# Boeing Alert Service Bulletin 757-27A0152: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0475; AD 2015-08-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 757-27A0152](https://openairdocs.org/service-documents/boeing/757-27a0152.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 194
- PDF: https://openairdocs.org/files/sha256/3b/90/3b90a0a8704886c72dc66bdb28435cd89ad8a34d3392e341f32b84d638af65a0
- Page: https://openairdocs.org/service-documents/boeing/757-27a0152/file/3b90a0a87048

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Service Bulletin
Number: 757-27A0152
Original Issue: April 29, 2009
Revision 3: October 28, 2013
ATA System: 2760
SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings -
New Spoiler Control Module Relay Installation
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2009 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
1 of 194
3.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
2 of 194
BOEING SERVICE BULLETIN 757-27A0152
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 8
B. Concurrent Requirements ...................................... 1 8
C. Reason ................................................ 1 8
D. Description .............................................. 2 0
E. Compliance .............................................. 2 2
F. Approval ............................................... 2 2
G. Manpower .............................................. 2 3
H. Weight and Balance Changes .................................... 2 7
I. Electrical Load Data ......................................... 2 7
J. References .............................................. 2 7
1. Existing Data: ......................................... 2 7
2. Data Supplied with this Service Bulletin: ........................... 2 8
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 8
K. Publications Affected ........................................ 2 8
L. Interchangeability and Intermixability of Parts ........................... 2 9
M. Software Accomplishment Summary ................................ 2 9
2. MATERIAL INFORMATION ........................................ 3 1
A. Material - Price and Availability ................................... 3 1
B. Industry Support Information .................................... 3 3
C. Parts Necessary for Each Airplane ................................. 3 3
1. Kits/Parts: ........................................... 3 3
2. Parts and Materials Supplied by the Operator: ........................ 4 1
3. Parts Modified and Reidentified: ............................... 4 1
4. Parts Removed and Not Replaced: .............................. 4 1
D. Parts Necessary to Change Spares ................................. 4 2
E. Special Tooling - Price and Availability ............................... 4 2
F. Special Tooling Necessary to do this Service Bulletin ....................... 4 2
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 3
A. GENERAL INFORMATION ..................................... 4 3
B. WORK INSTRUCTIONS ....................................... 4 4
FIGURE 1: E3-1 ELECTRONICS SHELF - REMOVAL [Group 1-5, Configuration 1] .......... 7 4
FIGURE 2: E3-1 ELECTRONICS SHELF - RELAY BRACKET INSTALLATION [Group 1-5, Configuration
1 ]  ................................................ 7 7
FIGURE 3: SPOILER CONTROL MODULE - WIRE PIN STRAPPING REMOVAL [Group 1-5, Configuration
1 ]  ................................................ 8 7
FIGURE 4: W1265 WIRE BUNDLE ROUTING [Group 1-2, 5, Configuration 1] ............. 8 9
FIGURE 5: W1265 WIRE BUNDLE CHANGES [Group 1, Configuration 1] ............... 9 0
FIGURE 6: W1265 WIRE BUNDLE CHANGES [Group 2, Configuration 1] ............... 9 7
FIGURE 7: W1265 WIRE BUNDLE CHANGES [Group 5, Configuration 1] .............. 1 0 4
FIGURE 8: W1265 WIRE BUNDLE ROUTING [Group 3, Configuration 1] ............... 1 1 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
3 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 4

FIGURE 9: W1265 WIRE BUNDLE CHANGES [Group 3, Configuration 1] .............. 1 1 2
FIGURE 10: W1265 WIRE BUNDLE ROUTING [Group 4, Configuration 1] ............... 1 1 9
FIGURE 11: W1265 WIRE BUNDLE CHANGES [Group 4, Configuration 1] .............. 1 2 0
FIGURE 12: E3-1 ELECTRONICS SHELF - RELAY BRACKET EQUIPPING [Group 1-5, Configuration 1]
................................................. 1 2 7
FIGURE 13: E3-1 ELECTRONICS SHELF - INSTALLATION [Group 1-5, Configuration 1] ....... 1 3 4
FIGURE 14: W4471 WIRE BUNDLE ROUTING [Group 1-2, 5, Configuration 1] ............ 1 3 8
FIGURE 15: W4471 WIRE BUNDLE CHANGES [Group 1, Configuration 1] .............. 1 4 4
FIGURE 16: W4471 WIRE BUNDLE CHANGES [Group 2, Configuration 1] .............. 1 4 6
FIGURE 17: W4471 WIRE BUNDLE CHANGES [Group 5, Configuration 1] .............. 1 4 8
FIGURE 18: W4471 WIRE BUNDLE ROUTING [Group 3, Configuration 1] ............... 1 5 0
FIGURE 19: W4471 WIRE BUNDLE CHANGES [Group 3, Configuration 1] .............. 1 5 6
FIGURE 20: W4471 WIRE BUNDLE ROUTING [Group 4, Configuration 1] ............... 1 5 8
FIGURE 21: W4471 WIRE BUNDLE CHANGES [Group 4, Configuration 1] .............. 1 6 4
FIGURE 22: E3-1 ELECTRONICS SHELF - REMOVAL [Group 1, Configuration 2-3; Group 2, Configuration
2-3; Group 3, Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration 2-3] . 166
FIGURE 23: E3-1 ELECTRONICS SHELF - RELAY BRACKET ASSEMBLY - TORQUE NUTS [Group 1-5,
Configuration 2] ........................................ 1 6 9
FIGURE 24: E3-1 ELECTRONICS SHELF - RELAY BRACKET GROUND STUD - TORQUE NUTS AND
BOND RESISTANCE TESTS [Group 1-5, Configuration 2] ................. 1 7 2
FIGURE 25: E3-1 ELECTRONICS SHELF - INSTALLATION [Group 1, Configuration 2-3; Group 2,
Configuration 2-3; Group 3, Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration
2-3] ............................................... 1 7 6
FIGURE 26: E3-1 ELECTRONICS SHELF - WIRE BUNDLE AND NEW RELAY - INSPECTION AND
INSTALLATION CHANGE [Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3,
Configuration 2-3; Group 4, Configuration 2-3; Group 5, Configuration 2-3] ........ 1 8 0
FIGURE 27: E3-1 ELECTRONICS SHELF - WIRE BUNDLE AND NEW RELAY CLEARANCE - INSPECTION
[Group 1, Configuration 2-3; Group 2, Configuration 2-3; Group 3, Configuration 2-3; Group 4,
Configuration 2-3; Group 5, Configuration 2-3] ....................... 1 8 9
FIGURE 28: E3-1 ELECTRONICS SHELF - MODULE M531 - WIRE BUNDLE AND NEW RELAY
CLEARANCE - ADJUSTMENT [Group 1-3, 5, Configuration 1] .............. 1 9 1
FIGURE 29: E3-1 ELECTRONICS SHELF - MODULE M531 - WIRE BUNDLE AND NEW RELAY
CLEARANCE - ADJUSTMENT [Group 4, Configuration 1] ................. 1 9 3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
4 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 5

Commercial 
Airplanes
757
Service Bulletin
Revision Transmittal SheetNumber: 757-27A0152Original Issue: April 29, 2009
Revision 3: October 28, 2013
ATA System: 2760
SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings -
New Spoiler Control Module Relay Installation
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Notice of Proposed Rule Making FAA NPRM 2010-NM-199-AD, is related
to this service bulletin.
No more work is necessary on the airplane(s) changed in accordance with the Revision 2 of this service bulletin.
More work is necessary on the airplane(s) changed in accordance with the Original Issue or Revision 1, but not
Revision 2, of this service bulletin as given below.
– Operators that have incorporated the Original Issue, but not Revision 1 or Revision 2, must remove the
E3-1 electronics shelf and torque the relay bracket assembly installation nuts and ground stud nuts and
then do a bond resistance test between the relay bracket assemblies and terminal lugs on the ground studs.
Operators must also do a General Visual Inspection (GVI) to make sure the three new relays do not touch
the adjacent wire bundles. If the three new relays do not touch adjacent wire bundles no more work is
necessary. If any of the new relays are found to touch adjacent wire bundles, more work is necessary to
do a GVI of the same wire bundles for wire chafing damage, near the relays, and repair as necessary. The
three new relays must be removed and installed again on the opposite side of the same relay bracket
assembly, to prevent further wire bundle damage. This more work is identified as Configuration 2, for Groups
1 thru 5.
– Operators that have incorporated Revision 1, but not Revision 2, must do a General Visual Inspection (GVI)
to make sure the three new relays do not touch the adjacent wire bundles. If the three new relays do not
touch the adjacent wire bundles no more work is necessary. If any of the new relays are found to touch
adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing
damage, near the relays, and repair as necessary. The three new relays must be removed and installed
again on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage.
This more work is identified as Configuration 3, for Groups 1 thru 5.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
5 of 194

