# Boeing Alert Service Bulletin 767-54A0062: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2010-0031; AD 2010-03-08 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-54A0062](https://openairdocs.org/service-documents/boeing/767-54a0062.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 66
- PDF: https://openairdocs.org/files/sha256/24/fe/24fec752ecd98d5afbc3f4aa36b3a1a6b9627ab2f49dc12a12b4ac37689b2f78
- Page: https://openairdocs.org/service-documents/boeing/767-54a0062/file/24fec752ecd9

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 1 of 66
 
 
ALERT ALERT
Commercial
Airplanes
767
ALERTALERT
Service Bulletin
Number: 767-54A0062
Original Issue: April 14, 1994
Revision 6: November 05, 2009
ATA System: 5451
SUBJECT: NACELLES / PYLONS - Strut Attach Fuse Pins - Midspar Fuse Pin Inspection and 
Replacement
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 1994 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable 
subject matter.  Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third 
parties.  Treatment of the document and the information it contains is governed by contract with Boeing.    For 
more information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, 
DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the  Boeing 
livery are all trademarks owned by The Boeing Company; and no trademark license is granted in connection 
with this document unless provided in writing by Boeing.

### Page 2

BLANK PAGE
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 2 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 3

Table of Contents
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 3 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
Table of Contents
Revision Transmittal Sheet .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 5
Summary .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  . 9
1. PLANNING INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
A. Effectivity .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
1. Airplanes   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  13
2. Spares Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
B. Concurrent Requirements  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  24
C. Reason .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  24
D. Description .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  26
E. Compliance.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  28
F. Approval .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  32
G. Manpower   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  33
H. Weight and Balance Changes  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  34
I. Electrical Load Data  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  34
J. References .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  .  .  .  34
1. Existing Data: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  34
2. Data supplied with this Service Bulletin:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  35
3. Installation Drawings Used in the Preparation of this Service Bulletin: .  .  .  .  .  .  .  .  .  .  35
K. Publications Affected .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  36
L. Interchangeability and Intermixability of Parts  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  36
2. MATERIAL INFORMATION .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
A. Material - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
B. Industry Support Information .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   .  37
C. Parts Necessary For Each Airplane  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
1. Kits/Parts: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  37
2. Parts and Materials Supplied by the Operator:  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  38
3. Parts Modified and Reidentified:   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  40
4. Parts Removed and Not Replaced: .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  40
D. Parts Necessary to Change Spares  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  40
E. Special Tooling - Price and Availability.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .   40
F. Special Tooling Necessary to do this Service Bulletin .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  40
3. ACCOMPLISHMENT INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  41
A. GENERAL INFORMATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  41
B. WORK INSTRUCTIONS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  42
FIGURE  1:   DELETED - REFER TO PARAGRAPH 1.E. - COMPLIANCE .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  48
FIGURE  2:   MIDSPAR FUSE PIN ACCESS   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  49
FIGURE  3:   ON WING MIDSPAR FUSE PIN INSPECTION  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  51
FIGURE  4:   OFF WING MIDSPAR FUSE PIN INSPECTION.  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  55
FIGURE  5:   MIDSPAR FUSE PIN REPLACEMENT  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  58
FIGURE  6:   OFF WING MIDSPAR FUSE PIN MAGNETIC PARTICLE INSPECTION .  .  .  .  .  .  .  .  .  60
FIGURE  7:   MIDSPAR FUSE PIN FINISH RESTORATION   .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  61
APPENDIX  A: APPROVED REPAIRS .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  .  62

### Page 4

Table of Contents
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 4 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 5

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 5 of 66
 
 
ALERT ALERT
Commercial
Airplanes
767
ALERTALERT
Service Bulletin
Number: 767-54A0062 Revision Transmittal Sheet
Original Issue: April 14, 1994
Revision 6: November 05, 2009
ATA System: 5451
SUBJECT: NACELLES / PYLONS - Strut Attach Fuse Pins - Midspar Fuse Pin Inspection and 
Replacement
 
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directives (AD) 94-11-02 and 2003-03-02 are related to 
this service bulletin. 
More work is necessary on airplanes that have not been changed in accordance with either service bulletin 767-
54-0069, or the applicable 767 SIP service bulletin 767-54-0080, 767-54-0081 or 767-54-0082. Continued 
inspections of the midspar fuse pins are required at reduced thresholds and repeat intervals in accordance with 
Paragraph 1.E., Compliance.
No more work is necessary on airplanes that have been changed in accordance with either service bulletin 767-
54-0069, or the applicable 767 Strut Improvement Program (SIP) service bulletin 767-54-0080, 767-54-0081 or 
767-54-0082. Accomplishment of either service bulletin 767-54-0069 or the applicable 767 SIP service bulletin 
767-54-0080, 767-54-0081 or 767-54-0082 is terminating action for this service bulletin.
REASON FOR REVISION
This revision is sent to reduce the midspar fuse pin inspection threshold and repeat intervals based on an 
operator report of a cracked midspar fuse pin, after the Revision 5 date of this service bulletin. 
These sections were changed:
1. Summary: Added statement of consequences of not accomplishing the service bulletin; added/changed 
references; added service history; changed Action paragraph; changed effectivity statement; added FAA 
AD statement; changed illustration.
2. Paragraph 1.A., Effectivity: Added Group/Configuration table
3. Paragraph 1.C., Reason: Added statement of consequences of not accomplishing the service bulletin; 
added/changed references; added service history; added Revision 6 changes information.

### Page 6

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 6 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
4. Paragraph 1.D., Description: Changed reference; added note; deleted Group descriptions; added Revision 
6 change information.
5. Paragraph 1.E., Compliance: Added/deleted references; added/changed compliance table; added ferry 
flight information.
6. Paragraph 1.F., Approval: Added references.
7. Paragraph 1.G., Manpower: Changed task names
8. Paragraph 1.J.1., Existing Data: Added/changed/deleted references
9. Paragraph 1.K., Publications Affected: Added paragraph
10. Paragraph 2.C., Material - Price and Availability: Updated price and availability data
11. Paragraph 2.C.2., Parts and Materials Supplied by the Operator: Changed part number; deleted materials; 
revised notes.
12. Paragraph 3.A., General Instructions: Added instructions; added inspection information; revised 
referenced procedures information; added serviceable pin criteria.
13. Paragraph 3.B., Work Instructions: Changed instructions to CONDITION/Option format; added/changed/
deleted instructions; deleted torque stripe requirement.
14. Figure 1: Deleted figure
15. Figure 2: Changed title; changed illustration; changed step numbers; added/changed references.
16. Figure 3: Changed/added illustration; added/changed steps; added/changed/deleted references; added 
corrosion information.
17. Figure 4: Added/changed illustration; added/changed steps; changed reference; added option for Magnetic 
Particle Inspection; added corrosion information.
18. Figure 5: Changed illustration; changed/deleted steps; changed reference.
19. Figure 6: Completely revised figure
20. Figure 7: New Figure
21. Appendix A: New Appendix
Paragraph 1.A., Effectivity, shows changes of airplane operators. Each operator should examine the Effectivity 
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location 
of important changes.

### Page 7

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 7 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
REVISION HISTORY
Original Issue: April  14, 1994
Revision 1: May  11, 1994
Revision 2: December 21, 1994
Revision 3: June  15, 1995
Revision 4: May 7, 1998
Revision 5: November 11, 2002
Revision 6: November 5, 2009

### Page 8

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 8 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
BLANK PAGE

### Page 9

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 9 of 66
 
 
ALERT ALERT
Commercial
Airplanes
767
ALERTALERT
Service Bulletin
Number: 767-54A0062 Summary
Original Issue: April 14, 1994
Revision 6: November 05, 2009
ATA System: 5451
SUBJECT: NACELLES / PYLONS - Strut Attach Fuse Pins - Midspar Fuse Pin Inspection and 
Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN 
PARAGRAPH 1.A., EFFECTIVITY.  IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OPERATOR.  IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This inspection/replacement program will permit early detection of cracks in the midspar fuse pin on the inboard 
and outboard sides of the number one and number two pylons. Midspar fuse pin cracks can result in the loss of 
structural integrity of the midspar fuse pins and cause an engine breakaway from the airplane.
There have been eight reports involving a total of fourteen midspar fuse pins suspected of having longitudinal 
cracks. Of these fuse pins, seven pins were confirmed cracked. The cracked pins were from one operator on 
airplanes with 15,628 to 23,056 flight cycles. Both airplanes are equipped with CF6-80A engines. 
The first pins suspected of being cracked were found during midspar bushing migration rework. The cracks were 
found by a detailed visual inspection. The cracking was confirmed by magnetic particle inspection with the pins 
removed. The second cracked pin was found using eddy current inspection on the inner bore of the fuse pin with 
the engine installed. Subsequent inspections of at least sixty-nine additional fuse pins from the same engine 
type have revealed no cracks. These additional pins were on airplanes with as many as 23,007 flight cycles. 
These cracks are believed to be caused by stresses due to ovalization of the fuse pin. Because this strut has 
redundant load paths, one pin can fail without affecting flight safety. Boeing testing of similar fuse pins showed 
no significant reduction in shear strength with longitudinal cracks up to 1 inch. 
An all base message M-7240-94-0006 was sent to inform operators of the development of this service bulletin 
and of Delta Airlines involvement as the “Lead the Fleet” airline.

