# Boeing Alert Service Bulletin 757-54A0047: Revision 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0724; AD 2012-26-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 757-54A0047](https://openairdocs.org/service-documents/boeing/757-54a0047.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin -757-54A0047-04
- Pages: 62
- PDF: https://openairdocs.org/files/sha256/99/bc/99bc62dc6f37c4a9c96e17149eb838f64ea86d82a810d6eb8ec0df7e6a8f4c39
- Page: https://openairdocs.org/service-documents/boeing/757-54a0047/file/99bc62dc6f37

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
757
Service Bulletin
ALERT
Number: 757-54A0047
Original Issue: November 13, 2003
Revision 4: June 24, 2010
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - Inspection
for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2003 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
1 of 62
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
2 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 4
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 8
E. Compliance .............................................. 2 0
F. Approval ............................................... 2 3
G. Manpower .............................................. 2 4
H. Weight and Balance Changes .................................... 2 5
I. Electrical Load Data ......................................... 2 6
J. References .............................................. 2 6
1. Existing Data: ......................................... 2 6
2. Data supplied with this Service Bulletin: ........................... 2 6
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 6
K. Publications Affected ........................................ 2 6
L. Interchangeability and Intermixability of Parts ........................... 2 7
2. MATERIAL INFORMATION ........................................ 2 9
A. Material - Price and Availability ................................... 2 9
B. Industry Support Information .................................... 2 9
C. Parts Necessary For Each Airplane ................................. 2 9
1. Kits/Parts: ........................................... 2 9
2. Parts and Materials Supplied by the Operator: ........................ 2 9
3. Parts Modified and Reidentified: ............................... 3 0
4. Parts Removed and Not Replaced: .............................. 3 0
D. Parts Necessary to Change Spares ................................. 3 0
E. Special Tooling - Price and Availability ............................... 3 0
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 0
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 1
A. GENERAL INFORMATION ..................................... 3 1
B. WORK INSTRUCTIONS ....................................... 3 2
FIGURE 1: ACCESS FOR INSPECTION ................................. 3 5
FIGURE 2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE .............. 3 8
FIGURE 3: INSPECTION - HORIZONTAL FLANGE FASTENERS AND TORQUE BULKHEAD . . . 40
FIGURE 4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE ............ 4 3
FIGURE 5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE .......... 4 6
FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE ........ 4 8
FIGURE 7: THIS FIGURE HAS BEEN DELETED ............................. 5 1
FIGURE 8: REPAIR - SEALANT AND LEVELING COMPOUND ..................... 5 2
FIGURE 9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE ..................... 5 4
FIGURE 10: SEAL COVER PLATES .................................... 5 6
FIGURE 11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS ....... 5 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
3 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 4

FIGURE 12: NACELLE/PYLONS - ALTERNATIVE ACCESS TO THE CRITICAL HORIZONTAL FLANGE
FASTENERS .......................................... 6 0
FIGURE 13: NACELLE/PYLONS - ULTRASONIC INSPECTION OF THE CRITICAL FASTENERS . . 61
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
4 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 5

Commercial 
Airplanes
757
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 757-54A0047Original Issue: November 13, 2003
Revision 4: June 24, 2010
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - Inspection
for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes changed in accordance with the original issue, Revision 1, Revision 2 or
Revision 3 of this service bulletin. On airplanes without conclusive records of previous inspections, do a one
time open hole High Frequency Eddy Current (HFEC) inspection or ultrasonic inspection of the four critical
fastener holes in the horizontal flange as given in this service bulletin.
No airplanes ware added or removed from this service bulletin effectivity.
REASON FOR REVISION
This revision is sent to revise the compliance information and to give an alternative method of accessing the
critical fasteners at the strut-to-diagonal brace fitting. It is also sent to add more instructions for inspecting the
aft torque bulkhead.
The following sections were changed:
1. More information is added to the Background and Reason sections.
2. Paragraph 1.D., Description - Affected maintenance zones are added.
3. Paragraph 1.E., Compliance - The compliance information is revised.
4. Paragraph 1.F., Approval - An Alternative Method of Compliance (AMOC) statement is added, and the
Federal Aviation Administration (FAA) Airworthiness Directives (AD) reference is changed.
5. Paragraph 1.G., Manpower - Added a new manpower table and changed manpower information.
6. Paragraph 1.J.1., Existing Data - Service Related Problem (SRP), Nondestructive Test (NDT) and the FAA
(AD) reference is changed.
7. Paragraph 1.K., Publications Affected - A Damage Tolerance Based Structural Inspection statement is
added.
8. Paragraph 3.A., General Information - Added new standard Note 1 and Note 7.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
5 of 62

### Page 6

9. Paragraph 3.B., Work Instructions - More inspection instructions are added to Part II and Part IV.
10. FIGURE 3 - A new view and more inspection instructions are added.
11. FIGURE 12 and FIGURE 13 are added.
The data given in Information Notice 757-54A0047 R03 IN-01 is included in this revision. 757-54A0047 R03
IN-01 was sent to inform operators about the Federal Aviation Administration (FAA) approval of an Alternative
Method of Compliance (AMOC) to paragraph (g) of Airworthiness Directive (AD) 2007-16-13.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
November 13, 2003Original Issue:
March 24, 2005Revision 1:
January 31, 2007Revision 2:
June 27, 2007Revision 3:
June 24, 2010Revision 4:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
6 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 7

Commercial 
Airplanes
757
Service Bulletin
ALERT
SummaryNumber: 757-54A0047Original Issue: November 13, 2003
Revision 4: June 24, 2010
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - Inspection
for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives the instructions to inspect the joint between the aft torque bulkhead and the
strut-to-diagonal brace fitting for a loose shim, and/or loose, missing, or damaged fasteners. Instructions are
also given to make repairs if loose fasteners or migrated shims are found during the inspections and to do an
inspection and repair of the four critical fastener holes on the horizontal flange.
Since 1993, Boeing has eighteen reports of cracks, loose and broken bolts, and shim migration in the joint
between the aft torque bulkhead and the strut-to-diagonal brace fitting.
Service History
ReportStrutCyclesHoursDate
One bolt sheared in horizontal flange. Four bolts
loose in vertical flange.
-10,28429,45112/93
Four bolts loose in vertical flange of both struts.No. 1 & 29,35825,76811/96
One bolt loose in vertical flange of Strut No. 1. Four
bolts loose in vertical flange of Strut No. 2.
No. 1 & 2--06/98
Four bolts loose in vertical flange of both struts. Two
bolts sheared in horizontal flange of both struts. All
remaining bolts loose in horizontal flange of both
struts.
No. 1 & 221,74955,78911/99
Sixteen bolts loose in horizontal flange.No. 1 & 220,16146,45901/01
Two bolts loose in vertical flange.No. 113,66249,01909/01
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
7 of 62

