# Boeing Alert Requirements Bulletin 767-27A0240 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2022-0458; AD 2023-13-09 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 767-27A0240 RB](https://openairdocs.org/service-documents/boeing/767-27a0240-rb.md)
- Title as filed: 767-27A0240 RB
- Pages: 28
- PDF: https://openairdocs.org/files/sha256/2d/5a/2d5af40480881ed9d1fb927af1a312794f7281d13d13aa869612e8956cdc7a96
- Page: https://openairdocs.org/service-documents/boeing/767-27a0240-rb/file/2d5af4048088

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Requirements Bulletin
ALERT
Number: 767-27A0240 RB
Original Issue: January 19, 2021
ATA System: 2740 2741
SUBJECT: FLIGHT CONTROLS - Horizontal Stabilizer - Drain Holes, Limit Switch and Position
Transmitter Modules Inspection, and Repair
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2021 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: January 19, 2021
767-27A0240 RB
1 of 28
4.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
2 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1 . E F F E C T I V I T Y  ................................................ 5
A. Airplanes ................................................ 5
B . S p a r e s  A f f e c t e d  ............................................ 7
2. CONCURRENT REQUIREMENTS ..................................... 8
3 . C O M P L I A N C E  ................................................ 8
4. APPROVAL ................................................ 1 2
5. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 3
A. General Information ......................................... 1 3
B. Work Instructions ........................................... 1 5
FIGURE 1: LIMIT SWITCH AND POSITION TRANSMITTER MODULE - INSPECTION ........ 2 0
FIGURE 2: LSPTM ELECTRICAL WIRING - GENERAL WIRING INSPECTION ............ 2 1
FIGURE 3: DRAIN HOLE BLOCKAGE INSPECTION ........................... 2 2
FIGURE 4: LEVELING COMPOUND INSPECTION ............................ 2 5
FIGURE 5: LSPTM ELECTRICAL WIRING - DETAILED INSPECTION ................. 2 7
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
3 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
4 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
767
Requirements Bulletin
ALERT
Number: 767-27A0240 RB
Original Issue: January 19, 2021
ATA System: 2740 2741
SUBJECT: FLIGHT CONTROLS - Horizontal Stabilizer - Drain Holes, Limit Switch and Position
Transmitter Modules Inspection, and Repair
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 767-200, 767-300, 767-300F, 767-400ER Airplane(s), line number(s)
1-717, 719-1064, 1068, 1070-1090, 1093-1097, 1099, 1101, 1103, 1105-1106, 1108, 1110, 1112,
1115, 1118, 1121, 1123, 1125, 1127, 1130, 1133, 1136, 1138, 1140-1142, 1144, 1146, 1148,
1150, 1152-1153, 1155, 1157, 1159, 1161, 1163, 1165, 1167, 1169, 1171, 1173, 1175, 1177,
1179-1180, 1182-1183, 1185-1187, 1189-1191, 1193-1195, 1197-1199, 1201, 1203-1204, 1206,
1208-1209, 1211-1212, 1214-1215, 1217-1218, 1220-1222, 1224-1225, 1227-1229, 1231-1233,
1235, 1237, 1239-1240, 1242, 1244-1245, 1247, 1249, 1251, 1253, 1255-1256, 1258, 1260,
1262-1263, 1265-1266, 1268 in 1 Group(s). Where the effectivity is presented with hyphens
between line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers
1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below. Refer
to PRR B16007 for data about this change.
NOTE: The Variable Number table below includes all affected airplanes up to Line Number 1268.
Affected airplanes after Line Number 1268 will be added to the service bulletin's
MyBoeingFleet.com (MBF) "get effectivity" result when they are added to the MBF Fleet
Profile Page.
DESCRIPTIONCONFIGURATIONGROUP
All 767-200/-300/-300F/-400ER passenger and freighter airplanes.-1
Airplane Models:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
5 of 28

