# Boeing Alert Service Bulletin 757-28A0073: Revision 2

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-0496; AD 2016-11-06 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 757-28A0073](https://openairdocs.org/service-documents/boeing/757-28a0073.md)
- Title as filed: U.S. DOT/FAA - SB-757-28A0073-02
- Pages: 69
- PDF: https://openairdocs.org/files/sha256/cc/24/cc24ae94132a3113e560dc93d4434651b1aebd0e85ea00de2ae53afebd7c3555
- Page: https://openairdocs.org/service-documents/boeing/757-28a0073/file/cc24ae94132a

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Service Bulletin
ALERT
Number: 757-28A0073
Original Issue: November 20, 2003
Revision 2: June 04, 2009
ATA System: 2822
SUBJECT: FUEL - Fuel Shutoff Valve Wire Inspection and Reroute in Nacelles/Pylons, Engine to
Wing Aft Fairings - Rolls Royce Powered Airplanes
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2003 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P .O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
1 of 69
8.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
2 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ..................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 4
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 6
E. Compliance .............................................. 1 7
F . Approval ............................................... 1 7
G. Manpower .............................................. 1 7
H. Weight and Balance Changes .................................... 1 8
I. Electrical Load Data ......................................... 1 8
J. References .............................................. 1 8
1. Existing Data: .......................................... 1 8
2. Data supplied with this Service Bulletin: ........................... 1 9
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 9
K. Publications Affected ......................................... 1 9
L. Interchangeability and Intermixability of Parts ........................... 1 9
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 1
C. Parts Necessary For Each Airplane ................................. 2 1
1. Kits/Parts: ............................................ 2 1
2. Parts and Materials Supplied by the Operator: ........................ 2 4
3. Parts Modified and Reidentified: ................................ 2 5
4. Parts Removed and Not Replaced: .............................. 2 5
D. Parts Necessary to Change Spares ................................. 2 5
E. Special Tooling - Price and Availability ............................... 2 5
F . Special Tooling Necessary to do this Service Bulletin ....................... 2 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 7
A. GENERAL INFORMATION ..................................... 2 7
B. WORK INSTRUCTIONS ....................................... 2 7
FIGURE 1: PREPARE FOR INSPECTION OF WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
[Group 1, Configuration 1] ................................... 3 9
FIGURE 2: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - GROUP 1 CONFIGURATION 1
AIRPLANES [Group 1, Configuration 1] ............................ 4 1
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
[Group 1, Configuration 1] ................................... 4 5
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
[Group 1, Configuration 1] ................................... 5 2
FIGURE 5: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - FOR GROUP 1 CONFIGURATION
1 AIRPLANES [Group 1, Configuration 1] ........................... 6 0
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
3 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 4

FIGURE 6: RIGHT HAND STRUT - INSTALL BACK-TO-BACK CLAMPS AT THE AFT END OF THE STRUT -
GROUP 1 CONFIGURATION 2, AND GROUP 2 AIRPLANES [Group 1, Configuration 2; Group
2 ]  ................................................ 6 4
FIGURE 7: LEFT HAND STRUT - INSTALL THE TFE SPIRAL CABLE WRAP ON WIRE BUNDLE W5100
AT THE AFT END OF THE STRUT - GROUP 1 CONFIGURATION 2 AND 3, AND GROUP 2
AIRPLANES [Group 1, Configuration 2-3; Group 2] ..................... 6 6
FIGURE 8: RIGHT HAND STRUT - INSTALL SPIRAL CABLE WRAP ON WIRE BUNDLE W5200 AT THE
AFT END OF THE STRUT - GROUP 1 CONFIGURATION 2 AND 3, AND GROUP 2 AIRPLANES
[Group 1, Configuration 2-3; Group 2] ............................. 6 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
4 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 5

Commercial 
Airplanes
757
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 757-28A0073Original Issue: November 20, 2003
Revision 2: June 04, 2009
ATA System: 2822
SUBJECT: FUEL - Fuel Shutoff Valve Wire Inspection and Reroute in Nacelles/Pylons, Engine to
Wing Aft Fairings - Rolls Royce Powered Airplanes
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive 2005-18-18 dated October 14, 2005, is related
to this service bulletin.
More work is necessary on airplanes changed as shown in the original issue of this service bulletin dated
November 20, 2003 or Revision 1 of this service bulletin dated February 24, 2005.
REASON FOR REVISION
This revision is sent to tell the operators that Boeing received messages from some operators regarding the
interference between the Fuel Shutoff Valve wires and the adjacent fairing at the aft end of the right engine strut.
To prevent possible damage of the Fuel Shutoff Valve wires, Boeing decided to add additional protection to the
Fuel Shutoff Valve wires that do not have a Teflon sleeve already installed during production. A new TFE
(Tetrafluoroethylene) Spiral Cable Wrap is added to the Fuel Shutoff Valve wires at the aft end of the strut, for
both, the left and right engine strut. The Spiral Cable Wrap will improve the Fuel Shutoff Valve wires protection.
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve wires during production. The
Teflon Sleeve installed during production starts at the lower part of Nacelle STA 278 and ends in the
wing area. It is not necessary to install the Spiral Cable Wrap at the locations given in the bulletin, if
the Fuel Shutoff Valve wires already have a Teflon sleeve installed at those locations.
These sections were changed:
1. In Summary, Paragraph Action - Added new action requirement to protect the aft end of the Fuel Shutoff
valve wires with a Spiral Cable Wrap, on both Left and Right Engine. Added clarification note.
2. In Summary - Added additional data to Summary, Paragraph Action, and to the Summary illustration.
3. In Planning Information, paragraph 1.A. Effectivity - Added Configuration 3 to Group 1 airplanes in the Group
Configuration Table.
4. In Planning Information, paragraph 1.C. Reason - Added the list of all changes included in Revision 2 of
this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
5 of 69

### Page 6

5. In Planning Information, paragraph 1.D. Description - Added new action requirement to protect the aft end
of the Fuel Shutoff Valve wires with a Spiral Cable Wrap, on both, Left and Right Engine. Added a clarification
note.
6. In Planning Information, paragraph 1.E., Compliance - Added data related to the Airworthiness Directive
(AD).
7. In Planning Information, paragraph 1.F ., Approval - Changed the existing approval statement with the new
approval statement and added data related to the Airworthiness Directive (AD).
8. In Planning Information, paragraph 1.G., Manpower - Added the manpower for the new figures and changed
the manpower for some existing figures.
9. In Material Section, paragraph 2.C.2., Parts and Materials Supplied by Operators - Added the Spiral Cable
Wrap.
10. In Material Section, paragraph 2.C4., Parts Removed and Not Replaced - Added to the table two screws
and two washers that are removed and not replaced.
11. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Part I - Changed format and added
instructions to install the Spiral Cable Wrap on Fuel Shutoff Valve wires, at the aft end of the strut, for both,
Left and Right Engine.
12. In Accomplishment Instructions, paragraph 3.B. Work Instructions - Added a new Part III that provides
instructions to install the Spiral Cable Wrap on Fuel Shutoff Valve wires, at the aft end of the strut, for both,
Left and Right Engine, for airplanes that already incorporated Revision 1 of the service bulletin.
13. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Part V - Changed the word "Left" with
"Right" in step instruction 1.i.
14. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Figure 1- Added two notes.
15. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Figure 3, Figure 4 - Added the Spiral
Cable Wrap and did some minor graphical changes to figures.
16. In Accomplishment Instructions, paragraph 3.B. Work Instructions - Added Figure 7 and Figure 8, for
airplanes that incorporated Revision 1 of the service bulletin that have to add the Spiral Cable Wrap on
Fuel Shutoff Valve wires, at the aft end of the strut, for both, Left and Right Engine.
The data given in Information Notice 757-28A0073 IN 01 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
November 20, 2003Original Issue:
February 24, 2005Revision 1:
June 04, 2009Revision 2:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
6 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 7

Commercial 
Airplanes
757
Service Bulletin
ALERT
SummaryNumber: 757-28A0073Original Issue: November 20, 2003
Revision 2: June 04, 2009
ATA System: 2822
SUBJECT: FUEL - Fuel Shutoff Valve Wire Inspection and Reroute in Nacelles/Pylons, Engine to
Wing Aft Fairings - Rolls Royce Powered Airplanes
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
The related 757-300 bulletin is 757-28A0074.
This service bulletin provides instructions to do an inspection of wires in the left and right engine to wing aft
fairings, repair as necessary and reroute.
One operator reported tripping of the spar fuel shutoff valve circuit breaker due to a chafed wire shorted against
structure in the aft fairing flammable leakage zone.The airplane had 10900 hours and 6225 cycles.The operator
examined other airplanes in their fleet and found chafed wires in some of the airplanes. The cause of the chafe
condition was missing or incorrectly installed wire sleeving, incorrect chafe grommet installation and incorrect
wire bundle clamp installation.
Shorting and the creation of arcs and sparks in a flammable leakage zone could cause a fire in flight or on the
ground.
Boeing Service Related Problem (SRP) 757-SRP-28-0090 is related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
7 of 69

