# Boeing Alert Service Bulletin 767-53A0209: Revision 1

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2011-1168; AD 2012-22-17 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-53A0209](https://openairdocs.org/service-documents/boeing/767-53a0209.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 301
- PDF: https://openairdocs.org/files/sha256/98/83/9883e7c9be777ebe19cf967ea0f176ba47aaaeeb5b553168cbf28248dc8592f9
- Page: https://openairdocs.org/service-documents/boeing/767-53a0209/file/9883e7c9be77

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Service Bulletin
Number: 767-53A0209
Original Issue: September 30, 2010
Revision 1: July 27, 2011
ATA System: 5350
SUBJECT: FUSELAGE - Main Frame - Section 45 STA 859.5, 883.5 and 903.5, Left and Right
Side BL 89, Below WL 200 - Frame Inner Chord Transition Radius - Inspection and
Repair
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2010 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
1 of 301
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
2 of 301
BOEING SERVICE BULLETIN 767-53A0209
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 6
B. Concurrent Requirements ...................................... 1 6
C. Reason ................................................ 1 7
D. Description .............................................. 1 7
E. Compliance .............................................. 1 8
F. Approval ............................................... 2 9
G. Manpower .............................................. 2 9
H. Weight and Balance Changes .................................... 3 1
I. Electrical Load Data ......................................... 3 4
J. References .............................................. 3 5
1. Existing Data .......................................... 3 5
2. Data supplied with this Service Bulletin ............................ 3 5
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 3 5
K. Publications Affected ........................................ 3 5
L. Interchangeability and Intermixability of Parts ........................... 3 6
2. MATERIAL INFORMATION ........................................ 3 7
A. Material - Price and Availability ................................... 3 7
B. Industry Support Information .................................... 3 9
C. Parts Necessary For Each Airplane ................................. 3 9
1. Kits/Parts ............................................ 3 9
2. Parts and Materials Supplied by the Operator ........................ 4 6
3. Parts Modified and Reidentified ................................ 4 6
4. Parts Removed and Not Replaced .............................. 4 6
D. Parts Necessary to Change Spares ................................. 4 6
E. Special Tooling - Price and Availability ............................... 4 6
F. Special Tooling Necessary to do this Service Bulletin ....................... 4 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 4 9
A. GENERAL INFORMATION ..................................... 4 9
B. WORK INSTRUCTIONS ....................................... 5 0
FIGURE 1: INNER CHORD INSPECTION ................................. 5 6
FIGURE 2: FRAME TO STUB-BEAM FILLER INSPECTION ....................... 6 0
FIGURE 3: STATION 859.5 INNER CHORD OPEN HOLE INSPECTION [Group 1-5; Group 6, Configuration
1-3] ............................................... 6 2
FIGURE 4: STATION 883.5 INNER CHORD OPEN HOLE INSPECTION [Group 1-5; Group 6, Configuration
1-3] ............................................... 6 5
FIGURE 5: STATION 903.5 INNER CHORD OPEN HOLE INSPECTION FOR A ONE HOLE TRIM OUT
REPAIR [Group 2-3, 5; Group 6, Configuration 2-3] ..................... 6 8
FIGURE 6: STATION 903.5 INNER CHORD OPEN HOLE INSPECTION FOR A TWO HOLE TRIM OUT
REPAIR [Group 2-3, 5; Group 6, Configuration 2-3] ..................... 7 1
FIGURE 7: STATION 859.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
(-1) [Group 1-3; Group 6, Configuration 1-3] ......................... 7 4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
3 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 4

FIGURE 8: STATION 859.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
(-2) [Group 1-3; Group 6, Configuration 1-3] ......................... 8 4
FIGURE 9: STATION 883.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
- TWO RADIUS FILLER INSTL (-5) [Group 3, 5; Group 6, Configuration 3] ......... 9 4
FIGURE 10: STATION 883.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
- TWO RADIUS FILLER INSTL (-6) [Group 3, 5; Group 6, Configuration 3] ........ 1 0 4
FIGURE 11: STATION 883.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
- THREE RADIUS FILLER INSTL (-3) [Group 1-2, 4; Group 6, Configuration 1-2] .... 1 1 4
FIGURE 12: STATION 883.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
- THREE RADIUS FILLER INSTL (-4) [Group 1-2, 4; Group 6, Configuration 1-2] .... 1 2 4
FIGURE 13: STATION 903.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A ONE HOLE TRIM OUT REPAIR (-7) [Group 2; Group 6, Configuration 2] .... 1 3 4
FIGURE 14: STATION 903.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A ONE HOLE TRIM OUT (-8) [Group 2; Group 6, Configuration 2] ......... 1 4 3
FIGURE 15: STATION 903.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A TWO HOLE TRIM OUT (-9) [Group 2; Group 6, Configuration 2] ......... 1 5 2
FIGURE 16: STATION 903.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A TWO HOLE TRIM OUT (-10) [Group 2; Group 6, Configuration 2] ......... 1 6 1
FIGURE 17: STATION 903.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A ONE HOLE TRIM OUT (-11) [Group 3; Group 6, Configuration 3] ......... 1 7 0
FIGURE 18: STATION 903.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A ONE HOLE TRIM OUT (-12) [Group 3; Group 6, Configuration 3] ......... 1 7 9
FIGURE 19: STATION 903.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A TWO HOLE TRIM OUT (-13) [Group 3; Group 6, Configuration 3] ......... 1 8 8
FIGURE 20: STATION 903.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A TWO HOLE TRIM OUT (-14) [Group 3; Group 6, Configuration 3] ......... 1 9 7
FIGURE 21: STATION 859.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
- FREIGHTER CONVERSION (-1) [Group 4-5] ....................... 2 0 6
FIGURE 22: STATION 859.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
- FREIGHTER CONVERSION (-2) [Group 4-5] ....................... 2 1 6
FIGURE 23: STATION 903.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A ONE HOLE TRIM OUT - FREIGHTER CONVERSION (-11) [Group 5] ...... 2 2 6
FIGURE 24: STATION 903.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A ONE HOLE TRIM OUT - FREIGHTER CONVERSION (-12) [Group 5] ...... 2 3 5
FIGURE 25: STATION 903.5 LEFT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A TWO HOLE TRIM OUT - FREIGHTER CONVERSION (-13) [Group 5] ...... 2 4 4
FIGURE 26: STATION 903.5 RIGHT SIDE INNER CHORD CRACK REMOVAL AND REPAIR INSTALLATION
FOR A TWO HOLE TRIM OUT- FREIGHTER CONVERSION (-14) [Group 5] ...... 2 5 4
FIGURE 27: POST-REPAIR INSPECTION - STA 859.5 [Group 1-5; Group 6, Configuration 1-3] . . . 264
FIGURE 28: POST-REPAIR INSPECTION - STA 883.5 [Group 1-5; Group 6, Configuration 1-3] . . . 268
FIGURE 29: POST-REPAIR INSPECTION - STA 903.5 - ONE HOLE TRIM OUT [Group 2-3, 5; Group 6,
Configuration 2-3] ....................................... 2 7 2
FIGURE 30: POST REPAIR INSPECTION - STA 903.5 - TWO HOLE TRIM OUT [Group 2-3, 5; Group 6,
Configuration 2-3] ....................................... 2 7 6
APPENDIX A: FILLER DATA ......................................... 2 8 0
APPENDIX B: HOLE INSPECTION DATA .................................. 2 9 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
4 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 5

Commercial 
Airplanes
767
Service Bulletin
Revision Transmittal SheetNumber: 767-53A0209Original Issue: September 30, 2010
Revision 1: July 27, 2011
ATA System: 5350
SUBJECT: FUSELAGE - Main Frame - Section 45 STA 859.5, 883.5 and 903.5, Left and Right
Side BL 89, Below WL 200 - Frame Inner Chord Transition Radius - Inspection and
Repair
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2003-18-10 is related to this service bulletin.
No more work is necessary on the airplane(s) changed in accordance with the original issue of this service
bulletin.
Group 6 of this service bulletin effectivity was added in this revision. Affected 767-200 passenger airplanes after
line number 1023 were added to Group 6 of this service bulletin effectivity. Also affected 767-300 passenger
airplanes after line number 1023 were moved from Group 3 to Group 6 of this service bulletin effectivity.
REASON FOR REVISION
As a part of a service bulletin validation program, this change was completed on airplane VN015 by Service
Bulletin 767-53A0209, original issue before the release of Revision 1 of this service bulletin. The repairs completed
on airplane VN015 by Service Bulletin 767-53A0209, original issue is equivalent to the release of Revision 1 of
this service bulletin. Airplane VN015 has the configuration of a Group 3 airplane. Also, the effectivity was updated
to add Group 6 airplanes.
This revision is sent to incorporate minor clarifications resulting from a validation of this service bulletin.
These sections were changed:
1. Summary Background and Paragraph 1.C., Reason, added validation information.
2. Paragraph 1.A.1., Airplanes, added Group 6 airplanes and updated the Group/Configuration table.
3. Paragraph 1.D., Description, added revision information.
4. Paragraph 2.A., updated kit price and availability table.
5. Paragraph 2.E. and Paragraph 2.F., added special tooling information.
6. Accomplishment Instructions, added standard notes and a repair caution note.
7. Figure 1, clarified inspection requirements and added STA 883.5 view.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
5 of 301

### Page 6

8. Figure 7 and 8, added reference to coldwork tool off-set adapter.
9. All figures, revised trim detail to indicate a minimum radius.
10. All sections, removed "edge distance" wording and replaced with "edge margin", "edge margins" or "distance"
as applicable.
11. All sections with Group/Configuration applicability was updated to address Group 6 airplanes.
The data given in Information Notice 767-53A0209 IN 01 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
September 30, 2010Original Issue:
July 27, 2011Revision 1:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
6 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 7

