# Boeing Alert Service Bulletin 777-54A0024: Revision 2

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2014-0580; AD 2015-01-01 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 777-54A0024](https://openairdocs.org/service-documents/boeing/777-54a0024.md)
- Title as filed: U.S. DOT/FAA - SB-777-54A0024-02
- Pages: 147
- PDF: https://openairdocs.org/files/sha256/2d/b9/2db9157b76312d7a61ac49049b7e532685d78ed1ddb3375b497558be10ccda70
- Page: https://openairdocs.org/service-documents/boeing/777-54a0024/file/2db9157b7631

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
Number: 777-54A0024
Original Issue: April 01, 2010
Revision 2: January 23, 2014
ATA System: 5454
SUBJECT: NACELLES / PYLONS - Strut Fireseal and Firewall - Pratt and Whitney Engines -
System Disconnect Assembly - Inspection and Replacement
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 300-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL AND/OR TRADE SECRET
Copyright © 2010 Boeing.
Unpublished Work. All Rights Reserved.
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
1 of 147
4.0

### Page 2

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
2 of 147
BOEING SERVICE BULLETIN 777-54A0024
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ..................................................... 1 1
1. PLANNING INFORMATION ........................................ 1 5
A. Effectivity ............................................... 1 5
1. Airplanes ............................................ 1 5
2. Spares Affected ........................................ 1 6
B. Concurrent Requirements ...................................... 1 6
C. Reason ................................................ 1 6
D. Description .............................................. 1 8
E. Compliance .............................................. 1 9
F. Approval ............................................... 2 1
G. Manpower .............................................. 2 1
H. Weight and Balance Changes .................................... 2 5
I. Electrical Load Data ......................................... 2 5
J. References .............................................. 2 5
1. Existing Data: ......................................... 2 5
2. Data Supplied with this Service Bulletin: ........................... 2 5
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 2 6
K. Publications Affected ........................................ 2 6
L. Interchangeability and Intermixability of Parts ........................... 2 6
M. Software Accomplishment Summary ................................ 2 6
2. MATERIAL INFORMATION ........................................ 2 7
A. Material - Price and Availability ................................... 2 7
B. Industry Support Information .................................... 2 8
C. Parts Necessary for Each Airplane ................................. 2 8
1. Kits/Parts ............................................ 2 8
2. Parts and Materials Supplied by the Operator ........................ 3 2
3. Parts Modified and Reidentified ................................ 3 3
4. Parts Removed and Not Replaced .............................. 3 3
D. Parts Necessary to Change Spares ................................. 3 3
E. Special Tooling - Price and Availability ............................... 3 3
F. Special Tooling Necessary to do this Service Bulletin ....................... 3 3
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 3 5
A. GENERAL INFORMATION ..................................... 3 5
B. WORK INSTRUCTIONS ....................................... 3 6
FIGURE 1: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION . . 43
FIGURE 2: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION . . 46
FIGURE 3: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - DET INSPECTION ........ 4 9
FIGURE 4: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERIOR DET INSPECTION . . 53
FIGURE 5: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - EXTERIOR DET INSPECTION . 57
FIGURE 6: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - EXTERIOR DET INSPECTION . 59
FIGURE 7: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - PREPARATION .......... 6 1
FIGURE 8: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - HYDRAULIC SIDE REMOVALS . 69
FIGURE 9: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - ELECTRICAL SIDE REMOVALS . 72
FIGURE 10: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - REPLACEMENT ......... 7 6
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
3 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 4

FIGURE 11: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - ELECTRICAL SIDE INSTALLATION
.................................................. 8 5
FIGURE 12: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - HYDRAULIC SIDE INSTALLATION
.................................................. 9 1
FIGURE 13: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - PREPARATION .......... 9 8
FIGURE 14: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - HYDRAULIC SIDE REMOVALS . 106
FIGURE 15: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - ELECTRICAL SIDE REMOVALS . 109
FIGURE 16: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - REPLACEMENT ......... 1 1 3
FIGURE 17: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - ELECTRICAL SIDE INSTALLATION
................................................. 1 2 2
FIGURE 18: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - HYDRAULIC SIDE INSTALLATION
................................................. 1 2 8
FIGURE 19: STRUT 1 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION
................................................. 1 3 5
FIGURE 20: STRUT 2 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION
................................................. 1 3 8
FIGURE 21: STRUT 1 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER
INSTALLATION AND DET OF ELECTRICAL COMPONENTS .............. 1 4 1
FIGURE 22: STRUT 2 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER
INSTALLATION AND DET OF ELECTRICAL COMPONENTS .............. 1 4 4
APPENDIX A: SCOPE OF WORK ...................................... 1 4 7
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
4 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 5

Commercial 
Airplanes
777
Service Bulletin
Revision Transmittal SheetNumber: 777-54A0024Original Issue: April 01, 2010
Revision 2: January 23, 2014
ATA System: 5454
SUBJECT: NACELLES / PYLONS - Strut Fireseal and Firewall - Pratt and Whitney Engines -
System Disconnect Assembly - Inspection and Replacement
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-09-11 is related to this service bulletin.
More work is necessary on the airplanes changed in accordance with the Original Issue or Revision 1 of this
service bulletin. These airplanes need to inspect the top and side cover plates in accordance with PART 5 -
MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION within the compliance time in
Table 2 in Paragraph 1.E., Compliance. If missing fasteners are found, install cover plate fasteners, do a DET
of the electrical components, and repair any damaged electrical components found in accordance with PART
6 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER INSTALLATION AND DET OF
ELECTRICAL COMPONENTS at the compliance time in Table 2 in Paragraph 1.E., Compliance.
REASON FOR REVISION
This revision is sent to:
1. Add cover plate attach bolts to the kits, which are part of the system disconnect assembly, and the
instructions to install them. This results in the need for new replacement and supplemental kits which
include the bolts. Subsequent to the release of Revision 1 of this service bulletin, an operator reported
that the side and top cover plates were only temporarily installed with 2 bolts per cover plate, additional
bolts were not in the kits, and the service bulletin did not provide instructions to install the remaining
bolts. This will also require the addition of Part 5 and Part 6 in the service bulletin for operators that
have accomplished the change in the service bulletin and did not transfer the existing bolts securing
the cover plates on the old system disconnect assembly to the new system disconnect assembly.
2. Add optional leveling compound.
3. Add reference to Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-09-11.
4. Make minor corrections; a) Correct access panel callouts in Part 4. Strut no. 2 panels were inadvertently
labeled with strut no 1. labels. Delete access panel 432AR and 442AR which access the strut forward
dry bay and not the area above the system disconnect box; b) Add removal of the main fuel line o-ring
to hydraulic side removals for strut no. 2, same as strut no. 1.
5. Add optional disconnection of the hydraulic lines inside the strut to make replacement of system
disconnect assembly easier.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
5 of 147

### Page 6

6. Update document to current service bulletin format standards.
These sections were changed:
1. Summary
a. Background - Add Summary Evaluation Table to meet current service bulletin format standards.
b. Action - Add Part 5 and Part 6.
c. Compliance - Add reference to FAA AD 2011-09-11 and the effective date of the AD.
d. Manpower - Add Part 5 and Part 6.
e. Illustration - Add Part 5 and Part 6.
2. Planning Information
a. Paragraph 1.C., Reason - Add reason for revision information.
b. Paragraph 1.D., Description
(1) Add Part 5 and Part 6.
(2) Add compliance information related to this revision.
c. Paragraph 1.E., Compliance
(1) Add Table 2 to for Part 5 and Part 6.
(2) Add reference to FAA AD 2011-09-11 and the effective date of the AD.
(3) Revise compliance time from "after the original issue date of this service bulletin" to "after the
effective date of FAA AD 2011-09-11.
d. Paragraph 1.F., Approval - Add paragraph that shows this revision has been approved as an
Alternate Method of Compliance (AMOC) to FAA AD 2011-09-11.
e. Paragraph 1.G., Manpower - Add Part 5 and Part 6.
f. Paragraph 1.J.1., Existing Data - Add FAA AD 2011-09-11.
g. Paragraph 1.M., Software Accomplishment Summary - Add new section to meet current service
bulletin format standards.
3. Material Information
a. Paragraph 2.A., Material - Price and Availability - Add new replacement and supplemental kits
which include the cover plate attach bolts.
b. Paragraph 2.C.1., Kits/Parts - Add new replacement and supplemental kits which include the cover
plate attach bolts.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
6 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 7

c. Paragraph 2.C.2., Parts and Materials Supplied by the Operator - Add optional leveling compound
4. Accomplishment Instructions
a. Paragraph 3.A., General Information
(1) Delete Note 1. to meet current service bulletin format standards.
(2) Revise Note 4. to meet current service bulletin format standards.
(3) Add Note 6. to meet current service bulletin format standards.
(4) Revise Note 7. to meet current service bulletin format standards.
(5) Add Note 15. to meet current service bulletin format standards.
(6) Add Note 16. to meet current service bulletin format standards.
(7) Add Note 17. to meet current service bulletin format standards.
b. Paragraph 3.B., Work Instructions
(1) Add section title to original high level work flow.
(2) Add new high level work instruction section and title. This adds Condition 4 and Condition 5,
that call out Part 5 and Part 6.
(3) PART 4, Step 2.c. - Correct access panel part numbers.
c. FIGURE 7
(1) Illustrations - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(2) Step Table
(a) Step 2 - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(b) Step 5 - Add optional leveling compound.
(3) Fastener code Table - Add fastener code table and example of fastener symbol for the cover
plate attach fasteners.
d. FIGURE 8
(1) Step Table
(a) Step 3 - Add optional disconnection of the hydraulic lines inside the strut to make
replacement of system disconnect assembly easier.
e. FIGURE 10
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
7 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 8

