# Boeing Alert Service Bulletin 757-54A0047: Revision 3

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0724; AD 2012-26-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 757-54A0047](https://openairdocs.org/service-documents/boeing/757-54a0047.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin 
SB-757-54A0047-03
- Pages: 56
- PDF: https://openairdocs.org/files/sha256/dc/db/dcdbaf2072ff61febf05cda30ae83cd69d8ab2ae94c124d5aad40166e8f80c95
- Page: https://openairdocs.org/service-documents/boeing/757-54a0047/file/dcdbaf2072ff

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 56
 
 
ALERT ALERT
Commercial
Airplane
Group 757
ALERTALERT
Service Bulletin
Number: 757-54A0047
Date: November 13, 2003
Revision 3: June 27, 2007
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - 
Inspection for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2003 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.  For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, BOEING BUSINESS JET, DC-8, DC-9, DC-10, MD-10, 
MD-11, MD-80, MD-90, the Boeing logo and the Boeing livery are among the trademarks owned by Boeing or 
its subsidiaries. No intellectual property license (express or implied) is granted in connection with this document 
or otherwise.

### Page 2

BLANK PAGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 3

Table of Contents
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  19
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  22
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  23
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  25
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  26
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  26
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  26
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  26
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  26
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  26
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  26
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  27
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  29
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  29
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   30
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  30
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  31
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  32
FIGURE  1: ACCESS FOR INSPECTION  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  34
FIGURE  2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
FIGURE  3: INSPECTION - FASTENERS - HORIZONTAL FLANGE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  39
FIGURE  4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE .  .  .  .  .  .  .  .  .  .  .  .  41
FIGURE  5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE  .  .  .  .  .  .  .  .  .  .  43
FIGURE  6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE .  .  .  .  .  .  .  .  45
FIGURE  7: THIS FIGURE HAS BEEN DELETED .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  48
FIGURE  8: REPAIR - SEALANT AND LEVELING COMPOUND  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  49
FIGURE  9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  51
FIGURE  10: SEAL COVER PLATES   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  53
FIGURE  11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS .  .  .  .  .  .  55

### Page 4

Table of Contents
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 5

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 56
 
 
ALERT ALERT
Commercial
Airplane
Group 757
ALERTALERT
Service Bulletin
Number: 757-54A0047 Revision Transmittal Sheet
Date: November 13, 2003
Revision 3: June 27, 2007
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - 
Inspection for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed as shown in the Original issue, Revision 1, or Revision 2 of 
this service bulletin, however the conditions and the compliance time for doing the inspection of the four critical 
fasteners in the horizontal flange have changed.
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2005-12-04, is related to this service 
bulletin. 
REASON FOR REVISION
Revision 03 is sent to give revised inspection compliance times and replace the phrase "one time inspection" 
with "inspection" when refering to the Part IV inspection of the critical fastener holes on the horizontal flange .
These sections of the service bulletin are changed with revision 03:
— Summary - Compliance information is deleted from the Compliance section.
— Paragraph 1.E., Compliance - Compliance times are revised and presented in a tabular format.
— Summary, Planning Information, Work Instructions: replaced the words "one time inspection" with 
"inspection".
Paragraph 1.A., Effectivity, shows changes of airplane operators.  Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.

### Page 6

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
REVISION HISTORY
Original Issue: November 13, 2003
Revision 01: March 24, 2005
Revision 02: January 31, 2007
Revision 03: June 27, 2007

### Page 7

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 56
 
 
ALERT ALERT
Commercial
Airplane
Group 757
ALERTALERT
Service Bulletin
Number: 757-54A0047 Summary
Date: November 13, 2003
Revision 3: June 27, 2007
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - 
Inspection for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN 
PARAGRAPH 1.A., EFFECTIVITY.  IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OPERATOR.  IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives the instructions to inspect the joint between the aft torque bulkhead and the strut-to-
diagonal brace fitting for a loose shim, and/or loose, missing, or damaged fasteners. Instructions are also given 
to make repairs if loose fasteners or migrated shims are found during the inspections and to do an inspection 
and repair of the four critical fastener holes on the horizontal flange.
Since 1993, Boeing has eighteen reports of cracks, loose and broken bolts, and shim migration in the joint 
between the aft torque bulkhead and the strut-to-diagonal brace fitting.
Service History
Date Hours Cycles Strut Report
12/93 29,451 10,284 - One bolt sheared in horizontal flange. Four bolts 
loose in vertical flange.
11/96 25,768 9,358 No. 1 & 2 Four bolts loose in vertical flange of both struts.
06/98 - - No. 1 & 2 One bolt loose in vertical flange of Strut No. 1. Four 
bolts loose in vertical flange of Strut No. 2.
11/99 55,789 21,749 No. 1 & 2 Four bolts loose in vertical flange of both struts. Two 
bolts sheared in horizontal flange of both struts. All 
remaining bolts loose in horizontal flange of both 
struts.
01/01 46,459 20,161 No. 1 & 2 Sixteen bolts loose in horizontal flange.
09/01 49,019 13,662 No. 1 Two bolts loose in vertical flange.

### Page 8

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 56
 
 Continued operation with cracks, and/or loose and broken fasteners, could cause separation of the joint 
between the aft torque bulkhead and the strut-to-diagonal brace fitting. With separation of these components, 
the diagonal brace would not transmit the engine loads through to the wing structure. Continued safe flight, as 
related to this characteristic of the strut installation, would then have dependence on the upper link load path of 
the strut. The upper link load path is designed with sufficient strength to carry the load redistribution. However, 
if a separation in the diagonal brace load path goes undetected for a long enough period, loss of the strut could 
occur.
Boeing Service Related Problems (SRP) 757-SRP-54-0095 and 757-SRP-54-0118 are related to this service 
bulletin.
ACTION
Get access to the forward and aft surfaces of the torque bulkhead assembly. Do an inspection of the shims 
between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Also, do an inspection 
of the four fasteners through the vertical flange of the fitting and the torque bulkhead. If shim migration and/or 
loose bolts are found in the diagonal brace load path, make the applicable interim repairs.
Get more access for the inspection of the horizontal flange of the strut-to-diagonal brace fitting. Do an inspection 
of the sixteen fasteners through the horizontal flange of the fitting. A boroscope, or other inspections aids, can 
be necessary for this inspection. If necessary remove the engine and install oversize fasteners. 
If loose fasteners are found or shim migration is beyond limits, do an inspection and repair of the four critical 
fastener holes on the horizontal flange. 
01/02 23,423 14,633 - Two bolt heads cracked.
04/02 16,601 12,493 No. 1 & 2 Two bolts loose in horizontal flange of Strut No. 1. 
Three bolts loose in horizontal flange of Strut No. 2.
05/02 43,822 15,522 No. 1 & 2 Migrated shim between bulkhead and vertical 
flange of fitting.
06/02 46,758 15,900 No. 2 Four bolts loose in vertical flange. Five bolts loose 
in horizontal flange.
12/02 49,807 20,090 No. 1 One bolt missing and one bolt loose in horizontal 
flange. Cracks in the aluminum bulkhead at three 
hole locations.
04/03 50,841 22,111 - Two loose bolts in vertical flange.
09/03 30,072 9,991 No. 1 Three loose bolts in vertical flange.
09/03 60,715 26,914 No. 1 & 2 Migrated shims between bulkhead and vertical 
flange of fitting.
10/03 44,985 15,004 No. 2 Three loose bolts in vertical flange.
01/04 12,368 7,922 No. 2 Three loose bolts in vertical flange.
02/04 12,119 7,592 No. 1 Four loose bolts in vertical flange.
04/06 44,423 13,083 No. 1 One loose fastener in the vertical flange. Cracks in 
the aluminum bulkhead at two hole locations and 
web at one hole location common to the horizontal 
flange.
Service History
Date Hours Cycles Strut Report

