# Boeing Alert Service Bulletin 747-57A2357: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2016-9394; AD 2017-09-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 747-57A2357](https://openairdocs.org/service-documents/boeing/747-57a2357.md)
- Title as filed: SB-747-57A2357 R00
- Pages: 49
- PDF: https://openairdocs.org/files/sha256/eb/18/eb18e9198b3af4f9c9f4a028a887bb1f31303c173c84c62a046b067ebab72195
- Page: https://openairdocs.org/service-documents/boeing/747-57a2357/file/eb18e9198b3a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-57A2357
Original Issue: September 12, 2016
ATA System: 5711
SUBJECT: WINGS - Wing Spars - Front Spar Station Inboard 628 to Front Spar Station Inboard
713 - Front Spar Web Inspection
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2016 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: September 12, 2016
747-57A2357
1 of 49
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
2 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. PLANNING INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
A. Effectivity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
B. Concurrent Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
C. Reason . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
D. Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
E. Compliance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
F. Approval . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
G. Manpower . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
H. Weight and Balance Changes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
I. Electrical Load Data . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
J. References . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
1. Existing Data: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2. Data Supplied with this Service Bulletin: . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
3. Installation Drawings Used in the Preparation of this Service Bulletin: . . . . . . . . . . . 17
K. Publications Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
L. Interchangeability and Intermixability of Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
M. Software Accomplishment Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
2. MATERIAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
A. Material - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
B. Industry Support Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
C. Parts Necessary for Each Airplane . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
1. Kits/Parts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
2. Parts and Materials Supplied by the Operator . . . . . . . . . . . . . . . . . . . . . . . . 19
3. Parts Modified and Reidentified . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4. Parts Removed and Not Replaced . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
D. Parts Necessary to Change Spares . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
E. Special Tooling - Price and Availability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
F. Special Tooling Necessary to do this Service Bulletin . . . . . . . . . . . . . . . . . . . . . . . 19
3. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
A. GENERAL INFORMATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
B. WORK INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
FIGURE 2: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 36
FIGURE 4: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
APPENDIX A: LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 1: FRONT SPAR WEB
INSPECTION - LEFT & RIGHT SIDE - FSSI 628 STIFFENER TO FSSI 713 FITTING . . 48
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
3 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
4 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
747
Service Bulletin
ALERT
SummaryNumber: 747-57A2357Original Issue: September 12, 2016
ATA System: 5711
SUBJECT: WINGS - Wing Spars - Front Spar Station Inboard 628 to Front Spar Station Inboard
713 - Front Spar Web Inspection
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of the inspections in this service bulletin will make sure any crack in the front spar web from
Front Spar Station Inboard (FSSI) 628 to FSSI 713 is found and repaired. If this service bulletin is not
accomplished, a crack in the front spar web in this location could grow undetected and allow a fuel leak which
could lead to a fire.
One operator found a fuel leak which led to the discovery of a 13.4 inch long crack in the left wing front spar
web inboard of pylon number 2 between FSSI 655.75 and FSSI 660. The airplane had 13,909 total flight-cycles
and 107,151 total flight-hours.
Inspections of the front spar web between FSSI 628 and FSSI 713 will supersede 747 Supplemental Structural
Inspection Document (SSID) inspections of Structural Significant Items (SSI) W-24A, W-24B, and W-24C.
The cracking addressed by this service bulletin is similar to the cracking addressed by Service Bulletins
747-57A2266 and 747-57A2311.
Boeing Fleet Team Digest (FTD) 747-400 FTD 57-15005 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-SRP-57-0285 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
5 of 49

### Page 6

ReferenceAffectedPlanning Data
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedNoPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
Get access to the forward side of the left and right wing spar web from stiffener at FSSI 628 to the fittings at
FSSI 713.
Remove the fillet seals from the inboard and outboard edges of the stiffeners, fittings and from the inner edge
of the upper and lower chords attached to the web from the outboard edge of the stiffener at FSSI 628 to the
inboard edge of the fittings at FSSI 713. Also remove cap seals from rib post fastener heads at FSSI 656 and
FSSI 684.
Do the following detailed, Ultrasonic (UT) and High Frequency Eddy Current (HFEC) inspections on each wing:
– Do a detailed inspection of the front spar web for any crack from the outboard edge of the stiffener at FSSI
628 to the inboard edge of the fittings at FSSI 713.
– Do a UT inspection for any crack in the front spar web under the stiffeners between FSSI 628 and FSSI
713 and under the outer edges of the upper link fittings and the outer edges of the midspar back up fittings.
– Do a UT inspection for any crack in the front spar web under the upper and lower chords from FSSI 628 to
FSSI 713.
– Do a HFEC surface inspection for any crack in the front spar web at the edges of the upper and lower chords
from FSSI 628 to FSSI 713.
– Do a HFEC inspection for any crack in the front spar web around the fastener heads common to the FSSI
656 rib post and FSSI 684 rib post.
If any crack is found, contact The Boeing Company for repair instructions and do the repair. Repeat the inspections
in unrepaired areas.
If no crack is found, repeat the inspections.
EFFECTIVITY
All 747-400/400D/400F Airplane(s). Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplane(s).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
6 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 7

COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2004-07-22 R1 is related to this service bulletin.
The effective date of AD 2004-07-22 R1 is January 22, 2008.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
41.880.8Group 1
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
7 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 8 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
DO DETAILED, HIGH FREQUENCY
EDDY CURRENT AND ULTRASONIO
INSPECTIONS FOR ANY CRACK IN
THE WEB OF THE FRONT SPAR.
IF ANY CRACK FOUND, CONTACT
BOEING FOR REPAIR INSTRUCTIONS
AND DO THE REPAIR. REPEAT
INSPECTIONS IN UNREPAIRED
AREAS.
SEAL RIB SSI  OUTBOARD
UPPER  713
LINK
FSSI  FITTINGS
688
UPPER  FSSI
CHORD  711  RIB POST
INBOARD  FSSI  684  FITTINGS  MIDSPAR  BACK-UP
SEAL RIB
WEB  FSSI  656  RIB POST
628  FSSI  RIB POST  INDE
CHORD  LOWER  RIGHT WING OPPOSITE  LEFT WING SHOWN  FRONT SPAR WEB  2500816
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  8 of 49

### Page 9

Commercial 
Airplanes
747
Service Bulletin
ALERT
Number: 747-57A2357
Original Issue: September 12, 2016
ATA System: 5711
SUBJECT: WINGS - Wing Spars - Front Spar Station Inboard 628 to Front Spar Station Inboard
713 - Front Spar Web Inspection
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is applicable to all 747-400/400D/400F airplanes in 1 Group. The Variable
Numbers and Group Information for the applicable airplanes is given below.
Refer to Service Bulletin Index D6-30300 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
All 747-400/400D/400F Airplanes.-1
Airplane Models:
747-400, 747-400D, 747-400F
GroupVariable Number
1RF001 - RF006
1RL401 - RL403
1RL411 - RL436
1RL451 - RL456
1RL461 - RL462
1RL471 - RL481
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
9 of 49

### Page 10

GroupVariable Number
1RL491 - RL492
1RL501 - RL502
1RL511 - RL516
1RL521 - RL522
1RL531 - RL534
1RL551
1RL561 - RL568
1RL571 - RL572
1RL576 - RL577
1RL579
1RL581 - RL586
1RL651 - RL655
1RL671 - RL675
1RL681 - RL684
1RL751 - RL752
1RM001 - RM007
1RM010 - RM013
1RM021 - RM024
1RM026 - RM030
1RM036 - RM045
1RM051 - RM053
1RM071
1RM081 - RM084
1RM091
1RM096 - RM097
1RM116 - RM117
1RM126 - RM132
1RM136 - RM147
1RM156 - RM158
1RM166 - RM177
1RM191 - RM192
1RM231 - RM233
1RM241 - RM246
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
10 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 11

GroupVariable Number
1RM261 - RM264
1RM316 - RM318
1RM331 - RM333
1RM341
1RM351 - RM355
1RM366 - RM367
1RM401 - RM403
1RM426
1RM431
1RM441 - RM443
1RM445
1RM801 - RM803
1RM811 - RM813
1RM851 - RM859
1RM861 - RM863
1RM871 - RM899
1RM901 - RM906
1RM911
1RR701
1RR721 - RR724
1RR746 - RR748
1RR851 - RR856
1RR861 - RR862
1RR951 - RR952
1RT001 - RT014
1RT021 - RT022
1RT031 - RT035
1RT041 - RT047
1RT061
1RT071 - RT075
1RT101 - RT103
1RT121
1RT131 - RT137
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
11 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 12