### Page 8

ACTION
Inspect the Fuel Shutoff Valve wires from Power Plant Station (PP STA) 278, aft, to the rear spar of the wing in
the left and right engine to wing aft fairings. Inspect the Fuel Shutoff Valve wires for chafe sleeves and wire
damage at PP STA's 278, 290 and 301. Repair the Fuel Shutoff Valve wires found with damage as required. If
no chafe sleeve is installed on the Fuel Shutoff Valve wires, add wrap-on sleeve. Inspect the PP STA 278 and
PP STA 301 bulkheads to make sure the installation of the caterpillar grommet is correct. Add a new wire bundle
support bracket at PP STA 301 bulkheads. Add also a TFE Spiral Cable Wrap on the Fuel Shutoff Valve wires
at the aft end of the right and left strut, if no chafe sleeve was installed during production. Add back-to-back
P-clamps between wire and hydraulic supply tube at the aft end of the right hand strut only. Re-route the wire
bundles.
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve wires during production. The
Teflon Sleeve installed during production starts at the lower part of Nacelle STA 278 and ends in the
wing area. It is not necessary to install the Spiral Cable Wrap at the locations given in the bulletin, if
the Fuel Shutoff Valve wires already have a Teflon sleeve installed at those locations.
EFFECTIVITY
757-200, 757-200CB and 757-200PF airplanes powered by Rolls Royce engines. Refer to service bulletin
Paragraph 1.A.1 for effectivity.
COMPLIANCE
Boeing recommends that operators inspect and make the change given in this service bulletin within 5 years
from the date of this service bulletin revision.
Federal Aviation Administration (FAA) Airworthiness Directive 2005-18-18 dated October 14, 2005, is related
to this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of November 8, 2002. Please refer to
Paragraph 2.B., Industry Support Information.
MANPOWER
The total Task Hours time and Elapsed Hours time depend of the airplane configuration and necessary rework
figures. Please refer to Paragraph 1.G, Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
8 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 9

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
9 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
10 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT
BLANK PAGE

### Page 11

Commercial 
Airplanes
757
Service Bulletin
ALERT
Number: 757-28A0073
Original Issue: November 20, 2003
Revision 2: June 04, 2009
ATA System: 2822
SUBJECT: FUEL - Fuel Shutoff Valve Wire Inspection and Reroute in Nacelles/Pylons, Engine to
Wing Aft Fairings - Rolls Royce Powered Airplanes
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY . IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes with wire bundles which are not correctly installed and are
in a location where damage to wires can occur.
-1
Airplanes that did not incorporate the intent of the initial release of
this service bulletin.
1
Airplanes that have incorporated the intent of the initial release of
this bulletin.
2
Airplanes that have incorporated the intent of revision 1 of this service
bulletin.
3
Airplanes that incorporated the intent of the initial release of this
service bulletin during production.
-2
Airplane Models:
757-200, 757-200CB, 757-200PF
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
11 of 69

### Page 12

GroupVariable Number
1NA001 - NA028
1NA191 - NA199
1NA201 - NA239
1NA301 - NA305
1NA341 - NA352
1NA391 - NA399
1NA401 - NA408
1NA441 - NA447
1NB021 - NB023
1NB036 - NB041
1NB051 - NB053
1NB061 - NB073
1NB079
1NB131 - NB148
1NB161 - NB162
1NB201 - NB204
1NB221 - NB228
1NB230
1NB236
1NB239
1NB261 - NB267
1NB291 - NB299
1NB301 - NB302
1NB311 - NB312
1NB321 - NB331
1NB421 - NB438
1NB446
1NB451 - NB454
1NB501 - NB523
1NB561
1NB571
1NB581 - NB583
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
12 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 13

GroupVariable Number
1NC058 - NC062
1NC936 - NC950
1NC971 - NC974
1ND001 - ND007
1ND011 - ND059
1ND111 - ND113
1ND161 - ND199
1ND201 - ND203
1ND221 - ND225
1ND241 - ND248
1ND301 - ND322
1ND401
1ND891
1ND895
2NJ001 - NJ004
2NJ031 - NJ032
1NN001 - NN002
1NN051 - NN052
1NS601 - NS616
1NT001 - NT009
1NT201 - NT202
1NT231 - NT234
1NT237 - NT240
1NT242
1NT245 - NT248
1NT281 - NT289
1NT381 - NT386
1NT401 - NT409
1NT411 - NT412
1NT426 - NT427
1NT431 - NT432
1NT436 - NT438
1NT446
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
13 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 14

GroupVariable Number
1NT731 - NT769
1NT861 - NT862
1NT901 - NT916
1NT971 - NT985
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
The related 757-300 bulletin is 757-28A0074.
This service bulletin provides instructions to do an inspection of wires in the left and right engine to
wing aft fairings, repair as necessary and reroute.
One operator reported tripping of the spar fuel shutoff valve circuit breaker due to a chafed wire shorted
against structure in the aft fairing flammable leakage zone. The airplane had 10900 hours and 6225
cycles. The operator examined other airplanes in their fleet and found chafed wires in some of the
airplanes. The cause of the chafe condition was missing or incorrectly installed wire sleeving, incorrect
chafe grommet installation and incorrect wire bundle clamp installation.
Shorting and the creation of arcs and sparks in a flammable leakage zone could cause a fire in flight
or on the ground.
Revision 1 is sent to include the following changes:
— In Summary, Paragraph Manpower, removed table and reference to Manpower paragraph.
— In Planning Information, Paragraph 1.A., Effectivity, added the table with the airplanes groups and
configurations.
— In Planning Information, Paragraph 1.D., Description, added the back-to-back p-clamps installation.
— In Planning Information, Paragraph 1.G., Manpower, changed Table.
— In Planning Information, Paragraph 1.H., Weight and Balance Change, changed Table.
— In Planning Information, Paragraph 1.J.3., Installation Drawings Used in the Preparation of this
Service Bulletin, added four drawings.
— In Material Information, Paragraph 2.A. Material-Price and Availability, added Note.
— In Material Information, Paragraph 2.A. Material-Price and Availability, replaced the top kit
012N1023-1 with the new top kit 012N1023-8 and added top kit 012N1023-6.
— In Material Information, Paragraph 2.C.1. Kits/Parts, replaced the top kit 012N1023-1 with top kit
012N1023-8, and added top kit 012N1023-6. Added the parts for each kit.
— In Material Information, Paragraph 2.C.2. Parts and Materials Supplied by Operator, added an
optional adhesive and more parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
14 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 15

— In Accomplishment Instructions, Paragraph 3.B., Work Instructions, added Part I for Group 1
Configuration 1 airplanes, and changed the instructions to re-route wire bundle W5100 for the Left
Engine Strut and wire bundle W5200 for the Right Engine Strut. Added also new instructions to
install back-to-back p-clamps at the aft end of the Right Engine Strut.
— In Accomplishment Instructions, Paragraph 3.B. Work Instructions added Part II for Group 1
Configuration 2 and Group 2 airplanes for installation of the back-to-back p-clamps at the aft end
of the Right Engine Strut.
— In Accomplishment Instructions, Paragraph 3.B. Work Instructions added Part III. Moved the
instructions to test the Left Engine Fuel Shut-off Wire Bundle W5100 to Part III.
— In Accomplishment Instructions, Paragraph 3.B. Work Instructions added Part IV. Moved the
instructions to test the Right Engine Fuel Shut-off Wire Bundle W5200 to Part IV.
— In Accomplishment Instructions, Paragraph 3.B Work Instructions, changed Figure 2 and Figure
3.
— In Accomplishment Instructions, Paragraph 3.B. Work Instructions, added Figure 4, Figure 5, and
Figure 6.
Revision 2 is sent to include the following changes:
1. In Summary, Paragraph Action - Added new action requirement to protect the aft end of the Fuel
Shutoff valve wires with a Spiral Cable Wrap, on both Left and Right Engine. Added clarification
note.
2. In Summary - Added additional data to Summary, Paragraph Action, and to the Summary illustration.
3. In Planning Information, paragraph 1.A. Effectivity - Added Configuration 3 to Group 1 airplanes
in the Group Configuration Table.
4. In Planning Information, paragraph 1.C. Reason - Added the list of all changes included in Revision
2 of this service bulletin.
5. In Planning Information, paragraph 1.D. Description - Added new action requirement to protect
the aft end of the Fuel Shutoff Valve wires with a Spiral Cable Wrap, on both, Left and Right Engine.
Added a clarification note.
6. In Planning Information, paragraph 1.E., Compliance - Added data related to the Airworthiness
Directive (AD).
7. In Planning Information, paragraph 1.F ., Approval - Changed the existing approval statement with
the new approval statement and added data related to the Airworthiness Directive (AD).
8. In Planning Information, paragraph 1.G., Manpower - Added the manpower for the new figures
and changed the manpower for some existing figures.
9. In Material Section, paragraph 2.C.2., Parts and Materials Supplied by Operators - Added the
Spiral Cable Wrap.
10. In Material Section, paragraph 2.C4., Parts Removed and Not Replaced - Added to the table two
screws and two washers that are removed and not replaced.
11. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Part I - Changed format and
added instructions to install the Spiral Cable Wrap on Fuel Shutoff Valve wires, at the aft end of
the strut, for both, Left and Right Engine.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
15 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 16