### Page 9

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 56
 
 
As necessary, apply new sealant to the fasteners and leveling compound to the strut structure. As necessary 
install the engine, diagonal brace, and other components removed to get access. Put the airplane back to a 
serviceable condition and schedule the repeat inspections.
EFFECTIVITY
757-200/-200CB and -200PF airplanes line numbers 1 thru 1048, powered by Rolls Royce engines. 
COMPLIANCE
Refer to paragraph 1.E., Compliance for compliance information.
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2005-12-04, is related to this service 
bulletin. 
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this service 
bulletin.
MANPOWER
(a) Inspections only. Does not include time to make repairs if 
loose fasteners or cracks are found.
MATERIAL INFORMATION
Operator Supplied Parts/Materials. 
Refer to Paragraph 2.A., Material - Price and Availability.
Airplanes Total Task Hours Elapsed Hours
All 34 (a) 17 (a)

### Page 10

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
HORIZONTAL FLANGE OF
FITTING (16 LOCATIONS)
INSPECT FASTENERS IN
INSTALLATION
INSPECT SHIM
INSPECT FASTENERS
IN VERTICAL FLANGE
(4 LOCATIONS)
OF FITTING
A
A
FWD
FWD
A-A
W38926

### Page 11

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 56
 
 
ALERT ALERT
Commercial
Airplane
Group 757
ALERTALERT
Service Bulletin
Number: 757-54A0047
Date: November 13, 2003
Revision 3: June 27, 2007
ATA System: 5451
SUBJECT: NACELLE/PYLONS - Nacelle Strut - Rolls Royce RB 211 Powered Airplanes - 
Inspection for Loose and/or Broken Fasteners on the Strut-to-Diagonal Brace Fitting
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN 
PARAGRAPH 1.A., EFFECTIVITY.  IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OPERATOR.  IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OWNER.
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
Airplane models:
757-200 757-200CB 757-200PF
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AEROTURBINE  (AUB)
1 NA023 NA395
GROUP CONFIGURATION DESCRIPTION
1 - All 757-200 airplanes line number 1 thru 735, 
powered by Rolls Royce engines.
1 Airplanes without SB 757-54-0035 incorporation
2 Airplanes with SB 757-54-0035 incorporation
2 - All 757-200 airplanes line number 736 thru 
1048, powered by Rolls Royce engines.

### Page 12

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
AIR ASTANA  (AKZ)
1N B 5 6 1
2 NT231 NT411–NT412
AIR CHINA SOUTHWEST BRANCH  (XIN)
1 NB291–NB295 NB297–NB299 NB301–NB302 NB327
2 NT201–NT202
AIR FINLAND  (FNL)
1 NB221 NB239 NB454
AIR GREENLAND AS  (GRL)
1N A 3 5 0
AMERICA WEST AIRLINES  (AMW)
1 NA018–NA020 NB021–NB023 NB036–NB041
AMERICAN AIRLINES  (AAL)
1 ND011–ND044 ND046–ND059 ND111–ND113 ND161–ND166
ND168–ND199
2 NT731–NT750 NT971–NT985
ASTRAEUS, LTD.  (AUA)
1 NA442 NB131 NB134 NB142
2 ND401
ATA AIRLINES, INC.  (AAT)
1 NC058 NC061
2 NC062 NT281–NT283
ATLASJET AIRLINES  (ABE)
1 NA025–NA026 NA196
2 NT910–NT911
AVIANCA  (AVI)
1 NA341 NA347 NA351 NA406
NA444 NB324 NB326
AZERBAIJAN AIRLINES  (AHY)
1 ND248
2 NT437–NT438
BABCOCK & BROWN A/C MANAGEMENT  (BBB)
1N A 4 4 7
BELAIR AIRLINES  (BLB)
2 NT426–NT427
BRITISH AIRWAYS  (BAB)
1 NA237–NA239 NA303–NA305 NA398
2 NB581–NB583 NT401–NT403

### Page 13

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
CAMEROON AIRLINES  (CAM)
1 NB135
CEBU PACIFIC AIR  (CEB)
1 NA301–NA302
CHINA SOUTHERN AIRLINES  (GUN)
1 NA349 NB064–NB068 NB070 NB261–NB267
NB296
CHINA XINJIANG AIRLINES  (XIJ)
1 NB325 NB328
2 NT381–NT386 NT408–NT409
CONTINENTAL AIRLINES  (CAL)
1 ND301–ND317
2 ND318–ND322 NT751–NT769
CORPORACION YGNUS AIR  (REI)
1 ND241
DHL INTERNATIONAL  (DHI)
1 NA201–NA204 NA206–NA213 NA215–NA236
EL AL ISRAEL AIRLINES  (ELA)
1 NB073 ND002 ND004–ND007
ESTADO NACIONAL ARGENTINO ENA  (ESA)
1 NB144
EUROATLANTIC AIRWAYS  (MAE)
1 NA197
EUROPEAN AIR TRANSPORT  (EPT)
1 NC974
FAR EASTERN AIR TRANSPORT  (FAT)
1 NC973
FEDEX  (FED)
1 NA394 NB501 NB503 NB508
FIRST CHOICE AIRWAYS  (ATZ)
1 NA346 NA352 NA443 NB322
NB329 NB506–NB507
2 NJ001–NJ004 NT245–NT246 NT404–NT407
FLYGLOBESPAN.COM  (FGS)
1 NB224
FLYJET LIMITED  (FJE)
1 NB132 NB140

### Page 14

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FUNAIR  (FUN)
2 NT909
GIRJET  (GRJ)
1N A 3 4 8
HARMONY AIRWAYS INC.  (MYA)
1 ND001 ND003
2 NT248
HOLA AIRLINES  (HLB)
1N A 3 9 9
HONEYWELL AEROSPACE  (SGC)
1N A 0 0 5
IBERIA AIRLINES  (IBE)
2 NT905–NT908 NT915–NT916
ICELANDAIR  (ICE)
1 NA028 NB079 NB138–NB139 NB421
NC971 ND201–ND203 ND244–ND247
2 NN001–NN002 NT861–NT862 NT913
JET2.COM LTD  (CEX)
1 NA396–NA397 NB061–NB063 NB071–NB072 NB145
KRASAIR  (ZXD)
2 NT901–NT904
L-3 C.I.S.  (CIJ)
1 NB146–NB148
2 NT436
L.T.E. INTERNATIONAL AIRWAYS  (LTE)
1N A 1 9 1
LEGATUM  (LGM)
1 NC060
MACQUARIE AIR FINANCE  (ZGT)
1N A 1 9 4
MAP  (MGP)
1N A 2 1 4
MEXICO'S PRESIDENTIAL AIRCRAFT  (MXG)
1N A 0 2 7
MONARCH AIRLINES  (MON)
1 NA401–NA405 NA407–NA408

### Page 15

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
MYTRAVEL AIRWAYS  (GUE)
1 NA006 NA008
2 NB571
NASA  (NAS)
1 NA002
NORTH AMERICAN AIRLINES  (NNA)
1 NB236
2 NT239–NT240 NT242 NT247
OCEANAIR AIRLINES  (OAL)
1 NB453
OMNI AIR INTERNATIONAL  (OAE)
1 NA446 NB137 NB204 NB225
ORIENT THAI AIRLINES  (OTH)
1 NA193
PACE AIRLINES  (PIE)
1 NA205 ND242
PAI AVIATION, INC.  (PSS)
1 NA391
PLUNA  (PLU)
1 NB133
PRIMARIS AIRLINES INC.  (PIM)
1 NA199
PRIVATAIR  (PTS)
1 NB136
PRIVILEGE STYLE  (PVG)
1 ND243
RAK AIRWAYS  (RKW)
2 NT914
ROYAL BRUNEI AIRLINES  (RBA)
1 NB052
ROYAL NEPAL AIRLINES  (RNA)
1 ND891 ND895
ROYAL NEW ZEALAND AIR FORCE  (RNZ)
1 NB451–NB452
RYAN INTERNATIONAL AIRLINES  (RYN)
1 NA195 NA198 NA342 NB203

