# Boeing Alert Service Bulletin 767-53A0139: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-0993; AD 2012-09-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-53A0139](https://openairdocs.org/service-documents/boeing/767-53a0139.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin
- Pages: 180
- PDF: https://openairdocs.org/files/sha256/7a/7c/7a7c33bc05d77328794b07706153a8bd1509fea031e88a5b49b8d9847bd1f461
- Page: https://openairdocs.org/service-documents/boeing/767-53a0139/file/7a7c33bc05d7

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Service Bulletin
ALERT
Number: 767-53A0139
Original Issue: November 12, 2009
ATA System: 5383
SUBJECT: FUSELAGE - Section 48 - STA 1582 Aft Pressure Bulkhead Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2009 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
1 of 180
4.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
2 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 1
B. Concurrent Requirements ...................................... 1 1
C. Reason ................................................ 1 1
D. Description .............................................. 1 2
E. Compliance .............................................. 1 2
F. Approval ............................................... 1 4
G. Manpower .............................................. 1 4
H. Weight and Balance Changes .................................... 1 6
I. Electrical Load Data ......................................... 1 6
J. References .............................................. 1 6
1. Existing Data .......................................... 1 6
2. Data supplied with this Service Bulletin ............................ 1 7
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 9
K. Publications Affected ........................................ 2 0
L. Interchangeability and Intermixability of Parts ........................... 2 0
2. MATERIAL INFORMATION ........................................ 2 1
A. Material - Price and Availability ................................... 2 1
B. Industry Support Information .................................... 2 1
C. Parts Necessary For Each Airplane ................................. 2 1
1. Kits/Parts ............................................ 2 1
2. Parts and Materials Supplied by the Operator ........................ 3 5
3. Parts Modified and Reidentified ................................ 3 6
4. Parts Removed and Not Replaced .............................. 3 6
D. Parts Necessary to Change Spares ................................. 3 6
E. Special Tooling - Price and Availability ............................... 3 6
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 8
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 9
A. GENERAL INFORMATION ..................................... 3 9
B. WORK INSTRUCTIONS ....................................... 4 0
FIGURE 1: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION ................ 5 4
FIGURE 2: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION [Group 2] ........... 5 9
FIGURE 3: REMOVAL OF AUXILIARY PITOT SYSTEM TUBES AND SEALS ............. 6 1
FIGURE 4: REMOVAL OF PRESSURE SEALS .............................. 6 5
FIGURE 5: APU FUEL LINE BULKHEAD FITTING REMOVAL ..................... 6 8
FIGURE 6: APU FUEL LINE BULKHEAD FITTING INSTALLATION ................... 7 1
FIGURE 7: AFT SECTION 48 (TAIL CONE) FASTENER REMOVAL .................. 7 4
FIGURE 8: STA 1809.5 CENTER BULKHEAD REMOVAL ........................ 7 7
FIGURE 9: FORWARD SECTION 48 PARTS REMOVAL ........................ 8 5
FIGURE 10: AFT PRESSURE BULKHEAD PRESSURE RING FASTENER REMOVAL ......... 8 7
FIGURE 11: AFT PRESSURE BULKHEAD ATTACHMENT TO THE PRESSURE RING AT STA 1582 . 89
FIGURE 12: FORWARD SECTION 48 INSTALLATION .......................... 9 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
3 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 4

FIGURE 13: LEFT STA 1809.5 CENTER BULKHEAD INSTALLATION ................. 1 1 0
FIGURE 14: RIGHT STA 1809.5 CENTER BULKHEAD INSTALLATION ................ 1 2 2
FIGURE 15: AFT SECTION 48 (TAIL CONE) INSTALLATION ...................... 1 3 4
FIGURE 16: PRESSURE SEAL INSTALLATION ............................. 1 3 9
FIGURE 17: INSTALLATION OF AUXILIARY PITOT SYSTEM TUBES AND PRESSURE SEALS . . 142
FIGURE 18: BULKHEAD INSPECTIONS PRIOR TO REPLACEMENT ................. 1 4 7
FIGURE 19: MAKE AND INSTALL STA 1809.5 BULKHEAD STABILIZATION TOOLS ......... 1 5 0
FIGURE 20: REMOVE STA 1809.5 BULKHEAD STABILIZATION TOOLS ............... 1 6 0
FIGURE 21: STA 1582 FLOOR BEAM DETACHMENT .......................... 1 6 2
FIGURE 22: STA 1582 FLOOR BEAM SUPPORT ............................ 1 6 6
FIGURE 23: STA 1582 FLOOR BEAM ATTACHMENT .......................... 1 7 0
APPENDIX A: APU WIRING TEST PROCEDURE ............................. 1 7 5
APPENDIX B: ALIGNMENT PINS ...................................... 1 8 0
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
4 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 5

Commercial 
Airplanes
767
Service Bulletin
ALERT
SummaryNumber: 767-53A0139Original Issue: November 12, 2009
ATA System: 5383
SUBJECT: FUSELAGE - Section 48 - STA 1582 Aft Pressure Bulkhead Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin gives instructions for the removal and replacement of the STA 1582 aft pressure bulkhead.
Service Bulletin 767-53A0026, "Fuselage - Section 48 - Body Station 1582 Pressure Bulkhead Inspection" was
previously released to give instructions to inspect for cracks in the the STA 1582 aft pressure bulkhead radial
web lap splices and tear strap splices. Aft pressure bulkhead radial web lap splice multiple site damage (MSD)
cracks that are not found and repaired can link together and become large. This condition could result in rapid
decompression of the passenger compartment and possible damage or interference with airplane control systems
that penetrate the bulkhead, and consequent loss of controllability of the airplane.
Operators have told Boeing that MSD fatigue cracks have been found in the STA 1582 aft pressure bulkhead
radial web lap splices on multiple airplanes with 31,746 to 36,597 flight cycles. On four airplanes, the crack
findings demonstrated MSD fatigue cracking common to the radial web lap splices. Design changes to improve
the durability of the bulkhead were made in production at line number 176, and again at line number 424. Service
Bulletin 767-53A0026 Revision 5 was released to give instructions to inspect for these types of cracks.
Accomplishment of the aft pressure bulkhead replacement given in this service bulletin will end the repeat
inspections currently required by Boeing Service Bulletin 767-53A0026 and FAA Airworthiness Directive
2005-03-11.
Accomplishment of the aft pressure bulkhead replacement given in this service bulletin will also end the repeat
inspections currently required by Boeing Service Bulletin 767-53A0087, "Fuselage - Section 48 - BS 1582 Aft
Pressure Bulkhead Web Inspection at Web to Pressure Chord Joint" and FAA Airworthiness Directive 2004-05-16.
Inspections of the replacement aft pressure bulkhead are to be done as specified in the Boeing Document
D622T001 "767 Maintenance Planning Data" and Airworthiness Limitations - Structural Inspections as specified
in Section 9 of Boeing Document D622T001, with threshold modifications identified in Paragraph 1.E., Compliance.
Boeing Service Related Problem (SRP) 767-SRP-53-0228 is related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
5 of 180

### Page 6

ACTION (PRR B12901-74S)
Remove equipment for access to the forward and aft sides of the STA 1582 aft pressure bulkhead. Remove the
vertical fin, the tail cone (with the APU installed), the left and right STA 1809.5 center bulkhead, and the horizontal
stabilizer. Disconnect and remove the forward portion of Section 48 (with the aft pressure bulkhead attached)
from Section 46 at STA 1582. Remove the aft pressure bulkhead from Section 48 and install a new aft pressure
bulkhead in accordance with this service bulletin. Attach the modified forward part of Section 48 to Section 46
at STA 1582. Reinstall the horizontal stabilizer and reassemble the STA 1809.5 bulkhead. Reinstall the tail cone
and the vertical fin. Install the equipment that was removed for access to the aft pressure bulkhead. Test disturbed
systems in accordance with this service bulletin.
EFFECTIVITY
767-200 and 767-300 Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Federal Aviation Administration (FAA) Airworthiness Directive 2005-03-11 is related to this service bulletin. FAA
Airworthiness Directive 2004-05-16 is affected by this service bulletin.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
265.51541All
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
6 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 7

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
7 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 8

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
8 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
767
Service Bulletin
ALERT
Number: 767-53A0139
Original Issue: November 12, 2009
ATA System: 5383
SUBJECT: FUSELAGE - Section 48 - STA 1582 Aft Pressure Bulkhead Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRRB12901-74S for data about this change
Conversion Airplanes: If the aft pressure bulkhead replacement will be done on an affected airplane
listed in this paragraph that has been modified by an approved "Boeing Converted Freighter
Modification" of a 767-200 passenger airplane to a 767-200 Special Freighter (SF) airplane or of
a 767-300 passenger airplane to a 767-300 Boeing Converted Freighter (BCF), contact Boeing
for additional instructions.
DESCRIPTIONCONFIGURATIONGROUP
Airplanes line number 1 - 175 without a dual-loop APU fire detection
system, except Group 3 airplanes.
-1
Airplanes line number 1 - 175 with a dual-loop APU fire detection
system.
-2
Airplanes line number 158 and 165, which do not have a dual-loop
APU fire detection system, but have been modified to include
dedicated static pressure inputs to the elevator feel computer per
PRRB11770.
-3
Airplane Models:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
9 of 180

### Page 10

767-200, 767-300
GroupVariable Number
1VA001 - VA020
1VA301 - VA315
1VA501 - VA526
1VA701 - VA712
2VA801
1VA802
2VA803 - VA804
1VA805
2VA806 - VA810
1VB001 - VB002
1VB051 - VB055
1VB101 - VB125
1VB201 - VB202
1VB251 - VB253
1VB281 - VB284
1VB301 - VB302
1VB321 - VB324
2VB371 - VB373
1VB401
1VE001 - VE002
1VE021 - VE023
1VE041 - VE043
2VE061
1VE062
2VE063 - VE064
1VE065
2VE066 - VE068
2VE083 - VE084
1VE101 - VE103
1VE116 - VE117
1VE121 - VE123
1VE141 - VE142
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
10 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 11