### Page 8

Service History
ReportStrutCyclesHoursDate
Two bolt heads cracked.-14,63323,42301/02
Two bolts loose in horizontal flange of Strut No. 1.
Three bolts loose in horizontal flange of Strut No. 2.
No. 1 & 212,49316,60104/02
Migrated shim between bulkhead and vertical flange
of fitting.
No. 1 & 215,52243,82205/02
Four bolts loose in vertical flange. Five bolts loose in
horizontal flange.
No. 215,90046,75806/02
One bolt missing and one bolt loose in horizontal
flange. Cracks in the aluminum bulkhead at three
hole locations.
No. 120,09049,80712/02
Two loose bolts in vertical flange.-22,11150,84104/03
Three loose bolts in vertical flange.No. 19,99130,07209/03
Migrated shims between bulkhead and vertical flange
of fitting.
No. 1 & 226,91460,71509/03
Three loose bolts in vertical flange.No. 215,00444,98510/03
Three loose bolts in vertical flange.No. 27,92212,36801/04
Four loose bolts in vertical flange.No. 17,59212,11902/04
One loose fastener in the vertical flange. Cracks in
the aluminum bulkhead at two hole locations and web
at one hole location common to the horizontal flange.
No. 113,08344,42304/06
In addition, one operator found a strut torque bulkhead fitting with loose fasteners and cracks at the joint common
to the strut diagonal brace fitting on two airplanes with the Strut Improvement Program (SIP) incorporated during
production. One airplane had been inspected for loose fasteners in 2006 per service bulletin 75-54A0047 Revision
01 with no findings. Since that inspection, the airplane had accumulated less than 3000 flight cycles. The loose
fasteners and cracks were found during an engine change while the area was exposed.
Continued operation with cracks, and/or loose and broken fasteners, could cause separation of the joint between
the aft torque bulkhead and the strut-to-diagonal brace fitting. With separation of these components, the diagonal
brace would not transmit the engine loads through to the wing structure. Continued safe flight, as related to this
characteristic of the strut installation, would then have dependence on the upper link load path of the strut. The
upper link load path is designed with sufficient strength to carry the load redistribution. However, if a separation
in the diagonal brace load path goes undetected for a long enough period, loss of the strut could occur.
Boeing Service Related Problems (SRP) 757-SRP-54-0095, 757-SRP-54-0118 and 757-SRP-54-0130 are
related to this service bulletin.
ACTION
Get access to the forward and aft surfaces of the torque bulkhead assembly. Do an inspection of the shims
between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Also, do an inspection
of the four fasteners through the vertical flange of the fitting and the torque bulkhead. If shim migration and/or
loose bolts are found in the diagonal brace load path, make the applicable interim repairs.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
8 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 9

Get more access for the inspection of the horizontal flange of the strut-to-diagonal brace fitting. Do an inspection
of the sixteen fasteners through the horizontal flange of the fitting. A borescope, or other inspections aids, can
be necessary for this inspection. If necessary remove the engine and install oversize fasteners.
If loose fasteners are found or shim migration is beyond limits, do an inspection and repair of the four critical
fastener holes on the horizontal flange.
As necessary, apply new sealant to the fasteners and leveling compound to the strut structure. As necessary
install the engine, diagonal brace, and other components removed to get access. Put the airplane back to a
serviceable condition and schedule the repeat inspections.
EFFECTIVITY
757-200/-200CB and -200PF airplanes line numbers 1 thru 1048, powered by Rolls Royce engines.
COMPLIANCE
Refer to paragraph 1.E., Compliance for compliance information.
Federal Aviation Administration (FAA) Airworthiness Directives (AD) 2004-12-07 and 2008-05-10, are related
to this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this service
bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
22.0 (a)44.0 (a)All
(a) Inspections only. Does not include time to make repairs
if loose fasteners or cracks are found.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
9 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 10 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
INSPECT FASTENERS IN
HORIZONTAL FLANGE OF
FITTING (16 LOCATIONS).
FWD
A-A
INSPECT THE ACCESS DOOR CUTOUT FOR
FWD ‹
CRACKING.
INSPECT SHIM  INSPECT FASTENERS
INSTALLATION.  IN VERTICAL FLANGE
OF FITTING
(4 LOCATIONS) .
INSPECT THE BULKHEAD
FOR CRACKING.
W38926
Original Issue: November 13, 2003
Revision 4: June 24, 2010  757-54A0047
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  10 of 62

### Page 11

Commercial 
Airplanes
757
Service Bulletin
ALERT
Number: 757-54A0047
Original Issue: November 13, 2003
Revision 4: June 24, 2010
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - Inspection
for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
757-200/-200CB/-200PF airplanes line number 1 thru 735, powered
by Rolls Royce engines.
-1
Airplanes without SB 757-54-0035 incorporation.1
Airplanes with SB 757-54-0035 incorporation.2
757-200/-200PF airplanes line number 736 thru 1048, powered by
Rolls Royce engines.
-2
Airplane Models:
757-200, 757-200CB, 757-200PF
GroupVariable Number
1NA002 - NA028
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
11 of 62

### Page 12

GroupVariable Number
1NA191 - NA199
1NA201 - NA239
1NA301 - NA305
1NA341 - NA352
1NA391 - NA399
1NA401 - NA408
1NA441 - NA447
1NB021 - NB023
1NB036 - NB041
1NB051 - NB053
1NB061 - NB073
1NB079
1NB131 - NB148
1NB161 - NB162
1NB201 - NB204
1NB221 - NB225
2NB226 - NB228
2NB230
1NB236
1NB239
1NB261 - NB267
1NB291 - NB299
1NB301 - NB302
1NB311 - NB312
1NB321 - NB331
1NB421 - NB438
1NB446
1NB451 - NB454
1NB501 - NB523
1NB561
2NB571
2NB581 - NB583
1NC058 - NC061
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
12 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 13

GroupVariable Number
2NC062
1NC936 - NC950
1NC971 - NC974
1ND001 - ND007
1ND011 - ND059
1ND111 - ND113
1ND161 - ND199
1ND201 - ND203
1ND221 - ND225
1ND241 - ND248
1ND301 - ND317
2ND318 - ND322
2ND401
1ND891
1ND895
2NJ001 - NJ004
2NJ031 - NJ032
2NN001 - NN002
2NN051 - NN052
1NS601 - NS610
2NS611 - NS616
2NT001 - NT009
2NT201 - NT202
2NT231 - NT234
2NT237 - NT240
2NT242
2NT245 - NT248
2NT281 - NT289
2NT381 - NT386
2NT401 - NT409
2NT411 - NT412
2NT426 - NT427
2NT431 - NT432
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
13 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 14

GroupVariable Number
2NT436 - NT438
2NT446
2NT731 - NT769
2NT861 - NT862
2NT901 - NT916
2NT971 - NT985
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives the instructions to inspect the joint between the aft torque bulkhead and the
strut-to-diagonal brace fitting for a loose shim, and/or loose, missing, or damaged fasteners. Instructions
are also given to make repairs if loose fasteners or migrated shims are found during the inspections
and do an inspection and repair of the four critical fastener holes on the horizontal flange.
Since 1993, Boeing has eighteen reports of cracks, loose and broken bolts, and shim migration in the
joint between the aft torque bulkhead and the strut-to-diagonal brace fitting.
Service History
ReportStrutCyclesHoursDate
One bolt sheared in horizontal flange. Four bolts
loose in vertical flange.
-10,28429,45112/93
Four bolts loose in vertical flange of both struts.No. 1 & 29,35825,76811/96
One bolt loose in vertical flange of Strut No. 1. Four
bolts loose in vertical flange of Strut No. 2.
No. 1 & 2--06/98
Four bolts loose in vertical flange of both struts. Two
bolts sheared in horizontal flange of both struts. All
remaining bolts loose in horizontal flange of both
struts.
No. 1 & 221,74955,78911/99
Sixteen bolts loose in horizontal flange.No. 1 & 220,16146,45901/01
Two bolts loose in vertical flange.No. 113,66249,01909/01
Two bolt heads cracked.-14,63323,42301/02
Two bolts loose in horizontal flange of Strut No. 1.
Three bolts loose in horizontal flange of Strut No. 2.
No. 1 & 212,49316,60104/02
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
14 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 15

