# Boeing Alert Service Bulletin 777-28A0034: U.S. DOT/FAA - Service Information

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2008-0847; AD 2013-05-03 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 777-28A0034](https://openairdocs.org/service-documents/boeing/777-28a0034.md)
- Title as filed: U.S. DOT/FAA - Service Information
- Pages: 96
- PDF: https://openairdocs.org/files/sha256/60/b6/60b63d6e6c8bdd26475d52eda7d2ae1c65911bab970e21093eef881b70cdb516
- Page: https://openairdocs.org/service-documents/boeing/777-28a0034/file/60b63d6e6c8b

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
Number: 777-28A0034
Original Issue: August 02, 2007
Revision 2: September 20, 2010
ATA System: 2822 2825 2826 2831
SUBJECT: FUEL - Main and Center Tank Valve Actuators - Inspection and Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2007 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
1 of 96
2.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
2 of 96
BOEING SERVICE BULLETIN 777-28A0034
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 3
B. Concurrent Requirements ...................................... 1 4
C. Reason ................................................ 1 4
D. Description .............................................. 1 4
E. Compliance .............................................. 1 5
F. Approval ............................................... 1 6
G. Manpower .............................................. 1 6
H. Weight and Balance Changes .................................... 2 8
I. Electrical Load Data ......................................... 2 8
J. References .............................................. 2 8
1. Existing Data: ......................................... 2 8
2. Data supplied with this Service Bulletin: ........................... 2 8
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 9
K. Publications Affected ........................................ 2 9
L. Interchangeability and Intermixability of Parts ........................... 2 9
2. MATERIAL INFORMATION ........................................ 3 1
A. Material - Price and Availability ................................... 3 1
B. Industry Support Information .................................... 3 1
C. Parts Necessary For Each Airplane ................................. 3 1
1. Kits/Parts: ........................................... 3 1
2. Parts and Materials Supplied by the Operator: ........................ 3 1
3. Parts Modified and Reidentified: ............................... 3 2
4. Parts Removed and Not Replaced: .............................. 3 2
D. Parts Necessary to Change Spares ................................. 3 2
E. Special Tooling - Price and Availability ............................... 3 2
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 3
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 5
FIGURE 1: INSPECT AND RECORD THE ENGINE FUEL SPAR MOV ACTUATOR PART NUMBER (LEFT
WING) .............................................. 5 4
FIGURE 2: REMOVE AND KEEP INDEX PLATE ............................. 5 6
FIGURE 3: REWORK INDEX PLATE ................................... 5 8
FIGURE 4: MEASURE AND RECORD ELECTRICAL RESISTANCE FROM THE ADAPTER PLATE TO
THE AIRPLANE STRUCTURE ................................ 5 9
FIGURE 5: PREPARE ADAPTER PLATE SURFACE ........................... 6 0
FIGURE 6: PUT INDEX PLATE IN POSITION FOR INSTALLATION .................. 6 1
FIGURE 7: INSTALL THE MOV ACTUATOR (DIRECTLY TO THE INDEX PLATE) .......... 6 2
FIGURE 8: CLEAN ADAPTER PLATE AND AIRPLANE SURFACE ................... 6 6
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
3 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 4

FIGURE 9: INSPECT AND RECORD THE ENGINE FUEL SPAR MOV ACTUATOR PART NUMBER (RIGHT
WING) .............................................. 6 7
FIGURE 10: INSPECT AND RECORD THE FORWARD/AFT CROSSFEED MOV ACTUATOR PART NUMBER
(LEFT WING) .......................................... 6 9
FIGURE 11: INSPECT AND RECORD THE APU FUEL SHUTOFF MOV ACTUATOR PART NUMBER (LEFT
WING). ............................................. 7 1
FIGURE 12: INSPECT AND RECORD THE APU ISOLATION MOV ACTUATOR PART NUMBER (LEFT
WING). ............................................. 7 3
FIGURE 13: REWORK BRACKET AT APU ISOLATION MOV ACTUATOR AREA ONLY ........ 7 5
FIGURE 14: INSPECT AND RECORD THE DEFUEL MOV ACTUATOR PART NUMBER (RIGHT WING).
.................................................. 7 9
FIGURE 15: INSPECT AND RECORD FUEL JETTISON NOZZLE MOV ACTUATOR PART NUMBER (INSIDE
THE LEFT WING AREA) .................................... 8 1
FIGURE 16: INSPECT AND RECORD FUEL JETTISON NOZZLE MOV ACTUATOR PART NUMBER (INSIDE
THE RIGHT WING AREA) ................................... 8 2
FIGURE 17: INSPECT AND RECORD FUEL JETTISON NOZZLE MOV ACTUATOR PART NUMBER (LEFT
WING) .............................................. 8 3
FIGURE 18: INSPECT AND RECORD FUEL JETTISON NOZZLE MOV ACTUATOR PART NUMBER (RIGHT
WING) .............................................. 8 4
FIGURE 19: INSPECT AND RECORD FUEL JETTISON ISOLATION MOV ACTUATOR PART NUMBER
(LEFT WING) .......................................... 8 5
FIGURE 20: INSPECT AND RECORD FUEL JETTISON ISOLATION MOV ACTUATOR PART NUMBER
(RIGHT WING) ......................................... 8 7
FIGURE 21: INSTALL THE MOV ACTUATOR ............................... 8 9
FIGURE 22: INSTALL THE FUEL JETTISON NOZZLE VALVE MOV ACTUATOR (INSIDE WING AREA)
.................................................. 9 3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
4 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 5

