# Boeing Alert Service Bulletin 767-27A0229: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0430; AD 2014-22-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-27A0229](https://openairdocs.org/service-documents/boeing/767-27a0229.md)
- Title as filed: Boeing Commercial Airplanes - Service Bulletin
- Pages: 121
- PDF: https://openairdocs.org/files/sha256/19/87/1987ffdf3401f268646f4c90518d9c5c522b324b88d46e10cc071a71c7948859
- Page: https://openairdocs.org/service-documents/boeing/767-27a0229/file/1987ffdf3401

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Service Bulletin
ALERT
Number: 767-27A0229
Original Issue: March 04, 2014
ATA System: 2751
SUBJECT: FLIGHT CONTROLS - Trailing Edge Flap System - TE Flap Rotary Actuator and
Reaction Ring Inspection, Rework and Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2014 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: March 04, 2014
767-27A0229
1 of 121
9.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
2 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 5
B. Concurrent Requirements ...................................... 1 5
C. Reason ................................................ 1 5
D. Description .............................................. 1 6
E. Compliance .............................................. 1 7
F. Approval ............................................... 2 0
G. Manpower .............................................. 2 0
H. Weight and Balance Changes .................................... 2 2
I. Electrical Load Data ......................................... 2 2
J. References .............................................. 2 2
1. Existing Data: ......................................... 2 2
2. Data Supplied with this Service Bulletin: ........................... 2 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 3
K. Publications Affected ........................................ 2 3
L. Interchangeability and Intermixability of Parts ........................... 2 3
M. Software Accomplishment Summary ................................ 2 4
2. MATERIAL INFORMATION ........................................ 2 5
A. Material - Price and Availability ................................... 2 5
B. Industry Support Information .................................... 2 5
C. Parts Necessary for Each Airplane ................................. 2 5
1. Kits/Parts ............................................ 2 5
2. Parts and Materials Supplied by the Operator ........................ 2 5
3. Parts Modified and Reidentified ................................ 2 8
4. Parts Removed and Not Replaced .............................. 2 8
D. Parts Necessary to Change Spares ................................. 2 9
E. Special Tooling - Price and Availability ............................... 2 9
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 9
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 1
A. GENERAL INFORMATION ..................................... 3 1
B. WORK INSTRUCTIONS ....................................... 3 3
FIGURE 1: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL [Group 1-2] ......... 4 0
FIGURE 2: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION [Group 1-2] ...... 4 5
FIGURE 3: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL [Group 1-2] ................ 4 9
FIGURE 4: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION [Group 1-2] .............. 5 3
FIGURE 5: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL [Group 1-2] ................ 5 7
FIGURE 6: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION [Group 1-2] .............. 6 1
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
3 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 4

FIGURE 7: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL [Group 3] .......... 6 5
FIGURE 8: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION [Group 3] ....... 6 9
FIGURE 9: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL [Group 3] ................. 7 3
FIGURE 10: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION [Group 3] ............... 7 7
FIGURE 11: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL [Group 3] ................. 8 0
FIGURE 12: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION [Group 3] ............... 8 4
FIGURE 13: TRAILING EDGE ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR DETAILED
INSPECTION .......................................... 8 7
FIGURE 14: TRAILING EDGE REACTION RING DETAILED INSPECTION ............... 9 3
FIGURE 15: CORROSION AND PITTING REWORK FOR TITANIUM-CADMIUM PLATED (4340M) ROTARY
ACTUATOR ASSEMBLY FIXED RING GEAR AND (4330M) REACTION RING SPLINES . 97
FIGURE 16: CORROSION AND PITTING REWORK FOR CADMIUM PLATED (15-5PH) REACTION RING
SPLINES ........................................... 1 0 4
FIGURE 17: LIGHT SURFACE DAMAGE REWORK FOR TITANIUM-CADMIUM PLATED (4340M) ROTARY
ACTUATOR ASSEMBLY FIXED RING GEAR AND (4330M) REACTION RING SPLINES . 110
FIGURE 18: LIGHT SURFACE DAMAGE REWORK FOR CADMIUM PLATED (15-5PH) REACTION RING
SPLINES ........................................... 1 1 3
FIGURE 19: SPLINE BLENDOUT AND LIMIT GUIDE .......................... 1 1 7
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
4 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 5

Commercial 
Airplanes
767
Service Bulletin
ALERT
SummaryNumber: 767-27A0229Original Issue: March 04, 2014
ATA System: 2751
SUBJECT: FLIGHT CONTROLS - Trailing Edge Flap System - TE Flap Rotary Actuator and
Reaction Ring Inspection, Rework and Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will provide operators with a repetitive inspection to check the outboard
and inboard trailing edge flap rotary actuator joints, replace the rotary actuator or reaction ring if necessary and
update the grease to a corrosion inhibiting compound. If this service bulletin is not done, flaps could separate
from the airplane, which could lead to loss of airplane control during takeoff or landing.
Boeing recently received a report of an unexpected roll on a 767-300ER. The control input required to offset the
condition was 0.5 to 1.5 units of aileron trim and was ultimately traced to an Outboard TE flap skew condition.
This was the first report of this condition in the fleet. Investigation by the operator revealed that the #7 TE flap
rotary actuator had slipped relative to its mating reaction ring that is attached to the flap support rib. Removal
of the reaction ring and actuator revealed that the mating splines were severely corroded. The noted airplane
was delivered in June 1997 and had accumulated approximately 79,000 hours and 14,000 cycles in service.
The potential for the subject condition exists on all 767-200/-300/-300F airplanes prior to L/N 922. The early
design of this interface utilized MIL-PRF-23827 grease to lubricate the mating splines of the actuator and reaction
ring. The 767-400ER installation utilized BMS 3-27 corrosion inhibiting compound(CIC). Boeing later revised
the actuator / reaction ring interface to be assembled using BMS 3-38, also a CIC material, for all other 767
models, from L/N 922 and on. The MIL-PRF-23827 grease must not be used on the mating splines of the actuator
and reaction ring. After further evaluation of the joint design for the 767-400ER, and for all other model 767's,
from L/N 922 and on, it was determined that periodic teardown inspections and reapplication of the BMS 3-38
was required to prevent significant corrosion of this joint over the life of the airplane. Boeing recommends
checking 767-200/-300/-300F airplanes from L/N 922 and on and 767-400ER airplanes from L/N 758 and on,
for the subject condition as recommended by the Compliance Table.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
5 of 121

### Page 6

Boeing worked with the operator to gather more information after the initial report and performed a safety analysis
of the event and potential cascading implications beyond that which was reported. It was found that if the corrosion
were to affect the mating splines on either surface (actuator or ring) to the point where they could no longer
effectively engage, the actuator would be prone to possible slippage. Due to the similarity of the design, the
potential condition could develop at multiple flap supports. Should degradation reach the point where both
actuators on a single flap were unable to react the torsion created by air loads, a flap blowback could occur.
The condition of uncommanded roll with flaps extended, due to flap blowback or loss, could potentially degrade
handling performance and preclude continued safe flight and landing.
Boeing Service Related Problem (SRP) 767-SRP-27-0238 is related to this service bulletin.
Boeing Fleet Team Digest Article 767 FTD FTD-27-13001 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesNoWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsNoKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION
PART 1: AIRPLANE WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS 1, 2, 3, 4, 5, 6, 7 AND 8 -
ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION RING SPLINE INSPECTION
– Prepare the access in accordance with PART 3.
– Remove the rotary actuator assembly and the reaction ring if necessary in accordance with PART 4.
– Do a Detailed Inspection of the rotary actuator assembly fixed ring gear splines and reaction ring splines.
– If there is no corrosion on the rotary actuator assembly fixed ring gear splines or reaction ring splines, then
no rework is required and the parts are ready to be reinstalled onto the airplane in accordance with PART
5.
– If there is corrosion on the rotary actuator assembly fixed ring gear splines, replace the rotary actuator
assembly with a new rotary actuator assembly, or with a rotary actuator assembly that has been repaired
in accordance with PART 2. Install rotary actuator assembly in accordance with PART 5.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
6 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 7