Service History
ReportStrutCyclesHoursDate
Migrated shim between bulkhead and vertical flange
of fitting.
No. 1 & 215,52243,82205/02
Four bolts loose in vertical flange. Five bolts loose in
horizontal flange.
No. 215,90046,75806/02
One bolt missing and one bolt loose in horizontal
flange. Cracks in the aluminum bulkhead at three
hole locations.
No. 120,09049,80712/02
Two loose bolts in vertical flange.-22,11150,84104/03
Three loose bolts in vertical flange.No. 19,99130,07209/03
Migrated shims between bulkhead and vertical flange
of fitting.
No. 1 & 226,91460,71509/03
Three loose bolts in vertical flange.No. 215,00444,98510/03
Three loose bolts in vertical flange.No. 27,92212,36801/04
Four loose bolts in vertical flange.No. 17,59212,11902/04
One loose fastener in the vertical flange. Cracks in
the aluminum bulkhead at two hole locations and web
at one hole location common to the horizontal flange.
No. 11308344,42304/06
In addition, one operator found a strut torque bulkhead fitting with loose fasteners and cracks at the
joint common to the strut diagonal brace fitting on two airplanes with the Strut Improvement Program
(SIP) incorporated during production. One airplane had been inspected for loose fasteners in 2006 per
service bulletin 75-54A0047 Revision 01 with no findings. Since that inspection, the airplane had
accumulated less than 3000 flight cycles. The loose fasteners and cracks were found during an engine
change while the area was exposed.
Continued operation with cracks, and/or loose and broken fasteners, could cause separation of the
joint between the aft torque bulkhead and the strut-to-diagonal brace fitting. With separation of these
components, the diagonal brace would not transmit the engine loads through to the wing structure.
Continued safe flight, as related to this characteristic of the strut installation, would then have dependence
on the upper link load path of the strut. The upper link load path is designed with sufficient strength to
carry the load redistribution. However, if a separation in the diagonal brace load path goes undetected
for a long enough period, loss of the strut could occur.
Boeing Service Related Problems (SRP) 757-SRP-54-0095, 757-SRP-54-0118 and 757-SRP-54-0130
are related to this service bulletin.
Revision 01 is sent to give migration limits for the shims in the diagonal brace load path. The inspection
given in the initial release of this service bulletin made it necessary to repair a loose shim before an
airplane could be put back in service. With these new migration limits, an airplane can be put back in
service with a migrated shim if the inspection finds that it is in the permitted limits. The bulkhead crack
repair as given in the initial release has been deleted. If cracks are found, they will be reviewed on a
case-by-case basis.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
15 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 16

A new repair is added for the shims in the diagonal brace load path. There are now 4 repairs and 1
repair that has been deleted. For identification, they are referred to as Interim Repairs I, II, III, IV and
V. Interim Repair I is almost the same as the one given in the initial release and replaces the two shims
between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Interim Repairs
II and III are the same as those given in the initial release. Interim Repair II installs oversize fasteners
in the vertical flange of the fitting, and Interim Repair III installs oversize fasteners in the horizontal
flange of the fitting. Interim Repair IV is the same bulkhead crack repair given in the initial release and
has been deleted. Interim Repair V is new and gives the instructions to cut and remove the exposed
plies of the shims as a repair for shim migration of 0.50, or less
These sections of the service bulletin were changed with revision 01:
— Compliance - Decreased repeat inspection thresholds to address additional in service reports
where loose fasteners were found on airplanes with less than 12,000 flight cycles. Also, added
compliance information for airplanes line numbers 736 thru 1048 to address additional reports of
loose fasteners on airplanes with the latest configuration.
— Reason and Description - Add six reports to the service history table.
— Effectivity - Added 757-200/-200CB and 200PF airplanes with RB211 engines, Line numbers 736
thru 1048.
— Work Instructions, Part I, Step 2 - Add shim migration limits to show the necessary work if shim
migration is found during the inspection.
— Figure 2 - Add instructions to measure and record the distance a shim has moved from the installed
position, if the shim shows signs of movement during the inspection.
— Figure 4 - Make changes to the figure as follows:
— Change the figure title to show that it is Interim Repair I.
— Make corrections to the illustration and instructions to show the replacement of two shims.
One on the left flange of the fitting and one on the right flange of the fitting.
— Add a step is to apply sealant around the outer edge of the shim.
— Add a step to increase the hole diameter after shim is in place.
— Removed repair instructions for cracks.
— Figure 5 - Make changes to the figure as follows:
— Change the figure title to show that it is Interim Repair II.
— Removed repair instructions for cracks.
— Figure 6 - Make changes to the figure as follows:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
16 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 17

— Change the figure title to show that it is Interim Repair III.
— Removed repair instructions for cracks.
— Figure 7 - Deleted.
— Figure 9 - Add this new figure to give the instructions for Interim Repair V.
— Figure 10 - Added this new figure to give instructions for sealing removed parts.
Revision 02 is sent to give revised inspection schedule and repair requirements. Instructions are added
to inspect for cracking at four critical horizontal flange fasteners holes if one or more loose fasteners
is found. Also, do a one-time inspection and repair of the four critical faster holes on the horizontal
flange. Figure 11, Interim Repair VI is new and gives location and instruction for the four critical horizontal
flange fastener locations.
These sections of the service bulletin are changed with revision 02:
— Summary - Added revised inspection intervals in the Compliance section. Added horizontal flange
one-time critical fastener inspection and repair requirement in the Action section. Added one report
to the Service History in Background section.
— Planning - Added revised inspection intervals in the Compliance section. Added horizontal flange
one-time critical fastener inspection and repair requirement in the Description section. Added one
report to the Service History in the Reason section. Added Manpower hours for Part IV inspection.
— Accomplishment Instructions - Revised access instructions. Added inspections, critical fastener
identification, locations, compliance requirement Notes and Part IV inspection.
— Figure 6 - Added HFEC inspections to aluminum bulkhead and steel web with NDT references.
— Figure 11 - Added, for critical horizontal flange fastener locations, HFEC inspections to aluminum
bulkhead and steel web with NDT references.
— All references to AD 2004-12-07 are changed to AD 2005-12-04.
Revision 03 is sent to give revised inspection compliance times and replace the phrase "one time
inspection" with "inspection" when referring to the Part IV inspection of the critical fastener holes on
the horizontal flange .
These sections of the service bulletin are changed with revision 03:
— Summary - Compliance information is deleted from the Compliance section.
— Paragraph 1.E., Compliance - Compliance times are revised and presented in a tabular format.
— Summary, Planning Information, Work Instructions: replaced the words "one time inspection" with
"inspection".
Revision 04 is sent to revise the compliance information and to give an alternative method of accessing
the critical fasteners at the strut-to-diagonal brace fitting. It is also sent to add more instructions for
inspecting the aft torque bulkhead.
The following sections were changed:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
17 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 18

