# Boeing Alert Requirements Bulletin 777-47A0007 RB: No revision named

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2024-0761; AD 2024-15-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 777-47A0007 RB](https://openairdocs.org/service-documents/boeing/777-47a0007-rb.md)
- Title as filed: SB777-47A0007_RB_original
- Pages: 28
- PDF: https://openairdocs.org/files/sha256/63/43/6343e6eeaea913d203ba9803b13d82019baea8035b7501be56094356b7c20c35
- Page: https://openairdocs.org/service-documents/boeing/777-47a0007-rb/file/6343e6eeaea9

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Requirements Bulletin
ALERT
Number: 777-47A0007 RB
Original Issue: November 21, 2023
ATA System: 4721
SUBJECT: INERT GAS SYSTEM - Nitrogen Enriched Air Distribution - Cover Plate Assembly and
Vent Stringer No. 15 Electrical Bond Repair
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2023 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: November 21, 2023
777-47A0007 RB
1 of 28
7.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
2 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
FIGURE 3: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND VENT STRINGER
NO.15 SURFACE PREPARATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
3 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
4 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
777
Requirements Bulletin
ALERT
Number: 777-47A0007 RB
Original Issue: November 21, 2023
ATA System: 4721
SUBJECT: INERT GAS SYSTEM - Nitrogen Enriched Air Distribution - Cover Plate Assembly and
Vent Stringer No. 15 Electrical Bond Repair
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT
TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE
NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING
PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN
(RB) ENSURE THAT THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL
TO THE INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB
WHICH THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 777-200, 777-200LR, 777-300, 777-300ER, 777F Airplane(s), line
number(s) 41, 43, 47, 49, 52-67, 69-71, 73-74, 76, 78, 80, 82-88, 90-94, 96-99, 101-106, 108-112,
114-130, 132-133, 135-136, 138-140, 142-145, 147-158, 160-167, 169-172, 174-178, 180-212,
215-239, 241-263, 265-279, 281, 283-289, 291-292, 294, 298-337, 339-341, 343, 345-348, 350-436,
438-481, 483-494, 496-506, 508, 510-522, 524-634, 636-1566, 1568-1573, 1575-1580, 1582-1586,
1588-1604, 1606-1610, 1612-1614, 1616-1619, 1621-1623, 1625-1628, 1630-1632, 1634-1637,
1639-1641, 1643-1646, 1648-1650, 1652-1655, 1657-1658, 1660-1667, 1669, 1671, 1673,
1675-1676, 1678-1679, 1681, 1683-1684, 1686, 1689, 1691-1694, 1696-1699 in 2 Group(s).
Where the effectivity is presented with hyphens between line numbers, the airplane applicability
means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
DESCRIPTIONCONFIGURATIONGROUP
777-200, 777-200LR, 777-300ER and 777F airplanes that had the
Nitrogen Generation System (NGS) float valve installed in production
-1
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
5 of 28

### Page 6

DESCRIPTIONCONFIGURATIONGROUP
777-200, 777-200LR, 777-300 and 777-300ER airplanes affected by
Boeing Service Bulletin 777-47-0002.
-2
Airplanes that have incorporated Boeing Service Bulletin 777-47-0002
before the Original Issue date of Requirements Bulletin 777-47A0007
RB.
1
Airplanes that incorporate Boeing Service Bulletin 777-47-0002 on
or after the Original Issue date of Requirements Bulletin 777-47A0007
RB. These airplanes must incorporate Boeing Requirements Bulletin
777-47A0007 RB at the same time as 777-47-0002.
2
Airplane Models:
777-200, 777-200LR, 777-300, 777-300ER, 777F
GroupVariable Number
2WB001 - WB021
2WB031 - WB042
2WB044 - WB046
2WB051 - WB088
2WB101 - WB106
2WB121 - WB125
2WB131 - WB146
1WB147 - WB148
2WB151 - WB155
2WB161 - WB177
2WB181 - WB194
2WB201 - WB215
2WB231 - WB247
2WB271 - WB273
2WB276 - WB286
2WB291 - WB302
2WB306 - WB307
2WB311 - WB337
2WB341 - WB342
2WB366 - WB368
GroupVariable Number
2WB371 - WB388
2WB406
2WB411 - WB413
2WB416 - WB439
2WB446 - WB453
2WB476
2WB481 - WB484
2WB501 - WB512
2WB531 - WB537
2WB551 - WB554
2WB591 - WB597
2WB601 - WB606
2WB611 - WB622
2WB631 - WB638
2WB646 - WB649
2WC051 - WC073
2WC101 - WC104
2WC111 - WC119
1WC120
2WC221 - WC222
GroupVariable Number
1WC223 - WC224
2WC241 - WC243
2WC281 - WC290
2WC301 - WC308
2WC361 - WC364
2WC371 - WC374
2WC381 - WC395
2WC441
2WC446 - WC449
2WC456 - WC459
2WC486 - WC493
2WC506 - WC508
2WC521 - WC522
2WC531 - WC536
2WC546 - WC548
2WC556
2WC566 - WC567
1WC571 - WC574
1WC581
1WC586 - WC587
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
6 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 7

