# Boeing Alert Requirements Bulletin 777-28A0098 RB: No revision named, part 2 of 3

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-2546; AD 2026-15-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 777-28A0098 RB](https://openairdocs.org/service-documents/boeing/777-28a0098-rb.md)
- Title as filed: 777-28A0098 RB - Part2
- Pages: 61
- PDF: https://openairdocs.org/files/sha256/a5/10/a5108375cdc6ad6ffb0deb394da5154d082437d177df47ddf4c39a7ac3efb39f
- Page: https://openairdocs.org/service-documents/boeing/777-28a0098-rb/file/a5108375cdc6

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

FIGURE 16: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT APPLICATION
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
163 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 2 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
FRONT SPAR
BULKHEAD  - 0.25
0.12 MINIMUM  MINIMUM
†
0.25
MINIMUM
IN-TANK ENGINE
FUEL FEED
TUBE
INBD
AFT SIDE FRONT SPAR BULKHEAD FITTING
(VIEW LOOKING DOWN)
A-A
SEALANT APPLICATION  3072468
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
Step  Task  Name  Identification  Qty  More Data
Remove  SEALANT  (a)
2  Clean  (b)
3  Apply  SEALANT  BMS5-45, CLASS A-2  (c)
Apply  SEALANT  BMS5-45, CLASS B-2  (c)
FIGURE 16: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT APPLICATION
(SHEET 2 OF 3)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  164 of 231

### Page 3

More DataQtyIdentificationNameTaskStep
(a) Use a non-metallic scraper to remove all sealant covering the aft side of the front spar bulkhead fitting,
coupling, in-tank engine fuel feed tube, and front spar bulkhead. Refer to SOPM 20-50-19 as an accepted
procedure.
(b) Solvent clean area where sealant was removed in accordance with APPENDIX F.
(c) Apply sealant in accordance with APPENDIX G. Make sure the aft side of the front spar bulkhead fitting
and coupling is sealed with a minimum thickness of 0.12 inches. Sealant is considered sufficient when
the outline of the coupling or fitting hardware is not visible under the sealant. Make sure the sealant extends
a minimum of 0.25 inches from the coupling up the tube. Make sure the sealant extends a minimum of
0.25 inches beyond the maximum diameter of the front spar bulkhead fitting hex nut on the front spar
bulkhead.
FIGURE 16: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT APPLICATION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
165 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 4

This Figure applies only to: Group 1.
FIGURE 17: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
166 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 5

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-BONDING JUMPERInspect1
(b)1-TUBE CLAMPInspect2
(c)--ELECTRICAL BOND-
ING RESISTANCE
Measure3
(a) Do a Detailed Inspection (DET) of the in-tank engine fuel feed tube to wing structure bonding jumper for
correct installation. Bonding jumper correct installation is defined as no missing bonding jumper, no
damaged bonding jumper, and no loose bonding jumper lugs found. Bonding jumper damage is defined
as one or more broken strands in the wire braid. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
FIGURE 17: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
167 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 6

More DataQtyIdentificationNameTaskStep
(b) Do a DET of the tube clamp for correct installation. Tube clamp correct installation is defined as no
missing tube clamp, no damaged tube clamp, and no loose tube clamp found. Tube clamp damage is
defined as tube clamp being cracked, broken or screw hole elongated. Loose condition is defined as
component rotation when trying to rotate with light finger pressure.
(c) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the in-tank engine
fuel feed tube and the wing structure. An acceptable resistance is 4.0 milliohms or less. Refer to SWPM
20-20-00 as an accepted procedure.
FIGURE 17: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
168 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 7

This Figure applies only to: Group 1.
FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 1 OF 5)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
169 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 8 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
WING STRUCTURE BRACKET
153
3072574
FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 2 OF 5)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  170 of 231

### Page 9

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-NUTRemove1
-1NAS1149D0316JWASHERRemove / Keep
-1-NUTRemove2
-2NAS1149D0316JWASHERRemove / Keep
-1BACS12GU3K7SCREWRemove / Keep
(b)1BACJ40A20-4BONDING JUMPERRemove3
(c)(d)1AN735D32 OR
AN735DC32 OR
AN735DC40 OR
AN735D40
TUBE CLAMPRemove4
(e)--GROUND STUD
THREAD AND NUT
Clean5
(f)1AN735D32 OR
AN735DC32 OR
AN735DC40 OR
AN735D40
TUBE CLAMPClean
(f)(g)--IN-TANK ENGINE FU-
EL FEED TUBE
Clean
(e)(h)1BACJ40A20-4BONDING JUMPERClean
(e)2BACN10YR3CDNUTClean
New part.
(e)3NAS1149D0316JWASHERClean
(e)1BACS12GU3K7SCREWClean
(j)(k)(l)1BACJ40A20-4BONDING JUMPERInstall (New)6
(d)(i)(k)1AN735D32 OR
AN735DC32 OR
AN735DC40 OR
AN735D40
TUBE CLAMPInstall (New)
(k)1BACS12GU3K7SCREWInstall (Kept)7
(k)2NAS1149D0316JWASHERInstall (Kept)
(k)1BACN10YR3CDNUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 3 OF 5)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
171 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 10

More DataQtyIdentificationNameTaskStep
(l)1NAS1149D0316JWASHERInstall (Kept)8
(l)(a)1BACN10YR3CDNUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(m)(p)--ELECTRICAL BOND-
ING RESISTANCE
Measure9
(n)(p)--ELECTRICAL BOND-
ING RESISTANCE
Measure10
(o)(p)--ELECTRICAL BOND-
ING RESISTANCE
Measure11
(q)1 OzTYPE II, CLASS DCHEMICAL CONVER-
SION COATING
Apply12
(a) Hold the ground stud head if it is accessible when torque is applied to the nut. Failure to hold ground stud
head when applying torque to the nut could result in rotation of the ground stud assembly and subsequent
ground stud rework.
(b) If installed, it is only necessary to discard a damaged bonding jumper. Bonding jumper damage is defined
as one or more broken strands in the wire braid.
(c) If installed, it is only necessary to discard a damaged tube clamp. Tube clamp damage is defined as tube
clamp being cracked, broken or screw hole elongated.
(d) Tube clamp part numbers are not interchangeable. The part number of the tube clamp removed must be
the same as the part number of the tube clamp installed. See below for tube clamp part number information:
AN735DC32 is for 777-200 Airplane line numbers 1-313.
AN735D32 is for 777-200 Airplane line numbers 314-829.
AN735DC40 is for 777-300 Airplane line numbers 1-313.
AN735D40 is for 777-200LR, 777-300, 777-300ER and 777F Airplane line numbers 314-829.
(e) Solvent clean all bond surfaces. Refer to APPENDIX A as an accepted procedure.
(f) Abrasive clean all bond surfaces. Refer to APPENDIX B as an accepted procedure.
(g) Make sure the fuel feed tube surface that will contact the tube clamp is cleaned.
(h) The bonding jumper has two terminals. Each terminal has two bonding surfaces. Make sure all of the
bonding surfaces on the bonding jumper are cleaned.
(i) Install a new or serviceable tube clamp. A tube clamp that has no damage is a serviceable tube clamp.
(j) Install new or serviceable bonding jumper. A bonding jumper that has no damage is a serviceable bonding
jumper.
(k) Install the bonding jumper to the tube clamp with a 0.5 inch minimum clearance from any structure or
part. Refer to SWPM 20-20-00 as an accepted procedure.
FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 4 OF 5)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
172 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 11

