# Boeing Alert Service Bulletin 777-28A0037: Boeing - Service Bulletin

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2010-1205; AD 2011-09-15 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 777-28A0037](https://openairdocs.org/service-documents/boeing/777-28a0037.md)
- Title as filed: Boeing - Service Bulletin
- Pages: 110
- PDF: https://openairdocs.org/files/sha256/e1/07/e1071f8f81b9635a27ba9220915b8123a0e42fc4e154d716b4154f775fac8e40
- Page: https://openairdocs.org/service-documents/boeing/777-28a0037/file/e1071f8f81b9

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
Number: 777-28A0037
Original Issue: June 13, 2008
Revision 2: September 20, 2010
ATA System: 2831 2822
SUBJECT: FUEL - Fuel Jettison System - Center Tank Override/Jettison Pumps and Main Tank
Jettison Pump Ground Fault Protection and Uncommanded On Protection Change
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2008 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
1 of 110
4.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
2 of 110
BOEING SERVICE BULLETIN 777-28A0037
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 9
1. PLANNING INFORMATION ........................................ 1 3
A. Effectivity ............................................... 1 3
1. Airplanes ............................................ 1 3
2. Spares Affected ........................................ 1 5
B. Concurrent Requirements ...................................... 1 5
C. Reason ................................................ 1 6
D. Description .............................................. 1 8
E. Compliance .............................................. 1 9
F. Approval ............................................... 1 9
G. Manpower .............................................. 1 9
H. Weight and Balance Changes .................................... 2 1
I. Electrical Load Data ......................................... 2 1
J. References .............................................. 2 2
1. Existing Data: ......................................... 2 2
2. Data supplied with this Service Bulletin: ........................... 2 2
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 2
K. Publications Affected ........................................ 2 2
L. Interchangeability and Intermixability of Parts ........................... 2 3
2. MATERIAL INFORMATION ........................................ 2 5
A. Material - Price and Availability ................................... 2 5
B. Industry Support Information .................................... 2 6
C. Parts Necessary For Each Airplane ................................. 2 7
1. Kits/Parts: ........................................... 2 7
2. Parts and Materials Supplied by the Operator: ........................ 3 4
3. Parts Modified and Reidentified: ............................... 3 5
4. Parts Removed and Not Replaced: .............................. 3 5
D. Parts Necessary to Change Spares ................................. 3 5
E. Special Tooling - Price and Availability ............................... 3 5
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 5
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 7
A. GENERAL INFORMATION ..................................... 3 7
B. WORK INSTRUCTIONS ....................................... 3 8
FIGURE 1: P301 PANEL INSTALLATION [Group 1-2, Configuration 2] ................. 5 4
FIGURE 2: P302 RELAY PANEL ASSEMBLY INSTALLATION [Group 1-2, Configuration 2] ..... 5 9
FIGURE 3: LEFT MAIN TANK JETTISON PUMP WIRING CHANGE [Group 1-2, Configuration 2] . . 64
FIGURE 4: CENTER TANK LEFT OVERRIDE/JETTISON PUMP WIRING CHANGE [Group 1-2, Configuration
2 ]  ................................................ 6 9
FIGURE 5: LEFT MAIN TANK JETTISON NOZZLE VALVE WIRING CHANGE [Group 1, Configuration 2]
.................................................. 7 2
FIGURE 6: LEFT MAIN TANK JETTISON NOZZLE VALVE WIRING CHANGE [Group 2, Configuration 2]
.................................................. 7 5
FIGURE 7: RIGHT MAIN TANK JETTISON PUMP WIRING CHANGE [Group 1-2, Configuration 2] . 78
FIGURE 8: CENTER TANK RIGHT OVERRIDE/JETTISON PUMP WIRING CHANGE [Group 1-2,
Configuration 2] ......................................... 8 1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
3 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 4

FIGURE 9: RIGHT MAIN TANK JETTISON NOZZLE VALVE WIRING CHANGE [Group 1-2, Configuration
2 ]  ................................................ 8 4
FIGURE 10: DEFUEL VALVE WIRING CHANGE [Group 1-2, Configuration 2] .............. 8 6
FIGURE 11: WIRING INSTALLATION [Group 1-2, Configuration 2] .................... 8 7
FIGURE 12: P301 RELAY INSTALLATION [Group 1-2, Configuration 2] ................ 1 0 0
FIGURE 13: P302 PANEL RELAY INSTALLATION [Group 1-2, Configuration 2] ............ 1 0 3
FIGURE 14: P110 AND P210 PANEL CHANGE [Group 1-2, Configuration 2] .............. 1 0 6
FIGURE 15: P301 PANEL - MORE WORK - BOND RESISTANCE MEASUREMENT [Group 1-2, Configuration
1 ]  ................................................ 1 0 7
FIGURE 16: P302 PANEL - MORE WORK - BOND RESISTANCE MEASUREMENT [Group 1-2, Configuration
1 ]  ................................................ 1 0 9
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
4 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 5

Commercial 
Airplanes
777
Service Bulletin
Revision Transmittal SheetNumber: 777-28A0037Original Issue: June 13, 2008
Revision 2: September 20, 2010
ATA System: 2831 2822
SUBJECT: FUEL - Fuel Jettison System - Center Tank Override/Jettison Pumps and Main Tank
Jettison Pump Ground Fault Protection and Uncommanded On Protection Change
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
More work is necessary on airplanes changed in accordance with the original issue or Revision 1 of this service
bulletin. The resistance of the bond between each ground wire terminal lug on the ground studs GD41253-DC,
GD41254-DC and the ground bracket assembly must be measured to make sure the resistance is not more
than 0.001 ohm.
REASON FOR REVISION
This revision is sent to correct discrepancies and typographical errors found in this service bulletin. Also, a new
top kit has been added for Group 2 airplanes. The Group 2 top kit 005W3256-3 contains the same parts as the
Group 1 top kit 005W3256-2.
Terminology has been changed in the Work Instructions to agree with the terminology defined in Paragraph
3.A., General Information - Notes.
These sections were changed:
1. In Summary, Action and Paragraph 1.D., Description, added the more work necessary data.
2. In Paragraph 1.C., Reason, added Information Notice data.
3. In Paragraph 1.D., Description, added Affected Maintenance Zones tables.
4. In Paragraph 1.G., Manpower, added manpower table for more work necessary.
5. In Paragraph 1.H., Weight and Balance Changes, changed weight and balance data.
6. In Paragraph 1.j.1., Existing Data, added Standard Wiring Practices Manual (SWPM) references.
7. In Paragraph 2.A., Material - Price and Availability, added top kit pricing data.
8. In Paragraph 2.C., Parts Necessary for Each Airplane:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
5 of 110

### Page 6

a. Added Group 2 top kit 005W3256-3.
b. Top kit 005W3256-2, added optional retainer part numbers.
c. Top kit 005W3256-2, added screw, cap part number.
d. Sub kit 280W3256-113, changed terminal, lug part number.
e. Sub kit 280W3256-118, added optional contact part numbers.
9. In Paragraph 3.B., Work Instructions:
a. Steps 17.a.(4).(a).1), 17.a.(4).(a).2), 17.a.(4).(b) and 17.a.(11).(b), changed fuel quantity data.
b. Steps 17.b.(10).(b), 17.b.(13).(b), 17.b.(17).(c).2), 17.c.(4).(d).5.a).{2} and 17.c.(5).(h).1).b), changed
voltage data.
c. Steps 17.b.(14).(f).2) and 17.b.(15).(b), changed fuel jettison switch name.
d. Step 17.b.(19), added Engine Indication and Crew Alerting System (EICAS) status message data.
e. Step 17.c.(5).(k).9), changed center pumps switch name.
f. Step 17.c.(5).(t), changed Fuel Management maintenance page data.
g. Added steps to do the more work necessary.
10. In Figure 1:
a. Sheet 2 and step table, removed steps 15 and 16.
b. Step table, steps 8 and 9, added optional retainer part numbers.
11. In Figure 2:
a. Sheet 1, changed incorrect location of panel P302 and stringer references.
b. Sheet 2 and step table, removed steps 15 and 16.
c. Sheet 3, changed incorrect stringer reference.
d. Step table, steps 8 and 9, added optional retainer part numbers and a note.
12. In Figure 3, sheet 1, changed incorrect wire identification number.
13. In Figure 4:
a. Sheet 1, changed incorrect flag note reference.
b. Flag note table, flag notes 3 and 4, changed contact quantity.
14. In Figure 5:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
6 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 7

a. Sheet 1, changed flag note 2 data.
b. Sheet 1 and flag note table, added flag note 11.
c. Flag note table, flag note 2, changed contact quantity.
15. In Figure 11:
a. Sheet 1, added wire bundle data.
b. Sheets 3 and 7, added circle notes 14 thru 16.
c. Step table, steps 3, 6 and 13, added a note.
d. Step table, added steps 14 thru 16.
e. Extra parts table, added screw, cap BACS12GU3K70 and a note.
16. In Figures 3 thru 10, added SWPM references.
17. Added new Figures 15 and 16 to do bond resistance measurements.
The data given in Information Notice 777-28A0037 IN02 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
June 13, 2008Original Issue:
June 15, 2009Revision 1:
September 20, 2010Revision 2:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
7 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 8

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
8 of 110
BOEING SERVICE BULLETIN 777-28A0037
BLANK PAGE