GroupVariable Number
1WC591 - WC595
2WD001 - WD002
2WD011 - WD014
1WD015 - WD018
2WD031 - WD034
1WD035 - WD036
2WD046 - WD049
1WD050 - WD055
1WD066 - WD075
1WD081 - WD089
1WD091
1WD096
1WD101 - WD106
1WD111 - WD112
1WD116 - WD117
1WD121 - WD123
1WD156
2WD501 - WD507
1WD508 - WD513
2WD521 - WD537
1WD538 - WD541
2WD546 - WD552
1WD553 - WD554
2WD561 - WD572
1WD573
2WD581 - WD594
1WD595 - WD599
2WD606 - WD609
2WD621 - WD632
2WD651 - WD658
1WD659 - WD665
2WD671 - WD675
1WD676 - WD677
GroupVariable Number
2WD691 - WD701
1WD702 - WD709
2WD741 - WD745
1WD746 - WD752
2WD761 - WD768
1WD769 - WD771
2WD786 - WD787
1WD788
2WD796 - WD801
1WD802 - WD825
2WD826 - WD828
1WD829 - WD837
2WD846 - WD847
1WD848 - WD867
2WD871 - WD872
1WD873 - WD918
1WD921 - WD957
1WD966 - WD970
1WD981 - WD982
1WD986 - WD987
1WD991 - WD996
1WE001 - WE007
1WE011 - WE012
1WE021 - WE026
1WE031 - WE040
1WE051 - WE057
1WE071 - WE078
1WE081 - WE084
1WE091 - WE095
1WE126 - WE178
1WE186 - WE219
1WE226 - WE231
1WE236 - WE253
GroupVariable Number
1WE261 - WE267
1WE271 - WE278
1WE291 - WE298
1WE301 - WE320
1WE331 - WE356
1WE366 - WE368
1WE376 - WE377
1WE381
1WE386 - WE387
1WE391 - WE392
1WE396 - WE411
1WE416 - WE420
1WE426 - WE431
1WE436 - WE446
1WE451 - WE484
1WE486 - WE493
1WE495 - WE499
1WE501 - WE504
1WE511 - WE516
1WE526 - WE528
1WE536 - WE549
1WE556 - WE573
1WE576 - WE587
1WE591
1WE601 - WE605
1WE626 - WE627
1WE631
1WE641 - WE642
1WE646 - WE647
1WE651 - WE661
1WE666 - WE677
1WE681 - WE689
1WE701 - WE705
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
7 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 8