Commercial 
Airplanes
777
Service Bulletin
Revision Transmittal SheetNumber: 777-28A0034Original Issue: August 02, 2007
Revision 2: September 20, 2010
ATA System: 2822 2825 2826 2831
SUBJECT: FUEL - Main and Center Tank Valve Actuators - Inspection and Replacement
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM 2008-NM-056-AD, is related to
this service bulletin.
No more work is necessary on the airplane(s) changed in accordance with the original issue or Revision 1 of
this service bulletin.
REASON FOR REVISION
This revision is sent to inform operators of the following corrections to apply cap seal to the fasteners of the
Motor Operated Valve (MOV) actuator bonding jumper fasteners:
– In paragraph 2.C., Parts Necessary For Each Airplane, the QTY for BMS 5-95 was increased to reflect the
approximate total amount to consume when applying cap seal to the bonding jumper fasteners.
– In paragraph 2.C., Parts Necessary For Each Airplane, footnote (e) was added to clarify optional part
numbers for BMS 5-95 when applying cap seal on the bonding jumper fasteners.
– In Figure 7, Figure 21, and Figure 22, for the install of the MOV actuator, the step table was revised to add
a step to apply cap seal on the bonding jumper fasteners after measuring the electrical bond resistance.
– In Figure 7, Figure 21, and Figure 22, footnote (f) was added to clarify optional part numbers for BMS 5-95
when applying cap seal on the bonding jumper fasteners.
The information given in Information Notice 777-28A0034 IN 3 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
August 02, 2007Original Issue:
May 20, 2010Revision 1:
September 20, 2010Revision 2:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
5 of 96

### Page 6

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
6 of 96
BOEING SERVICE BULLETIN 777-28A0034
BLANK PAGE

### Page 7

Commercial 
Airplanes
777
Service Bulletin
SummaryNumber: 777-28A0034Original Issue: August 02, 2007
Revision 2: September 20, 2010
ATA System: 2822 2825 2826 2831
SUBJECT: FUEL - Main and Center Tank Valve Actuators - Inspection and Replacement
CONCURRENT REQUIREMENTS
None
BACKGROUND
This service bulletin gives instruction to inspect all the motor operated valve (MOV) actuators and to install new
MOV actuators where necessary. The MOV actuators are installed at each fuel system. The new MOV actuator
will prevent electrical current flow through the actuator into the fuel tank. If this service bulletin is not done it is
possible that a flow of electricity into the fuel tank will supply an ignition source for the fuel fumes in the tank.
The Boeing system safety assessment necessary for Special Federal Aviation Regulation (SFAR) 88, showed
that under specific conditions it was possible for electrical current to flow through certain MOV actuators into
the fuel tank. A new MOV actuator is available to replace the existing MOV actuator with this condition. The new
MOV actuator includes an internal electrical isolator to give the MOV actuator protection against electrical energy
from lightning, 115 VAC hot shorts, and 28 VDC internal shorts. The new MOV actuator will prevent the flow of
an electrical current into the fuel tank and increase the reliability of the fuel system.
This service bulletin replaces the MOV actuator part number MA20A1001-1 with the new MOV actuator part
number MA30A1001. The MOV actuator part number MA20A1001-1 is the only installed MOV actuator part
number that is affected by this service bulletin.
This service bulletin gives instruction on how to measure the electrical resistance of bonds at the installed MOV
actuator locations, how to prepare a Faying surface for the install of the new MOV actuator, how to prepare
affected airplane parts, and how to install the new MOV actuator.
This service bulletin is the result of a safety assessment conducted by Boeing under SFAR 88, "Fuel Tank
System Fault Tolerance Evaluation Requirements".
Section 9 of the Maintenance Planning Data (MPD) document was changed.
ACTION (PRR 61777-187, PRR 61998-3)
The following actions are necessary:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
7 of 96

### Page 8

— Gain access to each MOV actuator.
— Inspect each MOV actuator part number. If the MOV actuator part number is MA20A1001-1, remove, discard,
and replace with the MOV actuator part number MA30A1001. The MOV actuator part number MA20A1001-1
is the only installed MOV actuator part number that is affected by this service bulletin.
— If you are required to install the MOV actuator part number MA30A1001, you must do an electrical resistance
check of each location. If the measured resistance is not acceptable, you must rework the Faying bond and
the airplane parts. This may require rework of the index plate and the adapter plate. This may require a
tank entry to rework the interface between the adapter plate and the airplane structure.
— Remove, rework, and reinstall the bracket at the APU Isolation MOV actuator location to prevent part
interference with the new MOV actuator part number MA30A1001.
— Close access to each MOV actuator.
EFFECTIVITY
777 -200 /-200LR /-300 /-300ER airplanes. Refer to Paragraph 1.A., Effectivity for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2008-NM-056-AD, is related to this
service bulletin.
Boeing recommends that operators accomplish this service bulletin be incorporated within 60 months after the
original issue date on this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Elapsed HoursTotal Task HoursAirplanes
142.35 (a) (b)327.35 (a)(b)Group 1
182.05 (a) (b)427.05 (a)(b)Group 2
(a) Entry into the fuel tank should not be frequent.
(b) If entry into the fuel tank is not necessary, the time
needed to do the work is much less.
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
8 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 9 (OCR)

