# Boeing Alert Requirements Bulletin 757-27A0158 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2020-0903; AD 2021-05-11 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 757-27A0158 RB](https://openairdocs.org/service-documents/boeing/757-27a0158-rb.md)
- Title as filed: 757-27A0158 RB - BOEING
- Pages: 445
- PDF: https://openairdocs.org/files/sha256/a1/cc/a1cc53538575c53bb8bfdbdaf5bea03db0cf39b891807cf024945f9ba0194471
- Page: https://openairdocs.org/service-documents/boeing/757-27a0158-rb/file/a1cc53538575

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Requirements Bulletin
ALERT
Number: 757-27A0158 RB
Original Issue: July 09, 2020
ATA System: 2760
SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings -
New Spoiler Control Module Relay Installation and Wiring Changes
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
Copyright © 2020 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: July 09, 2020
757-27A0158 RB
1 of 445
3.0

### Page 2

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
2 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1 . E F F E C T I V I T Y................................................ 7
A. Airplanes ................................................ 7
B . S p a r e s  A f f e c t e d  ........................................... 1 3
2. CONCURRENT REQUIREMENTS .................................... 1 3
3 . C O M P L I A N C E............................................... 1 3
4. APPROVAL ................................................. 1 7
5. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 9
A. General Information ......................................... 1 9
B. Work Instructions ........................................... 2 1
FIGURE 2: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - SPOILER CONTROL
MODULES REMOVAL [Group 1-22] .............................. 6 8
FIGURE 3: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - RELAY BRACKET
ASSEMBLIES AND RELAYS REMOVAL [Group 1-22, Configuration 1] ........... 7 0
FIGURE 4: MAIN ELECTRONIC COMPARTMENT - E3 RACK - NEW RELAY BRACKET ASSEMBL Y -
POSITION AND DRILL [Group 1-22] ............................. 7 4
FIGURE 5: RELAY BRACKET ASSEMBL Y - GROMMET, RELAYS AND LABELS INSTALLATION [Group
1 - 2 2 ] ............................................... 7 7
FIGURE 6: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 1-5, 10-12, 18-20, 22] ........................... 8 1
FIGURE 7: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 6-7] ..................................... 8 3
FIGURE 8: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 8-9, 21] ................................... 8 5
FIGURE 9: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 13-14] .................................... 8 7
FIGURE 10: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 16-17] .................................... 8 9
FIGURE 11: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 15] ..................................... 9 1
FIGURE 12: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 1-12, 18-22, Configuration 1] ....................... 9 3
FIGURE 13: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 13-14, 16-17, Configuration 1] ....................... 9 4
FIGURE 14: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - WIRE BUNDLE W1265
ROUTING [Group 15, Configuration 1] ............................ 9 5
FIGURE 19: WIRE BUNDLE W1265 CHANGES [Group 1-12, 18-22, Configuration 1] .......... 9 6
FIGURE 20: WIRE BUNDLE W1265 CHANGES [Group 13-17, Configuration 1] ............. 9 8
FIGURE 21: WIRE BUNDLE W1265 CHANGES [Group 4-5, 12, 18, 22] ................ 1 0 0
FIGURE 22: WIRE BUNDLE W1265 CHANGES [Group 1-3, 10-11, 19-20] ............... 1 0 3
FIGURE 23: WIRE BUNDLE W1265 CHANGES [Group 6-7] ....................... 1 0 6
FIGURE 24: WIRE BUNDLE W1265 CHANGES [Group 8-9] ....................... 1 0 9
FIGURE 25: WIRE BUNDLE W1265 CHANGES [Group 13-14] ..................... 1 1 2
FIGURE 26: WIRE BUNDLE W1265 CHANGES [Group 16-17] ..................... 1 1 5
FIGURE 27: WIRE BUNDLE W1265 CHANGES [Group 15] ....................... 1 1 8
FIGURE 28: WIRE BUNDLE W1265 CHANGES [Group 21] ....................... 1 2 1
FIGURE 29: MAIN ELECTRONIC COMPARTMENT - E3-1 ELECTRONICS SHELF - SPOILER CONTROL
MODULES INSTALLATION [Group 1-22] .......................... 1 2 4
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
3 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 4