### Page 6

REASON FOR REVISION
This revision is sent to make improvements and corrections to illustrations, as a result of comments received
from operators. An alternative configuration of the E3-1 electronics shelf, applicable to Group 4, is added to the
illustrations in Figures 2, 12 and 20. In Figure 14 a connector reference is corrected to agree with the related
W4471 wire bundle change figures. In Figures 5, 6, 7, 9 and 11, Flag Note 6 and the related footnote are
corrected. Also, Figures 28 and 29 are added to give instructions to adjust wire bundles, if necessary, to make
space for the installation of the new bracket and relay on the E3-1 electronics shelf. Manpower, Operator Supplied
Materials and Accomplishment Instructions paragraphs are updated to include the new figures and consumable
parts necessary to adjust wire bundles. Module references and illustration locators are added throughout the
figures to clarify relay bracket installation locations and wire routing instructions.
These sections are changed:
1. Paragraph 1.A., Effectivity: Updated group configuration descriptions to include Revision 2.
2. Paragraph 1.G., Manpower: Tables updated.
3. Paragraph 1.J., References: Updated.
4. Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Added parts necessary for wire bundle
adjustment and footnote. Updated tape part number.
5. Paragraph 3.B., Work Instructions: Improved Step 6 and added optional work in Step 10 to adjust wire
bundles, in Configuration 1 instructions. Updated titles for Configuration 2 and 3 instructions.
6. Figure 2 Illustrations: Added locators and module references. Added alternate Group 4 configuration
for E3-1 electronics shelf. Updated footnote (c) in step table.
7. Figures 4, 8 and 10 Illustrations: Added locators and updated module references.
8. Figures 5, 6, 7, 9 and 11 Flag Note Table: Corrected More Data in Flag Note 6. Corrected Footnote
(b) or (c), referenced in Flag Note 10.
9. Figure 12 Illustrations: Added module references and alternate Group 4 configuration for E3-1 electronics
shelf.
10. Figure 14 Illustration: Corrected connector reference.
11. Figure 20 Illustration: Corrected view of E3-1 electronics shelf to show Group 4 configuration.
12. Figures 23, 24, 26 and 27 Illustrations: Added locators and module references as necessary.
13. Figure 28: Added - applicable to Groups 1-3 and 5, Configuration 1.
14. Figure 29: Added - applicable to Group 4, Configuration 1.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
6 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 7

REVISION HISTORY
April 29, 2009Original Issue:
June 30, 2010Revision 1:
May 25, 2012Revision 2:
October 28, 2013Revision 3:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
7 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 8

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
8 of 194
BOEING SERVICE BULLETIN 757-27A0152
BLANK PAGE

### Page 9

Commercial 
Airplanes
757
Service Bulletin
SummaryNumber: 757-27A0152Original Issue: April 29, 2009
Revision 3: October 28, 2013
ATA System: 2760
SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings -
New Spoiler Control Module Relay Installation
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to install new relays adjacent to the Spoiler Control Modules (SCM's).
The new relays will ground a pin at each of the SCM's, M530 spoiler control module 1L and M531 spoiler control
module 2L, when landing flaps are selected and prevent deployment of spoiler pairs 1 and 12, and, 5 and 8,
during landing operations. If this service bulletin is not done, under certain gusty and windy conditions during
landing, the airplane could potentially be put in an unsafe condition because of excessive lateral control.
Boeing has received twelve reports of 757 in-service events where the flight crew reported unwanted lateral
oscillations during the final approach just before landing. The oscillations are characterized by large wheel inputs
at high rates that are out of phase with airplane response. Pilot inputs being out of phase with airplane response
is known as Pilot Induced Oscillation (PIO). PIO's are often related to tasks where the pilot is trying to precisely
and quickly accomplish a flight maneuver, such as the final phase of a landing in gusty and turbulent wind
conditions. To help reduce PIO's Boeing issued Service Bulletin 757-27A0146 (757-200's) and Service Bulletin
757-27A0147 (757-300's) which install a wheel damper to the first officer's lateral control quadrant, and Service
Bulletin 757-57A0058 (757-200's) which installs vortex generators on the leading edge of each outboard main
flap. This service bulletin adds another level of protection to further reduce the chance of PIO's on the 757
airplanes.
The two spoiler pairs 1 and 12, and, 5 and 8, will be disabled from responding to control wheel commands when
the flaps are in the landing configuration by the use of relays to ground pins at each affected SCM. The speedbrake
operation will be unaffected in-air and during on-ground operation. The airplane will be protected for the most
important hydraulic system failures by re-engaging the spoiler pairs 1 and 12 if the right hydraulic system fails.
Accomplishment of the service bulletin will reduce the lateral control capability at landing flap (detent 25 and
detent 30) by disabling spoiler pairs 1 and 12, and, 5 and 8, during landing operations. Disablement of these
spoiler pairs will reduce the chance of a PIO occurrence.
Boeing Service Related Problem (SRP) 757-SRP-27-0182 is related to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane ND310 by Service
Bulletin 757-27A0152 Original Issue before the release of Revision 1 of this service bulletin. The change
completed on airplane ND310 by Service Bulletin 757-27A0152 Original Issue is equivalent to the release of
Revision 1 of this service bulletin. Airplane ND310 has the configuration of a Group 2 airplane.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
9 of 194

### Page 10

ACTION (PRR 54530-278RS)
Group 1-5, Configuration 1:
Get access to the Electronic Equipment Bay (E/E Bay) and remove the E3-1 electronics shelf from the airplane.
Make changes to the E3-1 electronics shelf to install three new bracket assemblies, three new relays, and to
make changes to wire bundle W1265. Install the E3-1 electronics shelf to the airplane and make changes to
wire bundle W4471 between the E3-1 electronics shelf and the E5-1 electronics shelf. Do a test of the
Spoiler/Speedbrake Control System.
Group 1-5, Configuration 2:
Get access to the Electronic Equipment Bay (E/E Bay) and remove the E3-1 electronics shelf from the airplane.
Torque the relay bracket assembly installation nuts and ground stud nuts and then do a bond resistance test
between the relay bracket assemblies and terminal lugs on the ground studs. Do a General Visual Inspection
(GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the three new relays do not
touch the adjacent wire bundles no more work is necessary. If any of the new relays are found to touch adjacent
wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing damage, near the
relays, and repair as necessary. The three new relays must be removed and installed again on the opposite
side of the same relay bracket assembly, to prevent further wire bundle damage. Test all disconnected wiring.
Install the E3-1 electronics shelf to the airplane.
Group 1-5, Configuration 3:
Get access to the Electronic Equipment Bay (E/E Bay) and the E3-1 electronics shelf. Do a General Visual
Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the three new
relays do not touch the adjacent wire bundles no more work is necessary. If any of the new relays are found to
touch adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing
damage, near the relays, and repair as necessary. The three new relays must be removed and installed again
on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage. Test all
disconnected wiring as necessary. Install the E3-1 electronics shelf to the airplane, if necessary.
EFFECTIVITY
All 757-200, -200CB, -200PF, -300 Airplanes. Refer to Paragraph 1.A., Effectivity, for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Notice of Proposed Rule Making FAA NPRM 2010-NM-199-AD, is related
to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months after the original
issue date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the test procedures given in this service bulletin.
MANPOWER
Refer to Service Bulletin Manpower Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
10 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 11 (OCR)

BOEING SERVICE BULLETIN 757-27A0152
Refer to Paragraph 2.A., Material - Price and Availability.
GROUP 1-5, CONFIGURATION 1:
E3-1 ELECTRONICS SHELF:
-REMOVE ELECTRONICS SHELF.
-CHANGE WIRE BUNDLES
W1265 AND W4471.
-INSTALL CHANGED
ELECTRONICS SHELF.
K10877
GROUP 1-5, CONFIGURATION 1:  K10878
E5-1 ELECTRONICS SHELF:
-CHANGE WIRE BUNDLE W4471.
K10876
GROUP 1-5, CONFIGURATION 1:
-INSTALL NEW BRACKET
ASSEMBLIES AND RELAYS.
-CHANGE WIRE BUNDLE
W1265.
W1265
E3-1 ELECTRONICS SHELF
(TYPICAL INSTALLATION)
GROUP 1-5, CONFIGURATION 2 AND 3:
-DO A GVI TO MAKE SURE THE NEW
RELAYS AND ADJACENT WIRE BUNDLES DO NOT TOUCH, IF FOUND TO TOUCH.
-DO A GVI FOR WIRE CHAFING DAMAGE, OF WIRE BUNDLES ADJACENT TO THE NEW RELAYS.
REPAIR THE WIRE BUNDLES IF NECESSARY.
-CHANGE RELAY INSTALLATION.
CONFIGURATION 2 ONLY:
-REMOVE ELECTRONICS SHELF.
-TORQUE BRACKET ASSEMBLY INSTALLATION NUTS AND GROUND STUD NUTS.
-DO A BOND RESISTANCE TEST BETWEEN THE NEW BRACKET ASSEMBLIES AND THE
TERMINAL LUGS.
-INSTALL ELECTRONICS SHELF.
Original Issue: April 29, 2009
Revision 3: October 28, 2013  Export Controlled ECCN: 9E991 - BOEING  757-27A0152
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  11 of 194

### Page 12

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
12 of 194
BOEING SERVICE BULLETIN 757-27A0152
BLANK PAGE

### Page 13

Commercial 
Airplanes
757
Service Bulletin
Number: 757-27A0152
Original Issue: April 29, 2009
Revision 3: October 28, 2013
ATA System: 2760
SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings -
New Spoiler Control Module Relay Installation
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D624N001 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR 54530-278RS for data about
this change.
DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with Wiring Configuration Differences.-1
Airplanes with Wiring Configuration Differences that have not
accomplished the Original Issue, Revision 1 or Revision 2 of this
service bulletin.
1
Airplanes with Wiring Configuration Differences that have
accomplished the Original Issue of this service bulletin, but not
Revision 1 or Revision 2.
2
Airplanes with Wiring Configuration Differences that have
accomplished Revision 1 of this service bulletin, but not Revision 2.
3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
13 of 194

