# Boeing Alert Service Bulletin 767-56A0010: U.S. DOT/FAA - Boeing Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2007-27223, the docket of AD 2012-05-04. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 767-56A0010](https://openairdocs.org/service-documents/boeing/767-56a0010.md)
- Title as filed: U.S. DOT/FAA - Boeing Service Bulletin
- Pages: 141
- PDF: https://openairdocs.org/files/sha256/ab/fc/abfce8505f86250e1e99be291eb8fd7969ac451ad93d458a7683d1988492821c
- Page: https://openairdocs.org/service-documents/boeing/767-56a0010/file/abfce8505f86

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
767
Service Bulletin
Number: 767-56A0010
Original Issue: September 07, 2006
Revision 3: March 03, 2011
ATA System: 5611
SUBJECT: WINDOWS - Flight Compartment Windows - Number 2 Openable Window - Link Arm
Modification
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2006 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
1 of 141
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
2 of 141
BOEING SERVICE BULLETIN 767-56A0010
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 9
B. Concurrent Requirements ...................................... 1 9
C. Reason ................................................ 1 9
D. Description .............................................. 2 0
E. Compliance .............................................. 2 2
F. Approval ............................................... 2 3
G. Manpower .............................................. 2 3
H. Weight and Balance Changes .................................... 2 8
I. Electrical Load Data ......................................... 2 8
J. References .............................................. 2 8
1. Existing Data: ......................................... 2 8
2. Data supplied with this Service Bulletin: ........................... 2 9
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 9
K. Publications Affected ........................................ 2 9
L. Interchangeability and Intermixability of Parts ........................... 3 0
2. MATERIAL INFORMATION ........................................ 3 1
A. Material - Price and Availability ................................... 3 1
B. Industry Support Information .................................... 3 2
C. Parts Necessary For Each Airplane ................................. 3 2
1. Kits/Parts: ........................................... 3 2
2. Parts and Materials Supplied by the Operator: ........................ 3 4
3. Parts Modified and Reidentified: ............................... 3 4
4. Parts Removed and Not Replaced: .............................. 3 6
D. Parts Necessary to Change Spares ................................. 3 6
E. Special Tooling - Price and Availability ............................... 3 7
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 7
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 9
A. GENERAL INFORMATION ..................................... 3 9
B. WORK INSTRUCTIONS ....................................... 4 0
FIGURE 1: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE [Group 1, 4, 6, Configuration
1 ]  ................................................ 4 6
FIGURE 2: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE [Group 1, Configuration 2;
Group 2-3; Group 4, Configuration 2; Group 5; Group 6, Configuration 2; Group 7] .... 5 1
FIGURE 3: NUMBER 2 WINDOW - LINK BRACKET - OPTIONAL REWORK - LEFT SIDE [Group 2, 7] . 56
FIGURE 4: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE [Group 1, 6, Configuration
1 ]  ................................................ 5 8
FIGURE 5: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE [Group 1, Configuration
2; Group 2-3; Group 6, Configuration 2; Group 7] ...................... 6 3
FIGURE 6: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE [Group 4, Configuration
1 ]  ................................................ 6 8
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
3 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 4

FIGURE 7: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE [Group 4, Configuration
2; Group 5] ........................................... 7 3
FIGURE 8: NUMBER 2 WINDOW - CAM BLOCK - REMOVAL - LEFT SIDE .............. 7 8
FIGURE 9: NUMBER 2 WINDOW - CAM BLOCK - OPTIONAL REWORK - LEFT SIDE ........ 8 1
FIGURE 10: NUMBER 2 WINDOW - CAM BLOCK - INSTALLATION - LEFT SIDE ........... 8 3
FIGURE 11: NUMBER 2 WINDOW - CRANK/ROLLER ASSEMBLY - REMOVAL - LEFT SIDE ..... 8 6
FIGURE 12: NUMBER 2 WINDOW - CRANK/ROLLER ASSEMBLY - OPTIONAL REWORK ...... 8 8
FIGURE 13: NUMBER 2 WINDOW - CRANK/ROLLER ASSEMBLY - OPTIONAL REWORK ...... 9 0
FIGURE 14: NUMBER 2 WINDOW - CRANK/ROLLER ASSEMBLY - INSTALLATION - LEFT SIDE . . 92
FIGURE 15: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - RIGHT SIDE [Group 1, 4, 6, Configuration
1 ]  ................................................ 9 4
FIGURE 16: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - RIGHT SIDE [Group 1, Configuration
2; Group 2-3; Group 4, Configuration 2; Group 5; Group 6, Configuration 2; Group 7] . . . 99
FIGURE 17: NUMBER 2 WINDOW - LINK BRACKET - OPTIONAL REWORK - RIGHT SIDE [Group 2, 7]
................................................. 1 0 4
FIGURE 18: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - RIGHT SIDE [Group 1, 6,
Configuration 1] ........................................ 1 0 6
FIGURE 19: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - RIGHT SIDE [Group 1, Configuration
2; Group 2-3; Group 6, Configuration 2; Group 7] ...................... 1 1 1
FIGURE 20: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - RIGHT SIDE [Group 4, Configuration
1 ]  ................................................ 1 1 6
FIGURE 21: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - RIGHT SIDE [Group 4, Configuration
2; Group 5] .......................................... 1 2 1
FIGURE 22: NUMBER 2 WINDOW - CAM BLOCK - REMOVAL - RIGHT SIDE ............ 1 2 6
FIGURE 23: NUMBER 2 WINDOW - CAM BLOCK - OPTIONAL REWORK - RIGHT SIDE ...... 1 2 9
FIGURE 24: NUMBER 2 WINDOW - CAM BLOCK - INSTALLATION - RIGHT SIDE .......... 1 3 1
FIGURE 25: NUMBER 2 WINDOW - CRANK/ROLLER ASSEMBLY - REMOVAL - RIGHT SIDE . . . 134
FIGURE 26: NUMBER 2 WINDOW - CRANK/ROLLER ASSEMBLY - INSTALLATION - RIGHT SIDE . 136
FIGURE 27: NUMBER 2 WINDOW - LINK ARM - INSPECTION - LEFT SIDE ............. 1 3 8
FIGURE 28: NUMBER 2 WINDOW - LINK ARM - INSPECTION - RIGHT SIDE ............ 1 4 0
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
4 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 5

Commercial 
Airplanes
767
Service Bulletin
Revision Transmittal SheetNumber: 767-56A0010Original Issue: September 07, 2006
Revision 3: March 03, 2011
ATA System: 5611
SUBJECT: WINDOWS - Flight Compartment Windows - Number 2 Openable Window - Link Arm
Modification
This Revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
No more work is necessary on airplanes changed as given in Revision 2 of this service bulletin. However, as
specified in Revision 1 and Revision 2, more work is necessary on airplanes changed as given in the original
issue of this service bulletin. If not previously accomplished, Boeing recommends that operators do an inspection
of the number 2 openable window mechanism to make sure that the link arm is in the over-center position, as
given in paragraph 1.E., Compliance.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making (NPRM) 2006-NM-224-AD, is related
to this service bulletin.
REASON FOR REVISION
This revision is sent to delete inspection/modification actions that were previously recommended to be done if
a number 2 window assembly is changed or when rigging changes are made.
Changes to this service bulletin include:
— In the Summary Background section and in Paragraph 1.C., Reason: Revised the Background and Reason
sections to clarify that accomplishment of this service bulletin will reduce the likelihood (will not ensure) that
and unlatched number 2 flight compartment window will open during take off.
— In Paragraph 1.D., Description: Added Revision 3 information and added maintenance zone information.
— In Paragraph 1.E., Compliance: Revised compliance information to remove airplane conditions that were
based on line maintenance activities. Also, condensed compliance information into one table due to removal
of airplane conditions, which simplified the compliance data.
— In Paragraph 1.K.1., Publications: Added 767 Component Maintenance Manual as an affected publication.
— In Paragraph 2.C.3., Parts Modified and Reidentified: Changed reidentification requirement for
141T4835-47/-48 window assemblies. Clarified note (f).
— In Paragraph 2.E. and paragraph 2.F., Special Tooling information: Revised note (a) to clarify that operators
can use their own tool as an alternative to Boeing tool MIT141T4890.
— In Paragraph 3.B., Work Instructions: Deleted variations of the inspection instructions (Parts 2, 3, 6, and 7)
that are no longer necessary due to removed conditions and compliance information changes.
— In Paragraph 3. B., Work Instructions: The words "as given in" have been changed to "refer to" throughout
the Work Instructions when referencing the Aircraft Maintenance Manual (AMM). Also, PART 4 and PART
8 modification instructions have been revised to separate changes to the airplane and changes to the
window assembly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
5 of 141

