# Boeing Alert Service Bulletin 767-51A0028: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2005-22523; AD 2013-05-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-51A0028](https://openairdocs.org/service-documents/boeing/767-51a0028.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin - SB-767-51A0028-01
- Pages: 52
- PDF: https://openairdocs.org/files/sha256/71/54/71549cdcd8a9c69cb98a4f1508b7cbc8d9ecc58a3585fc0acd8f9700f74fea76
- Page: https://openairdocs.org/service-documents/boeing/767-51a0028/file/71549cdcd8a9

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 52
 
 
 
Commercial
Airplane
Group 767
Service Bulletin
Number: 767-51A0028
Date: December 09, 2004
Revision 1: October 12, 2006
ATA System: 5141
SUBJECT: STRUCTURES - Airframe Drainage - Horizontal Stabilizer Center Section - Gutter 
Installation
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2004 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.  For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, 707, 717, 727, 737, 747, 757, 767, 777, BBJ, BOEING BUSINESS JET, DC-8, DC-9, DC-10, MD-10, 
MD-11, MD-80, MD-90, the Boeing logo and the Boeing livery are among the trademarks owned by Boeing or 
its subsidiaries. No intellectual property license (express or implied) is granted in connection with this document 
or otherwise.

### Page 2

BLANK PAGE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
BLANK PAGE

### Page 3

Table of Contents
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 7
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  11
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  12
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  12
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  12
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  13
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  14
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  14
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  15
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  15
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  15
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  16
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  16
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  17
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  17
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  18
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  19
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   19
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  20
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  21
FIGURE  1: GUTTER PREPARATION AND PROTECTION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  25
FIGURE  2: REWORK SIDE BRACE FITTINGS - HORIZONTAL STABILIZER CENTER SECTION .  .  26
FIGURE  3: GUTTER INSTALLATION - UPPE R SURFACE, HORIZONTAL  STABILIZER CENTER
SECTION - LEFT SIDE .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  28
FIGURE  4: GUTTER INSTALLATION - UPPE R SURFACE, HORIZONTAL  STABILIZER CENTER
SECTION - RIGHT SIDE  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  32
FIGURE  5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION.  .  .  .  .  .  .  .  35
FIGURE  6: DISCONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION .  .  40
FIGURE  7: GUTTER PREPARATION - LOCATOR IDENTIFICATION  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  42
FIGURE  8: GUTTER INSTALLATION - UPPE R SURFACE, HORIZONTAL  STABILIZER CENTER
SECTION  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  43

### Page 4

Table of Contents
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
FIGURE  9: GUTTER SEALING - HORIZONTAL STABILIZER CENTER SECTION.  .  .  .  .  .  .  .  .  .  . 49
FIGURE  10: CONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION   .  .  . 51

### Page 5

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 52
 
 
 
Commercial
Airplane
Group 767
Service Bulletin
Number: 767-51A0028 Revision Transmittal Sheet
Date: December 09, 2004
Revision 1: October 12, 2006
ATA System: 5141
SUBJECT: STRUCTURES - Airframe Drainage - Horizontal Stabilizer Center Section - Gutter 
Installation
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed as shown in the initial release of this service bulletin.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2005-NM-058-AD is related to this 
service bulletin.
REASON FOR REVISION
This revision is sent to improve the work instructions as a result of access restrictions found during the validation 
of the related 767-200, 767-300, 767-300F service bulletin 767-51A0027. Additionally, based on one other 
operator report revision 1 is sent to provide instructions to install the gutter as a one piece assembly. Instructions 
throughout the service bulletin are changed to provide two options to install the gutter as one piece or as two 
pieces.
The related 767-200, 767-300 and 767-300F Boeing service bulletin is 767-51A0027. Service bulletin 
767-51A0027 was validated on airplane VN097. In the validation the gutter was installed in two pieces. The 
changes necessary as a result of the validation of service bulletin 767-51A0027 are included in this service 
bulletin.
Changes to this service bulletin include:
– References to a FAA Notice of Proposed Rule Making are added throughout the service bulletin.
– Material Information - A new 180T3250-9 gutter assembly is added. The 180T3250-4 gutter assembly is 
optional to the 180T3250-9 gutter assembly. The Boeing drawing number and parts modified and 
reidentified are changed. The quantity of optional rivets supplied by the operator is reduced.
– Accomplishment Instructions - An additional access door is added. Maintenance manual references to test 
the elevator control system, elevator power control actuator and autopilot systems are added. A stabilizer 
tool reference has been removed as it is acceptable to use another lock tool. A maintenance manual 
reference to install the service platform is changed.
– Figure 1 is changed to add a dimension for the gutter assembly cut location.
– Figure 2 is changed to give rework instructions if cracks are found and to add an alternative high frequency 
eddy current inspection for cracks. The two possible side brace fittings installed after the rework are 
identified.
– Figures 3 and 4 are changed to remove the option to install rivets and to change the quantity of hi loks used 
to install the gutter assembly at each hydraulic bracket.

### Page 6

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
– Figure 6 is added to disconnect and move the hydraulic lines at the hydraulic control brackets.
– Figure 7 is added to identify a locator mark on the gutter when installing the gutter as one piece.
– Figure 8 is added to install the gutter as one piece.
– Figure 9 is added to apply sealant between the upper spar chord and gutter when installing the gutter as 
one piece.
– Figure 10 is added to connect the hydraulic lines at the hydraulic control brackets.
Paragraph 1.A., Effectivity, shows changes of airplane operators. Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
Original Issue: December 09, 2004
Revision 1: October 12, 2006

### Page 7

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 52
 
 
 