### Page 10

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 10 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
Subsequent to the release of Revision 4 of this service bulletin one operator has reported a fractured midspar 
fuse pin. The fractured midspar fuse pin was found during routine maintenance on the outboard side of the 
number one pylon. Further inspection of the inboard side of the number one pylon, revealed the midspar fuse 
pin to have corrosion within the bore and on the pin surface. The 767-ER airplane was equipped with RB211 
engines and had accumulated 9,456 flight cycles. Service bulletin 767-54-0069 to replace the midspar fuse pins 
and service bulletin 767-54-0082 to modify the nacelle strut and wing structure had not been incorporated on 
this airplane.
Reduced thresholds for the inspections given in this service bulletin will provide early detection of cracks and 
ensure the structural integrity of the number one and two pylons.
An all base message M-7200-02-01708 was sent to inform operators of the development of revision 5 of this 
service bulletin.
After the Revision 5 date of this service bulletin, one operator of a 767-300 airplane with CF6-80C2 engines 
reported a fractured midspar fuse pin. The airplane had accumulated 16,054 flight cycles and neither service 
bulletin 767-54-0069 nor 767 Strut Improvement Program (SIP) service bulletin 767-54-0081 had been 
incorporated. The fractured midspar fuse pin was found during routine maintenance on the outboard side of the 
number one pylon, prior to the next scheduled midspar fuse pin inspection in accordance with Revision 5 of this 
service bulletin. Further inspection revealed a cracked midspar fuse pin on the inboard side of the number one 
pylon. Subsequent inspection of both midspar fuse pins revealed discrepant circumferential machining grooves 
on the fuse pin main bore surface, in addition to longitudinal cracks. Eddy Current Inspection (ECI) of the 
midspar fuse pins in accordance with the requirements of Revision 5 of this service bulletin will not reveal the 
presence of the discrepant machining grooves. The roughness of the discrepant machining grooves exceeded 
the maximum allowable roughness of the fuse pin main bore surface. Metallurgical analysis determined the fuse 
pin fracture or crack origins coincided with the discrepant machining groove locations, in all cases. Stresses due 
to pin ovalization contributed to the longitudinal cracking of the midspar fuse pins.
Multi-Operator Message (MOM) 1-1171248586 was sent to inform operators of the development of Revision 6 
of this service bulletin.
Reduced inspection thresholds and repeat intervals in accordance with Revision 6 of this service bulletin will 
provide early detection of cracks due to discrepant circumferential machining grooves and will ensure the 
structural integrity of the number one and two pylons.
Boeing Service Related Problems (SRP) 767-SRP-54-0093 and 767-SRP-54-0131 are related to this service 
bulletin.
ACTION
Do either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse Pin Inspection or 
Part 3 - Midspar Fuse Pin Replacement of each inboard and outboard midspar fuse pin on the number one and 
two pylons, for any crack and any corrosion. 
— If any crack is found on the midspar fuse pin, replace the fuse pin.
— If any corrosion is only found on a non-critical midspar fuse pin surface, remove the corrosion and continue 
the fuse pin inspection or replace the fuse pin.
— If any corrosion is found on any midspar fuse pin surface except a non-critical surface, either contact 
Boeing for repair instructions and do the repair or replace the fuse pin.

### Page 11

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 11 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
— If no crack is found and no corrosion is found on the midspar fuse pin, install the fuse pin (if removed) or 
replace the fuse pin.
Repeat either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse Pin Inspection 
or Part 3 - Midspar Fuse Pin Replacement of each inboard and outboard midspar fuse pin on the number one 
and two pylons, in accordance with Paragraph 1.E., Compliance.
Accomplishment of either service bulletin 767-54-0069 or the applicable 767 SIP service bulletin 767-54-0080, 
767-54-0081 or 767-54-0082 is terminating action for this service bulletin.
EFFECTIVITY
767-200, 767-300 and 767-300F Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected 
airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Revision 
6 of this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this 
service bulletin mandatory.
FAA Airworthiness Directives (AD) 94-11-02 and 2003-03-02 are related to this service bulletin.
See Service Bulletin Paragraph 1.E. for compliance information.
INDUSTRY SUPPORT INFORMATION
This service bulletin was first released before October of 1994. Thus industry support for affected airplanes 
depends upon whether you ever filed a warranty claim with Boeing on this service bulletin.
MANPOWER
See the table in the Manpower section.
MATERIAL INFORMATION
Operator Supplied Parts/Materials.
Refer to Paragraph 2.A., Material - Price and Availability.

### Page 12

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 12 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
PIN
COTTER
DETAIL I
SEESEE
DETAIL I
WING
FITTING
WASHER
MIDSPAR
FITTING
WASHER
SELF-LOCKING NUT
(2 LOCATIONS)
DETAIL I
TYPICAL MIDSPAR FITTING
DO A DETAILED AND EDDY CURRENT (MAGNETIC PARTICLE OPTIONAL, OFF WING)
INSPECTION OF THE MIDSPAR FUSE PIN FOR ANY CRACK AND ANY CORROSION.
REPLACE FUSE PIN IF ANY CRACK OR ANY CORROSION IS FOUND, EXCEPT ON
NON-CRITICAL SURFACES. REMOVE CORROSION ON NON-CRITICAL SURFACES OR
REPLACE FUSE PIN. DO REPEAT INSPECTIONS.
CASTELLATED
NUT
WASHER
BOLT
WASHER
END CAP
FWD
UP
E09896

### Page 13

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 13 of 66
 
 
ALERT ALERT
Commercial
Airplanes
767
ALERTALERT
Service Bulletin
Number: 767-54A0062
Original Issue: April 14, 1994
Revision 6: November 05, 2009
ATA System: 5451
SUBJECT: NACELLES / PYLONS - Strut Attach Fuse Pins - Midspar Fuse Pin Inspection and 
Replacement
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN 
PARAGRAPH 1.A., EFFECTIVITY.  IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OPERATOR.  IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE 
BULLETIN TO THE NEW OWNER.
1. PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D6-24T001 Part 3 for Airplane Variable Number, Line 
Number, and Serial Number data.
This service bulletin is for the airplanes shown below.
GROUP CONFIGURATION DESCRIPTION
1 - 767-200 airplane line numbers 6 thru 347 with 
CF6-80A Engines and 311T3102-1 (311T3102-3 
Optional) Midspar Fuse Pins
2 - 767-200 airplane line numbers 1 thru 254 with 
JT9D-7R4 Engines and 311T3102-1 (311T3102-
3 Optional) Midspar Fuse Pins
3 - 767-300 airplane line numbers 136 thru 427 
with CF6-80A Engines and 311T3102-2 
(311T3102-4 Optional) Midspar Fuse Pins
4 - 767-300 airplane line numbers 132 thru 329 
with JT9D-7R4 Engines and 311T3102-2 
(311T3102-4 Optional) Midspar Fuse Pins

### Page 14

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 14 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
Airplane models:
767-200 767-300 767-300F
IDENTIFICATION BY CUSTOMER, CUSTOMER CODE, GROUP AND VARIABLE NUMBER
AA 767 LLC  (SVX)
2 VE067
ABX AIR  (ABX)
1 VA301 VA304–VA305 VA309–VA312 VA314–VA315
VA509 VB101–VB123 VB125
2 VA803 VA807–VA809 VB302
AEROFLOT  (ARO)
5 VL896–VL897 VN471–VN472
AEROMEXICO  (AMX)
6 VF071 VF093 VF162 VN166
VN531
AEROSVIT  (UKA)
6 VN154–VN155 VN157
AEROTURBINE  (AUB)
1 VB051 VB054–VB055 VB321
5 VB331–VB332
AIR ALGERIE  (ALG)
5 VK131–VK133
AIR CANADA  (ACN)
2 VA701–VA709 VA711–VA719 VB001–VB002 VB201–VB202
5 VN051–VN054 VN056–VN062 VN546–VN547 VN751–VN752
VN811–VN812
6 VN541 VN931–VN936
AIR CHINA  (BEJ)
6 VE085 VK161–VK164
5 - 767-200, 767-300 and 767-300F airplane line 
numbers 158 thru 636 with CF6-80C2 Engines 
and 311T2102-1 (311T2102-2 Optional) Midspar 
Fuse Pins
6 - 767-200 and 767-300 airplane line numbers 165 
thru 635 with PW4000 Engines and 311T2102-1 
(311T2102-2 Optional) Midspar Fuse Pins
7 - 767-300 airplane line numbers 265 thru 627 
with RB211-524H Engines and 311T2102-1 
(311T2102-2 Optional) Midspar Fuse Pins
GROUP CONFIGURATION DESCRIPTION

### Page 15

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 15 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
AIR ITALY  (RIT)
5 VF001–VF002 VL913
AIR MADAGASCAR  (MAD)
6 VN167 VN556
AIR NEW ZEALAND  (ANZ)
5 VN653 VN655–VN656
AIR PACIFIC  (APC)
5 VN676
AIR SEYCHELLES  (ASY)
1V E 1 0 4
2V B 3 0 1
AIR TRANSPORT INTERNATIONAL  (TIN)
1 VA313 VA511–VA512
AIR ZIMBABWE  (ZMB)
6 VF061–VF062
ALITALIA COMPAGNIA AEREA ITALIANA SPA  (ILQ)
5 VL701–VL702 VN426 VN732 VN813
ALL NIPPON AIRWAYS  (ANA)
5 VK081–VK112 VN191–VN196
AMERICAN AIRLINES  (AAL)
1 VA501–VA505 VA514–VA523 VA525 VA527–VA530
5 VN001–VN041
AMERIJET INTERNATIONAL  (AMJ)
1V A 3 0 3 V A 3 0 6
ARKEFLY  (HXL)
6 VN156 VN164–VN165
ASIANA AIRLINES  (AAR)
5 VK143–VK144 VW851
AUSTRIAN AIRLINES AG  (AUL)
6 VN242–VN243 VN671
AVIANCA  (AVI)
6 VE171 VF072 VF161 VN152
VN500 VN532
AWAS  (AWW)
1V B 3 2 5
5 VN651
6 VE172 VF092

### Page 16

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 16 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
BELLVIEW AIRLINES  (BEB)
5 VE125–VE126
BLUE CITY HOLDING  (BCY)
2 VE069
BLUE PANORAMA AIRLINES  (BPA)
6 VN174 VN225 VN681
BOEING  (TBC)
2 VA001
BOEING CAPITAL CORPORATION  (ZMF)
1 VE117
BRISTOL AIR LIMITED  (BMD)
2 VA804
BRITISH AIRWAYS  (BAB)
7 VN111–VN114 VN118–VN122 VN124–VN127 VN133–VN137
BTM CAPITAL CORPORATION  (BTO)
2 VE022–VE023
CARGOJET AIRWAYS LTD.  (WNT)
1 VA510 VA513
CHILEAN AIR FORCE  (CHF)
6V N 5 6 1
CHINA EASTERN AIRLINES  (CEA)
7 VL871–VL873
COLOMBIAN AIR FORCE  (CLB)
6 VE086
COMPANIA MEXICANA DE AVIACION S.A. DE C.V.  (CMA)
5 VF041–VF042 VL001–VL002
CONDOR  (CDF)
6 VN683–VN691
CSDS AVIATION  (CSO)
1 VA506–VA507
DELTA AIR LINES  (DAL)
1 VA302
3 VK036 VK039–VK054
5 VL753 VN301–VN306
6 VK055–VK056 VN251–VN268
DNIPROAVIA  (DNE)
6V N 4 9 5

### Page 17

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 17 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
EL AL ISRAEL AIRLINES  (ELA)
2 VB283–VB284
6 VF101–VF102 VN537 VN682 VN972
ERITREAN AIR LINES  (ERJ)
2V E 0 6 6
ETHIOPIAN AIRLINES  (ETH)
5 VL898
6 VN388
EUROATLANTIC AIRWAYS  (MAE)
5 VN055
6 VN151 VN551 VN562
EVERGREEN MAINTENANCE CENTER  (EAC)
2V E 0 6 1
FIRST AIR  (BRS)
1V A 5 0 8
FLYGLOBESPAN.COM  (FGS)
5 VL891 VN654
GA TELESIS  (GTG)
4 VK002–VK003
GABON AIRLINES  (GBO)
2 VA017–VA018
GECAS  (GEF)
5 VN731
GENERIC CUSTOMER/SUPPLIER  (XXX)
2 VA005 VE002 VE041 VE063
5 VN310 VN314
6 VN221–VN222
GOL AIRLINES  (GOT)
5 VF171 VN637 VN753
6 VN163 VN557
GUGGENHEIM AVIATION PARTNERS  (GPR)
6 VN153
HAWAIIAN AIRLINES  (HWI)
3 VK031–VK034
6 VN171–VN173 VN381
HEWA BORA AIRWAYS  (EXD)
2V E 0 2 1