### Page 6

— In Paragraph 3.B., Work Instructions: Revised PART 4, step 4 (previously step 16) and PART 8, step 4
(previously step 16) to clarify that fay surface sealing at the cam block is only required on the shim, if a shim
is installed.
— In Figure 3: Clarified dimensions for chamfer and clarified note (b) for shot peen requirement.
— In Figures 8 and 22: Deleted note (a) regarding removal of washers. In Revision 1, the intent of note (a)
was to give instructions for removal of adjustment washers that may be installed under the cam block. In
Revision 2, note (b) was revised to give instructions for removal of adjustment washers. Note (a) should
have been deleted in Revision 2.
— In Figures 10 and 24: Deleted note (d) regarding installation of washers. In Revision 1, the intent of note
(d) was to give instructions for installation of adjustment washers under the cam block. In Revision 2, note
(e) was revised to give instructions for installation of adjustment washers. Note (d) should have been deleted
in Revision 2.
— In Figure 12: Clarified step 3 and note (d) for location of new hole. Also, added step 9 and notes (e) and (f)
for identification of reworked crank/roller assembly.
— In Figure 13: Clarified step 3 and note (c) for location of new hole. Also, added step 8 and notes (d) and (e)
for identification of reworked crank/roller assembly.
— In Figures 14 and 26: Deleted note (b) and revised note (c) to refer to Paragraph 2.C.3 for re-identification
of the window assembly after modification.
— In Figure 17: Clarified dimensions for chamfer and clarified note (b) for shot peen requirement.
— In Figures 4, 5, 6, 7, 18, 19, 20, 21: Revised note (c) regarding installation of lockwire.
— In Figures 1, 2, 4, 5, 6, 7, 15, 16, 18, 19, 20, and 21: Clarified which steps are not required if MIT141T4890
tool, or equivalent, is used to remove the link bracket. Also, clarified that operators can use their own tool,
instead of MIT141T4890, during removal/installation of the link bracket.
Paragraph 1.A., Effectivity, shows changes of airplane operators. Each operator should examine the Effectivity
paragraph for changes.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
September 07, 2006Original Issue:
January 24, 2008Revision 1:
June 18, 2009Revision 2:
March 03, 2011Revision 3:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
6 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 7

Commercial 
Airplanes
767
Service Bulletin
SummaryNumber: 767-56A0010Original Issue: September 07, 2006
Revision 3: March 03, 2011
ATA System: 5611
SUBJECT: WINDOWS - Flight Compartment Windows - Number 2 Openable Window - Link Arm
Modification
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will reduce the likelihood that a number 2 flight compartment window
will open during take off, if the window is not latched. If a number 2 flight compartment window opens during
take off, a high speed aborted takeoff or an unscheduled landing will be necessary. In addition, the ability of the
flight crew to perform critical take off communication will be adversely affected. Note that proper latching of the
number 2 flight compartment windows by the flight crew is required, prior to flight, in order to ensure that a
number 2 window will not open during take off.
The modification shown in this service bulletin will allow the number 2 window link arm to be positioned at an
angle less than 90 degrees (over-center), in reference to the track roller, when the window is closed.
Boeing has received six reports of the Number 2 windows opening during takeoff roll. This has resulted in aborted
takeoffs, which have occurred at speeds up to 140 knots.
The number 2 windows are opened and closed by rotating an operating crank. When closing the window the
crank/roller assembly at the end of the torque tube will move and engage the cam block at the top aft corner of
the window. On airplanes before line number 930, except line number 923, the crank roller can move at 18
degree increments with one gear tooth rotation. Airplane line number 923 and airplanes after line number 929,
have the modification given in this service bulletin installed in production.
Accomplishment of this service bulletin will allow the crank roller to move at 9 degree increments with a change
of position of a retaining pin, instead of one gear tooth rotation of 18 degree increments. The link arm that drives
the window shut will be positioned at an angle less than 90 degrees (over-center), in reference to the track roller,
when the window is closed.
Boeing Service Related Problem (SRP) 767-SRP-56-0012 and 767-SRP-56-0023 are related to this service
bulletin.
As a part of a service bulletin validation program, this change was completed on airplane VS078 by the original
issue of Service Bulletin 767-56A0010 before the release of Revision 01 of this service bulletin. The change
completed on airplane VS078 by the original issue of Service Bulletin 767-56A0010 is equivalent to the release
of Revision 01 of this service bulletin. Airplane VS078 has the configuration of a Group 3 airplane.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
7 of 141

### Page 8

ACTION (PRR 12901-58S)
INSPECTION: Do a general visual inspection to determine if the link arm on the number 2 window is in an
over-center position when the window is closed. If the link arm is not in an over-center position when the window
is closed, re-rig the window. If the link arm cannot be rigged to get the over-center position, do the modification
as given in this service bulletin.
MODIFICATION: Remove the link brackets from the carriage assembly lower track operating system, left and
right. Remove the cam blocks from the window number 2 upper sill, left and right. Remove the crank/roller
assembly from the number 2 window assemblies, left and right.
Operators can do one of the two options that follow:
1. Option 1: Replace the link brackets, cam blocks and crank/roller assemblies with new parts. Install the
number 2 windows, left and right.
2. Option 2: Rework and replace the cam blocks and crank/roller assemblies. Rework and replace, or install
new link brackets. Operators who have older link brackets installed will not be able to rework the link brackets
and will need to install new link brackets. Refer to Paragraph 3.B., Work Instructions for reworking existing
parts or new part installation applicability.
Group 1-2:
It is recommended that operators accomplish service bulletin 767-56-0002, "WINDOWS - Flight Compartment
Windows - Openable Windows Number 2 - Latch Hook and Striker Plate Installation", due to common access.
Group 1, 4, 6:
It is recommended that operators accomplish service bulletin 767-56-0004, "WINDOWS - Number 2 Openable
Window- Window Stop Installation", due to common access.
EFFECTIVITY
767-200, -300, -300F and -400ER Airplanes. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
Refer to Paragraph 1.E., Compliance.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2006-NM-224-AD is related to this service
bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes, inspection and/or repair procedures
given in this service bulletin.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
8 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 9 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
Refer to Paragraph 2.A., Material - Price and Availability.
OPENABLE
WINDOW
MODIFICATION:  NUMBER 2
REWORK OR
INSTALL NEW  LATCH
CAM BLOCK  LOCK
HANDLE
MODIFICATION:
REWORK OR
INSTALL NEW
CRANK/ROLLER
ASSEMBLY
' FWD
SEE A
MODIFICATION:
REWORK OR
INSTALL NEW
LINK BRACKET  D58609
Original Issue: September 07, 2006
Revision 3: March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  9 of 141

### Page 10 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
CENTER LINE OF LINK ARM  REFERENCE LINE (90° FROM
CENTER LINE OF TRACK)
INSPECTION:
DO A GENERAL VISUAL
INSPECTION TO DETERMINE IF  MINIMUM
THE LINK ARM IS IN AN  2 DEGREES  WINDOW
OVERCENTER POSITION WHEN THE  OVERCENTER  ASSEMBLY
WINDOW IS CLOSED. IF THE LINK
ARM IS NOT IN AN OVERCENTER
POSITION, RIG THE WINDOW AS
GIVEN IN THE AMM AND IF
NECESSARY DO THE MODIFICATION  82-88
AS GIVEN IN THIS SERVICE  DEGREES
BULLETIN.
LOWER AFT
TRACK  LINK ARM
CENTER LINE
OF TRACK
INBD
LINK BRACKET
LOOKING OUTBOARD
(LEFT SIDE SHOWN, RIGHT SIDE OPPOSITE)
1501063
Original Issue: September 07, 2006
Revision 3: March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  10 of 141

### Page 11

Commercial 
Airplanes
767
Service Bulletin
Number: 767-56A0010
Original Issue: September 07, 2006
Revision 3: March 03, 2011
ATA System: 5611
SUBJECT: WINDOWS - Flight Compartment Windows - Number 2 Openable Window - Link Arm
Modification
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624T001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR B12901-58S for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
767-200 airplane, line numbers 2 through 114 with short grip length
bolts installed on the window operating mechanism with common
effectivity to Boeing Service Bulletins 767-56-0002 and 767-56-0004.
-1
Group 1 airplanes that HAVE NOT accomplished Boeing Service
Bulletin 767-56-0004.
1
Group 1 airplanes that HAVE accomplished Boeing Service Bulletin
767-56-0004.
2
767-200 airplane, line number 1 with short grip length bolts installed
on the window operating mechanism and have link brackets that can
be reworked installed on the airplane with common effectivity to
Boeing Service Bulletin 767-56-0002.
-2
767-200, -300 and -300F airplanes, line numbers 710 through 929
with short grip length bolts installed on the window operating
mechanism and have link brackets that can not be reworked installed
on the airplane.
-3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
11 of 141

