# Boeing Alert Service Bulletin 747-53A2808: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0774; AD 2016-06-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-53A2808](https://openairdocs.org/service-documents/boeing/747-53a2808.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin 747-53A2808-00
- Pages: 93
- PDF: https://openairdocs.org/files/sha256/b0/58/b058ef43bad80d5e30afb4b22968491d681d0a9be4815a7985287cafaf974772
- Page: https://openairdocs.org/service-documents/boeing/747-53a2808/file/b058ef43bad8

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-53A2808
Original Issue: November 30, 2012
ATA System: 5311
SUBJECT: FUSELAGE - Main Frame - Nose Wheel Well Side and Top Panel - Web and Stiffener
Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2012 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: November 30, 2012
747-53A2808
1 of 93
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
2 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 0
B. Concurrent Requirements ...................................... 1 0
C. Reason ................................................ 1 1
D. Description .............................................. 1 1
E. Compliance .............................................. 1 2
F. Approval ............................................... 1 5
G. Manpower .............................................. 1 6
H. Weight and Balance Changes .................................... 1 6
I. Electrical Load Data ......................................... 1 6
J. References .............................................. 1 7
1. Existing Data: ......................................... 1 7
2. Data Supplied with this Service Bulletin: ........................... 1 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 8
K. Publications Affected ........................................ 1 8
L. Interchangeability and Intermixability of Parts ........................... 1 8
M. Software Accomplishment Summary ................................ 1 9
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 1
C. Parts Necessary for Each Airplane ................................. 2 1
1. Kits/Parts: ........................................... 2 1
2. Parts and Materials Supplied by the Operator: ........................ 3 6
3. Parts Modified and Reidentified: ............................... 3 6
4. Parts Removed and Not Replaced: .............................. 3 6
D. Parts Necessary to Change Spares ................................. 3 6
E. Special Tooling - Price and Availability ............................... 3 6
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 6
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 7
A. GENERAL INFORMATION ..................................... 3 7
B. WORK INSTRUCTIONS ....................................... 3 8
FIGURE 1: REMOVALS FOR ACCESS AT NOSE WHEEL WELL STA 260 BULKHEAD ....... 4 8
FIGURE 2: REMOVALS FOR ACCESS AT NOSE WHEEL WELL STA 340 BULKHEAD ....... 5 0
FIGURE 3: REMOVAL OF TOP PANEL [Group 1] ............................ 5 2
FIGURE 4: LEFT SIDE PANEL REPLACEMENT [Group 1] ....................... 5 5
FIGURE 5: RIGHT SIDE PANEL REPLACEMENT [Group 1] ....................... 5 8
FIGURE 6: INSTALLATION OF TOP PANEL [Group 1] .......................... 6 1
FIGURE 7: RESTORATION AT NOSE WHEEL WELL STA 340 BULKHEAD .............. 6 4
FIGURE 8: RESTORATION AT NOSE WHEEL WELL STA 260 BULKHEAD .............. 6 6
FIGURE 9: REMOVAL OF TOP PANEL COMPONENTS [Group 2] ................... 6 8
FIGURE 10: LEFT SIDE PANEL REPLACEMENT [Group 2] ....................... 7 1
FIGURE 11: RIGHT SIDE PANEL REPLACEMENT ............................ 7 4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
3 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 4

FIGURE 12: INSTALLATION OF NEW TOP PANEL COMPONENTS [Group 2] ............. 7 7
FIGURE 13: POST MODIFICATION INSPECTION - SIDE PANEL WEB EXTERNAL DETAILED INSPECTION
.................................................. 8 0
FIGURE 14: POST MODIFICATION INSPECTION - TOP PANEL WEB EXTERNAL DETAILED INSPECTION
.................................................. 8 3
FIGURE 15: POST MODIFICATION INSPECTION - TOP AND SIDE PANEL STIFFENER INTERNAL
DETAILED AND HFEC INSPECTIONS ............................ 8 6
APPENDIX A: NOSE WHEEL WELL MODIFICATION - SUGGESTED SEQUENCE OF STEPS ..... 8 9
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
4 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 5

Commercial 
Airplanes
747
Service Bulletin
ALERT
SummaryNumber: 747-53A2808Original Issue: November 30, 2012
ATA System: 5311
SUBJECT: FUSELAGE - Main Frame - Nose Wheel Well Side and Top Panel - Web and Stiffener
Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of the modification in this service bulletin will ensure the structural integrity of the nose wheel
well top and side panels. Widespread Fatigue Damage (WFD) in the nose wheel well top and side panels could
result in a depressurization event with damage significant enough to adversely affect the structural integrity of
the fuselage.
Boeing has received 16 reports of cracking in the nose wheel well top panel and side panel webs and/or stiffeners.
One airplane lost pressurization due to cracking in a nose wheel well side panel. Boeing has determined that
all the cracks were caused by fatigue.
The nose wheel well top and side panels have been determined to be structure that is susceptible to develop
WFD. Although loss of pressurization due to cracks in the nose wheel well structure is not necessarily an airplane
safety concern, WFD could result in a nose wheel well depressurization event severe enough to reduce the
structural integrity of the fuselage. Due to the concern of WFD in the nose wheel well top and side panel structure,
Boeing recommends that operators accomplish the modification given in this service bulletin.
Group 1:
This service bulletin gives instructions to modify the nose wheel well top panel and side panels by replacing the
existing webs, support beams, and stiffeners with improved parts. The modifications in this service bulletin will
eliminate the concern of WFD in the nose wheel well.
Group 2:
This service bulletin gives instructions to modify the nose wheel well side panels by replacing the existing webs,
support beams, and stiffeners with improved parts. This service bulletin will also modify the nose wheel well top
panel by replacing the existing support beams and stiffeners with improved parts. The modifications in this
service bulletin will eliminate the concern of WFD in the nose wheel well.
For more information about WFD, refer to Boeing Service Letter 747-SL-53-088.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
5 of 93

### Page 6

The modification given in this service bulletin terminates the repetitive inspections given in Service Bulletin
747-53A2465.
Boeing Service Related Problem (SRP) 747-SRP-53-0339 is related to this Service Bulletin.
Boeing Fleet Team Digest articles 747 FTD 53-04002 and 747 FTD 53-12006 are related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 85901-99RS)
Open the nose landing gear doors, and jack the airplane. Remove the nose landing gear, nose landing gear
doors, nose landing gear door actuator, passenger seats, floor covering, floor panels, and insulation as necessary
to get access to the upper, left, and right hand webs in the nose wheel well.
Group 1:
Modify the nose wheel well top and side panels by replacing the existing webs, support beams, and stiffeners
with improved parts.
Group 2:
Modify the nose wheel well side panels by replacing the existing webs, support beams, and stiffeners with
improved parts. Modify the nose wheel well top panel by replacing the existing support beams and stiffeners
with improved parts.
Install all parts removed for access at completion of the modification, and return the airplane to a serviceable
condition.
Do post-modification detailed and high frequency eddy current (HFEC) inspections at the time specified in
Paragraph 1.E., Compliance. If any crack is found, contact Boeing for repair instructions and do the repair.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
6 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 7

EFFECTIVITY
747-400/400F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2006-22-15 is related to this service bulletin.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the modification given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
7 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 8 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
00000000000000  GROUP 1:
MODIFY THE TOP PANEL BY REPLACING
THE EXISTING WEB, SUPPORT BEAMS,
AND STIFFENERS WITH IMPROVED PARTS
GROUP 2:
MODIFY THE TOP PANEL BY REPLACING
THE EXISTING SUPPORT BEAMS AND
STIFFENERS WITH IMPROVED PARTS.
STA
280
STA
400
STA
340
STA
400
BL
GROUP 1-2:
MODIFY THE LEFT AND RIGHT
SIDE PANELS BY REPLACING
IMPROVED PARTSENERS WIN
INSIDE NOSE WHEEL WELL
LEFT SIDE SHOWN  2178510
RIGHT SIDE OPPOSITE
Original Issue: November 30, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2808
Work - See page 1 for details.  8 of 93

### Page 9

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-53A2808
Original Issue: November 30, 2012
ATA System: 5311
SUBJECT: FUSELAGE - Main Frame - Nose Wheel Well Side and Top Panel - Web and Stiffener
Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR 85901-99RS for data about
this change.
DESCRIPTIONCONFIGURATIONGROUP
747-400 airplanes, line numbers 1308 - 1419.-1
747-400F airplanes, line numbers 1315 - 1419.-2
Airplane Models:
747-400, 747-400F
GroupVariable Number
1RF001 - RF006
2RL421 - RL436
2RL451 - RL456
2RL461 - RL462
2RL471 - RL481
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
9 of 93

