# Boeing Alert Requirements Bulletin 757-53A0123 RB: No revision named, part 1 of 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-0012; AD 2025-11-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 757-53A0123 RB](https://openairdocs.org/service-documents/boeing/757-53a0123-rb.md)
- Title as filed: RB 757-53A0123 R0_Part1
- Pages: 110
- PDF: https://openairdocs.org/files/sha256/a6/5c/a65c5df6762b17ed533b1cb279bf1f01597292df907be95b4763e41b7b3dad71
- Page: https://openairdocs.org/service-documents/boeing/757-53a0123-rb/file/a65c5df6762b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Requirements Bulletin
ALERT
Number: 757-53A0123 RB
Original Issue: March 13, 2024
ATA System: 5360
SUBJECT: FUSELAGE - Section 46 - Body Station 1640 Frame Inner Chord, Web and Outer
Chord Inspection
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2024 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: March 13, 2024
757-53A0123 RB
1 of 178
4.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
2 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
FIGURE 1: LEFT SIDE - STA 1640 FRAME INNER CHORD, WEB AND OUTER CHORD - GENERAL
VISUAL INSPECTION (GVI) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
FIGURE 2: LEFT SIDE - FUSELAGE FRAME WEB AT STA 1640 BETWEEN S-9L AND S-10L - SURFACE
HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 1, APPROVED
FRAME SEGMENT REPLACEMENT REPAIR . . . . . . . . . . . . . . . . . . . . . . . . 94
FIGURE 3: LEFT SIDE- FUSELAGE FRAME WEB AT STA 1640 BETWEEN S-9L AND S-10L - OPEN-HOLE
HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 1, NO EXISTING
REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
FIGURE 4: LEFT SIDE - FUSELAGE FRAME INNER CHORD AT STA 1640 BETWEEN S-10L AND S-11L
- SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 2, NO
EXISTING REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
FIGURE 5: LEFT SIDE - FUSELAGE FRAME WEB AT STA 1640 AND S-10L - OPEN-HOLE HIGH
FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 3 . . . . . . . . . 103
FIGURE 6: LEFT SIDE - FUSELAGE FRAME WEB AT STA 1640 BETWEEN S-11L AND S-13L -
SUB-SURFACE LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION - LOCATIONS
4 AND 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
FIGURE 7: LEFT SIDE - FUSELAGE FRAME INNER CHORD AT STA 1640 BETWEEN S-11L AND S-13L
- SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 6. 111
FIGURE 8: LEFT SIDE - FUSELAGE FRAME INNER CHORD AT STA 1640 BETWEEN S-13L AND S-14L
- SUBSURFACE LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION - LOCATION 7
[Group 1-3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
FIGURE 9: LEFT SIDE - FUSELAGE FRAME WEB AND OUTER CHORD AT STA 1640 BELOW S-13L -
SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 8,
AIRPLANES WITH A BACKUP FITTING INSTALLED . . . . . . . . . . . . . . . . . . . 118
FIGURE 10: LEFT SIDE - FUSELAGE FRAME WEB AND OUTER CHORD AT STA 1640 BELOW S-13L -
SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 8,
AIRPLANES WITHOUT A BACKUP FITTING INSTALLED . . . . . . . . . . . . . . . . 121
FIGURE 11: LEFT SIDE - FUSELAGE FRAME WEB AT STA 1640 LOWER HINGE FITTING - OPEN-HOLE
HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 9 . . . . . . 124
FIGURE 12: LEFT SIDE - FUSELAGE FRAME WEB AT STA 1640 ABOVE S-19L - SURFACE HIGH
FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 10 . . . . . . . . . 127
FIGURE 13: RIGHT SIDE - STA 1640 FRAME INNER CHORD, WEB AND OUTER CHORD - GENERAL
VISUAL INSPECTION (GVI) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 131
FIGURE 14: RIGHT SIDE - FUSELAGE FRAME WEB AT STA 1640 BETWEEN S-9R AND S-10R - SURFACE
HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 1, APPROVED
FRAME SEGMENT REPLACEMENT REPAIR . . . . . . . . . . . . . . . . . . . . . . . 142
FIGURE 15: RIGHT SIDE - FUSELAGE FRAME WEB AT STA 1640 BETWEEN S-9R AND S-10R -
OPEN-HOLE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 1,
NO EXISTING REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 145
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
3 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 4

