# Boeing Alert Service Bulletin 777-78A0066: Revision 3

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2019-0602; AD 2020-05-24 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Alert Service Bulletin 777-78A0066](https://openairdocs.org/service-documents/boeing/777-78a0066.md)
- Title as filed: SB-777-78A0066 Rev3
- Pages: 61
- PDF: https://openairdocs.org/files/sha256/34/c9/34c95808c7dc2fdd592501a61a134787de4a6d092ae8418971d5498ddf7301d8
- Page: https://openairdocs.org/service-documents/boeing/777-78a0066/file/34c95808c7dc

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

Commercial 
Airplanes
777
Service Bulletin
Number: 777-78A0066
Original Issue: June 05, 2008
Revision 3: April 28, 2011
ATA System: 7831
SUBJECT: EXHAUST (GE90 Engine) - Thrust Reverser System - Latch Beam Firewall - Install
Insulation Blanket
Export of this technology is controlled under the United States Export Administration Regulations (EAR) (15
CFR 730-774). An export license may be required before it is used for development, production or use by foreign
persons from specific countries. The controller of this data has the individual responsibility to abide by all export
laws.
9E991ECCN:
BOEING PROPRIETARY, CONFIDENTIAL, AND/OR TRADE SECRET
Copyright © 2008 The Boeing Company
Unpublished Work - All Rights Reserved
Boeing claims copyright in each page of this document only to the extent that the page contains copyrightable
subject matter. Boeing also claims copyright in this document as a compilation and/or collective work.
This document includes proprietary information owned by The Boeing Company and/or one or more third parties.
Treatment of the document and the information it contains is governed by contract with Boeing. For more
information, contact The Boeing Company, P.O. Box 3707, Seattle, Washington 98124.
Boeing, the Boeing signature, the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner,
BBJ, DC-8, DC-9, DC-10, KC-10, KDC-10, MD-10, MD-11, MD-80, MD-88, MD-90, P-8A, Poseidon and the
Boeing livery are all trademarks owned by The Boeing Company; and no trademark license is granted in
connection with this document unless provided in writing by Boeing.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
1 of 61
4.0

### Page 2

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
2 of 61
BOEING SERVICE BULLETIN 777-78A0066
BLANK PAGE

### Page 3

Table of Contents
Revision Transmittal Sheet ............................................ 5
Summary ...................................................... 7
1. PLANNING INFORMATION ........................................ 1 1
A. Effectivity ............................................... 1 1
1. Airplanes ............................................ 1 1
2. Spares Affected ........................................ 1 2
B. Concurrent Requirements ...................................... 1 2
C. Reason ................................................ 1 2
D. Description .............................................. 1 3
E. Compliance .............................................. 1 4
F. Approval ............................................... 1 5
G. Manpower .............................................. 1 5
H. Weight and Balance Changes .................................... 1 6
I. Electrical Load Data ......................................... 1 7
J. References .............................................. 1 7
1. Existing Data: ......................................... 1 7
2. Data supplied with this Service Bulletin: ........................... 1 7
3. Installation Drawings Used in the Preparation of this Service Bulletin: ........... 1 7
K. Publications Affected ........................................ 1 7
L. Interchangeability and Intermixability of Parts ........................... 1 8
2. MATERIAL INFORMATION ........................................ 1 9
A. Material - Price and Availability ................................... 1 9
B. Industry Support Information .................................... 2 0
C. Parts Necessary For Each Airplane ................................. 2 0
1. Kits/Parts: ........................................... 2 0
2. Parts and Materials Supplied by the Operator: ........................ 2 2
3. Parts Modified and Reidentified: ............................... 2 2
4. Parts Removed and Not Replaced: .............................. 2 2
D. Parts Necessary to Change Spares ................................. 2 2
E. Special Tooling - Price and Availability ............................... 2 3
F. Special Tooling Necessary to do this Service Bulletin ....................... 2 3
3. ACCOMPLISHMENT INSTRUCTIONS .................................. 2 5
A. GENERAL INFORMATION ..................................... 2 5
B. WORK INSTRUCTIONS ....................................... 2 6
FIGURE 1: THRUST REVERSER - LATCH BEAM - REMOVE AFT INSULATION BLANKET AND
INSULATION FOAM [Group 1] ................................ 2 8
FIGURE 2: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION [Group
1 ]  ................................................ 3 0
FIGURE 3: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION [Group
1 ]  ................................................ 3 4
FIGURE 4: THRUST REVERSER - LATCH BEAM - INSPECTION AND INSULATION FOAM REMOVAL
[Group 2] ............................................ 3 8
FIGURE 5: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION [Group
2 ]  ................................................ 4 1
FIGURE 6: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
[Group 2] ............................................ 4 5
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
3 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 4

FIGURE 7: RIGHT SIDE T/R HALF, AFT LATCH BEAM - FITTING ASSEMBLY MODIFICATION [Group 2,
Configuration 2] ......................................... 4 9
FIGURE 8: LEFT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
[Group 2] ............................................ 5 2
FIGURE 9: RIGHT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
[Group 2] ............................................ 5 6
Appendix A: COMPOSITE STUD - ADHESIVE BONDED INSTALLATION ................ 6 0
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
4 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 5

Commercial 
Airplanes
777
Service Bulletin
Revision Transmittal SheetNumber: 777-78A0066Original Issue: June 05, 2008
Revision 3: April 28, 2011
ATA System: 7831
SUBJECT: EXHAUST (GE90 Engine) - Thrust Reverser System - Latch Beam Firewall - Install
Insulation Blanket
This revision includes all pages of the service bulletin.
COMPLIANCE INFORMATION RELATED TO THIS REVISION
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-26-01 is related to this service bulletin.
More work is necessary on Group 2 airplanes changed as shown in the Original Issue, Revision 1 or Revision
2 of this service bulletin.
REASON FOR REVISION
This revision is sent to move certain airplanes from Group 1 to Group 2. For Group 2 airplanes, instructions are
added to install a new bracket and nutplate necessary for the installation of the forward insulation blanket. Also,
Group 2 airplanes will do a general visual inspection for the presence of a fitting assembly on the aft latch beam
of the right thrust reverser (T/R) half and take necessary action prior to installation of the aft insulation blanket.
These sections were changed:
1. In Paragraph 1.A.1., Airplanes - Airplanes with variable numbers WB010-WB013, WB123-WB125, WB271,
WB276-WB285, WB306-WB307 and WB336 are moved from Group 1 to Group 2.
2. In Summary Action and Paragraph 1.D. Description, Group 2 instructions changed to address new work.
3. In Paragraph 1.E. Compliance, added reference to Airworthiness Directive 2010-26-01.
4. In Paragraph 1.G. Manpower, data has changed.
5. In Paragraph 1.H. Weight and Balance Changes, data has changed.
6. In Paragraph 1.J. References, added reference to AD 2010-26-01.
7. In Paragraph 2.A., Material - Price and Availability, Supplemental kit and replacement kit for Group 2
airplanes are added. Revised price information.
8. In Paragraph 2.C., Parts Necessary for Each Airplane, a supplemental kit and replacement kit for Group 2
airplanes are added.
9. In Paragraph 3.B., Work Instructions, Group 2 work instructions are changed to include new bracket and
nutplate installation and inspection for fitting assembly.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
5 of 61