### Page 16

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 56
 
 
SANTA BARBARA AIRLINES C.A.  (YDJ)
1 NA392–NA393
SKYSERVICE AIRLINES  (SKB)
1 NA345
STATE AIR COMPANY "BERKUT"  (ORE)
1 NB053
THE YUCAIPA COMPANIES  (YUC)
1 NB312
THOMAS COOK AIRLINES UK  (JMA)
1 NA445 NB201 NB222–NB223 NB330–NB331
NB446
2 NB226–NB228 NB230 NT232–NT234 NT237–NT238
THOMSONFLY  (BRI)
1 NA343–NA344 NB422–NB424 NB426–NB438
2 NT431–NT432
TITAN AIRWAYS  (TIU)
1 NB323
2 NT912
TURKMENISTAN AIRLINES  (TUE)
1 NB143 NB161–NB162
2 NT446
UPS  (UPS)
1 NC936–NC950 NS601–NS610
2 NS611–NS616 NT001–NT009
US AIRWAYS  (USA)
1 NA003–NA004 NA007 NA009–NA010 NA012–NA016
NB502 NB504–NB505 NB509–NB523
2 NT286 NT288–NT289
VARIG LOGISTICA S.A.  (VRG)
1 NA021–NA022 NA441
VIM AVIA  (VIM)
1 NC059
2 NT284–NT285 NT287
VULCAN INC.  (VUL)
1 NB141 NB311
XIAMEN AIRLINES  (XIA)
1 ND221–ND225
2 NJ031–NJ032 NN051–NN052

### Page 17

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
XL AIRWAYS  (SBE)
1 NA024 NB321
ZOOM AIRLINES  (YFM)
1 NB202
IDENTIFICATION BY VARIABLE NUMBER
Variable  Group
NA002–NA028 1
NA191–NA199 1
NA201–NA239 1
NA301–NA305 1
NA341–NA352 1
NA391–NA399 1
NA401–NA408 1
NA441–NA447 1
NB021–NB023 1
NB036–NB041 1
NB051–NB053 1
NB061–NB073 1
NB079 1
NB131–NB148 1
NB161–NB162 1
NB201–NB204 1
NB221–NB225 1
NB226–NB228 2
NB230 2
NB236 1
NB239 1
NB261–NB267 1
NB291–NB299 1
NB301–NB302 1
NB311–NB312 1
NB321–NB331 1
NB421–NB438 1
NB446 1
NB451–NB454 1
NB501–NB523 1
NB561 1
NB571 2
NB581–NB583 2

### Page 18

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
NC058–NC061 1
NC062 2
NC936–NC950 1
NC971–NC974 1
ND001–ND007 1
ND011–ND059 1
ND111–ND113 1
ND161–ND199 1
ND201–ND203 1
ND221–ND225 1
ND241–ND248 1
ND301–ND317 1
ND318–ND322 2
ND401 2
ND891 1
ND895 1
NJ001–NJ004 2
NJ031–NJ032 2
NN001–NN002 2
NN051–NN052 2
NS601–NS610 1
NS611–NS616 2
NT001–NT009 2
NT201–NT202 2
NT231–NT234 2
NT237–NT240 2
NT242 2
NT245–NT248 2
NT281–NT289 2
NT381–NT386 2
NT401–NT409 2
NT411–NT412 2
NT426–NT427 2
NT431–NT432 2
NT436–NT438 2
NT446 2
NT731–NT769 2
Variable  Group

### Page 19

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives the instructions to inspect the joint between the aft torque bulkhead and the 
strut-to-diagonal brace fitting for a loose shim, and/or loose, missing, or damaged fasteners. 
Instructions are also given to make repairs if loose fasteners or migrated shims are found during the 
inspections and do an inspection and repair of the four critical fastener holes on the horizontal flange.
Since 1993, Boeing has eighteen reports of cracks, loose and broken bolts, and shim migration in the 
joint between the aft torque bulkhead and the strut-to-diagonal brace fitting.
NT861–NT862 2
NT901–NT916 2
NT971–NT985 2
Service History
Date Hours Cycles Strut Report
12/93 29,451 10,284 - One bolt sheared in horizontal flange. Four bolts 
loose in vertical flange.
11/96 25,768 9,358 No. 1 & 2 Four bolts loose in vertical flange of both struts.
06/98 - - No. 1 & 2 One bolt loose in vertical flange of Strut No. 1. Four 
bolts loose in vertical flange of Strut No. 2.
11/99 55,789 21,749 No. 1 & 2 Four bolts loose in vertical flange of both struts. Two 
bolts sheared in horizontal flange of both struts. All 
remaining bolts loose in horizontal flange of both 
struts.
01/01 46,459 20,161 No. 1 & 2 Sixteen bolts loose in horizontal flange.
09/01 49,019 13,662 No. 1 Two bolts loose in vertical flange.
01/02 23,423 14,633 - Two bolt heads cracked.
04/02 16,601 12,493 No. 1 & 2 Two bolts loose in horizontal flange of Strut No. 1. 
Three bolts loose in horizontal flange of Strut No. 2.
05/02 43,822 15,522 No. 1 & 2 Migrated shim between bulkhead and vertical 
flange of fitting.
06/02 46,758 15,900 No. 2 Four bolts loose in vertical flange. Five bolts loose 
in horizontal flange.
12/02 49,807 20,090 No. 1 One bolt missing and one bolt loose in horizontal 
flange. Cracks in the aluminum bulkhead at three 
hole locations.
04/03 50,841 22,111 - Two loose bolts in vertical flange.
Variable  Group

### Page 20

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
Continued operation with cracks, and/or loose and broken fasteners, could cause separation of the 
joint between the aft torque bulkhead and the strut-to-diagonal brace fitting. With separation of these 
components, the diagonal brace would not transmit the engine loads through to the wing structure. 
Continued safe flight, as related to this characteristic of the strut installation, would then have 
dependence on the upper link load path of the strut. The upper link load path is designed with sufficient 
strength to carry the load redistribution. However, if a separation in the diagonal brace load path goes 
undetected for a long enough period, loss of the strut could occur.
Boeing Service Related Problems (SRP) 757-SRP-54-0095 and 757-SRP-54-0118 are related to this 
service bulletin.
Revision 01 is sent to give migration limits for the shims in the diagonal brace load path. The 
inspection given in the initial release of this service bulletin made it necessary to repair a loose shim 
before an airplane could be put back in service. With these new migration limits, an airplane can be 
put back in service with a migrated shim if the inspection finds that it is in the permitted limits. The 
bulkhead crack repair as given in the initial release has been deleted. If cracks are found, they will be 
reviewed on a case-by-case basis.
A new repair is added for the shims in the diagonal brace load path. There are now 4 repairs and 1 
repair that has been deleted. For identification, they are referred to as Interim Repairs I, II, III, IV and 
V. Interim Repair I is almost the same as the one given in the initial release and replaces the two shims 
between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Interim 
Repairs II and III are the same as those given in the initial release. Interim Repair II installs oversize 
fasteners in the vertical flange of the fitting, and Interim Repair III installs oversize fasteners in the 
horizontal flange of the fitting. Interim Repair IV is the same bulkhead crack repair given in the initial 
release and has been deleted. Interim Repair V is new and gives the instructions to cut and remove 
the exposed plies of the shims as a repair for shim migration of 0.50, or less
These sections of the service bulletin were changed with revision 01:
— Compliance - Decreased repeat inspection thresholds to address additional in service reports 
where loose fasteners were found on airplanes with less than 12,000 flight cycles. Also, added 
compliance information for airplanes line numbers 736 thru 1048 to address additional reports of 
loose fasteners on airplanes with the latest configuration.
— Reason and Description - Add six reports to the service history table. 
— Effectivity - Added 757-200/-200CB and 200PF airplanes with RB211 engines, Line numbers 736 
thru 1048.
09/03 30,072 9,991 No. 1 Three loose bolts in vertical flange.
09/03 60,715 26,914 No. 1 & 2 Migrated shims between bulkhead and vertical 
flange of fitting.
10/03 44,985 15,004 No. 2 Three loose bolts in vertical flange.
01/04 12,368 7,922 No. 2 Three loose bolts in vertical flange.
02/04 12,119 7,592 No. 1 Four loose bolts in vertical flange.
04/06 44,423 13083 No. 1 One loose fastener in the vertical flange. Cracks in 
the aluminum bulkhead at two hole locations and 
web at one hole location common to the horizontal 
flange.
Service History
Date Hours Cycles Strut Report

