# Boeing Alert Requirements Bulletin 777-57A0128 RB: No revision named, part 1 of 4

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2026-1339, the docket of a proposed AD (Federal Register 2026-03782). Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Requirements Bulletin 777-57A0128 RB](https://openairdocs.org/service-documents/boeing/777-57a0128-rb.md)
- Title as filed: 777-57A0128_RB_00- part 1
- Pages: 48
- PDF: https://openairdocs.org/files/sha256/a8/dc/a8dc7e80a689ad202b251b4a07b8cd09352d33b2c09ca8558a7df570ebd0f576
- Page: https://openairdocs.org/service-documents/boeing/777-57a0128-rb/file/a8dc7e80a689

## Text

Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Requirements Bulletin
ALERT
Number: 777-57A0128 RB
Original Issue: June 02, 2025
ATA System: 5754
SUBJECT: WINGS - Landing Gear Attach Fittings and Support Beam - Main Landing Gear Support
Beam Lower Stabilizer Brace AFT Fitting Inspection and Replacement
EXPORT CONTROLLED - This technology or software is subject to the U.S. Export Administration Regulations
(EAR), (15 C.F.R. Parts 730-774). No authorization from the U.S. Department of Commerce is required for
export, re-export, in-country transfer, or access EXCEPT to country group E:1 or E:2 countries/persons per
Supp.1 to Part 740 of the EAR.
9E991ECCN:
Copyright © 2025 The Boeing Company
Treatment of this document and its content is governed by contract with Boeing. Rights to use this document
are licensed on a per aircraft basis and such rights may not be transferable. For more information, contact The
Boeing Company.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and
Boeing liveries are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
Original Issue: June 02, 2025
777-57A0128 RB
1 of 144
4.0

### Page 2

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
2 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT
BLANK PAGE

### Page 3

Table of Contents
1. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
A. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
B. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
2. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
3. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
4. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
5. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
A. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 33
B. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35
FIGURE 1: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING,
MLG SUPPORT BEAM AND STABILIZER BRACE - DETAILED INSPECTION (DET) . . 63
FIGURE 3: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
AND MLG SUPPORT BEAM - OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC)
INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
FIGURE 4: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- ULTRASONIC (UT) INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70
FIGURE 9: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 73
FIGURE 10: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
FIGURE 11: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
FIGURE 12: LEFT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
FIGURE 13: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING,
MLG SUPPORT BEAM AND STABILIZER BRACE - DETAILED INSPECTION (DET) . . 104
FIGURE 15: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
AND MLG SUPPORT BEAM - OPEN HOLE HIGH FREQUENCY EDDY CURRENT (HFEC)
INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 108
FIGURE 16: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- ULTRASONIC (UT) INSPECTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
FIGURE 21: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 1] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 114
FIGURE 22: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 2] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121
FIGURE 23: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 129
FIGURE 24: RIGHT MAIN LANDING GEAR - SUPPORT BEAM LOWER STABILIZER BRACE AFT FITTING
- REPLACEMENT [Group 4] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 137
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
3 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 4

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
4 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT
BLANK PAGE

### Page 5

Commercial 
Airplanes
777
Requirements Bulletin
ALERT
Number: 777-57A0128 RB
Original Issue: June 02, 2025
ATA System: 5754
SUBJECT: WINGS - Landing Gear Attach Fittings and Support Beam - Main Landing Gear Support
Beam Lower Stabilizer Brace AFT Fitting Inspection and Replacement
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN IN
EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND THIS DOCUMENT TO THE NEW
OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD, SEND THIS DOCUMENT TO THE NEW OWNER.
THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED
TO CREATE THE SERVICE BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT
THE INFORMATION BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE
INFORMATION IN THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS…) OF THE RB WHICH
THE SB REFERS TO AS THE RELATED DOCUMENT.
1. Effectivity
A. Airplanes
This bulletin is applicable to 777-200, 777-200LR, 777-300, 777-300ER, 777F Airplane(s), line
number(s) 1-1566, 1568-1573, 1575-1580, 1582-1586, 1588-1604, 1606-1610, 1612-1614,
1616-1619, 1621-1623, 1625-1628, 1630-1632, 1634-1637, 1639-1641, 1643-1646, 1648-1650,
1652-1655, 1657-1658, 1660-1667, 1669, 1671, 1673, 1675-1676, 1678-1679, 1681, 1683-1684,
1686-1687, 1689-1715, 1717-1722, 1724-1727, 1729-1736, 1738-1739, 1741-1745, 1747-1780,
1782-1784, 1786-1787, 1789-1793, 1795-1797, 1799-1800, 1802, 1804-1805, 1807, 1809-1810,
1812, 1814-1815, 1817, 1819-1820, 1822, 1824-1825, 1827, 1829-1830, 1832, 1834-1835,
1837-99999 in 4 Group(s). Where the effectivity is presented with hyphens between line numbers,
the airplane applicability means "through" and "inclusive", e.g. line numbers 1-9 means line numbers
1 through 9 inclusive.
The Variable Numbers and Group Information for the applicable airplanes is given below.
NOTE: The Variable Number table below includes affected airplanes available as of the issue
date of this bulletin. Affected airplane Variable Numbers added to MyBoeingFleet.com
after the issue date of this bulletin will be shown using the Maintenance Performance
Toolbox EFFECTIVITY search function result.
DESCRIPTIONCONFIGURATIONGROUP
777-200 Airplanes with Main Landing Gear (MLG) Support Beam
Lower Stabilizer Brace Aft Fitting part number 115W1613-1 &
115W1613-2 installed.
-1
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
5 of 144