FIGURE 16: RIGHT SIDE - FUSELAGE FRAME INNER CHORD AT STA 1640 BETWEEN S-10R AND
S-11R - SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION
2, NO EXISTING REPAIR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148
FIGURE 17: RIGHT SIDE - FUSELAGE FRAME WEB AT STA 1640 AND S-10R - OPEN-HOLE HIGH
FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 3 . . . . . . . . . 151
FIGURE 18: RIGHT SIDE - FUSELAGE FRAME WEB AT STA 1640 BETWEEN S-11R AND S-13R -
SUB-SURFACE LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION - LOCATIONS
4 AND 5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 155
FIGURE 19: RIGHT SIDE - FUSELAGE FRAME INNER CHORD AT STA 1640 BETWEEN S-11R AND
S-13R - SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION
6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 159
FIGURE 20: RIGHT SIDE - FUSELAGE FRAME INNER CHORD AT STA 1640 BETWEEN S-13R AND
S-14R - SUBSURFACE LOW FREQUENCY EDDY CURRENT (LFEC) INSPECTION -
LOCATION 7 [Group 1-3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162
FIGURE 21: RIGHT SIDE - FUSELAGE FRAME WEB AND OUTER CHORD AT STA 1640 BELOW S-13R
- SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 8,
AIRPLANES WITH A BACKUP FITTING INSTALLED . . . . . . . . . . . . . . . . . . . 166
FIGURE 22: RIGHT SIDE - FUSELAGE FRAME WEB AND OUTER CHORD AT STA 1640 BELOW S-13R
- SURFACE HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 8,
AIRPLANES WITHOUT A BACKUP FITTING INSTALLED . . . . . . . . . . . . . . . . 169
FIGURE 23: RIGHT SIDE - FUSELAGE FRAME WEB AT STA 1640 LOWER HINGE FITTING - OPEN-HOLE
HIGH FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 9 . . . . . . 172
FIGURE 24: RIGHT SIDE - FUSELAGE FRAME WEB AT STA 1640 ABOVE S-19R - SURFACE HIGH
FREQUENCY EDDY CURRENT (HFEC) INSPECTION - LOCATION 10 . . . . . . . . . 175
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
4 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 5

Commercial 
Airplanes
757
Requirements Bulletin
ALERT
Number: 757-53A0123 RB
Original Issue: March 13, 2024
ATA System: 5360
SUBJECT: FUSELAGE - Section 46 - Body Station 1640 Frame Inner Chord, Web and Outer
Chord Inspection
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 757-200, 757-200CB, 757-300 Airplane(s), line number(s) 1-138, 140,
142, 144-146, 148, 150-175, 177-180, 182-183, 185, 187-188, 190, 192, 194, 196, 198, 200-236,
238-257, 259-299, 301-313, 315-317, 319-321, 323-325, 327-329, 331-333, 335-339, 341-394,
396-398, 400-402, 404-406, 408-410, 412-476, 478-480, 482-484, 486-488, 490-492, 494-568,
570-572, 574-576, 578, 580, 582-624, 626-627, 629-630, 632-633, 635, 637, 639, 641, 643, 645,
647-648, 650, 652-653, 655, 657-658, 660-674, 676-678, 680-682, 684-686, 688-690, 692-727,
731-732, 735-754, 756-758, 760-762, 764, 766, 768, 770, 772-773, 775, 777, 779-812, 814,
816-822, 824-878, 880-881, 883-1050 in 5 Group(s). Where the effectivity is presented with hyphens
between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers
1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
DESCRIPTIONCONFIGURATIONGROUP
757-200 and -200CB airplanes with a long inner chord strap.-1
757-200 airplanes that have been converted to Special Freighter
(757-200SF) using STC ST00916WI-D and have a long inner chord
strap.
-2
757-300 airplanes.-3
757-200 airplanes with a short inner chord strap.-4
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
5 of 178

### Page 6

DESCRIPTIONCONFIGURATIONGROUP
757-200 airplanes that have been converted to Special Freighter
(757-200SF) using STC ST00916WI-D and have a short inner chord
strap.
-5
Airplane Models:
757-200, 757-200CB, 757-300
GroupVariable Number
4NA001 - NA021
1NA022 - NA028
4NA191
1NA192 - NA199
5NA201 - NA204
4NA205
5NA206 - NA213
4NA214
2NA215 - NA236
1NA237 - NA239
1NA301 - NA305
1NA341 - NA352
1NA391 - NA399
4NA401 - NA403
1NA404 - NA408
1NA441 - NA447
4NA501 - NA504
1NA505 - NA586
4NB001
1NB002 - NB004
1NB021 - NB023
1NB036 - NB041
1NB051 - NB053
1NB061 - NB073
1NB079
GroupVariable Number
1NB131 - NB148
1NB161 - NB162
1NB166 - NB168
1NB201 - NB204
1NB221 - NB228
1NB230
1NB236
1NB239
1NB261 - NB267
1NB291 - NB299
1NB301 - NB302
1NB311 - NB312
1NB321 - NB331
1NB421 - NB438
1NB446
1NB451 - NB454
1NB501 - NB523
1NB561
1NB571
1NB581 - NB583
1NC001 - NC033
1NC041 - NC042
1NC051 - NC052
1NC056 - NC062
1NC066 - NC084
GroupVariable Number
1NC091 - NC094
1NC151
1NC161
1ND001 - ND007
1ND011 - ND059
1ND111 - ND113
1ND161 - ND199
1ND201 - ND203
1ND221 - ND225
1ND241 - ND248
1ND301 - ND322
1ND401
1ND891
1ND895
1NE001 - NE008
1NE011 - NE088
1NE091 - NE094
1NE141 - NE150
1NE161 - NE177
1NE201 - NE204
1NE301 - NE302
1NE311 - NE325
1NJ001 - NJ004
1NJ031 - NJ032
1NJ551 - NJ555
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
6 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 7

GroupVariable Number
3NL001 - NL002
3NL006 - NL017
3NL101 - NL109
3NL141
3NL601 - NL616
1NN001 - NN002
1NN051 - NN052
1NP901 - NP904
1NT201 - NT202
1NT231 - NT234
1NT237 - NT240
1NT242
GroupVariable Number
1NT245 - NT248
1NT281 - NT289
1NT341 - NT347
1NT351 - NT360
1NT371 - NT373
1NT375 - NT379
1NT381 - NT386
1NT401 - NT409
1NT411 - NT412
1NT426 - NT427
1NT431 - NT432
1NT436 - NT438
GroupVariable Number
1NT441 - NT442
1NT446
1NT701 - NT769
1NT791 - NT796
1NT861 - NT862
1NT881 - NT885
1NT901 - NT916
1NT971 - NT985
1NU031 - NU038
3NU701 - NU705
3NU721 - NU728
3NU731 - NU732
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 757-53A0123 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 757-53A0123 RB mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Accomplish the required action(s), based on the applicable condition(s) in Table 1 through Table 22, in
accordance with Accomplishment Instructions.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
7 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 8