Commercial
Airplane
Group 767
Service Bulletin
Number: 767-51A0028 Summary
Date: December 09, 2004
Revision 1: October 12, 2006
ATA System: 5141
SUBJECT: STRUCTURES - Airframe Drainage - Horizontal Stabilizer Center Section - Gutter 
Installation
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions to install a gutter on the horizontal stabilizer center section. This gutter 
will channel water that enters Section 48 at the side of body seals away from the elevator control system 
components aft of the horizontal stabilizer. This will make it less likely that ice can accumulate on the elevator 
control system components. Ice on the elevator systems can restrict elevator movement which limits the ability 
of the flight crew to make elevator control inputs, resulting in reduced controllability of the airplane.
Boeing has received three reports of stiff or jammed elevator controls. Analysis of all three reports indicated that 
ice had formed on the elevator control components aft of the horizontal stabilizer, which restricted the movement 
of the elevator controls. Water was found to get into Section 48 of the airplane through the fairing panels at the 
side of the body. The ice then formed from water that had accumulated on the horizontal stabilizer center 
section. In one case, the water accumulated due to a leak in the Auxiliary Power Unit (APU) inlet duct. In another 
case, the water came from a leak in a galley water drain line.
After line number 921, a gutter is installed on the horizontal stabilizer center section in production.
Accomplishment of the modification shown in this service bulletin will make it less likely that movement of the 
elevator control system will be restricted due to the accumulation of ice on the elevator control system 
components aft of the horizontal stabilizer center section.
As a part of a service bulletin validation program, this change was completed on airplane VN097 by Service 
Bulletin 767-51A0027 before the release of Revision 1 of this service bulletin. The change completed on 
airplane VN097 by Service Bulletin 767-51A0027 is equivalent to the release of Revision 1 of this service 
bulletin.
The related 767-200, 767-300 and 767-300F Boeing service bulletin is 767-51A0027.
Boeing Service Related Problem (SRP) 767-SRP-27-0147 is related to this service bulletin.

### Page 8

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 52
 
 
ACTION (PRR B12901-51S)
Get access to the horizontal stabilizer center section through the service doors 312AR and 313AL. Disconnect 
6 hydraulic lines. Rework the horizontal stabilizer side brace fittings to enlarge the drain holes.
Option 1: Install the gutter as two pieces along the rear spar upper chord of the horizontal stabilizer center 
section, on the controls brackets. Seal the gap between the gutter sections. Install two splices to re-join the 
gutter sections using shims between mating surfaces. Apply sealant between the gutter, the rear upper spar 
chord and splices.
Option 2: Install the gutter as one piece along the rear spar upper chord of the horizontal stabilizer center 
section, on the controls brackets. Apply sealant between the gutter and the rear upper spar chord.
Do system tests of the elevator control system, elevator power control actuator and autopilot systems.
EFFECTIVITY
767-400ER airplanes line number 758 through 878. Refer to Paragraph 1.A.1., Airplanes for the list of affected 
airplanes.
COMPLIANCE
Boeing recommends that operators accomplish the modifications shown in this bulletin within five years after 
the issue date of the initial release of this service bulletin.
FAA Notice of Proposed Rule Making 2005-NM-058-AD is related to this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service 
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin 
mandatory.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of April 27, 2001. Please refer to Paragraph 
2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts. 
Refer to Paragraph 2.A., Material - Price and Availability.

### Page 9

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
STABILIZER CENTER SECTION
TO THE HORIZONTAL
INSTALL GUTTER ASSEMBLY
FWD
UP
438865

### Page 10

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
BLANK PAGE

### Page 11

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 52
 
 
 
Commercial
Airplane
Group 767
Service Bulletin
Number: 767-51A0028
Date: December 09, 2004
Revision 1: October 12, 2006
ATA System: 5141
SUBJECT: STRUCTURES - Airframe Drainage - Horizontal Stabilizer Center Section - Gutter 
Installation
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent 
production airplanes. Refer to PRR B12901-51S for data about this change.
Airplane models:
767-400ER
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
CONTINENTAL AIRLINES  (CAL)
1 VQ071–VQ086
DELTA AIR LINES  (DAL)
1 VQ001–VQ021
IDENTIFICATION BY VARIABLE NUMBER
GROUP CONFIGURATION DESCRIPTION
1 - 767-400ER airplanes, line number 758 through 
878.
Variable  Group
VQ001–VQ021 1
VQ071–VQ086 1

### Page 12

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 52
 
 
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions to install a gutter on the horizontal stabilizer center section. This 
gutter will channel water that enters Section 48 at the side of body seals away from the elevator control 
system components aft of the horizontal stabilizer. This will make it less likely that ice can accumulate 
on the elevator control system components. Ice on the elevator systems can restrict elevator 
movement which limits the ability of the flight crew to make elevator control inputs, resulting in reduced 
controllability of the airplane.
Boeing has received three reports of stiff or jammed elevator controls. Analysis of all three reports 
indicated that ice had formed on the elevator control components aft of the horizontal stabilizer, which 
restricted the movement of the elevator controls. Water was found to get into Section 48 of the airplane 
through the fairing panels at the side of the body. The ice then formed from water that had 
accumulated on the horizontal stabilizer center section. In one case, the water accumulated due to a 
leak in the Auxiliary Power Unit (APU) inlet duct. In another case, the water came from a leak in a 
galley water drain line.
After line number 921, a gutter is installed on the horizontal stabilizer center section in production.
Accomplishment of the modification shown in this service bulletin will make it less likely that movement 
of the elevator control system will be restricted due to the accumulation of ice on the elevator control 
system components aft of the horizontal stabilizer center section.
The related 767-200, 767-300 and 767-300F Boeing service bulletin is 767-51A0027.
Boeing Service Related Problem (SRP) 767-SRP-27-0147 is related to this service bulletin.
Revision 1 is sent to improve the work instructions as a result of access restrictions found during the 
validation of the related 767-200, 767-300, 767-300F service bulletin 767-51A0027. Additionally, 
based on one other operator report revision 1 is sent to provide instructions to install the gutter as a 
one piece assembly. Instructions throughout the service bulletin are changed to provide two options 
to install the gutter as one piece or as two pieces.
The related 767-200, 767-300 and 767-300F Boeing service bulletin is 767-51A0027. Service bulletin 
767-51A0027 was validated on airplane VN097. In the validation the gutter was installed in two pieces. 
The changes necessary as a result of the validation of service bulletin 767-51A0027 are included in 
this service bulletin.
Changes to this service bulletin include:
– References to a FAA Notice of Proposed Rule Making are added throughout the service bulletin.
– Material Information - A new 180T3250-9 gutter assembly is added. The 180T3250-4 gutter 
assembly is optional to the 180T3250-9 gutter assembly. The Boeing drawing number and parts 
modified and reidentified are changed. The quantity of optional rivets supplied by the operator is 
reduced.