### Page 6

DESCRIPTIONCONFIGURATIONGROUP
777-200 Airplanes with extended range with Main Landing Gear
(MLG) Support Beam Lower Stabilizer Brace Aft Fitting part number
115W1613-7 & 115W1613-8 installed.
-2
777-300 Airplanes with Main Landing Gear (MLG) Support Beam
Lower Stabilizer Brace Aft Fitting part number 115W1613-11 &
115W1613-12 installed.
-3
777-200LR, -300ER, -777F Airplanes with Main Landing Gear (MLG)
Support Beam Lower Stabilizer Brace Aft Fitting part number
115W1613-17 & 115W1613-18 installed.
-4
Airplane Models:
777-200, 777-200LR, 777-300, 777-300ER, 777F
GroupVariable Number
1WA001 - WA017
1WA076 - WA080
1WA086 - WA093
1WA101 - WA104
1WA116 - WA119
1WA131 - WA137
1WA171 - WA175
1WA196 - WA198
1WA206 - WA212
1WA221 - WA223
1WA231 - WA232
1WA241 - WA250
1WA261 - WA266
1WA281 - WA283
1WA301 - WA304
2WB001 - WB021
2WB031 - WB046
2WB051 - WB088
2WB101 - WB106
2WB121 - WB125
GroupVariable Number
2WB131 - WB148
2WB151 - WB155
2WB161 - WB177
2WB181 - WB194
2WB201 - WB215
2WB231 - WB247
2WB271 - WB273
2WB276 - WB286
2WB291 - WB302
2WB306 - WB307
2WB311 - WB337
2WB341 - WB342
2WB366 - WB368
2WB371 - WB388
2WB406
2WB411 - WB413
2WB416 - WB439
2WB446 - WB453
2WB476
2WB481 - WB484
GroupVariable Number
3WB501 - WB512
3WB531 - WB537
3WB551 - WB554
3WB591 - WB597
3WB601 - WB606
3WB611 - WB622
3WB631 - WB638
3WB646 - WB649
2WC051 - WC073
2WC101 - WC104
2WC111 - WC120
2WC221 - WC224
2WC241 - WC243
2WC281 - WC290
2WC301 - WC308
2WC361 - WC364
2WC371 - WC374
2WC381 - WC395
2WC441
2WC446 - WC449
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
6 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 7

GroupVariable Number
2WC456 - WC459
2WC486 - WC493
2WC506 - WC508
2WC521 - WC522
2WC531 - WC536
2WC546 - WC548
2WC556
2WC566 - WC567
2WC571 - WC574
2WC581
2WC586 - WC587
2WC591 - WC595
4WD001 - WD002
4WD011 - WD018
4WD031 - WD036
4WD046 - WD055
4WD066 - WD075
4WD081 - WD089
4WD091
4WD096
4WD101 - WD106
4WD111 - WD112
4WD116 - WD117
4WD121 - WD123
4WD156
4WD501 - WD513
4WD521 - WD541
4WD546 - WD554
4WD561 - WD573
4WD581 - WD599
4WD606 - WD609
4WD621 - WD632
4WD651 - WD665
GroupVariable Number
4WD671 - WD677
4WD691 - WD709
4WD741 - WD752
4WD761 - WD771
4WD786 - WD788
4WD796 - WD837
4WD846 - WD867
4WD871 - WD918
4WD921 - WD957
4WD966 - WD970
4WD981 - WD982
4WD986 - WD987
4WD991 - WD996
4WE001 - WE007
4WE011 - WE012
4WE021 - WE026
4WE031 - WE040
4WE051 - WE057
4WE071 - WE078
4WE081 - WE084
4WE091 - WE095
4WE126 - WE178
4WE186 - WE219
4WE226 - WE231
4WE236 - WE253
4WE261 - WE267
4WE271 - WE278
4WE291 - WE298
4WE301 - WE320
4WE331 - WE356
4WE366 - WE368
4WE376 - WE377
4WE381
GroupVariable Number
4WE386 - WE387
4WE391 - WE392
4WE396 - WE411
4WE416 - WE420
4WE426 - WE431
4WE436 - WE446
4WE451 - WE484
4WE486 - WE493
4WE495 - WE499
4WE501 - WE504
4WE511 - WE516
4WE526 - WE528
4WE536 - WE549
4WE556 - WE573
4WE576 - WE587
4WE591
4WE601 - WE605
4WE626 - WE627
4WE631
4WE641 - WE642
4WE646 - WE647
4WE651 - WE661
4WE666 - WE677
4WE681 - WE689
4WE701 - WE705
4WE711 - WE712
4WE731 - WE732
4WE736 - WE740
4WE746 - WE772
4WE776 - WE786
4WE791 - WE792
4WE796 - WE798
4WE801 - WE806
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
7 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 8