(1) Step Table
(a) Step 13 - Add optional leveling compound.
f. FIGURE 11
(1) Illustrations - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(2) Step Table
(a) Step 12 - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(3) Fastener code Table - Add fastener code table and example of fastener symbol for the cover
plate attach fasteners.
g. FIGURE 12
(1) Illustrations - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(2) Step Table
(a) Step 7, Step 8, and Step 9 - Add connection of hydraulic lines inside strut, if disconnected.
(b) Step 15 - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(3) Fastener code Table - Add fastener code table and example of fastener symbol for the cover
plate attach fasteners.
h. FIGURE 13
(1) Illustrations - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(2) Step Table
(a) Step 2 - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(b) Step 5 - Add optional leveling compound.
(3) Fastener code Table - Add fastener code table and example of fastener symbol for the cover
plate attach fasteners.
i. FIGURE 14
(1) Illustrations - Add option to disconnect hydraulic lines and main fuel line inside the strut to
make replacement of system disconnect assembly easier.
(2) Step Table
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
8 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 9

(a) Step 2 - Add removal of main fuel line o-ring which was inadvertently omitted.
(b) Step 3 - Add optional disconnection of the hydraulic lines and main fuel line inside the
strut to make replacement of system disconnect assembly easier.
j. FIGURE 16
(1) Step Table
(a) Step 13 - Add optional leveling compound.
k. FIGURE 17
(1) Illustrations - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(2) Step Table
(a) Step 12 - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(3) Fastener code Table - Add fastener code table and example of fastener symbol for the cover
plate attach fasteners.
l. FIGURE 18
(1) Illustrations - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(2) Step Table
(a) Step 7, Step 8, and Step 9 - Add connection of hydraulic lines inside strut, if disconnected.
(b) Step 15 - Add installation of the cover plate attach fasteners that are not part of the system
disconnect assembly.
(3) Fastener code Table - Add fastener code table and example of fastener symbol for the cover
plate attach fasteners.
m. FIGURE 19 - New figure for strut no. 1 to accomplish the more work requirements to inspect the
side and top cover plate fasteners to determine if fasteners are missing.
n. FIGURE 20 - New figure for strut no. 2 to accomplish the more work requirements to inspect the
side and top cover plate fasteners to determine if fasteners are missing.
o. FIGURE 21 - New figure for strut no. 1 to accomplish the more work requirements, to install the
missing fasteners, fillet seal the cover plates, and inspect the electrical connectors for damage.
p. FIGURE 22 - New figure for strut no. 2 to accomplish the more work requirements, to install the
missing fasteners, fillet seal the cover plates, and inspect the electrical connectors for damage.
q. APPENDIX A - Add New Part 5 and Part 6.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
9 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 10

Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
April 01, 2010Original Issue:
November 04, 2010Revision 1:
January 23, 2014Revision 2:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
10 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 11

Commercial 
Airplanes
777
Service Bulletin
SummaryNumber: 777-54A0024Original Issue: April 01, 2010
Revision 2: January 23, 2014
ATA System: 5454
SUBJECT: NACELLES / PYLONS - Strut Fireseal and Firewall - Pratt and Whitney Engines -
System Disconnect Assembly - Inspection and Replacement
CONCURRENT REQUIREMENTS
None.
BACKGROUND
Accomplishment of the inspections and replacement of the system disconnect assembly will detect and prevent
cracking of the system disconnect assembly. Cracks in the system disconnect area may allow fire in the engine
area to enter the strut. This could result in an uncontained engine strut fire.
Several operators have reported system disconnect boxes that have been contaminated with hydraulic fluid as
detailed in service bulletin 777-54-0023. In addition, 1 operator has reported finding cracks in the system
disconnect assembly bulkheads and lower skin panel. Subsequent analysis at Boeing found hydrogen
embrittlement of the system disconnect assembly bulkheads and lower skin panel. The system disconnect
assembly is made from titanium and is located near the hot engine core of the engine where temperatures can
exceed 270 degrees Fahrenheit. The presence of hydraulic fluid and temperature above 270 degrees Fahrenheit
can result in hydrogen embrittlement of the titanium system disconnect assembly. Hydrogen embrittlement
combined with a high sonic vibration environment can result in cracking of the system disconnect assembly.
The system disconnect assembly is a box where hydraulic, fuel, and electrical connections are made between
the engine and the strut. This box acts as firewall between the engine compartment and the strut. The engine
compartment has a dedicated fire extinguishing system while the strut does not. The strut is considered a
flammable leakage zone where flammable fluids may be present. These fluids are subsequently drained from
the strut and system disconnect box. Cracking of the system disconnect assembly could allow a fire into the
strut if a fire was present in the engine compartment. If a fire was able to enter the strut and flammable fluid was
present, and since the strut does not have a dedicated fire suppression system, it is possible an uncontained
engine strut fire could result.
Inspection of the system disconnect assembly will show the presence of coked hydraulic fluid or cracking. The
presence of coked hydraulic fluid is an indication that hydrogen embrittlement may have occurred. Replacement
of the titanium system disconnect assembly with an Inconel system disconnect assembly will eliminate the
potential for hydrogen embrittlement and subsequent cracking.
Boeing Service Related Problem (SRP) 777-SRP-54-0125 is related to this service bulletin.
This table is provided to operators for planning purposes only. Refer to the applicable sections for more
information.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
11 of 147

### Page 12

ReferenceAffectedPlanning Data
Paragraph 1.A.2., Spares AffectedNoSpares Affected
Paragraph 1.E., Compliance and Paragraph
1.F., Approval
YesAD Related
Paragraph 1.H., Weight and Balance ChangesYesWeight and Balance Change
Paragraph 1.I., Electrical Load DataNoElectrical Load Changed
Paragraph 1.K., Publications AffectedYesPublications Affected
Paragraph 1.K., Publications AffectedNoAirplane Flight Operations Affected (Flight Crew
Operations Manual and/or FAA Approved Air-
plane Flight Manual)
Paragraph 2.C.1., Kits/PartsYesKits/Parts Required
Paragraph 2.C.2., Parts and Materials Supplied
by the Operator
YesOperator Supplied Parts/Material
Paragraph 2.F., Special Tooling Necessary to
do this Service Bulletin
NoSpecial Tooling Required
ACTION (PRR 62777-62S)
Part 1 - Hydraulic Fluid Contamination Inspection
Open the thrust reversers. Remove the thermal blankets. Remove the cover plates and do a General Visual
Inspection (GVI) of the interior of the strut disconnect assembly for hydraulic fluid contamination. Install the cover
plate. Install the thermal blankets. Close the thrust reversers.
Part 2 - Interior Detailed Inspection (DET)
Open the thrust reversers. Remove the thermal blankets. Remove the cover plates and do a Detailed Inspection
(DET) of the interior of strut disconnect assembly for hydraulic fluid coking, heat discoloration, cracks, and
etching or pitting. Install the cover plate. Install the thermal blankets. Close the thrust reversers.
Part 3 - Exterior Detailed Inspection (DET)
Open the thrust reversers. Remove the thermal blankets. Do a DET of the exterior of the strut disconnect
assembly for cracks. Install the thermal blankets. Close the thrust reversers.
Part 4 - System Disconnect Assembly Replacement (Terminating Action)
Prepare the new system disconnect assembly for installation (apply sealant, install drain fittings and drain
screens, install markers). Remove the engine. Remove the thrust reverser. Remove the access panels. Remove
the precooler. Remove the thermal blankets. Level airplane. Replace system disconnect assembly. Lower
airplane from jacks, if required. Install access panels. Install thermal blankets. Install precooler. Install thrust
reverser. Install engine.
PART 5 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION
Open the thrust reversers. Remove the thermal blankets. Inspect the side and top cover plates to determine if
all cover plate attach fasteners have been installed. Install the thermal blankets. Close the thrust reversers.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
12 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 13