GroupVariable Number
2VK001 - VK004
1VK031 - VK037
3VL001
3VL011
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instructions for the removal and replacement of the STA 1582 aft pressure
bulkhead. Service Bulletin 767-53A0026, "Fuselage - Section 48 - Body Station 1582 Pressure Bulkhead
Inspection" was previously released to give instructions to inspect for cracks in the the STA 1582 aft
pressure bulkhead radial web lap splices and tear strap splices. Aft pressure bulkhead radial web lap
splice multiple site damage (MSD) cracks that are not found and repaired can link together and become
large. This condition could result in rapid decompression of the passenger compartment and possible
damage or interference with airplane control systems that penetrate the bulkhead, and consequent
loss of controllability of the airplane.
Operators have told Boeing that MSD fatigue cracks have been found in the STA 1582 aft pressure
bulkhead radial web lap splices on multiple airplanes with 31,746 to 36,597 flight cycles. On four
airplanes, the crack findings demonstrated MSD fatigue cracking common to the radial web lap splices.
Design changes to improve the durability of the bulkhead were made in production at line number 176,
and again at line number 424. Service Bulletin 767-53A0026 Revision 5 was released to give instructions
to inspect for these types of cracks.
Accomplishment of the aft pressure bulkhead replacement given in this service bulletin will end the
repeat inspections currently required by Boeing Service Bulletin 767-53A0026 and FAA Airworthiness
Directive 2005-03-11.
Accomplishment of the aft pressure bulkhead replacement given in this service bulletin will also end
the repeat inspections currently required by Boeing Service Bulletin 767-53A0087, "Fuselage - Section
48 - BS 1582 Aft Pressure Bulkhead Web Inspection at Web to Pressure Chord Joint" and FAA
Airworthiness Directive 2004-05-16.
Inspections of the replacement aft pressure bulkhead are to be done as specified in the Boeing Document
D622T001 "767 Maintenance Planning Data" and Airworthiness Limitations - Structural Inspections as
specified in Section 9 of Boeing Document D622T001, with threshold modifications identified in
Paragraph 1.E., Compliance.
Boeing Service Related Problem (SRP) 767-SRP-53-0228 is related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
11 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 12

D. Description
Remove equipment for access to the forward and aft sides of the STA 1582 aft pressure bulkhead.
Remove the vertical fin, the tail cone (with the APU installed), the left and right STA 1809.5 center
bulkhead, and the horizontal stabilizer. Disconnect and remove the forward portion of Section 48 (with
the aft pressure bulkhead attached) from Section 46 at STA 1582. Remove the aft pressure bulkhead
from Section 48 and install a new aft pressure bulkhead in accordance with this service bulletin. Attach
the modified forward part of Section 48 to Section 46 at STA 1582. Reinstall the horizontal stabilizer
and reassemble the STA 1809.5 bulkhead. Reinstall the tail cone and the vertical fin. Install the
equipment that was removed for access to the ft pressure bulkhead. Test disturbed systems in
accordance with this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-2:
Affected Maintenance Zones
ZoneModel
165, 166, 251, 252, 253, 254, 311, 312, 313,
314, 315, 316, 321, 322, 323, 324, 325, 326,
331, 332, 333, 334, 335, 336, 337, 338, 341,
342, 343, 344, 345, 346, 347, 348
767-200, 767-300
Group 3:
Affected Maintenance Zones
ZoneModel
165, 166, 251, 252, 253, 254, 311, 312, 313,
314, 315, 316, 321, 322, 323, 324, 325, 326,
331, 332, 333, 334, 335, 336, 337, 338, 341,
342, 343, 344, 345, 346, 347, 348
767-300
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Federal Aviation Administration (FAA) Airworthiness Directive 2005-03-11 is related to this service
bulletin. FAA Airworthiness Directives 2004-05-16 is affected by this service bulletin.
Boeing recommends that the aft pressure bulkhead replacement given in Paragraph 3.B., PART 2,
PART 3, and PART 4 of this service bulletin be done when the airplane has flown 43,000 total
flight-cycles, or within 5,000 flight-cycles after the original issue date on this service bulletin, whichever
is later.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
12 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 13

Table 1: Inspection and Replacement of the STA 1582 Aft Pressure Bulkhead
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 5,000
flight-cycles af-
ter the original
issue date on
this service bul-
letin.
Before 43,000
total flight-cy-
cles.
Replace the STA 1582 aft
pressure bulkhead in ac-
cordance with Accom-
plishment Instructions
PART 2 through PART 4.
(a) (b)
All airplanes.
1,600 flight-cycles.
(d)
Within 1,600
flight-cycles af-
ter the last re-
peat inspection
done in accor-
dance with Boe-
ing Service Bul-
letin 767-
53A0026. (d)
Before 43,000
total flight-cy-
cles.
Do detailed, Low Frequen-
cy Eddy Current (LFEC)
and Mid Frequency Eddy
Current (MFEC) inspec-
tions of the STA 1582 aft
pressure bulkhead for
cracks in accordance with
Accomplishment Instruc-
tions PART 1. (b) (c)
-Before further flight.Replace the STA 1582 aft
pressure bulkhead in ac-
cordance with Accom-
plishment Instructions
PART 2 through PART 4.
(a)
Any crack found.
(a) After bulkhead replacement, the repeat inspections specified in Boeing Service Bulletins 767-53A0026
and 767-53A0087 are not necessary.
(b) Bulkhead inspections are an interim alternative to aft pressure bulkhead replacement.
(c) These inspections replace the repeat inspections specified in Boeing Service Bulletin 767-53A0026
during the compliance time.
(d) But do the aft pressure bulkhead replacement within 5,000 flight-cycles after the original issue date on
this service bulletin.
After the aft pressure bulkhead has been replaced, continue to do the structural inspections of the aft
pressure bulkhead as defined in Boeing Document D622T001 "767 Maintenance Planning Data". In
addition, the inspections for Structural Significant Items (SSIs) 53-80-I01A, 53-80-I01B, 53-80-I01C,
53-80-I01D, and 53-80-I01E as defined in Section 9 of the Boeing Maintenance Planning Document,
Boeing Document D622T001-9, Airworthiness Limitations - Structural Inspections (ALI) must begin at
or before a threshold of 37,500 flight-cycles after the aft pressure bulkhead has been replaced. Repetitive
inspections for these SSIs must follow DTR check forms contained in Boeing Document D622T001
Appendix B (will be D622T001-DTR) following the line number 424 and on configuration applicability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
13 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 14

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the inspection defined in Figure 18 of this service bulletin as an alternative
method of compliance to the requirements of paragraph (f) of AD 2005-03-11. All provisions of AD
2005-03-11 that are not specifically referenced in the above statement remain fully applicable and must
be complied with.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the aft pressure bulkhead replacement modification defined in this service
bulletin as an alternative method of compliance to the requirements of paragraph (f) of AD 2005-03-11.
All provisions of AD 2005-03-11 that are not specifically referenced in the above statement remain fully
applicable and must be complied with.
This service bulletin has been approved by the FAA. In addition, the Manager of the FAA Seattle Aircraft
Certification Office approves the aft pressure bulkhead replacement modification defined in this service
bulletin as an alternative method of compliance to the requirements of paragraph (a), (b) and (f) of AD
2004-05-16. All provisions of AD 2004-05-16 that are not specifically referenced in the above statement
remain fully applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
NOTE: If the aft pressure bulkhead will not be replaced immediately, refer to Service Bulletin
767-53A0026 for an estimate of the task hours necessary to do the inspections described in
Paragraph 3.B., Part 1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
14 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 15

Aft Pressure Bulkhead Replacement
Elapsed HoursTask HoursNumber of Per-
sons
Task
362Prepare the new bulkhead (Para-
graph 3.B., Part 2)
382286Get Access (Paragraph 3.B., Part 3,
through step 21)
362166Remove the vertical fin (Paragraph
3.B., Part 3, step 22)
14846Remove the tail cone (Paragraph
3.B., Part 3, steps 23 through 25)
19.51176Remove the horizontal stabilizer
(Paragraph 3.B., Part 3, steps 26
through 29)
15906Remove the forward part of Section
48 (Paragraph 3.B., Part 3, step 30
through step 32)
3.25134Remove the aft pressure bulkhead
from the forward part of Section 48
(Paragraph 3.B., Part 3, step 33)
3.25134Install the new aft pressure bulkhead
in the forward part of Section 48
(Paragraph 3.B., Part 3, step 34)
15906Install the forward part of Section 48
(Paragraph 3.B., Part 3, step 35)
20.51236Install the horizontal stabilizer
(Paragraph 3.B., Part 3, steps 36
through 41)
13.5816Install the tail cone (Paragraph 3.B.,
Part 3, steps 42 through 44)
362166Install the vertical fin (Paragraph
3.B., Part 3, step 45)
39.52376Restore Access (Paragraph 3.B.,
Part 3, step 46 through step 65)
9273Test disturbed systems (Paragraph
3.B., Part 4)
265.51541TOTAL FOR EACH AIRPLANE
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
15 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 16

H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+98084.0+62.0767-200
+106268.0+62.0767-300
I. Electrical Load Data
Not changed.
J. References
1. Existing Data
a. Engineering Change Memo PRR B12901-74S
b. Boeing Service Bulletins 767-25A0300, "Equipment/Furnishings - Insulation - Aft Bulkhead
to Floor Insulation Blankets Modification", 767-53A0026, "Fuselage- Section 48 - Body Station
1582 Pressure Bulkhead Inspection", 767-53A0085, "Fuselage - Section 48 - Supports And
Fittings - Vertical Fin Attachment Bolt And Barrel Nut Inspection And Replacement",
767-53A0078, "Fuselage - Section 48 - Body Station 1809.5 Bulkhead Outer Chord Inspection,
Repair, and Modification", 767-53A0087, "Fuselage - Section 48 - BS 1582 Aft Pressure
Bulkhead Web Inspection at Web to Pressure Chord Joint", 767-53-0118, "Fuselage - Section
48 - STA 1725.5 Aft Skin and Bulkhead Outer Chord Strap - Inspection and Repair",
767-53A0131, "Fuselage - Section 48 - Main Frame and Skins - STA 1809.5 Bulkhead -
Forward Outer Chord, Horizontal and Vertical Inner Chord, and External Skin - Inspection",
767-55-0006, "Stabilizers - Horizontal Stabilizer - Stabilizer Pivot Fittings - Bushing Modification"
and 767-55-0008 "Stabilizers - Horizontal Stabilizer Pivot Fittings - Pivot Fitting Rework and
Bearing Retainer Replacement"
c. Boeing Service Letter 767-SL-51-008-B.
d. Federal Aviation Administration (FAA) Airworthiness Directives 2004-05-16 and 2005-03-11
e. Standard Overhaul Practices Manual (SOPM) 20-50-19
f. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-10-19
g. 767 Aircraft Maintenance Manual (AMM) 05-51-24, 07-11-03, 12-15-01, 12-15-02, 20-10-03,
20-10-04, 20-10-09, 22-10-00, 22-21-00, 23-11-00, 23-41-00, 24-22-00, 25-21-01, 25-21-05,
25-22-01, 25-22-02, 25-22-10, 25-25-01, 25-25-04, 25-27-02, 25-31-04, 25-41-04, 25-52-01,
25-52-03, 27-21-00, 27-21-11, 27-21-13, 27-23-00, 27-28-00, 27-31-00, 27-32-00, 27-41-00,
27-41-10, 27-48-00, 27-58-01, 28-25-05, 29-11-00, 31-31-00, 31-51-04, 32-00-20, 33-31-00,
33-45-00, 34-11-01, 36-11-01, 38-11-01, 38-32-11, 38-32-51, 53-01-01, 53-66-02, 53-80-70,
55-17-51
h. 767 Aircraft Recovery Document (ARD)
i. 767 Non-Destructive Testing (NDT) Manual Part 6, 53-80-06, Part 6, 53-80-02
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
16 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 17

j. 767-200 Structural Repair Manual (SRM) 51-50-02, 53-80-08
k. 767-200SF Structural Repair Manual (SRM) 51-50-02
l. 767-300 Structural Repair Manual (SRM) 51-50-02, 53-80-08
m. 767-300BCF Structural Repair Manual (SRM) 51-50-02, 53-80-08
2. Data supplied with this Service Bulletin
a. Drawings:
ADCNDCN/REVSheetTitleDrawing No
-J1Section 48/72 Integration100T3480
-CPSDL
--1Mechanical Equipment Forward 48 Section
Stand
2ME148T0200PBR
--2
--1Mechanical Equipment Aft 48 Section Stand2ME148T0600PBR
--2
--1Mechanical Equipment Strongback, Pres-
sure Bulkhead Transportation and Installa-
tion
2ME148T2610PBR
--2
--3
--4
--5
--1Miscellaneous Tool Torque Multiplier and
Adapter, Vertical Fin
2MIT100T3480PBR
--2
--3
--4
--5
--6
--1Overhead Mechanical Equipment Vertical
Fin Assembly Sling
2OHME100T3480PBR
--1Mechanical Equip Sling & Strongback Fwd
48 Section Pressure Bulkhead R & R
3ME140T0140PBR
--2
--3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
17 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 18