GroupVariable Number
1WE711 - WE712
1WE731 - WE732
1WE736 - WE740
1WE746 - WE772
1WE776 - WE786
1WE791 - WE792
1WE796 - WE798
1WE801 - WE806
1WE811 - WE812
1WE826 - WE828
1WE831 - WE835
1WE851 - WE853
1WE856
1WE861 - WE863
GroupVariable Number
1WE866
1WE871
1WF001 - WF004
1WF016 - WF029
1WF031 - WF043
1WF046 - WF077
1WF081 - WF088
1WF096 - WF101
1WF106 - WF109
1WF111 - WF124
1WF131 - WF144
1WF146 - WF147
1WF151 - WF152
1WF156 - WF173
GroupVariable Number
1WF176 - WF184
1WF191
1WF201
1WF206 - WF217
1WF221 - WF225
1WF231 - WF248
1WF256 - WF258
1WF261 - WF262
1WF266 - WF278
1WF281 - WF288
1WF296
1WF301
1WF311 - WF313
1WF321
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 777-47A0007 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 777-47A0007 RB mandatory.
Group 1:
Accomplish the required action(s), based on the applicable condition(s) in Table 1, in accordance with
Accomplishment Instructions.
Group 2, Configuration 1:
Accomplish the required action(s), based on the applicable condition(s) in Table 2, in accordance with
Accomplishment Instructions.
Group 2, Configuration 2:
Accomplish the required action(s), based on the applicable condition(s) in Table 3, in accordance with
Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
8 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 9

Group 1:
Table 1: Nitrogen Generation System Vent Stringer No.15 Cover Plate Assembly Electrical Bond Repair
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 42 months after the
Original Issue date of Re-
quirements Bulletin 777-
47A0007 RB
ACTION 1: Prepare the surfaces of
the cover plate assembly and vent
stringer No. 15 for four clearance fit
fastener bonds and make sure the in-
ner surfaces of the holes in the
stringer and cover plate are bare at all
fastener locations.
All Airplanes
-ACTION 2: Install the cover plate as-
sembly and its attached float valve
assembly to the vent stringer No. 15
with new updated fasteners and make
sure bonding resistance between the
bolt heads and the vent stringer No.15
is 0.001 Ohm or less, between the
nuts and the cover plate assembly is
0.0015 Ohm or less, between the
cover plate assembly and the vent
stringer No. 15 is 0.001 Ohm or less,
and between the float valve assembly
mounting flange and the vent stringer
No. 15 is 0.1 Ohm or less.
-Before further flight after
accomplishing ACTION 1
and ACTION 2
ACTION 3: Incorporate Maintenance
Planning Data (MPD) document
D622W001-9 MAY 2023 - TEMPO-
RARY REVISION (TR) 09-0052 Airwor-
thiness Limitation (AWL) 47-AWL-08
"NGS Float Valve Installation - Electro-
static Protection Electrical Design
Features" and 47-AWL-09 "Static Dis-
sipation Protection Design Features -
NGS Float Valve Cover Plate," or later
approved revisions of Maintenance
Planning Data (MPD) document
D622W001-9 that incorporate 47-
AWL-08 and 47-AWL-09, into the op-
erators' maintenance program.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
9 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 10

Group 2, Configuration 1:
Table 2: Nitrogen Generation System Vent Stringer No.15 Cover Plate Assembly Electrical Bond Repair
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 42 months after the
Original Issue date of Re-
quirements Bulletin 777-
47A0007 RB.
ACTION 1: Prepare the surfaces of
the cover plate assembly and vent
stringer No. 15 for four clearance fit
fastener bonds and make sure the in-
ner surfaces of the holes in the
stringer and cover plate are bare at all
fastener locations.
All Airplanes
-ACTION 2: Install the cover plate as-
sembly and its attached float valve
assembly to the vent stringer No. 15
with new updated fasteners and make
sure bonding resistance between the
bolt heads and the vent stringer No.15
is 0.001 Ohm or less, between the
nuts and the cover plate assembly is
0.0015 Ohm or less, between the
cover plate assembly and the vent
stringer No. 15 is 0.001 Ohm or less,
and between the float valve assembly
mounting flange and the vent stringer
No. 15 is 0.1 Ohm or less.
-Before further flight after
accomplishing ACTION 1
and ACTION 2
ACTION 3: Incorporate Maintenance
Planning Data (MPD) document
D622W001-9 MAY 2023 - TEMPO-
RARY REVISION (TR) 09-0052 Airwor-
thiness Limitation (AWL) 47-AWL-08
"NGS Float Valve Installation - Electro-
static Protection Electrical Design
Features" and 47-AWL-09 "Static Dis-
sipation Protection Design Features -
NGS Float Valve Cover Plate," or later
approved revisions of Maintenance
Planning Data (MPD) document
D622W001-9 that incorporate 47-
AWL-08 and 47-AWL-09, into the op-
erators' maintenance program.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
10 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 11