### Page 13

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 52
 
 
– Accomplishment Instructions - An additional access door is added. Maintenance manual 
references to test the elevator control system, elevator power control actuator and autopilot 
systems are added. A stabilizer tool reference has been removed as it is acceptable to use 
another lock tool. A maintenance manual reference to install the service platform is changed.
– Figure 1 is changed to add a dimension for the gutter assembly cut location.
– Figure 2 is changed to give rework instructions if cracks are found and to add an alternative high 
frequency eddy current inspection for cracks. The two possible side brace fittings installed after 
the rework are identified.
– Figures 3 and 4 are changed to remove the option to install rivets and to change the quantity of 
hi loks used to install the gutter assembly at each hydraulic bracket.
– Figure 6 is added to disconnect and move the hydraulic lines at the hydraulic control brackets.
– Figure 7 is added to identify a locator mark on the gutter when installing the gutter as one piece.
– Figure 8 is added to install the gutter as one piece.
– Figure 9 is added to apply sealant between the upper spar chord and gutter when installing the 
gutter as one piece.
– Figure 10 is added to connect the hydraulic lines at the hydraulic control brackets.
D. Description
Get access to the horizontal stabilizer center section through the service doors 312AR and 313AL. 
Disconnect 6 hydraulic lines. Rework the horizontal stabilizer side brace fittings to enlarge the drain 
holes.
Option 1: Install the gutter as two pieces along the rear spar upper chord of the horizontal stabilizer 
center section, on the controls brackets. Seal the gap between the gutter sections. Install two splices 
to re-join the gutter sections using shims between mating surfaces. Apply sealant between the gutter, 
the rear upper spar chord and splices.
Option 2: Install the gutter as one piece along the rear spar upper chord of the horizontal stabilizer 
center section, on the controls brackets. Apply sealant between the gutter and the rear upper spar 
chord.
Do system tests of the elevator control system, elevator power control actuator and autopilot systems.
NOTE: Boeing Service Bulletins 767-25A0323 and 767-27A0193 are also related to
767-SRP-27-0147. Boeing recommends that operators accomplish these service bulletins,
and this service bulletin, to make it less likely that movement of the elevator control system
will be restricted due to the accumulation of ice on the elevator control system components
aft of the horizontal stabilizer center section.
Revision 1 - No more work is necessary on airplanes changed as shown in the initial release of this 
service bulletin.
E. Compliance
Boeing recommends that operators accomplish the modifications shown in this bulletin within five 
years after the issue date of the initial release of this service bulletin.
FAA Notice of Proposed Rule Making 2005-NM-058-AD is related to this service bulletin.
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to 
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in 
this service bulletin mandatory.

### Page 14

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 52
 
 
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this modification for each 
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with 
operator task-hour data if necessary. The estimate does not include lost time. These are some 
examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Option 1 - Two Piece Gutter Installation
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 1 0.50 0.50
Figure 1 1 0.25 0.25
Figure 2 1 0.75 0.75
Figure 3 1 3.00 3.00
Figure 4 1 3.00 3.00
Figure 5 1 2.00 2.00
Figure 6 1 2.50 2.50
Figure 10 1 2.50 2.50
Close Access 1 0.50 0.50
TOTAL FOR EACH AIRPLANE 15 15
Option 2 - One Piece Gutter Installation
Task
Number of 
Persons Task-Hours Elapsed Hours
Open Access 1 0.50 0.50
Figure 2 1 0.75 0.75
Figure 6 1 2.50 2.50
Figure 7 1 0.25 0.25

### Page 15

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
H. Weight and Balance Changes
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR B12901-51S
b. Service Related Problem (SRP) 767-SRP-27-0147
c. 767 Aircraft Maintenance Manual (AMM) 06-42-00/201, 20-10-09, 20-10-10, 22-10-00/501, 
27-31-00/501, 27-31-05/601, 27-41-10/401, 29-11-00/201, 52-48-00
d. 767 Structural Repair Manual (SRM) 51-20-11
e. 767 Non-Destructive Testing (NDT) Manual, Part 6, 51-00-04, Part 6, 51-00-11, Part 6, 
51-00-16
f. Boeing Standard Overhaul Practices Manual (SOPM) Subject 20-20-02, 20-41-02, 
20-43-01, 20-43-03, 20-50-10, 20-50-19 and 20-50-20
g. Boeing Service Bulletin 767-25A0323, “EQUIPMENT/FURNISHINGS - Buffet/Galley - Aft 
Galley - A2 Galley Drain Leak Inspection” and 767-27A0193, “FLIGHT CONTROLS - 
Elevator Control System - Seal Block Hole Addition”
h. Boeing Parts Standards Document D-590
i. Boeing Drawing 012W6100 
j. FAA Notice of Proposed Rule Making 2005-NM-058-AD
Figure 8 1 4.00 4.00
Figure 9 1 0.50 0.50
Figure 10 1 2.50 2.50
Close Access 1 0.50 0.50
TOTAL FOR EACH AIRPLANE 11.5 11.5
Airplane
Change in Weight 
(Pounds)
Change in Moment 
(Pound-Inches)
767-400ER Airplanes +3.2 +6609.5
Option 2 - One Piece Gutter Installation
Task
Number of 
Persons Task-Hours Elapsed Hours

### Page 16

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
None.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability 
information.

### Page 17

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane as shown 
below. If there is a limit to the quantity (QTY) of available kits, a supply sequence is given by Spares. 
More kits become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from the 
date Boeing gets the purchase order.
The kit is subject to the terms and conditions of the Boeing standard purchase order acknowledgment. 
After the Unit Price date, new price data is applicable. Prices are in United States dollars. Terms: Net 
30 days.
Reference this service bulletin and submit your purchase order by one of the methods that follow: 
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington   98124-2207  USA
B. Industry Support Information
Boeing warranty remedies are available for 767 airplanes in warranty as of April 27, 2001. For man-
hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing 
Commercial Airplanes Group - Warranties. The kits/parts for airplanes in warranty as of that date will 
be supplied at no charge. Send a purchase order for the kits/parts to Boeing Spares. Please refer to 
this service bulletin number and reference the airplane variable number(s) in your purchase order.
Kit Number Name Date QTY
ROLT
(Days)
Unit Price thru
Dec 31/06
015T1770-1 Top Kit 07/26/04 1 80 $ 1,902.00
09/21/04 22
10/19/04 22
11/16/04 22
12/16/04 22
01/24/05 22
02/21/05 22
03/21/05 22
04/18/05 22
05/16/05 22
06/14/05 22

### Page 18

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kit shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane.
Kit 015T1770                        
New Part Number
QTY
Name
Existing Part 
Number Notes-1
180T3250-9 
(180T3250-4 optional)
1 GUTTER ASSY
180T3251-2 1 SPLICE (c)
180T3251-3 1 SPLICE (c)
BACB30VT5HK3 24 BOLT, PROTRUDING HD (a) (b)
BACB30VT5HK4 9 BOLT, PROTRUDING HD (a) (b)
BACC30BL5 33 COLLAR, SHEAR (a)
BACS40R006C025F 4 SHIM, LAMINATED (a)
BACS40R007C046F 1 SHIM, LAMINATED (a)
BACS40R007D046F 2 SHIM,LAMINATED (a)
BACS40R009B015F 6 SHIM,LAMINATED (a)
BACS40R015B020F 2 SHIM, LAMINATED (a)
(a) There are more parts than are necessary.
(b) If grip length shown is not available at Boeing, fasteners supplied in kits may be 
one grip length longer than indicated. Also, if any fasteners part numbers listed are 
not available or have been superseded, substitute fasteners may be supplied in kits. 
Boeing Document D-590 and Boeing Drawing 012W6100 are used to determine the 
part numbers used as substitutes.
(c) This part is only necessary for option 1, two piece gutter installation.