BOEING SERVICE BULLETIN 777-28A0034
FUEL JETTISON
FORWARD/ AFT  ISOLATION MOV
ACTUATOR
CROSS FEED
MOV ACTUATOR
FUEL JETTISON
NOZZLE MOV
APU FUEL SHUTOFF  ACTUATOR
MOV ACTUATOR
APU FUEL ISOLATION
MOV ACTUATOR
FUEL JETTISON
ISOLATION MOV  DEFUELING MOV
ACTUATOR  ACTUATOR  ENGINE FUEL SPAR
MOV ACTUATOR
FUEL JETTISON NOZZLE
MOV ACTUATOR
INSPECT THE MOV ACTUATORS AT THE ABOVE LOCATIONS.
- IF THE MOV ACTUATOR HAS AN UNACCEPTABLE PART
NUMBER, REPLACE THE MOV ACTUATOR.
- AT LOCATIONS WITH AN INDEX PLATE, PREPARE AN
ELECTRICAL BOND.
REAR SPAR
INDEX
REAR SPAR  PLATE
FWD  ADAPTER PLATE  → FWD
TYPICAL MOV ACTURATOR  TYPICAL MOV ACTUATOR
INSTALLATION WITHOUT INDEX  INSTALLATION WITH INDEX PLATE
PLATE  U32450
Original Issue: August 02, 2007
Revision 2: September 20, 2010  777-28A0034
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  9 of 96

### Page 10

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
10 of 96
BOEING SERVICE BULLETIN 777-28A0034
BLANK PAGE

### Page 11

Commercial 
Airplanes
777
Service Bulletin
Number: 777-28A0034
Original Issue: August 02, 2007
Revision 2: September 20, 2010
ATA System: 2822 2825 2826 2831
SUBJECT: FUEL - Main and Center Tank Valve Actuators - Inspection and Replacement
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624W001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 61998-3 for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
777-200/-300 airplanes with jettison nozzle MOV actuator located
inside the rear wing area.
-1
777-200LR/-300ER airplanes with jettison nozzle MOV actuator
located on the rear wing spar.
-2
Airplane Models:
777-200, 777-200LR, 777-300, 777-300ER
GroupVariable Number
1WA001 - WA017
1WA076 - WA080
1WA086 - WA093
1WA101 - WA104
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
1WA196 - WA198
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
11 of 96

### Page 12

GroupVariable Number
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281 - WA282
1WA301 - WA304
1WB001 - WB021
1WB031 - WB046
1WB051 - WB088
1WB101 - WB106
1WB121 - WB125
1WB131 - WB141
1WB151 - WB155
1WB161 - WB177
1WB181 - WB194
1WB201 - WB215
1WB231 - WB247
1WB271 - WB273
1WB276 - WB286
1WB291 - WB302
1WB306 - WB307
1WB311 - WB337
1WB341 - WB342
1WB366 - WB368
1WB371 - WB388
1WB406
1WB411 - WB413
1WB416 - WB437
1WB446 - WB453
1WB476
1WB481 - WB484
1WB501 - WB511
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
12 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 13

GroupVariable Number
1WB531 - WB537
1WB551 - WB554
1WB591 - WB597
1WB601 - WB606
1WB611 - WB622
1WB631 - WB638
1WB646 - WB649
1WC051 - WC073
1WC101 - WC104
1WC111 - WC116
1WC241 - WC243
1WC281 - WC290
1WC301 - WC308
1WC361 - WC364
1WC371 - WC374
1WC381 - WC390
1WC441
1WC446 - WC448
1WC456 - WC458
1WC486 - WC489
2WD001 - WD002
2WD501 - WD504
2WD521 - WD532
2WD561 - WD563
2WD581 - WD586
2WD606
2WD621 - WD625
2WD651 - WD652
2WD671 - WD675
2. Spares Affected
Examine your spares supply for the parts or components identified in Paragraph 2.C., Parts
Necessary for Each Airplane. If any parts or components are found, refer to Paragraph 2.C. for
the recommended use.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
13 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 14