Group 2, Configuration 2:
Table 3: Nitrogen Generation System Vent Stringer No.15 Cover Plate Assembly Electrical Bond Repair
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-At the same time as accom-
plishing Boeing Service
Bulletin 777-47-0002.
ACTION 1: Prepare the surfaces of
the cover plate assembly and vent
stringer No. 15 for four clearance fit
fastener bonds and make sure the in-
ner surfaces of the holes in the
stringer and cover plate are bare at all
fastener locations.
All Airplanes
-ACTION 2: Install the cover plate as-
sembly and its attached float valve
assembly to the vent stringer No. 15
with new updated fasteners and make
sure bonding resistance between the
bolt heads and the vent stringer No.15
is 0.001 Ohm or less, between the
nuts and the cover plate assembly is
0.0015 Ohm or less, between the
cover plate assembly and the vent
stringer No. 15 is 0.001 Ohm or less,
and between the float valve assembly
mounting flange and the vent stringer
No. 15 is 0.1 Ohm or less.
-Before further flight after
accomplishing ACTION 1
and ACTION 2
ACTION 3: Incorporate Maintenance
Planning Data (MPD) document
D622W001-9 MAY 2023 - TEMPO-
RARY REVISION (TR) 09-0052 Airwor-
thiness Limitation (AWL) 47-AWL-08
"NGS Float Valve Installation - Electro-
static Protection Electrical Design
Features" and 47-AWL-09 "Static Dis-
sipation Protection Design Features -
NGS Float Valve Cover Plate," or later
approved revisions of Maintenance
Planning Data (MPD) document
D622W001-9 that incorporate 47-
AWL-08 and 47-AWL-09, into the op-
erators' maintenance program.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
11 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 12

If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
12 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 13

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
OBEY THE MANUFACTURER'S PROCEDURES WHEN YOU DO TASKS THAT
ARE RELATED TO AIRWORTHINESS LIMITATIONS (AWL). IF YOU DO NOT
OBEY THE PROCEDURES, IT CAN INCREASE THE RISK OF A SOURCE OF
IGNITION. INJURIES TO PERSONNEL, AND DAMAGE TO EQUIPMENT CAN
OCCUR IF THERE IS A FIRE OR EXPLOSION.
WARNING
KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF
METAL PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED
MATERIAL, METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE
BUNDLES CAN CAUSE DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES
CAN CAUSE SPARKS OR OTHER ELECTRICAL DAMAGE.
CAUTION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. For the related SB, some locations are marked RC Start and RC
End to identify the requirements that are restated from the RB. For the related SB,
the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD.
Therefore, an Alternative Method of Compliance (AMOC) is required for any deviations
to steps between RC Start and RC End, including substeps and identified figures.
For the related SB, the steps not between RC Start and RC End may be deviated
from using accepted methods in accordance with the operator's maintenance or
inspection program without obtaining approval of an AMOC; this is provided that the
steps between RC Start and RC End, including sub-steps and identified figures, can
still be done as specified, and the airplane can be put back in an airworthy condition.
Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
5. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
6. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
13 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 14

7. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
8. The instructions in Work Instructions and the figures can include operation of tools
or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and
Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain
data on versions of the tools or test equipment that you can use. It is permitted to
use replaced tools. It is not permitted to use superseded tools.
9. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification with
a length which meets the installation standards given in SRM Chapter 51 may be
used. In addition, washers may be installed for fastener grip length in accordance
with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners
(screws) needed installation in this service bulletin.
10. Some Work Instructions task(s) are related to Critical Design Configuration Control
Limitations (CDCCL) required by Certification Maintenance Requirements (CMRs).
Strict adherence to Airworthiness Limitations are required.
11. These data have been reviewed by the Boeing ODA for fuel tank ignition prevention
requirements, and no further approval from the FAA Oversight Office is required to
satisfy the requirements of CDCCL 28-AWL-29 provided the repair or alteration is
accomplished in accordance with these instructions.
12. Where work instructions refer to the application of a fillet seal to a fastener this
process results in a configuration often referred to as a cap seal.
B. WORK INSTRUCTIONS
Actions Required For Compliance
1. Requirements
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
14 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 15