### Page 6

767-200, 767-300, 767-300F, 767-400ER
GroupVariable Number
1VA001 - VA020
1VA301 - VA315
1VA501 - VA530
1VA701 - VA719
1VA801 - VA810
1VB001 - VB002
1VB051 - VB055
1VB101 - VB125
1VB201 - VB202
1VB251 - VB253
1VB281 - VB284
1VB301 - VB302
1VB321 - VB332
1VB371 - VB373
1VB401
1VB441 - VB444
1VE001 - VE003
1VE021 - VE023
1VE041 - VE043
1VE061 - VE069
1VE083 - VE086
1VE101 - VE104
1VE116 - VE118
1VE121 - VE126
1VE141 - VE152
1VE171 - VE172
1VF001 - VF002
1VF041 - VF042
1VF051
1VF061 - VF062
1VF071 - VF072
GroupVariable Number
1VF091 - VF093
1VF101 - VF102
1VF161 - VF162
1VF171 - VF172
1VF180 - VF184
1VF251
1VK001 - VK016
1VK021 - VK022
1VK031 - VK056
1VK081 - VK113
1VK131 - VK133
1VK141 - VK148
1VK161 - VK164
1VK171
1VK181
1VK186
1VL001 - VL006
1VL011
1VL701 - VL703
1VL751 - VL755
1VL806 - VL807
1VL871 - VL873
1VL891 - VL900
1VL911 - VL914
1VL931 - VL932
1VL941
1VN001 - VN041
1VN051 - VN064
1VN081 - VN099
1VN111 - VN127
1VN130 - VN137
GroupVariable Number
1VN151 - VN158
1VN163 - VN168
1VN171 - VN174
1VN191 - VN198
1VN211 - VN212
1VN221 - VN225
1VN231 - VN234
1VN241 - VN243
1VN251 - VN276
1VN291 - VN293
1VN301 - VN314
1VN371 - VN372
1VN376
1VN381 - VN388
1VN421 - VN427
1VN436
1VN471 - VN472
1VN491 - VN513
1VN531 - VN532
1VN536 - VN537
1VN541 - VN542
1VN546 - VN547
1VN551
1VN556 - VN557
1VN561 - VN562
1VN631 - VN638
1VN651 - VN658
1VN671 - VN672
1VN676
1VN681 - VN691
1VN731 - VN732
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
6 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 7

GroupVariable Number
1VN751 - VN753
1VN791 - VN792
1VN811 - VN813
1VN921 - VN922
1VN931 - VN936
1VN951 - VN953
1VN966 - VN972
1VQ001 - VQ021
1VQ071 - VQ086
1VQ111
1VR051 - VR060
1VR081
1VR084
1VR086 - VR089
1VR106 - VR109
1VR201 - VR211
1VR251
1VR256 - VR260
1VR266 - VR305
1VR401
1VR421 - VR423
1VR426
1VR441
1VR461
1VR471 - VR472
1VS051 - VS056
1VS061
1VS066 - VS070
1VS073 - VS078
1VS091 - VS104
1VS111 - VS113
GroupVariable Number
1VS131 - VS133
1VS136 - VS137
1VS176 - VS177
1VS186 - VS187
1VS196 - VS203
1VS206 - VS208
1VS211
1VS216 - VS217
1VS231
1VS246 - VS248
1VS261 - VS263
1VS266 - VS274
1VS291 - VS293
1VS301 - VS303
1VS306 - VS311
1VS316
1VS321 - VS324
1VS331 - VS333
1VS336 - VS337
1VS366 - VS367
1VS381 - VS382
1VS391 - VS392
1VS401
1VS426 - VS428
1VS466 - VS472
1VS486
1VS496 - VS497
1VS506 - VS507
1VS526
1VS546 - VS549
1VS701 - VS736
GroupVariable Number
1VS751 - VS759
1VS821 - VS825
1VS841 - VS844
1VS861
1VS881 - VS883
1VS891
1VS896
1VS901 - VS912
1VS916
1VS921 - VS928
1VS931 - VS933
1VS941
1VS951 - VS954
1VS961 - VS969
1VS971 - VS977
1VS981 - VS984
1VT001 - VT013
1VT021
1VT031 - VT033
1VT501
1VT511 - VT513
1VT521 - VT523
1VT531 - VT533
1VT541 - VT546
1VT551 - VT552
1VT556 - VT667
1VT731 - VT733
1VV001
1VW701 - VW721
1VW851
--
B. Spares Affected
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
7 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 8