– If there is corrosion on the reaction ring splines, replace the reaction ring with a new reaction ring, or a
reaction ring that has been repaired in accordance with PART 2. Install the reaction ring in accordance with
PART 5.
PART 2: COMPONENT WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS 1, 2, 3, 4, 5, 6, 7 AND 8 -
ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION RING SPLINE REPAIR
– Do a Detailed Inspection of the rotary actuator assembly fixed ring gear splines and reaction ring splines
in accordance with PART 1.
– Repair the rotary actuator assembly fixed ring gear splines and reaction ring splines in accordance with
PART 2.
EFFECTIVITY
767-200, -300, -300F, -400ER Airplanes. Refer to Paragraph 1.A., Effectivity for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory. Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspections and repair procedures given in this service
bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
7 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 8 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
ROTARY
ACTUATOR
ASSEMBLY
NO. 6  ROTARY  ROTARY
ACTUATOR  ACTUATOR
ROTARY  ACTUATOR  NO. 7  ASSEMBLY  ASSEMBLY  NO. 8
ASSEMBLY
NO. 5
ROTARY
ACTUATOR
ASSEMBLY  ROTARY
NO. 3  ACTUATOR
ASSEMBLY
NO. 4
OUTBOARD
ROTARY  FLAP
ACTUATOR
ASSEMBLY
NO. 2
INBOARD
ROTARY  FLAP
ACTUATOR
ASSEMBLY
NO. 1
AT ROTARY ACTUATOR ASSEMBLY LOCATIONS, DO A GENERAL  HE
VISUAL INSPECTION (GVI) FOR CORROSION ON THE MATING
SPLINE SURFACES OF THE ROTARY ACTUATOR ASSEMBLY FIXED
RING GEAR AND THE RE  ACTION RING. IF THERE IS CORROSION
ON THE ROTARY ACT  OR ASSEMBLY FIXED RING GEAR
SPLINES, REPLACE THE ROTARY ACTUATOR ASSEMBLY WITH A
NEW ROTARY ACTUATOR ASSEMBLY, OR WITH A ROTARY
ACTUATOR ASSEMBLY FIXED RING GEAR THAT HAS BEEN
REPAIRED. IF THERE IS CORROSION ON THE REACTION RING
SPLINES, REPLACE THE REACTION RING WITH A NEW REACTION
RING, OR WITH A REACTION RING THAT HAS BEEN REPAIRED.
COMPONENT WORK:
REPAIR MATING SPLINE SURFACES OF THE ROTARY ACTUATOR
ASSEMBLY FIXED RING GEAR AND REACTION RING.
TRAILING EDGE FLAP ROTARY ACTUATOR LOCATIONS  2267964
Original Issue: March 04, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-27A0229
Work - See page 1 for details.  8 of 121

### Page 9

Commercial 
Airplanes
767
Service Bulletin
ALERT
Number: 767-27A0229
Original Issue: March 04, 2014
ATA System: 2751
SUBJECT: FLIGHT CONTROLS - Trailing Edge Flap System - TE Flap Rotary Actuator and
Reaction Ring Inspection, Rework and Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplane(s) shown below.
Refer to Service Bulletin Index D624T001 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
NOTE: The Variable Number table below includes all affected airplanes up to Line Number 1083.
Affected airplanes after Line Number 1083 will be added to the service bulletin's
MyBoeingFleet.com (MBF) "get effectivity" result when they are added to the MBF Fleet
Profile Page.
DESCRIPTIONCONFIGURATIONGROUP
767-200, -300, -300F Airplanes from Line Number 1 through 921.-1
767-200, -300, -300F Airplanes from Line Number 922 and on.-2
767-400ER Airplanes from Line Number 758 and on.-3
Airplane Models:
767-200, 767-300, 767-300F, 767-400ER
GroupVariable Number
1VA001 - VA020
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
9 of 121

### Page 10

GroupVariable Number
1VA301 - VA315
1VA501 - VA530
1VA701 - VA719
1VA801 - VA810
1VB001 - VB002
1VB051 - VB055
1VB101 - VB125
1VB201 - VB202
1VB251 - VB253
1VB281 - VB284
1VB301 - VB302
1VB321 - VB332
1VB371 - VB373
1VB401
1VB441 - VB444
1VE001 - VE003
1VE021 - VE023
1VE041 - VE043
1VE061 - VE069
1VE083 - VE086
1VE101 - VE104
1VE116 - VE118
1VE121 - VE126
1VE141 - VE152
1VE171 - VE172
1VF001 - VF002
1VF041 - VF042
1VF051
1VF061 - VF062
1VF071 - VF072
1VF091 - VF093
1VF101 - VF102
1VF161 - VF162
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
10 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 11

GroupVariable Number
1VF171 - VF172
1VF180 - VF184
1VF251
1VK001 - VK016
1VK021 - VK022
1VK031 - VK056
1VK081 - VK113
1VK131 - VK133
1VK141 - VK148
1VK161 - VK164
1VK171
1VK181
1VK186
1VL001 - VL006
1VL011
1VL701 - VL703
1VL751 - VL755
1VL806 - VL807
1VL871 - VL873
1VL891 - VL900
1VL911 - VL914
1VL931 - VL932
1VL941
1VN001 - VN041
1VN051 - VN064
1VN081 - VN099
1VN111 - VN127
1VN130 - VN137
1VN151 - VN158
1VN163 - VN168
1VN171 - VN174
1VN191 - VN198
1VN211 - VN212
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
11 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 12

GroupVariable Number
1VN221 - VN225
1VN231 - VN234
1VN241 - VN243
1VN251 - VN276
1VN291 - VN293
1VN301 - VN314
1VN371 - VN372
1VN376
1VN381 - VN388
1VN421 - VN427
1VN436
1VN471 - VN472
1VN491 - VN513
1VN531 - VN532
1VN536 - VN537
1VN541 - VN542
1VN546 - VN547
1VN551
1VN556 - VN557
1VN561 - VN562
1VN631 - VN638
1VN651 - VN658
1VN671 - VN672
1VN676
1VN681 - VN691
1VN731 - VN732
1VN751 - VN753
1VN791 - VN792
1VN811 - VN813
1VN921 - VN922
1VN931 - VN936
1VN951 - VN953
1VN966 - VN972
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
12 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 13

GroupVariable Number
3VQ001 - VQ021
3VQ071 - VQ086
3VQ111
1VR051 - VR060
1VR081
1VR084
1VR086
2VR087 - VR089
2VR106 - VR109
1VR201 - VR211
1VR251
1VR256 - VR260
2VR266 - VR292
1VR401
1VR421 - VR423
1VR426
1VR441
1VR461
1VR471 - VR472
1VS051 - VS056
1VS061
1VS066 - VS070
1VS073 - VS078
1VS091 - VS104
1VS111 - VS113
1VS131 - VS133
1VS136 - VS137
1VS176 - VS177
1VS186 - VS187
1VS196 - VS203
1VS206 - VS208
1VS211
1VS216 - VS217
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
13 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 14

GroupVariable Number
1VS231
1VS246 - VS248
1VS261 - VS263
1VS266 - VS274
1VS291 - VS293
1VS301 - VS303
1VS306 - VS311
1VS316
1VS321 - VS324
1VS331 - VS333
1VS336 - VS337
1VS366 - VS367
1VS381 - VS382
1VS391 - VS392
1VS401
1VS426 - VS428
1VS466 - VS472
1VS486
1VS496 - VS497
1VS506 - VS507
1VS526
1VS546 - VS549
1VS701 - VS709
2VS710 - VS720
1VS721 - VS730
2VS731 - VS736
1VS751 - VS759
1VS821 - VS825
1VS841 - VS844
1VS861
1VS881
2VS882 - VS883
2VS891
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
14 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 15

