# Boeing Alert Requirements Bulletin 757-25A0319 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2003; AD 2024-10-05 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 757-25A0319 RB](https://openairdocs.org/service-documents/boeing/757-25a0319-rb.md)
- Title as filed: 757-25A0319-00 RB Original Issue 3-24-23
- Pages: 177
- PDF: https://openairdocs.org/files/sha256/b3/cf/b3cff31c340c059462955105d6b17f01f1087c6d1d84cacb415782320444bca1
- Page: https://openairdocs.org/service-documents/boeing/757-25a0319-rb/file/b3cff31c340c

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Requirements Bulletin
ALERT
Number: 757-25A0319 RB
Original Issue: March 24, 2023
ATA System: 2550
SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Blowout Panel and Bulkhead
Grille Assembly Change
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2023 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: March 24, 2023
757-25A0319 RB
1 of 177
4.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
2 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1 . E F F E C T I V I T Y  ................................................ 5
A. Airplanes ................................................ 5
B . S p a r e s  A f f e c t e d  ............................................ 7
2. CONCURRENT REQUIREMENTS ..................................... 7
3 . C O M P L I A N C E  ................................................ 7
4. APPROVAL ................................................ 2 1
5. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 3
A. General Information ......................................... 2 3
B. Work Instructions ........................................... 2 4
FIGURE 3: STA 1640 - BULKHEAD PANEL ASSEMBLY INSTALLATION [Group 1, Configuration 1] . 58
FIGURE 14: LANYARD - DETAILED INSPECTION [Group 1-2, 4-6] ................... 6 8
FIGURE 15: PANEL - 453N1835-8 - DETAILED INSPECTION [Group 1-2, 4, 6] ............. 6 9
FIGURE 16: BLOWOUT PANEL ASSY, SQUARE, RELIEF VALVES - 453N1623-8 OR 453N1623-10 OR
453N1623-12 - DETAILED INSPECTION [Group 1-2, 4-6] ................. 7 0
FIGURE 17: BLOWOUT PANEL ASSY, RECTANGULAR, RELIEF VALVES - 453N1623-9 OR 453N1623-11
OR 453N1623-14 - DETAILED INSPECTION [Group 1-2, 4, 6] ............... 7 5
FIGURE 18: RETAINER - 453N1625-5 - DETAILED INSPECTION [Group 1-2, 4-6] ........... 8 0
FIGURE 19: RETAINER, RECTANGULAR - 453N1625-11 - DETAILED INSPECTION [Group 1-2, 4, 6] . 82
FIGURE 20: GRILLE - BLOWOUT PANEL, BILLET, SQUARE- 453N1639-1 - DETAILED INSPECTION
[Group 1-2, 4-6] ......................................... 8 3
FIGURE 21: GRILLE - BLOWOUT PANEL, BILLET, RECTANGLE - 453N1639-2 - DETAILED INSPECTION
[Group 1-2, 4, 6] ........................................ 8 5
FIGURE 22: STA 560 E5 EE RACK BULKHEAD - PANEL ASSEMBLY - 453N1637-4 - DETAIL INSPECTION
[Group 1-2, 4, 6] ........................................ 8 6
FIGURE 23: VALVE ASSEMBLY - 65-4704-5 - DETAILED INSPECTION [Group 3, 5] ......... 8 8
FIGURE 24: SPACER RING - 65-15274-3 - DETAILED INSPECTION [Group 3, 5] ........... 9 2
FIGURE 25: BULKHEAD GRILLE ASSEMBLY - 69-4337-1 - DETAILED INSPECTION [Group 3, 5] . . 93
FIGURE 26: PANEL ASSEMBLY - 453A1512-1 - DETAILED INSPECTION [Group 3, 5] ........ 9 5
FIGURE 27: PANEL ASSEMBLY - 453N1164-40 - DETAILED INSPECTION [Group 3] ......... 9 7
FIGURE 31: STA 508-530 RIGHT SIDE SIDEWALL - PANEL ASSY-BLOWOUT - INSTALLATION [Group
1 - 2 ,  4 ,  6 ]  ............................................ 9 9
FIGURE 32: STA 845 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2, 4-6] . . 101
FIGURE 33: STA 845 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2, 4-6] . . 110
FIGURE 34: STA 1200 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2, 4-6] . 112
FIGURE 35: STA 1640 BULKHEAD - DOUBLER - INSTALLATION [Group 4] ............. 1 1 5
FIGURE 36: STA 1640 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 1-2] .... 1 1 7
FIGURE 37: STA 1640 BULKHEAD - PANEL ASSY-BLOWOUT - INSTALLATION [Group 4] ..... 1 1 9
FIGURE 40: CEILING BLOWOUT PANEL - INSPECTION [Group 1-2, 4, 6] .............. 1 2 1
FIGURE 41: CAP STRIP - 453N1700-7 - INSPECTION [Group 1-2, 4, 6] ................ 1 2 3
FIGURE 42: CAP STRIP - 453N1700-8 - INSPECTION [Group 1-2, 4, 6] ................ 1 2 5
FIGURE 43: CAP STRIP - 453N1700-10 - INSPECTION [Group 1-2, 4, 6] ............... 1 2 7
FIGURE 44: FORWARD LOWER LOBE CARGO COMPARTMENT - CEILING - FOAM RUBBER SEAL AND
CAP STRIP INSPECTION [Group 1-2, 4, 6] ......................... 1 2 8
FIGURE 45: AFT LOWER LOBE CARGO COMPARTMENT - CEILING - FOAM RUBBER SEAL AND CAP
STRIP INSPECTION [Group 1-2, 4, 6] ............................ 1 3 1
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
3 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 4

