# Boeing Alert Service Bulletin 767-21A0247: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0797; AD 2017-01-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-21A0247](https://openairdocs.org/service-documents/boeing/767-21a0247.md)
- Title as filed: SB-767-21A0247-01
- Pages: 114
- PDF: https://openairdocs.org/files/sha256/12/92/12920b9ae9c6996776771e138ec2250c5003a91bff1e46a25109f22c66ef2970
- Page: https://openairdocs.org/service-documents/boeing/767-21a0247/file/12920b9ae9c6

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial
Airplanes
767
Service Bulletin
ALERT
Number: 767-21A0247
Original Issue: October 10, 2011
Revision 1: April 09, 2013
ATA System: 2158
SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2011 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner™,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and Boeing
liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in connection
with this document unless provided in writing by Boeing. BOEING is a trademark of Boeing Management
Company.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
1 of 114
2.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
2 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
S u m m a r y ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 3
A . E f f e c t i v i t y  ............................................... 1 3
1. Airplanes ............................................ 1 3
2 . S p a r e s  A f f e c t e d  ........................................ 1 4
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 5
E. Compliance .............................................. 1 6
F . A p p r o v a l  ............................................... 1 6
G. Manpower .............................................. 1 6
H. Weight and Balance Changes .................................... 1 8
I. Electrical Load Data ......................................... 1 8
J . R e f e r e n c e s  .............................................. 1 9
1. Existing Data: ......................................... 1 9
2. Data Supplied with this Service Bulletin: ........................... 1 9
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 9
K. Publications Affected ........................................ 1 9
L. Interchangeability and Intermixability of Parts ........................... 2 0
M. Software Accomplishment Summary ................................ 2 0
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 1
C. Parts Necessary for Each Airplane ................................. 2 1
1 . K i t s / P a r t s  ............................................ 2 1
2. Parts and Materials Supplied by the Operator ........................ 3 0
3. Parts Modified and Reidentified ................................ 3 0
4. Parts Removed and Not Replaced .............................. 3 0
D. Parts Necessary to Change Spares ................................. 3 1
E. Special Tooling - Price and Availability ............................... 3 1
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 1
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 3
A. GENERAL INFORMATION ..................................... 3 3
B. WORK INSTRUCTIONS ....................................... 3 4
FIGURE 1: E8 EICAS RACK PRESSURE SWITCH BRACKET - INSTALLATION [Group 1-2] ..... 3 7
FIGURE 2: E8 EICAS RACK PRESSURE SWITCH AND ATTACH HARDWARE - INSTALLATION [Group
1 - 2 ]............................................... 4 1
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
ROUTING [Group 1-2] ..................................... 4 4
FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
WIRING CHANGE [Group 1-2] ................................ 4 9
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING [Group 1-2] ....... 5 1
FIGURE 6: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 AND P50 ELECTRICAL SYSTEMS CARD
FILE PANEL WIRE BUNDLE W1114 - WIRING CHANGES [Group 1-2] .......... 5 9
FIGURE 7: MAIN EQUIPMENT CENTER WIRE BUNDLE W1702 - ROUTING [Group 1-2] ...... 6 0
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
3 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 4

FIGURE 8: MAIN EQUIPMENT CENTER WIRE BUNDLE W1702 - WIRING CHANGE [Group 1-2] . . 63
FIGURE 9: E8 EICAS RACK WIRE BUNDLE W2000 - ROUTING [Group 1-2] ............. 6 4
FIGURE 10: E8 EICAS RACK WIRE BUNDLE W2000 - WIRING CHANGE [Group 1-2] ......... 6 6
FIGURE 11: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL - RELAY REPLACEMENT
[Group 1-2] ........................................... 6 8
FIGURE 12: EXISTING DUCT REPLACEMENT .............................. 7 1
FIGURE 13: FDARS DUCTS AND VALVE INSTALLATION ........................ 7 7
FIGURE 14: W756 ADDITION BETWEEN PANEL P36 AND NEW VALVE (WIRE DIAGRAM)  [Group 1]
.................................................. 8 4
FIGURE 15: W756 ADDITION BETWEEN PANEL P36 AND NEW VALVE (WIRE DIAGRAM)  [Group 2-3]
.................................................. 8 6
F I G U R E  1 6 : W 1 8 4  C H A N G E  I N  P A N E L  P 3 6  ( W I R E  D I G R A M )  [ G r o u p  1 ]  ................ 8 8
FIGURE 17: W184 CHANGE IN PANEL P36 (WIRE DIGRAM)  [Group 2-3] ............... 9 1
FIGURE 18: W176 CHANGE IN PANEL P36 (WIRE DIGRAM)  [Group 1] ................ 9 4
FIGURE 19: W176 CHANGE IN PANEL P36 (WIRE DIGRAM)  [Group 2-3] ............... 9 6
FIGURE 20: FDARS RELAY INSTALLATION IN P36 ........................... 9 8
FIGURE 21: W756 ROUTING BETWEEN P36 AND AIR RELIEF VALVE ............... 1 0 2
FIGURE 22: W176 AND W184 ROUTING WITHIN PANEL P36 ..................... 1 1 0
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
4 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 5

Commercial
Airplanes
767
Service Bulletin
ALERT
Revision Transmittal SheetNumber: 767-21A0247Original Issue: October 10, 2011
Revision 1: April 09, 2013
ATA System: 2158
SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Airplanes VR273-VR279 were added to this service bulletin effectivity.
More work is necessary on the airplane(s) changed in accordance with the original issue of this service bulletin.
Original modification instruction is now identified as Part 1 and additional modification is identified as Part 2.
Original airplanes require both Part 1 and Part 2 modification. Added airplanes require only Part 2 modification.
REASON FOR REVISION
This revision is issued to reduce noise in the flight compartment resulting when the operating logic of the
3-way-valve (also called the manifold interconnect valve) is changed as described in the original release of this
service bulletin. Noise in the flight compartment caused by the increased airflow of the 3-way valve logic system
changes made the Traffic Alert and Collision Avoidance System (TCAS) difficult to hear. Noise is reduced by
adding a Flight Deck Air Relief System (FDARS) consisting of ducting and an outlet valve and additional relays.
The outlet valve reduces airflow noise on the flight deck by exhausting a portion of the flight deck air distribution
air into the area below the flight deck floor when the 3-way-valve is closed (nominally below 10,000 feet).
These sections were changed:
1. Summary Section:
a. Added Revision 1 statement to Background paragraph and revised position of some existing text;
b. Added Summary Table to Background paragraph to comply with current standards;
c. Added Revision 1 statement to Action paragraph and clarified some existing text;
d. Updated Compliance paragraph to refer to Revision 1 date;
e. Updated Manpower Table;
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
5 of 114