GroupVariable Number
2VS896
2VS901 - VS912
2VS916
2VS921 - VS928
2VS931 - VS933
2VS941
2VS951 - VS954
2VS961 - VS969
2VS971 - VS977
2VS981 - VS984
2VT001 - VT013
2VT021
2VT031 - VT033
1VT501
2VT511 - VT513
2VT521 - VT523
2VT531 - VT533
2VT541 - VT546
2VT551 - VT552
2VT556 - VT573
2VV001
1VW701 - VW721
1VW851
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of this service bulletin will provide operators with a repetitive inspection, to check the
outboard and inboard trailing edge flap rotary actuator joints, replace the rotary actuator or reaction
ring if necessary and update the grease to a corrosion inhibiting compound. If this service bulletin is
not done, flaps could separate from the airplane, which could lead to loss of airplane control during
takeoff or landing.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
15 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 16

Boeing recently received a report of an unexpected roll on a 767-300ER. The control input required to
offset the condition was 0.5 to 1.5 units of aileron trim and was ultimately traced to an Outboard TE
flap skew condition. This was the first report of this condition in the fleet. Investigation by the operator
revealed that the #7 TE flap rotary actuator had slipped relative to its mating reaction ring that is attached
to the flap support rib. Removal of the reaction ring and actuator revealed that the mating splines were
severely corroded. The noted airplane was delivered in June 1997 and had accumulated approximately
79,000 hours and 14,000 cycles in service.
The potential for the subject condition exists on all 767-200/-300/-300F airplanes prior to L/N 922. The
early design of this interface utilized MIL-PRF-23827 grease to lubricate the mating splines of the
actuator and reaction ring. The 767-400ER installation utilized BMS 3-27 corrosion inhibiting
compound(CIC). Boeing later revised the actuator / reaction ring interface to be assembled using BMS
3-38, also a CIC material, for all other 767 models, from L/N 922 and on. The MIL-PRF-23827 grease
must not be used on the mating splines of the actuator and reaction ring. After further evaluation of the
joint design for the 767-400ER, and for all other model 767's, from L/N 922 and on, it was determined
that periodic teardown inspections and reapplication of the BMS 3-38 was required to prevent significant
corrosion of this joint over the life of the airplane. Boeing recommends checking 767-200/-300/-300F
airplanes from L/N 922 and on and 767-400ER airplanes from L/N 758 and on, for the subject condition
as recommended by the Compliance Table.
Boeing worked with the operator to gather more information after the initial report and performed a
safety analysis of the event and potential cascading implications beyond that which was reported. It
was found that if the corrosion were to affect the mating splines on either surface (actuator or ring) to
the point where they could no longer effectively engage, the actuator would be prone to possible
slippage. Due to the similarity of the design, the potential condition could develop at multiple flap
supports. Should degradation reach the point where both actuators on a single flap were unable to
react the torsion created by air loads, a flap blowback could occur. The condition of uncommanded roll
with flaps extended, due to flap blowback or loss, could potentially degrade handling performance and
preclude continued safe flight and landing.
Boeing Service Related Problem (SRP) 767-SRP-27-0238 is related to this service bulletin.
Boeing Fleet Team Digest Article 767 FTD FTD-27-13001 is related to this service bulletin.
D. Description
PART 1: AIRPLANE WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS 1, 2, 3, 4, 5, 6, 7 AND
8 - ROTARY ACTUATOR ASSEMBLY AND REACTION RING SPLINE INSPECTION
– Prepare the access in accordance with PART 3.
– Remove the rotary actuator assembly and the reaction ring if necessary in accordance with PART
4.
– Do a Detailed Inspection of the rotary actuator assembly fixed ring gear splines and reaction ring
splines.
– If there is no corrosion on the rotary actuator assembly fixed ring gear splines or reaction ring
splines, then no rework is required and the parts are ready to be reinstalled onto the airplane in
accordance with PART 5.
– If there is corrosion on the rotary actuator assembly fixed ring gear splines, replace the rotary
actuator assembly with a new rotary actuator assembly, or with a rotary actuator assembly that
has been repaired in accordance with PART 2. Install rotary actuator assembly in accordance with
PART 5.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
16 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 17

– If there is corrosion on the reaction ring splines, replace the reaction ring with a new reaction ring,
or a reaction ring that has been repaired in accordance with PART 2. Install the reaction ring in
accordance with PART 5.
PART 2: COMPONENT WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS 1, 2, 3, 4, 5, 6, 7
AND 8 - ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION RING SPLINE
REPAIR
– Do a Detailed Inspection of the rotary actuator assembly fixed ring gear splines and reaction ring
splines in accordance with PART 1.
– Repair the rotary actuator assembly fixed ring gear splines and reaction ring splines in accordance
with PART 2.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-2:
Affected Maintenance Zones
ZoneModel
566, 666767-200, 767-300, 767-300F
Group 3:
Affected Maintenance Zones
ZoneModel
566, 666767-400ER
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
17 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 18

Group 1:
Table 1: INSPECTION, REPAIRS OF THE ACTUATOR/REACTION RING SUPPORT POSITIONS #1,
#2, #3, #4, #5, #6, #7 and #8
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
Within 12 years.Within 30 months
after the original is-
sue date of this
Service Bulletin.
Do a Detailed Inspection,
in accordance with the
Accomplishment Instruc-
tions PART 1.
All GROUP 1 Airplanes,
Trailing Edge Actuator/Re-
action Ring joints at sup-
port positions #1, #2, #3,
#4, #5, #6, #7 and #8 that
have not been disassem-
bled within 6 years prior to
the original issue date of
this Service Bulletin.
Within 12 years.Within 6 years after
the original issue
date of this Service
Bulletin.
Do a Detailed Inspection,
in accordance with the
Accomplishment Instruc-
tions PART 1.
All GROUP 1 Airplanes,
Trailing Edge Actuator/Re-
action Ring joints at sup-
port positions #1, #2, #3,
#4, #5, #6, #7 and #8 that
have been disassembled
within 6 years prior to the
original issue date of this
Service Bulletin.
--The rotary actuator as-
sembly fixed ring gear
and reaction ring do not
need to be replaced. The
rotary actuator assembly
and reaction ring are
ready to reinstall onto the
airplane in accordance
with PART 5.
PART 1, CONDITION 1:
NO CORROSION ON THE
TE ROTARY ACTUATOR
FIXED RING GEAR AND
REACTION RING
SPLINES.
PART 1, CONDITION 2:
-Before Further
flight.
Replace the rotary actua-
tor assembly with a new
rotary actuator assembly,
or with a rotary actuator
assembly that has been
repaired in accordance
with PART 2.
CORROSION ON THE TE
ROTARY ACTUATOR
FIXED RING GEAR
SPLINES.
Replace the reaction ring
with a new reaction ring,
or a reaction ring that has
been repaired in accor-
dance with PART 2.
CORROSION ON THE
REACTION RING
SPLINES
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
18 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 19

