# Boeing Service Bulletin A3536: Revision 1, from page 13

- Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2013-0215; AD 2016-19-16 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Document: [Boeing Service Bulletin A3536](https://openairdocs.org/service-documents/boeing/a3536.md)
- Title as filed: U.S. DOT/FAA - Service Bulletin - 707-A3536-00
- Pages: 76
- PDF: https://openairdocs.org/files/sha256/39/a4/39a44bdb231341403e999467b9a66bee5ea742b94ba1369d7879242c726f1967
- Page: https://openairdocs.org/service-documents/boeing/a3536/file/39a44bdb2313

## Text

Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 13

D. Description
Get access to the MCD. Do a detailed inspection of the cam latches and latch pins. Check the torque
of the cross bolts in the latch pins. Measure the extension of the latch pins. Replace all alloy steel cross
bolts through the latch pins with CRES cross bolts. Do a High Frequency Eddy Current (HFEC) or
magnetic particle inspection of cam latch 1 and cam latch 2 for signs of cracks. Replace any cracked
or broken parts. Rig the MCD to the requirements for door flushness, cam latch/latch pin concentricity,
latch pin fitting forward/aft gap and shim thickness. Do the latch mechanism adjustment test and
post-rigging inspections in accordance with this service bulletin.
The work in this service bulletin is done in the maintenance zone(s) given below.
Affected Maintenance Zones
ZoneModel
2-49707-300, 707-300B, 707-300C
E. Compliance
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to
this service bulletin. The Airworthiness Directive will make the compliance tasks and times given in this
service bulletin mandatory.
Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 150 days
after the original
issue date of
this service bul-
letin.
Within 330 flight
cycles after the
original issue
date of this ser-
vice bulletin.
Do the following for all
MCD cam latches and
latch pins:
Do a detailed inspection
of the cam latches and
latch pins in accordance
with Accomplishment In-
struction 3.B.1.b.
All airplanes
AND
Torque the cross bolts in
the latch pins in accor-
dance with Accomplish-
ment Instruction 3.B.1.c.
AND
Measure the extension of
the latch pins in accor-
dance with Accomplish-
ment Instruction 3.B.1.d.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
13 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 14

Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.Replace all cracked or
broken part(s) and re-
place all alloy steel cross
bolts through the latch
pins with Corrosion Resis-
tant Steel (CRES) cross
bolts in accordance with
Accomplishment Instruc-
tion 3.B.2.a.
Inspection Condition 1 - If
the inspections reveal one
or more of the following:
1. Cracked or bro-
ken cam
latch(es).
2. Cracked or bro-
ken latch pin(s).
3. Broken latch pin
cross bolt(s).
AND
-Before further flight.Unless replaced with new
parts, do a High Frequen-
cy Eddy Current (HFEC)
or magnetic particle in-
spection of cam latch 1
and cam latch 2 in accor-
dance with Accomplish-
ment Instruction 3.B.2.b.
AND
-Before further flight.Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.2.c.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
14 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 15

Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 150 days
after the initial
inspection.
Within 330 flight
cycles after the
initial inspection.
Contact Boeing for re-
work instructions and do
the rework instructed by
Boeing in accordance
with Accomplishment In-
struction 3.B.3.a.
Inspection Condition 2 - If
the inspections reveal one
or more of the following:
1. Local deformation
of the cam latch
lip.
2. Flaking of the
chrome plating on
the cam latch or
latch pin.
3. Wear of the
chrome plating
down to the base
material of the
cam latch or latch
pin.
AND
Replace all cam latches
and latch pins in accor-
dance with Accomplish-
ment Instruction 3.B.3.b.
AND
330 flight cycles or
150 days
(whichever occurs
first). (a)
Within 150 days
after the initial
inspection.
Within 330 flight
cycles after the
initial inspection.
Do a detailed inspection
of the cam latches and
latch pins in accordance
with Accomplishment In-
struction 3.B.3.c.
AND
-Within 24
months after the
original issue
date of this ser-
vice bulletin.
Within 3000
flight cycles af-
ter the original
issue date of
this service bul-
letin.
Do a HFEC or magnetic
particle inspection of cam
latch 1 and cam latch 2 in
accordance with Accom-
plishment Instruction
3.B.3.d.
AND
Replace all alloy steel
cross bolts through the
latch pins with CRES
cross bolts in accordance
with Accomplishment In-
struction 3.B.3.e.
AND
Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.3.f.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
15 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 16

Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.Contact Boeing for addi-
tional inspection and/or
repair instructions and do
the inspection and/or re-
pair in accordance with
the Boeing instructions in
accordance with Accom-
plishment Instructions
3.B.4.a.
Inspection Condition 3 - If
the initial inspections reveal
one or more signs of the
following:
1. Corrosion of the
cam latch or latch
pin.
2. Gouges and/or
scrapes in the
cam latch or latch
pin chrome plat-
ing or base mate-
rial.
3. Deformations of
the cam latch or
latch pin.
4. Any other dam-
age not identified
in Inspection
Conditions 1 and
2.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
16 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 17

Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 150 days
after the initial
inspection.
Within 330 flight
cycles after the
initial inspection.
Replace the latch pin in
accordance with Accom-
plishment Instruction
3.B.5.a.(1).
Inspection Condition 4.1 -
If the latch pin extension is
less than 0.84 inches or
greater than 0.94 inches.
AND
Remove the mating cam
latch and do a detailed
inspection in accordance
with Accomplishment In-
struction 3.B.5.a.(2).
AND
330 flight cycles or
150 days
(whichever occurs
first). (a)
Within 150 days
after the initial
inspection.
Within 330 flight
cycles after the
initial inspection.
Do a general visual in-
spection of the cam
latches and latch pins for
broken, cracked, deforma-
tions, flaking or wear of
the chrome plating in ac-
cordance with Accom-
plishment Instruction
3.B.5.a.(3).
AND
-Within 24
months after the
original issue
date of this ser-
vice bulletin.
Within 3000
flight cycles af-
ter the original
issue date of
this service bul-
letin.
Do a HFEC or magnetic
particle inspection of cam
latch 1 and cam latch 2 in
accordance with Accom-
plishment Instruction
3.B.5.a.(4).
AND
Replace all alloy steel
cross bolts through the
latch pins with CRES
cross bolts in accordance
with Accomplishment In-
struction 3.B.5.a.(5).
AND
Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.5.a.(6).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
17 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 18

Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
330 flight cycles or
150 days
(whichever occurs
first). (a)
Within 150 days
after the initial
inspection.
Within 330 flight
cycles after the
initial inspection.
Do a detailed inspection
of the cam latches and
latch pins in accordance
with Accomplishment In-
struction 3.B.5.b.(1).
Inspection Condition 4.2 -
If the latch pin extension is
greater than or equal to
0.84 inches and less than
or equal to 0.89 inches or
greater than or equal to
0.91 inches and less than
or equal to 0.94 inches.
AND
-Within 24
months after the
original issue
date of this ser-
vice bulletin.
Within 3000
flight cycles af-
ter the original
issue date of
this service bul-
letin.
Do a HFEC or magnetic
particle inspection of cam
latch 1 and cam latch 2 in
accordance with Accom-
plishment Instruction
3.B.5.b.(2).
AND
Replace all alloy steel
cross bolts through the
latch pins with CRES
cross bolts in accordance
with Accomplishment In-
struction 3.B.5.b.(3).
AND
Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.5.b.(4).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
18 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 19

Table 1: Initial (Pre-Rigging) Inspections of the Cam Latches and Latch Pins for the Main Cargo Door
(MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
330 flight cycles or
150 days
(whichever occurs
first). (a)
Within 150 days
after the initial
inspection.
Within 330 flight
cycles after the
initial inspection.
Do a general visual in-
spection in accordance
with Accomplishment In-
struction 3.B.6.a.
Inspection Condition 5 - If
the inspections reveal no
signs of damage, distress
or incorrect rigging as de-
scribed in Inspection Condi-
tions 1 through 4. AND
3000 flight cycles
or 24 months
(whichever occurs
first). (a)
24 months after
the initial inspec-
tion.
Within 3000
flight cycles af-
ter the initial in-
spection.
Do a detailed inspection
of the cam latches and
latch pins in accordance
with Accomplishment In-
struction 3.B.6.b.
AND
Do a HFEC or magnetic
particle inspection of cam
latch 1 and cam latch 2 in
accordance with Accom-
plishment Instruction
3.B.6.c
AND
-Within 48
months after the
original issue
date of this ser-
vice.
Within 6000
flight cycles af-
ter the original
issue date of
this service bul-
letin.
Replace all alloy steel
cross bolts through the
latch pins with CRES
cross bolts in accordance
with Accomplishment In-
struction 3.B.6.d.
AND
Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.6.e.
(a) Accomplishment of the MCD rig and the latch mechanism adjustment test in accordance with Accomplish-
ment Instruction 3.B.2.c. or 3.B.3.f. or 3.B.5.a.(6) or 3.B.5.b.(4) or 3.B.6.e. terminates repeat inspections.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
19 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 20