### Page 21

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
— Work Instructions, Part I, Step 2 - Add shim migration limits to show the necessary work if shim 
migration is found during the inspection. 
— Figure 2 - Add instructions to measure and record the distance a shim has moved from the 
installed position, if the shim shows signs of movement during the inspection.
— Figure 4 - Make changes to the figure as follows:
— Change the figure title to show that it is Interim Repair I.
— Make corrections to the illustration and instructions to show the replacement of two shims. 
One on the left flange of the fitting and one on the right flange of the fitting.
— Add a step is to apply sealant around the outer edge of the shim.
— Add a step to increase the hole diameter after shim is in place.
— Removed repair instructions for cracks.
— Figure 5 - Make changes to the figure as follows:
— Change the figure title to show that it is Interim Repair II.
— Removed repair instructions for cracks.
— Figure 6 - Make changes to the figure as follows:
— Change the figure title to show that it is Interim Repair III.
— Removed repair instructions for cracks.
— Figure 7 - Deleted.
— Figure 9 - Add this new figure to give the instructions for Interim Repair V.
— Figure 10 - Added this new figure to give instructions for sealing removed parts.
Revision 02 is sent to give revised inspection schedule and repair requirements. Instructions are 
added to inspect for cracking at four critical horizontal flange fasteners holes if one or more loose 
fasteners is found. Also, do a one-time inspection and repair of the four critical faster holes on the 
horizontal flange. Figure 11, Interim Repair VI is new and gives location and instruction for the four 
critical horizontal flange fastener locations.
These sections of the service bulletin are changed with revision 02:
— Summary - Added revised inspection intervals in the Compliance section. Added horizontal 
flange one-time critical fastener inspection and repair requirement in the Action section. Added 
one report to the Service History in Background section.
— Planning - Added revised inspection intervals in the Compliance section. Added horizontal flange 
one-time critical fastener inspection and repair requirement in the Description section. Added one 
report to the Service History in the Reason section. Added Manpower hours for Part IV 
inspection. 
— Accomplishment Instructions - Revised access instructions. Added inspections, critical fastener 
identification, locations, compliance requirement Notes and Part IV inspection.
— Figure 6 - Added HFEC inspections to aluminum bulkhead and steel web with NDT references.
— Figure 11 - Added, for critical horizontal flange fastener locations, HFEC inspections to aluminum 
bulkhead and steel web with NDT references.
— All references to AD 2004-12-07 are changed to AD 2005-12-04.
Revision 03 is sent to give revised inspection compliance times and replace the phrase "one time 
inspection" with "inspection" when refering to the Part IV inspection of the critical fastener holes on 
the horizontal flange .
These sections of the service bulletin are changed with revision 03:
— Summary - Compliance information is deleted from the Compliance section.
— Paragraph 1.E., Compliance - Compliance times are revised and presented in a tabular format.
— Summary, Planning Information, Work Instructions: replaced the words "one time inspection" 
with "inspection".

### Page 22

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
D. Description
Get access to the forward and aft surfaces of the torque bulkhead assembly. Do an inspection of the 
shims between the vertical flange of the strut-to-diagonal brace fitting and the torque bulkhead. Also, 
do an inspection of the four fasteners through the vertical flange of the fitting and the torque bulkhead. 
If shim migration and/or loose bolts are found in the diagonal brace load path, make the applicable 
interim repairs.
Get more access for the inspection of the horizontal flange of the strut-to-diagonal brace fitting. Do an 
inspection of the sixteen fasteners through the horizontal flange of the fitting. A boroscope, or other 
inspections aids, can be necessary for this inspection. If necessary remove the engine and install 
oversize fasteners. 
If loose fasteners are found or shim migration is beyond limits, do an inspection of the four critical 
fastener holes on the horizontal flange. 
As necessary, apply new sealant to the fasteners and leveling compound to the strut structure. As 
necessary install the engine, diagonal brace, and other components removed to get access. Put the 
airplane back to a serviceable condition and schedule the repeat inspections.
Revision 01 - More work is necessary on airplanes changed as shown in the initial release of this 
service bulletin. Repeat inspections are required for airplanes that have incorporated Service Bulletin 
757-54-0035.
Revision 02 - More work is necessary on airplanes changed as shown in the initial release and revision 
01 of this service bulletin. Instructions are added to do a one-time inspection and repair of the four 
critical fastener holes on the horizontal flange.
Revision 03 - No more work is necessary on airplanes changed as shown in the Original issue, 
Revision 1, or Revision 2 of this service bulletin, however the conditions and the compliance time for 
doing the inspection of the four critical fasteners on the horizontal flange have changed.

### Page 23

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
E. Compliance
Table 1: Compliance
Condition Action
Compliance Time
(Whichever Occurs later)
Repeat Interval 
(Whichever 
Occurs first)
All airplane struts that 
had findings on the 
horizontal or vertical 
fasteners or the shims 
which lead to a rejection 
while doing Revision 1 or 
the original release of 
this service bulletin, and 
all airplanes that had 
equivalent findings prior 
to the original release of 
this service bulletin (a)
Inspect the four critical 
fasteners in the horizontal 
flange as given in Part IV 
unless already accomplished 
as given in Revision 2 of this 
service bulletin.
90 days after the 
date on this service 
bulletin
-- -
Group 1 Configuration 1 Inspect the shim installation 
as given in Part I, Step 3.
AND
Inspect all four fasteners in 
the vertical flange as given in 
Part I, Step 5
AND
Inspect the fasteners in the 
horizontal flange as given in 
Part II, Step 2
90 days after the 
date on this service 
bulletin (b)
-6 , 0 0 0  
Flight 
Cycles
36 
months
Group 1 Configuration 2 Inspect the shim installation 
as given in Part I, Step 3
AND
Inspect all four fasteners in 
the vertical flange as given in 
Part I, Step 5
AND
Inspect the fasteners in the 
horizontal flange as given in 
Part II, Step 2
6,000 flight cycles or 
36 months, 
whichever occurs 
first, after 
incorporation of 
service bulletin 757-
54-0035. (b)
90 days 
after the 
date on 
this 
service 
bulletin  
(b)
9,000 
Flight 
Cycles
54 
months
Group 2 Inspect the shim installation 
as given in Part I, step 3
AND
Inspect all four fasteners in 
the vertical flange as given in 
Part I, Step 5
AND
Inspect the fasteners in the 
horizontal flange as given in 
Part II, Step 2
6,000 flight cycles or 
36 months, 
whichever occurs 
first, after date of 
issuance of 
airworthiness 
certificate. (b)
90 days 
after the 
date on 
this 
service 
bulletin  
(b)
9,000 
Flight 
Cycles
54 
months
Total cumulative shim 
movement equal to or 
less than 0.50 inch
Repair as given in Part I, 
Step 4.a.
Before further flight 
after completing all 
inspections
-- -