GroupVariable Number
1RT151 - RT152
1RT161 - RT168
1RT401 - RT412
1RT431 - RT447
1RT451 - RT469
1RT471 - RT499
1RT501 - RT535
1RT551 - RT568
1RT571 - RT591
1RT601 - RT657
1RT671 - RT673
1RT681 - RT682
1RT691 - RT699
1RT701 - RT704
1RT711 - RT717
1RT741 - RT757
1RT776 - RT777
1RT781 - RT784
1RT801 - RT803
1RT811 - RT814
1RT831 - RT837
1RT861 - RT864
1RT876 - RT880
1RT931 - RT932
1RT945 - RT949
1RT951 - RT955
1RT966 - RT967
1RU001 - RU006
1RU016 - RU017
1RU031 - RU032
1RU051 - RU052
1RU059 - RU062
1RU081 - RU083
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
12 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 13

GroupVariable Number
1RU101 - RU102
1RU121 - RU132
1RU801 - RU809
1RU831 - RU841
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of the inspections in this service bulletin will make sure any crack in the front spar
web from Front Spar Station Inboard (FSSI) 628 to FSSI 713 is found and repaired. If this service
bulletin is not accomplished, a crack in the front spar web in this location could grow undetected and
allow a fuel leak which could lead to a fire
One operator found a fuel leak which led to the discovery of a 13.4 inch long crack in the left wing front
spar web inboard of pylon number 2 between FSSI 655.75 and FSSI 660. The airplane had 13,909
total flight-cycles and 107,151 total flight-hours.
Inspections of the front spar web between FSSI 628 and FSSI 713 will supersede 747 Supplemental
Structural Inspection Document (SSID) inspections of Structural Significant Item (SSI) W-24B between
FSSI 655 and FSSI 710.
The cracking addressed by this service bulletin is similar to the cracking addressed by Service Bulletins
747-57A2266 and 747-57A2311.
Boeing Fleet Team Digest (FTD) 747-400 FTD 57-15005 is related to this service bulletin.
Boeing Service Related Problem (SRP) 747-SRP-57-0285 is related to this service bulletin.
D. Description
Get access to the forward side of the left and right wing spar web from stiffener at FSSI 628 to the
fittings at FSSI 713.
Remove the fillet seals from the inboard and outboard edges of the stiffeners, fittings and from the
inner edge of the upper and lower chords attached to the web from the outboard edge of the stiffener
at FSSI 628 to the inboard edge of the fittings at FSSI 713. Also remove cap seals from rib post fastener
heads at FSSI 656 and FSSI 684.
Do the following detailed, Ultrasonic (UT) and High Frequency Eddy Current (HFEC) inspections on
each wing:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
13 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 14

– Do a detailed inspection of the front spar web for any crack from the outboard edge of the stiffener
at FSSI 628 to the inboard edge of the fittings at FSSI 713.
– Do a UT inspection for any crack in the front spar web under the stiffeners between FSSI 628 and
FSSI 713 and under the outer edges of the upper link fittings and the outer edges of the midspar
back up fittings.
– Do a UT inspection for any crack in the front spar web under the upper and lower chords from
FSSI 628 to FSSI 713.
– Do a HFEC surface inspection for any crack in the front spar web at the edges of the upper and
lower chords from FSSI 628 to FSSI 713.
– Do a HFEC inspection for any crack in the front spar web around the fastener heads common to
the FSSI 656 rib post and FSSI 684 rib post.
If any crack is found, contact The Boeing Company for repair instructions and do the repair. Repeat
the inspections in unrepaired areas.
If no crack is found, repeat the inspections.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
511, 521, 611, 621747-400, 747-400D, 747-400F
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2004-07-22 R1 is related to this
service bulletin. The effective date of AD 2004-07-22 R1 is January 22, 2008.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
A logic diagram showing compliance tasks and compliance times is included as an aid in APPENDIX
A.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Accomplish the required action(s), based on the applicable condition(s) in Table 1, in accordance with
Paragraph 3. Accomplishment Instructions.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
14 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 15

Table 1: Front Spar Web Detailed Inspection, Ultrasonic Inspection, and High Frequency Eddy Current
(HFEC) Inspection for Any Crack - Left and Right Wing - Front Spar Station Inboard 628 to Front Spar
Station Inboard 713
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 6 months
after the original
issue date of
this service bul-
letin.
Before 10,000
total flight cycles
or 80,000 total
flight hours,
whichever oc-
curs first.
Do PART 2: FRONT
SPAR WEB INSPEC-
TIONS for any crack.
All Airplanes
1,200 flight cycles.-Repeat PART 2: FRONT
SPAR WEB INSPEC-
TIONS for any crack.
CONDITION 1: NO
CRACK FOUND
-Before further flightACTION 1: Contact The
Boeing Company for re-
pair instructions and do
the repair
CONDITION 2: ANY
CRACK FOUND
1,200 flight cycles-ACTION 2: Repeat PART
2: FRONT SPAR WEB
INSPECTIONS for any
crack at the unrepaired
areas.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, The Manager of the FAA Seattle (ACO) approves the accomplishment of the applicable
inspection procedures of this service bulletin as an alternative method of compliance (AMOC) to the
accomplishment of the corresponding inspection requirements of structurally significant items (SSI)
W-24A, W-24B, and W-24C of Boeing supplemental structural inspection document (SSID) D6-35022,
Revision G, dated December 2000 required by paragraphs (h) and (i) of FAA AD 2004-07-22 R1. This
AMOC only applies to the areas inspected as given in this service bulletin. When this service bulletin
specifies contacting Boeing for repair instructions, the repair instructions must be in accordance with
FAA-approved procedures as required by paragraph (j) of the AD. All provisions of AD 2004-07-22 R1
that are not specifically referenced in this paragraph, remain fully applicable and must be complied
with. Operators must revise their FAA approved maintenance or inspection program with these alternative
inspections prior to threshold.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
15 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 16