B. Concurrent Requirements
None.
C. Reason
This service bulletin gives instruction to inspect all the motor operated valve (MOV) actuators and to
install new MOV actuators where necessary. The MOV actuators are installed at each fuel system.
The new MOV actuator will prevent electrical current flow through the actuator into the fuel tank. If this
service bulletin is not done it is possible that a flow of electricity into the fuel tank will supply an ignition
source for the fuel fumes in the tank.
The Boeing system safety assessment necessary for Special Federal Aviation Regulation (SFAR) 88,
showed that under specific conditions it was possible for electrical current to flow through certain MOV
actuators into the fuel tank. A new MOV actuator is available to replace the existing MOV actuator with
this condition. The new MOV actuator includes an internal electrical isolator to give the MOV actuator
protection against electrical energy from lightning, 115 VAC hot shorts, and 28 VDC internal shorts.
The new MOV actuator will prevent the flow of an electrical current into the fuel tank and increase the
reliability of the fuel system.
This service bulletin replaces the MOV actuator part number MA20A1001-1 with the new MOV actuator
part number MA30A1001. The MOV actuator part number MA20A1001-1 is the only installed MOV
actuator part number that is affected by this service bulletin.
This service bulletin gives instruction on how to measure the electrical resistance of bonds at the
installed MOV actuator locations, how to prepare a Faying surface for the install of the new MOV
actuator, how to prepare affected airplane parts, and how to install the new MOV actuator.
This service bulletin is the result of a safety assessment conducted by Boeing under SFAR 88, "Fuel
Tank System Fault Tolerance Evaluation Requirements".
Section 9 of the Maintenance Planning Data (MPD) document was changed.
Revision 1 is sent to correct the accomplishment instructions and to correct the MOV actuator part
number.
Revision 2 is sent to add a step to apply BMS 5-95 as cap seal on the bonding jumper fasteners, to
clarify the quantity of BMS 5-95 consumed, and to clarify optional part numbers for BMS 5-95 when
installing the MOV actuator.
D. Description
The following actions are necessary:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
14 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 15

— Gain access to each MOV actuator.
— Inspect each MOV actuator part number. If the MOV actuator part number is MA20A1001-1,
remove, discard, and replace with the MOV actuator part number MA30A1001. The MOV actuator
part number MA20A1001-1 is the only installed MOV actuator part number that is affected by this
service bulletin.
— If you are required to install the MOV actuator part number MA30A1001, you must do an electrical
resistance check of each location. If the measured resistance is not acceptable, you must rework
the Faying bond and the airplane parts. This may require rework of the index plate and the adapter
plate. This may require a tank entry to rework the interface between the adapter plate and the
airplane structure.
— Remove, rework, and reinstall the bracket at the APU Isolation MOV actuator location to prevent
part interference with the new MOV actuator part number MA30A1001.
— Close access to each MOV actuator.
Revision 1 - No more work is necessary on airplanes changed as shown in the original issue of this
service bulletin.
Revision 2 - No more work is necessary on airplanes changed in accordance with the original issue or
Revision 1 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
531, 533, 543, 551, 631, 633, 643, 651777-200, 777-300
Group 2:
Affected Maintenance Zones
ZoneModel
531, 533, 543, 551, 631, 633, 643, 651777-200LR, 777-300ER
E. Compliance
Federal Aviation Administration (FAA) Notice of Proposed Rule Making 2008-NM-056-AD, is related
to this service bulletin.
Boeing recommends that operators accomplish this service bulletin be incorporated within 60 months
after the original issue date on this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
15 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 16

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The tables below shows an estimate of the task hours necessary to do these work packages for each
airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Work Package Versus MOV Actuator Equipment Numbers
MOV Actuator Equipment No.Work Package No.
V281641
V282642
V28163/V282633
V280234
V280315
V283106
V281667
V282668
V281669
V2826610
V2816511
V2826512
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
16 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 17

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 1
0.100.101Open MOV ac-
tuator access
0.250.251Figure 1
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
17 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 18

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 2
0.100.101Open MOV ac-
tuator access
0.250.251Figure 9
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
18 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 19

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 3
0.100.101Open MOV ac-
tuator access
0.500.501Figure 10
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
22.2052.70Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
19 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 20

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 4
0.100.101Open MOV ac-
tuator access
0.500.501Figure 11
0.250.251Remove MOV
actuator
0.250.251Figure 21
0.500.501Close MOV ac-
tuator access
2.12.6Total for Work Package
0.501.002PrepareWork Package 5
0.100.101Open MOV ac-
tuator access
0.500.501Figure 12
0.250.251Remove MOV
actuator
2.002.001Figure 13
0.250.251Figure 21
0.500.501Close MOV ac-
tuator access
4.14.6Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
20 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 21

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 6
0.100.101Open MOV ac-
tuator access
0.250.251Figure 14
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
21 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 22

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 7
0.100.101Open MOV ac-
tuator access
0.500.501Figure 15
0.250.251Remove MOV
actuator
0.250.251Figure 22
0.500.501Close MOV ac-
tuator access
2.12.6Total for Work Package
0.501.002PrepareWork Package 8
0.100.101Open MOV ac-
tuator access
0.500.501Figure 16
0.250.251Remove MOV
actuator
0.250.251Figure 22
0.500.501Close MOV ac-
tuator access
2.12.6Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
22 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 23

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 9
0.100.101Open MOV ac-
tuator access
0.250.251Figure 17
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
23 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 24

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 10
0.100.101Open MOV ac-
tuator access
0.250.251Figure 18
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
24 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 25

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 11
0.100.101Open MOV ac-
tuator access
0.250.251Figure 19
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
25 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 26

