# Boeing Alert Service Bulletin 757-57A0064: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2010-0698; AD 2011-05-04 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 757-57A0064](https://openairdocs.org/service-documents/boeing/757-57a0064.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 444
- PDF: https://openairdocs.org/files/sha256/7a/15/7a15d9368ce78688ba676e0ae910f9ea7fc4ca4d94f96960a44e826fcb65275a
- Page: https://openairdocs.org/service-documents/boeing/757-57a0064/file/7a15d9368ce7

## Text

This text is OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1 (OCR)

Commercial
DEDEING  Airplanes  757
Service Bulletin
- ALERT
Number:  757-57A0064
Original Issue: July 16, 2007
Revision 1:  October 05, 2009
ATA System:  5710 5720
SUBJECT:  WINGS - Center and Outer Wing - Fastener Sealing and Wire Bundle Support Inspection
and Modification
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
ECCN: 9E991
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2007 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  1 of 442
6.0

### Page 2 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
BLANK PAGE
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  2 of 442

### Page 3 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Table of Contents
Revision Transmittal Sheet  7
Summary .  11
1.  PLANNING INFORMATION  15
A.  Effectivity  15
1.  Airplanes  15
2. Spares Affected  21
B.  Concurrent Requirements  21
C.  Reason  21
D.  Description  22
Compliance  23
F  Approval  24
G.  Manpower  25
H.  Weight and Balance Changes.  35
Electrical Load Data  35
J.  References .  35
Existing Data:  35
2  Data supplied with this Service Bulletin  35
3.  Installation Drawings Used in the Preparation of this Service Bulletin:  35
K.  Publications Affected  36
L  Interchangeability and Intermixability of Parts  36
2.  MATERIAL INFORMATION.  37
A.  Material - Price and Availability.  37
B.  Industry Support Information.  37
C.  Parts Necessary For Each Airplane  37
Kits/Parts:  37
2.  Parts and Materials Supplied by the Operator:  37
3.  Parts Modified and Reidentified:  45
4.  Parts Removed and Not Replaced:  46
D.  Parts Necessary to Change Spares.  46
E.  Special Tooling - Price and Availability  46
F.  Special Tooling Necessary to do this Service Bulletin.  46
3.  47
GENERAL INFORMATION  47
WORK INSTRUCTIONS.  49
FIGURE 1:  GROUPS 1-2 - LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 1-2] •  76
FIGURE 2:  GROUPS 1-2 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 1-2] .
FIGURE 3:  GROUPS 3-4 - LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 3-4] .
FIGURE 4:  GROUPS 3-4 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 3-4] .
FIGURE 5:  GROUPS 5-7 - LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 5-7] •
FIGURE 6:  GROUPS 5-7 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 5-7]
FIGURE 7:  GROUPS 8-10 - LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 8-10] .
FIGURE 8:  GROUPS 8-10 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 8-10].
FIGURE 9:  GROUPS 11-12 - LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 11-12] .
FIGURE 10:  GROUPS 11-12 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 11-12]
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  3 of 442

### Page 4 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
FIGURE 11:  GROUPS 13-14 - LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 13-14] . 212
FIGURE 12:  GROUPS 13-14 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS [Group 13-14]
FIGURE 13:  GROUPS 1-5 - LEFT SIDE - FRONT SPAR - LOCATION OF FASTENERS [Group 1-5] . 240
FIGURE 14:  GROUPS 1-5 - RIGHT SIDE - FRONT SPAR - LOCATION OF FASTENERS [Group 1-5] . 248
FIGURE 15:  GROUPS 6-7, GROUPS 11-12 - LEFT SIDE - FRONT SPAR - LOCATION OF FASTENERS
[Group 6-7, 11-12]
FIGURE 16:  GROUPS 6-7, GROUPS 11-12 - RIGHT SIDE - FRONT SPAR - LOCATION OF FASTENERS
[Group 6-7, 11-12]
FIGURE 17:  GROUPS 8-10, GROUPS 13-14 - LEFT SIDE - FRONT SPAR - LOCATION OF FASTENERS
[Group 8-10, 13-14] .
FIGURE 18:  GROUPS 8-10, GROUPS 13-14 - RIGHT SIDE - FRONT SPAR - LOCATION OF FASTENERS
[Group 8-10, 13-14]
FIGURE 19:  GROUP 1, GROUP 3, GROUPS 5-7, GROUPS 11-12 - CENTER TANK - LOCATION OF
FASTENERS [Group 1, 3, 5-7, 11-12]  286
FIGURE 20:  GROUP 2, GROUP 4 - CENTER TANK - LOCATION OF FASTENERS [Group 2, 4]  293
FIGURE 21:  GROUPS 8-10, GROUPS 13-14 - CENTER TANK - LOCATION OF FASTENERS [Group 8-10,
13-14]  300
FIGURE 22:  GROUPS 1-7, GROUPS 11-12 - LEFT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY -
WIRE BUNDLES SUPPORT - GENERAL VISUAL INSPECTION [Group 1-7, 11-12]
FIGURE 23:  GROUPS 1-7, GROUPS 11-12 - RIGHT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY
- WIRE BUNDLES SUPPORT - GENERAL VISUAL INSPECTION [Group 1-7, 11-12]
FIGURE 24:  GROUPS 8-10, GROUPS 13-14 - LEFT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY
- WIRE BUNDLES SUPPORT - GENERAL VISUAL INSPECTION [Group 8-10, 13-14] . 314
FIGURE 25:  GROUPS 8-10, GROUPS 13-14 - RIGHT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY
- WIRE BUNDLES SUPPORT - GENERAL VISUAL INSPECTION [Group 8-10, 13-14] . 318
FIGURE 26:  GROUPS 1-7, GROUPS 11-12 - LEFT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY -
WIRE BUNDLES - CLAMP REPLACMENT AND/OR SLEEVE INSTALLATION [Group 1-7,
322
FIGURE 27:  GROUPS 1-7, GROUPS 11-12 - RIGHT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY
- WIRE BUNDLES - CLAMP REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 1-7,
11-12]
FIGURE 28:  GROUPS 8-10, GROUPS 13-14 - LEFT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY
- WIRE BUNDLES - CLAMP REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 8-10,
FIGURE 29:  GROUPS 8-10, GROUPS 13-14 - RIGHT SIDE - EQUIPMENT COOLING SYSTEM (ECS) BAY
- WIRE BUNDLES - CLAMP REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 8-10,
FIGURE 30:  ALL GROUPS - LEFT SIDE - REAR SPAR - WIRE BUNDLES SUPPORT - GENERAL VISUAL
INSPECTION [Group 1-14]  342
FIGURE 31:  ALL GROUPS - RIGHT SIDE - REAR SPAR - WIRE BUNDLES SUPPORT - GENERAL VISUAL
INSPECTION [Group 1-14]
FIGURE 32:  ALL GROUPS - LEFT SIDE - REAR SPAR - WIRE BUNDLES - CLAMP REPLACEMENT
AND/OR SLEEVE INSTALLATION [Group 1-14]
FIGURE 33:  ALL GROUPS - RIGHT SIDE - REAR SPAR - WIRE BUNDLES - CLAMP REPLACEMENT
AND/OR SLEEVE INSTALLATION [Group 1-14]
FIGURE 34:  GROUPS 7-8, GROUP 12, GROUP 14 - LEFT SIDE - FRONT SPAR - WIRE BUNDLES
SUPPORT - GENERAL VISUAL INSPECTION [Group 7-8, 12, 14]
FIGURE 35:  GROUPS 7-8, GROUP 12, GROUP 14 - RIGHT SIDE - FRONT SPAR - WIRE BUNDLES
SUPPORT - GENERAL VISUAL INSPECTION [Group 7-8, 12, 14]
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  4 of 442