FIGURE 46: FORWARD LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL -
INSTALLATION [Group 1-2, 4, 6] .............................. 1 3 4
FIGURE 47: AFT LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL - INSTALLATION
[Group 1-2, 4, 6] ........................................ 1 3 7
FIGURE 48: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 508 - 530 RIGHT SIDE SIDEWALL
- INSTALLATION INSPECTION [Group 1-2, 4, 6] ...................... 1 4 1
FIGURE 49: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 845 BULKHEAD - INSTALLATION
INSPECTION [Group 1-2, 4-6] ................................ 1 4 3
FIGURE 50: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 845 BULKHEAD - INSTALLATION
INSPECTION [Group 1-2, 4-6] ................................ 1 5 0
FIGURE 51: AFT LOWER LOBE CARGO COMPARTMENT - STA 1200 BULKHEAD - INSTALLATION
INSPECTION [Group 1-2, 4-6] ................................ 1 5 2
FIGURE 52: AFT LOWER LOBE CARGO COMPARTMENT - STA 1640 BULKHEAD - INSTALLATION
INSPECTION [Group 1-2] .................................. 1 5 4
FIGURE 53: AFT LOWER LOBE CARGO COMPARTMENT - STA 1640 BULKHEAD - INSTALLATION
INSPECTION [Group 4] .................................... 1 5 6
FIGURE 54: FORWARD LOWER LOBE CARGO COMPARTMENT - STA 845 BULKHEAD - INSTALLATION
INSPECTION [Group 3] .................................... 1 5 8
FIGURE 55: AFT LOWER LOBE CARGO COMPARTMENT - STA 1180 + 20 BULKHEAD - INSTALLATION
INSPECTION [Group 3] .................................... 1 6 1
FIGURE 56: AFT LOWER LOBE CARGO COMPARTMENT - STA 1600 - 1640 - INSTALLATION INSPECTION
[Group 3, 5] .......................................... 1 6 4
FIGURE 57: FORWARD LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL -
INSTALLATION INSPECTION [Group 1-2, 4, 6] ...................... 1 6 7
FIGURE 58: AFT LOWER LOBE CARGO COMPARTMENT - CEILING BLOWOUT PANEL - INSTALLATION
INSPECTION [Group 1-2, 4, 6] ................................ 1 7 0
APPENDIX C: DETAILED INSPECTION OF PARTS [Group 3] ...................... 1 7 3
APPENDIX D: DETAILED INSPECTION OF PARTS [Group 5] ...................... 1 7 4
APPENDIX E: DETAILED INSPECTION OF PARTS [Group 1-2, 4, 6] ................... 1 7 5
APPENDIX H: REPAIR/REPLACEMENT OF DAMAGED PARTS/ASSEMBLIES ............. 1 7 6
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
4 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 5

Commercial 
Airplanes
757
Requirements Bulletin
ALERT
Number: 757-25A0319 RB
Original Issue: March 24, 2023
ATA System: 2550
SUBJECT: EQUIPMENT/FURNISHINGS - Cargo Compartments - Blowout Panel and Bulkhead
Grille Assembly Change
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 757-200, 757-200CB, 757-200PF, 757-300 Airplane(s), line number(s)
2-782, 784-786, 788-823, 825-828, 830-1050 in 6 Group(s). Where the effectivity is presented
with hyphens between line numbers, the airplane applicability means "through" and "inclusive",
e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
DESCRIPTIONCONFIGURATIONGROUP
757-200 and -200CB airplanes that may have done any revision of
SB 757-25-0157.
-1
Airplanes that have not done any revision of SB 757-25-0157.1
Airplanes that have done any revision of SB 757-25-0157.2
757-200 airplanes that do not need doublers for the STA 1640 rigid
bulkhead decompression panel installation.
-2
757-300 airplanes.-3
757-200 airplanes that need doublers for the STA 1640 rigid bulkhead
decompression panel installation.
-4
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
5 of 177