Work Packages for All Groups
Elapsed
Hours
Task HoursNumber of
Persons
TasksWork Package
0.501.002PrepareWork Package 12
0.100.101Open MOV ac-
tuator access
0.250.251Figure 20
0.250.251Remove MOV
actuator
1.001.001Figure 2
1.001.001Figure 3
0.500.501Figure 4
8.0032.04MOV access/
fuel tank entry
(a)
1.002.002Remove
adapter plate
and adapter
shaft (a)
1.001.001Figure 8 (a)
1.002.002Install adapter
plate and
adapter shaft
(a)
0.500.501Figure 4 (a)
1.501.501Figure 5
0.500.501Figure 6
0.500.501Install index
plate
0.250.251Figure 7
4.008.002Close fuel tank
access (a)
0.100.101Close MOV ac-
tuator access
21.9552.45Total for Work Package
(a) Task is associated with a tank entry. A tank entry should not be likely. A tank entry
is only required if the electrical bonding resistance measure is not satisfactory.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
26 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 27

Group 1:
Only the Work Packages for this Group
Total Elapsed Hours (a)Total Task-Hours (a)Sum of Work Packages
21.9552.45Work Package 1
21.9552.45Work Package 2
22.2052.70Work Package 3
2.102.60Work Package 4
4.104.60Work Package 5
21.9552.45Work Package 6
2.102.60Work Package 7
2.102.60Work Package 8
21.9552.45Work Package 11
21.9552.45Work Package 12
142.35327.35TOTAL FOR EACH AIRPLANE
(a) See the Work Package tables for details.
Group 2:
Only the Work Packages for this Group
Total Elapsed Hours (a)Total Task-Hours (a)Sum of Work Packages
21.9552.45Work Package 1
21.9552.45Work Package 2
22.2052.70Work Package 3
2.102.60Work Package 4
4.104.60Work Package 5
21.9552.45Work Package 6
21.9552.45Work Package 9
21.9552.45Work Package 10
21.9552.45Work Package 11
21.9552.45Work Package 12
182.05427.05TOTAL FOR EACH AIRPLANE
(a) See the Work Package tables for details.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
27 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 28

H. Weight and Balance Changes
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+5448.9+4.1777-200
+6199.2+4.1777-300
Change in Moment (Pound-Inch-
es)
Change in Weight (Pounds)Work Package
+483.2+0.4Work Package 1
+483.2+0.4Work Package 2
+466.6+0.4Work Package 3
+474.0+0.4Work Package 4
+474.0+0.4Work Package 5
+465.1+0.4Work Package 6
+582.4+0.4Work Package 7
+582.4+0.4Work Package 8
+582.4+0.4Work Package 9
+582.4+0.4Work Package 10
+465.3+0.4Work Package 11
+465.3+0.4Work Package 12
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 61998-3
b. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-43-03, 20-50-10
c. Standard Wiring Practices Manual (SWPM) 20-20-00
d. 777 Aircraft Maintenance Manual (AMM) 28-22-01, 28-22-02, 28-22-02, 28-22-03, 28-22-04,
28-25-02, 28-25-05, 28-26-01, 28-26-02, 28-31-02, 28-31-03, 28-31-04, 28-31-05
e. FAA Notice of Proposed Rule Making 2008-NM-056-AD.
2. Data supplied with this Service Bulletin:
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
28 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 29

3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Equipment Inst - Engine Fuel Feed System343W3001
Equipment Inst - Refueling and Jettison System (left wing)344W3001
Equipment Inst - Refueling and Jettison System (right wing)344W3001
Equipment Inst - APU Fuel Feed (wing)346W3001
Rear Spar Assy - Wing112W1003
K. Publications Affected
Chapter-SectionPublication
28-22, 28-25, 28-26, 28-31777 Maintenance Manual
28-22, 28-25, 28-26, 28-31777 Illustrated Parts Catalog
9777 Maintenance Planning Data
1. Publications:
None.
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Refer to Paragraph 2.C., Parts Necessary For Each Airplane, for interchangeability and intermixability
information.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
29 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 30

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
30 of 96
BOEING SERVICE BULLETIN 777-28A0034
BLANK PAGE

### Page 31

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary For Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
None.
2. Parts and Materials Supplied by the Operator:
Group 1:
NotesNameQTYPart Number /
Specification
Replaces MA20A1001-1
(S343T003-39)
Motor Operated Valve Actuator11MA30A1001
(S343T003-66) (a)
(b) (c) (e)pressure and environmental sealant-
chromate type, class B
66 ozBMS 5-95
(d)bonding jumper, 5 inch6BACJ40A20-5
(d)bonding jumper, 6 inch3BACJ40A20-6
(d)bonding jumper, 7 inch1BACJ40A20-7
(d)bonding jumper, 9 inch1BACJ40A20-9
colored chemical conversion coating
for aluminum, type 2, class A or D
4 oz.BAC 5626
chemical and solvent resistant finish
(primer)
4 oz.BMS 10-11
(a) Supplier: ITT Aerospace Controls 28150 Industry Drive, Valencia, CA, 91355 USA.
(b) For use on surfaces outside of a fuel tank that may be exposed to fuel.
(c) BMS 5-45 Fuel Tank Sealant is optional (BAC5117-6).
(d) The new MOV actuator (MA30A1001) installation may require that a longer bonding
jumper be installed to reach the bonding jumper mounting screw on either side of the
MOV actuator.
(e) BMS 5-45 or BMS 5-145 can be used as a substitute for BMS 5-95 for the application of
cap seal on the MOV actuator bonding jumper fasteners as described in the work packages
of this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
31 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 32