### Page 14

DESCRIPTIONCONFIGURATIONGROUP
757-200, -200CB, -200PF airplanes with Wiring Configuration
Differences.
-2
Airplanes with Wiring Configuration Differences that have not
accomplished the Original Issue, Revision 1 or Revision 2 of this
service bulletin.
1
Airplanes with Wiring Configuration Differences that have
accomplished the Original Issue of this service bulletin, but not
Revision 1 or Revision 2.
2
Airplanes with Wiring Configuration Differences that have
accomplished Revision 1 of this service bulletin, but not Revision 2.
3
757-300 airplanes with Wiring Configuration Differences.-3
Airplanes with Wiring Configuration Differences that have not
accomplished the Original Issue, Revision 1 or Revision 2 of this
service bulletin.
1
Airplanes with Wiring Configuration Differences that have
accomplished the Original Issue of this service bulletin, but not
Revision 1 or Revision 2.
2
Airplanes with Wiring Configuration Differences that have
accomplished Revision 1 of this service bulletin, but not Revision 2.
3
757-200, -300 airplanes with Wiring Configuration Differences.-4
Airplanes with Wiring Configuration Difference that have not
accomplished the Original Issue, Revision 1 or Revision 2 of this
service bulletin.
1
Airplanes with Wiring Configuration Differences that have
accomplished the Original Issue of this service bulletin, but not
Revision 1 or Revision 2.
2
Airplanes with Wiring Configuration Differences that have
accomplished Revision 1 of this service bulletin, but not Revision 2.
3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
14 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 15

DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with Wiring Configuration Differences.-5
Airplanes with Wiring Configuration Differences that have not
accomplished the Original Issue, Revision 1 or Revision 2 of this
service bulletin.
1
Airplanes with Wiring Configuration Differences that have
accomplished the Original Issue of this service bulletin, but not
Revision 1 or Revision 2.
2
Airplanes with Wiring Configuration Differences that have
accomplished Revision 1 of this service bulletin, but not Revision 2.
3
Airplane Models:
757-200, 757-200CB, 757-200PF, 757-300
GroupVariable Number
1NA002 - NA028
1NA191 - NA199
1NA201 - NA239
1NA301 - NA305
1NA341 - NA352
1NA391 - NA399
1NA401 - NA408
1NA441 - NA447
2NA501 - NA586
2NB001 - NB004
2NB021 - NB023
2NB036 - NB041
2NB051 - NB053
2NB061 - NB073
2NB079
2NB131 - NB148
2NB161 - NB162
2NB166 - NB168
1NB201 - NB204
1NB221 - NB228
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
15 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 16

GroupVariable Number
1NB230
1NB236
1NB239
2NB261 - NB267
2NB291 - NB299
2NB301 - NB302
2NB311 - NB312
2NB321 - NB331
2NB421 - NB438
2NB446
2NB451 - NB454
2NB501 - NB523
2NB561
2NB571
2NB581 - NB583
2NC001 - NC033
2NC041 - NC042
2NC051 - NC052
2NC056 - NC062
2NC066 - NC084
2NC091 - NC094
2NC151
2NC161
2NC901 - NC951
2NC971 - NC974
2ND001 - ND007
2ND011 - ND059
2ND111 - ND113
2ND161 - ND199
2ND201 - ND203
2ND221 - ND225
2ND241 - ND248
2ND301 - ND322
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
16 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 17

GroupVariable Number
2ND401
2ND891
2ND895
2NE001 - NE008
2NE011 - NE088
2NE091 - NE094
2NE141 - NE150
1NE161 - NE177
2NE201 - NE204
2NE301 - NE302
2NE311 - NE325
4NJ001 - NJ004
4NJ031 - NJ032
4NJ551 - NJ555
3NL001 - NL002
3NL006 - NL017
4NL101 - NL109
4NL141
4NL601 - NL616
2NN001 - NN002
2NN051 - NN052
2NP901 - NP904
2NS601 - NS616
2NT001 - NT009
2NT201 - NT202
1NT231 - NT234
1NT237 - NT240
1NT242
1NT245 - NT248
2NT281 - NT289
2NT341 - NT347
2NT351 - NT360
2NT371 - NT373
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
17 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 18

GroupVariable Number
2NT375 - NT379
1NT381 - NT386
2NT401 - NT403
5NT404 - NT409
2NT411 - NT412
2NT426 - NT427
2NT431 - NT432
2NT436 - NT438
2NT441 - NT442
2NT446
2NT701 - NT769
2NT791 - NT796
2NT861 - NT862
2NT881 - NT885
2NT901 - NT916
2NT971 - NT985
2NU031 - NU038
3NU701 - NU705
3NU721 - NU728
3NU731 - NU732
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to install new relays adjacent to the Spoiler Control Modules
(SCM's). The new relays will ground a pin at each of the SCM's, M530 spoiler control module 1L and
M531 spoiler control module 2L, when landing flaps are selected and prevent deployment of spoiler
pairs 1 and 12, and, 5 and 8, during landing operations. If this service bulletin is not done, under certain
gusty and windy conditions during landing, the airplane could potentially be put in an unsafe condition
because of excessive lateral control.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
18 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 19

Boeing has received twelve reports of 757 in-service events where the flight crew reported unwanted
lateral oscillations during the final approach just before landing. The oscillations are characterized by
large wheel inputs at high rates that are out of phase with airplane response. Pilot inputs being out of
phase with airplane response is known as pilot induced oscillation (PIO). PIO's are often related to
tasks where the pilot is trying to precisely and quickly accomplish a flight maneuver, such as the final
phase of a landing in gusty and turbulent wind conditions. To help reduce PIO's Boeing issued Service
Bulletin 757-27A0146 (757-200's) and Service Bulletin 757-27A0147 (757-300's) which install a wheel
damper to the first officer's lateral control quadrant, and Service Bulletin 757-57A0058 (757-200's)
which installs vortex generators on the leading edge of each outboard main flap. This service bulletin
adds another level of protection to further reduce the chance of PIO's on the 757 airplanes.
The two spoiler pairs 1 and 12, and, 5 and 8, will be disabled from responding to control wheel commands
when the flaps are in the landing configuration by the use of relays to ground pins at each affected
SCM. The speedbrake operation will be unaffected in-air and during on-ground operation. The airplane
will be protected for the most important hydraulic system failures by re-engaging the spoiler pairs 1
and 12 if the right hydraulic system fails.
Accomplishment of the service bulletin will reduce the lateral control capability at landing flap (detent
25 and detent 30) by disabling spoiler pairs 1 and 12, and, 5 and 8, during landing operations.
Disablement of these spoiler pairs will reduce the chance of a PIO occurrence.
Boeing Service Related Problem (SRP) 757-SRP-27-0182 is related to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane ND310 by
Service Bulletin 757-27A0152 Original Issue before the release of Revision 1 of this service bulletin.
The change completed on airplane ND310 by Service Bulletin 757-27A0152 Original Issue is equivalent
to the release of Revision 1 of this service bulletin. Airplane ND310 has the configuration of a Group
2 airplane.
Revision 1 is sent to correct discrepancies found during the validation of the original issue of this service
bulletin.
Revision 2 is sent to install the three new relays, and related relay sockets, on the opposite side of the
same relay bracket assembly. Changes to the position of the relays will improve wire routing and
maintenance access to the relays and prevent possible wire chafing on adjacent wire bundles. General
Visual Inspections are added to the more work required for changed airplanes, because of the possibility
of wire chafing damage, and the relay installation change is also added, as necessary. This revision
installs the relay bracket assemblies with two screws, instead of three, to improve edge margins. Notes
are added, in Figures 2, 5, 6, 7, 9 and 11, to give more data on relay bracket assembly installation,
wire bundle clearances and sleeving. Figures 4, 8 and 10 are changed to show the correct W1265 wire
routing from M532 and Figure 10 is updated to agree with the Group 4 configuration of the E3-1
electronics shelf. In the work instructions four circuit breakers are added, that must be opened before
wiring changes are done and the order of the work has been improved. Compliance to FAA Notice of
Proposed Rule Making (NPRM) is added.
Revision 3 is sent to make improvements and corrections to illustrations, as a result of comments
received from operators. An alternative configuration of the E3-1 electronics shelf, applicable to Group
4, is added to the illustrations in Figures 2, 12 and 20. In Figure 14 a connector reference is corrected
to agree with the related W4471 wire bundle change figures. In Figures 5, 6, 7, 9 and 11, Flag Note 6
and the related footnote are corrected. Also, Figures 28 and 29 are added to give instructions to adjust
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
19 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 20

wire bundles, if necessary, to make space for the installation of the new bracket and relay on the E3-1
electronics shelf. Manpower, Operator Supplied Materials and Accomplishment Instructions paragraphs
are updated to include the new figures and consumable parts necessary to adjust wire bundles. Module
references and illustration locators are added throughout the figures to clarify relay bracket installation
locations and wire routing instructions.
D. Description
Group 1-5, Configuration 1:
Get access to the Electronic Equipment Bay (E/E Bay) and remove the E3-1 electronics shelf from the
airplane. Make changes to the E3-1 electronics shelf to install three new bracket assemblies, three
new relays, and to make changes to wire bundle W1265. Install the E3-1 electronics shelf to the airplane
and make changes to wire bundle W4471 between the E3-1 electronics shelf and the E5-1 electronics
shelf. Do a test of the Spoiler/Speedbrake Control System.
Group 1-5, Configuration 2:
Get access to the Electronic Equipment Bay (E/E Bay) and remove the E3-1 electronics shelf from the
airplane. Torque the relay bracket assembly installation nuts and ground stud nuts and then do a bond
resistance test between the relay bracket assemblies and terminal lugs on the ground studs. Do a
General Visual Inspection (GVI) to make sure the three new relays do not touch the adjacent wire
bundles. If the three new relays do not touch the adjacent wire bundles no more work is necessary. If
any of the new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI
of the same wire bundles for wire chafing damage, near the relays, and repair as necessary. The three
new relays must be removed and installed again on the opposite side of the same relay bracket
assembly, to prevent further wire bundle damage. Test all disconnected wiring. Install the E3-1 electronics
shelf to the airplane.
Group 1-5, Configuration 3:
Get access to the Electronic Equipment Bay (E/E Bay) and the E3-1 electronics shelf. Do a General
Visual Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If
the three new relays do not touch the adjacent wire bundles no more work is necessary. If any of the
new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI of the same
wire bundles for wire chafing damage, near the relays, and repair as necessary. The three new relays
must be removed and installed again on the opposite side of the same relay bracket assembly, to
prevent further wire bundle damage. Test all disconnected wiring as necessary. Install the E3-1
electronics shelf to the airplane, if necessary.
Revision 1 - More work is necessary on airplanes changed in accordance with the original issue of this
service bulletin. The Work Instructions to do bond resistance tests between the bracket assemblies
and the terminal lugs on the ground studs were not included in the original issue of this service bulletin.
Also, the Work Instructions to torque the bracket assembly installation nuts, and the bracket assembly
ground stud nuts were not included in the original issue of this service bulletin.
Revision 2 - More work is necessary on the airplane(s) changed in accordance with the Original Issue
or Revision 1 of this service bulletin as given below.
Operators that have incorporated the Original Issue, but not Revision 1, must remove the E3-1 electronics
shelf and torque the relay bracket assembly installation nuts and ground stud nuts and then do a bond
resistance test between the relay bracket assemblies and terminal lugs on the ground studs. Operators
must also do a General Visual Inspection (GVI) to make sure the three new relays do not touch the
adjacent wire bundles. If the three new relays do not touch adjacent wire bundles no more work is
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
20 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 21