2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 767-27A0240 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 767-27A0240 RB mandatory.
Boeing is issuing this service bulletin as an interim solution for preventing water and ice accumulation in
the area aft of body STA 1725.5. Boeing will issue a subsequent service bulletin with a permanent solution
for preventing water and ice accumulation in the area.
Accomplish the required actions, based on the applicable conditions in Tables 1, 2, 3, and 4 in accordance
with the Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
TABLE 1: LIMIT SWITCH AND POSITION TRANSMITTER MODULES (LSPTMS) INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 90 days after
the date of issuance
of the original stan-
dard certificate of air-
worthiness or the
original export certifi-
cate of airworthiness
Within 90 days after
the Original Issue
date of the Require-
ments Bulletin 767-
27A0240 RB
Do a General Visual
Inspection (GVI) of
each Limit Switch
and Position Trans-
mitter Module
(LSPTM) to see if
any of the LSPTMs
are partially or fully
immersed in water or
ice.
All Airplanes
-Before further flight.ACTION 1: Remove
any water or any ice
found.
CONDITION 1: NO
LSPTM IS PARTIAL-
LY OR FULLY IM-
MERSED IN WATER
OR ICE 90 Days.-ACTION 2: Repeatthe GVI of each
LSPTM to see if any
of the LSPTMs are
partially or fully im-
mersed in water or
ice.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
8 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 9

Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.ACTION 1: Remove
any water or any ice
found.
CONDITION 2: ANY
LSPTM IS PARTIAL-
LY OR FULLY IM-
MERSED IN WATER
OR ICE -Before further flight.ACTION 2: Removeany LSPTM that was
partially or fully im-
mersed in water or
ice and do a detailed
inspection for dam-
age. (a)
-Before further flight.ACTION 1: Install
serviceable LSPTM.
CONDITION 2.1: NO
LSPTM DAMAGE
FOUND 90 Days-ACTION 2: Repeat
the GVI of each
LSPTM to see if any
of the LSPTMs are
partially or fully im-
mersed in water or
ice.
-Before further flight.ACTION 1: Install
serviceable LSPTM.
CONDITION 2.2:
ANY LSPTM DAM-
AGE FOUND 90 Days-ACTION 2: Repeat
the GVI of each
LSPTM to see if any
of the LSPTMs are
partially or fully im-
mersed in water or
ice.
(a) Damage is defined as corrosion or any water damage to the LSPTM.
TABLE 2: LSPTM ELECTRICAL WIRING INSPECTION
ActionCompliance Time (Whichever Occurs
Later)
ActionCondition
-Within 90 days after
the date of issuance
of the original stan-
dard certificate of air-
worthiness or the
original export certifi-
cate of airworthiness
Within 90 days after
the Original Issue
date of the Require-
ments Bulletin 767-
27A0240 RB
Do a General Visual
Inspection(GVI) of
the LSPTM electrical
wiring to see if any of
the LSPTM electrical
wiring is partially or
fully immersed in wa-
ter or ice.
All Airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
9 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 10

ActionCompliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.ACTION 1: Remove
any water or any ice
found.
CONDITION 3: NO
LSPTM ELECTRI-
CAL WIRING PAR-
TIALLY OR FULLY
IMMERSED IN WA-
TER OR ICE
90 Days-ACTION 2: Repeat
the GVI of the
LSPTM electrical
wiring to see if any of
the LSPTM electrical
wiring is partially or
fully immersed in wa-
ter or ice.
-Before further flight.ACTION 1: Remove
any water or any ice
found.
CONDITION 4: ANY
LSPTM ELECTRI-
CAL WIRING PAR-
TIALLY OR FULLY
IMMERSED IN WA-
TER OR ICE
-Before further flight.ACTION 2: Do a de-
tailed inspection of
the LSPTM electrical
wiring for any dam-
age and repair or re-
place any damaged
LSPTM electrical
wiring found. (a)
90 Days-ACTION 3: Repeat
the GVI of the
LSPTM electrical
wiring to see if any of
the LSPTM electrical
wiring is partially or
fully immersed in wa-
ter or ice.
(a) Damage is defined as corrosion or any water damage to the wires.
TABLE 3: DRAIN HOLE INSPECTION
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 90 days after
the date of issuance
of the original stan-
dard certificate of air-
worthiness or the
original export certifi-
cate of airworthiness.
Within 90 days after
the Original Issue
date of the Require-
ments Bulletin 767-
27A0240 RB
Do a General Visual
Inspection (GVI) of
the three drain holes
for blockage.
All Airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
10 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 11

Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Before further flight.ACTION 1: Clean
each drain hole.
CONDITION 5: NO
BLOCKAGE FOUND
90 Days-ACTION 2: Repeat
the GVI of three
drain holes for block-
age.
-Before further flight.ACTION 1: Clear the
affected drain hole
blockage.
CONDITION 6: ANY
BLOCKAGE FOUND
-Before further flight.ACTION 2: Clean
each drain hole.
90 Days-ACTION 3: Repeat
the GVI of three
drain holes for block-
age.
TABLE 4: LEVELING COMPOUND INSPECTION
Repeat Interval (Not
to Exceed)
Repeat Interval (Not to Exceed)ActionCondition
-Within 90 days after
the date of issuance
of the original stan-
dard certificate of air-
worthiness or the
original export certifi-
cate of airworthiness.
Within 90 days after
the Original Issue
date of the Require-
ments Bulletin 767-
27A0240 RB.
Do a General Visual
Inspection (GVI) of
the leveling com-
pound for any loose
or cracked leveling
compound.
All Airplanes
90 Days-ACTION 1: Repeat
the GVI of the level-
ing compound for
any loose or cracked
leveling compound.
CONDITION 7: NO
LOOSE OR
CRACKED LEVEL-
ING COMPOUND
FOUND
-Before further flight or within 7 days after
the loose or cracked leveling compound is
found if the leveling compound is removed
before further flight.
ACTION 1: Repair
any loose or any
cracked leveling
compound.
CONDITION 8:
LOOSE OR
CRACKED LEVEL-
ING COMPOUND
FOUND 90 Days-ACTION 2: Repeat
the GVI of the level-
ing compound for
any loose or cracked
leveling compound.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
11 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 12

4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
12 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 13

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 767 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 767
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 767
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
13 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 14

5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
9. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation or assembly to detect damage, failure or irregularity. This could include
tactile assessment in which a component or assembly can be checked for
tightness/security. Available lighting is normally supplemented with a direct source
of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors
and magnifying lenses may be necessary. Surface cleaning and elaborate access
procedures may be required.
10. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance, unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked. Basic cleaning may be
required to ensure appropriate visibility.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
12. The instructions in Work Instructions and the figures can include operation of tools
or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and
Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain
data on versions of the tools or test equipment that you can use. It is permitted to
use replaced tools. It is not permitted to use superseded tools.
13. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
14 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 15

B. WORK INSTRUCTIONS
Actions Required for Compliance:
1. Requirements
TABLE 1: LIMIT SWITCH AND POSITION TRANSMITTER MODULES (LSPTMS) INSPECTION
Refer to the listed
procedures in SB
767-27A0240
Original Issue or
later approved re-
visions as an ac-
cepted proce-
dure.
Method of Compli-
ance
ActionCondition
PART 1: OPEN
ACCESS
-Do a General Visual In-
spection (GVI) of each
Limit Switch and Position
Transmitter Module
(LSPTM) to see if any of
the LSPTMs are partially
or fully immersed in water
or ice.
All Airplanes
-Figure 1
PART 2: WATER
AND ICE RE-
MOVAL
-ACTION 1: Remove any
water or any ice found.
CONDITION 1: NO LSPTM
IS PARTIALLY OR FULLY
IMMERSED IN WATER
OR ICE -Figure 1ACTION 2: Repeat the
GVI of each LSPTM to
see if any of the LSPTMs
are partially or fully im-
mersed in water or ice.
PART 2: WATER
AND ICE RE-
MOVAL
-ACTION 1: Remove any
water or any ice found.
CONDITION 2: ANY
LSPTM IS PARTIALLY OR
FULLY IMMERSED IN
WATER OR ICE PART 3: LSPTM
REMOVAL
-ACTION 2: Remove any
LSPTM that was partially
or fully immersed in water
or ice and do a detailed
inspection for damage.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
15 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 16

