# Boeing Alert Requirements Bulletin 777-28A0098 RB: No revision named, part 1 of 3

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-2546; AD 2026-15-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 777-28A0098 RB](https://openairdocs.org/service-documents/boeing/777-28a0098-rb.md)
- Title as filed: 777-28A0098 RB - Part1
- Pages: 162
- PDF: https://openairdocs.org/files/sha256/f0/46/f046137e98047dba3951c557fc0fa021d784cea312ecf954978af2d8a2f2b058
- Page: https://openairdocs.org/service-documents/boeing/777-28a0098-rb/file/f046137e9804

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Requirements Bulletin
ALERT
Number: 777-28A0098 RB
Original Issue: August 15, 2025
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Engine Fuel Feed Tube Spar, Sealant Inspection
and Electrical Bonding Resistance Measurement
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2025 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: August 15, 2025
777-28A0098 RB
1 of 231
5.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
2 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
FIGURE 1: LEFT WING - FORWARD FRONT SPAR TO THREADED PORTION OF FRONT SPAR
BULKHEAD FITTING - ELECTRICAL BONDING RESISTANCE MEASUREMENT . . . 101
FIGURE 2: LEFT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT INSPECTION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 104
FIGURE 3: LEFT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT APPLICATION
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
FIGURE 4: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
[Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 110
FIGURE 5: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 1] . . . . . . . . . . . 113
FIGURE 6: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
[Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 118
FIGURE 7: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER AND
TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 2] . . . . . . . . . . 121
FIGURE 8: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 125
FIGURE 9: LEFT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 2] . . 128
FIGURE 10: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 1-2, Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . 135
FIGURE 11: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS – REMOVAL, CLEAN AND INSTALLATION [Group 1-2,
Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 138
FIGURE 12: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 1-2, Configuration 3] . . . . . . . . . . . . . . . . . . . . . . . 145
FIGURE 13: LEFT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 1-2,
Configuration 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 148
FIGURE 14: RIGHT WING - FORWARD FRONT SPAR TO THREADED PORTION OF FRONT SPAR
BULKHEAD FITTING - ELECTRICAL BONDING RESISTANCE MEASUREMENT . . . 157
FIGURE 15: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT
INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 160
FIGURE 16: RIGHT WING - AFT SIDE OF THE FRONT SPAR BULKHEAD FITTING - SEALANT
APPLICATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 163
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
3 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 4

FIGURE 17: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER
AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE MEASUREMENT
[Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 166
FIGURE 18: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER
AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 1] . . . . . . . . 169
FIGURE 19: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER
AND TUBE CLAMPS INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 174
FIGURE 20: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE CONNECTION - BONDING JUMPER
AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 2] . . . . . . . 177
FIGURE 21: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 181
FIGURE 22: RIGHT WING - IN-TANK ENGINE FUEL FEED TUBE AND WING STRUCTURE - BONDING
JUMPER AND TUBE CLAMP - REMOVAL, CLEAN AND INSTALLATION [Group 2] . . 184
FIGURE 23: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 1-2, Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . 191
FIGURE 24: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 1-2,
Configuration 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 194
FIGURE 25: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMP INSPECTION AND ELECTRICAL BONDING RESISTANCE
MEASUREMENT [Group 1-2, Configuration 3] . . . . . . . . . . . . . . . . . . . . . . . 201
FIGURE 26: RIGHT WING - OUT-TANK ENGINE FUEL FEED TUBE FLEXIBLE COUPLING - BONDING
JUMPERS AND TUBE CLAMPS - REMOVAL, CLEAN AND INSTALLATION [Group 1-2,
Configuration 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 204
APPENDIX D: MAXIMUM ELECTRICAL BONDING RESISTANCES . . . . . . . . . . . . . . . . . . . 213
APPENDIX F: FRONT SPAR BULKHEAD FITTING CLEANING REQUIREMENTS . . . . . . . . . . . 217
APPENDIX G: AFT SIDE FRONT SPAR BULKHEAD FITTING SEALANT APPLICATION . . . . . . . . 220
APPENDIX H: ACCEPTABLE BONDING JUMPER INSTALLATIONS . . . . . . . . . . . . . . . . . . . 231
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
4 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 5

Commercial 
Airplanes
777
Requirements Bulletin
ALERT
Number: 777-28A0098 RB
Original Issue: August 15, 2025
ATA System: 2822
SUBJECT: FUEL - Engine Fuel Feed System - Engine Fuel Feed Tube Spar, Sealant Inspection
and Electrical Bonding Resistance Measurement
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW
OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER.
THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED
TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT
THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE
INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH
THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 777-200, 777-200LR, 777-300, 777-300ER, 777F Airplane(s), line
number(s) 1-1566, 1568-1573, 1575-1580, 1582-1586, 1588-1604, 1606-1610, 1612-1614,
1616-1619, 1621-1623, 1625-1628, 1630-1632, 1634-1637, 1639-1641, 1643-1646, 1648-1650,
1652-1655, 1657-1658, 1660-1667, 1669, 1671, 1673, 1675-1676, 1678-1679, 1681, 1683-1684,
1686-1687, 1689-1715, 1717-1722, 1724-1727, 1729-1736, 1738-1739, 1741-1745, 1747-1780,
1782-1784, 1786-1787, 1789-1793, 1795-1797, 1799-1800, 1802, 1804-1805, 1807, 1809-1810,
1812, 1814-1815, 1817, 1819-1820, 1822, 1824-1825, 1827, 1829-1830, 1832, 1834-1835,
1837-1838, 1840-99999 in 2 Group(s). Where the effectivity is presented with hyphens between
line numbers, the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9
means line numbers 1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
NOTE: The Variable Number table below includes affected airplanes available as of the issue
date of this bulletin. Affected airplane Variable Numbers added to MyBoeingFleet.com
after the issue date of this bulletin will be shown using the Maintenance Performance
Toolbox EFFECTIVITY search function result.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
5 of 231

### Page 6

DESCRIPTIONCONFIGURATIONGROUP
777-200,-200LR,-300,-300ER and 777F Airplane line numbers 1 thru
829 that require an electrical bonding resistance measurement
between the engine fuel feed tube bulkhead fitting and the front spar.
-1
Airplanes equipped with GE engines.1
Airplanes equipped with Pratt and Whitney engines.2
Airplanes equipped with Rolls-Royce engines.3
777-200,-200LR,-300,-300ER and 777F Airplane line numbers 830
and on that require an electrical bonding resistance measurement
between the engine fuel feed tube bulkhead fitting and the front spar.
-2
Airplanes equipped with GE engines.1
Airplanes equipped with Pratt and Whitney engines.2
Airplanes equipped with Rolls-Royce engines.3
Airplane Models:
777-200, 777-200LR, 777-300, 777-300ER, 777F
GroupVariable Number
1WA001 - WA017
1WA076 - WA080
1WA086 - WA093
1WA101 - WA104
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
1WA196 - WA198
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281 - WA283
GroupVariable Number
1WA301 - WA304
1WB001 - WB021
1WB031 - WB046
1WB051 - WB088
1WB101 - WB106
1WB121 - WB125
1WB131 - WB148
1WB151 - WB155
1WB161 - WB177
1WB181 - WB194
1WB201 - WB215
1WB231 - WB247
1WB271 - WB273
1WB276 - WB286
GroupVariable Number
1WB291 - WB302
1WB306 - WB307
1WB311 - WB337
1WB341 - WB342
1WB366 - WB368
1WB371 - WB388
1WB406
1WB411 - WB413
1WB416 - WB439
1WB446 - WB453
1WB476
1WB481 - WB484
1WB501 - WB512
1WB531 - WB537
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
6 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 7