necessary. If any of the new relays are found to touch adjacent wire bundles, more work is necessary
to do a GVI of the same wire bundles for wire chafing damage, near the relays, and repair as necessary.
The three new relays must be removed and installed again on the opposite side of the same relay
bracket assembly, to prevent further wire bundle damage. This more work is identified by Configuration
2, applicable to groups 1 thru 5.
Operators that have incorporated Revision 1, must do a General Visual Inspection (GVI) to make sure
the three new relays do not touch the adjacent wire bundles. If the three new relays do not touch
adjacent wire bundles no more work is necessary. If any of the new relays are found to touch adjacent
wire bundles, more work is necessary to do a GVI of the same wire bundles for wire chafing damage,
near the relays, and repair as necessary. The three new relays must be removed and installed again
on the opposite side of the same relay bracket assembly, to prevent further wire bundle damage. This
more work is identified by Configuration 3, applicable to groups 1 thru 5.
NOTE: At Revision 2 a change has been made to install the new relay bracket assemblies with two
screws, instead of three, to improve edge margins when match drilling to the existing holes
on the E3-1 electronics shelf. For airplanes changed in accordance with the Original Issue,
or Revision 1 (Configuration 2 or 3), that use the three screw configuration, no more work is
necessary to change the existing relay bracket assemblies.
Revision 3:
No more work is necessary on the airplane(s) changed in accordance with the Revision 2 of this service
bulletin.
More work is necessary on the airplane(s) changed in accordance with the Original Issue or Revision
1, but not Revision 2, of this service bulletin as given below.
– Operators that have incorporated the Original Issue, but not Revision 1 or Revision 2, must remove
the E3-1 electronics shelf and torque the relay bracket assembly installation nuts and ground stud
nuts and then do a bond resistance test between the relay bracket assemblies and terminal lugs
on the ground studs. Operators must also do a General Visual Inspection (GVI) to make sure the
three new relays do not touch the adjacent wire bundles. If the three new relays do not touch
adjacent wire bundles no more work is necessary. If any of the new relays are found to touch
adjacent wire bundles, more work is necessary to do a GVI of the same wire bundles for wire
chafing damage, near the relays, and repair as necessary. The three new relays must be removed
and installed again on the opposite side of the same relay bracket assembly, to prevent further
wire bundle damage. This more work is identified as Configuration 2, for Groups 1 thru 5.
– Operators that have incorporated Revision 1, but not Revision 2, must do a General Visual
Inspection (GVI) to make sure the three new relays do not touch the adjacent wire bundles. If the
three new relays do not touch the adjacent wire bundles no more work is necessary. If any of the
new relays are found to touch adjacent wire bundles, more work is necessary to do a GVI of the
same wire bundles for wire chafing damage, near the relays, and repair as necessary. The three
new relays must be removed and installed again on the opposite side of the same relay bracket
assembly, to prevent further wire bundle damage. This more work is identified as Configuration
3, for Groups 1 thru 5.
The work in this service bulletin is done in the maintenance zone(s) given below.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
21 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 22

Group 1, 5:
Affected Maintenance Zones
ZoneModel
119757-200
Group 2:
Affected Maintenance Zones
ZoneModel
119757-200, 757-200CB, 757-
200PF
Group 3:
Affected Maintenance Zones
ZoneModel
119757-300
Group 4:
Affected Maintenance Zones
ZoneModel
119757-200, 757-300
E. Compliance
Federal Aviation Administration (FAA) Notice of Proposed Rule Making FAA NPRM 2010-NM-199-AD,
is related to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months after the
original issue date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
22 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 23

G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
NOTE: The work in this service bulletin includes the removal and installation of the E3-1 electronics
shelf in the Main Equipment Center. The Manpower estimates that follow only include the
removal, installation and test of the flight Control System Electronics Unit (CSEU) modules.
If there are more modules installed on the E3-1 electronics shelf, that must be removed for
access, the estimates that follow must be increased, as applicable, to include all removals,
installations and tests.
Group 1, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 1
2.302.301FIGURE 2
0.600.601FIGURE 3
---FIGURE 4 (Wire Routing only)
8.6517.302FIGURE 5
0.500.501FIGURE 12
0.50 (a)0.50 (a)1FIGURE 28
0.500.501FIGURE 13
---FIGURE 14 (Wire Routing only)
3.703.701FIGURE 15
1.503.002Close Access
2.254.502Test
22.0035.90TOTAL FOR EACH AIRPLANE
(a) Add time to total if interference is found between wire bundles and new relay
brackets / assembles in FIGURE 12 and adjustment of wire bundles is nec-
essary. Task Hours given are for changes in one of three possible locations.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
23 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 24

Group 2, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 1
2.302.301FIGURE 2
0.600.601FIGURE 3
---FIGURE 4 (Wire Routing only)
8.6517.302FIGURE 6
0.500.501FIGURE 12
0.50 (a)0.50 (a)1FIGURE 28
0.500.501FIGURE 13
---FIGURE 14 (Wire Routing only)
0.800.801FIGURE 16
1.503.002Close Access
2.254.502Test
19.1033.00TOTAL FOR EACH AIRPLANE
(a) Add time to total if interference is found between wire bundles and new relay
brackets / assembles in FIGURE 12 and adjustment of wire bundles is nec-
essary. Task Hours given are for changes in one of three possible locations.
Group 3, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 1
2.302.301FIGURE 2
0.600.601FIGURE 3
---FIGURE 8 (Wire Routing only)
8.6517.302FIGURE 9
0.500.501FIGURE 12
0.50 (a)0.50 (a)1FIGURE 28
0.500.501FIGURE 13
---FIGURE 18 (Wire Routing only)
0.800.801FIGURE 19
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
24 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 25

Group 3, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Close Access
2.254.502Test
19.1033.00TOTAL FOR EACH AIRPLANE
(a) Add time to total if interference is found between wire bundles and new relay
brackets / assembles or FIGURE 12 and adjustment of wire bundles is nec-
essary. Task Hours given are for changes in one of three possible locations.
Group 4, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 1
2.302.301FIGURE 2
0.600.601FIGURE 3
---FIGURE 10 (Wire Routing only)
8.6517.302FIGURE 11
0.500.501FIGURE 12
0.50 (a)0.50 (a)1FIGURE 29
0.500.501FIGURE 13
---FIGURE 20 (Wire Routing only)
0.800.801FIGURE 21
1.503.002Close Access
2.254.502Test
19.1033.00TOTAL FOR EACH AIRPLANE
(a) Add time to total if interference is found between wire bundles and new relay
brackets / assembles in FIGURE 12 and adjustment of wire bundles is nec-
essary. Task Hours given are for changes in one of three possible locations.
Group 5, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
25 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 26

Group 5, Configuration 1:
Elapsed
Hours
Task HoursNumber of
Persons
Task
2.302.301FIGURE 2
0.600.601FIGURE 3
---FIGURE 4 (Wire Routing only)
8.6517.302FIGURE 7
0.500.501FIGURE 12
0.50 (a)0.50 (a)1FIGURE 28
0.500.501FIGURE 13
---FIGURE 14 (Wire Routing only)
3.803.801FIGURE 17
1.503.002Close Access
2.254.502Test
22.1036.00TOTAL FOR EACH AIRPLANE
(a) Add time to total if interference is found between wire bundles and new relay
brackets / assembles in FIGURE 12 and adjustment of wire bundles is nec-
essary. Task Hours given are for changes in one of three possible locations.
Group 1-5, Configuration 2:
MORE WORK - CONDITION: FOR AIRPLANES THAT HAVE INCORPORATED THE ORIGINAL
ISSUE, BUT NOT REVISION 1 OR REVISION 2
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 22
0.750.751FIGURE 23
0.500.501FIGURE 24
0.500.501FIGURE 27
1.001.001FIGURE 26 (a)
0.500.501FIGURE 25
1.503.002Close Access
1.503.002Test
8.2512.75TOTAL FOR EACH AIRPLANE (b)
(a) Only necessary if any of the three new relays are found to touch the adjacent
wire bundles in FIGURE 27.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
26 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 27