Commercial 
Airplanes
767
Service Bulletin
SummaryNumber: 767-53A0209Original Issue: September 30, 2010
Revision 1: July 27, 2011
ATA System: 5350
SUBJECT: FUSELAGE - Main Frame - Section 45 STA 859.5, 883.5 and 903.5, Left and Right
Side BL 89, Below WL 200 - Frame Inner Chord Transition Radius - Inspection and
Repair
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will inspect frame inner chords for cracks at Station 859.5, 883.5 and
903.5, LBL and RBL 89, below the passenger cabin floor (WL 200), on airplanes with Type III overwing exit
doors. Cracks in the frame inner chord transition radius can propagate and intersect fastener holes in the frame
chord. These cracks can further propagate into the frame structure and adjacent structure and become large.
Large cracks in frames and adjacent structure may adversely affect the structural integrity of the airplane.
Station 859.5, 883.5 and 903.5 frames join the outboard side of body stub beam fittings located below the
passenger cabin floor.
Boeing has received multiple operator reports of cracks found in frame inner chords at both left and right side
Station 859.5, 883.5 and 903.5 on airplanes with Type III overwing exit doors. The reports indicate a crack length
range from 0.10 inch up to 1.8 inch that originates from the inner chord transition radius, and in some cases the
crack has intersected adjacent fastener holes. Boeing analysis has determined the cause for cracks in the frame
inner chords to be a result of stress concentration at the transition radius. Boeing has also determined that these
frame inner chords are susceptible to cracking only on airplanes with Type III overwing exit doors.
The work accomplished in this service bulletin will inspect the frame inner chord transition radius for cracks at
Station 859.5, 883.5 and 903.5, LBL and RBL 89, below WL 200, on airplanes with Type III overwing exit doors
and install a repair if cracks are found.
Boeing Service Related Problem (SRP) 767-SRP-53-0321 is related to this service bulletin.
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2003-18-10 is related to this service bulletin.
As a part of a service bulletin validation program, this change was completed on airplane VN015 by Service
Bulletin 767-53A0209, original issue before the release of Revision 1 of this service bulletin. The repairs completed
on airplane VN015 by Service Bulletin 767-53A0209, original issue is equivalent to the release of Revision 1 of
this service bulletin. Airplane VN015 has the configuration of a Group 3 airplane.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
7 of 301

### Page 8

ACTION (PRR B12901-89RS)
Group 1-5; Group 6, Configuration 1-3:
Do a Detailed Inspection or a surface high frequency eddy current (HFEC) inspection of the frame inner chord
transition radius for cracks at Station 859.5, 883.5 and 903.5, LBL and RBL 89, below WL 200. If no cracks are
found, do repeat Detailed or HFEC inspections. If any crack is found, accomplish additional inspections and
applicable repairs in accordance with this service bulletin.
Group 6, Configuration 4:
No work is necessary. This configuration is for airplanes not yet delivered that will have no Type III overwing
exit doors, which do not have the affected frame inner chords.
EFFECTIVITY
767-200/-300 Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Federal Aviation Administration (FAA) Airworthiness Directive 2003-18-10 is related to this service bulletin.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the inspection and/or repair procedures given in this service
bulletin.
MANPOWER
Group 1-5; Group 6, Configuration 1-3:
INSPECTION - DETAILED
Elapsed HoursTotal Task HoursAirplanes
6.0022.00Group 1, 4;
Group 6, Config-
uration 1
6.523.00Group 2-3, 5;
Group 6, Config-
uration 2-3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
8 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 9

Group 1-5; Group 6, Configuration 1-3:
INSPECTION - HFEC
Elapsed HoursTotal Task HoursAirplanes
7.0024.00Group 1, 4;
Group 6, Config-
uration 1
8.0026.00Group 2-3, 5;
Group 6, Config-
uration 2-3
Group 1-5; Group 6, Configuration 1-3:
REPAIR INSTALLATION (ONE FRAME)
Elapsed HoursTotal Task HoursAirplanes
12.0023.50Group 1-5;
Group 6, Config-
uration 1-3
Group 1-5; Group 6, Configuration 1-3:
POST-REPAIR INSPECTION (ONE FRAME)
Elapsed HoursTotal Task HoursAirplanes
7.5025.00Group 1-5;
Group 6, Config-
uration 1-3
Group 6, Configuration 4:
None.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
9 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 10 (OCR)

BOEING SERVICE BULLETIN 767-53A0209
STA
903.5
STA
883.5
GROUP 1, 4 AIRPLANES
STA 859.5, 883.5  STA
GROUP 2, 3, 5 AIRPLANES  859.5
STA 859.5, 883.5, 903.5
DO A DETAILED OR SURFACE HFEC
INSPECTION FOR CRACKS IN THE
FRAME INNER CHORD TRANSITION
RADIUS AND INSTALL A REPAIR IF
CRACKS ARE FOUND.
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
1958368
Original Issue: September 30, 2010
Revision 1: July 27, 2011  767-53A0209
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  10 of 301

### Page 11

Commercial 
Airplanes
767
Service Bulletin
Number: 767-53A0209
Original Issue: September 30, 2010
Revision 1: July 27, 2011
ATA System: 5350
SUBJECT: FUSELAGE - Main Frame - Section 45 STA 859.5, 883.5 and 903.5, Left and Right
Side BL 89, Below WL 200 - Frame Inner Chord Transition Radius - Inspection and
Repair
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below. Refer to PRR B12901-89RS for data about
this change.
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
NOTE: This service bulletin is for the airplanes identified below. The effectivity list shown below
is complete for airplanes through line number 1018. At least one airplane after line number
1018 is also affected by this service bulletin, and these airplanes are in Group(s) 3,6.
These airplanes will be added to the service bulletin's MyBoeingFleet.com (MBF) \"get
effectivity\" result when they are added to the MBF Fleet Profile Page.
DESCRIPTIONCONFIGURATIONGROUP
767-200 passenger airplanes through line number 1023 with one
Type III overwing exit door.
-1
767-200 passenger airplanes through line number 1023 with two
Type III overwing exit doors.
-2
767-300 passenger airplanes through line number 1023 with one or
two Type III overwing exit doors.
-3
767-200 passenger airplane with one Type III overwing exit door,
VA511, changed to a Special Freighter (SF) configuration which is
given in Boeing Service Bulletin 767-53-0125.
-4
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
11 of 301

### Page 12

DESCRIPTIONCONFIGURATIONGROUP
767-300 passenger airplanes with two Type III overwing exit doors,
changed to a Boeing Converted Freighter (BCF) configuration.
-5
767-300 passenger airplane VN191, changed to a BCF configuration
which is given in Boeing Service Bulletin 767-53-0140.
1
767-300 passenger airplane VN192, changed to a BCF configuration
which is given in Boeing Service Bulletin 767-53-0148.
2
767-300 passenger airplane VN193, changed to a BCF configuration
which is given in Boeing Service Bulletin 767-53-0150.
3
767-300 passenger airplane VN194, changed to a BCF configuration
which is given in Boeing Service Bulletin 767-53-0154.
4
767-300 passenger airplane VN195, VN196 and VN197 changed to
a BCF configuration which is given in Boeing Service Bulletin
767-53-0157.
5
767-200 and 767-300 passenger airplanes after line number 1024.
These airplanes are not yet delivered and the configuration is
unknown.
-6
767-200 passenger airplanes with one Type III overwing exit door.1
767-200 passenger airplanes with two Type III overwing exit doors.2
767-300 passenger airplanes with one or two Type III overwing exit
doors.
3
Airplanes with no Type III overwing exit doors.4
Airplane Models:
767-200, 767-300
GroupVariable Number
6VA001
1VA002 - VA020
1VA301 - VA315
1VA501 - VA510
4VA511
1VA512 - VA530
1VA701 - VA719
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
12 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 13

GroupVariable Number
1VA801 - VA810
1VB001 - VB002
1VB051 - VB055
1VB101 - VB125
1VB201 - VB202
1VB251 - VB253
1VB281 - VB284
2VB301 - VB302
2VB321 - VB332
1VB371 - VB373
1VB401
1VB441 - VB444
1VE001 - VE003
1VE021 - VE023
1VE041 - VE043
1VE061 - VE069
1VE083 - VE086
1VE101 - VE104
1VE116 - VE118
1VE121 - VE126
1VE141 - VE152
1VE171 - VE172
1VF001 - VF002
1VF041 - VF042
1VF051
1VF061 - VF062
1VF071 - VF072
1VF091 - VF093
2VF101 - VF102
1VF161 - VF162
1VF171 - VF172
1VF180 - VF184
1VF251
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
13 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 14

GroupVariable Number
3VK001 - VK016
3VK021 - VK022
3VK031 - VK056
3VK081 - VK113
3VK141 - VK148
3VK161 - VK164
3VK171
3VK181
3VK186
3VL001 - VL006
3VL011
3VL701 - VL703
3VL751 - VL755
3VL931 - VL932
3VL941
3VN001 - VN041
3VN051 - VN064
3VN081 - VN099
3VN151 - VN158
3VN163 - VN168
3VN171 - VN174
5VN191 - VN197
3VN198
3VN211 - VN212
3VN221 - VN225
3VN231 - VN234
3VN241 - VN243
3VN251 - VN276
3VN291 - VN293
3VN301 - VN314
6VN387
3VN422 - VN427
3VN436
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
14 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 15