Group 2-3:
Table 2: INSPECTION, REPAIRS OF THE ACTUATOR/REACTION RING SUPPORT POSITIONS #1,
#2, #3, #4, #5, #6, #7 and #8
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
Within 12 years.Within 6 years after
the original issue
date of this Service
Bulletin, within 12
years from the date
of issuance of the
original certificate
of airworthiness or
the original export
certificate of airwor-
thiness, whichever
occurs later.
Do a Detailed Inspection,
in accordance with the
Accomplishment Instruc-
tions PART 1.
All GROUP 2 and GROUP
3 Airplanes, Trailing Edge
Actuator/Reaction Ring
joints at support positions
#1, #2, #3, #4, #5, #6, #7
and #8 that have not been
disassembled within 6
years prior to the original
issue date of this Service
Bulletin.
Within 12 years.Within 12 years af-
ter the original is-
sue date of this
Service Bulletin.
Do a Detailed Inspection,
in accordance with the
Accomplishment Instruc-
tions PART 1.
All GROUP 2 and GROUP
3 Airplanes, Trailing Edge
Actuator/Reaction Ring
joints at support positions
#1, #2, #3, #4, #5, #6, #7
and #8 that have been dis-
assembled within 6 years
prior to the original issue
date of this Service Bul-
letin.
--The rotary actuator as-
sembly fixed ring gear
and reaction ring do not
need to be replaced. The
rotary actuator assembly
and reaction ring are
ready to reinstall onto the
airplane in accordance
with PART 5.
PART 1, CONDITION 1:
NO CORROSION ON THE
TE ROTARY ACTUATOR
FIXED RING GEAR AND
REACTION RING
SPLINES.
PART 1, CONDITION 2:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
19 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 20

Group 2-3:
Table 2: INSPECTION, REPAIRS OF THE ACTUATOR/REACTION RING SUPPORT POSITIONS #1,
#2, #3, #4, #5, #6, #7 and #8
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before Further
flight.
Replace the rotary actua-
tor assembly with a new
rotary actuator assembly,
or with a rotary actuator
assembly that has been
repaired in accordance
with PART 2.
CORROSION ON THE TE
ROTARY ACTUATOR
FIXED RING GEAR
SPLINES.
Replace the reaction ring
with a new reaction ring,
or a reaction ring that has
been repaired in accor-
dance with PART 2.
CORROSION ON THE
REACTION RING
SPLINES
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection/repair/replacement
for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
20 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 21

TABLE 1: AIRPLANE WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3, #4,
#5, #6, #7 AND #8 - ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION
RING SPLINE INSPECTION
Elapsed HoursTask HoursNumber of Per-
sons
Task
2.004.002PART 3: PREPARE
ACCESS
4.0024.006PART 4: TRAILING
EDGE FLAP - SUP-
PORT POSITIONS
#1, #2, #3, #4, #5,
#6, #7 and #8 - RO-
TARY ACTUATOR
ASSEMBLY AND
REACTION RING
REMOVAL
2.004.002PART 1: AIRPLANE
WORK - TRAILING
EDGE FLAP - SUP-
PORT POSITIONS
#1, #2, #3, #4, #5,
#6, #7 and #8 - RO-
TARY ACTUATOR
ASSEMBLY FIXED
RING GEAR AND
REACTION RING
SPLINE INSPEC-
TION
4.0024.006PART 5: TRAILING
EDGE FLAP - SUP-
PORT POSITIONS
#1, #2, #3, #4, #5,
#6, #7 and #8 - RO-
TARY ACTUATOR
ASSEMBLY AND
REACTION RING
INSTALLATION
2.004.002Close Access
14.0060.00TOTAL FOR EACH AIRPLANE
TABLE 2 - COMPONENT WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3,
#4, #5, #6, #7, and #8 - ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION
RING SPLINE REPAIR
Elapsed HoursTask HoursNumber of Per-
sons
Task
4.004.001FIGURE 13
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
21 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 22

TABLE 2 - COMPONENT WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3,
#4, #5, #6, #7, and #8 - ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION
RING SPLINE REPAIR
Elapsed HoursTask HoursNumber of Per-
sons
Task
4.004.001FIGURE 14
(a)(a)FIGURE 15
(a)(a)FIGURE 16
(a)(a)FIGURE 17
(a)(a)FIGURE 18
(a)(a)FIGURE 19
8.008.00TOTAL FOR EACH AIRPLANE
(a) Estimated time for the tasks are variable, depending upon number of parts
affected and extent of repairs required.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Boeing Service Related Problem (SRP) 767-SRP-27-0238
b. Component Maintenance Manual (CMM) 27-51-08, 27-51-10, 27-51-48, 27-51-49
c. Standard Overhaul Practices Manual (SOPM) 20-10-01, 20-10-02, 20-10-03, 20-20-01,
20-30-02, 20-30-03, 20-41-02, 20-42-02, 20-42-05, 20-42-10, 20-50-01
d. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19
e. 767 Aircraft Maintenance Manual (AMM) 27-51-00, 27-51-05, 27-51-11, 27-51-22
f. 767 Fleet Team Digest (FTD) FTD-27-13001
g. 767 Illustrated Parts Catalog (IPC) 27-51
2. Data Supplied with this Service Bulletin:
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
22 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 23

3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Flap Instl Pos. 1 and 8, Flap Actuation (a)113T3000
Rib Assy Pos. 1 and 8, Flap Actuation (b)113T1328
Flap Instl Pos. 2 and 7, Flap Actuation (a)113T3000
Rib Assy Pos. 2 and 7, Flap Actuation (b)113T1329
Flap Instl Pos. 3 and 6, Flap Actuation (a)113T2000
Rib Assy Pos. 3 and 6, Flap Actuation (b)113T1200
Flap Instl Pos. 4 and 5, Flap Actuation (a)113T2000
Rib Assy Pos. 4 and 5, Flap Actuation (b)113T1200
Actuator Instl Pos. 1 and 8, Flap Actuation (a)256T3240
Actuator Instl Pos. 1 and 8, Flap Actuation (b)256T6100
Actuator Instl Pos. 2 and 7, Flap Actuation (a)256T3280
Actuator Instl Pos. 2 and 7, Flap Actuation (b)256T6200
Actuator Instl Pos. 3 and 6, Flap Actuation (a)256T3200
Actuator Instl Pos. 3 and 6, Flap Actuation (b)256T6300
Actuator Instl Pos. 4 and 5, Flap Actuation (a)256T3290
Actuator Instl Pos. 4 and 5, Flap Actuation (b)256T6400
(a) For 767-200, -300, -300F.
(b) For 767-400ER.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
767 IPC 27-51767 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS but no new DTIs are necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
23 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 24

M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
24 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the inspections and repair procedures given in this
service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
Group 1-2:
NotesNameQTYPart Number /
Specification
(a)Reaction Ring, Outboard Flap - Sup
No. 1 and 2.
1113T1342-1
(a)Reaction Ring, Outboard Flap - Sup
No. 1 and 2.
1113T1342-7
Reaction Ring, Outboard Flap - Sup
No. 1 and 2.
1113T1342-9
(b)Reaction Ring, Outboard Flap - Sup
No. 7 and 8.
1113T1342-2
(b)Reaction Ring, Outboard Flap - Sup
No. 7 and 8.
1113T1342-8
Reaction Ring, Outboard Flap - Sup
No. 7 and 8.
1113T1342-10
(c)Reaction Ring, Inboard Flap - Sup
No. 3.
1113T1251-1
Reaction Ring, Inboard Flap - Sup
No. 3.
1113T1251-7
(d)Reaction Ring, Inboard Flap - Sup
No. 6.
1113T1251-2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
25 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 26