### Page 6

10. In Figure 4 a general visual inspection is added to determine if fitting assembly is installed on the aft latch
beam of the right side T/R half.
11. In Figure 5, changed quantities to delete excess fasteners and added optional washer part number.
12. In Figure 6, added optional washer part number.
13. Added new Figure 7 to cut the clevis from existing fitting assembly on the aft latch beam of the right side
T/R half, for Group 2, Configuration 2 airplanes.
14. Added new Figure 8 to install bracket assembly and nut plate on left T/R half, for Group 2 airplanes.
15. Added new Figure 9 to install bracket assembly and nut plate on right T/R half, for Group 2 airplanes.
The data given in Information Notice 777-78A0066 IN 02 is included in this revision.
Vertical lines are put on the left edge of each page, except in Paragraph 1.A., Effectivity, to show the location
of important changes.
Pages with no vertical lines have no important changes.
REVISION HISTORY
June 05, 2008Original Issue:
March 12, 2009Revision 1:
April 08, 2010Revision 2:
April 28, 2011Revision 3:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
6 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 7

Commercial 
Airplanes
777
Service Bulletin
SummaryNumber: 777-78A0066Original Issue: June 05, 2008
Revision 3: April 28, 2011
ATA System: 7831
SUBJECT: EXHAUST (GE90 Engine) - Thrust Reverser System - Latch Beam Firewall - Install
Insulation Blanket
CONCURRENT REQUIREMENTS
None.
BACKGROUND
This service bulletin tells the operator to add a thermal insulation blankets, and attachments, to the rear section
of the latch beam of each Thrust Reverser (T/R) half. This change will make sure that a fire can not breach the
bolt-on aluminum plate at the rear of the latch beam and move into the transcowl cavity. A fire that is not contained
could move to other cowl or strut areas. This could cause weakened structural pieces of the T/R to separate in
flight, with the result of a damaged airplane or injury to persons on the ground.
An operator performed an In Flight Shut Down (IFSD) because of an engine fire indication. An air turn back and
satisfactory landing was completed without incident. An under cowl engine fire was put out on the ground. The
cause was determined to be an uncontained failure of the starter in the engine core compartment, which
progressed into the latch beam cavity fuelled by oil supplied by a damaged Integrated Drive Generator (IDG)
oil line. The fire breached the bolt-on aluminum plate on the rear of the latch beam fire wall and moved inside
the translating sleeve. This caused damage to inner and outer walls of the T/R translating sleeve. Installation
of a thermal insulation blanket over the bolt-on aluminum plate area at the rear of the latch beam will protect
this area of the firewall so that it is not breached by a fire. This retrofit is not necessary on T/Rs after airplane
line 413, because of a design change. The design change to the T/R, integrated the bolt on the aluminum plate
area into the main latch beam casting and incorporated thermal insulation blankets across the area.
Boeing Service Related Problem (SRP) 777-SRP-78-0059 is related to this service bulletin.
ACTION (PRR 62777-57RS)
Open a T/R and accomplish the work below:
Group 1:
1. Remove and keep the existing latch beam insulation blanket.
2. Remove insulation foam on the aft fire wall.
3. Install bonded studs on fire wall.
4. Install new thermal insulation blanket on fire wall.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
7 of 61

### Page 8

5. Install removed latch beam insulation blanket.
6. Apply sealant around new thermal insulation blanket.
7. Repeat the work for the opposite T/R. Close the T/R when the work is complete.
NOTE: Service Bulletin 777-24-0058 which installs a check valve in the IDG oil supply should also be
done. The bulletin addresses the potential event of failure of the oil supply line, stopping the flow
of oil which can help feed a fire in the area of the IDG.
Group 2:
1. Inspect for fitting on right T/R half and remove insulation foam on the aft fire wall of both left and right T/R
halves.
2. If necessary, remove clevis from fitting on right T/R half aft firewall.
3. Install brackets and nutplate to support forward blanket assembly.
4. Install bonded studs on fire wall.
5. Install new thermal insulation blanket on fire wall.
6. Install new latch beam insulation blanket.
7. Apply sealant around new thermal insulation blanket.
8. Repeat the work for the opposite T/R. Close the T/R when the work is complete.
NOTE: Service Bulletin 777-24-0058 which installs a check valve in the IDG oil supply should also be
done. The bulletin addresses the potential event of failure of the oil supply line, stopping the flow
of oil which can help feed a fire in the area of the IDG.
EFFECTIVITY
777-200 Airplanes with GE-90 engines. Refer to Paragraph 1.A.1., Airplanes for the list of affected airplanes.
COMPLIANCE
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-26-01 is related to this service bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months or 4,500 flight cycles
after the effective date of AD 2010-26-01.
INDUSTRY SUPPORT INFORMATION
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
8 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 9

MANPOWER
Group 1:
EACH ENGINE
Elapsed HoursTotal Task Hours
7.507.50
Group 2, Configuration 1:
EACH ENGINE
Elapsed HoursTotal Task Hours
10.5010.50
Group 2, Configuration 2:
EACH ENGINE
Elapsed HoursTotal Task Hours
12.7512.75
MATERIAL INFORMATION
Boeing Supplied Kits/Parts.
Refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
9 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 10 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
RIGHT LATCH BEAM
SEE
LEFT LATCH BEAM  GROUP 2 AIRPLANES.
SEE  INSPECT FOR FITTING
ASSEMBLY. REMOVE
CLEVIS IF NECESSARY.
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
REMOVE INSULATION
FOAM. INSTALL
BONDED STUDS,
NEW INSULATION
BLANKET AND
SEALANT.
GROUP 2 AIRPLANES:
INSTALL NEW BRACKET  LATCH ACCESS DOOR
FWD <  AND INSULATION
BLANKET
RIGHT LATCH BEAM SHOWN
LEFT LATCH BEAM SIMILAR
1493858
Original Issue: June 05, 2008
Revision 3: April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  10 of 61

### Page 11

Commercial 
Airplanes
777
Service Bulletin
Number: 777-78A0066
Original Issue: June 05, 2008
Revision 3: April 28, 2011
ATA System: 7831
SUBJECT: EXHAUST (GE90 Engine) - Thrust Reverser System - Latch Beam Firewall - Install
Insulation Blanket
1.    PLANNING INFORMATION
A. Effectivity
1. Airplanes
Refer to Service Bulletin Index Document D624W001 Part 3 for Airplane Variable Number, Line
Number, and Serial Number data.
This service bulletin is for the airplanes shown below. Refer to PRR 62777-57RS for data about
this change.
DESCRIPTIONCONFIGURATIONGROUP
All 777-200 airplanes with GE90 engines through line number 413
with a forward insulation blanket.
-1
All 777-200 airplanes with GE90 engines through line number 413
without a forward insulation blanket.
-2
All 777-200 airplanes with GE90 engines through line number 413
without a forward insulation blanket and without the fitting assembly
at the aft insulation blanket location.
1
All 777-200 airplanes with GE90 engines through line number 413
without a forward insulation blanket and with the fitting assembly at
the aft insulation blanket location.
2
Airplane Models:
777-200
GroupVariable Number
2WA076 - WA080
2WA116 - WA119
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
11 of 61

