulletin 747-53A2507: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2009-0607; AD 2012-15-13 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-53A2507](https://openairdocs.org/service-documents/boeing/747-53a2507.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin
- Pages: 114
- PDF: https://openairdocs.org/files/sha256/3b/40/3b407e2f47288908998b7731af607e27fe444cc3d5a3e9eb13fd9e1e79d57950
- Page: https://openairdocs.org/service-documents/boeing/747-53a2507/file/3b407e2f4728

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 114
 
 
ALERT ALERT
Commercial
Airplanes
747
ALERTALERT
Service Bulletin
Number: 747-53A2507
Original Issue: April 21, 2005
Revision 1: January 14, 2010
ATA System: 5310
SUBJECT: FUSELAGE - Stretched Upper Deck Frame and Tension Tie - Inspection and Repair
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2005 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.    For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, 
DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the  Boeing 
livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection 
with this document unless provided in writing by Boeing.

### Page 2

BLANK PAGE
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 3

Table of Contents
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 9
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  23
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  23
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  23
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  27
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  30
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  32
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  32
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  32
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  32
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  32
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  33
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  33
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  33
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  35
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  35
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  35
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  35
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  35
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  36
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   37
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  39
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  39
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  40
FIGURE  1: DETAILED INSPECTION OF TENSIO N TIES FROM STA 1120 TO STA 1220 (STAGE 1
ONLY) .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  49
FIGURE  2: Deleted (Revision 1) .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  54
FIGURE  3: SHEAR WEB COMPONENT INSPECTION (STAGE 1 AND 2).  .  .  .  .  .  .  .  .  .  .  .  .  .  .  55
FIGURE  4: FRAME INSPECTIONS  - STA 1120 TO STA 1220 (STAGE 1 AND 2)   .  .  .  .  .  .  .  .  .  .  58
FIGURE  5: HFEC AND DETAILED INSPECTIONS OF TENSION TIES, STEEL PLATES, AND FRAMES
FROM STA 1120 TO STA 1220 (STAGE 2 ONLY) .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  61
FIGURE  6: OVERSIZE HOLE REPAIR STA 1120 TO STA 1220 .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  67
FIGURE  7: HFEC INSPECTION OF HOLES FOR INSULATION BLANKET STUDS .  .  .  .  .  .  .  .  .  .  72
FIGURE  8: DETAILED INSPECTION OF TENSIO N TIES FROM STA 1120 TO STA 1220 (STAGE 1
ONLY) .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  75

### Page 4

Table of Contents
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
FIGURE  9: FRAME INSPECTIONS  - STA 1120 TO STA 1220 (STAGE 1 AND 2) .  .  .  .  .  .  .  .  .  .  . 80
FIGURE  10: HFEC AND DETAILED INSPECTIONS OF TENSION TIES, STEEL PLATES, AND FRAMES
FROM STA 1120 TO STA 1220 (STAGE 2 ONLY)  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 83
FIGURE  11: OVERSIZE HOLE REPAIR STA 1120 TO STA 1220   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 89
FIGURE  12: HFEC INSPECTION OF HOLES FOR INSULATION BLANKET STUDS   .  .  .  .  .  .  .  .  . 94
FIGURE  13: STA 1140 - INSPECTION FOR MISLOCATED ANGLE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 97
FIGURE  14: ONE-TIME INSPECTION FOR CRACKS IN FRAMES AT PREVIOUS TENSION TIE
LOCATIONS (Revision 1 - More Work)  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  102
FIGURE  15: STAGE 2 INSPECTION - ADDITIONAL WORK at STA 1140  .  .  .  .  .  .  .  .  .  .  .  .  .  .  109
APPENDIX  A: Deleted (Revision 1)   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  111
APPENDIX  B: TENSION TIE DISCONNECTION METHODS. .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  112
APPENDIX  C: COMMON FASTENER TYPE REQUIREMENT  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  114

### Page 5

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 114
 
 
ALERT ALERT
Commercial
Airplanes
747
ALERTALERT
Service Bulletin
Number: 747-53A2507 Revision Transmittal Sheet
Original Issue: April 21, 2005
Revision 1: January 14, 2010
ATA System: 5310
SUBJECT: FUSELAGE - Stretched Upper Deck Frame and Tension Tie - Inspection and Repair
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2007-23-18 is related to this service bulletin.  
AD 2007-23-18 supersedes AD 2006-06-11.
Federal Aviation Administration (FAA) Airworthiness Directive 2004-07-22 R1 is related to this service bulletin.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2009-NM-024-AD, is related to this 
service bulletin.
More work is necessary on airplanes inspected as shown in the original issue of this service bulletin.  
Compliance times for Stage 1 inspections have been revised to match the requirements of FAA AD 2007-23-
18.  This revision also recommends new compliance times for Stage 2 inspections, which is not included in FAA 
AD 2007-23-18.  For airplanes that are past the new compliance time for Stage 2 inspections, continue to do 
the Stage 1 inspection work at the repeat interval specified until the Stage 2 inspection work is started.  Also, a 
requirement has been added to do eddy current inspection of twelve additional fastener holes in the tension tie 
inboard of the aluminum straps at STA 1140.  Boeing recommends that operators incorporate this additional 
inspection requirement before 10,000 total flight cycles or within 3,000 flight cycles after the Revision 1 date of 
this service bulletin, whichever is later.
Group 1, Configuration 1: In addition, more work is necessary on airplanes that have not been modified to SF 
or BCF.  A new inspection of the shear panels for a mislocated angle is recommended within 3,000 flight cycles 
after the Revision 1 date of this service bulletin.
Group 1, Configuration 2; Group  2-3: In addition, more work is necessary on airplanes that have been modified 
by Boeing to Special Freighter (SF) or Boeing Converted Freighter (BCF).  A new inspection of fastener holes 
in the frames at locations where tension ties existed before freighter modification is recommended within 3,000 
flight cycles after the Revision 1 date of this service bulletin. 
For other clarifications or corrections to work instructions that are transmitted with this revision, Boeing 
recommends that operators incorporate the revised instructions at the next planned Stage 1 or Stage 2 
inspection as given in this service bulletin.
No airplanes were added to this service bulletin effectivity.

### Page 6

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
REASON FOR REVISION
This alert revision is sent to revise compliance times of Stage 1 inspections to match the requirements of AD 
2007-23-18, and reduce the initial Stage 2 inspection compliance time.  In addition, this revision adds references 
to Structural Repair Manual (SRM) repairs that were released after the original issue of this service bulletin, and 
adds new inspection requirements. 
Many other changes have also been made in Revision 1.  The following list describes important changes.
Changes to this service bulletin include:
— In Summary, Reason, and Description sections:  Updated these sections with current data.
— In Paragraph 1.A., Effectivity:  Revised effectivity to remove RT631, RT632, RT743, and RT876.  These 
airplanes no longer have tension ties.  Also, the Effectivity has been divided into three groups.  Group 1 is 
for passenger airplanes.  Groups 2 and 3 are for airplanes modified by Boeing to SF or BCF.
— In Paragraph 1.E., Compliance:  This section is changed to recommend new compliance times for Stage 
1 and Stage 2 inspections.  Also, added compliance information for new inspections, updated existing AD 
callouts to 2004-07-22 R1, and added reference to AD 2007-23-18.
— In Paragraph 1.F., Approval:   Updated this section with Alternative Method of Compliance (AMOC) 
information.
— In Paragraph 1.J., References:  Added new SRM and AD references.
— In Paragraph 1.K., Publications Affected:  This section has been revised to add Damage Tolerance 
Inspection information.
— In Paragraph 2.C.2., Parts and Materials Supplied by the Operator:  Updated table to reflect additional parts 
that may be necessary to support new inspections.
— In Paragraph 3.A., General Information:  Some existing notes have been updated and new notes have 
been added.
— In Paragraph 3.B., Work Instructions:  Added reference to SRM repairs.  Revised to provide separate 
instructions for passenger airplanes and SF/BCF airplanes.  Also, added instructions for new inspections 
and revised instructions for additional inspections when a severed tension tie is found.
— In Figure 1: Revised figure to clarify shear web information.
— In Figure 2: This figure is deleted.  In previous revisions of this service bulletin, Figure 2 gave instructions 
for additional inspections that were required if a tension tie was found severed.  Boeing now recommends 
instructions given in the Accomplishment Instructions section and Figure 5 for additional inspections if a 
tension tie is found severed.
— In Figure 5:  Revised figure to clarify shear web information and to clarify the location of view E-E.  Revised 
instructions to require that all removed fasteners be re-installed wet with BMS 3-27 or BMS 3-38 in close 
ream holes, instead of installed dry in transition fit holes.  Note (g) has been revised to remove instruction 
to contact Boeing for repair instructions.  Repair instructions are contained in the Accomplishment 
Instructions section.  Also, some footnotes and footnote identifiers have been revised.
— In Figure 6:  Revised figure to clarify shear web information, to remove instruction to contact Boeing for 
repair instructions, and to add instruction to repair as given in the Accomplishment Instructions.  Revised 
instructions to require that all removed fasteners be re-installed wet with BMS 3-27 or BMS 3-38 in close 
ream holes, instead of installed dry in transition fit holes.  Also, some footnotes and footnote identifiers have 
been revised.
— New Figure 8 has been added for airplanes that were modified by Boeing to SF or BCF.  Figure 8 is similar 
to Figure 1.
— New Figure 9 has been added for airplanes that were modified by Boeing to SF or BCF.  Figure 9 is similar 
to Figure 4.
— New Figure 10 has been added for airplanes that were modified by Boeing to SF or BCF.  Figure 10 is 
similar to Figure 5.
— New Figure 11 has been added for airplanes that were modified by Boeing to SF or BCF.  Figure 11 is 
similar to Figure 6.

### Page 7

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
— New Figure 12 has been added for airplanes that were modified by Boeing to SF or BCF.  Figure 12 is 
similar to Figure 7.
— New Figure 13 has been added for passenger airplanes (airplanes not modified by Boeing to SF or BCF).  
Figure 13 is a one-time inspection for a mislocated angle common to the shear panel and tension tie at 
STA 1140.
— New Figure 14 has been added for airplanes that were modified by Boeing to SF or BCF.  Figure 14 is a 
one-time inspection for cracks in frames at locations where tension ties existed before SF or BCF 
modification.
— New Figure 15 has been added for all airplanes to specify eddy current inspection of twelve additional 
fastener holes in the tension tie inboard of the aluminum straps at STA 1140.
— Appendix A has been deleted.
— Appendix B has been revised to delete Method 2 and Method 4 for disconnecting tension ties.
Paragraph 1.A., Effectivity, shows changes of airplane operators. Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
Original Issue: April 21, 2005
Revision 1: January 14, 2010

### Page 8

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 9

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 114
 
 
ALERT ALERT
Commercial
Airplanes
747
ALERTALERT
Service Bulletin
Number: 747-53A2507 Summary
Original Issue: April 21, 2005
Revision 1: January 14, 2010
ATA System: 5310
SUBJECT: FUSELAGE - Stretched Upper Deck Frame and Tension Tie - Inspection and Repair
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN 
PARAGRAPH 1.A., EFFECTIVITY.  IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OPERATOR.  IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions for inspection and repair of upper deck tension ties and adjacent frame 
structure on stretched upper deck (SUD) airplanes.  The tension ties have been determined to be structure that 
is susceptible to Widespread Fatigue Damage (WFD).  WFD could cause tension ties to become severed or 
disconnected from the frames.  Severed or disconnected tension ties and/or frames at multiple locations could 
result in rapid in-flight decompression of the airplane.
For more information about WFD, refer to Boeing Service Letter 747-SL-53-088A.
Tension ties are installed just aft of the floor beams that support the upper deck.  Tension ties are installed at 
Stations (STA) 1120, 1140, 1160, 1180, 1200, and 1220 and extend from the left side to the right side of the 
airplane.
During routine maintenance an operator found two severed upper deck tension ties at STA 1120 and STA 1140. 
The cause of the severed tension ties was fatigue cracking due to an incorrect configuration. As a result of this 
report, Boeing released Service Bulletin 747-53-2483 which recommended a one time inspection to make sure 
proper configuration and a crack free condition.  
During inspections per Service Bulletin 747-53-2483 one operator found severed tension ties at both STA 1120 
and STA 1140 at approximately 14,000 total flight cycles, and a second operator found a severed tension tie at 
STA 1120 at approximately 28,000 total flight cycles. For these three additional severed tension tie reports, the 
tension tie configuration was as shown on Boeing Engineering Drawings.