### Page 6

DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with a vacuum waste system.-5
757-200PF airplanes.-6
Airplane Models:
757-200, 757-200CB, 757-200PF, 757-300
GroupVariable Number
1NA002 - NA028
1NA191 - NA199
4NA201 - NA233
2NA234 - NA236
1NA237 - NA238
2NA239
1NA301 - NA305
2NA341 - NA352
4NA391 - NA394
2NA395 - NA399
1NA401 - NA408
1NA441 - NA447
1NA501 - NA584
2NA585 - NA586
1NB001 - NB004
1NB021 - NB023
1NB036 - NB041
1NB051 - NB053
1NB061 - NB073
1NB079
1NB131 - NB148
2NB161 - NB162
1NB166 - NB168
1NB201 - NB204
1NB221
GroupVariable Number
2NB222 - NB228
2NB230
2NB236
1NB239
1NB261 - NB267
1NB291 - NB298
2NB299
2NB301 - NB302
1NB311 - NB312
1NB321 - NB331
1NB421 - NB437
2NB438
2NB446
1NB451 - NB453
2NB454
1NB501 - NB513
2NB514 - NB523
2NB561
2NB571
2NB581 - NB583
1NC001 - NC033
1NC041 - NC042
1NC051 - NC052
1NC056 - NC057
2NC058 - NC062
GroupVariable Number
1NC066 - NC071
2NC072 - NC084
2NC091 - NC094
2NC151
2NC161
6NC901 - NC951
6NC971 - NC974
1ND001 - ND007
1ND011 - ND059
2ND111 - ND113
1ND161 - ND189
2ND190 - ND199
1ND201 - ND203
1ND221 - ND223
2ND224 - ND225
1ND241 - ND248
1ND301 - ND303
2ND304 - ND322
2ND401
1ND891
1ND895
1NE001 - NE005
2NE006 - NE008
1NE011 - NE088
2NE091 - NE094
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
6 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 7

GroupVariable Number
1NE141 - NE150
1NE161 - NE177
1NE201 - NE204
1NE301 - NE302
2NE311 - NE325
5NJ001 - NJ004
5NJ031 - NJ032
5NJ551 - NJ555
3NL001 - NL002
3NL006 - NL017
3NL101 - NL109
3NL141
3NL601 - NL616
5NN001 - NN002
5NN051 - NN052
GroupVariable Number
6NS601 - NS616
6NT001 - NT009
2NT201 - NT202
2NT231 - NT234
2NT237 - NT240
2NT242
2NT245 - NT248
2NT281 - NT289
2NT341 - NT347
2NT351 - NT360
2NT371 - NT373
2NT375 - NT379
2NT381 - NT386
2NT401 - NT409
2NT411 - NT412
GroupVariable Number
2NT426 - NT427
2NT431 - NT432
2NT436 - NT438
2NT441 - NT442
2NT446
2NT701 - NT769
2NT791 - NT796
2NT861 - NT862
2NT881 - NT885
2NT901 - NT916
2NT971 - NT985
2NU031 - NU038
3NU701 - NU705
3NU721 - NU728
3NU731 - NU732
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 757-25A0319 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 757-25A0319 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Accomplish the required action(s), based on the applicable condition(s) in Table 1 through Table 7, in
accordance with Accomplishment Instructions.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
7 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 8

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
All airplanes.
-Before further flight.CONDITION 1 (ACTION 1):CONDITION 1:
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 1 (ACTION 2):
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
-Before further flight.CONDITION 1 (ACTION 3):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 1 (ACTION 4):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
8 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 9

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 2 (ACTION 1):CONDITION 2:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 2 (ACTION 2):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 2 (ACTION 3):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall, if installed.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead, if installed.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located between STA 1200-1640, ceiling.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
9 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 10

Group 1, Configuration 1:
Table 2: Detailed Inspection Of Decompression Panels At The STA 1640 Bulkhead And Replacement
of the Soft Bulkhead with Rigid Bulkhead that has Decompression Panel Assemblies with Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
ACTION 1:
Replace the STA 1640 soft
bulkhead with a rigid bulk-
head that has decompres-
sion panels with billet grilles
installed.
All airplanes.
-Within 26
months after
ACTION 1 was
done.
Within 9,000
flight hours after
ACTION 1 was
done.
ACTION 2 :
Do a Detailed Inspection
(DET) of STA 1640 bulkhead
decompression panels for
any damage.
-Before further flight.CONDITION 3 (ACTION 1):CONDITION 3:
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 3 (ACTION 2):
Repeat the DET of STA
1640 bulkhead decompres-
sion panels for any damage.
-Before further flight.CONDITION 4 (ACTION 1):CONDITION 4:
Install decompression panels
with billet grilles on the STA
1640 bulkhead.
NO DECOMPRES-
SION PANEL DAMAGE
FOUND.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 4 (ACTION 2):
Repeat the DET of STA
1640 bulkhead decompres-
sion panels for any damage.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
10 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 11