More DataQtyIdentificationNameTaskStep
(l) Install the bonding jumper to the ground stud with a 0.5 inch minimum clearance from any structure or
part. Make sure the terminal lugs do not interfere with another structure or part. Refer to SWPM 20-20-
10 as an accepted procedure.
(m) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and wing structure bracket and make sure the maximum resistance is within limits in accordance with
APPENDIX D.
(n) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and in-tank engine fuel feed tube and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(o) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the in-tank engine
fuel feed tube and the wing structure. Make sure the bonding resistance is 2.5 milliohms or less. Refer
to SWPM 20-20-00 as an accepted procedure.
(p) If the electrical bonding resistance measurement is more than the maximum resistance allowed, disas-
semble parts, clean faying surfaces, install parts and measure electrical bonding resistance again.
(q) Apply chemical conversion coating Type II, Class D to the engine fuel feed tube and tube clamp part
numbers AN735DC32 and AN735DC40 only. Refer to SOPM 20-43-03 as an accepted procedure.
FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 5 OF 5)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
173 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 12

This Figure applies only to: Group 2.
FIGURE 19: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
174 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 13 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
BONDING MPER
IN-TANK ENGINE FUEL
FEED TUBE CONNECTED
TO THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING.
SECOND AFT IN-TANK
ENGINE FUEL FEED
TUBE
FWD
A-A
3086570
FIGURE 19: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 2 OF 3)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  175 of 231

### Page 14

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-BONDING JUMPERInspect1
(b)2-TUBE CLAMPInspect2
(c)--ELECTRICAL BOND-
ING RESISTANCE
Measure3
(a) Do a Detailed Inspection (DET) of the bonding jumper that connects the in-tank engine fuel feed tube
connected to the AFT side of the front spar bulkhead fitting to the second aft in-tank engine fuel feed tube
for correct installation. Bonding jumper correct installation is defined as no missing bonding jumper, no
damaged bonding jumper, and no loose bonding jumper lugs found. Bonding jumper damage is defined
as one or more broken strands in the wire braid. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
(b) Do a DET of the tube clamp for correct installation. Tube clamp correct installation is defined as no
missing tube clamp, no damaged tube clamp, and no loose tube clamp found. Tube clamp damage is
defined as tube clamp being cracked, broken or screw hole elongated. Loose condition is defined as
component rotation when trying to rotate with light finger pressure.
(c) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the in-tank engine
fuel feed tube connected to the aft side of the front spar bulkhead fitting and second AFT in-tank engine
fuel feed tube. An acceptable resistance is 4.0 milliohms or less. Refer to SWPM 20-20-00 as an accepted
procedure.
FIGURE 19: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
176 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 15

This Figure applies only to: Group 2.
FIGURE 20: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 1 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
177 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 16 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
e0Q
5) 12
3086572
FIGURE 20: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 2 OF 4)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  178 of 231

### Page 17

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
-1-NUTRemove1
-2NAS1149D0316JWASHERRemove / Keep
-1BACS12GU3K7SCREWRemove / Keep
-1-NUTRemove2
-2NAS1149D0316JWASHERRemove / Keep
-1BACS12GU3K7SCREWRemove / Keep
(a)1BACJ40A20-6BONDING JUMPERRemove3
(b)(c)2AN735D32 OR
AN735D40
TUBE CLAMPRemove4
(d)(f)2-IN-TANK ENGINE FU-
EL FEED TUBE
Clean5
(d)2AN735D32 OR
AN735D40
TUBE CLAMPClean
(e)(g)1BACJ40A20-6BONDING JUMPERClean
(e)2BACN10YR3CDNUTClean
New part.
(e)4NAS1149D0316JWASHERClean
(e)2BACS12GU3K7SCREWClean
(i)(j)(k)1BACJ40A20-6BONDING JUMPERInstall (New)6
(c)(h)(j)(k)2AN735D32 OR
AN735D40
TUBE CLAMPInstall (New)
(j)1BACS12GU3K7SCREWInstall (Kept)7
(j)2NAS1149D0316JWASHERInstall (Kept)
(j)1BACN10YR3CDNUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(k)1BACS12GU3K7SCREWInstall (Kept)8
(k)2NAS1149D0316JWASHERInstall (Kept)
(k)1BACN10YR3CDNUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(l)(n)--ELECTRICAL BOND-
ING RESISTANCE
Measure9
FIGURE 20: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
179 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 18

More DataQtyIdentificationNameTaskStep
(l)(n)--ELECTRICAL BOND-
ING RESISTANCE
Measure10
(m)(n)--ELECTRICAL BOND-
ING RESISTANCE
Measure11
(o)1 OzTYPE II, CLASS DCHEMICAL CONVER-
SION COATING
Apply12
(a) If installed, it is only necessary to discard a damaged bonding jumper. Bonding jumper damage is defined
as one or more broken strands in the wire braid.
(b) If installed, it is only necessary to discard a damaged tube clamp. Tube clamp damage is defined as tube
clamp being cracked, broken or screw hole elongated.
(c) Tube clamp part numbers are not interchangeable. The part number of the tube clamp removed must be
the same as the part number of the tube clamp installed. See below for tube clamp part number information:
AN735D32 is for 777-200 Airplanes.
AN735D40 is for 777-200LR, 777-300, 777-300ER and 777F Airplanes.
(d) Abrasive clean all bond surfaces. Refer to APPENDIX B as an accepted procedure.
(e) Solvent clean all bond surfaces. Refer to APPENDIX A as an accepted procedure.
(f) Make sure the fuel feed tube surface that will contact the tube clamp is cleaned.
(g) The bonding jumper has two terminals. Each terminal has two bonding surfaces. Make sure all of the
bonding surfaces on the bonding jumper are cleaned.
(h) Install new or serviceable tube clamps. A tube clamp that has no damage is a serviceable tube clamp.
(i) Install a new or serviceable bonding jumper. A bonding jumper that has no damage is a serviceable
bonding jumper.
(j) Install the bonding jumper to the forward tube clamp with a 0.5 inch minimum clearance from any structure
or part. Refer to SWPM 20-20-00 as an accepted procedure.
(k) Install the bonding jumper to the aft tube clamp with a 0.5 inch minimum clearance from any structure or
part. Refer to SWPM 20-20-00 as an accepted procedure.
(l) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and in-tank engine fuel feed tube and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(m) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the in-tank engine
fuel feed tubes. Make sure the bonding resistance is 2.5 milliohms or less. Refer to SWPM 20-20-00 as
an accepted procedure.
(n) If the electrical bonding resistance measurement is more than the maximum resistance allowed, disas-
semble parts, clean faying surfaces, install parts and measure electrical bonding resistance again.
(o) Apply chemical conversion coating Type II, Class D to the engine fuel feed tube. Refer to SOPM 20-43-
03 as an accepted procedure.
FIGURE 20: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
180 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 19