12. In Accomplishment Instructions, paragraph 3.B. Work Instructions - Added a new Part III that
provides instructions to install the Spiral Cable Wrap on Fuel Shutoff Valve wires, at the aft end
of the strut, for both, Left and Right Engine, for airplanes that already incorporated Revision 1 of
the service bulletin.
13. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Part V - Changed the word
"Left" with "Right" in step instruction 1.i.
14. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Figure 1- Added two notes.
15. In Accomplishment Instructions, paragraph 3.B. Work Instructions, Figure 3, Figure 4 - Added the
Spiral Cable Wrap and did some minor graphical changes to figures.
16. In Accomplishment Instructions, paragraph 3.B. Work Instructions - Added Figure 7 and Figure 8,
for airplanes that incorporated Revision 1 of the service bulletin that have to add the Spiral Cable
Wrap on Fuel Shutoff Valve wires, at the aft end of the strut, for both, Left and Right Engine.
D. Description
Inspect the Fuel Shutoff Valve wires from Power Plant Station (PP STA) 278, aft, to the rear spar of
the wing in the left and right engine to wing aft fairings. Inspect the Fuel Shutoff Valve wires for chafe
sleeves and wire damage at PP STA's 278, 290 and 301. Repair the Fuel Shutoff Valve wires found
with damage as required. If no chafe sleeve is installed during production, add wrap-on sleeve. Inspect
the PP STA 278 and PP STA 301 bulkheads to make sure the installation of the caterpillar grommet
is correct. Add a new wire bundle support bracket at PP STA 301 bulkheads. Add also a TFE Spiral
Cable Wrap on the Fuel Shutoff Valve wires at the aft end of the right and left strut, if no chafe sleeve
was installed during production. Add back-to-back P-clamps between wire and hydraulic supply tube
at the aft end of the right hand strut only. Re-route the wire bundles.
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve wires during
production. The Teflon Sleeve installed during production starts at the lower part of Nacelle
STA 278 and ends in the wing area. It is not necessary to install the Spiral Cable Wrap at the
locations given in the bulletin, if the Fuel Shutoff Valve wires already have a Teflon sleeve
installed at those locations.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
433, 434757-200, 757-200CB, 757-
200PF
Group 2:
Affected Maintenance Zones
ZoneModel
433, 434757-200
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
16 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 17

E. Compliance
Boeing recommends THAT OPERATORS INSPECT AND MAKE THE CHANGE GIVEN IN THIS
SERVICE BULLETIN within 5 years from the date of this service bulletin revision.
Federal Aviation Administration (FAA) Airworthiness Directive 2005-18-18 effective from October 14,
2005 is related to this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA).The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the action (i.e. inspection or modification) defined in this service bulletin
as an alternative method of compliance to the requirements of paragraph (f)(1) and (f)(2) of AD
2005-18-18. All provisions of AD 2005-18-18 that are not specifically referenced in the above statement
remain fully applicable and must be complied with.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this inspection/change for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task-hour data if necessary.The estimate does not include lost time.These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Elapsed
Hours
Task-HoursNumber of
Persons
Task
1.02.02Open Access
1.02.02Figure 1
2.04.02Figure 2
2.7511.04Figure 3
3.012.04Figure 4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
17 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 18

Elapsed
Hours
Task-HoursNumber of
Persons
Task
2.04.02Figure 5
1.0 (a)1.0 (a)1Figure 6
0.750.751Figure 7
1.251.251Figure 8
4.0 (b)8.0 (b)2Test
1.02.02Close Access
Variable (c)Variable (c)TOTAL FOR EACH AIRPLANE
(a) For Right Hand Strut Only.
(b) For aircraft test, additional time required for repairs.
(c) Total Task-Hours time and Elapsed hours time depend
of the airplane configuration and necessary rework fig-
ures.
H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
NegligibleNegligibleAll
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. 757 WDM 28-22-11
b. Service Related Problem (SRP) 757-SRP-28-0090
c. Boeing Service Bulletin 757-54-0013 R04
d. Boeing Service Bulletin 757-28A0074
e. Boeing Drawing 65-88700.
f. Standard Wiring Practices Manual (SWPM) 20-00-14, 20-10-11, 20-10-12, 20-10-13, 20-10-14,
20-10-15, 20-10-19, 20-30-11, 20-30-12, 20-61-11
g. 757 Aircraft Maintenance Manual (AMM) 06-43-00, 06-44-00, 24-22-00
h. 757 Structural Repair Manual (SRM) 51-40-02
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
18 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 19

2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing
Number
LOWER PANEL INSTL. OUTBD WING112N4001
BRACKET INSTL. - HYDRAULIC, LOWER SURFACE WING AND REAR SPAR
SECT
271N6171
WIRE BUNDLE INSTL - L FILLET AREA & REAR SPAR IRSS 150 - 325288N1315
WIRE BUNDLE INSTL - R FILLET AREA & REAR SPAR IRSS 150 - 325288N1316
WIRE BUNDLE INSTL - LEFT REAR SPAR IRSS 325.0 - W.S. 836.55288N1317
WIRE BUNDLE INSTL - RIGHT REAR SPAR IRSS 325.0 - W.S. 836.55288N1318
TUBING INSTL LEFT AFT STRUT FAIRING208N3121
ELECT. CABLE INSTL LEFT AFT STRUT FAIRING PP3 208-53-PPS 278288N3121
WIRE BUNDLE INSTL - RIGHT AFT STRUT FAIRING PPS 208.53 - PPS 278288N3122
TRAILING EDGE INSTL - AFT FAIRING, STRUT313N5023
BULKHEAD INSTL - AFT FAIRING, STRUT313N5033
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
None.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
19 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 20

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
20 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT
BLANK PAGE

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane as shown
below. Kits availability is shown in the Reorder Lead Time (ROLT). ROLT is calculated from the date
Boeing gets the purchase order.
NOTE: Operators that did not incorporate the initial release of this service bulletin need to order top
kit 012N1023-8 given in the table below. Operators that incorporated the intent of the initial
release of this service bulletin need to order only 012N1023-6 top kit.
Unit Price thru Dec.
31 2008
ROLT
(Weeks)
NameKit Number
$1,491.0047STRUT WIRE BUNDLE ROUT -
ING REVISION - TOP KIT
012N1023-8
$3.1045RH STRUT WIRE BUNDLE
ROUTING REVISION - TOP KIT
012N1023-6
The Kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
After the Unit Price date, new price and ROLT data is applicable. Prices are in United States dollars.
Term: 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65 Boeing Spares Department P .O. Box 3707 Seattle,
Washington 98124-2207 USA
B. Industry Support Information
Boeing warranty remedies are available for 757 airplanes in warranty as of November 8, 2002. For
man-hour and material reimbursement for airplanes in warranty as of that date, send a warranty claim
to Boeing Commercial Airplanes Group - Warranties.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
21 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 22

NOTE: The top kit 012N1023-8 and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, are necessary for Group 1 Configuration 1 airplanes (airplanes
that do not have the intent of the initial release of this service bulletin incorporated). The
kit 012N1023-6 and the items shown in Paragraph 2.C.2., Parts and Materials Supplied
by the Operator, are necessary for Group 1 Configuration 2 airplanes (airplanes that
incorporated the intent of the initial release of this service bulletin) and Group 2 airplanes.
For Group 1 Configuration 3 airplanes, operators should use the the Spiral Cable Wrap
and Lacing Tape provided in Paragraph 2.C.2., Parts and Materials Supplied by the
Operator table.
Kit 012N1023
NotesExisting Part
Number
NameQTYNew Part Number
-8-7-6-5-2-1
(h)STRUT WIRE
BUNDLE ROUT -
ING REVISION-
TOP KIT
1....-012N1023-1
STRUT WIRE
BUNDLE ROUT -
ING REVISION-
STRUT KIT
....-2012N1023-2
(h)STRUT WIRE
BUNDLE ROUT -
ING REVISION-
TOP KIT
1..-..012N1023-5
(i)RH STRUT WIRE
BUNDLE ROUT -
ING REVISION-
TOP KIT
..-1..012N1023-6
STRUT WIRE
BUNDLE ROUT -
ING REVISION-
STRUT KIT
.-.2..012N1023-7
(h)STRUT WIRE
BUNDLE ROUT -
ING REVISION-
TOP KIT
-.....012N1023-8
(e)TFE-2X SLEEVING....1.012N1023-3
(f)LOCKSTITCH
LACING TAPE
....1.012N1023-4
(b)BRACKET ASSY....1.313N5033-134
(a) (d)BOLT, PROTRUD-
ING HD
....2.BACB30NX6K3X
(a)CLAMP , LOOP..1...BACC10DK20
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
22 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 23

Kit 012N1023
NotesExisting Part
Number
NameQTYNew Part Number
-8-7-6-5-2-1
(a)CLAMP , WIRE
BUNDLE
..1.2.BACC10GU101
(a)COLLAR....2.BACC30M6
(b)GROMMET....1.BACG20Z-
E001275
(b) (g)NUTPLATE.1....BACN10JA3
(a)NUT..1...BACN10YR3CD
(b) (d)
(g)
RIVET.2....BACR15DR3AC5
(a) (d)BOLT..1...BACS12HN3-10
(a)WASHER..1.1.NAS1149D0332J
(b)SCREW....1.NAS1801-3-8
(b) (c)
(g)
NUT SPACER.2....NAS463YDD10H
(b)CLAMP....2.TA025041-02
(a) This part is not used in production.
(b) This part is used in production.
(c) Y ou can use the existing part to replace the new part.
(d) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 65-88700 (757)
are used to determine the part numbers used as substitutes.
(e) 18 inches long, light blue, Zeus #7 unperforated thin wall.
(f) 120 inches long, BMS 13-54, Class 1, Grade D, Type 3, Color - White, Finish C, aramid fabric.
(g) Discard the existing part.
(h) Top Kit 012N1023-8 replaces Top Kit 012N1023-1 on airplanes that have not accomplished the initial release
of this Service Bulletin. Note: Operators that have already received Top Kit 012N1023-1 but have not ac-
complished the initial release of this Service Bulletin (Group 1, Configuration 1) require Top Kit 012N1023-
5 to achieve the improvements detailed in this service bulletin.
(i) Top Kit 012N1023-6 is required on airplanes that have accomplished the initial release of this Service
Bulletin (Group 1, Configuration 2) and on airplanes that incorporated the intent of the initial release of
this Service Bulletin during production (Group 2).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
23 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 24