Group 1-5, Configuration 2:
MORE WORK - CONDITION: FOR AIRPLANES THAT HAVE INCORPORATED THE ORIGINAL
ISSUE, BUT NOT REVISION 1 OR REVISION 2
Elapsed
Hours
Task HoursNumber of
Persons
Task
(b) Manpower totals include time for FIGURE 26, that is a condition of FIGURE
27.
Group 1-5, Configuration 3:
MORE WORK - CONDITION: FOR AIRPLANES THAT HAVE INCORPORATED REVISION 1,
BUT NOT REVISION 2
Elapsed
Hours
Task HoursNumber of
Persons
Task
1.503.002Open Access
0.500.501FIGURE 27
0.500.501FIGURE 22 (a)
1.001.001FIGURE 26 (a)
0.500.501FIGURE 25 (a)
1.503.002Close Access
1.503.002Test (a)
7.0011.50TOTAL FOR EACH AIRPLANE (b)
(a) Only necessary if any of the three new relays are found to touch the adjacent
wire bundles in FIGURE 27.
(b) Manpower totals include time for FIGURE 22, FIGURE 25, FIGURE 26 and
Test, that are a condition of FIGURE 27.
H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+ 340+ 0.8All 757-200 airplanes
+ 220+ 0.8All 757-300 airplanes
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 54530-278RS.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
27 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 28

b. Boeing Service Bulletins 757-27A0146, 757-27A0147, 757-57A0058.
c. Boeing Service Related Problem (SRP) 757-SRP-27-0182.
d. Service Bulletin Index D624N001.
e. Standard Overhaul Practices Manual (SOPM) 20-11-03, 20-43-03, 20-50-05.
f. Standard Wiring Practices Manual (SWPM) 20-10-06, 20-10-11, 20-10-12, 20-10-13, 20-10-18,
20-10-19, 20-20-00, 20-20-10, 20-30-11, 20-30-12, 20-61-11 , 20-71-14, 20-74-11, 20-74-12,
20-81-19, 20-81-22, 20-90-11, 20-90-15.
g. 757 Aircraft Maintenance Manual (AMM) 20-11-00, 27-09-00, 29-11-00.
h. 757 Wiring Diagram Manual (WDM) 27-09-11, 27-09-13, 27-61-13, 27-61-17, 31-51-42.
i. Federal Aviation Administration (FAA) Notice of Proposed Rule Making FAA NPRM
2010-NM-199-AD.
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Equipment / Wire Installation, Reduction of Lateral Control at Landing Flaps012N0053
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes, and is not supplied with this service bulletin. The drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
27-09, 27-61, 31-51 and Equipment
List
757 Wiring Diagram Manual
27-41757 Illustrated Parts Catalog
27-61757 Aircraft Maintenance Manual
27-09, 27-61, 31-51757 System Schematic Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
28 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 29

L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
29 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 30

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
30 of 194
BOEING SERVICE BULLETIN 757-27A0152
BLANK PAGE

### Page 31

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page.
2. Fax to (206) 662-7145.
Group 1, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as of the
Revision 1 date
of this Service
Bulletin (Calen-
dar Days)
QTYDateNameKit Number
$4,691.0028040May 08, 2010TOP KIT - 757
REDUCTION OF
LATERAL CON-
TROL SENSITIV-
ITY AT LAND-
ING FLAPS
012N8932-15
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
31 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 32

Group 2, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as of the
Revision 1 date
of this Service
Bulletin (Calen-
dar Days)
QTYDateNameKit Number
$4,610.002801May 29, 2008TOP KIT - 757
REDUCTION OF
LATERAL CON-
TROL SENSITIV-
ITY AT LAND-
ING FLAPS
012N8932-16
195Aug 05, 2010
Group 3, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as of the
Revision 1 date
of this Service
Bulletin (Calen-
dar Days)
QTYDateNameKit Number
$4,619.002805Aug 05, 2010TOP KIT - 757
REDUCTION OF
LATERAL CON-
TROL SENSITIV-
ITY AT LAND-
ING FLAPS
012N8932-17
Group 4, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as of the
Revision 1 date
of this Service
Bulletin (Calen-
dar Days)
QTYDateNameKit Number
$4,610.002809Aug 05, 2010TOP KIT - 757
REDUCTION OF
LATERAL CON-
TROL SENSITIV-
ITY AT LAND-
ING FLAPS
012N8932-18
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
32 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 33

Group 5, Configuration 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin
(US Dollars)
ROLT as of the
Revision 1 date
of this Service
Bulletin (Calen-
dar Days)
QTYDateNameKit Number
$4,701.002801Aug 05, 2010TOP KIT - 757
REDUCTION OF
LATERAL CON-
TROL SENSITIV-
ITY AT LAND-
ING FLAPS
012N8932-19
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts:
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 012N8932
NotesNameQTYNew Part Number
-19-18-17-16-15
TOP KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
....-012N8932-15
TOP KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
...-.012N8932-16
TOP KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
..-..012N8932-17
TOP KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
.-...012N8932-18
TOP KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
-....012N8932-19
BRACKET ASSY - RELAY33333012N0053-3
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
....1280N3368-1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
33 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 34

Kit 012N8932
NotesNameQTYNew Part Number
-19-18-17-16-15
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
...1.280N3368-2
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
..1..280N3368-3
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
.1...280N3368-4
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
1....280N3368-5
NUT22222BACN10YR3CD
(b)NUT99999BACN10YR4CD
RELAY33333BACR13CE2
(a) (b)SCREW99999BACS12HN4-9
WASHER22222NAS1149D0316H
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits.
(b) There are more parts than are necessary.
Kit 280N3368
NotesNameQTYNew Part Number
-5-4-3-2-1
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
....-280N3368-1
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
...-.280N3368-2
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
..-..280N3368-3
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
.-...280N3368-4
WIRE KIT - 757 REDUCTION OF LATERAL
CONTROL SENSITIVITY AT LANDING FLAPS
-....280N3368-5
ASSY - W12651..11280N3368-101
ASSY - W1265..1..280N3368-102
ASSY - W1265.1...280N3368-103
ASSY - W4471....1280N3368-104
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
34 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 35

Kit 280N3368
NotesNameQTYNew Part Number
-5-4-3-2-1
ASSY - W4471...1.280N3368-105
ASSY - W4471..1..280N3368-106
ASSY - W4471.1...280N3368-107
ASSY - W44711....280N3368-108
ASSY - W126511111280N3368-109
Kit 280N3368
NotesNameQTYNew Part Number
-104-103-102-101
(b)ASSY - W1265...-280N3368-101
(b)ASSY - W1265..-.280N3368-102
(b)ASSY - W1265.-..280N3368-103
ASSY - W4471-...280N3368-104
TAPE, CONNECTOR ID.111280N3368-10101
TAPE, CONNECTOR ID.111280N3368-10102
TAPE, CONNECTOR ID.111280N3368-10103
SLEEVE, SPLICE ID.111280N3368-10104
SLEEVE, SPLICE ID.111280N3368-10105
SLEEVE, SPLICE ID.111280N3368-10106
SLEEVE, SPLICE ID.111280N3368-10107
SLEEVE, SPLICE ID.111280N3368-10108
SLEEVE, SPLICE ID.111280N3368-10109
LOCKSTITCH.111280N3368-10110
WIRE LIST...1280N3368-101W
WIRE LIST..1.280N3368-102W
WIRE LIST.1..280N3368-103W
SLEEVE, SPLICE ID1...280N3368-10401
LOCKSTITCH - RED1...280N3368-10402
WIRE LIST1...280N3368-104W
(a)CONTACT, PIN3...BACC47CN1S
(a)CONTACT, SOCKET...2BACC47CP1S
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
35 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 36

Kit 280N3368
NotesNameQTYNew Part Number
-104-103-102-101
(a)CONTACT, PIN.131313BACC47EF1
(a)CONTACT, SOCKET.363636BACC47ER1
(a)CONTACT.2..BACC47FK1A
RELAY SOCKET.333BACS16AF1
(a) (b)TERMINAL, LUG.777BACT12AC2
(a)CONTACT, SOCKET, SIZE 20..2.CTA-0165
(a)SPLICE SEALED CRIMP2...D-436-36
(a)WIRE SPLICE SLEEVE.777D-436-58
(a)CONTACT, PIN, CRIMP REMOVABLE, PER MIL-
C-39029/11
...4M39029/11-145
(a)CONTACT, PIN, SIZE 20.44.S280W555-920
(a) There are more parts than are necessary.
(b) See wire kit 280N3368-109 for alternative parts.
Kit 280N3368
NotesNameQTYNew Part Number
-109-108-107-106-105
ASSY - W4471....-280N3368-105
ASSY - W4471...-.280N3368-106
ASSY - W4471..-..280N3368-107
ASSY - W4471.-...280N3368-108
ASSY - W1265-....280N3368-109
SLEEVE, SPLICE ID.1111280N3368-10401
LOCKSTITCH - RED.1...280N3368-10402
LOCKSTITCH - RED..111280N3368-10502
WIRE LIST....1280N3368-105W
WIRE LIST...1.280N3368-106W
WIRE LIST..1..280N3368-107W
WIRE LIST1...280N3368-108W
WIRE LIST1....280N3368-109W
(a)CONTACT, PIN.3..2BACC47CN1S
(a)CONTACT..2..BACC47FJ1A
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
36 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 37