1. More information is added to the Background and Reason sections.
2. Paragraph 1.D., Description - Affected maintenance zones are added.
3. Paragraph 1.E., Compliance - The compliance information is revised.
4. Paragraph 1.F., Approval - An Alternative Method of Compliance (AMOC) statement is added,
and the Federal Aviation Administration (FAA) Airworthiness Directives (AD) reference is changed.
5. Paragraph 1.G., Manpower - Added a new manpower table and changed manpower information.
6. Paragraph 1.J.1., Existing Data - Service Related Problem (SRP), Nondestructive Test (NDT) and
the FAA (AD) reference is changed.
7. Paragraph 1.K., Publications Affected - A Damage Tolerance Based Structural Inspection statement
is added.
8. Paragraph 3.A., General Information - Added new standard Note 1 and Note 7.
9. Paragraph 3.B., Work Instructions - More inspection instructions are added to Part II and Part IV.
10. FIGURE 3 - A new view and more inspection instructions are added.
11. FIGURE 12 and FIGURE 13 are added.
D. Description
Get access to the forward and aft surfaces of the torque bulkhead assembly. Do an inspection of the
shims between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Also,
do an inspection of the four fasteners through the vertical flange of the fitting and the torque bulkhead.
If shim migration and/or loose bolts are found in the diagonal brace load path, make the applicable
interim repairs.
Get more access for the inspection of the horizontal flange of the strut-to-diagonal brace fitting. Do an
inspection of the sixteen fasteners through the horizontal flange of the fitting. A borescope, or other
inspections aids, can be necessary for this inspection. If necessary remove the engine and install
oversize fasteners.
If loose fasteners are found or shim migration is beyond limits, do an inspection of the four critical
fastener holes on the horizontal flange.
As necessary, apply new sealant to the fasteners and leveling compound to the strut structure. As
necessary install the engine, diagonal brace, and other components removed to get access. Put the
airplane back to a serviceable condition and schedule the repeat inspections.
Revision 01 - More work is necessary on airplanes changed as shown in the initial release of this
service bulletin. Repeat inspections are required for airplanes that have incorporated Service Bulletin
757-54-0035.
Revision 02 - More work is necessary on airplanes changed as shown in the initial release and revision
01 of this service bulletin. Instructions are added to do a one-time inspection and repair of the four
critical fastener holes on the horizontal flange.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
18 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 19

Revision 03 - No more work is necessary on airplanes changed as shown in the Original issue, Revision
1, or Revision 2 of this service bulletin, however the conditions and the compliance time for doing the
inspection of the four critical fasteners on the horizontal flange have changed.
Revision 04 - More work is necessary on airplanes changed in accordance with the original issue,
Revision 1, Revision 2 or Revision 3 of this service bulletin. On airplanes without conclusive records
of previous inspections, do a one time open hole High Frequency Eddy Current (HFEC) inspection or
ultrasonic inspection of the four critical fastener holes in the horizontal flange as given in this service
bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
433, 443757-200, 757-200CB, 757-
200PF
Group 2:
Affected Maintenance Zones
ZoneModel
433, 443757-200, 757-200PF
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
19 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 20

E. Compliance
Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque
Bulkhead .
Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition
--Within 90 days of the
date of Revision 4 of
this service bulletin.
Inspect the four critical
fasteners in the horizon-
tal flange in accordance
with Part IV unless al-
ready accomplished in
accordance with Revi-
sion 2 or Revision 3 of
this service bulletin.
All airplane
struts that had
findings on the
horizontal or
vertical fasten-
ers or the
shims which
lead to a rejec-
tion while do-
ing Revision 1
or the original
release of this
service bul-
letin, and all
airplanes that
had equivalent
findings prior to
the original re-
lease of this
service bul-
letin. (a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
20 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 21

Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque
Bulkhead .
Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition
1800 flight cycles.1800 flight cycles
from the last inspec-
tion for loose fasten-
ers and migrated
shims per this service
bulletin.
Within 90 days of the
date of Revision 4 of
this service bulletin.
Inspect the shim instal-
lation in accordance
with Part I, Step 3. In-
spect all four fasteners
in the vertical flange in
accordance with Part I,
Step 5. Inspect the fas-
teners in the horizontal
flange in accordance
with Part II, Step 2. Do
a detailed inspection of
the bulkhead in accor-
dance with Part II, Step
3.
Group 1 Config-
uration 1
OR
3000 flight cycles.1800 flight cycles
from the last inspec-
tion for loose fasten-
ers and migrated
shims per this service
bulletin.
Within 90 days of the
date of Revision 4 of
this service bulletin.
Inspect the shim instal-
lation in accordance
with Part I, Step 3. In-
spect all four fasteners
in the vertical flange in
accordance with Part I,
Step 5. Inspect the fas-
teners in the horizontal
flange in accordance
with Part II, Step 2. Do
a detailed inspection
and an ultrasonic in-
spection of the bulk-
head in accordance
with Part II, Step 3.
3000 flight cycles.3,000 flight cycles
from the last inspec-
tion for loose fasten-
ers and migrated
shims per this service
bulletin.
Within 90 days of the
date of Revision 4 of
this service bulletin.
Inspect the shim instal-
lation in accordance
with Part I, Step 3. In-
spect all four fasteners
in the vertical flange in
accordance with Part I,
Step 5. Inspect the fas-
teners in the horizontal
flange in accordance
with Part II, Step 2. Do
a detailed inspection of
the bulkhead in accor-
dance with Part II, Step
3.
Group 1 Config-
uration 2
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
21 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 22

Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque
Bulkhead .
Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition
3000 flight cycles.3,000 flight cycles
from the last inspec-
tion for loose fasten-
ers and migrated
shims per this service
bulletin.
Within 90 days of the
date of Revision 4 of
this service bulletin.
Inspect the shim instal-
lation in accordance
with Part I, step 3. In-
spect all four fasteners
in the vertical flange in
accordance with Part I,
Step 5. Inspect the fas-
teners in the horizontal
flange in accordance
with Part II, Step 2. Do
a detailed inspection of
the bulkhead in accor-
dance with Part II, Step
3.
Group 2
--Within 90 days of the
date of Revision 04 of
this service bulletin.
Do an open hole High
Frequency Eddy Cur-
rent (HFEC) inspection
at the critical fastener
location in accordance
with Work Instructions
Part IV, Step 2.a.
Airplanes with-
out conclusive
records of pre-
vious inspec-
tion.
OR
--Within 90 days of the
date of Revision 04 of
this service bulletin.
Do an ultrasonic inspec-
tion of the critical fasten-
er holes in the horizon-
tal flange in accordance
with Work Instructions
Part IV, Step 2.b.
--Before further flight
after completing all
inspections.
Repair in accordance
with Part I, Step 4.a.
Total cumula-
tive shim
movement
equal to or less
than 0.50 inch.
--Before further flight
after completing all
inspections.
Repair in accordance
with Part I, Step.4.b.
Total cumula-
tive shim
movement
more than 0.50
inch.
--Before further flight
after completing all
inspections.
Repair in accordance
with Part I, Step 5.a.(2)
AND Inspect and repair
in accordance with Part
I, Step 5.a.(3)
Rejected fas-
tener in the
vertical flange.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
22 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 23

Table 1: Inspection of Fasteners, Fastener Holes and Bulkhead Flange at the Nacelle Strut Torque
Bulkhead .
Repeat IntervalCompliance Time (Whichever Occurs later)ActionCondition
--Before further flight
after completing all
inspections.
Repair in accordance
with Part II, Step 2.a.(2)
AND Inspect and repair
in accordance with Part
II, Step 2.a.(3)
Rejected fas-
tener in the
horizontal
flange.
--Before further flight.Contact Boeing for re-
pair instructions and do
the repair.
Any crack
found in the
bulkhead
flange or the
vertical stiffen-
ers or the ac-
cess door
cutout edge.
--Before further flight.Contact Boeing for re-
pair instructions and do
the repair.
Any crack
found in any
critical fastener
hole.
(a) Findings on Group 1, Configuration 2 airplane struts prior to service bulletin 757-54-0035 incorporation
are excluded from this condition.
Federal Aviation Administration (FAA) Airworthiness Directives (AD) 2004-12-07 and 2008-05-10 are
related to this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
The Manager of the FAA Seattle Aircraft Certification Office (SACO) approves the inspection methods
and fastener replacements specified in Table 1 under paragraph 1.E., "Compliance," of Service Bulletin
757-54A0047, Revision 4, as an AMOC to the inspection methods and modifications specified in SB
757-54-0035, Revision 1, dated April 15, 1999; or Revision 2, dated June 13, 2002, as required by
paragraphs (b) and (d) of AD 2004-12-07. All provisions of AD 2004-12-07, including the compliance
times, that are not specifically referenced in the preceding sentence remain fully applicable and must
be complied with.
In addition, the manager of the SACO approves the inspection methods, and modifications specified
in Table 1 under paragraph 1.E., "Compliance," of Service Bulletin 757-54A0047, Revision 4, including
Part IV, Option 2 - Ultrasonic Inspection, as an AMOC to the inspections and modifications in accordance
with SB 757-54A0047 Revision 3, dated June 27, 2007 specified by paragraphs (g) and (l) of AD
2008-05-10. All provisions of AD 2008-05-10, including the compliance times, that are not specifically
referenced in the preceding sentence remain fully applicable and must be complied with.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
23 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 24