Table 2: Repetitive Post-Rigging Inspections of the Cam Latches and Latch Pins for the Main Cargo
Door (MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
330 flight cycles or
150 days
(whichever occurs
first).
Within 150 days
after the MCD
rig.
Within 330 flight
cycles after the
MCD rig.
Do a general visual in-
spection in accordance
with Accomplishment In-
struction 3.B.7.a.(1).
All airplanes that have
completed the MCD rig in
accordance with Accom-
plishment Instruction
3.B.2.c. or 3.B.3.f. or
3.B.5.a.(6) or 3.B.5.b.(4) or
3.B.6.e.
AND
3000 flight cycles
or 24 months
(whichever occurs
first).
Within 24
months after the
MCD rig.
Within 3000
flight cycles af-
ter the MCD rig.
Do a detailed inspection
of the cam latches and
latch pins in accordance
with Accomplishment In-
struction 3.B.7.a.(2).
AND
6000 flight cycles
or 48 months
(whichever occurs
first).
Within 48
months after the
MCD rig.
Within 6000
flight cycles af-
ter the MCD rig.
Do a HFEC or magnetic
particle inspection of cam
latch 1 and cam latch 2 in
accordance with Accom-
plishment Instruction
3.B.7.a.(3).
-Before further flight.Replace all cracked or
broken part(s) in accor-
dance with Accomplish-
ment Instruction
3.B.7.b.(1).
Post-rigging Inspection
Condition 1 - If the inspec-
tions reveal one or more of
the following:
1. Cracked or bro-
ken cam
latch(es).
2. Cracked or bro-
ken latch pin(s).
3. Broken latch pin
cross bolt(s).
AND
-Before further flight.Unless replaced with new
parts, do a HFEC or
magnetic particle inspec-
tion of cam latch 1 and
cam latch 2 in accor-
dance with Accomplish-
ment Instruction
3.B.7.b.(2).
AND
-Before further flight.Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.7.b.(3).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
20 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 21

Table 2: Repetitive Post-Rigging Inspections of the Cam Latches and Latch Pins for the Main Cargo
Door (MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Within 150 days
after the post-
rigging inspec-
tion.
Within 330 flight
cycles after the
post-rigging in-
spection.
Contact Boeing for re-
work instructions and do
the rework instructed by
Boeing in accordance
with Accomplishment In-
struction 3.B.7.c.(1).
Post-rigging Inspection
Condition 2 - If the inspec-
tions reveal one or more of
the following:
1. Local deformation
of the cam latch
lip.
2. Flaking of the
chrome plating on
the cam latch or
latch pin.
3. Wear of the
chrome plating
down to the base
material of the
cam latch or latch
pin.
AND
Replace all cam latches
and latch pins in accor-
dance with Accomplish-
ment Instruction
3.B.7.c.(2).
AND
330 flight cycles or
150 days
(whichever occurs
first).
Within 150 days
after the post-
rigging inspec-
tion.
Within 330 flight
cycle after the
post-rigging in-
spection.
Do a detailed inspection
of the remaining cam
latches and latch pins in
accordance with Accom-
plishment Instruction
3.B.7.c.(3).
AND
-Within 24
months after the
post-rigging in-
spection.
Within 3000
flight cycles af-
ter the post-rig-
ging inspection.
Do a HFEC or magnetic
particle inspection of cam
latch 1 and cam latch 2 in
accordance with Accom-
plishment Instruction
3.B.7.c.(4).
AND
Rig the MCD and do the
latch mechanism adjust-
ment test in accordance
with Accomplishment In-
struction 3.B.7.c.(5).
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
21 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 22

Table 2: Repetitive Post-Rigging Inspections of the Cam Latches and Latch Pins for the Main Cargo
Door (MCD)
Repeat Interval
(Not to Exceed)
Compliance Time (Whichever
Occurs First)
ActionCondition
-Before further flight.Contact Boeing for addi-
tional inspection and/or
repair instructions and do
the inspection and/or re-
pair in accordance with
the Boeing instructions in
accordance with Accom-
plishment Instruction
3.B.7.d.(1).
Post-rigging Inspection
Condition 3 - If the inspec-
tions reveal one or more
signs of the following:
1. Corrosion of the
cam latch or latch
pin.
2. Gouges and/or
scrapes in the
cam latch or latch
pin chrome plat-
ing or base mate-
rial.
3. Deformations of
the cam latch or
latch pin.
4. Any other dam-
age not identified
in Inspection
Conditions 1 and
2.
F. Approval
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved, as well as European
Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in the service bulletin effectivity. This service bulletin and its approval were based on
the airplane in its original Boeing delivery configuration or as modified by other approved Boeing
changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected
by this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this service bulletin.
G. Manpower
The table below shows an estimate of the task hours necessary to do the inspections and modifications
for each airplane. This estimate is for direct labor only, done by an experienced crew. Adjust the estimate
with operator task hour data if necessary. The estimate does not include lost time. These are some
examples of lost time:
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
22 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 23

 Time to adjust to the workplace
 Time to schedule the work
 Time to inspect the work
 Time to cure the materials
 Time to make the parts
 Time to find the tools.
Elapsed HoursTask HoursNumber of PersonsTask
0.250.251Open Access
1.601.601FIGURE 1
0.500.501FIGURE 2
0.500.501FIGURE 3
1.00 (h)1.00 (h)1FIGURE 4
1.001.001FIGURE 5
0.50 (a) (f) (i)0.50 (a) (f) (i)1(i)FIGURE 6
0.10 (b) (g)0.10 (b) (g)1FIGURE 7
0.60 (c)0.60 (c)1FIGURE 8
0.10 (d)0.10 (d)1FIGURE 9
20.0048.002-3FIGURE 10 - FIGURE
11
0.250.251Close Access
(e)(e)TOTAL FOR EACH AIRPLANE
(a) Estimate is per cam latch requiring replacement.
(b) Estimate is per latch pin requiring replacement.
(c) Estimate is per cam latch requiring inspection.
(d) Estimate is per cam latch.
(e) Total time required may vary depending upon conditions found during inspections.
(f) Does not include time to match drill cam shaft.
(g) Does not include time to match drill latch pin
(h) Does not include inspection time
(i) Cam latch 4 will require 2 hours and a second person to remove.
H. Weight and Balance Changes
None.
I. Electrical Load Data
Not changed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
23 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 24

J. References
1. Existing Data
a. Boeing Service Bulletin 707-3477.
b. Boeing Service Related Problem (SRP) 707-SRP-52-0088.
c. Federal Aviation Administration (FAA) Airworthiness Directive (AD) 91-22-04.
d. Standard Overhaul Practices Manual (SOPM) 20-20-01.
e. 707 Aircraft Maintenance Manual (AMM) 52-11-0.
f. 707 Non-Destructive Testing (NDT) Manual Part 6, 51-00-00.
2. Data supplied with this Service Bulletin
None.
3. Installation Drawings Used in the Preparation of this Service Bulletin
TitleDrawing Number
DOOR INSTALLATION - MAIN CARGO65-25326
LATCH MECHANISM INSTALLATION - MAIN CARGO DOOR65-25339
SILL INSTL - LOWER, MAIN CARGO DOOR65-25343
LATCH PIN FITTING - ASSY65-25771
CAM - LATCH MECHANISM CARGO DOOR69-23438
BODY INSTALLATION - SECTION 4350-2543
These drawings were used to prepare this service bulletin. These drawings are not necessary to
make the specified changes, and are not supplied with this service bulletin. These drawings may
not be applicable to all airplane configurations or operators.
K. Publications Affected
None.
L. Interchangeability and Intermixability of Parts
Accomplishment of this service bulletin does not affect interchangeability or intermixability of parts.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
24 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 25

2.    MATERIAL INFORMATION
A. Material - Price and Availability
The operator can supply the parts and materials shown in Paragraph 2.C., Parts Necessary for Each
Airplane. As an alternative, operators can purchase the parts from Boeing Spares. This service bulletin
does not show the Boeing price and supply data.
B. Industry Support Information
Boeing warranty remedies are not available for the inspections and modifications given in this service
bulletin.
C. Parts Necessary For Each Airplane
1. Kits/Parts
None.
2. Parts and Materials Supplied by the Operator
NotesNameQTYPart Number /
Specification
(a) (b)BOLT, HEX HEAD, 160 KSI MIN
TENSILE, LONG THREAD, A286,
NONLOCKING
8BACB30LM3-24
OR
BACB30LM3-22
Parts are only needed
if existing part cannot
be reworked. (c)
Cam Latch 1-69-23438-2
Cam Latch 2-143N8060-1
Cam Latch 3-143N8027-2
Cam Latch 4-69-23439-3
Cam Latch 5-69-23439-4
Cam Latch 6-143N8027-1
Cam Latch 7-143N8060-2
Cam Latch 8-69-23438-1
Latch Pin-6-83137-2
(d)Corrosion Inhibiting Compound5 oz.BMS 3-27
(d)Pressure and Environmental
Sealant
5 oz.BMS 5-95, TYPE
1, CLASS B 1/2
(e)Flexbar ReproRubber Quicksetting
Putty or equivalent
8 oz-
(f)Rod, 3/16 diameter, 2 inches long1-
(a) Refer to 707 Structural Repair Manual Chapter 51 for alternate fasteners.
(b) BACB30LM3-24 is used if optional 143N8157-2 Clip Assembly is installed.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
25 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 26