FIGURE 32: MAIN ELECTRONIC COMPARTMENT – E5-2 ELECTRONICS SHELF - WIRE BUNDLE W1284
ROUTING [Group 18-20, 22] ................................. 1 2 6
FIGURE 33: MAIN ELECTRONIC COMPARTMENT – E5-2 ELECTRONICS SHELF - WIRE BUNDLE W1284
ROUTING [Group 13-14, 16-17] ............................... 1 2 7
FIGURE 34: MAIN ELECTRONIC COMPARTMENT – E5-2 ELECTRONICS SHELF - WIRE BUNDLE W1284
ROUTING [Group 15] ..................................... 1 2 8
FIGURE 35: MAIN ELECTRONIC COMPARTMENT – E5-2 ELECTRONICS SHELF - WIRE BUNDLE W1284
ROUTING [Group 1-3, 6-12, 21] ............................... 1 2 9
FIGURE 36: WIRE BUNDLE W1284 CHANGES [Group 18-20, 22] ................... 1 3 0
FIGURE 37: WIRE BUNDLE W1284 CHANGES [Group 13-14, 16-17] ................. 1 3 2
FIGURE 38: WIRE BUNDLE W1284 CHANGES [Group 15] ....................... 1 3 4
FIGURE 39: WIRE BUNDLE W1284 CHANGES [Group 1-3, 10-12] ................... 1 3 6
FIGURE 40: WIRE BUNDLE W1284 CHANGES [Group 6-9, 21] ..................... 1 3 8
FIGURE 41: MAIN ELECTRONIC COMPARTMENT – E5-3 ELECTRONICS SHELF - WIRE BUNDLE W1286
ROUTING [Group 1-3, 6-12, 18-22] ............................. 1 4 0
FIGURE 42: MAIN ELECTRONIC COMPARTMENT – E5-3 ELECTRONICS SHELF - WIRE BUNDLE W1286
ROUTING [Group 13-14, 16-17] ............................... 1 4 1
FIGURE 43: MAIN ELECTRONIC COMPARTMENT – E5-3 ELECTRONICS SHELF - WIRE BUNDLE W1286
ROUTING [Group 15] ..................................... 1 4 2
FIGURE 44: WIRE BUNDLE W1286 CHANGES [Group 1-3, 6-12, 18-22] ................ 1 4 3
FIGURE 45: WIRE BUNDLE W1286 CHANGES [Group 13-14, 16-17] ................. 1 4 5
FIGURE 46: WIRE BUNDLE W1286 CHANGES [Group 15] ....................... 1 4 7
FIGURE 47: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2350 AND W2354 ROUTING [Group
2 ,  5 - 6 ,  9 - 1 0 ,  1 2 - 2 2 ]  ...................................... 1 4 9
FIGURE 48: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2350 AND W2354 ROUTING [Group
3 - 4 ,  7 - 8 ,  1 1 ]  .......................................... 1 5 5
FIGURE 49: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2350 AND W2354 ROUTING [Group
1 ] ................................................ 1 6 1
FIGURE 50: WIRE BUNDLE W2350 CHANGES [Group 1-12, 18-22] .................. 1 6 4
FIGURE 51: WIRE BUNDLE W2350 CHANGES [Group 13-14, 16-17] ................. 1 6 6
FIGURE 52: WIRE BUNDLE W2350 CHANGES [Group 15] ....................... 1 6 8
FIGURE 53: WIRE BUNDLE W2354 CHANGES [Group 1-12, 18-22] .................. 1 7 0
FIGURE 54: WIRE BUNDLE W2354 CHANGES [Group 13-14, 16-17] ................. 1 7 2
FIGURE 55: WIRE BUNDLE W2354 CHANGES [Group 15] ....................... 1 7 4
FIGURE 56: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2358 ROUTING [Group 1-12, 15,
1 8 - 2 2 ]............................................. 1 7 6
FIGURE 57: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2358 ROUTING ....... 1 7 9
FIGURE 58: WIRE BUNDLE W2358 CHANGES [Group 1-12, 18-22] .................. 1 8 0
FIGURE 59: WIRE BUNDLE W2358 CHANGES [Group 15] ....................... 1 8 3
FIGURE 60: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2360 ROUTING [Group 1-14, 18-22]
................................................. 1 8 5
FIGURE 61: WIRE BUNDLE W2360 CHANGES [Group 1-12, 18-22] .................. 1 8 7
FIGURE 62: WIRE BUNDLE W2360 CHANGES [Group 13-14] ..................... 1 8 9
FIGURE 63: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2378 ROUTING [Group 13-14,
1 6 - 1 7 ]............................................. 1 9 1
FIGURE 65: WIRE BUNDLE W2378 CHANGES [Group 13-14] ..................... 1 9 4
FIGURE 66: WIRE BUNDLE W2378 CHANGES [Group 16-17] ..................... 1 9 7
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
4 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 5