Group 1-2:
NotesNameQTYPart Number /
Specification
Reaction Ring, Inboard Flap - Sup
No. 6.
1113T1251-8
(e)Reaction Ring, Inboard Flap - Sup
No. 4.
1113T1269-3
Reaction Ring, Inboard Flap - Sup
No. 4.
1113T1269-9
(f)Reaction Ring, Inboard Flap - Sup
No. 5.
1113T1269-4
Reaction Ring, Inboard Flap - Sup
No. 5.
1113T1269-10
Rotary Actuator Assembly, Outboard
Flap Sup No. 1, 2, 7 and 8.
1256T3250-2
(g)Rotary Actuator Assembly, Outboard
Flap Sup No. 1, 2, 7 and 8.
1256T3250-4
Rotary Actuator Assembly, Inboard
Flap Sup No. 3 and 6.
1256T3210-2
Rotary Actuator Assembly, Inboard
Flap Sup No. 3 and 6.
1256T3210-4
Rotary Actuator Assembly, Inboard
Flap Sup No. 4 and 5.
1256T3250-2
(g)Rotary Actuator Assembly, Inboard
Flap Sup No. 4 and 5.
1256T3250-4
To be installed into the Re-
action Rings located at Sup
No. 1, 2, 4, 5, 7 and 8. One
seal per one reaction ring.
Reaction Ring Seal6113T1256-31
To be installed into the Re-
action Rings located at Sup
No. 3 and 6. One seal per
one reaction ring.
Reaction Ring Seal2113T1256-29
(h)Shim1113T1361-2
(i)Shim1113T1361-3
(j)Shim1113T1361-4
Shim1113T1361-5
Shim1113T1361-13
Shim1113T1361-14
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
26 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 27

Group 1-2:
NotesNameQTYPart Number /
Specification
Use for installation of Reac-
tion Ring Seal. (k)
Primer-BMS 10-11
Use on rotary actuator and
reaction ring splines. (k)
Corrosion Inhibiting Compound-BMS 3-38
(a) Optional replacement part is 113T1342-9.
(b) Optional replacement part is 113T1342-10.
(c) Optional replacement part is 113T1251-7.
(d) Optional replacement part is 113T1251-8.
(e) Optional replacement part is 113T1269-9.
(f) Optional replacement part is 113T1269-10.
(g) Optional replacement part is 256T3250-2.
(h) Optional replacement part is 113T11361-5.
(i) Optional replacement part is 113T11361-13.
(j) Optional replacement part is 113T11361-14.
(k) See the Qualified Products List at the end of Boeing Material Specification (BMS) for
supplier data.
Group 3:
NotesNameQTYPart Number /
Specification
Reaction Ring, Outboard Flap - Sup
No. 1 and 2.
1113T1342-5
Reaction Ring, Outboard Flap - Sup
No. 7 and 8.
1113T1342-6
Reaction Ring, Inboard Flap - Sup
No. 3.
1113T1251-5
Reaction Ring, Inboard Flap - Sup
No. 6.
1113T1251-6
Reaction Ring, Inboard Flap - Sup
No. 4.
1113T1269-7
Reaction Ring, Inboard Flap - Sup
No. 5.
1113T1269-8
(a)Rotary Actuator Assembly, Outboard
Flap Sup No. 1, 2, 7 and 8.
1256T6110-2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
27 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 28

Group 3:
NotesNameQTYPart Number /
Specification
(a)Rotary Actuator Assembly, Outboard
Flap Sup No. 1, 2, 7 and 8.
1256T6110-3
(b)Rotary Actuator Assembly, Inboard
Flap Sup No. 3 and 6.
1256T6310-2
(b)Rotary Actuator Assembly, Inboard
Flap Sup No. 3 and 6.
1256T6310-3
(a)Rotary Actuator Assembly, Inboard
Flap Sup No. 4 and 5.
1256T6110-2
(a)Rotary Actuator Assembly, Inboard
Flap Sup No. 4 and 5.
1256T6110-3
To be installed into the Re-
action Rings located at Sup
No. 1, 2, 4, 5, 7 and 8. One
seal per one reaction ring.
Reaction Ring Seal6113T1256-31
To be installed into the Re-
action Rings located at Sup
No. 3 and 6. One seal per
one reaction ring.
Reaction Ring Seal2113T1256-29
To be installed at Sup No.
1 and 8.
Shim2113T1361-11
To be installed at Sup No.
2 and 7.
Shim2113T1361-12
To be installed at Sup No.
4 and 5.
Shim2113T1361-14
Use for installation of Reac-
tion Ring Seal.
Primer-BMS 10-11
Use on rotary actuator and
reaction ring splines.
Corrosion Inhibiting Compound-BMS 3-38
(a) The 256T6110-2 and 256T6110-3 are interchangeable with one another.
(b) The 256T6310-2 and 256T6310-3 are interchangeable with one another.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
28 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 29

D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
29 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 30

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
30 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT
BLANK PAGE

### Page 31

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Torque Values:
— Values for structural fasteners are given in Structural Repair Manual, Chapter
51.
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. The necessary conditions for selection of clamp type and size are included in SWPM
20-10-12. If any wire bundle support clamp specified in this service bulletin does not
make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted
procedure to select a clamp that fits correctly.
7. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
8. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
31 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 32

9. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
10. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
11. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
12. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
13. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
14. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
15. If shading is used, shaded areas in Figures are to separate the non-critical and
non-authoritative information from the critical and authoritative information.
16. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an
OPTION number, do all of the ACTION numbers for that CONDITION number or
OPTION number.
17. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
18. Some steps in the Work Instructions are identified as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
identified as RC must be done to comply with the AD. Alternative procedures for
steps not identified with RC can be used if the RC steps can still be done as specified,
and the airplane can be put back in a serviceable condition. An Alternative Method
of Compliance (AMOC) is not necessary for deviations to steps that are not identified
as RC.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
32 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 33

B. WORK INSTRUCTIONS
PART 1: AIRPLANE WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3, #4, #5,
#6, #7 and #8 - ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION RING
SPLINE INSPECTION
1. Prepare for access in accordance with PART 3.
2. Remove the rotary actuator assembly and the reaction ring in accordance with PART 4.
3. Clean the spline mating surfaces of the TE rotary actuator assembly fixed ring gear and the reaction
ring. Refer to SOPM 20-30-03 as an accepted procedure.
a. The reaction ring does not need to be removed from the rib structure if a Detailed Inspection
for corrosion of the reaction ring is done and no corrosion is found.
4. RC - Do a Detailed Inspection, for corrosion, of the rotary actuator assembly fixed ring gear and
reaction ring splines for each support position.
CONDITION 1 - NO CORROSION ON THE TE ROTARY ACTUATOR ASSEMBLY FIXED RING
GEAR AND REACTION RING SPLINES
a. RC - If there is no corrosion on the TE rotary actuator assembly fixed ring gear splines, then
the rotary actuator assembly does not need to be replaced or reworked.
b. RC - If there is no corrosion on the reaction ring splines, then the reaction ring does not need
to be removed from the rib support and replaced.
c. RC - Surface wear is acceptable on the surfaces of the spline teeth where contact is made
between the Rotary Actuator Ring Gear and the Reaction Ring. Surface wear is defined as a
change in color or a local loss of finishes, provided there is no surface corrosion or pitting.
d. RC - Install the rotary actuator assembly in accordance with PART 5.
CONDITION 2 - CORROSION ON THE TE ROTARY ACTUATOR ASSEMBLY FIXED RING
GEAR SPLINES OR REACTION RING SPLINES
a. RC - If there is corrosion on the rotary actuator assembly fixed ring gear splines, replace the
rotary actuator assembly with a new rotary actuator assembly, or with a rotary actuator
assembly that has been repaired in accordance with PART 2.
b. RC - If there is corrosion on the reaction ring splines, then replace the reaction ring with a
new reaction ring, or with a reaction ring that has been repaired in accordance with PART 2.
c. RC - Install the rotary actuator assembly and reaction ring in accordance with PART 5.
PART 2: COMPONENT WORK - TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3, #4,
#5, #6, #7 and #8 - ROTARY ACTUATOR ASSEMBLY FIXED RING GEAR AND REACTION RING
SPLINE REPAIR
1. Disassemble the rotary actuator assembly to isolate the fixed ring gear that contains the splines
before reworking the splines.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
33 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 34