### Page 10

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
In addition, before the original issue of this service bulletin, operators reported finding 10 cracks in tension ties, 
10 broken fasteners, 9 cracks in frames adjacent to tension ties, and 8 cracks in the shear ties adjacent to the 
tension ties.  The cracks and broken fasteners were at STA 1120, STA 1140, STA 1160, STA 1180, STA 1200, 
and STA 1220.  There were also 4 reports of cracks in the shear web between the STA 1120 and STA 1140 
tension ties.  For these additional reports, the airplanes had between 7,000 and 28,000 total flight cycles. 
Subsequent to the release of the original issue of this service bulletin, one operator reported that three adjacent 
tension ties were found severed on a 747-300 series airplane with approximately 18,400 flight cycles.  Another 
operator reported that two adjacent tension ties were found severed on a 747-300 series airplane with 
approximately 14,000 flight cycles.  In addition, multiple operators have reported finding cracks in tension ties 
and frames during inspections per the original issue of this service bulletin.  Due to these reports, Boeing finds 
it necessary to reduce the compliance times and repeat intervals for the inspections recommended by this 
service bulletin.
In addition to receiving multiple crack reports after the release of the original issue of this service bulletin, Boeing 
has determined that Stage 2 inspections should include open hole eddy current inspection at twelve additional 
fastener locations in the STA 1140 tension tie inboard of the aluminum straps.  The aluminum straps create load 
conditions in the STA 1140 tension tie that could cause cracks at these additional fastener locations, which are 
farther inboard than where eddy current inspections are done on other tension ties.
Also, due to operator reports of a mislocated angle common to the shear panel, a one-time inspection has been 
added to inspect for the mislocated angle and install a new angle in the correct location, as necessary.  A 
mislocated angle could lead to cracks in the shear panel.
Also, Boeing has determined that it is necessary to add a one-time inspection of fastener holes in the frames of 
Boeing Special Freighter and Boeing Converted Freighter airplanes at locations where tension ties existed 
before freighter modification.  These fastener holes were not inspected during modification at Boeing.  
Inspection is necessary to ensure the fastener holes are crack free.
This service bulletin provides instructions for inspections and repair of the tension ties and frames at the aft end 
of the upper deck. 
The tension ties and frames have been found to be structually significant in that they are critical to the structural 
integrity of the airplane. Tension tie and frame cracks not found before they reach critical crack lengths can 
cause in-flight depressurization.
Boeing Service Related Problem (SRP) 747-SRP-53-0215 is related to this service bulletin.
Modification Service Bulletin 747-53A2559 has been released to address Widespread Fatigue Damage (WFD) 
in the tension ties and adjacent frame structure.  Accomplishment of Service Bulletin 74753A2559 will terminate 
the repeat inspection requirements of this service bulletin.  For more information about WFD, refer to Boeing 
Service Letter 747-SL-53-088A.
ACTION
Get access to the frame to tension tie joints at STA 1120 through STA 1220.  Do Stage 1 or Stage 2 inspections 
for cracks, and broken, loose, or missing fasteners in the tension ties, the shear webs, and the attached frames.  
If cracks are found, or if broken, loose, or missing fasteners are found, do the repairs given in this service bulletin 
before the airplane is returned to service.  Repeat inspections at the specified intervals.

### Page 11

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
This service bulletin contains a flight safety inspection program.  The flight safety inspection program is the 
minimum inspection program to maintain the structural integrity of the affected area of the airplane.  An optional 
economics based inspection, to be done earlier than the flight safety inspection, would usually be included in 
this type of bulletin.  However, for this area there is no economics based inspection program.  The repair 
necessary when a crack is found in the flight safety inspection is the same as the repair necessary if a crack is 
found earlier.
EFFECTIVITY
747-100B SUD, 747-200B, 747-300, 747-400, and 747-400D airplanes.  Refer to paragraph 1.A.1, Effectivity.
NOTE: For 747-200B airplanes, only airplanes that have been modified to Stretched Upper Deck are affected.
COMPLIANCE
Refer to paragraph 1.E, Compliance.
Federal Aviation Administration (FAA) Airworthiness Directive 2004-07-22 R1 is related to this service bulletin.
Federal Aviation Administration (FAA) Airworthiness Directive 2007-23-18 is related to this service bulletin.  AD 
2007-23-18 supersedes AD 2006-06-11.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2009-NM-024-AD, is related to this 
service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection or repair procedures given in this service bulletin.
MANPOWER
Refer to paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.

### Page 12

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
REPAIR IF NECESSARY
AND LOOSE OR MISSING FASTENERS.
INSPECT TENSION TIES FOR CRACKS
1120
STA
1220
STA
1120
STA
1220
STA
REPAIR IF NECESSARY
CRACKS AND LOOSE OR MISSING FASTENERS.
TO 2 STRINGERS BELOW TENSION TIES FOR
INSPECT FRAMES FROM 2 STRINGERS ABOVE
CRACKS. REPAIR IF NECESSARY
INSPECT SHEAR WEBS FOR
1140
STA
FWD
466909

### Page 13

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 114
 
 
ALERT ALERT
Commercial
Airplanes
747
ALERTALERT
Service Bulletin
Number: 747-53A2507
Original Issue: April 21, 2005
Revision 1: January 14, 2010
ATA System: 5310
SUBJECT: FUSELAGE - Stretched Upper Deck Frame and Tension Tie - Inspection and Repair
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN 
PARAGRAPH 1.A., EFFECTIVITY.  IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OPERATOR.  IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OWNER.
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below. Refer to PRR 85901-53RS for data about 
this change. 
Refer to Service Bulletin Index Document D6-30300 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.

### Page 14

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
NOTE: Some airplanes were delivered with Extended Upper Deck Modifications that installed
floor beams aft of Station 740. These airplanes are not the same as airplanes delivered
with a Stretched Upper Deck (SUD), which includes 747-300, 747-400 passenger
airplanes, and some 747-100 and 747-200 airplanes that have been modified to SUD.
NOTE: Revision 1 changed the effectivity to remove RT631, RT632, RT743, and RT876.  These
airplanes have been modified to Large Cargo Freighter (LCF) configuration and no
longer have tension ties.
Airplane models:
747-100B SUD 747-200B 747-300 747-400
747-400D
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AEROLINEAS ARGENTINAS  (ARG)
1 RT701–RT702 RT704
AEROSUR  (REO)
1R M 3 5 4 R S 2 3 5
AIR ATLANTA ICELANDIC  (AID)
1 RS211 RS233 RS237 RS332–RS333
RT515 RT777 RT834
3 RT776
AIR CARGO GERMANY  (CGU)
1 RT633–RT634
AIR CHINA  (BEJ)
1 RM341 RM811–RM813 RT034–RT035 RT878–RT880
3 RT033
GROUP CONFIGURATION DESCRIPTION
1 - 747-100B/-200B/-300/-400/-400D airplanes, 
built in a Stretched Upper Deck (SUD) 
configuration, or modified to SUD by Boeing, 
except airplanes modified by Boeing to Special 
Freighter (SF) or Boeing Converted Freighter 
(BCF) configuration before Revision 1.
1 Group 1 airplane that have not been modified by 
Boeing to SF or BCF.
2 Group 1 airplanes that are modified to BCF 
configuration after release of Revision 1 of this 
service bulletin.
2 - 747-200B SUD and -300 airplanes that have 
been modified by Boeing to SF configuration.
3 - 747-400 airplanes that have been modified by 
Boeing to BCF configuration before release of 
Revision 1 of this service bulletin.

### Page 15

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
AIR CHINA CARGO  (CGC)
1 RT101 RT103
3 RT031–RT032
AIR FRANCE  (AFA)
1 RM401–RM403 RT073–RT074 RT121 RT591
RT711–RT716
3 RT071–RT072 RT075 RT751
AIR INDIA  (AIN)
1 RS781–RS782 RU001–RU006
AIR NEW ZEALAND  (ANZ)
1 RM082 RM191–RM192 RT671–RT673 RT703
RT932
AIR PACIFIC  (APC)
1 RT502 RT504
AIR PULLMANTUR  (PUL)
1 RT523 RT525 RT749
AIRBRIDGE CARGO  (ABM)
2 RS762
AL WAFEER  (WFR)
1 RU016
ALL NIPPON AIRWAYS  (ANA)
1 RT753–RT755 RU831 RU833–RU841
ASIANA AIRLINES  (AAR)
1 RM071 RT131–RT136 RU032
ATLAS AIR  (TLS)
1 RM232–RM233
2 RS722
3 RT752
BAHRAIN ROYAL FLIGHT  (BHR)
1R M 4 2 6
BRITISH AIRWAYS  (BAB)
1 RM096–RM097 RM136–RM145 RM261–RM264 RT471–RT499
RU121–RU132
CATHAY PACIFIC AIRWAYS  (CAT)
1 RT451–RT455 RT457–RT460 RT462–RT469 RT511–RT512
RT514 RT517 RT522 RT529
3 RT456 RT461 RT508 RT518–RT519
RT524 RT528 RT781–RT782 RT837