GroupVariable Number
4WE811 - WE812
4WE826 - WE828
4WE831 - WE835
4WE851 - WE853
4WE856 - WE857
4WE861 - WE863
4WE866 - WE868
4WE871
4WF001 - WF004
4WF016 - WF043
4WF046 - WF077
4WF081 - WF088
4WF096 - WF101
4WF106 - WF109
4WF111 - WF124
4WF131 - WF144
4WF146 - WF147
GroupVariable Number
4WF151 - WF152
4WF156 - WF173
4WF176 - WF184
4WF191
4WF201
4WF206 - WF217
4WF221 - WF229
4WF231 - WF251
4WF256 - WF262
4WF266 - WF288
4WF296 - WF298
4WF301 - WF323
4WF326 - WF330
4WF336 - WF350
4WF356 - WF359
4WF366 - WF377
4WF381 - WF390
GroupVariable Number
4WF396 - WF399
4WF401 - WF404
4WF411 - WF412
4WF416 - WF417
4WF421
4WF426 - WF427
4WF431 - WF434
4WF441 - WF442
4WF446 - WF449
4WF456
4WF461 - WF462
4WF471 - WF472
4WF482 - WF483
4WF486 - WF487
4WF491
--
--
B. Spares Affected
None.
2. CONCURRENT REQUIREMENTS
None.
3. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
Requirements Bulletin 777-57A0128 RB. The Airworthiness Directive will make the compliance tasks and
times given in Requirements Bulletin 777-57A0128 RB mandatory.
Accomplish the required actions, based on the applicable conditions in Tables 1 through 6, in accordance
with Accomplishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION or an OPTION, do all of the ACTION numbers for that
CONDITION or OPTION.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
8 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 9

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 1,600
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 777-
57A0128 RB.
Before 16,000
total flight cycles
or 90,000 total
flight hours,
whichever oc-
curs first.
OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes with less
than 25,000 total flight
cycles and less than
90,000 total flight hours
as of the Original Issue
date of Requirements
Bulletin 777-57A0128
RB.
OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the left MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-Within 1,600
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 777-
57A0128 RB.
Before 16,000
total flight cycles
or 90,000 total
flight hours,
whichever oc-
curs first.
OPTION 2 (ACTION 1): Do
a DET of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
9 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 10

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
5,000 flight cycles
or 20,000 flight
hours, whichever
occurs first. (b)
-CONDITION 1 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 1: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 1 INSPECTIONS.
-CONDITION 1 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting and MLG
Support Beam for any crack.
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 1 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 1 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
10 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 11

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 2 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 2: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 2 INSPECTIONS.
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 2 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
3,000 flight cycles
or 10,000 flight
hours, whichever
occurs first.
-CONDITION 2 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-CONDITION 2 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
-Before further flight.CONDITION 3 (ACTION 1):
Replace left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting.
CONDITION 3: ANY
CRACK FOUND ON
THE MLG SUPPORT
BEAM LOWER STABI-
LIZER BRACE AFT FIT-
TING AS A RESULT OF
OPTION 1 OR OPTION
2 INSPECTIONS.
-At the times specified in Table 3.CONDITION 3 (ACTION 2):
Do the actions specified in
Table 3.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
11 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 12

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 4: ANY
CRACK FOUND DUR-
ING OPEN HOLE HFEC
INSPECTION OF THE
MLG SUPPORT BEAM.
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 5: ANY
DAMAGE FOUND ON
THE MLG SUPPORT
BEAM OR ANY DAM-
AGE FOUND ON LOW-
ER STABILIZER
BRACE AS A RESULT
OF OPTION 1 OR OP-
TION 2 INSPECTIONS.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
(b) If OPTION 2 inspections have been previously accomplished at the same MLG Support Beam Lower
Stabilizer Brace AFT Fitting location at any time, the following repeat interval (not to exceed) must be
used: 3,000 flight cycles or 10,000 flight hours, whichever occurs first.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
12 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 13

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections and
Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 800 flight cycles after the
Original Issue date of Require-
ments Bulletin 777-57A0128
RB.
OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes with greater
than or equal to 25,000 to-
tal flight cycles or greater
than or equal to 90,000 to-
tal flight hours as of the
Original Issue date of Re-
quirements Bulletin 777-
57A0128 RB.
OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the left MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-Within 800 flight cycles after the
Original Issue date of Require-
ments Bulletin 777-57A0128
RB.
OPTION 2 (ACTION 1): Do
a DET of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
13 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 14