If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this inspection and repair for
each strut. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task-hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
— Time to adjust to the workplace.
— Time to schedule the work.
— Time to examine the work.
— Time to cure the materials.
— Time to make the parts.
— Time to find the tools.
Part I - Inspection - Fasteners and Shim - Vertical Flange
Elapsed HoursTask-HoursNumber of Per-
sons
Task
6.012.02Open Access
1.02.02Inspect
---Repair (a)
7.014.02Close Access
14.028.0TOTAL FOR EACH STRUT
(a) An estimate for the task-hours necessary to do the repair is not given.
Part II - Inspection - Fasteners - Horizontal Flange
Elapsed HoursTask-HoursNumber of Per-
sons
Task
1.02.02Open Access
6.012.02Inspect
---Repair (a)
1.02.02Close Access
8.016.0TOTAL FOR EACH STRUT (b)
(a) An estimate for the task-hours necessary to do the repair is not given.
(b) More time can be necessary for the removal of the engine, diagonal brace,
and precooler.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
24 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 25

Part IV - Inspection - Critical Fastener Holes on the Horizontal Flange (Engine Removed)
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.510.04Open Access (En-
gine Removed)
1.02.02.0Inspect Option 1
2.04.02.0Inspect Option 2
---Repair (a)
3.012.04Close Access (En-
gine Removed)
3.06.03Trim and Check En-
gine
8.5 (b)28.0 (b)TOTAL FOR EACH STRUT (b)
(a) An estimate for the task-hours necessary to do the repair is not given.
(b) Total does not include inspection estimate. Add inspection estimate for
option used to total shown to arrive at revised total.
Part IV - Inspection - Critical Fastener Holes on the Horizontal Flange (Common Nozzle
Exhaust Removed)
Elapsed HoursTask-HoursNumber of Per-
sons
Task
3.57.02Open Access
(Common Nozzle
Exhaust Removed)
1.02.02.0Inspect Option 1
2.04.02.0Inspect Option 2
---Repair (a)
3.57.02Close Access
(Common Nozzle
Exhaust Removed)
7.0 (b)14.0 (b)TOTAL FOR EACH STRUT (b)
(a) An estimate for the task-hours necessary to do the repair is not given.
(b) Total does not include inspection estimate. Add inspection estimate for
option used to total shown to arrive at revised total.
H. Weight and Balance Changes
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
25 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 26

I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Service Related Problems (SRP) 757-SRP-54-0095, 757-SRP-54-0118 and 757-SRP-54-0130.
b. 757 Aircraft Maintenance Manual (AMM) 54-51-02, 54-53-01, 54-53-02, 71-00-02, 71- 00-02,
71-11-07, 78-11-04 and 78-31-00.
c. 757 Structural Repair Manual (SRM) Chapter 51.
d. 757 Non-Destructive Testing (NDT) Manual Part 4, 54-50-02, Part 6, 51-00-14, Part 6, 51-00-16
and Part 6, 51-00-17.
e. Standard Overhaul Practices Manual (SOPM) 20-43-03, 20-50-19
f. Boeing Service Bulletin 757-54-0035, 'NACELLES/PYLONS Rolls Royce RB211 Powered
Airplanes - Nacelle Strut and Wing Structure Improvement'.
g. FAA Airworthiness Directives AD 2004-12-07 and 2008-05-10.
h. Boeing Parts Standards Document D-590.
i. Boeing Drawing 65-88700.
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Spar Installation - Lower Nacelle Strut311N5042
Torque Bulkhead Installation311N5045
Seal Application - Nacelle Strut311N5062
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
26 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 27

None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
27 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 28

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
28 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT
BLANK PAGE

### Page 29

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this
service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number / Speci-
fication
(a)Chemical Conversion
Treatment
4 oz.Type 2, Class A
(c)Primer8 oz.BMS 10-11, Type 1
(c)Sealant1 pt.BMS 5-63
(d)Primer8 oz.DAPCO 1-400
(e)Primer8 oz.DC 1200
-Sealant1 pt.DC 93-006
-Leveling Compound1 qt.DC 3110
(f)--RTV 560
(f)--RTV 3
(f)--RTV 60
2.50 x 2.50 x 0.080 (g)CRES Plate-301 SS 1/2 Hard
(h)Bolt-BACB30*
-Collar-BACC30*
(i) BACS40R015C027F optionalShim, Laminated2BACS40R015B027F
(j)Filler, Radius2BACF3H10JT010HG
(a) Can be necessary if you make the radius filler shown in Figure 6. Refer to SOPM 20-
43-03 for data about the Chemical Conversion Treatment.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
(c) Alternative to DC 93-006.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
29 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 30

NotesNameQTYPart Number / Speci-
fication
(d) Primer is necessary if BMS 5-63 is applied over rubber/silicon substrates.
(e) Use with DC 93-006 and DC 3110.
(f) Alternative to DC 3110.
(g) Can be necessary if a crack is found in the aft bulkhead that cannot be repaired with
the installation of an oversize fastener.
(h) See the Paragraph 3.B., Work Instructions, Figures 4, 5, 6, and 7, for the oversize
bolt/collars that can be necessary if the inspections find a loose shim and/or damaged
fasteners.
(i) Can be necessary if loose shims are found during the inspection.
(j) Can be necessary if oversize fasteners are installed as shown in Figure 6. Instructions
are also given to make the filler from 0.063 thick 2024-T3, T4, T42, or 7075-T6 Bare
Aluminum Sheet.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
A borescope, or other inspection aids, can be necessary to do the inspection of the fasteners in the
horizontal flange of the strut-to-diagonal brace fitting. Also, maintenance and overhaul tools in the
manuals given in Paragraph 1.J., References, can be necessary. Examine operator tool supply to make
sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
30 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 31

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions in Paragraph 3.B., Work Instructions, and the Figure(s) give the
recommended sequence of steps. The sequence of steps to do this service bulletin
can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches.
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch.
— Angular tolerance is plus or minus 2 degrees.
— Hole dimensions for standard solid rivets are in 757 SRM, Chapter 51.
— Torque limits to tighten nuts and bolts are in 757 SRM, Chapter 51.
5. For approved fastener and process material substitutions, refer to 757 SRM, Chapter
51, Alternate fasteners are in 757 SRM Chapter 51 and Boeing Drawing 65-88700.
6. If the length of fasteners specified in this service bulletin do not meet the installation
standards, fasteners of the same specification, or an approved substitute, one grip
length longer or shorter may be used.
7. Inspections, used in the service bulletin, are defined as follows:
Detailed Inspection: An intensive visual examination of a specific structural area,
system, installation or assembly to detect damage, failure or irregularity. Available
lighting is normally supplemented with a direct source of good lighting at an intensity
deemed appropriate by the inspector. Inspection aids such as mirrors, magnifying
lenses, etc. may be used. Surface cleaning and elaborate access procedures may
be required.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
31 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 32