### Page 10

GroupVariable Number
2RL491 - RL492
2RL501 - RL502
2RL511 - RL516
2RL521 - RL522
2RL531 - RL534
2RL551
2RL561 - RL568
2RL571 - RL572
2RL576 - RL577
2RL579
2RL581 - RL586
2RL671 - RL675
2RL681 - RL684
1RM030
1RM053
1RM401 - RM403
1RM426
1RM431
1RM441 - RM443
1RM445
2RM859
2RM863
2RM877 - RM880
2RM888 - RM890
2RM906
2. Spares Affected
None.
B. Concurrent Requirements
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
10 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 11

C. Reason
Accomplishment of the modification in this service bulletin will ensure the structural integrity of the nose
wheel well top and side panels. Widespread Fatigue Damage (WFD) in the nose wheel well top and
side panels could result in a depressurization event with damage significant enough to adversely affect
the structural integrity of the fuselage.
Boeing has received 16 reports of cracking in the nose wheel well top panel and side panel webs and/or
stiffeners. One airplane lost pressurization due to cracking in a nose wheel well side panel. Boeing has
determined that all the cracks were caused by fatigue.
The nose wheel well top and side panels have been determined to be structure that is susceptible to
develop WFD. Although loss of pressurization due to cracks in the nose wheel well structure is not
necessarily an airplane safety concern, WFD could result in a nose wheel well depressurization event
severe enough to reduce the structural integrity of the fuselage. Due to the concern of WFD in the nose
wheel well top and side panel structure, Boeing recommends that operators accomplish the modification
given in this service bulletin.
Group 1:
This service bulletin gives instructions to modify the nose wheel well top panel and side panels by
replacing the existing webs, support beams, and stiffeners with improved parts. The modifications in
this service bulletin will eliminate the concern of WFD in the nose wheel well.
Group 2:
This service bulletin gives instructions to modify the nose wheel well side panels by replacing the
existing webs, support beams, and stiffeners with improved parts. This service bulletin will also modify
the nose wheel well top panel by replacing the existing support beams and stiffeners with improved
parts. The modifications in this service bulletin will eliminate the concern of WFD in the nose wheel
well.
For more information about WFD, refer to Boeing Service Letter 747-SL-53-088.
The modification given in this service bulletin terminates the repetitive inspections given in Service
Bulletin 747-53A2465.
Boeing Service Related Problem (SRP) 747-SRP-53-0339 is related to this Service Bulletin.
Boeing Fleet Team Digest articles 747 FTD 53-04002 and 747 FTD 53-12006 are related to this service
bulletin.
D. Description
Open the nose landing gear doors, and jack the airplane. Remove the nose landing gear, nose landing
gear doors, nose landing gear door actuator, passenger seats, floor covering, floor panels, and insulation
as necessary to get access to the upper, left, and right hand webs in the nose wheel well.
Group 1:
Modify the nose wheel well top and side panels by replacing the existing webs, support beams, and
stiffeners with improved parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
11 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 12

Group 2:
Modify the nose wheel well side panels by replacing the existing webs, support beams, and stiffeners
with improved parts. Modify the nose wheel well top panel by replacing the existing support beams and
stiffeners with improved parts.
Install all parts removed for access at completion of the modification, and return the airplane to a
serviceable condition.
Do post-modification detailed and high frequency eddy current (HFEC) inspections at the time specified
in Paragraph 1.E., Compliance. If any crack is found, contact Boeing for repair instructions and do the
repair.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
113, 114747-400
Group 2:
Affected Maintenance Zones
ZoneModel
113, 114747-400F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2006-22-15 is related to this service
bulletin.
Table 1: Nose Wheel Well Modification
Compliance TimeActionCondition
Before 22,000 total flight
cycles. (a)
Do the nose wheel well
modification (and detailed
inspection of attaching
structural elements) in ac-
cordance with paragraph
3.B., Work Instructions,
PART 2.
All airplanes.
Before further flight.Contact Boeing for repair
instructions, and do the re-
pair.
Any crack found during
detailed inspections of at-
taching structural elements
while accomplishing the
modification.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
12 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 13

Table 1: Nose Wheel Well Modification
Compliance TimeActionCondition
(a) Boeing recommends that the modification not be installed prior to 15,000 total
flight cycles. If the modification is installed prior to 15,000 total flight cycles,
then Post Modification Inspections will be required prior to 35,000 total flight
cycles. 35,000 total flight cycles is the Limit of Validity (LOV) for the affected
airplanes.
Group 1:
Table 2: Nose Wheel Well - Post Modification Inspections
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 20,000 flight
cycles after modifi-
cation in accor-
dance with para-
graph 3.B., Work
Instructions, PART
2.
Do an external detailed
inspection for cracks in
the side panel webs, and
do internal detailed and
high frequency eddy cur-
rent (HFEC) inspections
for cracks in the top and
side panel stiffeners in
accordance with para-
graph 3.B., Work Instruc-
tions, PART 6.
All airplanes.
Do an external detailed
inspection for cracks in
the top panel web in ac-
cordance with paragraph
3.B., Work Instructions,
PART 7.
-Before further
flight.
Contact Boeing for repair
instructions, and do the
repair.
Any crack found.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
13 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 14

Group 1:
Table 2: Nose Wheel Well - Post Modification Inspections
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
6,000 flight cycles.-Repeat the external de-
tailed inspection for
cracks in the side panel
webs, and repeat the in-
ternal detailed and HFEC
inspections for cracks in
the top and side panel
stiffeners in accordance
with paragraph 3.B.,
Work Instructions, PART
6.
No crack found, or crack
has been repaired.
6,000 flight cycles.-Repeat the external de-
tailed inspection for
cracks in the top panel
web in accordance with
paragraph 3.B., Work In-
structions, PART 7.
Group 2:
Table 3: Nose Wheel Well - Post Modification Inspections
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 20,000 flight
cycles after modifi-
cation in accor-
dance with para-
graph 3.B., Work
Instructions, PART
2.
Do an external detailed
inspection for cracks in
the side panel webs, and
do internal detailed and
high frequency eddy cur-
rent (HFEC) inspections
for cracks in the top and
side panel stiffeners in
accordance with para-
graph 3.B., Work Instruc-
tions, PART 6.
All airplanes.
Do an external detailed
inspection for cracks in
the top panel web in ac-
cordance with paragraph
3.B., Work Instructions,
PART 7.
-Before further
flight.
Contact Boeing for repair
instructions, and do the
repair.
Any crack found.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
14 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 15

Group 2:
Table 3: Nose Wheel Well - Post Modification Inspections
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
6,000 flight cycles.-Repeat the external de-
tailed inspection for
cracks in the side panel
webs, and repeat the in-
ternal detailed and HFEC
inspections for cracks in
the top and side panel
stiffeners in accordance
with paragraph 3.B.,
Work Instructions, PART
6.
No crack found, or crack
has been repaired.
3,000 flight cycles.-Repeat the external de-
tailed inspection for
cracks in the top panel
web in accordance with
paragraph 3.B., Work In-
structions, PART 7.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the accomplishment of the modification action with the corresponding
compliance times specified in paragraph 1.E., "Compliance", of Service Bulletin 747-53A2808, Original
Issue, as a Method of Compliance (MOC) to the actions with corresponding compliance times required
by paragraph (o) of AD 2006-22-15. All provisions of AD 2006-22-15 that are not specifically referenced
in the above statement remain fully applicable and must be complied with accordingly.
Modification in accordance with this service bulletin is consistent with AD 2006-22-15, except AD
2006-22-15 paragraph (o) requires top panel replacement for all airplanes. Boeing analysis, however,
has shown that top panel web replacement is not required for Group 2 airplanes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
15 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 16

G. Manpower
The table below shows an estimate of the task-hours necessary to do this modification for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
15604Open Access
30012004Change
20804Close Access
3.06.02Test
3381346TOTAL FOR EACH AIRPLANE
Group 2:
Elapsed HoursTask-HoursNumber of Per-
sons
Task
14.5584Open Access
2008004Change
19.5784Close Access
3.06.02Test
237942TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Due to this service bulletin usually being accomplished as part of a heavy maintenance check of the
airplane, Boeing recommends that the operator should weigh the airplane and determine the center
of gravity after completing this work, and before return to service. The actual data will be recorded and
placed in Chapter 2 of the Weight and Balance Manual.
I. Electrical Load Data
Not applicable.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
16 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 17

