# Boeing Alert Service Bulletin 767-53A0266: No revision named, from page 25

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2015-4210; AD 2016-13-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-53A0266](https://openairdocs.org/service-documents/boeing/767-53a0266.md)
- Title as filed: U.S. DOT/FAA - SB 767-53A0266  R0
- Pages: 41
- PDF: https://openairdocs.org/files/sha256/03/aa/03aa4e4eefb97582192d64aac429f756e14460d4bf8d55ffdabc15f8123f6306
- Page: https://openairdocs.org/service-documents/boeing/767-53a0266/file/03aa4e4eefb9

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
None.
B. Industry Support Information
Boeing warranty remedies are not available for the inspection and/or repair procedures given in this
service bulletin.
C. Parts Necessary for Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
The following parts or materials are necessary to do the change in this service bulletin. Parts and
materials in the manuals given in Paragraph 1.J., References, can also be necessary. Examine
operator part and material supply to make sure all necessary parts and materials are available.
Group 2, Configuration 1; Group 3:
NotesNameQTYPart Number /
Specification
-Rivet18BACR15FT6D8C
Group 1; Group 2, Configuration 2; Group 4:
NotesNameQTYPart Number /
Specification
-Rivet24BACR15FT6D8C
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
25 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 26

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
26 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 27

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 767 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 767
Aircraft Maintenance Manual (AMM).
4. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. Boeing Service Letter 767-SL-51-036, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
27 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 28

8. Refer to Appendices A and B for logic diagrams. Logic diagrams are provided as an
aid only. Information contained in Paragraph 1.E., Compliance is the primary source
for compliance times. Information in Paragraph 3.B., Work Instructions is the primary
source for tasks required for compliance.
9. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
10. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
11. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
12. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
13. The compliance times for the actions in Paragraph 3.B., WORK INSTRUCTIONS
are in Paragraph 1.E., Compliance.
14. Some steps in the Work Instructions are identified as Required for Compliance (RC).
If this service bulletin is mandated by an Airworthiness Directive (AD), then the steps
identified as RC must be done to comply with the AD. Alternative procedures for
steps not identified with RC can be used if the RC steps can still be done as specified,
and the airplane can be put back in a serviceable condition. An Alternative Method
of Compliance (AMOC) is not necessary for deviations to steps that are not identified
as RC.
B. WORK INSTRUCTIONS
1. Do PART 1: OPEN ACCESS.
2. RC - Do PART 2: FASTENER REMOVAL AND OPEN HOLE HFEC INSPECTION.
a. CONDITION 1: ANY CRACK FOUND IN THE AFT PRESSURE BULKHEAD WEB.
(1) RC - Contact The Boeing Company for repair instructions and do the repair.
b. CONDITION 2: NO CRACK FOUND IN THE AFT PRESSURE BULKHEAD WEB.
(1) RC - Repeat PART 2: FASTENER REMOVAL AND OPEN HOLE HFEC INSPECTION.
3. Do PART 3: FASTENER INSTALLATION.
4. Do PART 4: CLOSE ACCESS.
5. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
28 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 29