### Page 18

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 18 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
HIS MAJESTY THE SULTAN'S FLIGHT  (BWN)
5V F 1 8 0
ICELANDAIR  (ICE)
6V N 1 5 8 V N 2 1 1
ILFC  (ILF)
5V F 0 5 1
INTEGRATED DEFENSE SYSTEMS  (BAC)
2 VA806
ITOCHU CORPORATION  (CIT)
5 VF181–VF183
JAL INTERNATIONAL  (JAL)
2 VB371–VB373
4 VK001 VK004–VK011 VK021–VK022
5 VK012–VK015
JETAIRFLY  (TLB)
5V N 2 3 4
JORDAN AVIATION  (JOR)
1 VB327 VB329–VB330
KALAIR (BERMUDA)  (KLB)
5V N 3 1 1
KAM AIR  (KMC)
2 VA019
KENYA AIRWAYS  (KEN)
5 VK141 VL003 VN421
LAN AIRLINES  (LAN)
5 VL703 VN063–VN064
6 VN168 VN966–VN967 VN971
LOT POLISH AIRLINES  (LOT)
5 VL893 VN233 VN291–VN292 VN652
MALEV HUNGARIAN AIRLINES LTD.  (HGA)
5V F 1 7 2
MARTINAIR HOLLAND  (MTH)
6 VN223–VN224 VN385 VN672
MID EAST JET  (SKL)
5V F 2 5 1
NEOS  (NEO)
5 VL892 VL894

### Page 19

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 19 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
NORTH AMERICAN AIRLINES  (NNA)
5 VL755 VL895 VL911 VN634
VN922
OMNI AIR INTERNATIONAL  (OAE)
5 VN424 VN427 VN635
PACE AIRLINES  (PIE)
1V B 0 5 3
PHOENIX AIRCRAFT LEASING, INC.  (PLB)
2V A 8 1 0
PTC AEROSPACE  (PTE)
2V B 2 8 2
QANTAS  (QAN)
5 VN081–VN097
7 VN115–VN117 VN123 VN130–VN132
ROYAL AIR MAROC  (RAM)
5 VN636
ROYAL BRUNEI AIRLINES  (RBA)
6 VN372 VN382–VN384 VN386–VN387
RYAN INTERNATIONAL AIRLINES  (RYN)
3V K 0 3 5 V K 0 3 8
6 VL011 VN376
S7 AIRLINES  (SBR)
5 VN638
SAFI AIRWAYS  (FFI)
2V E 0 8 4
SALAMIS AVIATION  (LMV)
2V E 0 6 8
SHANGHAI AIRLINES  (SHA)
6V K 1 7 1
SKY HOLDING COMPANY  (PSH)
6 VL931
SKY KING  (SKN)
2V E 0 6 4
SKYSTAR  (SYW)
2 VA008 VA011–VA012 VA020
SMARTLYNX AIRLINES  (LCH)
6 VN536 VN542

### Page 20

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 20 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
SOJITZ CORPORATION  (SOJ)
5 VN231–VN232
STAR AIR  (SBJ)
1 VA307–VA308 VB323 VB328 VE101–VE103
5 VB441–VB444
TAA  (TNL)
2 VA002–VA004 VA007 VA014–VA015
TAM  (TPR)
5 VN422–VN423 VN425
TAMPA CARGO  (TMP)
5 VE121–VE124
TEEBAH AIRLINES  (EBH)
2 VA710
THOMAS COOK AIRLINES UK  (JMA)
5 VN951–VN952
THOMSON AIRWAYS  (BRI)
5 VL751–VL752 VL754 VN791–VN792 VN921
TRANSAERO AIRLINES  (TRX)
1 VE116 VE118
5 VE143 VN307–VN309 VN313
6 VN371 VN631–VN633
TRANSATLANTIC INTL AIRLINES  (TIB)
2 VA016
TUIFLY NORDIC  (TNS)
5 VL912
UNITED AIR LINES  (UAL)
6 VN491–VN494 VN496–VN499 VN501–VN513
UPS  (UPS)
5 VW701–VW713
US AIRWAYS  (USA)
5 VE141–VE142 VE144–VE149 VE151–VE152
UT FINANCE CORPORATION  (ZZJ)
2 VE001
UZBEKISTAN AIRWAYS  (UZB)
6 VL806
VISION AIR  (VEG)
2 VA006 VA009–VA010

### Page 21

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 21 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
VIVA MACAU  (VMC)
5V K 1 4 2
6V F 0 9 1
WELLS FARGO  (FSB)
5 VL004–VL006
WEST DOVER LLC  (WDR)
3V K 0 3 7
YONA  (IOP)
5 VN312
IDENTIFICATION BY VARIABLE NUMBER
Variable  Group
VA001–VA020 2
VA301–VA315 1
VA501–VA530 1
VA701–VA719 2
VA801–VA810 2
VB001–VB002 2
VB051–VB055 1
VB101–VB125 1
VB201–VB202 2
VB251–VB253 1
VB281–VB284 2
VB301–VB302 2
VB321–VB330 1
VB331–VB332 5
VB371–VB373 2
VB401 1
VB441–VB444 5
VE001–VE003 2
VE021–VE023 2
VE041–VE043 2
VE061–VE069 2
VE083–VE084 2
VE085–VE086 6
VE101–VE104 1
VE116–VE118 1
VE121–VE126 5
VE141–VE152 5

### Page 22

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 22 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
VE171–VE172 6
VF001–VF002 5
VF041–VF042 5
VF051 5
VF061–VF062 6
VF071–VF072 6
VF091–VF093 6
VF101–VF102 6
VF161–VF162 6
VF171–VF172 5
VF180–VF183 5
VF251 5
VK001–VK011 4
VK012–VK015 5
VK021–VK022 4
VK031–VK054 3
VK055–VK056 6
VK081–VK112 5
VK131–VK133 5
VK141–VK144 5
VK161–VK164 6
VK171 6
VL001–VL006 5
VL011 6
VL701–VL703 5
VL751–VL755 5
VL806 6
VL871–VL873 7
VL891–VL898 5
VL911–VL913 5
VL931 6
VN001–VN041 5
VN051–VN064 5
VN081–VN097 5
VN111–VN127 7
VN130–VN137 7
VN151–VN158 6
VN163–VN168 6
VN171–VN174 6
Variable  Group

### Page 23

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 23 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
VN191–VN196 5
VN211–VN212 6
VN221–VN225 6
VN231–VN234 5
VN241–VN243 6
VN251–VN268 6
VN291–VN292 5
VN301–VN314 5
VN371–VN372 6
VN376 6
VN381–VN388 6
VN421–VN427 5
VN471–VN472 5
VN491–VN513 6
VN531–VN532 6
VN536–VN537 6
VN541–VN542 6
VN546–VN547 5
VN551 6
VN556–VN557 6
VN561–VN562 6
VN631–VN633 6
VN634–VN638 5
VN651–VN656 5
VN671–VN672 6
VN676 5
VN681–VN691 6
VN731–VN732 5
VN751–VN753 5
VN791–VN792 5
VN811–VN813 5
VN921–VN922 5
VN931–VN936 6
VN951–VN952 5
VN966–VN967 6
VN971–VN972 6
VW701–VW713 5
VW851 5
Variable  Group

### Page 24

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 24 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
2. Spares Affected
None
B. Concurrent Requirements
None.
C. Reason
This inspection/replacement program will permit early detection of cracks in the midspar fuse pin on 
the inboard and outboard sides of the number one and number two pylons. Midspar fuse pin cracks 
can result in the loss of structural integrity of the midspar fuse pins and cause an engine breakaway 
from the airplane.
There have been eight reports involving a total of fourteen midspar fuse pins suspected of having 
longitudinal cracks. Of these fuse pins, seven pins were confirmed cracked. The cracked pins were 
from one operator on airplanes with 15,628 to 23,056 flight cycles. Both airplanes are equipped with 
CF6-80A engines. 
The first pins suspected of being cracked were found during a midspar bushing migration rework. The 
cracks were found by a detailed visual inspection. The cracking was confirmed by magnetic particle 
inspection with the pins removed. The second cracked pin was found using eddy current inspection 
on the inner bore of the fuse pin with the engine installed. Subsequent inspections of at least sixty-
nine additional fuse pins from the same engine type have revealed no cracks. These additional pins 
were on airplanes with as many as 23,007 flight cycles. 
These cracks are believed to be caused by stresses due to ovalization of the fuse pin. Because this 
strut has redundant load paths, one pin can fail without affecting flight safety. Boeing testing of similar 
fuse pins showed no significant reduction in shear strength with longitudinal cracks up to 1 inch. 
An all base message M-7240-94-0006 was sent to inform operators of the development of this service 
bulletin and of Delta Airlines involvement as the “Lead the Fleet” airline. 
Subsequent to the release of Revision 4 of this service bulletin one operator has reported a fractured 
midspar fuse pin. The fractured midspar fuse pin was found during routine maintenance on the 
outboard side of the number one pylon. Further inspection of the inboard side of the number one 
pylon, revealed the midspar fuse pin to have corrosion within the bore and on the pin surface. The 
767-ER airplane was equipped with RB211 engines and had accumulated 9,456 flight cycles. Service 
bulletin 767-54-0069 to replace the midspar fuse pins and service bulletin 767-54-0082 to modify the 
nacelle strut and wing structure had not been incorporated on this airplane.
Reduced thresholds for the inspections given in this service bulletin will provide early detection of 
cracks and ensure the structural integrity of the number one and two pylons.
An all base message M-7200-02-01708 was sent to inform operators of the development of Revision 
5 of this service bulletin.