### Page 24

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2005-12-04, is related to this 
service bulletin. AD worksheet 06-AD-42 is also related to this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle 
Aircraft Certification Office approves the modification defined in this service bulletin as an alternative 
method of compliance (AMOC) to the modification required by paragraphs (b) and (d) of AD 2004-12-
07. Also, the Manager of the FAA Seattle Aircraft Certification Office approves the inspection defined 
in this service bulletin as an AMOC to the inspection required by paragraph (g) of AD 2005-12-04. All 
provisions of AD 2004-12-07 and 2005-12-04 that are not specifically referenced in the above 
statements remain fully applicable and must be complied with.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
Total cumulative shim 
movement more than 
0.50 inch
Repair as given in Part I, 
Step.4.b.
Before further flight 
after completing all 
inspections
-- -
Rejected fastener in the 
vertical flange
Repair as given in Part I, 
Step 5.a.(2)
AND
Inspect and repair as given 
in Part I, Step 5.a.(3)
Before further flight 
after completing all 
inspections
-- -
Rejected fastener in the 
horizontal flange
Repair as given in Part II, 
Step 2.a.(2)
AND
Inspect and repair as given 
in Part II, Step 2.a.(3)
Before further flight 
after completing all 
inspections
-- -
(a)  Findings on Group 1, Configuration 2 airplane struts prior to SB 757-54-0035 incorporation are excluded
      from this condition.
(b)   If you have done this inspection as given in an earlier release of this service bulletin, then the compliance
       time to initiate this inspection does not apply. You must still do repeat inspections at the intervals shown.
Table 1: Compliance
Condition Action
Compliance Time
(Whichever Occurs later)
Repeat Interval 
(Whichever 
Occurs first)

### Page 25

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
G. Manpower
The table below shows an estimate of the task-hours necessary to do this inspection and repair for 
each strut. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate 
with operator task-hour data if necessary. The estimate does not include lost time. These are some 
examples of lost time:
— Time to adjust to the workplace.
— Time to schedule the work.
— Time to examine the work.
— Time to cure the materials.
— Time to make the parts.
— Time to find the tools.
(a) An estimate for the task-hours necessary to do the repair is not given.
(a) An estimate for the task-hours necessary to do the repair is not given.
(b) More time can be necessary for the removal of the engine, diagonal brace, and precooler.
(a) An estimate for the task-hours necessary to do the repair is not given.
Part I - Inspection - Fasteners and Shim - Vertical Flange
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 2 12.0 6.0
Inspect 2 2.0 1.0
Repair (a) - - -
Close Access 2 14.0 7.0
TOTAL FOR EACH STRUT 28.0 14.0
Part II - Inspection - Fasteners - Horizontal Flange
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 2 2.0 1.0
Inspect 2 2.0 1.0
Repair (a) - - -
Close Access 2 2.0 1.0
TOTAL FOR EACH STRUT (b) 6.0 3.0
Part IV - Inspection - Critical Fastener Holes on the Horizontal Flange
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 2 2.0 1.0
Inspect 2 2.0 1.0
Repair (a) - - -
Close Access 2 2.0 1.0
TOTAL FOR EACH STRUT (b) 6.0 3.0

### Page 26

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
(b) More time can be necessary for the removal of the engine, diagonal brace, and precooler.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Service Related Problems (SRP) 757-SRP-54-0095 and 757-SRP-54-0118.
b. 757 Maintenance Manual (AMM) 54-53-01, 54-53-02, 71-00-02, 71-11-07, 78-31-00.
c. 757 Structural Repair Manual (SRM) Subject 51-00-06.
d. 757 Nondestructive Test (NDT) Manual Part 6, 51-00-14, Part 6, 51-00-16, Part 6, 51-00-17.
e. Standard Overhaul Practices Manual (SOPM) 20-43-03, 20-50-19.
f. Boeing Service Bulletin 757-54-0035,’NACELLES/PYLONS Rolls Royce RB211 Powered 
Airplanes - Nacelle Strut and Wing Structure Improvement’.
g. FAA Airworthiness Directive AD 2005-12-04.
h. Boeing Parts Standards Document D-590.
i. Boeing Drawing 65-88700.
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin. These drawings are not necessary to 
make the specified changes, and are not supplied with this service bulletin. These drawings may 
not be applicable to all airplane configurations or operators.
K. Publications Affected
None.
Drawing Number Title
311N5042 Spar Installation - Lower Nacelle Strut
311N5045 Torque Bulkhead Installation
311N5062 Seal Application - Nacelle Strut

### Page 27

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.

### Page 28

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 29

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection, and/or repair procedures given in this 
service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
(a) Can be necessary if you make the radius filler shown in Figure 6. Refer to SOPM 20-
43-03 for data about the Chemical Conversion Treatment.
(b) See the Qualified Products List at the end of the Boeing Material Specification (BMS) 
for supplier data.
(c) Alternative to DC 93-006.
(d) Primer is necessary if BMS 5-63 is applied over rubber/silicon substrates.
(e) Use with DC 93-006 and DC 3110.
(f) Alternative to DC 3110.
Part Number / 
Specification QTY Name Notes
Type 2, Class A 4 oz. Chemical Conversion 
Treatment
(a)
BMS 10-11, Type 1 8 oz. Primer (b)
BMS 5-63 1 pt. Sealant (c)
DAPCO 1-400 8 oz. Primer (d)
DC 1200 8 oz. Primer (e)
DC 93-006 1 pt. Sealant -
DC 3110 1 qt. Leveling Compound -
RTV 560 - - (f)
RTV 3 - - (f)
RTV 60 - - (f)
301 SS 1/2 Hard - CRES Plate 2.50 x 2.50 x 0.080 (g)
BACB30* - Bolt (h)
BACC30* - Collar -
BACS40R015B027F 2 Shim, Laminated (i) BACS40R015C027F optional
BACF3H10JT010HG 2 Filler, Radius (j)

### Page 30

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
(g) Can be necessary if a crack is found in the aft bulkhead that cannot be repaired 
with the installation of an oversize fastener.
(h) See the Paragraph 3.B., Work Instructions, Figures 4, 5, 6, and 7, for the 
oversize bolt/collars that can be necessary if the inspections find a loose shim 
and/or damaged fasteners.
(i) Can be necessary if loose shims are found during the inspection.
(j) Can be necessary if oversize fasteners are installed as shown in Figure 6. 
Instructions are also given to make the filler from 0.063 thick 2024-T3, T4, T42, 
or 7075-T6 Bare Aluminum Sheet.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
A boroscope, or other inspection aids, can be necessary to do the inspection of the fasteners in the 
horizontal flange of the strut-to-diagonal brace fitting. Also, maintenance and overhaul tools in the 
manuals given in Paragraph 1.J., References, can be necessary. Examine operator tool supply to 
make sure all necessary tools are available.