PART 6 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER INSTALLATION AND DET
OF ELECTRICAL COMPONENTS
Open the thrust reversers. Remove the thermal blankets. Do a DET of the electrical wires and connectors for
damage and repair if damaged. Install the fasteners for the side and top cover plates. Install the thermal blankets.
Close the thrust reversers.
EFFECTIVITY
777-200 and -300 Airplanes powered by Pratt and Whitney (PW) Engines. Refer to Paragraph 1.A., Effectivity,
for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-09-11 is related to this service bulletin.
The effective date of AD 2011-09-11 is June 6, 2011.
Refer to Paragraph 1.E., Compliance.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are available for airplanes in warranty as of October 25, 2007. Please refer to
Paragraph 2.B., Industry Support Information.
MANPOWER
Elapsed HoursTotal Task Hours
10.2010.20Part 1 - Hydraulic Fluid Contamination Inspection
10.2010.20Part 2 - Interior Detailed Inspection (DET)
15.0015.00Part 3 - Exterior Detailed Inspection (DET)
117.50296.00Part 4 - System Disconnect Assembly Replacement
(Terminating Action)
9.609.60PART 5 - MORE WORK REQUIRED - COVER PLATE
FASTENERS - DET INSPECTION
19.6033.60PART 6 - MORE WORK REQUIRED - COVER PLATE
FASTENERS - FASTENER INSTALLATION AND DET
OF ELECTRICAL COMPONENTS
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
13 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 14 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
PART 1:
DO A GVI OF THE INTERIOR
FOR HYDRAULIC FLUID
CONTAMINATION
PART 2:
DO A DET OF THE INTERIOR
FOR HYDRAULIC FLUID
COKING, HEAT DAMAGE,
CRACKS, AND ETCHING OR
PITTING.
PART 5:
DO A DET OF THE TOP AND
SIDE COVER PLATES TO
DETERMINE IF THE COVER
PLATE ATTACH FASTENERS
WERE INSTALLED
STRUT
LOWER  PART 4:
SPAR  REPLACE SYSTEM
DISCONNECT ASSEMBLY
PART 6:
REMOVE TOP COVER PLATE ON
ELECTRICAL SIDE. DO A DET OF
THE WIRING AND CONNECTORS
PART 3:  FOR DAMAGE. REPAIR ANY WIRING
DO A DET OF THE  DAMAGE FOUND. INSTALL COVER
EXTERIOR FOR CRACKS  PLATE. INSTALL ALL COVER PLATE
ATTACH FASTENERS. FILLET SEAL
COVER PLATES.
1880206
Original Issue: April 01, 2010
Revision 2: January 23, 2014  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-54A0024
Work - See page 1 for details.  14 of 147

### Page 15

Commercial 
Airplanes
777
Service Bulletin
Number: 777-54A0024
Original Issue: April 01, 2010
Revision 2: January 23, 2014
ATA System: 5454
SUBJECT: NACELLES / PYLONS - Strut Fireseal and Firewall - Pratt and Whitney Engines -
System Disconnect Assembly - Inspection and Replacement
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
This service bulletin is for the airplanes shown below. An equivalent change is on subsequent
production airplanes. Refer to PRR 62777-62S for data about this change.
Refer to Service Bulletin Index Document D624W001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
DESCRIPTIONCONFIGURATIONGROUP
777-200 and -300 Airplanes line position 2 through 738 powered by
Pratt and Whitney (PW) Engines.
-1
Airplane Models:
777-200, 777-300
GroupVariable Number
1WA002 - WA017
1WA131 - WA137
1WA171 - WA175
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281 - WA283
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
15 of 147

### Page 16

GroupVariable Number
1WA301 - WA304
1WB051 - WB088
1WB131 - WB148
1WB151 - WB155
1WB366 - WB368
1WB481 - WB484
1WB531 - WB537
1WB551 - WB554
1WB591 - WB597
1WC111 - WC120
1WC371 - WC374
1WC506 - WC508
2. Spares Affected
None.
B. Concurrent Requirements
None.
C. Reason
Accomplishment of the inspections and replacement of the system disconnect assembly will detect
and prevent cracking of the system disconnect assembly. Cracks in the system disconnect area may
allow fire in the engine area to enter the strut. This could result in an uncontained engine strut fire.
Several operators have reported system disconnect boxes that have been contaminated with hydraulic
fluid as detailed in service bulletin 777-54-0023. In addition, 1 operator has reported finding cracks in
the system disconnect assembly bulkheads and lower skin panel. Subsequent analysis at Boeing found
hydrogen embrittlement of the system disconnect assembly bulkheads and lower skin panel. The
system disconnect assembly is made from titanium and is located near the hot engine core of the
engine where temperatures can exceed 270 degrees Fahrenheit. The presence of hydraulic fluid and
temperature above 270 degrees Fahrenheit can result in hydrogen embrittlement of the titanium system
disconnect assembly. Hydrogen embrittlement combined with a high sonic vibration environment can
result in cracking of the system disconnect assembly. The system disconnect assembly is a box where
hydraulic, fuel, and electrical connections are made between the engine and the strut. This box acts
as firewall between the engine compartment and the strut. The engine compartment has a dedicated
fire extinguishing system while the strut does not. The strut is considered a flammable leakage zone
where flammable fluids may be present. These fluids are subsequently drained from the strut and
system disconnect box. Cracking of the system disconnect assembly could allow a fire into the strut if
a fire was present in the engine compartment. If a fire was able to enter the strut and flammable fluid
was present, and since the strut does not have a dedicated fire suppression system, it is possible an
uncontained engine strut fire could result.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
16 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 17

Inspection of the system disconnect assembly will show the presence of coked hydraulic fluid or cracking.
The presence of coked hydraulic fluid is an indication that hydrogen embrittlement may have occurred.
Replacement of the titanium system disconnect assembly with an Inconel system disconnect assembly
will eliminate the potential for hydrogen embrittlement and subsequent cracking.
Boeing Service Related Problem (SRP) 777-SRP-54-0125 is related to this service bulletin.
Revision 1 is sent to:
1. Revise the threshold to accomplish Part 4 - System Disconnect Assembly Replacement (Terminating
Action) after hydraulic coking and heat damage is found in Condition 2B. The original threshold
was from the time that hydraulic contamination was found, when it should have been from the time
hydraulic fluid coking and/or heat damage is found. Condition 2A allows for repeat inspections if
hydraulic fluid contamination is found and no hydraulic fluid coking and/or heat damage is found
at the same interval as the threshold for accomplishing Part 4 in Condition 2B. Therefore, it is
possible that the threshold from when accomplishment of Part 4 is required in Condition 2B would
be exceeded by the time hydraulic fluid coking and/or heat damage was found. The intent was to
require the accomplish Part 4 within the threshold after Condition 2B is found.
2. Revise a marker in the kit. A typographical error in a part number in the kit resulted in the wrong
marker in the kit and the wrong callout in the service bulletin.
3. Revise circle note for installing the left side drain fitting for the strut no. 2 disconnect box. The
same circle note was inadvertently used for both the left and right side drain fittings when two
separate circle notes were required.
4. Revise the requirement to jack the airplane to level the airplane. The requirement for the leveling
compound is to level the airplane. In many cases the airplane can be leveled without jacking.
5. Clarify that the shims between the disconnect box and the strut lower spar are only required if
necessary to meet the pull-up requirements.
6. Add application of prepack of sealant between the "chimney" and the lower spar to match original
installation.
7. Add the rubber seal blocks for the power feeder cables to the operator supplied materials. During
the validation, the rubber seal blocks were damaged.
8. Increased the amount of sealant, BMS 5-63 specified in the operator supplied materials to match
the quantity needed during the validation.
9. Replace the statements in access and restoration with new General Note. Add new General Note
describing access used in the validation.
This revision 2 is sent to:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
17 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 18

1. Add cover plate attach bolts to the kits, which are part of the system disconnect assembly, and
the instructions to install them. This results in the need for new replacement and supplemental
kits which include the bolts. Subsequent to the release of Revision 1 of this service bulletin, an
operator reported that the side and top cover plates were only temporarily installed with 2 bolts
per cover plate, additional bolts were not in the kits, and the service bulletin did not provide
instructions to install the remaining bolts. This will also require the addition of Part 5 and Part 6 in
the service bulletin for operators that have accomplished the change in the service bulletin and
did not transfer the existing bolts securing the cover plates on the old system disconnect assembly
to the new system disconnect assembly.
2. Add optional leveling compound.
3. Add reference to Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-09-11.
4. Make minor corrections; a) Correct access panel callouts in Part 4. Strut no. 2 panels were
inadvertently labeled with strut no 1. labels. Delete access panel 432AR and 442AR which access
the strut forward dry bay and not the area above the system disconnect box; b) Add removal of
the main fuel line o-ring to hydraulic side removals for strut no. 2, same as strut no. 1.
5. Add optional disconnection of the hydraulic lines inside the strut to make replacement of system
disconnect assembly easier.
6. Update document to current service bulletin format standards.
D. Description
Part 1 - Hydraulic Fluid Contamination Inspection
Open the thrust reversers. Remove the thermal blankets. Remove the cover plates and do a General
Visual Inspection (GVI) of the interior of the strut disconnect assembly for hydraulic fluid contamination.
Install the cover plate. Install the thermal blankets. Close the thrust reversers.
Part 2 - Interior Detailed Inspection (DET)
Open the thrust reversers. Remove the thermal blankets. Remove the cover plates and do a Detailed
Inspection (DET) of the interior of strut disconnect assembly for hydraulic fluid coking, heat discoloration,
cracks, and etching or pitting. Install the cover plate. Install the thermal blankets. Close the thrust
reversers.
Part 3 - Exterior Detailed Inspection (DET)
Open the thrust reversers. Remove the thermal blankets. Do a DET of the exterior of the strut disconnect
assembly for cracks. Install the thermal blankets. Close the thrust reverser.
Part 4 - System Disconnect Assembly Replacement (Terminating Action)
Prepare the new system disconnect assembly for installation (apply sealant, install drain fittings and
drain screens, install markers). Remove the engine. Remove the thrust reverser. Remove the access
panels. Remove the precooler. Remove the thermal blankets. Level airplane. Replace system disconnect
assembly, if required. Lower airplane from jacks. Install access panels. Install thermal blankets. Install
precooler. Install thrust reverser. Install engine.
PART 5 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
18 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 19