### Page 25

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 25 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
After the Revision 5 date of this service bulletin, one operator of a 767-300 airplane with CF6-80C2 
engines reported a fractured midspar fuse pin. The airplane had accumulated 16,054 flight cycles and 
neither service bulletin 767-54-0069 nor 767 Strut Improvement Program (SIP) service bulletin 767-
54-0081 had been incorporated. The fractured midspar fuse pin was found during routine 
maintenance on the outboard side of the number one pylon, prior to the next scheduled midspar fuse 
pin inspection in accordance with Revision 5 of this service bulletin. Further inspection revealed a 
cracked midspar fuse pin on the inboard side of the number one pylon. Subsequent inspection of both 
midspar fuse pins revealed discrepant circumferential machining grooves on the fuse pin main bore 
surface, in addition to longitudinal cracks. Eddy Current Inspection of the midspar fuse pins in 
accordance with the requirements of Revision 5 of this service bulletin will not reveal the presence of 
the discrepant machining grooves. The roughness of the discrepant machining grooves exceeded the 
maximum allowable roughness of the fuse pin main bore surface. Metallurgical analysis determined 
the fuse pin fracture or crack origins coincided with the discrepant machining groove locations, in all 
cases. Stresses due to pin ovalization contributed to the longitudinal cracking of the midspar fuse pins.
Multi-Operator Message (MOM) 1-1171248586 was sent to inform operators of the development of 
Revision 6 of this service bulletin.
Reduced inspection thresholds and repeat intervals in accordance with Revision 6 of this service 
bulletin will provide early detection of cracks due to discrepant circumferential machining grooves and 
will ensure the structural integrity of the number one and two pylons.
Boeing Service Related Problems (SRP) 767-SRP-54-0093 and 767-SRP-54-0131 are related to this 
service bulletin.
Revision 1 is sent to do the following:
Revise the compliance and repeat inspection thresholds in Figure 1. 
Add BMS 10-11 primer to the operator supplied parts list. 
Change the VN546-VN547 airplanes from Group 6 to Group 5.
Modify the action and description to direct operators to contact Boeing for a possible ferry flight to 
repair facility if cracks are found. 
Change 767 Maintenance Manual 54-51-02 Temporary Revision dates to reflect a change in tooling 
requirements. 
Clarify the removal of cadmium plating in Figure 4.   
Revision 2 is sent to do the following:
— Clarify the fuse pin plating removal. 
— Call out BMS 5-95 as a superseding sealant to BMS 5-79.   
— Add VE118 to Group 1 airplanes.
— Clarify aft fairing door access panel numbers.
— Add corrosion inspection text to Figure 3 and 4.
— Add “Remove and Retain” text to Figure 3.
— Remove torque values and add 767 AMM reference to Figure 3. 
— Add statements to Figure 1 addressing corrosion inspection. 
Revision 3 is sent to do the following:

### Page 26

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 26 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
Change the text in Figure 1 to read: “On Group 5, 6 and 7 airplanes with 311T2102-1 fuse pins, when 
the fuse pins reach or exceed 15,000 flight-cycles within 90 days of the release date of revision 1 of 
this service bulletin.” The word “within” was omitted.
Change the text in Figure 1 to read: “Replace or reinspect fuse pin within 15,000 flight-cycles.” The 
text “15,000” was inadvertently replaced with 10,000 during the last revision.
Revision 4 is sent to do the following:
Limit the effectivity to 767 airplanes line position 1 through 636. Airplanes line position 637 and on 
have received a new fuse pin configuration in production that do not require inspections as specified 
in this service bulletin.
Add new replacement fuse pin part numbers.
Add Alternate Method of Compliance for installation of the new fuse pin part numbers.
Add reference to service bulletin 767-54-0069 as terminating action for the repeat inspections.
Add requirement to install a torque stripe on midspar fuse pin primary nut.
Revision 5 is sent to do the following:
Reduce the compliance recommendation statements given in “Figure 1 - Inspection Threshold and 
Repeat Inspection Interval Logic Diagram”.
Add reference to service bulletins 767-54-0080, 767-54-0081 and 767-54-0082 as terminating action 
to the repeat inspections. 
Add clarification to the finish and corrosion preventive compound requirements during the installation 
of the midspar fuse pins within Figures 3, 5 and 6.
Revision 6 is sent to reduce inspection thresholds and repeat intervals to provide early detection of 
cracks due to discrepant circumferential machining grooves and to ensure the structural integrity of 
the number one and two pylons. Refer to the Reason For Revision paragraph of the Revision 
Transmittal Sheet for a detailed list of changes in this revision.
Boeing Service Related Problems (SRP) 767-SRP-54-0093 and 767-SRP-54-0131 are related to this 
service bulletin.
D. Description
Do either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse Pin 
Inspection or Part 3 - Midspar Fuse Pin Replacement of each inboard and outboard midspar fuse pin 
on the number one and two pylons, for any crack and any corrosion. 
— If any crack is found on the midspar fuse pin, replace the fuse pin.
— If any corrosion is only found on a non-critical midspar fuse pin surface, remove the corrosion 
and continue the fuse pin inspection or replace the fuse pin.
— If any corrosion is found on any midspar fuse pin surface except a non-critical surface, either 
contact Boeing for repair instructions and do the repair or replace the fuse pin.
— If no crack is found and no corrosion is found on the midspar fuse pin, install the fuse pin (if 
removed) or replace the fuse pin.

### Page 27

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 27 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
Repeat either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse Pin 
Inspection or Part 3 - Midspar Fuse Pin Replacement of each inboard and outboard midspar fuse pin 
on the number one and two pylons, in accordance with Paragraph 1.E., Compliance.
Accomplishment of either service bulletin 767-54-0069 or the applicable 767 SIP service bulletin 767-
54-0080, 767-54-0081 or 767-54-0082 is terminating action for this service bulletin.
Revision 1: No more work is necessary on airplanes changed by the original issue of this service 
bulletin.
Revision 2: No more work is necessary on airplanes changed by the original issue or Revision 1 of 
this service bulletin.
Revision 3: No more work is necessary on airplanes changed by the original issue, Revision 1 or 
Revision 2 of this service bulletin.
Revision 4: No more work is necessary on airplanes changed by the original issue, Revision 1, 
Revision 2, or Revision 3 of this service bulletin.
Revision 5:
More work is necessary on airplanes that have not completed the midspar fuse pin inspections or 
replacement requirements given in this service bulletin within the last 5 years or 5000 flight cycles. 
Accomplish the midspar fuse pin inspection and replacement requirements given in this service 
bulletin within 30 days from the release date of revision 5 of this service bulletin.
Airplanes that have accomplished the midspar fuse pin inspections or replacement requirements 
given in this service bulletin within the last 5 years or 5000 flight cycles, repeat the inspection and 
replacement requirements as given in Figure 1 - Inspection Threshold and Repeat Inspection Interval 
Logic Diagram”, until terminating action is completed.
Revision 6:
More work is necessary on airplanes that have not been changed in accordance with either service 
bulletin 767-54-0069, or the applicable 767 SIP service bulletin 767-54-0080, 767-54-0081 or 767-54-
0082. Continued inspections of the midspar fuse pins are required at reduced thresholds and repeat 
intervals in accordance with Paragraph 1.E., Compliance.
No more work is necessary on airplanes that have been changed in accordance with either service 
bulletin 767-54-0069, or the applicable 767 Strut Improvement Program (SIP) service bulletin 767-54-
0080, 767-54-0081 or 767-54-0082. Accomplishment of either service bulletin 767-54-0069 or the 
applicable 767 SIP service bulletin 767-54-0080, 767-54-0081 or 767-54-0082 is terminating action 
for this service bulletin.
These service bulletins have similar access requirements as this service bulletin but are not required 
by this service bulletin:
— 767-54-0059 "Nacelle Pylon - Wing to Strut Attach Fittings - Mid Spar Bushing - Inspection and 
Replacement"
— 767-54-0061 "Nacelle Pylon - Wing to Strut Attach Fittings - Lower Spar Bushing - Inspection and 
Replacement"
— 767-54-0095 "Nacelle Pylon - Wing to Strut Attach Fittings - Upper Spar Bushing - Inspection and 
Replacement" (Replaced 767-54-0060)
The changes in this service bulletin will not change the Engine Indication and Crew Alerting System 
(EICAS).

### Page 28

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 28 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to 
Revision 6 of this service bulletin. The Airworthiness Directive will make the compliance tasks and 
times given in this service bulletin mandatory.
Accomplish the actions in Table 1 below in accordance with Paragraph 3., Accomplishment 
Instructions.
Evaluate and accomplish the actions in Table 1 below independently for each midspar fuse pin.
Table 1: Midspar Fuse Pin Inspection 
Condition Action (a)
Compliance Time
(Whichever Occurs Later)
Repeat Interval      
(Not to Exceed)
ALL 
AIRPLANES
Do Part 1 - On Wing 
Midspar Fuse Pin Inspection 
for any crack and any 
corrosion
-OR-
Do Part 2 - Off Wing 
Midspar Fuse Pin Inspection 
for any crack and any 
corrosion
-OR-
Do Part 3 - Midspar Fuse 
Pin Replacement
1) Before 5,000 Total 
Flight Cycles on the 
midspar fuse pin or 5 
Years since the 
midspar fuse pin was 
installed as new, 
whichever occurs first
-OR-
2) Within 2,000 Flight 
Cycles or 2 Years after 
the midspar fuse pin 
was last inspected in 
accordance with this 
service bulletin, 
whichever occurs first.
Within 30 
days after 
the 
Revision 6 
date of this 
service 
bulletin
Within 2,000 Flight 
Cycles or 2 Years, 
whichever occurs first
CONDITION 1: 
Any Crack Is 
Found by 
Detailed 
Inspection
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 1
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 2: 
No Crack Is 
Found AND 
Any Corrosion 
Is Only Found 
On A Non-
Critical Surface 
(c)
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2, Option 1
-OR-
Do the Midspar Fuse Pin 
Rework in accordance with 
CONDITION 2, Option 2
BEFORE FURTHER 
FLIGHT (b)
--

### Page 29

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 29 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
CONDITION 
2.1: Any 
Corrosion 
Found Is 
Removed
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.1, Option 1
-OR-
Do an Eddy Current 
Inspection (ECI) of the 
Midspar Fuse Pin for any 
crack in accordance with 
CONDITION 2.1, Option 2
-OR-
Do Part 4 - Magnetic 
Particle Inspection of the 
Midspar Fuse Pin for any 
crack in accordance with 
CONDITION 2.1, Option 3
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 
2.1.1: Any 
Crack Is Found 
By ECI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.1.1, Option 1
-OR-
Do Part 4 - Magnetic 
Particle Inspection of the 
Midspar Fuse Pin for any 
crack in accordance with 
CONDITION 2.1.1, Option 2
BEFORE FURTHER 
FLIGHT (b)
--
Table 1: Midspar Fuse Pin Inspection 
Condition Action (a)
Compliance Time
(Whichever Occurs Later)
Repeat Interval      
(Not to Exceed)