### Page 31

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches.
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch.
— Angular tolerance is plus or minus 2 degrees.
— Hole dimensions for standard solid rivets are given in 757 Structural Repair 
Manual, Chapter 51.
— Torque limits to tighten nuts and bolts are given in 757 Structural Repair Manual, 
Chapter 51.
4. For approved fastener and process material substitutions, refer to 757 Structural Repair 
Manual, Chapter 51, Alternate fasteners are given in 757 Structural Repair Manual 
Chapter 51 and Boeing Drawing 65-88700.
5. If the length of fasteners specified in this service bulletin do not meet the installation 
standards, fasteners of the same specification, or an approved substitute, one grip 
length longer or shorter may be used.
6. Inspections, used in the service bulletin, are defined as follows:
Detailed Inspection: An intensive visual examination of a specific structural area, 
system, installation or assembly to detect damage, failure or irregularity. Available 
lighting is normally supplemented with a direct source of good lighting at an intensity 
deemed appropriate by the inspector. Inspection aids such as mirrors, magnifying 
lenses, etc. may be used. Surface cleaning and elaborate access procedures may be 
required.
Special Detailed (non-Destructive Testing) Inspection: An intensive examination of a 
specific item(s), installation, or an assembly to detect damage, failure or irregularity. The 
examination is likely to make extensive use of specialized inspection techniques and/or 
equipment. Intricate cleaning and substantial access or disassembly procedure may be 
required.
Non-Destructive Testing (NDT) inspections are used to examine all subsurface damage 
and most small cracks. NDT is also used in areas where a visual inspection is not

### Page 32

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
sufficient to find the dimensions of damage. 
B. WORK INSTRUCTIONS
PART I - INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE - ALL AIRPLANES
1. Refer to 757 AMM 78-31-00 and do the Thrust Reverser Deactivation for Ground Maintenance.
WARNING: DO THE THRUST REVERSER DEACTIVATION PROCEDURE TO PREVENT THE
OPERATION OF THE THRUST REVERSER. THE ACCIDENTAL OPERATION OF
THE THRUST REVERSER CAN CAUSE INJURY TO PERSONS OR DAMAGE TO
EQUIPMENT.
2. Refer to Figure 1 and do the steps necessary to get access for the inspection of the fasteners 
and shim in the vertical flange.
3. Refer to Figure 2 and do the inspection of the shim installation between the vertical flange and 
bulkhead:
a. For Group 1 and Group 2 airplanes: If the shim installation shows signs of movement and is 
rejected: Continue with Step 4, below.
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
b. If the shim installation is satisfactory: Continue with the inspection of the four fasteners in 
the vertical flange as given in step 5, below.
4. Do repairs to the shim installation between the vertical flange and the bulkhead as given below:
a. If the shim(s) Total cumulative movement is 0.50 or less: Do Interim Repair V as shown in 
Figure 9. Record the amount of total shim movement and save for future inspections.
b. If the shim(s) Total cumulative movement is more than 0.50: Remove the engine as given 
in 757 AMM 71-00-02 and do Interim Repair I as shown in Figure 4. Also, do the inspection 
and repair of the four critical fastener holes on the horizontal flange as given in Part IV. 
5. Refer to Figure 2 and do the inspection of the four fasteners in the vertical flange:
a. If one or more of the four fasteners are rejected: 
(1) Remove the engine 757 AMM 71-00-02 
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
(2) At the locations where fasteners are rejected in the vertical flange: Remove the 
fastener, increase the hole diameter and install oversize fasteners as shown for Interim 
Repair II in Figure 5.
(3) Do the inspection and repair of the four critical fastener holes on the horizontal flange 
as given in Part IV.

### Page 33

November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
PART II - INSPECTION - FASTENERS - HORIZONTAL FLANGE - ALL AIRPLANES
1. Refer to Figure 1 and do the steps necessary to get more access, and removal of the leveling 
compound, for the inspection of the fasteners in the horizontal flange.
2. Refer to Figure 3 and do the inspection of the sixteen fasteners that hold the strut to the horizontal 
flange of the strut-to-diagonal brace fitting:
a. If one or more of the sixteen fasteners are rejected: 
(1) Remove the engine as given in 757 AMM 71-00-02.
NOTE: All Part I and Part II inspections can be accomplished before repairs are done.
(2) Remove the rejected fastener, inspect the fastener hole for cracking, increase the hole 
diameters and install oversize fasteners as shown for Interim Repair III in Figure 6.
(3) Do the inspection and repair of the four critical horizontal flange fastener holes on the 
horizontal flange as given in Part IV.
PART III - CLOSE ACCESS - ALL AIRPLANES
1. Apply new sealant as shown in Figure 8.
2. Apply the leveling compound shown in Figure 8.
3. Install and seal the covers as shown in Figure 10.
4. Install the remaining components that were removed to get access for the inspection.
5. If necessary, install the engine as given in 757 AMM 71-00-02.
6. Put the airplane back to a serviceable condition.
7. Schedule the airplane for the repeat inspection at the time given in Paragraph 1.E., Compliance.
PART IV - INSPECTION - CRITICAL FASTENER HOLES ON THE HORIZONTAL FLANGE 
1. Remove engine to gain access if not already done, as given in 757 AMM 71-00-02.
2. Remove the four critical horizontal flange fasteners and do a HFEC inspection of the fastener 
holes for cracking as given in Figure 11. 
a. If any crack or crack indication is found contact Boeing for repair instructions and repair 
before further flight.
3. At locations where the critical fastener hole was rejected, increase the hole size and install an 
oversize fastener as given in Figure 11. Oversize only if warranted by the hole condition, 
otherwise install the same size fastener as given in Figure 11.
4. At locations where the fastener hole was not rejected, install the same size fastener as was 
removed as given in Figure 11. Oversize only if warranted by the hole condition, otherwise install 
the same size fastener as given in Figure 11.

### Page 34

FIGURE 1: ACCESS FOR INSPECTION
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  1: ACCESS FOR INSPECTION
RIGHT ALMOST THE SAME
LEFT SHOWN
FWD
FWD
LEFT
ASEE
A
RIGHT WING/STRUT THE SAME
WING/STRUT SHOWN
BSEE
6
5
4
3
2
1
W39396
(SHEET 1 OF 3)

### Page 35

FIGURE 1: ACCESS FOR INSPECTION
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
LEFT SHOWN
RIGHT OPPOSITE
FWD
A-A
A
A
EXISTING
COMPOUND
INBD
B
7
W39439
(SHEET 2 OF 3)

### Page 36

FIGURE 1: ACCESS FOR INSPECTION
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for one strut.
STEP TASK NAME REFERENCES QTY NOTES
1 Open or Remove Access Door 757 AMM 54-53-02 1 -
2 Loosen Clamp - 1 -
3 Move Boot Seal - 1 -
4 Remove Cover - 1 -
5 Remove Coverplate 757 AMM 54-53-01 1 -
6 Remove Seal 757 AMM 71-11-07 1 Remove the seal between the 
strut and the common nozzle 
fairing.
7 Remove Leveling 
Compound
- - As necessary, remove the 
leveling compound from the 
area around the fasteners.
(SHEET 3 OF 3)

### Page 37

FIGURE 2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE
A
A
SHIM
FASTENER
(4 LOCATIONS)
1
5
SHIM
32 4
A-A
FITTING
2
VERTICAL
MEASUREMENT
HORIZONTAL
MEASUREMENT
2
4
VERTICAL
MEASUREMENT
HORIZONTAL
MEASUREMENT
4
SHIM SHOWN
IN MIGRATED
POSITION
FWD
W39458
(SHEET 1 OF 2)

### Page 38

FIGURE 2: INSPECTION - FASTENERS AND SHIM - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
STEP TASK NAME PROCEDURE REFERENCES NOTES
1 Inspect Shim Installation 
(left shim)
Detailed Inspection 757 SRM 51-00-06 (a)
2 Measure/
Record
Shim Migration 
(left shim)
-- ( b )
3 Inspect Shim Installation 
(right shim)
Detailed Inspection 757 SRM 51-00-06 (a)
4 Measure/
Record
Shim Migration 
(right shim)
-- ( b )
5 Inspect Fastener Detailed Inspection 757 SRM 51-00-06, (c) Four locations
(a) Look for signs of damaged sealant around the outer edge of the shim. Look for signs that show 
movement of the shim. Reject a shim that shows signs of movement.
(b) Measure and record the horizontal movement and the vertical movement of the shim from the installed 
position. Add the movement in each direction together to obtain the total movement of the shim at this 
inspection. This movement must be added to all previous measurements to obtain total cumulative 
movement of the shim(s). This data is used during the repeat inspection and to make decisions about 
repairs. Data necessary for the repeat inspection and to make decisions about repairs are:
- The shims have not moved from the installed position.
- The shim total cumulative movement is 0.50, or less.
-The shim total cumulative movement is more than 0.50.
(c) Look at the two sides of the fastener installation for signs of damaged sealant. Remove the sealant from 
the head, or collar, if there are signs of damage.
Look for signs of movement, such as debris around the head or collar. Look for gaps under the head or 
collar.
Reject a fastener that shows signs of movement, or that has gaps under the head or collar.
(SHEET 2 OF 2)