PART 1: OPEN ACCESS
1. For passenger airplanes only:
a. Remove and keep the aft galley. Refer to 767 AMM 25-31-04 as an accepted procedure.
2. For freighter airplanes (including Boeing Converted Freighters) only:
a. Remove and keep the cargo lining panels from the aft pressure bulkhead in the main deck
cargo compartment. Refer to 767 AMM 25-59-01 as an accepted procedure.
3. Remove and keep insulation from around splice plates that splice pressure chords on the aft
pressure bulkhead in the main deck cargo compartment. Refer to 767 AMM 25-59-05 as an
accepted procedure.
4. Remove and keep the end wall in the bulk cargo compartment. Refer to 767 AMM 25-52-01 as an
accepted procedure.
5. For passenger airplanes only:
a. Remove and keep the right side potable water tank. If installed, remove and keep the left side
potable water tank. Refer to 767 AMM 38-11-01 as an accepted procedure.
b. If necessary for access, remove and keep the waste tank. On some affected airplanes, the
waste tanks are installed forward of the affected area. On these airplanes, waste tank removal
is not necessary for access to the aft pressure bulkhead. Refer to 767 AMM 38-32-11 as an
accepted procedure.
6. Remove and keep insulation from around splice plates that splice pressure chords on the aft
pressure bulkhead in the bulk cargo compartment. Refer to 767 AMM 25-52-03 as an accepted
procedure.
WARNING: MAKE SURE THAT PERSONNEL AND EQUIPMENT ARE CLEAR OF THE HORIZONTAL
STABILIZER AND ELEVATOR SURFACES BEFORE MOVING THE STABILIZER.
INJURY TO PERSONNEL AND DAMAGE TO EQUIPMENT COULD OCCUR.
7. Position the horizontal stabilizer to neutral and deactivate controls. Refer to 767 AMM 27-41-00
as an accepted procedure.
WARNING: DO NOT STAND ON ACCESS DOOR 312AR. THE WEIGHT OF PERSONNEL COULD
CAUSE THE SPRING LOADED LATCH TO RELEASE, AND PERSONNEL MAY BE
INJURED BY FALLING THROUGH THE OPENING.
8. Open access door 312AR for access to the aft side of the aft pressure bulkhead. Use a suitable
platform or cover over the access door while working inside the tail section.
PART 2: FASTENER REMOVAL AND OPEN HOLE HFEC INSPECTION
CAUTION: TO PREVENT ANY MOVEMENT OF THE PRESSURE DOME, PERFORM PART 2 ON
ONE SPLICE PLATE AT A TIME.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
29 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 30

IF DRILLING OF FASTENERS IS REQUIRED, HOLD STEEL SHEETS TO THOSE
FASTENERS ON THE AFT SIDE OF THE AFT PRESSURE BULKHEAD.
1. Group 2, Configuration 1; Group 3:
Remove the aft row of fasteners from splice plates that splice pressure chords and do open hole
HFEC inspections for any crack in the aft pressure bulkhead web in accordance with FIGURE 1.
2. Group 1; Group 2, Configuration 2; Group 4:
Remove the aft row of fasteners from splice plates that splice pressure chords and do open hole
HFEC inspections for any crack in the aft pressure bulkhead web in accordance with FIGURE 2.
PART 3: FASTENER INSTALLATION
1. Group 2, Configuration 1; Group 3:
Install the aft row of fasteners on splice plates that splice pressure chords in accordance with
FIGURE 3.
2. Group 1; Group 2, Configuration 2; Group 4:
Install the aft row of fasteners on splice plates that splice pressure chords in accordance with
FIGURE 4.
PART 4: CLOSE ACCESS
WARNING: DO NOT STAND ON ACCESS DOOR 312AR. THE WEIGHT OF PERSONNEL COULD
CAUSE THE SPRING LOADED LATCH TO RELEASE, AND PERSONNEL MAY BE
INJURED BY FALLING THROUGH THE OPENING.
1. Remove any platforms or covers that were used to cover access door 312AR and close the access
door.
WARNING: MAKE SURE THAT PERSONNEL AND EQUIPMENT ARE CLEAR OF THE HORIZONTAL
STABILIZER AND ELEVATOR SURFACES BEFORE MOVING THE STABILIZER.
INJURY TO PERSONNEL AND DAMAGE TO EQUIPMENT COULD OCCUR.
2. Reactivate controls for the horizontal stabilizer. Refer to 767 AMM 27-41-00 as an accepted
procedure.
3. Install insulation to splice plates that splice pressure chords on the aft pressure bulkhead in the
bulk cargo compartment. Refer to 767 AMM 25-52-03 as an accepted procedure.
4. For passenger airplanes only:
a. If removed, install the waste tank. Refer to 767 AMM 38-32-11 as an accepted procedure.
b. Install the right side potable water tank. If removed, install the left side potable water tank.
Refer to 767 AMM 38-11-01 as an accepted procedure.
5. Install the end wall in the bulk cargo compartment. Refer to 767 AMM 25-55-01 as an accepted
procedure.
6. Install insulation to splice plates that splice pressure chords on the aft pressure bulkhead in the
main deck compartment. Refer to 767 AMM 25-59-05 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
30 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 31