### Page 30

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 30 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
CONDITION 
2.1.2: No 
Crack Is Found 
By ECI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.1.2, Option 1
-OR-
Do Part 5 - Fuse Pin 
Secondary Retention 
Hardware Installation in 
accordance with Part 1, 
CONDITION 2.1.2, Option 2
-OR-
Install the Midspar Fuse Pin 
(if removed) in accordance 
with Part 2, CONDITION 
2.1.2, Option 2
BEFORE FURTHER 
FLIGHT
--
CONDITION 
2.1.3: Any 
Crack Is Found 
By MPI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.1.3
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 
2.1.4: No 
Crack Is Found 
By MPI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.1.4, Option 1
-OR-
Install the Midspar Fuse Pin 
in accordance with 
CONDITION 2.1.4, Option 2
BEFORE FURTHER 
FLIGHT
--
CONDITION 
2.1.5: No 
Crack Is Found 
By MPI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.1.3
-OR-
Do a Midspar Fuse Pin 
Repair in accordance with 
CONDITION 2.1.5, Option 2
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 
2.2: Any 
Corrosion 
Found Is Not 
Removed
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 2.2
BEFORE FURTHER 
FLIGHT (b)
--
Table 1: Midspar Fuse Pin Inspection 
Condition Action (a)
Compliance Time
(Whichever Occurs Later)
Repeat Interval      
(Not to Exceed)

### Page 31

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 31 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
CONDITION 3: 
No Crack Is 
Found AND 
Any Corrosion 
Is Found On 
Any Surface 
Other Than A 
Non-Critical 
Surface (c)
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 3, Option 1
-OR-
Do a Midspar Fuse Pin 
Repair in accordance with 
CONDITION 3, Option 2
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 
3.1: Any Crack 
Is Found By 
ECI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 3.1, Option 1
-OR-
Do a Magnetic Particle 
Inspection (MPI) of the 
Midspar Fuse Pin for any 
crack in accordance with 
CONDITION 3.1 Option 2
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 
3.2: No Crack 
Is Found By 
ECI
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 3.2, Option 1
-OR-
Do a Midspar Fuse Pin 
Repair in accordance with 
CONDITION 3.2, Option 2
BEFORE FURTHER 
FLIGHT (b)
--
CONDITION 4: 
No Crack Is 
Found AND No 
Corrosion Is 
Found By 
Detailed 
Inspection
Do Part 3 - Midspar Fuse 
Pin Replacement in 
accordance with 
CONDITION 4, Option 1
-OR-
Do an Eddy Current 
Inspection (ECI) of the 
Midspar Fuse Pin for any 
crack in accordance with 
CONDITION 4, Option 2
BEFORE FURTHER 
FLIGHT
--
Table 1: Midspar Fuse Pin Inspection 
Condition Action (a)
Compliance Time
(Whichever Occurs Later)
Repeat Interval      
(Not to Exceed)

### Page 32

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 32 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
Federal Aviation Administration (FAA) Airworthiness Directives (AD) 94-11-02 and 2003-03-02 are related to 
this service bulletin.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes 
specified in this service bulletin comply with the applicable regulations and are FAA approved, as well 
as European Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/
JAA approved airplanes listed in the service bulletin effectivity. This service bulletin and its approval 
were based on the airplane in its original Boeing delivery configuration or as modified by other 
approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected 
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency 
approval before incorporating this service bulletin.
The FAA has examined the inspection, and/or replacement procedures specified in Revision 3 to 
Service Bulletin 767-54A0062 “Nacelles/Pylon - Strut Attach fuse Pins - Midspar Fuse Pin Inspection 
and Replacement”. The FAA has approved the inspection, and/or replacement as an alternative to 
those specified in Airworthiness Directives (AD) 94-11-02, Amendment 39-8918.
The FAA has examined the configuration changes, inspection, and/or repair procedures specified in 
Revision 4 to this service bulletin. The FAA has approved the configuration changes, inspection, and/
or repair procedures as an alternative to those specified in Airworthiness Directives (AD) 94-11-02, 
Amendment 39-8918.
The FAA has examined the configuration changes, inspection, and/or repair procedures specified in 
Revision 5 to this service bulletin. The FAA has approved the configuration changes, inspection, and/
or repair procedures as an alternative to those specified in Airworthiness Directives (AD) 94-11-02, 
Amendment 39-8918.
(a) Accomplishment of service bulletin 767-54-0069, or the applicable 767 Strut Improvement Program 
(SIP) service bulletin 767-54-0080, 767-54-0081 or 767-54-0082 is terminating action for this service 
bulletin.
(b) A non-revenue ferry flight to a repair facility may be allowed. Non-revenue ferry flights for airplanes with 
one or less midspar fuse pin with either CONDITION 1, 2, 2.1, 2.1.1, 2.1.3, 2.2, 3, 3.1 or 3.2 per wing, will 
be considered on a case-by-case basis. An airplane with more than one midspar fuse pin with either 
CONDITION 1, 2, 2.1, 2.1.1, 2.1.3, 2.2, 3, 3.1 or 3.2 found on one wing, will not be considered for ferry 
flights. Ferry flight approval will be contingent on Eddy Current Inspection of both midspar fuse pins on each 
wing, and verification that only one midspar fuse pin per wing has either CONDITION 1, 2, 2.1, 2.1.1, 2.1.3, 
2.2, 3, 3.1 or 3.2. A Detailed Inspection of the other strut-to-wing load paths, including the Upper Link, 
Upper Link Fuse Pin, Diagonal Brace and Lower Diagonal Brace Fuse Pin is required. Contact Boeing with 
inspection results and for further instructions.
(c) Refer to Paragraph 3.A.,General Information, for more information on non-critical midspar fuse pin 
surfaces. 
Table 1: Midspar Fuse Pin Inspection 
Condition Action (a)
Compliance Time
(Whichever Occurs Later)
Repeat Interval      
(Not to Exceed)

### Page 33

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 33 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
This service bulletin has been approved by the FAA. In addition, the Manager of the Seattle Aircraft 
Certification Office approves the accomplishment of the inspections, replacements, and repairs 
specified in Section 1.E, Compliance, of SB 767-54A0062, Revision 6 as an AMOC to the applicable 
inspections, replacements, and repairs required by paragraphs (h), (i), and (j) of AD 2003-03-02. All 
provisions of AD 2003-03-02 that are not specifically referenced in the preceding sentence remain 
fully applicable and must be complied with.
G. Manpower
The data below shows an estimate of the man-hours necessary to do this inspection/replacement for 
each airplane and/or strut whichever is applicable. This estimate is for direct labor only, done by an 
experienced crew. Adjust the estimate with operator man-hour data if necessary. The estimate does 
not include lost time. These are some examples of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
FUSE PIN INSPECTION - ENGINE NOT REMOVED
Task Number of Persons Man-Hours Elapsed Time (Hours)
Open Access 2 2 1
Inspection 1 2 2
Close Access 2 2 1
TOTAL FOR EACH STRUT 6 4
FUSE PIN INSPECTION - ON BENCH
Task Number of Persons Man-Hours Elapsed Time (Hours)
Inspection 1 2 2
TOTAL PER AIRPLANE 2 2
FUSE PIN REPLACEMENT - ENGINE NOT REMOVED
Task Number of Persons Man-Hours Elapsed Time (Hours)
Open Access 5 15 3
Removal of components
from aft fairing hydraulic
bay
18 8
-EDP supply shut off
valve.
-Hydraulic reservoir
-Alternating current
pump.
Replace fuse pins 1 1 1

### Page 34

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 34 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
H. Weight and Balance Changes
None
I. Electrical Load Data
Not changed
J. References
1. Existing Data:
a. Service Related Problem (SRP)  767-SRP-54-0093, 767-SRP-54-0131.
b. 767 Airplane Maintenance Manual (AMM)  6-43-00, 27-81-00, 29-11-00, 29-11-06,              
29-11-20, 54-51-04, 54-52-00, 54-52-01, 54-53-00, and 78-31-00.
c. Boeing Multi-Operator Message (MOM) 1-1171248586
d. 767 Nondestructive Test (NDT) Manual D634T301, Part 6, Subject 54-51-01
e. Boeing Service Bulletin 767-54-0059, “Nacelles/Pylons - Wing to Strut Attach Fittings - 
Midspar Bushing Inspection and Replacement”.
f. Boeing Service Bulletin 767-54-0095, “Nacelles/Pylons - Wing to Strut Attach Fittings - 
Forward Upper Spar Bushing Inspection and Replacement”.
Install components from
aft fairing hydraulic bay
11 0 1 0
Close Access 5 15 3
TOTAL PER STRUT  49 25
FUSE PIN REPLACEMENT - ENGINE REMOVED 
Task Number of Persons Man-Hours Elapsed Time (Hours)
Remove engine 5 20 4
Removal of components
from aft fairing hydraulic
bay
18 8
-EDP supply shut off valve.
-Hydraulic reservoir
-Alternating current pump. 
Replace fuse pin 1 1 1
Install components from aft
fairing hydraulic bay
11 0 1 0
Install engine 5 30 6
TOTAL PER STRUT 69 29

### Page 35

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 35 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
NOTE: Service bulletin 767-54-0060 was replaced by 767-54-0095.
g. Boeing Service Bulletin 767-54-0061, “Nacelles/Pylons - Wing to Strut Attach Fittings - 
Lower Spar Bushing Inspection and Replacement”.
h. Boeing Service Bulletin 767-54-0069, “Nacelles/Pylons - Midspar Fitting - Underwing Side 
Load Fitting - Fuse Pin Replacement and Wing Rework”.
i. Boeing Service Bulletin 767-54-0080, “NACELLES/PYLONS - Pratt and Whitney Powered 
Airplanes - Nacelle Strut and Wing Structure Modification”.
j. Boeing Service Bulletin 767-54-0081, “NACELLES/PYLONS - General Electric Powered 
Airplanes - Nacelle Strut and Wing Structure Modification”.
k. Boeing Service Bulletin 767-54-0082, “NACELLES/PYLONS - Rolls Royce Powered 
Airplanes - Nacelle Strut and Wing Structure Modification”.
l. Boeing Standard Overhaul Practices Manual (BSOPM)  20-10-01, 20-10-03, 20-20-01, 20-
30-02, 20-30-03 and 20-50-10.
m. Boeing All Base Message  M-7240-94-0006, M-7200-02-01708
n. FAA Airworthiness Directive (AD)  94-11-02, 2003-03-02
o. Boeing Parts Standards Document  D-590
p. Boeing Drawing  012W6100
q. 767 Component Maintenance Manual (CMM)  54-50-21.
2. Data supplied with this Service Bulletin:
None
3. Installation Drawings Used in the Preparation of this Service Bulletin:
These drawings were used to prepare this service bulletin. These drawings are not necessary to 
make the specified changes, and are not supplied with this service bulletin. These drawings may 
not be applicable to all airplane configurations or operators.
Drawing Number Title
311T5700 STRUT TO WING INSTL
310T3030 ENGINE TO STRUT MOUNT INSTL
310T1030 ENGINE STRUT MOUNT INSTL - CF6-80 ENGINE
310T2030 STRUT  TO WING INSTL - CF6-80C ENGINE
310T4040 STRUT TO WING INSTL

### Page 36

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 36 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
K. Publications Affected
1. Publications
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue 
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the 
Maintenance Program. This service bulletin affects FCS and new DTI requirements for the 
structure affected are contained in Paragraph 1.E., Compliance, of this service bulletin.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability 
information.
Publication             Chapter-Section
767 Airplane Maintenance Manual 54-51