### Page 16

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
CHINA AIRLINES  (CHI)
1 RM021–RM024 RM441–RM443 RM445 RT636–RT640
CORSAIR  (COR)
1 RS239–RS240 RT613–RT614 RT616 RT618–RT619
RT621
DRAGONAIR  (DRG)
3 RT510 RT513 RT516
DUBAI AIR WING  (DAW)
1 RM167–RM168 RT102
EAGLE AVIATION EUROPE  (EAU)
1 RT831
EL AL ISRAEL AIRLINES  (ELA)
1 RM091 RT527 RU081–RU083
EVA AIR  (EVA)
1 RM116–RM117 RT162–RT163 RT165–RT168 RT951–RT955
EXPORT RESTRICTED AIRPLANES  (YWV)
1 RS751–RS752 RT602 RT606 RT620
FINOVA  (GRB)
1R S 7 6 1
GARUDA INDONESIA  (GIA)
1 RT931 RU061–RU062
GECAS  (GEF)
1 RT412 RT615 RT622
GENERIC CUSTOMER/SUPPLIER  (XXX)
1 RD382 RS331
GOVERNMENT OF JAPAN  (JAG)
1 RT681–RT682
GREAT WALL AIRLINES  (GWL)
3 RT520
HIS MAJESTY THE SULTAN'S FLIGHT  (BWN)
1 RT440
JAL INTERNATIONAL  (JAL)
1 RM126–RM127 RM129–RM132 RM316–RM318 RS251–RS252
RS259 RT641 RT643–RT654 RT861–RT864
RT966 RU801–RU809
3 RM128 RT642 RT655–RT657 RT967

### Page 17

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
KALITTA AIR  (KAC)
3 RT021–RT022
KINGDOM HOLDING COMPANY  (KBA)
1 RT877
KLM - ROYAL DUTCH AIRLINES  (KLM)
1 RM801–RM803 RT001–RT014 RT531–RT535
KOREAN AIR  (KAL)
1 RM011–RM013 RT061 RT571 RT577–RT588
RT590 RT811–RT814
3 RT572–RT576
KUWAIT AIRWAYS  (KUW)
1 RT151
LION AIR  (MLI)
1 RT503 RT505
LUFTHANSA GERMAN AIRLINES  (DLH)
1 RM001–RM007 RT041–RT047 RT431–RT439 RT441–RT447
MALAYSIA AIRLINES  (MAS)
1 RM036–RM040 RM366–RM367 RT744 RT746
RT748 RT750 RU017
MARTINAIR HOLLAND  (MTH)
3 RT501 RT506–RT507 RT509
MAX AIR  (MXE)
1 RS266–RS267
NORTHWEST AIRLINES  (NWA)
1 RM241–RM246 RT401–RT410
OMAN ROYAL FLIGHT  (RFO)
1R M 0 1 0
ORIENT THAI AIRLINES  (OTH)
1 RS001–RS002 RS253–RS254 RS257
PAKISTAN INT'L AIRLINES  (PIA)
1 RS301–RS303 RS305–RS306
PHILIPPINE AIRLINES  (PAL)
1 RT152 RU051–RU052 RU059–RU060
PHUKET AIRLINES  (PHK)
1 RD381 RD605 RS238 RS241
RS711

### Page 18

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
PRESIDENTIAL FLIGHT  (ABD)
1 RM084 RT137
QANTAS  (QAN)
1 RF001–RF006 RM331–RM333 RS273–RS274 RS276
RT551–RT568 RT741–RT742 RU031
ROYAL AIR MAROC  (RAM)
1 RT717
SATAIR  (SAI)
1 RD606
SAUDI ARABIAN AIRLINES  (SVA)
1 RM156–RM157 RS311–RS320 RU101–RU102
SAUDI ROYAL FLIGHT  (SRF)
1R M 1 5 8 R S 6 9 9
SINGAPORE AIRLINES  (SIA)
1 RM041–RM045 RT521 RT530 RT833
RT835
3 RT526
SKYTECH-AIC  (SKC)
1 RT832
SONAIR  (SON)
1R M 2 3 1
SOUTH AFRICAN AIRWAYS  (SAA)
1 RM081 RM083 RM147 RS212
RS232 RS236
SOUTHERN AIR  (SOF)
2 RD601–RD602 RS721 RS786
SURINAM AIRWAYS  (SUR)
1R S 7 1 3
TAAG (ANGOLA AIRLINES)  (ANG)
1R S 7 0 3 R S 7 4 2
THAI AIRWAYS INTERNATIONAL  (TII)
1 RM026–RM030 RM431 RT691–RT699 RT801–RT803
TRANSAERO AIRLINES  (TRX)
1 RM146 RS255 RS258 RS263
RS268 RS271 RT783–RT784
UNICAL AVIATION  (UNL)
1 RS341–RS342

### Page 19

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
UNITED AIR LINES  (UAL)
1 RM166 RM169–RM177 RT411 RT601
RT603–RT605 RT607–RT612 RT617 RT623–RT630
UPS  (UPS)
3 RT161 RT164
VIRGIN ATLANTIC AIRWAYS  (VAA)
1 RM051–RM053 RM351–RM353 RM355 RT945–RT949
WORLD AIRWAYS, INC.  (WLD)
1 RT745 RT747
YANGTZE RIVER EXPRESS  (YTH)
1 RT756–RT757
IDENTIFICATION BY VARIABLE NUMBER
Variable  Group
RD381–RD383 1
RD601–RD602 2
RD603–RD607 1
RD721–RD722 1
RF001–RF006 1
RM001–RM007 1
RM010–RM013 1
RM021–RM024 1
RM026–RM030 1
RM036–RM045 1
RM051–RM053 1
RM071 1
RM081–RM084 1
RM091 1
RM096–RM097 1
RM116–RM117 1
RM126–RM127 1
RM128 3
RM129–RM132 1
RM136–RM147 1
RM156–RM158 1
RM166–RM177 1
RM191–RM192 1
RM231–RM233 1
RM241–RM246 1

### Page 20

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
RM261–RM264 1
RM316–RM318 1
RM331–RM333 1
RM341 1
RM351–RM355 1
RM366–RM367 1
RM401–RM403 1
RM426 1
RM431 1
RM441–RM443 1
RM445 1
RM801–RM803 1
RM811–RM813 1
RS001–RS002 1
RS201 1
RS211–RS212 1
RS221–RS222 1
RS231–RS241 1
RS251–RS259 1
RS263 1
RS265–RS268 1
RS271–RS276 1
RS291–RS292 1
RS301–RS306 1
RS311–RS320 1
RS331–RS333 1
RS341–RS342 1
RS699 1
RS701–RS703 1
RS711–RS713 1
RS721–RS722 2
RS731–RS732 1
RS741 2
RS742 1
RS743 2
RS751–RS752 1
RS761 1
RS762 2
RS771 2
Variable  Group

### Page 21

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
RS781–RS782 1
RS786 2
RT001–RT014 1
RT021–RT022 3
RT031–RT033 3
RT034–RT035 1
RT041–RT047 1
RT061 1
RT071–RT072 3
RT073–RT074 1
RT075 3
RT101–RT103 1
RT121 1
RT131–RT137 1
RT151–RT152 1
RT161 3
RT162–RT163 1
RT164 3
RT165–RT168 1
RT401–RT412 1
RT431–RT447 1
RT451–RT455 1
RT456 3
RT457–RT460 1
RT461 3
RT462–RT469 1
RT471–RT499 1
RT501 3
RT502–RT505 1
RT506–RT510 3
RT511–RT512 1
RT513 3
RT514–RT515 1
RT516 3
RT517 1
RT518–RT520 3
RT521–RT523 1
RT524 3
RT525 1
Variable  Group

### Page 22

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
RT526 3
RT527 1
RT528 3
RT529–RT535 1
RT551–RT568 1
RT571 1
RT572–RT576 3
RT577–RT591 1
RT601–RT630 1
RT633–RT641 1
RT642 3
RT643–RT654 1
RT655–RT657 3
RT671–RT673 1
RT681–RT682 1
RT691–RT699 1
RT701–RT704 1
RT711–RT717 1
RT741–RT742 1
RT744–RT750 1
RT751–RT752 3
RT753–RT757 1
RT776 3
RT777 1
RT781–RT782 3
RT783–RT784 1
RT801–RT803 1
RT811–RT814 1
RT831–RT836 1
RT837 3
RT861–RT864 1
RT877–RT880 1
RT931–RT932 1
RT945–RT949 1
RT951–RT955 1
RT966 1
RT967 3
RU001–RU006 1
RU016–RU017 1
Variable  Group

### Page 23

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions for inspection and repair of upper deck tension ties and 
adjacent frame structure on stretched upper deck (SUD) airplanes.  The tension ties have been 
determined to be structure that is susceptible to Widespread Fatigue Damage (WFD).  WFD could 
cause tension ties to become severed or disconnected from the frames.  Severed or disconnected 
tension ties and/or frames at multiple locations could result in rapid in-flight decompression of the 
airplane.
For more information about WFD, refer to Boeing Service Letter 747-SL-53-088A.
Tension ties are installed just aft of the floor beams that support the upper deck.  Tension ties are 
installed at Stations (STA) 1120, 1140, 1160, 1180, 1200, and 1220 and extend from the left side to 
the right side of the airplane.
During routine maintenance an operator found two severed upper deck tension ties at STA 1120 and 
STA 1140. The cause of the severed tension ties was fatigue cracking due to an incorrect 
configuration. As a result of this report, Boeing released Service Bulletin 747-53-2483 which 
recommended a one time inspection to make sure proper configuration and a crack free condition.  
During inspections per Service Bulletin 747-53-2483 one operator found severed tension ties at both 
STA 1120 and STA 1140 at approximately 14,000 total flight cycles, and a second operator found a 
severed tension tie at STA 1120 at approximately 28,000 total flight cycles. For these three additional 
severed tension tie reports, the tension tie configuration was as shown on Boeing Engineering 
Drawings.
In addition, before the original issue of this service bulletin, operators reported finding 10 cracks in 
tension ties, 10 broken fasteners, 9 cracks in frames adjacent to tension ties, and 8 cracks in the shear 
ties adjacent to the tension ties.  The cracks and broken fasteners were at STA 1120, STA 1140, STA 
1160, STA 1180, STA 1200, and STA 1220.  There were also 4 reports of cracks in the shear web 
between the STA 1120 and STA 1140 tension ties.  For these additional reports, the airplanes had 
between 7,000 and 28,000 total flight cycles. 
RU031–RU032 1
RU051–RU052 1
RU059–RU062 1
RU081–RU083 1
RU101–RU102 1
RU121–RU132 1
RU801–RU809 1
RU831–RU841 1
Variable  Group