TABLE 1: LIMIT SWITCH AND POSITION TRANSMITTER MODULES (LSPTMS) INSPECTION
Refer to the listed
procedures in SB
767-27A0240
Original Issue or
later approved re-
visions as an ac-
cepted proce-
dure.
Method of Compli-
ance
ActionCondition
PART 5: LSPTM
INSTALLATION
-ACTION 1: Install service-
able LSPTM.
CONDITION 2.1: NO
LSPTM DAMAGE FOUND
PART 9: CLOSE
ACCESS
-
-Figure 1ACTION 2: Repeat the
GVI of each LSPTM to
see if any of the LSPTMs
are partially or fully im-
mersed in water or ice.
PART 4: REPAIR
OR REPLACE
THE LSPTM
-ACTION 1: Install service-
able LSPTM
CONDITION 2.2: ANY
LSPTM DAMAGE FOUND
PART 5: LSPTM
INSTALLATION
-
PART 9: CLOSE
ACCESS (a)
-
-Figure 1ACTION 2: Repeat the
GVI of each LSPTM to
see if any of the LSPTMs
are partially or fully im-
mersed in water or ice.
(a) This step may be skipped if additional work is required. Perform this step if no additional
work is required.
TABLE 2: LSPTM ELECTRICAL WIRING INSPECTION
Refer to the listed proce-
dures in SB 767-27A0240
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
(b)
-Do a GVI of the LSPTM
electrical wiring to see if
any of the LSPTM electri-
cal wiring is partially or ful-
ly immersed in water or
ice.
All Airplanes
-Figure 2
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
16 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 17

TABLE 2: LSPTM ELECTRICAL WIRING INSPECTION
Refer to the listed proce-
dures in SB 767-27A0240
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
PART 2: WATER AND ICE
REMOVAL
-ACTION 1: Remove any
water or any ice found.
CONDITION 3: NO
LSPTM ELECTRICAL
WIRING PARTIALLY OR
FULLY IMMERSED IN
WATER OR ICE
PART 9: CLOSE ACCESS-
-Figure 2ACTION 2: Repeat the GVI
of the LSPTM electrical
wiring to see if any of the
LSPTM electrical wiring is
partially or fully immersed
in water or ice.
PART 2: WATER AND ICE
REMOVAL
-ACTION 1: Remove any
water or any ice found.
CONDITION 4: ANY
LSPTM ELECTRICAL
WIRING PARTIALLY OR
FULLY IMMERSED IN
WATER OR ICE
-Figure 5ACTION 2: Do a detailed
inspection of the LSPTM
electrical wiring for any
damage and repair or re-
place any damaged
LSPTM electrical wiring
found. (a)
PART 9: CLOSE ACCESS
(c)
-
-Figure 2ACTION 3: Repeat the GVI
of the LSPTM electrical
wiring to see if any of the
LSPTM electrical wiring is
partially or fully immersed
in water or ice.
(a) Damage is defined as corrosion or any water damage to the wires.
(b) This step may be skipped if access door 312AR is open and there is access to the area aft of body STA
1725.5.
(c) This step may be skipped if additional work is required. Perform this step if no additional work is required.
TABLE 3: DRAIN HOLE INSPECTION
Refer to the listed proce-
dures in SB 767-27A0240
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
(a)
-Do a GVI of the three drain
holes for blockage.
All Airplanes
-Figure 3
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
17 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 18

TABLE 3: DRAIN HOLE INSPECTION
Refer to the listed proce-
dures in SB 767-27A0240
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
PART 7: DRAIN HOLE
CLEAN
-ACTION 1: Clean each
drain hole.
CONDITION 5: NO
BLOCKAGE FOUND
PART 9: CLOSE ACCESS-
-Figure 3ACTION 2: Repeat the GVI
of the three drain holes for
blockage.
PART 6: BLOCKAGE RE-
MOVAL
-ACTION 1: Clear the affect-
ed drain hole blockage.
CONDITION 6: ANY
BLOCKAGE FOUND
PART 7: DRAIN HOLE
CLEAN
-ACTION 2: Clean each
drain hole.
PART 9: CLOSE ACCESS
(b)
-
-Figure 3ACTION 3: Repeat the GVI
of the three drain holes for
blockage.
(a) This step may be skipped if access door 312AR is open and there is access to the area aft of body STA
1725.5.
(b) This step may be skipped if additional work is required. Perform this step if no additional work is required.
TABLE 4: LEVELING COMPOUND INSPECTION
Refer to the listed proce-
dures in SB 767-27A0240
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS
(a)
-Do a GVI of the leveling
compound for any loose or
cracked leveling com-
pound.
All Airplanes
-Figure 4
PART 9: CLOSE ACCESS-ACTION 1: Repeat the GVI
of the leveling compound
for any loose or cracked
leveling compound.
CONDITION 7: NO
LOOSE OR CRACKED
LEVELING COMPOUND
FOUND
-Figure 4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
18 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 19