### Page 37

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 37 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
2. MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 2.C., Parts Necessary For Each Airplane, as shown 
below. If there is a limit to the quantity (QTY) of available parts, a supply sequence is given by Spares. 
More parts become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from 
the date Boeing gets the purchase order.
The parts are subject to the terms and conditions of the Boeing standard purchase order 
acknowledgment. After the Unit Price date, new price and ROLT data is applicable. Prices are in 
United States dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that follow: 
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65
Boeing Spares Department
P.O. Box 3707
Seattle, Washington   98124-2207  USA
B. Industry Support Information
This service bulletin was first released before October of 1994. Thus industry support for affected 
airplanes depends upon whether you ever filled a warranty claim with Boeing on this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
Part Number Name ROLT
(weeks)
Unit Price Thru
Dec 31/09
311T3102-1 Fuse Pin (a) No Longer Available
311T3102-2 Fuse Pin (b) No Longer Available
311T2102-1 Fuse Pin (c) No Longer Available
311T3102-3 Fuse Pin (a) 35 $4,596.00
311T3102-4 Fuse Pin (b) 35 $4,596.00
311T2102-2 Fuse Pin (c) 46 $1,635.00
(a) The 311T3102-1 fuse pin is no longer available. The 311T3102-3 fuse pin replaces the
311T3102-1 fuse pin.
(b) The 311T3102-2 fuse pin is no longer available. The 311T3102-4 fuse pin replaces the
311T3102-2 fuse pin.
(c) The 311T2102-1 fuse pin is no longer available. The 311T2102-2 fuse pin replaces the
311T2102-1 fuse pin.

### Page 38

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 38 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
2. Parts and Materials Supplied by the Operator:
To get the parts shown below, refer to Paragraph 2.A., Material - Price and Availability.

### Page 39

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 39 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
NOTE: Quantities shown are necessary for each airplane. 
NOTE: Parts in the table below are listed for replacement if not serviceable. Quantities shown
are necessary for each airplane. Not all operator supplied parts are used on all airplane
groups. Parts can be salvaged from existing installation if in serviceable condition.
Airplane Group
7654321
Quantity New Part Number Notes Existing Part Number Name
. . . . . 4 4 311T3102-1 (a) 311T3102-1 Fuse Pin
. . . 4 4 . . 311T3102-2 (b) 311T3102-2 Fuse Pin
4 4 4 . . . . 311T2102-1 (c) 311T2102-1 Fuse Pin
. . . . . 4 4 311T3102-3 (a)(d) 311T3102-1 Fuse Pin
. . . 4 4 . . 311T3102-4 (b)(d) 311T3102-2 Fuse Pin
4 4 4 . . . . 311T2102-2 (c)(d) 311T2102-1 Fuse Pin
(a) The 311T3102-1 fuse pin is no longer available. The 311T3102-3 fuse pin replaces the 
311T3102-1 fuse pin.
(b) The 311T3102-2 fuse pin is no longer available. The 311T3102-4 fuse pin replaces the 
311T3102-2 fuse pin.
(c) The 311T2102-1 fuse pin is no longer available. The 311T2102-2 fuse pin replaces the 
311T2102-1 fuse pin.
(d) Discard the existing part if cracked. Keep if not cracked and confirmed by magnetic particle 
inspection. If kept part is installed reinspections of the part is required in this bulletin as
specified in Paragraph 1.E., Compliance.
(e) This is the part number for the new equivalent or replacement part.
Airplane Group 
7654321
Quantity Part Number Name
. . . 4444B A C B 3 0 L T 6 D 8 3  ( j ) B o l t
..4 ....B A C B 3 0 L T 6 D 8 6  ( j ) B o l t
.4 .....B A C B 3 0 L T 6 D 8 7  ( j ) B o l t
4 ......B A C B 3 0 L T 6 D 8 8  ( j ) B o l t
4444444M S 2 4 6 6 5 - 3 0 4   ( h ) ( j ) C o t t e r  P i n
4444444B A C N 1 0 J D 6 A U  ( j ) N u t
4444444N A S 1 8 0 5 - 1 6  ( j ) N u t
4 4 . . . 4 4 311N5066-2 (b) (j) Washer 
. . . 44443 1 1 T 3 0 9 7 - 3  ( b )  ( j ) W a s h e r  
44444443 1 1 T 3 0 9 7 - 4  ( b )  ( j ) W a s h e r  
. . . 44443 1 1 T 3 0 9 7 - 5  ( b )  ( j ) W a s h e r  
4444444A N 9 6 0 C 6 1 6 L  ( j ) W a s h e r  
4444444A N 9 7 0 - 6  ( j ) W a s h e r  
4 4 .....B A C W 1 0 B N 6 S P  ( j ) W a s h e r

### Page 40

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 40 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None
E. Special Tooling - Price and Availability
The operator can supply the tools shown in Paragraph 2.F., Special Tooling Necessary to do this 
Service Bulletin. Tool price and supply data are not given.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, new 
maintenance tools listed below and in the manuals given in Paragraph 1.J., References, will be 
necessary. Examine operator tool supply to make sure all necessary tools are available.
.....4 4 3 1 1 T 3 1 0 3 - 2  ( d ) E n d  R e t a i n i n g  c a p  
. . . 4 4 . . 311T3103-3 (e) End Retaining cap 
4 4 4 ....3 1 1 T 2 1 0 3 - 1   ( f ) E n d  R e t a i n i n g  c a p  
(c) (c) (c) (c) (c) (c) (c) BMS 10-11, Type I Primer
(a) This note is not used.
(b) Not all washer part numbers are used.
(c) One pint required.
(d) End cap 311T3103-2 is used with 311T3102-1 (311T3102-3 optional) fuse pin.
(e) End cap 311T3103-3 is used with 311T3102-2 (311T3102-4 optional) fuse pin.
(f) End cap 311T2103-1 is used with 311T2102-1 (311T2102-2 optional) fuse pin.
(g) This note is not used.
(h) Refer to the applicable Qualified Products List (QPL) of the military specification listed for 
the approved material part number vendor.
(j) Refer to 767 Structural Repair Manual Chapter 51, Boeing document D-590 and Boeing 
drawing 012W6100 for alternative fasteners.
Tool Kit Number Name
A54011  (a) Mid Spar Fuse Pin Removal / Installation Tool Kit
(a) Tool kit is used to perform inspection and removal/installation of fuse pin.

### Page 41

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 41 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
3. ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS.  UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES
CAN CAUSE DAMAGE TO THE BUNDLES.  DAMAGED WIRE BUNDLES CAN CAUSE
SPARKS OR OTHER ELECTRICAL DAMAGE.
NOTE:
1. The instructions identified in Paragraph 3.B., Work Instructions, and the Figures give the 
recommended sequence of steps. The sequence of steps to do this service bulletin can 
be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for 
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or 
minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Angular tolerance is plus or minus 2 degrees
— Hole dimensions for standard solid rivets are given in 767 Structural Repair 
Manual, Chapter 51.
— Torque limits to tighten nuts and bolts are given in 767 Structural Repair Manual, 
Chapter 51.
5. For approved fastener and process material substitutions, refer to 767 Structural Repair 
Manual, Chapter 51, Alternate fasteners are given in 767 Structural Repair Manual 
Chapter 51 and Boeing Drawing 012W6100.
6. If the length of fasteners specified in this service bulletin do not meet the installation 
standards, fasteners of the same specification, or an approved substitute, one grip 
length longer or shorter may be used.
7. A Detailed Inspection is defined as: An intensive examination of a specific item, 
installation, or assembly to detect damage, failure, or irregularity. Available lighting is 
normally supplemented with a direct source of good lighting at an intensity deemed 
appropriate. Inspection aids such as mirrors magnifying lenses, etc. may be necessary. 
Surface cleaning and elaborate procedures may be required.
8. These work instructions refer to procedures included on other Boeing documents. When 
the words "refer to" are used and the operator has an accepted alternative procedure, 
the accepted alternative procedure can be used. When the words "in accordance with" 
are included in the instruction, the procedure in the Boeing document must be used.
9. A serviceable midspar fuse pin meets the following criteria:
— Has prior service history

### Page 42

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 42 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
AND
— No crack or corrosion can be found by Detailed Inspection in accordance with 
paragraph 3.B., Work Instructions,
AND EITHER
— No crack can be found by Eddy Current Inspection (ECI) in accordance with 
Paragraph 3.B., Work Instructions,
OR
— Any crack found by ECI cannot also be found by Magnetic Particle Inspection (MPI) 
in accordance with Paragraph 3.B., Work Instructions,
OR
— No crack can be found by MPI in accordance with Paragraph 3.B., Work 
Instructions.
10. The midspar fuse pins have multiple non-critical surfaces. The non-critical fuse pin 
surfaces are shown in Figure 3, Figure 4 and Appendix A.
B. WORK INSTRUCTIONS
1. Do either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse Pin 
Inspection or Part 3 - Midspar Fuse Pin Replacement of the inboard and outboard midspar fuse 
pins, on the number one and two pylons.
Part 1 - On Wing Midspar Fuse Pin Inspection
1. Retract the leading edge slats if they are extended and install the leading edge slat drive unit 
locks. Refer to 767 AMM 27-81-00 and 767 AMM 78-31-00 as accepted procedures.
2. Remove aft fairing access doors and midspar fuse pin access doors in accordance with Figure 2.
3. Do a Detailed Inspection of the midspar fuse pin for any crack and any corrosion in accordance 
with Figure 3.
a. CONDITION 1:  Any Crack Is Found By Detailed Inspection, Do Part 3 - Midspar Fuse Pin 
Replacement
b. CONDITION 2:  No Crack Is Found AND Any Corrosion Is Only Found On A Non-Critical 
Surface
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Midspar Fuse Pin Rework
(a) Remove any light corrosion in accordance with Figure 3; remove any heavy 
corrosion in accordance with Appendix A.
(b) CONDITION 2.1:  Any Corrosion Found Is Removed
1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement 
2) Option 2:  Do an Eddy Current Inspection (ECI) of the midspar fuse pin for 
any crack in accordance with Figure 3. 
{a} CONDITION 2.1.1:  Any Crack Is Found By ECI