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections and
Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
5,000 flight cycles
or 20,000 flight
hours, whichever
occurs first. (b)
-CONDITION 6 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 6: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 1
INSPECTIONS.
CONDITION 6 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting and MLG
Support Beam for any crack.
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 6 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 6 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
14 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 15

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections and
Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 7 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 7: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 2
INSPECTIONS.
CONDITION 7 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
3,000 flight cycles
or 10,000 flight
hours, whichever
occurs first.
-CONDITION 7 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 7 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
-Before further flight.CONDITION 8 (ACTION 1):
Replace left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting.
CONDITION 8: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING AS
A RESULT OF OPTION 1
OR OPTION 2 INSPEC-
TIONS.
-At the times specified in Table
3.
CONDITION 8 (ACTION 2):
Do the actions specified in
Table 3.
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 9: ANY
CRACK FOUND DURING
OPEN HOLE HFEC IN-
SPECTION OF THE MLG
SUPPORT BEAM.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
15 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 16

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections and
Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 10: ANY
DAMAGE FOUND ON THE
MLG SUPPORT BEAM OR
ANY DAMAGE FOUND
ON LOWER STABILIZER
BRACE AS A RESULT OF
OPTION 1 OR OPTION 2
INSPECTIONS.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
(b) If OPTION 2 inspections have been previously accomplished at the same MLG Support Beam Lower
Stabilizer Brace AFT Fitting location at any time, the following repeat interval (not to exceed) must be
used: 3,000 flight cycles or 10,000 flight hours, whichever occurs first.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
16 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 17

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 16,000 flight cycles or
90,000 flight hours, whichever
occurs first, after the left MLG
Support Beam Lower Stabilizer
Brace AFT Fitting replacement.
OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes that have
done the MLG Support
Beam Lower Stabilizer
Brace AFT Fitting Replace-
ment.
OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the left MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-Within 16,000 flight cycles or
90,000 flight hours, whichever
occurs first, after the left MLG
Support Beam Lower Stabilizer
Brace AFT Fitting replacement.
OPTION 2 (ACTION 1): Do
a DET of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
17 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 18

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
5,000 flight cycles
or 20,000 flight
hours, whichever
occurs first. (b)
-CONDITION 11 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 11: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 1
INSPECTIONS.
CONDITION 11 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting and MLG
Support Beam for any crack.
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 11 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 11 OPTION 2
(ACTION 2): Do an UT in-
spection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
18 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 19

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 12 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 12: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 2
INSPECTIONS.
CONDITION 12 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
3,000 flight cycles
or 10,000 flight
hours, whichever
occurs first.
-CONDITION 12 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
CONDITION 12 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 13: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING OR
MLG SUPPORT BEAM OR
ANY DAMAGE FOUND
ON THE MLG SUPPORT
BEAM OR LOWER STABI-
LIZER BRACE AS A RE-
SULT OF OPTION 1 OR
OPTION 2 INSPECTIONS.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
19 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 20

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
(b) If OPTION 2 inspections have been previously accomplished at the same MLG Support Beam Lower
Stabilizer Brace AFT Fitting location at any time, the following repeat interval (not to exceed) must be
used: 3,000 flight cycles or 10,000 flight hours, whichever occurs first.
Table 4: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 1,600
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 777-
57A0128 RB.
Before 16,000
total flight cycles
or 90,000 total
flight hours,
whichever oc-
curs first.
OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the right MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes with less
than 25,000 total flight
cycles and less than
90,000 total flight hours
as of the Original Issue
date of Requirements
Bulletin 777-57A0128
RB.
OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
and MLG Support Beam for
any crack.
-Within 1,600
flight cycles af-
ter the Original
Issue date of
Requirements
Bulletin 777-
57A0128 RB.
Before 16,000
total flight cycles
or 90,000 total
flight hours,
whichever oc-
curs first.
OPTION 2 (ACTION 1): Do
a DET of the right MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting for
any crack and the MLG
Support Beam and Lower
Stabilizer Brace for any
damage. (a)
OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
20 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 21

Table 4: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
5,000 flight cycles
or 20,000 flight
hours, whichever
occurs first. (b)
-CONDITION 14 OPTION 1
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 14: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 1 INSPECTIONS.
-CONDITION 14 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the right MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 14 OPTION 2
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 14 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
21 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 22