### Page 24

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
Subsequent to the release of the original issue of this service bulletin, one operator reported that three 
adjacent tension ties were found severed on a 747-300 series airplane with approximately 18,400 
flight cycles.  Another operator reported that two adjacent tension ties were found severed on a 747-
300 series airplane with approximately 14,000 flight cycles.  In addition, multiple operators have 
reported finding cracks in tension ties and frames during inspections per the original issue of this 
service bulletin.  Due to these reports, Boeing finds it necessary to reduce the compliance times and 
repeat intervals for the inspections recommended by this service bulletin.
In addition to receiving multiple crack reports after the release of the original issue of this service 
bulletin, Boeing has determined that Stage 2 inspections should include open hole eddy current 
inspection at twelve additional fastener locations in the STA 1140 tension tie inboard of the aluminum 
straps.  The aluminum straps create load conditions in the STA 1140 tension tie that could cause 
cracks at these additional fastener locations, which are farther inboard than where eddy current 
inspections are done on other tension ties.
Also, due to operator reports of a mislocated angle common to the shear panel, a one-time inspection 
has been added to inspect for the mislocated angle and install a new angle in the correct location, as 
necessary.  A mislocated angle could lead to cracks in the shear panel.
Also, Boeing has determined that it is necessary to add a one-time inspection of fastener holes in the 
frames of Boeing Special Freighter and Boeing Converted Freighter airplanes at locations where 
tension ties existed before freighter modification.  These fastener holes were not inspected during 
modification at Boeing.  Inspection is necessary to ensure the fastener holes are crack free.
This service bulletin provides instructions for inspections and repair of the tension ties and frames at 
the aft end of the upper deck. 
The tension ties and frames have been found to be structurally significant in that they are critical to 
the structural integrity of the airplane.  Tension tie and frame cracks not found before they reach critical 
crack lengths can cause in-flight depressurization.
Boeing Service Related Problem (SRP) 747-SRP-53-0215 is related to this service bulletin.
Modification Service Bulletin 747-53A2559 has been released to address Widespread Fatigue 
Damage (WFD) in the tension ties and adjacent frame structure.  Accomplishment of Service Bulletin 
74753A2559 will terminate the repeat inspection requirements of this service bulletin.  For more 
information about WFD, refer to Boeing Service Letter 747-SL-53-088A.
Revision 1 is sent to revise compliance times of Stage 1 inspections to match the requirements of AD 
2007-23-18, and reduce the initial Stage 2 inspection compliance time.  In addition, this revision adds 
references to Structural Repair Manual (SRM) repairs that were released after the original issue of this 
service bulletin, and adds new inspection requirements.  A list of Revision 1 changes can be found on 
the Revision Transmittal Sheet for Revision 1.
D. Description
Get access to the frame to tension tie joints at STA 1120 through STA 1220.  Do Stage 1 or Stage 2 
inspections for cracks, and broken, loose, or missing fasteners in the tension ties, the shear webs, and 
the attached frames.  If cracks are found, or if broken, loose, or missing fasteners are found, do the 
repairs given in this service bulletin before the airplane is returned to service.  Repeat inspections at 
the specified intervals.

### Page 25

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
This service bulletin contains a flight safety inspection program. The flight safety inspection program 
is the minimum inspection program to maintain the structural integrity of the affected area of the 
airplane. An optional economics based inspection, to be done earlier than the flight safety inspection, 
would usually be included in this type of bulletin. However, for this area there is no economics based 
inspection program. The repair necessary when a crack is found in the flight safety inspection is the 
same as the repair necessary if a crack is found earlier.
Revision 1 includes the following work:
1. More work is necessary on airplanes inspected as shown in the original issue of this service 
bulletin.  Compliance times for Stage 1 inspections have been revised to match the requirements 
of FAA AD 2007-23-18.  This revision also recommends new compliance times for Stage 2 
inspections, which is not included in FAA AD 2007-23-18.  For airplanes that are past the new 
compliance time for Stage 2 inspections, continue to do the Stage 1 inspection work at the repeat 
interval specified until the Stage 2 inspection work is started.  Also, a requirement has been 
added to do eddy current inspection of twelve additional fastener holes in the tension tie inboard 
of the aluminum straps at STA 1140.  Boeing recommends that operators incorporate this 
additional inspection requirement before 10,000 total flight cycles or within 3,000 flight cycles 
after the Revision 1 date of this service bulletin, whichever is later.
2. Group 1, Configuration 1: In addition, more work is necessary on airplanes that have not been 
modified to SF or BCF.  A new inspection of the shear panels for a mislocated angle is 
recommended within 3,000 flight cycles after the Revision 1 date of this service bulletin.
3. Group 1, Configuration 2; Group  2-3: In addition, more work is necessary on airplanes that have 
been modified by Boeing to Special Freighter (SF) or Boeing Converted Freighter (BCF).  A new 
inspection of fastener holes in the frames at locations where tension ties existed before freighter 
modification is recommended within 3,000 flight cycles after the Revision 1 date of this service 
bulletin. 
NOTE: For other clarifications or corrections to work instructions that are transmitted with Revision
1, Boeing recommends that operators incorporate the revised instructions at the next planned
Stage 1 or Stage 2 inspection as given in this service bulletin.
NOTE: If the damaged area is more than the specified limits, contact Boeing for repair instructions.
Give the size and location of the damage. When possible, send sketches and photographs.
If the damage includes corrosion, send data on the length, width, and largest depth of clean
up.
PLEASE SEND A REPORT OF YOUR INSPECTION PROGRAM.  ALSO, SEND THE INSPECTION 
RESULTS WHEN EACH INSPECTION IS COMPLETE.
Send your report to:
BOEING COMMERCIAL AIRPLANES GROUP
ATTENTION:  MANAGER, AIRLINE SUPPORT

### Page 26

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
Because of common access, the inspections specified in Service Bulletin 747-53-2483 "FUSELAGE 
- Frame to Tension Tie Joint Inspection - Body Station 1120 to 1220" can be done at the same time 
as the changes specified in this service bulletin.

### Page 27

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
E. Compliance
Table 1:  Compliance Time for STAGE 1 and STAGE 2 Inspection
Condition Action Compliance Time (Whichever is earlier)
Repeat Interval      
(Not to Exceed)
Airplanes that  
accumulated 
less than 
12,000 total 
flight cycles 
as of 
November 28, 
2007. (and 
DID NOT do a 
STAGE 1 
inspection 
prior to 
November 
28,2007)
Do detailed 
inspections for 
damage as given in 
the STAGE 1 
INSPECTION section 
of the Work 
Instructions, 
Paragraph 3.B.  
(b)(c)(d)
At the earlier of the 
following:
Before 8,000 total flight 
cycles, or within 1,500 
flight cycles after April 26, 
2006, or within 4,000 flight 
cycles since inspection per 
Service Bulletin 747-
53A2483, whichever 
occurs later,
-OR-
Before 10,000 total flight 
cycles, or within 250 flight 
cycles after November 28, 
2007, whichever occurs 
later.
At the later of the 
following:
Before 12,000 
total flight cycles,
-OR-
Within 50 flight 
cycles or 20 days 
after November 
28, 2007, 
whichever is 
earlier.
Do the next 
inspection before 
10,000 total flight 
cycles or within 250 
flight cycles after the 
initial STAGE 1 
inspection, whichever 
occurs later,
-AND-
Do inspections 
thereafter every 250 
flight cycles.
Airplanes that  
accumulated 
less than 
12,000 total 
flight cycles 
as of 
November 28, 
2007. (and 
DID do a 
STAGE 1 
inspection 
prior to 
November 28, 
2007)
Do detailed 
inspections for 
damage as given in 
the STAGE 1 
INSPECTION section 
of the Work 
Instructions, 
Paragraph 3.B.  
(b)(c)(d)
- - Do the next 
inspection before 
10,000 total flight 
cycles or within 250 
flight cycles after 
November 28, 2007, 
whichever occurs 
later,
-AND-
Do inspections 
thereafter every 250 
flight cycles.
Airplanes that  
accumulated 
12,000 total 
flight cycles or 
more as of 
November 28, 
2007. (and 
DID NOT do a 
STAGE 1 
inspection 
prior to 
November 
28,2007)
Do detailed 
inspections for 
damage as given in 
the STAGE 1 
INSPECTION section 
of the Work 
Instructions, 
Paragraph 3.B.  
(b)(c)(d)
Within 50 flight cycles after 
November 28, 2007.
Within 20 days 
after November 
28, 2007.
250 flight cycles.

### Page 28

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
Airplanes that  
accumulated 
12,000 total 
flight cycles or 
more as of 
November 28, 
2007. (and 
DID do a 
STAGE 1 
inspection 
prior to 
November 
28,2007)
Do detailed 
inspections for 
damage as given in 
the STAGE 1 
INSPECTION section 
of the Work 
Instructions, 
Paragraph 3.B.  
(b)(c)(d)
- - At the later of the 
following:
Within 250 flight 
cycles after last 
STAGE 1 inspection
-OR-
Within 50 flight cycles 
or 20 days after 
November 28, 2007, 
whichever is earlier.
-AND-
Do inspections 
thereafter every 250 
flight cycles.
All airplanes. Do detailed and HFEC 
inspections for 
damage as given in 
the STAGE 2 
INSPECTION section 
of the Work 
Instructions, 
Paragraph 3.B.  
(a)(b)(c)(d)
Before 10,000 
total flight cycles 
or within 1,000 
flight cycles after 
the Revision 1 
date of this 
service bulletin, 
whichever is 
later.
3,000 flight cycles.
All airplanes. Do a HFEC inspection 
for cracks in the 
tension tie as given in 
the STAGE 2 
INSPECTION - 
ADDITIONAL WORK 
at STA 1140 section of 
the Work Instructions, 
Paragraph 3.B.
Before 10,000 
total flight cycles 
or within 3,000 
flight cycles after 
the Revision 1 
date of this 
service bulletin, 
whichever is 
later.
3,000 flight cycles.
No damage 
found, or 
damage has 
been 
repaired.
Repeat the STAGE 1 
or STAGE 2 inspection 
as given in this 
compliance table.
At the times 
given in this 
compliance 
table.
-
Damage 
found.  (d)
Repair as given in the 
Work Instructions, 
paragraph 3.B.
Before further 
flight.
-
(a) Revision 1 of this service bulletin reduces the initial inspection threshold for STAGE 2 inspection work.  
Continue to do STAGE 1 inspection work at the times specified until the STAGE 2 inspection work is started. 
Table 1:  Compliance Time for STAGE 1 and STAGE 2 Inspection
Condition Action Compliance Time (Whichever is earlier)
Repeat Interval      
(Not to Exceed)

### Page 29

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
Federal Aviation Administration (FAA) Airworthiness Directive 2004-07-22 R1 is related to this service 
bulletin.
(b) The requirement to do the STAGE 1 INSPECTION ends when the STAGE 2 INSPECTION work is started.
(c) Once the STAGE 2 INSPECTION work is started, continue doing the STAGE 2 inspections.  Do not do the 
STAGE 1 inspections after the STAGE 2 inspections are started.
(d) For this table, damage is defined as: Any crack, broken fastener, loose fastener, or fastener that is 
missing.
Group 1, Configuration 1: One-Time Inspection for Mislocated Angles (Revision 1 - More Work)
Condition Action Compliance Time
All airplanes. Do the ONE-TIME INSPECTION FOR 
MISLOCATED ANGLES as given in the 
Work Instructions, Paragraph 3.B.
Within 3,000 flight cycles after the Revision 1 
date of this service bulletin.  (a)
No mislocated 
angle found.
No further action. -
Mislocated angle 
found.
Correctly install a new angle as given in 
the Work Instructions, Paragraph 3.B.
Before further flight.
All airplanes. After inspection and rework as 
necessary, continue STAGE 1 or 
STAGE 2 inspections as applicable at 
the times shown in Table 1.
-
(a) Due to common access the inspection can be done concurrent with the next planned Stage 2 inspection 
as given in this service bulletin.
Group 1, Configuration 2; Group  2-3: One-Time Inspection of Frames at Previous Tension Tie Locations
(Revision 1 - More Work)
Condition Action Compliance Time
All airplanes. Do the ONE-TIME INSPECTION FOR 
CRACKS IN FRAMES AT PREVIOUS 
TENSION TIE LOCATIONS as given in 
the Work Instructions, Paragraph 3.B.
Within 3,000 flight cycles after the Revision 1 
date of this service bulletin.  (a)
No crack found, or 
crack has been 
repaired.
No further action. -
Any crack found. Repair as given in the Work 
Instructions, paragraph 3.B.
Before further flight.
All airplanes. After inspection and rework as 
necessary, continue STAGE 1 or 
STAGE 2 inspections as applicable at 
the times shown in Table 1.
-
(a) Due to common access the inspection can be done concurrent with the next planned Stage 2 inspection 
as given in this service bulletin.
Table 1:  Compliance Time for STAGE 1 and STAGE 2 Inspection
Condition Action Compliance Time (Whichever is earlier)
Repeat Interval      
(Not to Exceed)