J. References
1. Existing Data:
a. Engineering Change Memo PRR 85901-99RS
b. Boeing Service Bulletin 747-00-2158, 747-53A2465, 747-53A2562
c. Boeing Service Letter 747-SL-00-018, 747-SL-53-088
d. Boeing Service Related Problem (SRP) 747-SRP-53-0339
e. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2006-22-15
f. Service Bulletin Index D6-30300
g. Standard Overhaul Practices Manual (SOPM) 20-50-01
h. 747 Fleet Team Digest (FTD) 53-04002, 53-12006
i. 747 Non-Destructive Testing (NDT) Manual Part 6, 51-00-00
j. 747-400 Aircraft Maintenance Manual (AMM) 05-51-08, 07-11-01, 09-11-00, 12-15-05,
20-11-05, 24-22-00, 25-25-01, 25-27-01, 25-28-03, 25-57-01, 25-57-04, 29-11-00, 32-00-30,
32-09-03, 32-21-01, 32-22-01, 32-22-03, 32-22-05, 32-34-05, 32-34-06, 32-34-07, 32-34-08,
32-34-10, 32-34-14, 32-34-15, 32-35-04, 32-45-05, 33-31-00, 53-21-02
2. Data Supplied with this Service Bulletin:
a. Drawings:
ADCNDCN/REVSheetTitleDrawing No
-B1Kit - Nose Wheel Well Modification, STA
260 - STA 340
141U1192
--10
--11
--12
--13
--14
--15
--16
--17
-A5
-B8
--PSDL
-AKPLTop Panel Modification - Kit (Passenger)141U1192-13
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
17 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 18

ADCNDCN/REVSheetTitleDrawing No
-AKPLTop Panel Modification - Kit (Freighter)141U1192-15
-AKPLLeft Side Panel Modification - Kit (Passen-
ger)
141U1192-17
-AKPLRight Side Panel Modification - Kit (Passen-
ger)
141U1192-18
-AKPLLeft Side Panel Modification - Kit (Freighter)141U1192-19
-AKPLRight Side Panel Modification - Kit
(Freighter)
141U1192-20
-AKPLNose Wheel Well Modification, STA 260 to
STA 340 - Top Kit (Passenger)
141U1192-3
-AKPLTop Panel Modification Fasteners - Kit
(Passenger)
141U1192-39
-AKPLNose Wheel Well Modification, STA 260 to
STA 340 - Top Kit (Freighter)
141U1192-4
-AKPLSide Panel Modification Fasteners - Kit
(Passenger)
141U1192-41
-AKPLTop Panel Modification Fasteners - Kit
(Freighter)
141U1192-43
-AKPLSide Panel Modification Fasteners - Kit
(Freighter)
141U1192-45
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
32-34747 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
18 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 19

M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
19 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 20

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
20 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT
BLANK PAGE

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The are kits subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the date of this
Service Bulletin
(US Dollars)
ROLT as of the
date of this Ser-
vice Bulletin (Cal-
endar Days)
NameKit Number
(c)(c)Nose Wheel Well Modification, STA 260 to
STA 340 - Top Kit
141U1192-3 (a)
(c)(c)Nose Wheel Well Modification, STA 260 to
STA 340 - Top Kit
141U1192-4 (b)
(a) Group 1 (Passenger).
(b) Group 2 (Freighter).
(c) Boeing Spares does not have a stocking plan for this top kit. Therefore, the top kit will not available at the
time of release of this service bulletin. Reorder Lead Time (ROLT) and Price information is not provided.
Operators should contact Boeing and order parts at least 2 years prior to planned modification incorporation
to ensure that parts can be made available.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
21 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 22

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-4-3
(a)NOSE WHEEL
WELL MODIFICA-
TION, STA 260 TO
STA 340 - TOP KIT
.-141U1192-3
(b)NOSE WHEEL
WELL MODIFICA-
TION, STA 260 TO
STA 340 - TOP KIT
-.141U1192-4
TOP PANEL MOD-
IFICATION - KIT
.1141U1192-13
TOP PANEL MOD-
IFICATION - KIT
1.141U1192-15
LEFT SIDE PANEL
MODIFICATION -
KIT
.1141U1192-17
RIGHT SIDE PAN-
EL MODIFICA-
TION - KIT
.1141U1192-18
LEFT SIDE PANEL
MODIFICATION -
KIT
1.141U1192-19
RIGHT SIDE PAN-
EL MODIFICA-
TION - KIT
1.141U1192-20
TOP PANEL MOD-
IFICATION FAS-
TENERS - KIT
.1141U1192-39
SIDE PANEL
MODIFICATION
FASTENERS - KIT
.1141U1192-41
TOP PANEL MOD-
IFICATION FAS-
TENERS - KIT
1.141U1192-43
SIDE PANEL
MODIFICATION
FASTENERS - KIT
1.141U1192-45
(a) Group 1.
(b) Group 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
22 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 23

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
TOP PANEL MOD-
IFICATION - KIT
.....-141U1192-13
TOP PANEL MOD-
IFICATION - KIT
....-.141U1192-15
LEFT SIDE PANEL
MODIFICATION -
KIT
...-..141U1192-17
RIGHT SIDE PAN-
EL MODIFICA-
TION - KIT
..-...141U1192-18
LEFT SIDE PANEL
MODIFICATION -
KIT
.-....141U1192-19
RIGHT SIDE PAN-
EL MODIFICA-
TION - KIT
-.....141U1192-20
WEB - ROUGH
MACHINED
1111..141U1193-1
WEB.....1141U1193-3
BEAM....11141U1193-4
BEAM....66141U1193-5
BEAM.....1141U1193-6
BEAM.....1141U1193-7
BEAM.....1141U1193-8
BEAM....22141U1193-9
BEAM....22141U1193-10
ANGLE....22141U1193-11
ANGLE....22141U1193-12
BEAM.....1141U1193-13
BEAM.....1141U1193-14
BEAM....1.141U1193-15
ANGLE....11141U1193-16
BEAM....77141U1193-17
BEAM....88141U1193-18
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
23 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 24

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
BEAM.....1141U1193-19
CLIP....11141U1193-20
CLIP....55141U1193-21
BEAM3333..141U1193-23
ANGLE111111141U1193-25
BEAM2222..141U1193-27
BEAM1111..141U1193-29
BEAM.2.2..141U1193-31
BEAM2.2...141U1193-32
BEAM.7.7..141U1193-33
BEAM7.7...141U1193-34
ANGLE....1414141U1193-35
BEAM.1.1..141U1193-37
BEAM1.1...141U1193-38
BEAM.1.1..141U1193-39
BEAM1.1...141U1193-40
BEAM.1.1..141U1193-41
BEAM1.1...141U1193-42
BEAM.3.3..141U1193-43
BEAM3.3...141U1193-44
BEAM.1.1..141U1193-45
BEAM1.1...141U1193-46
BEAM.7.7..141U1193-47
BEAM8.8...141U1193-48
BEAM...1..141U1193-49
BEAM.1.1..141U1193-51
BEAM1.1...141U1193-52
BEAM.1.1..141U1193-53
BEAM1.1...141U1193-54
BEAM....1.141U1193-55
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
24 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 25

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
BEAM....2.141U1193-56
BEAM....1.141U1193-57
FILLER11....141U1193-58
FILLER.1....141U1193-59
FILLER.1....141U1193-60
SPLICE ANGLE....5.141U1193-61
BEAM....1.141U1193-62
BEAM....1.141U1193-63
BEAM....1.141U1193-64
BEAM....1.141U1193-65
BEAM....1.141U1193-66
BEAM....1.141U1193-67
BEAM....1.141U1193-68
(a)TRIPLER2222..141U1195U18
(a)TRIPLER2222..141U1195U19
(a)TRIPLER3333..141U1195U20
(a)TRIPLER4444..141U1195U21
(a)TRIPLER5555..141U1195U22
(a)TRIPLER2222..141U1195U23
STIFFENER.....3141U5190-219
STIFFENER.....2141U5190-220
STIFFENER....1.141U5385-34
(a)STIFFENER....1.141U5385U353
(a)STIFFENER....1.141U5385U391
(a)STIFFENER....1.141U5385U392
(a)STIFFENER....1.141U5385U393
(a)STIFFENER....1.141U5385U394
(a)ANGLE - SIDE.....165B07941U145
(a)ANGLE - SIDE.....165B07941U146
(a)ANGLE-SIDE.....165B07941U147
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
25 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 26

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
(a)ANGLE-SIDE.....165B07941U148
(a)ANGLE-FWD.....165B07941U163
(a)GUSSET-AFT.....265B07941U21
(a)CLIP....2265B07941U60
(a)GUSSET-FWD.....165B07941U76
(a)BEAM1.1...65B07942U100
(a)CLIP.1.1..65B07942U103
(a)CLIP1.1...65B07942U104
(a)CLIP..22..65B07942U113
(a)ANGLE.3.3..65B07942U127
(a)ANGLE3.3...65B07942U128
(a)CHORD.1.1..65B07942U15
(a)BEAM.1.1..65B07942U151
(a)BEAM1.1...65B07942U152
(a)CHORD1.1...65B07942U16
(a)CLIP1111..65B07942U329
(a)CLIP.1.1..65B07942U47
(a)CLIP1.1...65B07942U48
(a)CLIP.1.1..65B07942U49
(a)CLIP1.1...65B07942U50
(a)CHORD.1....65B07942U519
(a)CHORD1.....65B07942U520
(a)CLIP.2....65B07942U545
(a)CLIP2.....65B07942U546
(a)CHORD...1..65B07942U67
(a)CHORD..1...65B07942U68
(a)CHORD.1.1..65B07942U71
(a)CHORD1.1...65B07942U72
(a)CHORD.1.1..65B07942U75
(a)CHORD1.1...65B07942U76
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
26 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 27