This Figure applies only to: Group 2.
FIGURE 21: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
181 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 20

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-BONDING JUMPERInspect1
(b)1-TUBE CLAMPInspect2
(c)--ELECTRICAL BOND-
ING RESISTANCE
Measure3
FIGURE 21: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
182 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 21

More DataQtyIdentificationNameTaskStep
(a) Do a Detailed Inspection (DET) of the in-tank engine fuel feed tube to wing structure bonding jumper for
correct installation. Bonding jumper correct installation is defined as no missing bonding jumper, no
damaged bonding jumper, and no loose bonding jumper lugs found. Bonding jumper damage is defined
as one or more broken strands in the wire braid. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
(b) Do a DET of the tube clamp for correct installation. Tube clamp correct installation is defined as no
missing tube clamp, no damaged tube clamp, and no loose tube clamp found. Tube clamp damage is
defined as tube clamp being cracked, broken or screw hole elongated. Loose condition is defined as
component rotation when trying to rotate with light finger pressure.
(c) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the in-tank engine
fuel feed tube and the wing structure. An acceptable resistance is 4.0 milliohms or less. Refer to SWPM
20-20-00 as an accepted procedure.
FIGURE 21: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
183 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 22

This Figure applies only to: Group 2.
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 1 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
184 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 23 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
•WING STRUCTURE BRACKET
200
3085121
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 2 OF 7)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  185 of 231

### Page 24 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
200
WING STRUCTURE BRACKET
200
ALTERNATIVE INSTALLATION
3093295
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 3 OF 7)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  186 of 231

### Page 25

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-GROUND STUDLocate1
(a)1-SCREWLocate
(b)1-NUTRemove2
Applicable to View B
only.
Applicable to View B
only.
1NAS1149D0316JWASHERRemove / Keep
Applicable to View C
only (alternative in-
stallation).
1-NUTRemove
Applicable to View C
only (alternative in-
stallation).
3NAS1149D0316JWASHERRemove / Keep
Applicable to View C
only (alternative in-
stallation).
1BACS12GU3K7SCREWRemove / Keep
-1-NUTRemove3
-2NAS1149D0316JWASHERRemove / Keep
-1BACS12GU3K7SCREWRemove / Keep
(c)1BACJ40A20-4BONDING JUMPERRemove4
(d)(e)1AN735D32 OR
AN735D40
TUBE CLAMPRemove5
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 4 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
187 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 26

More DataQtyIdentificationNameTaskStep
(h)1AN735D32 OR
AN735D40
TUBE CLAMPClean6
(h)(i)--IN-TANK ENGINE FU-
EL FEED TUBE
Clean
(f)(j)1BACJ40A20-4BONDING JUMPERClean
(f)2BACN10YR3CDNUTClean
New part.
(f)--GROUND STUD
THREAD AND NUT
Clean
Applicable to View B
only.
(f)3NAS1149D0316JWASHERClean
Applicable to View B
only.
(f)1BACS12GU3K7SCREWClean
Applicable to View B
only.
(g)--WING STRUCTURE
BRACKET
Clean
Applicable to View C
only (alternative in-
stallation).
(f)5NAS1149D0316JWASHERClean
Applicable to View C
only (alternative in-
stallation).
(f)2BACS12GU3K7SCREWClean
Applicable to View C
only (alternative in-
stallation).
(l)(m)(n)1BACJ40A20-4BONDING JUMPERInstall (New)7
(e)(k)(m)1AN735D32 OR
AN735D40
TUBE CLAMPInstall (New)
(m)1BACS12GU3K7SCREWInstall (Kept)8
(m)2NAS1149D0316JWASHERInstall (Kept)
(m)1BACN10YR3CDNUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 5 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
188 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 27

More DataQtyIdentificationNameTaskStep
(n)1NAS1149D0316JWASHERInstall (Kept)9
Applicable to View B
only.
(n)(b)1BACN10YR3CDNUTInstall (New)
Applicable to View B
only.
Torque nut to 28 to
35 inch-lbs.
(n)1BACS12GU3K7SCREWInstall (Kept)
Applicable to View C
only (alternative in-
stallation).
(n)3NAS1149D0316JWASHERInstall (Kept)
Applicable to View C
only (alternative in-
stallation).
(n)(o)1BACN10YR3CDNUTInstall (New)
Applicable to View C
only (alternative in-
stallation).
Torque nut to 28 to
35 inch-lbs.
(p)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure10
(q)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure11
(r)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure12
(t)1 OzTYPE II, CLASS DCHEMICAL CONVER-
SION COATING
Apply13
(a) Find the view applicable to the installation. Installations with a ground stud are identified in View B. Instal-
lations with a screw instead of a ground stud are identified in View C (alternative installation).
(b) Hold the ground stud head if it is accessible when torque is applied to the nut. Failure to hold ground stud
head when applying torque to the nut could result in rotation of the ground stud assembly and subsequent
ground stud rework.
(c) If installed, it is only necessary to discard a damaged bonding jumper. Bonding jumper damage is defined
as one or more broken strands in the wire braid.
(d) If installed, it is only necessary to discard a damaged tube clamp. Tube clamp damage is defined as tube
clamp being cracked, broken or screw hole elongated.
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
189 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 28