GroupVariable Number
1WB551 - WB554
1WB591 - WB597
1WB601 - WB606
1WB611 - WB622
1WB631 - WB638
1WB646 - WB649
1WC051 - WC073
1WC101 - WC104
1WC111 - WC120
1WC221 - WC222
2WC223 - WC224
1WC241 - WC243
1WC281 - WC290
1WC301 - WC308
1WC361 - WC364
1WC371 - WC374
1WC381 - WC395
1WC441
1WC446 - WC449
1WC456 - WC459
1WC486 - WC493
1WC506 - WC508
1WC521 - WC522
1WC531 - WC536
1WC546 - WC548
1WC556
1WC566 - WC567
1WC571 - WC574
2WC581
2WC586 - WC587
2WC591 - WC595
1WD001 - WD002
1WD011 - WD018
GroupVariable Number
1WD031 - WD036
1WD046 - WD055
1WD066 - WD073
2WD074 - WD075
1WD081 - WD083
2WD084 - WD089
2WD091
2WD096
2WD101 - WD106
2WD111 - WD112
2WD116 - WD117
2WD121 - WD123
2WD156
1WD501 - WD513
1WD521 - WD541
1WD546 - WD554
1WD561 - WD573
1WD581 - WD599
1WD606 - WD609
1WD621 - WD632
1WD651 - WD664
2WD665
1WD671 - WD675
2WD676 - WD677
1WD691 - WD709
1WD741 - WD752
1WD761 - WD771
1WD786 - WD788
1WD796 - WD807
2WD808 - WD825
1WD826 - WD834
2WD835 - WD837
1WD846 - WD859
GroupVariable Number
2WD860 - WD867
1WD871 - WD878
2WD879 - WD910
1WD911 - WD914
2WD915 - WD918
2WD921 - WD935
1WD936 - WD939
2WD940 - WD945
1WD946 - WD948
2WD949 - WD957
1WD966 - WD969
2WD970
1WD981 - WD982
1WD986
2WD987
2WD991 - WD996
2WE001 - WE007
2WE011 - WE012
2WE021 - WE026
2WE031 - WE040
2WE051 - WE057
2WE071 - WE078
2WE081 - WE084
2WE091 - WE095
2WE126 - WE178
2WE186 - WE219
2WE226 - WE231
2WE236 - WE253
2WE261 - WE267
2WE271 - WE278
2WE291 - WE298
2WE301 - WE320
2WE331 - WE356
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
7 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 8

GroupVariable Number
2WE366 - WE368
2WE376 - WE377
2WE381
2WE386 - WE387
2WE391 - WE392
2WE396 - WE411
2WE416 - WE420
2WE426 - WE431
2WE436 - WE446
2WE451 - WE484
2WE486 - WE493
2WE495 - WE499
2WE501 - WE504
2WE511 - WE516
2WE526 - WE528
2WE536 - WE549
2WE556 - WE573
2WE576 - WE587
2WE591
2WE601 - WE605
2WE626 - WE627
2WE631
2WE641 - WE642
2WE646 - WE647
2WE651 - WE661
2WE666 - WE677
2WE681 - WE689
2WE701 - WE705
2WE711 - WE712
2WE731 - WE732
2WE736 - WE740
GroupVariable Number
2WE746 - WE772
2WE776 - WE786
2WE791 - WE792
2WE796 - WE798
2WE801 - WE806
2WE811 - WE812
2WE826 - WE828
2WE831 - WE835
2WE851 - WE853
2WE856 - WE857
2WE861 - WE863
2WE866 - WE868
2WE871
1WF001 - WF004
1WF016 - WF019
2WF020 - WF030
1WF031 - WF032
2WF033 - WF043
1WF046 - WF047
2WF048 - WF075
1WF076 - WF077
1WF081 - WF082
2WF083 - WF088
2WF096 - WF101
2WF106 - WF109
2WF111 - WF124
2WF131 - WF144
2WF146 - WF147
2WF151 - WF152
2WF156 - WF173
2WF176 - WF184
GroupVariable Number
2WF191
2WF201
2WF206 - WF217
2WF221 - WF229
2WF231 - WF251
2WF256 - WF262
2WF266 - WF288
2WF296 - WF298
2WF301 - WF323
2WF326 - WF330
2WF336 - WF350
2WF356 - WF359
2WF366 - WF377
2WF381 - WF390
2WF396 - WF399
2WF401 - WF404
2WF411 - WF412
2WF416 - WF417
2WF421
2WF426 - WF427
2WF431 - WF435
2WF441 - WF442
2WF446 - WF449
2WF456
2WF461 - WF462
2WF471 - WF472
2WF476 - WF477
2WF482 - WF483
2WF486 - WF487
2WF491 - WF492
--
B. Spares Affected
None.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
8 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 9

2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 777-28A0098 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 777-28A0098 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Tables 1 through 4, in accordance
with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
The Conditions, Actions, and Compliance times shown in the Tables below apply to the Left and Right side
independently.
Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 39 months after
the Original Issue date of
Requirements Bulletin
777-28A0098 RB.
Do an electrical bonding resis-
tance measurement between
the forward side of the front spar
and the threaded portion of the
front spar bulkhead fitting.
All Airplanes
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS 1.0 MILLIOHM
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
9 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 10

Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a Detailed Inspection (DET)
of the AFT side of the front spar
bulkhead fitting and coupling for
any area without sealant, for
any damaged sealant, and for
any insufficient sealant. (a)(b)
CONDITION 2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS MORE THAN
1.0 MILLIOHM
-Before further flight.CONDITION 2.1 (ACTION 1):
Remove any existing sealant
from the AFT side of the front
spar bulkhead fitting and cou-
pling and apply sealant.
CONDITION 2.1: ANY AREA
WITHOUT SEALANT, OR
ANY DAMAGED SEALANT,
OR ANY INSUFFICIENT
SEALANT FOUND
-Before further flight.CONDITION 2.1 (ACTION 2):
Do a DET of the in-tank engine
fuel feed tube to wing structure
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube. (c)
-Before further flight.CONDITION 2.1.1 (ACTION 1):
Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure the
electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube is 2.5 milliohms or
less.
CONDITION 2.1.1: ANY IN-
CORRECT INSTALLATION
OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE WING
STRUCTURE AND IN-TANK
ENGINE FUEL FEED TUBE
IS MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 2.1.1 (ACTION 2):
Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
10 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 11

Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE WING STRUCTURE
AND IN-TANK ENGINE FU-
EL FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
-Before further flight.Do a DET of the in-tank engine
fuel feed tube to wing structure
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube. (c)
CONDITION 2.2: NO AREA
WITHOUT SEALANT, NO
DAMAGED SEALANT, AND
NO INSUFFICIENT
SEALANT FOUND
-Before further flight.CONDITION 2.2.1 (ACTION 1):
Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure the
electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube is 2.5 milliohms or
less.
CONDITION 2.2.1: ANY IN-
CORRECT INSTALLATION
OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE WING
STRUCTURE AND IN-TANK
ENGINE FUEL FEED TUBE
IS MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 2.2.1 (ACTION 2):
Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
11 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 12

Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE WING STRUCTURE
AND IN-TANK ENGINE FU-
EL FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
(a) Damaged sealant is defined as any crack or void in the sealant, any disbonded sealant from surfaces,
and any exposed underlying metallic surface.
(b) Sealant is considered insufficient when the thickness of the sealant allows for the outline of the coupling
or fitting hardware to be visible under the sealant.
(c) Bonding jumper and tube clamp correct installation is defined as no damaged or missing bonding jumper
or tube clamp found, and no loose bonding jumper lugs or tube clamp found. Bonding jumper damage
is defined as one or more broken strands in the wire braid. Tube clamp damage is defined as tube clamp
being cracked, broken or screw hole elongated. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 39 months after
the Original Issue date of
Requirements Bulletin
777-28A0098 RB.
Do a Detailed Inspection (DET)
of the out-tank engine fuel feed
tube to engine nacelle strut
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
All Airplanes
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
12 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 13

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 3 (ACTION 1):CONDITION 3: ANY INCOR-
RECT INSTALLATION OF
THE BONDING JUMPER
OR TUBE CLAMP(S)
FOUND, OR ANY ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE NACELLE
STRUT STRUCTURE AND
OUT-TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
Remove the bonding jumpers
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumpers
and tube clamps. Make sure the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube is 4.0 mil-
liohms or less. Make sure the
electrical bonding resistance
measurement across the cou-
pling between two out-tank en-
gine fuel feed tubes is 10.0 mil-
liohms or less.
-Before further flight.CONDITION 3 (ACTION 2): Do
an electrical bonding resistance
measurement between the for-
ward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 3.1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS 1.0 MILLIOHM
OR LESS
-Before further flight.Do a DET of the AFT side of the
front spar bulkhead fitting and
coupling for any area without
sealant, for any damaged
sealant, and for any insufficient
sealant. (b)(c)
CONDITION 3.2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS MORE THAN
1.0 MILLIOHM
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
13 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 14

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 3.2.1 (ACTION 1):
Remove any existing sealant
from the AFT side of the front
spar bulkhead fitting and cou-
pling and apply sealant.
CONDITION 3.2.1: ANY
AREA WITHOUT SEALANT,
OR ANY DAMAGED
SEALANT, OR ANY INSUF-
FICIENT SEALANT FOUND
-Before further flight.CONDITION 3.2.1 (ACTION 2):
Do a DET of the in-tank engine
fuel feed tube to wing structure
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube. (a)
-Before further flight.CONDITION 3.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure the
electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube is 2.5 milliohms or
less.
CONDITION 3.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE WING
STRUCTURE AND IN-TANK
ENGINE FUEL FEED TUBE
IS MORE THAN 4.0 MIL-
LIOHMS 39 Months.CONDITION 3.2.1.1 (ACTION
2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
14 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 15

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 3.2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE WING STRUCTURE
AND IN-TANK ENGINE FU-
EL FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
-Before further flight.Do a DET of the in-tank engine
fuel feed tube to wing structure
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube. (a)
CONDITION 3.2.2: NO
AREA WITHOUT SEALANT,
NO DAMAGED SEALANT,
AND NO INSUFFICIENT
SEALANT FOUND
-Before further flight.CONDITION 3.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure the
electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube is 2.5 milliohms or
less.
CONDITION 3.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE WING
STRUCTURE AND IN-TANK
ENGINE FUEL FEED TUBE
IS MORE THAN 4.0 MIL-
LIOHMS 39 Months.CONDITION 3.2.2.1 (ACTION
2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
15 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 16

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 3.2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE WING STRUCTURE
AND IN-TANK ENGINE FU-
EL FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
-Before further flight.Do an electrical bonding resis-
tance measurement between
the forward side of the front spar
and the threaded portion of the
front spar bulkhead fitting.
CONDITION 4: CORRECT
INSTALLATION OF THE
BONDING JUMPER AND
TUBE CLAMPS FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE NACELLE STRUT
STRUCTURE AND OUT-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 4.1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS 1.0 MILLIOHM
OR LESS
-Before further flight.Do a DET of the AFT side of the
front spar bulkhead fitting and
coupling for any area without
sealant, for any damaged
sealant, and for any insufficient
sealant. (b)(c)
CONDITION 4.2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS MORE THAN
1.0 MILLIOHM
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
16 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 17

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 4.2.1 (ACTION 1):
Remove any existing sealant
from the AFT side of the front
spar bulkhead fitting and cou-
pling and apply sealant.
CONDITION 4.2.1: ANY
AREA WITHOUT SEALANT,
OR ANY DAMAGED
SEALANT, OR ANY INSUF-
FICIENT SEALANT FOUND
-Before further flight.CONDITION 4.2.1 (ACTION 2):
Do a DET of the in-tank engine
fuel feed tube to wing structure
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube. (a)
-Before further flight.CONDITION 4.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure the
electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube is 2.5 milliohms or
less.
CONDITION 4.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE WING
STRUCTURE AND IN-TANK
ENGINE FUEL FEED TUBE
IS MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 4.2.1.1 (ACTION
2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
17 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 18

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 4.2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE WING STRUCTURE
AND IN-TANK ENGINE FU-
EL FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
-Before further flight.Do a DET of the in-tank engine
fuel feed tube to wing structure
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube.
CONDITION 4.2.2: NO
AREA WITHOUT SEALANT,
NO DAMAGED SEALANT,
AND NO INSUFFICIENT
SEALANT FOUND
-Before further flight.CONDITION 4.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure the
electrical bonding resistance
measurement between the wing
structure and in-tank engine fuel
feed tube is 2.5 milliohms or
less.
CONDITION 4.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE WING
STRUCTURE AND IN-TANK
ENGINE FUEL FEED TUBE
IS MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 4.2.2.1 (ACTION
2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
18 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 19

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 4.2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE WING STRUCTURE
AND IN-TANK ENGINE FU-
EL FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
(a) Bonding jumper and tube clamp correct installation is defined as no damaged or missing bonding jumper
or tube clamp found, and no loose bonding jumper lugs or tube clamp found. Bonding jumper damage
is defined as one or more broken strands in the wire braid. Tube clamp damage is defined as tube clamp
being cracked, broken or screw hole elongated. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
(b) Damaged sealant is defined as any crack or void in the sealant, any disbonded sealant from surfaces,
and any exposed underlying metallic surface.
(c) Sealant is considered insufficient when the thickness of the sealant allows for the outline of the coupling
or fitting hardware to be visible under the sealant.
Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 39 months after
the Original Issue date of
Requirements Bulletin
777-28A0098 RB, or
within 39 months after
the date of issuance of
the original standard cer-
tificate of airworthiness
or the original export cer-
tificate of airworthiness,
whichever occurs later.
Do an electrical bonding resis-
tance measurement between
the forward side of the front spar
and the threaded portion of the
front spar bulkhead fitting.
All Airplanes
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
19 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 20