G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection for each Airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
• Time to find the tools
Elapsed HoursTask HoursNumber of PersonsTask
6.513.02Open Access
13.026.02Figure 1
1.41.41Figure 2
13.026.02
1.41.41Figure 4
6.513.02Close Access
41.880.8TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Boeing Service Bulletin 747-57A2266, 747-57A2311
b. Boeing Service Letter 747-SL-51-048
c. Boeing Service Related Problem (SRP) 747-SRP-57-0285
d. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2004-07-22 R1
e. Service Bulletin Index D6-30300
f. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-50-19
g. 747 Non-Destructive Testing (NDT) Manual Part 4, 57-10-09, Part 4, 57-10-25, Part 6, 51-00-00
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
16 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 17

h. 747-400 Aircraft Maintenance Manual (AMM) 06-09-08, 27-81-00, 28-11-00
i. 747-400 Fleet Team Digest (FTD) 57-15005
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
FRONT SPAR INSTL - WING112U2000
The table above lists applicable drawings used to prepare this service bulletin. The drawings are
not necessary to make the specified changes, and are not supplied with this service bulletin. The
drawings may not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS but no new DTIs are necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
17 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 18

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
18 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT
BLANK PAGE

### Page 19

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane if needed. As an alternative, operators can purchase the parts from Boeing Spares. This
service bulletin does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
NotesNameQTYPart Number / Specification
(a)Sealant1 GallonBMS 5-95, TYPE I, CLASS B
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
19 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 20

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
20 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT
BLANK PAGE

### Page 21

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 747 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 747
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 747
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
4. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. Boeing Service Letter 747-SL-51-048, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
21 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 22

7. Refer to APPENDIX A for logic diagram(s). Logic diagrams are provided as an aid
only. Information contained in Paragraph 1.E., Compliance is the primary source for
compliance times. Information in Paragraph 3.B., Work Instructions is the primary
source for tasks required for compliance.
8. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
9. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
10. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an
OPTION number, do all of the ACTION numbers for that CONDITION number or
OPTION number.
12. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
13. Some steps in the Work Instructions are labeled as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
labeled as RC, including sub-steps under an RC step and any figures identified in
an RC step, must be done to comply with the AD. If a step or sub-step is labeled
"RC Exempt," then the RC requirement is removed from that step or sub-step. An
Alternative Method of Compliance (AMOC) is required for any deviations to RC steps,
including sub-steps and identified figures. Steps not labeled as RC may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC. This is provided that
the RC steps, including sub-steps and identified figures, can still be done as specified,
and the airplane can be put back in an airworthy condition.
B. WORK INSTRUCTIONS
1. Do PART 1: OPEN ACCESS
2. RC - Do PART 2: FRONT SPAR WEB INSPECTIONS for any crack.
a. CONDITION 1: NO CRACK FOUND.
(1) Repeat PART 2: FRONT SPAR WEB INSPECTIONS.
b. CONDITION 2: ANY CRACK FOUND.
(1) ACTION 1: Contact The Boeing Company for repair instructions and do the repair.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
22 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 23