Non-Destructive Testing (NDT) inspections are used to examine all subsurface
damage and most small cracks. NDT is also used in areas where a visual inspection
is not sufficient to find the dimensions of damage.
8. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
B. WORK INSTRUCTIONS
PART I - INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE - ALL AIRPLANES
1. Refer to 757 AMM 78-31-00 and do the Thrust Reverser Deactivation for Ground Maintenance.
WARNING: DO THE THRUST REVERSER DEACTIVATION PROCEDURE TO PREVENT THE
OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF THE
THRUST REVERSER CAN CAUSE INJURY TO PERSONS OR DAMAGE TO
EQUIPMENT.
2. Get access for the inspection of the fasteners and shim in the vertical flange in accordance with
FIGURE 1.
3. Do the inspection of the shim installation between the vertical flange and bulkhead in accordance
with FIGURE 2:
a. For Group 1 and Group 2 airplanes: If the shim installation shows signs of movement and is
rejected: Continue with Step 4, below.
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
b. If the shim installation is satisfactory: Continue with the inspection of the four fasteners in the
vertical flange in accordance with step 5, below.
4. Do repairs to the shim installation between the vertical flange and the bulkhead as given below:
a. If the shim(s) Total cumulative movement is 0.50 or less: Do Interim Repair V in accordance
with FIGURE 9. Record the amount of total shim movement and save for future inspections.
b. If the shim(s) Total cumulative movement is more than 0.50: Remove the engine. Refer to
757 AMM 71-00-02 as an accepted procedure and do Interim Repair I in accordance with
FIGURE 4. Also, do the inspection and repair of the four critical fastener holes on the horizontal
flange in accordance with Part IV.
5. Do the inspection of the four fasteners in the vertical flange in accordance with FIGURE 2:
a. If one or more of the four fasteners are rejected:
(1) Remove the engine. Refer to 757 AMM 71-00-02 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
32 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 33

NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
(2) At the locations where fasteners are rejected in the vertical flange: Remove the fastener,
increase the hole diameter and install oversize fasteners as shown for Interim Repair II
in accordance with FIGURE 5.
(3) Do the inspection and repair of the four critical fastener holes on the horizontal flange in
accordance with Part IV.
PART II - INSPECTION - FASTENERS - HORIZONTAL FLANGE - ALL AIRPLANES
1. Get more access, and removal of the leveling compound, for the inspection of the fasteners in the
horizontal flange in accordance with FIGURE 1.
2. Do the inspection of the sixteen fasteners that hold the strut to the horizontal flange of the
strut-to-diagonal brace fitting in accordance with FIGURE 3:
a. If one or more of the sixteen fasteners are rejected:
(1) Remove the engine. Refer to 757 AMM 71-00-02 as an accepted procedure.
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
(2) Remove the rejected fastener, inspect the fastener hole for cracking, increase the hole
diameters and install oversize fasteners as shown for Interim Repair III in accordance
with FIGURE 6.
(3) Do the inspection and repair of the four critical horizontal flange fastener holes on the
horizontal flange in accordance with Part IV.
3. Inspect the bulkhead in the area around the access door cutout and around the critical fasteners
in the horizontal flange in accordance with FIGURE 3, and do an optional ultrasonic inspection of
the bulkhead around the fasteners in the horizontal flange in accordance with FIGURE 13.
a. If any crack is found in the bulkhead or the access door cutout edge, contact Boeing for repair
instructions and do the repair.
b. If no crack is found in the bulkhead or the access door cutout edge, do repeat inspections in
accordance with Paragraph 1.E., Compliance.
PART III - CLOSE ACCESS - ALL AIRPLANES
1. Apply new sealant in accordance with FIGURE 8.
2. Apply the leveling compound in accordance with FIGURE 8.
3. Install and seal the covers in accordance with FIGURE 10.
4. Install the remaining components that were removed to get access for the inspection.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
33 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 34

5. If necessary, install the engine. Refer to 757 AMM 71-00-02 as an accepted procedure.
6. Put the airplane back to a serviceable condition.
7. Schedule the airplane for the repeat inspection at the time in accordance with Paragraph 1.E.,
Compliance.
PART IV - INSPECTION - CRITICAL FASTENER HOLES ON THE HORIZONTAL FLANGE
1. If not already done get access in accordance with FIGURE 1.
2. Inspect the critical fastener holes in the horizontal flange using one of the options that follow:
a. Option 1 - High Frequency Eddy Current (HFEC) inspection.
(1) Get additional access by removing the engine, if not already done. Refer to 757 AMM
71- 00-02 as an accepted procedure, or remove the common exhaust in accordance with
FIGURE 12.
(2) Remove the fasteners and do an HFEC inspection in accordance with FIGURE 11.
(a) If any crack is found, contact Boeing for repair instructions and do the repair.
(3) At locations where the critical fastener hole was rejected, increase the hole size and
install an oversize fastener in accordance with FIGURE 11. Oversize only if warranted
by the hole condition, otherwise install the same size fastener in accordance with FIGURE
11.
(4) At locations where the fastener hole was not rejected, install the same size fastener as
was removed in accordance with FIGURE 11. Oversize only if warranted by the hole
condition, otherwise install the same size fastener in accordance with FIGURE 11.
b. Option 2 - Ultrasonic Inspection:
(1) Do an ultrasonic inspection in accordance with FIGURE 13.
(a) If any crack is found, contact Boeing for repair instructions and repair.
(b) If no crack is found, do the repeat inspections in accordance with Paragraph 1.E.,
Compliance.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4: June 24, 2010
34 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 35 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
SEE (A
FWD
LEFT SHOWN
RIGHT ALMOST THE SAME
(3)
FWD •
SEE
LEFT  WING/STRUT SHOWN  W39396
RIGHT WING/STRUT THE SAME
FIGURE 1: ACCESS FOR INSPECTION
(SHEET 1 OF 3)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  35 of 62

### Page 36 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
LEFT SHOWN
RIGHT OPPOSITE
EXISTING
COMPOUND -
A-A
W39439
FIGURE 1: ACCESS FOR INSPECTION
(SHEET 2 OF 3)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  757-54A0047
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  36 of 62

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut.
NOTESQTYREFERENCESNAMETASKSTEP
-1Refer to 757 AMM
54-53-02.
Access DoorOpen or Remove1
-1-ClampLoosen2
-1-Boot SealMove3
-1-CoverRemove4
-1Refer to 757 AMM
54-53-01.
Cover PlateRemove5
Remove the seal between the
strut and the common nozzle
fairing.
1Refer to 757 AMM
71-11-07.
SealRemove6
As necessary, remove the level-
ing compound from the area
around the fasteners.
--Leveling Com-
pound
Remove7
FIGURE 1: ACCESS FOR INSPECTION
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
37 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 38 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
FASTENER
(4 LOCATIONS)
FWD<
12)
SHIM  SHIM
SHIM SHOWN
VERTICAL  IN MIGRATED  VERTICAL
MEASUREMENT  POSITION  MEASUREMENT
HORIZONTAL (2)  MEASUREMENT  ® MASUREMENT
FITTING  W39458
A-A
FIGURE 2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE
(SHEET 1 OF 2)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  38 of 62