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 5: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS 1.0 MILLIOHM
OR LESS
-Before further flight.Do a Detailed Inspection (DET)
of the AFT side of the front spar
bulkhead fitting and coupling for
any area without sealant, for
any damaged sealant, and for
any insufficient sealant. (a)(b)
CONDITION 6: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS MORE THAN
1.0 MILLIOHM
-Before further flight.CONDITION 6.1 (ACTION 1):
Remove any existing sealant
from the AFT side of the front
spar bulkhead fitting and cou-
pling and apply sealant.
CONDITION 6.1: ANY AREA
WITHOUT SEALANT, OR
ANY DAMAGED SEALANT,
OR ANY INSUFFICIENT
SEALANT FOUND
-Before further flight.CONDITION 6.1 (ACTION 2):
Do a DET of the bonding jumper
and tube clamps that connect
the in-tank engine fuel feed tube
connected to the AFT side of
the front spar bulkhead fitting to
the second AFT in-tank engine
fuel feed tube for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the in-tank en-
gine fuel feed tube connected
to the AFT side of the front spar
bulkhead fitting and the second
AFT in-tank engine fuel feed
tube. (c)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
20 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 21

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 6.1.1 (ACTION 1):
Remove the bonding jumper
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumper
and tube clamps. Make sure
electrical bonding resistance
measurement between the in-
tank engine fuel feed tube con-
nected to the AFT side of the
front spar bulkhead fitting and
the second AFT in-tank engine
fuel feed tube is 2.5 milliohms
or less.
CONDITION 6.1.1: ANY IN-
CORRECT INSTALLATION
OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE IN-
TANK ENGINE FUEL FEED
TUBE CONNECTED TO
THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING AND THE SEC-
OND AFT IN-TANK ENGINE
FUEL FEED TUBE IS
MORE THAN 4.0 MIL-
LIOHMS
-Before further flight.CONDITION 6.1.1 (ACTION 2):
Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (c)
-Before further flight.CONDITION 6.1.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 6.1.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 6.1.1.1 (ACTION2): Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
21 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 22

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 6.1.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE AND THE WING
STRUCTURE IS 4.0 MIL-
LIOHMS OR LESS
-Before further flight.Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (c)
CONDITION 6.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMPS
FOUND, AND ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE IN-TANK EN-
GINE FUEL FEED TUBE
CONNECTED TO THE AFT
SIDE OF THE FRONT
SPAR BULKHEAD FITTING
AND THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
22 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 23

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 6.1.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 6.1.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 6.1.2.1 (ACTION2): Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 6.1.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE AND THE WING
STRUCTURE IS 4.0 MIL-
LIOHMS OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
23 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 24

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the bonding jumper
and tube clamps that connect
the in-tank engine fuel feed tube
connected to the AFT side of
the front spar bulkhead fitting to
the second AFT in-tank engine
fuel feed tube for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the in-tank en-
gine fuel feed tube connected
to the AFT side of the front spar
bulkhead fitting and the second
AFT in-tank engine fuel feed
tube. (c)
CONDITION 6.2: NO AREA
WITHOUT SEALANT, NO
DAMAGED SEALANT, AND
NO INSUFFICIENT
SEALANT FOUND
-Before further flight.CONDITION 6.2.1 (ACTION 1):
Remove the bonding jumper
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumper
and tube clamps. Make sure
electrical bonding resistance
measurement between the in-
tank engine fuel feed tube con-
nected to the AFT side of the
front spar bulkhead fitting and
the second AFT in-tank engine
fuel feed tube is 2.5 milliohms
or less.
CONDITION 6.2.1: ANY IN-
CORRECT INSTALLATION
OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE IN-
TANK ENGINE FUEL FEED
TUBE CONNECTED TO
THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING AND THE SEC-
OND AFT IN-TANK ENGINE
FUEL FEED TUBE IS
MORE THAN 4.0 MIL-
LIOHMS
-Before further flight.CONDITION 6.2.1 (ACTION 2):
Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (c)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
24 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 25

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 6.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 6.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 6.2.1.1 (ACTION2): Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 6.2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE AND THE WING
STRUCTURE IS 4.0 MIL-
LIOHMS OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
25 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 26

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (c)
CONDITION 6.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMPS
FOUND, AND ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE IN-TANK EN-
GINE FUEL FEED TUBE
CONNECTED TO THE AFT
SIDE OF THE FRONT
SPAR BULKHEAD FITTING
AND THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.CONDITION 6.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 6.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 6.2.2.1 (ACTION2): Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
26 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 27

Group 2, Configuration 1:
Table 3: Left and Right Wing Front Spar to Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed
Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the electrical bonding
resistance measurement be-
tween the forward side of the
front spar and the threaded
portion of the front spar bulk-
head fitting.
CONDITION 6.2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE AND THE WING
STRUCTURE IS 4.0 MIL-
LIOHMS OR LESS
(a) Damaged sealant is defined as any crack or void in the sealant, any disbonded sealant from surfaces,
and any exposed underlying metallic surface.
(b) Sealant is considered insufficient when the thickness of the sealant allows for the outline of the coupling
or fitting hardware to be visible under the sealant.
(c) Bonding jumper and tube clamp correct installation is defined as no damaged or missing bonding jumper
or tube clamp found, and no loose bonding jumper lugs or tube clamp found. Bonding jumper damage
is defined as one or more broken strands in the wire braid. Tube clamp damage is defined as tube clamp
being cracked, broken or screw hole elongated. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 39 months after
the Original Issue date of
Requirements Bulletin
777-28A0098 RB, or
within 39 months after
the date of issuance of
the original standard cer-
tificate of airworthiness
or the original export cer-
tificate of airworthiness,
whichever occurs later.
Do a Detailed Inspection (DET)
of the out-tank engine fuel feed
tube to engine nacelle strut
bonding jumper and tube clamp
for correct installation, and do
an electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
All Airplanes
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
27 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 28

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 7 (ACTION 1):
Remove the bonding jumpers
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumpers
and tube clamps. Make sure the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube is 4.0 mil-
liohms or less. Make sure the
electrical bonding resistance
measurement across the cou-
pling between two out-tank en-
gine fuel feed tubes is 10.0 mil-
liohms or less.
CONDITION 7: ANY INCOR-
RECT INSTALLATION OF
THE BONDING JUMPER
OR TUBE CLAMP(S)
FOUND, OR ANY ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE NACELLE
STRUT STRUCTURE AND
OUT-TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
-Before further flight.CONDITION 7 (ACTION 2): Do
an electrical bonding resistance
measurement between the for-
ward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 7.1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS 1.0 MILLIOHM
OR LESS
-Before further flight.Do a DET of the AFT side of the
front spar bulkhead fitting and
coupling for any area without
sealant, for any damaged
sealant, and for any insufficient
sealant. (b)(c)
CONDITION 7.2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS MORE THAN
1.0 MILLIOHM
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
28 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 29

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 7.2.1 (ACTION 1):
Remove any existing sealant
from the AFT side of the front
spar bulkhead fitting and cou-
pling and apply sealant.
CONDITION 7.2.1: ANY
AREA WITHOUT SEALANT,
OR ANY DAMAGED
SEALANT, OR ANY INSUF-
FICIENT SEALANT FOUND
-Before further flight.CONDITION 7.2.1 (ACTION 2):
Do a DET of the bonding jumper
and tube clamps that connect
the in-tank engine fuel feed tube
connected to the AFT side of
the front spar bulkhead fitting to
the second AFT in-tank engine
fuel feed tube for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the in-tank en-
gine fuel feed tube connected
to the AFT side of the front spar
bulkhead fitting and the second
AFT in-tank engine fuel feed
tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
29 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 30