a. Group 1-2:
For rotary actuator assemblies at support positions #1, #2, #4, #5, #7 and #8, refer to CMM
27-51-10.
b. Group 1-2:
For rotary actuator assemblies at support positions #3 and #6, refer to CMM 27-51-08.
c. Group 3:
For rotary actuator assemblies at support positions #1, #2, #4, #5, #7 and #8, refer to CMM
27-51-49.
d. Group 3:
For rotary actuator assemblies at support positions #3 and #6, refer to CMM 27-51-48.
2. RC - Do a Detailed Inspection, for corrosion, of the rotary actuator assembly fixed ring gear in
accordance with FIGURE 13
a. Repair the rotary actuator assembly fixed ring gear in accordance with CONDITION 3.
3. RC - Do a Detailed Inspection, for corrosion, of the reaction ring in accordance with FIGURE 14.
a. Repair the reaction rings made of 4330M steel Titanium-Cadmium plated in accordance with
CONDITION 4.
b. Repair the reaction rings made of 15-5PH CRES CADMIUM plated in accordance with
CONDITION 5.
CONDITION 3 - CORROSION ON THE TE ROTARY ACTUATOR ASSEMBLY FIXED RING
GEAR MADE OF 4340M TITANIUM-CADMIUM PLATED
a. RC - ACTION 1: Do the repair for Light Surface Damage in accordance with FIGURE 17.
NOTE: Before doing any plating, baking and refinish work, make sure to measure and
evaluate the reworked parts in accordance with FIGURE 19.
(1) Measure and evaluate the repaired parts in accordance with FIGURE 19.
(a) If the reworked rotary actuator assembly fixed ring gear is within limits, then the rotary
actuator assembly can be installed onto the airplane in accordance with PART 5.
(b) If the reworked rotary actuator assembly fixed ring gear is not within limits, then the
rotary actuator assembly must be replaced with a new rotary actuator assembly, or
a rotary actuator assembly that has been repaired in accordance with PART 2.
b. RC - ACTION 2: Do the repair for moderate corrosion pitting and heavy corrosion pitting in
accordance with FIGURE 15.
NOTE: Before doing any plating, baking and refinish work, make sure to measure and
evaluate the reworked parts in accordance with FIGURE 19.
(1) Measure and evaluate the repaired parts in accordance with FIGURE 19.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
34 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 35

(a) If the reworked rotary actuator assembly fixed ring gear is within limits, then the rotary
actuator assembly can be installed onto the airplane in accordance with PART 5.
(b) If the reworked rotary actuator assembly fixed ring gear is not within limits, then the
rotary actuator assembly must be replaced with a new rotary actuator assembly, or
a rotary actuator assembly that has been repaired in accordance with PART 2.
CONDITION 4 - CORROSION PITTING ON THE REACTION RING MADE OF 4330M
TITANIUM-CADMIUM PLATED
a. RC - ACTION 3: Do the repair for Light Surface Damage in accordance with FIGURE 17.
NOTE: Before doing any plating, baking and refinish work, make sure to measure and
evaluate the reworked parts in accordance with FIGURE 19.
(1) Measure and evaluate the repaired parts in accordance with FIGURE 19.
(a) If the reworked reaction ring is within limits, it can be installed onto the airplane as
shown in PART 5.
(b) If the reworked reaction ring is not within limits, it must be replaced with a new reaction
ring or a reaction ring that has been repaired in accordance with PART 2.
b. RC - ACTION 4: Do the repair for moderate corrosion pitting and heavy corrosion pitting, in
accordance with FIGURE 15.
NOTE: Before doing any plating, baking and refinish work, make sure to measure and
evaluate the reworked parts in accordance with FIGURE 19.
(1) Measure and evaluate the repaired parts in accordance with FIGURE 19.
(a) If the reworked reaction ring is within limits, it can be installed onto the airplane as
shown in PART 5.
(b) If the reworked reaction ring is not within limits, it must be replaced with a new reaction
ring or a reaction ring that has been repaired in accordance with PART 2.
CONDITION 5 - CORROSION PITTING ON THE REACTION RING MADE OF 15-5PH CADMIUM
PLATED
a. RC - ACTION 5: Do the repair for Light Surface Damage in accordance with FIGURE 18.
NOTE: Before doing any plating, baking and refinish work, make sure to measure and
evaluate the reworked parts in accordance with FIGURE 19.
(1) Measure and evaluate the repaired parts in accordance with FIGURE 19.
(a) If the reworked reaction ring is within limits, it can be installed onto the airplane as
shown in PART 5.
(b) If the reworked reaction ring is not within limits, it must be replaced with a new reaction
ring or a reaction ring that has been repaired in accordance with PART 2.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
35 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 36

b. RC - ACTION 6: Do the repair for moderate corrosion pitting and heavy corrosion pitting, in
accordance with FIGURE 16.
NOTE: Before doing any plating, baking and refinish work, make sure to measure and
evaluate the reworked parts in accordance with FIGURE 19.
(1) Measure and evaluate the repaired parts in accordance with FIGURE 19.
(a) If the reworked reaction ring is within limits, it can be installed onto the airplane as
shown in PART 5.
(b) If the reworked reaction ring is not within limits, it must be replaced with a new reaction
ring or a reaction ring that has been repaired in accordance with PART 2.
PART 3: PREPARE ACCESS
1. Prepare for access as follows.
a. For support positions #1, #2, #7 and #8 rotary actuator assembly removal. Refer to 767 AMM
27-51-22.
b. For support positions #3 and #6 rotary actuator assembly removal. Refer to 767 AMM 27-51-11.
c. For support positions #4 and #5 rotary actuator assembly removal. Refer to 767 AMM 27-51-05.
PART 4: TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3, #4, #5, #6, #7 and #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL
1. Do PART 3 - PREPARE ACCESS.
2. Remove the TE rotary actuator assembly as follows.
a. For support positions #1, #2, #7 and #8 rotary actuator assembly removal:
(1) Group 1-2:
Refer to 767 AMM 27-51-22 and in accordance with FIGURE 1.
(2) Group 3:
Refer to 767 AMM 27-51-22 and in accordance with FIGURE 7.
b. For support positions #3 and #6 rotary actuator assembly removal:
(1) Group 1-2:
Refer to 767 AMM 27-51-11 and in accordance with FIGURE 3.
(2) Group 3:
Refer to 767 AMM 27-51-11 and in accordance with FIGURE 9.
c. For support positions #4 and #5 rotary actuator assembly removal:
(1) Group 1-2:
Refer to 767 AMM 27-51-05 and in accordance with FIGURE 5.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
36 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 37

(2) Group 3:
Refer to 767 AMM 27-51-05 and in accordance with FIGURE 11.
3. Remove the reaction rings as followings.
NOTE: Before removing the reaction ring from the rib support, see PART 1 - INSPECTION,
CONDITION 1, because the reaction ring does not need to be removed from the rib
structure, if reaction ring corrosion is not found.
a. For support positions #1, #2, #7 and #8 reaction ring removal:
(1) Group 1-2:
In accordance with FIGURE 1.
(2) Group 3:
In accordance with FIGURE 7.
b. For support positions #3 and #6 reaction ring removal:
(1) Group 1-2:
In accordance with FIGURE 3.
(2) Group 3:
In accordance with FIGURE 9.
c. For support positions #4 and #5 reaction ring removal:
(1) Group 1-2:
In accordance with FIGURE 5.
(2) Group 3:
In accordance with FIGURE 11.
PART 5: TRAILING EDGE FLAP - SUPPORT POSITIONS #1, #2, #3, #4, #5, #6, #7 and #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION
1. Install the reaction ring as follows.
NOTE: Make sure to use BMS 3-38 corrosion inhibiting compound to cover the splines after
installation of the reaction ring.
a. Make sure to install the grease seal into the reaction ring, before installing the reaction ring
on the rib support.
(1) For support positions #1, #2, #7 and #8, install the grease seal into the reaction ring:
(a) Group 1-2:
In accordance with FIGURE 2.
(b) Group 3:
In accordance with FIGURE 8
(2) For support positions #3 and #6 install the grease seal into the reaction ring:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
37 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 38