More DataQtyIdentificationNameTaskStep
(e) Tube clamp part numbers are not interchangeable. The part number of the tube clamp removed must be
the same as the part number of the tube clamp installed. See below for tube clamp part number information:
AN735D32 is for 777-200 Airplanes.
AN735D40 is for 777-200LR, 777-300, 777-300ER and 777F Airplanes.
(f) Solvent clean all bond surfaces. Refer to APPENDIX A as an accepted procedure.
(g) Abrasive clean, stainless steel rotary brush clean, or abrasive disc clean all bond surfaces. Refer to AP-
PENDIX B or APPENDIX C as an accepted procedure.
(h) Abrasive clean all bond surfaces. Refer to APPENDIX B as an accepted procedure.
(i) Make sure the fuel feed tube surface that will contact the tube clamps is cleaned.
(j) The bonding jumper has two terminals. Each terminal has two bonding surfaces. Make sure all of the
bonding surfaces on the bonding jumper are cleaned.
(k) Install a new or serviceable tube clamp. A tube clamp that has no damage is a serviceable tube clamp.
(l) Install a new or serviceable bonding jumper. A bonding jumper that has no damage is a serviceable
bonding jumper.
(m) Install the bonding jumper to the tube clamp with a minimum clearance of 0.5 inches from any structure
or part. Refer to SWPM 20-20-00 as an accepted procedure.
(n) Install the bonding jumper to the ground stud with a 0.5 inch minimum clearance from any structure or
part, or for alternative installation install the bonding jumper to the wing structure bracket with a 0.5 inch
minimum clearance from any structure or part. Make sure the terminal lugs do not interfere with another
structure or part. Refer to SWPM 20-20-10 as an accepted procedure.
(o) If the nut is not accessible, it is acceptable to torque the screw head to 32 to 38 inch-lbs.
(p) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and wing structure bracket and make sure the maximum resistance is within limits in accordance with
APPENDIX D.
(q) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and in-tank engine fuel feed tube and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(r) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the in-tank engine
fuel feed tube and the wing structure. Make sure the bonding resistance is 2.5 milliohms or less. Refer
to SWPM 20-20-00 as an accepted procedure.
(s) If the electrical bonding resistance measurement is more than the maximum resistance allowed, disas-
semble parts, clean faying surfaces, install parts and measure electrical bonding resistance again.
(t) For both installations, apply chemical conversion coating Type II, Class D to the engine fuel feed tube.
For alternative installation only, apply chemical conversion coating Type II, Class D to any exposed bare
metal on the wing structure bracket. Refer to SOPM 20-43-03 as an accepted procedure.
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
190 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 29 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
This Figure applies only to: Group 1-2, Configuration 2.
292
3072509
FIGURE 23: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 1 OF 3)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  191 of 231

### Page 30 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
TUBE CLAMP
OUT-TANK
ENGINE FUEL
FEED TUBE
BONDING
JUMPER LUGS
NACELLE STRUT
STRUCTURE
=WD
DETAILED INSPECTION  3072508
FIGURE 23: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 2 OF 3)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991  See page 1 for details  192 of 231

### Page 31

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-BONDING JUMPERInspect1
(b)1-TUBE CLAMPInspect2
(c)--ELECTRICAL BOND-
ING RESISTANCE
Measure3
(a) Do a Detailed Inspection (DET) of the out-tank engine fuel feed tube to nacelle strut structure bonding
jumper for correct installation. Bonding jumper correct installation is defined as no missing bonding jumper,
no damaged bonding jumper, and no loose bonding jumper lugs found. Bonding jumper damage is defined
as one or more broken strands in the wire braid. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
(b) Do a DET of the tube clamp for correct installation. Tube clamp correct installation is defined as no
missing tube clamp, no damaged tube clamp, and no loose tube clamp found. Tube clamp damage is
defined as tube clamp being cracked, broken or screw hole elongated. Loose condition is defined as
component rotation when trying to rotate with light finger pressure.
(c) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the nacelle strut
structure and the out-tank engine fuel feed tube. An acceptable resistance is 4.0 milliohms or less. Refer
to SWPM 20-20-00 as an accepted procedure.
FIGURE 23: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
193 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 32 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
This Figure applies only to: Group 1-2, Configuration 2.
292
3072495
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 1 OF 7)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  194 of 231

### Page 33 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
COUPLING
9)
7\11
8 18
NACELLE STRUT  ) NACELLE STRUT  STRUCTURE
STRUCTURE
BRACKET
3072503
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 2 OF 7)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  195 of 231

### Page 34

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-NUTRemove1
(b)1NAS1149D0332J OR
NAS1149D0332H
WASHERRemove / Keep
-1-NUTRemove2
(b)2NAS1149D0332J OR
NAS1149D0332H
WASHERRemove / Keep
(b)1BACS12HN3-7 OR
BACS12HN3-8
SCREWRemove / Keep
-1-NUTRemove3
(b)2NAS1149D0332J OR
NAS1149D0332H
WASHERRemove / Keep
(b)1BACS12HN3-7 OR
BACS12HN3-8
SCREWRemove / Keep
(c)1BACJ40A20-5BONDING JUMPERRemove4
(c)1BACJ40A20-4BONDING JUMPERRemove5
(b)(d)2AN735-32 OR
AN735DC32
TUBE CLAMPRemove6
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 3 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
196 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 35

More DataQtyIdentificationNameTaskStep
(e)--GROUND STUD
THREAD AND NUT
Clean7
(e)(g)2AN735-32 OR
AN735DC32
TUBE CLAMPClean
(f)(h)--OUT-TANK ENGINE
FUEL FEED TUBE
Clean
(e)(i)1BACJ40A20-5BONDING JUMPERClean
(b)(e)1BACN11AG3 OR
BACN10YR3CD
NUTClean
New part.
(e)1NAS1149D0332J OR
NAS1149D0332H
WASHERClean
(b)(e)1BACN11AG3 OR
BACN10YR3CD
NUTClean
New part.
(e)2NAS1149D0332J OR
NAS1149D0332H
WASHERClean
(e)1BACS12HN3-7 OR
BACS12HN3-8
SCREWClean
(b)(e)1BACN11AG3 OR
BACN10YR3CD
NUTClean
New part.
(e)2NAS1149D0332J OR
NAS1149D0332H
WASHERClean
(e)1BACS12HN3-7 OR
BACS12HN3-8
SCREWClean
(e)(i)1BACJ40A20-4BONDING JUMPERClean
(k)(l)(m)(n)1BACJ40A20-5BONDING JUMPERInstall (New)8
To the nacelle strut
structure and tube
clamp as shown.
(k)(l)(n)1BACJ40A20-4BONDING JUMPERInstall (New)
To the tube clamps
as shown.
(b)(j)(l)2AN735-32 OR
AN735DC32
TUBE CLAMPInstall (New)
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 4 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
197 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 36

More DataQtyIdentificationNameTaskStep
(b)(l)1BACS12HN3-7 OR
BACS12HN3-8
SCREWInstall (Kept)9
(b)(l)2NAS1149D0332J OR
NAS1149D0332H
WASHERInstall (Kept)
(b)(l)1BACN11AG3 OR
BACN10YR3CD
NUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(b)(m)1NAS1149D0332J OR
NAS1149D0332H
WASHERInstall (Kept)10
(b)(m)(a)1BACN11AG3 OR
BACN10YR3CD
NUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(b)(l)1BACS12HN3-7 OR
BACS12HN3-8
SCREWInstall (Kept)11
(b)(l)2NAS1149D0332J OR
NAS1149D0332H
WASHERInstall (Kept)
(b)(l)1BACN11AG3 OR
BACN10YR3CD
NUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(o)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure12
(p)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure13
(p)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure14
(p)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure15
(q)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure16
(r)(s)--ELECTRICAL BOND-
ING RESISTANCE
Measure17
(t)1 OzTYPE II, CLASS DCHEMICAL CONVER-
SION COATING
Apply18
(u).5 OzBMS10-11,TYPE 1PRIMERApply19
(a) Hold the ground stud head if it is accessible when torque is applied to the nut. Failure to hold ground stud
head when applying torque to the nut could result in rotation of the ground stud assembly and subsequent
ground stud rework.
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 5 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
198 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 37