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
All airplanes.
-Before further flight.CONDITION 5 (ACTION 1):CONDITION 5:
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 5 (ACTION 2):
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
-Before further flight.CONDITION 5 (ACTION 3):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 5 (ACTION 4):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
11 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 12

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 6 (ACTION 1):CONDITION 6:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 6 (ACTION 2):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 6 (ACTION 3):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall, if installed.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead, if installed.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located at STA 1640 bulkhead.
3. Decompression panel(s) located between STA 1200-1640, ceiling.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
12 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 13

Group 3:
Table 4: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
Do a Detailed Inspection
(DET) of certain bulkhead
and sidewall decompression
panels and pressure equal-
ization valves in the forward
and aft lower lobe cargo
compartments for any dam-
age. (a)
All airplanes.
-Before further flight.CONDITION 7 (ACTION 1):CONDITION 7:
Repair or replace any dam-
aged decompression panels
and any damaged pressure
equalization valves with new
or serviceable decompres-
sion panels and pressure
equalization valves at the
affected location.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND OR ANY
PRESSURE EQUAL-
IZATION VALVE DAM-
AGE FOUND.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 7 (ACTION 2):
Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage. (a)
9,000 flight hours
or 26 months,
whichever occurs
first.
-Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage. (a)
CONDITION 8:
NO DECOMPRES-
SION PANEL DAMAGE
FOUND AND NO
PRESSURE EQUAL-
IZATION VALVE DAM-
AGE FOUND.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
13 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 14

Group 3:
Table 4: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
(a) Certain bulkhead and sidewall decompression panels or pressure equalization valves are defined as
follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 845 bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 1180 + 20 bulkhead.
2. Decompression panel(s) and pressure equalization valve(s) located on RBL 3.58 between STA
1600 - 1640.
Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
ACTION 1:
Install doublers to the STA
1640 bulkhead at the decom-
pression panel installation
locations.
All airplanes.
-ACTION 2:
Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
14 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 15

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 9 (ACTION 1):CONDITION 9:
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 9 (ACTION 2):
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
-Before further flight.CONDITION 9 (ACTION 3):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 9 (ACTION 4):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
15 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 16

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 10 (ACTION 1):CONDITION 10:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 10 (ACTION 2):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 10 (ACTION 3):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located at STA 1640 bulkhead.
3. Decompression panel(s) located between STA 1200-1640, ceiling.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
16 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 17

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
Do a Detailed Inspection
(DET) of certain bulkhead
and sidewall decompression
panels and pressure equal-
ization valves in the forward
and aft lower lobe cargo
compartments for any dam-
age. (a)
All airplanes.
-Before further flight.CONDITION 11 (ACTION 1):CONDITION 11:
Repair or replace any dam-
aged decompression panels
and any damaged pressure
equalization valves with new
or serviceable decompres-
sion panels and pressure
equalization valves at the
affected location.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND OR ANY
PRESSURE EQUAL-
IZATION VALVE DAM-
AGE FOUND.
-Before further flight.CONDITION 11 (ACTION 2):
Install decompression panels
with billet grilles on the bulk-
heads and sidewall of the
forward and aft lower lobe
cargo compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 11 (ACTION 3):
Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage. (a)
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
17 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 18

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 12 (ACTION 1):CONDITION 12:
Install decompression panels
with billet grilles on the bulk-
heads and sidewall of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRES-
SION PANEL DAMAGE
FOUND AND NO
PRESSURE EQUAL-
IZATION VALVE DAM-
AGE FOUND. 9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 12 (ACTION 2):
Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage. (a)
(a) Certain bulkhead decompression panels or pressure equalization valves are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 845 bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 1200 bulkhead.
2. Decompression panel(s) and pressure equalization valve(s) located on RBL 3.58 between STA
1600 - 1640.
Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 16
months after the
original issue
date of Require-
ments Bulletin
757-25A0319
RB.
Within 5,425
Flight Hours af-
ter the original
issue date of
Requirements
Bulletin 757-
25A0319 RB.
Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
All airplanes.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
18 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 19

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 13 (ACTION 1):CONDITION 13:
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
ANY DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 13 (ACTION 2):
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
-Before further flight.CONDITION 13 (ACTION 3):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 13 (ACTION 4):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
19 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 20

