# Boeing Special Attention Requirements Bulletin B787-81205-SB250253-00 RB

## Copies (2)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision 002 ("B787-81205-SB250253-00 RB_002"), 36 pages: PDF https://openairdocs.org/files/sha256/9f/de/9fdef97ea993d78f0570ac322d3616b51a330ac43c5e8d7a206dc301c921a9ed; text https://openairdocs.org/service-documents/boeing/b787-81205-sb250253-00-rb/file/9fdef97ea993.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-3428; AD 2026-13-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Revision 001 ("787-25-0253 RB Issue 001"), 25 pages: PDF https://openairdocs.org/files/sha256/d0/70/d07082b6efaf490f63c0aacdaa52e907795c2ea90653673c17d0d5fd453b42fd; text https://openairdocs.org/service-documents/boeing/b787-81205-sb250253-00-rb/file/d07082b6efaf.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2022-0876, the docket of a proposed AD (Federal Register 2022-20442, 2024-05913). Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Special Attention Requirements Bulletin)
- Number: B787-81205-SB250253-00 RB
- Latest revision known: B787-81205-SB250253-00 RB, Issue 002, dated July 11, 2024 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb250253-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2026-13-07](https://openairdocs.org/ad/2026-13-07.md), effective Aug 6, 2026: Revision 002

Also cited in [2 proposed ADs](https://openairdocs.org/service-documents/boeing/b787-81205-sb250253-00-rb/proposed.md).

## Text (36 pages)

Revision 002, the newest copy. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-3428; AD 2026-13-07 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

SPECIAL ATTENTION
Requirements Bulletin B787-81205-SB250253-00 RB EQUIPMENT AND
FURNISHINGS - Passenger Compartment Panel and Lining - Doorway
Assist Handle Inspection and Support Bracket Retainer Installation
Copyright © 2024 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 1 of 36
Export Controlled ECCN: 9E991
See page 1 for details
4.0
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
Revision Transmittal Information  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 2 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

Requirements Bulletin B787-81205-SB250253-00 RB EQUIPMENT AND
FURNISHINGS - Passenger Compartment Panel and Lining - Doorway
Assist Handle Inspection and Support Bracket Retainer Installation
Revision Transmittal Information
BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT
IMMEDIATELY. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
Special Attention:
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND
THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN
"RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH
THE SB REFERS TO AS THE RELATED DOCUMENT.
This revision includes all pages of the requirements bulletin.
1. COMPLIANCE INFORMATION RELATED TO THIS REVISION
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Require-
ments Bulletin B787-81205-SB250253-00 RB Issue 002. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB250253-00 RB Issue 002 mandatory.
Airplanes 874, 888, 894, 900-901, 904, 906-907, 909 were added to Group 2 of this service bulletin effectiv-
ity.
Effects of this revision on Airplanes on which Issue 001 was previously done:
None.
2. REASON FOR REVISION
This issue is sent to add airplanes to the effectivity of this service bulletin and to update the Supplier Service
Bulletin information to the current revision.
These sections were changed:
1. In Effectivity, added airplanes, Updated change notice reference and group description table.
2. In Concurrent Requirements, Updated supplier service bulletin revision.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 3 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

3. In Accomplishment Instructions, Section 1. General Information, Added definition of detailed inspection.
4. In Accomplishment Instructions, Section 2. Work Instructions, Updated Table 1 through Table 16 Actions,
and Method of Compliance. Added "PART 3: CLOSE ACCESS" in Table 1, for Condition 1. Changed "PART
6: CLOSE ACCESS" to "PART 3: CLOSE ACCESS" in Table 8.
5. In Accomplishment Instructions, Section 2. Work Instructions, Updated supplier service bulletin revision
information in "Method of Compliance" column in Table 1 through Table 16. Changed "ACTION 3 (OPTION
2)" to "ACTION 3 (OPTION 1)" in Table 9, for Condition 2. Changed "ACTION 2 (OPTION 2)" to "ACTION
2 (OPTION 1)", in Table 12.
The data given in Information Notice 787-81205-SB250253-00 IN 01 is included in this issue.
3. REVISION HISTORY
Table 1  
Service BulletinService BulletinRequirement BulletinRequirement Bulletin
787-25-0253787-25-0253787-25-0253 RB787-25-0253 RB
Issue DateIssue Date
June 18, 2021Issue 1:June 18, 2021Issue 1:
July 11, 2024Issue 2:July 11, 2024Issue 2:
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 4 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