7. For passenger airplanes only:
a. Install the aft galley. Refer to 767 AMM 25-31-04 as an accepted procedure.
8. For freighter airplanes (including Boeing Converted Freighters) only:
a. Install the cargo lining panels to the aft pressure bulkhead in the main deck cargo compartment.
Refer to 767 AMM 25-59-01 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
31 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 32 (OCR)

BOEING SERVICE BULLETIN 767-53A0266
ALERT  ALERT
This Figure applies only to: Group 2, Configuration 1; Group 3.
BULKHEAD WEB
6 LOCATIONS
STA
1582
S-12R
SKIN
INBD
SPLICE PLATE
(TYPICAL)
S-39L TO S-39R
SOME AFFECTED AIRPLANE CONFIGURATIONS HAVE
SHORT STIFFENERS AT THE AFT PRESSURE  BULKHEAD TO PRESSURE CHORD JOINT.  2385797
SHORT STIFFENERS ARE NOT SHOWN FOR CLARITY.
FIGURE 1: AFT PRESSURE BULKHEAD WEB COMMON TO PRESSURE CHORD SPLICE PLATE -
FASTENER REMOVAL AND WEB INSPECTION
(SHEET 1 OF 2)
Original Issue: April 20, 2015
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-53A0266
Work - See page 1 for details.  32 of 41

### Page 33

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Six fasteners on aft
row of each of three
splice plates. (a) (b)
18-FastenerRemove1
Do a HFEC inspec-
tion of open holes
for any crack in ac-
cordance with 767
NDT Manual Part 6,
51-00-04 or 767
NDT Manual Part 6,
51-00-11. (b)
3-Aft Pressure Bulkhead
Web
Inspect2
(a) Refer to 767-200 SRM 51-40-02, 767-200SF SRM 51-40-02, 767-300 SRM 51-40-02, 767-300F SRM
51-40-02, 767-300BCF SRM 51-40-02 or 767-400 SRM 51-40-02 as an accepted procedure.
(b) It is not necessary to do inspections in accordance with this service bulletin in areas where existing repairs
approved by the Boeing ODA via FAA form 8100-9 cover the affected inspection areas. Damage Tolerance
Inspection instructions specified in approval for existing repairs must continue. Inspection outside of the
repaired region must continue in accordance with this service bulletin.
FIGURE 1: AFT PRESSURE BULKHEAD WEB COMMON TO PRESSURE CHORD SPLICE PLATE -
FASTENER REMOVAL AND WEB INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
33 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 34 (OCR)

BOEING SERVICE BULLETIN 767-53A0266
ALERT  ALERT
This Figure applies only to: Group 1; Group 2, Configuration 2; Group 4.
BULKHEAD WEB
1)2
6 LOCATIONS
INBD  STA
1582
S-11L
TO
S-12L
S-11R
SKIN  TO
S-12R
SPLICE PLATE
(TYPICAL)
S-23R
NOTE:
SOME AFFECTED AIRPLANE CONFIGURATIONS HAVE
SHORT STIFFENERS AT THE AFT PRESSURE  2385802
BULKHEAD TO PRESSURE CHORD JOINT.
SHORT STIFFENERS ARE NOT SHOWN FOR CLARITY.  S-24L
FIGURE 2: AFT PRESSURE BULKHEAD WEB COMMON TO PRESSURE CHORD SPLICE PLATE -
FASTENER REMOVAL AND WEB INSPECTION
(SHEET 1 OF 2)
Original Issue: April 20, 2015
PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  767-53A0266
Work - See page 1 for details.  34 of 41