### Page 5 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
FIGURE 36:  GROUP 9, GROUP 11, GROUP 13 - LEFT SIDE - FRONT SPAR - WIRE BUNDLES SUPPORT
- GENERAL VISUAL INSPECTION [Group 9, 11, 13]  375
FIGURE 37:  GROUP 9, GROUP 11, GROUP 13 - RIGHT SIDE - FRONT SPAR - WIRE BUNDLES SUPPORT
- GENERAL VISUAL INSPECTION [Group 9, 11, 13]  380
FIGURE 38:  GROUPS 1-6, GROUP 10 - LEFT SIDE - FRONT SPAR - WIRE BUNDLES SUPPORT
GENERAL VISUAL INSPECTION [Group 1-6, 10]  384
FIGURE 39:  GROUPS 1-6,  GROUP 10 - RIGHT SIDE - FRONT SPAR - WIRE BUNDLES SUPPORT -
GENERAL VISUAL INSPECTION [Group 1-6, 10]  389
FIGURE 40:  GROUPS 7-8, GROUP 12, GROUP 14 - LEFT SIDE - FRONT SPAR - WIRE BUNDLES
CLAMP REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 7-8, 12, 14]  393
FIGURE 41:  GROUPS 7-8,  GROUP 12, GROUP 14 - RIGHT SIDE - FRONT SPAR - WIRE BUNDLES
CLAMP REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 7-8, 12, 14]  399
FIGURE 42:  GROUP 9, GROUP 11, GROUP 13 - LEFT SIDE - FRONT SPAR - WIRE BUNDLES - CLAMP
REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 9, 11, 13] .  403
FIGURE 43:  GROUP 9, GROUP 11, GROUP 13 - RIGHT SIDE - FRONT SPAR - WIRE BUNDLES - CLAMP
REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 9, 11, 13] .  409
FIGURE 44:  GROUPS 1-6, GROUP 10 - LEFT SIDE - FRONT SPAR - WIRE BUNDLES - CLAMP
REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 1-6, 10].  . 414
FIGURE 45:  GROUPS 1-6, GROUP 10 - RIGHT SIDE - FRONT SPAR - WIRE BUNDLES - CLAMP
REPLACEMENT AND/OR SLEEVE INSTALLATION [Group 1-6, 10].  420
FIGURE 46:  ALL GROUPS - REAR SPAR, FRONT SPAR AND CENTER TANK FASTENERS - APPLICATION
OF SEALANT [Group 1-14] .  425
FIGURE 47:  GROUPS 1-10 LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS.  427
FIGURE 48:  GROUPS 1-10 RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS  431
FIGURE 49:  GROUPS 11- 14 LEFT SIDE - REAR SPAR - LOCATION OF FASTENERS  435
FIGURE 50:  GROUPS 11-14 - RIGHT SIDE - REAR SPAR - LOCATION OF FASTENERS  439
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  5 of 442

### Page 6 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
BLANK PAGE
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  6 of 442

### Page 7 (OCR)

Commercial
OBOEING  Airplanes  757
Service Bulletin
- ALERT
Number:  757-57A0064  Revision Transmittal Sheet
Original Issue: July 16, 2007
Revision 1:  October 05, 2009
ATA System:  5710 5720
SUBJECT:  WINGS - Center and Outer Wing - Fastener Sealing and Wire Bundle Support Inspection
and Modification
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2008-23-19, is related to this service bulletin.
More work is necessary as shown in the original issue of this service bulletin. Operators that have done the work
in accordance with the original issue must do the additional fastener sealing in accordance with Part 11 of this
service bulletin.
REASON FOR REVISION
This revision is sent to:
Add requirements to seal 20 additional fasteners in the main fuel tanks (left and right sides) for lightning
strike protection.
- Allow the installation of TFE-2X Teflon sleeve on the breakout wire separately from main bundle at locations
where the wire break out is within 1.5 inches of the clamp.
- Allow the use of Teflon tape to wrap around TFE-2X Teflon sleeve on wire bundle for smooth transition and
cover any gaps at locations where the bend radius of the wire bundle is too small to allow the proper
installation of Teflon sleeves.
Replace BACC10JU-101 and BACC10JU-102 full cushion clamps with BACC10GU-101 and BACC10GU-102
due to availability.
Clarify required length of Teflon sleeve protruding beyond the clamp at 0.5 inch minimum (both ends).
- Allow the use of alternate size clamps and to note existing wire bundle may differ from those shown in this
service bulletin.
- Correct names of fuel tank access doors that were not named correctly.
- Correct the warranty information in Industry Support Information in the Summary to match exiting warranty
information in Paragraph 2.B of the service bulletin.
The data given in Information Notice 757-57A0064 IN 01 and 757-57A0064 IN 02 is included in this revision.
Original issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY  757-57A0064
•Copyright © Unpublished Work - See page 1 for details.  7 of 442

### Page 8 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
These sections were changed:
1. In the Summary section, the background was revised, added reference to the AD and updated the warrant
and manpower sections.
2. In Paragraph 1.C., Reason, clarified and formated reason statement to be Airworthiness Directive Friendly.
3. In Paragraph 1.D., Description, added Maintenance Zone tables.
4. In Paragraph 1.E., Compliance, changed as follows:
a.  Federal Aviation Administration (FAA) Airworthiness Directive AD 2008-23-19.
b. Revised compliance times to within 5 years after December 30, 2008, was within 5 years after issue
date on this Service Bulletin, to match effective date in Federal Aviation Administration (FAA)
Airworthiness Directive AD 2008-23-19.
5. In Paragraph 1.F., Approval, added an Alternative Methods of Compliance statement.
6. In Paragraph 1.G., Manpower, changed as follows:
a. Changed task hours for Figures 1 through 10, to increase hours for additional fasteners to be sealed.
b. Added task hour tables for Figures 47 through 50, for groups 1 through 14.
7. In Paragraph 1.K., Publications Affected, added the Damage Tolerance statement.
8. In Paragraph 2.C.2., Parts and Material Supplied by the Operator, for all groups change as follows:
a. Changed Full Cushion Clamp part number in parts tables to BACC10GU-101 and BACC10GU-102
was BACC10JU-101 and BACC10JU-102.
b. Added Teflon tape and associated notes (f) and (g).
9. In Paragraph 3.A., General Information, changed as follows:
a. Added note 10 to note existing fasteners that have been sealed previously are acceptable.
b. Added note 11 to note quantity of fasteners shown are approximate and to seal additional fasteners
as required.
c. Added notes 12 and 13 to explain operator applicability of Parts 1 through 11.
d. Added note 14 to allow approved wire bundle support installation deviations
10. In Paragraph 3.B., Work Instructions, Part 1, for all groups corrected access door names as follows:
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  8 of 442

### Page 9 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
a. In steps (2) and (14) changed name of 531AB, 531BB, and 531CB to center fuel tank access door,
was left main fuel tank access door.
b. In steps (4) and (16) changed name of 631AB, 631BB, and 631CB to center fuel tank access door,
was right main fuel tank access door.
c.  In steps (6) and (12) changed name of 134BZ, 134CZ and 134DZ to fuel bay baffle door, was center
fuel fuel tank access door.
11. In Paragraph 3.B., Work Instructions, Part 2 through Part 10, for all groups, changed instructions; from
replace Teflon tape to install TFE-2X sleeve.
12. In Paragraph 3.B., Work Instructions, added Part 11 work instructions for operators that has done the work
of the original issue of this service bulletin
13. In Figures 1 through 12, changed as follows:
a.  Changed view B to show 21 fasteners was 22.
b.  Changed work step 1 to locate 21 fasteners was 22.
c.  Added requirements to seal additional fasteners in areas between rib numbers 14 and 15, and between
rib numbers 18 and 19.
14. In Figures 3 and 4, work step 7, changed quantity to 7 was 9.
15. IN Figures 5 and 6, work step 8, changed quantity to 7 was 9.
16. In Figures 23 and 27, revised wire harness (W2506) routing to better match actual aircraft configuration.
17. In Figures 22 through 45, added notes to:
a. Allow the installation of TFE-2X Teflon sleeve on the breakout wire separately from main bundle at
locations where the wire break out is within 1.5 inches of the clamp
D.  Allow the use of Teflon tape to wrap around TFE-2X Teflon sleeve on wire bundle for smooth transition
and cover any gaps at locations where the bend radius of the wire bundle is too small to allow the
proper installation of Teflon sleeves
18. In Figures 26 through 29, 32, 33 and 40 through 45, added view to show 0.5 inch minimum sleeve protruding
beyond ends of clamp added note to show the same.
19. In Figures 27, 28, 29, 32, 33, 40, 41, 42, 43, 44, and 45 changed quantity of Teflon Sleeve in illustration to
match quantity in step table.
20. In Figures 40, 42 and 44, added note to advice operators that to remove clamps between IFSS 119.21 and
IFSS 132.98 surrounding pneumatic ducts may have to be removed.
21. Added Figures 47, 48, 49 and 50 to seal an additional 20 fasteners in the main fuel tank (left and right side)
for operators that have done the work of the original issues of this service bulletin.
Pages with no vertical lines have no important changes
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  9 of 442