### Page 12

GroupVariable Number
2WB001 - WB013
1WB014 - WB021
2WB121 - WB125
2WB271
1WB272 - WB273
2WB276 - WB285
1WB286
1WB291 - WB302
2WB306 - WB307
2WB311 - WB313
1WB314 - WB335
2WB336
1WB337
1WB341 - WB342
1WB371 - WB388
1WB406
1WB411 - WB413
1WB476
1WC241
1WC281
2. Spares Affected
Spare Thrust Reversers (T/R) are affected. Refer to Paragraph 2.C., Parts Necessary for Each
Airplane, for parts necessary to change spares.
B. Concurrent Requirements
None.
C. Reason
This service bulletin tells the operator to add a thermal insulation blankets, and attachments, to the
rear section of the latch beam of each Thrust Reverser (T/R) half. This change will make sure that a
fire can not breach the bolt-on aluminum plate at the rear of the latch beam and move into the transcowl
cavity. A fire that is not contained could move to other cowl or strut areas. This could cause weakened
structural pieces of the T/R to separate in flight, with the result of a damaged airplane or injury to
persons on the ground..
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
12 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 13

An operator performed an In Flight Shut Down (IFSD) because of an engine fire indication. An air turn
back and satisfactory landing was completed without incident. An under cowl engine fire was put out
on the ground. The cause was determined to be an uncontained failure of the starter in the engine core
compartment, which progressed into the latch beam cavity fuelled by oil supplied by a damaged
Integrated Drive Generator (IDG) oil line. The fire breached the bolt-on aluminum plate on the rear of
the latch beam fire wall and moved inside the translating sleeve. This caused damage to inner and
outer walls of the T/R translating sleeve. Installation of a thermal insulation blanket over the bolt-on
aluminum plate area at the rear of the latch beam will protect this area of the firewall so that it is not
breached by a fire. This retrofit is not necessary on T/Rs after airplane line 413, because of a design
change. The design change to the T/R, integrated the bolt on the aluminum plate area into the main
latch beam casting and incorporated thermal insulation blankets across the area.
Boeing Service Related Problem (SRP) 777-SRP-78-0059 is related to this service bulletin.
Revision 1 is sent to change the assigned grouping of three airplanes that were assigned to the incorrect
group in the original issue of this service bulletin. Also, the Summary illustration and Figures 1 thru 6
are corrected to show and accurate view of the lower attachment points for insulation blanket assemblies
315W1654-31 and 315W1654-32.
Revision 2 is sent to add airplanes that were inadvertantly omitted in the original issue of this service
bulletin, to change information in the compliance section, and to add an optional instruction to mark
the thrust reverser identification plate.
Revision 3 is sent to move certain airplanes from Group 1 to Group 2. For Group 2 airplanes, instructions
are added to install a new bracket and nutplate necessary for the installation of the forward insulation
blanket. Also, Group 2 airplanes will do a general visual inspection for the presence of a fitting assembly
on the aft latch beam of the right thrust reverser (T/R) half and take necessary action prior to installation
of the aft insulation blanket.
The data given in Information Notice 777-78A0066 IN 02 is included in this revision.
D. Description
Open a T/R and accomplish the work below.
Group 1:
1. Remove and keep the existing latch beam insulation blanket.
2. Remove insulation foam on the aft fire wall.
3. Install bonded studs on fire wall.
4. Install new thermal insulation blanket on fire wall.
5. Install removed latch beam insulation blanket.
6. Apply sealant around new thermal insulation blanket.
7. Repeat the work for the opposite T/R. Close the T/R when the work is complete.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
13 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 14

NOTE: Service Bulletin 777-24-0058 which installs a check valve in the IDG oil supply should
also be done. The bulletin addresses the potential event of failure of the oil supply line,
stopping the flow of oil which can help feed a fire in the area of the IDG.
Group 2:
1. Inspect for fitting on right T/R half and remove insulation foam on the aft fire wall of both left and
right T/R halves.
2. If necessary, remove clevis from fitting on right T/R half aft firewall.
3. Install brackets and nutplate to support forward blanket assembly.
4. Install bonded studs on fire wall.
5. Install new thermal insulation blanket on fire wall.
6. Install new latch beam insulation blanket.
7. Apply sealant around new thermal insulation blanket.
8. Repeat the work for the opposite T/R. Close the T/R when the work is complete.
NOTE: Service Bulletin 777-24-0058 which installs a check valve in the IDG oil supply should
also be done. The bulletin addresses the potential event of failure of the oil supply line,
stopping the flow of oil which can help feed a fire in the area of the IDG.
Revision 3 - More work is necessary on Group 2 airplanes changed as shown in the original issue,
Revision 1, or Revision 2 of this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
415, 416, 425, 426777-200
E. Compliance
Federal Aviation Administration (FAA) Airworthiness Directive AD 2010-26-01 is related to this service
bulletin.
Boeing recommends that the change given in this service bulletin be done within 60 months or 4,500
flight cycles after the effective date of AD 2010-26-01.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
14 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 15

F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
In addition, the Manager of the FAA Seattle Aircraft Certification Office approves the accomplishment
of the modification and inspection defined in this service bulletin as an alternative method of compliance
with paragraph (g) of AD 2010-26-01. All provisions of AD 2010-26-01 that are not specifically referenced
in the above statement remain fully applicable and must be complied with accordingly.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do this service bulletin for each
engine. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate with
operator task hour data if necessary. The estimate does not include lost time. These are some examples
of lost time:
— Time to adjust to the workplace
— Time to schedule the work
— Time to inspect the work
— Time to cure the materials
— Time to make the parts
— Time to find the tools.
Group 1:
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access
1.001.001Figure 1
2.752.751Figure 2
2.752.751Figure 3
0.500.501Close Access
7.507.50TOTAL FOR EACH ENGINE
Group 2, Configuration 1:
Elapsed HoursTask HoursNumber of Per-
sons
Task
0.500.501Open Access
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
15 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 16

Group 2, Configuration 1:
Elapsed HoursTask HoursNumber of Per-
sons
Task
1.001.001Figure 4
2.752.751Figure 5
2.752.751Figure 6
1.501.501Figure 8
1.501.501Figure 9
0.500.501Close Access
10.5010.50TOTAL FOR EACH ENGINE
Group 2, Configuration 2:
Elapsed HoursTask HoursNumber of PersonsTask
0.500.501Open Access
1.001.001Figure 4
2.752.751Figure 5
2.752.751Figure 6
2.252.251Figure 7
1.501.501Figure 8
1.501.501Figure 9
0.500.501Close Access
12.7512.75TOTAL FOR EACH ENGINE
H. Weight and Balance Changes
Group 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+ 3431.7+ 3.2For Each Engine
Group 2, Configuration 1:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+ 5473.7 Ib-in+ 4.3 lbsFor Each Engine
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
16 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 17