Kit 012N1023
NotesExisting Part
Number
NameQTYNew Part Number
-6
RH STRUT WIRE
BUNDLE ROUTING
REVISION-TOP KIT
-012N1023-6
(a)CLAMP , LOOP1BACC10DK20
(a)CLAMP , WIRE
BUNDLE
1BACC10GU101
(a)NUT1BACN10YR3CD
(a) (b)BOLT1BACS12HN3-10
(a) (b)WASHER1NAS1149D0332J
(a) This part is not used in production.
(b) If grip length shown is not available at Boeing, fasteners supplied in
kits may be one grip length longer than indicated. Also, if any fasteners
part numbers listed are not available or have been superseded, substi-
tute fasteners may be supplied in kits. Boeing Document D-590 and
Boeing Drawing 65-88700 (757) are used to determine the part numbers
used as substitutes.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
Type II, Class 1, Grade B (a) (b)Adhesive: Epoxy Polyamide, 2 Compo-
nent
2 oz.BMS 5-126
Type V or Type VI (a)(b)Adhesive, Urethane2 oz.BMS 5-105
Type 5, Class 1. Cut the length
as necessary at assembly. (a)
Wire5 Ft.BMS 13-60, 18
AWG
Type 1, Class 1. Cut the length
as necessary at assembly. (a)
Pigtail Wire10 InchBMS 13-16, 18
AWG
Refer to SWPM 20-30-12 as an
accepted procedure.
Splice Kit1D-150-0169
Refer to SWPM 20-30-11 as an
accepted procedure.
Terminal, Lug1BACT12AC3
Refer to SWPM 20-61-11 as an
accepted procedure.
Socket Contact1BACC47CP2T
Refer to SWPM 20-10-15 as an
accepted procedure. (c)
Inner Ferrule1BACS13S149BNP
Refer to SWPM 20-10-15 BSW-
PM 20-10-15. (d)
Outer Ferrule1BACS13S225CNP
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
24 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 25

NotesNameQTYPart Number /
Specification
(e)Heat Shrinkable Sleeve1TFE-4X, 1/4 DIA
Type III, Class 1, Grade D, Finish
C. Length as necessary. (a)
Lacing Tape10 Ft.BMS 13-54
M.M. Newman TFE Spiral Wrap
0.125 Inch OD, 0.065 ID (f)
Spiral, Cable Wrap4.0 Ft.HT1-8T1
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
(b) Y ou can use BMS 5-126 or BMS 5-105, whichever is available. However, if a faster cure time is
needed, use BMS 5-105 adhesive.
(c) Measure the OD of the wire. The applicable inner ferrule has an ID that is a small amount larger than
the OD of the wire. If necessary use a smaller or larger size inner ferrule. Refer to SWPM 20-10-15,
Table VII.
(d) More than one outer ferrule can be specified for one inner ferrule. Refer to SWPM 20-10-15, Table
VII.
(e) Refer to SWPM 20-10-14 for other heat shrinkable sleeve sizes and for alternative materials.
(f) Operators can order this material from Boeing.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
NotesQTYNameExisting Part
Number
2ClampBACC10GU101
2WasherAN960PD10L
2ScrewNAS1801-3-( )
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
25 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 26

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
26 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT
BLANK PAGE

### Page 27

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Hole dimensions for standard solid rivets are given in 757 Structural Repair
Manual, Chapter 51
— Torque limits to tighten nuts and bolts are given in 757 Structural Repair Manual,
Chapter 51.
4. For approved fastener and process material substitutions, refer to 757 Structural
Repair Manual, Chapter 51, Alternate fasteners are given in 757 Structural Repair
Manual Chapter 51 and Boeing Drawing 65-88700.
5. If the length of fasteners specified in this service bulletin do not meet the installation
standards, fasteners of the same specification, or an approved substitute, one grip
length longer or shorter may be used.
6. Refer to the Standard Wiring Practices Manuals SWPM 20-00-14 for replacement
of wires.
7. Refer to the Standard Wiring Practices Manuals SWPM 20-10-11 and SWPM 20-10-12
for the wire installation procedures.
8. Refer to the Standard Wiring Practices Manuals SWPM 20-10-13 for repair of electrical
wires and cables.
B. WORK INSTRUCTIONS
Group 1, Configuration 1:
PART I - Reroute of Fuel Shut-off Valve wires W5100 (L/H) and W5200 (R/H)
1. For Left Engine Strut Reroute of Wire Bundle W5100 as follows:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
27 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 28

a. Gain access to the left aft fairing. Open panel 434AL and remove panels 434DR and 434CL
as given in 757 AMM 06-43-00, or operators approved equivalent procedure.
b. Inspect wire W5100 routing from Power Plant Station 278 to the aft end of the strut fairing.
(1) If wire W5100 is installed as shown in FIGURE 1:
(a) Remove the support clamps as shown in FIGURE 1.
(b) Inspect wire bundle for damage, repair damage if found. Refer to FIGURE 2.
(c) Add support bracket to PP STA 301 Bulkhead as shown in FIGURE 2.
(d) Add protective sleeve and TFE spiral cable wrap if no chafe sleeve was installed
during production, and add the support clamps and change the wire routing as shown
in FIGURE 3. If there is not enough wire slack to re-route the wire:
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve
wires during production.The Teflon Sleeve installed during production starts
at the lower part of the Aft Strut fairing, at STA 278, and ends in the wing
area. It is not necessary to install the protective sleeves and the Spiral Cable
Wrap at the locations given in the bulletin, if the Fuel Shutoff Valve wires
already have a Teflon sleeve installed at those locations.
1) Gain access to the left wing trailing edge. Open panel 551EBX and 551BB as
given in 757 AMM 06-44-00, or approved equivalent procedure.
2) Loosen all clamps from Fuel shut-off valve IRSS 270 to IRSS 353 as shown in
FIGURE 3.
3) Pull enough wire back into the strut fairing, and attach wire to the loop clamp
as shown in FIGURE 3.
NOTE: Excess wire may be available in an existing loop made during
production between IRSS 270 and IRSS 353. If no wire slack is found
make a wire splice at the location shown in Figure 3. Remove the end
of the wire W5100 from the splice location to connector D02142 (at
Fuel Shut-off Valve) and ground GD2319-ST and discard. Splice a new
wire, long enough to provide enough slack for re-routing the wire in the
engine strut, that matches the discarded wire except for length added
at the splice location. Make sure that the splice does not touch any
clamp or structure.
NOTE: Make sure that wire bundle is correctly installed and does not touch
the hydraulic tubes, strut fairing panel, or surrounding structure. Inspect
that wire bundle clearance to surrounding structure or tubing, anywhere
along the wire bundle routing, is as given in SWPM 20-10-11, Table
IX.
4) Tighten all clamps from IRSS 270 to IRSS 353 and tie wire W5100 with lacing
tape to the bundle as initially found.
(2) If wire W5100 is installed as shown in FIGURE 5:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
28 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 29

(a) Inspect wire bundle for damage, repair damage if found. Refer to FIGURE 5.
(b) Add support bracket to PP STA 301 Bulkhead as shown in FIGURE 5.
(c) Add protective sleeve and TFE spiral cable wrap if no chafe sleeve was installed
during production, and change wire W5100 routing as shown in FIGURE 3. If there
is not enough wire slack to re-route the wire:
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve
wires during production.The Teflon Sleeve installed during production starts
at the lower part of the Aft Strut Fairing, at STA 278, and ends in the wing
area. It is not necessary to install the protective sleeves and the Spiral Cable
Wrap at the locations given in the bulletin, if the Fuel Shutoff Valve wires
already have a Teflon sleeve installed at those locations.
1) Gain access to the left wing trailing edge. Open panel 551EBX and 551BB as
given in 757 AMM 06-44-00, or approved equivalent procedure.
2) Loosen all clamps from Fuel shut-off valve IRSS 270 to IRSS 353 as shown in
FIGURE 3.
3) Pull enough wire back into the strut fairing, and attach wire to the loop clamp
as shown in FIGURE 3.
NOTE: Excess wire may be available in an existing loop made during
production between IRSS 270 and IRSS 353. If no wire slack is found
make a wire splice at the location shown in Figure 3. Remove the end
of the wire W5100 from the splice location to connector D02142 (at
Fuel Shut-off Valve) and ground GD2319-ST and discard. Splice a new
wire, long enough to provide enough slack for re-routing the wire in the
engine strut, that matches the discarded wire except for length added
at the splice location. Make sure that the splice does not touch any
clamp or structure.
NOTE: Make sure that wire bundle is correctly installed and does not touch
the hydraulic tubes, strut fairing panel, or surrounding structure. Inspect
that wire bundle clearance to surrounding structure or tubing, anywhere
along the wire bundle routing, is as given in SWPM 20-10-11, Table
IX.
4) Tighten all clamps from IRSS 270 to IRSS 353 and tie wire W5100 with lacing
tape to the bundle as initially found.
c. If wire damage was repaired or wire was spliced, test the Fuel Shut-Off valve wire W5100 as
given in PART IV.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
29 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 30

d. Close panel 434AL and install panels 434DR and 434CL as given in 757 AMM 06-43-00, or
operators approved equivalent procedure.
e. Close panels 551EBX and 551BB as given in 757 AMM 06-43-00, or operators approved
equivalent procedure.
f. Put the airplane back to a serviceable condition.
2. For Right Engine Strut re-route the wire bundle W5200 as follows:
a. Gain access to the right aft fairing. Open panel 444AL and remove panels 444DR and 444CL
as given in 757 AMM 06-43-00, or operators approved equivalent procedure
b. Inspect wire W5200 routing from Power Plant Station 278 to the aft end of the strut fairing.
(1) If wire W5200 is installed as shown in FIGURE 1:
(a) Remove the support clamps as shown in FIGURE 1.
(b) Inspect wire bundle for damage, repair damage if found. Refer to FIGURE 2.
(c) Add support bracket to PP STA 301 Bulkhead as shown in FIGURE 2.
(d) Add support clamps and change wire routing as shown in FIGURE 4.
(e) Add protective sleeve and TFE spiral cable wrap if no chafe sleeve was installed
during production, and add back-to-back P-clamps on the hydraulic supply tube at
the aft end of the Fairing strut as shown in FIGURE 4, and attach the wire to the loop
clamps. If there is no slack to attach the wire:
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve
wires during production.The Teflon Sleeve installed during production starts
at the lower part of the Aft Strut Fairing, at STA 278, and ends in the wing
area. It is not necessary to install the protective sleeves and the Spiral Cable
Wrap at the locations given in the bulletin, if the Fuel Shutoff Valve wires
already have a Teflon sleeve installed at those locations.
1) Gain access to the right wing trailing edge. Open panel 651EBX and 651BB as
given in 757 AMM 06-44-00, or operators approved equivalent procedure.
2) Loosen all clamps from Fuel shut-off valve IRSS 270 to IRSS 353 as shown in
FIGURE 4.
3) Pull enough wire back into the strut fairing, and attach wire to the loop clamps
as shown in FIGURE 4.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
30 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 31