ADCNDCN/REVSheetTitleDrawing No
--1Aft Pressure Bulkhead Parts Removal624T0020
-A10
--11
-A12
-A13
-A14
-A15
-A16
-A17
--2
--3
--4
--5
-A6
-A7
-A8
-A9
--1Mechanical Equipment Vertical Fin Lift Fit-
tings
ME100T3480PBR
--1Mechanical Equipment Forward 48 Section
Handling Fitting
ME148T0200PBR
--1Mechanical Equipment Aft 48 Section Han-
dling Fitting
ME148T0600PBR
--1Mechanical Equipment Strongback Pressure
Bulkhead Removal
ME148T2610PBR
--2
--3
--5
--1Mechanical Equipment Vert Fin Stand Floor
Mounted
ME170T0100PBR
--2
--1Mechanical Equipment Floor Mounted Stand
Horizontal Stabilizer
ME180T0000PBR
--1Mechanical Equipment Lift Fittings Front
and Rear Spar Horizontal Stabilizer
ME182T0000PBR
--1Misc Tool Alignment Pins Vertical Fin Body
Join
MIT100T3480PBR
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
18 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 19

ADCNDCN/REVSheetTitleDrawing No
--1Overhead Mech Equip Pressure Dome Sling
Fwd 48 Section
OHME148T2610PBR
--2
--1Overhead Mech Equip Horizontal Stabilizer
Complete
OHME180T0100PBR
--2
--1Portable Mechanical Equipment Forward
48 Section Internal Scaffolding
PME148T0010PBR
--2
--3
--4
--5
--6
--1Protective Equipment Pressure Bulkhead
Cover
PRE148T2610PBR
--1Shipping Mech Equip Ground Transporta-
tion Aft Pressure Bulkhead
SME148T2610PBR
--2
--3
--4
3. Installation Drawings Used in the Preparation of this Service Bulletin
TitleDrawing Number
Section 48/72 Integration100T3480
Monocoque Integration - Section 46/48140T0140
Floor System Integration Section 46 - 48140T0540
Seal Application Section 48 Integration140T4800
Stanchion Installation - Sect 46146T5500
Support Instl - Galley Tie Down Fittings, Sect 46146T5604
Fastener Instl Bulkhead Splice STA 1809.5148T0006
Fastener Instl148T0007
Fastener Instl - STA 1809.5 Splice, Sect 48148T0008
Frame Instl - Pivot Bulkhead148T1150
Bulkhead End Item - Center, Horiz Stab Pivot, STA 1809.5148T2740
Seal Instl - Pitot/Static Tubing Pressure Dome233T9112
Pressure Seal Instl - Pressure Dome STA 1582.0255T4821
Retainer Instl - Pressure Seal, Hydraulic Tubing272T4831
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
19 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 20

TitleDrawing Number
Tubing Instl - APU Fuel Feed, Body Sections 45, 46 and 48346T0003
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated this service bulletin for effects on Fatigue Critical Structure (FCS) and for
changes to Damage Tolerance Inspections (DTI) required in the Maintenance Program. This
service bulletin affects FCS. DTI requirements for the structure affected are contained in Paragraph
1.E., Compliance of this service bulletin.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
20 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 21

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits/parts shown in Paragraph 2.C., Parts Necessary for Each Airplane as shown
below. Kits/Parts availability is shown in the Reorder Lead Time (ROLT). ROLT is calculated from the
date Boeing gets the purchase order.
Unit Price thru Dec
31/09
ROLT
(Weeks)
NameKit or Part Number
$27,650(a)Top Kit015T1812-1
$371,889(a)Pressure Bulkhead691T0103-1
(a) No Reorder Lead Time (ROLT) is provided. Boeing strongly recommends that operators
contact Boeing and order parts at least 2 years prior to planned modification incorporation
to ensure that parts can be made available.
The kits and parts are subject to the terms and conditions of the Boeing standard purchase order
acknowledgment. After the Unit Price date, new price and ROLT data is applicable. Prices are in United
States dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that
follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington 98124-2207 USA
B. Industry Support Information
Boeing warranty remedies are not available for the configuration change given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One 691T0103-1 Pressure Bulkhead, one 015T1812-1 Top Kit, and the items shown in
Paragraph 2.C.2., Parts and Materials Supplied by the Operator, are necessary for each
airplane. The Top Kit is divided into Figure kits for each installation figure shown in the
table below.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
21 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 22

Figure Kit
1413121161Top Kit
111111015T1812-1
Figure Kit
171615Top Kit
111015T1812-1
ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
WASHER2140T0140-5
CLIP1140T0142-1
CLIP1140T0142-2
FITTING ASSY2140T0169-7
COVER PLATE1140T0345-1
SEAL BLOCK AS-
SY
1140T0345-3
FILLER11148T0012-11
SHIM2148T0012-18
SHIM2148T0012-19
FILLER22148T0012-2
FILLER22148T0012-3
SHIM11148T0012-4
SHIM11148T0012-5
SPLICE-STRAP22148T0015-1
SEAL BLOCK AS-
SY
1148T2629-2
washer148T2746-1
filler148T2746-2
TUBE ASSY233T9110-566
TUBE ASSEMBLY233T9110-665
PLATER RETAIN-
ER
233T9113-4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
22 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 23

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
SEAL270T0004-1101
SEAL270T0004-1102
BRACKET ASSY-1272T4825-9
RETAINER-272T4830-1
RETAINER ASSY-272T4830-2
SEAL140345 (678782 op-
tional)
FITTING ASSY2412T3106-406
fitting assy1412T3106-408
SEAL-69B41314-6
BOLTBACB30LM3-3
BOLT, 12 PT
HEAD
BACB30LT5-12
BOLT, 12 PT
HEAD
BACB30LT7-12
BOLT, PROTRUD-
ING HD
88BACB30MY10K10X
BOLT TITANIUM
O/S
1010BACB30MY10K3X
BOLT, PROTRUD-
ING HD
55BACB30MY10K5X
BOLT, PROTRUD-
ING HD
11BACB30MY10K6X
BOLT, PROTRUD-
ING HD
1111BACB30MY10K7X
BOLT, PROTRUD-
ING HD
1414BACB30MY10K8X
BOLT, PROTRUD-
ING HD
44BACB30MY12K10X
BOLT, PROTRUD-
ING HD
22BACB30MY12K6X
BOLT, PROTRUD-
ING HD
44BACB30MY12K7X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
23 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 24

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
BOLT, PROTRUD-
ING HD
44BACB30MY12K8X
BOLT, PROTRUD-
ING HD
77BACB30MY8K10X
BOLT, PROTRUD-
ING HD
33BACB30MY8K11X
BOLT, PROTRUD-
ING HD
44BACB30MY8K12X
BOLT, PROTRUD-
ING HD
3535BACB30MY8K5X
BOLT, PROTRUD-
ING HD
11BACB30MY8K6X
BOLT, PROTRUD-
ING HD
6565BACB30MY8K7X
BOLT, PROTRUD-
ING HD
33BACB30MY8K8X
BOLT, PROTRUD-
ING HD
11BACB30MY8K9X
BOLT, HEX HEAD8BACB30NM4K14
BOLT, 100 DEG
HEX DR
44BACB30NW8K13X
BOLT, 100 DEG
HEX DR
22BACB30NW8K5X
BOLT, 100 DEG
HEX DR
22BACB30NW8K7X
BOLT, 100 DEG
HEX DR
44BACB30NW8K8X
HEX DRIVE BOLTBACB30NX10K10
BOLT, PROTRUD-
ING HD
44BACB30NX10K11X
BOLT, PROTRUD-
ING HD
44BACB30NX10K12X
BOLTBACB30NX10K7
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
24 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 25

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
BOLT, PROTRUD-
ING HD
22BACB30NX10K8X
BOLT, PROTRUD-
ING HD
22BACB30NX10K9X
BOLT, PROTRUD-
ING HD
44BACB30NX12K12X
BOLTBACB30NX14K16
BOLT, PROTRUD-
ING HD
2BACB30NX6K10X
BOLT, PROTRUD-
ING HD
20BACB30NX6K4X
BOLTBACB30NX6K5
BOLT, PROTRUD-
ING HD
2BACB30NX6K5X
HI LOKBACB30NX8K5
BOLT, HEX DRIVEBACB30NX8K7
BOLT, 12 PT
HEAD
BACB30US12K37
BOLT, 12 PT
HEAD
BACB30US12K40
BOLT, 12 PT
HEAD
26BACB30US5K16
BOLT, 12 PT
HEAD
58BACB30US5K17
BOLT, 12 PT
HEAD
40BACB30US5K18
BOLT, 12 PT
HEAD
24BACB30US5K19
BOLT, 12 PT
HEAD
10BACB30US5K21
BOLT, 12 PT
HEAD
6BACB30US5K25
BOLT, 12 PT
HEAD
4BACB30US6K31
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
25 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 26

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
BOLT, 12 PT
HEAD
40BACB30US6K33
BOLT, 12 PT
HEAD
32BACB30US6K34
BOLT, 12 PT
HEAD
8BACB30US6K35
BOLT, 12 PT
HEAD
8BACB30US6K36
BOLT, 12 PT
HEAD
BACB30US7K24
BOLT, 12 PT
HEAD
BACB30US7K26
BOLT, 12 PT
HEAD
BACB30US7K27
BOLT, 12 PT
HEAD
BACB30US7K28
BOLT, 12 PT
HEAD
20BACB30US7K35
BOLT, 12 PT
HEAD
12BACB30US7K39
BOLT, 12 PT
HEAD
16BACB30US7K40
BOLT, 12 PT
HEAD
BACB30US8K30
BOLT, 12 PT
HEAD
BACB30US8K31
BOLT, 12 PT
HEAD
16BACB30US8K42
CLAMP, LOOPBACC10DK6
COLLAR1414BACC30BH10
COLLAR44BACC30BH12
COLLAR,
PRELOAD
BACC30BH14
COLLAR24BACC30BH6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
26 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 27