GroupVariable Number
3VN491 - VN513
3VN634 - VN636
3VN651 - VN658
3VN671 - VN672
3VN676
3VN681 - VN691
3VN731 - VN732
3VN751 - VN753
3VN791 - VN792
3VN811 - VN813
3VN931 - VN936
3VN966 - VN972
1VR051 - VR060
1VR081
1VR084
1VR086 - VR089
1VR106 - VR109
3VR401
3VR421 - VR423
3VR426
3VR441
3VR461
3VR471 - VR472
3VS061
3VS066 - VS070
3VS073 - VS078
3VS091 - VS104
3VS111 - VS113
3VS131 - VS133
3VS176 - VS177
3VS186 - VS187
3VS196 - VS203
3VS206 - VS208
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
15 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 16

GroupVariable Number
3VS231
3VS266 - VS274
3VS291 - VS293
3VS301 - VS303
3VS366 - VS367
3VS381 - VS382
3VS391 - VS392
3VS401
3VS466 - VS472
3VS486
3VS496 - VS497
3VS506 - VS507
3VS526
3VS546 - VS549
3VS701 - VS736
3VS751 - VS759
3VS821 - VS825
3VS841 - VS844
3VS861
3VS896
3VS901 - VS912
3VS921 - VS928
3VS931 - VS933
3VS941
3VS951 - VS954
3VS961 - VS968
3VS971 - VS976
1VV001
2. Spares Affected
None.
B. Concurrent Requirements
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
16 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 17

C. Reason
Accomplishment of this service bulletin will inspect frame inner chords for cracks at Station 859.5,
883.5 and 903.5, LBL and RBL 89, below the passenger cabin floor (WL 200), on airplanes with Type
III overwing exit doors. Cracks in the frame inner chord transition radius can propagate and intersect
fastener holes in the frame chord. These cracks can further propagate into the frame structure and
adjacent structure and become large. Large cracks in frames and adjacent structure may adversely
affect the structural integrity of the airplane.
Station 859.5, 883.5 and 903.5 frames join the outboard side of body stub beam fittings located below
the passenger cabin floor.
Boeing has received multiple operator reports of cracks found in frame inner chords at both left and
right side Station 859.5, 883.5 and 903.5 on airplanes with Type III overwing exit doors. The reports
indicate a crack length range from 0.10 inch up to 1.8 inch that originates from the inner chord transition
radius, and in some cases the crack has intersected adjacent fastener holes. Boeing analysis has
determined the cause for cracks in the frame inner chords to be a result of stress concentration at the
transition radius. Boeing has also determined that these frame inner chords are susceptible to cracking
only on airplanes with Type III overwing exit doors.
The work accomplished in this service bulletin will inspect the frame inner chord transition radius for
cracks at Station 859.5, 883.5 and 903.5, LBL and RBL 89, below WL 200, on airplanes with Type III
overwing exit doors and install a repair if cracks are found.
Boeing Service Related Problem (SRP) 767-SRP-53-0321 is related to this service bulletin.
Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2003-18-10 is related to this service
bulletin.
As a part of a service bulletin validation program, this change was completed on airplane VN015 by
Service Bulletin 767-53A0209, original issue before the release of Revision 1 of this service bulletin.
The repairs completed on airplane VN015 by Service Bulletin 767-53A0209, original issue is equivalent
to the release of Revision 1 of this service bulletin. Airplane VN015 has the configuration of a Group
3 airplane.
Revision 1 is sent to incorporate minor clarifications resulting from a validation of this service bulletin
and update the effectivity to add Group 6 airplanes.
The data given in Information Notice 767-53A0209 IN 01 is included in this revision.
D. Description
Do a Detailed Inspection or a surface high frequency eddy current (HFEC) inspection of the frame inner
chord transition radius for cracks at Station 859.5, 883.5 and 903.5, LBL and RBL 89, below WL 200.
If no cracks are found, do repeat Detailed or HFEC inspections. If any crack is found, accomplish
additional inspections and applicable repairs in accordance with this service bulletin.
Revision 1: No more work is necessary on the airplane(s) changed in accordance with the original
issue of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
17 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 18

Group 1-2, 4:
Affected Maintenance Zones
ZoneModel
241, 242767-200
Group 3, 5:
Affected Maintenance Zones
ZoneModel
241, 242767-300
Group 6:
Affected Maintenance Zones
ZoneModel
241, 242767-200, 767-300
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Federal Aviation Administration (FAA) Airworthiness Directive 2003-18-10 is related to this service
bulletin.
The following tables describe compliance for airplanes defined in groups. Group 1, 2, 3, and 6 are
airplanes in a passenger configuration. Group 4 and 5 are airplanes changed, before the original issue
date of this service bulletin, to a Special Freighter configuration and Boeing Converted Freighter
configuration respectively.
Compliance TableAirplane
Table 1, Inspection and RepairGroup 1; Group 6, Configuration 1 (Passenger Airplane)
Table 2, Post-Repair Inspection
Table 3, Inspection and RepairGroup 2-3; Group 6, Configuration 2-3 (Passenger
Airplane) Table 4, Post-Repair Inspection
Table 5, Inspection and RepairGroup 4 (Special Freighter)
Table 6, Post-Repair Inspection
Table 7, Inspection and RepairGroup 5 (Boeing Converted Freighter)
Table 8, Post-Repair Inspection
Table 9, Inspection and RepairGroup 6, Configuration 4 (Passenger Airplane)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
18 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 19

Group 1; Group 6, Configuration 1:
Table 1: STA 859.5 and 883.5, Left and Right Side Inner Chord Transition Radius Inspection and Repair
(Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 14,000 total flight cycles or
within 3,000 flight cycles after the
original issue date of this service
bulletin, whichever occurs later.
Do a Detailed Inspection
or surface high frequency
eddy current (HFEC) in-
spection for any crack in
the STA 859.5 and 883.5
frame inner chord transi-
tion radius in accordance
with Accomplishment In-
structions, 3.B.2.
Group 1; Group 6, Configu-
ration 1 airplanes.
3,000 flight cyclesWithin 3,000 flight cycles after the
previous inspection.
Do a Detailed Inspection
for any crack in the STA
859.5 and 883.5 frame
inner chord transition ra-
dius in accordance with
Accomplishment Instruc-
tions, 3.B.2.
No crack(s) found during a
Detailed Inspection. See note (a)
See note (b)
6,000 flight cyclesWithin 6,000 flight cycles after the
previous inspection.
Do a surface high frequen-
cy eddy current (HFEC)
inspection for any crack
in the STA 859.5 and
883.5 frame inner chord
transition radius in accor-
dance with Accomplish-
ment Instructions, 3.B.2.
No crack(s) found during a
surface HFEC inspection. See note (a)
See note (b)
-Before further flight.Do a Detailed Inspection
for fillers installed be-
tween the frame and
stub-beam
Any crack(s) found in the
inner chord transition ra-
dius during a Detailed In-
spection or surface HFEC
inspection. AND
Do an open hole HFEC
inspection for cracks in
the frame inner chord,
failsafe chord, frame web
and stub beam, as appli-
cable, in accordance with
Accomplishment Instruc-
tions 3.B.2 and 3.B.3.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
19 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 20

Group 1; Group 6, Configuration 1:
Table 1: STA 859.5 and 883.5, Left and Right Side Inner Chord Transition Radius Inspection and Repair
(Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Repair. See Appendix A
in this Service Bulletin for
additional filler data that
is to be documented and
sent to Boeing, then con-
tact Boeing for repair data
and do the repair provid-
ed by Boeing.
Filler(s) installed and the
total thickness is greater
than 0.125 inch.
-Before further flight.Repair. See Appendix B
in this Service Bulletin for
data that is to be docu-
mented and sent to Boe-
ing, then contact Boeing
for repair data and do the
repair provided by Boe-
ing.
Any crack exists in holes
1/32 inch oversize nominal
diameter or greater.
-Before further flight.Trim out the inner chord
transition radius crack
and install a one or two-
hole repair angle in accor-
dance with Accomplish-
ment Instructions 3.B.4.
No filler(s) installed or
filler(s) installed and the to-
tal thickness is 0.125 inch
or less
AND
No crack(s) found or
crack(s) removed and
holes are 1/32 inch over-
size nominal or less.
(a) Either Detailed Inspections or surface HFEC inspections can be performed so long as the repeat interval
associated with each inspection is followed.
(b) This inspection does not accomplish the work or satisfy the requirements given in the 767 Maintenance
Planning Document (MPD) D622T001-9 and Appendix B or D622T001-DTR, Structural Significant Items (SSI)
53-50-I18 or 53-50-I24 as mandated by FAA Airworthiness Directive (AD) 2003-18-10.
Group 1; Group 6, Configuration 1:
Table 2: STA 859.5 and 883.5 Post-Repair Inspections (Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
12,000 flight cy-
cles.
Before 37,500 total flight cycles or
within 12,000 flight cycles after
repair installation, whichever is
later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 1; Group 6, Configu-
ration 1 airplanes, STA
859.5 and/or 883.5 frame
repair installed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
20 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 21