### Page 9

Commercial 
Airplanes
777
Service Bulletin
SummaryNumber: 777-28A0037Original Issue: June 13, 2008
Revision 2: September 20, 2010
ATA System: 2831 2822
SUBJECT: FUEL - Fuel Jettison System - Center Tank Override/Jettison Pumps and Main Tank
Jettison Pump Ground Fault Protection and Uncommanded On Protection Change
CONCURRENT REQUIREMENTS
Refer to Paragraph 1.B., Concurrent Requirements.
BACKGROUND
This service bulletin will add an extra layer of protection to prevent possible sources of ignition in a fuel tank
caused by electrical faults or uncommanded dry operation of the center tank override/jettison pumps or main
tank jettison pumps. An ignition source in the fuel tank could result in a fire or an explosion.
This service bulletin is the result of the safety assessments conducted by Boeing under Special Federal Aviation
Regulation 88 (SFAR 88), "Fuel Tank System Fault Tolerance Evaluation Requirements". The safety assessments
indicate that wiring deterioration or damage in the center tank override/jettison pumps or main tank jettison
pumps can result in electrical faults. Internal electrical faults in the center tank override/jettison pumps or main
tank jettison pumps could cause an ignition source in the fuel tank from an overheat condition or electrical arcs.
There is also a safety concern that these pumps may continue to operate dry for an extended period of time
due to electrical faults or a single failure in the pump switch or the Electrical Load Control Unit (ELCU). The
extended dry operation of the pump could cause an overheat, electrical arcs or frictional sparks in the fuel tank.
This service bulletin provides instructions to modify the pump control circuit to include new Ground Fault Interrupt
(GFI) relays between the pumps and their ELCU. New GFI relays provide ground fault protection and changes
in the control circuit and ELMS software provide the necessary redundancy that allows the system to remove
the power to prevent uncommanded operation of the pump.
This change affected Section 9 of the Maintenance Planning Data (MPD) Document. New Airworthiness Limitation
(AWL) 28-AWL-18 will be added to Section 9 of the MPD to include the GFI operational check of the center tank
override/jettison pumps and main tank jettison pumps.
ACTION (PRR 61998-1)
Group 1-2, Configuration 2:
Install the new P301 panel on the left side frame in the main equipment center. Install the new P302 panel on
the right side frame in the main equipment center. Do a wiring change. Install new GFI relays in P301 and P302
panels. Install new ELMS software in accordance with Boeing Service Bulletin 777-28A0039. Do the functional
test.
Group 1-2, Configuration 1:
More work is necessary. Get access to the main equipment center. Measure the resistance of the bond between
each terminal lug on the ground studs GD41253-DC, GD41254-DC and the ground bracket assembly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
9 of 110

### Page 10

EFFECTIVITY
777-200, 777-300 Airplanes. Refer to Paragraph 1.A.1 Airplanes, for the list of affected airplanes.
COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to this service
bulletin. The Airworthiness Directive will make the compliance tasks and times given in this service bulletin
mandatory.
Boeing recommends that the change given in this service bulletin be done within 36 months after the original
issue date of this service bulletin.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
MANPOWER
Group 1-2, Configuration 2:
Elapsed HoursTotal Task HoursAirplanes
45.5064.00All
Group 1-2, Configuration 2:
The time to make the change to the ELMS panels in accordance with the GE Aviation service bulletins is not
included.
Group 1-2, Configuration 1:
Elapsed HoursTotal Task HoursAirplanes
1.101.10More Work
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
10 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 11 (OCR)

BOEING SERVICE BULLETIN 777-28A0037
MAKE A WIRING CHANGE
IN THE P210 PANEL AS
GIVEN IN THE GE
AVIATION SERVICE  MAKE A WIRING
BULLETIN  CHANGE
MAKE A WIRING CHANGE
IN THE P110 PANEL AS
P200
GIVEN IN THE GE
INSTALL NEW  AVIATION SERVICE
P302 PANEL  BULLETIN
AND RELAYS
AE0232
MAKE A WIRING
CHANGE IN THE
P205 PANEL
AE0231  P100
MAKE A WIRING  INSTALL NEW P301
CHANGE IN THE  PANEL AND RELAYS
P105 PANEL
MAIN EQUIPMENT CENTER  1327972
Original Issue: June 13, 2008
Revision 2: September 20, 2010  777-28A0037
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  11 of 110

### Page 12

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
12 of 110
BOEING SERVICE BULLETIN 777-28A0037
BLANK PAGE

### Page 13

Commercial 
Airplanes
777
Service Bulletin
Number: 777-28A0037
Original Issue: June 13, 2008
Revision 2: September 20, 2010
ATA System: 2831 2822
SUBJECT: FUEL - Fuel Jettison System - Center Tank Override/Jettison Pumps and Main Tank
Jettison Pump Ground Fault Protection and Uncommanded On Protection Change
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624W001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 61998-1, Part B for data about this change.
DESCRIPTIONCONFIGURATIONGROUP
777-200 airplanes line numbers 1 through 453.-1
777-200 airplanes line numbers 1 through 453 that have accomplished
the original issue or Revision 1 of this service bulletin.
1
777-200 airplanes line numbers 1 through 453 that have not
accomplished the original issue or Revision 1 of this service bulletin.
2
777-300 airplanes line numbers 1 through 453.-2
777-300 airplanes line numbers 1 through 453 that have accomplished
the original issue or Revision 1 of this service bulletin.
1
777-300 airplanes line numbers 1 through 453 that have not
accomplished the original issue or Revision 1 of this service bulletin.
2
Airplane Models:
777-200, 777-300
GroupVariable Number
1WA001 - WA017
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
13 of 110

### Page 14

GroupVariable Number
1WA076 - WA080
1WA086 - WA093
1WA101 - WA104
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
1WA196 - WA198
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281
1WB001 - WB021
1WB031 - WB046
1WB051 - WB088
1WB101 - WB106
1WB121 - WB125
1WB131 - WB139
1WB151 - WB155
1WB161 - WB175
1WB181 - WB192
1WB201 - WB214
1WB231 - WB247
1WB271 - WB273
1WB276 - WB286
1WB291 - WB302
1WB306 - WB307
1WB311 - WB337
1WB341 - WB342
1WB366 - WB367
1WB371 - WB388
1WB406
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
14 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 15

GroupVariable Number
1WB411 - WB413
1WB416 - WB437
1WB446 - WB453
1WB476
1WB481 - WB484
2WB501 - WB507
2WB531 - WB537
2WB551 - WB554
2WB591 - WB595
2WB601 - WB606
2WB611 - WB618
2WB631 - WB638
2WB646 - WB649
1WC051 - WC073
1WC101 - WC104
1WC111 - WC114
1WC241 - WC243
1WC281 - WC286
1WC301 - WC302
1WC361 - WC362
1WC371 - WC372
2. Spares Affected
None.
B. Concurrent Requirements
The service bulletins listed below must be done at the same time as this service bulletin.
Group 1-2, Configuration 2:
DescriptionService BulletinCompany
Install Electrical Load Management System
(ELMS) software.
777-28A0039 original issue thru
Revision 1
Boeing
Make a wiring change in the P110 panel.5000ELM-28-454 original issueGE Aviation
Make a wiring change in the P210 panel.6000ELM-28-455 original issue
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
15 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 16

C. Reason
This service bulletin will add an extra layer of protection to prevent possible sources of ignition in a fuel
tank caused by electrical faults or uncommanded dry operation of the center tank override/jettison
pumps or main tank jettison pumps. An ignition source in the fuel tank could result in a fire or an
explosion.
This service bulletin is the result of the safety assessments conducted by Boeing under Special Federal
Aviation Regulation 88 (SFAR 88), "Fuel Tank System Fault Tolerance Evaluation Requirements". The
safety assessments indicate that wiring deterioration or damage in the center tank override/jettison
pumps or main tank jettison pumps can result in electrical faults. Internal electrical faults in the center
tank override/jettison pumps or main tank jettison pumps could cause an ignition source in the fuel tank
from an overheat condition or electrical arcs. There is also a safety concern that these pumps may
continue to operate dry for an extended period of time due to electrical faults or a single failure in the
pump switch or the Electrical Load Control Unit (ELCU). The extended dry operation of the pump could
cause an overheat, electrical arcs or frictional sparks in the fuel tank. This service bulletin provides
instructions to modify the pump control circuit to include new Ground Fault Interrupt (GFI) relays between
the pumps and their ELCU. New GFI relays provide ground fault protection and changes in the control
circuit and ELMS software provide the necessary redundancy that allows the system to remove the
power to prevent uncommanded operation of the pump.
This change affected Section 9 of the Maintenance Planning Data (MPD) Document. New Airworthiness
Limitation (AWL) 28-AWL-18 will be added to Section 9 of the MPD to include the GFI operational
check of the center tank override/jettison pumps and main tank jettison pumps.
Revision 1 was sent to make these changes. An operator reported these findings during incorporation
of this service bulletin.
1. Increase the manhour estimate to include more time.
2. Replace top kit 005W3256-1 with the new top kit 005W3256-2 that contains these changes:
a. Replace the P301 panel 284W2014-1 and P302 panel 284W2014-9 with new panel
284W2014-10 and -11. The new panels are identical with the existing panel except the new
panels have the GFI relay HTDG-X7N-001 instead of non GFI relay HT-C7N-060.
b. Replace the wire kit 280W3256-103 with the new 280W3256-119 that contains the wires
W4126-0101-22 and W4126-0102-22 with the correct length.
c. Replace the wire kit 280W3256-104 with the new 280W3256-120 that contains the necessary
parts for the installation.
d. Replace the wire kit 280W3256-106 with the new 280W3256-121 that contains the wires
W4226-0250-22 and W4226-0251-22 with the correct length.
e. Replace the wire kit 280W3256-107 with the new 280W3256-123 that contains the wire
W4229-0735-22 with the correct length.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
16 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 17