FIGURE 67: MAIN ELECTRONIC COMPARTMENT – E3 RACK - RELAY BRACKET ASSEMBL Y WIRE
BUNDLE W2722 ROUTING [Group 1-14, 18-22] ...................... 1 9 9
FIGURE 68: MAIN ELECTRONIC COMPARTMENT – E3 RACK - RELAY BRACKET ASSEMBL Y WIRE
BUNDLE W2722 ROUTING [Group 15-17] ......................... 2 0 2
FIGURE 69: WIRE BUNDLE W2722 CHANGES [Group 1-14, 18-22] .................. 2 0 3
FIGURE 70: WIRE BUNDLE W2722 CHANGES [Group 15] ....................... 2 0 8
FIGURE 71: WIRE BUNDLE W2722 CHANGES [Group 17] ....................... 2 1 1
FIGURE 72: WIRE BUNDLE W2722 CHANGES [Group 16] ....................... 2 1 4
FIGURE 73: MAIN ELECTRONIC COMPARTMENT - WIRE BUNDLE W4236 ROUTING [Group 1-3, 6-9,
1 5 ,  1 8 ,  2 0 - 2 2 ]  ......................................... 2 1 7
FIGURE 74: WIRE BUNDLE W4236 CHANGES [Group 1-3, 6-9, 15, 18, 20-22] ............ 2 2 2
FIGURE 75: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4427 ROUTING [Group 1-12, 18-22]
................................................. 2 2 4
FIGURE 76: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4427 ROUTING [Group 13-14] . 226
FIGURE 77: WIRE BUNDLE W4427 CHANGES [Group 1-12, 18-22] .................. 2 2 8
FIGURE 78: WIRE BUNDLE W4427 CHANGES [Group 13-14] ..................... 2 3 0
FIGURE 79: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 1-3, 18,
2 0 ,  2 2 ]  ............................................. 2 3 2
FIGURE 80: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 13, 16]
................................................. 2 3 9
FIGURE 81: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 14, 17]
................................................. 2 4 6
FIGURE 82: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 15] . 254
FIGURE 83: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 6-9, 21]
................................................. 2 6 1
FIGURE 84: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 10-12, 19]
................................................. 2 6 8
FIGURE 85: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 4] . 276
FIGURE 86: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4471 ROUTING [Group 5] . 283
FIGURE 87: WIRE BUNDLE W4471 CHANGES [Group 18, 22, Configuration 1] ............ 2 9 1
FIGURE 88: WIRE BUNDLE W4471 CHANGES [Group 18, 22, Configuration 2] ............ 2 9 4
FIGURE 89: WIRE BUNDLE W4471 CHANGES [Group 13, 16, Configuration 1] ............ 2 9 7
FIGURE 90: WIRE BUNDLE W4471 CHANGES [Group 13, 16, Configuration 2] ............ 3 0 0
FIGURE 91: WIRE BUNDLE W4471 CHANGES [Group 14, 17, Configuration 1] ............ 3 0 3
FIGURE 92: WIRE BUNDLE W4471 CHANGES [Group 14, 17, Configuration 2] ............ 3 0 7
FIGURE 93: WIRE BUNDLE W4471 CHANGES [Group 15, Configuration 1] .............. 3 1 1
FIGURE 94: WIRE BUNDLE W4471 CHANGES [Group 15, Configuration 2] .............. 3 1 4
FIGURE 95: WIRE BUNDLE W4471 CHANGES [Group 6-9, Configuration 1] ............. 3 1 7
FIGURE 96: WIRE BUNDLE W4471 CHANGES [Group 6-9, 21, Configuration 2] ........... 3 2 0
FIGURE 97: WIRE BUNDLE W4471 CHANGES [Group 10-12, 19, Configuration 1] .......... 3 2 3
FIGURE 98: WIRE BUNDLE W4471 CHANGES [Group 10-12, 19, Configuration 2] .......... 3 2 7
FIGURE 99: WIRE BUNDLE W4471 CHANGES [Group 4-5, Configuration 1] ............. 3 3 1
FIGURE 100: WIRE BUNDLE W4471 CHANGES [Group 4-5, Configuration 2] ............. 3 3 5
FIGURE 101: WIRE BUNDLE W4471 CHANGES [Group 1-3, 20, Configuration 1] ........... 3 3 9
FIGURE 102: WIRE BUNDLE W4471 CHANGES [Group 1-3, 20, Configuration 2] ........... 3 4 2
FIGURE 103: WIRE BUNDLE W4471 CHANGES [Group 21, Configuration 1] .............. 3 4 5
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
5 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 6