NotesNameQTYPart Number /
Specification
(c) Drill attachment holes to the new latch cam to match with the existing bell crank assembly
to ensure proper installation and clocking.
(d) Refer to the Qualified Products List at the end of the Boeing Material Specification (BMS)
for supplier data.
(e) Available from Flexbar Machine Corp. (2R260), 250 Gibbs Road, Islandia, NY 11749,
USA.
(f) Used for aligning the rigging pin slot with the cross bolt hole in accordance with AP-
PENDIX A.
3. Parts Modified and Reidentified
None.
4. Parts Removed and Not Replaced
None.
D. Parts Necessary to Change Spares
None.
E. Special Tooling - Price and Availability
Boeing can supply the tool(s) shown in Paragraph 2.F., Special Tooling Necessary to do this Service
Bulletin. Operators are encouraged to share schedule requirements with Boeing for incorporation of
the service bulletin. The tool(s) are subject to the terms and conditions of the Boeing standard purchase
order acknowledgement. Prices are in United States Dollars. Terms: Net 30 days.
Reference this service bulletin and submit your purchase order by one of these methods:
1. Order on-line via ATA Spec 2000 or Boeing Part Page
2. Fax to (206) 662-7145
REFER TO THE BOEING PART PAGE ON MYBOEINGFLEET.COM OR CONTACT FIRST RESPON-
DER AT FR@BOEING.COM FOR THE LATEST REORDER LEAD TIME (ROLT) AND PRICE INFOR-
MATION
Purchase Data:
Unit Price as of the Original
Issue date of this Service
Bulletin (US Dollars)
NameTool Kit Number
8,821.00Pin Set - Rigging, Main Deck, Main Cargo
Door
B52029-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
26 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 27

Rental Data
Daily Price as of the Original
Issue date of this service
bulletin (US Dollars)
NameTool Kit Number
180.00Pin Set - Rigging, Main Deck, Main Cargo
Door
B52029-1
F. Special Tooling Necessary to do this Service Bulletin
To get the tools shown below, refer to Paragraph 2.E., Special Tooling - Price and Availability.
Maintenance and overhaul tools in the manuals shown in Paragraph 1.J., References, can also be
necessary. Examine operator tool supply to make sure all necessary tools are available.
NameTool Kit Number
Pin Set - Rigging, Main Deck, Main Cargo DoorB52029-1
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
27 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 28

BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
28 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT
BLANK PAGE

### Page 29

3.    ACCOMPLISHMENT INSTRUCTIONS
A. GENERAL INFORMATION
CAUTION: KEEP THE WORK AREA, WIRES AND ELECTRICAL BUNDLES CLEAN OF METAL
PARTICLES OR CONTAMINATION WHEN YOU USE TOOLS. UNWANTED MATERIAL,
METAL PARTICLES OR CONTAMINATION CAUGHT IN WIRE BUNDLES CAN CAUSE
DAMAGE TO THE BUNDLES. DAMAGED WIRE BUNDLES CAN CAUSE SPARKS OR
OTHER ELECTRICAL DAMAGE.
NOTE: 1. Manual titles are referred to by acronyms. Refer to Paragraph 1.J., References, for
definition of the acronyms.
2. Obey all of the warnings and cautions given in the specified manual sections.
3. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus
or minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Torque limits to tighten nuts and bolts are in 707 SRM, Chapter 51
4. Use the approved fastener and process material substitutions in accordance with
707 SRM, Chapter 51. Alternate fasteners are listed in 707 SRM Chapter 51.
5. If the length of any fastener specified in this service bulletin does not meet the
installation standards in SRM Chapter 51, then a fastener of the same specification,
or an approved substitute, with a length which meets the installation standards in
SRM Chapter 51 may be used.
6. A Detailed Inspection is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting
is normally supplemented with a direct source of good lighting at an intensity deemed
appropriate. Inspection aids such as mirrors, magnifying lenses, etc. may be
necessary. Surface cleaning and elaborate procedures may be required.
7. A General Visual Inspection is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise
specified. A mirror may be necessary to ensure visual access to all surfaces in the
inspection area. This level of inspection is made under normal available lighting
conditions such as daylight, hangar lighting, flashlight or drop-light and may require
removal or opening of access panels or doors. Stands, ladders or platforms may be
required to gain proximity to the area being checked.
8. These work instructions refer to procedures included in other Boeing documents.
When the words "refer to" are used and the operator has an accepted alternative
procedure, the accepted alternative procedure can be used. When the words "in
accordance with" are included in the instruction, the procedure in the Boeing document
must be used.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
29 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 30

B. WORK INSTRUCTIONS
NOTE: It is important to do the following steps in the specified order.
1. Initial Inspections
a. Open the Main Cargo Door to get access to the cam latches and latch pins. Refer to 707 AMM
52-11-01 as an accepted procedure.
b. Do a detailed inspection of the cam latches and latch pins in accordance with FIGURE 1.
c. Torque the cross bolts in the latch pins in accordance with FIGURE 2.
d. Measure the extension of the latch pins in accordance with FIGURE 3.
2. Inspection Condition 1:
If the inspections reveal one or more signs of the following:
– Cracked or broken cam latch(es)
– Cracked or broken latch pin(s)
– Broken latch pin cross bolt(s)
a. Replace cam latch in accordance with FIGURE 6, replace latch pin in accordance with FIGURE
7 and replace latch pin cross bolts with CRES cross bolts in accordance with FIGURE 5.
b. Unless replaced with new parts, do a High Frequency Eddy Current (HFEC) or magnetic
particle inspection of cam latch 1 and cam latch 2 for signs of cracks in accordance with
FIGURE 4. Address the inspection findings as described in Inspection Condition 1.
c. Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the latch
mechanism adjustment test in accordance with APPENDIX A.
3. Inspection Condition 2:
If the inspections reveal one or more signs of the following:
– Local deformation of the cam latch lip
– Flaking of the chrome plating on the cam latch or latch pin
– Wear of the chrome plating down to the base material of the cam latch or latch pin
a. Contact Boeing for rework instructions and do the rework instructed by Boeing.
NOTE: Boeing recommends the operator provide a detailed description of the cam latch
deformations (including size and location, as well as the total number of flights the
cam latch has been in service) so that Boeing has time to determine rework
instructions and the operator has time to organize the resources needed to complete
the changes within the applicable compliance period.
b. Replace all cam latches and latch pins with signs of flaking of the chrome plating or wear
down to the base material in accordance with FIGURE 6 and FIGURE 7.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
30 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 31

c. Do a detailed inspection of the cam latches and latch pins in accordance with FIGURE 1.
Address the inspection findings as described in Inspection Conditions 1 through 4.
d. Do a HFEC or magnetic particle inspection of cam latch 1 and cam latch 2 for signs of cracking
in accordance with FIGURE 4. Address the inspection findings as described in Inspection
Condition 1.
e. Replace all alloy steel cross bolts through the latch pins with CRES cross bolts in accordance
with FIGURE 5.
f. Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the latch
mechanism adjustment test in accordance with APPENDIX A.
4. Inspection Condition 3:
If the inspections reveal one or more signs of the following:
– Corrosion of the cam latch or latch pin
– Gouges and/or scrapes in the cam latch or latch pin chrome plating or base material
– Deformations of the cam latch or latch pin
– Any other damage not identified in Inspection Conditions 1 and 2.
a. Contact Boeing for additional inspection and/or repair instructions and do the applicable
inspection and/or repair in accordance with the Boeing instructions.
NOTE: Boeing recommends the operator provide a detailed description of the inspection
findings (including photographs if possible).
5. Inspection Condition 4:
a. Inspection Condition 4.1 - If the latch pin extension is less than 0.84 inches or greater than
0.94 inches:
(1) Replace the latch pin in accordance with FIGURE 7.
(2) Remove the mating cam latch and do a detailed inspection in accordance with FIGURE
8. Address the inspection findings as described in Inspection Condition 1.
(3) Do a general visual inspection of the cam latches and latch pins in accordance with
FIGURE 9. Address the inspection findings as described in Inspection Condition 1.
(4) Do a HFEC or magnetic particle inspection of cam latch 1 and cam latch 2 for signs of
cracking in accordance with FIGURE 4. Address the inspection findings as described in
Inspection Condition 1.
(5) Replace all alloy steel cross bolts through the latch pins with CRES cross bolts in
accordance with FIGURE 5.
(6) Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the
latch mechanism adjustment test in accordance with APPENDIX A.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
31 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 32