Kit 280N3368
NotesNameQTYNew Part Number
-109-108-107-106-105
(a)CONTACT, PIN, SIZE 20...2.CTA-0166
(a)SPLICE SEALED CRIMP.2222D-436-36
(a)TERMINAL, LUG7....BACT12AC3
(a) There are more parts than are necessary.
Kit 280N3368
NotesNameQTYNew Part Number
-10105-10104-10103-10102-10101
TAPE, CONNECTOR ID....-280N3368-10101
TAPE, CONNECTOR ID...-.280N3368-10102
TAPE, CONNECTOR ID..-..280N3368-10103
SLEEVE, SPLICE ID.-...280N3368-10104
SLEEVE, SPLICE ID-....280N3368-10105
TAPE, ID..111BACT19C-T
SLEEVE, IDENTIFICATION,
HEAT SHRINKABLE
11...BMS13-69D044B
Kit 280N3368
NotesNameQTYNew Part Number
-10110-10109-10108-10107-10106
SLEEVE, SPLICE ID....-280N3368-10106
SLEEVE, SPLICE ID...-.280N3368-10107
SLEEVE, SPLICE ID..-..280N3368-10108
SLEEVE, SPLICE ID.-...280N3368-10109
LOCKSTITCH-....280N3368-10110
SLEEVE, IDENTIFICATION,
HEAT SHRINKABLE
.1111BMS13-69D044B
BMS 13-541....NA374H2
Kit 280N3368
NotesNameQTYNew Part Number
-10502-10402-10401
SLEEVE, SPLICE ID..-280N3368-10401
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
37 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 38

Kit 280N3368
NotesNameQTYNew Part Number
-10502-10402-10401
LOCKSTITCH - RED.-.280N3368-10402
LOCKSTITCH - RED-..280N3368-10502
SLEEVE, IDENTIFICATION, HEAT SHRINK-
ABLE
..1BMS13-69D044B
BMS 13-54 GD TIII C1 FC LACING TAPE,
FLAT BRAID
11.NR331H
Kit 280N3368
NotesNameQTYNew Part Number
-104W-103W-102W-101W
WIRE LIST...-280N3368-101W
WIRE LIST..-.280N3368-102W
WIRE LIST.-..280N3368-103W
WIRE LIST-...280N3368-104W
WIRE.111BMS13-48T10C01G020
Wire, Identified as W1265-0737-20,
Length 4 Inches
.111-
Wire, Identified as W1265-0738-20,
Length 4 Inches
.111-
Wire, Identified as W1265-0739-20,
Length 4 Inches
.111-
Wire, Identified as W1265-0740-20,
Length 4 Inches
.111-
Wire, Identified as W1265-0741-20,
Length 4 Inches
.111-
Wire, Identified as W1265-0742-20,
Length 4 Inches
.111-
WIRE1111BMS13-48T10C01G022
Wire, Identified as W1265-0734-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0735-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0736-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0743-22,
Length 12 Inches
.111-
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
38 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 39

Kit 280N3368
NotesNameQTYNew Part Number
-104W-103W-102W-101W
Wire, Identified as W1265-0744-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0745-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0746-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0747-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0748-22,
Length 24 Inches
.111-
Wire, Identified as W1265-0749-22,
Length 24 Inches
.111-
Wire, Identified as W1265-0750-22,
Length 12 Inches
.111-
Wire, Identified as W1265-0751-22,
Length 12 Inches
.111-
Wire, Identified as W4471-0285-22,
Length 312 Inches
1...-
Wire, Identified as W4471-0575-22,
Length 24 Inches
1...-
WIRE.111BMS13-48T10C02G022
Wire, Identified as W1265-2061B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2062B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2063B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2064B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2065B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2066B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2067B/R-
22, Length 16 Inches
.111-
Wire, Identified as W1265-2068B/R-
22, Length 16 Inches
.111-
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
39 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 40

Kit 280N3368
NotesNameQTYNew Part Number
-104W-103W-102W-101W
Wire, Identified as W1265-2069B/R-
22, Length 16 Inches
.111-
Kit 280N3368
NotesNameQTYNew Part Number
-109W-108W-107W-106W-105W
WIRE LIST....-280N3368-105W
WIRE LIST...-.280N3368-106W
WIRE LIST..-..280N3368-107W
WIRE LIST.-...280N3368-108W
WIRE LIST-....280N3368-109W
WIRE11111BMS13-48T10C01G022
Wire, Identified as W4471-0285-
22, Length 312 Inches
.1...-
Wire, Identified as W4471-0575-
22, Length 24 Inches
.1111-
Wire, Identified as W1265-0743-
22, Length 24 Inches
1....-
Wire, Identified as W1265-0745-
22, Length 16 Inches
1....-
Wire, Identified as W1265-0746-
22, Length 24 Inches
1....-
WIRE1....BMS13-48T10C02G022
Wire, Identified as W1265-
2064B/R-22, Length 30 Inches
1....-
Wire, Identified as W1265-
2065B/R-22, Length 30 Inches
1....-
Wire, Identified as W1265-
2066B/R-22, Length 30 Inches
1....-
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
40 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 41

2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Specifica-
tion
Use BMS
5-95 Class
B-2, Type 1
or BMS 5-
95 Class B-
1/2, Type 1
sealant. (a)
SEALANT4 ozBMS 5-95
Or equiva-
lent. (b)
DYMO TAPE6 inchesDymo 358 (3M 425 optional)
Standard
wall, diame-
ter 1 inch
(c)
SLEEVE, TEFLON24 inchesTFE 2X
(d)CHEMICAL CONVERSION
COATING (ALODINE)
--
(a) (f)LACING TAPEAs NecessaryBMS 13-54, Type 3, Class 1
Size as
necessary -
match color
to existing
use. (e) (f)
TIE STRAP, PLASTICAs NecessaryBACS38K10( )
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) Dymo Corporation, 44 Commerce Road Stamford, CT. 06902-4561. Voice Phone Number: 203-
355-9000 Fax Phone Number: 203-355-9071. Cage Code: 0TH24.
(c) Zeus Industrial Products, 620 Magnolia St, P.O. Box 2167, Orangeburg, SC. 29116-2167. Cage
Code: 6Y609.
(d) Refer to SOPM 20-43-03 for more data on chemical conversion coating.
(e) Refer to SWPM 20-10-11 and SWPM 20-10-19 for more information.
(f) These parts are only necessary if interference is found between wire bundles and new relay
brackets / assembles in FIGURE 12 and adjustment of wire bundles is necessary.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
41 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 42

D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
42 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 43

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are given in 757 SRM, Chapter 51
– Torque limits to tighten nuts and bolts are given in 757 SRM, Chapter 51
4. For approved fastener and process material substitutions, refer to 757 SRM, Chapter
51. Alternate fasteners are given in 757 SRM Chapter 51 and Boeing Drawing
65-88700.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements.
6. If the length of any fastener specified in this service bulletin does not meet the
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used. In addition, washers may be
installed for fastener grip length in accordance with SRM Chapter 51.
7. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
43 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 44

9. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
10. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
11. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
The removed part can be discarded if a new or serviceable part is installed.
12. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
B. WORK INSTRUCTIONS
Group 1, Configuration 1:
1. Open the circuit breakers that follow and attach "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
2. Get access to the E3-1 electronics shelf in the Main Equipment Center.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
44 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 45

3. Remove the flight Control System Electronics Unit (CSEU) modules from E3-1 electronics shelf.
Refer to 757 AMM 27-09-00 as an accepted procedure.
4. Disconnect and stow all electrical connectors from the E3-1 electronics shelf disconnect bracket
AE0301. Refer to SWPM 20-10-11 as an accepted procedure.
5. Remove the E3-1 electronics shelf from the airplane in accordance with FIGURE 1.
6. Install the three new bracket assemblies on the E3-1 electronics shelf, adjacent to the location of
Modules M530, M531 and M522, in accordance with FIGURE 2.
7. Remove the wire bundle pin strapping from the Spoiler Control Modules M530 and M531 in
accordance with FIGURE 3.
8. Change the W1265 wire bundle, on the E3-1 electronics shelf in accordance with FIGURE 4 and
FIGURE 5.
9. Do a continuity check of the new and changed wires in the E3-1 electronics shelf.
10. Install the new relays K10876, K10877, and K10878 to the new bracket assemblies, on the E3-1
electronics shelf in accordance with FIGURE 12.
a. If wire bundles on the E3-1 electronics shelf, connected to Modules M530, M531 or M522,
interfere with the installation of any of the new relays or brackets, adjust the wire bundle and
install a sleeve, as necessary, in accordance with FIGURE 28.
NOTE: FIGURE 28 shows only the module related to relay K10878. Use the same instruction
to adjust and sleeve wire bundles near to modules related to relays K10876 and
K10877, if necessary.
11. Install the E3-1 electronics shelf to the airplane in accordance with FIGURE 13.
12. Disconnect electrical connector D41325P (position 16) from the E5-1 electronics shelf disconnect
bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
13. Change the W4471 wire bundle, on the E3-1 electronic shelf and the E5-1 electronics shelf in
accordance with FIGURE 14 and FIGURE 15.
14. Do a continuity check of the new and changed wires in the E3-1 electronics shelf and the E5-1
electronics shelf.
15. Connect all electrical connectors to the E3-1 electronics shelf disconnect bracket AE0301. Refer
to SWPM 20-10-11 as an accepted procedure.
16. Connect electrical connector D41325P to the E5-1 electronics shelf disconnect bracket AE0501.
Refer to SWPM 20-10-11 as an accepted procedure.
17. Install the flight Control System Electronics Unit (CSEU) modules on E3-1 electronics shelf. Refer
to 757 AMM 27-09-00 as an accepted procedure.
18. Close the circuit breakers that follow and remove the "DO-NOT-CLOSE" tags:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
45 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 46

NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
19. Do the CSEU Modules Installation Test. Refer to 757 AMM 27-09-00 as an accepted procedure.
20. Do the operational test of the Spoiler/Speedbrake Control System in accordance with the following
accomplishment instructions for this group.
Group 2, Configuration 1:
1. Open the circuit breakers that follow and attach "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
46 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 47