Open the thrust reversers. Remove the thermal blankets. Inspect the side and top cover plates to
determine if all cover plate attach fasteners have been installed. Install the thermal blankets. Close the
thrust reversers.
PART 6 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER INSTALLATION
AND DET OF ELECTRICAL COMPONENTS
Open the thrust reversers. Remove the thermal blankets. Do a DET of the electrical wires and connectors
for damage and repair if damaged. Install the fasteners for the side and top cover plates. Install the
thermal blankets. Close the thrust reversers.
Revision 1 - No more work is necessary on the airplane(s) changed in accordance with the original
issue of this service bulletin.
Revision 2 - More work is necessary on the airplanes changed in accordance with the Original Issue
or Revision 1 of this service bulletin. These airplanes need to inspect the top and side cover plates in
accordance with PART 5 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET
INSPECTION within the compliance time in Table 2 in Paragraph 1.E., Compliance. If missing fasteners
are found, install cover plate fasteners, do a DET of the electrical components, and repair any damaged
electrical components found in accordance with PART 6 - MORE WORK REQUIRED - COVER PLATE
FASTENERS - FASTENER INSTALLATION AND DET OF ELECTRICAL COMPONENTS at the
compliance time in Table 2 in Paragraph 1.E., Compliance.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
432, 442777-200, 777-300
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2011-09-11 is related to this service
bulletin. The effective date of AD 2011-09-11 is June 6, 2011.
Accomplish the actions in Table 1 as given in Paragraph 3., Accomplishment Instructions.
Accomplish the actions and evaluate the conditions in Table 1 separately for each system disconnect
assembly.
Table 1: System Disconnect Assembly Inspection and Replacement
Repeat Interval
(Not to Exceed)
Compliance TimeAction (a)Condition
-Within 12 Months after
the effective date of
FAA AD 2011-09-11.
Do a General Visual Inspection
(GVI) of the interior of the strut dis-
connect assembly for hydraulic fluid
contamination in accordance with
Part 1 - Hydraulic Fluid Contamina-
tion Inspection.
All Airplanes
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
19 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 20

Table 1: System Disconnect Assembly Inspection and Replacement
Repeat Interval
(Not to Exceed)
Compliance TimeAction (a)Condition
6000 Flight-cycles
or 750 Days,
whichever occurs
first.
-Repeat GVI of the interior of the
strut disconnect assembly for hy-
draulic fluid contamination in accor-
dance with Part 1 - Hydraulic Fluid
Contamination Inspection.
Condition 1 -
No hydraulic fluid contami-
nation is found.
-Before further flight.Do a Detailed Inspection (DET) of
the interior of the strut disconnect
assembly for hydraulic fluid coking,
heat discoloration, cracks, and
etching or pitting in accordance with
Part 2 - Interior Detailed Inspection
(DET).
Condition 2 -
Hydraulic fluid contamina-
tion is found.
6000 Flight-cycles
or 750 Days,
whichever occurs
first.
-Repeat DET of the strut disconnect
assembly for hydraulic fluid coking,
heat discoloration, cracks, and
etching or pitting in accordance with
Part 2 - Interior Detailed Inspection
(DET).
Condition 2A -
1) No hydraulic fluid coking
is found; and
2) No heat discoloration is
found; and
3) No crack is found; and
4) No etching or pitting is
found.
300 Flight-cycles.Within 300 Flight-cy-
cles.
Do a DET of the exterior of the strut
disconnect assembly for cracks in
accordance with Part 3 - Exterior
Detailed Inspection (DET) and re-
peat at the interval shown.
Condition 2B -
1) Hydraulic fluid coking
and/or heat discoloration is
found; and
2) No crack is found; and
3) No etching or pitting is
found. And
-Within 6000 Flight-cy-
cles or 750 Days after
hydraulic fluid coking
and/or heat discol-
oration was found,
whichever occurs first.
Do Part 4 - System Disconnect As-
sembly Replacement (Terminating
Action).
-Before further flight.Do Part 4 - System Disconnect As-
sembly Replacement (Terminating
Action).
Condition 3 -
1) Any crack is found; or
2) Any etching or pitting is
found.
(a) As an option to Part 1 - Hydraulic Fluid Contamination Inspection, Part 2 - Interior Detailed Inspection
(DET), or Part 3 - Exterior Detailed Inspection (DET), do Part 4 - System Disconnect Assembly Replacement
as Terminating Action.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
20 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 21

Table 2: MORE WORK REQUIRED for Airplanes Which Accomplished Part 4 - System Disconnect As-
sembly Replacement in accordance with the original issue or Revision 1 of this service bulletin
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 1125 Days after
the Revision 2 date of
this service bulletin.
Do PART 5 - MORE WORK RE-
QUIRED - COVER PLATE FASTEN-
ERS - DET INSPECTION to deter-
mine if the cover plate attach fasten-
ers were installed.
Airplanes Which Accom-
plished Part 4 - System
Disconnect Assembly Re-
placement in accordance
with the original issue or
Revision 1 of this service
bulletin
--No additional action required.CONDITION 4:
NO MISSING FASTENERS
FOUND
-Before Further FlightDo PART 6 - MORE WORK RE-
QUIRED - COVER PLATE FASTEN-
ERS - FASTENER INSTALLATION
AND DET OF ELECTRICAL COM-
PONENTS
CONDITION 5:
ANY MISSING FASTEN-
ERS FOUND
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the action (i.e. inspection
or modification) defined in this service bulletin as an alternative method of compliance to the requirements
of paragraph (g), (g)(1), (g)(2), (g)(2)(i), (g)(2)(ii), (g)(2)(ii)(A), (g)(2)(ii)(B), (h), and (i), of AD 2011-09-11.
All provisions of AD 2011-09-11 that are not specifically referenced in the above statement remain fully
applicable and must be complied with.
G. Manpower
The table below shows an estimate of the task hours necessary to do this inspection and replacement
for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
21 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 22

 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Part 1 - Hydraulic Fluid Contamination Inspection
Elapsed
Hours
Task HoursNumber of
Persons
Task
0.500.501Open Thrust Reverser
0.500.501Remove Thermal Blankets
Inspect
3.103.101...Strut No. 1 - FIGURE 1
3.103.101...Strut No. 2 - FIGURE 2
0.500.501Install Thermal Blankets
0.500.501Close Thrust Reverser
5.105.10TOTAL FOR EACH ENGINE
10.2010.20TOTAL FOR EACH AIRPLANE
Part 2 - Interior Detailed Inspection (DET)
Elapsed
Hours
Task HoursNumber of
Persons
Task
0.500.501Open Thrust Reverser
0.500.501Remove Thermal Blankets
Inspect
3.103.101...Strut No. 1 - FIGURE 3
3.103.101...Strut No. 2 - FIGURE 4
0.500.501Install Thermal Blankets
0.500.501Close Thrust Reverser
5.105.10TOTAL FOR EACH ENGINE
10.2010.20TOTAL FOR EACH AIRPLANE
Part 3 - Exterior Detailed Inspection (DET)
Elapsed
Hours
Task HoursNumber of
Persons
Task
0.500.501Open Thrust Reverser
3.003.001Remove Thermal Blankets
Inspect
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
22 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 23

Part 3 - Exterior Detailed Inspection (DET)
Elapsed
Hours
Task HoursNumber of
Persons
Task
0.500.501...Strut No. 1 - FIGURE 5
0.500.501...Strut No. 2 - FIGURE 6
3.003.001Install Thermal Blankets
0.500.501Close Thrust Reverser
7.507.50TOTAL FOR EACH ENGINE
15.0015.00TOTAL FOR EACH AIRPLANE
Part 4 - System Disconnect Assembly Replacement
Elapsed
Hours
Task HoursNumber of
Persons
Task
Prepare the new System Discon-
nect Assembly for Installation
4.258.502...Strut No. 1 - FIGURE 7
4.258.502...Strut No. 1 - FIGURE 13
4.0020.005Remove Engine
4.0016.004Remove Thrust Reverser
0.500.501Remove access Panels
5.0010.002Remove Precooler
3.003.001Remove Thermal Blankets
1.005.005Level Airplane
Disconnect Hydraulic Compo-
nents
2.002.001...Strut No. 1 - FIGURE 8
2.002.001...Strut No. 2 - FIGURE 14
Disconnect Electrical Compo-
nents
2.254.502...Strut No. 1 - FIGURE 9
2.254.502...Strut No. 2 - FIGURE 15
Replace System Disconnect As-
sembly
4.509.002...Strut No. 1 - FIGURE 10
4.509.002...Strut No. 2 - FIGURE 16
Connect Electrical Components
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
23 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 24