### Page 30

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
Federal Aviation Administration (FAA) Airworthiness Directive 2007-23-18 is related to this service 
bulletin.  AD 2007-23-18 supersedes AD 2006-06-11.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2009-NM-024-AD, is related 
to this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity.  This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
This service bulletin has been approved by the FAA.  In addition, the Manager of the FAA Seattle 
Aircraft Certification Office approves the inspection and repair procedures with the corresponding 
compliance times specified in Table 1, under paragraph 1.E., "Compliance" of Service Bulletin 747-
53A2507, Revision 1, as an AMOC to the inspections and repairs required by paragraphs (h), (i), and 
(j) of AD 2004-07-22 R1, for the inspection of Structural Significant Item (SSI) F-19A of Supplemental 
Structural Inspection Document (SSID) D6-35022, Revision G.  This AMOC only applies to the areas 
inspected by this service bulletin.  When this service bulletin specifies contacting Boeing for repair 
instructions, the repair instructions must be approved by the FAA in accordance with paragraph (l) of 
the AD.  All provisions of AD 2004-07-22 R1 that are not specifically referenced in this paragraph, 
including the initial inspection threshold per paragraph (i) of AD 2004-07-22 R1, remain fully applicable 
and must be complied with.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the inspection and 
repair procedures with corresponding compliance times specified in Table 1, under paragraph 1.E., 
"Compliance" of Service Bulletin 747-53A2507, Revision 1, as an AMOC to the inspection and repair 
procedures specified in Table 1, under paragraph 1.E., "Compliance" of Service Bulletin 747-
53A2507, dated April 21, 2005, with the corresponding compliance times required by paragraphs (f), 
(g), (h) and (i) of AD 2007-23-18.  When this service bulletin specifies contacting Boeing for repair 
instructions, the repair instructions must be approved by the FAA in accordance with paragraph (l) of 
the AD.  All provisions of AD 2007-23-18 that are not specifically referenced in this paragraph remain 
fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this Service Bulletin for each 
Airplane.  This estimate is for direct labor only, done by an experienced crew.  Adjust the estimate with 
operator task-hour data if necessary.  The estimate does not include lost time.  These are some 
examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts

### Page 31

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
— Time to find the tools.
Group 1, Configuration 1: 
Task
Number of 
Persons Task-Hours
Elapsed 
Hours
Open Access (Stage 1 and 2) 2 12.00 6.00
Figure 1 (Stage 1) 2 8.00 4.00
Figure 3 (Stage 1 and 2) 2 1.00 0.50
Figure 4 (Stage 1 and 2) 2 10.00 5.00
Figure 5 (Stage 2) 2 72.00 36.00
Figure 6 (a) (b) 1 0.50 0.50
Figure 7 (b) 1 0.15 0.15
Figure 13  (c) 1 0.10 0.10
Figure 15 (Stage 2) 2 3.00 1.50
Close Access (Stage 1 and 2) 2 14 7
TOTAL FOR EACH AIRPLANE (Stage 1 only) 45.1 22.6
TOTAL FOR EACH AIRPLANE (Stage 2 only) 112.1 56.1
(a) If required.  Not included in total.
(b) Estimate given is for repair/inspection of one hole location.  Actual task-hours 
necessary will depend on the number of holes that need to be repaired/inspected.
(c) One-time inspection.  Hours will not be required after inspection is done the first time.  
Estimate given is for inspection only.  Time for part fabrication and replacement is not 
included.
Group 1, Configuration 2; Group  2-3: 
Task
Number of 
Persons Task-Hours
Elapsed 
Hours
Open Access (Stage 1 and 2) 2 12.00 6.00
Figure 8 (Stage 1) 2 8.00 4.00
Figure 9 (Stage 1 and 2) 2 10.00 5.00
Figure 10 (Stage 2) 2 72.00 36.00
Figure 11 (a) (b) 1 0.50 0.50
Figure 12 (b) 1 0.15 0.15
Figure 14 (c) 2 9.00 4.50
Figure 15 (Stage 2) 2 3.00 1.50
Close Access (Stage 1 and 2) 2 14 7
TOTAL FOR EACH AIRPLANE  (Stage 1 only) 53.0 26.5
TOTAL FOR EACH AIRPLANE  (Stage 2 only) 120.0 60.0
(a) If required.  Not included in total.
(b) Estimate given is for repair/inspection of one hole location.  Actual task-hours 
necessary will depend on the number of holes that need to be repaired/inspected.
(c) One-time inspection.  Hours will not be required after inspection is done the first time.

### Page 32

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
The times for any additional repairs that are found because of the inspections are listed within the 
SRM.
The times shown for the Figures above are for the tension ties at six station locations, both left side 
and right side.
H. Weight and Balance Changes
None.
NOTE: No significant weight and balance changes are expected due to inspection or fastener
replacement procedures in this service bulletin. However, SRM repairs and/or use of
substitute fasteners could cause a significant weight and balance change.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. 747-100/200/300 Aircraft Maintenance Manual (AMM)  24-22-00, 25-14-02, 25-22-04, 
25-24-00, 25-25-01, 25-59-01, 25-59-05
b. 747-100/200/300 Structural Repair Manual (SRM)  51-30-02, 51-30-03, 51-30-05, 53-10-04, 
53-10-11, 53-30-03, Chapter 51
c. 747-400 Aircraft Maintenance Manual (AMM)  24-22-00, 25-22-00, 25-22-04, 25-24-00, 
25-25-01, 25-59-01, 25-59-05
d. 747-400 Structural Repair Manual (SRM)  51-40-02, 51-40-03, 51-40-05, 53-40-01, 
53-40-07, 53-40-30, Chapter 51
e. 747-400SF Structural Repair Manual (SRM)  53-40-01, Chapter 51
f. 747 Non-Destructive Testing (NDT) Manual,  Part 6, 51-00-00
g. FAA Airworthiness Directive 2004-07-22 R1
h. FAA Airworthiness Directive 2007-23-18
i. FAA Notice of Proposed Rule Making 2009-NM-024-AD
j. Standard Overhaul Practices Manual (SOPM)  20-41-05, 20-50-19
2. Data supplied with this Service Bulletin:
None.

### Page 33

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin.  These drawings are not necessary 
to make the specified changes, and are not supplied with this service bulletin.  These drawings 
may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue 
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the 
Maintenance Program. This service bulletin affects FCS and new DTI requirements for the 
structure affected are contained in Paragraph 1.E, Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
Drawing Number Title
65B01749 FRAME INSTALLATION - BODY STA 1120
65B18703 FRAME INSTALLATION - BODY STA 1140
65B01751 FRAME INSTALLATION - BODY STA 1160
65B01752 FRAME INSTALLATION - BODY STA 1180
65B01753 FRAME INSTALLATION - BODY STA 1200
65B01754 FRAME INSTALLATION - BODY STA 1220
65B09631 TENSION TIE INSTALLATION - AFT OF UPPER DECK FLOOR
657U7304 TENSION TIE INSTALLATION - STA 880 - STA 1220, MOD

### Page 34

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 35

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary For Each 
Airplane.  As an alternative, operators can purchase the parts from Boeing Spares.  This service 
bulletin does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection or repair procedures given in this 
service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.

### Page 36

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
2. Parts and Materials Supplied by the Operator:
Part Number / Specification QTY Name Notes
BACB30MY6K4Y 2 Hex Drive Bolt (a)
BACB30MY6K5X 2 Hex Drive Bolt (a)
BACB30NX( )K( ) 380 Hex Drive Bolt (a) (c) (d) (e) (f)
BACB30VT6K3X 2 Hex Drive Bolt (a) (g)
BACB30VT8K3 4 Hex Drive Bolt (a) (d) (e)
BACC30BL6 2 Collar (a) (g)
BACC30BL8 4 Collar (a) (d) (e)
BACC30M6 2 Collar (a) (j)
BACC30R6 2 Collar (a) (j)
BACN10YT( )CD 380 Nut (a) (c) (d) (e) (f)
BACR15BB6D( ) 24 Rivet (a) (j)
BACR15BB7D( ) 28 Rivet (a) (j)
BACR15FT5D( )C 10 Rivet (a) (g) (h)
BACR15FT6D( ) 36 Rivet (a) (j)
BACW10BP( )DP 380 Washer (a) (c) (d) (e)
BMS 3-23, Type II 16 Ounces Corrosion Inhibiting Compound (b) (e)
BMS 3-27 (BMS 3-38 optional) 8 Ounces Corrosion Inhibiting Compound (b) (e)
BMS 10-11, Type 1 8 Ounces Primer (b) (e)
Alodine as required Chemical Conversion Coating (b) (e) (i)
65B09631-139/-140 as required Angle (g)
(a) Refer to 747 Structural Repair Manual Chapter 51 for alternative fasteners.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
(c) Operators should have access to 3/16 inch and 1/4 inch fasteners in the first and second oversize 
diameters.  Operators should also have access to 5/16 inch standard diameter fasteners.  Grip lengths from -
3 to -8 could be required.
(d) Quantities are approximate, operators may need more or less fasteners, but these quantities are to be 
used as a guide and are for the total number of fasteners including all the grip lengths specified.
(e) The quantity required will depend on the inspection results and if any repairs are necessary.
(f) To allow for easier removal during repeat inspections, it is optional to install BACB30MR( )K( ) bolts and 
BACW10BP( )CD washers, with BACN11Z( )CD nuts and BACW10BP( )DP washers at fastener locations 
common to the steel plates. However, availability of BACB30MR( )K( ) bolts is limited. Also, if fasteners are 
substituted, the same type of fastener should be used throughout each joint, as shown in Appendix C, Figure 
F.
(g) Group 1, Configuration 1: These parts may be necessary if it is necessary to re-install a mislocated angle.  
Refer to the "INSPECTION FOR MISLOCATED ANGLE" section of the paragraph 3.B., Work Instructions.  
Make from BAC1503-100031 extrusion, 7075-T6511 per QQ-A-200/11.
(h) Grip lengths -5 and -6 are expected, but grip length -7 could be necessary.
(i) Refer to SOPM 20-43-03 for material alternatives.
(j) This part is only needed for Group 1, Configuration 2; Group 2-3.  For rivets, grip length as required.

### Page 37

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, 
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be 
necessary. Examine operator tool supply to make sure all necessary tools are available.

