# Boeing Alert Service Bulletin 777-27A0109: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2012-1104; AD 2012-21-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 777-27A0109](https://openairdocs.org/service-documents/boeing/777-27a0109.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 22
- PDF: https://openairdocs.org/files/sha256/6c/5b/6c5b6f638778f3ebd39b52cc739332d27b84a191f7ebf868ee446de038d1cdce
- Page: https://openairdocs.org/service-documents/boeing/777-27a0109/file/6c5b6f638778

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
ALERT
Number: 777-27A0109
Original Issue: December 01, 2011
ATA System: 2711
SUBJECT: FLIGHT CONTROLS - Rudder and Tab - Rudder Power Control Units Reaction Link
Assembly Replacement or Repair
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2011 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
1 of 22
3.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
2 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
Summary ...................................................... 5
1. PLANNING INFORMATION ........................................ 9
A. Effectivity ................................................ 9
1. Airplanes ............................................. 9
2. Spares Affected ........................................ 1 0
B. Concurrent Requirements ...................................... 1 0
C. Reason ................................................ 1 0
D. Description .............................................. 1 1
E. Compliance .............................................. 1 1
F. Approval ............................................... 1 3
G. Manpower .............................................. 1 3
H. Weight and Balance Changes .................................... 1 4
I. Electrical Load Data ......................................... 1 4
J. References .............................................. 1 4
1. Existing Data .......................................... 1 4
2. Data supplied with this Service Bulletin ............................ 1 4
3. Installation Drawings Used in the Preparation of this Service Bulletin ............ 1 4
K. Publications Affected ........................................ 1 4
L. Interchangeability and Intermixability of Parts ........................... 1 5
2. MATERIAL INFORMATION ........................................ 1 7
A. Material - Price and Availability ................................... 1 7
B. Industry Support Information .................................... 1 7
C. Parts Necessary For Each Airplane ................................. 1 7
1. Kits/Parts ............................................ 1 7
2. Parts and Materials Supplied by the Operator ........................ 1 7
3. Parts Modified and Reidentified ................................ 1 8
4. Parts Removed and Not Replaced .............................. 1 8
D. Parts Necessary to Change Spares ................................. 1 8
E. Special Tooling - Price and Availability ............................... 1 8
F. Special Tooling Necessary to do this Service Bulletin ....................... 1 8
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 1 9
A. GENERAL INFORMATION ..................................... 1 9
B. WORK INSTRUCTIONS ....................................... 1 9
FIGURE 1: REACTION LINK ASSEMBLY, END CAP ASSEMBLY BUSHINGS REPLACEMENT . . . 21
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
3 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 4

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
4 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
777
Service Bulletin
ALERT
SummaryNumber: 777-27A0109Original Issue: December 01, 2011
ATA System: 2711
SUBJECT: FLIGHT CONTROLS - Rudder and Tab - Rudder Power Control Units Reaction Link
Assembly Replacement or Repair
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of this service bulletin will prevent vibration caused by the bushing liners of the rudder power
control unit (PCU) reaction link end cap assemblies coming out of the bushing bores. Loss of the bushing liners
in each of the three PCU reaction link assemblies can cause the rudder control surface to have excessive
freeplay which may cause rudder vibration and could result in structural damage severe enough to prevent
continued safe flight and landing.
Boeing received a report from a 777-300ER operator of abnormal airframe vibration in the aft fuselage during
flight. A subsequent inspection of the rudder PCU installations found that the bushing liners were missing from
all six end cap assemblies There have also been several reports from other 777-300ER operators of either
partial or complete loss of the bushing liners. An investigation revealed that the cause of the problem was a
failure of the bond between the liner and the bushing substrate because of the use of liquid nitrogen during
installation of the bushing into the reaction link end cap housing. All of these reports are associated with one
bushing supplier and limited to bushings manufactured before 2008, after which the installation procedure for
the bushings in the end cap assemblies was changed from liquid nitrogen to a dry ice alcohol bath. Because
777-200LR's use the same bushings, they are subject to the same condition.
This Service Bulletin gives instructions to install serviceable Rudder PCUs and related Reaction Link Assemblies
or PCU Reaction Link Assemblies which have been repaired on airplanes in which bushings have been installed
using liquid nitrogen. Installation of serviceable PCUs and their related reaction link assembly with bushings
installed using a dry ice ethyl alcohol or Dowanol DPM bath procedure will prevent the loss of rudder power
control unit (PCU) reaction link assembly bushing liners and subsequent rudder vibration.
Boeing Service Related Problem (SRP) 777-SRP-27-0212 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 777 FTD 27-07005 is related to this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
5 of 22