### Page 10 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
REVISION HISTORY
Original Issue:  July 16, 2007
Revision 1:  October 05, 2009
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  10 of 442

### Page 11 (OCR)

Commercial
CADEING  Airplanes  757
Service Bulletin
- ALERT
Number:  757-57A0064  Summary
Original Issue:  July 16, 2007
Revision 1:  October 05, 2009
ATA System:  57 10 5720
SUBJECT:  WINGS - Center and Outer Wing - Fastener Sealing and Wire Bundle Support Inspection
and Modification
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
A review by Boeing has found it possible for some fuel tank fasteners, in the event of a fault current, to become
an ignition source. Sealing fuel tank fasteners, general inspection of wire support bundles, replacing clamps
and installing a Teflon sleeve where required may reduce the risk of fuel tank fasteners becoming an ignition
source. Replacing clamps and installing Teflon sleeve provides for additional layers of protection against hot
shorts. Accomplishment of the this service bulletin will help prevent certain ignition sources within the fuel tanks.
If not corrected, in the event of a fault current, ignition sources within the fuel tanks may possibly result in fire
or explosion.
This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88,iFuel Tank
System Fault Tolerance Evaluation Requirementsi
ACTION
Purge the left and right main fuel tanks. Get access to the left and right main fuel tanks. Seal fasteners on the
front and rear spars, left and right side. Purge the center fuel tanks. Get access to the center fuel tank. Seal
fasteners on the center tank lower panel. In the left and right Equipment Cooling System (ECS) bay, do a general
visual inspection of the wire bundle clamps. Along the left and right side front and rear spars, do a general visual
inspection of the wire bundle clamps. If the wire bundle support installation is not as shown in this service bulletin,
get access to and change the wire bundle support hardware. The airplanes are divided into 14 groups because
of variations in the fasteners to be sealed and the wire bundle clamps to be inspected.
EFFECTIVITY
All 757-200, 757-200CB, 757-200PF., and 757-300 series airplanes. See Service Bulletin Paragraph 1.A.1 for
effectivity.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  11 of 442

### Page 12 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2008-23-19 is related to this service bulletin.
See Service Bulletin Paragraph 1.E. for compliance information.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for 757 airplanes in warranty as of May 17, 2005. Please refer to
Paragraph 2.B Industry Support Information.
MANPOWER
Total hours for Parts 1 through 10:
Group  Total  Total  Group  Total  Total  Group  Total  Total
Task  Elapsed  Task  Elapsed  Task  Elapsed
Hours  Hours  Hours  Hours  Hours  Hours
1  642.94  128.43  6  652.94  131.67  11  659.17  133.03
643.68  130.42  7  654.53  132.21  12  658.53  132.71
646.18  127.41  8  645.39  126.93  13  653.27  127.49
4  648.44  131.68  9  646.03  127.25  14  652.63  127.17
5  646.94  128.93  10  | 643.80  126.39
Part 11:
Group  Task  Elapsed
Hours  Hours
1-14  48.00  14.25
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  12 of 442

### Page 13 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
SEAL FASTENERS IN
CENTER FUEL TANK,  DO A GENERAL VISUAL INSPECTION OF THE
LOWER PANEL  WIRE BUNDLE SUPPORT INSTALLATION ON  FRONT SPAR
THE FRONT AND REAR SPAR, LEFT AND
RIGHT SIDE REPLACE AS NECESSARY
REAR SPAR
SEAL FASTENERS ON THE
FRONT AND REAR SPAR
INSIDE LEFT AND RIGHT
MAIN FUEL TANKS
DO A GENERAL VISUAL INSPECTION OF THE WIRE
BUNDLE SUPPORT INSTALLATIONS INSIDE LEFT  J72723
AND RIGHT ECS BAYS. REPLACE AS NECESSARY
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  13 of 442

### Page 14 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
BLANK PAGE
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  14 of 442

### Page 15 (OCR)

Commercial
BOEING  Airplanes  757
Service Bulletin
- ALERT:
Number:  757-57A0064
Original Issue:  July 16, 2007
Revision 1:  October 05, 2009
ATA System:  5710 5720
SUBJECT:  WINGS - Center and Outer Wing - Fastener Sealing and Wire Bundle Support Inspection
and Modification
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624N001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
GROUP  CONFIGURATION  DESCRIPTION
757-200 and 757-200CB series airplanes that require 688 fasteners
to be sealed in the center and main fuel tanks, and 94 clamps to be
inspected (general visual inspection) on the left and right main spars
and ECS bays.
2  757-200PF series airplanes that require 690 fasteners to be sealed
in the center and main fuel tanks, and 94 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
3  757-200 series airplanes that require 692 fasteners to be sealed in
the center and main fuel tanks, and 94 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  15 of 442

### Page 16 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
GROUP  CONFIGURATION  DESCRIPTION
4  757-200PF series airplanes that require 694 fasteners to be sealed
in the center and main fuel tanks, and 94 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
5  757-200 series airplanes that require 696 fasteners to be sealed in
the center and main fuel tanks, and 94 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
6  757-200 series airplanes that require 706 fasteners to be sealed in
the center and main fuel tanks, and 94 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
7  757-200 series airplanes that require 706 fasteners to be sealed in
the center and main fuel tanks, and 90 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
8  757-300 series airplanes that require 692 fasteners to be sealed in
the center and main fuel tanks, and 86 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
9  757-300 series airplanes that require 692 fasteners to be sealed in
the center and main fuel tanks, and 88 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
10  757-300 series airplanes that require 692 fasteners to be sealed in
the center and main fuel tanks, and 90 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
11  757-200 series airplanes that require 710 fasteners to be sealed in
the center and main fuel tanks, and 92 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
Days.
12  757-200 series airplanes that require 710 fasteners to be sealed in
the center and main fuel tanks, and 90 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
13  757-300 series airplanes that require 690 fasteners to be sealed in
the center and main fuel tanks, and 88 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details  16 of 442

### Page 17 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
GROUP  CONFIGURATION  IDESCRIPTION
14  757-300 series airplanes that require 690 fasteners to be sealed in
the center and main fuel tanks, and 86 clamps to be inspected
(general visual inspection) on the left and right main spars and ECS
bays.
Airplane Models:
757-200, 757-200CB, 757-200PF, 757-300
Variable Number  Group
NA001 - NẠ028
NA191 - NA199
NA201 - NA236
NA237 - NA239  3
NA301 - NA305  : 1
NA341 - NA352
NA391 - NA399
NA401 - NA408
NA441 - NA447
NA501 - NA584
NA585 - NA586  3
NB001 - NB004
NB021 - NB023
NB036 - NB041
NB051 - NB053
NB061 - NB073
NB079
NB131 - NB147
NB148
NB161 - NB162
NB166 - NB167  1
NB168  3
NB201 - NB204  : 1
NB221 - NB228
NB230
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  17 of 442

### Page 18 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Variable Number  Group
NB236  3
NB239  1
NB261 - NB264  1
NB265 - NB267  3
NB291 - NB292  1
NB293 - NB299  3
NB301 - NB302
NB311 - NB312  1
NB321 - NB329  1
NB330 - NB331  3
NB421 - NB430
NB431 - NB438  3
NB446  3
NB451 - NB452  1
NB453 - NB454  3
NB501 - NB507
NB508 - NB523
NB561  3
NB571
NB581 - NB583
NC001 - NC033  1
NC041 - NC042  1
NC051 - NC052  1
NC056 - NC057  1
NC058 - NC062  3
NC066  1
NC067 - NC084  3
NC091 - NC094
NC151  3
NC161  3
NC901 - NC930  2
NC931  3
NC932 - NC933  4
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details  18 of 442