FIGURE 104: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4473 ROUTING [Group 1-3, 6-12,
1 8 - 2 2 ]............................................. 3 4 8
FIGURE 105: MAIN ELECTRONIC COMPARTMENT - WIRE BUNDLE W4473 ROUTING [Group 4] . . 354
FIGURE 106: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4473 ROUTING [Group 5] . 360
FIGURE 107: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4473 ROUTING [Group 13-14,
1 6 - 1 7 ]............................................. 3 6 7
FIGURE 108: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W4473 ROUTING [Group 15] . 373
FIGURE 109: WIRE BUNDLE W4473 CHANGES [Group 22] ....................... 3 7 9
FIGURE 110: WIRE BUNDLE W4473 CHANGES [Group 1-3, 10-12, 18-20] ............... 3 8 1
FIGURE 111: WIRE BUNDLE W4473 CHANGES [Group 6-7] ....................... 3 8 4
FIGURE 112: WIRE BUNDLE W4473 CHANGES [Group 8-9, 21] ..................... 3 8 7
FIGURE 113: WIRE BUNDLE W4473 CHANGES [Group 4-5] ....................... 3 9 0
FIGURE 114: WIRE BUNDLE W4473 CHANGES [Group 13-14, 16-17] ................. 3 9 3
FIGURE 115: WIRE BUNDLE W4473 CHANGES [Group 15] ....................... 3 9 5
FIGURE 116: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W6670 ROUTING [Group 13, 16]
................................................. 3 9 7
FIGURE 117: WIRE BUNDLE W6670 CHANGES [Group 13, 16] ..................... 4 0 2
FIGURE 118: MAIN ELECTRONIC COMPARTMENT - E3 RACK RELAY BRACKET ASSEMBL Y - WIRE
BUNDLE CLAMP INSTALLATION [Group 1-22] ....................... 4 0 4
FIGURE 119: MAIN ELECTRONIC COMPARTMENT - E3 RACK - MEASURE WIRE BUNDLE CLEARANCE
[Group 1-22] .......................................... 4 0 9
FIGURE 120: MAIN ELECTRONIC COMPARTMENT - E3 RACK - WIRE BUNDLE SLEEVE INSTALLATION
[Group 1-22] .......................................... 4 1 1
FIGURE 121: MAIN ELECTRONIC COMPARTMENT - E3 RACK - WIRE BUNDLE CHANGE [Group 1-22]
................................................. 4 1 3
FIGURE 122: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2358 ROUTING [Group 23] . 417
FIGURE 123: WIRE BUNDLE W2358 CHANGES [Group 23] ....................... 4 1 8
FIGURE 124: MAIN ELECTRONIC COMPARTMENT – WIRE BUNDLE W2722 ROUTING [Group 23] . 420
FIGURE 125: WIRE BUNDLE W2722 CHANGES [Group 23] ....................... 4 2 1
APPENDIX A: LANDING CONFIGURATION WARNING MODULE (LCWM) LANDING FLAPS TEST [Group
1 - 2 2 ].............................................. 4 2 3
APPENDIX B: SYSTEM TEST FOR THE SPOILER CONTROL MODULES (SCMS) [Group 1-22] . . . 426
APPENDIX C: OPERATIONAL TEST OF THE SPOILER INHIBIT FUNCTION .............. 4 3 5
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
6 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 7

Commercial 
Airplanes
757
Requirements Bulletin
ALERT
Number: 757-27A0158 RB
Original Issue: July 09, 2020
ATA System: 2760
SUBJECT: FLIGHT CONTROLS - Spoiler, Drag Devices and Variable Aerodynamic Fairings -
New Spoiler Control Module Relay Installation and Wiring Changes
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 757-200, 757-200CB, 757-200PF , 757-300 Airplane(s), line number(s)
2, 5, 8, 14-15, 18-19, 42, 46, 56, 62, 74-75, 80, 83, 96-97, 99, 101-102, 106-107, 111-115, 117,
123, 127, 130, 132, 139, 141-145, 147-151, 153, 155-156, 162-163, 165-167, 169, 171, 173-174,
176-178, 180-184, 186-187, 189, 191, 193, 195, 197, 199-200, 203-204, 208-209, 211-215,
218-221, 224-233, 235-242, 246-250, 254-257, 259, 262, 264-265, 267-268, 270-271, 273-276,
278-279, 281, 285, 287-288, 290-294, 297-298, 300-302, 304, 306-307, 310-312, 314-315, 317-318,
322-323, 325-326, 329-345, 347-355, 357, 359-364, 367-379, 381-389, 392-395, 397-405, 407-426,
429-430, 432-433, 436-446, 448-449, 453, 455, 458-461, 463, 465-466, 468, 470-478, 480-483,
485-486, 489, 493, 495-504, 506-516, 518-519, 521, 523-528, 530-546, 548-549, 551-575, 577-590,
592-597, 599, 601-620, 622-717, 719, 721-888, 890-1050 in 23 Group(s). Where the effectivity is
presented with hyphens between line numbers, the airplane applicability means "through" and
"inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with different wiring configurations.-1
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
7 of 445

### Page 8

DESCRIPTIONCONFIGURATIONGROUP
757-200, -200PF airplanes with different wiring configurations.-2
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200, -200CB airplanes with different wiring configurations.-3
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200, -200PF airplanes with different wiring configurations.-4
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200PF airplanes with different wiring configurations.-5
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-6
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-7
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
8 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 9

DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with different wiring configurations.-8
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-9
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-10
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200, -200PF airplanes with different wiring configurations.-11
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-12
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-13
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
9 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 10

DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with different wiring configurations.-14
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-300 airplanes with different wiring configurations.-15
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-300 airplanes with different wiring configurations.-16
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-300 airplanes with different wiring configurations.-17
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-18
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-19
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
10 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 11

DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes with different wiring configurations.-20
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-21
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
757-200 airplanes with different wiring configurations.-22
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157.
1
Airplanes that have not accomplished service bulletins 757-27A0152
and 757-27A0157.
2
Airplanes that have accomplished service bulletins 757-27A0152 and
757-27A0157 and were changed in accordance with Boeing Service
Bulletin 757-27A0158 RC01.
-23
Airplane Models:
757-200, 757-200CB, 757-200PF , 757-300
GroupVariable Number
1NA002
1NA005
1NA008
1NA021 - NA028
1NA195
1NA197 - NA199
1NA205
2NA227 - NA228
2NA230
GroupVariable Number
2NA235 - NA236
6NA237 - NA239
7NA301 - NA305
3NA342 - NA344
3NA346 - NA352
1NA392 - NA399
1NA401 - NA404
1NA406
1NA441 - NA447
GroupVariable Number
4NA505
4NA519 - NA522
4NA537 - NA538
4NA549 - NA552
4NA554 - NA555
4NA558 - NA576
4NA578 - NA584
10NA585 - NA586
3NB023
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
11 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 12

GroupVariable Number
3NB036 - NB038
3NB041
3NB053
3NB061 - NB068
3NB070 - NB073
3NB079
3NB131 - NB147
2NB148
2NB161 - NB162
4NB167
10NB168
3NB201 - NB202
2NB221 - NB228
2NB230
2NB236
3NB239
3NB261 - NB267
3NB291 - NB292
2NB293 - NB299
2NB301 - NB302
3NB311 - NB312
3NB321 - NB331
3NB421
3NB424
3NB428 - NB430
2NB431
2NB434 - NB438
2NB446
3NB451 - NB452
2NB453 - NB454
3NB501 - NB510
2NB511 - NB523
2NB561
GroupVariable Number
2NB571
8NB581 - NB583
4NC005
4NC012
4NC017
4NC042
4NC051 - NC052
4NC056 - NC057
10NC058 - NC062
11NC066 - NC067
10NC068 - NC084
10NC091 - NC094
10NC151
10NC161
4NC901 - NC930
11NC931 - NC935
2NC936 - NC950
5NC951
2NC971
2NC973 - NC974
3ND002
3ND004
3ND012 - ND014
3ND017
3ND021
3ND025
3ND027
3ND030
3ND032
3ND037 - ND044
3ND046
3ND048 - ND054
3ND057 - ND059
GroupVariable Number
2ND111
2ND113
3ND161 - ND166
3ND169 - ND188
3ND190 - ND199
3ND201 - ND203
3ND221 - ND223
2ND224 - ND225
3ND241 - ND243
2ND244 - ND248
2ND301 - ND322
2ND401
3ND891
3ND895
4NE001 - NE003
11NE004
10NE006 - NE008
4NE011 - NE013
4NE015
4NE017
4NE020 - NE022
4NE025 - NE029
4NE033 - NE037
4NE039 - NE041
4NE043 - NE045
4NE047 - NE051
4NE055
4NE067 - NE079
11NE080 - NE081
11NE083 - NE088
12NE092 - NE094
4NE141 - NE142
4NE144 - NE148
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
12 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 13

GroupVariable Number
4NE161 - NE164
4NE166 - NE168
4NE170 - NE172
4NE174 - NE176
11NE177
4NE201 - NE204
10NE301
10NE311 - NE325
13NJ001 - NJ004
13NJ031 - NJ032
14NJ551 - NJ555
17NL001 - NL002
17NL006 - NL017
16NL101 - NL109
16NL141
15NL601 - NL616
2NN001 - NN002
18NN051 - NN052
11NP901 - NP904
2NS601 - NS616
2NT001 - NT009
GroupVariable Number
2NT201 - NT202
2NT231 - NT234
2NT237 - NT238
3NT239 - NT240
2NT242
2NT245 - NT248
2NT281 - NT285
3NT286 - NT289
10NT341 - NT343
11NT344 - NT345
19NT346 - NT347
10NT351 - NT360
10NT371 - NT373
10NT375 - NT379
2NT381 - NT385
20NT386
9NT401 - NT403
21NT404 - NT409
2NT411 - NT412
2NT426 - NT427
2NT431 - NT432
GroupVariable Number
2NT436 - NT438
10NT441 - NT442
2NT446
10NT701 - NT730
3NT731 - NT740
2NT741 - NT769
10NT791 - NT796
2NT861 - NT862
10NT881 - NT885
2NT901 - NT903
2NT905 - NT916
22NT971 - NT977
23NT978
22NT979 - NT980
18NT981 - NT985
10NU031 - NU033
19NU034 - NU038
17NU701 - NU705
17NU721 - NU728
17NU731 - NU732
--
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2017-26-10, is related to this service
bulletin. The effective date of the AD is January 3, 2018.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 757-27A0158 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 757-27A0158 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Table 1, Table 2, Table 3, and Table
4, as applicable, in accordance with the Accomplishment Instructions.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
13 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 14