Group 1:
Table 1: Nitrogen Generation System Vent Stringer No.15 Cover Plate Assembly Electrical Bond Repair
Refer to the listed proce-
dures in SB 777-47A0007
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
Do PART 1: OPEN AC-
CESS
-ACTION 1: Prepare the surfaces of
the cover plate assembly and vent
stringer No. 15 for four clearance fit
fastener bonds and make sure the in-
ner surfaces of the holes in the
stringer and cover plate are bare at all
fastener locations.
All Airplanes
Do PART 2: COVER
PLATE ASSEMBLY AND
FLOAT VALVE ASSEM-
BLY REMOVAL
-
-FIGURE 3
-FIGURE 4ACTION 2: Install the cover plate as-
sembly and its attached float valve
assembly to the vent stringer No. 15
with new updated fasteners and make
sure bonding resistance between the
bolt heads and the vent stringer No.15
is 0.001 Ohm or less, between the
nuts and the cover plate assembly is
0.0015 Ohm or less, between the
cover plate assembly and the vent
stringer No. 15 is 0.001 Ohm or less,
and between the float valve assembly
mounting flange and the vent stringer
No. 15 is 0.1 Ohm or less.
Do PART 3: CLOSE AC-
CESS
-
--ACTION 3: Incorporate Maintenance
Planning Data (MPD) document
D622W001-9 MAY 2023 - TEMPO-
RARY REVISION (TR) 09-0052 Airwor-
thiness Limitation (AWL) 47-AWL-08
"NGS Float Valve Installation - Electro-
static Protection Electrical Design
Features" and 47-AWL-09 "Static Dis-
sipation Protection Design Features -
NGS Float Valve Cover Plate," or later
approved revisions of Maintenance
Planning Data (MPD) document
D622W001-9 that incorporate 47-
AWL-08 and 47-AWL-09, into the op-
erators' maintenance program.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
15 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 16

Group 2, Configuration 1:
Table 2: Nitrogen Generation System Vent Stringer No.15 Cover Plate Assembly Electrical Bond Repair
Refer to the listed proce-
dures in SB 777-47A0007
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
Do PART 1: OPEN AC-
CESS
-ACTION 1: Prepare the surfaces of
the cover plate assembly and vent
stringer No. 15 for four clearance fit
fastener bonds and make sure the in-
ner surfaces of the holes in the
stringer and cover plate are bare at all
fastener locations.
All Airplanes
Do PART 2: COVER
PLATE ASSEMBLY AND
FLOAT VALVE ASSEM-
BLY REMOVAL
-
-FIGURE 3
-FIGURE 4ACTION 2: Install the cover plate as-
sembly and its attached float valve
assembly to the vent stringer No. 15
with new updated fasteners and make
sure bonding resistance between the
bolt heads and the vent stringer No.15
is 0.001 Ohm or less, between the
nuts and the cover plate assembly is
0.0015 Ohm or less, between the
cover plate assembly and the vent
stringer No. 15 is 0.001 Ohm or less,
and between the float valve assembly
mounting flange and the vent stringer
No. 15 is 0.1 Ohm or less.
Do PART 3: CLOSE AC-
CESS
-
--ACTION 3: Incorporate Maintenance
Planning Data (MPD) document
D622W001-9 MAY 2023 - TEMPO-
RARY REVISION (TR) 09-0052 Airwor-
thiness Limitation (AWL) 47-AWL-08
"NGS Float Valve Installation - Electro-
static Protection Electrical Design
Features" and 47-AWL-09 "Static Dis-
sipation Protection Design Features -
NGS Float Valve Cover Plate," or later
approved revisions of Maintenance
Planning Data (MPD) document
D622W001-9 that incorporate 47-
AWL-08 and 47-AWL-09, into the op-
erators' maintenance program.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
16 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 17