f. Replace the wire kit 280W3256-110 with the new 280W3256-118 that contains the wire
W5141-0110-22 with the correct length.
g. Replace the wire kit 280W3256-111 with the new 280W3256-124 that contains the wires
W5149-3002R-10, W5149-3002Y-10, W5149-3002B-10 and W5149-3005R-10,
W5149-3005Y-10, W5149-3005B-10 with the correct length.
h. Replace the wire kit 280W3256-112 with the new 280W3256-122 that contains the necessary
parts for installation of wires W5218-3009R-10, W5218-3009Y-10, W5218-3009B-10 and
W5218-3018R-10, W5218-3018Y-10, W5218-3018B-10.
3. Make these changes in the Work Instructions section:
a. Add circuit breaker C28637 to the list of circuit breakers that need to be opened in step
3.B.17.a.(8).
b. Make a correction to the location of circuit breaker C28637 in step 3.B.17.b.(24).(i).
4. Revise Figures 1 and 2 to replace the panel part number 284W2014-1 and -9 with the new part
number 284W2014-10 and -11 respectively.
5. Make these changes to Figure 3:
a. Change the P301 panel boundary box on the wiring change diagram to correctly show that
the splices SP693 and SP694 are located outside of the P301 panel.
b. Change the wiring change diagram to show that the wires W5149-3005R-10, W5149-3005Y-10,
W5149-3005B-10 are new added wires and add the necessary parts for termination of the
wires to connector D1005P.
6. Change the wiring change diagram in Figure 4 to show that the wires W5149-3002R-10,
W5149-3002Y-10, W5149-3002B-10 are new added wires and add the necessary parts for
termination of the wires to connector D1005P.
7. Change the number of location for flag note 9 from 2 to 4 to provide contacts for termination of
existing wires W2381-0252-22 and W2381-0253-20 to the new connector.
8. Change the wiring change diagram in Figure 7 to show that the wires W5218-3009R-10,
W5218-3009Y-10, W5218-3009B-10 are new added wires and add the necessary parts for
termination of the wires to connector D2005P.
9. Change the wiring change diagram in Figure 8 to show that the wires W5218-3018R-10,
W5218-3018Y-10, W5218-3018B-10 are new added wires and add the necessary parts for
termination of the wires to connector D2005P.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
17 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 18

10. Change the wiring diagram in Figure 9 to correctly show that the wire W2482-0355-20 is
W2482-0335-20 and make a correction to the relay connector number.
11. Change the wiring diagram in Figure 10 to correctly show that the wires W4416-0336-22 and
W4416-0300 are terminated to connector D04199P, pin B1, not pin B2.
12. Change Figure 11 to include areas for splices SM9, SM10 (W4229), SM3, SM4, SM7 (W4132)
and add views G and H to provide detail routing instructions for wire bundles W4132, W5141 and
W5232.
Revision 2 is sent to correct discrepancies and typographical errors found in this service bulletin. Also,
a new top kit has been added for Group 2 airplanes. The Group 2 top kit 005W3256-3 contains the
same parts as the Group 1 top kit 005W3256-2.
Terminology has been changed in the Work Instructions to agree with the terminology defined in
Paragraph 3.A., General Information - Notes.
The data given in Information Notice 777-28A0037 IN02 is included in this revision.
D. Description
Group 1-2, Configuration 2:
Install the new P301 panel on the left side frame in the main equipment center. Install the new P302
panel on the right side frame in the main equipment center. Do a wiring change. Install new GFI relays
in P301 and P302 panels. Install new ELMS software in accordance with Boeing Service Bulletin
777-28A0039. Do the functional test.
Group 1-2, Configuration 1:
More work is necessary. Get access to the main equipment center. Measure the resistance of the bond
between each terminal lug on the ground studs GD41253-DC, GD41254-DC and the ground bracket
assembly.
Revision 1 - More work is necessary on airplanes changed in accordance with the original issue of this
service bulletin. Measure the bond resistance between cases of the replaced GFI relays K28247,
K28248, K28253, K28254 and the P301 or the P302 panel. Maximum bond resistance is 0.0025 ohm.
Refer to SWPM 20-20-00 as an accepted procedure for the bond measurement.
Revision 2 - More work is necessary on airplanes changed in accordance with the original issue or
Revision 1 of this service bulletin. The resistance of the bond between each ground wire terminal lug
on the ground studs GD41253-DC, GD41254-DC and the ground bracket assembly must be measured
to make sure the resistance is not more than 0.001 ohm.
The work in this service bulletin is done in the maintenance zone(s) given below.
Group 1:
Affected Maintenance Zones
ZoneModel
117, 118777-200
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
18 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 19

Group 2:
Affected Maintenance Zones
ZoneModel
117, 118777-300
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Boeing recommends that the change given in this service bulletin be done within 36 months after the
original issue date of this service bulletin.
F. Approval
This service bulletin was examined by the FAA. The changes specified in this service bulletin comply
with the applicable regulations and are FAA approved, as well as European Aviation Safety Agency
(EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved airplanes listed in the
service bulletin effectivity. This service bulletin and its approval were based on the airplane in its original
Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task-hours necessary to do this change for each airplane.
This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with operator
task-hour data if necessary. The estimate does not include lost time. These are some examples of lost
time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to examine the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
2.002.001FIGURE 1
2.002.001FIGURE 2
3.757.502FIGURE 3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
19 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 20

Group 1, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
4.509.002FIGURE 4
8.008.001FIGURE 5
4.008.002FIGURE 7
4.258.502FIGURE 8
7.007.001FIGURE 9
3.503.501FIGURE 10
2.002.001FIGURE 11
1.001.001FIGURE 12
0.500.501FIGURE 13
(a)(a)(a)FIGURE 14
0.500.501Close Access
2.004.002Test
45.5064.00TOTAL FOR EACH AIRPLANE
(a) Refer to the GE Aviation service bulletins for the time to make the change to the ELMS
panels.
Group 2, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
2.002.001FIGURE 1
2.002.001FIGURE 2
3.757.502FIGURE 3
4.509.002FIGURE 4
8.008.001FIGURE 6
4.008.002FIGURE 7
4.258.502FIGURE 8
7.007.001FIGURE 9
3.503.501FIGURE 10
2.002.001FIGURE 11
1.001.001FIGURE 12
0.500.501FIGURE 13
(a)(a)(a)FIGURE 14
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
20 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 21

Group 2, Configuration 2:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Close Access
2.004.002Test
45.5064.00TOTAL FOR EACH AIRPLANE
(a) Refer to the GE Aviation service bulletins for the time to make the change to the ELMS
panels.
Group 1-2, Configuration 2:
The time to make the change to the ELMS panels in accordance with the GE Aviation service bulletins
is not included.
Group 1-2, Configuration 1:
Elapsed HoursTask-HoursNumber of PersonsTask
0.500.501Open Access
0.050.051FIGURE 15
0.050.051FIGURE 16
0.500.501Close Access
1.101.10TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Group 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+ 8822.1+ 26.7777-200
Group 2:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+ 3218.3+ 26.7777-300
I. Electrical Load Data
Not changed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
21 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 22

J. References
1. Existing Data:
a. Engineering Change Memo PRR 61998-1
b. Boeing Service Bulletin 777-28A0039
c. Standard Overhaul Practices Manual (SOPM) 20-50-05
d. Standard Wiring Practices Manual (SWPM) 20-10-11, 20-10-12, 20-20-00, 20-20-10, 20-30-11,
20-30-12, 20-30-13, 20-30-22, 20-61-11, 20-61-19, 20-74-11, 20-81-12, 20-81-19, 20-81-22,
20-90-15
e. 777 Aircraft Maintenance Manual (AMM) 24-22-00, 25-80-00, 27-81-00, 28-22-06, 28-31-01,
32-09-00
f. 777 Wiring Diagram Manual (WDM) 28-22-13, 28-26-11, 28-31-11, 28-31-13, 28-31-21,
28-31-23
g. 777-200 Structural Repair Manual (SRM) 51-20-09
h. 777-300 Structural Repair Manual (SRM) 51-20-09
i. GE Aviation Service Bulletin 5000ELM-28-454, 6000ELM-28-455
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
Wire Bundle Instl - Bulkhead (STA 332.5)288W4106
Wire Bundle Instl - L.S. CAB Floor & FWD PASS FLR (STA 209.5-379)288W4115
Wire Bundle Instl - R.S CAB Floor & FWD PASS Floor 9STA 209.5-379)288W4116
Wire Bundle Instl - L.S. LWR SDWL FWD W/W BLKHD (STA 180.5-414)288W4117
Wire Bundle Instl - R.S LWR SDWL FWD W/W BLKHD (STA 180.5-414)288W4118
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
1. Publications:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
22 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 23