More DataQtyIdentificationNameTaskStep
(b) Part numbers are not interchangeable. The part number removed must be the same as the part number
installed. See below for part number information:
AN735-32, BACS12HN3-7, NAS1149D0332J and BACN11AG3 are for line numbers 1-230.
AN735DC32, BACS12HN3-8, NAS1149D0332H and BACN10YR3CD are for line numbers 231 and on.
(c) If installed, it is only necessary to discard a damaged bonding jumper. Bonding jumper damage is defined
as one or more broken strands in the wire braid.
(d) If installed, it is only necessary to discard a damaged tube clamp. Tube clamp damage is defined as tube
clamp being cracked, broken or screw hole elongated.
(e) Solvent clean all bond surfaces. Refer to APPENDIX A as an accepted procedure.
(f) Abrasive clean all bond surfaces. Refer to APPENDIX B as an accepted procedure.
(g) Make sure the bonding surfaces on the tube clamps that will contact a bonding jumper are cleaned.
(h) Make sure the fuel feed tube surface that will contact the tube clamp is cleaned.
(i) The bonding jumper has two terminals. Each terminal has two bonding surfaces. Make sure all of the
bonding surfaces on the bonding jumper are cleaned.
(j) Install new or serviceable tube clamps. A tube clamp that has no damage is a serviceable tube clamp.
(k) Install a new or serviceable bonding jumper. A bonding jumper that has no damage is a serviceable
bonding jumper.
(l) Install the bonding jumper to the tube clamp with a 0.5 inch minimum clearance from any structure or
part. Refer to SWPM 20-20-00 as an accepted procedure.
(m) Install the bonding jumper to the ground stud with a 0.5 inch minimum clearance from any structure or
part. Make sure the terminal lugs do not interfere with another structure or part. Refer to SWPM 20-20-
10 as an accepted procedure.
(n) In accordance with APPENDIX H for acceptable bonding jumper installations.
(o) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and nacelle strut structure bracket and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(p) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and out-tank engine fuel feed tube and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(q) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the nacelle strut
structure and the out-tank engine fuel feed tube. Make sure the bonding resistance is 4.0 milliohms or
less. Refer to SWPM 20-20-00 as an accepted procedure.
(r) Use a M1 or M1B bonding meter to measure the electrical bonding resistance across the coupling between
the out-tank engine fuel feed tubes. Make sure the bonding resistance is 10.0 milliohms or less. Refer to
SWPM 20-20-00 as an accepted procedure.
(s) If the electrical bonding resistance measurement is more than the maximum resistance allowed, disas-
semble parts, clean faying surfaces, install parts and measure electrical bonding resistance again.
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
199 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 38

More DataQtyIdentificationNameTaskStep
(t) Apply chemical conversion coating Type II, Class D to the engine fuel feed tube and part number
AN735DC32 tube clamp only to repair any damaged coating found. Refer to SOPM 20-43-03 as an ac-
cepted procedure.
(u) Apply BMS10-11, Type 1 (Grade A, B or E) primer to the abrasively cleaned area of the engine fuel feed
tube. Refer to SOPM 20-41-02 as an accepted procedure.
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
200 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 39 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
This Figure applies only to: Group 1-2, Configuration 3.
FWD
3072494
FIGURE 25: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 1 OF 3)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  201 of 231

### Page 40 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
OUT-TANK  ENGINE FUEL  TUBE CLAMP
FEED TUBE
BONDING
JUMPER LUGS
NACELLE STRUT
STRUCTURE
TYPICAL  3072489
DETAILED INSPECTION
FIGURE 25: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 2 OF 3)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  202 of 231

### Page 41

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-BONDING JUMPERInspect1
(b)1-TUBE CLAMPInspect2
(c)--ELECTRICAL BOND-
ING RESISTANCE
Measure3
(a) Do a Detailed Inspection (DET) of the out-tank engine fuel feed tube to nacelle strut structure bonding
jumper for correct installation. Bonding jumper correct installation is defined as no missing bonding jumper,
no damaged bonding jumper, and no loose bonding jumper lugs found. Bonding jumper damage is defined
as one or more broken strands in the wire braid. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
(b) Do a DET of the tube clamp for correct installation. Tube clamp correct installation is defined as no
missing tube clamp, no damaged tube clamp, and no loose tube clamp found. Tube clamp damage is
defined as tube clamp being cracked, broken or screw hole elongated. Loose condition is defined as
component rotation when trying to rotate with light finger pressure.
(c) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the nacelle strut
structure and the out-tank engine fuel feed tube. An acceptable resistance is 4.0 milliohms or less. Refer
to SWPM 20-20-00 as an accepted procedure.
FIGURE 25: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
203 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 42 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
This Figure applies only to: Group 1-2, Configuration 3.
FWD
3072488
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 1 OF 9)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  204 of 231

### Page 43 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
OUT-TANK AFT
ENGINE FUEL
FEED TUBE
19,20
18019
18
COUPLING
OUT-TANK
FORWARD ENGINE
FUEL FEED TUBE
17) NACELLE STRUT
STRUCTURE
NACELLE STRUT
STRUCTURE
BRACKET  3093371
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 2 OF 9)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  205 of 231

### Page 44 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
4) 8) 12
OUT-TANK AFT
ENGINE FUEL
FEED TUBE
3) 8) 11  6) 8/9
€ 30
D801
18
- COUPLING
OUT-TANK
FORWARD ENGINE
FUEL FEED TUBE
® U
NACELLE STRUT
STRUCTURE
BRACKET
NACELLE STRUT
STRUCTURE
ALTERNATIVE INSTALLATION  3072487
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 3 OF 9)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  206 of 231

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)1-GROUND STUDLocate1
(a)1-SCREWLocate
(b)1-NUTRemove2
Applicable to View B
only.
Applicable to View B
only.
1NAS1149D0332J OR
NAS1149C0332R
WASHERRemove / Keep
Applicable to View C
only (alternative in-
stallation).
1-NUTRemove
Applicable to View C
only (alternative in-
stallation).
2NAS1149D0332JWASHERRemove / Keep
(c)1BACS12HN3-7 OR
BACS12HN3-8
SCREWRemove / Keep
Applicable to View C
only (alternative in-
stallation).
-1-NUTRemove3
(c)2NAS1149D0332J OR
NAS1149C0332R
WASHERRemove / Keep
(c)1BACS12HN3-7 OR
BACS12HN3-8 OR
BACS12HN3U8
SCREWRemove / Keep
-1-NUTRemove4
(c)2NAS1149D0332J OR
NAS1149D0332H
WASHERRemove / Keep
(c)1BACS12HN3-7 OR
BACS12HN3-8
SCREWRemove / Keep
(c)(d)1BACJ40A20-6 OR
BACJ40AD44-6
BONDING JUMPERRemove5
(c)(d)1BACJ40A20-4 OR
BACJ40AC44-4
BONDING JUMPERRemove6
(c)(e)2AN735-32 OR
AN735C32 OR
AN735DC32
TUBE CLAMPRemove7
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 4 OF 9)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
207 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 46