b. Inspection Condition 4.2 - If the latch pin extension is greater than or equal to 0.84 inches and
less than or equal to 0.89 inches or greater than or equal to 0.91 inches and less than or equal
to 0.94 inches:
(1) Do a detailed inspection of the cam latches and latch pins in accordance with FIGURE
1. Address the inspection findings as described in Inspection Conditions 1 through 3.
(2) Do a HFEC or magnetic particle inspection of cam latch 1 and cam latch 2 for signs of
cracking in accordance with FIGURE 4. Address the inspection findings as described in
Inspection Condition 1.
(3) Replace all alloy steel cross bolts through the latch pins with CRES cross bolts in
accordance with FIGURE 5.
(4) Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the
latch mechanism adjustment test in accordance with APPENDIX A.
NOTE: Rigging for the latch pin will require it to be installed properly with an extension
of 0.90 +/- 0.01 inches. A latch pin originally in condition 4.2 with no other
discrepancies may be re-used by clocking the latch pin 90 degrees +/- 10 degrees
from original position and match drilling a new cross bolt hole that provides the
correct latch pin extension. Fill old cross bolt hole in latch pin with BMS 5-95
sealant and install pin with BMS 3-27 corrosion inhibiting compound.
6. Inspection Condition 5:
If the inspections reveal no signs of damage, distress, or incorrect rigging as described in Inspection
Conditions 1 through 4:
a. Do a general visual inspection of the cam latches and latch pins in accordance with FIGURE
9. Address the inspection findings as described in Inspection Condition 1.
b. Do a detailed inspection of the cam latches and latch pins in accordance with FIGURE 1.
Address the inspection findings as described in Inspection Conditions 1 through 5.
c. Do a HFEC or magnetic particle inspection of cam latch 1 and cam latch 2 for signs of cracking
in accordance with FIGURE 4. Address the inspection findings as described in Inspection
Condition 1.
d. Replace all alloy steel cross bolts through the latch pins with CRES cross bolts in accordance
with FIGURE 5.
e. Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the latch
mechanism adjustment test in accordance with APPENDIX A.
7. Post-Rigging Inspections for Airplanes that have completed the Main Cargo Door rig in accordance
with FIGURE 10 and FIGURE 11:
a. Post-Rigging Inspection of all airplanes:
(1) Do a general visual inspection of the cam latches and latch pins in accordance with
FIGURE 9. Address the inspection findings as described in Post-Rigging Inspection
Condition 1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
32 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 33

(2) Do a detailed inspection of the cam latches and latch pins in accordance with FIGURE
1. Address the inspection findings as described in Post-Rigging Inspection Conditions 1
through 3.
(3) Do a HFEC or magnetic particle inspection of cam latch 1 and cam latch 2 for signs of
cracking in accordance with FIGURE 4. Address the inspection findings as described in
Post-Rigging Inspection Condition 1.
b. Post-rigging Inspection Condition 1:
If the post-rigging inspections reveal one or more of the following:
– Cracked or broken cam latch(es)
– Cracked or broken latch pin(s)
– Broken latch pin cross bolt(s)
(1) Replace cam latch in accordance with FIGURE 6, replace latch pin in accordance with
FIGURE 7 and replace latch pin cross bolt in accordance with FIGURE 5.
(2) Unless replaced with new parts, do a HFEC or magnetic particle inspection of cam latch
1 and cam latch 2 for signs of cracks in accordance with FIGURE 4. Address the inspection
findings as described in Post-Rigging Inspection Condition 1.
(3) Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the
latch mechanism adjustment test in accordance with APPENDIX A.
c. Post-rigging Inspection Condition 2:
If the post-rigging inspections reveal one or more of the following:
– Local deformation of the cam latch lip
– Flaking of the chrome plating on the cam latch or latch pin
– Wear of the chrome plating down to the base material of the cam latch or latch pin
(1) Contact Boeing for rework instructions and do the rework instructed by Boeing.
NOTE: Boeing recommends the operator provide a detailed description of the cam latch
deformations (including size and location, as well as the total number of flights
the cam latch has been in service) so that Boeing has time to determine rework
instructions and the operator has time to organize the resources needed to
complete the changes within the applicable compliance period.
(2) Replace all cam latches and latch pins with signs of flaking of the chrome plating or wear
down to the base material in accordance with FIGURE 6 and FIGURE 7.
(3) Do a detailed inspection of the cam latches and latch pins in accordance with FIGURE
1. Address the inspection findings as described in Post-Rigging Inspection Conditions 1
through 3.
(4) Do a HFEC or magnetic particle inspection of cam latch 1 and cam latch 2 for signs of
cracking in accordance with FIGURE 4. Address the inspection findings as described in
Inspection Condition 1.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
33 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 34

(5) Rig the Main Cargo Door in accordance with FIGURE 10 and FIGURE 11 and do the
latch mechanism adjustment test in accordance with APPENDIX A.
d. Post-rigging Inspection Condition 3:
If the post-rigging inspections reveal one or more of the following:
– Corrosion of the cam latch or latch pin
– Gouges and/or scrapes in the cam latch or latch pin chrome plating or base material
– Deformations of the cam latch or latch pin
– Any other damage not identified in Inspection Conditions 1 and 2.
(1) Contact Boeing for additional inspection and/or repair instructions and do the applicable
inspection and/or repair in accordance with the Boeing instructions.
NOTE: Boeing recommends the operator provide a detailed description of the inspection
findings (including photographs if possible).
8. Put the airplane back to a serviceable condition.
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
34 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 35 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
(6) C  (5) C
C
2089401
FIGURE 1: MAIN CARGO DOOR - CAM LATCHES AND LATCH PINS INSPECTION
(SHEET 1 OF 3)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  35 of 76

### Page 36 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
LATCH PIN
(8 LOCATIONS)
(9)
POTENTIAL
CRACKING AREA
CHROME WEAR
THROUGH
GOUGES
POTENTIAL
CRACKING AREAS
CAM LATCH  CHROME WEAR
THROUGH
GOUGES
PROTRUDING LIP ON
EDGE OF CAM HEAD
2089729
FIGURE 1: MAIN CARGO DOOR - CAM LATCHES AND LATCH PINS INSPECTION
(SHEET 2 OF 3)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  36 of 76

### Page 37

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)169-23438-2Cam Latch 1Inspect1
(a) (c)1143N8060-1Cam Latch 2Inspect2
(a) (c)1143N8027-2Cam Latch 3Inspect3
(a)169-23439-3Cam Latch 4Inspect4
(a)169-23439-4Cam Latch 5Inspect5
(a) (c)1143N8027-1Cam Latch 6Inspect6
(a) (c)1143N8060-2Cam Latch 7Inspect7
(a)169-23438-1Cam Latch 8Inspect8
(b)86-83137-2Latch PinInspect9
(a) Do a detailed inspection of the cam latch for damage, distress or incorrect rigging. Some examples of
damage or distress are: broken parts, cracks, deformations, flaking of the chrome plating, wear of the
chrome plating down to the base material, corrosion, chips, gouges etc.
(b) Do a detailed inspection of the latch pin for signs of damage, distress or incorrect rigging. Some examples
are: broken parts, cracks, deformations, flaking of the chrome plating, wear of the chrome plating down
to the base material, corrosion, chips, gouges etc
(c) Cam Latches 2, 3, 6 and 7 are not chromed, therefore chrome flaking and chrome wear through cannot
be assessed at these locations. Check for excessive wear.
FIGURE 1: MAIN CARGO DOOR - CAM LATCHES AND LATCH PINS INSPECTION
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
37 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 38 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
MAIN CARGO DOORWAY
LOWER SILL
LATCH PIN FITTING
ASSEMBL
(8 LOCATIONS)
LATCH PIN FITTING ASSEMBLY  O BOLT
(SHOWN WITH OPTIONAL CLIP
ASSEMBLY INSTALLED)
2089730
FIGURE 2: MAIN CARGO DOOR - LATCH PIN CROSS BOLT TORQUE MEASUREMENT
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  38 of 76

### Page 39

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)8-BoltTorque1
(a) Make sure the cross bolt is capable of reacting a 15 pound-inch, +/- 1 pound-inch, torque from the head
side of the bolt and also the nut side if no nutplate is used. The 15 pound-inch, +/- 1 pound-inch, torque
value is approximately one-half of the installation torque and is used to give an indication of the integrity
of the cross bolt.
FIGURE 2: MAIN CARGO DOOR - LATCH PIN CROSS BOLT TORQUE MEASUREMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
39 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 40 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
MAIN CARGO DOORWAY
LOWER SILL
LATCH PIN FITTING
ASSEMBLY
(8 LOCATIONS)
0.91
0.89
LATCH PIN FITTING ASSEMBLY
(SHOWN WITH OPTIONAL CLIP
ASSEMBLY INSTALLED)
FIGURE 3: MAIN CARGO DOOR - LATCH PIN EXTENSION MEASUREMENT
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  40 of 76