(2) ACTION 2: Repeat PART 2 FRONT SPAR WEB INSPECTIONS for any crack at the
unrepaired areas.
3. Do PART 3: CLOSE ACCESS
4. Put the airplane back to a serviceable condition.
PART 1: OPEN ACCESS
1. Extend and deactivate Krueger and variable camber flaps. Refer to 747-400 AMM 27-81-00 as an
accepted procedure.
2. Remove access panels 511BB, 511CT, 511CTA, 521AB, and 521FB (left wing) or 611BB, 611CT,
611CTA, 621AB,and 621FB (right wing). Refer to 747-400 AMM 06-09-08 as an accepted procedure.
PART 2: FRONT SPAR WEB INSPECTIONS
1. Do a Detailed Inspection, an Ultrasonic (UT) Inspection, and a High Frequency Eddy Current
Inspection of the forward side of the front spar web for any crack from Front Spar Station Inboard
(FSSI) 628 to FSSI 713 on the left and right wing in accordance with FIGURE 1 and FIGURE 3.
PART 3: CLOSE ACCESS
1. Apply sealant on all areas from where it was removed in accordance with FIGURE 2 and FIGURE
4.
2. Install access panels 511BB, 511CT, 511CTA, 521AB, and 521FB (left wing) or 611BB, 611CT,
611CTA, 621AB,and 621FB (right wing). Refer to 747-400 AMM 06-09-08 as an accepted procedure.
3. Activate and retract Krueger and variable camber flaps. Refer to 747-400 AMM 28-11-00 as an
accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
23 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 24 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER
LINK  _ OUTBOARD
FITTINGS  SEAL RIB
FSSI
688
EN
UPPER  FSSI
CHORD  711
RIB POST
FSSI  MIDSPAR
684  BACK-UP
INBOARD  FITTINGS
SEAL RIB
WEB  FSSI  RIB POST
656
FSSI  RIB POST
628
LOWER
CHORD
2500817
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 1 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  24 of 49

### Page 25 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER  CRACK
CHORD  (TYPICAL)
FSSI  FSSI
628  637  FSSI  FSSI  FSSI  FSSI  FSSI  FSSI
646  656  661  668  675  684
+
UPPER
RIB POST  LINK
RIB POST  FITTING
STIFFENER  LOWER
(6 LOCATIONS)  CHORD
INBD
(LOOKING AFT)
A-A
2500828
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 2 OF 8)
Original Issue: September 12, 2016
PROPRIETARY - Copyright ® Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  25 of 49

### Page 26 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  RIB POST  FSSI
RIB POST  684  713
FSSI I
711
+
+ +
+  + +
+  +
UPPER LINK  MID SPAR  FITTING
BACK UP
FITTINGS  STIFFENER  FITTINGS
INBD
(LOOKING AFT)
B-B
2500829
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 3 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  26 of 49

### Page 27 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER  CRACK
12 LOCATIONS  CHORD  (TYPICAL)
FSSI  FSSI
628  637  FSSI  FSSI  FSSI  FSSI  FSSI  FSSI
646  656  661  668  675  684
XXXXX!
UPPER
RIB POST  LINK
FITTING
RIB POST
(6 LOCATIONS)  STIFFENER  LOWER  CHORD
INBD  (LOOKING AFT)
C-C
1.00
STIFFENER
TYPICAL
INSPECTION AREA  LOWER
CHORD
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 4 OF 8)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  27 of 49

### Page 28 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
RIB POST (  FSSI  RIB POST  FSSI
684  713
UPPER LINK  FSSI
FITTINGS  711
+  -‡-
+  +  + pass  +
+  +
+  +
+
+
+
+  +  +  +  6 LOCATIONS
+ +  +  +
+  +
MID SPAR  FITTING
BACK UP
STIFFENER  FITTINGS
INBD  (LOOKING AFT)
D-D
1.00
STIFFENER
TYPICAL
INSPECTION AREA  B  CHORD  LOWER  2501317
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 5 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  28 of 49

### Page 29 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
11 LOCATIONS (6)  CHORD  UPPER  CRACK  (TYPICAL)
FSSI  FSSI
628  637  ESSI  FSSI  FSSI  FSSI  FSSI
656  661  668  675  684
RIB POST  LOWER  UPPER
STIFFENER  CHORD  RIB POST  LINK
(6 LOCATIONS)  FITTING
12 LOCATIONS
NBD
(LOOKING AFT)
E-E
STIFFENER
TYPICAL
INSPECTION AREA  LOWER
CHORD
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 6 OF 8)
Original Issue: September 12, 2016
PROPRIETARY - Copyright ® Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  29 of 49

### Page 30 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
6 LOCATIONS  FSSI  684  FSSI 713  FSSI
RIB POST  711
RIB POST
+
+
FITTING
5) 6 LOCATIONS
UPPER LINK(
FITTINGS  STIFFENER  MID SPAR BACK
UP FITTINGS
INBD  (LOOKING AFT)
F-F
STIFFENER
TYPICAL
D  LOWER  CHORD
INSPECTION AREA
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 7 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  30 of 49