### Page 35

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Six fasteners on aft
row of each of four
splice plates. (a) (b)
24-FastenerRemove1
Do a HFEC inspec-
tion of open holes
for any crack in ac-
cordance with 767
NDT Manual Part 6,
51-00-04 or 767
NDT Manual Part 6,
51-00-11. (b)
4-Aft Pressure Bulkhead
Web
Inspect2
(a) Refer to 767-200 SRM 51-40-02, 767-200SF SRM 51-40-02, 767-300 SRM 51-40-02, 767-300F SRM
51-40-02, 767-300BCF SRM 51-40-02 or 767-400 SRM 51-40-02 as an accepted procedure.
(b) It is not necessary to do inspections in accordance with this service bulletin in areas where existing repairs
approved by the Boeing ODA via FAA form 8100-9 cover the affected inspection areas. Damage Tolerance
Inspection instructions specified in approval for existing repairs must continue. Inspection outside of the
repaired region must continue in accordance with this service bulletin.
FIGURE 2: AFT PRESSURE BULKHEAD WEB COMMON TO PRESSURE CHORD SPLICE PLATE -
FASTENER REMOVAL AND WEB INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
35 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 36 (OCR)

BOEING SERVICE BULLETIN 767-53A0266
ALERT  ALERT
This Figure applies only to: Group 2, Configuration 1; Group 3.
BULKHEAD WEB
STA
1582
6 LOCATIONS
00
INBD
SKIN
S-11R
SPLICE PLATE  TO
(TYPICAL)  S-12R
S-11L
TO
S-12L
NOTE:
SOME AFFECTED AIRPLANE CONFIGURATIONS HAVE
SHORT STIFFENERS AT THE AFT PRESSURE  BULKHEAD TO PRESSURE CHORD JOINT.  2385803
SHORT STIFFENERS ARE NOT SHOWN FOR CLARITY.  S-39L TO S-39R
FIGURE 3: AFT PRESSURE BULKHEAD - PRESSURE CHORD SPLICE PLATES - FASTENER
INSTALLATION
(SHEET 1 OF 2)
Original Issue: April 20, 2015
Export Controlled ECCN: 9E991 - BOEING  767-53A0266
PROPRIETARY - Copyright © Unpublished  Work - See page 1 for details.  36 of 41

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Six rivets on aft row
of each of three
splice plates. (a) (b)
18BACR15FT6D8CRivetInstall (New)1
(a) Refer to 767-200 SRM 51-40-02, 767-200SF SRM 51-40-02, 767-300 SRM 51-40-02, 767-300F SRM
51-40-02, 767-300BCF SRM 51-40-02 or 767-400 SRM 51-40-02 as an accepted procedure. Refer to
767-200 SRM 51-40-05, 767-200SF SRM 51-40-05, 767-300 SRM 51-40-05, 767-300F SRM 51-40-05,
767-300BCF SRM 51-40-05 or 767-400 SRM 51-40-05 for hole quality specifications.
(b) Alternative fastener installation in accordance with 767-200 SRM 51-40-03, 767-200SF SRM 51-40-03,
767-300 SRM 51-40-03, 767-300F SRM 51-40-03, 767-300BCF SRM 51-40-03 or 767-400 SRM 51-40-
03 is allowed. Also, installation of BACB30VT6K*X and BACC30BL6 in a transition fit hole is acceptable.
FIGURE 3: AFT PRESSURE BULKHEAD - PRESSURE CHORD SPLICE PLATES - FASTENER
INSTALLATION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
37 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 38 (OCR)

BOEING SERVICE BULLETIN 767-53A0266
ALERT  ALERT
This Figure applies only to: Group 1; Group 2, Configuration 2; Group 4.
BULKHEAD WEB
1) 6 LOCATIONS  STA
1582
B
S-11L
TO
S-12L
SKIN
INBD
SPLICE PLATE
(TYPICAL)
S-11R
_ TO
S-12R
FWD
NOTE:
SOME AFFECTED AIRPLANE CONFIGURATIONS HAVE
SHORT STIFFENERS AT THE AFT PRESSURE
BULKHEAD TO PRESSURE CHORD JOINT.  S-24L
SHORT STIFFENERS ARE NOT SHOWN FOR CLARITY.
FIGURE 4: AFT PRESSURE BULKHEAD - PRESSURE CHORD SPLICE PLATES - FASTENER
INSTALLATION
(SHEET 1 OF 2)
Original Issue: April 20, 2015
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  38 of 41