(a) Group 1-2:
In accordance with FIGURE 4
(b) Group 3:
In accordance with FIGURE 10
(3) For support positions #4 and #5 install the grease seal into the reaction ring:
(a) Group 1-2:
In accordance with FIGURE 6
(b) Group 3:
In accordance with FIGURE 12
b. For support positions #1, #2, #7 and #8 install the reaction ring:
(1) Group 1-2:
In accordance with FIGURE 2.
(2) Group 3:
In accordance with FIGURE 8.
c. For support positions #3 and #6 install the reaction ring:
(1) Group 1-2:
In accordance with FIGURE 4.
(2) Group 3:
In accordance with FIGURE 10.
d. For support positions #4 and #5 install the reaction ring:
(1) Group 1-2:
In accordance with FIGURE 6.
(2) Group 3:
In accordance with FIGURE 12.
2. Install the TE rotary actuator assembly as follows.
NOTE: Make sure to use BMS 3-38 corrosion inhibiting compound to cover the splines prior to
installation of the rotary actuator.
a. For support positions #1, #2, #7 and #8 rotary actuator assembly installation:
(1) Group 1-2:
Refer to 767 AMM 27-51-22 and in accordance with FIGURE 2.
(2) Group 3:
Refer to 767 AMM 27-51-22 and in accordance with FIGURE 8.
b. For support positions #3 and #6 rotary actuator assembly installation:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
38 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 39

(1) Group 1-2:
Refer to 767 AMM 27-51-11 and in accordance with FIGURE 4
(2) Group 3:
Refer to 767 AMM 27-51-11 and in accordance with FIGURE 10
c. For support positions #4 and #5 rotary actuator assembly installation:
(1) Group 1-2:
Refer to 767 AMM 27-51-05 and in accordance with FIGURE 6.
(2) Group 3:
Refer to 767 AMM 27-51-05 and in accordance with FIGURE 12.
3. Put the airplane back to a serviceable condition. Refer to 767 AMM 27-51-22.
4. Do the Trailing Edge Flap System - Adjustment/Test, refer to 767 AMM 27-51-00.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
39 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 40 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
This Figure applies only to: Group 1-2.
WING REAR SPAR
HOLD-DOWN CLAMP
(3 LOCATIONS)
TORQUE
TUBE
REFERENCE
ALIGN MARK
ROTARY
ACTUATOR
ASSEMBLY
ROTARY
ACTUATOR
ASSEMBLY
2267931
FIGURE 1: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL
(SHEET 1 OF 5)
Original Issue: March 04, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-27A0229
Work - See page 1 for details.  40 of 121

### Page 41 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
8) RING  \ REACTION
(6) SEAL
SHIM
TRAILING EDGE (TE) FLAP SUPPORT RIB POSITION 1 SHOWN.
TE FLAP SUPPORT RIB POSITION 2, 7 AND 8 SIMILAR.
2267932
FIGURE 1: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL
(SHEET 2 OF 5)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  767-27 A0229
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  41 of 121

### Page 42

More DataQtyIdentificationNameTaskStep
Remove the rotary
actuator. Refer to
767 AMM 27-51-22
as an accepted pro-
cedure.
1256T3250-2Rotary Actuator Assem-
bly
Remove1
Remove the rotary
actuator. Refer to
767 AMM 27-51-22
as an accepted pro-
cedure.
1256T3250-4Rotary Actuator Assem-
bly
Remove
2NAS1805-7LNutRemove2
2BACW10BP7PWasherRemove
3NAS1805-6LNutRemove3
3BACW10BP6PWasherRemove
3NAS1805-6LNutRemove4
3BACW10BP6PWasherRemove
8NAS1805-7LNutRemove5
8BACW10BP7PWasherRemove
FIGURE 1: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL
(SHEET 3 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
42 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 43

More DataQtyIdentificationNameTaskStep
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1342-1Reaction RingRemove6
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1342-2Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1342-7Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1342-8Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1342-9Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1342-10Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1256-31SealRemove
FIGURE 1: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
43 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 44

More DataQtyIdentificationNameTaskStep
1113T1361-2ShimRemove / Keep7
1113T1361-5ShimRemove / Keep
(b)1113T1342-1Reaction RingClean8
(b)1113T1342-2Reaction RingClean
(b)1113T1342-7Reaction RingClean
(b)1113T1342-8Reaction RingClean
(b)1113T1342-9Reaction RingClean
(b)1113T1342-10Reaction RingClean
(b)1113T1361-2ShimClean9
(b)1113T1361-5ShimClean
(a) Make sure to identify how the seal is oriented in the installed position, before removing the seal prior to
temperature stress relieving. In the assembly section, the new seal must be installed into the reaction
ring with the same orientation. Failure to do so will result in bearing damage, due to lack of lubrication.
(b) Use a piece of cloth damped with BMS11-9 or similar solvent. Refer also to SOPM 20-30-03 as an accepted
procedure.
FIGURE 1: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING REMOVAL
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
44 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 45 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
This Figure applies only to: Group 1-2.
O SHIM
→ REACTIO
< RIN
D SEAL
) 9 LOCATIONS
2273182
FIGURE 2: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 1 OF 4)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  767-27 A0229
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  45 of 121

### Page 46 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
2) SEAL
C .-
SEAL
PRFACTIO
- REACTION  2 RIN
RING
A-A
WING REAR SPAR
HOLD-DOWN CLAMP
(3 LOCATIONS)
TORQUE
TUBE
REFERENCE
ALIGN MARK
ROTARY
ACTUATOR
ASSEMBLY
6 ACTUATOR  ROTARY
ASSEMBLY
2273181
FIGURE 2: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 2 OF 4)
Original Issue: March 04, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-27A0229
Work - See page 1 for details.  46 of 121

### Page 47

More DataQtyIdentificationNameTaskStep
1113T1361-2ShimInstall (Kept)1
1113T1361-5ShimInstall (Kept)
Install new seal into
the reaction ring with
wet BMS 10-11,
Type 1 primer, refer
to SOPM 20-41-
02.(a)
1113T1256-31SealAssemble2
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a) (b)
1113T1342-1Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a) (c)
1113T1342-2Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a) (b)
1113T1342-7Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a) (c)
1113T1342-8Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a)
1113T1342-9Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a)
1113T1342-10Reaction RingAssemble
6BACW10BP6DPWasherAssemble3
Tighten nut to torque
range of 220-410
Inch-Pounds.
6BACN11Z6CDNutAssemble
FIGURE 2: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
47 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 48

More DataQtyIdentificationNameTaskStep
9BACW10BP7DPWasherAssemble4
Tighten nut to torque
range of 370-690
Inch-Pounds.
9BACN11Z7CDNutAssemble
1NAS1149D0763JWasherAssemble5
Tighten nut to torque
range of 150-170
Inch-Pounds.
1BACN10YR7CDNutAssemble
Install the rotary ac-
tuator. Refer to 767
AMM 27-51-22 as
an accepted proce-
dure.
1256T3250-2Rotary Actuator Assem-
bly
Assemble6
Install the rotary ac-
tuator. Refer to 767
AMM 27-51-22 as
an accepted proce-
dure.
1256T3250-4Rotary Actuator Assem-
bly
Assemble
(a) Make sure to install the new seal, oriented to the reaction ring, the same way as when the old seal was
removed. Failure to do so will result in bearing damage, due to lack of lubrication.
(b) Optional preferred part 113T1342-9.
(c) Optional preferred part 113T1342-10.
FIGURE 2: OUTBOARD TRAILING EDGE FLAP SUPPORT POSITION #1, #2, #7 AND #8 - ROTARY
ACTUATOR ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
48 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 49 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
This Figure applies only to: Group 1-2.
, WING REAR SPAR
HOLD-DOWN CLAMP
(3 LOCATIONS)
TORQUE
TUBE
REFERENCE
ALIGN MARK
ROTARY
ACTUATOR
ASSEMBLY
ROTARY
ACTUATOR
ASSEMBLY
2273661
FIGURE 3: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 1 OF 4)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  767-27 A0229
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  49 of 121