### Page 39

FIGURE 3: INSPECTION - FASTENERS - HORIZONTAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  3: INSPECTION - FASTENERS - HORIZONTAL FLANGE
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. 
STEP TASK NAME PROCEDURE REFERENCES NOTES
1 Inspect Fastener Detailed Inspection 757 SRM 51-00-06, (a) (b) 
Eight locations.
2 Inspect Fastener Detailed Inspection 757-SRM 51-00-06, (a) (b) 
Eight locations.
A
A
FWD
FWD A-A
2
1 8 LOCATIONS
8 LOCATIONS
W40119
(SHEET 1 OF 2)

### Page 40

FIGURE 3: INSPECTION - FASTENERS - HORIZONTAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
(a) Use a boroscope, or other inspection aids if necessary, to view the lower surface of the fasteners 
installation.
(b) Look at the two sides of the fastener installation for signs of damaged paint and/or sealant. Remove the 
paint and/or sealant from the head, or collar, if there are signs of damage. 
Look for signs of movement, such as debris around the head or collar. Look for gaps under the head or 
collar.
Reject a fastener that shows signs of movement, or that has gaps under the head or collar.
(SHEET 2 OF 2)

### Page 41

FIGURE 4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE
F
A
AFWD 42
A-A
4 LOCATIONS
A
10
FITTING
31 5 6
W40524
(SHEET 1 OF 2)

### Page 42

FIGURE 4: INTERIM REPAIR I - SHIM REPLACEMENT - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for the replacement of one shim.
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure. 
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than 
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute 
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to 
determine the part numbers used as substitutes. 
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Fastener - 2 (left bolts and/or right bolts).
2 Remove Shim - 1 (left shim and/or right shim).
3 Inspect Fastener Hole - 2 (a)
4 Measure Clearance - -
Adjust Shim BACS40R015B027F 1 (b) BACS40R015C027F is 
optional. (c)
Drill Holes - 2 Drill holes in shim to agree with 
hole diameters in fitting.
Clean/Deburr Shim - -
Apply Sealant DC93-006 - To mating surfaces.
Install Shim - -
5 Ream Holes - 2 Increase diameter by 0.0156
6 Install Fastener - 2 See Code A 1 and A2.
(a) Do an eddy current inspection of the holes through the titanium fitting as given in 757 NDT Part 6, 
51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead as given in 757 
NDT Part 6, 51-00-16. 
If you get an indication of a crack: Contact Boeing for repair instructions and repair prior to further flight.
(b) Remove laminations to adjust the shim thickness. Remove all sharp edges. The maximum clearance 
permitted with the shim in position is 0.005. 
(c) Alternative: Make a solid shim from 2024-T3, or 2024-T4, -T81, T861, or 7075-T6. Apply a Chemical 
Conversion Treatment, Type 2, Class A, and two layers of Primer BMS 10-11, Type I to the bare 
aluminum. Refer to SOPM 20-43-03 for data about the chemical conversion treatment.
CODE NAME PART NUMBER HOLE DIA NOTES
A1 Bolt BACB30NX14K10X 0.4526 - 0.4536 Install wet with Sealant BMS 5-63 or 
Dow Corning 93-006.Collar BACC30BH14S -
A2 Bolt BACB30NX14K10Y 0.4682 - 0.4692 Install wet with Sealant BMS 5-63 or 
Dow Corning 93-006.Collar BACC30AC14S -
(SHEET 2 OF 2)

### Page 43

FIGURE 5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE
F
A
A
FWD
A-A
4 LOCATIONS
A
10
FITTING
21 3
W40549
(SHEET 1 OF 2)

### Page 44

FIGURE 5: INTERIM REPAIR II - OVERSIZE FASTENERS - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for strut.
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure. 
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than 
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute 
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to 
determine the part numbers used as substitutes. 
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Fastener - - -
2 Inspect Fastener Hole - - (a)
3 Install Fastener - - See Codes A 1 and A2.
(a) Do an eddy current inspection of the hole(s) through the titanium fitting as given in 757 NDT Part 6, 
51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead as given in 757 
NDT Part 6, 51-00-16. 
If you get an indication of a crack: Contact Boeing for repair instructions and repair prior to further flight.
If you do not get an indication of a crack: Increase the diameter of the hole by 0.0156 and continue with 
the instructions.
CODE NAME PART NUMBER HOLE DIA NOTES
A1 Bolt BACB30NX14K10X 0.4526 - 0.4536 Install wet with Sealant BMS 5-63 or 
Dow Corning 93-006.Collar BACC30BH14S -
A2 Bolt BACB30NX14K10Y 0.4682 - 0.4692 Install wet with Sealant BMS 5-63 or 
Dow Corning 93-006.Collar BACC30AC14S -
(SHEET 2 OF 2)

### Page 45

FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
RADIUS FILLER
0.063
1.001.00
0.35 RADIUS OR LARGER
A
A
FWD
FWD
A
ASEE
A-A
FITTING
3
2
1
6 LOCATIONS
8 LOCATIONS
N
11
B
N
6
C
N
11
D
W40801
(SHEET 1 OF 3)

### Page 46

FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for one strut.
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure. 
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than 
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute 
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to 
determine the part numbers used as substitutes. 
STEP TASK NAME PART NUMBER QTY NOTES
1 Remove Fastener - - -
Inspect Fastener Hole - - (a)
Install Fastener - - See Codes B 1 and B2
2 Remove Fastener - - -
Inspect Fastener Hole - - (a)
Install Fastener - - See Codes C 1 and C2
3 Remove Fastener - - -
Inspect Fastener Hole - - (a)
Make/Install Radius Filler - - (b)
Install Fastener - - See Codes D 1 and D2
(a) Do an eddy current inspection of the hole(s) through the titanium fitting as given in 757 NDT, Part 6, 
51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead as given in 757 
NDT, Part 6, 51-00-16. Do an eddy current inspection of the holes through the steel web, as given in 
757 NDT, Part 6, 51-00-17:
If you get an indication of a crack: Contact Boeing for repair instructions and repair prior to further flight.
If you do not get an indication of a crack: Increase the diameter of the hole by 0.0156 and continue with 
the instructions.
(b) If necessary, make and install a radius filler below the seal retainer at these fastener locations. Install 
Radius Filler BACF3H10JT010HG, or make the filler from 0.063 thick 2024-T3, -T4, -T42, or 7075-T6 
Bare Aluminum Sheet as shown. Apply a Chemical Conversion Treatment, Type 2, Class A, and one 
layer of Primer BMS 10-11, Type I to the bare aluminum. Refer to SOPM 20-43-03 for data about the 
chemical conversion treatment. Install the filler with Sealant BMS 5-63 or Dow Corning 93-006. 
CODE NAME PART NUMBER HOLE DIA NOTES
B1 Bolt BACB30YK12K11X 0.3901 - 0.3911 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30CP12C -
B2 Bolt BACB30YK12K11Y 0.4057 - 0.4067 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30CP12CY -
C1 Bolt BACB30MC12A6U 0.3901 - 0.3911 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30BH12S -
(SHEET 2 OF 3)