Table 1: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Left Side
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 20,000
total flight cy-
cles.
ACTION 1:
Do a GVI of the STA 1640
frame between Stringers S-9L
and S-19L for any approved
frame segment replacement
repair. (a)(b)
Group 1 Airplanes.
ACTION 2:
Do a GVI of the STA 1640
frame at specified locations for
any local repair. (b)(c)
-Within 2,000 Flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
ACTION 1:
Do a GVI of the STA 1640
frame between Stringers S-9L
and S-19L for any approved
frame segment replacement
repair. (a)(b)
Group 2, 4-5 Airplanes.
-Within 2,000 Flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB
ACTION 2:
Do a GVI of the STA 1640
frame at specified locations for
any local repair. (b)(c)
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 10,000
total flight cy-
cles.
ACTION 1:
Do a GVI of the STA 1640
frame between Stringers S-9L
and S-19L for any approved
frame segment replacement
repair. (a)(b)
Group 3 Airplanes.
ACTION 2:
Do a GVI of the STA 1640
frame at specified locations for
any local repair. (b)(c)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
8 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 9

Table 1: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Left Side
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-At the times specified in Table 3.Group 1:CONDITION 1:
Do the actions specified in
Compliance Table 3.
ANY APPROVED
FRAME SEGMENT
REPLACEMENT RE-
PAIR FOUND. -At the times specified in Table 5.Group 2:Do the actions specified in
Compliance Table 5.
-At the times specified in Table 7.Group 3:
Do the actions specified in
Compliance Table 7.
-At the times specified in Table 9.Group 4:
Do the actions specified in
Compliance Table 9.
-At the times specified in Table 11.Group 5:
Do the actions specified in
Compliance Table 11.
-At the times specified in Table 4.Group 1:CONDITION 2:
Do the actions specified in
Compliance Table 4.
NO LOCAL REPAIR
FOUND AT ANY
SPECIFIED LOCATION
AND NO FRAME SEG-
MENT REPLACEMENT
REPAIR FOUND. (c)
-At the times specified in Table 6.Group 2:
Do the actions specified in
Compliance Table 6.
-At the times specified in Table 8.Group 3:
Do the actions specified in
Compliance Table 8.
-At the times specified in Table 10.Group 4:
Do the actions specified in
Compliance Table 10.
-At the times specified in Table 12.Group 5:
Do the actions specified in
Compliance Table 12.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
9 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 10

Table 1: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Left Side
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Group 1:Group 1:Contact The Boeing Company
for alternative inspections and
do the inspections and on-
condition corrective actions.
CONDITION 3:
ANY FRAME SEG-
MENT REPLACEMENT
REPAIR FOUND THAT
IS NOT AN AP-
PROVED FRAME
SEGMENT REPLACE-
MENT REPAIR.
Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 20,000
total flight cy-
cles.
OR
LOCAL REPAIR
FOUND AT ANY
SPECIFIED LOCA-
TION. (c)
-Group 2, 4, 5:
Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
-Group 3:Group 3:
Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 10,000
total flight cy-
cles.
(a) For Requirements Bulletin 757-53A0123 RB, an approved frame segment replacement repair is defined
as a frame segment replacement repair that is Boeing ODA-approved with an FAA Form 8100-9 and
meets all of the following requirements:
1. The frame segment replacement repair is a repair that splices in a new section of a frame from
above S-10 to S-19 and meets the requirements specified in the Boeing Multi-Operator Message
MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame Replace-
ment Repair Proposal.
2. Any Boeing ODA approved deviations to the requirements specified in the Boeing Multi-Operator
Message MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame
Replacement Repair Proposal are acceptable if they are outside of the local repair inspection
locations 1 through 10 in Requirements Bulletin 757-53A0123 RB.
3. There are no local repairs (reinforcing or non-reinforcing), or any oversized fastener that exceeds
1/32 inch diameter over the production fastener size in the areas common to inspection locations
1 through 10 in Requirements Bulletin 757-53A0123 RB. Frame segment replacement repair
splice parts are not considered a local repair.
(b) A Maintenance records check is acceptable in lieu of the General Visual Inspection if the records review
can conclusively determine a repair exists in that location.
(c) Frame segment replacement repair splice parts are not considered a local repair.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
10 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 11

Table 2: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 20,000
total flight cy-
cles.
ACTION 1:
Do a GVI of the STA 1640
frame between Stringers S-9R
and S-19R for any approved
frame segment replacement
repair. (a)(b)
Group 1 Airplanes.
ACTION 2:
Do a GVI of the STA 1640
frame at specified locations for
any local repair.(b)(c)
-Within 2,000 Flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
ACTION 1:
Do a GVI of the STA 1640
frame between Stringers S-9R
and S-19R for any approved
frame segment replacement
repair. (a)(b)
Group 2, 4-5 Airplanes.
-Within 2,000 Flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB
ACTION 2:
Do a GVI of the STA 1640
frame at specified locations for
any local repair.(b)(c)
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 10,000
total flight cy-
cles.
ACTION 1:
Do a GVI of the STA 1640
frame between Stringers S-9R
and S-19R for any approved
frame segment replacement
repair. (a)(b)
Group 3 Airplanes.
ACTION 2:
Do a GVI of the STA 1640
frame at specified locations for
any local repair.(b)(c)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
11 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 12