Part 4 - System Disconnect Assembly Replacement
Elapsed
Hours
Task HoursNumber of
Persons
Task
4.258.502...Strut No. 1 - FIGURE 11
4.258.502...Strut No. 2 - FIGURE 17
Connect Hydraulic Components
3.503.501...Strut No. 1 - FIGURE 12
3.503.501...Strut No. 2 - FIGURE 18
1.005.005Lower Airplane from Jacks
0.500.501Install Access Panels
3.003.001Install Thermal Blankets
5.0010.002Install Precooler
4.0016.004Install Thrust Reverser
4.0020.005Install Engine
4.008.002Test
59.75153.00TOTAL FOR EACH ENGINE
117.50296.00TOTAL FOR EACH AIRPLANE
PART 5 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION
Elapsed
Hours
Task HoursNumber of
Persons
Task
0.500.501Open Thrust Reverser
0.900.901Remove Thermal Blankets
Inspection
1.001.001...Strut No. 1 - FIGURE 19
1.001.001...Strut No. 2 - FIGURE 20
0.900.901Install Thermal Blankets
0.500.501Close Thrust Reverser
4.804.80TOTAL FOR EACH ENGINE
9.609.60TOTAL FOR EACH AIRPLANE
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
24 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 25

PART 6 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER INSTALLA-
TION AND DET OF ELECTRICAL COMPONENTS
Elapsed
Hours
Task HoursNumber of
Persons
Task
0.500.501Open Thrust Reverser
0.900.901Remove Thermal Blankets
Install cover plate attach fasteners and inspect electrical components
3.507.002...Strut No. 1 - FIGURE 21
3.507.002...Strut No. 2 - FIGURE 22
0.900.901Install Thermal Blankets
0.500.501Close Thrust Reverser
9.8016.80TOTAL FOR EACH ENGINE
19.6033.60TOTAL FOR EACH AIRPLANE
H. Weight and Balance Changes
Change in Moment (Pound-
Inches)
Change in Weight (Pounds)
+ 28997+ 28
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 62777-62S
b. Boeing Service Related Problem (SRP) 777-SRP-54-0125
c. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 2011-09-11
d. Standard Overhaul Practices Manual (SOPM) 20-11-03, 20-30-03, 20-44-01, 20-50-05,
20-60-03
e. Standard Wiring Practices Manual (SWPM) 20-10-04, 20-10-11, 20-10-12, 20-10-19, 20-60-01
f. 777 Aircraft Maintenance Manual (AMM) 06-43-00, 08-21-00, 20-10-09, 28-22-15, 36-11-15,
54-53-01, 54-54-01, 71-00-02, 78-31-00, 78-31-01
2. Data Supplied with this Service Bulletin:
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
25 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 26

3. Installation Drawings Used in the Preparation of this Service Bulletin:
TitleDrawing Number
SYS DISCONNECT INSTL311W3640
This drawing was used to prepare this service bulletin. This drawing is not necessary to make the
specified changes, and is not supplied with this service bulletin. This drawing may not be applicable
to all airplane configurations or operators.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
54-51777 Illustrated Parts Catalog
2. Damage Tolerance Based Structural Inspections:
Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
M. Software Accomplishment Summary
Not affected.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
26 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 27

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane. Operators
are encouraged to share schedule requirements with Boeing for incorporation of the service bulletin.
The kits are subject to the terms and conditions of the Boeing standard purchase order acknowledgment.
Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 2
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 2 date of
this Service Bul-
letin (Calendar
Days)
QTYDateNameKit Number
No Longer AvailableTOP KIT - PW ENGINE STRUT
DISCONNECT BOX - RE-
PLACEMENT
005W3393-1 (a)
$ 210,220.0032813Jan 17/14REPLACENMENT KIT - PW
ENGINE STRUT DISCONNECT
BOX - REPLACEMENT
005W3393-3 (c)
10Feb 14/14
10Mar 14/14
10Apr 11/14
10May 9/14
10Jun 9/14
$ 229.002452Jan 17/14SUPPLEMENTAL KIT - PW
ENGINE STRUT DISCONNECT
BOX - REPLACEMENT
005W3393-11 (b)
$ 529.00148--RUBBER BLOCK312W5220-4
$ 510.0075--RUBBER BLOCK312W5220-6
(a) Replaced by 005W3393-3.
(b) Supplements kit 005W3393-1 and is only necessary if 005W3393-1 has shipped.
(c) Equivalent to 005W3393-1 plus 005W3393-11. If no kits have been shipped,only 005W3393-3 is necessary.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
27 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 28

B. Industry Support Information
Boeing warranty remedies are available for 777 airplanes in warranty as of October 25, 2007. For task
hour reimbursement for airplanes in warranty as of that date, send a warranty claim to Boeing
Commercial Airplanes Group - Warranties. The kits for airplanes in warranty as of that date will be
supplied at no charge. Send a purchase order for the kits to Boeing Spares. Please refer to this service
bulletin number and reference the airplane variable numbers in your purchase order.
C. Parts Necessary for Each Airplane
1. Kits/Parts
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
New replacing KitSupplemental KitExisting Kit
005W3393-3 (c)005W3393-11 (b)005W3393-1 (a)
(a) Replaced by 005W3393-3.
(b) Supplements kit 005W3393-1 and is only necessary if 005W3393-1 has shipped.
(c) Equivalent to 005W3393-1 plus 005W3393-11. If no kits have been shipped,only 005W3393-3 is necessary.
NOTE: One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by
the Operator, are necessary for each airplane. The Top Kit is divided into Figure kits for
each installation figure shown in the table below.
Figure Kit
16131211107Top Kit
111111005W3393-3
Figure Kit
1817Top Kit
11005W3393-3
ALL
KIT 005W3393-3
Notes
Existing Part
NumberName
Figure
New Part Number
16131211107
Qty
SHIM2...2.311W3003-25
SHIM2...2.311W3003-26
SHIM2...2.311W3003-27
SHIM1...1.311W3003-29
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
28 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 29

ALL
KIT 005W3393-3
Notes
Existing Part
NumberName
Figure
New Part Number
16131211107
Qty
DRAIN SCREEN.1...1311W3011-5
DRAIN SCREEN.1...1311W3011-6
DRAIN FITTING.1...1311W3637-1
DRAIN FITTING.1...1311W3637-3
SYSTEM DISCONNECT -
ASSEMBLY
.1...1311W3641-37
BRACKET1...1.311W3648-76
NUT, TUBE, BULKHEAD.1...1AS5178J06
NUT, TUBE, BULKHEAD.1...1AS5178J12
MARKER,POS 1.1...1BAC27TPP0074
MARKER, POS 2.1...1BAC27TPP0075
MARKER,POS 3.1...1BAC27TPP0076
MARKER,POS 4.1...1BAC27TPP0077
MARKER,POS 5.1...1BAC27TPP0078
MARKER, POS 6.1...1BAC27TPP0079
MARKER,POS 7.1...1BAC27TPP0080
MARKER,POS 8.1...1BAC27TPP0532
MARKER,POS 9.1...1BAC27TPP0533
MARKER,POS 10.1...1BAC27TPP0534
MARKER,POS 11.1...1BAC27TPP0535
MARKER.1...1BAC27WPP38
BOLT4...4.BACB30FM8AK9
BOLT, PAN HD, CROSS.231311.23BACB30LK3U2
BOLT, PAN HD, CROSS.8.1.8BACB30LK3U4
BOLT4...4.BACB30MB6AK4
NUT, SELF-LOCK, HEX4...4.BACN10YT3CSA
NUT, SELF-LOCK, HEX4...4.BACN10YT4CD
WASHER4...4.BACW10EG6CU
WASHER4...4.BACW10EG8CU
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
29 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 30

ALL
KIT 005W3393-3
Notes
Existing Part
NumberName
Figure
New Part Number
16131211107
Qty
PACKING, O-RING..1...M25988/1-135
PACKING, O-RING..1...M25988/1-906
PACKING, PREFORMED..2...MS29513-330
WASHER, PLAIN.1...1NAS1149C0932R
WASHER.2...2NAS1149C1790R
ALL
KIT 005W3393-3
Notes
Existing Part
NumberName
Figure
New Part Number
1817
Qty
BOLT, PAN HD, CROSS1311BACB30LK3U2
BOLT, PAN HD, CROSS.1BACB30LK3U4
PACKING, O-RING1.M25988/1-135
PACKING, O-RING1.M25988/1-906
PACKING, PREFORMED2.MS29513-330
KIT 005W3393-1
NotesNameQtyNew Part Number
SHIM4311W3003-25
SHIM4311W3003-26
SHIM4311W3003-27
SHIM2311W3003-29
DRAIN SCREEN2311W3011-5
DRAIN SCREEN2311W3011-6
DRAIN FITTING2311W3637-1
DRAIN FITTING2311W3637-3
SYSTEM DISCONNECT -
ASSEMBLY
2311W3641-37
BRACKET2311W3648-76
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
30 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 31