### Page 38

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 39

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS.  UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES.  DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Angular tolerance is plus or minus 2 degrees
— Hole dimensions for standard solid rivets are given in 747 SRM, Chapter 51
— Torque limits to tighten nuts and bolts are given in 747 SRM, Chapter 51.
4. For approved fastener and process material substitutions, refer to 747 SRM, Chapter 51 
or Boeing Drawing 012W6100. Alternate fasteners are given in 747 SRM Chapter 51 
and Boeing Drawing 65B88700.
5. If the length of any fastener specified in this service bulletin does not meet the 
installation standards given in SRM Chapter 51, then a fastener of the same 
specification, or an approved substitute, with a length which meets the installation 
standards given in SRM Chapter 51 may be used.
6. A Detailed Inspection is defined as: An intensive examination of a specific item, 
installation, or assembly to detect damage, failure, or irregularity. Available lighting is 
normally supplemented with a direct source of good lighting at an intensity deemed 
appropriate. Inspection aids such as mirrors magnifying lenses, etc. may be necessary. 
Surface cleaning and elaborate procedures may be required.
7. These work instructions refer to procedures included on other Boeing documents. When 
the words "refer to" are used and the operator has an accepted alternative procedure, 
the accepted alternative procedure can be used. When the words "as given in" are 
included in the instruction, the procedure in the Boeing document must be used.
8. In the instructions and figures, the tension tie to frame joint configuration shown is a 
typical representative view. Actual configurations vary depending on location.
9. In the following work instructions, it is structurally satisfactory to substitute fasteners per 
747-100/200/300 SRM 51-30-03 or 747-400 SRM 51-40-03. However, if fasteners are 
substituted, the same type fasteners should be used throughout each joint, as shown in 
Appendix C.

### Page 40

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
10. Airplanes that have been modified by Boeing to Special Freighter (SF) or Boeing 
Converted Freighter (BCF) configuration have tension ties installed from Station (STA) 
880 to STA 1220.  However, only tension ties from STA 1120 to STA 1220 need to be 
inspected as given in this Service Bulletin.  Inspection per Supplemental Structural 
Inspection Document (SSID), Revision G, are still required for tension ties at STA 880 
through STA 1100.
11. Do not remove the fasteners from adjacent tension tie to frame joints at the same time. 
Refer to Appendix B for allowable methods to disconnect the tension ties.
12. In Figures 1, 2, 5, and 6 of this Service Bulletin Right Buttock Line (RBL) 26, and Left 
Buttock Line (LBL) 26 are used as reference points. RBL 26 is defined as the 
perpendicular distance 26 inches right of the fuselage vertical center line. LBL 26 is 
defined as the perpendicular distance 26 inches left of the fuselage center line.
13. Airplanes that have been modified by Boeing to SF or BCF configuration have had the 
shear panel removed by trimming.  The STA 1120 tension tie is replaced during 
modification.  The only remaining part of the shear panel is a strip common to the lower 
flange of the STA 1140 forward tension tie channel.
14. 747-300 and 747-400 airplanes that have been modified by Boeing to SF or BCF do not 
have an Aluminum Channel attached to the tension tie at STA 1220.  747-200 SUD 
airplanes that have been modified by Boeing to SF configuration do have an Aluminum 
Channel attached to the tension tie at STA 1220.
15. Tension tie configurations created by "non-Boeing" modifications are not shown in this 
service bulletin.  Operators of airplanes with non-Boeing tension tie configurations 
should seek approval of alternate inspection plans from their local regulatory agency.
16. If previous frame repairs are found during accomplishment of detailed inspections given 
in this service bulletin, also do a detailed inspection of the entire repaired area.
17. 747 SRM repairs for frame cracks include the following: 
— 747-100/200/300 SRM 53-10-04, Figures 123 through 131.
— 747-400 SRM 53-40-07, Repairs 1 through 9.
18. 747 SRM repairs for tension tie cracks include the following: 
— 747-100/200/300 SRM 53-10-04
— 747-400 SRM 53-40-07Repair 1.
19. For airplanes that have been modified by Boeing to BCF, equivalent tension tie and 
frame structure repairs have not yet been added to the 747-400SF SRM.  It is acceptable 
to use the referenced 747-400 SRM repairs for repair of the tension tie and frame 
structure on BCF airplanes until the 747-400SF SRM is updated.
B. WORK INSTRUCTIONS
Do the Stage 1 or Stage 2 Inspections at the compliance times specified in paragraph 1.E. of this 
service bulletin.

### Page 41

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
ACCESS
1. Remove electrical power and ground the airplane. Refer to 747-100/200/300 AMM 24-22-00 or 
747-400 AMM 24-22-00 as an accepted procedure.
2. Get access to the tension ties and frames:
a. Group 1, Configuration 1: Remove the seats as necessary between STA 1120 and STA 
1220.  Refer to 747-100/200/300 AMM 25-25-01 or 747-400 AMM 25-25-01 as an accepted 
procedure.
b. Group 1, Configuration 1: Remove the main deck ceiling panels as necessary between STA 
1120 and STA 1220 to get access to the tension ties and frames. Refer to 747-100/200/300 
AMM 25-22-04 or 747-400 AMM 25-22-04 as an accepted procedure.
c. Group 1, Configuration 1: Remove insulation as necessary to get access to the tension ties 
and frames. Refer to 747-100/200/300 AMM 25-14-02 or 747-400 AMM 25-22-00 as an 
accepted procedure.
NOTE: Additional access to the STA 1120 tension tie joints can be obtained through the
upper deck aft partition or closet(s). Refer to 747-100/200/300 AMM 25-24-00 or
747-400 AMM 25-24-00. However, this access is not required to accomplish the
inspections as given in this service bulletin.
d. Group 1, Configuration 2; Group  2-3: Remove main deck cargo compartment lining panels 
as necessary to get access to the tension ties and frames from STA 1120 to STA 1220.  
Refer to 747-100/200/300 AMM 25-59-01 or 747-400 AMM 25-59-01 as an accepted 
procedure.
e. Group 1, Configuration 2; Group  2-3: Remove main deck cargo compartment insulation as 
necessary to get access to the tension ties and frames from STA 1120 to STA 1220.  Refer 
to 747-100/200/300 AMM 25-59-05 or 747-400 AMM 25-59-05 as an accepted procedure.
STAGE 1 INSPECTION
CAUTION: IF FASTENER REMOVAL IS NECESSARY, DO NOT REMOVE THE FASTENERS
FROM ADJACENT TENSION TIE TO FRAME JOINTS AT THE SAME TIME. IF
FASTENERS ARE REMOVED FROM ADJACENT TENSION TIES, DAMAGE TO THE
AIRPLANE STRUCTURE MAY OCCUR. REFER TO APPENDIX B FOR ALLOWABLE
METHODS TO DISCONNECT THE TENSION TIES.
1. Do the ACCESS steps as given in this service bulletin.
2. Group 1, Configuration 1: Do a detailed inspection of the tension ties and steel plates from STA 
1120 to STA 1220 as given in Figure 1.
3. Group 1, Configuration 2; Group  2-3: Do a detailed inspection of the tension ties and steel plates 
from STA 1120 to STA 1220 as given in Figure 8.
4. Group 1, Configuration 1: Do a detailed inspection of the shear web components that attach to 
the tension ties as given in Figure 3.

### Page 42

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
5. Group 1, Configuration 1: Do a detailed inspection of each of the frames from 2 stringers above 
to 2 stringers below the tension ties, as given in Figure 4.
6. Group 1, Configuration 2; Group  2-3: Do a detailed inspection of each of the frames from 2 
stringers above to 2 stringers below the tension ties, as given in Figure 9. 
7. If no cracks are found, and there are no broken, loose, or missing fasteners, do the 
RESTORATION steps as given in this service bulletin.
8. If a severed tension tie is found, do the following before further flight:
a. Do a detailed inspection of the frame web, frame inner chord, fail-safe chord, shear ties, and 
fasteners from stringer 3 to stringer 18, for cracks and broken, loose, or missing fasteners.  
Do this inspection on both sides of the frame, and on both sides of the airplane, for the 
severed tension tie only.
b. Group 1, Configuration 1: Do the additional inspections (Open Hole HFEC, Surface HFEC, 
and Detailed) as given in Figure 5.  Do the Figure 5 inspections at the severed tension tie 
and at the tension ties adjacent to the severed tension tie.  If one of the inspected tension 
ties is at STA 1140, also do the open hole HFEC inspections as given in Figure 15.
c. Group 1, Configuration 2; Group  2-3: Do the additional inspections (Open Hole HFEC, 
Surface HFEC, and Detailed) as given in Figure 10.  Do the Figure 10 inspections at the 
severed tension tie and at the tension ties adjacent to the severed tension tie.  If one of the 
inspected tension ties is at STA 1140, also do the open hole HFEC inspections as given in 
Figure 15.
d. If no more cracks are found, and there are no broken, loose, or missing fasteners, repair the 
severed tension tie as given in 747-100/200/300 SRM 53-10-11 or 747-400 SRM 53-40-30.
e. If more cracks are found, or if there are broken, loose, or missing fasteners, do the following:
(1) Repair the severed tension tie as given in 747-100/200/300 SRM 53-10-11 or 747-400 
SRM 53-40-30.
(2) Do the STRUCTURE REPAIR steps as given in this service bulletin, as necessary.
f. Group 1, Configuration 1: Install steel plates and fasteners as given in Figure 5.  At STA 
1140, also install fasteners as given in Figure 15, as necessary.
g. Group 1, Configuration 2; Group  2-3: Install steel plates and fasteners as given in Figure 
10.  At STA 1140, also install fasteners as given in Figure 15, as necessary. 
h. Do the RESTORATION steps as given in this service bulletin.
9. If cracks are found in a tension tie, steel plate, frame or shear web components (and the tension 
tie is NOT severed), or if there are broken, loose, or missing fasteners, do the following before 
further flight:
a. Do the STRUCTURE REPAIR steps as given in this service bulletin, as necessary.
b. Group 1, Configuration 1: Install steel plates and fasteners as given in Figure 5.  At STA 
1140, also install fasteners as given in Figure 15, as necessary.