### Page 19 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Variable Number  Group
NC934  : 3
NC935 - NC950
NC951  2
NC971  2
NC972
NC973 - NC974  2
ND001 - ND007
ND011 - ND059  1
ND111 - ND113
ND161 - ND182
ND183 - ND199
ND201 - ND203
ND221  :1
ND222 - ND225  • 3
ND241
ND242 - ND248
ND301 - ND322  3
ND401  3
ND891
ND895
NE001 - NE003  1
NE004 - NE008
NE011 - NE082
NE083 - NE088
NE091 - NE094  3
NE141 - NE150
NE161 - NE176  : 1
NE177  3
NE201 - NE204  1
NE301 - NE302
NE311 - NE325  :3
NJ001 - NJ004  . 12
NJ031 - NJ032  12
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  19 of 442

### Page 20 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Variable Number  Group
NJ551 - NJ555  11
NL001 - NL002  8
NL006 - NL011  8
NL012 - NL015  10
NL016 - NL017  13
NL101 - NL104  8
NL105 - NL109  14
NL141  8
NL601 - NL603  9
NL604 - NL616  13
NN001 - NN002  3
NN051 - NN052  5
NP901 - NP904  3
NS601 - NS616  4
NT001 - NT009  4
NT201 - NT202  3
NT231 - NT234  3
NT237 - NT240  3
NT242  3
NT245 - NT248  3
NT281 - NT289  3
NT341 - NT345  3
NT346  5
NT347  6
NT351 - NT360  3
NT371 - NT373
NT375 - NT379  3
NT381 - NT385  3
NT386  6
NT401 - NT409  3
NT411 - NT412  3
NT426 - NT427  3
NT431 - NT432  3
Original Issue: July 16, 2007
Revision 1: October 05, 2009  190029-29
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  ZE 10 0Z

### Page 21 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Variable Number  Group
NT436 - NT438
NT441 - NT442
NT446  3
NT701 - NT769
NT791 - NT796
NT861 - NT862  3
NT881 - NT885
NT901 - NT916
NT971 - NT972
NT973 - NT984  5
NT985
NU031 - NU034  3
NU035  5
NU036 - NU038  7
NU701 - NU705
NU721 - NU728
NU731 - NU732  8
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
A review by Boeing has found it possible for some fuel tank fasteners, in the event of a fault current,
to become an ignition source. Sealing fuel tank fasteners, general inspection of wire support bundles,
replacing clamps and installing a Teflon sleeve where required may reduce the risk of fuel tank fasteners
becoming an ignition source. Replacing clamps and installing Teflon sleeve provides for additional
layers of protection against hot shorts. Accomplishment of the this service bulletin will help prevent
certain ignition sources within the fuel tanks, If not corrected, in the event of a fault current, ignition
sources within the fuel tanks may possibly result in fire or explosion.
This service bulletin is the result of the safety assessments conducted by Boeing under SFAR 88, "Fuel
Tank System Fault Tolerance Evaluation Requirements"
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details  21 of 442

### Page 22 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
D. Description
Purge the left and right main fuel tanks. Get access to the left and right main fuel tanks. Seal fasteners
on the front and rear spars, left and right side. Purge the center fuel tanks. Get access to the center
fuel tank. Seal fasteners on the center tank lower panel. In the left and right Equipment Cooling System
(ECS) bay, do a general visual inspection of the wire bundle clamps. Along the left and right side front
and rear spars, do a general visual inspection of the wire bundle clamps. If the wire bundle support
installation is not as shown in this service bulletin, get access to and change the wire bundle support
hardware. The airplanes are divided into 14 groups because of variations in the fasteners to be sealed
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
Model  Zone
757-200, 757-200CB, 757-  531, 541, 542, 561, 631, 641, 642, 661
200PF
Group 2, 4:
Affected Maintenance Zones
Model  Zone
757-200PF  531, 541, 542, 561, 631, 641, 642, 661
Group 3:
Affected Maintenance Zones
Model  Zone
757-200, 757-200PF  531, 541, 542, 561, 631, 641, 642, 661
Group 5-7, 11-12:
Affected Maintenance Zones
Model  Zone
757-200  531, 541, 542, 561, 631, 641, 642, 661
Group 8-10, 13-14:
Affected Maintenance Zones
Model  Zone
757-300  531, 541, 542, 561, 631, 641, 642, 661
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  22 of 442

### Page 23 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2008-23-19 is related to this service
bulletin.
Group 1-14:
Table 1. Fastener Sealing, Wire Bundle Support General Visual Inspection, Clamp Replacement
and Teflon Tape Installation
Condition  Action  Compliance Time
All Airplanes  Seal the fasteners inside the center and  Within 5 years after
main fuel tanks as given in Accomplish-  December 30, 2008.
ment Instructions Paragraph 3.B.1., Part
All Airplanes  Do a General Visual Inspection of the wire  Within 5 years after
bundle support installation in the ECS bay  December 30, 2008.
as given in Accomplishment Instructions
Paragraph 3.B.2., Part 2.
Incorrect clamps found in the  Replace the clamps as given in Accom-  Within 5 years after
LEFT ECS bay.  plishment Instructions Paragraph 3.B.3.,  December 30, 2008.
Part 3.
Teflon sleeving not installed  Install the Teflon sleeving as given in Ac-  Within 5 years after
in the LEFT ECS bay.  complishment Instructions Paragraph  December 30, 2008.
3.B.3., Part 3.
Incorrect clamps found in the  Replace the clamps as given in Accom-  Within 5 years after
RIGHT ECS bay.  plishment Instructions Paragraph 3.B.4.,  December 30, 2008.
Part 4.
Teflon sleeving not installed  Install the Teflon sleeving as given in Ac-  Within 5 years after
in the RIGHT ECS bay.  complishment Instructions Paragraph  December 30, 2008.
3.B.4., Part 4.
All Airplanes  Do a General Visual Inspection of the wire  Within 5 years after
bundle support installation on the Rear  December 30, 2008.
Spar as given in Accomplishment Instruc-
tions Paragraph 3.B.5., Part 5.
Incorrect clamps found on  Replace the clamps as given in Accom-  Within 5 years after
the LEFT side Rear Spar.  plishment Instructions Paragraph 3.B.6.,  December 30, 2008.
Part 6.
Teflon sleeving not installed  Install the Teflon sleeving as given in Ac-  Within 5 years after
on the LEFT side Rear Spar.  complishment Instructions Paragraph  December 30, 2008..
3.B.6., Part 6.
Incorrect clamps found on  Replace the clamps as given in Accom-  Within 5 years after
the RIGHT side Rear Spar.  plishment Instructions Paragraph 3.B.7.,  December 30, 2008.
Part 7.
Teflon sleeving not installed  Install the Teflon sleeving as given in Ac-  Within 5 years after
on the RIGHT side Rear  complishment Instructions Paragraph  December 30, 2008..
Spar.  3.B.7., Part 7:
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  23 of 442

### Page 24 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 1-14:
Table 1. Fastener Sealing, Wire Bundle Support General Visual Inspection, Clamp Replacement
and Teflon Tape Installation
Condition  Action  Compliance Time
All Airplanes  Do a General Visual Inspection of the wire  Within 5 years after
bundle support installation on the Front  December 30, 2008.
Spar as given in Accomplishment Instruc-
tions Paragraph 3.B.8., Part 8.
incorrect clamps found on  Replace the clamps as given in Accom-  Within 5 years after
the LEFT side Front Spar.  plishment Instructions Paragraph 3.B.9.,  December 30, 2008.
Part 9.
Teflon sleeving not installed  Install the Teflon sleeving as given in Ac-  Within 5 years after
on the LEFT side Front Spar.  complishment Instructions Paragraph  December 30, 2008..
3.B.9., Part 9.
Incorrect clamps found on  Replace the clamps as given in Accom-  Within 5 years after
the RIGHT side Front Spar.  plishment Instructions Paragraph 3.B.10.,  December 30, 2008.
Part 10.
Teflon sleeving not installed  Install the Teflon sleeving as given in Ac-  Within 5 years after
on the RIGHT side Front  complishment Instructions Paragraph  December 30, 2008.
Spar.  3.B.10., Part 10.
Airplanes that have done the  Seal the fasteners inside the main fuel  Within 5 years after
work of the original issue of  tanks as given in Accomplishment Instruc-  December 30, 2008.
service bulletin 757-  tions Paragraph 3.B.1., Part 11
57A0064.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the action (i.e. inspection or modification) defined in this service bulletin
as an alternative method of compliance to the requirements of paragraph (f) of AD 2008-23-19. All
provisions of AD 2008-23-19 that are not specifically referenced in the above statement remain fully
applicable and must be complied with.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  24 of 442