KIT 005W3393-1
NotesNameQtyNew Part Number
NUT, TUBE, BULKHEAD2AS5178J06
NUT, TUBE, BULKHEAD2AS5178J12
MARKER,POS 12BAC27TPP0074
MARKER, POS 22BAC27TPP0075
MARKER,POS 32BAC27TPP0076
MARKER,POS 42BAC27TPP0077
MARKER,POS 52BAC27TPP0078
MARKER, POS 62BAC27TPP0079
MARKER,POS 72BAC27TPP0080
MARKER,POS 82BAC27TPP0532
MARKER,POS 92BAC27TPP0533
MARKER,POS 102BAC27TPP0534
MARKER,POS 112BAC27TPP0535
MARKER2BAC27WPP38
BOLT8BACB30FM8AK9
BOLT8BACB30MB6AK4
NUT, SELF-LOCK, HEX8BACN10YT3CSA
NUT, SELF-LOCK, HEX8BACN10YT4CD
WASHER8BACW10EG6CU
WASHER8BACW10EG8CU
PACKING, O-RING2M25988/1-135
PACKING, O-RING2M25988/1-906
PACKING, PREFORMED4MS29513-330
WASHER, PLAIN2NAS1149C0932R
WASHER4NAS1149C1790R
KIT 005W3393-11
NotesNameQtyNew Part Number
BOLT, PAN HD, CROSS94BACB30LK3U2
BOLT, PAN HD, CROSS18BACB30LK3U4
NotesNameQTYPart Number/ Specification
(a)RUBBER BLOCK4312W5220-4
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
31 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 32

NotesNameQTYPart Number/ Specification
(b)RUBBER BLOCK4312W5220-6
(a) Seal for the IDG power feed cables, if damaged during removal. Airplanes WA002-WA013, WA131-WA133,
WA171-WA172. Contact Boeing Spares.
(b) Seal for the IDG power feed cables, if damaged during removal. Airplanes WA014-WA017, WA134-WA137,
WA173-WA175, WA206-WA212, WA221-WA223, WA231-WA232, WA241-WA250, WA261-WA266,
WA281-WA283, WA301-WA304, WB051-WB088, WB131-WB148, WB151-WB155, WB366-WB368,
WB481-WB484, WB531-WB537, WB551-WB554, WB591-WB597, WC111-WC120, WC371-WC374,
WC506-WC508. Contact Boeing Spares.
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number/ Specification
(b)Primer, Silicone1 QtBAC5432, COMPOUND 21, DOW CORNING 1201
RTV PRIME COAT  (DOW CORNING PR-1200 RTV
PRIME COAT RED OR SS4004P optional)
(b)Catalyst1 QtBAC5432, COMPOUND 21, XIAMETER RTV-3010-
S CATALYST  (XIAMETER RTV-3000 F CATALYST,
S TIN NW, OR RTV9950 optional)
(b)Leveling Compound, Silicone2 GalBAC5432, COMPOUND 21, XIAMETER RTV-3110
BASE  (DC 3110 OR RTV11 optional)
(a)Hydraulic Fluid1 OzBMS 3-11
(a)SEALANT120
Oz
BMS 5-63
(d)Lubricant1 OzNEVER-SEEZ PURE NICKEL SPECIAL
(c)Coating, Skydrol Resistant1 PtSOPM 20-44-01, TYPE 41
(d)Grease - Petrolatum1 OzVV-P-236
(a) See the Qualified Products List at the end of the Boeing Material Specification (BMS) for supplier data.
(b) See supplier data below. Leveling Compound, Catalyst, and Primer need to come from same source to
ensure compatibility.
(c) See SOPM 20-44-01 for supplier data.
(d) See SOPM 20-60-03 for supplier data.
– XIAMETER RTV-3110 BASE or DC 3110 (Leveling Compound); XIAMETER RTV-3010-S,
XIAMETER RTV-3000 F, or S TIN NW (Catalyst); and DOW CORNING 1201 RTV PRIME
COAT or DOW CORNING PR-1200 RTV PRIME COAT RED (Primer)
V71984
Dow Corning Corporation
2200 W Salzburg Rd
Midland Mi 48640 - 8531
Customer Service/www.dowcorning.com
(800) 248-248
– RTV11 (Leveling Compound), RTV9950 (catalyst), and SS4004P 01 P (Primer)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
32 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 33

V01139
Momentive Performance Materials Inc.
187 Danbury Road
Wilton Ct 06897-4122
www.momentive.com
(704) 992-4107
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
None.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
33 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 34

Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
34 of 147
BOEING SERVICE BULLETIN 777-54A0024
BLANK PAGE

### Page 35

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Deleted.
2. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
3. Obey all of the warnings and cautions given in the specified manual sections.
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. Refer to the SWPM 20-10-11 and SWPM 20-10-12 for the wire installation procedures,
and SWPM 20-10-19 for the wire separation requirements, as accepted procedures.
6. The necessary conditions for selection of clamp type and size are included in SWPM
20-10-12. If any wire bundle support clamp specified in this service bulletin does not
make a correct fit on the wire bundle, refer to SWPM 20-10-12 as an accepted
procedure to select a clamp that fits correctly.
7. If the length of any fastener specified in this service bulletin does not meet the
installation standards in the applicable SRM Chapter 51, then a fastener of the same
specification, or an approved substitute, with a length which meets the installation
standards in the applicable SRM Chapter 51 may be used. In addition, washers may
be installed for fastener grip length in accordance with SRM Chapter 51.
8. A General Visual Inspection (GVI) is defined as: A visual examination of an interior
or exterior area, installation or assembly to detect obvious damage, failure or
irregularity. This level of inspection is made from within touching distance unless
otherwise specified. A mirror may be necessary to enhance visual access to all
exposed surfaces in the inspection area. This level of inspection is made under
normally available lighting conditions such as daylight, hangar lighting, flashlight or
drop-light and may require removal or opening of access panels or doors. Stands,
ladders or platforms may be required to gain proximity to the area being checked.
9. A Detailed Inspection (DET) is defined as: An intensive examination of a specific
item, installation, or assembly to detect damage, failure, or irregularity. Available
lighting is normally supplemented with a direct source of good lighting at an intensity
deemed appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may
be necessary. Surface cleaning and elaborate procedures may be required.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
35 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 36

10. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
11. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
12. Accomplish the actions and evaluate the conditions separately for each system
disconnect assembly.
13. Refer to Appendix A for Scope of Change.
14. Removal of the engines, both trust reverser halves, and the precooler are not required.
Removal of these items provides additional optional access. During the validation of
Part 4 - System Disconnect Assembly Replacement, the engines, both left thrust
reverser halves, and the precooler were not removed.
15. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
16. This service bulletin includes functional test procedures for the systems changed by
this service bulletin. More functional tests can possibly be necessary in accordance
with standard maintenance practices because of interruption to other airplane systems.
17. The instructions in Paragraph 3.B., Work Instructions and the figures can include
operation of tools or test equipment. Boeing Engineering Tool Drawings, the Illustrated
Tool and Equipment Manual, and the Special Tool and Ground Handling Drawing
Index contain data on versions of the tools or test equipment that you can use. It is
permitted to use replaced tools. It is not permitted to use superseded tools.
B. WORK INSTRUCTIONS
All Airplanes - System Disconnect Assembly Inspection and Replacement
1. Do a General Visual Inspection (GVI) of the interior of the strut disconnect assembly for hydraulic
fluid contamination in accordance with Part 1 - Hydraulic Fluid Contamination Inspection within
the compliance time in Paragraph 1.E., Compliance.
As an option to Part 1 - Hydraulic Fluid Contamination Inspection, Part 2 - Interior Detailed Inspection
(DET), or Part 3 - Exterior Detailed Inspection (DET), do Part 4 - System Disconnect Assembly
Replacement as Terminating Action.
a. Condition 1 - No hydraulic fluid contamination is found, repeat GVI of the interior of the strut
disconnect assembly for hydraulic fluid contamination in accordance with Part 1 - Hydraulic
Fluid Contamination Inspection at the interval in Paragraph 1.E., Compliance.
b. Condition 2 - Hydraulic fluid contamination is found, Do a Detailed Inspection (DET) of the
strut disconnect assembly for hydraulic fluid coking, heat discoloration, cracks, and etching
or pitting in accordance Part 2 - Interior Detailed Inspection (DET) within the compliance time
in Paragraph 1.E., Compliance.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
36 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 37