Chapter-SectionPublication
28-22, 28-31777 Aircraft Maintenance Manual
28-22, 28-31777 Fault Isolation Manual
28-22, 28-26, 28-31777 Wiring Diagram Manual
28-22, 28-31777 Illustrated Parts Catalog
28-22, 28-31777 Schematic Diagram Manual
Section 9777 Maintenance Planning Data
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
23 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 24

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
24 of 110
BOEING SERVICE BULLETIN 777-28A0037
BLANK PAGE

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
25 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 26

Group 1, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of
this Service Bul-
letin (US Dollars)
ROLT as of the
Revision 2 date
of this Service
Bulletin (Calen-
dar Days)
QTYDateNameKit Number
25,440.0050120Jul 15/09TOP KIT - OVERRIDE
/JETTISON FUEL
PUMP GFI RELAY IN-
STALLATION
005W3256-2
10Aug 12/09
9Aug 26/09
10Sep 10/09
10Oct 08/09
10Nov 05/09
10Dec 07/09
10Jan 13/10
10Feb 10/10
10Mar 10/10
10Apr 07/10
10May 05/10
10Jun 03/10
10Jul 01/10
10Jul 30/10
10Aug 27/10
10Sep 27/10
4Oct 25/10
Group 2, Configuration 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of the
Revision 2 date of this
Service Bulletin (US
Dollars)
ROLT as of the Re-
vision 2 date of
this Service Bul-
letin (Calendar
Days)
NameKit Number
25,440.00 (a)501TOP KIT - OVERRIDE/JETTISON FUEL
PUMP GFI RELAY INSTALLATION
005W3256-3
(a) Operators that have purchased kit 005W3256-2 and have not accomplished the original issue or Revision
1 of this service bulletin, can use kit 005W3256-2 as a satisfactory alternative to kit 005W3256-3.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
26 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 27

B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
To get the kits shown below, refer to Paragraph 2.A., Material - Price and Availability.
NOTE: One top kit is necessary for each airplane. The Top Kit is divided into Figure kits for each
installation figure shown in the table below.
Figure Kit
965321Top Kit
1-1111005W3256-2
11-111005W3256-3
Figure Kit
131211Top Kit
111005W3256-2
111005W3256-3
Top Kit
005W3256-3005W3256-2Wire Kit
11280W3256-101
11280W3256-102
11280W3256-105
11280W3256-108
11280W3256-109
11280W3256-113
11280W3256-118
11280W3256-119
11280W3256-120
11280W3256-121
11280W3256-122
11280W3256-123
11280W3256-124
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
27 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 28

Group 1, Configuration 2:
KIT 005W3256-2
NOTES
Existing Part
NumberName
Figure
New Part Number
1195321
QTY
RETAINER,
PIERCER
442055306
(BACS31P1 optional)
PIERCING GROM-
MET RETAINER
442055308
(BACS31P3 optional)
P301 PANEL ASSEM-
BLY - LEFT OVER-
RIDE/JETTISON FU-
EL PUMP RELAYS
1284W2014-10
P302 PANEL ASSEM-
BLY - RIGHT OVER-
RIDE/JETTISON FU-
EL PUMP RELAYS
1284W2014-11
CLAMP4287T0011-4
CLAMP3287T0011-5
BRACKET ASSY-
GROUND
11287T4137-148
RETAINER CLIP AS-
SY
3411A4902-7
NUT2BACN10YR3CD
RIVET, UNIVERSAL
HD
34BACR15BB5D6C
SCREW, CAP2BACS12GU3K32
SCREW, CAP4BACS12GU3K48
SCREW, CAP4BACS12GU3K52
SCREW, CAP1BACS12GU3K58
SCREW, CAP44BACS12GU3K6
SCREW, CAP1BACS12GU3K70
RELAY SOCKET111BACS16AG1
RELAY SOCKET1BACS16W5A
RINGPOST, WIRE
HARNESS MOUNT-
ING SUPPORT
10BACS31H1A
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
28 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 29

Group 1, Configuration 2:
KIT 005W3256-2
NOTES
Existing Part
NumberName
Figure
New Part Number
1195321
QTY
RINGPOST, WIRE
HARNESS MOUNT-
ING SUPPORT
10BACS31H1B
STRAP25BACS38W3
SUPPORT, WIRE
HARNESS ASSEM-
BLY, STRINGER
CLIP
44BACS38Y3
WASHER2NAS1149D0316H
WASHER444NAS1149D0332J
SPACERS FOR
BOLTS
4NAS43DD3-128FC
SPACERS FOR
BOLTS
1NAS43DD3-64FC
SPACERS FOR
BOLTS
4NAS43DD3-96FC
Group 1, Configuration 2:
KIT 005W3256-2
NOTES
Existing Part
NumberName
Figure
New Part Number
1312
QTY
RELAY12BACR13CD2
TIME DELAY RELAY1TDH-7101-6002
Group 2, Configuration 2:
KIT 005W3256-3
NOTES
Existing Part
NumberName
Figure
New Part Number
1196321
QTY
RETAINER,
PIERCER
442055306
(BACS31P1 optional)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
29 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 30

Group 2, Configuration 2:
KIT 005W3256-3
NOTES
Existing Part
NumberName
Figure
New Part Number
1196321
QTY
PIERCING GROM-
MET RETAINER
442055308
(BACS31P3 optional)
P301 PANEL ASSEM-
BLY - LEFT OVER-
RIDE/JETTISON FU-
EL PUMP RELAYS
1284W2014-10
P302 PANEL ASSEM-
BLY - RIGHT OVER-
RIDE/JETTISON FU-
EL PUMP RELAYS
1284W2014-11
CLAMP4287T0011-4
CLAMP3287T0011-5
BRACKET ASSY-
GROUND
11287T4137-148
RETAINER CLIP AS-
SY
3411A4902-7
NUT2BACN10YR3CD
RIVET, UNIVERSAL
HD
34BACR15BB5D6C
SCREW, CAP2BACS12GU3K32
SCREW, CAP4BACS12GU3K48
SCREW, CAP4BACS12GU3K52
SCREW, CAP1BACS12GU3K58
SCREW, CAP44BACS12GU3K6
SCREW, CAP1BACS12GU3K70
RELAY SOCKET111BACS16AG1
RELAY SOCKET1BACS16W5A
RINGPOST, WIRE
HARNESS MOUNT-
ING SUPPORT
10BACS31H1A
RINGPOST, WIRE
HARNESS MOUNT-
ING SUPPORT
10BACS31H1B
STRAP25BACS38W3
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
30 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 31

Group 2, Configuration 2:
KIT 005W3256-3
NOTES
Existing Part
NumberName
Figure
New Part Number
1196321
QTY
SUPPORT, WIRE
HARNESS ASSEM-
BLY, STRINGER
CLIP
44BACS38Y3
WASHER2NAS1149D0316H
WASHER444NAS1149D0332J
SPACERS FOR
BOLTS
4NAS43DD3-128FC
SPACERS FOR
BOLTS
1NAS43DD3-64FC
SPACERS FOR
BOLTS
4NAS43DD3-96FC
Group 2, Configuration 2:
KIT 005W3256-3
NOTES
Existing Part
NumberName
Figure
New Part Number
1312
QTY
RELAY12BACR13CD2
TIME DELAY RELAY1TDH-7101-6002
KIT 280W3256-101
NotesNameQTYNew Part Number
wire1280W3256-101W
CONNECTOR, ELECTRICAL, RECEP-
TACLE, FLANGE MOUNT, BAYONET
COUPLING
1BACC45FN12-12S6
CONTACT, SOCKET7BACC47CP1S
CONTACT, SOCKET, SIZE 203CTA-0165
CONTACT, PIN, SIZE 203CTA-0166
CONTACT, PIN, SIZE 207S280W555-920
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
31 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 32

KIT 280W3256-102
NotesNameQTYNew Part Number
wire1280W3256-102W
CONTACT, SOCKET, SIZE 203CTA-0165
CONTACT, PIN, SIZE 202CTA-0166
CONTACT, PIN, SIZE 204S280W555-920
KIT 280W3256-105
NotesNameQTYNew Part Number
wire1280W3256-105W
CONTACT, SOCKET4BACC47CP1S
TERMINAL4BACT12AR222
KIT 280W3256-108
NotesNameQTYNew Part Number
wire1280W3256-108W
CONTACT, SOCKET4BACC47CP1S
TERMINAL4BACT12AR222
KIT 280W3256-109
NotesNameQTYNew Part Number
wire1280W3256-109W
CONTACT, SOCKET, SIZE 202CTA-0165
WIRE SPLICE2D-436-39
SPLICE2NAS1387-5
KIT 280W3256-113
NotesNameQTYNew Part Number
GROUND ID TAPE1280W3256-11301
wire1280W3256-113W
CONTACT, SOCKET7BACC47ER1
TERMINAL, LUG4BACT12AC3
CONTACT, PIN, SIZE 202CTA-0166
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
32 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 33