TABLE 4: LEVELING COMPOUND INSPECTION
Refer to the listed proce-
dures in SB 767-27A0240
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
PART 8: REPAIR THE
LEVELING COMPOUND
-ACTION 1: Repair any
loose or any cracked level-
ing compound.
CONDITION 8: LOOSE
OR CRACKED LEVELING
COMPOUND FOUND PART 9: CLOSE ACCESS-
-Figure 4ACTION 2: Repeat the GVI
of the leveling compound
for any loose or cracked
leveling compound.
(a) This step may be skipped if access door 312AR is open and there is access to the area aft of body STA
1725.5.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
19 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 20

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
By General Visual
Inspection to see if
any part of the
LSPTM is in water or
ice.
3S251T440-( )LIMIT SWITCH AND
POSITION TRANSMIT-
TER MODULE
Inspect1
FIGURE 1: LIMIT SWITCH AND POSITION TRANSMITTER MODULE - INSPECTION
(SHEET 1 OF 1)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
20 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 21

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
By General Visu-
al Inspection to
see if there is
any damage. (a)
1-WIRINGInspect1
(a) Damage is defined as any corrosion or water damage
FIGURE 2: LSPTM ELECTRICAL WIRING - GENERAL WIRING INSPECTION
(SHEET 1 OF 1)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
21 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 22

FIGURE 3: DRAIN HOLE BLOCKAGE INSPECTION
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
22 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 23 (OCR)

REQUIREMENTS BULLETIN 767-27A0240
ALERT  ALERT
CENTER  RIGHT
LSPTM  LSPTM
S-36L  S-36R
S-39L  S-39R
A-A  2940472
FIGURE 3: DRAIN HOLE BLOCKAGE INSPECTION
(SHEET 2 OF 3)
Original Issue: January 19, 2021
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  Work - See page 1 for details.  767-27A0240 RB  23 of 28

### Page 24

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
By General Visual
Inspection for any
blockage.
3-DRAIN HOLEInspect1
FIGURE 3: DRAIN HOLE BLOCKAGE INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
24 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 25 (OCR)

REQUIREMENTS BULLETIN 767-27A0240
ALERT  ALERT
STA
1725.5
STA
1725.5
LSPTMS
ELECTRICAL
WIRING
S-36R
S-39R
S-39L
S-36L
AREA AFT OF BODY
STATION 1725.5
(TYPICAL)
DRAIN HOLES
• LEVELING
COMPOUND
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 4: LEVELING COMPOUND INSPECTION
(SHEET 1 OF 2)
Original Issue: January 19, 2021
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-27A0240 RB
Work - See page 1 for details.  25 of 28

### Page 26

More DataQtyIdentificationNameTaskStep
By General Visual
Inspection to see if
there is any dam-
age. (a)
-BMS5-125, TYPE IILEVELING COM-
POUND
Inspect1
(a) Damage is defined as cracked or loose leveling compound.
FIGURE 4: LEVELING COMPOUND INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
26 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 27

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 5: LSPTM ELECTRICAL WIRING - DETAILED INSPECTION
(SHEET 1 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
27 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

### Page 28

More DataQtyIdentificationNameTaskStep
By Detailed In-
spection of the
LSPTM electrical
wiring for any
damage and re-
pair or replace
any damaged
LSPTM electrical
wiring found. (a)
1-WIRINGInspect1
(a) If any damage to wire(s) are found, repair the damage or replace affected wiring. Refer to SWPM 20-10-
13 as an accepted procedure.
FIGURE 5: LSPTM ELECTRICAL WIRING - DETAILED INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: January 19, 2021
767-27A0240 RB
28 of 28
REQUIREMENTS BULLETIN 767-27A0240
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.