### Page 12

DESCRIPTIONCONFIGURATIONGROUP
767-200 and -300 airplanes, line numbers 213 through 418 with long
grip length bolts installed on the window operating mechanism with
common effectivity to Boeing Service Bulletin 767-56-0004.
-4
Group 4 airplanes that HAVE NOT accomplished Boeing Service
Bulletin 767-56-0004.
1
Group 4 airplanes that HAVE accomplished Boeing Service Bulletin
767-56-0004.
2
767-200 and -300 airplanes, line numbers 419 through 665 with long
grip length bolts installed on the window operating mechanism.
-5
767-200 and -300 airplanes, line numbers 115 through 375 with short
grip length bolts installed on the window operating mechanism with
common effectivity to Boeing Service Bulletin 767-56-0004.
-6
Group 6 airplanes that HAVE NOT accomplished Boeing Service
Bulletin 767-56-0004.
1
Group 6 airplanes that HAVE accomplished Boeing Service Bulletin
767-56-0004.
2
767-200, -300, -300F and -400ER airplanes, line numbers 528 through
878 with short grip length bolts installed on the window operating
mechanism and have link brackets that can be reworked installed on
the airplane.
-7
Airplane Models:
767-200, 767-300, 767-300F, 767-400ER
GroupVariable Number
2VA001
1VA002 - VA020
1VA301 - VA315
1VA501 - VA513
6VA514 - VA530
1VA701 - VA712
6VA713 - VA719
1VA801 - VA810
1VB001 - VB002
1VB051 - VB055
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
12 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 13

GroupVariable Number
1VB101 - VB117
6VB118 - VB125
1VB201 - VB202
1VB251 - VB253
1VB281 - VB284
1VB301 - VB302
1VB321 - VB324
6VB325 - VB332
6VB371 - VB373
6VB401
5VB441 - VB442
7VB443 - VB444
1VE001 - VE002
6VE003
1VE021 - VE023
6VE041 - VE043
6VE061 - VE069
6VE083 - VE086
6VE101 - VE104
6VE116 - VE118
6VE121 - VE126
6VE141 - VE150
4VE151
5VE152
6VE171 - VE172
6VF001 - VF002
6VF041 - VF042
6VF051
6VF061 - VF062
6VF071 - VF072
6VF091 - VF093
6VF101 - VF102
4VF161
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
13 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 14

GroupVariable Number
5VF162
5VF171 - VF172
5VF180
7VF181 - VF184
7VF251
6VK001 - VK011
7VK012 - VK016
6VK021 - VK022
6VK031 - VK051
4VK052 - VK053
5VK054 - VK056
6VK081 - VK098
4VK099
5VK100 - VK107
7VK108 - VK113
6VK131 - VK133
6VK141 - VK142
5VK143
7VK144 - VK148
5VK161 - VK162
7VK163 - VK164
7VK171
7VK181
7VK186
6VL001 - VL006
6VL011
7VL701 - VL703
7VL751 - VL755
7VL806 - VL807
7VL871 - VL873
7VL891 - VL900
7VL911 - VL914
7VL931 - VL932
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
14 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 15

GroupVariable Number
7VL941
6VN001 - VN015
4VN016 - VN018
5VN019 - VN041
4VN051 - VN062
5VN063 - VN064
4VN081 - VN092
5VN093 - VN099
4VN111 - VN122
5VN123 - VN127
4VN130 - VN132
5VN133 - VN137
6VN151 - VN157
4VN158
6VN163 - VN167
4VN168
6VN171 - VN173
7VN174
6VN191 - VN192
4VN193
5VN194 - VN195
7VN196 - VN198
6VN211 - VN212
6VN221 - VN222
4VN223 - VN224
7VN225
6VN231 - VN234
6VN241
5VN242 - VN243
6VN251 - VN259
5VN260 - VN264
7VN265 - VN276
6VN291
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
15 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 16

GroupVariable Number
7VN292 - VN293
6VN301 - VN303
4VN304 - VN306
5VN307 - VN312
7VN313 - VN314
4VN371 - VN372
4VN376
5VN381 - VN387
7VN388
7VN421 - VN427
7VN436
6VN471 - VN472
6VN491 - VN494
4VN495
5VN496 - VN513
6VN531
4VN532
6VN536
4VN537
6VN541
4VN542
5VN546 - VN547
4VN551
5VN556 - VN557
5VN561 - VN562
6VN631
4VN632 - VN633
5VN634 - VN635
7VN636 - VN638
6VN651
4VN652
5VN653
7VN654 - VN658
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
16 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 17

GroupVariable Number
4VN671 - VN672
7VN676
4VN681 - VN683
5VN684 - VN688
7VN689 - VN691
4VN731
7VN732
4VN751 - VN753
5VN791 - VN792
5VN811 - VN813
5VN921 - VN922
5VN931
7VN932 - VN936
7VN951 - VN953
7VN966 - VN972
7VQ001 - VQ021
7VQ071 - VQ086
3VR051 - VR060
3VR081
3VR084
3VR086
7VR201
3VR202 - VR211
3VR251
3VR256 - VR260
7VR401
7VR421
3VR422 - VR423
7VR426
3VR441
7VR461
3VR471 - VR472
7VS051 - VS052
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
17 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 18

GroupVariable Number
3VS053 - VS056
3VS061
7VS066 - VS070
7VS073
3VS074 - VS078
7VS091
3VS092 - VS104
7VS111
3VS112 - VS113
7VS131 - VS132
3VS133
3VS136 - VS137
7VS176 - VS177
3VS186 - VS187
7VS196 - VS199
3VS200 - VS203
7VS206 - VS207
3VS208
3VS211
3VS216 - VS217
3VS231
7VS246 - VS248
3VS261 - VS263
3VS266 - VS274
3VS291 - VS293
3VS301 - VS303
3VS306 - VS311
3VS316
3VS321 - VS324
3VS331 - VS333
3VS336 - VS337
3VS366 - VS367
3VS381 - VS382
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
18 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 19

GroupVariable Number
3VS391 - VS392
3VS401
3VS426 - VS428
3VS466 - VS472
3VS486
3VS496 - VS497
3VS506 - VS507
3VS526
3VS546 - VS549
3VS701 - VS712
3VS721 - VS731
3VS751 - VS759
3VS821 - VS825
3VS841 - VS844
3VS861
3VS881 - VS882
3VS891
3VS896
3VT501
7VW701 - VW721
7VW851
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of this service bulletin will reduce the likelihood that a number 2 flight compartment
window will open during take off, if the window is not latched. If a number 2 flight compartment window
opens during take off, a high speed aborted takeoff or an unscheduled landing will be necessary. In
addition, the ability of the flight crew to perform critical take off communication will be adversely affected.
Note that proper latching of the number 2 flight compartment windows by the flight crew is required,
prior to flight, in order to ensure that a number 2 window will not open during take off.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
19 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 20

The modification shown in this service bulletin will allow the number 2 window link arm to be positioned
at an angle less than 90 degrees (over-center), in reference to the track roller, when the window is
closed.
Boeing has received six reports of the Number 2 windows opening during takeoff roll. This has resulted
in aborted takeoffs, which have occurred at speeds up to 140 knots.
The number 2 windows are opened and closed by rotating an operating crank. When closing the window
the crank roller at the end of the torque tube will move and engage the cam block at the top aft corner
of the window. On airplanes before line number 930, except line number 923, the crank/roller assembly
can move at 18 degree increments with one gear tooth rotation. Airplane line number 923 and airplanes
after line number 929, have the modification given in this service bulletin installed in production.
Accomplishment of this service bulletin will allow the crank roller to move at 9 degree increments with
a change of position of a retaining pin, instead of one gear tooth rotation of 18 degree increments. The
link arm that drives the window shut will be positioned at an angle less than 90 degrees (over-center),
in reference to the track roller, when the window is closed.
Boeing Service Related Problem (SRP) 767-SRP-56-0012 and 767-SRP-56-0023 are related to this
service bulletin.
Revision 1 is sent to add instructions to inspect the link arm on the number 2 openable window to
determine if an over-center position exists when the window is fully closed. The new inspection will
determine if the modification shown in this service bulletin will be necessary. This revision is also sent
to improve access to the link arm after observations from the service bulletin validation. A detailed list
of changes is given in the Revision Transmittal Sheet section of Revision 1.
Revision 2 is sent to clarify airplane/window assembly configurations that do not require on-going link
arm inspections as given in this service bulletin. Revision 2 also corrects and/or clarifies part numbers,
part identifications, and other data given in the service bulletin Figures. A detailed list of changes is
given in the Revision Transmittal Sheet section of Revision 2.
Revision 3 is sent to delete inspection/modification actions that were previously recommended to be
done if a number 2 window assembly is changed or when rigging changes are made. Other changes
have also been made. A detailed list of changes is given in the Revision Transmittal Sheet section of
Revision 3.
As a part of a service bulletin validation program, this change was completed on airplane VS078 by
the original issue of Service Bulletin 767-56A0010 before the release of Revision 01 of this service
bulletin. The change completed on airplane VS078 by the original issue of Service Bulletin 767-56A0010
is equivalent to the release of Revision 01 of this service bulletin. Airplane VS078 has the configuration
of a Group 3 airplane.
D. Description
INSPECTION: Do a general visual inspection to determine if the link arm on the number 2 window is
in an over-center position when the window is closed. If the link arm is not in an over-center position
when the window is closed, re-rig the window. If the link arm cannot be rigged to get the over-center
position, do the modification as given in this service bulletin.
MODIFICATION: Remove the link brackets from the carriage assembly lower track operating system,
left and right. Remove the cam blocks from the window number 2 upper sill, left and right. Remove the
crank/roller assembly from the number 2 window assemblies, left and right.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
20 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 21