### Page 31

More DataQtyIdentificationNameTaskStep
WARNING: DO NOT USE METAL TOOLS TO REMOVE SEALANT. IF A METAL TOOL IS USED TO RE-
MOVE SEALANT, IT COULD SCRAPE OR GOUGE THE STRUCTURE UNDER THE SEALANT.
A SCRAPE OR GOUGE IN THE STRUCTURE COULD LEAD TO A CRACK WHICH COULD
CAUSE A FUEL LEAK WHICH COULD CAUSE A FIRE.
(a)--SealantRemove1
(b)--WebClean2
(c)--WebInspect3
(d)--WebInspect4
(e)--WebInspect5
(f)--WebInspect6
(g)--WebInspect7
(h)--WebInspect8
(a) Remove the fillet seals common to the web, stiffeners, fittings, and upper and lower chords and remove
cap seals from the rib post fastener heads to get access to the inspection area. Refer to SOPM 20-50-19
as an accepted procedure.
(b) Clean the inspection area. Refer to SOPM 20-30-03 as an accepted procedure.
(c) Do a detailed inspection for any crack in the front spar web.
(d) Do a High Frequency Eddy Current (HFEC) surface inspection for any crack in the front spar web at the
edges of the upper and lower chords in accordance with 747 NDT Manual Part 6, 51-00-00, Procedure
4 or 23. Do the inspection along the edge of the chords where the sealant was removed.
(e) Do an Ultrasonic inspection for any crack in the front spar web under the upper and lower chords in ac-
cordance with 747 NDT Manual Part 4, 57-10-25. Do the inspection along the edge of the chords where
the sealant was removed.
(f) Do an Ultrasonic inspection for any crack in the front spar web under the stiffeners and fittings in accordance
with 747 NDT Manual Part 4, 57-10-25.
(g) Do a HFEC surface inspection for any crack in the front spar web around the fastener heads in accordance
with 747 NDT Manual Part 6, 51-00-00, Procedure 4 or 23 . Do the inspection around all fasteners between
the upper and lower chords.
(h) Do an Ultrasonic inspection for any crack in the front spar web under the upper link fittings and mid spar
back up fittings in accordance with 747 NDT Manual Part 4, 57-10-09.
FIGURE 1: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 8 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
31 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 32 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
LINK  UPPER  OUTBOARD
FITTINGS  SEAL RIB
FSSI
688
UPPER  FSSI
CHORD  711
RIB POST
FSSI  MIDSPAR
684  BACK-UP
INBOARD  FITTINGS
SEAL RIB
WEB  FSSI  656  RIB POST
FSSI  RIB POST
628
LOWER
CHORD
2502824
FIGURE 2: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 1 OF 4)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57 A2357
Work - See page 1 for details.  32 of 49

### Page 33 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER  CRACK
CHORD  (TYPICAL)
FSSI  FSSI
628  637  FSSI  FSSI  FSSI  FSSI
646  656  661  684
UPPER
RIB POST LINK
RIB POST  FITTING
STIFFENER  LOWEF
(6 LOCATIONS)  CHORT
INBD  (LOOKING AFT)
A-A
2502826
FIGURE 2: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 2 OF 4)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  747-57A2357
PROPRIETARY - Copyright ® Unpublished
Work - See page 1 for details.  33 of 49

### Page 34 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  RIB POST  FSSI
RIB POST  684  FSSI  711  713
- +
+  - +
+
+i
+
+
+
+
+ +
UPPER LINK  FITTINGS  STIFFENER  MID SPAR  FITTINGS  BACK UP  FITTING
INBD
(LOOKING AFT)
B-B
2502827
FIGURE 2: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 3 OF 4)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  34 of 49

### Page 35

More DataQtyIdentificationNameTaskStep
(a)-BMS 5-95, TYPE I,
CLASS B
SealantApply1
(a) Apply fillet seals common to the web, stiffeners, fittings, and upper and lower chords and apply cap seals
to the rib post fastener heads wherever sealant was removed for access to inspection area. Refer to
SOPM 20-50-19 as an accepted procedure.
FIGURE 2: LEFT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
35 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 36 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  OUTBOARD UPPER LINK
713  SEAL RIB  FITTINGS
B
D
F
FSSI  UPPER
711  CHORD
RIB POST
MIDSPAR  FSSI
BACK-UP  684
FITTINGS  INBOARD
SEAL RIB
RIB POST  FSSI  WEB
656
RIB POST  FSSI
628
LOWER
CHORD
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 1 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  36 of 49