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
NOTESPROCEDURENAMETASKSTEP
(a)Detailed InspectionShim Installation (left shim)Inspect1
(b)-Shim Migration (left shim)Measure/Record2
(a)Detailed InspectionShim Installation (right shim)Inspect3
(b)-Shim Migration (right shim)Measure/Record4
(c) Four locationsDetailed InspectionFastenerInspect5
(a) Look for signs of damaged sealant around the outer edge of the shim. Look for signs that show movement
of the shim. Reject a shim that shows signs of movement.
(b) Measure and record the horizontal movement and the vertical movement of the shim from the installed
position. Add the movement in each direction together to obtain the total movement of the shim at this
inspection. This movement must be added to all previous measurements to obtain total cumulative
movement of the shim(s). This data is used during the repeat inspection and to make decisions about
repairs. Data necessary for the repeat inspection and to make decisions about repairs are: (i) The shims
have not moved from the installed position. (ii) The shim total cumulative movement is 0.50, or less.
(iii)The shim total cumulative movement is more than 0.50.
(c) Look at the two sides of the fastener installation for signs of damaged sealant. Remove the sealant from
the head, or collar, if there are signs of damage. Look for signs of movement, such as debris around the
head or collar. Look for gaps under the head or collar. Reject a fastener that shows signs of movement,
or that has gaps under the head or collar.
FIGURE 2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
39 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 40

FIGURE 3: INSPECTION - HORIZONTAL FLANGE FASTENERS AND TORQUE BULKHEAD
(SHEET 1 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
40 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 41 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
TORQUE
BULKHEAD
FWD
VIEW LOOKING AFT  1856468
FIGURE 3: INSPECTION - HORIZONTAL FLANGE FASTENERS AND TORQUE BULKHEAD
(SHEET 2 OF 3)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  41 of 62

### Page 42

The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
NOTESPROCEDURENAMETASKSTEP
(a)(b)Detailed InspectionFastenerInspect1
Eight locations.
(a)(b)Detailed InspectionFastenerInspect2
Eight locations.
(c)Detailed InspectionAccess Door
Cutout
Inspect3
(d)Detailed InspectionBulkheadInspect4
(a) Use a borescope, or other inspection aids if necessary, to view the lower surface of the fasteners instal-
lation.
(b) Look at the two sides of the fastener installation for signs of damaged paint and/or sealant. Remove the
paint and/or sealant from the head, or collar, if there are signs of damage. Look for signs of movement,
such as debris around the head or collar. Look for gaps under the head or collar. Reject a fastener that
shows signs of movement, or that has gaps under the head or collar.
(c) Do a detailed inspection of the edge of the access door cutout for cracking at the forward and aft side
of the cutout.
(d) Do a detailed inspection of the bulkhead for cracking in the area shown.
FIGURE 3: INSPECTION - HORIZONTAL FLANGE FASTENERS AND TORQUE BULKHEAD
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
42 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 43 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
FWDS
FITTING
D350 450
4 LOCATIONS
A-A  W40524
FIGURE 4: INTERIM REPAIR T- SHIM REPLACEMENT - VERTICAL FLANGE
(SHEET 1 OF 3)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  43 of 62

### Page 44

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the replacement of one shim.
NOTESQTYPART NUMBERNAMETASKSTEP
(left bolts and/or right bolts).2-FastenerRemove1
(left shim and/or right shim).1-ShimRemove2
(a)2-Fastener HoleInspect3
--ClearanceMeasure4
(b) BACS40R015C027F is option-
al. (c)
1BACS40R015B027FShimAdjust
Drill holes in shim to agree with
hole diameters in fitting.
2-HolesDrill
--ShimClean/Deburr
To mating surfaces.-DC93-006SealantApply
--ShimInstall
Increase diameter by 0.01562-HolesReam5
See Code A1 and A2.2-FastenerInstall6
Do an eddy current inspection of the holes through the titanium fitting in accordance with 757 NDT Part
6, 51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead in accordance
with 757 NDT Part 6, 51-00-16.
(a)
If you get an indication of a crack: Contact Boeing for repair instructions and repair prior to further flight.
Remove laminations to adjust the shim thickness. Remove all sharp edges. The maximum clearance
permitted with the shim in position is 0.005.
(b)
Alternative: Make a solid shim from 2024-T3, or 2024-T4, -T81, T861, or 7075-T6. Apply a Chemical
Conversion Treatment, Type 2, Class A, and two layers of Primer BMS 10-11, Type I to the bare aluminum.
Refer to SOPM 20-43-03 for data about the chemical conversion treatment.
(c)
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to
determine the part numbers used as substitutes.
NOTESHOLE DIAPART NUMBERNAMECODE
Install wet with Sealant BMS 5-63 or
Dow Corning 93-006.
0.4526 - 0.4536BACB30NX14K10XBoltA1
-BACC30BH14SCollar
FIGURE 4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE
(SHEET 2 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
44 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 45

NOTESHOLE DIAPART NUMBERNAMECODE
Install wet with Sealant BMS 5-63 or
Dow Corning 93-006.
0.4682 - 0.4692BACB30NX14K10YBoltA2
-BACC30AC14SCollar
FIGURE 4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
45 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 46 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
FWD S
FITTING
3 45o
4 LOCATIONS
A-A
W40549
FIGURE 5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE
(SHEET 1 OF 2)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  757-54A0047
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  46 of 62

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for strut.
NOTESQTYPART NUMBERNAMETASKSTEP
---FastenerRemove1
(a)--Fastener HoleInspect2
See Codes A1 and A2.--FastenerInstall3
Do an eddy current inspection of the hole(s) through the titanium fitting in accordance with 757 NDT Part
6, 51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead in accordance
with 757 NDT Part 6, 51-00-16.
(a)
If you get an indication of a crack: Contact Boeing for repair instructions and repair prior to further flight.
If you do not get an indication of a crack: Increase the diameter of the hole by 0.0156 and continue with
the instructions.
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to
determine the part numbers used as substitutes.
NOTESHOLE DIAPART NUMBERNAMECODE
Install wet with Sealant BMS 5-63 or
Dow Corning 93-006.
0.4526 - 0.4536BACB30NX14K10XBoltA1
-BACC30BH14SCollar
Install wet with Sealant BMS 5-63 or
Dow Corning 93-006.
0.4682 - 0.4692BACB30NX14K10YBoltA2
-BACC30AC14SCollar
FIGURE 5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
47 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 48 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
1.00  1.00
0.063
0.35 RADIUS OR LARGER
FADE
RADIUS FILLER
FITTING
1 1118 LOCATIONS
SEE
·$
FWD  6 LOCATIONS  W40801
A—A
FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
(SHEET 1 OF 3)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  48 of 62

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut.
NOTESQTYPART NUMBERNAMETASKSTEP
---FastenerRemove1
(a)--Fastener HoleInspect
See Codes B1 and B2--FastenerInstall
---FastenerRemove2
(a)--Fastener HoleInspect
See Codes C1 and C2--FastenerInstall
---FastenerRemove3
(a)--Fastener HoleInspect
(b)--Radius FillerMake/Install
See Codes D1 and D2--FastenerInstall
Do an eddy current inspection of the hole(s) through the titanium fitting in accordance with 757 NDT,
Part 6, 51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead in accordance
with 757 NDT, Part 6, 51-00-16. Do an eddy current inspection of the holes through the steel web, in
accordance with 757 NDT, Part 6, 51-00-17:
(a)
If you get an indication of a crack: Contact Boeing for repair instructions and repair prior to further flight.
If you do not get an indication of a crack: Increase the diameter of the hole by 0.0156 and continue with
the instructions.
If necessary, make and install a radius filler below the seal retainer at these fastener locations. Install
Radius Filler BACF3H10JT010HG, or make the filler from 0.063 thick 2024-T3, -T4, -T42, or 7075-T6
Bare Aluminum Sheet as shown. Apply a Chemical Conversion Treatment, Type 2, Class A, and one
layer of Primer BMS 10-11, Type I to the bare aluminum. Refer to SOPM 20-43-03 for data about the
chemical conversion treatment. Install the filler with Sealant BMS 5-63 or Dow Corning 93-006.
(b)
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to
determine the part numbers used as substitutes.
NOTESHOLE DIAPART NUMBERNAMECODE
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.3901 - 0.3911BACB30YK12K11XBoltB1
-BACC30CP12CCollar
FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
(SHEET 2 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
49 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 50