Table 2: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-At the times specified in Table 13.Group 1:CONDITION 1:
Do the actions specified in
Compliance Table 13.
ANY APPROVED
FRAME SEGMENT
REPLACEMENT RE-
PAIR FOUND. -At the times specified in Table 15.Group 2:Do the actions specified in
Compliance Table 15.
-At the times specified in Table 17.Group 3:
Do the actions specified in
Compliance Table 17.
-At the times specified in Table 19.Group 4:
Do the actions specified in
Compliance Table 19.
-At the times specified in Table 21.Group 5:
Do the actions specified in
Compliance Table 21.
-At the times specified in Table 14.Group 1:CONDITION 2:
Do the actions specified in
Compliance Table 14.
NO LOCAL REPAIR
FOUND AT ANY
SPECIFIED LOCATION
AND NO FRAME SEG-
MENT REPLACEMENT
REPAIR FOUND. (c)
-At the times specified in Table 16.Group 2:
Do the actions specified in
Compliance Table 16.
-At the times specified in Table 18.Group 3:
Do the actions specified in
Compliance Table 18.
-At the times specified in Table 20.Group 4:
Do the actions specified in
Compliance Table 20.
-At the times specified in Table 22.Group 5:
Do the actions specified in
Compliance Table 22.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
12 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 13

Table 2: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Right Side
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Group 1:Group 1:Contact The Boeing Company
for alternative inspections and
do the inspections and on-
condition corrective actions.
CONDITION 3:
ANY FRAME SEG-
MENT REPLACEMENT
REPAIR FOUND THAT
IS NOT AN AP-
PROVED FRAME
SEGMENT REPLACE-
MENT REPAIR.
Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 20,000
total flight cycles
OR
LOCAL REPAIR
FOUND AT ANY
SPECIFIED LOCA-
TION. (c)
-Group 2, 4, 5:
Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
-Group 3:Group 3:
Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 10,000
total flight cycles
(a) For Requirements Bulletin 757-53A0123 RB, an approved frame segment replacement repair is defined
as a frame segment replacement repair that is Boeing ODA-approved with an FAA Form 8100-9 and
meets all of the following requirements:
1. The frame segment replacement repair is a repair that splices in a new section of a frame from
above S-10 to S-19 and meets the requirements specified in the Boeing Multi-Operator Message
MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame Replace-
ment Repair Proposal.
2. Any Boeing ODA approved deviations to the requirements specified in the Boeing Multi-Operator
Message MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame
Replacement Repair Proposal are acceptable if they are outside of the local repair inspection
locations 1 through 10 in Requirements Bulletin 757-53A0123 RB.
3. There are no local repairs (reinforcing or non-reinforcing), or any oversized fastener that exceeds
1/32 inch diameter over the production fastener size in the areas common to inspection locations
1 through 10 in Requirements Bulletin 757-53A0123 RB. Frame segment replacement repair
splice parts are not considered a local repair.
(b) A Maintenance records check is acceptable in lieu of the General Visual Inspection if the records review
can conclusively determine a repair exists in that location.
(c) Frame segment replacement repair splice parts are not considered a local repair.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
13 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 14

Group 1:
Table 3: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compliance
Time (Whichever Occurs Later)
ActionCondition
-Within 2,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 757-
53A0123 RB,
Within 9,000 flight
cycles after the
approved frame
segment replace-
ment repair is in-
stalled.
ACTION 1:
Do the Eddy Current Inspection
at location 1 for any crack. (a)
Airplanes with an
approved frame
segment replace-
ment repair result-
ing from Table 1,
Condition 1 finding.
-Within 2,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 757-
53A0123 RB.
Within 15,000
flight cycles after
the approved
frame segment re-
placement repair
is installed.
ACTION 2:
Do the Eddy Current Inspection
at locations 3 through 10 for
any crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK
FOUND.
9,000 flight cycles-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
6,000 flight cycles-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
14 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 15

Group 1:
Table 3: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compliance
Time (Whichever Occurs Later)
ActionCondition
9,000 flight cycles-CONDITION 2, ACTION 1:CONDITION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
NO CRACK
FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
6,000 flight cycles-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspection
plan for the repair affected area(s), and approves the inspection plan as an alternative inspection
method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 1:
Table 4: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB .
Before 20,000
total flight cy-
cles.
Do the Eddy Current Inspec-
tions at locations 1 through 10
for any crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 1, Condition 2
finding.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
15 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 16

Group 1:
Table 4: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
6,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
6,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
10,400 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
16 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 17

Group 2:
Table 5: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 7,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 1,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 5,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 10
for any crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
7,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,600 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
17 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 18

Group 2:
Table 5: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
7,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,600 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 2:
Table 6: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
Do the Eddy Current Inspec-
tion at locations 1 through 10
for any crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 1, Condition 2
finding.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
18 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 19

Group 2:
Table 6: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
2,600 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
2,600 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
4,300 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
19 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 20

Group 3:
Table 7: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 9,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 1,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 6,300
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 10
for any crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
9,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
5,300 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
3,200 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
20 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 21