### Page 41

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
Make sure the latch pin extends
out 0.90 inch +/- 0.01 inch from
the wear plate.
8-Latch PinMeasure1
FIGURE 3: MAIN CARGO DOOR - LATCH PIN EXTENSION MEASUREMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
41 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 42 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
120
WD
CAM LATCH
(3) INSPECTION AREA
2089732
FIGURE 4: MAIN CARGO DOOR - CAM LATCH 1 AND CAM LATCH 2 INSPECTION
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  42 of 76

### Page 43

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
-169-23438-2Cam Latch 1Remove / Keep1
-1143N8060-1Cam Latch 2Remove / Keep2
(a) (b) (c) (d)169-23438-2Cam Latch 1Inspect3
(a) (b) (c) (d)1143N8060-1Cam Latch 2Inspect
-169-23438-2Cam Latch 1Install (Kept)4
-1143N8060-1Cam Latch 2Install (Kept)5
(a) Do a High Frequency Eddy Current (HFEC) inspection of the cam latch for cracking in accordance with
707 NDT Part 6, 51-00-00 Figure 13 or Figure 24
(b) Use a 0.080 inch diameter or smaller HFEC probe. Set the HFEC instrument to operate between 50 KHz
and 75 KHz. If HFEC method indicates a crack, confirm a crack using magnetic particle inspection. Refer
to SOPM 20-20-01 as an accepted procedure.
(c) A magnetic particle inspection can be used as an alternative to the HFEC inspection or to confirm crack
indications from the HFEC inspections. Refer to SOPM 20-20-01 as an accepted procedure.
(d) If crack indications are found with HFEC and could not be confirmed with magnetic particle inspection,
the HFEC crack indication is a non relevant indication due to chrome cracking.
FIGURE 4: MAIN CARGO DOOR - CAM LATCH 1 AND CAM LATCH 2 INSPECTION
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
43 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 44 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
MAIN CARGO DOORWAY
LOWER SILL
LATCH PIN FITTING
ASSEMBL
(8 LOCATIONS)
LATCH PIN FITTING ASSEMBLY  13 BOLT
(SHOWN WITH OPTIONAL CLIP
ASSEMBLY INSTALLED)
2089734
FIGURE 5: MAIN CARGO DOOR - LATCH PIN CROSS BOLT REPLACEMENT
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  44 of 76

### Page 45

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
-8-BoltRemove1
If installed.8143N8157-2Clip AssemblyRemove / Keep2
(a) (b)8BACB30LM3-24 OR
BACB30LM3-22
BoltInstall (New)3
(b)8143N8157-2Clip AssemblyInstall (Kept)
(a) Install with BMS 3-27 corrosion inhibiting compound on faying surfaces.
(b) Installation of 143N8157-2 clip assembly is optional. Use a BACB30LM3-24 bolt if clip assembly is installed.
Use a BACB30LM3-22 bolt if clip assembly is not installed.
FIGURE 5: MAIN CARGO DOOR - LATCH PIN CROSS BOLT REPLACEMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
45 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 46 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
MAIN CARGO DOOR
2) CAM LATCH  (8 LOCATIONS) LA
FIGURE 6: MAIN CARGO DOOR - CAM LATCH REPLACEMENT
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  46 of 76

### Page 47

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
Gusset must be re-
moved to allow re-
moval of cam latch
number 4.
--Cam LatchRemove1
(a) (b) (c)--Cam LatchInstall (New)2
(a) Use the original removed cam latch as a pattern/template to locate new cross bolt holes. Match hole an-
gularity from existing cam latch.
(b) Cam latch number 2 and cam latch number 7 only have two cross bolt holes.
(c) There is a possibility the cam latch can be refinished with new chrome plating. Before a cam latch or latch
pin can be reused, the operator must provide Boeing with a detailed description of the chrome damage,
including size and location, as well as the total number of flights the cam latch or latch pin has been in
service. Boeing will use this information to determine if the cam latch or latch pin can be refinished and
reused.
FIGURE 6: MAIN CARGO DOOR - CAM LATCH REPLACEMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
47 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 48 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
MAIN CARGO DOORWAY
LOWER SILL
LATCH PIN FITTING
ASSEMBLY
(8 LOCATIONS)
LATCH PIN 1X
LATCH PIN FITTING ASSEMBLY
(SHOWN WITH OPTIONAL CLIP
ASSEMBLY INSTALLED)
FIGURE 7: MAIN CARGO DOOR - LATCH PIN REPLACEMENT
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  48 of 76

### Page 49

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
---Latch PinRemove1
Install latch pin wet
with BMS 3-27 corro-
sion compound on
faying surfaces. (a)
-6-83137-2Latch PinInstall (New)2
(a) There is a possibility the latch pin can be refinished with new chrome plating. Before a cam latch or latch
pin can be reused, the operator must provide Boeing with a detailed description of the chrome damage,
including size and location, as well as the total number of flights the cam latch or latch pin has been in
service. Boeing will use this information to determine if the cam latch or latch pin can be refinished and
reused.
FIGURE 7: MAIN CARGO DOOR - LATCH PIN REPLACEMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
49 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 50 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
13 в
З В
0З В
3) В  INED  2089738
FIGURE 8: MAIN CARGO DOOR - CAM LATCH REMOVAL AND INSPECTION
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  50 of 76

### Page 51

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
MORE DATAQTYIDENTIFICATIONNAMETASKSTEP
(a) (b)--Cam LatchRemove1
Do a detailed inspection of
the cam latch for cracking.
--Cam LatchInspect2
(a)--Cam LatchInstall (Kept)3
(a) Identify the Cam Latch part locations to make sure the parts are re-installed in correct locations. Cam
latches installed incorrectly may seriously compromise proper door operation.
(b) Gusset must be removed to allow removal of cam latch number 4.
FIGURE 8: MAIN CARGO DOOR - CAM LATCH REMOVAL AND INSPECTION
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
51 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 52 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
MAIN CARGO DOORWAY
LOWER SILL
2) LATCH PIN
(8 LOCATIONS)
1) CAM LATCH
(8 LOCATIONS)
FWD
2089748
FIGURE 9: MAIN CARGO DOOR - CAM LATCHES AND LATCH PINS INSPECTION
(SHEET 1 OF 2)
Original issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  52 of 76

### Page 53

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a)169-23438-2Cam Latch 1Inspect1
(a)1143N8060-1Cam Latch 2Inspect
(a)1143N8027-2Cam Latch 3Inspect
(a)169-23439-3Cam Latch 4Inspect
(a)169-23439-4Cam Latch 5Inspect
(a)1143N8027-1Cam Latch 6Inspect
(a)1143N8060-2Cam Latch 7Inspect
(a)169-23438-1Cam Latch 8Inspect
(a)86-83137-2Latch PinInspect2
(a) Do a general visual inspection of the cam latch for broken, cracked, missing or migrated parts.
FIGURE 9: MAIN CARGO DOOR - CAM LATCHES AND LATCH PINS INSPECTION
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
53 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 54 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
D  I CENTER LATCH  MECHANISM
o
FORWARD
LATCH
MECHANISM
AFT LATCH
MECHANISM
NO. 1
NO. 2
NO.4 B  NO. 3 B
NO. 6 B  NO. 5 B
NO. 8 B  NO. 7
INSO
A  2089749
FIGURE 10: MAIN CARGO DOOR - CAM LATCH AND LATCH PIN RIGGING
(SHEET 1 OF 3)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  54 of 76

### Page 55 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
CAM LATCH
TYPICAL
C CAM LATCH AXIAL  CENTERLINE  LATCH PIN AXIAL  CENTERLINE
CAM LATCH (1  1 LATCH PIN
END VIEW
A-A
• 0.025
MAX
0.025-
MAX
0.025
MAX
0.025
MAX
CAM LATCH
2089750
FIGURE 10: MAIN CARGO DOOR - CAM LATCH AND LATCH PIN RIGGING
(SHEET 2 OF 3)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  55 of 76

### Page 56

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) (b) (d)--Cam LatchMeasure1
(a) (b) (d)-6-83137-2Latch PinMeasure
(c) (d)--Latch Pin FittingMeasure
(a) During rigging procedure the latch pin is not to contact the cam latch in any direction.
(b) Wrap a single layer of 0.002 inch thick shim stock around latch pins 1 and 8. Use thin tape to keep shim
in place. With latch pins 1 and 8 engaging their respective cam latches, and with latch pins 2 through 7
not contacting their respective cam latches in any direction, adjust if required, latch pin fittings 2 through
7 such that latch pins 2 through 7 axial centerlines and their respective cam latch axial centerlines are
within the tolerance shown.
(c) Adjust latch pin fittings by moving fitting on serrations and by adjusting shim thickness. On the two forward
and two aft cam latches the Latch Pin Fitting/Cam Latch gap is 0.14 +/- 0.01 inch. On the four center cam
latches the Latch Pin Fitting/Cam Latch gap is 0.08 +/- 0.01 inch. Make sure the maximum allowed shim
thickness of 0.20 inch is not exceeded.
(d) Refer to 707 AMM 52-11-0 as an accepted procedure for rigging.
FIGURE 10: MAIN CARGO DOOR - CAM LATCH AND LATCH PIN RIGGING
(SHEET 3 OF 3)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
56 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 57 (OCR)