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
COLLARBACC30BH8
COLLAR4949BACC30M10
COLLAR1414BACC30M12
COLLAR145145BACC30M8
SELF-LOCKING
NUT
BACN10HR12CD
NUT156BACN10HR5CD
SELF-LOCKING
NUT
92BACN10HR6CD
NUT44BACN10HR7CD
NUT16BACN10HR8CD
NUTBACN10JC3CD
SELF-LOCKING
NUT
BACN10JC7CD
NUT, SELF-LOCK15BACN11AG3
NUTBACN11Z5CD
RIVET, UNIVER-
SAL HD
50BACR15FT5D7C
RIVET, UNIVER-
SAL HD
5BACR15FT6D8C
RIVET8BACR15FT6KE7C
RIVET55BACR15FV7KE7
RIVET11BACR15FV7KE8
BOLT15BACS12HN3-7
BOLTBACS12HN3-9
SHIM, LAMINAT-
ED
2BACS40R011B012F
SHIM,LAMINATED22BACS40R011B027F
SHIM, LAMINAT-
ED
22BACS40R012B027F
SHIM, LAMINAT-
ED
11BACS40R016B098F
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
27 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 28

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
1413121161
QTY
SHIM, LAMINAT-
ED
11BACS40R027C030F
WASHER, PLAINBACW10BP12CD
WASHER, PLAINBACW10BP12DP
CSK WASHER156BACW10BP5CD
WASHER-PLAIN154BACW10BP5DP
WASHER, PLAIN92BACW10BP6CD
WASHER92BACW10BP6DP
WASHER44BACW10BP7CD
WASHER44BACW10BP7DP
WASHER16BACW10BP8CD
WASHER16BACW10BP8DP
WASHER8NAS1149D0316J
WASHER30NAS1149D0332J
WASHER, FLAT5NAS1149D0363J
RIVET, BLIND31NAS1399D6A10
SPACERS FOR
RIVETS
1NAS42DD3-44FC
SPACERS FOR
RIVETS
1NAS42DD3-48FC
SPACERS FOR
RIVETS
1NAS42DD3-64FC
ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
WASHER140T0140-5
CLIP140T0142-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
28 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 29

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
CLIP140T0142-2
FITTING ASSY140T0169-7
COVER PLATE140T0345-1
SEAL BLOCK AS-
SY
140T0345-3
FILLER148T0012-11
SHIM148T0012-18
SHIM148T0012-19
FILLER148T0012-2
FILLER148T0012-3
SHIM148T0012-4
SHIM148T0012-5
SPLICE-STRAP148T0015-1
SEAL BLOCK AS-
SY
148T2629-2
washer2148T2746-1
filler2148T2746-2
TUBE ASSY1233T9110-566
TUBE ASSEMBLY1233T9110-665
PLATER RETAIN-
ER
2233T9113-4
SEAL3270T0004-1101
SEAL1270T0004-1102
BRACKET ASSY-272T4825-9
RETAINER-1272T4830-1
RETAINER ASSY-1272T4830-2
SEAL40345 (678782 op-
tional)
FITTING ASSY412T3106-406
fitting assy412T3106-408
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
29 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 30

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
SEAL-169B41314-6
BOLT16BACB30LM3-3
BOLT, 12 PT
HEAD
10BACB30LT5-12
BOLT, 12 PT
HEAD
8BACB30LT7-12
BOLT, PROTRUD-
ING HD
BACB30MY10K10X
BOLT TITANIUM
O/S
BACB30MY10K3X
BOLT, PROTRUD-
ING HD
BACB30MY10K5X
BOLT, PROTRUD-
ING HD
BACB30MY10K6X
BOLT, PROTRUD-
ING HD
BACB30MY10K7X
BOLT, PROTRUD-
ING HD
BACB30MY10K8X
BOLT, PROTRUD-
ING HD
BACB30MY12K10X
BOLT, PROTRUD-
ING HD
BACB30MY12K6X
BOLT, PROTRUD-
ING HD
BACB30MY12K7X
BOLT, PROTRUD-
ING HD
BACB30MY12K8X
BOLT, PROTRUD-
ING HD
BACB30MY8K10X
BOLT, PROTRUD-
ING HD
BACB30MY8K11X
BOLT, PROTRUD-
ING HD
BACB30MY8K12X
BOLT, PROTRUD-
ING HD
BACB30MY8K5X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
30 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 31

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
BOLT, PROTRUD-
ING HD
BACB30MY8K6X
BOLT, PROTRUD-
ING HD
BACB30MY8K7X
BOLT, PROTRUD-
ING HD
BACB30MY8K8X
BOLT, PROTRUD-
ING HD
BACB30MY8K9X
BOLT, HEX HEADBACB30NM4K14
BOLT, 100 DEG
HEX DR
BACB30NW8K13X
BOLT, 100 DEG
HEX DR
BACB30NW8K5X
BOLT, 100 DEG
HEX DR
BACB30NW8K7X
BOLT, 100 DEG
HEX DR
BACB30NW8K8X
HEX DRIVE BOLT44BACB30NX10K10
BOLT, PROTRUD-
ING HD
BACB30NX10K11X
BOLT, PROTRUD-
ING HD
BACB30NX10K12X
BOLT54BACB30NX10K7
BOLT, PROTRUD-
ING HD
BACB30NX10K8X
BOLT, PROTRUD-
ING HD
BACB30NX10K9X
BOLT, PROTRUD-
ING HD
BACB30NX12K12X
BOLT8BACB30NX14K16
BOLT, PROTRUD-
ING HD
BACB30NX6K10X
BOLT, PROTRUD-
ING HD
BACB30NX6K4X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
31 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 32

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
BOLT8BACB30NX6K5
BOLT, PROTRUD-
ING HD
BACB30NX6K5X
HI LOK8BACB30NX8K5
BOLT, HEX DRIVE76BACB30NX8K7
BOLT, 12 PT
HEAD
4BACB30US12K37
BOLT, 12 PT
HEAD
4BACB30US12K40
BOLT, 12 PT
HEAD
BACB30US5K16
BOLT, 12 PT
HEAD
BACB30US5K17
BOLT, 12 PT
HEAD
BACB30US5K18
BOLT, 12 PT
HEAD
BACB30US5K19
BOLT, 12 PT
HEAD
BACB30US5K21
BOLT, 12 PT
HEAD
BACB30US5K25
BOLT, 12 PT
HEAD
BACB30US6K31
BOLT, 12 PT
HEAD
BACB30US6K33
BOLT, 12 PT
HEAD
BACB30US6K34
BOLT, 12 PT
HEAD
BACB30US6K35
BOLT, 12 PT
HEAD
BACB30US6K36
BOLT, 12 PT
HEAD
22BACB30US7K24
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
32 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 33

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
BOLT, 12 PT
HEAD
2BACB30US7K26
BOLT, 12 PT
HEAD
4BACB30US7K27
BOLT, 12 PT
HEAD
32BACB30US7K28
BOLT, 12 PT
HEAD
BACB30US7K35
BOLT, 12 PT
HEAD
BACB30US7K39
BOLT, 12 PT
HEAD
BACB30US7K40
BOLT, 12 PT
HEAD
2BACB30US8K30
BOLT, 12 PT
HEAD
4BACB30US8K31
BOLT, 12 PT
HEAD
BACB30US8K42
CLAMP, LOOP10BACC10DK6
COLLAR107BACC30BH10
COLLARBACC30BH12
COLLAR,
PRELOAD
8BACC30BH14
COLLAR8BACC30BH6
COLLAR84BACC30BH8
COLLARBACC30M10
COLLARBACC30M12
COLLARBACC30M8
SELF-LOCKING
NUT
8BACN10HR12CD
NUTBACN10HR5CD
SELF-LOCKING
NUT
BACN10HR6CD
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
33 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 34

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
NUT60BACN10HR7CD
NUT4BACN10HR8CD
NUT18BACN10JC3CD
SELF-LOCKING
NUT
8BACN10JC7CD
NUT, SELF-LOCKBACN11AG3
NUT10BACN11Z5CD
RIVET, UNIVER-
SAL HD
BACR15FT5D7C
RIVET, UNIVER-
SAL HD
BACR15FT6D8C
RIVETBACR15FT6KE7C
RIVETBACR15FV7KE7
RIVETBACR15FV7KE8
BOLTBACS12HN3-7
BOLT24BACS12HN3-9
SHIM, LAMINAT-
ED
BACS40R011B012F
SHIM,LAMINATEDBACS40R011B027F
SHIM, LAMINAT-
ED
BACS40R012B027F
SHIM, LAMINAT-
ED
BACS40R016B098F
SHIM, LAMINAT-
ED
BACS40R027C030F
WASHER, PLAIN8BACW10BP12CD
WASHER, PLAIN8BACW10BP12DP
CSK WASHER10BACW10BP5CD
WASHER-PLAIN12BACW10BP5DP
WASHER, PLAINBACW10BP6CD
WASHERBACW10BP6DP
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
34 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 35

ALL
KIT 015T1812-1
NOTES
Existing Part
NumberName
Figure
New Part Number
171615
QTY
WASHER68BACW10BP7CD
WASHER68BACW10BP7DP
WASHERBACW10BP8CD
WASHER4BACW10BP8DP
WASHER24NAS1149D0316J
WASHERNAS1149D0332J
WASHER, FLATNAS1149D0363J
RIVET, BLINDNAS1399D6A10
SPACERS FOR
RIVETS
NAS42DD3-44FC
SPACERS FOR
RIVETS
NAS42DD3-48FC
SPACERS FOR
RIVETS
NAS42DD3-64FC
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number/ Specification
Sealant-BMS 5-95
Bolt8BACB30NM4K4
Epoxy Adhesive2 OzBMS5-25
Bolt8NAS6603-3
Sealant-BMS 5-142
Plate1A
Plate1B
Angle6C
Angle2D
Angle2E
Bolt120BACB30NX6K5
Collar138BACC30BH6SW
Bolt18BACB30NX6K8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
35 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 36