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Group 1-22:
Table 1: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 9,900 Flight
Hours after the
Original Issue date
of the Require-
ments Bulletin 757-
27A0158 RB
ACTION 1: Install new
relays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
All Airplanes
ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531. Or later
approved part number.
ACTION 3: Measure the
clearance between a wire
bundle and the top of new
relay bracket assembly.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
14 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 15

Group 1-22:
Table 2: CLEARANCE MEASUREMENT, WIRE BUNDLE CHANGES AND TESTS
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 9,900 Flight
Hours after the
Original Issue date
of the Require-
ments Bulletin 757-
27A0158 RB
CONDITION 1 (ACTION
1): Install new protective
sleeve, heat shrinkable to
wire bundle.
CONDITION 1: WIRE
BUNDLE CLEARANCE IS
0.25 INCHES OR MORE
after accomplishing AC-
TION 3 CONDITION 1 (ACTION
2): Do the LANDING
CONFIGURATION
WARNING MODULE
(LCWM) LANDING
FLAPS TEST.
CONDITION 1 (ACTION
3): Do the SYSTEM
TEST FOR THE SPOIL-
ER CONTROL MOD-
ULES (SCMs).
CONDITION 1 (ACTION
4): Do the OPERA-
TIONAL TEST OF THE
SPOILER INHIBIT
FUNCTION.
6,000 flight hours-CONDITION 1 (ACTION
5): Repeat the OPERA-
TIONAL TEST OF THE
SPOILER INHIBIT
FUNCTION.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
15 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 16

Group 1-22:
Table 2: CLEARANCE MEASUREMENT, WIRE BUNDLE CHANGES AND TESTS
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 9,900 Flight
Hours after the
Original Issue date
of the Require-
ments Bulletin 757-
27A0158 RB
CONDITION 2 (ACTION
1): Change wire bundle.
CONDITION 2: WIRE
BUNDLE CLEARANCE IS
LESS THAN 0.25 INCHES
after accomplishing AC-
TION 3
CONDITION 2 (ACTION
2): Do the LANDING
CONFIGURATION
WARNING MODULE
(LCWM) LANDING
FLAPS TEST.
CONDITION 2 (ACTION
3): Do the SYSTEM
TEST FOR THE SPOIL-
ER CONTROL MOD-
ULES (SCMs).
CONDITION 2 (ACTION
4): Do the OPERA-
TIONAL TEST OF THE
SPOILER INHIBIT
FUNCTION.
6,000 flight hours-CONDITION 2 (ACTION
5): Repeat the OPERA-
TIONAL TEST OF THE
SPOILER INHIBIT
FUNCTION.
Group 23:
Table 3: MORE WORK - WIRE BUNDLE CHANGES AND TESTS
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 9,900 Flight
Hours after the
Original Issue date
of the Require-
ments Bulletin 757-
27A0158 RB
ACTION 1: Make a
change to wire bundles
W2358 and W2722.
All Airplanes
ACTION 2: Do the OPER-
ATIONAL TEST OF THE
SPOILER INHIBIT
FUNCTION.
6,000 flight hours-ACTION 3: Repeat the
OPERATIONAL TEST
OF THE SPOILER INHIB-
IT FUNCTION.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
16 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 17

4. APPROVAL
NOTE: The approval statement that follows is valid for 757-200CB airplanes.
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved for all airplanes
listed in the Requirements Bulletin effectivity. This document and its approval were based on the airplane
in its original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
In addition, the Manager of the FAA Los Angeles ACO Branch approves accomplishment of the modifications
and tests defined in this Requirements Bulletin as an alternative method of compliance to the requirements
of paragraph (g)(1) of AD 2017-26-10. All provisions of AD 2017-26-10 that are not specifically referenced
in the above statement remain fully applicable and must be complied with accordingly.
NOTE: The approval statement that follows is valid for all affected airplanes, except 757-200CB airplanes.
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a components or system also affected
by this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency
approval before incorporating this Requirements Bulletin.
In addition, the Manager of the FAA Los Angeles ACO Branch approves accomplishment of the modifications
and tests defined in this Requirements Bulletin, as an alternative method of compliance to the requirements
of paragraph (g)(1) of AD 2017-26-10. All provisions of AD 2017-26-10 that are not specifically referenced
in the above statement remain fully applicable and must be complied with accordingly.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
17 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 18

Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
18 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT
BLANK PAGE

### Page 19

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 757 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 757
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 757
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
19 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 20