Group 2, Configuration 2:
Table 3: Nitrogen Generation System Vent Stringer No.15 Cover Plate Assembly Electrical Bond Repair
Refer to the listed proce-
dures in SB 777-47A0007
Original Issue or later
approved revisions as an
accepted procedure.
Method of ComplianceActionCondition
Do PART 1: OPEN AC-
CESS
-ACTION 1: Prepare the surfaces of
the cover plate assembly and vent
stringer No. 15 for four clearance fit
fastener bonds and make sure the in-
ner surfaces of the holes in the
stringer and cover plate are bare at all
fastener locations.
All Airplanes
Do PART 2: COVER
PLATE ASSEMBLY AND
FLOAT VALVE ASSEM-
BLY REMOVAL
-
-FIGURE 3
-FIGURE 4ACTION 2: Install the cover plate as-
sembly and its attached float valve
assembly to the vent stringer No. 15
with new updated fasteners and make
sure bonding resistance between the
bolt heads and the vent stringer No.15
is 0.001 Ohm or less, between the
nuts and the cover plate assembly is
0.0015 Ohm or less, between the
cover plate assembly and the vent
stringer No. 15 is 0.001 Ohm or less,
and between the float valve assembly
mounting flange and the vent stringer
No. 15 is 0.1 Ohm or less.
Do PART 3: CLOSE AC-
CESS
-
--ACTION 3: Incorporate Maintenance
Planning Data (MPD) document
D622W001-9 MAY 2023 - TEMPO-
RARY REVISION (TR) 09-0052 Airwor-
thiness Limitation (AWL) 47-AWL-08
"NGS Float Valve Installation - Electro-
static Protection Electrical Design
Features" and 47-AWL-09 "Static Dis-
sipation Protection Design Features -
NGS Float Valve Cover Plate," or later
approved revisions of Maintenance
Planning Data (MPD) document
D622W001-9 that incorporate 47-
AWL-08 and 47-AWL-09, into the op-
erators' maintenance program.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
17 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 18 (OCR)

REQUIREMENTS BULLETIN 777-47A0007
ALERT  ALERT
STRINGER 15
VENT STRINGER NO. 15 C
CENTER WING TANK  3003515
CLEAN
FIGURE 3: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND VENT STRINGER NO.15
SURFACE PREPARATION
(SHEET 1 OF 4)
Original Issue: November 21, 2023
777-47A0007 RB
Export Controlled ECCN: 9E991
See page 1 for details  18 of 28

### Page 19 (OCR)

REQUIREMENTS BULLETIN 777-47A0007
ALERT  ALERT
14 LOCATIONS (3
VENT STRINGER 15
(VIEW LOOKING DOWN)
A-A
COVER PLATE
ASSEMBLY
FLOAT VALVE
ASSEMBLY
CLEAN  COVER PLATE ASSEMBLY  3) 14 LOCATIONS
SURFACE PREPARATION AREA  (VIEW LOOKING DOWN)  B-B  3003522
FIGURE 3: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND VENT STRINGER NO.15
SURFACE PREPARATION
(SHEET 2 OF 4)
Original Issue: November 21, 2023
777-47A0007 RB
Export Controlled ECCN: 9E991
See page 1 for details  19 of 28

### Page 20

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)-112W3253-7COVER PLATE AS-
SEMBLY
Clean1
(a)-112W3215-( )VENT STRINGER
NO.15
Clean
(b)-112W3253-7COVER PLATE AS-
SEMBLY
Prepare2
(c)-112W3215-( )VENT STRINGER
NO.15
Prepare
(d)14-HOLEClean3
(a) Remove remaining sealant and solvent clean the surface of the vent stringer No.15 and cover plate as-
sembly at the locations shown. Refer to SOPM 20-30-93 as an accepted procedure.
FIGURE 3: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND VENT STRINGER NO.15
SURFACE PREPARATION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
20 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 21