### Page 43

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
c. Group 1, Configuration 2; Group  2-3: Install steel plates and fasteners as given in Figure 
10.  At STA 1140, also install fasteners as given in Figure 15, as necessary. 
d. Do the RESTORATION steps as given in this service bulletin.
10. Repeat the inspections at the intervals specified in paragraph 1.E., Compliance.
11. Report all inspection findings to Boeing.
STAGE 2 INSPECTION
CAUTION: DO NOT REMOVE THE FASTENERS FROM ADJACENT TENSION TIE TO FRAME
JOINTS AT THE SAME TIME. IF FASTENERS ARE REMOVED FROM ADJACENT
TENSION TIES, DAMAGE TO THE AIRPLANE STRUCTURE MAY OCCUR. REFER
TO APPENDIX B FOR ALLOWABLE METHODS TO DISCONNECT THE TENSION
TIES.
1. Do the ACCESS steps as given in this service bulletin.
2. Group 1, Configuration 1: Do HFEC and detailed inspections of the tension ties, frames, and steel 
plates as given in Figure 5.
3. Group 1, Configuration 2; Group  2-3: Do HFEC and detailed inspections of the tension ties, 
frames, and steel plates as given in Figure 10.
4. Group 1, Configuration 1: Do a detailed inspection of the shear web components that attach to 
the tension ties as given in Figure 3.
5. Group 1, Configuration 1: Do a detailed inspection of each of the frames from 2 stringers above 
to 2 stringers below the tension ties, as given in Figure 4.
NOTE: If there are insulation blanket studs attached to the frames in the inspection area, check
to see if the studs are bonded on to the frames, or if they go through holes in the frames.
At locations where the studs go through holes in the frames, remove the stud and
inspect the hole as given in Figure 7. 
6. Group 1, Configuration 2; Group  2-3: Do a detailed inspection of each of the frames from 2 
stringers above to 2 stringers below the tension ties, as given in Figure 9. 
NOTE: If there are insulation blanket studs attached to the frames in the inspection area, check
to see if the studs are bonded on to the frames, or if they go through holes in the frames.
At locations where the studs go through holes in the frames, remove the stud and
inspect the hole as given in Figure 12.  
7. Group 1, Configuration 1: If no cracks are found, and there are no broken, loose, or missing 
fasteners, install steel plates and fasteners as given in Figure 5, then do the RESTORATION 
steps.
8. Group 1, Configuration 2; Group  2-3: If no cracks are found, and there are no broken, loose, or 
missing fasteners, install steel plates and fasteners as given in Figure 10, then do the 
RESTORATION steps.
9. If a severed tension tie is found, do the following before further flight:

### Page 44

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
a. Do a detailed inspection of the frame web, frame inner chord, fail-safe chord, shear ties, and 
fasteners from stringer 3 to stringer 18, for cracks and broken, loose, or missing fasteners.  
Do this inspection on both sides of the frame, and on both sides of the airplane, for the 
severed tension tie only.
b. If no more cracks are found and there are no more broken, loose, or missing fasteners, 
repair the severed tension tie as given in 747-100/200/300 SRM 53-10-11 or 747-400 SRM 
53-40-30.
c. If more cracks or broken, loose, or missing fasteners are found, do the following:
(1) Repair the severed tension tie as given in 747-100/200/300 SRM 53-10-11 or 747-400 
SRM 53-40-30.
(2) Do the STRUCTURE REPAIR steps specified in this service bulletin, as necessary.
d. Group 1, Configuration 1: Install steel plates and fasteners as given in Figure 5.  At STA 
1140, also install fasteners as given in Figure 15, as necessary.
e. Group 1, Configuration 2; Group  2-3: Install steel plates and fasteners as given in Figure 
10.  At STA 1140, also install fasteners as given in Figure 15, as necessary.
f. Do the RESTORATION steps as given in this service bulletin.
10. If cracks are found in a tension tie, steel plate, frame or shear web components (and the tension 
tie is NOT severed), or if there are broken, loose, or missing fasteners, do the following before 
further flight:
a. Do the STRUCTURE REPAIR steps as given in this service bulletin, as necessary.
b. Group 1, Configuration 1: Install steel plates and fasteners as given in Figure 5.  At STA 
1140, also install fasteners as given in Figure 15, as necessary.
c. Group 1, Configuration 2; Group  2-3: Install steel plates and fasteners as given in Figure 
10.  At STA 1140, also install fasteners as given in Figure 15, as necessary.
d. Do the RESTORATION steps as given in this service bulletin.
11. Repeat the inspections at the intervals specified in paragraph 1.E., Compliance.
12. Report all inspection findings to Boeing.
STAGE 2 INSPECTION - ADDITIONAL WORK at STA 1140 (Revision 1 - More Work)
1. Do an open hole HFEC inspection for cracks in the forward and aft tension tie channels at twelve 
fastener locations (six left side and six right side) inboard of the aluminum straps as given in 
Figure 15.

### Page 45

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
NOTE: Group 1, Configuration 1: When possible, Figure 15 is intended to be done concurrently
with Figure 5 during accomplishment of STAGE 2 inspections.
NOTE: Group 1, Configuration 2; Group  2-3: When possible, Figure 15 is intended to be done
concurrently with Figure 10 during accomplishment of STAGE 2 inspections.
2. If any crack is found, remove the crack by doing OVERSIZE HOLE REPAIR, or repair the tension 
tie as given in 747-100/200/300 SRM 53-10-11 or 747-400 SRM 53-40-30.
3. If no crack is found, repeat the open hole HFEC inspection for cracks in the forward and aft 
tension tie channels at twelve fastener locations (six left side and six right side) inboard of the 
aluminum straps at the interval specified in paragraph 1.E., Compliance.
4. Repeat the inspection at the interval specified in paragraph 1.E., Compliance.
5. Report all inspection findings to Boeing.
STRUCTURE REPAIR
1. If there are broken, loose, or missing fasteners common to the tension tie to frame joint, do the 
following before further flight:
a. Group 1, Configuration 1: If the fasteners common to the steel plate, and three rows inboard 
of the steel plate have not already been removed, then remove them as given in Figure 5.
b. Group 1, Configuration 2; Group  2-3: If the fasteners common to the steel plate, and three 
rows inboard of the steel plate have not already been removed, then remove them as given 
in Figure 10. 
c. Group 1, Configuration 1: If the fastener holes common to the steel plate, and three rows 
inboard of the steel plate have not already been open hole HFEC inspected per Figure 5, 
then do an open hole HFEC inspection, as given in Figure 5, at all locations where fasteners 
were removed.
d. Group 1, Configuration 2; Group  2-3: If the fastener holes common to the steel plate, and 
three rows inboard of the steel plate have not already been open hole HFEC inspected per 
Figure 10, then do an open hole HFEC inspection, as given in Figure 10, at all locations 
where fasteners were removed.
e. At STA 1140, if the fastener holes three rows inboard of the aluminum straps have not 
already been open hole HFEC inspected per Figure 15, then do an open hole HFEC 
inspection as given in Figure 15.
f. If cracks are found, see STRUCTURE REPAIR steps 3 through 10 for repair instructions.
2. If there are broken, loose, or missing fasteners at any other location (not common to the tension 
tie to frame joint), contact Boeing for repair instructions before further flight.
3. If a crack is found in a shear tie at the flange common to the skin, do the following:
a. Remove all fasteners common to the cracked shear tie and skin.

### Page 46

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
b. Do an Open Hole HFEC inspection of the skin at all fastener locations common to the 
cracked shear tie as given in 747 NDT, Part 6, 51-00-00, Figure 16.
c. If a crack is found in the skin, repair the skin as given in 747-100/200/300 SRM 53-30-03 or 
747-400 SRM 53-40-01, or 747-400SF SRM 53-40-01. Repair the shear tie as given in 
747-100/200/300 SRM 53-10-04 or 747-400 SRM 53-40-07.
d. If no cracks are found in the skin, repair the shear tie as given in 747-100/200/300 SRM 
53-10-04 or 747-400 SRM 53-40-07.  Install new fasteners as given in 747-100/200/300 
SRM Chapter 51, or 747-400 SRM Chapter 51, or 747-400SF SRM Chapter 51, as 
applicable.
4. If a crack is found at a bolt, hilok, or rivet hole common to a frame, shear tie, failsafe chord, shear 
web component, tension tie, or steel plate, do the OVERSIZE HOLE REPAIR steps given in this 
service bulletin. If a crack is found at an insulation blanket stud hole common to a frame, contact 
Boeing for repair instructions.
5. If a crack is found in a shear tie and cannot be removed by doing the OVERSIZE HOLE REPAIR, 
repair the shear tie as given in 747-100/200/300 SRM 53-10-04 or 747-400 SRM 53-40-07.
6. If a crack is found in a frame and cannot be removed by doing the OVERSIZE HOLE REPAIR, 
repair as given in 747-100/200/300 SRM 53-10-04 or 747-400 SRM 53-40-07.
7. If a crack is found in the failsafe chord and cannot be removed by doing the OVERSIZE HOLE 
REPAIR, then repair the failsafe chord by splicing in a new segment as given in 747-100/200/300 
SRM 53-10-04 or 747-400 SRM 53-40-07.  The dimensions of the new Chord should be 
increased to maintain a 2D minimum edge margin.
8. If a crack is found in a shear web component and cannot be removed by doing the OVERSIZE 
HOLE REPAIR, contact Boeing for repair instructions.
9. If a crack is found in a tension tie and cannot be removed by doing the OVERSIZE HOLE 
REPAIR, repair the tension tie as given in 747-100/200/300 SRM 53-10-11 or 747-400 SRM 
53-40-30.
10. If a crack is found in a steel plate and cannot be removed by doing OVERSIZE HOLE REPAIR, 
repair as given in 747-100/200/300 SRM 53-10-11 or 747-400 SRM 53-40-30 or replace the steel 
plate with a new steel plate as given in one of the following two options:
a. Option 1: Replace the steel plate with a new steel plate made by Boeing, or
b. Option 2: If required, fabricate a new steel plate per Boeing engineering drawing 
requirements same as existing steel plate, except make the new steel plate wider as 
required to maintain minimum 1.5D fastener edge margins in the steel plate.  Make from the 
same material as existing steel plate, or it is also acceptable to make from alternative 
material 15-5 CRES per AMS5659, with heat treat to 150-170 ksi.  Make sure that wider 
steel plates do not interfere with the flanges of the tension tie forward channel when 
installed.
11. If any other crack is found that cannot be repaired per the instructions above, contact Boeing for 
repair instructions.

### Page 47

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
OVERSIZE HOLE REPAIR
1. Group 1, Configuration 1: Remove cracks and install new fasteners as shown in Figure 6.
2. Group 1, Configuration 2; Group  2-3: Remove cracks and install new fasteners as shown in 
Figure 11.
Group 1, Configuration 1: ONE-TIME INSPECTION FOR MISLOCATED ANGLES (Revision 1 - 
More Work)
1. On both sides of the airplane, do the ANGLE INSPECTION steps as shown in Figure 13.
2. If any angle has the incorrect installation, do the ANGLE REPLACEMENT steps as shown in 
Figure 13.
3. If both angles have the correct installation, no more work is required for the mislocated angles.
4. Continue STAGE 1 or STAGE 2 inspections, as applicable, as given in paragraph 1.E., 
Compliance.
Group 1, Configuration 2; Group  2-3: ONE-TIME INSPECTION FOR CRACKS IN FRAMES AT 
PREVIOUS TENSION TIE LOCATIONS (Revision 1 - More Work)
1. At STA 1120, 1160, 1200, and 1220, do open hole HFEC inspections at the fastener locations 
where the tension tie was previously attached to the frame prior to modification to SF or BCF 
configuration.  Do the inspection as given in Figure 14.
2. If any crack is found, remove the crack by doing OVERSIZE HOLE REPAIR, or repair the frame 
as given in 747-100/200/300 SRM 53-10-04 or 747-400 SRM 53-40-07.
3. If no crack is found, no more work is required for inspection of frames at previous tension tie 
locations.
4. Continue STAGE 1 or STAGE 2 inspections, as applicable, as given in paragraph 1.E., 
Compliance.
RESTORATION
1. Apply BMS 3-23, Type II, Corrosion Inhibiting Compound to all areas where fasteners were 
removed, and where repairs were done. Refer to SOPM 20-41-05 as an accepted procedure.
2. Group 1, Configuration 1: Install insulation between STA 1120 and STA 1220. Refer to 747-100/
200/300 AMM 25-14-02 or 747-400 AMM 25-22-00 as an accepted procedure.
3. Group 1, Configuration 1: Install ceiling panels between STA 1120 and STA 1220. Refer to 
747-100/200/300 AMM 25-22-04 or 747-400 AMM 25-22-04 as an accepted procedure.
4. Group 1, Configuration 1: Install seats between STA 1120 and STA 1220. Refer to 747-100/200/
300 AMM 25-25-01 or 747-400 AMM 25-25-01 as an accepted procedure.
5. Group 1, Configuration 1: If additional access to STA 1120 tension tie joints was obtained through 
the upper deck aft partition or closet(s) close the access. Refer to 747-100/200/300 AMM 
25-24-00 or 747-400 AMM 25-24-00 as an accepted procedure.