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
(a)BEAM.1.1..65B07942U85
(a)BEAM1.1...65B07942U86
(a)BEAM.1.1..65B07942U87
(a)BEAM1.1...65B07942U88
(a)CLIP.1.1..65B07942U89
(a)CLIP1.1...65B07942U90
(a)CLIP.1.1..65B07942U93
(a)CLIP1.1...65B07942U94
(a)BEAM.1.1..65B07942U95
(a)CLIP1.1...65B07942U96
(a)BEAM.1.1..65B07942U97
(a)CLIP1.1...65B07942U98
(a)BEAM.1.1..65B07942U99
FILLER11....65B07953-544
(a)ANGLE.1.1..65B07953U17
(a)ANGLE1.1...65B07953U18
(a)ANGLE.1.1..65B07953U19
(a)ANGLE1.1...65B07953U20
(a)FITTING, LS.1.1..65B07953U229
(a)FITTING, RS1.1...65B07953U230
(a)FITTING.1.1..65B07953U3
(a)FITTING1.1...65B07953U4
(a)FITTING.1....65B07953U541
(a)FITTING1.....65B07953U542
(a)FILLER11....65B07953U543
(a)FILLER11....65B07953U549
(a)FITTING...1..65B07953U7
(a)FITTING..1...65B07953U8
FITTING ASSY...1..65B11111-501
FITTING ASSY.1....65B11111-503
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
27 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 28

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
(a)ANGLE.1....65B11784U507
(a)ANGLE1.....65B11784U508
(a)ZEE.....165B13792U59
(a)ZEE.....165B13792U60
(a)STRAP.....265B13797U501
(a)STRAP.....265B13797U502
(a)FITTING.1....65B14749U7
(a)FITTING1.....65B14749U8
(a)CLIP.2....69B13450Y5
(a)CLIP2.....69B13450Y6
(a)CORNER FITTING...1..69B17168U1
(a)CORNER FITTING..1...69B17168U2
FILLER....2.BACF3F005L008NN
FILLER, FLAT11....BACF3F008B104NN
FILLER, FLAT,
ALUMINUM AL-
LOY
22....BACF3F010B010NN
FILLER, FLAT.1....BACF3F010B104NN
FILLER, RECTAN-
GULAR
....5.BACF3H09RF085AN
FILLER, RECTAN-
GULAR
....22BACF3H10JM020BN
FILLER, RECTAN-
GULAR
.....3BACF3H10RM020BN
FILLER, RECTAN-
GULAR
....3.BACF3H11RM020BN
FILLER16161616..BACF3T01D07-07
FILLER-TAPERED....3.BACF3T01E04-06
FILLER....6.BACF3T01E04-08
FILLER.....5BACF3T01E05-07
FILLER - TA-
PERED
....5.BACF3T01E05-08
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
28 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 29

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-20-19-18-17-15-13
FILLER, TAPERED....3030BACF3T01EE08-
08
FILLER-TAPERED....2.BACF3T01F06-
07B
TAPERED FILLER....1.BACF3T01F06-08
FILLER5555.5BACF3T01G07-07
FILLER, TAPERED....1.BACF3T01H08-08
TAPERED FILLER....1.BACF3T01H08-15
FILLER....1.BACF3T01L11-08
TAPERED FILLER....2.BACF3T01L12-08
FILLER, TAPERED3333..BACF3T02F07-08
FILLER2222..BACF3T02G08-08
SHIM,LAMINATED....3030BACS40R008B008F
SHIM, LAMINAT-
ED
.....2BACS40R010C023F
SHIM-LAMINATED.....2BACS40R013B013F
(a) To make installation easier, some Boeing parts are sent in an 'interim' configuration. Boeing will identify
these interim configurations with a 'U', 'W' or 'Y' in place of the '-' (dash) in the part number. Interim parts
are changed to the 'dash' configuration when installed in accordance with the Accomplishment Instructions
of this service bulletin. Refer to Boeing Drawing 005W0900 "INTERIM PARTS - SPARES" and Boeing
Service Letter 747-SL-00-018 for more information.
ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
TOP PANEL MOD-
IFICATION FAS-
TENERS - KIT
...-141U1192-39
SIDE PANEL
MODIFICATION
FASTENERS - KIT
..-.141U1192-41
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
29 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 30

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
TOP PANEL MOD-
IFICATION FAS-
TENERS - KIT
.-..141U1192-43
SIDE PANEL
MODIFICATION
FASTENERS - KIT
-...141U1192-45
(a)BOLT4...BACB30FP8A3
(a)BOLT, HEX HEAD...2BACB30LM4-9
(a)BOLT10...BACB30MC6A3
(a)BOLT8...BACB30MC6A4
(a)BOLT60...BACB30MC6A6
(a)BOLT8...BACB30MC6A9
(a)BOLT, PROTRUD-
ING HD
..2.BACB30MY6K4X
(a)BOLT, PROTRUD-
ING HD
6...BACB30MY8K10X
(a)BOLT, PROTRUD-
ING HD
22.2BACB30MY8K11X
(a)BOLT, PROTRUD-
ING HD
...2BACB30MY8K12X
(a)BOLT, PROTRUD-
ING HD
...8BACB30MY8K13X
(a)BOLT, PROTRUD-
ING HD
...2BACB30MY8K15X
(a)BOLT, PROTRUD-
ING HD
...2BACB30MY8K16X
(a)BOLT, PROTRUD-
ING HD
...2BACB30MY8K17X
(a)BOLT, PROTRUD-
ING HD
...2BACB30MY8K20X
(a)BOLT, PROTRUD-
ING HD
16.1616BACB30MY8K4X
(a)BOLT, PROTRUD-
ING HD
12.1212BACB30MY8K5X
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
30 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 31

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
(a)BOLT, PROTRUD-
ING HD
...8BACB30MY8K6X
(a)BOLT, PROTRUD-
ING HD
...6BACB30MY8K7X
(a)BOLT, PROTRUD-
ING HD
...14BACB30MY8K8X
(a)BOLT, PROTRUD-
ING HD
..1010BACB30MY8K9X
(a)BOLT, HEX HEAD...8BACB30NM4K18
(a)BOLT, HEX HEAD.5.5BACB30NR4K10
(a)BOLT..33BACB30NR4K11
(a)BOLT, HEX HEAD5...BACB30NR4K12
(a)BOLT3...BACB30NR4K15
(a)BOLT, HEX HEAD.5..BACB30NR4K9
(a)BOLT, 100 DEG
HEX DR
..3.BACB30NW6K3X
(a)BOLT, 100 DEG
HEX DR
12...BACB30NW8K14X
(a)BOLT, PROTRUD-
ING HD
1..1BACB30NX5HK5
(a)BOLT, PROTRUD-
ING HD
3.3.BACB30NX5HK6
(a)HEX DRIVE BOLT...6BACB30NX6K10
(a)BOLT, PROTRUD-
ING HD
.9.9BACB30NX6K10X
(a)BOLT...4BACB30NX6K11
(a)BOLT, PROTRUD-
ING HD
.6..BACB30NX6K11X
(a)BOLT, PROTRUD-
ING HD
...4BACB30NX6K12X
(a)BOLT, PROTRUD-
ING HD
6...BACB30NX6K2
(a)BOLT, PROTRUD-
ING HD
.2..BACB30NX6K3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
31 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 32

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
(a)BOLT, PROTRUD-
ING HD
2222BACB30NX6K3X
(a)BOLT, PROTRUD-
ING HD
.2..BACB30NX6K3Y
(a)BOLT, PROTRUD-
ING HD
.85.85BACB30NX6K4
(a)BOLT, PROTRUD-
ING HD
84848484BACB30NX6K4X
(a)BOLT, PROTRUD-
ING HD
.2..BACB30NX6K4Y
(a)BOLT4444.44BACB30NX6K5
(a)BOLT, PROTRUD-
ING HD
82828282BACB30NX6K5X
(a)BOLT53..53BACB30NX6K6
(a)BOLT, PROTRUD-
ING HD
60606060BACB30NX6K6X
(a)HI-LOK...47BACB30NX6K7
(a)BOLT, PROTRUD-
ING HD
.50.50BACB30NX6K7X
(a)BOLT, PROTRUD-
ING HD
...20BACB30NX6K8
(a)BOLT, PROTRUD-
ING HD
36363636BACB30NX6K8X
(a)BOLT...19BACB30NX6K9
(a)BOLT, PROTRUD-
ING HD
.6.6BACB30NX6K9X
(a)BOLT, PROTRUD-
ING HD
2...BACB30NX8K10X
(a)BOLT, PROTRUD-
ING HD
.4..BACB30NX8K12X
(a)HI-LOK..4.BACB30NX8K3
(a)BOLT, PROTRUD-
ING HD
11.11.BACB30NX8K5X
(a)BOLT..4.BACB30NX8K6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
32 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 33