More DataQtyIdentificationNameTaskStep
(b) Prepare cover plate surface at the four fastener locations to create a clearance fit fastener bond. Refer
to SWPM 20-20-00 ELECTRICAL BONDING THROUGH FASTENER - CLEARANCE FIT HOLE as an
accepted procedure. Masking tape can be used to protect areas that do not require surface preparation.
(c) Prepare surface of the vent stringer No.15 at the four fastener locations to create a clearance fit fastener
bond. Refer to SWPM 20-20-00 ELECTRICAL BONDING THROUGH FASTENER - CLEARANCE FIT
HOLE as an accepted procedure. Masking tape can be used to protect areas that do not require surface
preparation.
(d) Make sure the fastener holes identified are free from contaminants and protective finishes. Refer to SWPM
20-20-00 for a list of recommended cleaning solvents. Ream holes to remove any protective finish if
present in holes prior to fastener installation at the holes locations. Verify holes meet BAC5009 requirements
at 0.279 / 0.291 diameter.
FIGURE 3: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND VENT STRINGER NO.15
SURFACE PREPARATION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
21 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 22 (OCR)

REQUIREMENTS BULLETIN 777-47A0007
ALERT  ALERT
STRINGER 15
FAY SURFACE  CENTER WING TANK  3003300
SEAL
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 1 OF 7)
Original Issue: November 21, 2023
Export Controlled ECCN: 9E991  777-47A0007 RB
See page 1 for details  22 of 28

### Page 23 (OCR)

REQUIREMENTS BULLETIN 777-47A0007
ALERT  ALERT
COVER PLATE
ASSEMBLY
FLOAT VALVE
ASSEMBLY
COVER PLATE ASSEMBLI
VIEW LOOKING DOWN
A-A
VENT STRINGER 15
(VIEW LOOKING DOWN)  3003298
SURFACE PREPARATION AREA  B-B
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 2 OF 7)
Original Issue: November 21, 2023
Export Controlled ECCN: 9E991  777-47A0007 RB
See page 1 for details  23 of 28

### Page 24

FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 3 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
24 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 25 (OCR)

REQUIREMENTS BULLETIN 777-47A0007
ALERT  ALERT
- 0.12
0.10% 0.10
0.10
0.10  0.12
RIVET  BOLT
0.10  0.10
• MAKE THIS AREA
SMOOTH (EXAMPLE)
0.12 (MINIMUM)  • 0.12
RIVET  BOLT
NOTE: ALL DIMENSIONS ARE IN INCHES.
3051070
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 4 OF 7)
Original Issue: November 21, 2023
Export Controlled ECCN: 9E991  777-47A0007 RB
See page 1 for details  25 of 28

### Page 26 (OCR)

REQUIREMENTS BULLETIN 777-47A0007
ALERT  ALERT
10) 14 LOCATIONS
(3) WASHER
(14 LOCATIONS)
VENT  3) BOLT
STRINGER  (14 LOCATIONS)
NO.15
WASHER
NUT
(14 LOCATIONS)
FLOAT VALVE
ASSEMBLY
COVER PLATE ASSEMBLY
FWD  AND FLOAT VALVE
ASSEMBLY
3003292
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 5 OF 7)
Original Issue: November 21, 2023
777-47A0007 RB
Export Controlled ECCN: 9E991
See page 1 for details  26 of 28