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.CONDITION 14 (ACTION 1):CONDITION 14:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRES-
SION PANEL DAMAGE
FOUND.
-Before further flight.CONDITION 14 (ACTION 2):
Install decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
9,000 flight hours
or 26 months,
whichever occurs
first.
-CONDITION 14 (ACTION 3):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located between STA 1200-1640, ceiling.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
20 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 21

4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
In addition, the Manager of the FAA Los Angeles ACO Branch approves accomplishment of the inspection,
repair and replacement defined in this bulletin as an alternative method of compliance to accomplishing the
requirements of paragraph (A) of AD 85-07-02 and AD 86-02-02, and paragraph (a) of AD 92-10-11. All
provisions of AD 85-07-02, AD 86-02-02 and AD 92-10-11 that are not specifically referenced in the above
statement remain fully applicable and must be complied with accordingly.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
21 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 22

Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
22 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT
BLANK PAGE

### Page 23

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 757 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 757
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
23 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 24

6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation or assembly to detect damage, failure or irregularity. This could include
tactile assessment in which a component or assembly can be checked for
tightness/security. Available lighting is normally supplemented with a direct source
of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors
and magnifying lenses may be necessary. Surface cleaning and elaborate access
procedures may be required.
10. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance, unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked. Basic cleaning may be
required to ensure appropriate visibility.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
12. A serviceable decompression panel or pressure equalization valve is defined as any
decompression panel or pressure equalization valve with no damage and no repairs
done before the Original Issue date of Requirements Bulletin 757-25A0319 RB.
13. Bulkhead and sidewall decompression panels are also known as blowout panel
assemblies.
14. Ceiling and E5 EE rack decompression panels are also known as blowout panels.
15. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
24 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 25

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
All airplanes.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 6: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT -
STA 1200 BULKHEAD.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
25 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 26

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
-APPENDIX HCONDITION 1 (ACTION 1):CONDITION 1:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
APPENDIX I-
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31(b)CONDITION 1 (ACTION 2):
ANDInstall decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
FIGURE 48(b)
FIGURE 32
AND
FIGURE 49
FIGURE 33(c)
AND
FIGURE 50(c)
FIGURE 34
AND
FIGURE 51
-FIGURE 46CONDITION 1 (ACTION 3):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-CONDITION 1 (ACTION 4):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
26 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 27

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 6: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT -
STA 1200 BULKHEAD
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
27 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 28

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
APPENDIX I-CONDITION 2 (ACTION 1):CONDITION 2:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRESSION
PANEL DAMAGE
FOUND.
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31(b)
AND
FIGURE 48(b)
FIGURE 32
AND
FIGURE 49
FIGURE 33(c)
AND
FIGURE 50(c)
FIGURE 34
AND
FIGURE 51
-FIGURE 46CONDITION 2 (ACTION 2):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-CONDITION 2 (ACTION 3):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
28 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 29

Group 1, Configuration 1:
Table 1: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 6: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT -
STA 1200 BULKHEAD
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall, if installed.
3. Decompression panel(s) located at STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead, if installed.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located between STA 1200-1640, ceiling.
(b) Applicable if a decompression panel has been removed from the STA 508-530 RBL 50, right side sidewall.
(c) For airplanes with two bulkhead decompression panels installed in the center of the STA 845 bulkhead.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
29 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 30

Group 1, Configuration 1:
Table 2: Detailed Inspection Of Decompression Panels At The STA 1640 Bulkhead And Replacement of
the Soft Bulkhead with Rigid Bulkhead that has Decompression Panel Assemblies with Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
-ACTION 1:
Replace the STA 1640 soft
bulkhead with a rigid bulk-
head that has decompres-
sion panels with billet grilles
installed.
All airplanes.
Do PART 10: SOFT BULKHEAD
REMOVAL AT STA 1640
-FIGURE 3
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
-
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
-ACTION 2:
Do a Detailed Inspection
(DET) of STA 1640 bulkhead
decompression panels for
any damage. Do PART 7: DECOMPRESSIONPANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT -
STA 1640 BULKHEAD
APPENDIX A
-APPENDIX E
APPENDIX F-
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
30 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 31

Group 1, Configuration 1:
Table 2: Detailed Inspection Of Decompression Panels At The STA 1640 Bulkhead And Replacement of
the Soft Bulkhead with Rigid Bulkhead that has Decompression Panel Assemblies with Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
-APPENDIX HCONDITION 3 (ACTION 1):CONDITION 3:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels.
APPENDIX I-
-FIGURE 36
AND
FIGURE 52
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
-
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
-CONDITION 3 (ACTION 2):
Repeat the DET of STA
1640 bulkhead decompres-
sion panels for any damage. Do PART 7: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT -
STA 1640 BULKHEAD
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX I-CONDITION 4 (ACTION 1):CONDITION 4:
NO DECOMPRESSION
PANEL DAMAGE
FOUND.
Install decompression panels
with billet grilles on the
STA1640 bulkhead.
-FIGURE 36
AND
FIGURE 52
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
-
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
-CONDITION 4 (ACTION 2):
Repeat the DET of STA
1640 bulkhead decompres-
sion panels for any damage. Do PART 7: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT -
STA 1640 BULKHEAD
APPENDIX A
-APPENDIX E
APPENDIX F-
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
31 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 32