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
(a)BOLT, PROTRUD-
ING HD
11...BACB30NX8K6X
(a)BOLT, PROTRUD-
ING HD
..6.BACB30NX8K7X
(a)BOLT, 100 DEG
HEX DR
...3BACB30YP5K4
(a)BOLT, 100 DEG
HEX DR
.3..BACB30YP6K3
COLLAR.4..BACC30AC6
COLLAR.33.33BACC30AG6
COLLAR,
PRELOAD
1.11BACC30BH5
COLLAR575575575575BACC30BH6
COLLAR323232.BACC30BH8
COLLAR, SHEAR...3BACC30BL5
COLLAR.3..BACC30BL6
COLLAR..5.BACC30M6
COLLAR95959595BACC30M8
NUT, SPACER
PLATE
.1..BACN10GH3A10
NUT,SELF-LOCK-
ING
...2BACN10JC4CD
NUTPLATE...2BACN10JR3CD
NUTPLATE, SELF-
LOCK
6.6.BACN10JR3CKD
NUT PLATE8.8.BACN10JR4CFD
NUTPLATE6.6.BACN10JR5CFD
NUTPLATE6.6.BACN10JR6CFD
NUTPLATE, SELF-
LOCK
...6BACN10JZ4A2CD-
MU
NUTPLATE...2BACN10JZ4B2CDM
NUT8.8.BACN10YR4CD
(a)RIVET, 100 DEG...8BACR15BA3D11C
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
33 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 34

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
(a)RIVET, 100 DEG...4BACR15BA3D5C
(a)RIVET, 100 DEG...4BACR15BA3D9C
(a)RIVET...4BACR15BA4D9C
(a)RIVET, 100 DEG.1..BACR15BA5D6C
(a)RIVET, 100 DEG...4BACR15BA6D7C
(a)RIVET, UNIVER-
SAL HEAD
.2..BACR15BB4D5C
(a)RIVET, UNIVER-
SAL HD
.3..BACR15BB5D10C
(a)RIVET107107107107BACR15BB5D5C
(a)RIVET, UNIVER-
SAL HD
81818181BACR15BB5D6C
(a)RIVET, UNIVER-
SAL HD
15151515BACR15BB5D7C
(a)RIVET, UNIVER-
SAL HD
2.22BACR15BB5D8C
(a)RIVET, UNIVER-
SAL HD
12.12.BACR15BB6D10C
(a)RIVET, UNIVER-
SAL HD
6.6.BACR15BB6D11C
(a)RIVET.2.2BACR15BB6D12C
(a)RIVET, UNIVER-
SAL HD
.2..BACR15BB6D4C
(a)RIVET, UNIVER-
SAL HD
4.44BACR15BB6D5C
(a)RIVET, UNIVER-
SAL HD
378378378378BACR15BB6D6C
(a)RIVET, UNIVER-
SAL HD
593593593593BACR15BB6D7C
(a)RIVET, UNIVER-
SAL HD
75757575BACR15BB6D8C
(a)RIVET, UNIVER-
SAL HD
8.88BACR15BB6D9C
(a)RIVET, UNIVER-
SAL HD
2.2.BACR15BB8D10C
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
34 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 35

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
(a)RIVET, UNIVER-
SAL HD
47.47.BACR15BB8D11C
(a)RIVET, UNIVER-
SAL HD
...2BACR15BB8D18C
(a)RIVET, UNIVER-
SAL HD
.2..BACR15BB8D19C
(a)RIVET, UNIVER-
SAL HD
62.62.BACR15BB8D6C
(a)RIVET, UNIVER-
SAL HD
139.139.BACR15BB8D7C
(a)RIVET, UNIVER-
SAL HD
9999BACR15BB8D8C
(a)RIVET, UNIVER-
SAL HD
2222BACR15BB8D9C
(a)RIVET, 100 DEG..4.BACR15GF3D7
(a)RIVET, 100 DEG24.24.BACR15GF3D8
(a)RIVET, 100 DEG16.16.BACR15GF3D9
(a)RIVET, 100 DEG12.12.BACR15GF4D10
(a)RIVET12...BACR15GF4D13
(a)RIVET, 100 DEG..12.BACR15GF4D8
(a)RIVET, 100 DEG.7..BACR15GF5D4
(a)RIVET, 100 DEG1...BACR15GF6D10
(a)RIVET3...BACR15GF6D5
(a)RIVET, 100 DEG3.3.BACR15GF6D6
(a)RIVET, 100 DEG4.44BACR15GF6D7
(a)RIVET, 100 DEG...4BACR15GF6D9
(a)RIVET, 100 DEG3...BACR15GF8D9
(a)BOLT6.6.BACS12HN3-14
WASHER8.88BACW10BN4AC
WASHER,
SPRING
6.6.BACW10EC3CD
WASHER12.12.NAS1149D0316H
WASHER...2NAS1149D0416J
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
35 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 36

ALL
Kit 141U1192
NotesExisting Part
Number
NameQtyNew Part Number
-45-43-41-39
WASHER8.8.NAS1149D0463J
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip
length longer than indicated. Also, if any fasteners part numbers listed are not available or
have been superseded, substitute fasteners may be supplied in kits.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
(a)Chemical Conversion Coating8 OuncesType 2, Class A
(b)Primer8 OuncesBMS 10-11, Type 1
(b)Sealant16 OuncesBMS5-95
(a) Refer to the Boeing Standard Overhaul Practices Manual 20-43-03, or 747 Structural Repair
Manual, Chapter 51, for material sources.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
36 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 37

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque limits to tighten nuts and bolts are in SRM Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. Boeing Service Letter 747-SL-51-048, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
37 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 38

9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
11. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
12. Some Boeing parts are supplied in a temporary configuration. Those parts are
identified with a 'U', 'W', or 'Y' in place of the '-' (dash) in the part number. It is
permitted to install parts identified with a 'U', 'W', or 'Y' as an alternative to the '-'
(dash) part number. Boeing Drawing 005W0900 contains more data.
13. Use caution when using old parts as templates, and when transferring holes from
removed parts to new parts to avoid transferring any possible mis-located holes,
short edge margins, or incorrect profiles from the old parts to the new.
14. It is acceptable if the number of fasteners common to any individual side panel
horizontal stiffener is one more or one less than the number shown on drawing
141U1192, sheet 14, 15 and 16. The number of fasteners can vary if the old side
panel horizontal stiffeners are used as drill templates for the new stiffeners.
15. Keep removed parts as necessary for re-use and/or to use as templates.
16. Clecos are not considered fasteners for jacking purposes.
17. Fasteners may be oversized 1/64 or 1/32 inch in diameter as needed, provided that
the e/D in all parts common to the oversized hole is greater than or equal to 1.7. "e"
is defined as the distance from the edge of the part to the center of the hole. "D" is
the final hole diameter.
18. Refer to Appendix A for a suggested sequence of steps for nose wheel well
modification.
19. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
20. Shaded areas in Figures are reference only. Shaded areas in Figures may look
different than your airplane.
B. WORK INSTRUCTIONS
PART 1: Access and Jacking
1. Print out the EICAS (Engine Indication and Crew Alerting System) fault list prior to disturbing any
systems. This will limit the scope of any post-modification troubleshooting to only those systems
that were disturbed during the modification.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
38 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 39

2. Install landing gear ground lock pins and chock the wheels. Refer to 747-400 AMM 09-11-00 as
an accepted procedure.
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE LANDING
GEAR DOOR OPERATIONAL AREA. FAST MOVEMENT OF THE LANDING GEAR
DOORS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
3. Open the nose landing gear doors and install door locks. Refer to 747-400 AMM 32-00-30 as an
accepted procedure.
4. Install the safety/tow lock pin on the nose gear steering. Refer to 747-400 AMM 09-11-00 as an
accepted procedure.
5. Remove electrical power to airplane and ground airplane. Refer to 747-400 AMM 24-22-00 as an
accepted procedure.
CAUTION: DO NOT EXCEED ALLOWABLE CAPACITY OF A JACK OR PAD.
CAUTION: RAISING NOSE JACK POINT IN EXCESS OF 6 INCHES OF TIRE CLEARANCE CAN
IMPOSE SIDE LOADS IN EXCESS OF ALLOWABLE SIDE LOADS ON JACK RAM AND
JACK PAD AS THE JACK PAD IS TRAVELING IN AN ARC.
6. Jack the airplane. Refer to 747-400 AMM 07-11-01 as an accepted procedure.
7. Depressurize the hydraulic system. Refer to 747-400 AMM 29-11-00 as an accepted procedure.
WARNING: DO NOT GET THE HYDRAULIC FLUID IN YOUR MOUTH OR EYES, OR ON YOUR
SKIN. YOU CAN ABSORB POISONOUS MATERIALS FROM THE FLUID THROUGH
YOUR SKIN. IF YOU GET THE FLUID IN YOUR EYES OR YOUR MOUTH, OR ON
YOUR SKIN, INTERNAL INJURY CAN OCCUR.
CAUTION: TO PREVENT CONTAMINATION OF THE HYDRAULIC SYSTEM, USE CLEAN
EQUIPMENT WHEN YOU DO THE SERVICING OF THE SYSTEM. OTHERWISE,
DAMAGE TO THE AIRPLANE HYDRAULIC SYSTEM CAN OCCUR.
CAUTION: PUT CAPS ON THE HYDRAULIC LINES AND FITTINGS. UNWANTED MATERIAL CAN
CAUSE CONTAMINATION OF HYDRAULIC LINES, DAMAGE TO SYSTEM
COMPONENTS, AND LEAKAGE OF HYDRAULIC LINES.
8. Do one of the following options to prepare the nose landing gear before wheel well modification:
a. OPTION 1 - Remove the nose landing gear. Refer to 747-400 AMM 32-21-01 as an accepted
procedure.
b. OPTION 2 - Deflate the nose landing gear and leave open to atmosphere. Rest the tires on
the ground or an appropriate stand to support the weight of the nose landing gear. Refer to
747-400 AMM 12-15-05 as an accepted procedure.
9. Remove the forward nose wheel well doors. Refer to 747-400 AMM 32-22-01 as an accepted
procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
39 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 40