### Page 19

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
2. Parts and Materials Supplied by the Operator:
3. Parts Modified and Reidentified:
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the 
number of parts changed on each airplane.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
Part Number / 
Specification QTY Name Notes
BACR15BB5AD 16 Rivet (a)
BACR15BB5D 16 Rivet (a)
BACR15FT5AD 16 Rivet (a)
BACR15FT5D 16 Rivet (a)
BMS 10-11 1/2 pint Primer (b)
BMS 5-95, Type 1, 
Class B-1/2
1/2 pint Sealant (b)
Dye 1 ounce Dye Penetrant (b)
Alodine 1200, 
Type 2, Class A
1/2 pint Chemical Conversion Coating (b)
(a) This part is optional to BACB30VT5HK3 and BACB30VT5HK4 supplied in 
Kit 015T1770-1.
(b) See the Qualified Products List at the end of the Boeing Material 
Specification (BMS) for supplier data.
Existing Part 
Number QTY Name New Part Number Notes
182T1330-1 2 Side Brace Fitting 182T1330-3 (a) (b) (c) (d)
182T1330-2 2 Side Brace Fitting 182T1330-4 (a) (b) (c) (d)
(a) Make the change given in this service bulletin.
(b) This is the part number after the change given in this service bulletin.
(c) This part is used in production.
(d) The 182T1330-2 side brace fitting is optional to the 182T1330-1 side brace fitting.

### Page 20

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, 
maintenance and overhaul tools in the manuals given in Paragraph 1.J., References, can be 
necessary. Examine operator tool supply to make sure all necessary tools are available.

### Page 21

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for 
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Angular tolerance is plus or minus 2 degrees
— Torque limits to tighten nuts and bolts are given in 767 Structural Repair Manual, 
Chapter 51.
4. For approved fastener and process material substitutions, refer to 767 Structural Repair 
Manual, Chapter 51, Alternate fasteners are given in 767 Structural Repair Manual 
Chapter 51 and Boeing Drawing 012W6100.
5. If the length of fasteners specified in this service bulletin do not meet the installation 
standards, fasteners of the same specification, or an approved substitute, one grip 
length longer or shorter may be used.
B. WORK INSTRUCTIONS
1. Lock the horizontal stabilizer. Refer to 767 AMM 27-41-10/401.
2. Remove pressure from the Left, Right and Center hydraulic systems as shown in 
767 AMM 29-11-00/201 or equivalent approved procedure.
3. Put these switches on the right side panel, P61, in the off position and attach 
DO-NOT-OPERATE tags:
GRID SWITCH
S2 RIGHT TAIL HYD SHUT OFF VALVE SWITCH
S4 CENTER TAIL HYD SHUT OFF VALVE SWITCH
S6 LEFT TAIL HYD SHUT OFF VALVE SWICH

### Page 22

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
4. Open these circuit breakers on the overhead circuit breaker panel, P11, and attach 
DO-NOT-CLOSE tags:
WARNING: BEFORE YOU BEGIN TO WORK, MAKE SURE THAT THERE IS NO MOVEMENT OF
THE HORIZONTAL STABILIZER.
WARNING: STAY OFF THE SERVICE ACCESS DOOR 312AR, AND THE ACCESS DOOR FOR
THE CONTROLS BAY 313AL. YOUR WEIGHT CAN CAUSE THE SPRING-LOADED
LATCHES TO RELEASE. IF YOU FALL  THROUGH THE DOOR, INJURY CAN
OCCUR.
5. Get access to the horizontal stabilizer center section through access door 312AR and 313AL as 
shown in 767 AMM 06-42-00/201 or equivalent approved procedure.
WARNING: MAKE SURE THE SERVICE PLATFORM IS INSTALLED ABOVE THE SERVICE
ACCESS DOOR OPENING. IF YOU DO NOT INSTALL THE SERVICE PLATFORM,
YOU CAN FALL THROUGH THE SERVICE ACCESS DOOR OPENING AND INJURY
CAN OCCUR.
6. Install the service platform above the opening of the service access door as shown in 767 AMM 
52-48-00 or equivalent approved procedure.
7. Remove the hydraulic lines as given in Figure 6.
WARNING: REMOVE ALL PRESSURE FROM THE SYSTEM AS SPECIFIED IN THE APPLICABLE
MAINTENANCE INSTRUCTIONS BEFORE YOU START THE REMOVAL OF THE
FLARELESS TUBING ASSEMBLY. A PRESSURIZED SYSTEM CAN CAUSE INJURY.
WARNING: MAKE SURE EACH TUBE AND THE PORT FITTING HAVE TAGS TO IDENTIFY THE
CORRECT INSTALLATION LOCATION. IF YOU DO NOT PUT TAGS ON THE TUBES
AND PORT FITTINGS, CROSS-CONNECTION OF THE TUBES CAN OCCUR
DURING INSTALLATION. IF THIS OCCURS, UNINTENDED OPERATION OR
MALFUNCTION OF AIRPLANE SYSTEMS CAN RESULT AND CAUSE INJURY TO
PERSONS AND DAMAGE TO EQUIPMENT.
CAUTION: PUT CAPS ON THE HYDRAULIC LINES AND FITTINGS. UNWANTED MATERIAL
CAN CAUSE CONTAMINATION OF HYDRA ULIC LINES, DAMAGE TO SYSTEM
COMPONENTS, AND LEAKAGE OF HYDRAULIC FLUID.
CAUTION: DO NOT LET HYDRAULIC FLUID LEAKAGE COLLECT. REMOVE IT IMMEDIATELY.
HYDRAULIC FLUID CAN CAUSE DAMAGE.
CAUTION: PUT CAPS ON THE HOSES AND FITTING S. UNWANTED MATERIAL CAN CAUSE
CONTAMINATION OF HOSES, DAMAGE  TO SYSTEM COMPONENTS, AND
LEAKAGE OF HYDRAULIC FLUID. REMO VE ALL HYDRAULIC FLUID LEAKAGE.
HYDRAULIC FLUID CAN CAUSE CORROSION OR OTHER DAMAGE.
GRID CIRCUIT BREAKER
H17 FLT CONT SHUTOFF TAIL LEFT
H18 FLT CONT SHUTOFF TAIL CENTER
H27 FLT CONT SHUTOFF TAIL RIGHT