Group 1; Group 6, Configuration 1:
Table 2: STA 859.5 and 883.5 Post-Repair Inspections (Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Contact Boeing for repair
data and do the repair.
Any crack found.
Group 2-3; Group 6, Configuration 2-3:
Table 3: STA 859.5, 883.5 and 903.5, Left and Right Side Inner Chord Transition Radius Inspection and
Repair (Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 14,000 total flight cycles or
within 3,000 flight cycles after the
original issue date of this service
bulletin, whichever occurs later.
Do a Detailed Inspection
or surface high frequency
eddy current (HFEC) in-
spection for any crack in
the STA 859.5, 883.5 and
903.5 frame inner chord
transition radius in accor-
dance with Accomplish-
ment Instructions, 3.B.2.
Group 2-3; Group 6, Config-
uration 2-3 airplanes.
3,000 flight cyclesWithin 3,000 flight cycles after the
previous inspection.
Do a Detailed Inspection
for any crack in the STA
859.5, 883.5 and 903.5
frame inner chord transi-
tion radius in accordance
with Accomplishment In-
structions, 3.B.2.
No crack(s) found during a
Detailed Inspection. See note (a)
See note (b)
6,000 flight cyclesWithin 6,000 flight cycles after the
previous inspection.
Do a surface high frequen-
cy eddy current (HFEC)
inspection for any crack
in the STA 859.5, 883.5
and 903.5 frame inner
chord transition radius in
accordance with Accom-
plishment Instructions,
3.B.2.
No crack(s) found during a
surface HFEC inspection. See note (a)
See note (b)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
21 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 22

Group 2-3; Group 6, Configuration 2-3:
Table 3: STA 859.5, 883.5 and 903.5, Left and Right Side Inner Chord Transition Radius Inspection and
Repair (Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Do a Detailed Inspection
for fillers installed be-
tween the frame and
stub-beam
Any crack(s) found in the
inner chord transition ra-
dius during a Detailed In-
spection or surface HFEC
inspection. AND
Do an open hole HFEC
inspection for cracks in
the frame inner chord,
failsafe chord, frame web,
doubler (STA 903.5) and
stub beam, as applicable,
in accordance with Ac-
complishment Instruc-
tions 3.B.2 and 3.B.3.
-Before further flight.Repair. See Appendix A
in this Service Bulletin for
additional filler data that
is to be documented and
sent to Boeing, then con-
tact Boeing for repair data
and do the repair provid-
ed by Boeing.
Filler(s) installed and the
total thickness is greater
than 0.125 inch.
-Before further flight.Repair. See Appendix B
in this Service Bulletin for
data that is to be docu-
mented and sent to Boe-
ing, then contact Boeing
for repair data and do the
repair provided by Boe-
ing.
Any crack exists in holes
1/32 inch oversize nominal
diameter or greater.
-Before further flight.Trim out the inner chord
transition radius crack
and install a one or two-
hole repair angle in accor-
dance with Accomplish-
ment Instructions 3.B.4.
No filler(s) installed or
filler(s) installed and the to-
tal thickness is 0.125 inch
or less
AND
No crack(s) found or
crack(s) removed and
holes are 1/32 inch over-
size nominal or less.
(a) Either Detailed Inspections or surface HFEC inspections can be performed so long as the repeat interval
associated with each inspection is followed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
22 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 23

Group 2-3; Group 6, Configuration 2-3:
Table 3: STA 859.5, 883.5 and 903.5, Left and Right Side Inner Chord Transition Radius Inspection and
Repair (Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(b) This inspection does not accomplish the work or satisfy the requirements given in the 767 Maintenance
Planning Document (MPD) D622T001-9 and Appendix B or D622T001-DTR, Structural Significant Items (SSI)
53-50-I18 or 53-50-I24 as mandated by FAA Airworthiness Directive (AD) 2003-18-10.
Group 2-3; Group 6, Configuration 2-3:
Table 4: STA 859.5, 883.5 and 903.5 Post-Repair Inspections (Passenger Airplane)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
12,000 flight cy-
cles.
Before 37,500 total flight cycles or
within 12,000 flight cycles after
repair installation, whichever is
later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 2-3; Group 6, Config-
uration 2-3 airplanes, STA
859.5 frame repair in-
stalled.
12,000 flight cy-
cles.
Before 35,500 total flight cycles or
within 12,000 flight cycles after
repair installation, whichever is
later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 2; Group 6, Configu-
ration 2 airplanes, STA
883.5 frame repair in-
stalled.
12,000 flight cy-
cles.
Before 37,500 total flight cycles or
within 12,000 flight cycles after
repair installation, whichever is
later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 3; Group 6, Configu-
ration 3 airplanes, STA
883.5 frame repair in-
stalled.
12,000 flight cy-
cles.
Before 37,500 total flight cycles or
within 12,000 flight cycles after
repair installation, whichever is
later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 2-3; Group 6, Config-
uration 2-3 airplanes, STA
903.5 one hole trim out
frame repair installed.
12,000 flight cy-
cles.
Before 34,000 total flight cycles or
within 12,000 flight cycles after
repair installation, whichever is
later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 2-3; Group 6, Config-
uration 2-3 airplanes, STA
903.5 two hole trim out
frame repair installed.
-Before further flight.Contact Boeing for repair
data and do the repair.
Any crack found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
23 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 24

Group 4:
Table 5: STA 859.5 and 883.5, Left and Right Side Inner Chord Transition Radius Inspection and Repair
(Special Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 11,000 total flight cycles or
within 2,400 flight cycles after the
original issue date of this service
bulletin, whichever occurs later.
Do a Detailed Inspection
or surface high frequency
eddy current (HFEC) in-
spection for any crack in
the STA 859.5 and 883.5
frame inner chord transi-
tion radius in accordance
with Accomplishment In-
structions, 3.B.2.
Group 4 airplane.
2,400 flight cyclesWithin 2,400 flight cycles after the
previous inspection.
Do a Detailed Inspection
for any crack in the STA
859.5 and 883.5 frame
inner chord transition ra-
dius in accordance with
Accomplishment Instruc-
tions, 3.B.2.
No crack(s) found during a
Detailed Inspection. See note (a)
See note (b)
4,800 flight cyclesWithin 4,800 flight cycles after the
previous inspection.
Do a surface high frequen-
cy eddy current (HFEC)
inspection for any crack
in the STA 859.5 and
883.5 frame inner chord
transition radius in accor-
dance with Accomplish-
ment Instructions, 3.B.2.
No crack(s) found during a
surface HFEC inspection. See note (a)
See note (b)
-Before further flight.Do a Detailed inspection
for fillers installed be-
tween the frame and sub-
beam
Any crack(s) found in the
inner chord transition ra-
dius during a Detailed In-
spection or surface HFEC
inspection. AND
Do an open hole HFEC
inspection for cracks in
the frame inner chord,
failsafe chord, frame web
and stub beam, as appli-
cable, in accordance with
Accomplishment Instruc-
tions 3.B.2 and 3.B.3.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
24 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 25

Group 4:
Table 5: STA 859.5 and 883.5, Left and Right Side Inner Chord Transition Radius Inspection and Repair
(Special Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
Before further flight.Repair. See Appendix A
in this service bulletin for
additional filler data that
is to be documented and
sent to Boeing, then con-
tact Boeing for repair data
and do the repair provid-
ed by Boeing.
Filler(s) installed and the
total thickness is greater
than 0.125 inch.
-Before further flight.Repair. See Appendix B
in this Service Bulletin for
data that is to be docu-
mented and sent to Boe-
ing, then contact Boeing
for repair data and do the
repair provided by Boe-
ing.
Any crack exists in holes
1/32 inch oversize nominal
diameter or greater.
-Before further flight.Trim out the inner chord
transition radius crack
and install a one or two-
hole repair angle in accor-
dance with Accomplish-
ment Instructions 3.B.4.
No filler(s) installed or
filler(s) installed and the to-
tal thickness is 0.125 inch
or less
AND
No crack(s) found or
crack(s) removed and
holes are 1/32 inch over-
size nominal or less.
(a) Either Detailed Inspections or surface HFEC inspections can be performed so long as the repeat interval
associated with each inspection is followed.
(b) This inspection does not accomplish the work or satisfy the requirements given in the 767 Maintenance
Planning Document (MPD) D622T001-9 and Appendix B or D622T001-DTR, Structural Significant Items (SSI)
53-50-I18 or 53-50-I24 as mandated by FAA Airworthiness Directive (AD) 2003-18-10.
Group 4:
Table 6: STA 859.5 and 883.5 Post-Repair Inspections (Special Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
9,600 flight cycles.Before 30,000 total flight cycles or
within 9,600 flight cycles after re-
pair installation, whichever is later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 4 airplane, STA
859.5 and/or 883.5 frame
repair installed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
25 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 26

Group 4:
Table 6: STA 859.5 and 883.5 Post-Repair Inspections (Special Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Contact Boeing for repair
data and do the repair.
Any crack(s) found.
Group 5:
Table 7: STA 859.5, 883.5 and 903.5, Left and Right Side Inner Chord Transition Radius Inspection and
Repair (Boeing Converted Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before 11,000 total flight cycles or
within 2,400 flight cycles after the
original issue date of this service
bulletin, whichever occurs later.
Do a Detailed Inspection
or surface high frequency
eddy current (HFEC) in-
spection for any crack in
the STA 859.5, 883.5 and
903.5 frame inner chord
transition radius in accor-
dance with Accomplish-
ment Instructions, 3.B.2.
Group 5 airplanes.
2,400 flight cyclesWithin 2,400 flight cycles after the
previous inspection.
Do a Detailed Inspection
for any crack in the STA
859.5, 883.5 and 903.5
frame inner chord transi-
tion radius in accordance
with Accomplishment In-
structions, 3.B.2.
No crack(s) found during a
Detailed Inspection. See note (a)
See note (b)
4,800 flight cyclesWithin 4,800 flight cycles after the
previous inspection.
Do a surface high frequen-
cy eddy current (HFEC)
inspection for any crack
in the STA 859.5, 883.5
and 903.5 frame inner
chord transition radius in
accordance with Accom-
plishment Instructions,
3.B.2.
No crack(s) found during a
surface HFEC inspection. See note (a)
See note (b)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
26 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 27