5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. The instructions in Work Instructions and the figures can include operation of tools
or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and
Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain
data on versions of the tools or test equipment that you can use. It is permitted to
use replaced tools. It is not permitted to use superseded tools.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
11. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
20 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 21

B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements
Group 1, Configuration 1:
Table 1: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in SB
757-27A0158 Origi-
nal Issue or later
approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 35, 39, 41, 44, 49, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 79, 101, 104,
110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
21 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 22

Group 1, Configuration 2:
Table 2: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 35,39, 41, 44, 49, 50, 53, 56,
58, 60, 61, 67, 69, 73 - 75,
77, 79, 102, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
22 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 23

Group 2, Configuration 1:
Table 3: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 35, 39, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 79, 101, 104,
110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
23 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 24

Group 2, Configuration 2:
Table 4: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 35,39, 41, 44, 47, 50, 53, 56,
58, 60, 61, 67, 69, 73 - 75,
77, 79, 102, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
24 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 25

Group 3, Configuration 1:
Table 5: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 35, 39, 41, 44, 48, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 79, 101, 104,
110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
25 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 26

Group 3, Configuration 2:
Table 6: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 35,39, 41, 44, 48, 50, 53, 56,
58, 60, 61, 67, 69, 73 - 75,
77, 79, 102, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
26 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 27

Group 4, Configuration 1:
Table 7: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
21, 48, 50, 53, 56, 58, 60,
61, 67, 69, 75, 77, 85, 99,
105, 113, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
27 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 28

Group 4, Configuration 2:
Table 8: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 21, 48,50, 53, 56, 58, 60, 61, 67,
69, 75, 77, 85, 100, 105,
113, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
28 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 29

Group 5, Configuration 1:
Table 9: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
21, 47, 50, 53, 56, 58, 60,
61, 67, 69, 75, 77, 86, 99,
106, 113, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
29 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 30

Group 5, Configuration 2:
Table 10: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 21, 47,50, 53, 56, 58, 60, 61, 67,
69, 75, 77, 86, 100, 106,
113, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
30 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 31

Group 6, Configuration 1:
Table 11: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 7, 12, 19,
23, 35, 40, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 83, 95, 104,
111, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
31 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 32

Group 6, Configuration 2:
Table 12: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 7, 23,35, 40, 41, 44, 47, 50, 53,
56, 58, 60, 61, 67, 69, 73
- 75, 77, 83, 96, 104, 111,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
32 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 33

Group 7, Configuration 1:
Table 13: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 7, 12, 19,
23, 35, 40, 41, 44, 48, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 83, 95, 104,
111, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
33 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 34

Group 7, Configuration 2:
Table 14: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 7, 23,35, 40, 41, 44, 48, 50, 53,
56, 58, 60, 61, 67, 69, 73
- 75, 77, 83, 96, 104, 111,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
34 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 35

Group 8, Configuration 1:
Table 15: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 8, 12, 19,
24, 35, 40, 41, 44, 48, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 83, 95, 104,
112, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
35 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 36

Group 8, Configuration 2:
Table 16: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 8, 24,35, 40, 41, 44, 48, 50, 53,
56, 58, 60, 61, 67, 69, 73
- 75, 77, 83, 96, 104, 112,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
36 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 37

Group 9, Configuration 1:
Table 17: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 8, 12, 19,
24, 35, 40, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 83, 95, 104,
112, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
37 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 38

Group 9, Configuration 2:
Table 18: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 8, 24,35, 40, 41, 44, 47, 50, 53,
56, 58, 60, 61, 67, 69, 73
- 75, 77, 83, 96, 104, 112,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
38 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 39

Group 10, Configuration 1:
Table 19: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 29, 35, 39, 41, 44, 47,
50, 53, 56, 58, 60, 61, 67,
69, 75, 77, 84, 97, 104,
110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
39 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 40

Group 10, Configuration 2:
Table 20: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 35,39, 41, 44, 47, 50, 53, 56,
58, 60, 61, 67, 69, 75, 77,
84, 98, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
40 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 41

Group 11, Configuration 1:
Table 21: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 35, 39, 41, 44, 48, 50,
53, 56, 58, 60, 61, 67, 69,
75, 77, 84, 97, 104, 110,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
41 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 42

Group 11, Configuration 2:
Table 22: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 35,39, 41, 44, 48, 50, 53, 56,
58, 60, 61, 67, 69, 75, 77,
84, 98, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes to Spoiler Control
Modules (SCMs) M530
and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
42 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 43

Group 12, Configuration 1:
Table 23: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
21, 35, 39, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
75, 77, 84, 97, 104, 110,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
43 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 44

Group 12, Configuration 2:
Table 24: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 21, 35,39, 41, 44, 47, 50, 53, 56,
58, 60, 61, 67, 69, 75, 77,
84, 98, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
44 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 45