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 7.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumper
and tube clamps. Make sure
electrical bonding resistance
measurement between the in-
tank engine fuel feed tube con-
nected to the AFT side of the
front spar bulkhead fitting and
the second AFT in-tank engine
fuel feed tube is 2.5 milliohms
or less.
CONDITION 7.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE IN-
TANK ENGINE FUEL FEED
TUBE CONNECTED TO
THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING AND THE SEC-
OND AFT IN-TANK ENGINE
FUEL FEED TUBE IS
MORE THAN 4.0 MIL-
LIOHMS
-Before further flight.CONDITION 7.2.1.1 (ACTION
2): Do a DET of the second AFT
in-tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
30 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 31

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 7.2.1.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 7.2.1.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 7.2.1.1.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 7.2.1.1.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
31 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 32

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
CONDITION 7.2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMPS
FOUND, AND ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE IN-TANK EN-
GINE FUEL FEED TUBE
CONNECTED TO THE AFT
SIDE OF THE FRONT
SPAR BULKHEAD FITTING
AND THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.CONDITION 7.2.1.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 7.2.1.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 7.2.1.2.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
32 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 33

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 7.2.1.2.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.Do a DET of the bonding jumper
and tube clamps that connect
the in-tank engine fuel feed tube
connected to the AFT side of
the front spar bulkhead fitting to
the second AFT in-tank engine
fuel feed tube for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the in-tank en-
gine fuel feed tube connected
to the AFT side of the front spar
bulkhead fitting and the second
AFT in-tank engine fuel feed
tube. (a)
CONDITION 7.2.2: NO
AREA WITHOUT SEALANT,
NO DAMAGED SEALANT,
AND NO INSUFFICIENT
SEALANT FOUND
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
33 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 34

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 7.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumper
and tube clamps. Make sure
electrical bonding resistance
measurement between the in-
tank engine fuel feed tube con-
nected to the AFT side of the
front spar bulkhead fitting and
the second AFT in-tank engine
fuel feed tube is 2.5 milliohms
or less.
CONDITION 7.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE IN-
TANK ENGINE FUEL FEED
TUBE CONNECTED TO
THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING AND THE SEC-
OND AFT IN-TANK ENGINE
FUEL FEED TUBE IS
MORE THAN 4.0 MIL-
LIOHMS
-Before further flight.CONDITION 7.2.2.1 (ACTION
2): Do a DET of the second AFT
in-tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
34 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 35

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 7.2.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 7.2.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 7.2.2.1.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 7.2.2.1.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
35 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 36

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
CONDITION 7.2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMPS
FOUND, AND ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE IN-TANK EN-
GINE FUEL FEED TUBE
CONNECTED TO THE AFT
SIDE OF THE FRONT
SPAR BULKHEAD FITTING
AND THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.CONDITION 7.2.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 7.2.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 7.2.2.2.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
36 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 37

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 7.2.2.2.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.Do an electrical bonding resis-
tance measurement between
the forward side of the front spar
and the threaded portion of the
front spar bulkhead fitting.
CONDITION 8: CORRECT
INSTALLATION OF THE
BONDING JUMPER AND
TUBE CLAMPS FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE NACELLE STRUT
STRUCTURE AND OUT-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 8.1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS 1.0 MILLIOHM
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
37 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 38

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the AFT side of the
front spar bulkhead fitting and
coupling for any area without
sealant, for any damaged
sealant, and for any insufficient
sealant. (b)(c)
CONDITION 8.2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FORWARD
SIDE OF THE FRONT
SPAR AND THE THREAD-
ED PORTION OF THE
FRONT SPAR BULKHEAD
FITTING IS MORE THAN
1.0 MILLIOHM
-Before further flight.CONDITION 8.2.1 (ACTION 1):
Remove any existing sealant
from the AFT side of the front
spar bulkhead fitting and cou-
pling and apply sealant.
CONDITION 8.2.1: ANY
AREA WITHOUT SEALANT,
OR ANY DAMAGED
SEALANT, OR ANY INSUF-
FICIENT SEALANT FOUND
-Before further flight.CONDITION 8.2.1 (ACTION 2):
Do a DET of the bonding jumper
and tube clamps that connect
the in-tank engine fuel feed tube
connected to the AFT side of
the front spar bulkhead fitting to
the second AFT in-tank engine
fuel feed tube for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the in-tank en-
gine fuel feed tube connected
to the AFT side of the front spar
bulkhead fitting and the second
AFT in-tank engine fuel feed
tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
38 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 39

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 8.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumper
and tube clamps. Make sure
electrical bonding resistance
measurement between the in-
tank engine fuel feed tube con-
nected to the AFT side of the
front spar bulkhead fitting and
the second AFT in-tank engine
fuel feed tube is 2.5 milliohms
or less.
CONDITION 8.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE IN-
TANK ENGINE FUEL FEED
TUBE CONNECTED TO
THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING AND THE SEC-
OND AFT IN-TANK ENGINE
FUEL FEED TUBE IS
MORE THAN 4.0 MIL-
LIOHMS
-Before further flight.CONDITION 8.2.1.1 (ACTION
2): Do a DET of the second AFT
in-tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
39 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 40

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 8.2.1.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 8.2.1.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 8.2.1.1.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 8.2.1.1.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
40 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 41

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
CONDITION 8.2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMPS
FOUND, AND ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE IN-TANK EN-
GINE FUEL FEED TUBE
CONNECTED TO THE AFT
SIDE OF THE FRONT
SPAR BULKHEAD FITTING
AND THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.CONDITION 8.2.1.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 8.2.1.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 8.2.1.2.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
41 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 42

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 8.2.1.2.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.Do a DET of the bonding jumper
and tube clamps that connect
the in-tank engine fuel feed tube
connected to the AFT side of
the front spar bulkhead fitting to
the second AFT in-tank engine
fuel feed tube for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the in-tank en-
gine fuel feed tube connected
to the AFT side of the front spar
bulkhead fitting and the second
AFT in-tank engine fuel feed
tube. (a)
CONDITION 8.2.2: NO
AREA WITHOUT SEALANT,
NO DAMAGED SEALANT,
AND NO INSUFFICIENT
SEALANT FOUND
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
42 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 43

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 8.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamps. Clean electri-
cal bond surfaces. Install new
or serviceable bonding jumper
and tube clamps. Make sure
electrical bonding resistance
measurement between the in-
tank engine fuel feed tube con-
nected to the AFT side of the
front spar bulkhead fitting and
the second AFT in-tank engine
fuel feed tube is 2.5 milliohms
or less.
CONDITION 8.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE IN-
TANK ENGINE FUEL FEED
TUBE CONNECTED TO
THE AFT SIDE OF THE
FRONT SPAR BULKHEAD
FITTING AND THE SEC-
OND AFT IN-TANK ENGINE
FUEL FEED TUBE IS
MORE THAN 4.0 MIL-
LIOHMS
-Before further flight.CONDITION 8.2.2.1 (ACTION
2): Do a DET of the second AFT
in-tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
43 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 44

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.CONDITION 8.2.2.1.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 8.2.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 8.2.2.1.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 8.2.2.1.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
44 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 45