Group 2:
NotesNameQTYPart Number /
Specification
Replaces MA20A1001-1
(S343T003-39)
Motor Operated Valve Actuator11MA30A1001
(S343T003-66) (a)
(b) (c) (e)Pressure and Environmental
Sealant-Chromate Type
66 ozBMS 5-95
(d)bonding jumper, 5 inch6BACJ40A20-5
(d)bonding jumper, 6 inch1BACJ40A20-6
(d)bonding jumper, 7 inch3BACJ40A20-7
(d)bonding jumper, 9 inch1BACJ40A20-9
colored chemical conversion coating
for aluminum, type 2, class A or D
4 oz.BAC 5626
chemical and solvent resistant finish
(primer)
4 oz.BMS 10-11
(a) Supplier: ITT Aerospace Controls 28150 Industry Drive, Valencia, CA, 91355 USA
(b) For use on surfaces outside of a fuel tank that may be exposed to fuel
(c) BMS 5-45 Fuel Tank Sealant is optional (BAC5117-6).
(d) The new MOV actuator (MA30A1001) installation may require that a longer bonding
jumper be installed to reach the bonding jumper mounting screw on either side of the
MOV actuator.
(e) BMS 5-45 or BMS 5-145 can be used as a substitute for BMS 5-95 for the application of
cap seal on the MOV actuator bonding jumper fasteners as described in the work packages
of this service bulletin.
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
32 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 33

F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
33 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 34

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
34 of 96
BOEING SERVICE BULLETIN 777-28A0034
BLANK PAGE

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. The work instructions are divided into work packages. Task-Hours and Elapsed-Hours
for each package are given in Paragraph 1.G., Manpower. You can do each work
package independently.
4. Unless shown differently, these dimensions and tolerances are used:
— Torque limits to tighten nuts and bolts are given in Structural Repair Manual,
Chapter 51.
5. For approved fastener and process material substitutions, refer to 777 Structural
Repair Manual, Chapter 51, Alternate fasteners are given in 777 Structural Repair
Manual Chapter 51 and Boeing Drawing 777 012W6100.
6. Refer to the Boeing Standard Wiring Practices Manuals 20-10-11 and 20-10-12 for
the wire installation procedures.
7. These work instructions refer to procedures included on other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "as
given in" are included in the instruction, the procedure in the Boeing document must
be used.
8. All AMM references refer to the post 777-28A0034 procedures in the AMM.
B. WORK INSTRUCTIONS
Group 1-2:
Work Package 1 - ENGINE FUEL SPAR VALVE ACTUATOR - LEFT (V28164)
1. Get access to the MOV actuator. Refer to 777 AMM 28-22-02 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 1.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
35 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 36

(1) Close Access to each MOV actuator. Refer to 777 AMM 28-22-02 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-22-02 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-22-01 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-22-02 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-22-02 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-22-01
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-22-01 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-22-01 as
an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
36 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 37

5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-22-01 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-22-02 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-22-02
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-22-01 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-22-02 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1-2:
Work Package 2 - ENGINE FUEL SPAR VALVE ACTUATOR - RIGHT (V28264)
1. Get access to the MOV actuator. Refer to 777 AMM 28-22-02 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 9.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-22-02 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
37 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 38

(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-22-02 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-22-01 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-22-02 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-22-02 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-22-01
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-22-01 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-22-01 as
an accepted procedure.
5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
38 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 39

{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-22-01 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-22-02 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-22-02
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-22-01 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-22-02 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1-2:
Work Package 3 - FORWARD/AFT CROSSFEED VALVE ACTUATOR - LEFT (V28163/V28263)
1. Get access to each MOV actuator. Refer to 777 AMM 28-22-04 as an accepted procedure.
2. For each MOV actuator, read and record the part number of each MOV actuator as given in Figure
10.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-22-04 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-22-04 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
39 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 40

NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-22-03 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-22-04 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-22-04 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-22-03
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-22-03 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-22-03 as
an accepted procedure.
5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
40 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 41

{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-22-03 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-22-04 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-22-04
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-22-03 as an
accepted procedure.
3. For each MOV actuator, close access to the MOV actuator. Refer to 777 AMM 28-22-04 as an
accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1-2:
Work Package 4 - APU FUEL SHUTOFF VALVE ACTUATOR - LEFT (V28023)
1. Get access to the MOV actuator. Refer to 777 AMM 28-25-02 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 11.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-25-02 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
41 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 42

(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-25-02 as an accepted procedure.
(2) Install the MOV actuator as given in Figure 21. Refer to 777 AMM 28-25-02 as an accepted
procedure for the install of the MOV actuator body.
(3) Do an operational test of MOV actuator. Refer to 777 AMM 28-25-02 as an accepted
procedure.
3. When you are done with the work, close access to the MOV actuator. Refer to 777 AMM 28-25-02
as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1-2:
Work Package 5 - APU FUEL ISOLATION VALVE ACTUATOR - LEFT (V28031)
1. Get access to the MOV actuator. Refer to 777 AMM 28-25-05 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 12.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-25-05 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-25-05 as an accepted procedure.
(2) Remove, Rework, and Install the bracket at APU Isolation MOV actuator to provided
space for the new actuator. Do work as given in Figure 13.
(3) Install the MOV actuator as given in Figure 21. Refer to 777 AMM 28-25-05 as an accepted
procedure for the install of the MOV actuator body.
(4) Do an operational test of MOV actuator. Refer to 777 AMM 28-25-05 as an accepted
procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-25-05 as an acceptable procedure.
4. Put the airplane in a serviceable condition or do another work package.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
42 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 43