### Page 6

f. Expanded illustration.
2. PLANNING INFORMATION:
a. Paragraph 1.A., Effectivity: Added airplanes which had the intent of the original issue of this service
bulletin incorporated during production but which still require the FDARS related parts. These
airplanes are added as Group 3;
b. Paragraph 1.C., Reason - Added Revision 1 statement and revised position of some existing text;
c. Paragraph 1.D., Description - Added Revision 1 statement and clarified some existing text;
d. Paragraph 1.E., Compliance - Updated paragraph to refer to Revision 1 issue date;
e. Paragraph 1.G., Manpower - Added tables for added work;
f. Paragraph 1.Weight and Balance Changes - Updated table and added table.
3. MATERIAL INFORMATION - Updated entire section to show that kits for original airplanes (Groups 1
and 2) will be updated, before shipment, to include FDARS related parts. Kits for added airplanes
(Group 3) will include only FDARS parts. Also, additional operator-furnished material is identified.
4. ACCOMPLISHMENT INSTRUCTIONS:
a. Paragraph 3.B., WORK INSTRUCTIONS - Revised work instructions into Part 1 and Part 2. Part
1 contains original rework instructions applicable to original airplanes. Part 2 contains added rework
instructions applicable to original airplanes and added airplanes;
b. FIGURES 1-11 - Added applicability to original Figures 1 through 11 to be applicable to original
airplanes;
c. FIGURES 12-22 - Added these figures with applicability, as marked, for original airplanes and
added airplanes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
October 10, 2011Original Issue:
April 09, 2013Revision 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
6 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 7

Commercial
Airplanes
767
Service Bulletin
ALERT
SummaryNumber: 767-21A0247Original Issue: October 10, 2011
Revision 1: April 09, 2013
ATA System: 2158
SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
This service bulletin is sent to reduce malfunctions of flight compartment display units. Blanking, blurring, or loss
of color caused by moisture or condensation being collected inside the display units can occur during operation
in hot and humid environments. If this service bulletin is not done, there is an increased risk that the flight
compartment display units could malfunction and become unserviceable because of moisture ingress. Flight
compartment indication blanking can cause unscheduled maintenance and airplane downtime. Also, loss of the
primary attitude information on both primary display units could lead to flight crew confusion and difficulty in the
transition to standby attitude indication. The inability of the flight crew to transition from primary attitude indication
to standby attitude indication during a critical phase of flight could contribute to an unsafe flight condition.
Operators of 767-300F airplanes have reported display unit malfunctions such as blanking, blurring, or loss of
color caused by moisture or condensation being collected inside the display units during operation in hot and
humid environments. The reports have included single display unit and multiple display unit malfunctions. Boeing
is aware of instances that are the likely causes of display unit malfunctions related to moisture or condensation
ingress. These instances are as follows; an unserviceable air conditioning pack water separation system, that
allowed water to be delivered to the flight compartment in the air conditioned air, a malfunction of an air
conditioning pack which caused ice to be delivered to the flight compartment in the air conditioned air, and the
most frequent instance was display units being cold soaked by the air conditioned air delivered from the air
conditioning packs by the Electrical/Electronic cooling system through the 3-way valve (also called the manifold
interconnect valve) in hot and humid conditions. As a result of these findings, the control logic of the 3-way valve
is changed so that the valve will open after five minutes at an altitude above 10,000 feet, and close at an altitude
below 10,000 feet. Limiting the 3-way valve to open after five minutes above 10,000 feet will decrease the amount
of moisture or condensation that can collect in the display units because of the reduced water content in the
atmosphere at higher altitudes.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
7 of 114

### Page 8

Accomplishment of this service bulletin installs a new relay in the P36 Left Miscellaneous Electrical Equipment
Panel, with related wiring changes, and installs a new 10,000 feet altitude pressure switch to the E8 Engine
Indication and Crew Alerting System (EICAS) rack to change the control logic of the 3-way valve operation
above and below an altitude of 10,000 feet. This change reduces the amount of moisture or condensation that
can collect in the flight compartment display units and thus reduce malfunction occurrences.
Revision 1 - Incorporation of the equivalent change in production was found to cause excessive noise in the
flight compartment caused by the increased flight deck air distribution airflow. This increased noise made the
Traffic Alert and Collision Avoidance System (TCAS) difficult to hear. Because a solution to reduce the noise in
the flight deck was not immediately available, Information Notice 767-21A0247 IN 01 was issued advising
operators to not do this service bulletin until further improvements could be added. This revision adds ducting,
an outlet valve, and related wiring to reduce noise in the flight compartment caused by flight deck air distribution
air flow. These added components form the Flight Deck Air Relief System (FDARS).
Revision 1 also adds airplanes to the effectivity as Group 3 airplanes. These airplanes received changes
equivalent to the original release of this service bulletin during production. Therefore, these airplanes require
only the FDARS-related additions.
Boeing Service Related Problem (SRP) 767-SRP-21-0179 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 767 FTD 21-09003 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
8 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 9

ACTION (PRR B12900-260)
Group 1-2:
Get access to the airplane Main Equipment Center (MEC). Install a new bracket, new pressure switch, and
attach hardware to the E8 Engine Indication and Crew Alerting System (EICAS) rack. Install a tube and fittings
between the pressure switch and nearby existing Pitot system tubing. Open the P36 left miscellaneous equipment
panel in the MEC and make changes to wire bundle W176. Make changes to wire bundle W596 between the
P36 left miscellaneous equipment panel and P50 Electrical Systems Card File panel. In the P50 Electrical
Systems Card File panel, make changes to wire bundle W1114. Make changes to wire bundle W1702 between
the P36 left miscellaneous equipment panel and E8 EICAS rack. At the E8 EICAS rack, make changes to wire
bundle W2000. In the P36 left miscellaneous equipment panel, remove relay K10355 and install new relay
K10718. Flush and leak check the disturbed pitot system.
Revision 1 - In the area forward of the main equipment bay and under the flight deck floor, replace a duct for
equipment cooling with a duct that has an outlet port for the Flight Deck Air Relief System (FDARS) components.
Install mounting brackets, FDARS ducts, orifice, outlet valve and screen. Change wiring within panel P36 and
among panels and new outlet valve. Do an operational test of the revised system including the control logic of
the 3-way valve (also called the manifold interconnect valve) and the added outlet valve.
The changes in this service bulletin will not change the Engine Indication and Crew Alerting System (EICAS).
EFFECTIVITY
767-300F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends that the change given in this service bulletin be done within 6 years after the Revision 01
date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of July 29, 2009. Please refer to Paragraph
2.B., Industry Support Information.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
41.6561.85Group 1 - 2
26.2046.40Group 3
MATERIAL INFORMATION
Boeing Supplied Kits.
Operator Supplied Parts/Materials.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
9 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 10 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
Refer to Paragraph 2.A., Material - Price and Availability
P36 LEFT MISCELLANEOUS
EQUIPMENT PANEL:
MAKE CHANGES TO WIRE
BUNDLE W176, W184.
INSTALL NEW RELAYS
P50 ELECTRICAL SYSTEMS
CARD FILE PANEL:
MAKE CHANGES TO WIRE
BUNDLE W1114.
(GROUP 1-2)
MAKE CHANGES TO
WIRE BUNDLE W596.  MAKE CHANGES TO
(GROUP 1-2)  WIRE BUNDLE W1702.
(GROUP 1-2)
E8 EICAS RACK:
MAKE CHANGES TO WIRE BUNDLE W2000.
INSTALL NEW PRESSURE SWITCH, NEW
BRACKET, AND ATTACH NEW
HARDWARE. (GROUP 1-2)
MAIN EQUIPMENT CENTER (MEC)  2032531
(TYPICAL)
Original Issue: October 10, 2011
Revision 1: April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for detalls.  10 of 114