### Page 47

FIGURE 6: INTERIM REPAIR III - OVERSIZE FASTENERS - HORIZONTAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
C2 Bolt BACB30MD12A6U 0.4057 - 0.4067 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30AC12S -
D1 Bolt BACB30FP12A11U 0.3901 - 0.3911 (a) Install wet with Sealant BMS 5-63 or 
Dow Corning 93-006.Collar BACC30AB12SY -
D2 Bolt BACB30KK12A11U 0.4057 - 0.4067 (a) Install wet with Sealant BMS 5-63 or 
Dow Corning 93-006.Collar BACC30AC12S -
(a) If the installation of the radius filler is necessary, fasteners with longer grip lengths will also be 
necessary.
CODE NAME PART NUMBER HOLE DIA NOTES
(SHEET 3 OF 3)

### Page 48

FIGURE 7: THIS FIGURE HAS BEEN DELETED
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  7: THIS FIGURE HAS BEEN DELETED
THIS FIGURE IS DELETED.
1328539
(SHEET 1 OF 1)

### Page 49

FIGURE 8: REPAIR - SEALANT AND LEVELING COMPOUND
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 49 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  8: REPAIR - SEALANT AND LEVELING COMPOUND
COMPOUND
EXISTING
A
A
FWD
3
2
1
EXAMPLE-FASTENER LOCATIONS
A-A
ASEE
A
W42540
(SHEET 1 OF 2)

### Page 50

FIGURE 8: REPAIR - SEALANT AND LEVELING COMPOUND
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 50 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for one strut.
STEP TASK NAME PART NUMBER QTY NOTES
1
Apply Primer Dow Corning 1200 -
-
(a) (b) If the shim was replaced 
during the repair procedures, 
apply primer and a fillet seal 
around the outer edge of the 
shim/fitting flange.
Sealant Dow Corning 93-006
2 Apply Primer Dow Corning 1200 - (a) (b) Apply to all locations 
where sealant was removed for 
the inspections and/or fastener 
replacement.
Sealant Dow Corning 93-006 -
3 Apply Primer Dow Corning 1200 - (c) (d)
Leveling Compound Dow Corning 3110 - Optional compound is RTV560, 
RTV3 or RTV60.
(a) Before the Dow Corning 93-006 sealant is applied, let the Dow Corning 1200 primer dry for a minimum 
of 1 hour and a maximum of 24 hours.
(b) Primer DAPCO 1-400 and Sealant BMS 5-63, Type II is optional. Before Sealant BMS 5-63 is applied let 
the DAPCO 1-400 primer dry for a minimum of 1 hour and a maximum of 16 hours.
(c) Before the Dow Corning 3110 compound is applied, let the Dow Corning 1200 primer dry for a minimum 
of 1 hour and a maximum of 24 hours.
(d) You can mix solvent BMS 3-2, Type II, with the leveling compound to make it more liquid. The maximum 
quantity of solvent permitted in the mixture is 20 percent when measured by weight.
(SHEET 2 OF 2)

### Page 51

FIGURE 9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 51 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for one strut.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
CAUTION: DO NOT INSTALL A NEW COLLAR OR TRY TO TIGHTEN EXISTING COLLAR IN AN 
ATTEMPT TO TIGHTEN THE JOINT BETWEEN THE FITTING AND BULKHEAD AS STRUCTURAL 
DAMAGE MAY OCCUR.
1 Cut Exposed plies (left shim) -- -
2 Apply Primer BMS 10-11, Type 1 - -
3 Apply Primer DAPCO 1-400 - (a)
4 Apply Sealant BMS 5-63 - (b) Seal edges
5 Cut Exposed plies (right shim) -- -
6 Apply Primer BMS 10-11, Type 1 - -
7 Apply Primer DAPCO 1-400 (a)
8 Apply Sealant BMS 5-63, Type II - (b) Seal edges
FWD
SHIM
1
SHIM
52 63 74 8
386720
(SHEET 1 OF 2)

### Page 52

FIGURE 9: INTERIM REPAIR V - SHIM - VERTICAL FLANGE
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 52 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
(a) Dow Corning 93-006 sealant and Dow Corning 1200 primer are optional for this application. 
Before the Dow Corning 93-006 sealant is applied, let the Dow Corning 1200 primer dry for a minimum 
of 1 hour and a maximum of 24 hours.
(b) Before Sealant BMS 5-63 is applied let the DAPCO 1-400 primer dry for a minimum of 1 hour and a 
maximum of 16 hours.
(SHEET 2 OF 2)

### Page 53

FIGURE 10: SEAL COVER PLATES
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 53 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  10: SEAL COVER PLATES
RIGHT ALMOST THE SAME
LEFT SHOWN
FWD
FWD
ASEE
A
RIGHT WING/STRUT THE SAME
LEFT WING/STRUT SHOWN
3
2
4
5
1
D34431
(SHEET 1 OF 2)

### Page 54

FIGURE 10: SEAL COVER PLATES
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 54 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for one strut
STEP TASK NAME QTY REFERENCE NOTES
1I n s t a l l C o v e r 1 - -
2 Apply Primer DC 1200 
Sealant DC93-006
-
-
SOPM 20-50-19 (a) 
3 Install Cover Plate 1 AMM 54-53-01 -
4 Move Boot Seal 1 - (b)
5 Adjust Clamp 1 - Tighten Clamp
(a) Apply Intermediate liquid control fillet seal around entire periphery of the cover. Before the Dow 
Corning 93-006 sealant is applied, let the Dow Corning 1200 primer dry for a minimum of 1 hour 
and a maximum of 24 hours.
(b) Move the Boot Seal back to the original position as necessary.
(SHEET 2 OF 2)

### Page 55

FIGURE 11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 55 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
FIGURE  11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS
A
A
FWD
FWD
A-A
FITTING
1 4 LOCATIONS
N
11
B
2
3
1335626
(SHEET 1 OF 2)

### Page 56

FIGURE 11: INSPECTION - CRITICAL HORIZONTAL FLANGE FASTENER LOCATIONS
November 13, 2003
Revision 3:  June 27, 2007 757-54A0047
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 56 of 56
BOEING SERVICE BULLETIN 757-54A0047
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for one strut.
The codes shown below agree with the letter shown in the upper left corner of the fastener symbols in the figure. 
A number in the lower right corner gives the grip length of the fastener.
If the grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer than 
indicated. Also, if any of the fastener part numbers are not available or have been superseded, substitute 
fasteners may be supplied in Boeing kits, Boeing Document D-590 and Boeing drawing 65-88700 is used to 
determine the part numbers used as substitutes. 
STEP TASK NAME PART NUMBER QTY MORE DATA
1 Remove Fastener - - -
2 Inspect Fastener Hole - - (a) (b)
3 Install Fastener - - See Codes B0, B1 and B2
(a) Do an eddy current inspection of the hole(s) through the titanium fitting as given in 757 NDT, Part 6, 
51-00-14. Do an eddy current inspection of the holes through the aluminum bulkhead as given in 757 
NDT, Part 6, 51-00-16. Do an eddy current inspection of the holes through the steel web, as given in 
757 NDT, Part 6, 51-00-17.
(b) Measure the hole diameter. If the hole is true and round, and the diameter is within the limits allowed 
for installation of the same size fastener, do not increase the hole size. Otherwise, increase the hole 
size to remove damage.
CODE NAME PART NUMBER HOLE DIA NOTES
Bo Bolt BACB30YK12K11 0.3745 - 0.3755 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30CP12C -
B1 Bolt BACB30YK12K11X 0.3901 - 0.3911 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30CP12C -
B2 Bolt BACB30YK12K11Y 0.4057 - 0.4067 Install wet with Sealant BMS 5-63 or Dow 
Corning 93-006.Collar BACC30CP12CY -
(SHEET 2 OF 2)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.