Table 4: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 15 OPTION 1
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 15: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 2 INSPECTIONS.
-Within 3,000 flight cycles or
10,000 flight hours, whichever oc-
curs first.
CONDITION 15 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the right MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
3,000 flight cycles
or 10,000 flight
hours, whichever
occurs first.
-CONDITION 15 OPTION 2
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
-CONDITION 15 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
right MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
-Before further flight.CONDITION 16 (ACTION 1):
Replace right MLG Support
Beam Lower Stabilizer Brace
AFT Fitting.
CONDITION 16: ANY
CRACK FOUND ON
THE MLG SUPPORT
BEAM LOWER STABI-
LIZER BRACE AFT FIT-
TING AS A RESULT OF
OPTION 1 OR OPTION
2 INSPECTIONS.
-At the times specified in Table 6.CONDITION 16 (ACTION 2):
Do the actions specified in
Table 6.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
22 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 23

Table 4: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time (Whichever
Occurs Later)
ActionCondition
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 17: ANY
CRACK FOUND DUR-
ING OPEN HOLE HFEC
INSPECTION OF THE
MLG SUPPORT BEAM.
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 18: ANY
DAMAGE FOUND ON
THE MLG SUPPORT
BEAM OR ANY DAM-
AGE FOUND ON LOW-
ER STABILIZER
BRACE AS A RESULT
OF OPTION 1 OR OP-
TION 2 INSPECTIONS.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
(b) If OPTION 2 inspections have been previously accomplished at the same MLG Support Beam Lower
Stabilizer Brace AFT Fitting location at any time, the following repeat interval (not to exceed) must be
used: 3,000 flight cycles or 10,000 flight hours, whichever occurs first.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
23 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 24

Table 5: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 800 flight cycles after the
Original Issue date of Require-
ments Bulletin 777-57A0128
RB.
OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the right MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes with greater
than or equal to 25,000 to-
tal flight cycles or greater
than or equal to 90,000 to-
tal flight hours as of the
Original Issue date of Re-
quirements Bulletin 777-
57A0128 RB.
OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
and MLG Support Beam for
any crack.
-Within 800 flight cycles after the
Original Issue date of Require-
ments Bulletin 777-57A0128
RB.
OPTION 2 (ACTION 1): Do
a DET of the right MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting for
any crack and the MLG
Support Beam and Lower
Stabilizer Brace for any
damage. (a)
OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
24 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 25

Table 5: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
5,000 flight cycles
or 20,000 flight
hours, whichever
occurs first. (b)
-CONDITION 19 OPTION 1
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 19: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 1
INSPECTIONS.
CONDITION 19 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the right MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 19 OPTION 2
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 19 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
25 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 26

Table 5: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 20 OPTION 1
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 20: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 2
INSPECTIONS.
CONDITION 20 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the right MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
3,000 flight cycles
or 10,000 flight
hours, whichever
occurs first.
-CONDITION 20 OPTION 2
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 20 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
right MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
-Before further flight.CONDITION 21 (ACTION 1):
Replace right MLG Support
Beam Lower Stabilizer Brace
AFT Fitting.
CONDITION 21: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING AS
A RESULT OF OPTION 1
OR OPTION 2 INSPEC-
TIONS.
-At the times specified in Table
6.
CONDITION 21 (ACTION 2):
Do the actions specified in
Table 6.
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 22: ANY
CRACK FOUND DURING
OPEN HOLE HFEC IN-
SPECTION OF THE MLG
SUPPORT BEAM.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
26 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 27

Table 5: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 23: ANY
DAMAGE FOUND ON THE
MLG SUPPORT BEAM OR
ANY DAMAGE FOUND
ON LOWER STABILIZER
BRACE AS A RESULT OF
OPTION 1 OR OPTION 2
INSPECTIONS.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
(b) If OPTION 2 inspections have been previously accomplished at the same MLG Support Beam Lower
Stabilizer Brace AFT Fitting location at any time, the following repeat interval (not to exceed) must be
used: 3,000 flight cycles or 10,000 flight hours, whichever occurs first.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
27 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 28

Table 6: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replace-
ment Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 16,000 flight cycles or
90,000 flight hours, whichever
occurs first, after the right MLG
Support Beam Lower Stabilizer
Brace AFT Fitting replacement.
OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the right MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes that have
done the MLG Support
Beam Lower Stabilizer
Brace AFT Fitting Replace-
ment.
OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
and MLG Support Beam for
any crack.
-Within 16,000 flight cycles or
90,000 flight hours, whichever
occurs first, after the right MLG
Support Beam Lower Stabilizer
Brace AFT Fitting replacement.
OPTION 2 (ACTION 1): Do
a DET of the right MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting for
any crack and the MLG
Support Beam and Lower
Stabilizer Brace for any
damage. (a)
OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
28 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 29

Table 6: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replace-
ment Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
5,000 flight cycles
or 20,000 flight
hours, whichever
occurs first. (b)
-CONDITION 24 OPTION 1
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 24: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 1
INSPECTIONS.
CONDITION 24 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the right MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 24 OPTION 2
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 24 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the right
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
29 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 30