### Page 11

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
11 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 12

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
12 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT
BLANK PAGE

### Page 13

Commercial
Airplanes
767
Service Bulletin
ALERT
Number: 767-21A0247
Original Issue: October 10, 2011
Revision 1: April 09, 2013
ATA System: 2158
SUBJECT: AIR CONDITIONING - Equipment Cooling System - 3-Way Valve Control Logic Change
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplane(s) shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR B12900-260 for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
767-300F airplanes, Variable Numbers VR201 thru VR211, and
VW701 thru VW721 that must do Boeing service bulletin 767-21-0235
prior to or concurrent with this service bulletin.
-1
767-300F airplanes, Variable Numbers VR266 thru VR272 that have
had the intent of Boeing service bulletin 767-21-0235 incorporated
prior to delivery.
-2
767-300F airplanes, Variable Numbers VR273 thru VR279, that have
had the intent of the original issue of this service bulletin incorporated
prior to delivery.
-3
Airplane Models:
767-300F
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
13 of 114

### Page 14

GroupVariable Number
1VR201 - VR211
2VR266 - VR272
3VR273 - VR279
1VW701 - VW721
2. Spares Affected
None.
B. Concurrent Requirements
Group 1:
The service bulletin listed below must be done on Group 1 airplanes before or at the same time as this
service bulletin:
Group 1:
DescriptionService BulletinCompany
This service bulletin gives instructions to install
a relay and related wiring in the P36 left miscel-
laneous equipment panel to change the control
logic of the equipment cooling 3-way valve.
767-21-0235 Original Issue or
Revision 1
Boeing
Group 2-3:
None.
C. Reason
This service bulletin is sent to reduce malfunctions of flight compartment display units. Blanking, blurring,
or loss of color caused by moisture or condensation being collected inside the display units can occur
during operation in hot and humid environments. If this service bulletin is not done, there is an increased
risk that the flight compartment display units could malfunction and become unserviceable because of
moisture ingress. Flight compartment indication blanking can cause unscheduled maintenance and
airplane downtime. Also, loss of the primary attitude information on both primary display units could
lead to flight crew confusion and difficulty in the transition to standby attitude indication. The inability
of the flight crew to transition from primary attitude indication to standby attitude indication during a
critical phase of flight could contribute to an unsafe flight condition.
Operators of 767-300F airplanes have reported display unit malfunctions such as blanking, blurring,
or loss of color caused by moisture or condensation being collected inside the display units during
operation in hot and humid environments. The reports have included single display unit and multiple
display unit malfunctions. Boeing is aware of instances that are the likely causes of display unit
malfunctions related to moisture or condensation ingress. These instances are as follows; an
unserviceable air conditioning pack water separation system, that allowed water to be delivered to the
flight compartment in the air conditioned air, a malfunction of an air conditioning pack which caused
ice to be delivered to the flight compartment in the air conditioned air, and the most frequent instance
was display units being cold soaked by the air conditioned air delivered from the air conditioning packs
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
14 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 15

by the Electrical/Electronic cooling system through the 3-way valve (also called the manifold interconnect
valve) in hot and humid conditions. As a result of these findings, the control logic of the 3-way valve is
changed so that the valve will open after five minutes at an altitude above 10,000 feet, and close at an
altitude below 10,000 feet. Limiting the 3-way valve to open after five minutes above 10,000 feet will
decrease the amount of moisture or condensation that can collect in the display units because of the
reduced water content in the atmosphere at higher altitudes.
Accomplishment of this service bulletin installs a new relay in the P36 Left Miscellaneous Electrical
Equipment Panel, with related wiring changes, and installs a new 10,000 feet altitude pressure switch
to the E8 Engine Indication and Crew Alerting System (EICAS) rack to change the control logic of the
3-way valve operation above and below an altitude of 10,000 feet. This change reduces the amount
of moisture or condensation that can collect in the flight compartment display units and thus reduce
malfunction occurrences.
Revision 1 - Incorporation of the equivalent change in production was found to cause excessive noise
in the flight compartment caused by the increased flight deck air distribution airflow. This increased
noise made the Traffic Alert and Collision Avoidance System (TCAS) difficult to hear. Because a solution
to reduce the noise in the flight deck was not immediately available, Information Notice 767-21A0247
IN 01 was issued advising operators to not do this service bulletin until further improvements could be
added. This revision adds ducting, an outlet valve, and related wiring to reduce noise in the flight
compartment caused by flight deck air distribution air flow. These added components form the Flight
Deck Air Relief System (FDARS).
Revision 1 also adds airplanes to the effectivity as Group 3 airplanes. These airplanes received changes
equivalent to the original release of this service bulletin during production. Therefore, these airplanes
require only the FDARS-related additions.
Boeing Service Related Problem (SRP) 767-SRP-21-0179 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 767 FTD 21-09003 is related to this service bulletin.
D. Description
Group 1-2:
Get access to the airplane Main Equipment Center (MEC). Install a new bracket, new pressure switch,
and attach hardware to the E8 Engine Indication and Crew Alerting System (EICAS) rack. Install a tube
and fittings between the pressure switch and nearby existing Pitot system tubing. Open the P36 left
miscellaneous equipment panel in the MEC and make changes to wire bundle W176. Make changes
to wire bundle W596 between the P36 left miscellaneous equipment panel and P50 Electrical Systems
Card File panel. In the P50 Electrical Systems Card File panel, make changes to wire bundle W1114.
Make changes to wire bundle W1702 between the P36 left miscellaneous equipment panel and E8
EICAS rack. At the E8 EICAS rack, make changes to wire bundle W2000. In the P36 left miscellaneous
equipment panel, remove relay K10355 and install new relay K10718. Flush and leak check the disturbed
pitot system.
Revision 1 - More work is necessary on the airplane(s) changed in accordance with the original issue
of this service bulletin. These airplanes and the airplanes added to this service bulletin all require the
work summarized below and detailed in Paragraph 3.B. Accomplishment Instructions, Part 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
15 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 16