Group 5:
Table 7: STA 859.5, 883.5 and 903.5, Left and Right Side Inner Chord Transition Radius Inspection and
Repair (Boeing Converted Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Before further flight.Do a Detailed inspection
for fillers installed be-
tween the frame and
stub-beam
Any crack(s) found in the
inner chord transition ra-
dius during a Detailed In-
spection or surface HFEC
inspection. AND
Do an open hole HFEC
inspection for cracks in
the frame inner chord,
failsafe chord, frame web,
doubler (STA 903.5) and
stub beam, as applicable,
in accordance with Ac-
complishment Instruc-
tions 3.B.2 and 3.B.3.
Before further flight.Repair. See Appendix A
in this service bulletin for
additional filler data that
is to be documented and
sent to Boeing, then con-
tact Boeing for repair data
and do the repair provid-
ed by Boeing.
Filler(s) installed and the
total thickness is greater
than 0.125 inch.
-Before further flight.Repair. See Appendix B
in this Service Bulletin for
data that is to be docu-
mented and sent to Boe-
ing, then contact Boeing
for repair data and do the
repair provided by Boe-
ing.
Any crack exists in holes
1/32 inch oversize nominal
diameter or greater.
-Before further flight.Trim out the inner chord
transition radius crack
and install a one or two-
hole repair angle in accor-
dance with Accomplish-
ment Instructions 3.B.4.
No filler(s) installed or
filler(s) installed and the to-
tal thickness is 0.125 inch
or less
AND
No crack(s) found or
crack(s) removed and
holes are 1/32 inch over-
size nominal or less.
(a) Either Detailed Inspections or surface HFEC inspections can be performed so long as the repeat interval
associated with each inspection is followed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
27 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 28

Group 5:
Table 7: STA 859.5, 883.5 and 903.5, Left and Right Side Inner Chord Transition Radius Inspection and
Repair (Boeing Converted Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
(b) This inspection does not accomplish the work or satisfy the requirements given in the 767 Maintenance
Planning Document (MPD) D622T001-9 and Appendix B or D622T001-DTR, Structural Significant Items (SSI)
53-50-I18 or 53-50-I24 as mandated by FAA Airworthiness Directive (AD) 2003-18-10.
Group 5:
Table 8: STA 859.5, 883.5 and 903.5 Post-Repair Inspections (Boeing Converted Freighter)
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
9,600 flight cycles.Before 30,000 total flight cycles or
within 9,600 flight cycles after re-
pair installation, whichever is later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 5 airplanes, STA
859.5 frame repair in-
stalled.
9,600 flight cycles.Before 28,000 total flight cycles or
within 9,600 flight cycles after re-
pair installation, whichever is later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 5 airplanes, STA
883.5 frame repair in-
stalled.
9,600 flight cycles.Before 30,000 total flight cycles or
within 9,600 flight cycles after re-
pair installation, whichever is later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 5 airplanes, STA
903.5 one hole trim out
frame repair installed.
9,600 flight cycles.Before 27,000 total flight cycles or
within 9,600 flight cycles after re-
pair installation, whichever is later.
Do post-repair Detailed
and high frequency eddy
current (HFEC) inspec-
tions in accordance with
Accomplishment Instruc-
tions 3.B.5.
Group 5 airplanes, STA
903.5 two hole trim out
frame repair installed.
-Before further flight.Contact Boeing for repair
data and do the repair.
Any crack found.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
28 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 29

Group 6, Configuration 4:
Table 9: Inspection and Repair
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--No work is necessary in
accordance with this ser-
vice bulletin.
Group 6, Configuration 4
airplanes.(a)
(a) These airplanes do not have Type III overwing exit doors.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
The Manager of the FAA Seattle Aircraft Certification Office approves the repair and post-repair
inspections defined in this service bulletin with the corresponding compliance times specified in paragraph
1.E., "Compliance," of SB 767-53A0209, Revision 1 as an alternative method of compliance to the
inspections, defined in Appendix B of D622T001-DTR Structural Significant Items 53-50-I18, 53-50-I24
and certain locations of 53-50-I06A and 53-50-I22A that are covered by the repairs of this service
bulletin and the Maintenance Planning Document D622T001-9, required by paragraphs (c) and (d) of
AD 2003-18-10. When this SB specifies contacting Boeing for repair instructions, the repair instructions
must be approved by the FAA in accordance with paragraph (e) of the AD. All provisions of AD
2003-18-10 that are not specifically referenced in this paragraph remain fully applicable and must be
complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
29 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 30

Group 1-5; Group 6, Configuration 1-3:
INSPECTION
Elapsed HoursTask HoursNumber of Per-
sons
Task
2.5010.004Open Access
2.5010.00TOTAL FOR EACH AIRPLANE
1.50 (a), (b)3.00 (a), (b)2Detailed Inspection
(Left and Right
Side)
1.503.00TOTAL FOR EACH AIRPLANE
3.00 (a), (b)6.00 (a), (b)2Surface HFEC In-
spection (Left and
Right Side)
3.006.00TOTAL FOR EACH AIRPLANE
2.5010.004Close Access
9.5029.00TOTAL FOR EACH AIRPLANE
(a) Subtract these hours from the airplane total if this inspection was not per-
formed.
(b) Hours are for the inspection of both left and right side Stations 859.5, 883.5,
903.5. Less time will be required for airplanes with one Type III overwing exit
door.
Group 1-5; Group 6, Configuration 1-3:
REPAIR INSTALLATION
Elapsed HoursTask HoursNumber of PersonsTask
3.253.251Open Hole HFEC In-
spection
2.252.251Crack Removal
4.008.002Repair Installation
2.5010.004Close Access
12.00 (a)23.50 (a)TOTAL FOR EACH AIRPLANE
(a) Total is for one frame repair installation.
Group 1-5; Group 6, Configuration 1-3:
POST-REPAIR INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
2.5010.004Open Access
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
30 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 31

Group 1-5; Group 6, Configuration 1-3:
POST-REPAIR INSPECTION
Elapsed HoursTask HoursNumber of PersonsTask
2.50 (a)5.00 (a)2Post-Repair Inspec-
tion
2.5010.004Close Access
7.5025.00TOTAL FOR EACH AIRPLANE
(a) Hours are for one repaired frame.
Group 6, Configuration 4:
INSPECTION AND REPAIR
Elapsed HoursTask HoursNumber of PersonsTask
---None
H. Weight and Balance Changes
Group 1; Group 6, Configuration 1:
767-200 Airplanes with One Type III Overwing Exit Door
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+687.1+0.8STA 859.5 (Left)
+687.1+ 0.8STA 859.5 (Right)
+1374.2+1.6TOTAL STA 859.5
(Left/Right)
+919.5+1.0STA 883.5 (Left)
+919.5+1.0STA 883.5 (Right)
+1839.0+2.0TOTAL STA 883.5
(Left/Right)
Group 2; Group 6, Configuration 2:
767-200 Airplanes with Two Type III Overwing Exit Doors
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+687.1+0.8STA 859.5 (Left)
+687.1+0.8STA 859.5 (Right)
+1374.2+1.6TOTAL STA 859.5
(Left/Right)
+919.5+1.0STA 883.5 (Left)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
31 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 32

Group 2; Group 6, Configuration 2:
767-200 Airplanes with Two Type III Overwing Exit Doors
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+919.5+1.0STA 883.5 (Right)
+1839.0+2.0TOTAL STA 883.5
(Left/Right)
+857.9+0.95STA 903.5 One
Hole Trim Repair
(Left)
+857.9+0.95STA 903.5 One
Hole Trim Repair
(Right)
+1715.7+1.9TOTAL STA 903.5
One Hole Trim Re-
pair (Left/Right)
+912.0+1.0STA 903.5 Two
Hole Trim Repair
(Left)
+912.0+1.0STA 903.5 Two
Hole Trim Repair
(Right)
+1824.0+2.0TOTAL STA 903.5
Two Hole Trim Re-
pair (Left/Right)
Group 3; Group 6, Configuration 3:
767-300 Airplanes with One or Two Type III Overwing Exit Doors
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+687.1+0.8STA 859.5 (Left)
+687.1+0.8STA 859.5 (Right)
+1374.2+1.6TOTAL STA 859.5
(Left/Right)
+795.7+0.9STA 883.5 (Left)
+795.7+0.9STA 883.5 (Right)
+1591.4+1.8TOTAL STA 883.5
(Left/Right)
+857.9+0.95STA 903.5 One
Hole Trim Repair
(Left)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
32 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 33

Group 3; Group 6, Configuration 3:
767-300 Airplanes with One or Two Type III Overwing Exit Doors
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+857.9+0.95STA 903.5 One
Hole Trim Repair
(Right)
+1715.7+1.9TOTAL STA 903.5
One Hole Trim Re-
pair (Left/Right)
+912.0+1.0STA 903.5 Two
Hole Trim Repair
(Left)
+912.0+1.0STA 903.5 Two
Hole Trim Repair
(Right)
+1824.0+2.0TOTAL STA 903.5
Two Hole Trim Re-
pair (Left/Right)
Group 4:
767-200 Special Freighter (SF) Airplane with One Type III Overwing Exit Door
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+1357.25+1.6STA 859.5 (Left)
+1357.25+1.6STA 859.5 (Right)
+2748.5+3.2TOTAL STA 859.5
(Left/Right)
+954.8+1.1STA 883.5 (Left)
+954.8+1.1STA 883.5 (Right)
+1909.6+2.2TOTAL STA 883.5
(Left/Right)
Group 5:
767-300 Boeing Converted Freighter (BCF) Airplanes with Two Type III Overwing
Exit Doors
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+1357.25+1.6STA 859.5 (Left)
+1357.25+1.6STA 859.5 (Right)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
33 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 34