Table 6: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replace-
ment Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 3,000 flight cycles or
10,000 flight hours, whichever
occurs first.
CONDITION 25 OPTION 1
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 25: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 2
INSPECTIONS.
CONDITION 25 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the right MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
3,000 flight cycles
or 10,000 flight
hours, whichever
occurs first.
-CONDITION 25 OPTION 2
(ACTION 1): Repeat the
DET of the right MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
CONDITION 25 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
right MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
-Before further flight.Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 26: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING OR
MLG SUPPORT BEAM OR
ANY DAMAGE FOUND
ON THE MLG SUPPORT
BEAM OR LOWER STABI-
LIZER BRACE AS A RE-
SULT OF OPTION 1 OR
OPTION 2 INSPECTIONS.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
30 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 31

Table 6: Right Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replace-
ment Inspections
Repeat Interval
(Not to Exceed)
Boeing Recommended
Compliance Time
ActionCondition
(b) If OPTION 2 inspections have been previously accomplished at the same MLG Support Beam Lower
Stabilizer Brace AFT Fitting location at any time, the following repeat interval (not to exceed) must be
used: 3,000 flight cycles or 10,000 flight hours, whichever occurs first.
4. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA) approved for all EASA approved airplanes listed in the Requirements
Bulletin effectivity. This document and its approval were based on the airplane in its original Boeing delivery
configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
31 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 32

Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
32 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT
BLANK PAGE

### Page 33

5.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate
Service Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated
by an Airworthiness Directive (AD), then all applicable requirements specified in the
RB must be done. In the RB, the "Refer to the listed procedures..." column of the
table(s) in the Work Instructions is for reference only. The procedures in that column
are not required by the AD and are for guidance only. For the related SB, some
locations are marked RC Start and RC End to identify the requirements that are
restated from the RB. For the related SB, the areas between RC Start and RC End,
including sub-steps and any figures identified between RC Start and RC End, must
be done to comply with the AD. Therefore, an Alternative Method of Compliance
(AMOC) is required for any deviations to steps between RC Start and RC End,
including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance
with the operator's maintenance or inspection program without obtaining approval
of an AMOC; this is provided that the steps between RC Start and RC End, including
sub-steps and identified figures, can still be done as specified, and the airplane can
be put back in an airworthy condition. Figures not required for compliance are omitted
from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes
used to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure
that the information between "RC Start" and "RC End" in the SB are identical to the
information in the same sections (Compliance, Work Instructions...) of the RB which
the SB refers to as the related document.
3. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
4. Boeing Service Letter 777-SL-51-013, Damage Reporting and Repair Plan/Design
Guidelines, is an acceptable procedure to request information from Boeing for
additional structural repair instructions. The Service Letter describes what information
must be provided to Boeing before a structural repair can be provided.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque Values:
— Values for structural fasteners are given in 777 Structural Repair Manual,
Chapter 51.
— Values for airframe maintenance tasks are included in Chapter 20 of 777
Aircraft Maintenance Manual (AMM).
— Values for electrical maintenance tasks are included in Chapter 20 of
Standard Wiring Practices Manual (SWPM).
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
33 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 34

— Values for engine maintenance tasks are included in Chapter 70 of 777
Aircraft Maintenance Manual (AMM).
— Non-standard torque values for maintenance tasks are included in the
applicable installation step.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. Where the work instructions include installation of a kept part, a new or serviceable
part with the same part number can be installed as an alternative to the kept part.
8. If it is necessary to remove more parts for access, you can remove those parts. If
you can get access without removing identified parts, it is not necessary to remove
all of the identified parts. Jacking and shoring limitations must be observed.
9. Use the approved fastener, process and material substitutions in accordance with
SRM Chapter 51.
10. A Detailed Inspection (DET) is defined as: An intensive examination of a specific
item, installation or assembly to detect damage, failure or irregularity. This could
include tactile assessment in which a component or assembly can be checked for
tightness/security. Available lighting is normally supplemented with a direct source
of good lighting at an intensity deemed appropriate. Inspection aids such as mirrors
and magnifying lenses may be necessary. Surface cleaning and elaborate access
procedures may be required.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION or an OPTION,
do all of the ACTION numbers for that CONDITION or OPTION.
12. The instructions in Work Instructions and the figures can include operation of tools
or test equipment. Boeing Engineering Tool Drawings, the Illustrated Tool and
Equipment Manual, and the Special Tool and Ground Handling Drawing Index contain
data on versions of the tools or test equipment that you can use. It is permitted to
use replaced tools. It is not permitted to use superseded tools.
13. If the length of any fastener specified in this service bulletin does not meet installation
standards given in SRM Chapter 51, then a fastener of the same specification, or
an approved substitute, with a length which meets the installation standards given
in SRM Chapter 51 may be used. In addition, washers may be installed for fastener
grip length in accordance with SRM Chapter 51. Refer to SOPM 20-50-01 for alternate
full threaded fasteners (screws) needed for installation in this service bulletin.
14. Use of colors in Figures is based on guidance from the ATA e-Business Program
(ATA) iSpec 2200.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
34 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 35