(1) Condition 2A - 1) No hydraulic fluid coking is found; and 2) No heat discoloration is found;
and 3) No crack is found; and 4) No etching or pitting is found, repeat DET of the strut
disconnect assembly for hydraulic fluid coking, heat discoloration, cracks, and etching or
pitting in accordance Part 2 - Interior Detailed Inspection (DET) at the interval in Paragraph
1.E., Compliance.
(2) Condition 2B - 1) Hydraulic coking and/or heat discoloration is found; and 2) No crack is
found; and 3) No etching or pitting is found;
(a) Do a DET of the exterior of the strut disconnect assembly for cracks in accordance
with Part 3 - Exterior Detailed Inspection (DET) at the compliance time in Paragraph
1.E., Compliance and repeat at the interval in Paragraph 1.E., Compliance; and
(b) Do Part 4 - System Disconnect Assembly Replacement as terminating action at the
compliance time in Paragraph 1.E., Compliance.
c. Condition 3 - 1) Any crack is found; or 2) Any etching or pitting is found, do Part 4 - System
Disconnect Assembly Replacement as terminating action at the compliance time in Paragraph
1.E., Compliance.
MORE WORK REQUIRED for Airplanes Which Accomplished Part 4 - System Disconnect
Assembly Replacement in accordance with the original issue or Revision 1 of this service
bulletin
1. Do PART 5 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION to
determine if the cover plate attach fasteners were installed.
CONDITION 4: NO MISSING FASTENERS FOUND
a. No additional action required.
CONDITION 5: ANY MISSING FASTENERS FOUND
a. Do PART 6 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER
INSTALLATION AND DET OF ELECTRICAL COMPONENTS.
PART 1 - HYDRAULIC FLUID CONTAMINATION INSPECTION
1. Open thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
2. Remove the left top and right top System Disconnect Thermal blankets. Refer to 777 AMM 54-54-01
as an accepted procedure.
3. Remove the electrical and hydraulic side cover plates in accordance with the Figure below:
Strut No. 2Strut No. 1
FIGURE 2FIGURE 1
4. Do a GVI of the interior of the strut disconnect assembly for hydraulic fluid contamination in
accordance with the Figure below:
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
37 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 38

Strut No. 2Strut No. 1
FIGURE 2FIGURE 1
5. Install the electrical and hydraulic side cover plates in accordance with the Figure below:
Strut No. 2Strut No. 1
FIGURE 2FIGURE 1
6. Install the left top and right top System Disconnect Thermal blankets. Refer to 777 AMM 54-54-01
as an accepted procedure.
7. Close thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
8. Put the airplane back to a serviceable condition.
PART 2 - INTERIOR DETAILED INSPECTION (DET)
1. Open thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
2. Remove the left top and right top System Disconnect Thermal blankets. Refer to 777 AMM 54-54-01
as an accepted procedure.
3. Remove the electrical and hydraulic side cover plates in accordance with the Figure below:
Strut No. 2Strut No. 1
FIGURE 4FIGURE 3
4. Do a DET of the strut disconnect assembly for hydraulic fluid coking, heat discoloration, cracks,
and etching or pitting in accordance with the Figure below. Refer to 777 AMM 20-10-09 as an
accepted procedure for removal and installation of tubing to troubleshoot sources of hydraulic
leaks, if required. Refer to SWPM 20-10-04 and SWPM 20-60-01 as accepted procedures to clean
contamination from the electrical connectors and wire bundles, if required.
Strut No. 2Strut No. 1
FIGURE 4FIGURE 3
5. Install the electrical and hydraulic side cover plates in accordance with the Figure below:
Strut No. 2Strut No. 1
FIGURE 4FIGURE 3
6. Install the left top and right top System Disconnect Thermal blankets. Refer to 777 AMM 54-54-01
as an accepted procedure.
7. Close thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
8. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
38 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 39

PART 3 - EXTERIOR DETAILED INSPECTION (DET)
1. Open thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
2. Remove the left top, left forward, left aft, left bottom, right top, right middle, right lower, right forward,
right aft, right bottom, and center aft System Disconnect Thermal blankets. Refer to 777 AMM
54-54-01 as an accepted procedure.
3. Do a DET of the exterior of the strut disconnect assembly for cracks in accordance with the Figure
below:
Strut No. 2Strut No. 1
FIGURE 6FIGURE 5
4. Install the left top, left forward, left aft, left bottom, right top, right middle, right lower, right forward,
right aft, right bottom, and center aft System Disconnect Thermal blankets. Refer to 777 AMM
54-54-01 as an accepted procedure.
5. Close thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
6. Put the airplane back to a serviceable condition.
PART 4 - SYSTEM DISCONNECT ASSEMBLY REPLACEMENT (TERMINATING ACTION)
1. Prepare new System Disconnect Assembly for installation in accordance with the Figure below:
Strut No. 2Strut No. 1
FIGURE 13FIGURE 7
2. Access
a. Remove the engine. Refer to 777 AMM 71-00-02 as an accepted procedure.
b. Remove the thrust reverser. Refer to 777 AMM 78-31-01 as an accepted procedure.
c. Remove the following access panels. Refer to 777 AMM 06-43-00 and 777 AMM 54-53-01
as accepted procedures.
Strut No. 2Strut No. 1
442AL432AL
442BL432BL
442BR432BR
d. Remove the Precooler to access the center bottom Strut Thermal Blanket, if required. Refer
to 777 AMM 36-11-15 as an accepted procedure.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
39 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 40

e. Remove the left top, left forward, left aft, left bottom, right top, right middle, right lower, right
forward, right aft, right bottom, and center aft System Disconnect Thermal blankets. Refer to
777 AMM 54-54-01 as an accepted procedure.
f. Remove the left forward, right forward, and center bottom Strut Thermal Blankets. Refer to
777 AMM 54-54-01 as an accepted procedure.
3. Level the airplane. Refer to 777 AMM 08-21-00 as an accepted procedure.
NOTE: This step can be accomplished any time prior to leveling compound application in system
disconnect assembly replacement.
4. System Disconnect Assembly Replacement
a. Access and disconnect the tubing on the hydraulic side of disconnect assembly box in
accordance with the figure below:
Strut No. 2Strut No. 1
FIGURE 14FIGURE 8
b. Access and disconnect the wiring on the electrical side of disconnect assembly box in
accordance with the figure below:
Strut No. 2Strut No. 1
FIGURE 15FIGURE 9
c. Replace the disconnect assembly box in accordance with the figure below:
Strut No. 2Strut No. 1
FIGURE 16FIGURE 10
d. Connect the wiring on the electrical side of disconnect assembly box and install cover in
accordance with the figure below:
Strut No. 2Strut No. 1
FIGURE 17FIGURE 11
e. Connect the tubing on the hydraulic side of disconnect assembly box in accordance with the
figure below:
Strut No. 2Strut No. 1
FIGURE 18FIGURE 12
5. Lower airplane from jacks, if required. Refer to 777 AMM 08-21-00 as an accepted procedure.
NOTE: This step can be accomplished any time after the leveling compound has cured in system
disconnect assembly replacement.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
40 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 41

6. Restoration
The following steps restore the recommended access to the work area. Restore the access used
if different or additional access was accomplished.
a. Install the following access panels. Refer to 777 AMM 06-43-00 and 777 AMM 54-53-01 as
accepted procedures.
Strut No. 2Strut No. 1
442AL432AL
442BL432BL
442BR432BR
b. Install the left forward, right forward, and center bottom Strut Thermal Blankets. Refer to 777
AMM 54-54-01 as an accepted procedure.
c. Install the left top, left forward, left aft, left bottom, right top, right middle, right lower, right
forward, right aft, right bottom, and center aft System Disconnect Thermal blankets. Refer to
777 AMM 54-54-01 as an accepted procedure.
d. Install the Precooler, if removed. Refer to 777 AMM 36-11-15 as an accepted procedure.
e. Install the thrust reverser. Refer to 777 AMM 78-31-01 as an accepted procedure.
f. Install the engine. Refer to 777 AMM 71-00-02 as an accepted procedure.
g. Put the airplane back to a serviceable condition.
PART 5 - MORE WORK REQUIRED - COVER PLATE FASTENERS - DET INSPECTION
1. Open thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
2. Remove the left top, right top, right middle, and right lower System Disconnect Thermal blankets.
Refer to 777 AMM 54-54-01 as an accepted procedure.
3. Do a DET to determine if the cover plate fasteners were installed in accordance with the figure
below:
Strut No. 2Strut No. 1
FIGURE 20FIGURE 19
4. Install the left top, right top, right middle, and right lower System Disconnect Thermal blankets.
Refer to 777 AMM 54-54-01 as an accepted procedure.
5. Close thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
6. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
41 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 42