### Page 37 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER
CHORD
FSSI  FSSI
FSSI  FSSI  PSSI  FSSI  FSSI  637  628
684  668  661  656  646
+
UPPER
LINK  RIB POST
FITTING  RIB POST
LOWER  STIFFENER
CHORD  (6 LOCATIONS)
INBD
(LOOKING AFT)
A-A
2501338
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 2 OF 8)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  37 of 49

### Page 38 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  RIB POST  FSSI
713  684  RIB POST
FSSI
711
+
FITTING  MID SPAR  UPPER LINK
BACK UP
FITTINGS  STIFFENER  FITTINGS
(LOOKING AFT)
B-B  INBD
2501339
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 3 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  38 of 49

### Page 39 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER
CHORD  12 LOCATIONS
FSSI  FSSI
FSSI  FSSI  FSSI  FSSI  I FSSI  FSSI  637  628
684  675  668  661  656  646
UPPER
LINK  RIB POST
FITTING  INBD
RIB POST  STIFFENER
LOWER  CHORD  (6 LOCATIONS)
(LOOKING AFT)
C-C
1.00
STIFFENER
LOWER  TYPICAL
CHORD
INSPECTION AREA
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 4 OF 8)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  39 of 49

### Page 40 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  RIB POST  FSSI
713  684  7) RIB POST
FSSI  711  UPPER LINK  FITTINGS
+ +  +
+  +
+
+
4  +  +
6 LOCATIONS  +  +  +
+
+
+
+
INBD
FITTING  MID SPAR
BACK UF
-ITTINGS  STIFFENER
(LOOKING AFT)
D-D
1.00
STIFFENER
TYPICAL
INSPECTION AREA  LOWER  CHORD  2501342
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 5 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  40 of 49

### Page 41 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
CHORD  UPPER  (6) 11 LOCATIONS
FSSI  FSSI
FSSI  FSSI  FSSI  FSSI  FSSI  637  628
684  675  668  661  646
UPPER  LOWER  RIB POST
LINK  RIB POSTI  CHORD  STIFFENER
FITTING  (6 LOCATIONS)
INBD  12 LOCATIONS
(LOOKING AFT)
E-E
STIFFENER
TYPICAL
LOWER
INSPECTION AREA  CHORD  C
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 6 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  747-57A2357
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  41 of 49

### Page 42 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  713 FSSI  FSSI  684  6 LOCATIONS
711  RIB POST
RIB POST
+ +
+
+
+
+
FITTING  INBD
6 LOCATIONS (  8 UPPER LINK
FITTINGS
MID SPAR BACK  UP HITTINGS  STIFFENER
(LOOKING AFT)
F-F
STIFFENER
TYPICAL
INSPECTION AREA  LOWER  2501346
CHORD
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 7 OF 8)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  747-57A2357
Work - See page 1 for details.  42 of 49

### Page 43

More DataQtyIdentificationNameTaskStep
WARNING: DO NOT USE METAL TOOLS TO REMOVE SEALANT. IF A METAL TOOL IS USED TO RE-
MOVE SEALANT, IT COULD SCRAPE OR GOUGE THE STRUCTURE UNDER THE SEALANT.
A SCRAPE OR GOUGE IN THE STRUCTURE COULD LEAD TO A CRACK WHICH COULD
CAUSE A FUEL LEAK WHICH COULD CAUSE A FIRE
(a)--SealantRemove1
(b)--WebClean2
(c)--WebInspect3
(d)--WebInspect4
(e)--WebInspect5
(f)--WebInspect6
(g)--WebInspect7
(h)--WebInspect8
(a) Remove the fillet seals common to the web, stiffeners, fittings, and upper and lower chords and remove
cap seals from the rib post fastener heads to get access to the inspection area. Refer to SOPM 20-50-19
as an accepted procedure
(b) Clean the inspection area. Refer to SOPM 20-30-03 as an accepted procedure.
(c) Do a detailed inspection for any crack in the front spar web.
(d) Do a High Frequency Eddy Current (HFEC) surface inspection for any crack in the front spar web at the
edges of the upper and lower chords in accordance with 747 NDT Manual Part 6, 51-00-00, Procedure
4 or 23. Do the inspection along the edge of the chords where the sealant was removed.
(e) Do an Ultrasonic inspection for any crack in the front spar web under the upper and lower chords in ac-
cordance with 747 NDT Manual Part 4, 57-10-25. Do the inspection along the edge of the chords where
the sealant was removed.
(f) Do an Ultrasonic inspection for any crack in the front spar web under the stiffeners and fittings in accordance
with 747 NDT Manual Part 4, 57-10-25.
(g) Do a HFEC surface inspection for any crack in the front spar web around the fastener heads in accordance
with 747 NDT Manual Part 6, 51-00-00, Procedure 4 or 23 . Do the inspection around all fasteners between
the upper and lower chords.
(h) Do an Ultrasonic inspection for any crack in the front spar web under the upper link fittings and mid spar
back up fittings in accordance with 747 NDT Manual Part 4, 57-10-09.
FIGURE 3: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - INSPECTION
(SHEET 8 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
43 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 44 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  713  OUTBOARD  LINK  UPPER
SEAL RIB  FITTINGS
FSSI
• 688
FSS  UPPER
711  CHORD
RIB POST
MIDSPAR  FSSI
BACK-UP  684
FITTINGS  INBOARD
SEAL RIB
RIB POST  FSSI  656  WEB
RIB POST  FSSI
628
LOWER
CHORD
2502798
FIGURE 4: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 1 OF 4)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57A2357
Work - See page 1 for details.  44 of 49