BOEING RECOMMENDS THAT EACH OPERATOR EXAMINE THIS DOCUMENT
IMMEDIATELY. THIS IS AN ENHANCED REQUIRED FOR COMPLIANCE DOCUMENT.
Special Attention:
THE BOEING PROCESSES USED TO CREATE THE SERVICE BULLETIN (SB) AND
THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION BETWEEN
"RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH
THE SB REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9 Airplane(s), line number(s) 6-527, 529-547, 549-564,
566-621, 623-655, 657-671, 673-685, 687, 689-696, 698-708, 710-730, 732-742, 744-753, 755-
762, 764-769, 771-776, 778-781, 783-788, 790-794, 796-799, 801-808, 810-813, 815, 817-821,
823-827, 829-833, 835-837, 839-841, 843-847, 849-851, 853-855, 857-861, 863-865, 867-871,
873-879, 881, 883-885, 888-889, 892, 894-895, 897, 899-901, 903-904, 906-907, 909 in 2 Group(s).
Where the effectivity is presented with hyphens between line numbers, the airplane applicability
means "through" and "inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
The Variable Numbers and Group information for the applicable airplanes is given below.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 and 787-9 Airplanes line numbers 6-607, 609-618 and 621 af-
fected by Boeing Service Bulletin B787-81205-SB250176-00, Issue
001.
-1
Airplanes that have not incorporated Boeing Service Bulletin B787-
81205-SB250176-00, Issue 001.
1
Airplanes that have incorporated Boeing Service Bulletin B787-81205-
SB250176-00, Issue 001.
2
787-8 and 787-9 Airplanes not affected by Boeing Service Bulletin
B787-81205-SB250176-00, Issue 001.
-2
Airplane Models: 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA100 - ZA105
1ZA116 - ZA124
1ZA135 - ZA144
GroupVariable Number
1ZA152 - ZA156
1ZA175 - ZA189
1ZA195 - ZA204
1ZA215 - ZA225
GroupVariable Number
1ZA230 - ZA256
1ZA260 - ZA277
1ZA285 - ZA296
1ZA317 - ZA324
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 5 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

GroupVariable Number
1ZA327
1ZA334 - ZA335
1ZA341 - ZA342
1ZA380 - ZA389
1ZA430 - ZA439
1ZA445 - ZA448
2ZA449
1ZA450 - ZA458
2ZA459
1ZA460 - ZA489
1ZA506 - ZA516
1ZA536 - ZA545
1ZA560 - ZA567
1ZA576 - ZA580
1ZA586
1ZA588 - ZA593
1ZA610 - ZA617
1ZA650 - ZA652
1ZA655 - ZA663
1ZA665 - ZA675
2ZA676 - ZA677
1ZA680 - ZA685
1ZA695 - ZA697
2ZA698
1ZA715 - ZA716
1ZA718 - ZA719
1ZA740 - ZA741
1ZA768 - ZA769
1ZA778 - ZA779
1ZA783 - ZA784
1ZA817 - ZA831
GroupVariable Number
1ZA839
1ZA841 - ZA842
1ZA846 - ZA848
1ZA853 - ZA861
2ZA862
1ZA873 - ZA874
2ZA875 - ZA876
1ZA881 - ZA888
1ZA916 - ZA920
2ZA949 - ZA950
2ZA954 - ZA958
2ZA972
1ZB001 - ZB010
2ZB011 - ZB012
1ZB021 - ZB040
2ZB041 - ZB043
1ZB047 - ZB057
2ZB058 - ZB060
1ZB077 - ZB081
1ZB097 - ZB108
2ZB109 - ZB120
1ZB127 - ZB132
2ZB133 - ZB136
1ZB167 - ZB187
2ZB188 - ZB191
1ZB197 - ZB198
1ZB217
1ZB219
2ZB220
1ZB224 - ZB229
1ZB234 - ZB242
GroupVariable Number
1ZB246 - ZB247
2ZB248
1ZB251 - ZB254
2ZB255 - ZB258
1ZB261
2ZB262
1ZB265
2ZB266 - ZB268
1ZB269
2ZB270 - ZB276
1ZB299
1ZB302
2ZB303 - ZB305
1ZB332
2ZB333 - ZB337
1ZB362 - ZB377
2ZB378 - ZB379
1ZB407 - ZB418
1ZB422 - ZB425
2ZB426 - ZB432
1ZB446 - ZB457
2ZB458 - ZB467
1ZB536 - ZB543
1ZB545 - ZB547
1ZB558 - ZB579
2ZB580 - ZB586
1ZB603 - ZB618
1ZB646 - ZB649
1ZB656 - ZB659
2ZB660 - ZB665
1ZB676 - ZB679
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 6 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