BOEING SERVICE BULLETIN А3536
ALERT  ALERT
1 :0.20 TO +0.10 INCH  -5.08 TO +2.54 mm)
-5.08 TO +2.54 mm)  1) -0.20 TO +0.20 INCH
-5.08 TO +5.08 mm)
MAIN CARGO DOOR
‚DOOR
SCALE
INBD
FUSELAGE
A-A  2089752
NOTE: THIS VIEW SHOWS A NEGATIVE FLUSHNESS
FIGURE 11: MAIN CARGO DOOR - MAIN CARGO DOOR EDGE FLUSHNESS MEASUREMENT
(SHEET 1 OF 2)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  57 of 76

### Page 58

The step numbers shown below agree with the numbers shown in the circle symbols in the figure. The QTY
numbers shown below are the number of parts necessary for this figure.
More DataQtyIdentificationNameTaskStep
(a) (b)--Main Cargo DoorMeasure1
(a) Hold scale 90 degrees to door edge. Make sure the MCD lower edge and lower corner flushness are
within the tolerance shown.
(b) Refer to 707 AMM 52-11-0 as an accepted procedure for flushness measurement.
FIGURE 11: MAIN CARGO DOOR - MAIN CARGO DOOR EDGE FLUSHNESS MEASUREMENT
(SHEET 2 OF 2)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
58 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 59

1. Prepare to Adjust the Latch Mechanisms (Appendix Figure A1.1)
WARNING: MAKE SURE THAT ALL PERSONNEL AND EQUIPMENT ARE CLEAR OF THE CARGO
DOOR PATH BEFORE YOU OPERATE THE CARGO DOOR CONTROL SWITCH. THE
CARGO DOOR CAN CONTINUE TO MOVE AFTER YOU RELEASE THE SWITCH. THIS
CAN CAUSE INJURIES TO PERSONNEL AND DAMAGE TO EQUIPMENT.
a. Electrically close the door to the "latched-and-locked" position.
b. Use tape to mark the approximate location of the cam latch head, locations 1 through 8, on the external
side of the door.
c. Using a tape measurer, measure the external cargo door flushness between the sill plate and the door
at cam latch heads 1 through 8 (Appendix Figure A3).
d. Record the flushness measurements at cam latch head locations 1 through 8 (Appendix Figure A4.1).
e. Open the main cargo door to approximately 1/4 of the fully open position.
f. Clean the lower sill area around the latch pins and latch pin fittings with a cotton cloth.
g. Clean the head and throat of the cam latches with a cotton cloth.
h. Remove the cross bolt and clip or the cross bolt and nut from the latch pin fitting at sill locations 2
through 7.
i. Remove the latch pins at sill fitting locations 2 through 7 from the latch pin fittings (Appendix Figure
A1.3).
j. Record the latch pin location to the mating latch pin fitting.
k. Clean the latch pin holes in the latch pin fittings.
l. Wrap a 0.002 in. (0.051 mm) shim fully around the latch pins at sill fitting locations 1 and 8, making a
full circle.
(1) Make sure that you do not overlap the shims.
(2) Use thin tape to hold the ends of the 0.002 in. (0.051 mm) shim.
(3) Turn the shim until the splice points to the inboard side of the latch pin.
m. Electrically close the door to the "latched-and-locked" position.
n. Make sure that the 0.002 in. (0.051 mm) shims are on the pins.
o. Record the external flushness values for cam latch head locations 1 through 8 (Appendix Figure A4.1).
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 1 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
59 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 60

NOTE: Flushness values show if it is necessary to adjust fittings 1 and 8. You will not rig the door
with these flushness values.
NOTE: Have the same person measure the flushness as measured earlier in the task.
p. Do these steps for latch fittings 1 and 8 if the lower edge flushness values are more than the tolerances
(Appendix Figure A3).
(1) Remove latch fitting fillet seals.
(2) Remove the cap seals.
(3) Remove the leveling compound.
(4) Record the location of the latch pin fitting on the mating serrated plate.
(5) Measure shim thickness to make sure that the latch pin fitting 1 and 8 adjustments can move the
door into the necessary flushness (Appendix Figure A1.3).
NOTE: If you remove 0.10 in. (2.54 mm) of the shim thickness, the door will move approximately
0.07 in. (1.78 mm) in the inboard direction.
(6) Do these steps if the door is more than the flushness tolerance in this configuration:
(a) Remove only one of the setscrew lock wires.
(b) Loosen the setscrew to loosen the fitting.
(c) You may need to use a 1/4 inch 8 point socket.
(d) Remove the fitting.
(e) Record the location of the fasteners.
(f) Record the corresponding latch pin fitting location number on the serrated plate.
(g) Carefully clean the serrations and all mating surfaces. Be careful to not remove the recorded
location numbers and location marks.
(h) Adjust the latch pin shim thickness.
(i) If you move the latch pin fitting inboard, then increase the clearance between the stop pin and
the stop pad.
(j) Move the latch fitting up one serration if you removed more than 0.071 in. (1.803 mm) shim
thickness.
(k) Move the latch fitting down one serration if you added more than 0.071 in. (1.803 mm) shim
thickness.
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 2 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
60 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 61

(l) If necessary, change the length of the latch pin fitting fasteners for adjusted shim thickness.
(m) Install the latch pin fitting without the fillet seal.
(n) Make sure that the set screw is seated and tight.
(o) Install the three 0.5 in. (12.7 mm) bolts into the latch pin fitting with 200 in-lb (23 N m) to 225
in-lb (25 N m) torque.
(p) Install the 0.625 in. (15.875 mm) bolt into the latch pin fitting with 800 in-lb (90 N m) to 850
in-lb (96 N m) torque.
q. Make sure that the 0.002 in. (0.051 mm) shims are on latch pins 1 and 8.
WARNING: OBEY THE INSTRUCTIONS IN THE PROCEDURE TO OPEN OR CLOSE THE CARGO
DOOR. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO PERSONS OR DAMAGE
TO EQUIPMENT CAN OCCUR.
r. Manually close the door to the "latched and locked" position.
s. Make sure that there is forward/aft clearance between the cam latches and the latch pin fittings when
the door is closed.
t. If there is not forward/aft clearance, then adjust the cam latches and the latch pin fittings (Appendix
Figure A1.1).
u. Repeat the steps for the external flushness door measurements until the door is within the flushness
requirements (Appendix Figure A3).
(1) Use the Interim Flushness Recording Table to record measurements, if more adjustments are
necessary (Appendix Figure A4.1).
v. Electrically open the main cargo door to approximately 1/8 of the fully open position.
w. Make sure that the sequence valve has 0.40 in. (10.16 mm) to 0.50 in. (12.70 mm) clearance (Appendix
Figure A1.2).
x. Make sure that the cam latch hook is adjusted to the correct clearance.
2. Latch Mechanism Adjustment Test (Appendix Figure A4.1 - A4.5)
a. Put a piece of cardboard in front of the tooling hole in the cam latch throat.
NOTE: The cardboard prevents the rubber compound from entering the tooling holes. The cardboard
at the base of the cam latch will not impact the measurement.
(1) Mark the back of the cardboard with the corresponding latch numbers 2 through 7.
(2) Make sure that the cardboard is almost flush with the rear of the cam latch throat.
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 3 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
61 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 62

b. At the latch pin fitting locations 2, 3, 5, 6, and 7, use the rigging pin set, B52029-1 and install the long
rig pins.
(1) Make sure that the end face of the smaller diameter is flush with the bearing plate on the mating
pin fitting.
(2) Align the long slot in the rigging pin with the inboard cross bolt hole on the latch pin fitting.
(3) You can use a rod (3/16 Inch Diameter, 2 Inch Length), to align the rigging pin slot with the cross
bolt hole.
c. At latch pin fitting location 4, using the rigging pin set, B52029-1, install the short rig pin.
CAUTION: MAKE SURE THAT THE END OF THE SMALLER DIAMETER IS FLUSH WITH THE
BEARING PLATE ON THE MATING LATCH PIN FITTING. IF IT IS NOT FLUSH, DAMAGE
TO THE DOOR CAN OCCUR.
(1) Make sure that the end of the smaller diameter is flush with the bearing plate on the mating latch
pin fitting.
(2) Align the long slot in the rigging pin with the inboard cross bolt hole on the latch pin fitting.
(3) You can use a rod (3/16 Inch Diameter, 2 Inch Length), STD-10085, to align the rigging pin slot
with the cross bolt hole.
d. Do all of the checks necessary for "power on", but do not close the door.
e. Quickly mix a sufficient quantity of Flexbar ReproRubber Quicksetting Putty, to fill each cam throat.
NOTE: In warm weather, you can decrease the catalyst compound by approximately 1/3 to increase
the working time.
f. Quickly put the Flexbar ReproRubber Quicksetting Putty, G50673 into the cam throats at cam latch
locations 2 through 7.
NOTE: This has to be done in less than 45 seconds for all cam latches.
g. Close the door to the "latched and locked" position before the rubber compound paste sets.
h. Quickly move the pins at latch pin fitting locations 2 through 7 into the cam throat.
NOTE: You must close the door and move the pins in less than 1 minute for all cam latch pairs.
(1) Make sure that the larger diameter touches the cam.
i. Let the Flexbar ReproRubber Quicksetting Putty, G50673 set for 10 minutes at 72 degree F (22 degrees
C).
j. If possible, retract the rigging pins until the pins are flush with the bearing plate in the pin fitting.
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 4 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
62 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 63