### Page 25 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
Time to adjust to the workplace
Time to schedule the work
Time to examine the work
Time to cure the materials
Time to make the parts
Time to find the tools.
Group 1:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 1  8  114.00 (a)  14.25
Figure 2  114.00 (a)  14.25
Figure 13  8  129.75 (a)  14.22
Figure 14  8  123.75 (a)  15.47
Figure 19  2  51.00 (a)  23.50
Close Access  4  23.5  5.88
TOTAL FOR EACH AIRPLANE  598.50  104.19
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 1, 4-7, 11-12:
Part 2: ECS Bay -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  .30  .30
Figure 22  0.08  0.08
Figure 23  0.08  0.08
Close Access  0.30  0.30
TOTAL FOR EACH AIRPLANE  0.76  0.76
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  25 of 442

### Page 26 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 1-7, 11-12:
Part 3: Left Side ECS  Number of Per-  Task-Hours  Elapsed Hours
Bay - Clamp Replace-
ment
Open Access  2  1.5  0.75
Figure 26  2  5.12  2.56
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  8.37  4.18
Group 1, 4-7, 11-12:
Part 4: Right Side  Number of Per-  Task-Hours  Elapsed Hours
ECS Bay - Clamp  sons
Replacement
Open Access  2  1.50  0.75
Figure 27  2  3.84  1.92
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  7.09  3.54
Group 1, 4-7, 11-12:
Part 5: Rear Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  0.75  0.37
Figure 30  0.08  0.08
Figure 31  1  0.08  0.08
Close Access  2  0.75  0.75
TOTAL FOR EACH AIRPLANE  1.66  1.66
Group 1-14:
Part 6: Left Side Rear  Number of Per-  Task-Hours  Elapsed Hours
Spar - Clamp Replace-  sons
ment
Figure 32  5.12  2.56
Close Access  0.50  0.50
TOTAL FOR EACH AIRPLANE  5.62  3.06
Group 1-14:
Part 7: Right Side  Number of Per-  Task-Hours  Elapsed Hours
Rear Spar - Clamp  sons
Replacement
Figure 33  2  5.12  2.56
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  26 of 442

### Page 27 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 1-14:
Part 7: Right Side  Number of Per-  Task-Hours  Elapsed Hours
Rear Spar - Clamp  sons
Replacement
Close Access  0.50  0.50
TOTAL FOR EACH AIRPLANE  5.62  3.06
Group 1-6, 10:
Part 8: Front Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  2.50  1.25
Figure 38  0.08  0.08
Figure 39  1  0.08  0.08
Close Access  2.75  1.37
TOTAL FOR EACH AIRPLANE  5.41  2.78
Group 1-6, 10:
Part 9: Left Side Front  Number of Per-  Task-Hours  Elapsed Hours
Spar - Clamp Replace-  sons
ment
Figure 44  2  3.50  1.75
Close Access  0.50  0.50
TOTAL FOR EACH AIRPLANE  4.0  2.25
Group 1-6, 10:
Part 10: Right Side  Number of Per-  Task-Hours  Elapsed Hours
Front Spar - Clamp  sons
Replacement
Figure 45  2  4.16  2.08
Close Access  2  1:75  .87
TOTAL FOR EACH AIRPLANE  5.91  2.95
Group 2:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 1  8  114.00 (a)  14.25
Figure 2  8  114.00 (a)  14.25
Figure 13  8  129.75 (a)  16.22
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  27 of 442

### Page 28 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 2:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Figure 14  8  123.75 (a)  15.47
Figure 20  52.5 (a)  26.25
Close Access  4  23.5  6.12
TOTAL FOR EACH AIRPLANE  600.00  106.94
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 2:
Part 4: Right Side  Number of Per-  Task-Hours  Elapsed Hours
ECS Bay - Clamp  sons
Replacement
Open Access  2  1.50  0.75
Figure 27  2  3.84  1.92
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  7.09  3.54
Group 2:
Part 5: Rear Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  0.75  0.37
Figure 30  1  0.08  0.08
Figure 31  1  0.08  0.08
Close Access  2  0.75  0.75
TOTAL FOR EACH AIRPLANE  1.66  1.66
Group 3:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 3  8  116.00 (a)  14.50
Figure 4  8  116.00 (a)  14.50
Figure 13  8  129.75 (a)  16.22
Figure 14  8  123.75 (a)  15.47
Figure 19  2  51.0 (a)  25.5
Close Access  2  23.5  11.75
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  28 of 442

### Page 29 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 3:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
TOTAL FOR EACH AIRPLANE  602.50  104.69
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 3:
Part 4: Right Side  Number of Per-  Task-Hours  Elapsed Hours
ECS Bay - Clamp  sons
Replacement
Open Access  2  1.50  0.75
Figure 27  2  3.84  1.92
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  7.09  3.54
Group 3:
Part 5: Rear Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  0.75  0.37
Figure 30  0.08  0.08
Figure 31  0.08  0.08
Close Access  2  0.75  0.37
TOTAL FOR EACH AIRPLANE  1.66  0.90
Group 4:
Part 1 Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 3  8  116.00 (a)  14.50
Figure 4  8  116.00 (a)  14.50
Figure 13  8  129.75 (a)  14.22
Figure 14  8  123.75 (a)  15.47
Figure 20  2  52.5 (a)  26.25
Close Access  2  23.5  11.75
TOTAL FOR EACH AIRPLANE  604.00  107.44
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  29 of 442

### Page 30 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 5:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 5  8  116.00 (a)  14.50
Figure 6  8  116.00 (a)  14.50
Figure 13  8  129.75 (a)  16.22
Figure 14  8  123.75 (a)  15.47
Figure 19  2  51.0 (a)  23.5
Close Access  2  23.5  11.75
TOTAL FOR EACH AIRPLANE  602.50  104.69
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 6-7:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 5  8  116.00 (a)  14.50
Figure 6  8  116.00 (a)  14.50
Figure 15  8  133.5 (a)  16.68
Figure 16  8  126.0 (a)  15.75
Figure 19  2  51.0 (a)  25.5
Close Access  2  23.5  11.75
TOTAL FOR EACH AIRPLANE  608.50  107.43
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 7-8, 12, 14:
Part 8: Front Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  2.5  1.25
Figure 34  0.08  0.08
Figure 35  1  0.08  0.08
Close Access  2  2.75  1.37
TOTAL FOR EACH AIRPLANE  5.41  2.78
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  30 of 442

### Page 31 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 7-8, 12, 14:
Part 9: Left Side Front  Number of Per-  Task-Hours  Elapsed Hours
Spar - Clamp Replace-  sons
ment
Figure 40  2  4.50  2.25
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  6.25  3.12
Group 7-8, 12, 14:
Part 10: Right Side  Number of Per-  Task-Hours  Elapsed Hours
Front Spar - Clamp  sons
Replacement
Figure 41  2  3.50  1.75
Close Access  2  1:75  0.87
TOTAL FOR EACH AIRPLANE  5.25  2.62
Group 8-10:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 7  8  120.00 (a)  15.00
Figure 8  8  120.00 (a)  15.00
Figure 17  8  132.0 (a)  16.5
Figure 18  8  126.0 (a)  15.75
Figure 21  2  •36.0 (a)  18.0
Close Access  2  23.5  11.75
TOTAL FOR EACH AIRPLANE  600.00  102.75
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 8-10, 13-14:
Part 2: ECS Bay -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  0.30  0.30
Figure 24  0.08  0.08
Figure 25  1  0.08  0.08
Close Access  1  0.30  0.30
TOTAL FOR EACH AIRPLANE  0.76  0.76
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  31 of 442