### Page 23

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
8. Do Option 1 to install the Gutter in two pieces OR do Option 2 to install the gutter as one piece.
OPTION 1 - TWO PIECE GUTTER INSTALLATION
a. Cut the gutter into two sections and finish the cut edges as given in Figure 1.
b. Rework the horizontal stabilizer side brace fittings as given in Figure 2.
c. Install left gutter section as given in Figure 3.
d. Install right gutter section as given in Figure 4.
e. Splice the gutter sections as given in Figure 5.
OPTION 2 - ONE PIECE GUTTER INSTALLATION
a. Rework the horizontal stabilizer side brace fittings as given in Figure 2.
b. Identity a locator mark on the gutter as given in Figure 7.
c. Install the gutter as given in Figure 8.
d. Seal the gutter as given in Figure 9.
CAUTION: ALWAYS KEEP THE CLAMPS TIGHT. TIGHT CLAMPS KEEP THE AREA BETWEEN
THE TUBE AND THE CLAMP SURFACES FREE OF UNWANTED MATERIALS AND
CONTAMINATION. IF SURFACES ARE NOT CLEAN, DAMAGE BY FRICTION CAN
OCCUR.
CAUTION: USE THE INDEX LINE ON THE SIDE OF THE HOSE TO MAKE SURE THE HOSE IS
NOT TWISTED. IF THE HOSE IS TWISTE D, HOSE FAILURE OR HOSE COUPLING
LEAKAGE CAN OCCUR BEFORE THE USUAL TIME.
9. Install the hydraulic lines as given in Figure 10.
10. Remove the service platform and close access door 312AR and 313AL as shown in 767 AMM 
06-42-00/201 or equivalent approved procedure.
11. Close these circuit breakers on the overhead circuit breaker panel, P11, and remove 
DO-NOT-CLOSE tags:
GRID CIRCUIT BREAKER
H17 FLT CONT SHUTOFF TAIL LEFT
H18 FLT CONT SHUTOFF TAIL CENTER
H27 FLT CONT SHUTOFF TAIL RIGHT

### Page 24

December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
12. Put these switches on the right side panel, P61, in the ON position and remove 
DO-NOT-OPERATE tags:
13. Restore pressure to the Left, Right and Center hydraulic systems as shown in 
767 AMM 29-11-00/201 or equivalent approved procedure.
14. Unlock the horizontal stabilizer. Refer to 767 AMM 27-41-10/401.
15. Do an operational test of the elevator control system as shown in 767 AMM 27-31-00/501 or 
equivalent approved procedure and make sure that there is no leakage of hydraulic fluid.
16. Do a check of the Elevator Power Control Actuator as shown in 767 AMM 27-31-05/601 or 
equivalent approved procedure.
17. Do a systems test of the autopilot system as shown in 767 AMM 22-10-00/501 or equivalent 
approved procedure.
18. Put the airplane back to a serviceable condition.
GRID SWITCH
S2 RIGHT TAIL HYD SHUT OFF VALVE SWITCH
S4 CENTER TAIL HYD SHUT OFF VALVE SWITCH
S6 LEFT TAIL HYD SHUT OFF VALVE SWICH

### Page 25

FIGURE 1: GUTTER PREPARATION AND PROTECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
FIGURE  1: GUTTER PREPARATION AND PROTECTION
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane.
NOTE: This figure applies to option 1, two piece gutter installation.
STEP TASK NAME PART NUMBER QTY NOTES
1 Cut Gutter Assy 180T3250-9 
(180T3250-4 optional)
1( a )
2 Apply Chemical 
Conversion 
Coating
Type 2, Class A 2 layers To all bare aluminum surfaces. 
As given in SOPM 20-43-01.
3 Apply Primer BMS 10-11, Type 1 2 layers To all bare aluminum surfaces. 
As given in SOPM 20-41-02.
(a) Break all sharp edges, 0.015R to 0.03R.
34.0 + 0.050-
36.0 + 0.050-
1 2 3
438866
(SHEET 1 OF 1)

### Page 26

FIGURE 2: REWORK SIDE BRACE FITTINGS - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
FIGURE  2: REWORK SIDE BRACE FITTINGS - HORIZONTAL STABILIZER CENTER SECTION
A
A
B
B
4.05
1.00
SIDE BRACE FITTING
UP
FWD
FWD
INBD
A-A
1 2 3 4 5 6
438867
(SHEET 1 OF 2)

### Page 27

FIGURE 2: REWORK SIDE BRACE FITTINGS - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1 Drill Drain Hole - 2 (a)
2 Deburr Drain Hole - 2
3 Inspect Drain Hole Dye Penetrant 2 (b) (c) (d)
4
Apply Chemical 
Conversion Coating, 
Type 2, Class A
Type 2, Class A - To all bare aluminum surfaces. 
As given in SOPM 20-43-03.
5 Apply Primer BMS 10-11, Type 1 - To all bare aluminum surfaces. As given in SOPM 20-41-02.
6
Identify Side Brace Fitting - 
Horizontal Stabilizer
182T1330-1 2 Part mark as 182T1330-3 as shown in 
SOPM 20-50-10. (e)
OR
182T1330-2 2 Part mark as 182T1330-4 as shown in 
SOPM 20-50-10. (e)
(a) Enlarge the existing drain hole to a 0.500 - 0.504 inch diameter. Blend any sharp edges created at the 
intersection of the hole and the fitting wall radius.
(b) Inspect drain hole for cracks. Refer to SOPM 20-20-02.
(c) It is optional to do a high frequency eddy current inspection for cracks as shown in 767 NDT, Part 6, 
51-00-04 or 767 NDT, Part 6, 51-00-11 or 767 NDT, Part 6, 51-00-16, instead of a dye penetrant inspection.
(d) If cracks or damage are found oversize the hole to remove the crack or damage. Hole size up to 0.625 
inches in diameter is acceptable. If damage still remains at a hole size of 0.625 inches contact Boeing with 
details of the damage for further rework instructions.
(e) The 182T1330-2 side brace fitting is optional to the 182T1330-1 side brace fitting.
4.05
1.00
SIDE BRACE FITTING
B-B
1 2 3 4 56
INBD
FWD
438868
(SHEET 2 OF 2)