3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
Boeing can supply the tools shown in Paragraph 2.F., Special Tooling Necessary to do this Service
Bulletin. Send a Purchase Order to the Director of Spares. Give this service bulletin number and the
date the tools will be used. If there is a limit in the quantity of available rental tools, a supply sequence
is given by Spares.
Monthly PriceDaily Price thru
Dec 31/09
NameTool Kit Number
Not Available$500Forward 48 Section Internal
Scaffolding
PME148T0010PBR
Not Available$220Pressure Bulkhead CoverPRE148T2610PBR
Not Available$200Vertical Fin Alignment PinsMIT100T3480PBR
Not Available$240Vertical Fin Floor StandME170T0100PBR
Not Available$380Pressure Dome SlingOHME148T2610PBR
Not Available$240Vertical Fin Lift Sling2OHME100T3480PBR
Not Available$260Vertical Fin Lift FittingsME100T3480PBR
Not Available$200Horizontal Stabilizer Lift FittingsME182T0000PBR
Not Available$360Horizontal Stabilizer Lift SlingOHME180T0100PBR
Not Available$240Forward 48 Section Sling and
Strongback
3ME140T0140PBR
Not Available$500Vertical Fin Torque Multiplier
and Adapter
2MIT100T3480PBR
Not Available$460Aft 48 Section Lift Sling and At-
tach Fittings
ME148T0600PBR
Not Available(a)Pressure Bulkhead Removal
Strongback
ME148T2610PBR
Not Available$380Horizontal Stabilizer Floor StandME180T0000PBR
Not Available$360Aft 48 Section Stand2ME148T0600PBR
Not Available$420Forward 48 Section Attach Fit-
tings
ME148T0200PBR
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
36 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 37

Monthly PriceDaily Price thru
Dec 31/09
NameTool Kit Number
Not Available$360Forward 48 Section Stand2ME148T0200PBR
A $150.00 handling fee is added to all tool rentals.
(a) Rental price data for this tool was not available at the time this service bulletin was issued.
Purchase Data:
Unit Price thru
Dec 31/09
NameTool Kit Number
$151,600Forward 48 Section Internal
Scaffolding
PME148T0010PBR
$19,320Pressure Bulkhead CoverPRE148T2610PBR
$10,120Vertical Fin Alignment PinsMIT100T3480PBR
$21,400Vertical Fin Floor StandME170T0100PBR
$63,250Pressure Dome SlingOHME148T2610PBR
$22,400Vertical Fin Lift Sling2OHME100T3480PBR
$25,300Vertical Fin Lift FittingsME100T3480PBR
$10,120Horizontal Stabilizer Lift FittingsME182T0000PBR
$50,600Horizontal Stabilizer Lift SlingOHME180T0100PBR
$20,400Forward 48 Section Sling and
Strongback
3ME140T0140PBR
$151,800Vertical Fin Torque Multiplier
and Adapter
2MIT100T3480PBR
$124,000Aft 48 Section Lift Sling and At-
tach Fittings
ME148T0600PBR
(a)Pressure Bulkhead Removal
Strongback
ME148T2610PBR
$69,576Horizontal Stabilizer Floor StandME180T0000PBR
$50,600Aft 48 Section Stand2ME148T0600PBR
$83,200Forward 48 Section Attach Fit-
tings
ME148T0200PBR
$50,600Forward 48 Section Stand2ME148T0200PBR
(a) Purchase price data for this tool was not available at the time this ser-
vice bulletin was issued.
The kits are subject to the terms and conditions of the Boeing standard purchase order
acknowledgement. After the Price date, new price data is applicable. Prices are in United States dollars.
Terms: Net 30 days.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
37 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 38

Reference this service bulletin number and submit purchase order by one of the methods that follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington 98124-2207 USA
(Service Bulletin 767-53A0139)
F. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 2.E., Special Tooling - Price and Availability.
Maintenance and overhaul tools in the manuals shown in Paragraph 1.J., References, can also be
necessary. Examine operator tool supply to make sure all necessary tools are available.
NameTool Kit Number
Forward 48 Section Internal
Scaffolding
PME148T0010PBR
Pressure Bulkhead CoverPRE148T2610PBR
Vertical Fin Alignment PinsMIT100T3480PBR
Vertical Fin Floor StandME170T0100PBR
Pressure Dome SlingOHME148T2610PBR
Pressure Dome Removal
Strongback
ME148T2610PBR
Vertical Fin Lift Sling2OHME100T3480PBR
Vertical Fin Lift FittingsME100T3480PBR
Horizontal Stabilizer Lift FittingsME182T0000PBR
Horizontal Stabilizer Lift SlingOHME180T0100PBR
Forward 48 Section Sling and
Strongback
3ME140T0140PBR
Vertical Fin Torque Multiplier and
Adapter
2MIT100T3480PBR
Aft 48 Section Lift Sling and At-
tach Fittings
ME148T0600PBR
Horizontal Stabilizer Floor StandME180T0000PBR
Aft 48 Section Stand2ME148T0600PBR
Forward 48 Section Attach Fit-
tings
ME148T0200PBR
Forward 48 Section Stand2ME148T0200PBR
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
38 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 39

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions identified in Paragraph 3.B., Work Instructions and the Figure(s)
give the recommended sequence of steps. The sequence of steps to do this service
bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are given in 767-200 or 767-300 SRM,
Chapter 51
– Torque limits to tighten nuts and bolts are given in 767-200 or 767-300 SRM,
Chapter 51
5. Use the approved fastener and process material substitutions in accordance with
767-200 or 767-300 SRM, Chapter 51 and Boeing Drawing 012W6100. Alternate
fasteners are also listed in 767-200 or 767-300 SRM Chapter 51 and Boeing Drawing
012W6100. Note that the substitution of BACR15BB( ) rivets as substitutes for
BACR15FT( ) rivets is not acceptable at certain locations that require repeated surface
High Frequency Eddy Current (HFEC) inspections, due to reduced crack detectability
around the BACR15BB( ) rivet's larger manufactured head. Contact Boeing if
substitutes for the specified BACR15FT( ) rivets are necessary.
6. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements.
7. If the length of any fastener specified in this service bulletin does not meet the
installation standards given in SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards given in SRM Chapter 51 may be used.
8. Boeing recommends that the work that follows be done with the airplane indoors. If
the airplane is not indoors, the work instructions that follow are not complete.
Additional instructions will be necessary to prevent damage to the airplane and injury
to personnel.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
39 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 40

9. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "as
given in" or "in accordance with" are included in the instruction, the procedure in the
Boeing document must be used.
10. These work instructions refer to procedures included in other Boeing documents.
When the words "is shown in" are included in the instructions, the procedure in the
Boeing document is similar, but must be adjusted to compensate for differences.
11. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
B. WORK INSTRUCTIONS
PART 1 - BULKHEAD INSPECTIONS PRIOR TO REPLACEMENT
1. At the time given in Paragraph 1.E., Compliance, start to do inspections of the aft pressure bulkhead
as given in Figure 18.
NOTE: 1. If there are any existing repairs in the inspection areas, continue to inspect the
repaired areas as given in the repair instructions provided with the applicable
repair. If inspection instructions were not provided with the repair instructions,
contact Boeing for special inspection instructions.
2. As an alternative to inspection, replace the aft pressure bulkhead as given in
PART 2, PART 3, and PART 4.
2. If cracks are found, repair as given in 767-200 SRM 53-80-08, 767-300 SRM 53-80-08, 767-300BCF
SRM 53-80-08, ask Boeing for repair data, or replace the aft pressure bulkhead as given in PART
2, PART 3, and PART 4.
3. Put the airplane back to a serviceable condition. Do the inspections in PART 1 again at the time
given in Paragraph 1.E., Compliance. Replace the aft pressure bulkhead as given in PART 2,
PART 3, and PART 4 at the time given in Paragraph 1.E., Compliance.
PART 2 - BULKHEAD PREPARATION
1. Prepare the new aft pressure bulkhead assembly as given in Figure 1.
2. Group 2:
Do additional preparation of the new aft pressure bulkhead assembly as given in Figure 2.
3. Continue to PART 3.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
40 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 41

PART 3 - BULKHEAD REPLACEMENT
1. Supply airplane electrical power. Refer to 767 AMM 24-22-00 as an accepted procedure.
2. Pressurize the center hydraulic system. Refer to 767 AMM 29-11-00 as an accepted procedure.
3. Use the STAB TRIM levers or switches to move the horizontal stabilizer to the neutral position (2
units of trim on the position indicator).
4. Remove the pressure from the center, right, and left hydraulic systems. Refer to 767 AMM 29-11-00
as an accepted procedure.
5. Set the C, R, and L STAB TRIM switches on the P10 Panel to the CUTOUT position and attach
DO-NOT-OPERATE tags.
6. On the P61 right side panel, put these switches in the OFF position and attach DO-NOT-OPERATE
tags:
S2 RIGHT TAIL HYD SHUT OFF VALVE SWITCH
S4 CENTER TAIL HYD SHUT OFF VALVE SWITCH
S6 LEFT TAIL HYD SHUT OFF VALVE SWITCH
7. Open the following circuit breakers and attach DO-NOT-CLOSE tags:
a. On the P11 Overhead Circuit Breaker Panel:
(1) For the APU Fuel System:
11B36, APU START
11D34, FUEL DC PUMP PWR
11D35, FUEL DC PUMP CONT
11M25, FUEL PUMPS L FWD R AFT
(2) For the horizontal stabilizer ballscrew and pivot pins:
11A36, ALT STAB TRIM (if installed)
11C12, STAB TRIM SHUTOFF L
11C13, STAB TRIM SHUTOFF CENTER
11H17, FLT CONT SHUTOFF TAIL LEFT
11H18, FLT CONT SHUTOFF TAIL CENTER
11H27, FLT CONT SHUTOFF TAIL RIGHT
11D29, ENG HYD PUMP L SUPPLY
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
41 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 42

11D30, ENG HYD. PUMP R SUPPLY
11L25, HYD ELEC PUMP L
11L16, HYD ELEC PUMP R
11L15, ELEC HYD PUMP C
111L18, HYD SYS C PRESS
11D31, AIR HYD PUMP
b. On the P6 Main Power Distribution Panel:
6E3, APU FUEL VALVES
8. Remove airplane electrical power. Refer to 767 AMM 24-22-00 as an accepted procedure.
9. Support and jack the airplane indoors as follows:
a. Install nose and main landing gear down locks. Refer to 767 AMM 32-00-20 as an accepted
procedure.
b. Deflate the nose gear and pump oil into the nose gear. Simultaneously deflate both main
gears and pump oil into the main gears. When the oil flow is free of nitrogen bubbles close
the valves. Pump additional oil into both the nose and main landing gear oleos to achieve one
inch of chrome showing. Refer to 767 AMM 12-15-01 and 767 AMM 12-15-02 as accepted
procedures.
c. Partially support the airplane with nose and main landing gear/axial jacks at all five axle jack
points. Refer to 767 AMM 07-11-03 as an accepted procedure. Apply a a 10,000 - 12,000
pound load at each axial jack location. Install wheel chocks and chains at each main landing
gear.
NOTE: Parking brake can remain set.
d. Mechanically lock all five axle jacks.
10. Disassemble and remove (or shift forward) equipment from the aft part of the passenger
compartment for access to the Aft Pressure Bulkhead joint at STA 1582. This includes:
a. Passenger seats. Refer to 767 AMM 25-25-01 as an accepted procedure.
b. Partitions. Refer to 767 AMM 25-25-04 as an accepted procedure.
c. Aft Galley Complex A1, A4, or A1-A3. Refer to 767 AMM 25-31-04 as an accepted procedure.
d. Lavatories. Refer to 767 AMM 25-41-04 as an accepted procedure.
e. Sidewall Panels. Refer to 767 AMM 25-21-01 as an accepted procedure.
f. Ceiling panels. Refer to 767 AMM 25-22-01, 767 AMM 25-22-02, and/or 767 AMM 25-22-10
as accepted procedures.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
42 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 43