### Page 6

ACTION
For Each Rudder PCU, check maintenance records to identify if its related Reaction Link Assembly end cap
assembly bushings have been replaced in accordance with Part 1. Remove each affected Rudder PCU with its
related Reaction Link Assembly from the airplane and install a serviceable Rudder PCU and its related Reaction
Link Assembly in accordance with Part 2. As an alternative, a PCU Reaction Link Assembly which has been
repaired in accordance with Part 3 can be installed.
EFFECTIVITY
777-200LR/-300ER Airplanes. Refer to Paragraph 1.A.1., Airplanes, for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of October 28, 2010. Please refer to
Paragraph 2.B., Industry Support Information.
MANPOWER
Refer to Paragraph 1.G., Manpower.
MATERIAL INFORMATION
Boeing Supplied Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
6 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 7 (OCR)

BOEING SERVICE BULLETIN 777-27A0109
ALERT  ALERT
RUDDER PCU'S
(3 LOCATIONS)
FOR EACH RUDDER PCU, CHECK
MAINTENANCE RECORDS TO IDENTIFY IF
ITS RELATED REACTION LINK ASSEMBLY  END CAP ASSEMBLY BUSHINGS HAVE BEẺN
REPLACED.
- IF THE END CAP ASSEMBLY BUSHINGS
HAVE BEEN REPLACED OR HAVE BEEN
REPLACED USING THE DRY ICE ETHYL
ALCOHOL OR DOWANOL DPM BATH
PROCEDURE, THEN NO MORE WORK IS
NECESSARY.
- IF THE END CAP ASSEMBLY BUSHINGS
HAVE NOT BEEN REPLACED OR HAVE BEEN
REPLACED USING THE LIQUID NITROGEN
SHRINK FIT PROCEDURE, THEN INSTALL
RUDDER  REACTION LINK ASSEMBLIES WHERE THE
PCU LOCATIONS  BUSHINGS HAVE BEEN INSTALLED USING A
DRY ICE ETHYL ALCOHOL OR DOWANOL  DPM BATH.  2079458
Original Issue: December 01, 2011
777-27A0109
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  7 of 22

### Page 8

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
8 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT
BLANK PAGE

### Page 9

Commercial 
Airplanes
777
Service Bulletin
ALERT
Number: 777-27A0109
Original Issue: December 01, 2011
ATA System: 2711
SUBJECT: FLIGHT CONTROLS - Rudder and Tab - Rudder Power Control Units Reaction Link
Assembly Replacement or Repair
THIS BULLETIN IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN PARAGRAPH
1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS SERVICE BULLETIN TO
THE NEW OWNER.
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index D624W001 Part 3 for Airplane Variable Number, Line Number, and
Serial Number data.
This service bulletin is for the airplanes shown below.
DESCRIPTIONCONFIGURATIONGROUP
777-200LR airplanes line numbers 504 through 679, and 777-300ER
airplanes line numbers 540 through 686
-1
Airplane Models:
777-200LR, 777-300ER
GroupVariable Number
1WD001 - WD002
1WD011 - WD014
1WD031 - WD033
1WD046 - WD048
1WD505 - WD507
1WD532 - WD537
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
9 of 22