### Page 32 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 8-10, 13-14:
Part 3: Left Side ECS  Number of Per-  Task-Hours  Elapsed Hours
Bay - Clamp Replace-
ment
Open Access  2  1.50  0.75
Figure 28  2  4.16  2.08
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  7.41  3.70
Group 8-10, 13-14:
Part 4: Right Side  Number of Per-  Task-Hours  Elapsed Hours
ECS Bay - Clamp  sons
Replacement
Open Access  1.50  0.75
Figure 29  2  5.12  2.56
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  7.41  4.18
Group 8-10, 13-14:
Part 5: Rear Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  0.75  0.37
Figure 30  1  0.08  0.08
Figure 31  1  0.08  0.08
Close Access  2  0.75  0.37
TOTAL FOR EACH AIRPLANE  1.66  0.90
Group 9, 11, 13:
Part 8: Front Spar -  Number of Per-  Task-Hours  Elapsed Hours
Clamp Inspection  sons
Open Access  2  2.5  1.25
Figure 36  0.08  0.08
Figure 37  1  0.08  0.08
Close Access  2  2.75  1.37
TOTAL FOR EACH AIRPLANE  5.41  2.78
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  BOEING PROPRIETARY -  32 of 442

### Page 33 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 9, 11, 13:
Part 9: Left Side Front  Number of Per-  Task-Hours  Elapsed Hours
Spar - Clamp Replace-  sons
ment
Figure 42  2  4.8  2.40
Close Access  2  1,75  0.87
TOTAL FOR EACH AIRPLANE  6.55  3.27
Group 9, 11, 13:
Part 10: Right Side  Number of Per-  Task-Hours  Elapsed Hours
Front Spar - Clamp  sons
Replacement
Figure 43  2  3.84  1.92
Close Access  2  1.75  0.87
TOTAL FOR EACH AIRPLANE  5.59  2.79
Group 11-12:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 9  8  118.00 (a)  14.75
Figure 10  8  118.00 (a)  14.75
Figure 15  133.5 (a)  16.68
Figure 16  8  126.0 (a)  15.75
Figure 19  2  51.0 (a)  25.5
Close Access  2  23.5  11.75
TOTAL FOR EACH AIRPLANE  612.50  107.93
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 13-14:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  2  24.0  12.0
Open Access  4  18.5  4.62
Figure 11  8  124.00 (a)  15.50
Figure 12  8  124.00 (a)  15.50
Figure 17  8  132.0 (a).  16.5
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  33 of 442

### Page 34 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 13-14:
Part 1: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Figure 18  8  126.0 (a)  15.75
Figure 21  2  36.0 (a)  18.0
Close Access  2  23.5  11.75
TOTAL FOR EACH AIRPLANE  608.00  103.75
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Part 11 is only applicable for those airplanes that have had the work done in accordance with the
original issue of this service bulletin.
Group 1-10:
Part 11: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons *
Preparation  4  9.0  2.25
Open Access  2.0  1.00
Figure 47  4  15.00 (a)  3.75
Figure 48  2  15.00 (a)  3.75
Close Access  2  7.00  3.50
TOTAL FOR EACH AIRPLANE  48.00  14.25
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Group 11-14:
Part 11: Fastener  Number of Per-  Task-Hours  Elapsed Hours
Sealing  sons
Preparation  4  9.00  2.25
Open Access  2  2.00  1.00
Figure 49  4  15.00 (a)  3.75
Figure 50  4  15.00 (a)  3.75
Close Access  2  7.00  3.50
TOTAL FOR EACH AIRPLANE  48.00  14.25
(a) Includes time to apply but not cure BMS 5-45 sealant. Cure time can change
because of heat and humidity.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  34 of 442

### Page 35 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
H. Weight and Balance Changes
Airplane  Change in Weight  Change in Moment
(Pounds)  (Pound-Inches)
757-200/-200CB/-200PF/300  + 8.0  8800
Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. 757 Aircraft Maintenance Manual (AMM) 06-41-00, 06-44-00, 21-51-02, 27-61-00, 27-81-00,
27-81-07, 28-11-00, 28-11-01, 28-11-02, 28-11-07
b. 757-200/-200CB/-200PF/-300 Structural Repair Manual Chapter 51.
c. Boeing Drawing 65-88700.
d. Standard Overhaul Practices Manual (SOPM) 20-30-93.
e. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12
2. Data supplied with this Service Bulletin:
None.
3.  Installation Drawings Used in the Preparation of this Service Bulletin:
Drawing Number  Title
288N4473  Wire Bundle Instl. - Left Lower Stub, Keel Beam and Body
STA 900 - 1040
288N4474  Wire Bundle Instl. - Right Lower Stub, Keel Beam and Body
STA 900 - 1040
288N1401  Wire Bundle Instl. - Left Leading Edge and Front Spar BBL
70.5 - ISS 285.18
288N1402  Wire Bundle Instl. - Right Leading Edge and Front Spar BBL
70.5 - ISS 285.18
288N1317  Wire Bundle Instl. - Left Rear Spar IRSS 325 - WS 836.55
288N1318  Wire Bundle Instl. - Right Rear Spar IRSS 325 - WS 836.55
111N4001  Panel Instl. - Lower, Wing Center Section
112N1002  Spar Assy - Rear, Sect 12, Wing
113N1400  Support Instl. - Spoiler No. 1 thru 5, Wing Trailing Edge
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  35 of 442

### Page 36 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Drawing Number  Title
113N1305  Fitting Instl., Rear Spar Flap Track Support, W.S. 438.70 and
W.S. 442.30
112N2002  Spar InstI - Front, Sect 12, Wing
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS but no new DTIs are necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  36 of 442

### Page 37 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
2. MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary For Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are available for 757 airplanes in warranty as of May 17, 2005. For man-hour
and material reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Commercial Airplanes Group - Warranties.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
Group 1-6:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  14  (a) (c) (d)
BACC10JU-105  14
BACC10JU-106  24
BACC10JU-109  8
BACC10JU-111  4
BACC10JU-112  23
P-421  Teflon Tape, 1/2 inch wide  (f) (g)
or
Mil--23594, Type, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  37 of 442

### Page 38 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 1-6:
Part Number / Specification  QTY  Name  Notes
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC10GU-() clamps.
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
May substitute with any equivalent Teflon Tape. Quantity is as required.
(9)  • May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 7:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  11  (a) (c) (d)
BACC10JU-105  8
BACC10JU-106  24
BACC10JU-109  8
BACC10JU-111  4
BACC10JU-112  25
P-421  Teflon Tape  (f) (g)
or
Mil-I-23594, Type 1, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a)  See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  38 of 442

### Page 39 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 7:
Part Number / Specification  QTY  Name  Notes
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c)  The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC 10GU-() clamps.
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
May substitute with any equivalent Teflon Tape. Quantity is as required
(g) May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 8:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  12  (a) (c) (d)
BACC10JU-105  6
BACC10JU-106  24
BACC10JU-109  8
BACC10JU-111  4
BACC 10JU-112  25
P-421  Teflon Tape  (f) (g)
or
Mil--23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  39 of 442

### Page 40 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 8:
Part Number / Specification  QTY  Name  Notes
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC10GU-() clamps.
(e) May be purchased from:Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
(f) May substitute with any equivalent Teflon Tape. Quantity is as required.
(g)  May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 9:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  12  (a) (c) (d)
BACC10JU-105  9
BACC10JU-106  24
BACC10JU-109  8
BACC10JU-111  6
BACC10JU-112  23
P-421  Teflon Tape  (1) (g)
or
Mil-I-23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  40 of 442

### Page 41 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 9:
Part Number / Specification  QTY  Name  Notes
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC10GU-() clamps.
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
(f) May substitute with any equivalent Teflon Tape. Quantity is as required.
(g) May be purchased from: Permace, Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 10:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC 10GU-102  4
BACC10JU-103  12  (a) (c) (d)
BACC 10JU-105  12
BACC10JU-106  24
BACC 10JU-109  8
BACC10JU-111  4
BACC10JU-112  23
P-421  Teflon Tape  (f) (g)
or
Mil-1-23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  • Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d)  At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC 10GU-() clamps
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY .
Copyright © Unpublished Work - See page 1 for details.  41 of 442

### Page 42 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 10:
Part Number / Specification  | QTY  Name  Notes
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
(T)  May substitute with any equivalent Teflon Tape. Quantity is as required.
(g) May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 11:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  14  (a) (c) (d)
BACC10JU-105  8
BACC10JU-106  24
BACC10JU-109  18
BACC10JU-111
BACC10JU-112  13
P-421  Teflon Tape  (f) (g)
or
Mil-I-23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC10GU-() clamps.
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 BIvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  42 of 442