10. Group 1:
Remove the nose landing gear tire snubbers from the top panel. Refer to 747-400 AMM 32-45-05
as an accepted procedure.
11. Remove components from the nose wheel well forward bulkhead at STA 260 in accordance with
FIGURE 1.
12. Remove components from the nose wheel well aft bulkhead at STA 340 in accordance with FIGURE
2.
13. Group 1:
Remove the light from the top panel as given on drawing 141U1192.
14. Group 1:
Remove the equipment that follows from the main deck as necessary for access to the nose wheel
well top panel and side panels from Station (STA) 260 to STA 340, between LBL 20 and RBL 20:
AMM Subject (Refer to these as accepted
procedures)
Equipment
747-400 AMM 25-25-01Passenger Seats
747-400 AMM 25-27-01Floor Covering
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-28-03Insulation Blankets
15. Group 2:
Remove the equipment that follows from the main deck as necessary for access to the nose wheel
well top panel and side panels from Station (STA) 260 to STA 340, between LBL 20 and RBL 20:
AMM Subject (Refer to these as accepted
procedures)
Equipment
747-400 AMM 25-57-01Main Deck Cargo Compartment
Power Drive Unit
747-400 AMM 25-57-04Main Deck Cargo Compartment
Caster/Roller Tray
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-28-03Insulation Blankets
PART 2: Nose Wheel Well Modification
CAUTION: DO NOT REMOVE MORE THAN TWO PANELS (TOP AND SIDE WEBS) AT THE SAME
TIME. REMOVING MORE THAN TWO PANELS WILL COMPROMISE STRUCTURAL
INTEGRITY OF THE AIRPLANE IN THE AREA OF THE NOSE WHEEL WELL. A PANEL
IS CONSIDERED REMOVED WHEN MORE THAN FIFTY PERCENT OF THE
FASTENERS ARE REMOVED (EVERY OTHER FASTENER). A PANEL IS CONSIDERED
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
40 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 41

INSTALLED WHEN MORE THAN FIFTY PERCENT OF THE FASTENERS ARE
INSTALLED (EVERY OTHER FASTENER). POWER CLECOS ARE CONSIDERED
FASTENERS WHEN DEFINING A REMOVED OR INSTALLED PANEL. SPRING CLECOS
ARE NOT CONSIDERED FASTENERS WHEN DEFINING A REMOVED OR AN
INSTALLED PANEL.
1. Group 1:
Remove the top panel from the nose wheel well in accordance with FIGURE 3.
2. Group 1:
Do a detailed inspection for cracks in all attaching structural elements that were common to the
removed top panel.
a. If no cracks are found in the attaching structural elements, continue with the nose wheel well
modification.
b. If any crack is found in an attaching structural element, contact Boeing for repair instructions,
and do the repair.
3. Group 1:
Remove and replace either the left side panel or the right side panel of the nose wheel well, as
follows:
a. For the left side panel, remove the existing panel structure in accordance with FIGURE 4. For
the right side panel, remove the existing panel structure in accordance with FIGURE 5.
b. Before installation of the new panel, do a detailed inspection for cracks in all attaching structural
elements that were common to the removed side panel.
(1) If no cracks are found in the attaching structural elements, continue with the nose wheel
well modification.
(2) If any crack is found in an attaching structural element, contact Boeing for repair
instructions, and do the repair.
c. For the left side panel, install new panel structure in accordance with FIGURE 4. For the right
side panel, install new panel structure in accordance with FIGURE 5.
4. Group 1:
Remove and replace the other side panel of the nose wheel well, as follows:
a. For the left side panel, remove the existing panel structure in accordance with FIGURE 4. For
the right side panel, remove the existing panel structure in accordance with FIGURE 5.
b. Before installation of the new panel, do a detailed inspection for cracks in all attaching structural
elements that were common to the removed side panel.
(1) If no cracks are found in the attaching structural elements, continue with the nose wheel
well modification.
(2) If any crack is found in an attaching structural element, contact Boeing for repair
instructions, and do the repair.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
41 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 42

c. For the left side panel, install new panel structure in accordance with FIGURE 4. For the right
side panel, install new panel structure in accordance with FIGURE 5.
5. Group 1:
Install the new top panel in the nose wheel well in accordance with FIGURE 6.
6. Group 2:
Remove top panel components from the nose wheel well in accordance with FIGURE 9.
7. Group 2:
Do a detailed inspection for cracks in all attaching structural elements that were common to the
removed top panel components.
a. If no cracks are found in the attaching structural elements, continue with the nose wheel well
modification.
b. If any crack is found in an attaching structural element, contact Boeing for repair instructions,
and do the repair.
8. Group 2:
Remove and replace either the left side panel or the right side panel of the nose wheel well, as
follows:
a. For the left side panel, remove the existing panel structure in accordance with FIGURE 10.
For the right side panel, remove the existing panel structure in accordance with FIGURE 11.
b. Before installation of the new panel, do a detailed inspection for cracks in all attaching structural
elements that were common to the removed side panel.
(1) If no cracks are found in the attaching structural elements, continue with the nose wheel
well modification.
(2) if any crack is found in an attaching structural element, contact Boeing for repair
instructions, and do the repair.
c. For the left side panel, install new panel structure in accordance with FIGURE 10. For the
right side panel, install new panel structure in accordance with FIGURE 11.
9. Group 2:
Remove and replace the other side panel of the nose wheel well, as follows:
a. For the left side panel, remove the existing panel structure in accordance with FIGURE 10.
For the right side panel, remove the existing panel structure in accordance with FIGURE 11.
b. Before installation of the new panel, do a detailed inspection for cracks in all attaching structural
elements that were common to the removed side panel.
(1) If no cracks are found in the attaching structural elements, continue with the nose wheel
well modification.
(2) if any crack is found in an attaching structural element, contact Boeing for repair
instructions, and do the repair.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
42 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 43

c. For the left side panel, install new panel structure in accordance with FIGURE 10. For the
right side panel, install new panel structure in accordance with FIGURE 11.
10. Group 2:
Install the new top panel components in the nose wheel well in accordance with FIGURE 12.
PART 3: Close Access
1. Group 1:
Install the light on the top panel as given on drawing 141U1192.
2. Install components on the nose wheel well aft bulkhead at STA 340 in accordance with FIGURE
7.
3. Install components on the nose wheel well forward bulkhead at STA 260 in accordance with
FIGURE 8.
4. Group 1:
Install the nose landing gear tire snubbers on the top panel. Refer to 747-400 AMM 32-45-05 as
an accepted procedure.
5. Install the forward nose wheel well doors. Refer to 747-400 AMM 32-22-01 as an accepted
procedure.
6. If the nose landing gear was removed for access, install the nose landing gear. Refer to 747-400
AMM 32-21-01 as an accepted procedure.
7. If necessary, inflate the nose landing gear. Refer to 747-400 AMM 12-15-05 as an accepted
procedure.
8. Group 1:
Refer to the procedures that follow, as necessary, to re-install any equipment that was removed
from the main deck for internal access to the nose wheel well top panel and side panels:
AMM Subject (Refer to these as ac-
cepted procedures)
Equipment
747-400 AMM 25-28-03Insulation Blankets
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-27-01Floor Covering
747-400 AMM 25-25-01Passenger Seats
9. Group 2:
Refer to the procedures that follow, as necessary, to re-install any equipment that was removed
from the main deck for internal access to the nose wheel well top panel and side panels:
AMM Subject (Refer to these as ac-
cepted procedures)
Equipment
747-400 AMM 25-28-03Insulation Blankets
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
43 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 44