Revision 1 - In the area forward of the main equipment bay and under the flight deck floor, replace a
duct for equipment cooling with a duct that has an outlet port for the Flight Deck Air Relief System
(FDARS) components. Install mounting brackets, FDARS ducts, orifice, outlet valve and screen. Change
wiring within panel P36 and among panels and new outlet valve. Do an operational test of the revised
system including the control logic of the 3-way valve (also called the manifold interconnect valve) and
the added outlet valve.
The changes in this service bulletin will not change the Engine Indication and Crew Alerting System
(EICAS).
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
117, 119767-300F
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 6 years after the
Revision 01 date of this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved. This service
bulletin and its approval were based on the airplane in its original Boeing delivery configuration or as
modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
Included in the service bulletin approval is an FAA finding of compliance with the Fuel Tank Ignition
Prevention rule (14 CFR section 25.981(a)(3) Amendment 102 or higher).
G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
• Time to adjust to the workplace
• Time to schedule the work
• Time to inspect the work
• Time to cure the materials
• Time to make the parts
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
16 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 17

• Time to find the tools.
Group 1-2:
Part 1
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
1.001.001FIGURE 1
1.001.001FIGURE 2
---FIGURE 3 (Wire routing only)
1.701.701FIGURE 4
---FIGURE 5 (Wire routing only)
0.200.201FIGURE 6
---FIGURE 7 (Wire routing only)
2.102.101FIGURE 8
---FIGURE 9 (Wire routing only)
3.703.701FIGURE 10
0.750.751FIGURE 11
0.500.501Close Access
4.004.001Test
15.4515.45TOTAL FOR EACH AIRPLANE FOR PART 1
Group 1:
Part 2
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
1.251.251FIGURE 12
2.502.501FIGURE 13
12.3024.602FIGURE 14 (Wire Diagram),
FIGURE 21 (Wire Routing)
7.9015.802FIGURE 16, FIGURE 18, (Wire
Diagrams), FIGURE 22, (Wire
Routing)
0.500.501FIGURE 20
0.500.501Close Access
0.750.751Test
26.2046.40TOTAL FOR EACH AIRPLANE FOR PART 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
17 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 18

Group 2-3:
Part 2
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
1.251.251FIGURE 12
2.502.501FIGURE 13
12.3024.602FIGURE 15 (Wire Diagram),
FIGURE 21 (Wire Routing)
7.9015.802FIGURE 17, FIGURE 19, (Wire
Diagrams), FIGURE 22, (Wire
Routing)
0.500.501FIGURE 20
0.500.501Close Access
0.500.751Test
26.2046.40TOTAL FOR EACH AIRPLANE FOR PART 2
Elapsed HoursTotal Task
Hours
Total For Each Airplane
41.6561.85Group 1 - 2
26.2046.40Group 3
H. Weight and Balance Changes
Group 1-2:
Part 1 and Part 2
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+848.9+7.70767-300F
Group 3:
Part 2
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+ 660.1+6.5767-300F
I. Electrical Load Data
Not changed.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
18 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 19

J. References
1. Existing Data:
a. Engineering Change Memo PRR B12900-260
b. Boeing Service Bulletin 767-21-0235
c. Boeing Service Related Problem (SRP) 767-SRP-21-0179
d. Standard Overhaul Practices Manual (SOPM) 20-41-02, 20-50-05, 20-50-10, 20-50-19
e. Standard Wiring Practices Manual (SWPM) 20-00-11, 20-10-11, 20-10-11, 20-10-12, 20-10-19,
20-20-10, 20-20-11, 20-30-16, 20-60-09, 20-61-11, 20-81-12, 20-81-19, 20-81-22, 20-90-11
f. 767 Aircraft Maintenance Manual (AMM) 06-41-00, 20-10-33, 20-41-01, 21-22-02, 21-58-00,
24-22-00, 25-00-00, 31-01-36, 34-11-00
g. 767 Fleet Team Digest (FTD) 21-09003
h. 767 Wiring Diagram Manual (WDM) 21-58-16, 21-58-41, 31-41-13
2. Data Supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Duct Installation - Flight Deck Section 41214T1011
Duct Installation - Instrument Panel Cooling System217T2013
Tubing Installation Lower Lobe Sidewall LH, STA 132.5 Thru 290278T4107
Rack Instl - E8284T0971
Support Bracket, E8 Rack Instl284T1040
Modular Wire Bundle Instl P36, Misc. Relay Panel, Left288T2036
Modular Wire Bundle Installation E8 EICAS Rack288T2280
Wire Bundle Installation Lower Lobe Sidewall LH, STA 132.5288T4107
Wire Bundle Installation Lower Lobe Sidewall LH, STA 290 Thru 431288T4117
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
19 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 20

Chapter-SectionPublication
21-58767 Aircraft Maintenance Manual
21-58, 34-11767 Illustrated Parts Catalog
21-58, 31-41767 System Schematic Manual
21-58, 31-41, Equipment List767 Wiring Diagram Manual
21-58767 Fault Isolation Manual
2.21-58767 Dispatch Deviations Guide
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS but no new DTIs are necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary for Each Airplane, for interchangeability and intermixability
information.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
20 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
original issue date of
this Service Bulletin
(US Dollars)
ROLT as of the origi-
nal issue date of this
Service Bulletin (Cal-
endar Days)
QTYDateNameKit Number
$21,865.001797February 28,
2013
Top Kit - 767 Freighters
3-Way Valve Logic
Change With FDARS
(Group 1 - 2)
015T1860-1
10March 28,
2013
10April 25,
2013
10May 23, 2013
2June 21,
2013
$15,959.001797February 28,
2013
Top Kit - 767 Freighters
3-Way Valve Logic
Change FDARS Addi-
tion (Group 3)
015T1860-10
B. Industry Support Information
Boeing warranty remedies are available for 767 airplanes in warranty as of July 29, 2009. For task hour
reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing Commercial
Airplanes Group - Warranties. The kits for airplanes in warranty as of that date will be supplied at no
charge. Send a purchase order for the kits to Boeing Spares. Please refer to this service bulletin number
and reference the airplane variable numbers in your purchase order.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
21 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 22

NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane. The Top Kit is divided into Figure kits for
each installation figure shown in the table below.
Figure Kit
2013121121Top Kit
111111015T1860-1
111---015T1860-10
Figure Kit
2221Top Kit
11015T1860-1
11015T1860-10
Top Kit
015T1860-10015T1860-1Wire Kit
-1015T1860-3
-1015T1860-2
-1015T1860-4
11289T1169-106
11289T1169-107
11289T1169-108
Group 1-2:
KIT 015T1860-1
Notes
Existing Part
NumberName
Figure
New Part Number
2013121121
Qty
DECAL K10718...1..015T1860-10101
DECAL D31620...1..015T1860-10102
CLAMP MOUNT-
ING INSTRUMENT
....1.123-2222-F
(a), (b)STIFFENER.1....141T1226Y33
QUICK DISCON-
NECT
....1.1QF2-3-64A
DISCONNECT....1.1QM1-3-54A
DUCT ASSY.1....214T1120-313
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
22 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 23