NOTE: Excess wire may be available in an existing loop made during
production between IRSS 270 and IRSS 353. If no wire slack is found
make a wire splice at the location shown in Figure 4. Remove the end
of the wire W5200 from the splice location to connector D02022 (at
Fuel Shut-off Valve) and ground GD2419-ST and discard. Splice a new
wire, long enough to provide enough slack for re-routing the wire in the
engine strut, that matches the discarded wire except for length added
at the splice location. Make sure that the splice does not touch any
clamp or structure.
NOTE: Make sure that wire bundle is correctly installed and does not touch
the hydraulic tubes, strut fairing panel, or surrounding structure. Inspect
that wire bundle clearance to surrounding structure or tubing, anywhere
along the wire bundle routing, is as given in SWPM 20-10-11, Table
IX.
4) Tighten all clamps from IRSS 270 to IRSS 353 and tie wire W5200 with lacing
tape to the bundle as initially found.
(2) If wire W5200 is installed as shown in FIGURE 5:
(a) Inspect wire bundle for damage, repair damage if found. Refer to FIGURE 5.
(b) Add support bracket to PP STA 301 Bulkhead as shown in FIGURE 5.
(c) Add protective sleeve and TFE spiral cable wrap if no chafe sleeve was installed
during production, and add back-to-back P-clamps on the hydraulic supply tube at
the aft end of the Fairing strut as shown in FIGURE 4, and attach wire to the loop
clamp. If there is no slack to attach the wire:
NOTE: Some airplanes have a Teflon Sleeve installed on the Fuel Shutoff Valve
wires during production.The Teflon Sleeve installed during production starts
at the lower part of the Aft Strut Fairing, at STA 278, and ends in the wing
area. It is not necessary to install the protective sleeves and the Spiral Cable
Wrap at the locations given in the bulletin, if the Fuel Shutoff Valve wires
already have a Teflon sleeve installed at those locations.
1) Gain access to the right wing trailing edge. Open panel 651EBX and 651BB as
given in 757 AMM 06-44-00, or operators approved equivalent procedure.
2) Loosen all clamps from Fuel shut-off valve IRSS 270 to IRSS 353 as shown in
FIGURE 4.
3) Pull enough wire back into the strut fairing, and attach wire to the loop clamp
as shown in FIGURE 4.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
31 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 32

NOTE: Excess wire may be available in an existing loop made during
production between IRSS 270 and IRSS 353. If no wire slack is found
make a wire splice at the location shown in Figure 4. Remove the end
of the wire W5200 from the splice location to connector D02022 (at
Fuel Shut-off Valve) and ground GD2419-ST and discard. Splice a new
wire, long enough to provide enough slack for re-routing the wire in the
engine strut, that matches the discarded wire except for length added
at the splice location. Make sure that the splice does not touch any
clamp or structure.
NOTE: Make sure that wire bundle is correctly installed and does not touch
the hydraulic tubes, strut fairing panel, or surrounding structure. Inspect
that wire bundle clearance to surrounding structure or tubing, anywhere
along the wire bundle routing, is as given in SWPM 20-10-11, Table
IX.
4) Tighten all clamps from IRSS 270 to IRSS 353 and tie wire W5200 with lacing
tape to the bundle as initially found.
c. If wire damage was repaired or wire was spliced test the Fuel Shut-Off valve as given in PART
V.
d. Close panel 444AL and install panels 444DR and 444CL as given in 757 AMM 06-43-00, or
operators approved equivalent procedure.
e. Close panels 651EBX and 651BB as given in 757 AMM 06-44-00, or operators approved
equivalent procedure.
f. Put the airplane back to a serviceable condition.
Group 1, Configuration 2; Group 2:
PART II - Installation of the Back-to Back clamps on the Right Engine Strut only
1. Gain access to the right aft fairing. Open panel 444AL and remove panels 444DR and 444CL as
given in 757 AMM 06-43-00, or operators approved equivalent procedure.
2. Inspect wire bundle for damage, repair damage if found. Refer to FIGURE 6.
3. Add back-to-back p-clamps on the hydraulic supply tube at the aft end of the Fairing strut as shown
in Figure 6, and attach wire to the loop clamp.
NOTE: Make sure that wire bundle is correctly installed and does not touch the hydraulic tubes,
strut fairing panel, or surrounding structure. Inspect that wire bundle clearance to
surrounding structure or tubing, anywhere along the wire bundle routing, is as given in
SWPM 20-10-11, Table IX.
4. If wire damage was repaired test the Fuel Shut-Off Valve wire W5200 as given in PART V.
5. Close panel 444AL and install panels 444DR and 444CL as given in 757 AMM 06-43-00, or
operators approved equivalent procedure.
6. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
32 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 33

Group 1, Configuration 2-3; Group 2:
PART III - Installation of the TFE Spiral Cable Wrap on the Fuel Shutoff Valve wires at the aft
end of Left and Right Engine Strut
1. Gain access:
a. For the Left Engine Strut open panel 434AL and remove panels 434DR and 434CL. Refer to
757 AMM 06-43-00 as an accepted procedure.
b. For the Right Engine Strut open panel 444AL and remove panels 444DR and 444CL. Refer
to 757 AMM 06-43-00 as an accepted procedure.
2. Remove the wire bundle support clamps at the aft end of the Left and Right Engine Strut:
a. For the Left Engine Strut as given in FIGURE 7.
b. For the Right Engine Strut as given in FIGURE 8.
3. Inspect wire bundles W5100 (Left Engine Strut) and W5200 (Right Engine Strut) for damage. If
damage is found:
a. For the Left Engine Strut repair wire W5100 as given in FIGURE 7, and in SWPM 20-00-14
and SWPM 20-10-13.
b. For the Right Engine Strut repair wire W5200 as given in FIGURE 8, and SWPM 20-00-14
and SWPM 20-10-13.
4. Add the TFE Spiral Cable Wrap if no Teflon sleeve was installed during production, and install the
support clamps:
a. For the Left Engine Strut as given in FIGURE 7.
b. For the Right Engine Strut as given in FIGURE 8.
NOTE: Do not install the TFE Spiral Cable Wrap if Teflon sleeve was installed during
production at this location. Make sure that wire bundle is correctly installed and does
not touch the hydraulic tubes, strut fairing panel, or surrounding structure. Inspect
that wire bundle clearance to surrounding structure or tubing, anywhere along the
wire bundle routing, is as given in BSWPM 20-10-11, Table IX.
5. If wire damage was repaired test the Fuel Shut-Off Valve wires as follows:
a. For the Left Engine Strut, wire bundle W5100, do "Part IV - Test for Left Engine Strut Fuel
Shut-Off Valve wire W5100".
b. For the Right Engine Strut, wire bundle W5200, do "Part V - Test for Right Engine Strut Fuel
Shut-Off Valve wire W5200".
6. Close panels:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
33 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 34

a. For the left strut close panel 434AL and install panels 434DR and 434CL. Refer to 757 AMM
06-43-00 as an accepted procedure.
b. For the right strut close panel 444AL and install panels 444DR and 444CL. Refer to 757 AMM
06-43-00 as an accepted procedure.
7. Put the airplane back to a serviceable condition.
Group 1-2:
PART IV- Test for Left Engine Strut Fuel Shut-Off Valve wire W5100
WARNING: OBEY THE APPLICABLE SHOP PROCEDURES FOR MAINTENANCE ON ENERGIZED
ELECTRICAL SYSTEMS. SHORT CIRCUIT AND ELECTRICAL SHOCK TO PERSONS
CAN OCCUR.
1. Do a check of each of the two redundant wires that supply power to close the left engine fuel spar
valve
a. Gain access to left engine fuel shut-off valve. Remove access panel 551BB as given in 757
AMM 06-44-00
b. Open these circuit breakers on the P6 panel and attach DO-NOT -CLOSE tags:
(1) 6E1, FUEL VALVES L SPAR
(2) 6H1, FIRE EXTINGUISHING ENG L BTL 1
(3) 6H2, FIRE EXTINGUISHING ENG L BTL 2
c. PUT THE LEFT ENGINE FUEL CONTROL SWITCH, FOUND ON THE P10 QUADRANT
PANEL, TO THE "CUTOFF" POSITION
d. Put the left engine fire switch, found on the P8 quadrant panel, to the NORMAL position
e. Disconnect the connector for the left spar valve actuator, D2142
f. Remove the DO-NOT -CLOSE tag and close circuit breaker; 6E1, FUEL VALVES L SPAR on
the Main Power Distribution Panel, P6
g. For the left spar valve, do a check for 28 VDC power (21.0 VDC minimum, 34.0 VDC maximum)
between these pins on connector D2142
CONNECTOR D2142
TOFROM
pin 4pin 5
pin 4pin 6
h. Open circuit breaker; 6E1, FUEL VALVES L SPAR and attach A DO-NOT -CLOSE tag on the
Main Power Distribution Panel, P6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
34 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 35