Group 2, Configuration 2:
Change in Moment
(Pound-Inches)
Change in Weight
(Pounds)
Airplane
+ 4509.4 lb-in+ 4.2 lbsFor Each Engine
I. Electrical Load Data
Not changed.
J. References
1. Existing Data:
a. Engineering Change Memo PRR 62777-57RS
b. FAA Airworthiness Directive AD 2010-26-01.
c. Standard Overhaul Practices Manual (SOPM) 20-30-03, 20-41-02, 20-50-10, 20-50-12,
20-50-19
d. 777 Aircraft Maintenance Manual (AMM) 78-31-00
e. Boeing Drawing 012W6100
f. Boeing Parts Standards Document D-590
g. Service Related Problem (SRP) 777-SRP-78-0059
2. Data supplied with this Service Bulletin:
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin:
None.
K. Publications Affected
1. Publications:
Chapter-SectionPublication
78-31777 Maintenance Manual
78-31777 Illustrated Parts Catalog
78-31Component Maintenance Manual
2. Damage Tolerance Based Structural Inspections:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
17 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 18

Boeing has evaluated the repairs and/or changes in this service bulletin for effects on Fatigue
Critical Structure (FCS) and for changes to Damage Tolerance Inspections (DTI) required in the
Maintenance Program. This service bulletin does not affect FCS, therefore DTIs are not necessary.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
18 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 19

2.    MATERIAL INFORMATION
A. Material - Price and Availability
Boeing can supply the kits shown in Paragraph 2.C., Parts Necessary for Each Airplane, and Paragraph
2.D., Parts Necessary to Change Spares operators are encouraged to share schedule requirements
with Boeing for incorporation of the service bulletin. The kits are subject to the terms and conditions of
the Boeing standard purchase order acknowledgment. Prices are in United States Dollars. Terms: Net
30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or The Boeing PART Page
2. Fax to (206) 662-7145
Group 1:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 03
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 03 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$5,214151Top Kit - GE90 Latch Beam Insulation Blan-
ket
005W3346-1
Group 2:
Unit PriceROLT (Weeks)NameKit Number
Not ApplicableInactiveTop Kit - GE90 Latch Beam Insulation Blan-
ket
005W3346-4 (a)
(a) This kit is inactive for future procurement. Group 2 operators with the 005W3346-4 kit will need to order
supplemental kit 005W3346-5.
Group 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 03
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 03 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$7,529151Top Kit - GE90 Latch Beam Insulation Blan-
ket
005W3346-6 (a)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
19 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 20

Group 2:
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPONDER
AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFORMATION
Unit Price as of
the Revision 03
date of this Ser-
vice Bulletin (US
Dollars)
ROLT as of the
Revision 03 date
of this Service
Bulletin (Calendar
Days)
NameKit Number
$569151Supplemental Kit - GE90 Latch Beam Insu-
lation Blanket
005W3346-5 (b)
(a) Replacement kit for the Top Kit 005W3346-4
(b) Supplemental kit for the Top Kit 005W3346-4. Group 2 operators with the 005W3346-4 kit will need to
order supplemental kit 005W3346-5.
B. Industry Support Information
Boeing warranty remedies are not available for the configuration changes given in this service bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts:
One top kit and the items shown in Paragraph 2.C.2., Parts and Materials Supplied by the Operator,
are necessary for each airplane engine.
To get the kits/parts shown below, refer to Paragraph 2.A., Material - Price and Availability.
Figure Kit
986532Top Kit
----11005W3346-1
1111--005W3346-6
Group 1:
KIT 005W3346-1
NOTES
Existing Part
NumberName
Figure
New Part Number
32
QTY
WASHER34315W1163-26
KIT - LATCH
BEAM BLANKET
ASSY
1315W1257-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
20 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 21

Group 1:
KIT 005W3346-1
NOTES
Existing Part
NumberName
Figure
New Part Number
32
QTY
KIT - LATCH
BEAM BLANKET
ASSY
1315W1257-2
BUSHING, PLAIN34BACB28AK04-030
NUT34BACN10JC3C
STUD, COMPOS-
ITE BASE
34CB4017C3CRA12R
Group 2:
KIT 005W3346-6
NOTES
Existing Part
NumberName
Figure
New Part Number
9865
QTY
KIT - LATCH
BEAM BLANKET
ASSY
1315W1257-1
KIT - LATCH
BEAM BLANKET
ASSY
1315W1257-2
BRACKET ASSY11315W1427-25
BLANKET ASSY1315W1654-31
BLANKET ASSY1315W1654-32
BUSHING, PLAIN33BACB28AK04-030
BOLT, 100 DEG
HEX DR
66BACB30YP6K8
NUT33BACN10JC3C
NUTPLATE11BACN10KE3B4CD
NUT66BACN10ZV3
RIVET, 100 DEG22BACR15GF3D5
SCREW, CAP33BACS12GU3K15
WASHER66BACW10P458CD
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
21 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 22

Group 2:
KIT 005W3346-6
NOTES
Existing Part
NumberName
Figure
New Part Number
9865
QTY
STUD, COMPOS-
ITE BASE
33CB4017C3CRA12R
Group 2:
KIT 005W3346-5
NotesNameQTYNew Part Number
BRACKET ASSY2315W1427-25
BOLT, 100 DEG
HEX DR
12BACB30YP6K8
NUTPLATE2BACN10KE3B4CD
NUT12BACN10ZV3
RIVET, 100 DEG4BACR15GF3D5
2. Parts and Materials Supplied by the Operator:
NotesNameQTYPart Number/ Specification
PRIMER1 PtBMS 10-11,TYPE 1
ADHESIVE1 PtBMS 5-109, TYPE 2, CLASS 2
SEALANT1 PtBMS 5-63, TYPE 1, CLASS B-
4
PRIMER1 PtBMS 10-79 TYPE 3
3. Parts Modified and Reidentified:
None.
4. Parts Removed and Not Replaced:
None.
D. Parts Necessary to Change Spares
To get the kit shown below, refer to Paragraph 2.A., Material - Price and Availability.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
22 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 23

QTYNamePart Number
1(a)Top Kit - GE90 Latch Beam Insulation Blanket005W3346-1
1(a)
(b)
Top Kit - GE90 Latch Beam Insulation Blanket005W3346-6
(a) The top kit has parts to modify the left and right halves of a T/R.
(b) This kit contains the additional 315W1654-31 and 315W1654-32 insulation blankets and the attached
hardware necessary for the Group 2 airplane configuration.
E. Special Tooling - Price and Availability
None.
F. Special Tooling Necessary to do this Service Bulletin
No special tools or equipment are necessary to do the change in this service bulletin. But, maintenance
and overhaul tools in the manuals given in Paragraph 1.J., References, can be necessary. Examine
operator tool supply to make sure all necessary tools are available.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
23 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 24

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
24 of 61
BOEING SERVICE BULLETIN 777-78A0066
BLANK PAGE

### Page 25

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Hole dimensions for standard solid rivets and fasteners are in Structural Repair
Manual (SRM) Chapter 51
– Torque limits to tighten nuts and bolts are in SRM Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
SRM Chapter 51.
5. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to enhance visual access to all exposed surfaces
in the inspection area. This level of inspection is made under normally available
lighting conditions such as daylight, hangar lighting, flashlight or drop-light and may
require removal or opening of access panels or doors. Stands, ladders or platforms
may be required to gain proximity to the area being checked.
6. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
7. This service bulletin is done on each engine's Thrust Reverser (T/R) on the airplane.
8. Refer to Appendix A as an accepted procedure to install bonded studs.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
25 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 26