g. Sidewall and Ceiling Insulation. Refer to 767 AMM 25-21-05 as an accepted procedure.
h. Doorway/Galley Floor Covering. Refer to 767 AMM 25-27-02 as an accepted procedure.
i. Floor Panels. Refer to 767 AMM 53-01-01 as an accepted procedure.
11. Disassemble and remove (or shift forward) equipment from the aft end of the bulk cargo
compartment for access to the Aft Pressure Bulkhead joint at STA 1582. This includes:
a. Bulk Cargo Compartment Aft Lining. Refer to 767 AMM 25-52-01 as an accepted procedure.
b. Bulk Cargo Compartment Sidewall Lining, for access to the pitot-static tubes on the left side
from the aft pressure bulkhead to the bulk cargo door aft frame at STA 1461. Refer to 767
AMM 25-52-01 as an accepted procedure.
c. Potable Water Tanks. Refer to 767 AMM 38-11-01 as an accepted procedure.
d. Vacuum Lavatory Waste Tanks. Refer to 767 AMM 38-32-11 as an accepted procedure.
e. Sidewall Insulation, which includes insulation blankets and capstrips from the sidewall, ceiling,
and aft pressure bulkhead. Refer to 767 AMM 25-52-03 as an accepted procedure.
NOTE: Boeing Service Bulletin 767-25A0300, "Equipment/Furnishings - Insulation - Aft
Bulkhead to Floor Insulation Blankets Modification", which is mandated by FAA AD
2003-13-03, requires replacement of aft pressure bulkhead insulation blankets.
12. Disconnect the elevator (E1A/E1B/E2A/E2B), stabilizer trim (ST1A/ST1B/ ST2A/ST2B) and rudder
(RA/RB) control cables. Refer to 767 AMM 20-10-03 as an accepted procedure.
a. Install cable clamps.
b. Disconnect the cables at any turnbuckle aft of the aft pressure bulkhead.
c. Remove and salvage any air seals where the cable penetrates the aft pressure bulkhead.
d. Move and coil the cable ends forward and aft of the aft pressure bulkhead.
13. Remove and salvage the control cable air seals and fasteners for the elevator (E1A/E1B/E2A/E2B),
stabilizer trim (ST1A/ST1B/ ST2A/ST2B) and rudder (RA/RB) control cables. Refer to 767 AMM
20-10-04 as an accepted procedure. The salvaged air seals will be installed on the new aft pressure
bulkhead assembly when the control cables are reinstalled.
14. Disconnect and remove auxiliary pitot tubes and seals as given in Figure 3.
15. Disconnect and remove auxiliary static system tubes (if installed) and hydraulic lines as follows.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
43 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 44

a. Group 3:
Disconnect the auxiliary static system (AS1 and AS2) tubes at the junctions between STA
1605.5 and STA 1629, between stringers S-31L and S-32L. Cap the open ends of all tubes.
Refer to 767 AMM 20-10-09 as an accepted procedure.
b. Disconnect and cap the hydraulic lines at or near STA 1809.
c. Disconnect and cap the hydraulic lines forward of the aft pressure bulkhead.
d. Remove and discard the pressure seals at the aft pressure bulkhead as given in Figure 4.
e. Remove hydraulic lines between the aft pressure bulkhead and STA 1809.
f. Group 3:
Move the auxiliary static system (AS1 and AS2) tubes forward of STA 1582.
16. Disconnect the electrical connectors from the altitude pressure switches. Refer to 767 AMM
38-32-51 as an accepted procedure.
17. Disconnect electrical systems, including:
a. Lights
b. APU Power
c. High Frequency Communications
d. Stall Warning Systems
e. Interphone
f. Autopilot
g. Yaw Damper
h. Rudder Trim Actuator
i. Rudder Ratio Changer
j. Rudder and Elevator Shutoff Valves
k. Rudder Position Indicator
l. Stabilizer Trim Control System
m. Flap/Stabilizer Position Module
n. Flight Recorder Systems
o. APU Fire Detection System
18. Disassemble and remove and keep all seal components where wires penetrate the aft pressure
bulkhead. Move all loose wires forward or aft, as necessary.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
44 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 45

19. Disconnect and remove the APU Air Supply Duct. Refer to 767 AMM 36-11-01 as an accepted
procedure.
20. Disconnect the APU fuel line at the aft pressure bulkhead as follows:
a. In the aft end of the bulk cargo compartment, disconnect the shroud and APU fuel line at the
aft pressure bulkhead fitting. Salvage all bolts, nuts, and washers. Refer to the task "Remove
the APU Fuel Line and Shroud Between the Center Compartment of the Auxiliary Fuel Tank
and the Pressure Bulkhead for the Aft Cargo Compartment" in 767 AMM 28-25-05 as an
accepted procedure.
b. Remove the APU fuel line between the aft pressure bulkhead the the APU firewall. Refer to
the task "Remove the APU Fuel Line and Shroud Between the Pressure Bulkhead for the Aft
Cargo Compartment and the APU Firewall Bulkhead" in 767 AMM 28-25-05 as an accepted
procedure.
c. Remove and keep the APU fuel line bulkhead fitting as given in Figure 5.
d. Install the APU fuel line bulkhead fitting on the new aft pressure bulkhead as given in Figure
6.
21. Remove the Dorsal Fin. Refer to 767 AMM 53-66-02 as an accepted procedure.
CAUTION: SLOWLY LIFT AND REMOVE LARGE STRUCTURAL COMPONENTS TO PREVENT
DAMAGE TO THE AIRPLANE OR TO PERSONS.
22. Remove the Vertical Fin. A vertical fin removal procedure is shown in 767 ARD 2-60-2. (This
procedure has similarities that can be used as a guideline):
a. Install internal scaffolding PME148T0010PBR inside Section 48.
b. Attach vertical fin lift fittings ME100T3480PBR to the vertical fin.
c. Attach vertical fin lift sling 2OHME100T3480PBR to the vertical fin and apply 1,000 pounds
upward prelift tension to the sling.
d. Disconnect the fin-to-body link at the leading edge of the fin. Remove the 16 tension bolts
and 156 lock bolts that attach the vertical fin to the aft body. Use torque tool 2MIT100T3480PBR
as necessary when removing the tension bolts. Lift the vertical fin off the body. A vertical fin
removal procedure is shown in 767 ARD 2-60-2 for airplane recovery purposes.
e. Without a rotating fixture, the vertical fin must be stored in an upright position. Use fin stand
ME170T0100PBR or create a tool to act as a base to support the vertical fin by attaching to
the four corner tension bolt locations. The vertical fin should be stored indoors.
NOTE: All H-11 hardware should have been replaced at fin to body joint per Boeing Service
Bulletin 767-53A0085 and FAA AD 2003-10-11 by July 1, 2006.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
45 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 46

CAUTION: THE TRAP LOCKING DEVICES MUST BE REMOVED FROM THE HORIZONTAL
STABILIZER PIVOTS ON BOTH THE LEFT AND RIGHT SIDES TO DO THE PIN
ROTATION CHECK.
23. Support the horizontal stabilizer with 767 SRM Horizontal Stabilizer supplementary supports as
given in 767-200 SRM 51-50-02, 767-200SF SRM 51-50-02, 767-300 SRM 51-50-02, or
767-300BCF SRM 51-50-02 Detail IV on the left and right sides. Load four jacks approximately
uniform until the horizontal stabilizer pivot fittings begin to move vertically relative to the airplane
Section 48 structure (refer to 767 AMM 55-17-51) and check that the outer pin can be rotated
freely.
NOTE: The sum of all four jack loads should not exceed 5,000 pounds.
24. Remove the horizontal stabilizer seal fairings. Refer to 767 AMM 53-80-70 as an accepted
procedure.
CAUTION: INSUFFICIENT OR EXCESSIVE LIFT FORCE CAN RESULT IN STRUCTURAL DAMAGE
AND A SAFETY HAZARD.
25. Support the tail cone between STA 1809 and STA 1952 with lift fittings and sling ME148T0600PBR.
The APU will remain in place. Remove the fasteners that attach the tail cone to the STA 1809
bulkhead as given in Figure 7. Remove and store the tail cone on stand 2ME148T0600PBR.
26. Attach horizontal stabilizer lift fittings ME182T0000PBR and lift sling OHME180T0100PBR to the
horizontal stabilizer and make the sling cable assembly tight.
27. Disconnect the stabilizer trim ballscrew from the horizontal stabilizer center section. Refer to 767
AMM 27-41-10 as an accepted procedure.
28. Do not remove the horizontal stabilizer pivot pins. Make sure the horizontal stabilizer sling cable
assembly is still tight. With the horizontal stabilizer vertically balanced as described in Steps 23
and 26, complete the disassembly of the STA 1809.5 bulkhead as given in Figure 8 to allow the
horizontal stabilizer to be removed. The left and right STA 1809.5 center bulkhead assemblies will
remain attached to the horizontal stabilizer at the pivot pins.
CAUTION: THE LEFT AND RIGHT STA 1809.5 BULKHEAD OUTER CHORDS WILL NO LONGER
BE CONNECTED TO THE SURROUNDING STRUCTURE AFTER COMPLETION OF
THE FASTENER REMOVALS GIVEN IN FIGURES 7 AND 8. TO PREVENT DAMAGE
TO THE OUTER CHORDS, USE CARE TO REMOVE THE OUTER CHORDS WHILE
THE HORIZONTAL STABILIZER (WITH THE STA 1809.5 CENTER BULKHEAD
ASSEMBLIES ATTACHED) ARE REMOVED.
29. Use the horizontal stabilizer lift sling to vertically lift the horizontal stabilizer a small amount to
unload the 767 SRM Horizontal Stabilizer supplementary supports, then remove the supplementary
supports. Remove the left and right STA 1809.5 bulkhead outer chords, which are trapped between
the STA 1809.5 center bulkhead assemblies and the forward part of section 48 that remains. Move
the horizontal stabilizer aft until it is clear of the STA 1809.5 bulkhead. Set the horizontal stabilizer
down on a storage fixture similar to ME180T0000PBR.
30. Make and install temporary STA 1809.5 bulkhead stabilizing tools as given in Figure 19.
CAUTION: INSUFFICIENT OR EXCESSIVE LIFT FORCE CAN RESULT IN STRUCTURAL DAMAGE
AND A SAFETY HAZARD.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
46 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 47