Group 1-2:
Work Package 6 - DEFUEL VALVE ACTUATOR - RIGHT (V28310)
1. Get access to the MOV actuator. Refer to 777 AMM 28-26-02 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 14.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-26-02 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-26-02 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-26-01 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-26-02 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-26-02 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
43 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 44

1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-26-01
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-26-01 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-26-01 as
an accepted procedure.
5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-26-01 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-26-02 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-26-02
as an accepted procedure..
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-26-01 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to both 777 AMM 28-26-02 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1:
Work Package 7 - FUEL JETTISON NOZZLE VALVE ACTUATOR - LEFT (V28166)
1. Get access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 15.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
44 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 45

(1) Close Access to each MOV actuator. Refer to 777 AMM 28-31-03 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-31-03 as an accepted procedure.
(2) Install the MOV actuator as given in Figure 22. Refer to 777 AMM 28-31-03 as an accepted
procedure as an accepted procedure for the install of the MOV actuator body.
(3) Do an operational test of MOV actuator. Refer to 777 AMM 28-31-03 as an accepted
procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1:
Work Package 8 - FUEL JETTISON NOZZLE VALVE ACTUATOR - RIGHT (V28266)
1. Get access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 16.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-31-03 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator and remove and keep the bonding jumper. Refer
to 777 AMM 28-31-03 as an accepted procedure.
(2) Install the MOV actuator as given in Figure 22. Refer to 777 AMM 28-31-03 as an accepted
procedure for the install of the MOV actuator body.
(3) Do an operational test of MOV actuator. Refer to 777 AMM 28-31-03 as an accepted
procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
45 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 46

Group 2:
Work Package 9 - FUEL JETTISON NOZZLE VALVE ACTUATOR - LEFT (V8166)
1. Get access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 17.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-31-03 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-31-03 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-31-02 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-31-03 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-31-03 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
46 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 47

1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-31-02
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-31-02 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-31-02 as
an accepted procedure.
5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-31-02 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-31-03 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-31-03
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-31-02 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 2:
Work Package 10 - FUEL JETTISON NOZZLE VALVE ACTUATOR - RIGHT (V28266)
1. Get access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 18.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
47 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 48

(1) Close Access to each MOV actuator. Refer to 777 AMM 28-31-03 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-31-03 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-31-02 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-31-03 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-31-03 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-31-02
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-31-02 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-31-02 as
an accepted procedure.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
48 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 49

5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-31-02 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-31-03 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-31-03
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-31-02 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-31-03 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1-2:
Work Package 11 - FUEL JETTISON ISOLATION VALVE ACTUATOR - LEFT (V28165)
1. Get access to the MOV actuator. Refer to 777 AMM 28-31-05 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 19.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-31-05 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
49 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 50

(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-31-05 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-31-04 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-31-05 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-31-05 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-31-04
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-31-04 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-31-04 as
an accepted procedure.
5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
50 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 51

{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-31-04 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-31-05 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-31-05
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-31-04 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-31-05 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
Group 1-2:
Work Package 12 - FUEL JETTISON ISOLATION VALVE ACTUATOR - RIGHT (V28265)
1. Get access to the MOV actuator. Refer to 777 AMM 28-31-05 as an accepted procedure.
2. Read and record the part number of the MOV actuator as given in Figure 20.
a. If the MOV actuator is not part number MA20A1001-1, the part is acceptable. No more work
is necessary at this location.
(1) Close Access to each MOV actuator. Refer to 777 AMM 28-31-05 as an accepted
procedure.
(2) Put the airplane in a serviceable condition or do another work package.
b. If the MOV actuator is part number MA20A1001-1, the part is not acceptable. Do the following
steps to install the MOV actuator with part number MA30A1001:
(1) Remove and discard the MOV actuator, and remove and keep the bonding jumper. Refer
to 777 AMM 28-31-05 as an accepted procedure.
(2) Remove and keep the index plate as given in Figure 2.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
51 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 52

NOTE: Make an ink mark with a pen across the index plate, the adapter plate, and the
airplane structure as a reference for installation alignment.
(3) Rework the index plate as given in Figure 3.
(4) Prepare the adapter plate surface as given in Figure 5.
(5) Measure and record the electrical resistance of the bond from the adapter plate to the
airplane structure as given in Figure 4.
(a) If the resistance is less than 1.5 milliohms, the bond is acceptable. Do the following
steps:
1) Temporarily put the index plate in position for installation as given in Figure 6.
2) Install the index plate. Refer to 777 AMM 28-31-04 as an accepted procedure.
3) Install the MOV actuator as given in Figure 7. Refer to 777 AMM 28-31-05 as
an accepted procedure for the install of the MOV actuator body.
4) Do an operational test of MOV actuator. Refer to 777 AMM 28-31-05 as an
accepted procedure.
(b) If the resistance is 1.5 milliohms or greater, the bond is not acceptable. A fuel tank
entry is necessary to make an acceptable bond. Do the following steps:
1) Get access to the Motor Operated Valve (MOV). Refer to 777 AMM 28-31-04
as an accepted procedure.
2) Remove the adapter plate and adapter shaft. Refer to 777 AMM 28-31-04 as
an accepted procedure.
3) Clean the adapter plate and the airplane structure as given in Figure 8.
4) Install the adapter plate and the adapter shaft. Refer to 777 AMM 28-31-04 as
an accepted procedure.
5) Prepare the adapter plate surface as given in Figure 5.
6) Measure and record the electrical resistance of the bond from the adapter plate
to the airplane structure as given in Figure 4.
a) If the resistance is less than 0.5 milliohms, the bond is acceptable. Do the
following steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
52 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 53