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Do a DET of the second AFT in-
tank engine fuel feed tube to
wing structure bonding jumper
and tube clamp for correct instal-
lation, and do an electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure. (a)
CONDITION 8.2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMPS
FOUND, AND ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE IN-TANK EN-
GINE FUEL FEED TUBE
CONNECTED TO THE AFT
SIDE OF THE FRONT
SPAR BULKHEAD FITTING
AND THE SECOND AFT IN-
TANK ENGINE FUEL FEED
TUBE IS 4.0 MILLIOHMS
OR LESS
-Before further flight.CONDITION 8.2.2.2.1 (ACTION
1): Remove the bonding jumper
and tube clamp. Clean electrical
bond surfaces. Install new or
serviceable bonding jumper and
tube clamp. Make sure electrical
bonding resistance measure-
ment between the second AFT
in-tank engine fuel feed tube
and the wing structure is 2.5
milliohms or less.
CONDITION 8.2.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE CLAMP
FOUND, OR ELECTRICAL
BONDING RESISTANCE
MEASUREMENT BE-
TWEEN THE SECOND AFT
IN-TANK ENGINE FUEL
FEED TUBE AND THE
WING STRUCTURE IS
MORE THAN 4.0 MIL-
LIOHMS 39 Months.-CONDITION 8.2.2.2.1 (ACTION2): Repeat the DET of the out-
tank engine fuel feed tube to
engine nacelle strut bonding
jumper and tube clamp for cor-
rect installation, and repeat the
electrical bonding resistance
measurement between the na-
celle strut structure and out-tank
engine fuel feed tube. (a)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
45 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 46

Group 2, Configuration 2-3:
Table 4: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
39 Months.-Repeat the DET of the out-tank
engine fuel feed tube to engine
nacelle strut bonding jumper
and tube clamp for correct instal-
lation, and repeat the electrical
bonding resistance measure-
ment between the nacelle strut
structure and out-tank engine
fuel feed tube. (a)
CONDITION 8.2.2.2.2:
CORRECT INSTALLATION
OF THE BONDING
JUMPER AND TUBE
CLAMP FOUND, AND
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
SECOND AFT IN-TANK
ENGINE FUEL FEED TUBE
AND THE WING STRUC-
TURE IS 4.0 MILLIOHMS
OR LESS
(a) Bonding jumper and tube clamp correct installation is defined as no damaged or missing bonding jumper
or tube clamp found, and no loose bonding jumper lugs or tube clamp found. Bonding jumper damage
is defined as one or more broken strands in the wire braid. Tube clamp damage is defined as tube clamp
being cracked, broken or screw hole elongated. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
(b) Damaged sealant is defined as any crack or void in the sealant, any disbonded sealant from surfaces,
and any exposed underlying metallic surface.
(c) Sealant is considered insufficient when the thickness of the sealant allows for the outline of the coupling
or fitting hardware to be visible under the sealant.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA) approved for all EASA approved airplanes listed in this Requirements
Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery
configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
46 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 47

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. In the RB, the "Refer to the listed procedures..." column of the
table(s) in the Work Instructions is for reference only. The procedures in that column
are not required by the AD and are for guidance only. For the related SB, some
locations are marked RC Start and RC End to identify the requirements that are
restated from the RB. For the related SB, the areas between RC Start and RC End,
including sub-steps and any figures identified between RC Start and RC End, must
be done to comply with the AD. Therefore, an Alternative Method of Compliance
(AMOC) is required for any deviations to steps between RC Start and RC End,
including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance
with the operator's maintenance or inspection program without obtaining approval
of an AMOC; this is provided that the steps between RC Start and RC End, including
sub-steps and identified figures, can still be done as specified, and the airplane can
be put back in an airworthy condition. Figures not required for compliance are omitted
from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 777 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 777
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
— Values for engine maintenance tasks are included in Chapter 70 of 777
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
47 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 48

5. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
6. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
7. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
8. A Detailed Inspection (DET) is defined as: An intensive examination of a specific
item, installation or assembly to detect damage, failure or irregularity. This could
include tactile assessment in which a component or assembly can be checked for
tightness/security. Available lighting is normally supplemented with a direct source
of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors
and magnifying lenses may be necessary. Surface cleaning and elaborate access
procedures may be required.
9. The instructions in Work Instructions and the figures can include operation of tools
or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and
Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain
data on versions of the tools or test equipment that you can use. It is permitted to
use replaced tools. It is not permitted to use superseded tools.
10. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SOPM 20-50-01, then a fastener of the same specification, with
a length which meets the installation standards given in SOPM 20-50-01, may be
used. Use of additional washers for grip length adjustments is not permitted.
11. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
12. Some Work Instructions task(s) are related to Critical Design Configuration Control
Limitations (CDCCL) required by Special Compliance Items/Airworthiness Limitation
required by 28-AWL-28. Strict adherence to Airworthiness Limitations are required.
13. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
14. If an electrical bonding resistance measurement is more than the maximum resistance
allowed after installation of electrical bond parts, disassemble parts, clean faying
surfaces, install parts and do all electrical bonding resistance measurements again.
B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
48 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 49

The Conditions and Actions shown in the Tables below apply to the Left and Right side
independently.
Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing
Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
PART 1: OPEN
ACCESS.
-Do an electrical bonding resistance
measurement between the forward
side of the front spar and the
threaded portion of the front spar
bulkhead fitting.
All Airplanes
-FIGURE 1 (Left Wing)
-FIGURE 14 (Right Wing)
Do PART 4:
CLOSE ACCESS
and PART 5: RE-
PORT INSPEC-
TION RESULTS.
--CONDITION 1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FOR-
WARD SIDE OF THE
FRONT SPAR AND THE
THREADED PORTION OF
THE FRONT SPAR BULK-
HEAD FITTING IS 1.0
MILLIOHM OR LESS
PART 1: OPEN
ACCESS.
-Repeat the electrical bonding resis-
tance measurement between the
forward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
-FIGURE 1 (Left Wing)
-FIGURE 14 (Right Wing)
Do PART 2: OPEN
TANK ACCESS.
-Do a Detailed Inspection (DET) of
the AFT side of the front spar bulk-
head fitting and coupling for any
area without sealant, for any dam-
aged sealant, and for any insuffi-
cient sealant. (a)(b)
CONDITION 2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FOR-
WARD SIDE OF THE
FRONT SPAR AND THE
THREADED PORTION OF
THE FRONT SPAR BULK-
HEAD FITTING IS MORE
THAN 1.0 MILLIOHM
Refer to AP-
PENDIX E FOR
EXAMPLES OF
ACCEPTABLE
SEALANT, AREAS
WITHOUT
SEALANT, DAM-
AGED SEALANT,
OR INSUFFI-
CIENT SEALANT.
FIGURE 2 (Left Wing)
FIGURE 15 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
49 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 50

Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing
Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Refer to AP-
PENDIX E FOR
EXAMPLES OF
ACCEPTABLE
SEALANT, AREAS
WITHOUT
SEALANT, DAM-
AGED SEALANT,
OR INSUFFI-
CIENT SEALANT.
FIGURE 3 (Left Wing)CONDITION 2.1 (ACTION 1): Re-
move any existing sealant from the
AFT side of the front spar bulkhead
fitting and coupling and apply
sealant.
CONDITION 2.1: ANY
AREA WITHOUT
SEALANT, OR ANY DAM-
AGED SEALANT, OR ANY
INSUFFICIENT SEALANT
FOUND
FIGURE 16 (Right Wing)
-FIGURE 4 (Left Wing)CONDITION 2.1 (ACTION 2): Do
a DET of the in-tank engine fuel
feed tube to wing structure bonding
jumper and tube clamp for correct
installation, and do an electrical
bonding resistance measurement
between the wing structure and in-
tank engine fuel feed tube. (c)
-FIGURE 17 (Right Wing)
-FIGURE 5 (Left Wing)CONDITION 2.1.1 (ACTION 1):
Remove the bonding jumper and
tube clamp. Clean electrical bond
surfaces. Install new or serviceable
bonding jumper and tube clamp.
Make sure the electrical bonding
resistance measurement between
the wing structure and in-tank en-
gine fuel feed tube is 2.5 milliohms
or less.
CONDITION 2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
WING STRUCTURE AND
IN-TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
-FIGURE 18 (Right Wing)
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
-
PART 1: OPEN
ACCESS.
-CONDITION 2.1.1 (ACTION 2):
Repeat the electrical bonding resis-
tance measurement between the
forward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
-FIGURE 1 (Left Wing)
-FIGURE 14 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
50 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 51

Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing
Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
--CONDITION 2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP
FOUND, AND ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE WING
STRUCTURE AND IN-
TANK ENGINE FUEL
FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
PART 1: OPEN
ACCESS.
-Repeat the electrical bonding resis-
tance measurement between the
forward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
-FIGURE 1 (Left Wing)
-FIGURE 14 (Right Wing)
-FIGURE 4 (Left Wing)Do a DET of the in-tank engine fuel
feed tube to wing structure bonding
jumper and tube clamp for correct
installation, and do an electrical
bonding resistance measurement
between the wing structure and in-
tank engine fuel feed tube. (c)
CONDITION 2.2: NO
AREA WITHOUT
SEALANT, NO DAMAGED
SEALANT, AND NO INSUF-
FICIENT SEALANT
FOUND
-FIGURE 17 (Right Wing)
-FIGURE 5 (Left Wing)CONDITION 2.2.1 (ACTION 1):
Remove the bonding jumper and
tube clamp. Clean electrical bond
surfaces. Install new or serviceable
bonding jumper and tube clamp.
Make sure the electrical bonding
resistance measurement between
the wing structure and in-tank en-
gine fuel feed tube is 2.5 milliohms
or less.
CONDITION 2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
WING STRUCTURE AND
IN-TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
-FIGURE 18 (Right Wing)
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
-
PART 1: OPEN
ACCESS.
-CONDITION 2.2.1 (ACTION 2):
Repeat the electrical bonding resis-
tance measurement between the
forward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
-FIGURE 1 (Left Wing)
-FIGURE 14 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
51 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 52

Group 1, Configuration 1:
Table 1: Left and Right Wing Front Spar Bulkhead Fitting and In-Tank Engine Fuel Feed Tube to Wing
Structure Electrical Bonding Resistance Measurement and Sealant Inspection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
--CONDITION 2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP
FOUND, AND ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE WING
STRUCTURE AND IN-
TANK ENGINE FUEL
FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
PART 1: OPEN
ACCESS.
-Repeat the electrical bonding resis-
tance measurement between the
forward side of the front spar and
the threaded portion of the front
spar bulkhead fitting.
-FIGURE 1 (Left Wing)
-FIGURE 14 (Right Wing)
(a) Damaged sealant is defined as any crack or void in the sealant, any disbonded sealant from surfaces,
and any exposed underlying metallic surface.
(b) Sealant is considered insufficient when the thickness of the sealant allows for the outline of the coupling
or fitting hardware to be visible under the sealant.
(c) Bonding jumper and tube clamp correct installation is defined as no damaged or missing bonding jumper
or tube clamp found, and no loose bonding jumper lugs or tube clamp found. Bonding jumper damage is
defined as one or more broken strands in the wire braid. Tube clamp damage is defined as tube clamp
being cracked, broken or screw hole elongated. Loose condition is defined as component rotation when
trying to rotate with light finger pressure.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
52 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 53

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 1: OPEN
ACCESS.
-Do a Detailed Inspection (DET) of
the out-tank engine fuel feed tube
to engine nacelle strut bonding
jumper and tube clamp for correct
installation, and do an electrical
bonding resistance measurement
between the nacelle strut structure
and out-tank engine fuel feed tube.
(a)
All Airplanes
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
53 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 54

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
-Group 1, Configuration 2:CONDITION 3 (ACTION 1): Re-
move the bonding jumpers and tube
clamps. Clean electrical bond sur-
faces. Install new or serviceable
bonding jumpers and tube clamps.
Make sure the electrical bonding
resistance measurement between
the nacelle strut structure and out-
tank engine fuel feed tube is 4.0
milliohms or less. Make sure the
electrical bonding resistance mea-
surement across the coupling be-
tween two out-tank engine fuel feed
tubes is 10.0 milliohms or less.
CONDITION 3: ANY IN-
CORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP(S) FOUND, OR
ANY ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE NACELLE STRUT
STRUCTURE AND OUT-
TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
FIGURE 11 (Left Wing)
-Group 1, Configuration 2:
FIGURE 24 (Right Wing)
-Group 1, Configuration 3:
FIGURE 13 (Left Wing)
-Group 1, Configuration 3:
FIGURE 26 (Right Wing)
-FIGURE 1 (Left Wing)CONDITION 3 (ACTION 2): Do an
electrical bonding resistance mea-
surement between the forward side
of the front spar and the threaded
portion of the front spar bulkhead
fitting.
-FIGURE 14 (Right Wing)
Do PART 4:
CLOSE ACCESS
and PART 5: RE-
PORT INSPEC-
TION RESULTS.
--CONDITION 3.1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FOR-
WARD SIDE OF THE
FRONT SPAR AND THE
THREADED PORTION OF
THE FRONT SPAR BULK-
HEAD FITTING IS 1.0
MILLIOHM OR LESS
Do PART 1: OPEN
ACCESS.
-Repeat the DET of the out-tank
engine fuel feed tube to engine na-
celle strut bonding jumper and tube
clamp for correct installation, and
repeat the electrical bonding resis-
tance measurement between the
nacelle strut structure and out-tank
engine fuel feed tube. (a)
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
54 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 55

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 2: OPEN
TANK ACCESS.
-Do a Detailed Inspection (DET) of
the AFT side of the front spar bulk-
head fitting and coupling for any
area without sealant, for any dam-
aged sealant, and for any insuffi-
cient sealant. (b)(c)
CONDITION 3.2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FOR-
WARD SIDE OF THE
FRONT SPAR AND THE
THREADED PORTION OF
THE FRONT SPAR BULK-
HEAD FITTING IS MORE
THAN 1.0 MILLIOHM
Refer to AP-
PENDIX E FOR
EXAMPLES OF
ACCEPTABLE
SEALANT, AREAS
WITHOUT
SEALANT, DAM-
AGED SEALANT,
OR INSUFFI-
CIENT SEALANT.
FIGURE 2 (Left Wing)
FIGURE 15 (Right Wing)
Refer to AP-
PENDIX E FOR
EXAMPLES OF
ACCEPTABLE
SEALANT, AREAS
WITHOUT
SEALANT, DAM-
AGED SEALANT,
OR INSUFFI-
CIENT SEALANT.
FIGURE 3 (Left Wing)CONDITION 3.2.1 (ACTION 1):
Remove any existing sealant from
the AFT side of the front spar bulk-
head fitting and coupling and apply
sealant.
CONDITION 3.2.1: ANY
AREA WITHOUT
SEALANT, OR ANY DAM-
AGED SEALANT, OR ANY
INSUFFICIENT SEALANT
FOUND
FIGURE 16 (Right Wing)
-FIGURE 4 (Left Wing)CONDITION 3.2.1 (ACTION 2): Do
a DET of the in-tank engine fuel
feed tube to wing structure bonding
jumper and tube clamp for correct
installation, and do an electrical
bonding resistance measurement
between the wing structure and in-
tank engine fuel feed tube. (a)
-FIGURE 17 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
55 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 56