Group 3:
Table 7: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
9,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
5,300 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
3,200 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
21 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 22

Group 3:
Table 8: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 10,000
total flight cycles
Do the Eddy Current Inspec-
tion at locations 1 through 10
for any crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 1, Condition 2
finding.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
3,200 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
5,300 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
3,200 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
5,300 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
22 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 23

Group 3:
Table 8: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 4:
Table 9: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 9,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 1,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 8,600
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 6
and 8 through 10 for any
crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
23 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 24

Group 4:
Table 9: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
9,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
9,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
4,300 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
24 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 25

Group 4:
Table 9: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 4:
Table 10: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
Do the Eddy Current Inspec-
tion at locations 1 through 6
and 8 through 10 for any
crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 1, Condition 2
finding.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
4,300 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
25 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 26

Group 4:
Table 10: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
4,300 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
10,400 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
26 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 27

Group 5:
Table 11: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 7,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 1,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 3,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 6
and 8 through 10 for any
crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
7,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,100 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
27 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 28

Group 5:
Table 11: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
7,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,100 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 5:
Table 12: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
Do the Eddy Current Inspec-
tion at locations 1 through 6
and 8 through 10 for any
crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 1, Condition 2
finding.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
28 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 29

Group 5:
Table 12: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
2,100 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
2,100 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1,8
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
4,300 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
29 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 30

Group 1:
Table 13: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compliance
Time (Whichever Occurs Later)
ActionCondition
-Within 2,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 757-
53A0123 RB.
Within 9,000 flight
cycles after the
approved frame
segment replace-
ment repair is in-
stalled.
ACTION 1:
Do the Eddy Current Inspection
at location 1 for any crack. (a)
Airplanes with an
approved frame
segment replace-
ment repair result-
ing from Table 2,
Condition 1 finding.
-Within 2,000 flight
cycles after the
Original Issue date
of Requirements
Bulletin 757-
53A0123 RB.
Within 15,000
flight cycles after
the approved
frame segment re-
placement repair
is installed.
ACTION 2:
Do the Eddy Current Inspection
at locations 3 through 10 for
any crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK
FOUND.
9,000 flight cycles-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
6,000 flight cycles-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
30 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 31

Group 1:
Table 13: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compliance
Time (Whichever Occurs Later)
ActionCondition
9,000 flight cycles-CONDITION 2, ACTION 1:CONDITION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
NO CRACK
FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
6,000 flight cycles-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspection
plan for the repair affected area(s), and approves the inspection plan as an alternative inspection
method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 1:
Table 14: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 20,000
total flight cy-
cles.
Do the Eddy Current Inspec-
tions at locations 1 through 10
for any crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 2, Condition 2
finding.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
31 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 32

Group 1:
Table 14: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
6,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
6,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
10,400 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
32 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 33

Group 2:
Table 15: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 7,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 2,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 5,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 10
for any crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
7,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,600 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
33 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 34

Group 2:
Table 15: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
7,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,600 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 2:
Table 16: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
Do the Eddy Current Inspec-
tion at locations 1 through 10
for any crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 2, Condition 2
finding.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
34 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 35

Group 2:
Table 16: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
2,600 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
2,600 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
4,300 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
35 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 36

Group 3:
Table 17: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 9,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 2,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 6,300
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 10
for any crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
9,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
5,300 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
3,200 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
36 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 37

Group 3:
Table 17: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
9,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
5,300 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
3,200 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 7 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
37 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 38

Group 3:
Table 18: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Before 10,000
total flight cycles
Do the Eddy Current Inspec-
tion at locations 1 through 10
for any crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 2, Condition 2
finding.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
3,200 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
5,300 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
3,200 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 7
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
5,300 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
38 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 39

Group 3:
Table 18: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 4:
Table 19: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 9,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 2,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 8,600
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 6
and 8 through 10 for any
crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
39 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 40

Group 4:
Table 19: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
9,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
9,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
10,400 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
4,300 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
40 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 41

Group 4:
Table 19: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 4:
Table 20: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
Do the Eddy Current Inspec-
tion at locations 1 through 6
and 8 through 10 for any
crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 2, Condition 2
finding.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
4,300 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
10,400 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
41 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 42

Group 4:
Table 20: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
4,300 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
10,400 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
42 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 43

Group 5:
Table 21: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 7,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 1:
Do the Eddy Current Inspec-
tion at location 1 for any crack.
(a)
Airplanes with an ap-
proved frame segment
replacement repair re-
sulting from Table 2,
Condition 1 finding.
-Within 2,000
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 757-
53A0123 RB.
Within 3,000
flight cycles af-
ter the approved
frame segment
replacement re-
pair is installed.
ACTION 2:
Do the Eddy Current Inspec-
tion at locations 3 through 6
and 8 through 10 for any
crack.
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
7,000 flight cy-
cles
-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,100 flight cy-
cles
-CONDITION 1, ACTION 5:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
43 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 44

Group 5:
Table 21: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time (Whichever Occurs
Later)
ActionCondition
7,000 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at location 1 for any
crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
12,000 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
4,300 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at locations 4 through
6 for any crack. (b)
2,100 flight cy-
cles
-CONDITION 2, ACTION 4:
Repeat the Eddy Current In-
spection at locations 8 through
10 for any crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Group 5:
Table 22: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Within 2,000 flight cycles after the
Original Issue date of Require-
ments Bulletin 757-53A0123 RB.
Do the Eddy Current Inspec-
tion at locations 1 through 6
and 8 through 10 for any
crack. (a)
Airplanes with no local
repair at any specified
location and no frame
segment replacement
repair resulting from
Table 2, Condition 2
finding.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
44 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 45