### Page 43

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 43 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
1} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2} Option 2:  Do Part 4 - Magnetic Particle Inspection of the Midspar 
Fuse Pin for Any Crack
{b} CONDITION 2.1.2:  No Crack Is Found By ECI
1} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2} Option 2:  Do Part 5 - Fuse Pin Secondary Retention Hardware 
Installation
3) Option 3:  Do Part 4 - Magnetic Particle Inspection of the Midspar Fuse Pin 
for Any Crack 
(c) CONDITION 2.2:  Any Corrosion Found Is Not Removed, Do Part 3 - Midspar 
Fuse Pin Replacement
c. CONDITION 3:  No Crack Is Found AND Any Corrosion Is Found On Any Surface Other 
Than A Non-Critical Surface
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Midspar Fuse Pin Repair
(a) Remove the midspar fuse pin. Refer to 767 AMM 54-51-04 as an accepted 
procedure.
(b) Do an Eddy Current Inspection (ECI) of the midspar fuse pin for any crack in 
accordance with Figure 4. 
1) CONDITION 3.1:  Any Crack Is Found By ECI 
{a} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
{b} Option 2:  Do Part 6 - Magnetic Particle Inspection of the Midspar Fuse 
Pin for Any Crack Prior to Repair
2) CONDITION 3.2:  No Crack Is Found By ECI
{a} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
{b} Option 2:  Midspar Fuse Pin Repair
1} Contact Boeing for Repair Instructions and Do the Repair.
2} Install the repaired midspar fuse pin. Refer to 767 AMM 54-51-04 
as an accepted procedure.
d. CONDITION 4:  No Crack Is Found AND No Corrosion Is Found By Detailed Inspection
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement

### Page 44

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 44 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
(2) Option 2:  Do an Eddy Current Inspection (ECI) of the midspar fuse pin for any crack 
in accordance with Figure 3.
(a) CONDITION 2.1.1:  Any Crack Is Found By ECI 
1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2) Option 2:  Do Part 4 - Magnetic Particle Inspection of the Midspar Fuse Pin 
for Any Crack
(b) CONDITION 2.1.2:  No Crack Is Found By ECI
1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2) Option 2:  Do Part 5 - Fuse Pin Secondary Retention Hardware Installation
4. Install aft fairing access doors and midspar fuse pin access doors in accordance with Figure 2.
5. Remove the leading edge slat drive unit locks, if installed. Refer to 767 AMM 27-81-00 as an 
accepted procedure.
6. Return airplane to a serviceable condition.
7. Repeat either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse 
Pin Inspection or Part 3 - Midspar Fuse Pin Replacement in accordance with Paragraph 1.E., 
Compliance.
Part 2 - Off Wing Midspar Fuse Pin Inspection
1. Retract the leading edge slats if they are extended and install the leading edge slat drive unit 
locks. Refer to 767 AMM 27-81-00 and 767 AMM 78-31-00 as accepted procedures.
2. Remove aft fairing access doors and midspar fuse pin access doors in accordance with Figure 2.
3. Remove the midspar fuse pin. Refer to 767 AMM 54-51-04 as an accepted procedure.
4. Do a Detailed Inspection of the midspar fuse pin for any crack and any corrosion in accordance 
with Figure 4.
a. CONDITION 1:  Any Crack Is Found By Detailed Inspection, Do Part 3 - Midspar Fuse Pin 
Replacement
b. CONDITION 2:  No Crack Is Found AND Any Corrosion Is Only Found On A Non-Critical 
Surface
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Midspar Fuse Pin Rework
(a) Remove any light corrosion in accordance with Figure 3; remove any heavy 
corrosion in accordance with Appendix A.
(b) CONDITION 2.1:  Any Corrosion Found Is Removed

### Page 45

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 45 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement 
2) Option 2:  Do an Eddy Current Inspection (ECI) of the midspar fuse pin for 
any crack in accordance with Figure 4. 
{a} CONDITION 2.1.1:  Any Crack Is Found By ECI
1} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2} Option 2:  Do Part 4 - Magnetic Particle Inspection of the Midspar 
Fuse Pin for Any Crack
{b} CONDITION 2.1.2:  No Crack Is Found By ECI
1} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2} Option 2:  Install the midspar fuse pin. Refer to 767 AMM 54-51-04 
as an accepted procedure.
3) Option 3:  Do Part 4 - Magnetic Particle Inspection of the Midspar Fuse Pin 
for Any Crack 
(c) CONDITION 2.2:  Any Corrosion Found Is Not Removed, Do Part 3 - Midspar 
Fuse Pin Replacement
c. CONDITION 3:  No Crack Is Found AND Any Corrosion Is Found On Any Surface Other 
Than A Non-Critical Surface
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Midspar Fuse Pin Repair
(a) Do an Eddy Current Inspection (ECI) of the midspar fuse pin for any crack in 
accordance with Figure 4. 
1) CONDITION 3.1:  Any Crack Is Found By ECI 
{a} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
{b} Option 2:  Do Part 6 - Magnetic Particle Inspection of the Midspar Fuse 
Pin for Any Crack Prior to Repair
2) CONDITION 3.2:  No Crack Is Found By ECI
{a} Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
{b} Option 2:  Midspar Fuse Pin Repair
1} Contact Boeing for Repair Instructions and Do the Repair.
2} Install the repaired midspar fuse pin. Refer to 767 AMM 54-51-04 
as an accepted procedure.

### Page 46

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 46 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
d. CONDITION 4:  No Crack Is Found AND No Corrosion Is Found By Detailed Inspection
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Do an Eddy Current Inspection (ECI) of the midspar fuse pin for any crack 
in accordance with Figure 3.
(a) CONDITION 2.1.1:  Any Crack Is Found By ECI 
1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2) Option 2:  Do Part 4 - Magnetic Particle Inspection of the Midspar Fuse Pin 
for Any Crack
(b) CONDITION 2.1.2:  No Crack Is Found By ECI
1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
2) Option 2:  Install the midspar fuse pin. Refer to 767 AMM 54-51-04 as an 
accepted procedure.
5. Install aft fairing access doors and midspar fuse pin access doors in accordance with Figure 2.
6. Remove the leading edge slat drive unit locks, if installed. Refer to 767 AMM 27-81-00 as an 
accepted procedure.
7. Return airplane to a serviceable condition.
8. Repeat either Part 1 - On Wing Midspar Fuse Pin Inspection or Part 2 - Off Wing Midspar Fuse 
Pin Inspection or Part 3 - Midspar Fuse Pin Replacement in accordance with Paragraph 1.E., 
Compliance.
Part 3 - Midspar Fuse Pin Replacement
1. Replace the midspar fuse pin in accordance with Figure 5.
Part 4 - Magnetic Particle Inspection of the Midspar Fuse Pin for Any Crack
1. Remove the midspar fuse pin, if required. Refer to 767 AMM 54-51-04 as an accepted procedure.
2. Do a Magnetic Particle Inspection (MPI) of the midspar fuse pin for any crack in accordance with 
Figure 6.
a. CONDITION 2.1.3:  Any Crack is Found by MPI, Do Part 3 - Midspar Fuse Pin Replacement
b. CONDITION 2.1.4:  No Crack is Found by MPI
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Midspar Fuse Pin Installation
(a) If the midspar fuse pin finish was previously removed, restore the fuse pin finish 
in accordance with Figure 7.

### Page 47

Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 47 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
(b) Install the midspar fuse pin. Refer to 767 AMM 54-51-04 as an accepted 
procedure. 
Part 5 - Fuse Pin Secondary Retention Hardware Installation
1. If the midspar fuse pin finish was previously removed, restore the fuse pin finish in accordance 
with Figure 7. 
2. Install the fuse pin secondary retention hardware in accordance with Figure 3.
Part 6 - Magnetic Particle Inspection of the Midspar Fuse Pin for Any Crack Prior to Repair
1. Remove the midspar fuse pin, if required. Refer to 767 AMM 54-51-04 as an accepted procedure.
2. Do a Magnetic Particle Inspection (MPI) of the midspar fuse pin for any crack in accordance with 
Figure 6.
a. CONDITION 2.1.3:  Any Crack is Found by MPI, Do Part 3 - Midspar Fuse Pin Replacement
b. CONDITION 2.1.5:  No Crack is Found by MPI
(1) Option 1:  Do Part 3 - Midspar Fuse Pin Replacement
(2) Option 2:  Midspar Fuse Pin Repair
(a) Contact Boeing for Repair Instructions and Do the Repair.
(b) Install the midspar fuse pin. Refer to 767 AMM 54-51-04 as an accepted 
procedure.

### Page 48

FIGURE 1: DELETED - REFER TO PARAGRAPH 1.E. - COMPLIANCE
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 48 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
FIGURE  1:   DELETED - REFER TO PARAGRAPH 1.E. - COMPLIANCE
This Figure has been deleted. See Paragraph 1.E., Compliance, for inspection and maintenance alternatives.
THIS FIGURE DOES NOT HAVE AN ILLUSTRATION
V75032
(SHEET 1 OF 1)

### Page 49

FIGURE 2: MIDSPAR FUSE PIN ACCESS
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 49 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
FIGURE  2:   MIDSPAR FUSE PIN ACCESS
JT9D-7R4 ENGINES
PW4000 ENGINES
RB511-524 ENGINES
CF6-80A ENGINES
CF6-80C2 ENGINES
FWD
UP
1
1
4
2
3
1
E09773
(SHEET 1 OF 2)

### Page 50

FIGURE 2: MIDSPAR FUSE PIN ACCESS
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 50 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME IDENTIFICATION QTY NOTES
1 Remove/
Install
Group 1 thru Group 6 airplanes only
Strut No. 1 -
Aft fairing and fuse 
pin access doors
437BL 1 Refer to 767 AMM 06-43-00, 767
AMM 54-52-00, 767 AMM 54-52-
01, and 767 AMM 54-53-00 as ac-
cepted procedures.
437ELX 1
436AL 1
437BR 1
437ERX 1
436AR 1
Strut No. 2 -
Aft fairing and fuse 
pin access doors
447BL 1
447ELX 1
446AL 1
447BR 1
447ERX 1
446AR 1
Group 7 airplanes only
Strut No. 1 -
Aft fairing and fuse 
pin access doors
433DL 1 Refer to 767 AMM 06-43-00, 767
AMM 54-52-00, 767 AMM 54-52-
01, and 767 AMM 54-53-00 as ac-
cepted procedures.
434AL 1
433LR 1
434AR 1
Strut No. 2 -
Aft fairing and fuse 
pin access doors
443FL 1
444AL 1
443LR 1
444AR 1
Optional Additional Access
2 Remove/
Install
Hydraulic line
clamps 
- 2 Additional access can be gained to
the left side fuse pins by removing
the clamp blocks that support the
hydraulic tubes on the left side of
the struts. The hydraulic lines may
need to be pushed upward after the
clamp blocks are removed, to gain
better access to the fuse pin sec-
ondary retention device nut and the
cotter pin.
3 Remove/
Install
EDP Supply Shut
Off Valve 
- 1 Refer to 767 AMM 29-11-00 and
767 AMM 29-11-06 as accepted
procedures.   
4 Remove/
Install
Hydraulic Reservoir - 1 Refer to 767 AMM 29-11-00 and
767 AMM 29-11-20 as accepted
procedures.   
(SHEET 2 OF 2)