KIT 280W3256-118
NotesNameQTYNew Part Number
wire1280W3256-118W
(31A-2016-035 or 48-
100-5012P02 optional)
CONTACT448-100-5007P02
CONNECTOR, ELECTRICAL, PLUG,
STRAIGHT, BAYONET COUPLING
1BACC45FT12A12P6
CONTACT, PIN4BACC47CN1S
CONTACT, SOCKET7BACC47ER1
TERMINAL, LUG1BACT12AC8
KIT 280W3256-119
NotesNameQTYNew Part Number
wire1280W3256-119W
CONTACT, SOCKET1BACC47CP1S
TERMINAL2BACT12AR222
WIRE SPLICE2D-436-39
SPLICE2NAS1387-5
KIT 280W3256-120
NotesNameQTYNew Part Number
GROUND ID TAPE1280W3256-10401
wire1280W3256-104W
CONTACT, PIN4BACC47CN1S
CONTACT, SOCKET7BACC47DJ1
CONTACT, SOCKET7BACC47ER1
TERMINAL, LUG1BACT12AC3
TERMINAL, LUG1BACT12AC8
TERMINAL5BACT12AR222
CONTACT, SOCKET, SIZE 202CTA-0165
WIRE SPLICE6D-436-39
SPLICE6NAS1387-5
KIT 280W3256-121
NotesNameQTYNew Part Number
wire1280W3256-121W
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
33 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 34

KIT 280W3256-121
NotesNameQTYNew Part Number
CONTACT, SOCKET2BACC47CP1S
TERMINAL2BACT12AR222
WIRE SPLICE2D-436-39
SPLICE2NAS1387-5
KIT 280W3256-122
NotesNameQTYNew Part Number
FILLER SLEEVE7252-1231-000
SPLICE7277156-1
Insullation Tape1280W3256-12201
wire1280W3256-122W
CONTACT7BACC47DP3
TERMINAL14BACT12AR103
KIT 280W3256-123
NotesNameQTYNew Part Number
wire1280W3256-123W
CONTACT, PIN3BACC47CN1S
TERMINAL5BACT12AR222
WIRE SPLICE3D-436-39
SPLICE3NAS1387-5
KIT 280W3256-124
NotesNameQTYNew Part Number
FILLER SLEEVE7252-1231-000
SPLICE7277156-1
Insullation tape1280W3256-12401
wire1280W3256-124W
CONTACT7BACC47DP3
TERMINAL14BACT12AR103
2. Parts and Materials Supplied by the Operator:
None.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
34 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 35

3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
35 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 36

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
36 of 110
BOEING SERVICE BULLETIN 777-28A0037
BLANK PAGE

### Page 37

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. The instructions identified in Paragraph 3.B., Work Instructions, and the Figure(s)
give the recommended sequence of steps. The sequence of steps to do this service
bulletin can be changed.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Unless shown differently, these dimensions and tolerances are used:
— Linear dimensions are in inches
— Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch.
— Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
— Hole dimensions for standard solid rivets are given in 777 Structural Repair
Manual, Chapter 51
— Torque limits to tighten nuts and bolts are given in 777 Structural Repair Manual,
Chapter 51.
5. For approved fastener and process material substitutions, refer to 777 Structural
Repair Manual, Chapter 51, Alternate fasteners are given in 777 Structural Repair
Manual Chapter 51 and Boeing Drawing 012W6100.
6. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures.
7. If the length of fasteners specified in this service bulletin do not meet the installation
standards, fasteners of the same specification, or an approved substitute, one grip
length longer or shorter may be used.
8. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
37 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 38

B. WORK INSTRUCTIONS
Group 1-2, Configuration 2:
1. Remove the electrical power from the airplane. Refer to 777 AMM 24-22-00 as an accepted
procedure.
2. Get access to the main equipment center.
3. Install the P301 panel in accordance with FIGURE 1.
4. Install the P302 panel in accordance with FIGURE 2.
5. Do the main tank left jettison pump wiring change in accordance with FIGURE 3 and FIGURE 11.
6. Do the center tank left override/jettison pump wiring change in accordance with FIGURE 4 and
FIGURE 11.
7. Do the left main tank jettison nozzle valve wiring change as follows:
a. Group 1, Configuration 2:
Do the wiring change in accordance with FIGURE 5 and FIGURE 11.
b. Group 2, Configuration 2:
Do the wiring change in accordance with FIGURE 6 and FIGURE 11.
8. Do the right main tank jettison pump wiring change in accordance with FIGURE 7 and FIGURE
11.
9. Do the center tank right override/jettison pump wiring change in accordance with FIGURE 8 and
FIGURE 11.
10. Do the right main tank jettison nozzle valve wiring change in accordance with FIGURE 9 and
FIGURE 11.
11. Do the defuel valve wiring change in accordance with FIGURE 10 and FIGURE 11.
12. Install the relays in P301 panel in accordance with FIGURE 12.
13. Install the relays in P302 panel in accordance with FIGURE 13.
14. Do a change to P110 and P210 Electrical Load Management System (ELMS) panel in accordance
with FIGURE 14.
15. Install the new ELMS software in accordance with Boeing Service Bulletin 777-28A0039.
16. Supply the primary and secondary external power to the airplane. Refer to 777 AMM 24-22-00 as
an accepted procedure.
17. Do the functional test in accordance with the steps that follow:
a. Prepare for the test
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
38 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 39

(1) Obey these precautions at all times during the tests:
(a) To operate any of the fuel pumps, you must be in the flight compartment to
continuously monitor the fuel quantity and the low pressure indication in the applicable
tank.
WARNING: DO NOT OPERATE A FUEL PUMP IF THE LOW PRESSURE INDICATION
COMES ON AND STAYS ON. FUEL VAPORS IN THE TANK MAY IGNITE
AND CAUSE A FIRE OR EXPLOSION.
(b) Immediately set the applicable fuel pump switch to the OFF position if the low pressure
indication light comes on and stays on.
WARNING: DO NOT OPERATE THE LEADING EDGE SLATS. IF THE LEADING EDGE
SLATS MOVE, INJURY TO PERSONS AND DAMAGE TO EQUIPMENT CAN
OCCUR.
(2) Put DO-NOT-OPERATE tag on the flap control lever. Refer to 777 AMM 27-81-00 as an
accepted procedure.
(3) Open the refueling station door 521DB to get access to the P28, Integrated Refuel Panel
(IRP).
WARNING: MAKE SURE NO PERSONS OR GROUND EQUIPMENT ARE BELOW OR
NEAR THE WING TIPS. FUEL CAN SPILL FROM THE JETTISON NOZZLE
OUTLETS AND CAUSE INJURIES TO PERSONS AND DAMAGE TO
EQUIPMENT.
(4) Make sure that the fuel tanks have the fuel quantities as follows:
(a) Do these steps to find the minimum fuel quantity of each main tank:
1) If you installed a dry jettison pump in the main fuel tank before this test or if a
jettison pump is not primed, make sure that the tank contains a minimum of
24,000 pounds (10,886 kilograms) of fuel.
2) If the jettison pumps in the main fuel tank are wet and primed from operation,
make sure there is a minimum of 15,000 pounds (6,804 kilograms) of fuel in
each main tank.
(b) Make sure that there is 10,000 pounds (4,536 kilograms) of fuel or more in the center
fuel tank.
CAUTION: FUEL IN THE REFUEL/JETTISON MANIFOLD CAN BE PRESSURIZED 30
MINUTES AFTER REFUELING, DEFUELING, FUEL JETTISON OR FUEL
TRANSFER OPERATIONS. IF THE JETTISON NOZZLE VALVES ARE
OPENED, FUEL CAN SPILL FROM THE JETTISON NOZZLE OUTLETS.
(5) If the refuel/jettison manifold has been pressurized in the last 60 minutes, do these steps
before you continue:
(a) To remove pressure from the refuel/jettison manifold:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
39 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 40

1) On the P28, Integrated Refueling Panel, set the REFUEL VALVE CONTROL
switches for the left, right, and center fuel tanks to the OPEN position.
2) Wait 5 to 10 minutes to remove pressure in the manifold.
3) Set the three REFUEL VALVE CONTROL switches to the CLOSE position.
(6) If the refuel/jettison manifold has not been pressurized in the last 60 minutes, then continue
to the next step.
WARNING: MAKE SURE THAT THE AIRPLANE IS IN THE CONFIGURATION SHOWN
IN THIS TABLE. IF THE AIRPLANE IS NOT IN THE CONFIGURATION SHOWN,
WHEN THE AIRPLANE IS PUT IN THE AIR MODE, A FUEL SPILL AT THE
JETTISON NOZZLES CAN OCCUR AND CAUSE INJURY TO PERSONS AND
DAMAGE TO EQUIPMENT.
(7) Make sure that the switches and controls are in the position shown in this table:
LocationPositionSwitch/Control
P5 OVERHEAD PANELOFFAPU START SWITCH
P5 OVERHEAD PANELNORMALAPU FIRE SWITCH
P5 OVERHEAD PANELCLOSEDAFT FUEL CROSSFEED VALVE
P5 OVERHEAD PANELCLOSEDFWD FUEL CROSSFEED VALVE
P5 OVERHEAD PANELOFFL AFT FUEL PUMP
P5 OVERHEAD PANELOFFL FWD FUEL PUMP
P5 OVERHEAD PANELOFFL CENTER FUEL PUMP
P5 OVERHEAD PANELOFFR CENTER FUEL PUMP
P5 OVERHEAD PANELOFFR AFT FUEL PUMP
P5 OVERHEAD PANELOFFR FWD FUEL PUMP
P5 OVERHEAD PANELCLOSEDL JETTISON NOZZLE VALVE
P5 OVERHEAD PANELCLOSEDR JETTISON NOZZLE VALVE
P5 OVERHEAD PANELOFFFUEL TO REMAIN SWITCH
P5 OVERHEAD PANELOFFFUEL JETTISON ARM SWITCH
P8 AISLE STANDNORMALL ENGINE FIRE SWITCH
P8 AISLE STANDNORMALR ENGINE FIRE SWITCH
P8 AISLE STANDCUTOFFL FUEL CONTROL SWITCH
P8 AISLE STANDCUTOFFR FUEL CONTROL SWITCH
P28 INTEGRATED REFU-
EL PANEL
CLOSEDEFUEL VALVE
(8) Make sure that these circuit breakers are open.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
40 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 41