LEAVING THE PME148T0010PBR INTERNAL SCAFFOLDING INSIDE THE FORWARD
PART OF SECTION 48 DURING THE OVERHEAD REMOVAL PROCESS RESULTS
IN A FORWARD SHIFT IN THE CENTER OF GRAVITY OF THE FORWARD PART OF
SECTION 48 THAT MAY CAUSE SEPARATION DIFFICULTIES.
31. Support the forward part of Section 48 (STA 1582 to STA 1809) with lift fittings and sling
3ME140T0140PBR and handling fittings ME148T0200PBR. Remove fasteners, clips, and fittings
as given in Figure 9. Detach the STA 1582 floor beam as given in Figure 21. Remove the forward
part of Section 48 (the aft pressure bulkhead will remain attached to the forward part of Section
48 at this time). Remove and store the forward part of Section 48 (which includes the aft pressure
bulkhead) on stand 2ME148T0200PBR.
WARNING: UNTIL THE STA 1582 FLOOR BEAM TEMPORARY SUPPORTS ARE INSTALLED, DO
NOT PLACE EXCESSIVE WEIGHT ON THE MAIN DECK FLOOR STRUCTURE AFT
OF STA 1562. THE MAIN DECK FLOOR AFT OF STA 1562 IS NOT SUPPORTED. DO
THIS TO PREVENT INJURY TO PERSONNEL AND DAMAGE TO THE FLOOR
STRUCTURE.
WARNING: INSTALL APPROPRIATE SAFETY BARRICADES OR SIMILAR TO BLOCK THE END
OF THE MAIN DECK FLOOR AFT OF STA 1582. DO THIS TO PREVENT INJURY TO
PERSONNEL.
32. Install temporary supports for the STA 1582 floor beam as given in Figure 22. Prior to installation
of the supports, make sure that the floor grid is level, and not deflected down or up.
33. Attach removal strongback ME148T2610PBR and lifting fixture OHME148T2610PBR to the existing
aft pressure bulkhead in the forward part of Section 48. Remove the rivets that attach the aft
pressure bulkhead to the Section 48 pressure ring as given in Figure 10. Remove the old aft
pressure bulkhead from the forward part of Section 48.
NOTE: Some rivets will need to be removed just prior to installation of the strongback due to the
rivet location being hidden under the strongback attach location.
34. Attach lifting fixture OHME148T2610PBR to installation strongback 2ME148T2610PBR (this
strongback is shipped already attached to the new aft pressure bulkhead) and lift the new bulkhead
into position in the forward part of Section 48. Install fasteners to attach the new aft pressure
bulkhead to the Section 48 (STA 1582) pressure ring as given in Figure 11. Remove the aft pressure
bulkhead lifting fixture.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
47 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 48

WARNING: WITH THE STA 1582 FLOOR BEAM TEMPORARY SUPPORTS REMOVED, DO NOT
PLACE EXCESSIVE WEIGHT ON THE MAIN DECK FLOOR STRUCTURE AFT OF
STA 1562. THE MAIN DECK FLOOR AFT OF STA 1562 IS NOT SUPPORTED. DO
THIS TO PREVENT INJURY TO PERSONNEL AND DAMAGE TO THE FLOOR
STRUCTURE.
CAUTION: JUST PRIOR TO FINAL POSITIONING OF THE FORWARD PART OF SECTION 48,
REMOVE THE STA 1582 FLOOR BEAM TEMPORARY SUPPORTS. DO THIS TO
PREVENT DAMAGE TO THE NEW AFT PRESSURE BULKHEAD FROM THE FLOOR
BEAM SUPPORT FASTENERS.
35. Lift the forward part of Section 48 (STA 1582 to STA 1809, including the new aft pressure bulkhead)
into position from the storage stand with lift fittings and sling 3ME140T0140PBR and handling
fittings ME148T0200PBR. Install fasteners as given in Figure 12 to attach the new aft pressure
bulkhead and the forward part of Section 48 to Section 46 at STA 1582. Attach the STA 1582 floor
beam as given in Figure 23. Remove the sling, handling fittings, and lift fittings.
36. Remove the temporary STA 1809.5 bulkhead stabilizing tools as given in Figure 20.
37. Lift the horizontal stabilizer (with the left and right STA 1809.5 center bulkheads attached at the
hinge pins) from the storage fixture and move it near its final position using the lift sling and lift
fittings. Before moving the horizontal stabilizer into its final position, position the previously removed
left and right STA 1809.5 bulkhead outer chords between the forward part of Section 48 and the
STA 1809.5 center bulkhead assemblies. The final position is set by alignment of the left and right
center bulkhead fastener patterns.
38. Support the horizontal stabilizer with 767 SRM Horizontal Stabilizer supplementary supports as
given in 767-200 SRM 51-50-02, 767-200SF SRM 51-50-02, 767-300 SRM 51-50-02, or
767-300BCF SRM 51-50-02 Detail IV on the left and right sides. Load four jacks uniformly until
the supports have taken the load off the horizontal stabilizer lift sling. Do not yet remove the
horizontal stabilizer lift sling or lift fittings.
NOTE: The sum of all four jack loads should not exceed 5,000 pounds.
39. Attach the left and right STA 1809.5 center bulkheads as given in Figure 13 and Figure 14. Use
care to prevent excessive loading of the stabilizer hinge joints.
40. Connect the stabilizer trim ballscrew to the horizontal stabilizer center section. Refer to 767 AMM
27-41-10 as an accepted procedure.
41. Remove the horizontal stabilizer lift sling and lift fittings. Reinstall the production fasteners at the
lift fitting attach points.
42. Lift the tail cone into position with the sling and lift fittings. Install the fasteners as given in Figure
15, to attach the tail cone to the STA 1809 bulkhead. Remove the sling and lift fittings.
NOTE: Accomplishment of Part 3 Step 38 (horizontal stabilizer support), Step 39 (align and attach
STA 1809.5 center bulkheads), Step 40 (stabilizer trim ballscrew attachment), Step 41
(removal of lift sling and fittings), and Step 42 (attach tail cone) should return the horizontal
stabilizer to the position initially given in Step 23.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
48 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 49

43. The horizontal stabilizer is now supported by suitable means, with trap lock devices removed.
Check that the right and left horizontal stabilizer pivot pins can be rotated freely with an applied
torque of 400 in-lb or less. If necessary, remove and reinstall both the left and right pivot pins.
Refer to 767 AMM 55-17-51 as an accepted procedure.
44. Install the horizontal stabilizer seal fairings. Refer to 767 AMM 53-80-70 as an accepted procedure.
45. Install the Vertical Fin. Refer to Boeing Drawing 100T3480 and the vertical fin removal procedure
that is shown in 767 ARD 2-60-2 for guidance. The vertical fin installation procedure is described
in General Note 2 on Sheet PSDL of Drawing 100T3480.
a. If not already installed, install internal scaffolding PME148T0010PBR inside Section 48.
b. Lift the vertical fin off the storage fixture into position using the vertical fin lift fittings and lift
sling.
c. Install the 16 tension bolts and 156 lock bolts that attach the vertical fin to the aft body. Use
torque tool 2MIT100T3480PBR and alignment pins MIT100T3480PBR.
NOTE: 1. All H-11 hardware should have been replaced at fin to body joint per Boeing
Service Bulletin 767-53A0085 and FAA AD 2003-10-11 by July 1, 2006.
2. Reusing BACB30US*K* tension bolts and BACN11B* barrel nuts is
acceptable. Excess sealant should be removed from parts (in a manner
that does not damage the parts), and a detailed inspection of the parts
should be done to ensure that there is no damage. Ensure that the
self-locking feature of BACN11B* barrel nuts is operable.
d. Connect the fin-to-body link at the leading edge of the fin.
e. Remove the internal scaffolding PME148T0010PBR from inside Section 48.
f. Remove the vertical fin lift fittings and sling.
46. Finish all bare aluminum with chemical film treatment and two coats of BMS 10-11, Type I primer.
Apply corrosion inhibiting compound to both the forward and aft sides of the aft pressure bulkhead.
Refer to 767 AMM 51-24-09 as an accepted procedure.
47. Install the Dorsal Fin. Refer to 767 AMM 53-66-02 as an accepted procedure.
48. Install the APU fuel line between the aft pressure bulkhead the the APU firewall. Refer to the task
"Install the APU Fuel Line and Shroud Between the Pressure Bulkhead for the Aft Cargo
Compartment and the APU Firewall Bulkhead" in 767 AMM 28-25-05 as an accepted procedure.
49. In the aft end of the bulk cargo compartment, attach the APU fuel line and shroud to the aft pressure
bulkhead fitting. Refer to the task "Install the APU Fuel Line and Shroud Between the Center
Compartment of the Auxiliary Fuel Tank and the Pressure Bulkhead for the Aft Cargo Compartment"
in 767 AMM 28-25-05 as an accepted procedure.
50. Install the APU Air Supply Duct. Refer to 767 AMM 36-11-01 as an accepted procedure.
51. Connect electrical systems, including:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
49 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 50

a. Lights
b. APU Power
c. High Frequency Communications
d. Stall Warning Systems
e. Interphone
f. Autopilot
g. Yaw Damper
h. Rudder Trim Actuator
i. Rudder Ratio Changer
j. Rudder and Elevator Shutoff Valves
k. Rudder Position Indicator
l. Stabilizer Trim Control System
m. Flap/Stabilizer Position Module
n. Flight Recorder Systems
o. APU Fire Detection System
52. Install salvaged pressure seals where wires penetrate the aft pressure bulkhead.
53. Connect the electrical connectors for the altitude pressure switches. Refer to 767 AMM 38-32-51
as an accepted procedure.
54. Install the hydraulic lines that were removed earlier that pass through the aft pressure bulkhead.
55. Group 3:
Install the auxiliary static system tubes that were removed earlier that pass through the aft pressure
bulkhead.
56. Install pressure seals at the aft pressure bulkhead as given in Figure 16.
57. Install auxiliary pitot tubes and seals as given in Figure 17.
58. Reconnect the stabilizer trim (ST1A/ST1B/ ST2A/ST2B), elevator (E1A/E1B/E2A/E2B), and rudder
(RA/RB) control cables. Refer to 767 AMM 20-10-03 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
50 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 51