B. WORK INSTRUCTIONS
Group 1:
Part 1
1. Open a T/R. Refer to 777 AMM 78-31-00, as an accepted procedure to open a T/R.
2. Remove the aft most latch beam insulation blanket and insulation foam in accordance with FIGURE
1
3. Install studs, blankets and sealant for the left side T/R half, in accordance with FIGURE 2.
4. Install studs, blankets and sealant for the right side T/R half, in accordance with FIGURE 3.
5. OPTIONAL: Operators can mark the T/R identification plate with the service bulletin number to
show the change was done. Refer to SOPM 20-50-10 as an accepted procedure.
6. Close the T/R. Refer to 777 AMM 78-31-00, as an accepted procedure to close the T/R.
7. Put the airplane back to a serviceable condition.
Group 2:
Part 2
1. Open a T/R. Refer to 777 AMM 78-31-00, as an accepted procedure to open a T/R.
2. Do a general visual inspection to determine if fitting part number 315W1436-4 is installed on the
aft latch beam of the right side T/R half in accordance with FIGURE 4. Remove the latch beam
insulation foam on both left and right T/R half in accordance with FIGURE 4.
a. Group 2, Configuration 1:
Airplane with fitting part number 315W1436-4 not installed on the aft latch beam of the right
T/R half. Go to Step 4.
b. Group 2, Configuration 2:
Airplane with fitting part number 315W1436-4 installed on the aft latch beam of the right T/R
half. Go to Step 3.
3. Group 2, Configuration 2:
Cut the clevis from fitting part number 315W1436-4 on the aft latch beam of the right side T/R half
in accordance with FIGURE 7.
4. Install bracket assembly and nut plate for the left side T/R half, in accordance with FIGURE 8.
5. Install bracket assembly and nut plate for the right side T/R half, in accordance with FIGURE 9.
6. Install studs, blankets and sealant for the left side T/R half, in accordance with FIGURE 5.
7. Install studs, blankets and sealant for the right side T/R half, in accordance with FIGURE 6.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
26 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 27

8. OPTIONAL: Operators can mark the T/R identification plate with the service bulletin number to
show the change was done. Refer to SOPM 20-50-10 as an accepted procedure.
9. Close the T/R. Refer to 777 AMM 78-31-00, as an accepted procedure to close the T/R.
10. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3: April 28, 2011
27 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 28 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 1.
RIGHT LATCH BEAM
SEE A
LEFT LATCH BEAM
SEE A
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
LATCH
ACCESS
FWD <  DOOR
RIGHT LATCH BEAM SHOWN
LEFT LATCH BEAM SIMILAR
1494896
FIGURE 1: THRUST REVERSER - LATCH BEAM - REMOVE AFT INSULATION BLANKET AND INSULATION
FOAM
(SHEET 1 OF 2)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  28 of 61

### Page 29

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for both left and right T/R halves.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
6-SCREWRemove / Keep1
6-WASHERRemove / Keep
(a)2-BLANKET, INSULA-
TION
Remove / Keep2
(b)--INSULATIONRemove3
(c)--SCRAPED AREAClean4
(a) Carefully lift corner of the over-lapping insulation blanket to remove the aft-most insulation blanket. Loosen
other insulation blanket fasteners as necessary to remove the aft-most insulation blanket.
(b) Remove all insulation from the latch beam that the new insulation blanket will cover. Use a hard resin
phenolic scraper to remove as much as possible. Remove all loose material with a soft bristle brush or a
clean cotton wiper. If the exposed metal has hydraulic fluid on it, dry it with a cotton wiper.
(c) Refer to SOPM 20-30-03 as an accepted procedure to clean the scraped area. Make sure to dry the area
with a cotton wiper.
FIGURE 1: THRUST REVERSER - LATCH BEAM - REMOVE AFT INSULATION BLANKET AND INSULATION
FOAM
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
29 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 30 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 1.
LEFT LATCH BEAM
SEE
NO. 5
LATCH
BOLT  NO. 4
LATCH
BOLT
NO. 3
LATCH
BOLT
NO. 2
LATCH
BOLT
SEE C
→FWD
LATCH BEAM
FAIRING
LEFT LATCH BEAM
1494910
FIGURE 2: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 1 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  30 of 61

### Page 31 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
> FWD
USE ADHESIVE
HERE BETWEEN
BLANKETS
LEFT LATCH BEAM
1495409
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the left T/R half.
FIGURE 2: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 2 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  31 of 61

### Page 32

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)-BMS 10-11,TYPE 1PRIMERApply1
(b)1315W1257-1KIT - LATCH BEAM
BLANKET ASSY
Put / Hold2
(c)3-MARKApply3
1315W1257-1KIT - LATCH BEAM
BLANKET ASSY
Remove / Keep4
(d)3-PIN, PILOTRemove5
(e) (f) (g)4CB4017C3CRA12RSTUD, COMPOSITE
BASE
Install (New)6
(e)-BMS 5-109, TYPE 2,
CLASS 2
ADHESIVEApply
(g)4BACB28AK04-030BUSHING, PLAINInstall (New)7
1315W1257-1KIT - LATCH BEAM
BLANKET ASSY
Install (New)8
(g) (h)4315W1163-26WASHERInstall (New)9
(g) (i)4BACN10JC3CNUTInstall (New)10
(j)1-BLANKET, INSULA-
TION
Install (Kept)11
3-WASHERInstall (Kept)12
(i)3-SCREWInstall (Kept)13
(k)-BMS 5-63, TYPE 1,
CLASS B-4
SEALANTApply14
(a) If the removal of the insulation material removed primer, touch up the latch beam as necessary. Refer to
SOPM 20-41-02 as an accepted procedure to apply primer.
(b) Position the latch beam insulation blanket in the latch beam to mark the locations for the studs. The part
name indicates a kit, but the part is supplied assembled
(c) Use the insulation blanket holes to locate and mark the location for the three studs that will be bonded to
the latch beam. Center a Pressure Application Fixture (PAF), supplied with a composite stud, over the
hole marks and mark the latch beam around the bottom of the PAF. This mark will be used to locate the
PAF and composite stud with adhesive. Refer to APPENDIX A for PAF description.
(d) Cut off the pilot pin from the stud base of the composite stud as close as possible to the stud base. Abrade
or scrape the stud base if necessary to give a flat base.
(e) Clean stud base and latch beam mating area. Apply BMS 5-109, Type 2, Class 2, adhesive. Put, hold,
and cure stud to the latch beam with a PAF. Refer to Appendix A and SOPM 20-50-12, Type 94, as ac-
cepted procedures to install composite studs.
(f) Composite studs are supplied with a Pressure Application Fixture (PAF). Refer to APPENDIX A to see
how the PAF is used.
FIGURE 2: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
32 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 33