Circuit Breaker NameCircuit Breaker
Number
Location
GridPanel
L FUEL JETT PUMP CTRLC28645L022P110
CTR L OVRD FUEL PUMP CTRLC28647L021
L FUEL JETT NOZ VLVC28621L025
CTR R OVRD FUEL PUMP CTRLC28644L002P210
R FUEL JETT NOZ VALVEC28620K012
R FUEL JETT PUMP CTRLC28646K014
APUC 1C49601B006P310
APU INLET DR ACTRC49600B007
DC FUEL PUMPC28614B001
APU FUEL ISLN VLVC28638F005
FUEL XFEED VALVE-AFTC28612G009
FIRE EXT APUC26636L005
APU INLET DOOR/FUEL SOV CTRLC28650L011
RFLNG QTYC28623J011
DFUEL VLVSC28637J10
L FWD FUEL BOOST PUMP GND SVCC28301G009P320
APU FUEL S/O VALVEC28003A017P11
APUC 2C49602A003P49
(9) Make sure that this circuit breaker is closed:
Circuit Breaker NameCircuit Breaker
Number
Location
GridPanel
RFLNG CTRL GNDC28603D007P320
(10) Put a bucket below each fuel jettison nozzle on the wing tips and below the defuel valves
to catch small amounts of fuel that may spill.
(11) Do these steps to set a zero fuel weight (ZFW) that will let the fuel jettison system operate:
(a) On the Flight Management Computer (FMC) display, do these steps as necessary
to get access to the PREF INIT page:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
41 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 42

1) When the airplane is on the ground with the Air Data Inertial Reference Unit
(ADIRU) position initialized, push the INIT/REF mod key.
2) Push PERF from the INIT/REF INDEX page
3) Push PERF INIT from the ACT RTE page or the TAKEOFF REF page.
(b) On line 3L, under ZFW, enter a zero fuel weight that is 30,000 pounds (13,603
kilograms) less than the rated maximum landing weight (MLW) for the airplane.
NOTE: This shows the FMC that the airplane gross weight is more than MLW and
permits the jettison system to operate.
b. Do the operation and indication test for left and right main tank jettison pumps as follows:
(1) Put the airplane in the air mode simulation. Refer to 777 AMM 32-09-00 as an accepted
procedure.
(2) Get access to the left and right main tank jettison pumps. Refer to 777 AMM 28-31-01
as an accepted procedure for locations.
(3) Disconnect these electrical connectors:
(a) DM28104 from the left main tank jettison pump.
(b) DS28111 from pressure switch on the left main tank jettison pump.
(c) DM28204 from the right main tank jettison pump.
(d) DS28211 from pressure switch on the right main tank jettison pump.
(4) Do a check to make sure that the continuity exists between pin G of the electrical
connectors DM28104, DM28204 and the airplane ground.
(5) Do Step (a) or Step (b) to prepare for a check of power in the electrical connectors
DM28104 and DM28204.
(a) If phase rotation indicators are available, connect a phase rotation indicators to the
electrical connectors DM28104 and DM28204 as shown in the table below.
Electrical ConnectorPhase Rotation Indicator
Pin BPhase A
Pin DPhase B
Pin FPhase C
(b) If phase rotation indicators are not available, get the multimeter ready to check the
voltage between pins on the electrical connectors .
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
42 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 43

(6) On the 28 - Fuel Management maintenance page, make sure that the COMMAND and
STATUS indication for the left and right main fuel jettison pumps are displayed as OFF
and PRESS respectively.
WARNING: MAKE SURE THAT THE CONNECTOR TO THE FUEL PUMP IS
DISCONNECTED BEFORE THE FUEL JETTISON ARM SWITCH IS SET TO
THE ARMED POSITION. IF POWER IS SUPPLIED TO THE PUMP IN THE
AIR MODE, THE FUEL WILL COME OUT OF THE JETTISON NOZZLES.
INJURY TO PERSONS OR DAMAGE TO EQUIPMENT CAN OCCUR.
(7) Close the refueling station door 521DB.
(8) Close the circuit breakers C28621, C28645 on the P110 panel and C28620, C28646 on
P210 panel.
(9) On P5 overhead panel, do these steps:
(a) Set the FUEL JETTISON ARM switch to the ARMED position.
(b) Set the FUEL JETTISON L NOZZLE VALVE switch to the ON position.
(c) Start a timer.
(10) Do the applicable step to make sure that the power is present in the electrical connectors
DM28104 and DM28204.
(a) If phase rotation indicator is used, make sure that the 3-phase rotator light is on for
more than 70 seconds and display the correct phase sequence of A-B-C.
(b) If a multimeter is used, make sure that there is approximately 200 volts between one
of these sets of pins for more than 70 seconds.
– Pin B and Pin D
– Pin D and Pin F
– Pin B and Pin F
(11) Do this test to check the GFI functionality of the relay K28247.
(a) Press the BITE test button on the relay K28247 on the P301 panel
(b) Make sure that the RESET button on the relay has popped up showing a white line
of the button.
(c) From the phase rotation indicator or multimeter, make sure that the power is removed
from electrical connector DM28104.
(d) On the P5 overhead panel, do these steps:
1) Set the FUEL JETTISON L NOZZLE VALVE switch to the OFF position.
2) Set the FUEL JETTISON ARM switch to the DISARMED position.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
43 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 44

(e) Push the RESET button on the K28247 relay and make sure that the RESET button
stays in.
(f) On the P5 overhead panel, do these steps:
1) Set the FUEL JETTISON ARM switch to the ARMED position.
2) Set the FUEL JETTISON L NOZZLE VALVE switch to the ON position.
(g) From the phase rotation indication or multimeter , make sure that the power is present
at electrical connector DM28104.
(12) On the P5 overhead panel, do these steps:
(a) Set the FUEL JETTISON L NOZZLE VALVE switch to the OFF position.
(b) Set the FUEL JETTISON R NOZZLE VALVE switch to the ON position.
(13) Do one of these two steps to make sure the power is present at the electrical connectors
DM28104 and DM28204.
(a) If phase rotation indicator is used, make sure that the 3-phase rotator light is on for
more than 70 seconds and display the correct phase sequence of A-B-C.
(b) If a multimeter is used, make sure that there is approximately 200 volts between one
of these sets of pins for more than 70 seconds.
– Pin B and Pin D
– Pin D and Pin F
– Pin B and Pin F
(14) Do this test to check the GFI functionality of the relay K28248.
(a) Press the BITE test button on the relay K28248 on the P302 panel
(b) Make sure that the RESET button on the relay has popped up showing a white line
of the button.
(c) From the phase rotation indicator or multimeter, make sure that the power is removed
from electrical connector DM28204.
(d) On the P5 overhead panel, do these steps:
1) Set the FUEL JETTISON ARM switch to the DISARMED position.
2) Set the FUEL JETTISON R NOZZLE VALVE switch to the OFF position.
(e) Push the RESET button on the K28248 relay and make sure that the RESET button
stays in.
(f) On the P5 overhead panel, do these steps:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
44 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 45

1) Set the FUEL JETTISON ARM switch to the ARMED position.
2) Set the FUEL JETTISON R NOZZLE VALVE switch to the ON position.
(g) From the phase rotation indication or multimeter , make sure that the power is present
at electrical connector DM28204.
(15) On the P5 overhead panel, do these steps:
(a) Set the FUEL JETTISON ARM switch to the DISARMED position.
(b) Set the FUEL JETTISON R NOZZLE VALVE switch to the OFF position.
(16) Put the airplane back in the ground mode. Refer to 777 AMM 32-09-00 as an accepted
procedure.
(17) Do this test to make sure the jettison BITE time delay relay K28250 is installed correctly.
(a) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the left main tank jettison pumps are displayed as OFF
and PRESS respectively.
(b) On the P5 overhead panel, set the FUEL JETTISON ARM switch to the ARMED
position and start a timer.
(c) Do one of these two steps to make sure the power is present at the electrical
connectors DM28104 and DM28204.
1) If phase rotation indicator is used, make sure that the 3-phase rotator light is on
for approximately 60 seconds and display the correct phase sequence of A-B-C
and then the light is extinguished indicating that the power is removed.
2) If a multimeter is used, make sure that there is approximately 200 volts between
one of these sets of pins for approximately 60 seconds and then the power is
removed.
– Pin B and Pin D
– Pin D and Pin F
– Pin B and Pin F
(18) Make sure the Engine Indication and Crew Alerting System (EICAS) status message
FUEL JETTISON PUMP (L AND R) will be set after 30 seconds.
(19) Make sure that the EICAS status message is cleared automatically in approximately 10
seconds after power was removed from the electrical connectors DM28104 and DM28204.
(20) On the P5 overhead panel, set the FUEL JETTISON ARM switch to the DISARMED
position.
(21) Open the circuit breakers C28645 on the P110 panel and C28646 on the P210 panel.
(22) Remove the phase rotation indicators from electrical connectors DM28104 and DM28204
if phase rotation indicators were installed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
45 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 46