More DataQtyIdentificationNameTaskStep
(f)(i)2AN735-32 OR
AN735C32 OR
AN735DC32
TUBE CLAMPClean8
(f)(j)--OUT-TANK FORWARD
ENGINE FUEL FEED
TUBE
Clean
(h)(j)--OUT-TANK AFT EN-
GINE FUEL FEED
TUBE
Clean
(f)(k)1BACJ40A20-6 OR
BACJ40AD44-6
BONDING JUMPERClean
(f)(c)1BACN11AG3 OR
BACN10YR3CD
NUTClean
New part.
(f)(c)1BACN11AG3 OR
BACN10YR3CM
NUTClean
New part.
(f)2NAS1149D0332J OR
NAS1149C0332R
WASHERClean
(f)1BACS12HN3-7 OR
BACS12HN3-8
SCREWClean
(f)(c)1BACN11AG3 OR
BACN10YR3CM
NUTClean
New part.
(f)2NAS1149D0332J OR
NAS1149D0332H
WASHERClean
(f)1BACS12HN3-7 OR
BACS12HN3-8 OR
BACS12HN3U8
SCREWClean
(f)(k)1BACJ40A20-4 OR
BACJ40AC44-4
BONDING JUMPERClean
(f)--GROUND STUD
THREAD AND NUT
Clean
Applicable to View B
only.
(f)1NAS1149D0332J OR
NAS1149C0332R
WASHERClean
Applicable to View B
only.
(g)--WING STRUCTURE
BRACKET
Clean
Applicable to View C
only (alternative in-
stallation).
(f)2NAS1149D0332JWASHERClean
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 5 OF 9)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
208 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 47

More DataQtyIdentificationNameTaskStep
Applicable to View C
only (alternative in-
stallation).
(f)1BACS12HN3-7 OR
BACS12HN3-8
SCREWClean
Applicable to View C
only (alternative in-
stallation).
(c)(m)(n)(o)(q)1BACJ40A20-6 OR
BACJ40AD44-6
BONDING JUMPERInstall (New)9
To the nacelle strut
structure and tube
clamp as shown.
(c)(l)(n)2AN735-32 OR
AN735C32 OR
AN735DC32
TUBE CLAMPInstall (New)
(c)(m)(n)(p)(q)1BACJ40A20-4 OR
BACJ40AC44-4
BONDING JUMPERInstall (New)
Applicable to View B
only.
To the tube clamps
as shown.
(c)(o)1NAS1149C0332RWASHERInstall (Kept)10
Applicable to View B
only.
(c)(o)(b)1BACN11AG3 OR
BACN10YR3CM
NUTInstall (New)
Applicable to View B
only.
Torque nut to 33 to
40 inch-lbs.
(c)(o)1BACS12HN3-7 OR
BACS12HN3-8
SCREWInstall (Kept)
Applicable to View C
only (alternative in-
stallation).
(c)(o)2NAS1149D0332J OR
NAS1149C0332R
WASHERInstall (Kept)
Applicable to View C
only (alternative in-
stallation).
(c)(o)(r)1BACN11AG3 OR
BACN10YR3CM
NUTInstall (New)
Applicable to View C
only (alternative in-
stallation).
Torque nut to 28 to
35 inch-lbs.
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 6 OF 9)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
209 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 48

More DataQtyIdentificationNameTaskStep
(c)(n)1BACS12HN3-7 OR
BACS12HN3-8 OR
BACS12HN3U8
SCREWInstall (Kept)11
(c)(n)2NAS1149D0332J OR
NAS1149C0332R
WASHERInstall (Kept)
(c)(n)1BACN11AG3 OR
BACN10YR3CM
NUTInstall (New)
Torque nut to 33 to
40 inch-lbs.
(c)(n)1BACS12HN3-7 OR
BACS12HN3-8
SCREWInstall (Kept)12
(c)(n)2NAS1149D0332J OR
NAS1149D0332H
WASHERInstall (Kept)
(c)(n)1BACN11AG3 OR
BACN10YR3CD
NUTInstall (New)
Torque nut to 28 to
35 inch-lbs.
(s)(w)--ELECTRICAL BOND-
ING RESISTANCE
Measure13
(t)(w)--ELECTRICAL BOND-
ING RESISTANCE
Measure14
(t)(w)--ELECTRICAL BOND-
ING RESISTANCE
Measure15
(t)(w)--ELECTRICAL BOND-
ING RESISTANCE
Measure16
(u)(w)--ELECTRICAL BOND-
ING RESISTANCE
Measure17
(v)(w)--ELECTRICAL BOND-
ING RESISTANCE
Measure18
(x)1 OzTYPE II, CLASS DCHEMICAL CONVER-
SION COATING
Apply19
(y).5 OzBMS10-11,TYPE 1PRIMERApply20
(a) Find the view applicable to the installation. Installations with a ground stud are identified in View B. Instal-
lations with a screw instead of a ground stud are identified in View C (alternative installation).
(b) Hold the ground stud head if it is accessible when torque is applied to the nut. Failure to hold ground stud
head when applying torque to the nut could result in rotation of the ground stud assembly and subsequent
ground stud rework.
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 7 OF 9)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
210 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 49