Group 1-2:
KIT 015T1860-1
Notes
Existing Part
NumberName
Figure
New Part Number
2013121121
Qty
DUCT ASSY.1....214T1120-315
(c)214T1120-218 OR
-1218 OR -3218
DUCT ASSY..1...214T1120-3311
ORIFICE ASSY.1....214T3436-453
(a), (b)BRACKET.1....214T6419Y40
(a), (b)BRACKET.1....217T2434U10
(a), (b)BRACKET.....1233T9118Y105
Pressure Switch....1.6502-10K
VALVE - AIR
SHUTOFF
.1....67-2951-001
SCREEN ASSY.1....69B42275-4
HOSEDUCT,
SLEEVE
.1....AS1506-14D30
VINYL MARKER (1
2 3...30) VERTI-
CAL
1.....BAC27TEX4697
VINYL DECAL....1.BAC27TFDE534
CLAMP, MISCEL-
LANEOUS
.2....BACC10DU500ABE
SUPPORT, DUCT.2....BACC10ME20-1
HOSE, INSTRU-
MENT
....1.BACH30BC06-
0110
BONDING
JUMPER
.1....BACJ40A20-7
NUTPLATE.4....BACN10YD1G
(d)NUT.3....BACN10YR3CD
RELAY1.....BACR13CD2
(e)RIVET, UNIVER-
SAL HD
.....4BACR15FT6AD5C
(d), (e)RIVET, UNIVER-
SAL HD
.8....BACR15FT6KE5C
(d), (e)RIVET, UNIVER-
SAL HD
.4....BACR15FT6KE6C
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
23 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 24

Group 1-2:
KIT 015T1860-1
Notes
Existing Part
NumberName
Figure
New Part Number
2013121121
Qty
(d), (e)RIVET.3....BACR15FT6KE7C
(d)SCREW, CAP.7....BACS12GU3K7
(d)STRAP..3...BACS38K2
(d)STRAP.14...BACS38K6
(d)TAPE, ID6.....BACT19J4
PACKING, PRE-
FORMED
....1.MS28778-5
PACKING, PRE-
FORMED
..1...MS29512-08
(d)WASHER.6....NAS1149D0316J
(d)WASHER, PLAIN.8....NAS1149D0332H
CLAMP, HOSE.2....NAS1922-0350-3
CLAMP, HOSE.3....NAS1922-0525-3
TIME DELAY RE-
LAY
1.....TDH-1852-3002
TIME DELAY RE-
LAY
...1..TDH-8050-3003P
(a) This part not used in production.
(b) To make installation easier, some Boeing parts are sent in an 'interim' configuration. Boeing will identify
these interim configurations with a 'U', 'W' or 'Y' in place of the '-' (dash) in the part number. Interim parts
are changed to the 'dash' configuration when installed as given in the Accomplishment Instructions of this
service bulletin. Refer to Boeing Drawing 005W0900 "INTERIM PARTS - SPARES" and Boeing Service
Letter 767-SL-00-014 for more information.
(c) You cannot use the existing part to replace the new or changed part.
(d) There are more parts than are necessary.
(e) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
24 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 25

Group 1-2:
KIT 015T1860-1
Notes
Existing Part
NumberName
Figure
New Part Number
2221
Qty
RETAINER CLIP
ASSY
.2411A4902-7
LACING TAPE -
RED - PRESSUR-
IZED (TEMP 135
DEG)
11829A9001-2
LACING TAPE -
BLUE - PRESSUR-
IZED (TEMP 135
DEG)
1.829A9001-5
Group 3:
KIT 015T1860-10
Notes
Existing Part
NumberName
Figure
New Part Number
2221201312
Qty
(a), (b)STIFFENER...1.141T1226Y33
DUCT ASSY...1.214T1120-313
DUCT ASSY...1.214T1120-315
(c)214T1120-218 OR
-1218 OR -3218
DUCT ASSY....1214T1120-3311
ORIFICE ASSY...1.214T3436-453
(a), (b)BRACKET...1.214T6419Y40
(a), (b)BRACKET...1.217T2434U10
RETAINER CLIP
ASSY
.2...411A4902-7
VALVE - AIR
SHUTOFF
...1.67-2951-001
SCREEN ASSY...1.69B42275-4
LACING TAPE -
RED - PRESSUR-
IZED (TEMP 135
DEG)
11...829A9001-2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
25 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 26

Group 3:
KIT 015T1860-10
Notes
Existing Part
NumberName
Figure
New Part Number
2221201312
Qty
LACING TAPE -
BLUE - PRESSUR-
IZED (TEMP 135
DEG)
1....829A9001-5
HOSEDUCT,
SLEEVE
...1.AS1506-14D30
VINYL MARKER (1
2 3...30) VERTI-
CAL
..1..BAC27TEX4697
CLAMP, MISCEL-
LANEOUS
...2.BACC10DU500ABE
SUPPORT, DUCT...2.BACC10ME20-1
BONDING
JUMPER
...1.BACJ40A20-7
NUTPLATE...4.BACN10YD1G
(d)NUT...3.BACN10YR3CD
RELAY..1..BACR13CD2
(d), (e)RIVET, UNIVER-
SAL HD
...8.BACR15FT6KE5C
(d), (e)RIVET, UNIVER-
SAL HD
...4.BACR15FT6KE6C
(d), (e)RIVET...3.BACR15FT6KE7C
(d)SCREW, CAP...7.BACS12GU3K7
(d)STRAP....3BACS38K2
(d)STRAP...14BACS38K6
(d)TAPE, ID..6..BACT19J4
PACKING, PRE-
FORMED
....1MS29512-08
(d)WASHER...6.NAS1149D0316J
(d)WASHER, PLAIN...8.NAS1149D0332H
CLAMP, HOSE...2.NAS1922-0350-3
CLAMP, HOSE...3.NAS1922-0525-3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
26 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 27