(23) Connect these electrical connectors:
(a) DM28104 to the left main tank jettison pump.
(b) DS28111 to pressure switch on the left main tank jettison pump.
(c) DM28204 to the right main tank jettison pump.
(d) DS28211 to pressure switch on the right main tank jettison pump.
(24) Do this test to make sure that the Jettison Defuel Enable Relay K28251 is installed
correctly and the main tank jettison pumps are run briefly as a final verification of operation.
(a) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the left main tank jettison pump are displayed as OFF
and NO PRESS respectively.
(b) Close the circuit breakers C28645 on the P110 panel, C28646 on the P210 panel
and C28637 on the P310 panel.
(c) Open the refueling station door 521DB.
(d) Set the DEFUEL VALVE switch on the P28, Integrated Refuel Panel to OPEN position.
(e) On the P5 overhead panel, set the FUEL JETTISON ARM switch to the ARMED
position.
(f) Listen to make sure that the left and right main tank jettison pumps are running. The
noise of the pumps can be heard as they run.
(g) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the left and right main tank jettison pumps are displayed
as ON and PRESS respectively and the display is remained after more than 70
seconds.
(h) On the P5 overhead panel, set the FUEL JETTISON ARM switch to the DISARMED
position.
(i) Set the DEFUEL VALVE switch on the P28, Integrated Refuel Panel to CLOSE
position.
(j) Open the circuit breakers C28645 on the P110 panel, C28646 on the P210 panel
and C28637 on the P310 panel.
(k) Close the refueling station door 521DB.
(25) Close access to the left and right main tank jettison pumps. Refer to 777 AMM 28-31-01
as an accepted procedure for locations.
c. Do the operation and indication test of center tank left and right override/jettison pumps.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
46 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 47

(1) Get access to the center tank left and right override/jettison pumps. Refer to 777 AMM
28-22-06 as an accepted procedure for the locations.
(2) Make sure that the primary and secondary external power is supplied to the airplane.
Refer to 777 AMM 24-22-00 as an accepted procedure.
(3) Make sure that the airplane is set to the ground mode. Refer to 777 AMM 32-09-00 as
an accepted procedure.
(4) Do this test of the center tank left override/jettison pump.
(a) On P5 overhead panel, make sure the followings:
1) The L CENTER PUMPS switch is in the OFF position.
2) The amber PRESS light for the L CENTER PUMPS switch is off.
(b) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank left override/jettison pump are displayed
as OFF and NO PRESS respectively.
(c) Disconnect the electrical connector DM28103 from the center tank left fuel
override/jettison pump.
(d) Do this test for a check of the new auto shutoff hardware and GFI relay functionality.
1) Do a check to make sure that the continuity exists between pin G of the electrical
connectors DM28103 and the airplane ground.
2) Do Step (a) or Step (b) to prepare for a check of power in the electrical connector
DM28103.
a) If phase rotation indicators are available, connect a phase rotation indicators
to the electrical connector DM28103 as shown in the table below.
Electrical ConnectorPhase Rotation Indicator
Pin BPhase A
Pin DPhase B
Pin FPhase C
b) If phase rotation indicators are not available, get the multimeter ready to
check the voltage between pins on the electrical connector.
3) Close the circuit breaker C28647 on the P110 panel.
4) On P5 overhead panel, set the L CENTER PUMPS switch to ON. Start a timer.
5) Do these steps within 30 seconds:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
47 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 48

NOTE: The pump power will shut off in 30 seconds after the L CENTER
PUMPS switch is set to ON position because of the new low pressure
auto-shutoff functionality. Make sure that you do the next four steps in
the 30 seconds time period.
a) Do the applicable step to make sure that the power is present on the
electrical connector DM28103.
{1} If phase rotation indicator is used, make sure that the 3-phase rotator
displays the correct phase sequence of A-B-C.
{2} If a multimeter is used, make sure that there is approximately 200 volts
between one of these sets of pins.
– Pin B and Pin D
– Pin D and Pin F
– Pin B and Pin F
b) On the P5 overhead panel, make sure that the amber PRESS light for the
L CENTER PUMPS switch is on.
c) On the 28 - Fuel Management maintenance page, make sure that the
COMMAND and STATUS indication for the center tank left override/jettison
pump are displayed as ON and NO PRESS respectively.
d) From the phase rotation indicator or multimeter, make sure that the power
is removed from electrical connector DM28103 in approximately 30 seconds.
6) On the P5 overhead panel, do these steps:
a) Set the L CENTER PUMPS switch to OFF position.
b) Make sure that the amber PRESS light for the L CENTER PUMPS switch
is off.
7) Do this test to check the GFI functionality of the relay K28253.
a) On P5 overhead panel, set the L CENTER PUMPS switch to ON and do
these steps within 30 seconds:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
48 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 49

{1} On the P5 overhead panel, make sure that the amber PRESS light for
the L CENTER PUMPS switch is on.
{2} Press the BITE test button on the relay K28253 on P301 panel
{3} Make sure that the RESET button on the relay K28253 has popped up
showing a white line of the button.
{4} From the phase rotation indicator or multimeter, make sure that the
power is removed from electrical connector DM28103.
b) On P5 overhead panel, set the L CENTER PUMPS switch to the OFF
position.
c) Open the circuit breaker C28647 on the P110 panel.
d) Push the RESET button on the relay K28253 and make sure that the RESET
button stays in.
e) Close circuit breaker C28647 on P110 panel.
f) On the P5 overhead panel, do these steps:
{1} Set the L CENTER PUMPS switch to ON position.
{2} Make sure that the amber PRESS light for the L CENTER PUMPS
switch is on.
g) From the phase rotation indicator or multimeter, make sure that the power
is present in the electrical connector DM28103.
h) On the P5 overhead panel, set the L CENTER PUMPS switch to the OFF
position.
8) Open the circuit breakers C28647 on the P110 panel.
9) Remove the phase rotation indicators from electrical connector DM28103 if
phase rotation indicator was installed.
10) Connect the electrical connector DM28103 to the center tank left fuel
override/jettison pump.
11) Close circuit breaker C28647 on the P110 panel.
12) On the P5 overhead panel, do these steps:
a) Set the L CENTER PUMPS switch to ON position.
b) Make sure that the amber PRESS light for the L CENTER PUMPS switch
is off.
NOTE: If the amber PRESS light comes on and stays on, immediately set
the applicable fuel pump switch to the OFF position.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
49 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 50

13) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank left override/jettison pump are
displayed as ON and PRESS respectively.
14) Make sure that the center tank left override/jettison pump runs more than 30
seconds. The noise of the pump can be heard as it runs.
15) On the P5 overhead panel, do these steps:
a) Set the L CENTER PUMPS switch to OFF position.
b) Make sure that the amber PRESS light for the L CENTER PUMPS switch
is off.
16) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank left override/jettison pump are
displayed as OFF and NO PRESS respectively.
(5) Do this test of the center tank right override/jettison pump.
(a) On P5 overhead panel, make sure the following:
1) The center tank right override/jettison pump switch is in the OFF position.
2) The amber PRESS light for the R CENTER PUMPS switch is off.
(b) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank right override/jettison pump are displayed
as OFF and NO PRESS respectively.
(c) Disconnect the electrical connector DM28203 from the center tank right
override/jettison pump.
(d) Do a check to make sure that the continuity exists between pin G of the electrical
connectors DM28203 and the airplane ground.
(e) Do Step (a) or Step (b) to prepare for a check of power in the electrical connector
DM28203.
1) If phase rotation indicators are available, connect a phase rotation indicators to
the electrical connector DM28203 as shown in the table below.
Electrical ConnectorPhase Rotation Indicator
Pin BPhase A
Pin DPhase B
Pin FPhase C
2) If phase rotation indicators are not available, get the multimeter ready to check
the voltage between pins on the electrical connectors.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
50 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 51