More DataQtyIdentificationNameTaskStep
(c) Part numbers are not interchangeable. The part number removed must be the same as the part number
installed. See below for part number information:
BACJ40A20-4, BACJ40A20-6, AN735-32 (tube clamp aft of coupling), AN735C32 (tube clamp forward
of coupling), BACS12HN3-8, NAS1149D0332J and BACN11AG3 are for line numbers 14-46.
BACJ40A20-4, BACJ40A20-6, AN735-32, BACS12HN3-7, NAS1149D0332J and BACN11AG3 are for
line numbers 47-230.
BACJ40AC44-4, BACJ40AD44-6, AN735DC32 (tube clamp aft of coupling), AN735C32 (tube clamp forward
of coupling), BACS12HN3-7, BACS12HN3U8, NAS1149C0332R, NAS1149D0332H, BACN10YR3CM
and BACN10YR3CD are for line numbers 1-13, 231 and on.
(d) If installed, it is only necessary to discard a damaged bonding jumper. Bonding jumper damage is defined
as one or more broken strands in the wire braid.
(e) If installed, it is only necessary to discard a damaged tube clamp. Tube clamp damage is defined as tube
clamp being cracked, broken or screw hole elongated.
(f) Solvent clean all bond surfaces. Refer to APPENDIX A as an accepted procedure.
(g) Abrasive clean, stainless steel rotary brush clean, or abrasive disc clean all bond surfaces. Refer to AP-
PENDIX B or APPENDIX C as an accepted procedure.
(h) Abrasive clean all bond surfaces. Refer to APPENDIX B as an accepted procedure.
(i) Make sure the bonding surfaces on the tube clamps that will contact a bonding jumper are cleaned.
(j) Make sure the fuel feed tube surface that will contact the tube clamp is cleaned.
(k) The bonding jumper has two terminals. Each terminal has two bonding surfaces. Make sure all of the
bonding surfaces on the bonding jumper are cleaned.
(l) Install new or serviceable tube clamps. A tube clamp that has no damage is a serviceable tube clamp.
(m) Install a new or serviceable bonding jumper. A bonding jumper that has no damage is a serviceable
bonding jumper.
(n) Install the bonding jumper to the tube clamp with a 0.5 inch minimum clearance from any structure or
part. Refer to SWPM 20-20-00 as an accepted procedure.
(o) Install the bonding jumper to the ground stud with a 0.5 inch minimum clearance from any structure or
part, or for alternative installation install the bonding jumper to the nacelle strut structure bracket with a
0.5 inch minimum clearance from any structure or part. Make sure the terminal lugs do not interfere with
another structure or part. Refer to SWPM 20-20-10 as an accepted procedure.
(p) Install bonding jumper part number BACJ40AC44-4 with the red terminal attached to the tube clamp aft
of the coupling.
(q) In accordance with APPENDIX H for acceptable bonding jumper installations.
(r) If the nut is not accessible, it is acceptable to torque the screw head to 32 to 38 inch-lbs.
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 8 OF 9)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
211 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 50

More DataQtyIdentificationNameTaskStep
(s) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and nacelle strut structure bracket and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(t) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the bonding jumper
and out-tank engine fuel feed tube and make sure the maximum resistance is within limits in accordance
with APPENDIX D.
(u) Use a M1 or M1B bonding meter to measure the electrical bonding resistance between the nacelle strut
structure and the out-tank engine fuel feed tube. Make sure the bonding resistance is 4.0 milliohms or
less. Refer to SWPM 20-20-00 as an accepted procedure.
(v) Use a M1 or M1B bonding meter to measure the electrical bonding resistance across the coupling between
the out-tank engine fuel feed tubes. Make sure the bonding resistance is 10.0 milliohms or less. Refer to
SWPM 20-20-00 as an accepted procedure.
(w) If the electrical bonding resistance measurement is more than the maximum resistance allowed, disas-
semble parts, clean faying surfaces, install parts and measure electrical bonding resistance again.
(x) Apply chemical conversion coating Type II, Class D to the engine fuel feed tube and part number
AN735DC32 tube clamp only to repair any damaged coating found. Refer to SOPM 20-43-03 as an ac-
cepted procedure.
(y) Apply BMS10-11, Type 1 (Grade A, B or E) primer to the abrasively cleaned area of the engine fuel feed
tube. Refer to SOPM 20-41-02 as an accepted procedure.
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION
(SHEET 9 OF 9)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
212 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 51

Resistance of Bonds for Pre-Installed Ground Studs with a Terminal Lug
1. Table D1 shows the maximum electrical bonding resistance between a bonding jumper and wing/nacelle
strut structure bracket. The images below show the test points for the bonding jumper and structure
bracket. Place probe on the top bonding jumper's terminal (furthest terminal from the metal structure
being bonded). Measurement from terminal under top terminal is not required.
Table D1: Maximum Electrical Bonding Resistance Between the Bonding Jumper and Wing/Nacelle
Strut Structure Bracket
Maximum Electrical Bonding ResistanceLocation (Bracket Material)
OhmsMilliohms
0.00101.0Pratt and Whitney out-tank nacelle strut structure
bracket (Aluminum)
0.00151.5Rolls Royce out-tank nacelle strut structure bracket
with a pre-installed ground stud (Titanium)
0.00101.0Rolls Royce out-tank nacelle strut structure bracket
with a direct ground stud (Aluminum or Titanium)
0.00101.0In-tank wing structure bracket (Aluminum)
APPENDIX D:  MAXIMUM ELECTRICAL BONDING RESISTANCES
(SHEET 1 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
213 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 52 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
BOND METER
METAL
STRUCTURE
_ 0.30
0.20
TEST POINTS FOR A PRE-INSTALLED GROUND
STUD ASSEMBLY WITH TERMINAL LUGS
BOND METER
METAL
STRUCTURE
0.30
0.20
TEST POINTS FOR A DIRECT GROUND STUD  3084594
ASSEMBLY WITH TERMINAL LUGS
APPENDIX D: MAXIMUM ELECTRICAL BONDING RESISTANCES
(SHEET 2 OF 4)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  214 of 231

### Page 53

Maximum Electrical Bonding Resistance of Clamp and Tube Bonds
1. Table D2 shows the maximum electrical bonding resistance between a bonding jumper and engine
fuel feed tube. The image below shows the test points for a clamp and tube bond.
Table D2: Maximum Electrical Bonding Resistance Between the Bonding Jumper and the Engine Fuel
Feed Tube
Maximum Electrical Bonding ResistanceTube Clamp Part
Number
Location (Tube Material)
OhmsMilliohms
0.00090.9AN735D32,
AN735DC32,
AN735DC40 or
AN735D40
All in-tank tubes (Aluminum)
0.00090.9AN735DC32Pratt and Whitney forward and
aft nacelle strut out-tank tubes,
and Rolls Royce aft nacelle strut
out-tank tube (Aluminum)
0.00151.5AN735-32 or
AN735C32
0.00171.7AN735-32 or
AN735C32
Rolls Royce forward nacelle
strut out-tank tube (CRES)
APPENDIX D:  MAXIMUM ELECTRICAL BONDING RESISTANCES
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
215 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 54 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
BOND METER
0.30
0.20
TUBE OR CONDUIT
• TERMINAL LUG
CLAMP
TEST POINTS FOR A TUBE CLAMP
AND FUEL FEED TUBE
3084593
APPENDIX D: MAXIMUM ELECTRICAL BONDING RESISTANCES
(SHEET 4 OF 4)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  216 of 231

### Page 55

Front Spar Bulkhead Cleaning Requirements
1. Solvent clean the area where sealant was removed:
ALWAYS CLEAN EVEN IF THE SURFACE IS VISUALLY CLEAN, BECAUSE
CONTAMINATION MAY BE PRESENT BUT NOT VISIBLE.WARNING
a. Clean area larger than the area to be sealed.
b. Dispense solvent selected from Section 2.0 onto clean, dry, wiping materials or brushes selected
from Section 3.0.
c. Scrub the surfaces with the wiping materials or brushes that are wet with solvent. Continue to
clean until the wiping materials and surfaces are visually free of soils and contamination, including
ink marks.
NOTE: Change the wiping materials or brushes frequently to aid cleaning of the surfaces.
d. Before the solvent evaporates from the part surfaces, dry the part surfaces with clean, dry, wiping
materials or brushes selected from Section 3.0.
APPENDIX F:  FRONT SPAR BULKHEAD FITTING CLEANING REQUIREMENTS
(SHEET 1 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
217 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 56