### Page 10

GroupVariable Number
1WD546 - WD552
1WD564 - WD571
1WD585 - WD594
1WD606 - WD609
1WD625 - WD632
1WD653 - WD658
1WD672 - WD675
1WD691 - WD701
1WD741 - WD745
1WD761 - WD768
1WD786 - WD787
1WD796 - WD800
1WD826 - WD828
1WD846
1WD871 - WD872
2. Spares Affected
Examine your spares records for any original rudder Power Control Units (PCUs) removed and
held as a spare and also, any Reaction Link Assemblies held as spare to identify assemblies where
the end cap bushing liners have not been installed using a dry-ice ethyl alcohol or Dowanol DPM
bath.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of this service bulletin will prevent vibration caused by the bushing liners of the rudder
power control unit (PCU) reaction link end cap assemblies coming out of the bushing bores. Loss of
the bushing liners in each of the three PCU reaction link assemblies can cause the rudder control
surface to have excessive freeplay which may cause rudder vibration and could result in structural
damage severe enough to prevent continued safe flight and landing.
Boeing received a report from a 777-300ER operator of abnormal airframe vibration in the aft fuselage
during flight. A subsequent inspection of the rudder PCU installations found that the bushing liners
were missing from all six end cap assemblies There have also been several reports from other
777-300ER operators of either partial or complete loss of the bushing liners. An investigation revealed
that the cause of the problem was a failure of the bond between the liner and the bushing substrate
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
10 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 11

because of the use of liquid nitrogen during installation of the bushing into the reaction link end cap
housing. All of these reports are associated with one bushing supplier and limited to bushings
manufactured before 2008, after which the installation procedure for the bushings in the end cap
assemblies was changed from liquid nitrogen to a dry ice alcohol bath. Because 777-200LR's use the
same bushings, they are subject to the same condition.
This Service Bulletin gives instructions to install serviceable Rudder PCUs and related Reaction Link
Assemblies or PCU Reaction Link Assemblies which have been repaired on airplanes in which bushings
have been installed using liquid nitrogen. Installation of serviceable PCUs and their related reaction
link assembly with bushings installed using a dry ice ethyl alcohol or Dowanol DPM bath procedure
will prevent the loss of rudder power control unit (PCU) reaction link assembly bushing liners and
subsequent rudder vibration.
Boeing Service Related Problem (SRP) 777-SRP-27-0212 is related to this service bulletin.
Boeing Fleet Team Digest (FTD) 777 FTD 27-07005 is related to this service bulletin.
D. Description
For Each Rudder Power Control Unit (PCU), check maintenance records to identify if its related Reaction
Link Assembly end cap assembly bushings have been replaced in accordance with Part 1. Remove
each affected Rudder PCU with its related Reaction Link Assembly from the airplane and install a
serviceable Rudder PCU and its related Reaction Link Assembly in accordance with Part 2. As an
alternative, a PCU Reaction Link Assembly which has been repaired in accordance with Part 3 can be
installed.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
323, 324, 325777-200LR, 777-300ER
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Accomplish the required action(s), based on the applicable condition(s), in Table 1 in accordance with
Paragraph 3. Accomplishment Instructions.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
11 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 12

Table 1
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 48 months
after the original is-
sue date of this
service bulletin.
Check maintenance
records for each Rudder
PCU to identify the condi-
tion of its related Reac-
tion Link Assembly End
Cap Bushings in accor-
dance with PART 1.
All Airplanes
--No further action is neces-
sary.
Condition 1:
The two End Cap Assem-
bly Bushings have been
replaced on the Reaction
Link Assembly in accor-
dance with CMM 27-21-77
dated March 01, 2011 or
later, or an equivalent pro-
cedure has been used
--No further action is neces-
sary.
Condition 2:
The two End Cap Assem-
bly Bushings have been
replaced on the Reaction
Link Assembly in accor-
dance with CMM 27-21-77
dated before March 01,
2011, or an equivalent pro-
cedure was used, and it
can be confirmed that a dry
ice ethyl alcohol or
Dowanol DPM bath was
used to install the bushings
into the end caps.
--No further action is neces-
sary.
Condition 3:
The Reaction Link Assem-
bly was replaced with a unit
which was manufactured
before November 1, 2004
or after October 31, 2007.
-Within 48 months
after the original is-
sue date of this
service bulletin.
Do the Rudder PCU Reac-
tion Link Assembly re-
placement in accordance
with PART 2.
Condition 4:
The condition of the Reac-
tion Link Assembly is not
in accordance with Condi-
tions 1, 2 or 3.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
12 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 13