NumberNamePanel / Location
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
2. Get access to the E3-1 electronics shelf in the Main Equipment Center.
3. Remove the flight Control System Electronics Unit (CSEU) modules from E3-1 electronics shelf.
Refer to 757 AMM 27-09-00 as an accepted procedure.
4. Disconnect and stow all electrical connectors from the E3-1 electronics shelf disconnect bracket
AE0301. Refer to SWPM 20-10-11 as an accepted procedure.
5. Remove the E3-1 electronics shelf from the airplane in accordance with FIGURE 1.
6. Install the three new bracket assemblies, on the E3-1 electronics shelf, adjacent to the location of
Modules M530, M531 and M522, in accordance with FIGURE 2.
7. Remove the wire bundle pin strapping from the Spoiler Control Modules M530 and M531 in
accordance with FIGURE 3.
8. Change the W1265 wire bundle, on the E3-1 electronics shelf in accordance with FIGURE 4 and
FIGURE 6.
9. Do a continuity check of the new and changed wires in the E3-1 electronics shelf.
10. Install the new relays K10876, K10877, and K10878 to the new bracket assemblies, on the E3-1
electronics shelf in accordance with FIGURE 12.
a. If wire bundles on the E3-1 electronics shelf, connected to Modules M530, M531 or M522,
interfere with the installation of any of the new relays or brackets, adjust the wire bundle and
install a sleeve, as necessary, in accordance with FIGURE 28.
NOTE: FIGURE 28 shows only the module related to relay K10878. Use the same instruction
to adjust and sleeve wire bundles near to modules related to relays K10876 and
K10877, if necessary.
11. Install the E3-1 electronics shelf to the airplane in accordance with FIGURE 13.
12. Disconnect electrical connectors D41325P (position 16) and D42187P (position 17) from the E5-1
electronics shelf disconnect bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
13. Change the W4471 wire bundle, on the E3-1 electronic shelf and the E5-1 electronics shelf in
accordance with FIGURE 14 and FIGURE 16.
14. Do a continuity check of the new and changed wires in the E3-1 electronics shelf and the E5-1
electronics shelf.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
47 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 48

15. Connect all electrical connectors to the E3-1 electronics shelf disconnect bracket AE0301. Refer
to SWPM 20-10-11 as an accepted procedure.
16. Connect electrical connectors D41325P and D42187P to the E5-1 electronics shelf disconnect
bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
17. Install the flight Control System Electronics Unit (CSEU) modules on E3-1 electronics shelf. Refer
to 757 AMM 27-09-00 as an accepted procedure.
18. Close the circuit breakers that follow and remove the "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
19. Do the CSEU Modules Installation Test. Refer to 757 AMM 27-09-00 as an accepted procedure.
20. Do the operational test of the Spoiler/Speedbrake Control System in accordance with the following
accomplishment instructions for this group.
Group 3, Configuration 1:
1. Open the circuit breakers that follow and attach "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
Airplanes without Yaw Damper / Stabilizer Trim Module
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
48 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 49

NumberNamePanel / Location
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
Airplanes with Yaw Damper / Stabilizer Trim Module
C1560YAW DAMPER LP11 / A18
C1538CSEU 1L AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L DC orP11 / C9
FLT CONT ELEC 2L DC
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
2. Get access to the E3-1 electronics shelf in the Main Equipment Center.
3. Remove the flight Control System Electronics Unit (CSEU) modules from E3-1 electronics shelf.
Refer to 757 AMM 27-09-00 as an accepted procedure.
4. Disconnect and stow all electrical connectors from the E3-1 electronics shelf disconnect bracket
AE0301. Refer to SWPM 20-10-11 as an accepted procedure.
5. Remove the E3-1 electronics shelf from the airplane in accordance with FIGURE 1.
6. Install the three new bracket assemblies, on the E3-1 electronics shelf, adjacent to the location of
Modules M530, M531 and M522, in accordance with FIGURE 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
49 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 50

7. Remove the wire bundle pin strapping from the Spoiler Control Modules M530 and M531 in
accordance with FIGURE 3.
8. Change the W1265 wire bundle, on the E3-1 electronics shelf in accordance with FIGURE 8 and
FIGURE 9.
9. Do a continuity check of the new and changed wires in the E3-1 electronics shelf.
10. Install the new relays K10876, K10877, and K10878 to the new bracket assemblies, on the E3-1
electronics shelf in accordance with FIGURE 12.
a. If wire bundles on the E3-1 electronics shelf, connected to Modules M530, M531 or M522,
interfere with the installation of any of the new relays or brackets, adjust the wire bundle and
install a sleeve, as necessary, in accordance with FIGURE 28.
NOTE: FIGURE 28 shows only the module related to relay K10878. Use the same instruction
to adjust and sleeve wire bundles near to modules related to relays K10876 and
K10877, if necessary.
11. Install the E3-1 electronics shelf to the airplane in accordance with FIGURE 13.
12. Disconnect electrical connectors D41325P (position 12) and D42187P (position 17) from the E5-1
electronics shelf disconnect bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
13. Change the W4471 wire bundle, on the E3-1 electronic shelf and the E5-1 electronics shelf in
accordance with FIGURE 18 and FIGURE 19.
14. Do a continuity check of the new and changed wires in the E3-1 electronics shelf and the E5-1
electronics shelf.
15. Connect all electrical connectors to the E3-1 electronics shelf disconnect bracket AE0301. Refer
to SWPM 20-10-11 as an accepted procedure.
16. Connect electrical connectors D41325P and D42187P to the E5-1 electronics shelf disconnect
bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
17. Install the flight Control System Electronics Unit (CSEU) modules on E3-1 electronics shelf. Refer
to 757 AMM 27-09-00 as an accepted procedure.
18. Close the circuit breakers that follow and remove the "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
Airplanes without Yaw Damper / Stabilizer Trim Module
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
50 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 51

NumberNamePanel / Location
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
Airplanes with Yaw Damper / Stabilizer Trim Module
C1560YAW DAMPER LP11 / A18
C1538CSEU 1L AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L DC orP11 / C9
FLT CONT ELEC 2L DC
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
19. Do the CSEU Modules Installation Test. Refer to 757 AMM 27-09-00 as an accepted procedure.
20. Do the operational test of the Spoiler/Speedbrake Control System in accordance with the following
accomplishment instructions for this group.
Group 4, Configuration 1:
1. Open the circuit breakers that follow and attach "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
51 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 52

NumberNamePanel / Location
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
2. Get access to the E3-1 electronics shelf in the Main Equipment Center.
3. Remove the flight Control System Electronics Unit (CSEU) modules from E3-1 electronics shelf.
Refer to 757 AMM 27-09-00 as an accepted procedure.
4. Disconnect and stow all electrical connectors from the E3-1 electronics shelf disconnect bracket
AE0301. Refer to SWPM 20-10-11 as an accepted procedure.
5. Remove the E3-1 electronics shelf from the airplane in accordance with FIGURE 1.
6. Install the three new bracket assemblies, on the E3-1 electronics shelf, adjacent to the location of
Modules M530, M531 and M11482, in accordance with FIGURE 2.
7. Remove the wire bundle pin strapping from the Spoiler Control Modules M530 and M531 in
accordance with FIGURE 3.
8. Change the W1265 wire bundle, on the E3-1 electronics shelf in accordance with FIGURE 10 and
FIGURE 11.
9. Do a continuity check of the new and changed wires in the E3-1 electronics shelf.
10. Install the new relays K10876, K10877, and K10878 to the new bracket assemblies, on the E3-1
electronics shelf in accordance with FIGURE 12.
a. If wire bundles on the E3-1 electronics shelf, connected to Modules M530, M531 or M11482,
interfere with the installation of any of the new relays or brackets, adjust the wire bundle and
install a sleeve, as necessary, in accordance with FIGURE 29.
NOTE: FIGURE 29 shows only the module related to relay K10878. Use the same instruction
to adjust and sleeve wire bundles near to modules related to relays K10876 and
K10877, if necessary.
11. Install the E3-1 electronics shelf to the airplane in accordance with FIGURE 13.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
52 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 53

12. Disconnect electrical connectors D41325P (position C05) and D42187P (position D05) from the
E5-1 electronics shelf disconnect bracket AE0501. Refer to SWPM 20-10-11 as an accepted
procedure.
13. Change the W4471 wire bundle, on the E3-1 electronic shelf and the E5-1 electronics shelf in
accordance with FIGURE 20 and FIGURE 21.
14. Do a continuity check of the new and changed wires in the E3-1 electronics shelf and the E5-1
electronics shelf.
15. Connect all electrical connectors to the E3-1 electronics shelf disconnect bracket AE0301. Refer
to SWPM 20-10-11 as an accepted procedure.
16. Connect electrical connectors D41325P and D42187P to the E5-1 electronics shelf disconnect
bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
17. Install the flight Control System Electronics Unit (CSEU) modules on E3-1 electronics shelf. Refer
to 757 AMM 27-09-00 as an accepted procedure.
18. Close the circuit breakers that follow and remove the "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
19. Do the CSEU Modules Installation Test. Refer to 757 AMM 27-09-00 as an accepted procedure.
20. Do the operational test of the Spoiler/Speedbrake Control System in accordance with the following
accomplishment instructions for this group.
Group 5, Configuration 1:
1. Open the circuit breakers that follow and attach "DO-NOT-CLOSE" tags:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
53 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 54

NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
2. Get access to the E3-1 electronics shelf in the Main Equipment Center.
3. Remove the flight Control System Electronics Unit (CSEU) modules from E3-1 electronics shelf.
Refer to 757 AMM 27-09-00 as an accepted procedure.
4. Disconnect and stow all electrical connectors from the E3-1 electronics shelf disconnect bracket
AE0301. Refer to SWPM 20-10-11 as an accepted procedure.
5. Remove the E3-1 electronics shelf from the airplane in accordance with FIGURE 1.
6. Install the three new bracket assemblies, on the E3-1 electronics shelf, adjacent to the location of
Modules M530, M531 and M522, in accordance with FIGURE 2.
7. Remove the wire bundle pin strapping from the Spoiler Control Modules M530 and M531 in
accordance with FIGURE 3.
8. Change the W1265 wire bundle, on the E3-1 electronics shelf in accordance with FIGURE 4 and
FIGURE 7.
9. Do a continuity check of the new and changed wires in the E3-1 electronics shelf.
10. Install the new relays K10876, K10877, and K10878 to the new bracket assemblies, on the E3-1
electronics shelf in accordance with FIGURE 12.
a. If wire bundles on the E3-1 electronics shelf, connected to Modules M530, M531 or M522,
interfere with the installation of any of the new relays or brackets, adjust the wire bundle and
install a sleeve, as necessary, in accordance with FIGURE 28.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
54 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 55