### Page 43 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 11:
Part Number / Specification  QTY  Name  Notes
May substitute with any equivalent Teflon Tape. Quantity is as required.
(g) May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 12:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  14  (a) (c) (d)
BACC10J0-105  15
BACC 10JU-106  17
BACC10JU-109  8
BACC10JU-111  4
BACC10JU-112  25
P-421  Teflon Tape  (f) (g)
or
Mil-1-23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC 10GU-() clamps.
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
May substitute with any equivalent Teflon Tape. Quantity is as required.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  43 of 442

### Page 44 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 12:
Part Number / Specification  QTY  Name  Notes
(g) May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Group 13:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC10GU-102  5
BACC10JU-103  12  (a) (c) (d)
BACC10JU-105  6
BACC10JU-106  24
BACC10JU-109  8
BACC10JU-111  8
BACC10JU-112  23
P-421  Teflon Tape  (t) (g)
or
Mil-I-23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45, Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c) The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC10GU-() clamps.
(e) May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
May substitute with any equivalent Teflon Tape. Quantity is as required.
(g) May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  44 of 442

### Page 45 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
Group 14:
Part Number / Specification  QTY  Name  Notes
BACC10GU-101  2  Full Cushion Clamp  (a) (c)
BACC 10GU-102  5
BACC10JU-103  12  (a) (c) (d)
BACC10JU-105  6
BACC 10JU-106  24
BACC10JU-109  8
BACC10JU-111  4
BACC 10JU-112  25
P-421  Teflon Tape  (f) (g)
or
Mil-I-23594, Type I, Class 4
TFE-2X, 3/4 Inch Diameter, Standard Wall  24 Feet  Teflon Sleeving  (b) (e)
Thickness, Natural
BMS 13-54, Type III, Class 1, Finish C, Black  240 Feet  Lacing Tape  (a) (b)
BMS 5-45, Class A-2, Grade 1 or Grade 2  70 oz  Sealant  (a)
BMS 5-45,  Class B-2  70 oz  Sealant
BMS 15-5, Class A, Wiper, Absorbent, Process  60  Wiper
Cleaning
BMS 11-7  25 oz  Solvent
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier
data.
(b) The quantity shown is the maximum amount that may be necessary if the verification shows the
clamps to be missing.
(c)  The clamp sizes shown are approximate and to be determined on installation. The total quantity
is the maximum that may be necessary if the verification shows the clamps to be missing.
(d) At locations where the wire bundle is too large or too small to use BACC10JU-() clamps, it is per-
mitted to use BACC10GU-() clamps.
(e)  May be purchased from: Zeus Industrial Products, (V6Y609), 501 Blvd. S.E., P.O. Box 2167, Or-
angeburg, South Carolina 29116.
May substitute with any equivalent Teflon Tape.
(g)  May be purchased from: Permacel Corporation (V99742) - US Highway 1, P.O. Box 671 North
Brunswick, New Jersey 08902.
3. Parts Modified and Reidentified:
None.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  45 of 442

### Page 46 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  46 of 442

### Page 47 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
3.
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES, DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE
NOTE: 1.  Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2  The instructions identified in Paragraph 3.B. Work Instructions and the Figure(s) give
recommended sequence of steps. The sequence of steps to do this service bulletin
can be changed.
3.  Obey all of the warnings and cautions given in the specified manual sections.
4.  Unless shown differently, these dimensions and tolerances are used:
Linear dimensions are in inches
Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
5.  If the length of any fastener specified in this service bulletin does not meet the
installation standards in SRM Chapter 51, then a fastener of the same specification,
or an approved substitute, with a length which meets the installation standards in
SRM Chapter 51 may be used.
6  For approved fastener and process material substitutions, refer to 757 Structural
Repair Manual, Chapter 51. Alternate fasteners are given in 757 Structural Repair
Manual Chapter 51 and Boeing Drawing 65-88700.
7.  Refer to the Boeing Standard Wiring Practices Manuals SWPM 20-10-11 and SWPM
20-10-12 for the wire installation procedures.
8.  A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise  elve minor no
specified. A mirror may be necessary to ensure visual access to all surfaces in the
inspection area. This level of inspection is made under normal available lighting
conditions such as daylight, hangar lighting, flashlight or drop-light and may require
removal or opening of access panels or doors. Stands, ladders or platforms may be
required to gain proximity to the area being checked.
9.  These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "as
given in" are included in the instruction, the procedure in the Boeing document must
Original Issue: July 16, 2007
Revision 1: October 05, 2009  • BOEING PROPRIETARY  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  47 of 442

### Page 48 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
10.  For any fasteners that are previously sealed to the specifications of this service
bulletin, it is not required for the existing seal to be removed and fastener sealed
again. These sealed fasteners are acceptable as is and no further work is necessary
11.  Location and quantity of existing fasteners shown in Figures are approximate, and
may differ from your airplane configuration, seal additional fasteners as required.
12.  Operators that have not done the work in accordance with the original issue of service
bulletin 757-57A0064 must do Parts 1 through 10 of this service bulletin.
13.  Part 11 of this service bulletin is only applicable to operators that have done the work
in accordance with the original release of service bulletin.
14.  Approved wire bundle support installation deviations:
• Removal of ECS / Heat Exchanger components are optional and as required to
gain access for inspection and wire bundle support installation.
Clamps sizes called out in Figures maybe changed to get a better fit. Refer to
SWPM 20-10-12 as an accepted procedure.
Locations where tandem clamps are shown in Figures, single clamps may exists
for your airplane configuration and are acceptable as is
Location and quantity of existing clamps shown in Figures are approximate, and
may differ from your airplane contiguration.
Orientation of existing clamps shown in Figures are for reference only, and may
differ from your airplane configuration.
Wire bundles and routing shown in this service bulletin may differ from what is
on the airplane. Existing wire bundle configuration is acceptable it installed
(clamp size, routing and bend radii) to the standards of SWPM 20-10-11 and
SWPM 20-10-12 and the clamps and Teflon sleeves are in accordance with the
requirements of this service bulletin.
Wire bundle support installation with brackets) that has a grounding stud instead
of a clamp, no sleeve or clamp replacement will be necessary at that location.
Wire bundles that are protected by existing Convolex tubing, installation of the
new TFE-2X Teflon sleeve may end at the start of the Convolex tubing.
Wire bundles that are protected by existing BMS13-52 expando sleeving need
to be covered with TFE-2X Teflon Sleeving
Wire bundle segments that are supported by 2 or more clamps may use a
continuous piece of TFE-2X Teflon sleeve in place of separate 3 inch sleeves
as long as sleeve is smooth and without gaps. Install sleeves and lacing tape
in accordance with associated Figure(s), and refer to SWPM 20-20-11 as an
accepted procedure.
.  Wire bundle segments with sharp bends (small radius) near a clamp or other
interference, may deviate from centering of the Teflon sleeve to the clamp.
Acceptable to center the 3 inch Teflon sleeve as close as possible to the clamp.
Locations where a break out is within 1.5 inches of the clamp, it is acceptable
to install TFE-2X Teflon sleeve on the breakout wire separately from main bundle.
TFE-2X Teflon sleeve is required on the remaining wire bundle at clamp location.
Locations where a wire bundle or wire break out with sharp bends (small radius)
near a clamp and not allowing for proper installation of the TFE-2X Teflon sleeve,
it is acceptable to wrap Teflon tape around the TFE-2X Teflon sleeve installation
for smooth transition and cover any gaps.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  48 of 442

### Page 49 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
FULL CUSHION CLAMP  FULL CUSHION CLAMP
TEFLON
SLEEVING
TEFLON TAPE
TEFLON SLEEVING
(LOCATIONS WITH WIRE  (LOCATIONS WITH WIRE
BUNDLE/WIRE BREAKOUT  BREAKOUT WITHIN 1.5
WITH SMALL BEND RADIUS)  INCHES OF CLAMP)
B. WORK INSTRUCTIONS
1. PART 1: FUEL TANKS - FASTENER SEALING
a.  Group 1:
Seal fasteners in the center and main fuel tanks as follows:
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center fuel tank access door 134AZ, and remove and keep the
fuel bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an
accepted procedure.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  49 of 442