GroupVariable Number
2ZB680 - ZB681
1ZB688 - ZB699
2ZB700 - ZB702
1ZB703 - ZB705
2ZB706 - ZB707
1ZB733
2ZB734 - ZB735
1ZB738 - ZB739
2ZB740
2ZB742 - ZB744
2ZB749 - ZB750
2ZB753 - ZB757
1ZB763 - ZB767
2ZB768
2ZB771 - ZB775
1ZB778 - ZB779
2ZB780 - ZB781
GroupVariable Number
1ZB782 - ZB791
2ZB792 - ZB805
1ZB812 - ZB815
2ZB816 - ZB821
1ZB828 - ZB829
2ZB830 - ZB841
2ZB858 - ZB863
2ZB874 - ZB876
2ZB893 - ZB902
2ZB908 - ZB918
2ZB922
2ZB924
2ZB926 - ZB927
2ZB934 - ZB937
2ZB967 - ZB969
2ZB980 - ZB984
2ZB990 - ZB991
GroupVariable Number
2ZB993 - ZB997
1ZD001 - ZD009
1ZD012
2ZE001 - ZE006
2ZE013
2ZE031 - ZE032
2ZE040 - ZE042
2ZE085 - ZE086
2ZE090 - ZE091
2ZE095 - ZE096
2ZE150
2ZE165 - ZE166
2ZE195 - ZE198
2ZE220 - ZE225
2ZE270
2ZE310
2ZE375
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
Certain actions in the service bulletin specified below must be done as specified in Compliance and the
Accomplishment Instructions.
Table 3  
DescriptionService BulletinCompany
EQUIPMENT/FURNISHINGS - DOOR-
WAY ASSIST HANDLE CLIP REPLACE-
MENT
C355101-25-02, Revision 2 or
Revision 4
SAFRAN CABIN INC.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 7 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB250253-00 RB Issue 002. The Airworthiness Directive will make the
compliance tasks and times given in Requirements Bulletin B787-81205-SB250253-00 RB Issue 002
mandatory.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Accomplish the required actions, based on the applicable conditions in Table 5 and Table 6, in accordance
with Accomplishment Instructions.
The Conditions, Actions and Compliance times shown apply to each passenger entry door independently.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 8 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Group 1, Configuration 1:
Table 5  LEFT AND RIGHT SIDE PASSENGER ENTRY DOOR 1, 2, 3 AND 4 - DOORWAY ASSIST HANDLE
 SUPPORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 60 months
after the Issue 002
date of Require-
ments Bulletin
B787-81205-
SB250253-00 RB.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation at each passen-
ger entry door.
All Airplanes.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS INSTALLED
CORRECTLY.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
ACTION 1: Replace upper
spring clip.
CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT INSTALLED
CORRECTLY. ACTION 2: Install a newretainer above the lower
keyway on the support
bracket assembly.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 9 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