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this task for each airplane. This
estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator task
hour data if necessary. The estimate does not include lost time. These are some examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Airplane Work
Elapsed HoursTask HoursNumber of PersonsTask
1.001.001Open Access
1.503.002PCU/Reaction Link
Assembly Removal
2.004.002PCU/Reaction Link
Assembly Installation
and Test
1.001.001Close Access
5.509.00TOTAL FOR EACH PCU/REACTION LINK
(a)
(a) Open and close access only required once if multiple PCU/Reaction Link As-
sembly worked simultaneously.
Component Work
Elapsed HoursTask HoursNumber of Per-
sons
Task
1.001.001FIGURE 1
1.001.00TOTAL FOR EACH COMPONENT (a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
13 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 14

Component Work
Elapsed HoursTask HoursNumber of Per-
sons
Task
(a) Total given is for the repair of one Reaction Link Assembly.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
J. References
1. Existing Data
a. Boeing Service Related Problem (SRP) 777-SRP-27-0212
b. Component Maintenance Manual (CMM) 27-21-77
c. Service Bulletin Index D624W001
d. Standard Overhaul Practices Manual (SOPM) 20-50-03, 20-50-10
e. 777 Aircraft Maintenance Manual (AMM) 27-21-11
f. 777 Fleet Team Digest (FTD) 27-07005
2. Data supplied with this Service Bulletin
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin
None.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
27-21777 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
14 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 15

L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
15 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 16

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
16 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT
BLANK PAGE

### Page 17

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the parts shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the original issue
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
original issue
date of this Ser-
vice Bulletin (Cal-
endar Days)
NamePart Number
794.00180BUSHING, END CAP251W3135-5
B. Industry Support Information
Boeing warranty remedies are available for 777 airplanes in warranty as of October 28, 2010. For task
hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Commercial Airplanes Group - Warranties. The parts for airplanes in warranty as of that date will be
supplied at no charge. Send a purchase order for the parts to Boeing Spares. Please refer to this
service bulletin number and reference the airplane variable numbers in your purchase order.
C. Parts Necessary For Each Airplane
1. Kits/Parts
To get the parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
NotesNameQTYPart Number /
Specification
(a)BUSHING, END CAP2251W3135-5
(a) The quantity specified is sufficient to replace the end cap bushing assemblies of one
rudder PCU reaction link assembly. There are three rudder PCU reaction link assemblies
on each airplane.
2. Parts and Materials Supplied by the Operator
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
17 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 18

3. Parts Modified and Reidentified
The parts shown below are changed as shown in this service bulletin. The quantity (QTY) is the
number of parts changed on each rudder PCU reaction link assembly.
NotesNew Part NumberNameQTYExisting Part
Number
(a) (b)251W3131-5End Cap Assembly2251W3131-5
(a) Make the change in accordance with this service bulletin.
(b) Identify on the part that the change given in this service bulletin was made.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
It is recommended that operators check their records to see if they have any affected Reaction link
Assemblies or Power Control Units with affected Reaction Link Assemblies fitted held as spare. Once
this data is known, evaluate the condition and do the applicable action.
To get the parts shown below, refer to Paragraph 2.A., Material - Price and Availability. The QTY given
is for each rudder PCU reaction link assembly.
QTYNamePart Number
2 (a)BUSHING, END CAP251W3135-5
(a) The quantity specified is sufficient to replace
the end cap bushing assemblies of one rudder
PCU reaction link assembly.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
18 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 19

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
4. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
5. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
B. WORK INSTRUCTIONS
PART 1 - RUDDER POWER CONTROL UNIT, REACTION LINK ASSEMBLY END CAP ASSEMBLY
- MAINTENANCE RECORD CHECK
1. For each Rudder Power Control Unit (PCU) check maintenance records to identify the condition
of its related reaction link assembly.
a. Condition 1: The two End Cap Assembly Bushings have been replaced in accordance with
CMM 27-21-77 dated March 01, 2011 or later, or an equivalent procedure has been used.
b. Condition 2: The two End Cap Assembly Bushings have been replaced in accordance with
versions of CMM 27-21-77 dated before March 01, 2011, or an equivalent procedure has
been used, and it can be confirmed that a dry ice ethyl alcohol or Dowanol DPM bath was
used to shrink fit the bushings into the end caps.
c. Condition 3: The Reaction Link Assembly was manufactured before November 1, 2004 or
after October 31, 2007.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
19 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 20