Group 5:
767-300 Boeing Converted Freighter (BCF) Airplanes with Two Type III Overwing
Exit Doors
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)Airplane
+2748.5+3.2TOTAL STA 859.5
(Left/Right)
+954.8+1.1STA 883.5 (Left)
+954.8+1.1STA 883.5 (Right)
+1909.6+2.2TOTAL STA 883.5
(Left/Right)
+993.3+1.1STA 903.5 One
Hole Trim Repair
(Left)
+993.3+1.1STA 903.5 One
Hole Trim Repair
(Right)
+1986.6+2.2TOTAL STA 903.5
One Hole Trim Re-
pair (Left/Right)
+1083.6+1.2STA 903.5 Two
Hole Trim Repair
(Left)
+1083.6+1.2STA 903.5 Two
Hole Trim Repair
(Right)
+2167.2+2.4TOTAL STA 903.5
Two Hole Trim Re-
pair (Left/Right)
Group 6, Configuration 4:
None.
I. Electrical Load Data
Not changed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
34 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 35

J. References
1. Existing Data
a. Engineering Change Memo PRR B12901-89RS
b. Service Related Problem (SRP) 767-SRP-53-0321
c. Maintenance Planning Document (MPD) D622T001-9 and Appendix B Structural Significant
Item (SSI) 53-50-I06A, 53-50-I18, 53-50-I22A and 53-50-I24, D622T001-DTR.
d. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2003-18-10
e. Standard Overhaul Practices Manual (SOPM) 20-41-02, 20-43-03, 20-50-01, 20-50-19
f. 767 Aircraft Maintenance Manual (AMM) 25-21-01, 25-25-01, 25-27-01, 53-01-01
g. 767 Non-Destructive Testing (NDT) Manual Part 6, 51-00-16, Part 6, 51-00-19
h. 767-200 Structural Repair Manual (SRM) 51-40-09
i. 767-300 Structural Repair Manual (SRM) 51-40-09
j. 767-300BCF Structural Repair Manual (SRM) 51-40-09
k. Boeing Parts Standards Document D-590
l. Boeing Drawing 012W6100
2. Data supplied with this Service Bulletin
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin
None.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
D043T520767 Weight and Balance Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin affects FCS. DTI requirements for the structure affected
are contained in Paragraph 1.E., Compliance of this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
35 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 36

L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
36 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 37

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane as shown
below. If there is a limit in the quantity of kits, a supply sequence is given by Spares. Operators are
encouraged to share schedule requirements with Boeing for incorporation of the service bulletin. The
kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 1 date of
this Service Bul-
letin (Calendar
Days)
QTYDateNameKit Number
$7,901.00525(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 859.5,
LEFT SIDE
Group 1-5; Group
6, Configuration 1-
3
691T0003-1
$8,293.00525(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 859.5,
RIGHT SIDE
Group 1-5; Group
6, Configuration 1-
3
691T0003-2
$8,173.00525(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 883.5,
LEFT SIDE
Group 1-2, 4;
Group 6, Configura-
tion 1-2
691T0003-3
$8,173.00525(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 883.5,
RIGHT SIDE
Group 1-2, 4;
Group 6, Configura-
tion 1-2
691T0003-4
$8,158.00525(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 883.5,
LEFT SIDE
Group 3, 5; Group
6, Configuration 3
691T0003-5
$8,327.00525(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 883.5,
RIGHT SIDE
Group 3, 5; Group
6, Configuration 3
691T0003-6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
37 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 38

REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 1 date of
this Service Bul-
letin (Calendar
Days)
QTYDateNameKit Number
$3,954.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
LEFT SIDE
Group 2; Group 6,
Configuration 2
691T0003-7
$3,954.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
RIGHT SIDE
Group 2; Group 6,
Configuration 2
691T0003-8
$4,439.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
LEFT SIDE
Group 2; Group 6,
Configuration 2
691T0003-9
$4,456.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
RIGHT SIDE
Group 2; Group 6,
Configuration 2
691T0003-10
$3,898.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
LEFT SIDE
Group 3, 5; Group
6, Configuration 3
691T0003-11
$3,898.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
RIGHT SIDE
Group 3, 5; Group
6, Configuration 3
691T0003-12
$4,364.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
LEFT SIDE
Group 3, 5; Group
6, Configuration 3
691T0003-13
$4,364.00200(c)05/12/2011TOP KIT - INNER
CHORD MODIFICA-
TION, STATION 903.5,
RIGHT SIDE
Group 3, 5; Group
6, Configuration 3
691T0003-14
$1,074.00525(c)05/12/2011KIT - ALTERED CON-
FIGURATION FASTEN-
ER KIT FOR INNER
CHORD MODIFICA-
TION, STA 859.5
Group 4-5
691T0003-39
(a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
38 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 39

REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 1
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 1 date of
this Service Bul-
letin (Calendar
Days)
QTYDateNameKit Number
$383.00172(c)05/12/2011KIT - ALTERED CON-
FIGURATION FASTEN-
ER KIT FOR INNER
CHORD MODIFICA-
TION, STA 903.5
Group 5
691T0003-40
(b)
(a) Used on Boeing Special Freighter (SF) and Boeing Converted Freighter (BCF) configurations.
(b) Used on Boeing Converted Freighter (BCF) configurations.
(c) Refer to the Boeing Parts Page on MyBoeingFleet.com or contact Spares for available quantity.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes and/or repair procedures
given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One specified top kit and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, is necessary for a repaired frame.
Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-6-5-4-3-2-1
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
859.5, LEFT SIDE
.....-691T0003-1
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
859.5, RIGHT
SIDE
....-.691T0003-2
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
883.5, LEFT SIDE
...-..691T0003-3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
39 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 40

Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-6-5-4-3-2-1
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
883.5, RIGHT
SIDE
..-...691T0003-4
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
883.5, LEFT SIDE
.-....691T0003-5
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
883.5, RIGHT
SIDE
-.....691T0003-6
REPAIR ANGLE.....1691T0003-15
REPAIR ANGLE....1.691T0003-16
REPAIR ANGLE...1..691T0003-17
REPAIR ANGLE..1...691T0003-18
REPAIR ANGLE.1....691T0003-19
REPAIR ANGLE1.....691T0003-20
SOLID FILLER....11691T0003-30
TAPERED FILLER222222691T0003-31
SOLID FILLER1111..691T0003-32
TAPERED FILLER....11691T0003-34
TAPERED FILLER1111..691T0003-35
(a)BOLT TITANIUM
O/S
111111BACB30NX12K15X
(a)BOLT TITANIUM
O/S
333322BACB30NX14K15X
(a)BOLT, PROTRUD-
ING HD
111111BACB30NX14K16X
(a)BOLT, PROTRUD-
ING HD
112211BACB30NX8K10X
(a)BOLT, PROTRUD-
ING HD
..11..BACB30NX8K10Y
(a)BOLT, PROTRUD-
ING HD
11..11BACB30NX8K11X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
40 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 41

Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-6-5-4-3-2-1
(a)BOLT, PROTRUD-
ING HD
11....BACB30NX8K11Y
(a)BOLT, PROTRUD-
ING HD
....11BACB30NX8K7X
(a)BOLT, PROTRUD-
ING HD
444444BACB30NX8K8X
(a)BOLT, PROTRUD-
ING HD
222211BACB30NX8K9X
(a)BOLT, PROTRUD-
ING HD
....11BACB30NX8K9Y
COLLAR111111BACC30BH12
COLLAR,
PRELOAD
444433BACC30BH14
COLLAR333333BACC30BH8
COLLAR111122BACC30R8
FILLER223355BACF3H06LC008HN
(b)WASHER, PLAIN222222BACW10BP61DP
(b)WASHER, PLAIN888866BACW10BP71DP
(b)WASHER101010101010BACW10P417CG
COLLAR555555HL75-8APBW
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 012T2100 are
used to determine the part numbers used as substitutes.
(b) There are more parts than are necessary
Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-12-11-10-9-8-7
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, RIGHT
SIDE
..-...691T0003-10
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
41 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 42

Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-12-11-10-9-8-7
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, LEFT SIDE
.-....691T0003-11
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, RIGHT
SIDE
-.....691T0003-12
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, LEFT SIDE
.....-691T0003-7
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, RIGHT
SIDE
....-.691T0003-8
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, LEFT SIDE
...-..691T0003-9
REPAIR ANGLE.....1691T0003-21
REPAIR ANGLE....1.691T0003-22
REPAIR ANGLE...1..691T0003-23
REPAIR ANGLE..1...691T0003-24
REPAIR ANGLE.1....691T0003-25
REPAIR ANGLE1.....691T0003-26
SOLID FILLER..11..691T0003-29
SOLID FILLER11..11691T0003-33
TAPERED FILLER..11..691T0003-36
(a)BOLT, PROTRUD-
ING HD
..1111BACB30MY8K7X
(a)BOLT, PROTRUD-
ING HD
..1111BACB30MY8K8X
(a)BOLT, PROTRUD-
ING HD
333333BACB30NX16K15X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
42 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 43

Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-12-11-10-9-8-7
(a)BOLT, PROTRUD-
ING HD
222222BACB30NX16K16X
(a)BOLT, PROTRUD-
ING HD
222211BACB30NX8K10X
(a)BOLT, PROTRUD-
ING HD
..3322BACB30NX8K11X
(a)BOLT, PROTRUD-
ING HD
11....BACB30NX8K7X
(a)BOLT, PROTRUD-
ING HD
11....BACB30NX8K8X
(a)BOLT, PROTRUD-
ING HD
445533BACB30NX8K9X
COLLAR..2222BACC30AG8
COLLAR337733BACC30BH8
COLLAR555555BACC30X16
FILLER227766BACF3H06LC008HN
(b)WASHER, PLAIN101010101010BACW10BP81DP
(b)WASHER6610101010BACW10P417CG
COLLAR553333HL75-8APBW
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip length longer
than indicated. Also, if any fasteners part numbers listed are not available or have been superseded,
substitute fasteners may be supplied in kits. Boeing Document D-590 and Boeing Drawing 012T2100 are
used to determine the part numbers used as substitutes.
(b) There are more parts than are necessary
Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-40-39-14-13
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, LEFT SIDE
...-691T0003-13
TOP KIT - INNER
CHORD MODIFI-
CATION, STATION
903.5, RIGHT
SIDE
..-.691T0003-14
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
43 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 44

Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-40-39-14-13
KIT - ALTERED
CONFIGURATION
FASTENER KIT
FOR INNER
CHORD MODIFI-
CATION, STA
859.5
.-..691T0003-39
KIT - ALTERED
CONFIGURATION
FASTENER KIT
FOR INNER
CHORD MODIFI-
CATION, STA
903.5
-...691T0003-40
REPAIR ANGLE...1691T0003-27
REPAIR ANGLE..1.691T0003-28
SOLID FILLER..11691T0003-29
TAPERED FILLER..11691T0003-36
(a)BOLT TITANIUM
O/S
.1..BACB30NX12K15Y
(a)BOLT, HEX DRIVE.2..BACB30NX14K15Y
(a)BOLT, PROTRUD-
ING HD
.1..BACB30NX14K16Y
(a)BOLT, PROTRUD-
ING HD
..33BACB30NX16K15X
(a)BOLT, PROTRUD-
ING HD
3...BACB30NX16K15Y
(a)BOLT, PROTRUD-
ING HD
..22BACB30NX16K16X
(a)BOLT, PROTRUD-
ING HD
2...BACB30NX16K16Y
(a)BOLT, PROTRUD-
ING HD
..44BACB30NX8K10X
(a)BOLT, PROTRUD-
ING HD
..11BACB30NX8K7X
(a)BOLT, PROTRUD-
ING HD
..11BACB30NX8K8X
(a)BOLT, PROTRUD-
ING HD
..66BACB30NX8K9X
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
44 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 45

Kit 691T0003
NotesExisting Part
Number
NameQTYNew Part Number
-40-39-14-13
COLLAR.1..BACC30AC12
COLLAR.3..BACC30AC14
COLLAR5...BACC30AC16
COLLAR..77BACC30BH8
COLLAR..55BACC30X16
FILLER..22BACF3H06LC008HN
(b)WASHER, PLAIN..1010BACW10BP81DP
(b)WASHER..66BACW10P417CG
COLLAR..55HL75-8APBW
(a) If grip length shown is not available at Boeing, fasteners supplied in kits may be one grip
length longer than indicated. Also, if any fasteners part numbers listed are not available or
have been superseded, substitute fasteners may be supplied in kits. Boeing Document D-
590 and Boeing Drawing 012T2100 are used to determine the part numbers used as substi-
tutes.
(b) There are more parts than are necessary
Figure/Kit Tables
Figure
16151413121110987Kit 691T0003
---------1691T0003-1
--------1-691T0003-2
-----1----691T0003-3
----1-----691T0003-4
-------1--691T0003-5
------1---691T0003-6
---1------691T0003-7
--1-------691T0003-8
-1--------691T0003-9
1--------691T0003-10
Figure
26252423222120191817Kit 691T0003
-----1----691T0003-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
45 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 46

Figure
26252423222120191817Kit 691T0003
----1-----691T0003-2
---1-----1691T0003-11
--1-----1-691T0003-12
-1-----1--691T0003-13
1-----1---691T0003-14
---11----691T0003-39
1111------691T0003-40
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number /
Specification
(a)Sealant-BMS5-95, Type I,
Class B or C
(a)Primer-BMS10-11, Type 1
-Laminated Shim-BACS40R( )( )( )F
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for
supplier data.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
The 767-200 SRM 51-40-09, 767-300 SRM 51-40-09, 767-300BCF SRM 51-40-09 Figure 1 as applicable
gives data about cold working tools and sleeves necessary to do the work given in this service bulletin.
These tools are available from industry sources.
Engineering, service, and a kit of cold working tools made for this change are available from Fatigue
Technology, Inc. or West Coast Industries, Inc.
 Refer To: FTI Kit Number: FTI-767-53A0209-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
46 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 47

Fatigue Technology, Inc.
P.O. Box C-88388
Seattle, WA 98188 USA
Phone Number (206) 246-2010
Fax (206) 244-9886
 Refer To: WCI Kit Number: WCI-767-53A-0209-1
West Coast Industries, Inc.
14900 Whitman Avenue North
Seattle, WA 98133-6532 USA
Phone Number (206) 365-7513
Fax (206) 365-7483
F. Special Tooling Necessary to do this Service Bulletin
Cold working tools are necessary to do the change given in this service bulletin. To get the cold working
tools, refer to Paragraph 2.E., Special Tooling - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
47 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 48

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
48 of 301
BOEING SERVICE BULLETIN 767-53A0209
BLANK PAGE

### Page 49

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions identified in Paragraph 3.B., Work Instructions and the Figure(s)
give the recommended sequence of steps. The sequence of steps to do this service
bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margin, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets are in 767 SRM, Chapter 51
– Torque limits to tighten nuts and bolts are in 767 SRM, Chapter 51
5. Use the approved fastener and process material substitutions in accordance with
767 SRM, Chapter 51.
6. If the length of any fastener specified in this service bulletin does not meet the
installation standards in SRM Chapter 51, then a fastener of the same specification,
or an approved substitute, with a length which meets the installation standards in
SRM Chapter 51 may be used.
7. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
8. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
49 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 50

9. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
10. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
11. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
B. WORK INSTRUCTIONS
Group 6, Configuration 4:
No work is necessary in accordance with this service bulletin. These airplanes do not have Type III
overwing exit doors.
Group 1-5; Group 6, Configuration 1-3:
1. ACCESS
a. Group 1-3; Group 6, Configuration 1-3:
Passenger Compartment
(1) Remove passenger compartment seats as necessary. Refer to 767 AMM 25-25-01 as
an accepted procedure.
(2) Remove passenger floor coverings as necessary. Refer to 767 AMM 25-27-01 as an
accepted procedure.
(3) Remove passenger compartment sidewall panels as necessary. Refer to 767 AMM
25-21-02 as an accepted procedure.
(4) Remove passenger compartment floor panels as necessary. Refer to 767 AMM 53-01-01
as an accepted procedure.
b. Group 4-5:
Freighter Main Deck Cargo Compartment
(1) Remove main deck cargo compartment sidewall panels as necessary. Refer to 767 AMM
25-59-01 as an accepted procedure.
(2) Remove main deck cargo compartment floor panels as necessary. Refer to 767 AMM
53-01-06 as an accepted procedure.
2. INSPECTION
a. Group 1, 4; Group 6, Configuration 1:
At Station 859.5 and 883.5, LBL and RBL 89, Below WL 200 do a Detailed Inspection or
surface high frequency eddy current (HFEC) inspection of the frame inner chord transition
radius for any crack in accordance with Figure 1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
50 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 51

Group 2-3, 5; Group 6, Configuration 2-3:
At Station 859.5, 883.5 and 903.5, LBL and RBL 89, Below WL 200 do a Detailed Inspection
or surface high frequency eddy current (HFEC) inspection of the frame inner chord transition
radius for any crack in accordance with Figure 1.
b. If no crack(s) found, do repeat Detailed Inspection or surface HFEC inspection in accordance
with Paragraph 1.E., Compliance.
(1) Put the airplane back to a serviceable condition, go to paragraph 3.B.6.
c. If any crack is found, do a Detailed Inspection of the frame for one or more fillers installed
between the frame and stub-beam in accordance with Figure 2.
If there is no filler(s) installed, go to paragraph 3.B.3.
If one or more fillers are installed, measure the total filler thickness. If the the total thickness
is 0.125 inch or less, go to paragraph 3.B.3.
If one or more fillers are installed and the measured total filler thickness is greater than 0.125
inch, do the open hole HFEC inspection for cracks in the frame inner chord, failsafe chord,
frame web, doubler (Station 903.5) and stub-beam in accordance with paragraph 3.B.3.
(1) If no crack(s) found, do NOT proceed to paragraph 3.B.4 repair installation. See Appendix
A in this Service Bulletin for additional filler data that is to be documented and sent to
Boeing, then contact Boeing for repair data and do the repair provided by Boeing.
(2) If any crack is found, follow the instructions to remove a crack indication in accordance
with paragraph 3.B.3. Do NOT proceed to paragraph 3.B.4 repair installation. Send
Appendix A filler data and Appendix B hole data to Boeing, and then contact Boeing for
repair data and do the repair provided by Boeing.
3. OPEN HOLE INSPECTION
a. Group 1, 4; Group 6, Configuration 1:
At Station 859.5 and 883.5, LBL and RBL 89, Below WL 200 remove fasteners and do an
open hole high frequency eddy current (HFEC) inspection for any crack in the frame inner
chord, failsafe chord, frame web and stub-beam as applicable in accordance with Figures 3
and 4.
If no crack(s) found, go to paragraph 3.B.4.
If any crack is found, oversize the hole in accordance with Figures 3 or 4 and then do a repeat
open hole HFEC inspection to ensure no further crack indication exists. If a crack indication
still exists and the hole diameter is 1/32 inch greater than the specified nominal diameter DO
NOT FURTHER OVERSIZE THE HOLE. See Appendix B in this Service Bulletin for data that
is to be documented and sent to Boeing, then contact Boeing for repair data and do the repair
provided by Boeing.
b. Group 2-3, 5; Group 6, Configuration 2-3:
At Station 859.5, 883.5 and 903.5, LBL and RBL 89, Below WL 200 remove fasteners and do
an open hole high frequency eddy current (HFEC) inspection for any crack(s) in the frame
inner chord, failsafe chord, frame web, doubler (Station 903.5) and stub-beam as applicable
in accordance with Figures 3, 4 and 5 or 6.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
51 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 52