Operators can do one of the two options that follow:
1. Option 1: Replace the link brackets, cam blocks and crank/roller assemblies with new parts. Install
the number 2 windows, left and right.
2. Option 2: Rework and replace the cam blocks and crank/roller assemblies. Rework and replace,
or install new link brackets. Operators who have older link brackets installed will not be able to
rework the link brackets and will need to install new link brackets. Refer to Paragraph 3.B., Work
Instructions for reworking existing parts or new part installation applicability.
Group 1-2:
It is recommended that operators accomplish service bulletin 767-56-0002, "WINDOWS - Flight
Compartment Windows - Openable Windows Number 2 - Latch Hook and Striker Plate Installation",
due to common access.
Group 1, 4, 6:
It is recommended that operators accomplish service bulletin 767-56-0004, "WINDOWS - Number 2
Openable Window- Window Stop Installation", due to common access.
Revision 1 - More work is necessary on airplanes changed as given in the original issue of this service
bulletin. Boeing recommends that operators do an inspection of the number 2 openable window
mechanism to make sure that the link arm is in a over-center position when the window is fully closed.
If the link arm is not in an over-center position when the window is fully closed, the window should be
re-rigged as given in the Aircraft Maintenance Manual (AMM).
Revision 2 - No more work is necessary on airplanes changed as given in Revision 1. However, as
specified in Revision 1, more work is necessary on airplanes changed as given in the original issue of
this service bulletin. Boeing recommends that operators do an inspection of the number 2 openable
window mechanism to make sure that the link arm is in an over-center position when the window is
fully closed. If the link arm is not in an over-center position, the window should be re-rigged as given
in the AMM.
Revision 3 - No more work is necessary on airplanes changed as given in Revision 2 of this service
bulletin. However, as specified in Revision 1 and Revision 2, more work is necessary on airplanes
changed as given in the original issue of this service bulletin. If not previously accomplished, Boeing
recommends that operators do an inspection of the number 2 openable window mechanism to make
sure that the link arm is in the over-center position, in accordance with paragraph 1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1-2:
Affected Maintenance Zones
ZoneModel
211, 212767-200
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
21 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 22

Group 3:
Affected Maintenance Zones
ZoneModel
211, 212767-200, 767-300, 767-300F
Group 4-6:
Affected Maintenance Zones
ZoneModel
211, 212767-200, 767-300
Group 7:
Affected Maintenance Zones
ZoneModel
211, 212767-200, 767-300, 767-300F,
767-400ER
E. Compliance
Boeing recommends that operators do the inspections in this service bulletin at the times specified in
the table below:
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2006-NM-224-AD is related to
this service bulletin.
Table 1: Compliance Times for Inspections and Modifications
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 60 months
after the Revision 1
date of this service
bulletin.
Do a general visual inspection of the left side
number 2 window as given in Paragraph 3.B.,
PART 1 - INSPECTION - LEFT SIDE. (b)
-AND-
All Airplanes.
Do a general visual inspection of the right side
number 2 window as given in Paragraph 3.B.,
PART 5 - INSPECTION - RIGHT SIDE. (c)
--No further action is required.Inspection result:
Link arm IS over-
center.
-Before further flight.Rig the window. Refer to 767 AMM 56-11-02 as
an accepted procedure.
Inspection result:
Link arm IS NOT
over-center.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
22 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 23

Table 1: Compliance Times for Inspections and Modifications
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
--No further action is required.Rigging result:
Link arm IS over-
center.
-Before further flight.For left side windows: Do modifications as given
in Paragraph 3.B., PART 4 - MODIFICATION -
LEFT SIDE. (d)
Rigging result:
Link arm IS NOT
over-center. (a)
-OR-
For right side windows: Do modifications as given
in Paragraph 3.B., PART 8 - MODIFICATION -
RIGHT SIDE. (d)
(a) The action for this condition assumes that the window link arm cannot be rigged over-center due to physical
limitations of existing components. Modification will be required in order to allow the link arm to be adjusted to
the over-center position.
If maintenance records show that modifications have already been done as a previous action for this service
bulletin, then an unmodified window assembly could have been installed since the last inspection. Modification
or replacement of the window assembly with a modified (or equivalent) window assembly may be required in
order to allow the link arm to be adjusted to the over-center position.
(b) As an option to initial inspection, do all the modification steps as given in Paragraph 3.B., Part 4.
(c) As an option to initial inspection, do all the modification steps as given in Paragraph 3.B., Part 8.
(d) Airplane modification and window assembly modification steps are given in PART 4 and PART 8. Operators
are only required to do the modification steps as necessary to achieve the over-center position of the link arm.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this service bulletin for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task-hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
23 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 24

— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1-7:
Inspection
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.25 (a)0.251Figure 27
0.25 (a)0.251Figure 28
0.500.50TOTAL FOR EACH AIRPLANE
(a) The AMM Adjustment/Test will be necessary if the link arm is not in a over-center position
when the window is fully closed. Task hours are not given for the AMM Adjustment/Test.
Group 1, 6, Configuration 1:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.002.001Open Access
0.500.501Figure 1
0.750.751Figure 4
0.500.501Figure 8
1.001.001Figure 9 (a)
0.250.251Figure 10
0.250.251Figure 11
0.500.501Figure 12 (a)
0.500.501Figure 13 (a)
0.250.251Figure 14
0.500.501Figure 15
0.750.751Figure 18
0.500.501Figure 22
1.001.001Figure 23 (a)
0.250.251Figure 24
0.250.251Figure 25
0.250.251Figure 26
3.57.02Close Access
13.5017.0TOTAL FOR EACH AIRPLANE (a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
24 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 25

Group 1, 6, Configuration 1:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
10.5014.0TOTAL FOR EACH AIRPLANE (b)
(a) This estimate is for the rework option only.
(b) This estimate is for the replacement option only.
Group 1, Configuration 2; Group 3; Group 6, Configuration 2:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.002.001Open Access
0.500.501Figure 2
0.750.751Figure 5
0.500.501Figure 8
1.001.001Figure 9 (a)
0.250.251Figure 10
0.250.251Figure 11
0.500.501Figure 12 (a)
0.500.501Figure 13 (a)
0.250.251Figure 14
0.500.501Figure 16
0.750.751Figure 19
0.500.501Figure 22
1.001.001Figure 23 (a)
0.250.251Figure 24
0.250.251Figure 25
0.250.251Figure 26
3.57.02Close Access
13.5017.0TOTAL FOR EACH AIRPLANE (a)
10.5014.0TOTAL FOR EACH AIRPLANE (b)
(a) This estimate is for the rework option only.
(b) This estimate is for the replacement option only.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
25 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 26

Group 2, 7:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.002.001Open Access
0.500.501Figure 2
1.001.001Figure 3 (a)
0.750.751Figure 5
0.500.501Figure 8
1.001.001Figure 9 (a)
0.250.251Figure 10
0.250.251Figure 11
0.500.501Figure 12 (a)
0.500.501Figure 13 (a)
0.250.251Figure 14
0.500.501Figure 16
1.001.001Figure 17 (a)
0.750.751Figure 19
0.500.501Figure 22
1.001.001Figure 23 (a)
0.250.251Figure 24
0.250.251Figure 25
0.250.251Figure 26
3.57.02Close Access
15.5019.0TOTAL FOR EACH AIRPLANE (a)
10.5014.0TOTAL FOR EACH AIRPLANE (b)
(a) This estimate is for the rework option only.
(b) This estimate is for the replacement option only.
Group 4, Configuration 1:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.002.001Open Access
0.500.501Figure 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
26 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 27

Group 4, Configuration 1:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.750.751Figure 6
0.500.501Figure 8
1.001.001Figure 9 (a)
0.250.251Figure 10
0.250.251Figure 11
0.500.501Figure 12 (a)
0.500.501Figure 13 (a)
0.250.251Figure 14
0.500.501Figure 15
0.750.751Figure 20
0.500.501Figure 22
1.001.001Figure 23 (a)
0.250.251Figure 24
0.250.251Figure 25
0.250.251Figure 26
3.57.02Close Access
13.5017.0TOTAL FOR EACH AIRPLANE (a)
10.5014.0TOTAL FOR EACH AIRPLANE (b)
(a) This estimate is for the rework option only.
(b) This estimate is for the replacement option only.
Group 4, Configuration 2; Group 5:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
2.002.001Open Access
0.500.501Figure 2
0.750.751Figure 7
0.500.501Figure 8
1.001.001Figure 9 (a)
0.250.251Figure 10
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
27 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 28