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(g) The qty given is one more than necessary. Return part to your stores if it is not used
(h) Washer BACW10P458CD is optional to 315W1163-26.
(i) Torque to 20-25 in-lb. Make sure other insulation blanket fasteners that were loosened to remove the
kept insulation blanket, are tightened.
(j) Clean the mating areas of the two insulation blankets. Apply BMS 5-109, Type 2, Class 2, adhesive. Refer
to SOPM 20-50-12, Type 94, as an accepted procedure to apply the adhesive. Make sure the insulation
blanket that is forward of this insulation blanket, overlaps it.
(k) Seal where shown in bold line. Seal edge common to both blankets. Seal new blanket edges common to
the latch beam. Seal gap that forms next to the two blankets and the forward stiffener. Seal gap that forms
at the lower end of the stiffeners. DO NOT SEAL edges of new blanket that are directly above the access
door. DO NOT SEAL edges of new blanket around the upper end of the stiffeners. Be careful to not plug
drain holes when the sealant is applied. Refer to SOPM 20-50-19 as an accepted procedure to seal the
blanket.
FIGURE 2: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
33 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 34 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 1.
RIGHT LATCH BEAM
SEE A
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
SEE ®
LATCH
ACCESS
FWD <  DOOR
RIGHT LATCH BEAM
1494933
FIGURE 3: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 1 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  34 of 61

### Page 35 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
FWD <
10
USE ADHESIVE
HERE BETWEEN
BLANKETS
RIGHT LATCH BEAM
1494976
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right T/R half.
FIGURE 3: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 2 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  35 of 61

### Page 36

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)-BMS 10-11,TYPE 1PRIMERApply1
(b)1315W1257-2KIT - LATCH BEAM
BLANKET ASSY
Put / Hold2
(c)3-MARKApply3
1315W1257-2KIT - LATCH BEAM
BLANKET ASSY
Remove / Keep4
(d)3-PIN, PILOTRemove / Keep5
(e) (f)3CB4017C3CRA12RSTUD, COMPOSITE
BASE
Install (New)6
(e)-BMS 5-109, TYPE 2,
CLASS 2
ADHESIVEApply
3BACB28AK04-030BUSHING, PLAINInstall (New)7
1315W1257-2KIT - LATCH BEAM
BLANKET ASSY
Install (New)8
(g)3315W1163-26WASHERInstall (New)9
(h)3BACN10JC3CNUTInstall (New)10
(i)1-BLANKET, INSULA-
TION
Install (Kept)11
3-WASHERInstall (Kept)12
(h)3-SCREWInstall (Kept)13
(j)-BMS 5-63, TYPE 1,
CLASS B-4
SEALANTApply14
(a) If the removal of the insulation material removed primer then apply primer to the latch beam as necessary.
Refer to SOPM 20-41-02 as an accepted procedure to apply primer.
(b) Position the latch beam insulation blanket in the latch beam to mark the locations for the studs. The part
name indicates a kit, but the part is supplied assembled
(c) Use the insulation blanket holes to locate and mark the location for the three studs that will be bonded to
the latch beam. Center a Pressure Application Fixture (PAF), supplied with a composite stud, over the
hole marks and mark the latch beam around the bottom of the PAF. This mark will be used to locate the
PAF and composite stud with adhesive. Refer to APPENDIX A for PAF description.
(d) Cut off the pilot pin from the stud base of the composite stud as close as possible to the stud base. Abrade
or scrape the stud base if necessary to give a flat base.
(e) Clean stud base and latch beam mating area. Apply BMS 5-109, Type 2, Class 2, adhesive. Put, hold,
and cure stud to the latch beam with a PAF. Refer to Appendix A and SOPM 20-50-12, Type 94, as ac-
cepted procedures to install composite studs.
(f) Composite studs are supplied with a Pressure Application Fixture (PAF). Refer to APPENDIX A to see
how the PAF is used.
FIGURE 3: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
36 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 37

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(g) Washer BACW10P458CD is optional to 315W1163-26.
(h) Torque to 20-25 in-lb. Make sure that other insulation blanket fasteners that were loosened to remove
the kept insulation blanket, are tightened.
(i) Clean the mating areas of the two insulation blankets. Apply BMS 5-109, Type 2, Class 2, adhesive. Refer
to SOPM 20-50-12, Type 94 as an accepted procedure to install the adhesive. Make sure the insulation
blanket that is forward of this insulation blanket, overlaps it.
(j) Seal where shown in bold line. Seal edge common to both blankets. Seal new blanket edges common to
the latch beam. Seal gap that forms next to the two blankets and the forward stiffener. Seal gap that forms
at the lower end of the stiffeners. DO NOT SEAL edges of new blanket that are directly above the access
door. DO NOT SEAL edges of new blanket around the upper end of the stiffeners. Be careful to not plug
drain holes when the sealant is applied. Refer to SOPM 20-50-19 as an accepted procedure to seal the
blanket.
FIGURE 3: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKET INSTALLATION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
37 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 38 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 2.
RIGHT LATCH BEAM
LEFT LATCH BEAM
SEE
SEE (B
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
3
LATCH
ACCESS
DOOR
RIGHT LATCH BEAM
1541685
FIGURE 4: THRUST REVERSER - LATCH BEAM - INSPECTION AND INSULATION FOAM REMOVAL
(SHEET 1 OF 3)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  777-78A0066
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  38 of 61

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for both the left and right T/R halves..
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)--AFT LATCH BEAMInspect1
(b)--INSULATIONRemove2
(c)--SCRAPED AREAClean3
(a) Do a general visual inspection to determine if fitting part number 315W1436-4 is installed on aft latch
beam of right T/R half. This inspection will determine if the T/R half is a Group 2 Configuration 1 or a
Group 2 Configuration 2, in accordance with the accomplishment instructions.
FIGURE 4: THRUST REVERSER - LATCH BEAM - INSPECTION AND INSULATION FOAM REMOVAL
(SHEET 2 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
39 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 40

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(b) Remove all insulation from the latch beam that the new insulation blanket will cover. Use a hard resin
phenolic scraper to remove as much as possible. Remove all loose material with a soft bristle brush or a
clean cotton wiper. If the exposed metal has hydraulic fluid on it, dry it with a cotton wiper.
(c) Refer to SOPM 20-30-03 as an accepted procedure to clean the scraped area. Make sure to dry the area
with a cotton wiper.
FIGURE 4: THRUST REVERSER - LATCH BEAM - INSPECTION AND INSULATION FOAM REMOVAL
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
40 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 41 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 2.
LEFT LATCH BEAM
SEE
NO. 5
LATCH
BOLT  NO. 4
LATCH
BOLT
NO. 3
LATCH
BOLT
NO. 2
LATCH
BOLT
SEE
→FWD
LATCH BEAM
FAIRING
LEFT LATCH BEAM
1541686
FIGURE 5: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 1 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  777-78A0066
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  41 of 61

### Page 42 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
> FWD
USE ADHESIVE
HERE BETWEEN
BLANKETS
LEFT LATCH BEAM
1541687
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the left T/R half.
FIGURE 5: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 2 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  42 of 61