NOTESHOLE DIAPART NUMBERNAMECODE
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.4057 - 0.4067BACB30YK12K11YBoltB2
-BACC30CP12CYCollar
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.3901 - 0.3911BACB30MC12A6UBoltC1
-BACC30BH12SCollar
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.4057 - 0.4067BACB30MD12A6UBoltC2
-BACC30AC12SCollar
(a) Install wet with Sealant BMS 5-63 or
Dow Corning 93-006.
0.3901 - 0.3911BACB30FP12A11UBoltD1
-BACC30AB12SYCollar
(a) Install wet with Sealant BMS 5-63 or
Dow Corning 93-006.
0.4057 - 0.4067BACB30KK12A11UBoltD2
-BACC30AC12SCollar
(a) If the installation of the radius filler is necessary, fasteners with longer grip lengths will also be necessary.
FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
50 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 51 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
THIS FIGURE IS DELETED.
1328539
FIGURE 7: THIS FIGURE HAS BEEN DELETED
(SHEET 1 OF 1)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  51 of 62

### Page 52 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
SEE Q  FNDE  EXAMPLE-FASTENER LOCATIONS
EXISTING
COMPOUND -
A-A
W42540
FIGURE 8: REPAIR - SEALANT AND LEVELING COMPOUND
(SHEET 1 OF 2)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  52 of 62

### Page 53

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut.
NOTESQTYPART NUMBERNAMETASKSTEP
(a) (b) If the shim was replaced
during the repair procedures,
apply primer and a fillet seal
around the outer edge of the
shim/fitting flange.
-Dow Corning 1200PrimerApply1
Dow Corning 93-006Sealant
(a) (b) Apply to all locations
where sealant was removed for
the inspections and/or fastener
replacement.
-Dow Corning 1200PrimerApply2
-Dow Corning 93-006Sealant
(c) (d)-Dow Corning 1200PrimerApply3
Optional compound is RTV560,
RTV3 or RTV60.
-Dow Corning 3110Leveling Compound
(a) Before the Dow Corning 93-006 sealant is applied, let the Dow Corning 1200 primer dry for a minimum
of 1 hour and a maximum of 24 hours.
(b) Primer DAPCO 1-400 and Sealant BMS 5-63, Type II is optional. Before Sealant BMS 5-63 is applied let
the DAPCO 1-400 primer dry for a minimum of 1 hour and a maximum of 16 hours.
(c) Before the Dow Corning 3110 compound is applied, let the Dow Corning 1200 primer dry for a minimum
of 1 hour and a maximum of 24 hours.
(d) You can mix solvent BMS 3-2, Type II, with the leveling compound to make it more liquid. The maximum
quantity of solvent permitted in the mixture is 20 percent when measured by weight.
FIGURE 8: REPAIR - SEALANT AND LEVELING COMPOUND
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
53 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 54

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
CAUTION: DO NOT INSTALL A NEW COLLAR OR TRY TO TIGHTEN EXISTING COLLAR IN AN AT-
TEMPT TO TIGHTEN THE JOINT BETWEEN THE FITTING AND BULKHEAD AS STRUCTURAL
DAMAGE MAY OCCUR.
---Exposed plies (left shim)Cut1
--BMS 10-11, Type 1PrimerApply2
(a)-DAPCO 1-400PrimerApply3
(b) Seal edges-BMS 5-63SealantApply4
---Exposed plies (right shim)Cut5
--BMS 10-11, Type 1PrimerApply6
(a)DAPCO 1-400PrimerApply7
(b) Seal edges-BMS 5-63, Type IISealantApply8
FIGURE 9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
54 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 55

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a) Dow Corning 93-006 sealant and Dow Corning 1200 primer are optional for this application. Before
the Dow Corning 93-006 sealant is applied, let the Dow Corning 1200 primer dry for a minimum of 1
hour and a maximum of 24 hours.
(b) Before Sealant BMS 5-63 is applied let the DAPCO 1-400 primer dry for a minimum of 1 hour and a
maximum of 16 hours.
FIGURE 9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
55 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 56 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
SEE A
FWD
LEFT SHOWN
RIGHT ALMOST THE SAME
FWDS
LEFT  WING/STRUT SHOWN
RIGHT WING/STRUT THE SAME
FIGURE 10: SEAL COVER PLATES
(SHEET 1 OF 2)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  56 of 62

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut
NOTESREFERENCEQTYNAMETASKSTEP
--1CoverInstall1
(a)Refer to SOPM 20-50-19.--Primer DC 1200
Sealant DC93-006
Apply2
-Refer to 757 AMM 54-53-
01.
1Cover PlateInstall3
(b)-1Boot SealMove4
Tighten Clamp-1ClampAdjust5
(a) Apply Intermediate liquid control fillet seal around entire periphery of the cover. Before the Dow Corning
93-006 sealant is applied, let the Dow Corning 1200 primer dry for a minimum of 1 hour and a maximum
of 24 hours.
(b) Move the Boot Seal back to the original position as necessary.
FIGURE 10: SEAL COVER PLATES
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
57 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 58 (OCR)

BOEING SERVICE BULLETIN 757-54A0047
ALERT  ALERT
FADE
FITTING
B14 LOCATIONS
FWD  1335626
A—A
FIGURE 11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS
(SHEET 1 OF 2)
Original Issue: November 13, 2003
Revision 4 June 24, 2010  BOEING PROPRIETARY -  757-54A0047
Copyright © Unpublished Work - See page 1 for details.  58 of 62

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut.
MORE DATAQTYPART NUMBERNAMETASKSTEP
---FastenerRemove1
(a) (b)4-Fastener HoleInspect2
Refer to Codes B0, B1 and B2--FastenerInstall3
(a) Do an eddy current inspection of the hole(s) through the titanium fitting in accordance with 757 NDT,
Part 6, 51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead in accor-
dance with 757 NDT, Part 6, 51-00-16. Do an eddy current inspection of the holes through the steel
web, in accordance with 757 NDT, Part 6, 51-00-17.
(b) Measure the hole diameter. If the hole is true and round, and the diameter is within the limits allowed
for installation of the same size fastener, do not increase the hole size. Otherwise, increase the hole
size to remove damage
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure.
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to
determine the part numbers used as substitutes.
NOTESHOLE DIAPART NUMBERNAMECODE
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.3745 - 0.3755BACB30YK12K11BoltB0
-BACC30CP12CCollar
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.3901 - 0.3911BACB30YK12K11XBoltB1
-BACC30CP12CCollar
Install wet with Sealant BMS 5-63 or Dow
Corning 93-006.
0.4057 - 0.4067BACB30YK12K11YBoltB2
-BACC30CP12CYCollar
FIGURE 11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
59 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one strut.
MORE DATAQTYPART NUMBERNAMETASKSTEP
Refer to 757
AMM 78-11-04
as an accepted
procedure.
1-Common Nozzle
Exhaust
Remove1
(a)1-(Diagonal Brace)
Load
Release2
(a) Remove the load from the diagonal brace. Refer to 757 AMM 54-51-02 as an accepted procedure.
FIGURE 12: NACELLE/PYLONS - ALTERNATIVE ACCESS TO THE CRITICAL HORIZONTAL FLANGE
FASTENERS
(SHEET 1 OF 1)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 13, 2003
757-54A0047Revision 4 June 24, 2010
60 of 62
BOEING SERVICE BULLETIN 757-54A0047
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/757-54a0047/file/99bc62dc6f37.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