Group 4, Configuration 2; Group 5:
Modification
Elapsed HoursTask-HoursNumber of Per-
sons
Task
0.250.251Figure 11
0.500.501Figure 12 (a)
0.500.501Figure 13 (a)
0.250.251Figure 14
0.500.501Figure 16
0.750.751Figure 21
0.500.501Figure 22
1.001.001Figure 23 (a)
0.250.251Figure 24
0.250.251Figure 25
0.250.251Figure 26
3.57.02Close Access
13.5017.0TOTAL FOR EACH AIRPLANE (a)
10.5014.0TOTAL FOR EACH AIRPLANE (b)
(a) This estimate is for the rework option only.
(b) This estimate is for the replacement option only.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR B12901-58S
b. 767-200 Structural Repair Manual (SRM) 51-40-08
c. 767-300 Structural Repair Manual (SRM) 51-40-08
d. 767-300F Structural Repair Manual (SRM) 51-40-08
e. 767 Aircraft Maintenance Manual (AMM) 20-10-23, 56-11-02
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
28 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 29

f. Boeing Drawing 012W6100
g. Boeing Component Maintenance Manual 56-11-12
h. Boeing Parts Standards Document D-590
i. Boeing Service Bulletin 767-56-0002 "WINDOWS - Flight Compartment Windows - Openable
Windows Number 2 - Latch Hook and Striker Plate Installation"
j. Boeing Service Bulletin 767-56-0004 "WINDOWS - Number 2 Openable Window- Window
Stop Installation"
k. FAA Notice of Proposed Rule Making 2006-NM-224-AD
l. Service Related Problem (SRP) 767-SRP-56-0012 and 767-SRP-56-0023
m. Standard Overhaul Practices Manual (SOPM) 20-10-03, 20-41-02, 20-43-03, 20-50-10,
20-50-19
2. Data supplied with this Service Bulletin:
a. Drawings:
ADCNDCN/REVSheetTitleDrawing No
--1MISCELLANEOUS TOOL WRENCH ASSY
- FLIGHT DECK WINDOW TRACK
ROLLER BEARING STUD
MIT141T4890
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Clevis and Cam Lock Installation - Cab Structure, Number 2 Window141T4834
Operating Mechanism Installation - Number 2 Openable Window141T4843
Cover Installation - Cam Block Torque Tube232T1449
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications
Chapter-SectionPublication
56-11767 Maintenance Manual
56-11767 Illustrated Parts Catalog
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
29 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 30

Chapter-SectionPublication
56-11-12767 Component Maintenance Manual
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
30 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 31

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary For Each Airplane as shown
below. If there is a limit to the quantity (QTY) of available kits, a supply sequence is given by Spares.
More kits become available as shown in the Reorder Lead Time (ROLT). ROLT is calculated from the
date Boeing gets the purchase order.
Unit Price thru
May 30/08
ROLT
(Weeks)
QTYDateNameKit Number
$4,993.0016--SUB KIT - FLIGHT DECK
WINDOW #2 - LINK ARM
MODIFICATION -
TORQUE TUBE ASSY
(CRANK/ROLLER ASSY)
015T1784-3
$719.0024--SUB KIT - FLIGHT DECK
WINDOW #2 - LINK ARM
MODIFICATION - CAM
BLOCK
015T1784-4
$1040.0041--SUB KIT - FLIGHT DECK
WINDOW #2 - LINK ARM
MODIFICATION - LINK
BRACKETS
015T1784-5
$261.0024--SUB KIT - FLIGHT DECK
WINDOW #2 - LINK ARM
MODIFICATION - MISC
ITEMS
015T1784-6
$7,013.004116/20/06TOP KIT - FLIGHT DECK
WINDOW #2 - LINK ARM
MODIFICATION
015T1784-7
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
After the Unit Price date, new price and ROLT data is applicable. Prices are in United States dollars.
Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of the methods that
follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65 Boeing Spares Department P.O. Box 3707 Seattle,
Washington 98124-2207 USA
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
31 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 32

B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes, inspection and/or repair
procedures given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One 015T1784-7 top kit and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, are necessary for each airplane if you want to replace all parts.
NOTE: One 015T1784-6 sub kit and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, are necessary for each airplane if you want to rework all parts.
OPERATOR REWORK / REPLACEMENT OPTIONS
LINK BRACKET MODIFI-
CATION
CAM BLOCK MODIFICA-
TION
CRANK/ROLLER AS-
SEMBLY MODIFICA-
TION
AIRPLANE
GROUP
Replace
option
Rework op-
tion
Replace
option
Rework op-
tion
Replace
option
Rework op-
tion
YES (c) (e)NO (c)YES (b)YESYES (a)YESGroup 1
YES (d) (e)YES (d)YES (b)YESYES (a)YESGroup 2
YES (c) (e)NO (c)YES (b)YESYES (a)YESGroup 3
YES (c) (e)NO (c)YES (b)YESYES (a)YESGroup 4
YES (c) (e)NO (c)YES (b)YESYES (a)YESGroup 5
YES (c) (e)NO (c)YES (b)YESYES (a)YESGroup 6
YES (d) (e)YES (d)YES (b)YESYES (a)YESGroup 7
(a) If the operator replaces the crank/roller assemblies and reworks all other parts, one
015T1784-3 sub kit, one 015T1784-6 sub kit and the items shown in Paragraph 2.C.2., Parts
and Materials Supplied by the Operator, are necessary for each airplane.
(b) If the operator replaces the cam blocks and reworks all other parts, one 015T1784-4 sub
kit, one 015T1784-6 sub kit and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, are necessary for each airplane.
(c) These airplanes do not have 141T4890-15 and 141T4890-16 link brackets installed that
can be reworked. The existing link brackets will need to be replaced.
(d) These airplanes have 141T4890-15 and 141T4890-16 link brackets installed that can be
reworked. As an option the operator can replace the link brackets.
(e) If the operator replaces the link brackets and reworks all other parts, one 015T1784-5 sub
kit, one 015T1784-6 sub kit and the items shown in Paragraph 2.C.2., Parts and Materials
Supplied by the Operator, are necessary for each airplane.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
32 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 33

Kit 015T1784
NotesExisting Part
Number
NameQTYNew Part Num-
ber -7
Sub Kit - Flight Deck Window #2 - Link Arm Modification
- Torque Tube Assembly (Crank/Roller Assembly)
1015T1784-3
Sub Kit - Flight Deck Window #2 - Link Arm Modification
- Cam Blocks
1015T1784-4
Sub Kit - Flight Deck Window #2 - Link Arm Modification
- Link Brackets
1015T1784-5
Sub Kit - Flight Deck Window #2 - Link Arm Modification
- Misc. Items
1015T1784-6
Kit 015T1784
NotesExisting Part
Number
NameQTYNew Part Number
-3-4-5-6
Sub Kit - Flight Deck Window #2
- Link Arm Modification - Torque
Tube Assy (Crank/Roller Assem-
bly)
-...015T1784-3
Sub Kit - Flight Deck Window #2
- Link Arm Modification - Cam
Blocks
.-..015T1784-4
Sub Kit - Flight Deck Window #2
- Link Arm Modification - Link
Brackets
..-.015T1784-5
Sub Kit - Flight Deck Window #2
- Link Arm Modification - Misc.
Items
...-015T1784-6
(a) (b)Laminated Shims...2141T4836-9
(a) (b)Torque Tube Assy (Crank/Roller
Assembly)
2...141T4865-27
(a) (b) (c)Cam Block.1..141T4867-25
(a) (b) (c)Cam Block.1..141T4867-26
(a) (b)Link Bracket - LH..1.141T4890-19
(a) (b)Link Bracket - RH..1.141T4890-20
(a) (b) (d)Pin...4BACP18BC02A02P
(a) Discard the existing part.
(b) You cannot use the existing part to replace the new or changed part.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
33 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 34

Kit 015T1784
NotesExisting Part
Number
NameQTYNew Part Number
-3-4-5-6
(c) To make installation easier, some Boeing parts are sent in an 'interim' configuration. Boeing will identify
these interim configurations with a 'U', 'W' or 'Y' in place of the '-' (dash) in the part number. Interim parts are
changed to the 'dash' configuration when installed as given in the Accomplishment Instructions of this service
bulletin. Refer to Boeing Drawing 005W0900 "INTERIM PARTS - SPARES" and Service Letter 767-SL-00-
014 for more information.
(d) These parts are no longer necessary in Revision 1 of this service bulletin.
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number /
Specification
(a)Chemical Conversion Coating4 ouncesType 2, Class A
(b)Primer4 ouncesBMS 10-11, Type I
(b)Sealant2 ouncesBMS 5-95, Type I,
Class B-1/2 or B-2
(b)Flat Enamel4 ouncesBMS 10-11, Type II
(c)Lockwire24 inchesMS20995C32
(a) Refer to the Boeing Standard Overhaul Practices Manual 20-43-03 or 767
Structural Repair Manual, Chapter 51, for material sources.
(b) See the Qualified Products List at the end of the Boeing Material Specification
(BMS) for supplier data.
(c) See the Qualified Products List of the appropriate specification for supplier
data.
3. Parts Modified and Reidentified:
The parts shown below may be changed as shown in this service bulletin. The quantity (QTY) is
the number of parts changed on each airplane.
NotesNew Part NumberNameQTYExisting Part Number
(a) (b) (c)141T4890-19Link Bracket1141T4890-15
(a) (b) (c)141T4890-20Link Bracket1141T4890-16
(a) (b) (d)141T4867-25Cam Block1141T4867-7
Cam Block1141T4867-9
Cam Block1141T4867-11
Cam Block1141T4867-13
Cam Block1141T4867-17
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
34 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 35