Group 5:
Table 22: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Right Side.
Repeat Interval
(Not to Exceed)
Boeing Recommended Compli-
ance Time
ActionCondition
-Before further flight.CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Company
for repair instructions and do
the repair.
ANY CRACK FOUND.
2,100 flight cycle-CONDITION 1, ACTION 2:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
4,300 flight cy-
cles
-CONDITION 1, ACTION 3:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 1, ACTION 4:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
2,100 flight cy-
cles
-CONDITION 2, ACTION 1:
Repeat the Eddy Current In-
spection at locations 1, 8
through 10 for any crack. (a)(b)
CONDITION 2:
NO CRACK FOUND.
4,300 flight cy-
cles
-CONDITION 2, ACTION 2:
Repeat the Eddy Current In-
spection at locations 2, 4
through 6 for any crack. (b)
12,000 flight cy-
cles
-CONDITION 2, ACTION 3:
Repeat the Eddy Current In-
spection at location 3 for any
crack. (b)
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspec-
tion plan for the repair affected area(s), and approves the inspection plan as an alternative in-
spection method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
45 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 46

4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
46 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 47

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. In the RB, the "Refer to the listed procedures..." column of the
table(s) in the Work Instructions is for reference only. The procedures in that column
are not required by the AD and are for guidance only. For the related SB, some
locations are marked RC Start and RC End to identify the requirements that are
restated from the RB. For the related SB, the areas between RC Start and RC End,
including sub-steps and any figures identified between RC Start and RC End, must
be done to comply with the AD. Therefore, an Alternative Method of Compliance
(AMOC) is required for any deviations to steps between RC Start and RC End,
including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance
with the operator's maintenance or inspection program without obtaining approval
of an AMOC; this is provided that the steps between RC Start and RC End, including
sub-steps and identified figures, can still be done as specified, and the airplane can
be put back in an airworthy condition. Figures not required for compliance are omitted
from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Boeing Service Letter 757-SL-51-022, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet, bolt edge margins and
Inspection area, is plus or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Tolerance on inspection area is plus or minus 0.1 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
– Values for structural fasteners are given in 757 Structural Repair Manual,
Chapter 51.
– Values for airframe maintenance tasks are included in Chapter 20 of 757
Aircraft Maintenance Manual (AMM).
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
47 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 48

– Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 757
Aircraft Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the
applicable installation step.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance, unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked. Basic cleaning may be
required to ensure appropriate visibility.
10. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
11. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
12. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
13. Where the inspection location is presented with "through" between inspection location
numbers, the inspection location means "through" and "inclusive", e.g. inspection
location numbers 1 through 10 means inspection location numbers 1 through 10
inclusive.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
48 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 49

B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements
TABLE 1: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Left Side
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS-ACTION 1:All Airplanes
Do a GVI of the STA 1640
frame between Stringers
S-9L and S-19L for any
approved frame segment
replacement repair. (a)(b)
-FIGURE 1
-FIGURE 1ACTION 2:
Do a GVI of the STA 1640
frame at specified loca-
tions for any local re-
pair.(b)(c)
--Group 1-3:CONDITION 1:
Do the actions specified in
Work Instructions Table 3.
ANY APPROVED FRAME
SEGMENT REPLACE-
MENT REPAIR FOUND. --Group 4-5:
Do the actions specified in
Work Instructions Table 5.
--Group 1-3:CONDITION 2:
Do the actions specified in
Work Instructions Table 4.
NO LOCAL REPAIR
FOUND AT ANY SPECI-
FIED LOCATION AND NO
FRAME SEGMENT RE-
PLACEMENT REPAIR
FOUND. (c)
--Group 4-5:
Do the actions specified in
Work Instructions Table 6.
--Contact The Boeing Com-
pany for alternative inspec-
tions and do the inspec-
tions and on-condition cor-
rective actions.
CONDITION 3:
ANY FRAME SEGMENT
REPLACEMENT REPAIR
FOUND THAT IS NOT AN
APPROVED FRAME
SEGMENT REPLACE-
MENT REPAIR.
OR
LOCAL REPAIR FOUND
AT ANY SPECIFIED LO-
CATION. (c)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
49 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 50

TABLE 1: General Visual Inspection (GVI) or Maintenance Records Check - STA 1640 Frame, Left Side
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
(a) For Requirements Bulletin 757-53A0123 RB, an approved frame segment replacement repair is defined
as a frame segment replacement repair that is Boeing ODA-approved with an FAA Form 8100-9 and
meets all of the following requirements:
1. The frame segment replacement repair is a repair that splices in a new section of a frame from
above S-10 to S-19 and meets the requirements specified in the Boeing Multi-Operator Message
MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame Replacement
Repair Proposal.
2. Any Boeing ODA approved deviations to the requirements specified in the Boeing Multi-Operator
Message MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame
Replacement Repair Proposal are acceptable if they are outside of the local repair inspection
locations 1 through 10 in Requirements Bulletin 757-53A0123 RB.
3. There are no local repairs (reinforcing or non-reinforcing), or any oversized fastener that exceeds
1/32 inch diameter over the production fastener size in the areas common to inspection locations
1 through 10 in Requirements Bulletin 757-53A0123 RB. Frame segment replacement repair
splice parts are not considered a local repair.
(b) A Maintenance records check is acceptable in lieu of the General Visual Inspection if the records review
can conclusively determine a repair exists in that location.
(c) Frame segment replacement repair splice parts are not considered a local repair.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
50 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 51