AMM Subject (Refer to these as ac-
cepted procedures)
Equipment
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-57-04Main Deck Cargo Compartment
Caster/Roller Tray
747-400 AMM 25-57-01Main Deck Cargo Compartment
Power Drive Unit
PART 4: Test
1. Supply electrical power to airplane. Refer to 747-400 AMM 24-22-00 as an accepted procedure.
2. Pressurize the cabin and check for air leakage in the modified area of the nose wheel well. Refer
to 747-400 AMM 05-51-08 as an accepted procedure.
3. Pressurize the hydraulic system and check for leaks. Refer to 747-400 AMM 29-11-00 as an
accepted procedure.
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE LANDING
GEAR DOOR OPERATIONAL AREA. FAST MOVEMENT OF THE LANDING GEAR
DOORS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
4. Remove the nose landing gear locks and close the nose landing gear doors. Refer to 747-400
AMM 32-00-30 as an accepted procedure.
5. Remove ground locks on the landing gear. Refer to 747-400 AMM 09-11-00 as an accepted
procedure.
6. Remove the safety/tow lock pin on the nose gear steering. Refer to 747-400 AMM 09-11-00 as an
accepted procedure.
7. Test nose gear sequencing valve. Refer to 747-400 AMM 32-34-08 as an accepted procedure.
8. Test nose gear proximity switch. Refer to 747-400 AMM 32-09-03 as an accepted procedure.
9. Test the nose wheel well light. Refer to 747-400 AMM 33-31-00 as an accepted procedure.
PART 5: De-jack Airplane
1. Install ground locks on the landing gear. Refer to 747-400 AMM 09-11-00 as an accepted procedure.
CAUTION: REMOVE ALL OF THE AEROSTANDS, JACKS, WORK PLATFORMS, AND ENTRY
STANDS OUT OF THE AREA THAT ARE NOT NECESSARY
2. De-jack the airplane. Refer to 747-400 AMM 07-11-01 as an accepted procedure.
3. Remove ground locks on the landing gear. Refer to 747-400 AMM 09-11-00 as an accepted
procedure.
4. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
44 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 45

PART 6: Post Modification Inspections - External Detailed Inspections of Side Panel Webs, and
Internal Detailed and HFEC Inspections of Top and Side Panel Stiffeners
1. If not already done, install landing gear ground lock pins and chock the wheels. Refer to 747-400
AMM 09-11-00 as an accepted procedure.
WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE LANDING
GEAR DOOR OPERATIONAL AREA. FAST MOVEMENT OF THE LANDING GEAR
DOORS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
2. If not already done, open the nose landing gear doors and install door locks. Refer to 747-400
AMM 32-00-30 as an accepted procedure.
3. Group 1:
Remove the equipment that follows from the main deck, as necessary, for access to the nose
wheel well top panel and side panels from Station (STA) 260 to STA 340, between LBL 20 and
RBL 20:
AMM Subject (Refer to these as accepted
procedures)
Equipment
747-400 AMM 25-25-01Passenger Seats
747-400 AMM 25-27-01Floor Covering
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-28-03Insulation Blankets
4. Group 2:
Remove the equipment that follows from the main deck, as necessary, for access to the nose
wheel well top panel and side panels from Station (STA) 260 to STA 340, between LBL 20 and
RBL 20:
AMM Subject (Refer to these as accepted
procedures)
Equipment
747-400 AMM 25-57-01Main Deck Cargo Compartment
Power Drive Unit
747-400 AMM 25-57-04Main Deck Cargo Compartment
Caster/Roller Tray
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-28-03Insulation Blankets
5. Do an external detailed inspection for cracks in the side panel webs in accordance with FIGURE
13, and do internal detailed and high frequency eddy current inspections for cracks in the top and
side panel stiffeners in accordance with FIGURE 15.
a. If any crack is found: Contact Boeing for repair instructions, and do the repair.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
45 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 46

b. If no crack is found, or cracks have been repaired: Repeat the external detailed inspection
for cracks in the side panel webs in accordance with FIGURE 13, and repeat the internal
detailed and high frequency eddy current inspections for cracks in the top and side panel
stiffeners in accordance with FIGURE 15. Do the repeat inspections at the interval specified
in Paragraph 1.E., Compliance.
6. Group 1:
Refer to the procedures that follow, as necessary, to re-install any equipment that was removed
from the main deck for internal access to the nose wheel well top panel and side panels:
AMM Subject (Refer to these as ac-
cepted procedures)
Equipment
747-400 AMM 25-28-03Insulation Blankets
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-27-01Floor Covering
747-400 AMM 25-25-01Passenger Seats
7. Group 2:
Refer to the procedures that follow, as necessary, to re-install any equipment that was removed
from the main deck for internal access to the nose wheel well top panel and side panels:
AMM Subject (Refer to these as ac-
cepted procedures)
Equipment
747-400 AMM 25-28-03Insulation Blankets
747-400 AMM 53-21-02Floor Panels
747-400 AMM 25-57-04Main Deck Cargo Compartment
Caster/Roller Tray
747-400 AMM 25-57-01Main Deck Cargo Compartment
Power Drive Unit
8. Remove the nose landing gear door locks and close the nose landing gear doors. Refer to 747-400
AMM 32-00-30 as an accepted procedure.
9. Remove the ground locks on the landing gear. Refer to 747-400 AMM 09-11-00 as an accepted
procedure.
10. Put the airplane back to a serviceable condition.
PART 7: Post Modification Inspections - External Detailed Inspections of Top Panel Web
1. If not already done, install landing gear ground lock pins and chock the wheels. Refer to 747-400
AMM 09-11-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
46 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 47

WARNING: MAKE SURE THAT ALL PERSONS AND EQUIPMENT ARE CLEAR OF THE LANDING
GEAR DOOR OPERATIONAL AREA. FAST MOVEMENT OF THE LANDING GEAR
DOORS CAN CAUSE INJURY TO PERSONS OR DAMAGE TO EQUIPMENT.
2. If not already done, open the nose landing gear doors and install door locks. Refer to 747-400
AMM 32-00-30 as an accepted procedure.
3. Do an external detailed inspection for cracks in the top panel web in accordance with FIGURE 14.
a. If any crack is found: Contact Boeing for repair instructions, and do the repair.
b. If no crack is found, or cracks have been repaired: Repeat the external detailed inspection
for cracks in the top panel web in accordance with FIGURE 14, at the interval specified in
Paragraph 1.E., Compliance.
4. Remove the nose landing gear door locks and close the nose landing gear doors. Refer to 747-400
AMM 32-00-30 as an accepted procedure.
5. Remove the ground locks on the landing gear. Refer to 747-400 AMM 09-11-00 as an accepted
procedure.
6. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
47 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 48 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
STATION 260
• BULKHEAD
DOOR SAFETY 8  VALVE
ALT EXTENSION
MECHANISM
•STATION 260
BULKHEAD
UPPER ACTUATOR 6
SUPPORT FITTING
FORWARD
DOOR  BELLCRANK
ACTUATOR 2  FITTING
SHIM 7
LOWER ACTUATOR ( 7
SUPPORT FITTING
SHIM T
DOOR
OPERATOR
RODS
2178508
FIGURE 1: REMOVALS FOR ACCESS AT NOSE WHEEL WELL STA 260 BULKHEAD
(SHEET 1 OF 2)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2808
Work - See page 1 for details.  48 of 93