NotesNew Part NumberNameQTYExisting Part Number
(a) (b) (d)141T4867-26Cam Block1141T4867-8
Cam Block1141T4867-10
Cam Block1141T4867-12
Cam Block1141T4867-14
Cam Block1141T4867-18
(a)(e)Torque Tube Assem-
bly (Crank/Roller As-
sembly)
1141T4865-10
Torque Tube Assem-
bly (Crank/Roller As-
sembly)
1141T4865-21
(a) (g)(f)No. 2 Openable Win-
dow Assembly
1015T0195-7 thru -16
(a)(f)No. 2 Openable Win-
dow Assembly
1141T0012-( )
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-1 thru -18
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-21, -22
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-26 thru -28
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-36 thru -38
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-41, -43
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-45, -46
(a) (b)141T4835-67No. 2 Openable Win-
dow Assembly
1141T4835-47
(a) (b)141T4835-68No. 2 Openable Win-
dow Assembly
1141T4835-48
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-503, -504
(a)(f)No. 2 Openable Win-
dow Assembly
1141T4835-507, -508
(a) Make the change given in this service bulletin.
(b) The "New Part Number" is the part number after the change given in this service
bulletin.
(c) This part is used in production.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
35 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 36

NotesNew Part NumberNameQTYExisting Part Number
(d) The 141T4867-25/-26 cam blocks are not installed in production. These parts are
for service bulletin use only.
(e) There is no new part number available for the crank/roller assembly.
(f) There is no equivalent production part number for the window assembly after the
change is made. Apply the service bulletin number on the window assembly to indicate
that the service bulletin modification has been accomplished. Apply the service bulletin
number adjacent to the existing part number, or in another operator preferred location.
(g) These are rework configurations that may exist if service bulletin 767-56-0002 is
incorporated on some production window assemblies. If necessary, refer to service
bulletin 767-56-0002 for more information.
NOTE: As of the Revision 1 date on this service bulletin, the following window assembly part
numbers have been installed in production on airplanes after line number 929. These
window assemblies have had changes incorporated that are equivalent to the window
assembly modification given in this service bulletin.
NameExisting Part
Number
No. 2 Openable Window Assembly141T4835-65
No. 2 Openable Window Assembly141T4835-66
No. 2 Openable Window Assembly141T4835-67
No. 2 Openable Window Assembly141T4835-68
No. 2 Openable Window Assembly141T4835-71
No. 2 Openable Window Assembly141T4835-72
No. 2 Openable Window Assembly141T4835-73
No. 2 Openable Window Assembly141T4835-74
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
To get the parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NotesQTYNamePart Number
(a)1 for each number
2 window.
Torque Tube Assembly
(Crank/Roller Assembly)
141T4865-27
(a) A spare window assembly can be changed to the new configuration by replacing
or reworking the crank/roller assembly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
36 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 37

E. Special Tooling - Price and Availability
Boeing can supply the tools shown in Paragraph 2.F., Special Tooling Necessary to do this Service
Bulletin. Send a Purchase Order to the Director of Spares. Give this service bulletin number and the
date the tools will be used.
Purchase Data:
Unit Price thru
May 31/2008
NameTool Kit Number
$1977.00Miscellaneous Tool - Wrench Assembly - Flight
Deck Window Track Roller Bearing Stud (a)
MIT141T4890
(a) This tool will decrease the time necessary to access and remove/install the link
bracket when you do the modification given in this service bulletin. However, this tool is
not required to do the modification. Instead of purchasing the tool, operators can fabricate
the tool using the tool drawing identified in paragraph 1.J.2., Data supplied with this
Service Bulletin. Alternatively, operators can use their own tool.
The tools are subject to the terms and conditions of the Boeing standard purchase order
acknowledgement. After the Price date, new price data is applicable. Prices are in United States dollars.
Terms: Net 30 days.
Reference this service bulletin number and submit purchase order by one of the methods that
follow:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
3. Spares Customer Support - MC 36-65 Boeing Spares Department P.O. Box 3707 Seattle,
Washington 98124-2207 USA (Service Bulletin 767-56A0010)
F. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 2.E., Special Tooling - Price and Availability.
Maintenance and overhaul tools in the manuals shown in Paragraph 1.J., References, can also be
necessary. Examine operator tool supply to make sure all necessary tools are available.
NameTool Kit Number
Miscellaneous Tool - Wrench Assembly - Flight Deck Window Track
Roller Bearing Stud (a)
MIT141T4890
(a) This tool will decrease the time necessary to access and remove/install the link bracket when
you do the modification given in this service bulletin. However, this tool is not required to do the
modification. Instead of purchasing the tool, operators can fabricate the tool using the tool
drawing identified in paragraph 1.J.2., Data supplied with this Service Bulletin. Alternatively,
operators can use their own tool.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
37 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 38

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
38 of 141
BOEING SERVICE BULLETIN 767-56A0010
BLANK PAGE

### Page 39

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches.
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch.
— Angular tolerance is plus or minus 2 degrees.
— Hole dimensions for standard solid rivets are given in 767 Structural Repair
Manual, Chapter 51.
— Torque limits to tighten nuts and bolts are given in 767 Structural Repair Manual,
Chapter 51.
4. For approved fastener and process material substitutions, refer to 767 Structural
Repair Manual, Chapter 51, Alternate fasteners are given in 767 Structural Repair
Manual Chapter 51 and Boeing Drawing 012W6100.
5. If the length of fasteners specified in this service bulletin do not meet the installation
standards, fasteners of the same specification, or an approved substitute, one grip
length longer or shorter may be used.
6. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "as
given in" are included in the instruction, the procedure in the Boeing document must
be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
39 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 40

7. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to ensure visual access to all surfaces in the
inspection area. This level of inspection is made under normal available lighting
conditions such as daylight, hangar lighting, flashlight or drop-light and may require
removal or opening of access panels or doors. Stands, ladders or platforms may be
required to gain proximity to the area being checked.
8. Removal of the number 2 window assembly is not necessary to perform the window
assembly modifications given in this service bulletin. However, if an operator prefers
to remove the window assembly to perform the modification, it is acceptable to do
so. Refer to 767 AMM 56-11-02 as an accepted procedure for removal/installation
of the number 2 window assembly.
9. When this service bulletin refers to modification of the airplane vs. modification of
the window assembly, the Link Bracket rework/replacement and the Cam Block
rework/replacement are considered the airplane modifications, while the Crank/Roller
Assembly rework/replacement is considered the window assembly modification.
B. WORK INSTRUCTIONS
PART 1 - INSPECTION - LEFT SIDE
1. Do a general visual inspection of the Number 2 Openable Window Link Arm to determine if the
Link Arm is in the over-center position when the window is fully closed as given in Figure 27.
NOTE: As an option to inspection, do all the modification steps as given in "PART 4 -
MODIFICATION".
a. If the link arm is in the over-center position, no modification or adjustment is required.
b. If the link arm is not in the over-center position, attempt to rig the window so that the link arm
is over-center. Refer to 767 AMM 56-11-02 , "NO. 2 OPENABLE WINDOW -
ADJUSTMENT/TEST" instructions as an accepted procedure.
(1) If the over-center position of the link arm can be achieved by rigging the window, no
further modification or adjustment is required.
(2) If the over-center position of the link arm cannot be achieved by rigging the window, do
the airplane modifications and/or window assembly modifications as given in "PART 4 -
MODIFICATION". Do the modifications, as necessary, to achieve the over-center position
of the link arm.
2. No further action is required for the left side of the airplane.
PART 2 - (Deleted - Revision 3)
1. Part 2 steps are deleted.
PART 3 - (Deleted - Revision 3)
1. Part 3 steps are deleted.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
40 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 41