### Page 48

Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
NOTE: This access was not required to accomplish the inspections as given in this Service
Bulletin.
6. Group 1, Configuration 2; Group  2-3: Install main deck cargo compartment insulation as 
necessary from STA 1120 to STA 1220.  Refer to 747-100/200/300 AMM 25-59-05 or 747-400 
AMM 25-59-05 as an accepted procedure.
7. Group 1, Configuration 2; Group  2-3: Install main deck cargo compartment lining panels as 
necessary from STA 1120 to STA 1220.  Refer to 747-100/200/300 AMM 25-59-01 or 747-400 
AMM 25-59-01 as an accepted procedure.
8. Return airplane to a Serviceable Condition.

### Page 49

FIGURE 1: DETAILED INSPECTION OF TENSION TIES FROM STA 1120 TO STA 1220 (STAGE 1 ONLY)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 49 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
FIGURE  1: DETAILED INSPECTION OF TENSION TIES FROM STA 1120 TO STA 1220 (STAGE 1 ONLY)
STA
1120
STA
1220
STA
1120
STA
1220
ASEE SEE B
FWD
480026
(SHEET 1 OF 5)

### Page 50

FIGURE 1: DETAILED INSPECTION OF TENSION TIES FROM STA 1120 TO STA 1220 (STAGE 1 ONLY)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 50 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
TENSION TIE AFT CHANNEL
VERTICAL POST
ATTACHMENT
C
C
D
D
E
E AA
G
G
BL26
VIEW LOOKING AFT
(STA 1120 SHOWN, OTHER STATIONS SIMILAR)
A-A
STEEL
PLATE
NOTE: TYPICAL CONFIGURATION. ACTUAL FASTENER PATTERN AND CONFIGURATION
VARIES DEPENDING ON LOCATION.
NOTE:
SLOPING AND HORIZONTAL SHEAR WEB
ONLY AT STA 1120 AND STA 1140.
SHEAR WEB ATTACHES TO THE BOTOM
OF THE TENSION CHANNEL AT STA
1140.
(VIEW G-G SHOWN
FOR STA 1120 AND
STA 1140 ONLY)
UP
INBD
A
TENSION TIE
FORWARD CHANNEL
FRAME
1
2
STRINGERS
FRAME
FAILSAFE
CHORD
1
1
1
1
482472
(SHEET 2 OF 5)

### Page 51

FIGURE 1: DETAILED INSPECTION OF TENSION TIES FROM STA 1120 TO STA 1220 (STAGE 1 ONLY)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 51 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
C
C
D
D
F
FB B
G
G
BL26
STRINGERS
FRAME
FAILSAFE
CHORD
B-B
NOTE: TYPICAL CONFIGURATION. ACTUAL FASTENER PATTERN AND CONFIGURATION
VARIES DEPENDING ON LOCATION.
VERTICAL POST
ATTACHMENT
STEEL
PLATE
NOTE:
SLOPING AND HORIZONTAL SHEAR WEB
ONLY AT STA 1120 AND STA 1140.
SHEAR WEB ATTACHES TO THE BOTTOM
OF THE TENSION TIE CHANNEL AT
STA 1140.
VIEW LOOKING AFT
(STA 1120 SHOWN, OTHER STATIONS SIMILAR)
(VIEW G-G SHOWN
FOR STA 1120 AND
STA 1140 ONLY)
UP
INBD
2
B
TENSION TIE FORWARD CHANNEL
FRAMETENSION TIE AFT CHANNEL
11
1
1
1
482473
(SHEET 3 OF 5)

### Page 52

FIGURE 1: DETAILED INSPECTION OF TENSION TIES FROM STA 1120 TO STA 1220 (STAGE 1 ONLY)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 52 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
FRAME
ALUMINUM
CHANNEL
HORIZONTAL
SHEAR WEB
TENSION TIE
AFT CHANNEL TENSION TIE
FORWARD CHANNEL
STEEL PLATE
HORIZONTAL
SHEAR WEB
C-C
E-E F-F
(STA 1220)
(STA 1140)
(AT ALL OTHER STATIONS)
D-D
G-G
D-D
(STA 1120)
G-G
(TYPICAL)
(TYPICAL) (TYPICAL)
2 22 2
1
1
1
1
1
1
1
1
1
1
1 1
1 1
482474
(SHEET 4 OF 5)

### Page 53

FIGURE 1: DETAILED INSPECTION OF TENSION TIES FROM STA 1120 TO STA 1220 (STAGE 1 ONLY)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 53 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
This Figure applies to Group 1, Configuration 1: 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
STEP TASK NAME PROCEDURE REFERENCES MORE DATA
1 Inspect Tension Tie and 
Steel Plate 
Detailed 
Inspection
65B09631-( ) 
65B09614-( )
(a) (c)
2 Inspect Fasteners Detailed 
Inspection
-( b )
(a) Inspect for cracks in the forward and aft channels of the tension tie from Buttock Line (BL) 26 
outboard to side of body on the left and right side of the airplane. Inspect for cracks in the steel 
plate on the left and right side of the airplane. Pay special attention to the tension tie at the frame 
joint, at all fastener locations common to the steel plate and 3 fastener rows inboard of the steel 
plate. Also, pay special attention to the tension tie at the vertical post attachments.  At STA 1120 
and STA 1140, pay special attention to the tension ties where they attach to the sloping shear web 
and horizontal shear web.
(b) Inspect the fasteners common to the steel plate and 3 fastener rows inboard of the steel plate, for 
broken, loose, or missing fasteners.  At STA 1220, also inspect all fasteners common to the 
aluminum channel on the underside of the tension tie in the area under the steel plate. 
(c) The sloping and horizontal shear web are only at STA 1120 and STA 1140.
(SHEET 5 OF 5)

### Page 54

FIGURE 2: Deleted (Revision 1)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 54 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
FIGURE  2: Deleted (Revision 1)
THIS FIGURE IS DELETED.
D38438
(SHEET 1 OF 1)

### Page 55

FIGURE 3: SHEAR WEB COMPONENT INSPECTION (STAGE 1 AND 2)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 55 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
FIGURE  3: SHEAR WEB COMPONENT INSPECTION (STAGE 1 AND 2)
STA
1120
STA
1140
STA
1120
STA
1140
ASEE SEE B
FWD
482133
(SHEET 1 OF 3)

### Page 56

FIGURE 3: SHEAR WEB COMPONENT INSPECTION (STAGE 1 AND 2)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 56 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
1120
STA
1140
STA
SHEAR WEB
HORIZONTAL
INBD
1120
STA
1140
STA
SHEAR WEB
HORIZONTAL
INBD
WEB
SHEAR
SLOPING
VIEW LOOKING UP
VIEW LOOKING UP
WEB
SHEAR
SLOPING
213
A
2 1 3
B
482181
(SHEET 2 OF 3)

### Page 57

FIGURE 3: SHEAR WEB COMPONENT INSPECTION (STAGE 1 AND 2)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 57 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
This Figure applies to Group 1, Configuration 1: 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
STEP TASK NAME PROCEDURE REFERENCES MORE DATA
1 Inspect Sloping and 
Horizontal Shear 
Webs and 
Fasteners
Detailed 
Inspection
-( a )  ( b )
2 Inspect Bends in Sloping 
Shear Web
Detailed 
Inspection
-( a )
3 Inspect Sloping Shear Web 
to Supporting 
Structure (Gussets) 
and Fasteners
Detailed 
Inspection
-( a )  ( b )
(a) Inspect for cracks.
(b) Inspect for broken, loose, or missing fasteners.
(SHEET 3 OF 3)

### Page 58

FIGURE 4: FRAME INSPECTIONS - STA 1120 TO STA 1220 (STAGE 1 AND 2)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 58 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
FIGURE  4: FRAME INSPECTIONS  - STA 1120 TO STA 1220 (STAGE 1 AND 2)
STA
1120
STA
1220
STA
1120
STA
1220
ASEE SEE B
STA
1140
FWD
482449
(SHEET 1 OF 3)

### Page 59

FIGURE 4: FRAME INSPECTIONS - STA 1120 TO STA 1220 (STAGE 1 AND 2)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 59 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
TRIPLER
DOUBLER, AND
FRAME WEB,
CHORD
FAILSAFE
VIEW LOOKING AFT
STRINGERS
CHORD
FAILSAFE
VIEW LOOKING AFT
TIE (TYP)
SHEAR
CHORD
INNER
TIE (TYP)
SHEAR
TRIPLER
DOUBLER, AND
FRAME WEB,
CHORD
INNER
VARIES DEPENDING ON LOCATION.
NOTE: TYPICAL CONFIGURATION. ACTUAL FASTENER PATTERN AND CONFIGURATION
4
UP
INBD
A
321 65
4
UP
INBD
B
321 65
STRINGERS
482493
(SHEET 2 OF 3)

### Page 60

FIGURE 4: FRAME INSPECTIONS - STA 1120 TO STA 1220 (STAGE 1 AND 2)
Original Issue: April 21, 2005
Revision 1:  January 14, 2010 747-53A2507
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 60 of 114
BOEING SERVICE BULLETIN 747-53A2507
ALERT                                                                                                    ALERT
 
 
This Figure applies to Group 1, Configuration 1: 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
STEP TASK NAME PROCEDURE REFERENCES MORE DATA
1 Inspect Frame Web Detailed 
Inspection
(a) (c) (d)
2 Inspect Frame Doubler Detailed 
Inspection
(a) (c) (d)
3 Inspect Frame Tripler Detailed 
Inspection
(a) (c) (d)
4 Inspect Inner chord Detailed 
Inspection
(a) (c) (d)
5 Inspect Fail Safe Chord Detailed 
Inspection
(a) (c) (d)
6 Inspect Shear Tie Detailed 
Inspection
(a) (b) (c) (d)
(a) Pay special attention to the corners of the stringer cut outs and fastener locations common to the 
tension ties.
(b) Pay special attention to the bends in the shear ties common to the skin.
(c) Inspect for cracks.
(d) Inspect for broken, loose, or missing fasteners.
(SHEET 3 OF 3)

The text continues at https://openairdocs.org/service-documents/boeing/747-53a2507/file/3b407e2f4728.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