a. Connect the cable ends (coiled forward and aft of the aft pressure bulkhead) through the aft
pressure bulkhead at the appropriate turnbuckle.
b. Install new or salvaged air seals and fasteners where cables penetrate the aft pressure
bulkhead. Refer to 767 AMM 20-10-04 as an accepted procedure.
c. Remove cable clamps.
59. Adjust the Stabilizer Trim System. Refer to 767 AMM 27-41-00 as an accepted procedure.
60. Adjust the Elevator System. Refer to 767 AMM 27-31-00 as an accepted procedure.
61. Adjust the Rudder System. Refer to 767 AMM 27-21-00 as an accepted procedure.
62. Install equipment in the aft end of the bulk cargo compartment that was removed for access. This
includes:
a. Potable Water Tanks. Refer to 767 AMM 38-11-01 as an accepted procedure.
b. Vacuum Lavatory Waste Tanks. Refer to 767 AMM 38-32-11 as an accepted procedure.
c. Sidewall Insulation. Refer to 767 AMM 25-52-03 as an accepted procedure.
d. Bulk Cargo Compartment Aft Lining. Refer to 767 AMM 25-52-01 as an accepted procedure.
e. Bulk Cargo Compartment Sidewall Lining, for access to the pitot-static tubes on the left side
from the aft pressure bulkhead to the bulk cargo door aft frame at STA 1461. Refer to 767
AMM 25-52-01 as an accepted procedure.
63. Install equipment in the aft part of the passenger compartment that was removed for access. This
includes:
a. Floor Panels. Refer tor 767 AMM 53-01-01 as an accepted procedure.
b. Doorway/Galley Floor Covering. Refer to 767 AMM 25-27-02 as an accepted procedure.
c. Sidewall and Ceiling Insulation. Refer to 767 AMM 25-21-05 as an accepted procedure.
d. Ceiling panels. Refer to 767 AMM 25-22-01, 767 AMM 25-22-02, and/or 767 AMM 25-22-10
as accepted procedures.
e. Sidewall Panels. Refer to 767 AMM 25-21-01 as an accepted procedure.
f. Aft Galley Complex A1, A4, or A1-A3. Refer to 767 AMM 25-31-04 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
51 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 52

g. Lavatories. Refer to 767 AMM 25-41-04 as an accepted procedure.
h. Partitions. Refer to 767 AMM 25-25-04 as an accepted procedure.
i. Passenger seats. Refer to 767 AMM 25-25-01 as an accepted procedure.
64. Dejack the airplane. Service the nose and main landing gears and put them in serviceable condition.
65. Do the systems tests given in PART 4.
PART 4- SYSTEMS TESTS
1. Bleed the hydraulic system. Refer to 767 AMM 29-11-00 as an accepted procedure. Do a leak
check of the hydraulic lines that were removed and reinstalled. Refer to 767 AMM 20-10-09 as an
accepted procedure.
2. Do a leak test of the new pitot-static tubes. Refer to 767 AMM 34-11-01 as an accepted procedure.
3. Do a test of the Autopilot. Refer to the task "AFDS Operational Test" in 767 AMM 22-10-00 as an
accepted procedure.
4. Do a test of the Yaw Damper System. Refer to the task "Operational Test - Yam Damper System"
in 767 AMM 22-21-00 an accepted procedure.
5. Test the left and right High Frequency Communications Systems. Refer to the task "Operational
Test - HF Communication System" in 767 AMM 23-11-00 as an accepted procedure.
6. Do a test of the Interphone system. Refer to the task "Operational Test - Service Interphone
System" in 767 AMM 23-41-00 as an accepted procedure.
7. Do a test of the Stick Nudger. Refer to steps 2.A., 2.B., 2.C., 2.D., 2.G., and 2.H. in the task
"Operational Test - Stall Warning System" in 767 AMM 27-32-00 as an accepted procedure.
8. Test the Horizontal Stabilizer Trim Control System. Refer to the task "Operational Test" in 767
AMM 27-41-00 as an accepted procedure.
9. Test the Stabilizer Trim System. Refer to the "Manual-Mechanical Stabilizer Trim Control Operational
Test", the "Lever Force Test" and the "Horizontal Stabilizer Trim Control System Operational Test"
in 767 AMM 27-41-00 as an accepted procedure.
10. Test the Elevator System. Refer to the task "System Test - Elevator Controls" in 767 AMM 27-31-00
as an accepted procedure. It is acceptable to not perform the "Elevator Position Indication Test",
the "Elevator Power Control Actuators Test", the "Elevator Feel System Test", the "Stick Nudger
Test", and the "Elevator Autopilot Servo Rods Test" tasks within the Systems Test.
11. Do an operational test of the Elevator Control System. Refer to the task "Operational Test - Elevator
Control System" in 767 AMM 27-31-00 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
52 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 53

12. Test the Rudder System. Refer to the task "System Test - Rudder and Rudder Trim Control" in
767 AMM 27-21-00. It is acceptable to not perform the "Test Rudder Pedal Adjustment Mechanism
Travel", the "Test Captain's Rudder Pedal Travel", the "Test First Officer's Pedal Travel", the "Test
Single Hydraulic System and PCA", the "Test Rudder Ratio-Changer System", the "Test Rudder
Ration Flight Deck Annunciation", the "Test the Left RRCM", the "Test the Right RRCM", and the
"Rudder Trim Authority and Rate Test" tasks within the System Test.
13. Test the Rudder Trim Actuator. Refer to the task "Rudder Trim Actuator - Test" in 767 AMM
27-21-11 as an accepted procedure.
14. Test the Rudder Ratio Changer. Refer to the task "Rudder Ratio Changer Mechanism - Test" in
767 AMM 27-21-13 as an accepted procedure.
15. Test the Rudder and Elevator Shutoff Valves. Refer to the task "Rudder and Elevator Shutoff
Valves - System Test" in 767 AMM 27-23-00 as an accepted procedure.
16. Test the Rudder Position Indicator. Refer to the task "Rudder Position Indication - Operational
Test" in 767 AMM 27-28-00 as an accepted procedure.
17. Test the Position Indicating System. Refer to the task "Operational Test - Position Indicating
System" in 767 AMM 27-48-00 as an accepted procedure.
18. Test the Flap/Stabilizer Position Module. Refer to the task "Test for the FSPM" in 767 AMM 27-58-01
as an accepted procedure.
19. Test the Takeoff Configuration Warning Card Module. Refer to steps 4.A., 4.B., 4.C., 4.I., and 4.J.
in the task "Warning Electronics Unit (WEU) Card Module Test" in 767 AMM 31-51-04 as an
accepted procedure.
20. Test the Flight Data Recorder. Refer to the task "Flight Data Recorder Operational Test" in 767
AMM 31-31-00 as an accepted procedure.
21. Test the service lights. Refer to the task "Service Lights - Operational Test" in 767 AMM 33-31-00
as an accepted procedure.
22. Test the logo lights. Refer to the task "Logo Lights - Operational Test" in 767 AMM 33-45-00 as
an accepted procedure.
23. Test the altitude pressure switches. Refer to 767 AMM 38-32-51 as an accepted procedure.
24. Test the APU wiring as given in Appendix A.
25. Do a cabin pressure leakage test. Refer to 767 AMM 05-51-24 as an accepted procedure.
26. Put the airplane back to a serviceable condition. At the time given in Paragraph 1.E., Compliance,
start to do after-replacement inspections of the new aft pressure bulkhead.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
53 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 54 (OCR)

BOEING SERVICE BULLETIN 767-53A0139
ALERT  ALERT
VIEW IN THE FORWARD DIRECTION
FIGURE 1: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 1 OF 5)
Original Issue: November 12, 2009
BOEING PROPRIETARY -  767-53A0139
Copyright © Unpublished Work - See page 1 for details.  54 of 180

### Page 55 (OCR)

BOEING SERVICE BULLETIN 767-53A0139
ALERT  ALERT
2 3 21 LOCATIONS
3.78
2 3) SEAL BLOCK
2.42
4(6) 18 LOCATIONS
2.47
SEAL BLOCK (4)
PRESSURE
BULKHEAD
ASSEMBLY
FWD
1664002
FIGURE 1: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 2 OF 5)
Original Issue: November 12, 2009
767-53A0139
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  55 of 180

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each new aft pressure bulkhead.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
-4-FastenerRemove1
1.19 - 1.21 inch di-
ameter, normal to
the bulkhead sur-
face. 125 microinch
or better surface fin-
ish.
4-HoleDrill / Ream
Break sharp edges
and apply chemical
film treatment and
two coats of BMS
10-11, Type I primer
to the bare edges of
the holes.
--FinishApply
--148T2629-2SEAL BLOCK ASSYLocate2
-21-Rivet HoleDrill / Ream
FIGURE 1: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 3 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
56 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 57

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Apply a pressure
faying surface seal
to the entire mating
surface of the seal
block assembly.
-BMS 5-95SealantApply3
-1148T2629-2SEAL BLOCK ASSYInstall (New)
-21BACR15FT5D7CRIVET, UNIVERSAL
HD
Install (New)
-4-FastenerRemove4
--140T0345-3SEAL BLOCK ASSYLocate
-22-Rivet HoleDrill / Ream
Apply a pressure
faying surface seal
to the entire mating
surface of the seal
block assembly.
-BMS 5-95SealantApply5
-1140T0345-3SEAL BLOCK ASSYInstall (New)
-18BACR15FT5D7CRIVET, UNIVERSAL
HD
Install (New)6
-4BACR15FT5D7CRIVET, UNIVERSAL
HD
Install (New)7
Optional, if oversize
rivets are necessary.
4BACR15FT6D8CRIVET, UNIVERSAL
HD
Install (New)
Apply a pressure
faying surface seal
to the entire mating
surface of the cover
plate and pressure
pan.
-BMS 5-95SealantApply8
-1140T0345-1COVER PLATEInstall (New)
-14BACS12HN3-7BOLTInstall (New)9
Under screw head.14NAS1149D0332JWASHERInstall (New)
Under nut.14NAS1149D0332JWASHERInstall (New)
-14BACN11AG3NUT, SELF-LOCKInstall (New)
Fillet seal all screw
heads, nuts, and
washers.
-BMS 5-95SealantApply10
The parts shown in the table below are provided as extra parts for this figure.
FIGURE 1: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
57 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 58

MORE DATAQTYIDENTIFICATIONNAME
8BACB30NM4K14BOLT, HEX HEAD
-1BACN11AG3NUT, SELF-LOCK
-7BACR15FT5D7CRIVET, UNIVERSAL
HD
-1BACR15FT6D8CRIVET, UNIVERSAL
HD
8BACR15FT6KE7CRIVET
-1BACS12HN3-7BOLT
-2NAS1149D0332JWASHER
5NAS1149D0363JWASHER, FLAT
1NAS42DD3-44FCSPACERS FOR RIV-
ETS
1NAS42DD3-48FCSPACERS FOR RIV-
ETS
1NAS42DD3-64FCSPACERS FOR RIV-
ETS
FIGURE 1: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
58 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

### Page 59 (OCR)

BOEING SERVICE BULLETIN 767-53A0139
ALERT  ALERT
This Figure applies only to: Group 2.
VIEW IN THE FORWARD DIRECTION
1664714
FIGURE 2: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 1 OF 2)
Original Issue: November 12, 2009
Copyright © Unpublished Work - See page 1 for details.  BOEING PROPRIETARY -  767-53A0139  59 of 180

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure..
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
0.530 - 0.539 inch
diameter, normal to
the doubler. 125 mi-
croinch or better
surface finish.
1-HoleDrill / Ream1
Break sharp edges
and apply chemical
film treatment and
two coats of BMS
10-11, Type I primer
to the bare edges of
the holes.
--FinishApply
FIGURE 2: AFT PRESSURE BULKHEAD ASSEMBLY PREPARATION
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: November 12, 2009
767-53A0139
60 of 180
BOEING SERVICE BULLETIN 767-53A0139
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/767-53a0139/file/7a7c33bc05d7.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