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
-FIGURE 5 (Left Wing)CONDITION 3.2.1.1 (ACTION 1):
Remove the bonding jumper and
tube clamp. Clean electrical bond
surfaces. Install new or serviceable
bonding jumper and tube clamp.
Make sure the electrical bonding
resistance measurement between
the wing structure and in-tank en-
gine fuel feed tube is 2.5 milliohms
or less.
CONDITION 3.2.1.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
WING STRUCTURE AND
IN-TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
-FIGURE 18 (Right Wing)
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
-
Do PART 1: OPEN
ACCESS.
-CONDITION 3.2.1.1 (ACTION 2):
Repeat the DET of the out-tank
engine fuel feed tube to engine na-
celle strut bonding jumper and tube
clamp for correct installation, and
repeat the electrical bonding resis-
tance measurement between the
nacelle strut structure and out-tank
engine fuel feed tube. (a)
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
56 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 57

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
--CONDITION 3.2.1.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP
FOUND, AND ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE WING
STRUCTURE AND IN-
TANK ENGINE FUEL
FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
Do PART 1: OPEN
ACCESS.
-Repeat the DET of the out-tank
engine fuel feed tube to engine na-
celle strut bonding jumper and tube
clamp for correct installation, and
repeat the electrical bonding resis-
tance measurement between the
nacelle strut structure and out-tank
engine fuel feed tube. (a)
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
-FIGURE 4 (Left Wing)Do a DET of the in-tank engine fuel
feed tube to wing structure bonding
jumper and tube clamp for correct
installation, and do an electrical
bonding resistance measurement
between the wing structure and in-
tank engine fuel feed tube. (a)
CONDITION 3.2.2: NO
AREA WITHOUT
SEALANT, NO DAMAGED
SEALANT, AND NO INSUF-
FICIENT SEALANT
FOUND
-FIGURE 17 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
57 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 58

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
-FIGURE 5 (Left Wing)CONDITION 3.2.2.1 (ACTION 1):
Remove the bonding jumper and
tube clamp. Clean electrical bond
surfaces. Install new or serviceable
bonding jumper and tube clamp.
Make sure the electrical bonding
resistance measurement between
the wing structure and in-tank en-
gine fuel feed tube is 2.5 milliohms
or less.
CONDITION 3.2.2.1: ANY
INCORRECT INSTALLA-
TION OF THE BONDING
JUMPER OR TUBE
CLAMP FOUND, OR
ELECTRICAL BONDING
RESISTANCE MEASURE-
MENT BETWEEN THE
WING STRUCTURE AND
IN-TANK ENGINE FUEL
FEED TUBE IS MORE
THAN 4.0 MILLIOHMS
-FIGURE 18 (Right Wing)
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
-
Do PART 1: OPEN
ACCESS.
-CONDITION 3.2.2.1 (ACTION 2):
Repeat the DET of the out-tank
engine fuel feed tube to engine na-
celle strut bonding jumper and tube
clamp for correct installation, and
repeat the electrical bonding resis-
tance measurement between the
nacelle strut structure and out-tank
engine fuel feed tube. (a)
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
58 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 59

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
--CONDITION 3.2.2.2: COR-
RECT INSTALLATION OF
THE BONDING JUMPER
AND TUBE CLAMP
FOUND, AND ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE WING
STRUCTURE AND IN-
TANK ENGINE FUEL
FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
Do PART 1: OPEN
ACCESS.
-Repeat the DET of the out-tank
engine fuel feed tube to engine na-
celle strut bonding jumper and tube
clamp for correct installation, and
repeat the electrical bonding resis-
tance measurement between the
nacelle strut structure and out-tank
engine fuel feed tube. (a)
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
-FIGURE 1 (Left Wing)Do an electrical bonding resistance
measurement between the forward
side of the front spar and the
threaded portion of the front spar
bulkhead fitting.
CONDITION 4: CORRECT
INSTALLATION OF THE
BONDING JUMPER AND
TUBE CLAMPS FOUND,
AND ELECTRICAL BOND-
ING RESISTANCE MEA-
SUREMENT BETWEEN
THE NACELLE STRUT
STRUCTURE AND OUT-
TANK ENGINE FUEL
FEED TUBE IS 4.0 MIL-
LIOHMS OR LESS
-FIGURE 14 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
59 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

### Page 60

Group 1, Configuration 2-3:
Table 2: Left and Right Wing Out-Tank Engine Fuel Feed Tube to Nacelle Strut Structure, and In-Tank
Engine Fuel Feed Tube to Wing Structure Electrical Bonding Resistance Measurement and Sealant In-
spection
Refer to the listed
procedures in SB
777-28A00098
Original Issue or
later approved re-
visions as an ac-
cepted procedure
Method of ComplianceActionCondition
Do PART 3:
CLOSE TANK AC-
CESS and PART
4: CLOSE AC-
CESS and PART
5: REPORT IN-
SPECTION RE-
SULTS.
--CONDITION 4.1: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FOR-
WARD SIDE OF THE
FRONT SPAR AND THE
THREADED PORTION OF
THE FRONT SPAR BULK-
HEAD FITTING IS 1.0
MILLIOHM OR LESS Do PART 1: OPENACCESS.-Repeat the DET of the out-tankengine fuel feed tube to engine na-
celle strut bonding jumper and tube
clamp for correct installation, and
repeat the electrical bonding resis-
tance measurement between the
nacelle strut structure and out-tank
engine fuel feed tube. (a)
-Group 1, Configuration 2:
FIGURE 10 (Left Wing)
-Group 1, Configuration 2:
FIGURE 23 (Right Wing)
-Group 1, Configuration 3:
FIGURE 12 (Left Wing)
-Group 1, Configuration 3:
FIGURE 25 (Right Wing)
Do PART 2: OPEN
TANK ACCESS.
-Do a Detailed Inspection (DET) of
the AFT side of the front spar bulk-
head fitting and coupling for any
area without sealant, for any dam-
aged sealant, and for any insuffi-
cient sealant. (b)(c)
CONDITION 4.2: ELECTRI-
CAL BONDING RESIS-
TANCE MEASUREMENT
BETWEEN THE FOR-
WARD SIDE OF THE
FRONT SPAR AND THE
THREADED PORTION OF
THE FRONT SPAR BULK-
HEAD FITTING IS MORE
THAN 1.0 MILLIOHM
Refer to AP-
PENDIX E FOR
EXAMPLES OF
ACCEPTABLE
SEALANT, AREAS
WITHOUT
SEALANT, DAM-
AGED SEALANT,
OR INSUFFI-
CIENT SEALANT.
FIGURE 2 (Left Wing)
FIGURE 15 (Right Wing)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: August 15, 2025
777-28A0098 RB
60 of 231
REQUIREMENTS BULLETIN 777-28A0098
ALERTALERT

The text continues at https://openairdocs.org/service-documents/boeing/777-28a0098-rb/file/f046137e9804.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