Group 3:
KIT 015T1860-10
Notes
Existing Part
NumberName
Figure
New Part Number
2221201312
Qty
TIME DELAY RE-
LAY
..1..TDH-1852-3002
(a) This part not used in production.
(b) To make installation easier, some Boeing parts are sent in an 'interim' configuration. Boeing will
identify these interim configurations with a 'U', 'W' or 'Y' in place of the '-' (dash) in the part number.
Interim parts are changed to the 'dash' configuration when installed as given in the Accomplishment
Instructions of this service bulletin. Refer to Boeing Drawing 005W0900 "INTERIM PARTS - SPARES"
and Boeing Service Letter 767-SL-00-014 for more information.
(c) You cannot use the existing part to replace the new or changed part.
(d) There are more parts than are necessary.
(e) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length
longer than indicated. Also, if any fasteners part numbers listed are not available or have been su-
perseded, substitute fasteners may be supplied in kits.
Group 1-2:
KIT 015T1860-2
NotesNameQtyNew Part Number
WIRE W01761015T1860-101W
TAPE, LACING1015T1860-10104
SLEEVE IDENTIFI-
CATION, HEAT
SHRINKABLE
1015T1860-10106
CONTACT, SOCK-
ET
1BACC47CP1S
CONTACT, SOCK-
ET
4BACC47DJ1
RELAY SOCKET1BACS16W1A
CONTACT, PIN,
CRIMP REMOV-
ABLE, PER MIL-C-
39029/11
1M39029/11-145
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
27 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 28

Group 1-2:
KIT 015T1860-3
NotesNameQtyNew Part Number
WIRE W17021015T1860-102W
CONTACT, PIN1BACC47CN1S
CONTACT, PIN1BACC47CN1SB
SLEEVE, HEAT
SHRINK
1BACT63D1
Group 1-2:
KIT 015T1860-4
NotesNameQtyNew Part Number
WIRE W20001015T1860-103W
SLEEVE IDENTIFI-
CATION, HEAT
SHRINKABLE
1015T1860-10105
BACKSHELL
CLAMP
1BACC10GH10
CONNECTOR,
ELECTRICAL,
PLUG, STRAIGHT,
BAYONET COU-
PLING
1BACC45FT10A5S
CONTACT, SOCK-
ET
4BACC47CP1S
CONTACT2BACC47DE8A
PLUG1MS27488-20-1
KIT 289T1169-106
NotesNameQtyNew Part Number
WIRE - RAW MA-
TERIAL
1289T1169-106W
ID - CONNECTOR1289T1169-10301
CONNECTOR,
ELECTRICAL,
PLUG, STRAIGHT,
BAYONET COU-
PLING
1BACC45FT12C12S6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
28 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 29

KIT 289T1169-106
NotesNameQtyNew Part Number
(a)CONTACT, SOCK-
ET
14BACC47CP1S
(a)CONTACT, PIN5BACC47DE7A
(a) There are more parts than are necessary.
KIT 289T1169-107
NotesNameQtyNew Part Number
WIRE - RAW MA-
TERIAL
1289T1169-107W
ID - CONNECTOR1289T1169-10401
ID - CONNECTOR1289T1169-10402
ID - DIODE1289T1169-10403
(a)CONTACT, PIN3BACC47DE7A
(a)CONTACT3BACC47DE8A
(a)CONTACT, SOCK-
ET
4BACC47DJ1
(a)CONTACT, SOCK-
ET
12BACC47ER1
RELAY SOCKET1BACS16AG1
RELAY SOCKET1BACS16AH1
(a)CONTACT, PIN,
CRIMP REMOV-
ABLE, PER MIL-C-
39029/11
12M39029/11-145
TERMINAL BLOCK
RESISTOR AS-
SEMBLY MODULE
1YHLZR-17
(a) There are more parts than are necessary.
KIT 289T1169-108
NotesNameQtyNew Part Number
WIRE - RAW MA-
TERIAL
1289T1169-108W
(a)CONTACT, PIN6BACC47CN1S
(a)CONTACT, SOCK-
ET
5BACC47ER1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
29 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 30

KIT 289T1169-108
NotesNameQtyNew Part Number
(a)CONTACT, PIN,
CRIMP REMOV-
ABLE, PER MIL-C-
39029/11
6M39029/11-145
(a) There are more parts than are necessary.
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number / Specification
(a)SEALANT4 ozBMS5-95
(a)PRIMER4 ozBMS10-11, TYPE I
(a)TAPE5 ftBMS 5-157 TYPE I, CLASS 1,
GRADE A, COMPOSITION MPVF
LOCKWIRE1 ftMS20995N32 (MS20995NC32
optional)
(a) Refer to the Qualified Products List at the end of the Boeing Material Specification
(BMS) for supplier data.
3. Parts Modified and Reidentified
Group 1-2:
Part 1:
Group 1-2:
The part shown below is changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each airplane.
Group 1-2:
NotesNew Part NumberNameQTYExisting Part
Number
(a) (b)284T1040-16SUPPORT BRACKET1284T1040-6
(a) Make the change in accordance with this service bulletin.
(b) This is the part number after the change is done in accordance with this service bulletin.
Part 2:
None
4. Parts Removed and Not Replaced
Group 1-2:
Part 1:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
30 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 31

Group 1-2:
NotesQTYNameExisting Part Number
(a)1CAPBACC14AD06DN
(a)1RELAYBACR13CD2
(a)1RELAY, SOCKETBACS16AG
(a) Keep the part if there are other uses for it.
Part 2:
None
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
31 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 32

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
32 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT
BLANK PAGE

### Page 33

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in Structural Repair Manual (SRM)
Chapter 51
– Torque limits to tighten nuts and bolts are in SRM Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51.
7. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
33 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 34

10. The work instructions refer to panel(s) that contain Electro-static Sensitive Devices
(ESDS). Make sure you keep contamination or unwanted materials away from the
sensitive device. Contamination or unwanted material near the sensitive device can
cause a malfunction in the sensitive device. Refer to 767 AMM 20-41-01 as an
accepted procedure.
11. Work Instructions are broken into two parts. Part 1, including Figures 1 - 11, consists
of the instructions from the original release of the service bulletin. Part 2, including
Figures 12 - 19, is the addition of Flight Deck Air Relief System (FDARS) Components
with some additional wiring changes. Both Part 1 and Part 2 are required on Group
1 and Group 2 airplanes. Only Part 2 is required for Group 3 airplanes because
Group 3 airplanes received a change equivalent to Part 1 in production.
B. WORK INSTRUCTIONS
Group 1-2:
Part 1 - 3-Way-Valve (also called manifold interconnect valve) operating logic change.
1. Remove electrical power from the airplane. Refer to 767 AMM 24-22-00 as an accepted procedure.
2. Get access to the Main Equipment Center (MEC). Refer to 767 AMM 06-41-00 as an accepted
procedure for access locations.
3. In the MEC, open the circuit breaker specified in the table below and attach a "DO-NOT-CLOSE"
tag:
CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C00679EQPT COOL OVERRIDEC019P11-4
4. In the MEC, install the new bracket to the E8 Engine Indication and Crew Alerting System (EICAS)
rack at station 266.5 in accordance with FIGURE 1.
5. At the E8 EICAS rack, install the new pressure switch to the bracket and attach hardware in
accordance with FIGURE 2.
6. Open the P36 left miscellaneous equipment panel door to get access to the wiring. Refer to 767
AMM 31-01-36 for component locations.
7. In the P36 left miscellaneous equipment panel, make changes to wire bundle W176 in accordance
with FIGURE 3 and FIGURE 4.
8. In the MEC, make changes to wire bundle W596 between the P36 left miscellaneous equipment
panel and P50 electrical systems card file panel in accordance with FIGURE 5 and FIGURE 6.
9. In the P50 electrical systems card file panel, make changes to wire bundle W1114 in accordance
with FIGURE 6.
10. In the MEC, make changes to wire bundle W1702 between the P36 left miscellaneous equipment
panel and E8 EICAS rack in accordance with FIGURE 7 and FIGURE 8.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
34 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 35