Group 1, Configuration 2; Group 2:
Table 6  LEFT AND RIGHT SIDE PASSENGER ENTRY DOOR 1, 2, 3 AND 4 - DOORWAY ASSIST HANDLE
 SUPPORT BRACKET - RETAINER INSTALLATION
Repeat Interval
(Not to Exceed)
Compliance TimeActionCondition
-Within 60 months
after the Issue 002
date of Require-
ments Bulletin
B787-81205-
SB250253-00 RB.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at each
forward and aft door assist
handle location.
All airplanes.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 10 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any figures identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified figures, can still be done as specified, and the airplane can be put back in an
airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
5. The work instructions are divided into work packages. Each work package can be com-
pleted independently during separate maintenance visits. Task Hours and Elapsed Hours
for each package are given in Planning Information - Paragraph 7., Manpower.
6. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
7. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 11 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

8. The CONDITIONS, and ACTIONS shown apply to each door assist handle location on
each passenger service door independently.
9. A Detailed Inspection (DET) is defined as: An intensive examination of a specific item,
installation, or assembly to detect damage, failure, or irregularity. Available lighting is
normally supplemented with a direct source of good lighting at an intensity deemed ap-
propriate. Inspection aids such as mirrors, magnifying lenses, etc. may be necessary.
Surface cleaning and elaborate procedures may be required.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements
Group 1, Configuration 1:
Table 1  WORK PACKAGE 1: LEFT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 12 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Group 1, Configuration 1:
Table 1  WORK PACKAGE 1: LEFT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 13 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Group 1, Configuration 1:
Table 1  WORK PACKAGE 1: LEFT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 14 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

Group 1, Configuration 2; Group 2:
Table 2  WORK PACKAGE 1: LEFT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1:OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 15 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Group 1, Configuration 1:
Table 3  WORK PACKAGE 2: RIGHT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEP (2) AND (3) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 16 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

Group 1, Configuration 1:
Table 3  WORK PACKAGE 2: RIGHT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 17 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 18

Group 1, Configuration 2; Group 2:
Table 4  WORK PACKAGE 2: RIGHT SIDE PASSENGER ENTRY DOOR 1 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 18 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 19

Group 1, Configuration 1:
Table 5  WORK PACKAGE 3: LEFT SIDE PASSENGER ENTRY DOOR 2 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 19 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Group 1, Configuration 1:
Table 5  WORK PACKAGE 3: LEFT SIDE PASSENGER ENTRY DOOR 2 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--.CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 20 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21

Group 1, Configuration 2; Group 2:
Table 6  WORK PACKAGE 3: LEFT SIDE PASSENGER ENTRY DOOR 2 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 21 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22

Group 1, Configuration 1:
Table 7  WORK PACKAGE 4: RIGHT SIDE PASSENGER ENTRY DOOR 2 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 22 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 23

Group 1, Configuration 1:
Table 7  WORK PACKAGE 4: RIGHT SIDE PASSENGER ENTRY DOOR 2 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 23 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 24

Group 1, Configuration 2; Group 2:
Table 8  WORK PACKAGE 4: RIGHT SIDE PASSENGER ENTRY DOOR 2 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 24 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25

Group 1, Configuration 1:
Table 9  WORK PACKAGE 5: LEFT SIDE PASSENGER ENTRY DOOR 3 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 25 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 26

Group 1, Configuration 1:
Table 9  WORK PACKAGE 5: LEFT SIDE PASSENGER ENTRY DOOR 3 - DOORWAY ASSIST HANDLE SUPPORT
 BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEP
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 26 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 27

Group 1, Configuration 2; Group 2:
Table 10  WORK PACKAGE 5: LEFT SIDE PASSENGER ENTRY DOOR 3 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, PARA-
GRAPH 3.D STEP (1) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 27 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 28

Group 1, Configuration 1:
Table 11  WORK PACKAGE 6: RIGHT SIDE PASSENGER ENTRY DOOR 3 - DOORWAY ASSIST HANDLE 
SUPPORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 28 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 29