k. Carefully open the main cargo door to approximately 1/4 of the fully open position.
NOTE: The rubber compound can possibly fall out of the cam when the door moves.
(1) Look for the rubber compound molds. The molds can fall while the door opens.
l. Carefully remove the Flexbar ReproRubber Quicksetting Putty, G50673 in each of the cams at latch
pin fitting locations 2 through 7.
m. Record the cam latch location onto the rubber compound, near the closed end of the rubber mold.
n. Cut the Flexbar ReproRubber Quicksetting Putty, G50673 approximately 0.5 in. (12.7 mm) from the
closed end of the rubber compound mold, see Appendix A illustration.
(1) Keep the rubber piece with the cross-hair marks.
(2) Discard the rubber piece without the cross-hair marks.
o. Make extension lines on the cut piece.
(1) Align the extension lines with the cross-hair marks in the rubber compound mold.
p. Using a tape measurer, measure the thickness of the compound at the one line (measurement "A")
and in the middle of the two lines (measurement "B").
q. Record measurements "A" and "B" from the rubber compound molds, from latch pin locations 2 though
7, onto the Latch Mechanism Adjustment Worksheet.
(1) If measurement "A" is 0.179 in. (4.547 mm) to 0.229 in. (5.817 mm) and if no serration adjustment
is necessary, then do not adjust the latch pin fitting shim thickness.
(2) If measurement "A" is not 0.179 in. (4.547 mm) to 0.229 in. (5.817 mm) then adjust the latch pin
fitting shim thickness by the amount shown on the worksheet.
(3) If measurement "A" is 0.179 in. (4.547 mm) to 0.194 in. (4.928 mm) and if a serration adjustment
is necessary, then adjust the latch pin fitting shim.
(4) If measurement "A" is 0.195 in. (4.953 mm) to 0.213 in. (5.410 mm) and if a serration adjustment
is necessary, then do not adjust the latch pin fitting shim thickness.
(5) If measurement "A" is 0.214 in. (5.436 mm) to 0.229 in. (5.817 mm) and if a serration adjustment
is necessary, then adjust the latch pin fitting shim.
(6) If measurement "B" is 0.179 in. (4.547 mm) to 0.229 in. (5.817 mm) then do not adjust the latch
pin fitting serrations.
r. Calculate shim and serration adjustment values for each cam latch where adjustment is necessary.
s. Record the calculated values.
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 5 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
63 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 64

t. Calculate the shim thickness adjustment.
u. Calculate the number of serrations necessary for adjustment.
3. Latch Mechanism Adjustment
a. If necessary, remove the latch fillet seal, cap seal, and leveling compound on latch pin fittings 2 through
7.
b. Record the location of the latch pin fitting on the mating serrated plate.
c. Record the shim thickness for the latch pin fittings that will be adjusted.
d. Remove only one of the setscrews lock wire.
e. If it is necessary, loosen the bolts sufficiently to adjust the serrations.
f. If it is necessary, remove the bolts to adjust the shims.
g. Loosen the setscrew to loosen the fitting.
(1) You may need to use a 1/4 inch 8 point socket.
h. Remove the fitting.
i. Record the location of the fasteners.
j. Record the corresponding latch pin fitting location number on the serrated plate.
k. Clean the serrations and all mating surfaces.
(1) Be careful to not remove the recorded location numbers and location marks.
l. Adjust the latch pin shim thickness as calculated on the Latch Mechanism Adjustment "A"Dimension
Worksheet (Appendix Figure A4.4).
(1) If necessary, change the length of the sill fitting fasteners for adjusted shim thickness.
m. Adjust the latch pin serrations as calculated on the Latch Mechanism Adjustment "B" Dimension
Worksheet (Appendix Figure A4.5).
(1) Make sure that the serrations are correctly engaged.
(2) Make sure that the set screw is seated and tight.
n. Install the latch fittings without the fillet seal.
(1) Install the three 0.5 in. (12.7 mm) bolts into the latch pin fitting with 200 in-lb (23 N m) to 225 in-lb
(25 N m) torque.
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 6 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
64 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 65

(2) Install the 0.625 in. (15.875 mm) bolt into the latch pin fitting with 800 in-lb (90 N m) to850 in-lb
(96 N m) torque.
o. Do the Latch Mechanism Adjustment Test again.
p. Make sure that the adjustment is 0.179 in. (4.547 mm) to 0.229 in. (5.817 mm) for latches #2 through
#7.
(1) If latches #2 through #7 are not 0.179 in. (4.547 mm) to 0.229 in. (5.817 mm), do the Latch Pin
Adjustment and Latch Mechanism Adjustment Test.
(2) Use the Interim Flushness Recording Table to record measurements, if necessary.
q. Make sure that the shim thickness is less than 0.20 in. (5.08 mm) at each latch pin fitting location 1
through 8.
r. Remove rigging pin set, B52029-1, used in latch pin fitting locations 2 through 7.
s. Remove the rod (3/16 Inch Diameter, 2 Inch Length), STD-10085, from the latch pin fitting locations 1
through 8, if you used them.
t. Install latch pins for latch pin fitting locations 2 through 7.
(1) Install the cross bolt and clip or the cross bolt and nut to the latch pin fitting.
(2) Make sure that the pin extends 0.89 - 0.91 in. from the bearing plate on all eight latch pin fittings.
u. Remove the 0.002 in. (0.051 mm) shim and tape around the pins at sill fitting locations 1 and 8.
WARNING: OBEY THE INSTRUCTIONS IN THE PROCEDURE TO OPEN OR CLOSE THE CARGO
DOOR. IF YOU DO NOT OBEY THE INSTRUCTIONS, INJURIES TO PERSONS OR DAMAGE
TO EQUIPMENT CAN OCCUR.
v. Use the hydraulic hand pump to slowly close the door to the latched-and-locked position.
(1) Make sure that the cam latches smoothly engage the latch pins.
w. Using a tape measurer, measure the external cargo door flushness between the sill plate and the door
at latch cam heads 1 through 8.
(1) Record the flushness at cam latch head locations 1 through 8 (Appendix Figure A4.3).
(2) Make sure that the lower edge of the cargo door skin is within flushness tolerance (Appendix Figure
A3).
(3) Open the main cargo door to approximately 1/2 of the fully open position.
(4) Make sure that the stop pins are adjusted correctly (Appendix Figure A2).
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 7 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
65 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 66

(5) Make sure that the forward/aft clearance for the latch mechanism is correct (Appendix Figure
A1.1).
WARNING: MAKE SURE THAT ALL PERSONNEL AND EQUIPMENT ARE CLEAR OF THE CARGO
DOOR PATH BEFORE YOU OPERATE THE CARGO DOOR CONTROL SWITCH. THE
CARGO DOOR CAN CONTINUE TO MOVE AFTER YOU RELEASE THE SWITCH.
THIS CAN CAUSE INJURIES TO PERSONNEL AND DAMAGE TO EQUIPMENT.
(6) Close the door to the "latched-and-locked" position.
(7) Monitor the door while it closes for unusual operations.
4. Adjust the Sequence Valve (Appendix Figure A1.1 - A1.3)
a. Close and lock the main cargo door.
(1) Using a tape measurer, measure the distance between the sequence valve end cap and the striker
plate (View A-A). If the distance is not in the tolerance, do the steps that follow to adjust:
(a) Open the main cargo door.
(b) Loosen the bolts that attach the sequence valve.
(c) Move the sequence valve as necessary to get the dimension shown (View A-A).
(d) Tighten the bolts.
5. Adjust the Stop Fittings and Stop Pins (Appendix Figure A2)
a. Close and lock the main cargo door.
b. See that the stop pins will touch the stop fittings in the area shown.
(1) It is acceptable for the stop pin at the bottom, aft edge of the door to touch the stop pad a maximum
of 0.06 in. (1.52 mm) below the target area shown in (Appendix Figure A2).
c. Make sure the clearances at the stop fittings are as shown.
d. Install the lockspring in the stop pin.
6. Do an operational test of the main cargo door. Refer to 707 AMM 52-11-0 as an accepted procedure.
APPENDIX A:  LATCH MECHANISM ADJUSTMENT TEST
(SHEET 8 OF 18)
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.
Original Issue: February 06, 2012
A3536
66 of 76
BOEING SERVICE BULLETIN A3536
ALERTALERT