i. For the left spar valve, re-connect the connector for the left spar valve actuator, D2142
j. For the left actuator, remove the DO-NOT -CLOSE tag and close these circuit breakers on the
P6 panel
(1) 6E1, FUEL VALVES L SPAR
(2) 6H1, FIRE EXTINGUISHING ENG L BTL 1
(3) 6H2, FIRE EXTINGUISHING ENG L BTL 2
k. Supply electrical power as given in 757 AMM 24-22-00
2. Perform a functional test of the left engine fuel shutoff valve
a. Make sure to close circuit breaker; 6E1, FUEL VALVES L SPAR on the P6 panel
b. Make sure to close circuit breaker; 11D33, FUEL DISAGREE ENABLE LEFT on the P11 panel
c. Put the FUEL CONTROL switch for the left engine on the P10 stand to the RICH-RUN position
d. Get access to the actuator on the left engine fuel shutoff valve through the access door 551BB
as given in 757 AMM 06-44-00
e. Make sure the manual override handle on the left engine fuel shutoff valve moves to the open
position
f. Make sure the SPAR VALVE disagreement light comes on while the left engine fuel shutoff
valve moves to the open position
g. Open these circuit breakers on the P6 panel and attach the DO-NOT -CLOSE tags.
(1) 6H1, FIRE EXTINGUISHING ENG L BTL 1
(2) 6H2, FIRE EXTINGUISHING ENG L BTL 2
h. Pull the FIRE HANDLE for the left engine
i. Make sure the manual override handle on the left engine fuel shutoff valve moves to the closed
position
j. Make sure the SPAR VALVE disagreement light comes on while the left engine fuel shutoff
valve moves to the closed position
k. Put the FIRE HANDLE for the left engine to the NORMAL position
l. Make sure the manual override handle on the left engine fuel shutoff valve moves to the OPEN
position
m. Remove the DO-NOT -CLOSE tags and close these circuit breakers on the P6 panel.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
35 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 36

(1) 6H1, FIRE EXTINGUISHING ENG L BTL 1
(2) 6H2, FIRE EXTINGUISHING ENG L BTL 2
n. Open circuit breaker; 11D33, FUEL DISAGREE ENABLE LEFT, on the P11 panel
o. Make sure the EICAS message, L FUEL SPAR VAL, shows on the top display
p. Close circuit breaker; 11D33, FUEL DISAGREE ENABLE LEFT, on the P11 panel
q. Make sure that the EICAS message, L FUEL SPAR VAL, does not show on the top display
r. Put the FUEL CONTROL switch for the left engine on the P10 panel to the CUTOFF position
s. Make sure the manual override handle on the left engine fuel shutoff valve moves to the closed
position
t. Close access to left engine fuel shutoff valve. Install access panel 551BB as given in 757
AMM 06-44-00
Group 1-2:
PART V- Test for Right Engine Strut Fuel Shut-Off Valve wire W5200
WARNING: OBEY THE APPLICABLE SHOP PROCEDURES FOR MAINTENANCE ON ENERGIZED
ELECTRICAL SYSTEMS. SHORT CIRCUIT AND ELECTRICAL SHOCK TO PERSONS
CAN OCCUR.
1. Do a check of each of the two redundant wires that supply power to close the right engine fuel
spar valve
a. Gain access to right engine fuel shutoff valve. Remove access panel 651BB as given in 757
AMM 06-44-00, if not already removed.
b. Open these circuit breakers on the P6 panel and attach DO-NOT -CLOSE tags:
(1) 6E2, FUEL VALVES R SPAR
(2) 6H3, FIRE EXTINGUISHING ENG R BTL 1
(3) 6H4, FIRE EXTINGUISHING ENG R BTL 2
c. PUT THE RIGHT ENGINE FUEL CONTROL SWITCH, FOUND ON THE P10 QUADRANT
PANEL, TO THE "CUTOFF" POSITION
d. Put the right engine fire switch, found on the P8 quadrant panel, to the NORMAL position
e. Disconnect the connector for the right spar valve actuator, D2022
f. Remove the DO-NOT -CLOSE tag and close circuit breaker; 6E2, FUEL VALVES R SPAR on
the Main Power Distribution Panel, P6
g. For the right spar valve, do a check for 28 VDC power (21.0 VDC minimum, 34.0 VDC
maximum) between these pins on connector D2022
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
36 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 37

CONNECTOR D2022
TOFROM
pin 4pin 5
pin 4pin 6
h. Open circuit breaker; 6E2, FUEL VALVES R SPAR and attach a DO-NOT -CLOSE tag on the
Main Power Distribution Panel, P6
i. For the right spar valve, re-connect the connector for the right spar valve actuator, D2022
j. For the right actuator, remove the DO-NOT -CLOSE tag and close these circuit breakers on
the P6 panel
(1) 6E2, FUEL VALVES R SPAR
(2) 6H3, FIRE EXTINGUISHING ENG R BTL 1
(3) 6H4, FIRE EXTINGUISHING ENG R BTL 2
k. Supply electrical power as given in 757 AMM 24-22-00
2. Perform a functional test of the Engine Fuel Shutoff Valves
a. Make sure to close circuit breaker; 6E2, FUEL VALVES R SPAR on the P6 panel
b. Make sure to close circuit breaker; 11D34, FUEL DISAGREE ENABLE RIGHT on the P11
panel
c. Put the FUEL CONTROL switch for the right engine on the P10 stand to the RICH-RUN
position
d. Get access to the actuator on the right engine fuel shutoff valve through the access door
651BB as given in 757 AMM 06-44-00
e. Make sure the manual override handle on the right engine fuel shutoff valve moves to the
open position
f. Make sure the SPAR VALVE disagreement light comes on while the right engine fuel shutoff
valve moves to the open position
g. Open these circuit breakers on the P6 panel and attach the DO-NOT -CLOSE tags.
(1) 6H3, FIRE EXTINGUISHING ENG R BTL 1
(2) 6H4, FIRE EXTINGUISHING ENG R BTL 2
h. Pull the FIRE HANDLE for the right engine
i. Make sure the manual override handle on the right engine fuel shutoff valve moves to the
closed position
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
37 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 38

j. Make sure the SPAR VALVE disagreement light comes on while the right engine fuel shutoff
valve moves to the closed position
k. Put the FIRE HANDLE for the right engine to the NORMAL position
l. Make sure the manual override handle on the right engine fuel shutoff valve moves to the
OPEN position
m. Remove the DO-NOT -CLOSE tags and close these circuit breakers on the P6 panel.
(1) 6H3, FIRE EXTINGUISHING ENG R BTL 1
(2) 6H4, FIRE EXTINGUISHING ENG R BTL 2
n. Open circuit breaker; 11D34, FUEL DISAGREE ENABLE RIGHT, on the P11 panel
o. Make sure the EICAS message, R FUEL SPAR VAL, shows on the top display
p. Close circuit breaker; 11D34, FUEL DISAGREE ENABLE RIGHT, on the P11 panel
q. Make sure that the EICAS message, R FUEL SPAR VAL, does not show on the top display
r. Put the FUEL CONTROL switch for the right engine to the CUTOFF position
s. Make sure the manual override handle on the right engine fuel shutoff valve moves to the
closed position
t. Close access to right engine fuel shutoff valve. Install access panel 651BB as given in 757
AMM 06-44-00
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2: June 04, 2009
38 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 39 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
This Figure applies only to: Group 1, Configuration 1.
PP STA
276.93
PP
STA
301
AFT FAIRING ACCESS
PP
DOOR AND ACCESS PANEL
STA
290
PP
STA
278
FWD<
W49907
FIGURE 1: PREPARE FOR INSPECTION OF WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 1 OF 2)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  BOEING PROPRIETARY -  757-28A0073
Copyright © Unpublished Work - See page 1 for details.  39 of 69

### Page 40

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
NOTE: Access to the area between the bulkhead at PP STA 278 and the bulkhead at PP STA 301 is through
the lightening holes in the bulkheads.
NOTESQTYPART NUMBERNAMETASKSTEP
1NAS1801-3-()ScrewRemove/Keep1
1AN960PD10LWasher
1BACN10JC3Nut
(a)1-ClampRemove2
(a) (b)3NAS1801-3-()ScrewRemove/Keep3
3AN960PD10LWasher
3-Clamp
1NAS1801-3-()ScrewRemove/Keep4
1-Washer
1-Nut
1NAS1801-3-()ScrewRemove/Keep5
1AN960PD10LWasher
1BACN10JC3Nut
(a)1-ClampRemove6
(a) Discard these clamps. New clamps are provided in the kit.
(b) One screw and one washer removed in this step are not going to be replaced.
FIGURE 1: PREPARE FOR INSPECTION OF WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
40 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 41 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
This Figure applies only to: Group 1, Configuration 1.
PP STA
276.93
PP
STA
301
AFT FAIRING ACCESS
PP
DOOR AND ACCESS PANEL  STA
290
PP
STA
278
SEE
3(45
FWD
W49908
FIGURE 2: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - GROUP 1 CONFIGURATION 1
AIRPLANES
(SHEET 1 OF 4)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  BOEING PROPRIETARY -  757-28A0073
Copyright © Unpublished Work - See page 1 for details.  41 of 69