### Page 50 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
(2 14 LOCATIONS
35 RING  REACTION
3 SEAL
SHIM 4
TRAILING EDGE (TE) FLAP SUPPORT RIB POSITION 3 SHOWN.
TE FLAP SUPPORT RIB POSITION 6 SIMILAR.
2273664
FIGURE 3: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 2 OF 4)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  767-27A0229
Work - See page 1 for details.  50 of 121

### Page 51

More DataQtyIdentificationNameTaskStep
Remove the rotary
actuator. Refer to
767 AMM 27-51-11
as an accepted pro-
cedure.
1256T3210-2Rotary Actuator Assem-
bly
Remove1
Remove the rotary
actuator. Refer to
767 AMM 27-51-11
as an accepted pro-
cedure.
1256T3210-4Rotary Actuator Assem-
bly
Remove
14NAS1805-7NutRemove2
14BACW10BP7APWasherRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1251-1Reaction RingRemove3
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1251-2Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1251-7Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1251-8Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1256-29SealRemove
FIGURE 3: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
51 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 52

More DataQtyIdentificationNameTaskStep
1113T1361-3ShimRemove / Keep4
1113T1361-13ShimRemove / Keep
(b)1113T1251-1Reaction RingClean5
(b)1113T1251-2Reaction RingClean
(b)1113T1251-7Reaction RingClean
(b)1113T1251-8Reaction RingClean
(b)1113T1361-3ShimClean6
(b)1113T1361-13ShimClean
(a) Make sure to identify how the seal is oriented in the installed position, before removing the seal prior to
temperature stress relieving. In the assembly section, the new seal must be installed into the reaction
ring with the same orientation. Failure to do so will result in bearing damage, due to lack of lubrication.
(b) Use a piece of cloth damped with BMS11-9 or similar solvent. Refer to SOPM 20-30-03 as an accepted
procedure.
FIGURE 3: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
52 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 53 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
This Figure applies only to: Group 1-2.
© SHIM
· d
200  REACTIOI
2 RIN
2 SEAL
3) 14 LOCATIONS A
2273665
FIGURE 4: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 1 OF 4)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  767-27 A0229
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  53 of 121

### Page 54 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
(2) SEAL
C .-
SEAL
REACTION  3) REACTION  RING
RING
A-A
WING REAR SPAR
HOLD-DOWN CLAMP
(3 LOCATIONS)
TORQUE
TUBE
REFERENCE
ALIGN MARK
ROTARY
ACTUATOR
ASSEMBLY
ROTARY
ACTUATOR
ASSEMBLY
2273667
FIGURE 4: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 2 OF 4)
Original Issue: March 04, 2014
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-27A0229
Work - See page 1 for details.  54 of 121

### Page 55

More DataQtyIdentificationNameTaskStep
1113T1361-3ShimInstall (Kept)1
1113T1361-13ShimInstall (Kept)
Install new seal into
the reaction ring with
wet BMS 10-11,
Type 1 primer, refer
to SOPM 20-41-
02.(a)
1113T1256-29SealAssemble2
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a) (b)
1113T1251-1Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (a) (c)
1113T1251-2Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (b)
1113T1251-7Reaction RingAssemble
Apply BMS3-38 Cor-
rosion Inhibiting
Compound to mating
surfaces including
splines. (c)
1113T1251-8Reaction RingAssemble
14BACW10BP7APWasherAssemble3
Tighten nut to torque
range of 260-425
Inch-Pounds.
14BACN11Z7CDNutAssemble
Install the rotary ac-
tuator. Refer to 767
AMM 27-51-11 as
an accepted proce-
dure.
1256T3210-2Rotary Actuator Assem-
bly
Assemble4
Install the rotary ac-
tuator. Refer to 767
AMM 27-51-11 as
an accepted proce-
dure.
1256T3210-4Rotary Actuator Assem-
bly
Assemble
FIGURE 4: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
55 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 56

More DataQtyIdentificationNameTaskStep
(a) Make sure to install the new seal, oriented to the reaction ring, the same way as when the old seal was
removed. Failure to do so will result in bearing damage, due to lack of lubrication.
(b) Optional preferred part 113T1257-7.
(c) Optional preferred part 113T1257-8.
FIGURE 4: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #3 AND #6 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING INSTALLATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
56 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 57 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
This Figure applies only to: Group 1-2.
SIDE-OF-BODY
ROTARY
ACTUATOR
ASSEMBLY
TORQUE  WING-BODY-FAIRING
TUBE  SUPPORT STRUCTURE
HOLD-DOWN CLAMP
(3 LOCATIONS)
ROTARY
ACTUATOR
ASSEMBLY
2273669
FIGURE 5: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 1 OF 4)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  767-27 A0229
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  57 of 121

### Page 58 (OCR)

BOEING SERVICE BULLETIN 767-27A0229
ALERT  ALERT
(2) 6 LOCATIONS
39 RING TION
3 SEAL
SHIM 4
TRAILING EDGE (TE) FLAP SUPPORT RIB POSITION 4 SHOWN.
TE FLAP SUPPORT RIB POSITION 5 SIMILAR.  B  2273672
FIGURE 5: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 2 OF 4)
Original Issue: March 04, 2014
Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished  767-27A0229
Work - See page 1 for details.  58 of 121

### Page 59

More DataQtyIdentificationNameTaskStep
Remove the rotary
actuator. Refer to
767 AMM 27-51-05
as an accepted pro-
cedure.
1256T3250-2Rotary Actuator Assem-
bly
Remove1
Remove the rotary
actuator. Refer to
767 AMM 27-51-05
as an accepted pro-
cedure.
1256T3250-4Rotary Actuator Assem-
bly
Remove
6BACN10JC7NutRemove2
6BACW10BP7APWasherRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1269-3Reaction RingRemove3
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1269-4Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1269-9Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1269-10Reaction RingRemove
Remove seal from
the reaction ring be-
fore temperature
stress relieving. Dis-
card the removed
seal. (a)
1113T1256-31SealRemove
FIGURE 5: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
59 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

### Page 60

More DataQtyIdentificationNameTaskStep
1113T1361-4ShimRemove / Keep4
1113T1361-14ShimRemove / Keep
(b)1113T1269-3Reaction RingClean5
(b)1113T1269-4Reaction RingClean
(b)1113T1269-9Reaction RingClean
(b)1113T1269-10Reaction RingClean
(b)1113T1361-4ShimClean6
(a) Make sure to identify how the seal is oriented in the installed position, before removing the seal prior to
temperature stress relieving. In the assembly section, the new seal must be installed into the reaction
ring with the same orientation. Failure to do so will result in bearing damage, due to lack of lubrication.
(b) Use a piece of cloth damped with BMS11-9 or similar solvent. Refer SOPM 20-30-03 as an accepted
procedure.
FIGURE 5: INBOARD TRAILING EDGE FLAP SUPPORT POSITION #4 AND #5 - ROTARY ACTUATOR
ASSEMBLY AND REACTION RING REMOVAL
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: March 04, 2014
767-27A0229
60 of 121
BOEING SERVICE BULLETIN 767-27A0229
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/767-27a0229/file/1987ffdf3401.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.