Group 1, Configuration 1:
Table 11  WORK PACKAGE 6: RIGHT SIDE PASSENGER ENTRY DOOR 3 - DOORWAY ASSIST HANDLE 
SUPPORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 29 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 30

Group 1, Configuration 2; Group 2:
Table 12  WORK PACKAGE 6: RIGHT SIDE PASSENGER ENTRY DOOR 3 - DOORWAY ASSIST HANDLE 
SUPPORT BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 30 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31

Group 1, Configuration 1:
Table 13  WORK PACKAGE 7: LEFT SIDE PASSENGER ENTRY DOOR 4 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 31 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 32

Group 1, Configuration 1:
Table 13  WORK PACKAGE 7: LEFT SIDE PASSENGER ENTRY DOOR 4 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C35510125-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 32 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 33

Group 1, Configuration 2; Group 2:
Table 14  WORK PACKAGE 7: LEFT SIDE PASSENGER ENTRY DOOR 4 - DOORWAY ASSIST HANDLE SUP-
PORT BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 33 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 34

Group 1, Configuration 1:
Table 15  WORK PACKAGE 8: RIGHT SIDE PASSENGER ENTRY DOOR 4 - DOORWAY ASSIST HANDLE 
SUPPORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
-
FIGURE 1, DETAIL D OF
SAFRAN SB C355101-25-
02 REVISION 2 OR REVI-
SION 4.
Do a detailed inspection of
the forward and aft door
assist handles for correct
installation.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
-
-CONDITION 1: FOR ANY
DOOR ASSIST HANDLE
THAT IS CORRECTLY
INSTALLED.
-
PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-
PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 34 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 35

Group 1, Configuration 1:
Table 15  WORK PACKAGE 8: RIGHT SIDE PASSENGER ENTRY DOOR 4 - DOORWAY ASSIST HANDLE 
SUPPORT BRACKET - INSPECTION AND RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--CONDITION 2: FOR ANY
DOOR ASSIST HANDLE
THAT IS NOT CORRECT-
LY INSTALLED. -PARAGRAPH 3.B STEPS
(4) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.B STEPS
(2) THROUGH (9) OF
SAFRAN SB C355101-25-
02 REVISION 4.
ACTION 1: Replace upper
spring clip.
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 2: Install a new
retainer above the lower
keyway on the support
bracket assembly.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 1):
Install placard on the sup-
port bracket assembly.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 3 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 35 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 36

Group 1, Configuration 2; Group 2:
Table 16  WORK PACKAGE 8: SIDE PASSENGER ENTRY DOOR 4 - DOORWAY ASSIST HANDLE SUPPORT 
BRACKET - RETAINER INSTALLATION
Refer to the listed proce-
dures in B787-81205-
SB250253-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: OPEN ACCESS.--All Airplanes.
PART 2: GAIN ACCESS
TO THE DOORWAY
SUPPORT ASSEMBLY.
--
-PARAGRAPH 3.C STEPS
(6) AND (7) OF SAFRAN
SB C355101-25-02 REVI-
SION 2, OR PARAGRAPH
3.C STEPS (2) AND (3)
OF SAFRAN SB C355101-
25-02 REVISION 4.
ACTION 1: Install a new
retainer above the lower
keyway on the support
bracket assemblies at the
forward and aft door assist
handle locations.
-PARAGRAPH 3.D OF
SAFRAN SB C355101-25-
02 REVISION 2, OR
PARAGRAPH 3.D STEP
(1) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 1):
Install placard on the for-
ward and aft support
bracket assemblies.
-PARAGRAPH 3.D STEP
(2) OF SAFRAN SB
C355101-25-02 REVISION
4.
ACTION 2 (OPTION 2):
Mark on the part that the
change given in this bul-
letin has been done.
PART 3: CLOSE AC-
CESS.
--
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
Page 36 of 36
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250253-00 RB
Issue 002, 11 Jul 2024 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