### Page 42 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
PP
STA
301
FWDO
PP
STA
301
1.00 MINIMUM
6 /13)
61  & 1112
GROMMET
10)11
FWD  W49913
A-A
FIGURE 2: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - GROUP 1 CONFIGURATION 1
AIRPLANES
(SHEET 2 OF 4)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  BOEING PROPRIETARY -  757-28A0073
Copyright © Unpublished Work - See page 1 for details.  42 of 69

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one engine.
NOTESQTYPART NUMBERNAMETASKSTEP
from PP STA 278 to the aft end of
strut fairing for damage.
1W5100 left engineWire BundleInspect1
W5200 right engine
If damage is found, repair as given
in SWPM 20-00-14 and SWPM 20-
10-13, and check as given in the
WORK INSTRUCTIONS.
1W5100 left engineWire BundleRepair2
W5200 right engine
If installed, go to step 6. If missing,
go to step 4.
2BACG20Z-ECaterpillar GrommetInspect3
1313N5033-()BulkheadClean4
1 oz.-Isopropyl/Denatured
Alcohol
6 Inch Grommet at each location to
extend a minimum of 1 inch below
wire bundle. (a) (b)
2BACG20Z-ECaterpillar GrommetInstall5
Type II, Class 1, Epibond 1534 A/B.1 oz.BMS 5-126 orAdhesive
Type V or Type VI as given in BAC
5010 Type 82. (c)
1 oz.BMS 5-105
As given in 757 SRM 51-40-02.2-RivetRemove6
2-Spacer
1-Nut Plate
As given in 757 SRM 51-40-02.2-RivetsRemove7
over 2 attach holes.1313N5033-134Bracket AssyPut/Hold8
0.200-0.203 inch diameter as given
in 757 SRM 51-40-02.
2-HolesDrill9
1313N5033-134Bracket AssyRemove10
in bracket and bulkhead.2-HolesDeburr11
As given in 757 SRM 51-40-02.1313N5033-134Bracket AssyInstall12
2BACB30NX6K3XBolt
2BACC30M6Collar
As given in 757 SRM 51-40-02.2BACR15DR3AC5RivetInstall13
2NAS463YDD10HSpacer
1BACN10JA3Nut Plate
FIGURE 2: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - GROUP 1 CONFIGURATION 1
AIRPLANES
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
43 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 44

NOTESQTYPART NUMBERNAMETASKSTEP
(a) Remove the legs from the forward side of the grommet installed on STA 278 Bulkhead.
(b) Remove the legs from the forward side of the grommet installed on STA 301 Bulkhead. If necessary,
remove legs from the aft side of the grommet installed at STA 301, only at the location adjacent to the
existing bracket, to provide clearance.
(c) Use this adhesive when a faster cure time is needed.
FIGURE 2: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - GROUP 1 CONFIGURATION 1
AIRPLANES
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
44 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 45 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
This Figure applies only to: Group 1, Configuration 1.
PP STA  (6 13)
276.93
PP
STA
301
AFT FAIRING ACCESS
PP
DOOR AND ACCESS PANEL  STA
290
1.5 INCH
. MINIMUM
FROM CLAMP
2.5 INCH
MINIMUM
(10  FROM CLAMP
SEE
PP
STA
278
FWD
W49915
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 1 OF 7)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  757-28A0073
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  45 of 69

### Page 46 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
PP
STA
301
PP
STA
290
FWDO
W49916
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 2 OF 7)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  BOEING PROPRIETARY -  757-28A0073
Copyright © Unpublished Work - See page 1 for details.  46 of 69

### Page 47 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
W5100
5613)
WS
350
IRSS
346.54
FWDE
LEFT REAR SPAR
D35542
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 3 OF 7)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  757-28A0073
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  47 of 69

### Page 48 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
W5100
5)6 13)
SPLICE AREA
IRSS
250
FUEL
IRSS  SHUT-OFF
270  VALVE
IRSS
290
IRSS
310
IRSS  AINBD
330
→EWD
D35575
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 4 OF 7)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  757-28A0073
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  48 of 69

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one engine strut.
NOTE: Access to the area between the bulkhead at PP STA 278 and the bulkhead at PP STA 301 is through
the lightening holes in the bulkheads.
NOTESQTYPART NUMBERNAMETASKSTEP
If sleeve is installed go to step 2.1
Cut sleeve along length and wrap around
wire bundle.
4-5
inch
long
TFE-2XSleeveInstall
Each lacing tape is 12.0 inch long. Refer
to SWPM 20-10-11 as an accepted pro-
cedure.
3BMS 13-54Lacing Tape
Make sure all wire slack is evenly dis-
tributed.(a)
1BACC10GU101ClampInstall2
1AN960PD10LWasherInstall/Kept
1NAS1801-3-()Screw
1BACN10JC3Nut
If sleeve is installed go to step 4.3
Cut sleeve along length and wrap around
wire bundle.
4-5
inch
long
TFE-2XSleeveInstall
Each lacing tape is 12.0 inch long. Refer
to SWPM 20-10-11 as an accepted pro-
cedure.
3BMS 13-54Lacing Tape
If more wire is necessary to re-route the wire do steps 4, 5, and 6, or 7. If no more wire is necessary
go to step 7.
4
from IRSS 270 to IRSS 347.-ClampsLoosen
that hold wire W5100 from IRSS 270 to
IRSS 347.
Lacing tapeCut5
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 5 OF 7)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
49 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 50

NOTESQTYPART NUMBERNAMETASKSTEP
to the aft end of the strut fairing. If no
slack is found splice wire.(b)
W5100WirePull6
at the location shown using the splice kit
and route wire to the fuel shut-off valve
connector. Refer to SWPM 20-30-12 and
SWPM 20-10-11 as accepted proce-
dures. (c)
-BMS 13-60, Type
5, Class 1, AWG
18
WireSplice
Cut length as necessary, 6.0 inches
maximum permitted. Install the shield
ground wire as given in SWPM 20-10-15.
-BMS 13-16, Type
1, Class 1, AWG
18
Pigtail Wire
Refer to SWPM 20-30-12 as an accepted
procedure..
1D-150-0169Splice Kit
Refer to SWPM 20-61-11 as an accepted
procedure. (d) (e)
1BACC47CP2TSocket Contact
Refer to SWPM 20-10-15 as an accepted
procedure. (f)
1BACS13S149BNPInner Ferrule
Refer to SWPM 20-10-15 as an accepted
procedure. (g)
1BACS13S225CNPOuter Ferrule
Refer to SWPM 20-10-14 as an accepted
procedure.
1TFE 4X, 1/4 DIAHeat Shrinkable
Sleeve
Refer to SWPM 20-30-11 as an accepted
procedure.
1BACT12AC3Terminal Lug
Tie wire to the bundle. Refer to SWPM
20-10-11 as an accepted procedure.
-BMS13-54, Type
III, Class 1
Lacing tape
Make sure all wire slack is evenly dis-
tributed. (a)
1TA025041-02ClampInstall7
1-WasherInstall/Kept
1NAS1801-3-()Screw
1-Nut
If sleeve is installed go to step 9.8
Cut sleeve along length and wrap around
wire bundle.
4-5
inch
long
TFE-2XSleeveInstall
Each lacing tape is 12.0 inch long. Refer
to SWPM 20-10-11 as an accepted pro-
cedure.
3BMS 13-54Lacing Tape
Make sure all wire slack is evenly dis-
tributed. Refer to SWPM 20-10-12 as an
accepted procedure.(a)
1TA025041-02ClampInstall9
1NAS1149D0332JWasher
1NAS1801-3-8Screw
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 6 OF 7)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
50 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 51

NOTESQTYPART NUMBERNAMETASKSTEP
the TFE Spiral Cable Wrap on the wire
bundle. Extend the Spiral Cable Wrap on
both sides of the clamp. Apply 3 layers
of Permacel tape at each end of the TFE
Spiral Cable Wrap. Secure (tie) the Per-
macel tape with Lacing Tape. Refer to
SWPM 20-10-11 as an accepted proce-
dure.
2 Ft.HT1-8T1TFE Spiral Ca-
ble Wrap
Install10
As req.P-421Permacel Tape
As
Req.
BMS13-54, Type
III, Class 1
Lacing tape
With lobe containing wire bundle aft and
fastener head inboard . Refer toSWPM
20-10-12as an accepted procedure.(a)
1BACC10GU101ClampInstall11
1AN960PD10LWasherInstall/Kept
1NAS1801-3-()Screw
1BACN10JC3Nut
that have been loosen in step 4, from
loop clamp to the fuel shut-off valve locat-
ed at IRSS 270. Refer to SWPM 20-10-
12 as an accepted procedure.(a)
-ClampsTighten12
from the aft end of strut fairing to the fuel
shut-off valve. Refer to SWPM 20-10-11
and SWPM 20-10-19 as accepted proce-
dures. (a) (h)
-BMS13-54, Type
III, Class 1
Lacing tapeInstall13
(a) Make sure that wire bundle is correctly installed and does not touch the hydraulic tubes, strut fairing
panel, or surrounding structure. Inspect that the wire bundle clearance to the surrounding structure or
tubing, anywhere along the wire routing, is as given in SWPM 20-10-11, Table IX.
(b) Make sure that you do not damage wire W5100 or any other wire common to the bundle to which W5100
is attached.
(c) Remove the socket contact from the connector. Pull wire to the aft end of the strut to obtain the necessary
slack. Cut the wire so that the splice will be located at the location shown. Splice the new wire and route
it to the fuel shutoff valve connector the same as the initial wire.
(d) Use care to remove the initial contact, with their wire connected. Use isopropyl alcohol, as given in SWPM
20-61-11, to make it easier to remove contacts.
(e) Insert the new contact at the same position as the removed socket contact was found.
(f) Measure the OD of the wire. The applicable inner ferrule has an ID that is a small amount larger than
the OD of the wire. If necessary use a smaller or larger size inner ferrule.
(g) More than one outer ferrule can be specified for one inner ferrule. Refer to SWPM 20-10-15 Table VII.
(h) Make a drip loop at IRSS 270 as initially found. Refer to SWPM 20-10-11 as an accepted procedure.
FIGURE 3: LEFT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 7 OF 7)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
51 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 52 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
This Figure applies only to: Group 1, Configuration 1.
PP STA  5x6 14
276.93
PP
STA
301
AFT FAIRING ACCESS
PP
DOOR AND ACCESS PANEL  STA
290
SEE
PP
STA
278
→ SEE A
PP
STA
278
D30639
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 1 OF 8)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  757-28A0073
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  52 of 69