B. WORK INSTRUCTIONS
Actions Required for Compliance
1. Requirements.
Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 1: PREPARA-
TION.
-OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes with less
than 25,000 total flight
cycles and less than
90,000 total flight hours
as of the Original Issue
date of Requirements
Bulletin 777-57A0128
RB.
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the left MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-OPTION 2 (ACTION 1): Do
a DET of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
-FIGURE 1
-FIGURE 4OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
35 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 36

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 5: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER INSTALLATION.
--CONDITION 1: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 1 INSPECTIONS.
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS.
Do PART 10:
RESTORATION.
Do PART 1: PREPARA-
TION.
-CONDITION 1 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-CONDITION 1 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting and MLG
Support Beam for any crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-CONDITION 1 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-FIGURE 1
-FIGURE 4
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
36 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 37

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
CONDITION 1 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Do PART 10:
RESTORATION.
--CONDITION 2: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 2 INSPECTIONS.
Do PART 1: PREPARA-
TION.
-CONDITION 2 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-CONDITION 2 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-CONDITION 2 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-FIGURE 1
-FIGURE 4CONDITION 2 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
37 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 38

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 2: JACK THE
AIRPLANE. (If airplane is
not already on jacks)
-CONDITION 3 (ACTION 1):
Replace left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting.
CONDITION 3: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING AS
A RESULT OF OPTION
1 OR OPTION 2 INSPEC-
TIONS.
Do PART 7: TRUNNION
DOOR REMOVAL. (If
necessary to get better
access to replace left
MLG Support Beam
Lower Stabilizer Brace
AFT Fitting)
-Group 1: FIGURE 9
Group 2: FIGURE 10
Group 3: FIGURE 11
Group 4: FIGURE 12
Do PART 8: TRUNNION
DOOR INSTALLATION.
(If removed)
-
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS.
Do PART 10:
RESTORATION.
--CONDITION 3 (ACTION 2):
Do the actions specified in
Table 3.
--Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 4: ANY
CRACK FOUND DUR-
ING OPEN HOLE HFEC
INSPECTION OF THE
MLG SUPPORT BEAM. Do PART 9: LOWERTHE AIRPLANE OFF
JACKS. (If the airplane is
on jacks).
--
Do PART 10:
RESTORATION.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
38 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 39

Table 1: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
--Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 5: ANY
DAMAGE FOUND ON
THE MLG SUPPORT
BEAM OR ANY DAM-
AGE FOUND ON LOW-
ER STABILIZER BRACE
AS A RESULT OF OP-
TION 1 OR OPTION 2
INSPECTIONS.
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS. (If the airplane is
on jacks).
--
Do PART 10:
RESTORATION.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
39 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 40

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 1: PREPARA-
TION.
-OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes with greater
than or equal to 25,000
total flight cycles or
greater than or equal to
90,000 total flight hours
as of the Original Issue
date of Requirements
Bulletin 777-57A0128
RB.
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the left MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-OPTION 2 (ACTION 1): Do
a DET of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
-FIGURE 1
-FIGURE 4OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
40 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 41

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 5: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER INSTALLATION.
--CONDITION 6: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 1 INSPECTIONS.
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS.
Do PART 10:
RESTORATION.
Do PART 1: PREPARA-
TION.
-CONDITION 6 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-CONDITION 6 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting and MLG
Support Beam for any crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-CONDITION 6 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-FIGURE 1
-FIGURE 4
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
41 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 42

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
CONDITION 6 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Do PART 10:
RESTORATION.
--CONDITION 7: NO
CRACK FOUND AND
NO DAMAGE FOUND
AS A RESULT OF OP-
TION 2 INSPECTIONS.
Do PART 1: PREPARA-
TION.
-CONDITION 7 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-CONDITION 7 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-CONDITION 7 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-FIGURE 1
-FIGURE 4CONDITION 7 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
42 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 43

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 2: JACK THE
AIRPLANE. (If airplane is
not already on jacks)
-CONDITION 8 (ACTION 1):
Replace left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting.
CONDITION 8: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING AS
A RESULT OF OPTION
1 OR OPTION 2 INSPEC-
TIONS.
Do PART 7: TRUNNION
DOOR REMOVAL. (If
necessary to get better
access to replace left
MLG Support Beam
Lower Stabilizer Brace
AFT Fitting)
-Group 1: FIGURE 9
Group 2: FIGURE 10
Group 3: FIGURE 11
Group 4: FIGURE 12
Do PART 8: TRUNNION
DOOR INSTALLATION.
(If removed)
-
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS.
Do PART 10:
RESTORATION.
--CONDITION 8 (ACTION 2):
Do the actions specified in
Table 3.
--Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 9: ANY
CRACK FOUND DUR-
ING OPEN HOLE HFEC
INSPECTION OF THE
MLG SUPPORT BEAM. Do PART 9: LOWERTHE AIRPLANE OFF
JACKS. (If the airplane is
on jacks).
--
Do PART 10:
RESTORATION.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
43 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 44