2. Cleaning Solvents:
a. Citra Safe, Inland Technology, Inc., 401 East 27th Street, Tacoma, WA.
b. Citra Safe (Deodorized), Inland Technology, Inc., 401 East 27th Street, Tacoma, WA.
c. BMS11-7, Cleaning Solvent, Pre-Sealing.
d. BMS11-9, Methyl Propyl Ketone (MPK).
e. Methyl ethyl ketone (MEK), ASTM D740, Type I.
f. FD Cleaner, Daishin Chemical Co., Ltd.
3. Wiping Materials and Brushes.
a. Wiping Materials:
(1) BMS15-5, Class A, Absorbent Wipers for Process Cleaning.
(2) Gauze sponges, Johnson and Johnson.
(3) Cotton Swabs, Purwipe, American Fiber and Finishing Inc., Tianjin Senyang Wood Co. LTD.
b. Brushes, non-metallic, with natural or synthetic bristles:
BRUSHES MUST NOT BE REUSED IF THE MATERIAL CAN DEGRADE
AND TRANSFER CONTAMINATION TO THE SEALANT OR TO THE
SURFACE.WARNING
(1) Stencil brush as shown in Figure A, natural bristle, round aluminum ferrule, unfinished wood
handle, size 6 or other size, also known as Marsel 311 or Demco 311.
(a) Stencil brush 311-6 (size 6), Part number 401794F610543, Indeutsch Industries Private
Limited, Noida, India.
(b) Stencil brush 311-8 (size 8), Part number 401794F610542, Indeutsch Industries Private
Limited, Noida, India.
(2) Other brushes that meet these requirements:
(a) Must not cause contamination of the sealant application area or decrease sealant
adhesion. (for example: constructed with Teflon or Silicone).
(b) Must not cause contamination of the sealant (for example: fibers, bristles, lint, or cured
sealant).
APPENDIX F:  FRONT SPAR BULKHEAD FITTING CLEANING REQUIREMENTS
(SHEET 2 OF 3)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
218 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 57 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
FIGURE A - STENCIL BRUSH
(FOR REFERENCE ONLY)
3086067
APPENDIX F: FRONT SPAR BULKHEAD FITTING CLEANING REQUIREMENTS
(SHEET 3 OF 3)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  219 of 231

### Page 58 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
1. BRUSHCOAT APPLICATION
a. AFTER SOLVENT CLEANING, APPLY BMS5-45, CLASS A-2 SEALANT BRUSHCOAT TO PART
SURFACES USING A NON-METALLIC STIFF BRISTLED BRUSH IN A VIGOROUS SCRUBBING MOTION.
REFER TO SOPM 20-50-19 AS AN ACCEPTED PROCEDURE.
- A BRUSHCOAT IS A THIN LAYER OF CLASS A SEALANT THAT IS APPLIED ON THE PART
SURFACE BEFORE THE CLASS B SEALANT IN A CLASS B OVER CLASS A SEALING SYSTEM.
- DO NOT PAINT THE BMS5-45, CLASS A SEALANT ON WITH SMOOTH BRUSH STROKES.
- TOOLS MUST MEET THE REQUIREMENTS DEFINED IN SECTION 9. "TOOLS" OF THIS APPENDIX.
b. MAKE SURE SEALANT GOES INTO ALL CREVICES. EXTEND BRUSHCOAT BEYOND WHERE THE
BMS5-45, CLASS B SEALANT WILL END. IT IS ACCEPTABLE FOR THE STRUCTURE/HARDWARE TO
BE VISIBLE NEAR BRUSH STROKES.
c. IT IS NOT REQUIRED TO ALLOW THE BRUSHCOAT TO CURE
3088735
APPENDIX G: AFT SIDE FRONT SPAR BULKHEAD FITTING SEALANT APPLICATION
(SHEET 1 OF 11)
Original Issue: August 15, 2025
Export Controlled ECCN: 9E991  777-28A0098 RB
See page 1 for details  220 of 231

### Page 59 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
2. PREVENTION OF AIR ENTRAPMENT
a. TO PREVENT THE ENTRAPMENT OF AIR DURING THE APPLICATION OF THE FIRST FILLET:
POINT THE NOZZLE INTO THE SEAM. KEEP THE NOZZLE APPROXIMATELY PERPENDICULAR TO
THE SEAM. PUSH THE SEALANT BEAD IN FRONT OF THE NOZZLE.
MAKE SURE THAT THE SEALANT IS IN CONTINUOUS CONTACT WITH THE BOTTOM OF THE
SEAM. DO NOT MAKE THE SEALANT BRIDGE AS SHOWN IN VIEW BELOW.
SEALED
STRUCTURE
- NON-SEALED
STRUCTURE
SEALANT BRIDGE BETWEEN
SEALED AND NON-SEALED
STRUCTURE
EXAMPLE OF A SEALANT BRIDGE
(FOR REFERENCE ONLY)  (NOT ACCEPTABLE)  3088733
APPENDIX G: AFT SIDE FRONT SPAR BULKHEAD FITTING SEALANT APPLICATION
(SHEET 2 OF 11)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  221 of 231

### Page 60 (OCR)

REQUIREMENTS BULLETIN 777-28A0098
ALERT  ALERT
3. FIRST FILLET APPLICATION
a. APPLY A SMALL BEAD OF BMS5-45, CLASS B-2 SEALANT TO INTERFACES INCLUDING HEX NUT TO
SPAR WALL AND HEX NUT TO FITTING THREADS.
b. SMOOTH OUT THE FIRST FILLET SEAL USING A TOOL SUCH AS A SEALANT SPATULA OR FANNED
OUT STIFF BRISTLED BRUSH
- TOOLS MUST MEET THE REQUIREMENTS DEFINED IN SECTION 9. "TOOLS" OF THIS
APPENDIX.
- SMOOTH IS DEFINED AS AN EQUAL AND CONSTANT SURFACE. SMOOTH DOES NOT MEAN
FLAT OR WITHOUT SURFACE FEATURES. BRUSH MARKS ARE ACCEPTABLE IF 0.12 MINIMUM
THICKNESS IS MET.
3088736
APPENDIX G: AFT SIDE FRONT SPAR BULKHEAD FITTING SEALANT APPLICATION
(SHEET 3 OF 11)
Original Issue: August 15, 2025
777-28A0098 RB
Export Controlled ECCN: 9E991
See page 1 for details  222 of 231

The text continues at https://openairdocs.org/service-documents/boeing/777-28a0098-rb/file/a5108375cdc6.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