### Page 28

FIGURE 3: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - LEFT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
FIGURE  3: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SECTION 
- LEFT SIDE
0.02
0.08
LEFT GUTTER
1.65
RIGHT GUTTER
OF GAP
CENTER LINE
BRACKET
HYDRAULIC
B
B
D
D
A
A
C
C
INBD
FWD
UP
1
21
(3 LOCATIONS)
HYDRAULIC BRACKET
438870
A-A
(SHEET 1 OF 4)

### Page 29

FIGURE 3: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - LEFT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
INBD
BRACKET
HYDRAULIC
BRACKET
CONTROLS
GUTTER
C-C
B-B
FWD
33
4 5
7 8
6
4 5
438871
(SHEET 2 OF 4)

### Page 30

FIGURE 3: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - LEFT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane.
NOTE: This figure applies to option 1, two piece gutter installation.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1 Align Gutter Sections
(Left and Right)
180T3250-9 
(180T3250-4 optional)
2( a )
2 Remove / 
Keep
Gutter Section (Right) 180T3250-9 
(180T3250-4 optional)
1
3 Align Shim, Laminated BACS40R006C025F 2 (c)
4 Drill Controls bracket - 1 (b) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R006C025F 2
Gutter Section (Left) 180T3250-9 
(180T3250-4 optional)
1
5 Install Gutter Section (Left) 180T3250-9 
(180T3250-4 optional)
1
Shim, Laminated BACS40R006C025F 2
Bolt BACB30VT5HK3 4
Collar BACC30BL5 4
6 Align Shim, Laminated BACS40R007D046F 1 (c)
HYDRAULIC BRACKET
GUTTER
D-D
10 119
438872
(SHEET 3 OF 4)

### Page 31

FIGURE 3: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - LEFT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
7 Drill Hydraulic Bracket - 1 (b) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R007D046F 1
Gutter Section (Left) 180T3250-9 
(180T3250-4 optional)
1
8 Install Shim, Laminated BACS40R007D046F 1 (d)
Gutter Section (Left) 180T3250-9 
(180T3250-4 optional)
1
Bolt BACB30VT5HK4 2
Collar BACC30BL5 2
9 Align Shim, Laminated BACS40R007C046F 1 (c)
10 Drill Hydraulic Bracket - 1 (b) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R007C046F 1
Gutter Section (Left) 180T3250-9 
(180T3250-4 optional)
1
11 Install Shim, Laminated BACS40R007C046F 1 (d)
Gutter Section (Left) 180T3250-9 
(180T3250-4 optional)
1
Bolt BACB30VT5HK4 2
Collar BACC30BL5 2
(a) Align the 36 inch section on the left side and the 34 inch section on the right side with an equal clearance 
on either end from the stabilizer hinges, and a gap of 0.08 +/- 0.02 inches between the left and right gutter 
sections.
(b) Make sure there is a minimum 2 D edge margin at fastener locations. Deburr all sharp edges.
(c) Shim gaps greater than 0.010 inches prior to installation. Remove 0.003 inch laminations as required. 
Refer to SOPM 20-50-20 and 767 SRM 51-20-11. Optional solid shim stock and multiple shims can be used 
to prevent bending the bracket and gutter flanges during installation.
(d) Install collars on the upper surface of the gutter. This is to prevent interference between the bolts and
hydraulic lines.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 4 OF 4)

### Page 32

FIGURE 4: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - RIGHT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
FIGURE  4: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SECTION 
- RIGHT SIDE
BB
A
A
C
C
UP
FWD
INBDA-A 22
1
1
(3 LOCATIONS)
HYDRAULIC BRACKET
438873
(SHEET 1 OF 3)

### Page 33

FIGURE 4: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - RIGHT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
BRACKET
HYDRAULIC
BRACKET
CONTROLS
GUTTER
HYDRAULIC BRACKET
GUTTERGUTTER
3 4
6 7
5
8
FWD
UP
3 4
438874
B-B
C-C
(SHEET 2 OF 3)

### Page 34

FIGURE 4: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION - RIGHT SIDE
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane.
NOTE: This figure applies to option 1, two piece gutter installation.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1 Align Gutter Section
(Left and Right)
180T3250-9 
(180T3250-4 optional)
2( a )
2 Align Shim, Laminated BACS40R006C025F 2 (c)
3 Drill Controls bracket - 1 (b) 0.164 - 0.168 inch hole 
diameter.Shim, Laminated BACS40R006C025F 2
Gutter Section (Right) 180T3250-9 
(180T3250-4 optional)
1
4 Install Gutter Section (Right) 180T3250-9 
(180T3250-4 optional)
1
Shim, Laminated BACS40R006C025F 2
Bolt BACB30VT5HK3 4
Collar BACC30BL5 4
5 Align Shim, Laminated BACS40R007D046F 1 (c)
6 Drill Hydraulic Bracket - 1 (b) 0.164 - 0.168 inch hole 
diameter.Shim, Laminated BACS40R007D046F 1
Gutter Section (Right) 180T3250-9 
(180T3250-4 optional)
1
7 Install Shim, Laminated BACS40R007D046F 1 (d)
Gutter Section (Right) 180T3250-9 
(180T3250-4 optional)
1
Bolt BACB30VT5HK3 2
Collar BACC30BL5 2
8 Apply Sealant BMS 5-95 - Completely fill the gap 
between gutter sections. 
Refer to SOPM 20-50-19.
(a) Align the right gutter section with a gap of 0.08 +/- 0.02 inches between the left and right gutter sections. 
Make sure that the distance between the left gutter and left stabilizer hinge is equal to the distance between 
the right gutter and right stabilizer hinge.
(b) Make sure there is a minimum 2 D edge margin at fastener locations. Deburr all sharp edges.
(c) Shim gaps greater than 0.010 inches prior to installation. Remove 0.003 inch laminations as required. 
Refer to SOPM 20-50-20 and 767 SRM 51-20-11
(d) Install collars on the upper surface of the gutter. This is to prevent interference between the bolts and
hydraulic lines.
(SHEET 3 OF 3)