### Page 50 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 1 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 2 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 13 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 14 and Figure
46.
(11) Locate and seal the fasteners in the center fuel tank as given in Figure 19 and Figure 46.
CAUTION: MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION.
(12) Close access to the center tank. Install kept fuel bay baffle doors 134BZ, 134CZ and
134DZ and install the center fuel tank access door 134AZ, Refer to 757 AMM 28-11-02
as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install kept center fuel tank access doors 531AB, 531BB and 531CB, and install kept left
main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB, 541KB,
541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install kept center fuel tank access doors 631AB, 631BB and 631CB, and install kept
right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB, 641KB,
641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
b. Group 2:
Seal fasteners in the center and main fuel tanks as follows:
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  50 of 442

### Page 51 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 1 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 2 and Figure
46
(9) Locate and seal the fasteners on the left side front spar as given in Figure 13 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 14 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 20 and Figure 46.
CAUTION: MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION
(12) Close access to the center tank. Install kept fuel bay baffle doors 134BZ, 134CZ and
134DZ, and install the kept center fuel tank access door 134AZ. Refer to 757 AMM
28-11-02 as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install kept center fuel tank access doors 531AB, 531BB and 531CB, and install kept left
main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB, 541KB,
541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  51 of 442

### Page 52 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install kept center fuel tank access doors 631AB, 631BB and 631CB, and install kept
right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB, 641KB,
641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
c. Group 3:
Seal fasteners in the center and main fuel tanks as follows:
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 3 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 4 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 13 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 14 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 19 and Figure 46.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  52 of 442

### Page 53 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
CAUTION:  MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION
(12) Close access to the center tank. Install kept fuel bay baffle doors 134BZ, 134CZ and
134DZ, and install the kept center fuel tank access door 134AZ. Refer to 757 AMM
28-11-02 as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install kept center fuel tank access doors 531AB, 531BB and 531CB, and install kept left
main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB, 541KB,
541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install kept center fuel tank access doors 631AB, 631BB and 631CB, and install kept
right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB, 641KB,
641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
d. Group 4:
Seal fasteners in the center and main fuel tanks as follows:
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the left main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center fuel tank access door 134AZ, and remove and keep the
fuel bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an
accepted procedure.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
•BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  53 of 442

### Page 54 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 3 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 4 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 13 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 14 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 20 and Figure 46.
CAUTION: MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION.
(12) Close access to the center tank. Install kept fuel bay baffle doors 134BZ, 134CZ and
134DZ and install the kept center fuel tank access door 134AZ. Refer to 757 AMM
28-11-02 as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install kept center fuel tank access doors 531AB, 531BB and 531CB, and install kept left
main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB, 541KB,
541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install the kept center fuel tank access doors 631AB, 631BB and 631CB, and install the
kept right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB,
641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
e. Group 5:
Seal fasteners in the center and main fuel tanks as follows:
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  54 of 442

### Page 55 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
proceaure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB, and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 5 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 6 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 13 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 14 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 19 and Figure 46.
CAUTION: MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS, UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION
(12) Close access to the center tank. Install the kept fuel bay baffle doors 134BZ, 134CZ and
134DZ, and install the kept center tank access door 134AZ. Refer to 757 AMM 28-11-02
as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install the kept center fuel tank access doors 531AB, 531BB and 531CB, and install the
kept left main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB,
541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
• BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  55 of 442

### Page 56 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install the kept center fuel tank access doors 631AB, 631BB and 631CB, and install the
kept right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB,
641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
f.  Group 6-7:
Seal fasteners in the center and main fuel tanks as follows:
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 5 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 6 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 15 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 16 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 19 and Figure 46.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  56 of 442

### Page 57 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
CAUTION:  MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION
(12) Close access to the center tank. Install kept fuel bay baffle doors 134BZ, 134CZ and
134DZ, and install the kept center tank access door 134AZ. Refer to 757 AMM 28-11-02
as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install the kept center fuel tank access doors 531AB, 531BB and 531CB, and install the
kept left main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB,
541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install kept center fuel tank access doors 631AB, 631BB and 631CB, and install the kept
right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB, 641KB,
641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and 757 AMM
28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
g. Group 8-10:
Seal fasteners in the center and main fuel tanks as follows:
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure,
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  57 of 442

### Page 58 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 7 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 8 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 17 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 18 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 21 and Figure 46.
CAUTION: MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION.
(12) Close access to the center tank. Install the kept fuel bay baffle doors 134BZ, 134CZ and
134DZ, and install the kept center tank access door 134AZ. Refer to 757 AMM 28-11-02
as an accepted procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install the kept center fuel tank access doors 531AB, 531BB and 531CB, and install the
kept left main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB,
541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install the kept center fuel tank access doors 631AB, 631BB and 631CB, and install the
kept right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB,
641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
h. Group 11-12:
Seal fasteners in the center and main fuel tanks as follows:
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOEING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  58 of 442

### Page 59 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB and 631CB, and
remove and keep the right main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 9 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 10 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 15 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 16 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 19 and Figure 46.
CAUTION: MAKE SURE YOU REMOVE ALL UNWANTED PARTICLES AND MATERIALS
FROM THE FUEL TANKS. UNWANTED MATERIALS CAN COLLECT IN THE
FUEL TANKS, WHICH CAN CAUSE BLOCKAGE OR INCORRECT SYSTEM
OPERATION
(12) Close access to the center tank. Install the kept fuel bay baffle doors 134BZ, 134CZ and
134DZ, and install the kept center tank access door 134AZ. Refer to 757 AMM 28-11-02
as an accepteo procedure.
(13) Install kept left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(14) Install the kept center fuel tank access doors 531AB, 531BB and 531CB, and install the
kept left main fuel tank access doors 541AB, 541BB, 541EB, 541FB, 541HB, 541JB,
541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  BOẸING PROPRIETARY -  757-57A0064
Copyright © Unpublished Work - See page 1 for details.  59 of 442

### Page 60 (OCR)

BOEING SERVICE BULLETIN 757-57A0064
ALERT  ALERT
(15) Install kept right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer to 757 AMM
28-11-07 as an accepted procedure.
(16) Install the kept center fuel tank access doors 631AB, 631BB and 631CB, and install the
kept right main fuel tank access doors 641AB, 641BB, 641EB, 641FB, 641HB, 641JB,
641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM 28-11-01 and
757 AMM 28-11-02 as an accepted procedure.
(17) Make sure that all removed and installed fuel tank access doors do not leak. Refer to 757
AMM 28-11-00 as an accepted procedure.
Group 13-14:
Seal fasteners in the center and main fuel tanks as follows:
(1) Purge the center and main fuel tanks. Refer to 757 AMM 28-11-00 as an accepted
procedure.
(2) Remove and keep the center fuel tank access doors 531AB, 531BB and 531CB, and
remove and keep the left main fuel tank access doors 541AB, 541BB, 541EB, 541FB,
541HB, 541JB, 541KB, 541LB, 541MB, 542AB, 542CB and 542DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(3) Remove and keep the left wing dry bay access doors 532BZ, 532DZ and 532FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(4) Remove and keep the center fuel tank access doors 631AB, 631BB, and 631CB and
remove and keep the left main fuel tank access doors 641AB, 641BB, 641EB, 641FB,
641HB, 641JB, 641KB, 641LB, 641MB, 642AB, 642CB and 642DB. Refer to 757 AMM
28-11-01 and 757 AMM 28-11-02 as an accepted procedure.
(5) Remove and keep the right wing dry bay access doors 632BZ, 632DZ and 632FZ. Refer
to 757 AMM 28-11-07 as an accepted procedure.
(6) Remove and keep the center tank access door 134AZ, and remove and keep the fuel
bay baffle doors 134BZ, 134CZ and 134DZ. Refer to 757 AMM 28-11-02 as an accepted
procedure.
(7) Locate and seal the fasteners on the left side rear spar as given in Figure 11 and Figure
46.
(8) Locate and seal the fasteners on the right side rear spar as given in Figure 12 and Figure
46.
(9) Locate and seal the fasteners on the left side front spar as given in Figure 17 and Figure
46.
(10) Locate and seal the fasteners on the right side front spar as given in Figure 18 and Figure
46.
(11) Locate and seal the fasteners in the center tank as given in Figure 21 and Figure 46.
Original Issue: July 16, 2007
Revision 1: October 05, 2009  757-57A0064
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  60 of 442

The text continues at https://openairdocs.org/service-documents/boeing/757-57a0064/file/7a15d9368ce7.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