11. At the E8 EICAS rack, make changes to wire bundle W2000 in accordance with FIGURE 9 and
FIGURE 10.
12. In the P36 left miscellaneous equipment panel, remove relay K10355 and install new relay K10718
in accordance with FIGURE 11.
13. Close the P36 left miscellaneous equipment panel.
14. In the MEC, remove the "DO-NOT-CLOSE" tag and close the circuit breaker specified in the table
below:
CIRCUIT BREAKER PANEL ASSEMBLY
NumberNameLocationPanel
C00679EQPT COOL OVERRIDEC019P11-4
15. Supply electrical power to the airplane. Refer to 767 AMM 24-22-00 as an accepted procedure.
16. Flush the pitot/static system. Refer to 767 AMM 34-11-00 as an accepted procedure.
17. Do a leak test of the Auxiliary Static system No. 2 (AS2). Refer to 767 AMM 34-11-00 as an
accepted procedure.
18. Continue with Part 2.
Part 2 - Addition of Flight Deck Air Relief System (FDARS) Components.
1. Remove electrical power if not done for Part 1. Refer to 767 AMM 24-22-00 as an accepted
procedure.
2. Gain access to the main equipment center and the area under the left and right sides of the flight
deck floor.
3. Replace existing duct with new duct in accordance with FIGURE 12.
4. Install new Flight Deck Air Relief System (FDARS) components including mounting brackets, ducts,
orifice, outlet valve and screen in accordance with FIGURE 13.
5. Modify wiring as follows:
a. Add wires and connector between panel P36 and new valve:
(1) Group 1:
In accordance with FIGURE 14 (wire diagram) and FIGURE 21 (wire installation).
(2) Group 2-3:
In accordance with FIGURE 15 (wire diagram) and FIGURE 21 (wire installation).
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
35 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 36

b. Modify wiring within Panel P36:
(1) Group 1:
In accordance with FIGURE 16 and FIGURE 18 (wire diagrams) and FIGURE 22 (wire
installation).
(2) Group 2-3:
In accordance with FIGURE 17 and FIGURE 19 (wire diagrams) and FIGURE 22 (wire
installation).
6. Modify relay installation in panel P36 in accordance with FIGURE 20.
7. Restore electrical power. Refer to 767 AMM 24-22-00 as an accepted procedure.
8. Do an Operational Test - Manifold Interconnect Valve (Reconfiguration) - Post SB 767-21A0247R1.
Refer to 767 AMM 21-58-00 as an acceptable procedure. (This will also test operation of the added
outlet valve.)
9. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1: April 09, 2013
36 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 37 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
This Figure applies only to: Group 1-2.
B—
E8 EICAS RACK
MAIN EQUIPMENT CENTER (MEC)  2032537
(TYPICAL)
FIGURE 1: E8 EICAS RACK PRESSURE SWITCH BRACKET - INSTALLATION
(SHEET 1 OF 4)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  37 of 114

### Page 38 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA  STA
266.5  246
• E8 EICAS
RACK
SUPPORT
BRACKET
TEND
STR-19L
SOME PARTS NOT SHOWN FOR CLARITY  2036499
FIGURE 1: E8 EICAS RACK PRESSURE SWITCH BRACKET - INSTALLATION
(SHEET 2 OF 4)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright @ Unpublished  767-21A0247
Work - See page 1 for details.  38 of 114

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
on the support bracket at the posi-
tion shown.
1233T9118Y105BRACKETPut / Hold1
0.129 inch diameter in the support
bracket to agree with bracket.
4-PILOT HOLEDrill2
0.191 - 0.202 inch diameter in the
support bracket and bracket.
4-HOLEDrill3
in the support bracket and bracket.
Break all sharp edges.
4-HOLEDeburr
to the support bracket and bracket
mating surfaces. Refer to SOPM 20-
50-19 as an accepted procedure.
-BMS5-95SEALANTApply4
FIGURE 1: E8 EICAS RACK PRESSURE SWITCH BRACKET - INSTALLATION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1 April 09, 2013
39 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 40

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
on the support bracket at the posi-
tion shown.
1233T9118Y105BRACKETInstall
(New)
5
4BACR15FT6AD5CRIVET, UNIVERSAL
HD
Install
(New)
Apply two coats to all bare metal
surfaces of the support bracket and
bracket. Refer to SOPM 20-41-02
as an accepted procedure.
-BMS10-11, TYPE IPRIMERApply6
to the support bracket to identify that
this change is done. Refer to SOPM
20-50-10 code RH as an accepted
procedure. (a)
--PART NUMBERApply7
(a) Refer to Paragraph 2.C.3., Parts Modified and Reidentified for applicable part number.
FIGURE 1: E8 EICAS RACK PRESSURE SWITCH BRACKET - INSTALLATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1 April 09, 2013
40 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 41 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
| This Figure applies only to: Group 1-2.
STA
246
BEFORE CHANGE  2032540
FIGURE 2: E8 EICAS RACK PRESSURE SWITCH AND ATTACH HARDWARE - INSTALLATION
(SHEET 1 OF 3)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  41 of 114

### Page 42 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA
246
STA
276
AFTER CHANGE
2032948
FIGURE 2: E8 EICAS RACK PRESSURE SWITCH AND ATTACH HARDWARE - INSTALLATION
(SHEET 2 OF 3)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
to the bracket.1123-2222-FCLAMP MOUNTING
INSTRUMENT
Install
(New)
1
in the instrument mounting clamp.16502-10KPressure SwitchInstall
(New)
2
onto the pneumatic inlet port.1MS28778-5PACKING, PRE-
FORMED
Install
(New)
3
to the pressure switch.11QM1-3-54ADISCONNECTInstall
(New)
to the BACH30BC01-0110 instru-
ment hose.
11QF2-3-64AQUICK DISCONNECTInstall
(New)
4
from the AS2 system tubing tee fit-
ting located at STA 270, LBL70,
WL170.
1BACC14AD06DNCAPRemove5
between the AS2 system tubing tee
fitting and the pressure switch quick
disconnect.
1BACH30BC06-0110HOSE, INSTRUMENTInstall
(New)
6
on the bracket below the pressure
switch at the position shown. Refer
to SOPM 20-50-05 as an accepted
procedure.
1BAC27TFDE534VINYL DECALInstall
(New)
7
FIGURE 2: E8 EICAS RACK PRESSURE SWITCH AND ATTACH HARDWARE - INSTALLATION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1 April 09, 2013
43 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 44 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
This Figure applies only to: Group 1-2.
P36 LEFT
MISCELLANEOUS
EQUIPMENT PANEL
MAIN EQUIPMENT CENTER
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
ROUTING
(SHEET 1 OF 5)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  44 of 114