d. Condition 4: The condition of the reaction link assembly is not in accordance with Conditions
1, 2 or 3.
2. For each reaction link assembly found to have Conditions 1, 2 or 3, no further action is necessary.
3. For each reaction link assembly found to have Condition 4, do Part 2.
PART 2 - PCU REACTION LINK ASSEMBLY REPLACEMENT
1. Do these steps for each reaction link assembly found to have Condition 4:
a. Remove the applicable Rudder PCU and its related Reaction Link Assembly from the airplane.
Refer to 777 AMM 27-21-11 as an accepted procedure.
NOTE: It is not necessary to remove the Kick Link Assembly and the Damped Solenoid from
the Power Control Unit.
b. Install a serviceable Rudder PCU and its related Reaction Link Assembly. Refer to 777 AMM
27-21-11 as an accepted procedure. The PCU Reaction Link Assembly which is installed must
be in accordance with Condition 1, Condition 2 or Condition 3. As an alternative, the PCU
Reaction Link Assembly must have its bushings replaced in accordance with Part 3.
2. Put the airplane back to a serviceable condition.
PART 3 - PCU REACTION LINK ASSEMBLY END CAP ASSEMBLY BUSHING REPLACEMENT
1. Replace the Reaction Link Assembly End Cap Assembly Bushings in accordance with FIGURE
1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
20 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

### Page 21 (OCR)

BOEING SERVICE BULLETIN 777-27A0109
ALERT  ALERT
2 LOCATIONS 1®
LINK LEGS
END CAP
ASSEMBLIES
(2 LOCATIONS)
REACTION LINK
ASSEMBLY  _ A
MARKING
(2 LOCATIONS) 1
2 LOCATIONS
MARKING
(2 LOCATIONS) (1
A-A  2079788
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each Reaction Link Assembly.
FIGURE 1: REACTION LINK ASSEMBLY, END CAP ASSEMBLY BUSHINGS REPLACEMENT
(SHEET 1 OF 2)
Original Issue: December 01, 2011
BOEING PROPRIETARY -  777-27A0109
Copyright © Unpublished Work - See page 1 for details.  21 of 22

### Page 22

More DataQtyIdentificationNameTaskStep
Serial Number. (a)2-Reaction Link LegInspect1
Serial Number. (a)2251W3135-5Bushing, End CapInspect
Refer to SOPM 20-
50-03 as an accept-
ed procedure.
2251W3135-5Bushing, End CapRemove2
Refer to CMM 27-
21-77 dated March
01, 2011 or later,
Repair 2-1 as an ac-
cepted procedure.
(b)
2251W3135-5Bushing, End CapInstall (New)3
(c)-SB 777-27A0109Service Bulletin Num-
ber
Apply4
(a) To make sure that marking of matched set serial numbers are legible and visible, on the outside face, on
the Reaction Link Assembly link legs and their related End Cap Assemblies. If matched set markings are
not visible on all of the parts, then apply markings as follows: Each Reaction Link leg and mating End
Cap Assembly must be marked with the unique assembly serial number XXXX and serial dash number
"-001" or "-002" where XXXX represents the digits in a unique number. When marking is complete, one
Reaction Link leg and its mating/matched End Cap Assembly should be marked "S/N XXXX -001", and
the opposite Reaction Link leg and its mating/matched End Cap Assembly should be marked "S/N XXXX-
002". Refer to SOPM 20-50-10 code M as an accepted procedure to apply markings.
(b) CMM 27-21-77 dated March 01, 2011, or later, uses dry ice ethyl alcohol or Dowanol DPM bath to shrink
fit bushings into reaction link assembly end cap assemblies.
(c) Use rubber stamp method. Refer to SOPM 20-50-10 as an accepted procedure. Make sure that the
marking is on the outside face of each End Cap Assembly.
FIGURE 1: REACTION LINK ASSEMBLY, END CAP ASSEMBLY BUSHINGS REPLACEMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: December 01, 2011
777-27A0109
22 of 22
BOEING SERVICE BULLETIN 777-27A0109
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