### Page 35

FIGURE 5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
FIGURE  5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION
B
B
A
A
UP
FWD
A-A
0.1500 +0.0500-0.1000
BRACKET
HYDRAULIC
GUTTER
BRACKET
CONTROL
1
(3 LOCATIONS)
HYDRAULIC BRACKET
438875
(SHEET 1 OF 5)

### Page 36

FIGURE 5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
E
E
C
C
FWD DD
8C-C
HYDRAULIC BRACKET
GUTTER
5
6 7 6 7
438876
B-B
(SHEET 2 OF 5)

### Page 37

FIGURE 5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
HYDRAULIC BRACKET
GUTTER
GUTTER
2
3
2
4
3 4
3 4
438877
E-E
D-D
(SHEET 3 OF 5)

### Page 38

FIGURE 5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane.
NOTE: This figure applies to option 1, two piece gutter installation.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
CAUTION: DO NOT ALLOW THE SEALANT TO CREATE HIGH SPOTS OR RIDGES THAT WILL
TRAP WATER ONTO THE UPPER SKIN.
1 Apply Sealant BMS 5-95 - (a)
2 Align (New) Splice 180T3251-2 1 Align splice and shims 
to Gutter Assembly.
Shim, Laminated BACS40R015B020F 2 On the vertical edge of 
the gutter. (c)
Shim, Laminated BACS40R009B015F 2 On the lower edge of 
the gutter. (c)
3 Drill Splice 180T3251-2 1 (b) (c)
0.164 - 0.168 inch hole 
diameter.
Shim, Laminated BACS40R015B020F 2
Shim, Laminated BACS40R009B015F 2
Gutter Section
(left and Right)
180T3250-9 
(180T3250-4 optional)
2
4 Install Splice 180T3251-2 1 (c) (e)
Shim, Laminated BACS40R015B020F 2
Shim, Laminated BACS40R009B015F 2
Bolt
(Rivet)
BACB30VT5HK3 or
BACR15BB5AD (optional) or
BACR15BB5D (optional) 
BACR15FT5AD (optional) or
BACR15FT5D (optional)
12
Collar BACC30BL5 12
5 Align (New) Splice 180T3251-3 1 Align splice to Gutter 
Assembly.
6 Drill Splice 180T3251-3 1 (b) (c)
0.164 - 0.168 inch hole 
diameter.
Gutter Section
(left and Right)
180T3250-9 
(180T3250-4 optional)
2
7 Install Splice 180T3251-3 1 (c) (e)
Bolt
(Rivet)
BACB30VT5HK3 or
BACR15BB5AD (optional) or
BACR15BB5D (optional) or
BACR15FT5AD (optional) or
BACR15FT5D (optional)
4
Collar BACC30BL5 4
8 Apply Sealant BMS 5-95 - (d)
(SHEET 4 OF 5)

### Page 39

FIGURE 5: SPLICE INSTALLATION - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
(a) Inject sealant BMS 5-95 per SOPM 20-50-19 to fill void created beneath the three hydraulic brackets 
and the upper spar chord. Apply BMS 5-95 sealant per SOPM 20-50-19 at final installation of gutter to 
completely fill faying surfaces between upper spar chord and gutter, and to fair the upper skin to the 
forward flange of the gutter the entire length of the gutter. Allow sealant to dry for 2 hours.
(b) Make sure there is a minimum 2 D edge margin at fastener locations. Deburr all sharp edges.
(c) Shim gaps greater than 0.010 inches prior to installation. Remove 0.003 inch laminations as required. 
Refer to SOPM 20-50-20 and 767 SRM 51-20-11. Optional solid shim stock and multiple shims can be 
used to prevent bending the bracket and gutter flanges during installation
(d) Inject sealant BMS 5-95 per SOPM 20-50-19 to fill void between gutter and splice.
(e) It is acceptable to use solid rivets instead of bolts and collars. Install rivets in a 0.159 - 0.171 inch hole 
diameter.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 5 OF 5)

### Page 40

FIGURE 6: DISCONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
FIGURE  6: DISCONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION
41.5
RBBL
41.5
LBBL
0
BBL
UP
FWD
1
3
7
9
5
2
4
6
8
12
10
11
J74432
(SHEET 1 OF 2)

### Page 41

FIGURE 6: DISCONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Remove/Keep Hydraulic tube 272T8200-188 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
2 Disconnect Hydraulic hose AS115-06D0274 1 (a)
3
Remove/Keep Hydraulic tube 272T8200-187 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
4 Disconnect Hydraulic hose AS115-08D0280 1 (a)
5
Remove/Keep Hydraulic tube 272T8200-202 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
6 Disconnect Hydraulic hose AS115-06D0274 1 (a)
7
Remove/Keep Hydraulic tube 272T8200-203 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
8 Disconnect Hydraulic hose AS115-08D0274 1 (a)
9
Remove/Keep Hydraulic tube 272T8200-186 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
10 Disconnect Hydraulic hose AS115-06D0274 1 (a)
11
Remove/Keep Hydraulic tube 272T8200-185 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
12 Disconnect Hydraulic hose AS115-08D0280 1 (a)
(a) Refer to 767 AMM 20-10-10 or equivalent approved procedure. Move the hydraulic line away from the 
modification area.
(SHEET 2 OF 2)

### Page 42

FIGURE 7: GUTTER PREPARATION - LOCATOR IDENTIFICATION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
FIGURE  7: GUTTER PREPARATION - LOCATOR IDENTIFICATION
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for this figure.
NOTE: This figure applies to option 2, one piece gutter installation.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Identify Locator Mark - 1 As a reference for 
subsequent installation 
alignment. (a)
(a) Use a method that does not damage the gutter or surface finish on the gutter.
34.35 + 0.050-
1
U74059
(SHEET 1 OF 1)

### Page 43

FIGURE 8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
FIGURE  8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SECTION
GUTTER
BRACKET
HYDRAULIC
B
B
D
D
A
A
C
C
E
E
F
F
INBD
FWD
UP
1
1
(3 LOCATIONS)
HYDRAULIC BRACKET
U74045
A-A
(SHEET 1 OF 6)

### Page 44

FIGURE 8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
INBD
BRACKET
HYDRAULIC
BRACKET
CONTROLS
GUTTER
C-C
B-B
FWD
22
3 4
8 9
7
3 4
U74048
(SHEET 2 OF 6)