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
All airplanes.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
32 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 33

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
-APPENDIX HCONDITION 5 (ACTION 1):CONDITION 5:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
APPENDIX I-
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31(b)CONDITION 5 (ACTION 2):
ANDInstall decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
FIGURE 48(b)
FIGURE 32
AND
FIGURE 49
FIGURE 33(c)
AND
FIGURE 50(c)
FIGURE 34
AND
FIGURE 51
FIGURE 36
AND
FIGURE 52
-FIGURE 46CONDITION 5 (ACTION 3):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT.
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-CONDITION 5 (ACTION 4):
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
33 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 34

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
34 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 35

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
APPENDIX I-CONDITION 6 (ACTION 1):CONDITION 6:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRESSION
PANEL DAMAGE
FOUND.
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31(b)
AND
FIGURE 48(b)
FIGURE 32
AND
FIGURE 49
FIGURE 33(c)
AND
FIGURE 50(c)
FIGURE 34
AND
FIGURE 51
FIGURE 36
AND
FIGURE 52
-FIGURE 46CONDITION 6 (ACTION 2):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT.
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-CONDITION 6 (ACTION 3):
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
35 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 36

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
36 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 37

Group 1, Configuration 2; Group 2:
Table 3: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall, if installed.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead, if installed.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located at STA 1640 bulkhead.
3. Decompression panel(s) located between STA 1200-1640, ceiling.
(b) Applicable if a decompression panel has been removed from the STA 508-530 RBL 50, right side sidewall.
(c) For airplanes with two bulkhead decompression panels installed in the center of the STA 845 bulkhead.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
37 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 38

Group 3:
Table 4: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-Do a Detailed Inspection
(DET) of certain bulkhead
and sidewall decompression
panels and pressure equal-
ization valves in the forward
and aft lower lobe cargo
compartments for any dam-
age. (a)
All airplanes.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
-APPENDIX C
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
38 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 39

Group 3:
Table 4: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
-APPENDIX HCONDITION 7 (ACTION 1):CONDITION 7:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND OR ANY PRES-
SURE EQUALIZATION
VALVE DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
and any damaged pressure
equalization valves with new
or serviceable decompres-
sion panels and pressure
equalization valves at the
affected location.
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 9: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
AFT LOWER LOBE CARGO COM-
PARTMENT.
-FIGURE 54
FIGURE 55
FIGURE 56
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT.
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-CONDITION 7 (ACTION 2):
Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
-APPENDIX C
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
39 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 40

Group 3:
Table 4: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage.(a)
CONDITION 8:
NO DECOMPRESSION
PANEL DAMAGE
FOUND AND NO PRES-
SURE EQUALIZATION
VALVE DAMAGE
FOUND. Do PART 9: DECOMPRESSIONPANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
AFT LOWER LOBE CARGO COM-
PARTMENT.
-FIGURE 54
FIGURE 55
FIGURE 56
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT.
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
-APPENDIX C
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
40 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 41

Group 3:
Table 4: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
(a) Certain bulkhead and sidewall decompression panels or pressure equalization valves are defined as
follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 845 bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 1180 + 20 bulkhead.
2. Decompression panel(s) and pressure equalization valve(s) located on RBL 3.58 between STA
1600 - 1640.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
41 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 42

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-ACTION 1:
Install doublers to the STA
1640 bulkhead at the decom-
pression panel installation
locations.
All airplanes.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 11: BULKHEAD LINER
PANEL ASSEMBLY REMOVAL AT
STA 1640.
-FIGURE 35
Do PART 12: BULKHEAD LINER
PANEL ASSEMBLY INSTALLA-
TION AT STA 1640.
-
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
-ACTION 2:
Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
42 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 43

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
-APPENDIX HCONDITION 9 (ACTION 1):CONDITION 9:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
APPENDIX I-
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31CONDITION 9 (ACTION 2):
ANDInstall decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
FIGURE 48
FIGURE 32
AND
FIGURE 49
FIGURE 33(b)
AND
FIGURE 50(b)
FIGURE 34
AND
FIGURE 51
FIGURE 37
AND
FIGURE 53
-FIGURE 46CONDITION 9 (ACTION 3):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-CONDITION 9 (ACTION 4):
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
43 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 44

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
44 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 45