If no crack(s) found, go to paragraph 3.B.4.
If any crack is found, oversize the hole as specified in accordance with Figures 3, 4 and 5 or
6 and then do a repeat open hole HFEC inspection to ensure no further crack indication exists.
If a crack indication still exists and the hole diameter is 1/32 inch greater than the specified
nominal diameter DO NOT FURTHER OVERSIZE THE HOLE. See Appendix B in this Service
Bulletin for data that is to be documented and sent to Boeing, then contact Boeing for repair
data and do the repair provided by Boeing.
CAUTION: THE REPAIRS IN THIS SERVICE BULLETIN SHOULD BE DONE AT NO MORE THAN
TWO LOCATIONS ON ONE SIDE OF THE AIRPLANE AT A TIME WITHOUT SPECIAL
JACKING AND SUPPORT OF THE AIRPLANE. CONTACT BOEING IF SPECIAL
JACKING AND SUPPORT INSTRUCTIONS ARE NEEDED.
4. REPAIR INSTALLATION
a. Station 859.5
(1) Group 1-3; Group 6, Configuration 1-3:
If applicable, remove crack and install a left side inner chord repair in accordance with
Figure 7.
(2) Group 1-3; Group 6, Configuration 1-3:
If applicable, remove crack and install a right side inner chord repair in accordance with
Figure 8.
(3) Group 4-5:
If applicable, remove crack and install a left side inner chord repair in accordance with
Figure 21.
(4) Group 4-5:
If applicable, remove crack and install a right side inner chord repair in accordance with
Figure 22.
(5) Put the airplane back to a serviceable condition, go to paragraph 3.B.6.
b. Station 883.5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
52 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 53

(1) Group 3, 5; Group 6, Configuration 3:
If applicable, remove crack and install a left side, two radius filler inner chord repair in
accordance with Figure 9.
(2) Group 3, 5; Group 6, Configuration 3:
If applicable, remove crack and install a right side, two radius filler inner chord repair in
accordance with Figure 10.
(3) Group 1-2, 4; Group 6, Configuration 1-2:
If applicable, remove crack and install a left side, three radius filler inner chord repair in
accordance with Figure 11.
(4) Group 1-2, 4; Group 6, Configuration 1-2:
If applicable, remove crack and install a right side, three radius filler inner chord repair in
accordance with Figure 12.
(5) Put the airplane back to a serviceable condition, go to paragraph 3.B.6.
c. Station 903.5
(1) Group 2; Group 6, Configuration 2:
If applicable, remove crack and install a left side, one hole trim out inner chord repair in
accordance with Figure 13.
(2) Group 2; Group 6, Configuration 2:
If applicable, remove crack and install a right side, one hole trim out inner chord repair
in accordance with Figure 14.
(3) Group 2; Group 6, Configuration 2:
If applicable, remove crack and install a left side, two hole trim out inner chord repair in
accordance with Figure 15.
(4) Group 2; Group 6, Configuration 2:
If applicable, remove crack and install a right side, two hole trim out inner chord repair in
accordance with Figure 16.
(5) Group 3; Group 6, Configuration 3:
If applicable, remove crack and install a left side, one hole trim out inner chord repair in
accordance with Figure 17.
(6) Group 3; Group 6, Configuration 3:
If applicable, remove crack and install a right side, one hole trim out inner chord repair
in accordance with Figure 18.
(7) Group 3; Group 6, Configuration 3:
If applicable, remove crack and install a left side, two hole trim out inner chord repair in
accordance with Figure 19.
(8) Group 3; Group 6, Configuration 3:
If applicable, remove crack and install a right side, two hole trim out inner chord repair in
accordance with Figure 20.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
53 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 54

(9) Group 5:
If applicable, remove crack and install a left side, one hole trim out inner chord repair in
accordance with Figure 23.
(10) Group 5:
If applicable, remove crack and install a right side, one hole trim out inner chord repair
in accordance with Figure 24.
(11) Group 5:
If applicable, remove crack and install a left side, two hole trim out inner chord repair in
accordance with Figure 25.
(12) Group 5:
If applicable, remove crack and install a right side, two hole trim out inner chord repair in
accordance with Figure 26.
(13) Put the airplane back to a serviceable condition, go to paragraph 3.B.6.
5. POST-REPAIR INSPECTION
a. Group 1-3; Group 6, Configuration 1-3:
Passenger Compartment, refer to paragraph 3.B.1 as an accepted procedure for access.
b. Group 4-5:
Freighter Main Deck Cargo Compartment, refer to paragraph 3.B.1 as an accepted procedure
for access.
c. Group 1-5; Group 6, Configuration 1-3:
Station 859.5, do post-repair inspections in accordance with Figure 27.
d. Group 1-5; Group 6, Configuration 1-3:
Station 883.5, do post-repair inspections in accordance with Figure 28.
e. Group 2-3, 5; Group 6, Configuration 2-3:
Station 903.5, do one hole trim out post-repair inspections in accordance with Figure 29.
f. Group 2-3, 5; Group 6, Configuration 2-3:
Station 903.5, do two hole trim out post-repair inspections in accordance with Figure 30.
g. Put the airplane back to a serviceable condition, go to paragraph 3.B.6.
6. CLOSE ACCESS
a. Group 1-3; Group 6, Configuration 1-3:
Passenger Compartment
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
54 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 55

(1) Install passenger compartment floor panels as necessary. Refer to 767 AMM 53-01-01
as an accepted procedure.
(2) Install passenger compartment sidewall panels as necessary. Refer to 767 AMM 25-21-02
as an accepted procedure.
(3) Install passenger floor coverings as necessary. Refer to 767 AMM 25-27-01 as an accepted
procedure.
(4) Install passenger compartment seats necessary. Refer to 767 AMM 25-25-01 as an
accepted procedure.
b. Group 4-5:
Freighter Main Deck Cargo Compartment
(1) Install main deck cargo compartment sidewall panels as necessary. Refer to 767 AMM
25-59-01 as an accepted procedure.
(2) Install main deck cargo compartment floor panels as necessary. Refer to 767 AMM
53-01-06 as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1: July 27, 2011
55 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 56 (OCR)

BOEING SERVICE BULLETIN 767-53A0209
STA
903.5
STA
883.5
STA
859.5
1779327
FIGURE 1: INNER CHORD INSPECTION
(SHEET 1 OF 4)
Original Issue: September 30, 2010
Revision 1 July 27, 2011  767-53A0209
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  56 of 301

### Page 57 (OCR)

BOEING SERVICE BULLETIN 767-53A0209
INNER CHORD
FAIL-SAFE ~
CHORD
OUTER CHORD
FRAME WEB
TYPICAL CRACK
STUB BEAM
TRANSITION RADIUS
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
INSPECTION  (TYPICAL)
AREA  1779712
FIGURE 1: INNER CHORD INSPECTION
(SHEET 2 OF 4)
Original Issue: September 30, 2010
Revision 1 July 27, 2011  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.

### Page 58 (OCR)

BOEING SERVICE BULLETIN 767-53A0209
INNER CHORD
FRAME WEB
FAIL-SAFE
CHORD
OUTER CHORD
TYPICAL CRACK
STUB BEAM
TRANSITION RADIUS
LEFT SIDE SHOWN
RIGHT SIDE OPPOSITE
INSPECTION  STA 883.5  (TYPICAL)
AREA  2067177
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
FIGURE 1: INNER CHORD INSPECTION
(SHEET 3 OF 4)
Original Issue: September 30, 2010
Revision 1 July 27, 2011  BOEING PROPRIETARY -  767-53A0209
Copyright © Unpublished Work - See page 1 for details.  58 of 301

### Page 59

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)--Inner ChordInspect1
(a) Do a Detailed Inspection or surface high frequency eddy current (HFEC) inspection of the frame inner
chord surface and transition radius for cracks. Do HFEC inspection in accordance with 767 NDT Part 6,
51-00-19.
FIGURE 1: INNER CHORD INSPECTION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 30, 2010
767-53A0209Revision 1 July 27, 2011
59 of 301
BOEING SERVICE BULLETIN 767-53A0209

### Page 60 (OCR)

BOEING SERVICE BULLETIN 767-53A0209
INNER CHORD
OUTER CHORD
FRAME WEB
1 (TYPICAL  EDGE OF FILLEF
STUB BEAM
1) (TYPICAL  EDGE OF FILLE!
TYPICAL CRACK
STA 859.5 (SHOWN)
RIGHT SIDE OPPOSITE  LEFT SIDE SHOWN  STA 883.5 (SIMILAR)  STA 903.5 (SIMILAR)  1956113
(TYPICAL)
FIGURE 2: FRAME TO STUB-BEAM FILLER INSPECTION
(SHEET 1 OF 2)
Original Issue: September 30, 2010
Revision 1 July 27, 2011  BOEING PROPRIETARY -  767-53A0209
Copyright © Unpublished Work - See page 1 for details.  60 of 301

The text continues at https://openairdocs.org/service-documents/boeing/767-53a0209/file/9883e7c9be77.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