TABLE 2: General Visual Inspection (GVI) Or Maintenance Records Check - STA 1640 Frame, Right Side
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS-ACTION 1:All Airplanes.
Do a GVI of the STA 1640
frame between Stringers
S-9R and S-19R for any
approved frame segment
replacement repair. (a)(b)
-FIGURE 13
-FIGURE 13ACTION 2:
Do a GVI of the STA 1640
frame at specified loca-
tions for any local repair.
(b)(c)
--Group 1-3:CONDITION 1:
Do the actions specified in
Work Instructions Table 7.
ANY APPROVED FRAME
SEGMENT REPLACE-
MENT REPAIR FOUND. --Group 4-5:
Do the actions specified in
Work Instructions Table 9.
--Group 1-3:CONDITION 2:
Do the actions specified in
Work Instructions Table 8.
NO LOCAL REPAIR
FOUND AT ANY SPECI-
FIED LOCATION AND NO
FRAME SEGMENT RE-
PLACEMENT REPAIR
FOUND. (c)
--Group 4-5:
Do the actions specified in
Work Instructions Table
10.
--Contact The Boeing Com-
pany for alternative inspec-
tions and do the inspec-
tions and on-condition cor-
rective actions.
CONDITION 3:
ANY FRAME SEGMENT
REPLACEMENT REPAIR
FOUND THAT IS NOT AN
APPROVED FRAME
SEGMENT REPLACE-
MENT REPAIR.
OR
LOCAL REPAIR FOUND
AT ANY SPECIFIED LO-
CATION. (c)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
51 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 52

TABLE 2: General Visual Inspection (GVI) Or Maintenance Records Check - STA 1640 Frame, Right Side
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
(a) For Requirements Bulletin 757-53A0123 RB, an approved frame segment replacement repair is defined
as a frame segment replacement repair that is Boeing ODA-approved with an FAA Form 8100-9 and
meets all of the following requirements:
1. The frame segment replacement repair is a repair that splices in a new section of a frame from
above S-10 to S-19 and meets the requirements specified in the Boeing Multi-Operator Message
MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame Replacement
Repair Proposal.
2. Any Boeing ODA approved deviations to the requirements specified in the Boeing Multi-Operator
Message MOM-MOM-17-0037-01B, dated 20 Jan 2017, REF/I/ 757 Frame 1640 Partial Frame
Replacement Repair Proposal are acceptable if they are outside of the local repair inspection
locations 1 through 10 in Requirements Bulletin 757-53A0123 RB.
3. There are no local repairs (reinforcing or non-reinforcing), or any oversized fastener that exceeds
1/32 inch diameter over the production fastener size in the areas common to inspection locations
1 through 10 in Requirements Bulletin 757-53A0123 RB. Frame segment replacement repair
splice parts are not considered a local repair.
(b) A Maintenance records check is acceptable in lieu of the General Visual Inspection if the records review
can conclusively determine a repair exists in that location.
(c) Frame segment replacement repair splice parts are not considered a local repair.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
52 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 53

Group 1-3:
Table 3: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
(If Maintenance Records
Check was done in lieu of
a General Visual Inspec-
tion in Table 1.)
-ACTION 1:
Do the Eddy Current In-
spection at location 1 for
any crack. (a)
Airplanes with an approved
frame segment replace-
ment repair resulting from
Table 1, Condition 1 find-
ing.
-FIGURE 2
-Location 3 : FIGURE 5ACTION 2:
Do the Eddy Current In-
spection at locations 3
through 10 for any crack.
-Location 4, 5: FIGURE 6
-Location 6: FIGURE 7
-Location 7: FIGURE 8
-Location 8 with a backup
fitting installed:
FIGURE 9
-Location 8 without a back-
up fitting installed:
FIGURE 10
-Location 9: FIGURE 11
-Location 10: FIGURE 12
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
53 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 54

Group 1-3:
Table 3: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 2: CLOSE ACCESS-CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND.
PART 1: OPEN ACCESS-CONDITION 1, ACTION 2:
Repeat the Eddy Current
Inspection at location 1 for
any crack. (a)(b)
-FIGURE 2
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 1, ACTION 3:
Repeat the Eddy Current
Inspection at location 3 for
any crack. (b)
-FIGURE 5
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 1, ACTION 4:
Repeat the Eddy Current
Inspection at locations 4
through 6 for any crack. (b)
-Location 4,5: FIGURE 6
-Location 6: FIGURE 7
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 1, ACTION 5:
Repeat the Eddy Current
Inspection at locations 7
through 10 for any crack.
(b)
-Location 7: FIGURE 8
-Location 8 with a backup
fitting installed:
FIGURE 9
-Location 8 without a back-
up fitting installed:
FIGURE 10
-Location 9: FIGURE 11
-Location 10: FIGURE 12
PART 2: CLOSE ACCESS-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
54 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 55