PART 4 - MODIFICATION - LEFT SIDE
1. Airplane modifications:
a. Group 1, 4, 6, Configuration 1:
Remove the link bracket from the carriage assembly lower track operating mechanism as
given in Figure 1.
b. Group 1, Configuration 2; Group 2-3; Group 4, Configuration 2; Group 5; Group 6,
Configuration 2; Group 7:
Remove the link bracket from the carriage assembly lower track operating mechanism as
given in Figure 2.
c. Remove the cam block from the upper number 2 window frame as given in Figure 8.
d. Group 2, 7:
Rework the link bracket as given in Figure 3.
NOTE: The existing link brackets can be reworked to the required new configuration or the
new configuration parts can be procured from Boeing.
e. Rework the cam block as given in Figure 9.
NOTE: The existing cam blocks can be reworked to the required new configuration or the
new configuration parts can be procured from Boeing.
f. Group 1, 6, Configuration 1:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 4.
NOTE: It is recommended that operators accomplish service bulletin 767-56-0004,
"WINDOWS - Number 2 Openable Window - Window Stop Installation", due to
common access.
g. Group 1, Configuration 2; Group 2-3; Group 6, Configuration 2; Group 7:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 5.
h. Group 4, Configuration 1:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 6.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
41 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 42

NOTE: It is recommended that operators accomplish service bulletin 767-56-0004,
"WINDOWS - Number 2 Openable Window - Window Stop Installation", due to
common access.
i. Group 4, Configuration 2; Group 5:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 7.
j. Install the reworked/new cam block on the upper number 2 window frame as given in Figure
10.
2. Window assembly modifications:
a. Remove the crank/roller assembly from the number 2 window as given in Figure 11.
b. If the removed crank/roller assembly is part number 141T4865-21 then rework the crank/roller
assembly as given in Figure 13.
NOTE: The existing crank/roller assemblies can be reworked to the required new configuration
or the new configuration parts can be procured from Boeing.
c. If the removed crank/roller assembly is part number 141T4865-10 then rework the crank/roller
assembly as given in Figure 12.
NOTE: The existing crank/roller assemblies can be reworked to the required new configuration
or the new configuration parts can be procured from Boeing.
d. Install the reworked/new crank/roller assembly on the number 2 window as given in Figure
14.
3. Rig the window assembly and make sure the link arm is over-center. Refer to 767 AMM 56-11-02,
"NO. 2 OPENABLE WINDOW - ADJUSTMENT/TEST" instructions as an accepted procedure.
NOTE: The section of 767 AMM 56-11-02 titled "NO. 2 OPENABLE WINDOW -
ADJUSTMENT/TEST", includes the necessary adjustment and test procedures to ensure
appropriate window operation after incorporation of this service bulletin.
4. Permanently install the cam block parts using the sequence shown in Figure 10. If a shim is
installed under the cam block, remove the cam block and apply BMS 5-95, Type I, Class B-1/2 or
B-2 faying surface seal to the shim. Refer to SOPM 20-50-19 as an accepted procedure for sealant
application.
5. Check the window assembly. Refer to 767 AMM 56-11-02, "NO. 2 INSPECTION/CHECK"
instructions as an accepted procedure.
NOTE: The section of 767 AMM 56-11-02 titled "NO. 2 OPENABLE WINDOW -
INSPECTION/CHECK", includes the necessary inspections and checks to ensure
appropriate window operation after incorporation of this service bulletin.
6. No further action is required for the left side of the airplane.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
42 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 43

PART 5 - INSPECTION - RIGHT SIDE
1. Do a general visual inspection of the Number 2 Openable Window Link Arm to determine if the
Link Arm is in the over-center position when the window is fully closed as given in Figure 28.
NOTE: As an option to inspection, do all the modification steps as given in "PART 8 -
MODIFICATION".
a. If the link arm is in the over-center position, no modification or adjustment is required.
b. If the link arm is not in the over-center position, attempt to rig the window so that the link arm
is over-center. Refer to 767 AMM 56-11-02 , "NO. 2 OPENABLE WINDOW -
ADJUSTMENT/TEST" instructions as an accepted procedure.
(1) If the over-center position of the link arm can be achieved by rigging the window, no
further modification or adjustment is required.
(2) If the over-center position of the link arm cannot be achieved by rigging the window, do
the airplane modifications and/or window assembly modifications as given in "PART 8 -
MODIFICATION". Do the modifications, as necessary, to achieve the over-center position
of the link arm.
2. No further action is required for the right side of the airplane.
PART 6 - (Deleted - Revision 3)
1. Part 6 steps are deleted.
PART 7 - (Deleted - Revision 3)
1. Part 7 steps are deleted.
PART 8 - MODIFICATION - RIGHT SIDE
1. Airplane modifications:
a. Group 1, 4, 6, Configuration 1:
Remove the link bracket from the carriage assembly lower track operating mechanism as
given in Figure 15.
b. Group 1, Configuration 2; Group 2-3; Group 4, Configuration 2; Group 5; Group 6,
Configuration 2; Group 7:
Remove the link bracket from the carriage assembly lower track operating mechanism as
given in Figure 16.
c. Remove the cam block from the upper number 2 window frame as given in Figure 22.
d. Group 2, 7:
Rework the link bracket as given in Figure 17.
NOTE: The existing link brackets can be reworked to the required new configuration or the
new configuration parts can be procured from Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
43 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 44

e. Rework the cam block as given in Figure 23.
NOTE: The existing cam blocks can be reworked to the required new configuration or the
new configuration parts can be procured from Boeing.
f. Group 1, 6, Configuration 1:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 18.
NOTE: It is recommended that operators accomplish service bulletin 767-56-0004,
"WINDOWS - Number 2 Openable Window - Window Stop Installation", due to
common access.
g. Group 1, Configuration 2; Group 2-3; Group 6, Configuration 2; Group 7:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 19.
h. Group 4, Configuration 1:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 20.
NOTE: It is recommended that operators accomplish service bulletin 767-56-0004,
"WINDOWS - Number 2 Openable Window - Window Stop Installation", due to
common access.
i. Group 4, Configuration 2; Group 5:
Install the reworked/new link bracket on the carriage assembly lower track operating mechanism
as given in Figure 21.
j. Install the reworked/new cam block on the upper number 2 window frame as given in Figure
24.
2. Window assembly modifications:
a. Remove the crank/roller assembly from the number 2 window as given in Figure 25.
b. If the removed crank/roller assembly is part number 141T4865-21 then rework the crank/roller
assembly as given in Figure 13.
NOTE: The existing crank/roller assemblies can be reworked to the required new configuration
or the new configuration parts can be procured from Boeing.
c. If the removed crank/roller assembly is part number 141T4865-10 then rework the crank/roller
assembly as given in Figure 12.
NOTE: The existing crank/roller assemblies can be reworked to the required new configuration
or the new configuration parts can be procured from Boeing.
d. Install the reworked/new crank/roller assembly on the number 2 window as given in Figure
26.
3. Rig the window assembly and make sure the link arm is over-center. Refer to 767 AMM 56-11-02,
"NO. 2 OPENABLE WINDOW - ADJUSTMENT/TEST" instructions as an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
44 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 45

NOTE: The section of 767 AMM 56-11-02 titled "NO. 2 OPENABLE WINDOW -
ADJUSTMENT/TEST", includes the necessary adjustment and test procedures to ensure
appropriate window operation after incorporation of this service bulletin.
4. Permanently install the cam block parts using the sequence shown in Figure 24. If a shim is
installed under the cam block, remove the cam block and apply BMS 5-95, Type I, Class B-1/2 or
B-2 faying surface seal to the shim. Refer to SOPM 20-50-19 as an accepted procedure for sealant
application.
5. Check the window assembly. Refer to 767 AMM 56-11-02, "NO. 2 INSPECTION/CHECK"
instructions as an accepted procedure.
NOTE: The section of 767 AMM 56-11-02 titled "NO. 2 OPENABLE WINDOW -
INSPECTION/CHECK", includes the necessary inspections and checks to ensure
appropriate window operation after incorporation of this service bulletin.
6. No further action is required for the right side of the airplane.
PART 9 - CLOSE ACCESS
1. Put the airplane back to a serviceable condition.
2. This step is deleted.
3. This step is deleted.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3: March 03, 2011
45 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 46 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
This Figure applies only to: Group 1, 4, 6, Configuration 1.
OPERATING
CRANK
SEE
→ FWD
INBD
FIGURE 1: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 1 OF 5)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  46 of 141

### Page 47 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
LOWER
TRACK
CLOSURE
TRACK
SUPPORT ASSEMBLY
(GASPER AIR)
SEE  CHANNEL
ASSEMBLY
SEE C
OPERATING
MECHANISM
BALL SCREW
BEARING
BLOCK
ASSEMBLY
FWD
CHANNEL
ASSEMBLY
NYLON BLOCK
(IF INSTALLED)  LOWER TRACK
• FWD
D59128
FIGURE 1: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 2 OF 5)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  47 of 141