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
WARNING: DO NOT GET THE HYDRAULIC FLUID IN YOUR MOUTH OR EYES, OR ON YOUR SKIN. YOU
CAN ABSORB POISONOUS MATERIALS FROM THE FLUID THROUGH YOUR SKIN. IF YOU
GET THE FLUID IN YOUR EYES OR MOUTH, INTERNAL INJURY CAN OCCUR.
CAUTION: TO PREVENT CONTAMINATION OF THE HYDRAULIC SYSTEM, USE CLEAN EQUIPMENT
WHEN YOU DO THE SERVICING OF THE SYSTEM. DAMAGE TO THE AIRPLANE HYDRAULIC
SYSTEM CAN OCCUR.
CAUTION: PUT CAPS ON THE HYDRAULIC LINES AND FITTINGS. UNWANTED MATERIAL CAN CAUSE
CONTAMINATION OF HYDRAULIC LINES, DAMAGE TO SYSTEM COMPONENTS, AND
LEAKAGE OF HYDRAULIC FLUID.
MORE DATAQTYNAMETASKSTEP
Refer to 747-400 AMM 32-22-03 as
an accepted procedure.
2Nose Wheel Well Forward Door
Operator Rods
Remove/Keep1
Refer to 747-400 AMM 32-34-14 as
an accepted procedure.
1Nose Landing Gear Door ActuatorRemove/Keep2
Refer to 747-400 AMM 32-22-05 as
an accepted procedure.
1Nose Landing Gear Forward Door
Bellcrank
Remove/Keep3
Refer to 747-400 AMM 32-34-15 as
an accepted procedure.
1Door Unlock Safety ValveRemove/Keep4
As necessary. Refer to 747-400
AMM 32-35-04 as an accepted pro-
cedure.
1Nose Landing Gear Alternate Exten-
sion Door Unlock and Safety Valve
Mechanism
Remove/Keep5
Refer to SOPM 20-50-01 as an ac-
cepted procedure.
1Nose Landing Gear Actuator Upper
Support Fitting
Remove/Keep6
Refer to SOPM 20-50-01 as an ac-
cepted procedure.
1Nose Landing Gear Actuator Lower
Support Fitting
Remove/Keep7
A bonded shim is under each "leg"
of the support fitting common to the
left side panel of the nose wheel
well. Remove and keep the shims
with the fitting for re-installation.
2Nose Landing Gear Actuator Lower
Support Fitting Shims
As necessary for access.-Hydraulic Lines, Tubes, and
Clamps
Remove/Keep8
Refer to 747-400 AMM 20-11-05 as
an accepted procedure.
FIGURE 1: REMOVALS FOR ACCESS AT NOSE WHEEL WELL STA 260 BULKHEAD
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
49 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 50 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
STATION 340
BULKHEAD
2178504
FIGURE 2: REMOVALS FOR ACCESS AT NOSE WHEEL WELL STA 340 BULKHEAD
(SHEET 1 OF 2)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2808
Work - See page 1 for details.  50 of 93

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
WARNING: DO NOT GET THE HYDRAULIC FLUID IN YOUR MOUTH OR EYES, OR ON YOUR SKIN. YOU
CAN ABSORB POISONOUS MATERIALS FROM THE FLUID THROUGH YOUR SKIN. IF YOU
GET THE FLUID IN YOUR EYES OR MOUTH, INTERNAL INJURY CAN OCCUR.
CAUTION: TO PREVENT CONTAMINATION OF THE HYDRAULIC SYSTEM, USE CLEAN EQUIPMENT
WHEN YOU DO THE SERVICING OF THE SYSTEM. DAMAGE TO THE AIRPLANE HYDRAULIC
SYSTEM CAN OCCUR.
CAUTION: PUT CAPS ON THE HYDRAULIC LINES AND FITTINGS. UNWANTED MATERIAL CAN CAUSE
CONTAMINATION OF HYDRAULIC LINES, DAMAGE TO SYSTEM COMPONENTS, AND
LEAKAGE OF HYDRAULIC FLUID.
MORE DATAQTYNAMETASKSTEP
Refer to 747-400 AMM 32-34-06 as
an accepted procedure.
1Nose Landing Gear Door-Operated
Sequence Valve Mechanism
Remove/Keep1
Refer to 747-400 AMM 32-34-05 as
an accepted procedure.
1Nose Landing Gear Door-Operated
Sequence Valve
Remove/Keep2
Refer to 747-400 AMM 32-34-07 as
an accepted procedure.
1Nose Landing Gear-Operated Se-
quence Valve
Remove/Keep3
Refer to 747-400 AMM 32-34-10 as
an accepted procedure.
1Pressure-Operated Restrictor
Check Valve
Remove/Keep4
As necessary for access.-Hydraulic Lines, Tubes, and
Clamps
Remove/Keep5
Refer to 747-400 AMM 20-11-05 as
an accepted procedure.
FIGURE 2: REMOVALS FOR ACCESS AT NOSE WHEEL WELL STA 340 BULKHEAD
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
51 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 52 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
This Figure applies only to: Group 1.
TOP PANEL A
STA
280
STA  RBL
300  30
STA  CANTED
320  BULKHEAD
STA  LBL
340  30
STA
STA
380  360
STA
400
BL
SIA 340
BULKHEAD
STA 400
BULKHEAD  2178505
FIGURE 3: REMOVAL OF TOP PANEL
(SHEET 1 OF 3)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  747-53A2808
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  52 of 93

### Page 53 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
RBL  REL BL  LBL  LBL
20  10  20
.....
CANTED
BULKHEAD
- STA 280
- STA 300
- STA 320
STA 340
TOP PANEL
2178506
FIGURE 3: REMOVAL OF TOP PANEL
(SHEET 2 OF 3)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  747-53A2808
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  53 of 93

### Page 54

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
NOTE: A panel is considered removed when more than fifty percent of the fasteners are removed.
NOTE: Power clecos are considered fasteners when defining a removed panel. Spring clecos are not considered
fasteners when defining a removed panel.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a) (b) (c)1-Top PanelRemove1
(a) Remove the top panel in accordance with Drawing 141U1192, Sheets 1, 10, 11, and 17.
(b) Keep the removed top panel web to use as a template.
(c) Some top panel components will be kept for rework and/or re-installation in a another Figure. Determine
which components are to be kept, reworked, and re-installed, in accordance with Drawing 141U1192,
Sheets 1, 10, 11, and 17.
FIGURE 3: REMOVAL OF TOP PANEL
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
54 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 55 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
This Figure applies only to: Group 1.
STA  — RBL
300  30
STA  CANTED
320  BULKHEAD
STA  • LBL
340  30
STA STA  360
380
STA
400
SIDEWALL
PANEL
STA 340
BULKHEAD
STA 400
BULKHEAD
2178502
FIGURE 4: LEFT SIDE PANEL REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  747-53A2808
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  55 of 93

### Page 56 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
STA  STA  STA  STA  CANTED
340  320  300  280  BULKHEAD
00000009
...........
-WL170
-WL 160
-WL150
FWD
LEFT SIDE PANEL SHOWN
2178503
FIGURE 4: LEFT SIDE PANEL REPLACEMENT
(SHEET 2 OF 3)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2808
Work - See page 1 for details.  56 of 93

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this Figure.
NOTE: A panel is considered removed when more than fifty percent of the fasteners are removed.
NOTE: Power clecos are considered fasteners when defining a removed panel. Spring clecos are not considered
fasteners when defining a removed panel.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(b) (c) (d)1-Left Side PanelRemove1
(b) (e)1(a)Left Side PanelInstall
(New)
2
(a) For identification refer to drawing 141U1192.
(b) Replace the left side panel in accordance with 141U1192, Sheets 1, 5, 14, 15, and 16.
(c) Keep the removed left side panel web to use as a template.
(d) Some left side panel components will be kept for rework and/or re-installation. Determine which
components are to be kept, reworked, and re-installed, in accordance with Drawing 141U1192,
Sheets 1, 5, 14, 15, and 16.
(e) Use Left Side Panel Modification Kit 141U1192-17 and Side Panel Modification Fastener Kit
141U1192-41.
FIGURE 4: LEFT SIDE PANEL REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
57 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

### Page 58 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
This Figure applies only to: Group 1.
STA
LBL  _280
30  STA
_300
CANTED
BULKHEAD
RBL
30
STA
360
STA
380
FWD
STA
. 400
SIDEWALL  → BL
PANEL
STA 340
BULKHEAD
STA 400
BULKHEAD
2178498
FIGURE 5: RIGHT SIDE PANEL REPLACEMENT
(SHEET 1 OF 3)
Original Issue: November 30, 2012
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-53A2808
Work - See page 1 for details.  58 of 93

### Page 59 (OCR)

BOEING SERVICE BULLETIN 747-53A2808
ALERT  ALERT
CANTED  STA  STA  STA  STA
• BULKHEAD  280  300  320  340
WL170
WL 160-
WL150
FWD
RIGHT SIDE PANEL SHOWN
2178497
FIGURE 5: RIGHT SIDE PANEL REPLACEMENT
(SHEET 2 OF 3)
Original Issue: November 30, 2012
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-53A2808
Work - See page 1 for details.  59 of 93

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
NOTE: A panel is considered removed when more than fifty percent of the fasteners are removed.
NOTE: Power clecos are considered fasteners when defining a removed panel. Spring clecos are not considered
fasteners when defining a removed panel.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(b) (c) (d)1-Right Side PanelRemove1
(b) (e)1(a)Right Side PanelInstall
(New)
2
(a) For identification refer to drawing 141U1192.
(b) Replace the right side panel in accordance with 141U1192, Sheets 1, 5, 14, 15, and 16.
(c) Keep the removed right side panel web to use as a template.
(d) Some right side panel components will be kept for rework and/or re-installation. Determine which
components are to be kept, reworked, and re-installed, in accordance with Drawing 141U1192,
Sheets 1, 5, 14, 15, and 16.
(e) Use Right Side Panel Modification Kit 141U1192-18 and Side Panel Modification Fastener Kit
141U1192-41.
FIGURE 5: RIGHT SIDE PANEL REPLACEMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: November 30, 2012
747-53A2808
60 of 93
BOEING SERVICE BULLETIN 747-53A2808
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/747-53a2808/file/b058ef43bad8.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