{1} Temporarily put the index plate in position for installation as given in
Figure 6.
{2} Install the index plate. Refer to 777 AMM 28-31-04 as an accepted
procedure.
{3} Install the MOV actuator as given in Figure 7. Refer to 777 AMM
28-31-05 as an accepted procedure for the install of the MOV actuator
body.
{4} Do an operational test of MOV actuator. Refer to 777 AMM 28-31-05
as an accepted procedure.
b) If the resistance is 0.5 milliohms or greater, the bond is not acceptable. Do
the following steps:
{1} Return to step 2.b.(5)(b)2) and rework the bond until it is acceptable.
7) Close access to the Motor Operated Valve. Refer to 777 AMM 28-31-04 as an
accepted procedure.
3. Close access to the MOV actuator. Refer to 777 AMM 28-31-05 as an accepted procedure.
4. Put the airplane in a serviceable condition or do another work package.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2: September 20, 2010
53 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 54 (OCR)

BOEING SERVICE BULLETIN 777-28A0034
SEE A
FWD  09 INBD
FWD
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the figure.
FIGURE 1: INSPECT AND RECORD THE ENGINE FUEL SPAR MOV ACTUATOR PART NUMBER (LEFT
WING)
(SHEET 1 OF 2)
Original Issue: August 02, 2007
Revision 2 September 20, 2010  BOEING PROPRIETARY -  777-28A0034
Copyright © Unpublished Work - See page 1 for details.  54 of 96

### Page 55

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Get access to the
part number mark-
ings on the MOV ac-
tuator.1-
Motor Operated Valve
ActuatorGet1
Record the part
number.1-
Motor Operated Valve
ActuatorRecord2
FIGURE 1: INSPECT AND RECORD THE ENGINE FUEL SPAR MOV ACTUATOR PART NUMBER (LEFT
WING)
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2 September 20, 2010
55 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the figure.
FIGURE 2: REMOVE AND KEEP INDEX PLATE
(SHEET 1 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2 September 20, 2010
56 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 57

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Make an ink mark
with a pen across
both the index plate
and the adapter
plate as a reference
for installation align-
ment.--Reference MarkMake1
Remove from the in-
dex plate mounting
screws.--LockwireRemove2
3-
Index Plate Mounting
ScrewRemove / Keep3
Keep for rework.1-Index PlateRemove / Keep4
FIGURE 2: REMOVE AND KEEP INDEX PLATE
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2 September 20, 2010
57 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 58

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a) Remove an-
odized material from
the index plate con-
tact surface loca-
tions using an abra-
sive pad. Refer to
SOPM 20-30-03 as
an accepted proce-
dure.--Anodized MaterialRemove1
Clean contact sur-
faces. Refer to
SOPM 20-30-03 as
an accepted proce-
dure.--Index PlateClean2
(a) Make sure not to remove the reference mark needed for alignment.
FIGURE 3: REWORK INDEX PLATE
(SHEET 1 OF 1)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2 September 20, 2010
58 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Measure electrical
resistance from the
adapter plate to the
rear wing spar. Re-
fer to SWPM 20-20-
00 as an accepted
procedure.
1-Electrical BondMeasure1
Record the electrical
resistance in mil-
liohms.
1-Electrical BondRecord2
FIGURE 4: MEASURE AND RECORD ELECTRICAL RESISTANCE FROM THE ADAPTER PLATE TO THE
AIRPLANE STRUCTURE
(SHEET 1 OF 1)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2 September 20, 2010
59 of 96
BOEING SERVICE BULLETIN 777-28A0034

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Remove surface
material from
adapter plate con-
tact surface loca-
tions using an abra-
sive pad. Refer to
SOPM 20-30-03 as
an accepted proce-
dure.
--Adapter PlateClean1
Clean contact sur-
face locations. Refer
to SOPM 20-30-03
as an accepted pro-
cedure.
--Adapter PlateClean2
Use a minimum
amount of sealant to
reduce squeeze out.
-BMS 5-95 (BMS 5-45
optional)
Pressure and Environ-
mental Sealant-Chro-
mate Type
Apply3
FIGURE 5: PREPARE ADAPTER PLATE SURFACE
(SHEET 1 OF 1)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: August 02, 2007
777-28A0034Revision 2 September 20, 2010
60 of 96
BOEING SERVICE BULLETIN 777-28A0034

The text continues at https://openairdocs.org/service-documents/boeing/777-28a0034/file/60b63d6e6c8b.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