Group 13, Configuration 1:
Table 25: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 9, 13, 20,
25, 33, 37, 42, 45, 47, 51,
54, 60, 62, 63, 65, 67, 69,
76, 78, 80, 89, 107, 114,
116, 117, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
45 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 46

Group 13, Configuration 2:
Table 26: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 9, 25,33, 37, 42, 45, 47, 51, 54,
60, 62, 63, 65, 67, 69, 76,
78, 80, 90, 107, 114, 116,
117, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
46 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 47

Group 14, Configuration 1:
Table 27: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 9, 13, 20,
25, 33, 37, 42, 45, 47, 51,
54, 60, 62, 63, 65, 67, 69,
76, 78, 81, 91, 107, 114,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
47 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 48

Group 14, Configuration 2:
Table 28: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 9, 25,33, 37, 42, 45, 47, 51, 54,
60, 62, 63, 65, 67, 69, 76,
78, 81, 92, 107, 114, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
48 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 49

Group 15, Configuration 1:
Table 29: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 11, 14,
20, 27, 34, 38, 43, 46, 47,
52, 55, 56, 59, 68, 70, 73,
74, 82, 93, 108, 115, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
49 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 50

Group 15, Configuration 2:
Table 30: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 11, 27,34, 38, 43, 46, 47, 52, 55,
56, 59, 68, 70, 73, 74, 82,
94, 108, 115, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
50 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 51

Group 16, Configuration 1:
Table 31: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 10, 13,
20, 26, 33, 37, 42, 45, 47,
51, 54, 63, 66, 68, 72, 80,
89, 107, 114, 116 - 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
51 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 52

Group 16, Configuration 2:
Table 32: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4, 5, 10, 26,33, 37, 42, 45, 47, 51, 54,
63, 66, 68, 72, 80, 90,
107, 114, 116 - 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
52 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 53

Group 17, Configuration 1:
Table 33: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 5, 10, 13,
20, 26, 33, 37, 42, 45, 47,
51, 54, 63, 66, 68, 71, 81,
91, 107, 114, 118
ACTION 1: Install new re-
lays and make wire
changes to Spoiler Control
Modules (SCMs) M530
and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
53 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 54

Group 17, Configuration 2:
Table 34: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A015 -FIGURES 2, 4, 5, 10, 26,33, 37, 42, 45, 47, 51, 54,
63, 66, 68, 71, 81, 92,
107, 114, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
54 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 55

Group 18, Configuration 1:
Table 35: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
21, 32, 36, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 79, 87, 104,
110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
55 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 56

Group 18, Configuration 2:
Table 36: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 21, 32,36, 41, 44, 47, 50, 53, 56,
58, 60, 61, 67, 69, 73 - 75,
77, 79, 88, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
56 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 57

Group 19, Configuration 1:
Table 37: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 32, 36, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
75, 77, 84, 97, 104, 110,
118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
57 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 58

Group 19, Configuration 2:
Table 38: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 32,36, 41, 44, 47, 50, 53, 56,
58, 60, 61, 67, 69, 75, 77,
84, 98, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
58 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 59

Group 20, Configuration 1:
Table 39: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 Do PART 2: E3-1ELECTRONICS
SHELF WIRES RE-
MOVAL
--
-FIGURES 2 - 6, 12, 19,
22, 32, 36, 41, 44, 47, 50,
53, 56, 58, 60, 61, 67, 69,
73 - 75, 77, 79, 101, 104,
110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
59 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

### Page 60

Group 20, Configuration 2:
Table 40: NEW SPOILER CONTROL MODULE RELAYS INSTALLATION AND WIRE BUNDLE
CHANGES
Refer to the listed
procedures in
SB757-27A0158
Original Issue or
later approved revi-
sions as an accept-
ed procedure.
Method of ComplianceActionCondition
Do PART 1: AC-
CESS AND
PREPARATION
--All Airplanes that
have not done Boeing
Service Bulletins 757-
27A0152 and 757-
27A0157 -FIGURES 2, 4 - 6, 22, 32,36, 41, 44, 47, 50, 53, 56,
58, 60, 61, 67, 69, 73 - 75,
77, 79, 102, 104, 110, 118
ACTION 1: Install new re-
lays and make wire
changes for Spoiler Con-
trol Modules (SCMs)
M530 and M531.
Do PART 3: E3-1
ELECTRONICS
SHELF AND
MARKERS INSTAL-
LATION (IF APPLI-
CABLE)
--
-FIGURE 29ACTION 2: Install Spoiler
Control Modules (SCMs)
M530 and M531.
Export Controlled ECCN: 9E991
Copyright © Unpublished
Work - See page 1 for details.
Original Issue: July 09, 2020
757-27A0158 RB
60 of 445
REQUIREMENTS BULLETIN 757-27A0158
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/757-27a0158-rb/file/a1cc53538575.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.