NOTE: FIGURE 28 shows only the module related to relay K10878. Use the same instruction
to adjust and sleeve wire bundles near to modules related to relays K10876 and
K10877, if necessary.
11. Install the E3-1 electronics shelf to the airplane in accordance with FIGURE 13.
12. Disconnect electrical connector D41325P (position 16) from the E5-1 electronics shelf disconnect
bracket AE0501. Refer to SWPM 20-10-11 as an accepted procedure.
13. Change the W4471 wire bundle, on the E3-1 electronic shelf and the E5-1 electronics shelf in
accordance with FIGURE 14 and FIGURE 17.
14. Do a continuity check of the new and changed wires in the E3-1 electronics shelf and the E5-1
electronics shelf.
15. Connect all electrical connectors to the E3-1 electronics shelf disconnect bracket AE0301. Refer
to SWPM 20-10-11 as an accepted procedure.
16. Connect electrical connector D41325P to the E5-1 electronics shelf disconnect bracket AE0501.
Refer to SWPM 20-10-11 as an accepted procedure.
17. Install the flight Control System Electronics Unit (CSEU) modules on E3-1 electronics shelf. Refer
to 757 AMM 27-09-00 as an accepted procedure.
18. Close the circuit breakers that follow and remove the "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
19. Do the CSEU Modules Installation Test. Refer to 757 AMM 27-09-00 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
55 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 56

20. Do the operational test of the Spoiler/Speedbrake Control System that follows.
Group 1-5, Configuration 1:
Operational test of the Spoiler/Speedbrake Control System
WARNING: MOVE ALL PERSONS AND EQUIPMENT AWAY FROM THE SPOILERS, AND OTHER
FLIGHT CONTROL SURFACES, DURING THE FOLLOWING TEST STEPS. THE
CONTROL SURFACES CAN MOVE QUICKLY AND CAUSE INJURY TO PERSONS
OR DAMAGE TO EQUIPMENT.
1. Prepare for the test.
a. Supply pressure to the left, right, and center hydraulic systems. Refer to 757 AMM 29-11-00
as an accepted procedure.
b. Make sure the circuit breakers that follow are closed:
NumberNamePanel / Location
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1025FLAP SLAT ELEC UNIT 1 PWRP11 / G12
C1037FLAP SLAT ELEC UNIT 1 SENSORP11 / G14
c. Make sure that the Speedbrake Lever is in its down-and-locked detent position.
d. Set the Aileron Trim at 0 units.
e. Set the Stabilizer Trim at the Green Band.
f. Make sure the Control Wheel is in the neutral position.
g. Make sure that the Control Wheel is free to move and responds to manual inputs, and is not
being affected by other input signals.
2. Do the Control Wheel Input test that follows:
a. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(2) Do step (1) again two more times.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
56 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 57

b. Put the Flap Control Lever in the 20-unit detent.
c. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(a) Make sure spoiler pairs 1 and 12, and, 5 and 8, respond to control wheel commands.
Refer to 757 AMM 27-61-00 for more data on spoiler controls.
(2) Do step (1) again two more times.
d. Put the Flap Control Lever in the 25-unit detent.
e. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(a) Make sure spoiler pairs 1 and 12, and, 5 and 8, do not respond to control wheel
commands.
(2) Do step (1) again two more times.
f. Move the Speedbrake Lever to its up detent position.
(1) Make sure spoiler pairs 1 and 12, and, 5 and 8, move up along with other spoiler panels.
g. Put the Flap Control Lever in the 15-unit detent.
h. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(a) Make sure spoiler pairs 1 and 12, and, 5 and 8, respond to control wheel commands.
Refer to 757 AMM 27-61-00 for more data on spoiler controls.
(2) Do step (1) again two more times.
i. Move the Speedbrake Lever to its down-and-locked detent position.
(1) Make sure spoiler pairs 1 and 12, and, 5 and 8, move down along with other spoiler
panels.
j. Put the Flap Control Lever in the 25-unit detent.
k. Move the Speedbrake Lever to its up detent position.
(1) Make sure spoiler pairs 1 and 12, and, 5 and 8, move up along with other spoiler panels.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
57 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 58

l. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(a) Make sure spoiler pairs 1 and 12, and, 5 and 8, stay up for speedbrake function and
do not respond to control wheel commands.
(2) Do step (1) again two more times.
m. Move the Speedbrake Lever to its down-and-locked detent position.
(1) Make sure spoiler pairs 1 and 12, and, 5 and 8, move down along with other spoiler
panels.
n. Remove the power from the right hydraulic system. Refer to 757 AMM 29-11-00 as an accepted
procedure.
o. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(a) Make sure spoiler pairs 1 and 12, respond to control wheel commands. Refer to 757
AMM 27-61-00 for more data on spoiler controls.
(b) Make sure spoiler pairs 5 and 8, stay down.
(2) Do step (1) again two more times.
p. Move the Speedbrake Lever to its up detent position.
(1) Make sure spoiler pairs 1 and 12, and, 5 and 8, move up along with other speedbrake
panels.
q. The time for the test that follows must be done in 16 seconds or less.
(1) Turn the control wheel from the neutral position fully clockwise then back to the neutral
position, then turn the control wheel from the neutral position fully counterclockwise then
back to the neutral position.
(a) Make sure spoiler pairs 1 and 12, respond to control wheel commands. Refer to 757
AMM 27-61-00 for more data on spoiler controls.
(b) Make sure spoiler pairs 5 and 8, stay up for speedbrake function and do not respond
to control wheel commands. Refer to 757 AMM 27-61-00 for more data on spoiler
controls.
(2) Do step (1) again two more times.
r. Move the Speedbrake Lever to its down-and-locked detent position.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
58 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 59

(1) Make sure spoiler pairs 1 and 12, and, 5 and 8, move down along with other speedbrake
panels
s. Put the Flap Control Lever in the UP detent.
3. Close up.
a. Make sure the control wheels are in their neutral position.
b. Make sure the Speedbrake Lever is in its down-and-locked detent position.
4. Put the airplane back to a serviceable condition.
Group 1-2, 5, Configuration 2:
MORE WORK - FOR AIRPLANES THAT HAVE INCORPORATED THE ORIGINAL ISSUE, BUT NOT
REVISION 1 OR REVISION 2
1. Open the circuit breakers that follow and attach "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
2. Get access to the E3-1 electronics shelf in the Main Equipment Center.
3. Remove the flight Control System Electronics Unit (CSEU) modules from E3-1 electronics shelf.
Refer to 757 AMM 27-09-00 as an accepted procedure.
4. Disconnect and stow all electrical connectors from the E3-1 electronics shelf disconnect bracket
AE0301. Refer to SWPM 20-10-11 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
59 of 194
BOEING SERVICE BULLETIN 757-27A0152

### Page 60

5. Remove the E3-1 electronics shelf from the airplane in accordance with FIGURE 22.
6. Torque the bracket assembly installation nuts in accordance with FIGURE 23.
7. Torque the bracket assembly ground stud nuts and do bond resistance tests in accordance with
FIGURE 24.
8. Do a General Visual Inspection to make sure relays K10876, K10877 and K10878 do not touch
the adjacent wire bundles in accordance with FIGURE 27.
a. If the relays do not touch the adjacent wire bundles no more work is necessary.
b. If the relays touch the adjacent wire bundles:
(1) Do a General Visual Inspection of wire bundles near the aft bottom edge of relays K10876,
K10877 and K10878 for wire chafing damage, repair wires as necessary, and change
the installation of the same relays in accordance with FIGURE 26.
9. Install the E3-1 electronics shelf to the airplane in accordance with FIGURE 25.
10. Connect all electrical connectors to the E3-1 electronics shelf disconnect bracket AE0301. Refer
to SWPM 20-10-11 as an accepted procedure.
11. Install the flight Control System Electronics Unit (CSEU) modules on E3-1 electronics shelf. Refer
to 757 AMM 27-09-00 as an accepted procedure.
12. Close the circuit breakers that follow and remove the "DO-NOT-CLOSE" tags:
NumberNamePanel / Location
C1560YAW DAMPER LP11 / A18
C1017STAB TRIM CONT LP11 / C5 or
P11 / H11
C1538CSEU 1L-AC orP11 / C6
FLT CONT ELEC 1L AC
C1534CSEU 1L-DC orP11 / C7
FLT CONT ELEC 1L DC
C1537CSEU 2L-AC orP11 / C8
FLT CONT ELEC 2L AC
C1533CSEU 2L-DC orP11 / C9
FLT CONT ELEC 2L DC
C1031RUD RATIOP11 / D18 or
P11 / G10
C1025FLAP SLAT ELEC UNIT 1P11 / G12
C1037FLAP SLAT SENSOR ELEC UNIT 1P11 / G14
C585WARN ELEX AP11 / J33
C586WARN ELEX BP11 / B18
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 29, 2009
757-27A0152Revision 3: October 28, 2013
60 of 194
BOEING SERVICE BULLETIN 757-27A0152

The text continues at https://openairdocs.org/service-documents/boeing/757-27a0152/file/3b90a0a87048.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