### Page 51

FIGURE 3: ON WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 51 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
FIGURE  3:   ON WING MIDSPAR FUSE PIN INSPECTION
A
A
PIN
NUT
DETAIL I
SEE
BOLT
SEE
DETAIL I
WING
FITTING
WASHER FUSE PIN
MIDSPAR
FITTING
WASHER
SELF-LOCKING NUT
CASTELLATED
COTTER
END CAP
WASHER
WASHER
TYPICAL MIDSPAR FITTING
DETAIL I
(2 LOCATIONS)
FWD
UP
3
61
1 6
1 6
1 6
1 6
1 6
2 4 5
E09779
(SHEET 1 OF 4)

### Page 52

FIGURE 3: ON WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 52 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
NOTE:
1. This figure shows an expanded view of the midspar fuse pin installation. However, the fuse pin cleaning 
and inspections in this figure only require removal of the secondary retention hardware (cotter pin, 
castellated nut, washer, end cap, washer and bolt).
EDDY CURRENT INSPECTION AREA - FUSE
PIN MAIN BORE SURFACE
A-A
MIDSPAR
FITTING
LONGITUDINAL CRACK
(EXAMPLE)
WING ATTACH
FITTING
FUSE PIN
CROSS SECTION
ON WING MIDSPAR FUSE PIN INSPECTION AREAS
NON-CRITICAL FUSE PIN
HEAD BEARING SURFACE
FUSE PIN
MINOR BORE
NON-CRITICAL FUSE
PIN SHANK ENDFACE
SURFACE
DETAILED INSPECTION AREA COVERS VISIBLE
SURFACES EXCEPT THE MINOR BORE.
NON-CRITICAL FUSE
PIN END SURFACE
NON-CRITICAL
CHAMFER SURFACE
NON-CRITICAL FUSE PIN
HEAD EXTERIOR SURFACES
NON-CRITICAL FUSE PIN
HEAD EXTERIOR SURFACES
1852624
(SHEET 2 OF 4)

### Page 53

FIGURE 3: ON WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 53 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
2. The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
Secondary Retention Hardware Removal 
1 Remove Cotter pin - 2 If cotter pin cannot be removed
normally, place wrench from the
A54011 tool kit on nut and torque
the secondary retention through
bolt until the cotter pin shears off.
Clean remaining pieces of cotter
pin from bolt and nut.
Remove/
Keep
Castellated Nut - 2 Refer to 767 AMM 54-51-04 as an
accepted procedure.Washer - 2
End cap - 2
Washer - 2
Bolt - 2
2 Clean Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Remove any grease or corrosion
inhibitors from fuse pin bore. Do
this carefully so that the paint (prim-
er) and cadmium plate are not
damaged. Refer to BSOPM 20-30-
03 as an accepted procedure.
Use caution when cleaning the 
fuse pin. Nicks or scratches can 
cause false crack indications 
during Eddy Current Inspection.
Detailed Inspection
3 Inspect Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Do a Detailed Inspection of the 
fuse pin inner and outer surfaces 
for any crack and any corrosion.
Light corrosion is characterized by 
discoloration or pitting that can be 
removed by hand sanding with a 
fine abrasive material.
Heavy corrosion is corrosion that 
cannot be removed by hand 
sanding with a fine abrasive 
material.
(SHEET 3 OF 4)

### Page 54

FIGURE 3: ON WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 54 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
4 Clean (a) Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Hand sand with a fine abrasive 
material to remove any light 
corrosion from the non-critical 
surfaces, if required. Refer to Table 
2 below for a list of recommended 
light corrosion removal abrasives.
Use caution when cleaning the 
fuse pin. Nicks or scratches can 
cause false crack indications 
during Eddy Current Inspection.
Remove any heavy corrosion from 
the non-critical surfaces, in 
accordance with Appendix A, if 
required.
Eddy Current Inspection [ECI] (a)
5 Inspect Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Do an ECI of the fuse pin bore for 
any crack in accordance with 767 
NDT D634T301, Part 6, Subject 
54-51-01.
Secondary Retention Hardware Installation (a)(b)
6I n s t a l l
(Kept)
End cap - 2 Refer to 767 AMM 54-51-04 as an
accepted procedure.Bolt - 2
Washer - 2
Washer - 2
Castellated Nut - 2
Install
(New)
Cotter pin - 2
(a) Not required if any crack is found by Detailed Inspection.
(b) Not required if any crack is found by ECI.
Table 2: RECOMMENDED LIGHT CORROSION REMOVAL ABRASIVES
Backing Material Abrasive Material Recommended Grit Size
Abrasive Paper or Cloth Aluminum Oxide 150 or finer
Silicon Carbide 180 or finer
Fabric or Pad - Fine to Ultrafine
STEP TASK NAME PART NUMBER QTY NOTES
(SHEET 4 OF 4)

### Page 55

FIGURE 4: OFF WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 55 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
FIGURE  4:   OFF WING MIDSPAR FUSE PIN INSPECTION
A
A
EDDY CURRENT/MAGNETIC PARTICLE INSPECTION 
AREA - FUSE PIN MAIN BORE SURFACE
A-A
LONGITUDINAL CRACK
(EXAMPLE)
FUSE PIN
CROSS SECTION
OFF WING MIDSPAR FUSE PIN INSPECTION AREAS
NON-CRITICAL FUSE PIN
SHANK ENDFACE SURFACE
NON-CRITICAL FUSE PIN
HEAD BEARING SURFACE
FUSE PIN MINOR BORE
DETAILED INSPECTION AREA COVERS ALL INSIDE AND OUTSIDE FUSE PIN SURFACES
EXCEPT THE MINOR BORE.
NON-CRITICAL FUSE
PIN END SURFACE
NON-CRITICAL
CHAMFER SURFACE
NON-CRITICAL FUSE PIN
HEAD EXTERIOR SURFACES
NON-CRITICAL FUSE PIN
HEAD EXTERIOR SURFACES
2 341
E10317
(SHEET 1 OF 3)

### Page 56

FIGURE 4: OFF WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 56 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Clean Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Remove any grease or corrosion
inhibitors from fuse pin bore. Do
this carefully so that the paint (prim-
er) and cadmium plate are not
damaged. Refer to BSOPM 20-30-
03 as an accepted procedure.
Use caution when cleaning the 
fuse pin. Nicks or scratches can 
cause false crack indications 
during Eddy Current Inspection.
Detailed Inspection
2 Inspect Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Do a Detailed Inspection of the 
fuse pin inner and outer surfaces 
for any crack and any corrosion.
Light corrosion is characterized by 
discoloration or pitting that can be 
removed by hand sanding with a 
fine abrasive material.
Heavy corrosion is corrosion that 
cannot be removed by hand 
sanding with a fine abrasive 
material.
3 Clean Fuse Pin (a) 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Hand sand with a fine abrasive 
material to remove any light 
corrosion from the non-critical 
surfaces, if required. Refer to Table 
3 below for a list of recommended 
light corrosion removal abrasives.
Use caution when cleaning the 
fuse pin. Nicks or scratches can 
cause false crack indications 
during Eddy Current Inspection.
Remove any heavy corrosion from 
the non-critical surfaces, in 
accordance with Appendix A, if 
required.
Eddy Current Inspection (ECI) (a)(b)
(SHEET 2 OF 3)

### Page 57

FIGURE 4: OFF WING MIDSPAR FUSE PIN INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 57 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
4 Inspect Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Do an ECI of the fuse pin for any 
crack in accordance with 767 NDT 
D634T301, Part 6, Subject 54-51-
01.
Optional to do a Magnetic Particle 
Inspection [MPI] of the fuse pin for 
any crack, in accordance with 
Figure 6.
(a) Not required if any crack is found by detailed inspection.
(b) MPI in accordance with Figure 6 is optional to the ECI, for fuse pin that is Off Wing.
Table 3: RECOMMENDED LIGHT CORROSION REMOVAL ABRASIVES
Backing Material Abrasive Material Recommended Grit Size
Abrasive Paper or Cloth Aluminum Oxide 150 or finer
Silicon Carbide 180 or finer
Fabric or Pad - Fine to Ultrafine
STEP TASK NAME PART NUMBER QTY NOTES
(SHEET 3 OF 3)

### Page 58

FIGURE 5: MIDSPAR FUSE PIN REPLACEMENT
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 58 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
FIGURE  5:   MIDSPAR FUSE PIN REPLACEMENT
PIN
1 2
21
21
21
21
41
21
21
21
21
DETAIL I
SEE
(2 LOCATIONS)
DETAIL I
TYPICAL MIDSPAR FITTING
WASHER END CAP
COTTER
NUT
CASTELLATED
FITTING
MIDSPAR
FUSE PIN
FITTING
WING
DETAIL I
SEE
BOLTWASHER
SELF-LOCKING NUT
WASHER
WASHER
FWD
UP
E10319
(SHEET 1 OF 2)

### Page 59

FIGURE 5: MIDSPAR FUSE PIN REPLACEMENT
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 59 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME IDENTIFICA-TION QTY NOTES
1 Remove Fuse Pin - 1 and secondary retention hardware, if required. Refer
to 767 AMM 54-51-04 as an accepted procedure.
2I n s t a l l
New, Re-
paired, or
Service-
able
Fuse Pin Group 1 and 2
Airplanes:
311T3102-1 
(311T3102-3 
optional)
1 and secondary retention hardware. Refer to 767
AMM 54-51-04 as an accepted procedure.
Group 3 and 4
Airplanes:
311T3102-2 
(311T3102-4 
optional)
Group 5, 6 and 7
Airplanes:
311T2102-1 
(311T2102-2 
optional)
(SHEET 2 OF 2)

### Page 60

FIGURE 6:  OFF WING MIDSPAR FUSE PIN MAGNETIC PARTICLE INSPECTION
Original Issue: April 14, 1994
Revision 6:  November 05, 2009 767-54A0062
BOEING PROPRIETARY - Copyright © Unpublished Work - See page 1 for details. 60 of 66
BOEING SERVICE BULLETIN 767-54A0062
ALERT                                                                                                    ALERT
 
 
FIGURE  6:   OFF WING MIDSPAR FUSE PIN MAGNETIC PARTICLE INSPECTION
The step numbers shown below agree with the numbers shown in the circle symbols in the figure.
STEP TASK NAME PART NUMBER QTY NOTES
1 Clean Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Remove primer and cadmium plate
from fuse pin, if necessary. Refer to
BSOPM 20-30-02 as an accepted
procedure.
2 Inspect Fuse Pin 311T3102-1
(311T3102-3 optional)
OR
311T3102-2
(311T3102-4 optional)
OR
311T2102-1
(311T2102-2 optional)
2 Do a Magnetic Particle Inspection 
of the fuse pin for any crack. Refer 
to BSOPM 20-20-01 as an 
accepted procedure.
1 2
E10564
(SHEET 1 OF 1)

The text continues at https://openairdocs.org/service-documents/boeing/767-54a0062/file/24fec752ecd9.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