Group 1-3:
Table 3: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 2: CLOSE ACCESS-CONDITION 2, ACTION 1:CONDITION 2:
NO CRACK FOUND. Repeat the Eddy Current
Inspection at location 1 for
any crack. (a)(b)
PART 1: OPEN ACCESS-
-FIGURE 2
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 2, ACTION 2:
Repeat the Eddy Current
Inspection at location 3 for
any crack. (b)
-FIGURE 5
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 2, ACTION 3:
Repeat the Eddy Current
Inspection at locations 4
through 6 for any crack. (b)
-Location 4,5: FIGURE 6
-Location 6: FIGURE 7
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 2, ACTION 4:
Repeat the Eddy Current
Inspection at locations 7
through 10 for any crack.
(b)
-Location 7: FIGURE 8
-Location 8 with a backup
fitting installed:
FIGURE 9
-Location 8 without a back-
up fitting installed:
FIGURE 10
-Location 9: FIGURE 11
-Location 10: FIGURE 12
PART 2: CLOSE ACCESS-
(a) Some airplane configurations may not have the K-hole at location 1. The surface HFEC inspection is not
required for any airplane with no plugged K-hole at location 1.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
55 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 56

Group 1-3:
Table 3: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspection
plan for the repair affected area(s), and approves the inspection plan as an alternative inspection
method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
56 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 57

Group 1-3:
Table 4: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
(If Maintenance Records
Check was done in lieu of
a General Visual Inspec-
tion in Table 1.)
-Do the Eddy Current In-
spection at locations 1
through 10 for any crack.
(a)
Airplanes with no local re-
pair at any specified loca-
tion and no frame segment
replacement repair result-
ing from Table 1, Condition
2 finding. -Location 1: FIGURE 3
-Location 2 : FIGURE 4
-Location 3 : FIGURE 5
-Location 4, 5: FIGURE 6
-Location 6: FIGURE 7
-Location 7: FIGURE 8
-Location 8 with a backup
fitting installed:
FIGURE 9
-Location 8 without a back-
up fitting installed:
FIGURE 10
-Location 9: FIGURE 11
-Location 10: FIGURE 12
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
57 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 58

Group 1-3:
Table 4: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 2: CLOSE ACCESS-CONDITION 1, ACTION 1:CONDITION 1:
Contact The Boeing Com-
pany for repair instructions
and do the repair.
ANY CRACK FOUND.
PART 1: OPEN ACCESS-CONDITION 1, ACTION 2:
Repeat the Eddy Current
Inspection at locations 1,
7 through 10 for any crack.
(a)(b)
-Location 1: FIGURE 3
-Location 7: FIGURE 8
-Location 8 with a backup
fitting installed:
FIGURE 9
-Location 8 without a back-
up fitting installed:
FIGURE 10
-Location 9: FIGURE 11
-Location 10: FIGURE 12
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 1, ACTION 3:
Repeat the Eddy Current
Inspection at locations 2,
4 through 6 for any crack.
(b)
-Location 2: FIGURE 4
-Location 4,5: FIGURE 6
-Location 6: FIGURE 7
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 1, ACTION 4:
Repeat the Eddy Current
Inspection at location 3 for
any crack. (b)
-FIGURE 5
PART 2: CLOSE ACCESS-
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
58 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 59

Group 1-3:
Table 4: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
PART 2: CLOSE ACCESS-CONDITION 2, ACTION 1:CONDITION 2:
NO CRACK FOUND. Repeat the Eddy Current
Inspection at locations 1,
7 through 10 for any crack.
(a)(b)
PART 1: OPEN ACCESS-
-Location 1: FIGURE 3
-Location 7: FIGURE 8
-Location 8 with a backup
fitting installed:
FIGURE 9
-Location 8 without a back-
up fitting installed:
FIGURE 10
-Location 9: FIGURE 11
-Location 10: FIGURE 12
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 2, ACTION 2:
Repeat the Eddy Current
Inspection at locations 2,
4 through 6 for any crack.
(b)
-Location 2: FIGURE 4
-Location 4,5: FIGURE 6
-Location 6: FIGURE 7
PART 2: CLOSE ACCESS-
PART 1: OPEN ACCESS-CONDITION 2, ACTION 3:
Repeat the Eddy Current
Inspection at location 3 for
any crack. (b)
-FIGURE 5
PART 2: CLOSE ACCESS-
(a) Some airplane configurations may not have the K-hole at location 1. The open-hole HFEC inspection is
not required for any airplane with no K-hole at location 1.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
59 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

### Page 60

Group 1-3:
Table 4: Eddy Current Inspections - STA 1640 Frame Inner Chord, Web and Outer Chord, Left Side.
Refer to the listed proce-
dures in Service Bulletin
757-53A0123 Original Is-
sue or later approved re-
visions as an accepted
procedure.
Method of ComplianceActionCondition
(b) It is not required to do the eddy current inspections in accordance with Requirements Bulletin 757-53A0123
RB in the repair affected area(s) if the repair(s) meet all of the conditions that follow:
1. The repair inspection plan was approved after the Original Issue date of Requirements Bulletin
757-53A0123 RB.
2. The repair plan is approved by the Boeing ODA via a FAA Form 8100-9.
3. The FAA Form 8100-9 approval defines the repair affected area(s), states the post repair inspection
plan for the repair affected area(s), and approves the inspection plan as an alternative inspection
method to the repeat inspection(s) in Requirements Bulletin 757-53A0123 RB.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: March 13, 2024
757-53A0123 RB
60 of 178
REQUIREMENTS BULLETIN 757-53A0123
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/757-53a0123-rb/file/a65c5df6762b.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