### Page 45 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA
303
AE0209
P36 LEFT MISCELLANEOUS  2032984
EQUIPMENT PANEL
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
ROUTING
(SHEET 2 OF 5)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  45 of 114

### Page 46 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
D5360J
POS 35
W176
AE0209
2032986
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
ROUTING
(SHEET 3 OF 5)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  46 of 114

### Page 47 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
W176
go
2033283
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
ROUTING
(SHEET 4 OF 5)
Original Issue: October 10, 2011  Revision 1 April 09, 2013  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  47 of 114

### Page 48 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
K10718
K10355
W176
2033284
FIGURE 3: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 -
ROUTING
(SHEET 5 OF 5)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  48 of 114

### Page 49 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
This Figure applies only to: Group 1-2.
W176
24C-24 -  →
4  24D-24 -  →
5  INC
+ 24G-24 +H  +11DII GDX18-DC
• 24H-24 +  XB1 + W184-21J-24 + 33  - W596
TB218
K10355  D21730  D4992J
L & R ENG
N2<50% RELAY
A2
A3 NC
A1
X2  34G-24  41  - W1702
34H-24  Z10  • 18D-24 -  D5360J
TB222
K10718  D31620
MANIFOLD
INT RELAY
P36 LEFT MISCELLANEOUS EQUIPMENT PANEL
- ADDED WIRE OR NEW ROUTING
+ DELETED WIRE OR FORMER ROUTING
EXISTING WIRE
FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 - WIRING
CHANGE
(SHEET 1 OF 2)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  49 of 114

### Page 50

REFERENCE: 767 WDM 21-58-16
NOTE: The parts are in Wire Kit 015T1860-2.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Use lacing tape to tie wires. Refer to SWPM 20-
10-11 as an accepted procedure.
-015T1860-10104TAPE, LACING1
Refer to cut and code table for wire kit 015T1860-
101W.
1015T1860-101WWIRE W01762
1BACS16W1ARELAY SOCKET3
Refer to SWPM 20-81-12 as an accepted proce-
dure.
4BACC47DJ1CONTACT, SOCKET4
Install within 6 inches of equipment. Refer to
SWPM 20-10-11 as an accepted procedure.
1015T1860-10106SLEEVE IDENTIFICA-
TION, HEAT SHRINK-
ABLE
5
Refer to SWPM 20-61-11 as an accepted proce-
dure.
1BACC47CP1SCONTACT, SOCKET6
Refer to SWPM 20-90-11 as an accepted proce-
dure.
1M39029/11-145CONTACT, PIN,
CRIMP REMOVABLE,
PER MIL-C-39029/11
7
WIRE KIT - CUT AND CODE AS REQUIRED - 015T1860-101W
NOTESMATERIAL SPECIFICATIONLENGTH
(INCHES)
TYPE
CODE
GAGE
COLOR
WIRE#WBA#
BMS 13-48, TYPE 11, CLASS 1, AWG24100PK2434GW0176
BMS 13-48, TYPE 11, CLASS 1, AWG24100PK2434HW0176
FIGURE 4: P36 LEFT MISCELLANEOUS ELECTRICAL EQUIPMENT PANEL WIRE BUNDLE W176 - WIRING
CHANGE
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1 April 09, 2013
50 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 51 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
This Figure applies only to: Group 1-2.
P36 LEFT MISCELLANEOUS
EQUIPMENT PANEL
P50 ELECTRICAL SYSTEMS
CARD FILE PANEL
W596
MAIN EQUIPMENT CENTER (MEC)  2033285
(TYPICAL)
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 1 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  51 of 114

### Page 52

FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 2 OF 8)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1 April 09, 2013
52 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 53 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA
276
STA
287
S-291 -
W596
5-361 -
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 3 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  767-21A0247  53 of 114

### Page 54 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA
287
W596
LBL
10
RBL  10  2033288
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 4 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  54 of 114

### Page 55 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA
266.5
STA
287
S-24R
W596
S-35R
2033289
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 5 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  55 of 114

### Page 56 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
W596
W596
STA
276
STA
266.5
2033305
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 6 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  56 of 114

### Page 57 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
SIA  SIA  STA
212.5  228.5  246
W596
V
2033304
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 7 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  PROPRIETARY - Copyright ® Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
Work - See page 1 for details.  57 of 114

### Page 58 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
STA
276
STA
287
P50 ELECTRICAL  - W596
SYSTEMS CARD
FILE PANEL
- D8036P
2033320
FIGURE 5: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 - ROUTING
(SHEET 8 OF 8)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  Export Controlled ECCN: 9E991 - BOEING  767-21A0247
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  58 of 114

### Page 59

This Figure applies only to: Group 1-2.
REFERENCE: 767 WDM 21-58-16
NOTE: The part is in Wire Kit 015T1860-3.
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAQTYIDENTIFICATIONNAME
FLAG
NOTE
Remove and discard wire.1W596-606-24WIRE1
Refer to SWPM 20-30-16 as an accepted proce-
dure.
1BACT63D1SLEEVE, HEAT
SHRINK
2
FIGURE 6: MAIN EQUIPMENT CENTER WIRE BUNDLE W596 AND P50 ELECTRICAL SYSTEMS CARD
FILE PANEL WIRE BUNDLE W1114 - WIRING CHANGES
(SHEET 1 OF 1)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: October 10, 2011
767-21A0247Revision 1 April 09, 2013
59 of 114
BOEING SERVICE BULLETIN 767-21A0247
ALERTALERT

### Page 60 (OCR)

BOEING SERVICE BULLETIN 767-21A0247
ALERT  ALERT
This Figure applies only to: Group 1-2.
P36 LEFT MISCELLANEOUS
EQUIPMENT PANEL
W1702
E8 EICAS RACK
MAIN EQUIPMENT CENTER (MEC)  2033290
(TYPICAL)
FIGURE 7: MAIN EQUIPMENT CENTER WIRE BUNDLE W1702 - ROUTING
(SHEET 1 OF 3)
Original Issue: October 10, 2011
Revision 1 April 09, 2013  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  767-21A0247
Work - See page 1 for details.  60 of 114

The text continues at https://openairdocs.org/service-documents/boeing/767-21a0247/file/12920b9ae9c6.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