(f) Close the circuit breaker C28644 on the P210 panel.
(g) On P5 overhead panel, set the R CENTER PUMPS switch to ON. Start the timer.
(h) Do these steps within 30 seconds:
NOTE: The pump will shut off in 30 seconds after the R CENTER PUMPS switch
is set to ON because of the new low pressure auto-shutoff functionality.
Make sure that you do the next four steps in the 30 seconds time period.
1) Do the applicable step to make sure that the power is present in the electrical
connector DM28203.
a) If phase rotation indicator is used, make sure that the 3-phase rotator
displays the correct phase sequence of A-B-C.
b) If a multimeter is used, make sure that there is approximately 200 volts
between one of these sets of pins.
– Pin B and Pin D
– Pin D and Pin F
– Pin B and Pin F
2) On the P5 overhead panel, make sure that the amber PRESS light for the R
CENTER PUMPS switch is on.
3) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank right override/jettison pump are
displayed as ON and NO PRESS respectively.
4) From the phase rotation indicator or multimeter, make sure that the power is
removed from the electrical connector DM28203 approximately 30 seconds.
(i) On P5 overhead panel, set the R CENTER PUMPS switch to the OFF position.
(j) On the P5 overhead panel, make sure that the amber PRESS light for the R CENTER
PUMPS switch is off.
(k) Do this test to check the GFI functionality of the relay K28254.
1) On P5 overhead panel, set the R CENTER PUMPS switch to ON and do these
steps within 30 seconds:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
51 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 52

a) On the P5 overhead panel, make sure that the amber PRESS light for the
R CENTER PUMPS switch is on.
b) Press the BITE test button on the relay K28254 on the P302 panel.
c) Make sure that the RESET button on the relay K28254 has popped up
showing a white line of the button.
d) From the phase rotation indicator or multimeter, make sure that the power
is removed from electrical connector DM28203.
2) On the P5 overhead panel, set the R CENTER PUMPS switch to OFF position.
3) Open the circuit breaker C28644 on the P210 panel.
4) Push the RESET button on the relay K28254 and make sure that the RESET
button stays in.
5) Close the circuit breaker C28644 on the P210 panel.
6) On the P5 overhead panel, set the R CENTER PUMPS switch to ON position.
7) On the P5 overhead panel, make sure that the amber PRESS light for the R
CENTER PUMPS switch is on.
8) From the phase rotation indicator or multimeter, make sure that the power is
present in the electrical connector DM28203.
9) On P5 overhead panel, set the R CENTER PUMPS switch to the OFF position.
(l) Open the circuit breakers C28644 on the P210 panel.
(m) Remove the phase rotation indicators from electrical connectors DM28203 if phase
rotation indicator was installed.
(n) Connect this electrical connector DM28203 to the center tank right override/jettison
pump.
(o) Close the circuit breakers C28644 on the P210 panel.
(p) On P5 overhead panel, do these steps:
1) Set the R CENTER PUMPS switch to the ON position.
2) Make sure that the amber PRESS light for the R CENTER PUMPS switch is off
NOTE: If the amber PRESS light comes on and stays on, immediately set the
applicable fuel pump switch to the OFF position.
(q) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank right override/jettison pumps are displayed
as ON and PRESS respectively.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
52 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 53

(r) Listen to make sure that the center tank right override/jettison pump runs more than
30 seconds. The noise of the pump can be heard as it runs.
(s) On P5 overhead panel, do these steps:
1) Set the R CENTER PUMPS switch to the OFF position.
2) Make sure that the amber PRESS light for the R CENTER PUMPS switch is off.
(t) On the 28 - Fuel Management maintenance page, make sure that the COMMAND
and STATUS indication for the center tank right override/jettison pump are displayed
as OFF and NO PRESS respectively.
(6) Close access to the center tank left and right fuel override/jettison pumps. Refer to 777
AMM 28-22-06 as an accepted procedure for the locations.
18. Put the airplane back to a serviceable condition.
Group 1-2, Configuration 1:
CONDITION: MORE WORK IS NECESSARY - BOND RESISTANCE MEASUREMENT
1. Remove the electrical power from the airplane. Refer to 777 AMM 24-22-00 as an accepted
procedure.
2. Get access to the P301 panel in the main equipment center.
3. Measure the resistance between each each terminal lug on the ground stud GD41253-DC and
the ground bracket assembly in accordance with FIGURE 15.
4. Get access to the P302 panel in the main equipment center.
5. Measure the resistance between each terminal lug on the ground stud GD41254-DC and the
ground bracket assembly in accordance with FIGURE 16.
6. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2: September 20, 2010
53 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 54 (OCR)

BOEING SERVICE BULLETIN 777-28A0037
This Figure applies only to: Group 1-2, Configuration 2.
STA
STA  298.5
309.5
• P100
/ S-35L
/ S-36L
~S-37L
SEE M
P301  → FWD
1328769
FIGURE 1: P301 PANEL INSTALLATION
(SHEET 1 OF 5)
Original Issue: June 13, 2008
Revision 2 September 20, 2010  BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.

### Page 55 (OCR)

BOEING SERVICE BULLETIN 777-28A0037
STA  (4 LOCATIONS) 11
309.5
SEE
FOR STRINGER CLIPS  STA
AND GROUND BRACKET  INSTALLATION  →EWD  298.5
(4 LOCATIONS) 1
STA
309.5  ￾ S-35L
2.00
INSULATION
BLANKET
(4 LOCATIONS) T
9) (4 LOCATIONS)
& (4 LOCATIONS)  →FWD
• (4 LOCATIONS)  1328761
FIGURE 1: P301 PANEL INSTALLATION
(SHEET 2 OF 5)
Original Issue: June 13, 2008
Revision 2 September 20, 2010  BOEING PROPRIETARY -  777-28A0037
Copyright © Unpublished Work - See page 1 for details.  55 of 110

### Page 56 (OCR)

BOEING SERVICE BULLETIN 777-28A0037
2.04
0.62—-
0.30
STA
309.5
70
S-35L
0.17
(3 LOCATIONS) 3
UP
INBD ‹
A-A
FIGURE 1: P301 PANEL INSTALLATION
(SHEET 3 OF 5)
Original Issue: June 13, 2008
Revision 2 September 20, 2010  BOEING PROPRIETARY -  777-28A0037
Copyright © Unpublished Work - See page 1 for details.  56 of 110

### Page 57

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
NOTE: The parts are available in top kit 005W3256-2 or 005W3256-3, and sub kit 280W3256-120.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
From the frame. Refer to 777
AMM 25-80-00 as an accepted
procedure.
--INSULATION BLAN-
KET
Disconnect1
If necessary to install the
ground bracket and stringer
clips on the frames.
--INSULATION BLAN-
KET
Move
1287T4137-148BRACKET ASSY-
GROUND
Install (New)2
Refer to 777-200 SRM 51-20-
09 or 777-300 SRM 51-20-09
as an accepted procedure for
installation of driven rivet
bond.
3BACR15BB5D6CRIVET, UNIVERSAL
HD
Install (New)3
The maximum resistance be-
tween the ground bracket as-
sembly and the support struc-
ture is 0.0005 ohms. Refer to
SWPM 20-20-00 as an accept-
ed procedure to do a bond re-
sistance test.
--BOND RESISTANCEMeasure4
Refer to SOPM 20-50-05 as
an accepted procedure.
1280W3256-10401GROUND ID TAPEInstall (New)5
4BACS38Y3SUPPORT, WIRE
HARNESS ASSEM-
BLY, STRINGER CLIP
Install (New)6
Temporarily put the insulation
blanket back to its installed
position and mark holes on the
insulation blanket for the
standoff.
4-HOLELocate7
In the insulation blanket. Refer
to 777 AMM 25-80-00 as an
accepted procedure.
4-HOLECut
42055308
(BACS31P3 option-
al)
PIERCING GROM-
MET RETAINER
Install (New)8
FIGURE 1: P301 PANEL INSTALLATION
(SHEET 4 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2 September 20, 2010
57 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 58

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
42055306
(BACS31P1 option-
al)
RETAINER, PIERCERInstall (New)9
To the frame. Refer to 777
AMM 25-80-00 as an accepted
procedure.
--INSULATION BLAN-
KET
Attach10
1/4 turn to release the fasten-
er.
4-QUICK RELEASE
FASTENER
Turn11
The panel cover will be in-
stalled back in later figure.
1-PANEL COVERRemove / Keep12
1284W2014-10P301 PANEL ASSEM-
BLY - LEFT OVER-
RIDE/JETTISON FU-
EL PUMP RELAYS
Install (New)13
4BACS12GU3K6SCREW, CAPInstall (New)14
4NAS1149D0332JWASHERInstall (New)
The parts shown in the table below are provided as extra parts for this figure.
MORE DATAQTYIDENTIFICATIONNAME
1BACR15BB5D6CRIVET, UNIVERSAL HD
FIGURE 1: P301 PANEL INSTALLATION
(SHEET 5 OF 5)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 13, 2008
777-28A0037Revision 2 September 20, 2010
58 of 110
BOEING SERVICE BULLETIN 777-28A0037

### Page 59 (OCR)

BOEING SERVICE BULLETIN 777-28A0037
This Figure applies only to: Group 1-2, Configuration 2.
STA
298.5  STA
309.5
P200
S-35R
S-36R
S-37R
SEE
FWD  P302
1328773
FIGURE 2: P302 RELAY PANEL ASSEMBLY INSTALLATION
(SHEET 1 OF 5)
Original Issue: June 13, 2008
Revision 2 September 20, 2010  BOEING PROPRIETARY -  777-28A0037
Copyright © Unpublished Work - See page 1 for details.  59 of 110

### Page 60 (OCR)

BOEING SERVICE BULLETIN 777-28A0037
(4 LOCATIONS) (11  P302  309.5  STA
'SEE B
FOR STRINGER CLIPS
AND GROUND BRACKET
STA
INSTALLATION
298.5  FWD •
14 (4 LOCATIONS)
STA
309.5
S-36R .
50
INSULATION
BLANKET
7 (4 LOCATIONS)
(4 LOCATIONS) 9
FWD<  (4 LOCATIONS) 8
B  (4 LOCATIONS) 6  1328777
FIGURE 2: P302 RELAY PANEL ASSEMBLY INSTALLATION
(SHEET 2 OF 5)
Original Issue: June 13, 2008
Revision 2 September 20, 2010  BOEING PROPRIETARY -  777-28A0037
Copyright © Unpublished Work - See page 1 for details.  60 of 110

The text continues at https://openairdocs.org/service-documents/boeing/777-28a0037/file/e1071f8f81b9.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