### Page 48

FIGURE 1: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 3 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
48 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
NOTE: Tool number MIT141T4890 or similar tool can be used to remove the link bracket. If MIT141T4890 or
similar tool is used, steps 1 through 12, 16, and 17 of the following procedure will not be necessary.
Tool MIT141T4890 is designed to hold the heads of the roller bolts so that the link bracket can be
removed from the carriage assembly without removing the carriage assembly from the airplane. Tool
MIT141T4890 is available for purchase from Boeing. Refer to paragraph 2.E., Special Tooling - Price
and Availability for more information. Instead of purchasing the tool, operators can fabricate the tool
using the tool drawing identified in paragraph 1.J.2., Data supplied with this Service Bulletin. Alternatively,
operators can use their own tool to hold the heads of the roller bolts.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
1232T1429-31Support Assembly
(Gasper Air)
Remove / Keep1
4-Fastener
1232T1430-11Closure TrackRemove / Keep2
8-Screw
Washers not shown.4AN960JD10LLWasherRemove / Keep3
4BACS12FA3K8Screw
1-BoltRemove / Keep4
1-WasherRemove / Keep5
1-Nylon BlockRemove / Keep6
1141T4887-( )Bearing Block As-
sembly
Remove / Keep7
Keep all attaching fas-
teners from the forward
and aft end of the
channel assembly.
1141T4879-( )Channel AssemblyRemove / Keep8
--Fasteners
Move the operating
mechanism to the fur-
thest aft position.
1-Window Operating
Mechanism
Move9
From flange (ball nut
mounting).
2141T4923-1Bolt - Shoulder At-
tachment
Remove / Keep10
Refer to 767 AMM 20-
10-23 as an accepted
procedure.
2MS20995C32LockwireRemove
2AN960-416LWasherRemove / Keep11
1141T4883Carriage AssemblyRemove / Keep12
2BACN10JC5CDNutRemove / Keep13
FIGURE 1: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
49 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 50

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Quantity will depend on
the type of bearing that
is installed.
-NAS1149D0563J or
AN960PD516
WasherRemove / Keep14
(a)
1141T4890-( )Link BracketRemove / Keep15
NOTE: The 141T4890-1/-9/-501 Link Brackets can not be reworked and will need to be discarded.
2NAS43DD5-13FCSleeveRemove / Keep16
2MS21432-5R14A or
BACB10AF5N14HSA or
HRS3CAR16
Bearing (roller bolt)Remove / Keep17
(a) Record the number of washers under each nut. This information will be used during installation. The
number of washers under each nut will depend on which bearing exists (see Step 17). If MS21432-5R14A or
BACB10AF5N14HSA bearing is installed, one washer is expected under each nut (as shown). If HRS3CAR16
bearing is installed, three washers are expected under each nut (not shown).
FIGURE 1: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
50 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 51 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
This Figure applies only to: Group 1, Configuration 2; Group 2-3; Group 4, Configuration 2; Group 5;
Group 6, Configuration 2; Group 7.
OPERATING
CRANK
75778
SEE
UP
→ FWD
INBD  D59677
FIGURE 2: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 1 OF 5)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  51 of 141

### Page 52 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
LOWER
TRACK
CLOSURE
TRACK
2
SUPPORT ASSEMBLY
(GASPER AIR)
SEE  CHANNEL
ASSEMBLY
OPERATING SEE C
MECHANISM
BALL SCREW
BEARING
BLOCK
ASSEMBLY
→ FWD
CHANNEL
ASSEMBLY
LOWER TRACK
→ FWD
D59682
FIGURE 2: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 2 OF 5)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  52 of 141

### Page 53

FIGURE 2: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 3 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
53 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 54

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
NOTE: Tool number MIT141T4890 or similar tool can be used to remove the link bracket. If MIT141T4890 or
similar tool is used, steps 1 through 12, 16, and 17 of the following procedure will not be necessary.
Tool MIT141T4890 is designed to hold the heads of the roller bolts so that the link bracket can be
removed from the carriage assembly without removing the carriage assembly from the airplane. Tool
MIT141T4890 is available for purchase from Boeing. Refer to paragraph 2.E., Special Tooling - Price
and Availability for more information. Instead of purchasing the tool, operators can fabricate the tool
using the tool drawing identified in paragraph 1.J.2., Data supplied with this Service Bulletin. Alternatively,
operators can use their own tool to hold the heads of the roller bolts.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
1232T1429-31Support Assembly
(Gasper Air)
Remove / Keep1
4-Fastener
1232T1430-11Closure TrackRemove / Keep2
8-Screw
Washers not shown.4AN960JD10LLWasherRemove / Keep3
4BACS12FA3K8Screw
1-BoltRemove / Keep4
1-WasherRemove / Keep5
1141T4921-9Stop AssemblyRemove / Keep6
1141T4887-( )Bearing Block As-
sembly
Remove / Keep7
Keep all attaching fas-
teners from the forward
and aft end of the
channel assembly.
1141T4879-( )Channel AssemblyRemove / Keep8
--Fasteners
Move the operating
mechanism to the fur-
thest aft position.
1-Window Operating
Mechanism
Move9
From flange (ball nut
mounting).
2141T4923-1Bolt - Shoulder At-
tachment
Remove / Keep10
Refer to 767 AMM 20-
10-23 as an accepted
procedure.
2MS20995C32LockwireRemove
2AN960-416LWasherRemove / Keep11
1141T4883Carriage AssemblyRemove / Keep12
2BACN10JC5CDNutRemove / Keep13
FIGURE 2: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
54 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 55

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Quantity will depend on
the type of bearing that
is installed.
-NAS1149D0563J or
AN960PD516
WasherRemove / Keep14
(a)
1141T4890-( )Link BracketRemove / Keep15
NOTE: The 141T4890-1/-9/-501 Link Brackets can not be reworked and will need to be discarded.
2NAS43DD5-13FCSleeveRemove / Keep16
2MS21432-5R14A or
BACB10AF5N14HSA or
HRS3CAR16
Bearing (roller bolt)Remove / Keep17
(a) Record the number of washers under each nut. This information will be used during installation. The
number of washers under each nut will depend on which bearing exists (see Step 17). If MS21432-5R14A or
BACB10AF5N14HSA bearing is installed, one washer is expected under each nut (as shown). If HRS3CAR16
bearing is installed, three washers are expected under each nut (not shown).
FIGURE 2: NUMBER 2 WINDOW - LINK BRACKET - REMOVAL - LEFT SIDE
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
55 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 56 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
This Figure applies only to: Group 2, 7.
SEE I
A
0.080
0.100  RADIUS
B  D59161
A-A
FIGURE 3: NUMBER 2 WINDOW - LINK BRACKET - OPTIONAL REWORK - LEFT SIDE
(SHEET 1 OF 2)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  56 of 141

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for one side of the airplane.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)1141T4890-15Link BracketChamfer1
(b)1141T4890-15Link BracketShot Peen2
To chamfered area. Refer
to SOPM 20-43-03 as an
accepted procedure.
-Type 2, Class AChemical Conver-
sion Coating
Apply3
Refer to SOPM 20-41-02 as
an accepted procedure.
1 coatBMS 10-11, Type IPrimerApply4
Refer to SOPM 20-41-02 as
an accepted procedure.
1 coatBMS 10-11, Type IIFlat EnamelApply5
Part mark as 141T4890-19.
Refer to SOPM 20-50-10 as
an accepted procedure.
1141T4890-15Link BracketIdentify6
(a) Chamfer as shown. Break sharp edges. Surface roughness 125 RA.
(b) Shot peen the chamfered area. Self-contained (manual) shot peening optional. Intensity 0.006 Almen to
0.011 Almen. Coverage 1.0 automated, 2.0 manual. Refer to SOPM 20-10-03 as an accepted procedure.
FIGURE 3: NUMBER 2 WINDOW - LINK BRACKET - OPTIONAL REWORK - LEFT SIDE
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
57 of 141
BOEING SERVICE BULLETIN 767-56A0010

### Page 58 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
This Figure applies only to: Group 1, 6, Configuration 1.
OPERATING
_CRANK
SEE
> FWD
INBD
FIGURE 4: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE
(SHEET 1 OF 5)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  58 of 141

### Page 59 (OCR)

BOEING SERVICE BULLETIN 767-56A0010
LOWER
TRACK
CLOSURE
TRACK
SUPPORT ASSEMBLY
(GASPER AIR)
SEE B  CHANNEL
ASSEMBLY
OPERATING  SEE C
MECHANISM
BALL SCREW
BEARING
BLOCK
ASSEMBLY
• FWD
CHANNEL
ASSEMBLY
NYLON BLOCK (13
LOWER TRACK
• FWD
D59699
FIGURE 4: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE
(SHEET 2 OF 5)
Original Issue: September 07, 2006
Revision 3 March 03, 2011  767-56A0010
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  59 of 141

### Page 60

FIGURE 4: NUMBER 2 WINDOW - LINK BRACKET - INSTALLATION - LEFT SIDE
(SHEET 3 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: September 07, 2006
767-56A0010Revision 3 March 03, 2011
60 of 141
BOEING SERVICE BULLETIN 767-56A0010

The text continues at https://openairdocs.org/service-documents/boeing/767-56a0010/file/abfce8505f86.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
