# Boeing Alert Requirements Bulletin B787-81205-SB250277-00 RB

Copy: Revision 001 ("B787-81205-SB250277-00 RB"), 17 pages: PDF https://openairdocs.org/files/sha256/2e/49/2e49e7b1d87eee4592e0d4c56f093f1094916d0ac08bc2391cbb9f68c3dd365e; text https://openairdocs.org/service-documents/boeing/b787-81205-sb250277-00-rb/file/2e49e7b1d87e.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2398; AD 2025-18-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB250277-00 RB
- Latest revision known: B787-81205-SB250277-00 RB, Issue 001, dated February 15, 2023 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb250277-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2025-18-02](https://openairdocs.org/ad/2025-18-02.md), effective Oct 22, 2025: Revision 001

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb250277-00-rb/proposed.md).

## Text (17 pages)

Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2023-2398; AD 2025-18-02 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB250277-00 RB EQUIPMENT
AND FURNISHINGS - Passenger Service Unit - Oxygen Panel Assembly
Oxygen Supply Tube and Initiator Cable Assembly Inspection and Routing
Copyright © 2023 Boeing. Unpublished Work. All rights reserved.
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 1 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
4.0
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 2 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6, 11, 57-58, 62, 64,
82, 99, 101, 103, 109-110, 115-116, 120, 122-123, 127, 129, 134, 138-140, 142-144, 147, 149-
150, 155, 162-163, 175-176, 188-189, 193, 200, 207, 215, 217, 222, 225, 228-229, 231, 237, 239,
241-242, 249, 251-253, 255, 257, 261, 264, 266, 268, 271, 277-278, 286, 288, 290, 292, 294, 301-
303, 305-306, 312, 318, 320-321, 323, 325-326, 328, 330, 332-333, 336, 339-340, 344, 347, 352-
354, 359, 362, 364, 366-367, 371-372, 376, 378-380, 383-385, 387-389, 391, 393-395, 399, 405,
407, 409-411, 413, 417, 419-420, 423, 425, 427, 429-430, 433-435, 438, 440-441, 444, 446, 453-
455, 458, 460, 462, 464-467, 469-473, 476, 478-480, 483-485, 487, 491-492, 494-498, 501-504,
507, 509-510, 512-515, 517-519, 521, 523-527, 529, 533, 535-537, 539-542, 544-549, 551-555,
558-560, 562-563, 566-567, 570, 572, 574-577, 580, 582, 587, 589-590, 594, 596, 598-599, 601-
603, 605, 607, 610-612, 614-617, 621, 623-629, 631-633, 635-638, 640-641, 644, 646, 648, 650-
651, 653-655, 659, 666-671, 677, 679, 683, 685, 689-690, 696, 699, 701-702, 704-707, 711-714,
716, 718-732, 734-739, 741-743, 745-749, 751-754, 756-764, 766-767, 770-771, 774-792, 794-
795, 797, 799-803, 805-812, 814-815, 817, 819-826, 828-831, 833, 837, 841-842, 845-846, 848,
850-852, 854, 857, 859, 861, 863, 866-869, 871-872, 874-878, 880-881, 884-886, 890-892, 895,
900-903, 906-907, 909, 911-912, 915, 917-919, 921-925, 927-931, 933-937, 939-945, 947-951,
954, 958-960, 963-964, 966-967, 969-970, 972-975 in 1 Group(s). Where the effectivity is presented
with hyphens between line numbers, the airplane applicability means "through" and "inclusive",
e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8, 787-9 and 787-10 Airplanes with affected Passenger Service
Unit (PSU) oxygen panel assemblies part numbers 4572105-XXX-0D0
or 4572175-XXX-0D0 or 4572185-XXX-0D0.
-1
Airplane Models: 787-10, 787-8, 787-9
Table 2
GroupVariable Number
1ZA006
1ZA120 - ZA124
GroupVariable Number
1ZA195 - ZA204
1ZA215 - ZA225
GroupVariable Number
1ZA460 - ZA489
1ZA561 - ZA565
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 3 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