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
APPENDIX I-CONDITION 10 (ACTION 1):CONDITION 10:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRESSION
PANEL DAMAGE
FOUND.
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31
AND
FIGURE 48
FIGURE 32
AND
FIGURE 49
FIGURE 33(b)
AND
FIGURE 50(b)
FIGURE 34
AND
FIGURE 51
FIGURE 37
AND
FIGURE 53
-FIGURE 46CONDITION 10 (ACTION 2):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-CONDITION 10 (ACTION 3):
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
45 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 46

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
46 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 47

Group 4:
Table 5: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located at STA 1640 bulkhead.
3. Decompression panel(s) located between STA 1200-1640, ceiling.
(b) For airplanes with two bulkhead decompression panels installed in the center of the STA 845 bulkhead.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
47 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 48

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-Do a Detailed Inspection
(DET) of certain bulkhead
and sidewall decompression
panels and pressure equal-
ization valves in the forward
and aft lower lobe cargo
compartments for any dam-
age. (a)
All airplanes.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT
APPENDIX B
-APPENDIX D
APPENDIX F-
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
48 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 49

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
-APPENDIX HCONDITION 11 (ACTION 1):CONDITION 11:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND OR ANY PRES-
SURE EQUALIZATION
VALVE DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
and any damaged pressure
equalization valves with new
or serviceable decompres-
sion panels and pressure
equalization valves at the
affected location.
APPENDIX I-
Do PART 9: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
AFT LOWER LOBE CARGO COM-
PARTMENT.
-FIGURE 56
-FIGURE 32CONDITION 11 (ACTION 2):
ANDInstall decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
FIGURE 49
FIGURE 33(b)
AND
FIGURE 50(b)
FIGURE 34
AND
FIGURE 51
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-CONDITION 11 (ACTION 3):
Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT
-APPENDIX D
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
49 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 50

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
APPENDIX F-
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
50 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 51

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
APPENDIX I-CONDITION 12 (ACTION 1):CONDITION 12:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRESSION
PANEL DAMAGE
FOUND AND NO PRES-
SURE EQUALIZATION
VALVE DAMAGE
FOUND.
Do PART 9: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
AFT LOWER LOBE CARGO COM-
PARTMENT.
-FIGURE 56
-FIGURE 32
AND
FIGURE 49
FIGURE 33(b)
AND
FIGURE 50(b)
FIGURE 34
AND
FIGURE 51
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT
-CONDITION 12 (ACTION 2):
Repeat the DET of certain
bulkhead and sidewall de-
compression panels and
pressure equalization valves
in the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT
-APPENDIX D
APPENDIX F-
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
51 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 52

Group 5:
Table 6: Detailed Inspection Of Decompression Panels And Pressure Equalization Valves In The Forward
And Aft Lower Lobe Cargo Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of
Compliance
ActionCondition
(a) Certain bulkhead decompression panels or pressure equalization valves are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 845 bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) and pressure equalization valve(s) located at STA 1200 bulkhead.
2. Decompression panel(s) and pressure equalization valve(s) located on RBL 3.58 between STA
1600-1640.
(b) For airplanes with two bulkhead decompression panels installed in the center of the STA 845 bulkhead.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
52 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 53

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-Do a Detailed Inspection
(DET) of certain bulkhead,
sidewall and ceiling decom-
pression panels in the for-
ward and aft lower lobe car-
go compartments for any
damage. (a)
All airplanes.
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
53 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 54

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
-APPENDIX HCONDITION 13 (ACTION 1):CONDITION 13:
ANY DECOMPRESSION
PANEL DAMAGE
FOUND.
Repair or replace any dam-
aged decompression panels
with new or serviceable de-
compression panels at the
affected location.
APPENDIX I-
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31CONDITION 13 (ACTION 2):
ANDInstall decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
FIGURE 48
FIGURE 32
AND
FIGURE 49
FIGURE 33(b)
AND
FIGURE 50(b)
FIGURE 34
AND
FIGURE 51
-FIGURE 46CONDITION 13 (ACTION 3):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT.
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-CONDITION 13 (ACTION 4):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage.(a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
54 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 55

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
55 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 56