### Page 67 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
MAIN
CENTER  CARGO
LATCH  DOOR
MECHANISMS
FORWARD
LATCH
SEQUENCE  MECHANISM
VALVE
AFT LATCH
MECHANIS
PIN
PIN  LATCH  SUPPORT
PIN SUPPORT  CAM  TORQUE  ASSEMBLY
ASSEMBLY  TUBE
MOUNTING BOLTS
(4 LOCATIONS)
CAM
ON FOUR FORWARD AND AFT
CAMS; 0.14 10.01 INCH  LATCH MECHANISM
(3.56 t0.26 mm). ON  PIN  (EXAMPLE)
FOUR CENTER CAMS;
0.08 +0.01 INCH
0.001 TO 0.010 INCHES  (2.03 +0.26 mm)  LATCH MECHANISM ADJUSTMENT  2090521
(0.03 TO 0.25 mm)  FIGURE A1.1
APPENDIX A: LATCH MECHANISM ADJUSTMENT TEST
(SHEET 9 OF 18)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  67 0f 76

### Page 68 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
SEQUENCE
VALVE
SLOT
(4 LOCATIONS)
HYDRAULIC
- BOLT  LINES
HYDRAULIC
LINES
• SERRATED
PLATES
(2 LOCATIONS)
- BOLT
MAIN CARGO DOOR
STRUCTURE (REF)
VALVE
PLUNGER
STEM
SEQUENCE VALVE
•SEQUENCE
VALVE
BOLT
(2 LOCATIONS)
- MAIN CARGO
DOOR
- SERRATED
PLATE
0.45 +0.05 INCH
SLOT  • STRIKER
PLATE
SEQUENCE*
VALVE
END CAP
VALVE
PLUNGER  DOOR SILL
STEM  STRUCTURE)  (AIRPLANE
INBD  A-A  LATCH MECHANISM ADJUSTMENT
FIGURE A1.2
APPENDIX A: LATCH MECHANISM ADJUSTMENT TEST
(SHEET 10 OF 18)
Original Issue: February 06, 2012
A3536
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  68 of 76

### Page 69 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
MAIN DECK
CARGO DOOR
LOWER SILL
LOCATION 8
LOCATION 7
LOCATION 6
LOCATION 5
LOCATION 4
LOCATION 3
LATCH PIN INSTALLATION LOCATION
LOCATION 2
LATCH FITTING
ASSEMBLY
LOCATION 1
1/2-INCH BOLT
(3 LOCATIONS)
5/8-INCH
BOLT
RETAINING CLIP
(SHOWN INSTALLED)  A-A
LATCH PIN FITTING ASSEMBLY  (SHOWN WITH BOLTS INSTALLED)
(EXAMPLE)
LATCH MECHANISM ADJUSTMENT  2090527
FIGURE A1.3
APPENDIX A: LATCH MECHANISM ADJUSTMENT TEST
(SHEET 11 OF 18)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  69 0f 76

### Page 70 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
MAIN
CARGO  0.35 t0.05 INCH
DOOR
STOP PIN
CONTACT AREA  STOP PIN
0.02 0.03 INCH
0.01
STOP BOLTS
(6 LOCATIONS)  SHIM
STOP
PAD
FWD
INBD  DOOR
FITTING
HOOK
PIN
STOP FITTING (EXAMPLE)
LATCH
PINS  (THE DOOR IS CLOSED IN THIS VIEW)
CARGO DOOR OPENING  0.10 INCH
(FORWARD STOP BOLTS SHOWN, EXAMPLE)  (REF)
& STOP PIN MUST BE
WITHIN 0.30 INCH DIA
AREA ON STOP PAD
STOP PIN  STOP PAD
STOP PIN CONTACT AREA
THIS DIMENSION APPLIES TO THE STOP PIN THAT IS IN THE MIDDLE OF THE DOOR ONLY.
CHANGE THE SHIM IF IT IS NECESSARY TO GET THIS DIMENSION.
THIS REQUIREMENT APPLIES TO THE STOP PINS THAT ARE AT THE TOP AND BOTTOM OF THE
DOOR ONLY.  2090531
STOP BOLT ADJUSTMENT
FIGURE A2
APPENDIX A: LATCH MECHANISM ADJUSTMENT TEST
(SHEET 12 OF 18)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  70 of 76

### Page 71 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
-0.13 TO +0.07 INCH  -0.17 TO +0.06 INCH
(-3.30 TO +1.80 mm)  (-4.32 TO 1.52 mm)
-0.19 TO +0.07 INCH  8.0 INCHES (203.2 mm)
(-4.83 TO +1.80 mm)  EDGE OF
SKIN SPLICE
PRESSURE  -0.09 TO +0.06 INCH
RELIEF DOORS  (-2.30 TO +1.52 mm)
8.0 INCHES  (203.2 mm)  8.0 INCHES (203.2 mm)
EDGE OF
EDGE OF /  SKIN SPLICE
SKIN SPLICE  -0.17 TO +0.06 INCH
. (-4.32 TO +1.52 mm)
8.0 INCHES  8.0 INCHES (203.2 mm)
(203.2 mm)g
EDGE OF  'EDGE OF
SKIN SPLICE  SKIN SPLICE
-0.20 TO +0.10 INCH  (-5.08 TO +2.54 mm)  D  -0.20 TO +0.10 INCH  (-5.08 TO +2.54 mm)
-0.20 TO +0.20 INCH
(-5.08 TO +5.08 mm)
NOTE: THIS VIEW
FWD  MAIN CARGO DOOR  SHOWS A  NEGATIVE
FLUSHNESS
DOOR CLOSED
6" SCALE HOLD
90 DEGREES
TO DOOR EDGE
NOTE: A NEGATIVE TOLERANCE FOR THE FLUSHNESS SHOWS THE
DOOR IS INBOARD OF THE FUSELAGE CONTOUR.
IN ONE OR MORE LOCATIONS, 5% OF THE TOTAL LENGTH
AROUND THE DOOR IS PERMITTED TO HAVE A FLUSHNESS
+0.03 INCH MORE THAN THE TOLERANCE SHOWN.
ALL OF THE FLUSHNESS TOLERANCES ARE WHEN THE  FUSELAGE
DOOR IS NOT PRESSURIZED.
THE UPPER EDGE OF THE PRESSURE RELIEF DOOR  A-A  INBD
MAY BE UP TO 0.400 INCH INBOARD OF THE OUTER
EDGE OF THE CARGO DOOR SKIN. WHEN THE AIRPLANE
PRESSURIZES, THE PRESSURE RELIEF DOOR WILL MOVE
TO THE FAIRED POSITION.
MAIN CARGO DOOR FLUSHNESS  2090535
FIGURE A3
APPENDIX A: LATCH MECHANISM ADJUSTMENT TEST
(SHEET 13 OF 18)
Original Issue: February 06, 2012
A3536
BOEING PROPRIETARY -
Copyright © Unpublished Work - See page 1 for details.  71 0f 76

### Page 72 (OCR)

BOEING SERVICE BULLETIN A3536
ALERT  ALERT
LATCH  RIG PIN  LOCK  10  LOCK  RIG PIN  LATCH  CAM
CAM •  FLOOR FLOOR
'A' OR
'A'OR  'A' FINAL
'A' FINAL
SHIMMING  SHIMMING
SERRATION  DIRECTION  DIRECTION  SERRATION
DIRECTION  DIRECTION
B'OR  'B'OR
'B' FINAL  INBD  INBD  'B' FINAL
MEASUREMENT LOCATION FOR A AND B  MEASUREMENT LOCATION FOR A AND B
ON AN AFT FACING PIN  ON A FORWARD FACING PIN
LATCH PIN
RIG PIN  FITTING
INBOARD CROSS
BOLT HOLE
ALIGNMENT
SLOT
LATCH PIN FITTING ASSEMBLY
2-INCH  INBOARD CROSS
DOWEL  BOLT HOLE
FLUSH
ALIGNMENT  ALIGNMENT
SLOT
LATCH PIN FITTING ASSEMBLY
LATCH MECHANISM ADJUSTMENT  2089759
FIGURE A4.1
APPENDIX A: LATCH MECHANISM ADJUSTMENT TEST
(SHEET 14 OF 18)
Original Issue: February 06, 2012
BOEING PROPRIETARY -  A3536
Copyright © Unpublished Work - See page 1 for details.  72 of 76

The text continues at https://openairdocs.org/service-documents/boeing/a3536/file/39a44bdb2313.md?from=73

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.