### Page 43

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)-BMS 10-11,TYPE 1PRIMERApply1
(b)1315W1257-1KIT - LATCH BEAM
BLANKET ASSY
Put / Hold2
(c)3-MARKApply3
1315W1257-1KIT - LATCH BEAM
BLANKET ASSY
Remove / Keep4
(d)3-PIN, PILOTRemove5
(e) (f)3CB4017C3CRA12RSTUD, COMPOSITE
BASE
Install (New)6
(e)-BMS 5-109, TYPE 2,
CLASS 2
ADHESIVEApply
3BACB28AK04-030BUSHING, PLAINInstall (New)7
1315W1257-1KIT - LATCH BEAM
BLANKET ASSY
Install (New)8
(g)3BACW10P458CDWASHERInstall (New)9
(h)3BACN10JC3CNUTInstall (New)10
(i)1315W1654-31BLANKET ASSYInstall (New)11
(g)3BACW10P458CDWASHERInstall (New)12
(h)3BACS12GU3K15SCREW, CAPInstall (New)13
(j)-BMS 5-63, TYPE 1,
CLASS B-4
SEALANTApply14
(a) If the removal of the insulation material removed primer then apply primer to the latch beam as necessary.
Refer to SOPM 20-41-02 as an accepted procedure to apply primer.
(b) Position the latch beam insulation blanket in the latch beam to mark the locations for the studs. The part
name indicates a kit, but the part is supplied assembled
(c) Use the insulation blanket holes to locate and mark the location for the three studs that will be bonded to
the latch beam. Center a Pressure Application Fixture (PAF), supplied with a composite stud, over the
hole marks and mark the latch beam around the bottom of the PAF. This mark will be used to locate the
PAF and composite stud with adhesive. Refer to APPENDIX A for PAF description.
(d) Cut off the pilot pin from the stud base of the composite stud as close as possible to the stud base. Abrade
or scrape the stud base if necessary to give a flat base.
(e) Clean stud base and latch beam mating area. Apply BMS 5-109, Type 2, Class 2, adhesive. Put, hold,
and cure stud to the latch beam with a PAF. Refer to APPENDIX A and SOPM 20-50-12, Type 94, as
accepted procedures to install composite studs.
(f) Composite studs are supplied with a Pressure Application Fixture (PAF). Refer to APPENDIX A to see
how the PAF is used.
(g) Washers 315W1163-26 and BACW10P392CC are optional to BACW10P458CD.
FIGURE 5: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
43 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 44

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(h) Torque to 20-25 in-lb. Make sure other insulation blanket fasteners that were loosened to remove the
kept insulation blanket, are tightened.
(i) Clean the mating areas of the two insulation blankets. Apply BMS 5-109, Type 2, Class 2, adhesive. Refer
to SOPM 20-50-12, Type 94, as an accepted procedure to apply the adhesive. Make sure the insulation
blanket that is forward of this insulation blanket, overlaps it.
(j) Seal where shown in bold line. Seal edge common to both blankets. Seal new blanket edges common to
the latch beam. Seal gap that forms next to the two blankets and the forward stiffener. Seal gap that forms
at the lower end of the stiffeners. DO NOT SEAL edges of new blanket that are directly above the access
door. DO NOT SEAL edges of new blanket around the upper end of the stiffeners. Be careful to not plug
drain holes when the sealant is applied. Refer to SOPM 20-50-19 as an accepted procedure to seal the
blanket.
FIGURE 5: LEFT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
44 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 45 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 2.
RIGHT LATCH BEAM
SEE A
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
SEE B
LATCH
ACCESS
FWD <  DOOR
RIGHT LATCH BEAM
1541688
FIGURE 6: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 1 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  777-78A0066
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  45 of 61

### Page 46 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
FWD C
USE ADHESIVE
HERE BETWEEN
BLANKETS
RIGHT  LATCH BEAM
The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right T/R half.
FIGURE 6: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 2 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  46 of 61

### Page 47

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)-BMS 10-11,TYPE 1PRIMERApply1
(b)1315W1257-2KIT - LATCH BEAM
BLANKET ASSY
Put / Hold2
(c)3-MARKApply3
1315W1257-2KIT - LATCH BEAM
BLANKET ASSY
Remove / Keep4
3-PIN, PILOTRemove / Keep5
(e) (f)3CB4017C3CRA12RSTUD, COMPOSITE
BASE
Install (New)6
(e)-BMS 5-109, TYPE 2,
CLASS 2
ADHESIVEApply
3BACB28AK04-030BUSHING, PLAINInstall (New)7
1315W1257-2KIT - LATCH BEAM
BLANKET ASSY
Install (New)8
(g)3BACW10P458CDWASHERInstall (New)9
(h)3BACN10JC3CNUTInstall (New)10
(i)1315W1654-32BLANKET ASSYInstall (New)11
(g)3BACW10P458CDWASHERInstall (New)12
(h)3BACS12GU3K15SCREW, CAPInstall (New)13
(j)-BMS 5-63, TYPE 1,
CLASS B-4
SEALANTApply14
(a) If the removal of the insulation material removed primer, touch up the latch beam as necessary. Refer to
SOPM 20-41-02 as an accepted procedure to apply primer.
(b) Position the latch beam insulation blanket in the latch beam to mark the locations for the studs. The part
name indicates a kit, but the part is supplied assembled
(c) Use the insulation blanket holes to locate and mark the location for the three studs that will be bonded to
the latch beam. Center a Pressure Application Fixture (PAF), supplied with a composite stud, over the
hole marks and mark the latch beam around the bottom of the PAF. This mark will be used to locate the
PAF and composite stud with adhesive. Refer to APPENDIX A for PAF description.
(d) Cut off the pilot pin from the stud base of the composite stud as close as possible to the stud base. Abrade
or scrape the stud base if necessary to give a flat base.
(e) Clean stud base and latch beam mating area. Apply BMS 5-109, Type 2, Class 2, adhesive. Put, hold,
and cure stud to the latch beam with a PAF. Refer to APPENDIX A and SOPM 20-50-12, Type 94, as
accepted procedures to install composite studs.
(f) Composite studs are supplied with a Pressure Application Fixture (PAF). Refer to APPENDIX A to see
how the PAF is used.
(g) Washers 315W1163-26 and BACW10P392CC are optional to BACW10P458CD.
FIGURE 6: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 3 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
47 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 48

MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(h) Torque to 20-25 in-lb. Make sure that other insulation blanket fasteners that were loosened to remove
the kept insulation blanket, are tightened.
(i) Clean the mating areas of the two insulation blankets. Apply BMS 5-109, Type 2, Class 2, adhesive. Refer
to SOPM 20-50-12, Type 94 as an accepted procedure to install the adhesive. Make sure the insulation
blanket that is forward of this insulation blanket, overlaps it.
(j) Seal where shown in bold line. Seal edge common to both blankets. Seal new blanket edges common to
the latch beam. Seal gap that forms next to the two blankets and the forward stiffener. Seal gap that forms
at the lower end of the stiffeners. DO NOT SEAL edges of new blanket that are directly above the access
door. DO NOT SEAL edges of new blanket around the upper end of the stiffeners. Be careful to not plug
drain holes when the sealant is applied. Refer to SOPM 20-50-19 as an accepted procedure to seal the
blanket.
FIGURE 6: RIGHT THRUST REVERSER - LATCH BEAM - INSULATION BLANKETS INSTALLATION
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
48 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 49 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 2, Configuration 2.
RIGHT LATCH BEAM
SEE A  SEE ®
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
LATCH
ACCESS
FWD C  DOOR
RIGHT LATCH BEAM
2044422
FIGURE 7: RIGHT SIDE T/R HALF, AFT LATCH BEAM - FITTING ASSEMBLY MODIFICATION
(SHEET 1 OF 3)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  49 of 61

### Page 50 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
LATCH ACCESS  1 CUT LINE
DOOR
QCUT LINE
A-A  2044424
FIGURE 7: RIGHT SIDE T/R HALF, AFT LATCH BEAM - FITTING ASSEMBLY MODIFICATION
(SHEET 2 OF 3)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  777-78A0066
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  50 of 61