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each airplane.
More DataQtyIdentificationNameTaskStep
Six rivets on aft row
of each of four splice
plates. (a) (b)
24BACR15FT6D8CRivetInstall (New)1
(a) Refer to 767-200 SRM 51-40-02, 767-200SF SRM 51-40-02, 767-300 SRM 51-40-02, 767-300F SRM
51-40-02, 767-300BCF SRM 51-40-02 or 767-400 SRM 51-40-02 as an accepted procedure. Refer to
767-200 SRM 51-40-05, 767-200SF SRM 51-40-05, 767-300 SRM 51-40-05, 767-300F SRM 51-40-05,
767-300BCF SRM 51-40-05 or 767-400 SRM 51-40-05 for hole quality specifications.
(b) Alternative fastener installation in accordance with 767-200 SRM 51-40-03, 767-200SF SRM 51-40-03,
767-300 SRM 51-40-03, 767-300F SRM 51-40-03, 767-300BCF SRM 51-40-03 or 767-400 SRM 51-40-
03 is allowed. Also, installation of BACB30VT6K*X and BACC30BL6 in a transition fit hole is acceptable.
FIGURE 4: AFT PRESSURE BULKHEAD - PRESSURE CHORD SPLICE PLATES - FASTENER
INSTALLATION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
39 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 40

This Appendix applies only to: Group 2, Configuration 1; Group 3-4.
Logic diagrams are provided as an aid only. Information contained in Paragraph 1.E., Compliance is the primary
source for compliance times. Information contained in Paragraph 3.B., Work Instructions is the primary source
for tasks required for compliance.
1. The table below gives the description for the parts and conditions called out in the logic diagrams.
DescriptionTitle
FASTENER REMOVAL AND OPEN HOLE HFEC INSPECTION.PART 2
ANY CRACK FOUND IN THE AFT PRESSURE BULKHEAD WEB.CONDITION 1
NO CRACK FOUND IN THE AFT PRESSURE BULKHEAD WEB.CONDITION 2
APPENDIX A:  LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE TABLE 1: AFT PRESSURE
BULKHEAD WEB INSPECTIONS AT PRESSURE CHORD JOINT.
(SHEET 1 OF 1)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 20, 2015
767-53A0266
40 of 41
BOEING SERVICE BULLETIN 767-53A0266
ALERTALERT

### Page 41 (OCR)

BOEING SERVICE BULLETIN 767-53A0266
ALERT  ALERT
This Appendix applies only to: Group 1; Group 2, Configuration 2.
Logic diagrams are provided as an aid only. Information contained in Paragraph 1.E., Compliance is the primary
source for compliance times. Information contained in Paragraph 3.B., Work Instructions is the primary source
for tasks required for compliance.
1. The table below gives the description for the parts and conditions called out in the logic diagrams.
Title  Description
PART 2  FASTENER REMOVAL AND OPEN HOLE HFEC INSPECTION.
CONDITION 1  ANY CRACK FOUND IN THE AFT PRESSURE BULKHEAD WEB.
CONDITION 2  NO CRACK FOUND IN THE AFT PRESSURE BULKHEAD WEB.
WHICHEVER OCCURS LATER
WITHIN 37,500 FLIGHT  WITHIN 3,000 FLIGHT
CYCLES AFTER  CYCLES AFTER THE
REPLACEMENT OF THE  ORIGINAL ISSUE DATE OF
AFT PRESSURE BULKHEAD  THIS SERVICE BULLETIN
DO PART 2
CONDITION 1  CONDITION 2
NOT TO EXCEED 12,000
BEFORE FURTHER FLIGHT  FLIGHT CYCLES
CONTACT THE BOEING
COMPANY FOR REPAIR  REPEAT PART 2
INSTRUCTIONS AND DO THE
REPAIR
2406028
APPENDIX B: LOGIC DIAGRAM FOR PARAGRAPH 1.E. COMPLIANCE TABLE 2: AFT PRESSURE
BULKHEAD WEB INSPECTIONS AT PRESSURE CHORD JOINT.
(SHEET 1 OF 1)
Original Issue: April 20, 2015
Export Controlled ECCN: 9E991 - BOEING  767-53A0266
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  41 of 41

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