### Page 45

FIGURE 8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
HYDRAULIC BRACKET
GUTTER
D-D
INBDE-E
11 1210
22
U74050
(SHEET 3 OF 6)

### Page 46

FIGURE 8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for this figure.
NOTE: This figure applies to option 2, one piece gutter installation.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
CAUTION: DO NOT TO DAMAGE THE GUTTER AND ADJACENT STRUCTURE. MORE WORK WILL BE 
NECESSARY FOR REPAIRS IF THE GUTTER OR ADJACENT STRUCTURE IS DAMAGED.
1 Align Gutter Assembly 180T3250-9 
(180T3250-4 optional)
2( a )
2 Align Shim, Laminated BACS40R006C025F 4 (b)
3 Drill Controls bracket - 1 (c) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R006C025F 2
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
4 Install Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
Shim, Laminated BACS40R006C025F 2
Bolt BACB30VT5HK3 4
Collar BACC30BL5 4
5 Drill Controls bracket - 1 (c) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R006C025F 2
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
BRACKET
HYDRAULIC
BRACKET
CONTROLS
GUTTER
5 6
INBD
FWD
5 6
14 15
13
U74052
F-F
(SHEET 4 OF 6)

### Page 47

FIGURE 8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
6 Install Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
Shim, Laminated BACS40R006C025F 2
Bolt BACB30VT5HK3 4
Collar BACC30BL5 4
7 Align Shim, Laminated BACS40R007D046F 1 (b)
8 Drill Hydraulic Bracket - 1 (c) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R007D046F 1
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
9 Install Shim, Laminated BACS40R007D046F 1 (d)
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
Bolt BACB30VT5HK4 2
Collar BACC30BL5 2
10 Align Shim, Laminated BACS40R007C046F 1 (b)
11 Drill Hydraulic Bracket - 1 (c) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R007C046F 1
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
12 Install Shim, Laminated BACS40R007C046F 1 (d)
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
Bolt BACB30VT5HK4 2
Collar BACC30BL5 2
13 Align Shim, Laminated BACS40R007D046F 1 (b)
14 Drill Hydraulic Bracket - 1 (c) 0.164 - 0.168 inch 
hole diameter.Shim, Laminated BACS40R007D046F 1
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
15 Install Shim, Laminated BACS40R007D046F 1 (d)
Gutter Assembly 180T3250-9 
(180T3250-4 optional)
1
Bolt BACB30VT5HK4 2
Collar BACC30BL5 2
(a) Align the locator mark to the right side edge of the hydraulic bracket when looking forward.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 5 OF 6)

### Page 48

FIGURE 8: GUTTER INSTALLATION - UPPER SURFACE, HORIZONTAL STABILIZER CENTER SEC-
TION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
(b) Shim gaps greater than 0.010 inches prior to installation. Remove 0.003 inch laminations as required. 
Refer to SOPM 20-50-20 and 767 SRM 51-20-11. Optional solid shim stock and multiple shims can be used 
to prevent bending the bracket and gutter flanges during installation.
(c) Make sure there is a minimum 2 D edge margin at fastener locations. Deburr all sharp edges.
(d) Install collars on the upper surface of the gutter. This is to prevent interference between the bolts and 
hydraulic lines.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
(SHEET 6 OF 6)

### Page 49

FIGURE 9: GUTTER SEALING - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 49 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
FIGURE  9: GUTTER SEALING - HORIZONTAL STABILIZER CENTER SECTION
A
A
UP
FWD
A-A
0.1500 +0.0500-0.1000
BRACKET
HYDRAULIC
GUTTER
BRACKET
CONTROL
1
U74054
(SHEET 1 OF 2)

### Page 50

FIGURE 9: GUTTER SEALING - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 50 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for this figure.
NOTE: This figure applies to option 2, one piece gutter installation.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
CAUTION: DO NOT ALLOW THE SEALANT TO CREATE HIGH SPOTS OR RIDGES THAT WILL
TRAP WATER ONTO THE UPPER SKIN.
1 Apply Sealant BMS 5-95 - (a)
(a) Inject sealant BMS 5-95 per SOPM 20-50-19 to fill void created beneath the three hydraulic brackets 
and the upper spar chord. Apply BMS 5-95 sealant per SOPM 20-50-19 at final installation of gutter to 
completely fill faying surfaces between upper spar chord and gutter, and to fair the upper skin to the 
forward flange of the gutter the entire length of the gutter. Allow sealant to dry for 2 hours.
(SHEET 2 OF 2)

### Page 51

FIGURE 10: CONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 51 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
 
FIGURE  10: CONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION
41.5
RBBL
41.5
LBBL
0
BBL
UP
FWD
1
3
7
9
5
2
4
6
8
12
10
11
J74433
(SHEET 1 OF 2)

### Page 52

FIGURE 10: CONNECT HYDRAULIC LINES - HORIZONTAL STABILIZER CENTER SECTION
December 09, 2004
Revision 1:  October 12, 2006 767-51A0028
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 52 of 52
BOEING SERVICE BULLETIN 767-51A0028
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY 
numbers shown below are the number of parts necessary for each airplane.
STEP TASK NAME IDENTIFICATION QTY MORE DATA
1
Install (kept) Hydraulic tube 272T8200-188 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
2
Connect Hydraulic hose AS115-06D0274 1 Refer to 767 AMM 
20-10-10 or equivalent 
approved procedure.
3
Install (kept) Hydraulic tube 272T8200-187 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
4
Connect Hydraulic hose AS115-08D0280 1 Refer to 767 AMM 
20-10-10 or equivalent 
approved procedure.
5
Install (kept) Hydraulic tube 272T8200-202 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
6
Connect Hydraulic hose AS115-06D0274 1 Refer to 767 AMM 
20-10-10 or equivalent 
approved procedure.
7
Install (kept) Hydraulic tube 272T8200-203 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
8
Connect Hydraulic hose AS115-08D0274 1 Refer to 767 AMM 
20-10-10 or equivalent 
approved procedure.
9
Install (kept) Hydraulic tube 272T8200-186 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
10
Connect Hydraulic hose AS115-06D0274 1 Refer to 767 AMM 
20-10-10 or equivalent 
approved procedure.
11
Install (kept) Hydraulic tube 272T8200-185 1 Refer to 767 AMM 
20-10-09 or equivalent 
approved procedure.
12
Connect Hydraulic hose AS115-08D0280 1 Refer to 767 AMM 
20-10-10 or equivalent 
approved procedure.
(SHEET 2 OF 2)

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