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right T/R half.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a)2-CLEVISRemove1
(a) Remove clevis from fitting assembly to allow clearance for the installation of the aft latch beam blanket
assembly. Cut or grind flush as necessary. Break sharp edges. Surface finish to be 125 micro-inch or
better. Apply a chemical conversion coating to all bare surfaces, refer to SOPM 20-43-03, Type 2, Class
A as an accepted procedure. Apply BMS 10-11, Type 1 primer to all bare surfaces, refer to SOPM 20-41-
02 as an accepted procedure.
FIGURE 7: RIGHT SIDE T/R HALF, AFT LATCH BEAM - FITTING ASSEMBLY MODIFICATION
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
51 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 52 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 2.
LEFT LATCH BEAM
SEE (A)D
NO. 5
LATCH
BOLT  NO. 4
LATCH
BOLT
NO. 3
LATCH
BOLT
NO. 2
LATCH
BOLT
SEE DO
LATCH BEAM
→ FWD
FAIRING
LEFT LATCH BEAM
• FIGURE 8: LEFT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 1 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  52 of 61

### Page 53 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
) 6 LOCATIONS
→→FWD
4) 6 LOCATIONS
→FWD  2043981
• FIGURE 8: LEFT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 2 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  53 of 61

### Page 54 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
NO. 5
LATCH  BOLT  NO. 4  →FWD
LATCH
BOLT
NO. 5
LATCH
BOLT
NO. 2
LATCH
BOLT
5X7
→ FWD
LATCH BEAM
FAIRING
LEFT LATCH BEAM
2044378
• FIGURE 8: LEFT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 3 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  54 of 61

### Page 55

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the left T/R half.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
6-FASTENERRemove1
(a)1315W1427-25BRACKET ASSYLocate2
(b)6-HOLESDrill3
1315W1427-25BRACKET ASSYInstall (New)4
(c)6BACB30YP6K8BOLT, 100 DEG HEX
DR
Install (New)
(c)6BACN10ZV3NUTInstall (New)
(d)1315W1654-31BLANKET ASSYLocate5
(e)1-HOLESDrill6
(f)-BMS 10-79 TYPE 3PRIMERApply
(g)1315W1654-31BLANKET ASSYRemove / Keep7
(h)1BACN10KE3B4CDNUTPLATEInstall (New)8
2BACR15GF3D5RIVET, 100 DEGInstall (New)
(a) Locate bracket assembly 315W1427-25 over the existing holes. Center bracket over holes and ensure
outside fastener locations will have proper edge margin.
(b) Back drill holes through bracket assembly. Hole size 0.1870-.1900 in. Break sharp edges. Apply BMS
10-11, Type 1 primer to all bare surfaces, refer to SOPM 20-41-02 as an accepted procedure.
(c) Torque to 25-35 in-lb.
(d) Temporarily install the blanket assembly 315W1654-31 to locate the upper hole on the existing latch beam
splice plate. The blanket assembly is found in Figure 5 kit.
(e) Match drill a hole through the latch beam splice plate structure. Hole size 0.270 in. Break sharp edges.
(f) To all bare surfaces.
(g) Remove the blanket assembly 315W1654-31 after complete drilling the hole.
(h) Install nutplate on the far side of the latch beam splice plate at the hole location.
FIGURE 8: LEFT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
55 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 56 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
This Figure applies only to: Group 2.
RIGHT LATCH BEAM
SEE DO
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
LATCH
ACCESS
SEE DO  DOOR
FWD <
RIGHT LATCH BEAM
2044643
• FIGURE 9: RIGHT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 1 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  56 of 61

### Page 57 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
6 LOCATIONS
FWD+
LATCH
ACCESS
DOOR
(4
3 4 6 LOCATIONS
LATCH
FWD C  ACCESS  DOOR  2044721
• FIGURE 9: RIGHT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 2 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  57 of 61

### Page 58 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
FWD C
NO. 5
LATCH
NO. 4
LATCH
NO. 3
LATCH
NO. 2
LATCH
LATCH
ACCESS
DOOR
FWD <
RIGHT LATCH BEAM
2044939
• FIGURE 9: RIGHT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 3 OF 4)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  58 of 61

### Page 59

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for the right T/R half.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
6-FASTENERRemove1
(a)1315W1427-25BRACKET ASSYLocate2
(b)6-HOLESDrill3
1315W1427-25BRACKET ASSYInstall (New)4
(c)6BACB30YP6K8BOLT, 100 DEG HEX
DR
Install (New)
(c)6BACN10ZV3NUTInstall (New)
(d)1315W1654-32BLANKET ASSYLocate5
(e)1-HOLESDrill6
(f)-BMS 10-79 TYPE 3PRIMERApply
(g)1315W1654-32BLANKET ASSYRemove / Keep7
(h)1BACN10KE3B4CDNUTPLATEInstall (New)8
2BACR15GF3D5RIVET, 100 DEGInstall (New)
(a) Locate bracket assembly 315W1427-25 over the existing holes. Center bracket over holes and ensure
outside fastener locations will have proper edge margin.
(b) Back drill holes through bracket assembly. Hole size 0.1870-.1900 in. Break sharp edges. Apply BMS
10-11, Type 1 primer to all bare surfaces, refer to SOPM 20-41-02 as an accepted procedure.
(c) Torque to 25-35 in-lb.
(d) Temporarily install the blanket assembly 315W1654-32 to locate the upper hole on the existing latch beam
splice plate. The blanket assembly is found in Figure 6 kit.
(e) Match drill a hole through the latch beam splice plate structure. Hole size 0.270 in. Break sharp edges.
(f) To all bare surfaces.
(g) Remove the blanket assembly 315W1654-32 after complete drilling the hole.
(h) Install nutplate on the far side of the latch beam splice plate at the hole location.
FIGURE 9: RIGHT SIDE T/R HALF, LATCH BEAM - LOWER BRACKET AND NUTPLATE INSTALLATIONS
(SHEET 4 OF 4)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: June 05, 2008
777-78A0066Revision 3 April 28, 2011
59 of 61
BOEING SERVICE BULLETIN 777-78A0066

### Page 60 (OCR)

BOEING SERVICE BULLETIN 777-78A0066
PRESSURE APPLICATION
FIXTURE (PAF)
COMPOSITE STUD FIXTURE
PAF
(UNACTIVATED
POSITION)
- STEP 2
RELEASE LINER
BOTTOM
OF PAF  STUD
STEP 1  BASE
LATCH BEAM WALL
STEP 5
DISCARD
PAF
CACTIVATED
STEP 4  POSITION)
STEP 3
(P)  (P)  (P)
INSTALLED
COMPOSITE  STUD  1496442
LATCH BEAM WALL INSTALLATION SEQUENCE
Appendix A: COMPOSITE STUD - ADHESIVE BONDED INSTALLATION
(SHEET 1 OF 2)
Original Issue: June 05, 2008
Revision 3 April 28, 2011  BOEING PROPRIETARY -  777-78A0066
Copyright © Unpublished Work - See page 1 for details.  60 of 61

The text continues at https://openairdocs.org/service-documents/boeing/777-78a0066/file/34c95808c7dc.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.