Table 2: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Inspections
and Replacement
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
--Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 10: ANY
DAMAGE FOUND ON
THE MLG SUPPORT
BEAM OR ANY DAM-
AGE FOUND ON LOW-
ER STABILIZER BRACE
AS A RESULT OF OP-
TION 1 OR OPTION 2
INSPECTIONS.
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS. (If the airplane is
on jacks).
--
Do PART 10:
RESTORATION.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
44 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 45

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 1: PREPARA-
TION.
-OPTION 1 (ACTION 1): Do
a Detailed Inspection (DET)
of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
All Airplanes that have
done the MLG Support
Beam Lower Stabilizer
Brace AFT Fitting Replace-
ment.
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-OPTION 1 (ACTION 2): Do
an open hole High Frequen-
cy Eddy Current (HFEC) in-
spection of the upper and
lower flanges of the left MLG
Support Beam Lower Stabi-
lizer Brace AFT Fitting and
MLG Support Beam for any
crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-OPTION 2 (ACTION 1): Do
a DET of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting for any
crack and the MLG Support
Beam and Lower Stabilizer
Brace for any damage. (a)
-FIGURE 1
-FIGURE 4OPTION 2 (ACTION 2): Do
an Ultrasonic (UT) inspection
of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
45 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 46

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
Do PART 5: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER INSTALLATION.
--CONDITION 11: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 1
INSPECTIONS.
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS.
Do PART 10:
RESTORATION.
Do PART 1: PREPARA-
TION.
-CONDITION 11 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL
-CONDITION 11 OPTION 1
(ACTION 2): Repeat the
open hole HFEC inspection
of the upper and lower
flanges of the left MLG Sup-
port Beam Lower Stabilizer
Brace AFT Fitting and MLG
Support Beam for any crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-CONDITION 11 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-FIGURE 1
-FIGURE 4
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
46 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 47

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
CONDITION 11 OPTION 2
(ACTION 2): Do a UT inspec-
tion of the upper and lower
flange surfaces of the left
MLG Support Beam Lower
Stabilizer Brace AFT Fitting
for any crack.
Do PART 10:
RESTORATION.
--CONDITION 12: NO
CRACK FOUND AND NO
DAMAGE FOUND AS A
RESULT OF OPTION 2
INSPECTIONS.
Do PART 1: PREPARA-
TION.
-CONDITION 12 OPTION 1
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
Do PART 2: JACK THE
AIRPLANE.
-FIGURE 1
Do PART 3: LEFT MLG
SUPPORT BEAM LOW-
ER STABILIZER BRACE
AFT FITTING FASTEN-
ER REMOVAL.
-CONDITION 12 OPTION 1
(ACTION 2): Do an open
hole HFEC inspection of the
upper and lower flanges of
the left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting and MLG Support
Beam for any crack.
-FIGURE 3
Do PART 1: PREPARA-
TION.
-CONDITION 12 OPTION 2
(ACTION 1): Repeat the
DET of the left MLG Support
Beam Lower Stabilizer Brace
AFT Fitting for any crack and
the MLG Support Beam and
Lower Stabilizer Brace for
any damage. (a)
-FIGURE 1
-FIGURE 4CONDITION 12 OPTION 2
(ACTION 2): Repeat the UT
inspection of the upper and
lower flange surfaces of the
left MLG Support Beam
Lower Stabilizer Brace AFT
Fitting for any crack.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
47 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

### Page 48

Table 3: Left Main Landing Gear (MLG) Support Beam Lower Stabilizer Brace Aft Fitting Post-Replacement
Inspections
Refer to the listed pro-
cedures in SB 777-
57A0128 Original Issue
or later approved revi-
sions as an accepted
procedure
Method of ComplianceActionCondition
--Contact The Boeing Compa-
ny for repair instructions and
do the repair.
CONDITION 13: ANY
CRACK FOUND ON THE
MLG SUPPORT BEAM
LOWER STABILIZER
BRACE AFT FITTING OR
MLG SUPPORT BEAM OR
ANY DAMAGE FOUND
ON THE MLG SUPPORT
BEAM OR LOWER STABI-
LIZER BRACE AS A RE-
SULT OF OPTION 1 OR
OPTION 2 INSPECTIONS.
Do PART 9: LOWER
THE AIRPLANE OFF
JACKS. (If the airplane is
on jacks).
--
Do PART 10:
RESTORATION.
(a) Damage is defined as any abrasion, dent, scratch, gouge, nick or corrosion in the metallic structure.
Export Controlled ECCN: 9E991
See page 1 for details
Original Issue: June 02, 2025
777-57A0128 RB
48 of 144
REQUIREMENTS BULLETIN 777-57A0128
ALERTALERT

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