### Page 27

More DataQtyIdentificationNameTaskStep
(a)12030172-101FLOAT VALVE ASSEM-
BLY
Install (Kept)1
(b)-BMS 5-45, CLASS B-2
(BMS 5-45, CLASS C
optional)
SEALANTApply2
-1-COVER PLATE AS-
SEMBLY AND FLOAT
VALVE ASSEMBLY
Install (Kept)3
Refer to SOPM 20-
50-01 as an accept-
ed procedure. (c)
14BACB30LM4-5BOLTInstall (New)
Install under bolt
head. (c)
14BACW10BP4CDWASHERInstall (New)
Install under nut. (c)14BACW10BP4DPWASHERInstall (New)
Tighten all nuts to a
torque of 35-45 inch-
lbs, then tighten all
nuts to a torque of
55-65 inch-lbs. Refer
to SOPM 20-50-01
as an accepted pro-
cedure. (c)
14BACN11Z4CDNUTInstall (New)
(d)4-ELECTRICAL BOND-
ING RESISTANCE
Measure4
(e)4-ELECTRICAL BOND-
ING RESISTANCE
Measure
(f)--ELECTRICAL BOND-
ING RESISTANCE
Measure5
(g)--ELECTRICAL BOND-
ING RESISTANCE
Measure6
(h)-TYPE 2, CLASS ACHEMICAL CONVER-
SION COATING
Apply7
(i)-BMS 10-20 TYPE IICORROSION RESIS-
TANT FINISH
Apply8
(j)-BMS 5-45, CLASS A
AND BMS 5-45,
CLASS B
SEALANTApply9
(k)-BMS 5-45, CLASS A
AND BMS 5-45,
CLASS B
SEALANTApply10
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 6 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
27 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

### Page 28

More DataQtyIdentificationNameTaskStep
(a) If the float valve assembly was removed, install the float valve on the cover plate. Refer to APPENDIX D
as an accepted procedure. Make sure the installation meets the following requirements: A fay surface
bond is installed between the float valve mounting flange and the cover plate and the electrical bonding
resistance between the float valve mounting flange and the cover plate is 0.0005 ohm or less.
(b) Just before assembly, apply sealant to make a faying surface seal between the contact surfaces of vent
stringer No.15 and cover plate assembly. Refer to 777 AMM 28-11-00 as an accepted procedure.
(c) Solvent clean before installation. Refer to SWPM 20-20-00 ELECTRICAL BONDING THROUGH FAS-
TENER - CLEARANCE FIT HOLE - Surface Preparation as an accepted procedure.
(d) Make sure the bonding resistance between the identified bolt heads and vent stringer No.15 is 0.001 ohm
or less. Refer to SWPM 20-20-00 ELECTRICAL BONDING THROUGH FASTENER - CLEARANCE FIT
HOLE as an accepted procedure.
(e) Make sure the bonding resistance between the identified nuts and cover plate assembly is 0.0015 ohm
or less. Refer to SWPM 20-20-00 ELECTRICAL BONDING THROUGH FASTENER - CLEARANCE FIT
HOLE as an accepted procedure.
(f) Make sure the bonding resistance between the cover plate assembly and vent stringer No.15 is 0.001
ohm or less. Refer to SWPM 20-20-00 ELECTRICAL FAY SURFACE BONDS as an accepted procedure.
(g) Make sure the bonding resistance between the float valve assembly mounting flange and the vent stringer
No.15 is 0.1 ohms or less. Refer to APPENDIX D as an accepted procedure.
(h) Apply chemical conversion coating to the cover plate assembly and vent stringer No.15 in areas where
surface finish has been removed or damaged outside the locations identified during the surface preparation.
Refer to 777 AMM 51-21-04 as an accepted procedure.
(i) Apply corrosion resistant finish to the cover plate assembly and vent stringer No.15 in areas where
chemical conversion coating was applied. Refer to Refer to 777 AMM 28-11-00 as an accepted procedure
(j) Apply a fillet seal at the float valve cover plate and vent stringer interface with BMS 5-45 sealant. Refer
to 777 AMM 28-11-00 as an accepted procedure.
(k) Apply fillet seal (cap seal) to the fasteners with BMS 5-45 sealant to meet the requirements of FIGURE
4 (sheet 4 of 7). Refer to 777 AMM 28-11-00 as an accepted procedure.
FIGURE 4: NITROGEN GENERATION SYSTEM - COVER PLATE ASSEMBLY AND FLOAT VALVE
ASSEMBLY INSTALLATION
(SHEET 7 OF 7)
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: November 21, 2023
777-47A0007 RB
28 of 28
REQUIREMENTS BULLETIN 777-47A0007
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