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
APPENDIX I-CONDITION 14 (ACTION 1):CONDITION 14:
Install decompression panels
with billet grilles on the bulk-
heads and sidewalls of the
forward and aft lower lobe
cargo compartments.
NO DECOMPRESSION
PANEL DAMAGE
FOUND.
Do PART 8: DECOMPRESSION
PANEL AND PRESSURE EQUAL-
IZATION VALVE INSTALLATION -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-FIGURE 31
AND
FIGURE 48
FIGURE 32
AND
FIGURE 49
FIGURE 33(b)
AND
FIGURE 50(b)
FIGURE 34
AND
FIGURE 51
-FIGURE 46CONDITION 14 (ACTION 2):
ANDInstall decompression panels
on the ceilings of the forward
and aft lower lobe cargo
compartments.
FIGURE 57
FIGURE 47
AND
FIGURE 58
Do PART 13: CLOSE ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-
Do PART 14: CLOSE ACCESS -
AFT LOWER LOBE CARGO COM-
PARTMENT.
Do PART 1: OPEN ACCESS -
FORWARD LOWER LOBE CARGO
COMPARTMENT.
-CONDITION 14 (ACTION 3):
Repeat the DET of certain
bulkhead, sidewall and ceil-
ing decompression panels in
the forward and aft lower
lobe cargo compartments for
any damage. (a)
Do PART 2: OPEN ACCESS - AFT
LOWER LOBE CARGO COMPART-
MENT.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
56 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 57

Group 6:
Table 7: Detailed Inspection Of Decompression Panels In The Forward And Aft Lower Lobe Cargo
Compartment And Installation Of Billet Grilles.
Refer to the listed procedures in
SB 757-25A0319 Original Issue or
later approved revisions as an
accepted procedure
Method of Com-
pliance
ActionCondition
Do PART 3: DECOMPRESSION
PANEL REMOVAL - FORWARD
LOWER LOBE CARGO COMPART-
MENT.
Do PART 4: DECOMPRESSION
PANEL REMOVAL - AFT LOWER
LOBE CARGO COMPARTMENT.
Do PART 5: CEILING DECOM-
PRESSION PANEL REMOVAL -
LOWER LOBE CARGO COMPART-
MENT.
APPENDIX A
-APPENDIX E
APPENDIX F-
APPENDIX G
-FIGURE 44
FIGURE 45
(a) Certain bulkhead, sidewall and ceiling decompression panels are defined as follows:
Forward lower lobe cargo compartment:
1. Decompression panel(s) located at STA 845 bulkhead.
2. Decompression panel(s) located between STA 508-530 RBL 50, right side sidewall.
3. Decompression panel(s) located between STA 560-845, ceiling.
4. Decompression panel(s) located at STA 560 RBL 50, E5 EE rack bulkhead.
Aft lower lobe cargo compartment:
1. Decompression panel(s) located at STA 1200 bulkhead.
2. Decompression panel(s) located between STA 1200-1640, ceiling.
(b) For airplanes with two bulkhead decompression panels installed in the center of the STA 845 bulkhead.
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.
Original Issue: March 24, 2023
757-25A0319 RB
57 of 177
REQUIREMENTS BULLETIN 757-25A0319
ALERTALERT

### Page 58 (OCR)

REQUIREMENTS BULLETIN 757-25A0319
ALERT  ALERT
This Figure applies only to: Group 1, Configuration 1.
STA
1640
AFT LOWER LOBE
CARGO COMPARTMENT
BL
BHD
1640
3015467
FIGURE 3: STA 1640 - BULKHEAD PANEL ASSEMBLY INSTALLATION
(SHEET 1 OF 10)
Original Issue: March 24, 2023
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.  LLL10 89

### Page 59 (OCR)

REQUIREMENTS BULLETIN 757-25A0319
ALERT  ALERT
CHANNEL  214
ASSEMBLY
LBL
23 LOCATIONS (16  40  STANCHION
LBL
25
+ 610
EACH SIDE
- SUPPORT
ANGLE
SCREW
(EACH SIDE)
393
7 LOCATIONS
DECK  € D 15)
SUPPORT
6 LOCATIONS
INBD
LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE
(VIEW LOOKING AFT)  3015495
A-A
FIGURE 3: STA 1640 - BULKHEAD PANEL ASSEMBLY INSTALLATION
(SHEET 2 OF 10)
Original Issue: March 24, 2023
757-25A0319 RB
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.  59 of 177

### Page 60 (OCR)

REQUIREMENTS BULLETIN 757-25A0319
ALERT  ALERT
STRUCTURE  LBL
ASSEMBLY  40
28 LOCATIONS
BL  20) 21 LOCATIONS
STANCHION
BHD
1640
18 19
10 LOCATIONS
2 | 21 LOCATIONS
DECK  SUPPORT  € 18 22
INBD
LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE
(VIEW LOOKING AFT)  B-B  3015538
FIGURE 3: STA 1640 - BULKHEAD PANEL ASSEMBLY INSTALLATION
(SHEET 3 OF 10)
Original Issue: March 24, 2023
757-25A0319 RB
Export Controlled ECCN: 9E991
Copyright © Unpublished Work - See page 1 for details.  60 of 177

The text continues at https://openairdocs.org/service-documents/boeing/757-25a0319-rb/file/b3cff31c340c.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.