PART 6 - MORE WORK REQUIRED - COVER PLATE FASTENERS - FASTENER INSTALLATION
AND DET OF ELECTRICAL COMPONENTS
1. Open thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
2. Remove the left top, right top, right middle, and right lower System Disconnect Thermal blankets.
Refer to 777 AMM 54-54-01 as an accepted procedure.
3. Install fasteners, do a DET inspection of the electrical components, and repair any damaged
electrical components in accordance with the figure below:
Strut No. 2Strut No. 1
FIGURE 22FIGURE 21
4. Install the left top, right top, right middle, and right lower System Disconnect Thermal blankets.
Refer to 777 AMM 54-54-01 as an accepted procedure.
5. Close thrust reverser. Refer to 777 AMM 78-31-00 as an accepted procedure.
6. Put the airplane back to a serviceable condition.
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2: January 23, 2014
42 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 43 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
STRUT
A 12 LOCATIONS  STRUT
1875571
FIGURE 1: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION
(SHEET 1 OF 3)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-54A0024
Work - See page 1 for details.  43 of 147

### Page 44 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
FWD
1875639
FIGURE 1: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION
(SHEET 2 OF 3)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each disconnect assembly.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Note the location of the 3 thermal
blanket attach fastener holes.
13-BoltRemove /
Keep
1
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Note the location of the 4 thermal
blanket attach fastener holes.
12-BoltRemove /
Keep
2
for the electrical side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Do a General Visual Inspection (GVI)
of the interior of each side, hydraulic
and electrical, of the system disconnect
assembly for the presence of hydraulic
fluid. The system disconnect assembly
is painted with a high temperature
paint. Blistered and/or peeling paint in
the system disconnect assembly is a
sign that hydraulic fluid is (or has been)
present.
--System Disconnect -
Assembly
Inspect3
for the electrical side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
4
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
12-BoltInstall
(Kept)
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
5
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
13-BoltInstall
(Kept)
Fillet seal cover plates.-BMS 5-63SEALANTApply6
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAFLAG
NOTE
Thermal blanket attach fastener hole.1
FIGURE 1: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
45 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 46 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
(6  STRUT
A 12 LOCATIONS  STRUT
13 LOCAT  •  1875323
FIGURE 2: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION
(SHEET 1 OF 3)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  46 of 147

### Page 47 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
FIGURE 2: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION
(SHEET 2 OF 3)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  Export Controlled ECCN: 9E991 - BOEING  777-54A0024
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  47 of 147

### Page 48

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each disconnect assembly.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Note the location of the 3 thermal
blanket attach fastener holes.
13-BoltRemove /
Keep
1
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Note the location of the 4 thermal
blanket attach fastener holes.
12-BoltRemove /
Keep
2
for the electrical side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Do a General Visual Inspection (GVI)
of the interior of each side, hydraulic
and electrical, of the system disconnect
assembly for the presence of hydraulic
fluid. The system disconnect assembly
is painted with a high temperature
paint. Blistered and/or peeling paint in
the system disconnect assembly is a
sign that hydraulic fluid is (or has been)
present.
--System Disconnect -
Assembly
Inspect3
for the electrical side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
4
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
12-BoltInstall
(Kept)
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
5
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
13-BoltInstall
(Kept)
Fillet seal cover plates.-BMS 5-63SEALANTApply6
The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAFLAG
NOTE
Thermal blanket attach fastener hole.1
FIGURE 2: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERNAL GVI INSPECTION
(SHEET 3 OF 3)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
48 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 49 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
STRUT
® 12 LOCATIONS  STRUT
(1)  13 LOCATIONS
1875792
FIGURE 3: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - DET INSPECTION
(SHEET 1 OF 4)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  Export Controlled ECCN: 9E991 - BOEING  777-54A0024
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  49 of 147

### Page 50 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
FWD
1875796
FIGURE 3: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - DET INSPECTION
(SHEET 2 OF 4)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.  50 of 147

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each disconnect assembly.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Note the location of the 3 thermal
blanket attach fastener holes.
13-BoltRemove /
Keep
1
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Note the location of the 4 thermal
blanket attach fastener holes.
12-BoltRemove /
Keep
2
for the electrical side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Do a Detailed Inspection (DET) of the
electrical and hydraulic sides of the
system disconnect assembly for hy-
draulic fluid coking.
--System Disconnect -
Assembly
Inspect3
If hydraulic coking is present, clean a
minimum of 75% of the bottom surface
and a minimum 25% of each of the re-
maining surfaces of the electrical and
hydraulic sides of the system discon-
nect assembly. Pay particular attention
to the corners between the bottom and
the sides. Refer to SOPM 20-30-03 as
an accepted procedure.
1-System Disconnect -
Assembly
Clean4
Do a Detailed Inspection (DET) of the
electrical and hydraulic sides of the
system disconnect assembly for heat
discoloration, cracks, and etching or
pitting.
1-System Disconnect -
Assembly
Inspect5
for the electrical side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
6
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
12-BoltInstall
(Kept)
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
7
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
13-BoltInstall
(Kept)
Fillet seal cover plates.-BMS 5-63SEALANTApply8
FIGURE 3: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - DET INSPECTION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
51 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 52

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAFLAG
NOTE
Thermal blanket attach fastener hole.1
FIGURE 3: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - DET INSPECTION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
52 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 53 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
STRUT
® 12 LOCATIONS  STRUT
13 LOCATIONS  1875799
FIGURE 4: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERIOR DET INSPECTION
(SHEET 1 OF 4)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING  777-54A0024
Work - See page 1 for details.  53 of 147

### Page 54 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
FWD
1875800
FIGURE 4: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERIOR DET INSPECTION
(SHEET 2 OF 4)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  Export Controlled ECCN: 9E991 - BOEING  PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.

### Page 55

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each disconnect assembly.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Note the location of the 3 thermal
blanket attach fastener holes.
13-BoltRemove /
Keep
1
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Note the location of the 4 thermal
blanket attach fastener holes.
12-BoltRemove /
Keep
2
for the electrical side of the system
disconnect assembly.
1-Cover PlateRemove /
Keep
Do a Detailed Inspection (DET) of the
electrical and hydraulic sides of the
system disconnect assembly for hy-
draulic fluid coking.
--System Disconnect -
Assembly
Inspect3
If hydraulic coking is present, clean a
minimum of 75% of the bottom surface
and a minimum 25% of each of the re-
maining surfaces of the electrical and
hydraulic sides of the system discon-
nect assembly. Pay particular attention
to the corners between the bottom and
the sides. Refer to SOPM 20-30-03 as
an accepted procedure.
1-System Disconnect -
Assembly
Clean4
Do a Detailed Inspection (DET) of the
electrical and hydraulic sides of the
system disconnect assembly for heat
discoloration, cracks, and etching or
pitting.
1-System Disconnect -
Assembly
Inspect5
for the electrical side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
6
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
12-BoltInstall
(Kept)
for the hydraulic side of the system
disconnect assembly.
1-Cover PlateInstall
(Kept)
7
Tighten to 33.25 - 36.75 (35 target)
inch-pounds.
13-BoltInstall
(Kept)
Fillet seal cover plates.-BMS 5-63SEALANTApply8
FIGURE 4: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERIOR DET INSPECTION
(SHEET 3 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
55 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 56

The flag note numbers shown below agree with the numbers shown in the flag symbols in the figure.
MORE DATAFLAG
NOTE
Thermal blanket attach fastener hole.1
FIGURE 4: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - INTERIOR DET INSPECTION
(SHEET 4 OF 4)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
56 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 57 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
1875817
FIGURE 5: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - EXTERIOR DET INSPECTION
(SHEET 1 OF 2)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING
Work - See page 1 for details.  LUL O LS

### Page 58

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each disconnect assembly.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Do a Detailed Inspection (DET) of the
visible areas of the exterior of the sys-
tem disconnect assembly for cracks.
--System Disconnect -
Assembly
Inspect1
FIGURE 5: STRUT NO. 1 - SYSTEM DISCONNECT ASSEMBLY - EXTERIOR DET INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
58 of 147
BOEING SERVICE BULLETIN 777-54A0024

### Page 59 (OCR)

BOEING SERVICE BULLETIN 777-54A0024
1876242
FIGURE 6: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - EXTERIOR DET INSPECTION
(SHEET 1 OF 2)
Original Issue: April 01, 2010
Revision 2 January 23, 2014  PROPRIETARY - Copyright © Unpublished  Export Controlled ECCN: 9E991 - BOEING
Work - See page 1 for details.

### Page 60

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for each disconnect assembly.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
Do a Detailed Inspection (DET) of the
visible areas of the exterior of the sys-
tem disconnect assembly for cracks.
--System Disconnect -
Assembly
Inspect1
FIGURE 6: STRUT NO. 2 - SYSTEM DISCONNECT ASSEMBLY - EXTERIOR DET INSPECTION
(SHEET 2 OF 2)
Export Controlled ECCN: 9E991 - BOEING
PROPRIETARY - Copyright © Unpublished
Work - See page 1 for details.
Original Issue: April 01, 2010
777-54A0024Revision 2 January 23, 2014
60 of 147
BOEING SERVICE BULLETIN 777-54A0024

The text continues at https://openairdocs.org/service-documents/boeing/777-54a0024/file/2db9157b7631.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