### Page 45 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
UPPER
CHORD
FSSI  FSSI
FSSI  FSSI  FSSI  PSSI  FSSI  FSSI  637  628
684  675  668  661  656  646
++*+*
++i
UPPER
LINK  RIB POST
FITTING  RIB POST
LOWER  STIFFENER
CHORD  (6 LOCATIONS)
(LOOKING AFT)  INBD
A-A
2502799
FIGURE 4: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 2 OF 4)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  747-57A2357
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  45 of 49

### Page 46 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
FSSI  RIB POST  FSSI
713  684  RIB POST
FSSI
711
MID SPAR
BACK UP
FITTING  FITTINGS  STIFFENER  FITTINGS
(LOOKING AFT)
B-B  INBD
2502802
FIGURE 4: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 3 OF 4)
Original Issue: September 12, 2016
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  747-57 A2357
Work - See page 1 for details.  46 of 49

### Page 47

More DataQtyIdentificationNameTaskStep
(a)-BMS 5-95, TYPE I,
CLASS B
SealantApply1
(a) Apply fillet seals common to the web, stiffeners, fittings, and upper and lower chords and apply cap seals
to the rib post fastener heads wherever sealant was removed for access to inspection area. Refer to
SOPM 20-50-19 as an accepted procedure.
FIGURE 4: RIGHT WING FRONT SPAR WEB - FSSI 628 STIFFENER TO FSSI 713 FITTING - SEALANT
APPLICATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
47 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 48

Logic diagrams are provided as an aid only. Information contained in Paragraph 1.E., Compliance is the primary
source for compliance times. Information contained in Paragraph 3.B., Work Instructions is the primary source
for tasks required for compliance.
1. The table below gives the description for the parts and conditions called out in the logic diagrams.
DescriptionTitle
FRONT SPAR WEB INSPECTIONSPART 2
NO CRACK FOUNDCONDITION 1
ANY CRACK FOUNDCONDITION 2
APPENDIX A:  LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 1: FRONT SPAR WEB
INSPECTION - LEFT & RIGHT SIDE - FSSI 628 STIFFENER TO FSSI 713 FITTING
(SHEET 1 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: September 12, 2016
747-57A2357
48 of 49
BOEING SERVICE BULLETIN 747-57A2357
ALERTALERT

### Page 49 (OCR)

BOEING SERVICE BULLETIN 747-57A2357
ALERT  ALERT
WHICHEVER OCCURS LATER
BEFORE 10,000 TOTAL FLIGHT  WITHIN 6 MONTHS AFTER THE
CYCLES OR 80,000 TOTAL  ORIGINAL ISSUE DATE OF THIS
FLIGHT HOURS, WHICHEVER  SERVICE BULLETIN.
OCCURS FIRST
DO PART 2
CONDITION 2
CONDITION 1
BEFORE FURTHER
FLIGHT
NOT TO EXCEED
1,200 FLIGHT
CYCLES
ACTION 1:
CONTACT BOEING FOR
REPAIR INSTRUCTIONS
AND DO THE REPAIR
REPEAT
PART 2
NOT TO EXCEED
1,200 FLIGHT
CYCLES
REPEAT PART 2:
FRONT SPAR WEB
INSPECTIONS FOR ANY
CRACK AT THE
UNREPAIRED AREAS
APPENDIX A: LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE: TABLE 1: FRONT SPAR WEB
INSPECTION - LEFT & RIGHT SIDE - FSSI 628 STIFFENER TO FSSI 713 FITTING
(SHEET 2 OF 2)
Original Issue: September 12, 2016
Export Controlled ECCN: 9E991 - BOEING  747-57A2357
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  49 of 49

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