### Page 53 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
PP
STA
301
PP
STA
290
1.5 INCH
MINIMUM
FROM CLAMP
FWD '
1.5 INCH MINIMUM
FROM CLAMP
D31527
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 2 OF 8)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  BOEING PROPRIETARY -  757-28A0073
Copyright © Unpublished Work - See page 1 for details.  53 of 69

### Page 54 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
W5200
5)(6) 14
WS
350
IRSS
346.54
SFWD
RIGHT REAR SPAR
D35583
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 3 OF 8)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  757-28A0073
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  54 of 69

### Page 55 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
FUEL
SHUT-OFF
VALVE  W5200
5 6 14
SPLICE AREA
IRSS
250
IRSS  to a
270
IRSS
290
IRSS
310
INBD <
IRSS
FWD  330
D35609
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 4 OF 8)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  BOEING PROPRIETARY -  757-28A0073
Copyright © Unpublished Work - See page 1 for details.  55 of 69

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one engine strut.
NOTE: Access to the area between the bulkhead at PP STA 278 and the bulkhead at PP STA 301 is through
the lightening holes in the bulkheads.
NOTESQTYPART NUMBERNAMETASKSTEP
If sleeve is installed go to step 2.1
Cut sleeve along length and wrap around
wire bundle.
4-5
inch
long
TFE-2XSleeveInstall
Each lacing tape is 12.0 inch long. Refer
to SWPM 20-10-11 as an accepted pro-
cedure.
3BMS 13-54Lacing Tape
Make sure all wire slack is evenly dis-
tributed. Refer to SWPM 20-10-12 as an
accepted procedure. (a)
1BACC10GU101ClampInstall2
1AN960PD10LWasherInstall/Kept
1NAS1801-3-()Screw
1BACN10JC3Nut
If sleeve is installed go to step 4.3
Cut sleeve along length and wrap around
wire bundle.
4-5
inch
long
TFE-2XSleeveInstall
Each lacing tape is 12.0 inch long. Refer
to SWPM 20-10-11 as an accepted pro-
cedure.
3BMS 13-54Lacing Tape
If more wire is necessary to re-route the wire do steps 4, 5, and 6. If no more wire is necessary go to
step 7.
4
from IRSS 270 to IRSS 347.-ClampsLoosen
that hold wire W5200 from IRSS 270 to
IRSS 347.
Lacing tapeCut5
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 5 OF 8)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
56 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 57

NOTESQTYPART NUMBERNAMETASKSTEP
to the aft end of the strut fairing. If no
slack is found splice wire. (b)
W5200WirePull6
at the location shown using the splice kit
and route wire to the fuel shut-off valve
connector. Refer SWPM 20-30-12 and
SWPM 20-10-11 as accepted proce-
dures. (c)
-BMS 13-60, Type
5, Class 1, AWG
18
WireSplice
Cut length as necessary, 8.0 inches
maximum permitted. Install the shield
ground wire as given in SWPM 20-10-15.
-BMS 13-16, Type
1, Class 1, AWG
18
Pigtail Wire
Refer to SWPM 20-30-12 as an accepted
procedure.
1D-150-0169Splice Kit
Refer to SWPM 20-61-11 as an accepted
procedure. (d) (e)
1BACC47CP2TSocket Contact
Refer to SWPM 20-10-15 as an accepted
procedure. (f)
1BACS13S149BNPInner Ferrule
Refer to SWPM 20-10-15 as an accepted
procedure.(g)
1BACS13S225CNPOuter Ferrule
Refer to SWPM 20-10-14 as an accepted
procedure.
1TFE 4X, 1/4 DIAHeat Shrinkable
Sleeve
Refer to SWPM 20-30-11 as an accepted
procedure.
1BACT12AC3Terminal Lug
Tie wire to the bundle. Refer to SWPM
20-10-11 as an accepted procedure.
-BMS13-54, Type
III, Class 1
Lacing tape
Make sure all wire slack is evenly dis-
tributed. (a)
1TA025041-02ClampInstall7
1-WasherInstall/Kept
1NAS1801-3-()Screw
1-Nut
If sleeve is installed go to step 6.8
Cut sleeve along length and wrap around
wire bundle.
4-5
inch
long
TFE-2XSleeveInstall
Each lacing tape is 12.0 inch long. Refer
to SWPM 20-10-11 as an accepted pro-
cedure.
3BMS 13-54Lacing Tape
Make sure all wire slack is evenly dis-
tributed. Refer to SWPM 20-10-12 as an
accepted procedure. (a)
1TA025041-02ClampInstall9
1NAS1149D0332JWasher
1NAS1801-3-8Screw
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 6 OF 8)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
57 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 58

NOTESQTYPART NUMBERNAMETASKSTEP
the TFE Spiral Cable Wrap on the wire
bundle. Extend the Spiral Cable Wrap
away from each clamp as shown. Apply
3 layers of Permacel tape at each end of
the TFE Spiral Cable Wrap. Secure (tie)
the Permacel tape with Lacing Tape.
Refer to SWPM 20-10-11 as an accepted
procedure.
2 Ft.HT1-8T1TFE Spiral Ca-
ble Wrap
Install10
-P-421 (Permacel)Permacel Tape
As
Req.
BMS13-54, Type
III, Class 1
Lacing tape
With lobe containing wire bundle aft and
fastener head outboard. Refer to SWPM
20-10-12 as an accepted procedure. (a)
1BACC10GU101ClampInstall11
1AN960PD10LWasherInstall/Kept
1NAS1801-3-()Screw
1BACN10JC3Nut
on the hydraulic supply tube. (a) (h)1BACC10DK20ClampInstall12
1BACC10GU101Clamp
1BACS12HN3-10Screw
1NAS1149D0332JWasher
1BACN10YR3CDNut
that have been loosen in step 4, from
loop clamp to the fuel shut-off valve locat-
ed at IRSS 270. (a)
-ClampsTighten13
from the aft end of strut fairing to the fuel
shut-off valve. Refer to SWPM 20-10-11
and SWPM 20-10-19 as accepted proce-
dures. (a) (i)
-BMS13-54, Type
III, Class 1
Lacing tapeInstall14
(a) Make sure that wire bundle is correctly installed and does not touch the hydraulic tubes, strut fairing
panel, or surrounding structure. Inspect that the wire bundle clearance to the surrounding structure or
tubing, anywhere along the wire routing, is as given in SWPM 20-10-11, Table IX.
(b) Make sure that you do not damage wire W5200 or any other wire common to the bundle to which W5200
is attached.
(c) Remove the socket contact from the connector. Pull wire to the aft end of the strut to obtain the necessary
slack. Cut the wire so that the splice will be located at the location shown. Splice the new wire and route
it to the fuel shutoff valve connector the same as the initial wire.
(d) Use care to remove the initial contact, with their wire connected. Use isopropyl alcohol, as given in SWPM
20-61-11, to make it easier to remove contacts.
(e) Insert the new contact at the same position as the removed socket contact was found.
(f) Measure the OD of the wire. The applicable inner ferrule has an ID that is a small amount larger than
the OD of the wire. If necessary use a smaller or larger size inner ferrule.
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 7 OF 8)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
58 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 59

NOTESQTYPART NUMBERNAMETASKSTEP
(g) More than one outer ferrule can be specified for one inner ferrule. Refer to SWPM 20-10-15, Table VII
as an accepted procedure.
(h) Locate Clamps approximately 5.0 Inch aft of hydraulic clamp block.
(i) Make a drip loop at IRSS 270 as initially found. Refer to SWPM 20-10-11 as an accepted procedure.
FIGURE 4: RIGHT HAND STRUT - REROUTE WIRE BUNDLE - GROUP 1 CONFIGURATION 1 AIRPLANES
(SHEET 8 OF 8)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 20, 2003
757-28A0073Revision 2 June 04, 2009
59 of 69
BOEING SERVICE BULLETIN 757-28A0073
ALERTALERT

### Page 60 (OCR)

BOEING SERVICE BULLETIN 757-28A0073
ALERT  ALERT
This Figure applies only to: Group 1, Configuration 1.
PP STA
276.93
PP
STA
301
AFT FAIRING ACCESS
PP
DOOR AND ACCESS PANEL  STA
290
PP
STA
278
SEE A
PP
STA
278
780
FWD
D30899
FIGURE 5: INSPECT WIRE BUNDLE AND ADD SUPPORT BRACKET - FOR GROUP 1 CONFIGURATION
1 AIRPLANES
(SHEET 1 OF 4)
Original Issue: November 20, 2003
Revision 2 June 04, 2009  757-28A0073
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  60 of 69

The text continues at https://openairdocs.org/service-documents/boeing/757-28a0073/file/cc24ae94132a.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