GroupVariable Number
1ZA586
1ZA665 - ZA677
1ZA718 - ZA719
1ZA768 - ZA769
1ZA778 - ZA779
1ZA783 - ZA784
1ZA817 - ZA831
1ZA841 - ZA842
1ZA859 - ZA862
1ZA873 - ZA876
1ZA916 - ZA920
1ZA954 - ZA959
1ZA963 - ZA965
1ZA968 - ZA970
1ZA972
1ZB010 - ZB012
1ZB021 - ZB026
1ZB047 - ZB060
1ZB077 - ZB081
1ZB217
1ZB219 - ZB220
1ZB228 - ZB229
1ZB261 - ZB262
1ZB265 - ZB279
1ZB422 - ZB435
GroupVariable Number
1ZB446 - ZB467
1ZB536 - ZB543
1ZB545 - ZB547
1ZB558 - ZB586
1ZB603 - ZB610
1ZB656 - ZB665
1ZB676 - ZB681
1ZB688 - ZB707
1ZB738 - ZB740
1ZB744 - ZB745
1ZB753 - ZB754
1ZB763 - ZB768
1ZB771 - ZB775
1ZB782 - ZB805
1ZB810 - ZB821
1ZB858 - ZB863
1ZB893 - ZB902
1ZB910 - ZB918
1ZB922
1ZB924
1ZB934 - ZB943
1ZB967 - ZB970
1ZB980 - ZB986
1ZB990 - ZB991
1ZB993 - ZB997
GroupVariable Number
1ZC036 - ZC047
1ZC061 - ZC068
1ZC116 - ZC117
1ZC126 - ZC128
1ZC151 - ZC152
1ZC155 - ZC158
1ZC221 - ZC223
1ZE001 - ZE006
1ZE031 - ZE032
1ZE040 - ZE043
1ZE090 - ZE091
1ZE095 - ZE096
1ZE100
1ZE110
1ZE150
1ZE165 - ZE166
1ZE170 - ZE171
1ZE195 - ZE198
1ZE270
1ZE340 - ZE341
1ZE350 - ZE352
1ZE415
1ZE425 - ZE426
--
--
2. Spares Affected
Examine your spares supply for the parts or components identified below. If any parts or components
are found, refer to Work Instructions for the recommended action.
Table 3  
Part Number
4572105-XXX-0D0
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 4 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

Table 3  
Part Number
4572175-XXX-0D0
4572185-XXX-0D0
B. CONCURRENT REQUIREMENTS
Certain actions in the service bulletin specified below must be done as specified in Compliance and Accom-
plishment Instructions.
Table 4  
DescriptionService BulletinCompany
P/N 4572105-XXX-0D0 TUBING CON-
DITION CHECK AND REROUTING
4572105-25-001, Revision 1Collins Aerospace
P/N 4572175-XXX-0D0 TUBING CON-
DITION CHECK AND REROUTING
4572175-25-001, Revision 1Collins Aerospace
P/N 4572185-XXX-0D0 TUBING CON-
DITION CHECK AND REROUTING
4572185-25-001, Revision 1Collins Aerospace
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB250277-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB250277-00 RB mandatory.
Accomplish the required action, based on the applicable condition in Table 6 in accordance with the Accom-
plishment Instructions.
When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 5 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

Table 6  Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
-Within 24 months af-
ter date of issuance
of original standard
certificate of airworthi-
ness or original ex-
port certificate of air-
worthiness.
Within 24 months af-
ter the Issue 001
date of the Require-
ments Bulletin B787-
81205-SB250277-00
RB.
Do an inspection or
a maintenance
records check of all
Passenger Service
Unit (PSU) oxygen
panel assemblies in-
stalled on center
stowage bins for the
affected part num-
bers 4572105-XXX-
0D0 or 4572175-
XXX-0D0 or
4572185-XXX-0D0.
All Airplanes
---No further action re-
quired.
CONDITION 1: NO
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY PART
NUMBER FOUND.
--Before further flight.Do an inspection of
the affected PSU
oxygen panel assem-
bly ID label to find
the Date of Manufac-
ture (DMF).
CONDITION 2: ANY
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY PART
NUMBER FOUND.
---No further action re-
quired.
CONDITION 2.1:
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY ID LA-
BEL DMF IS 062020
OR LATER.
--Before further flight.Do an inspection to
find the supplier SB
modification label
adjacent to the PSU
oxygen panel assem-
bly ID label.
CONDITION 2.2:
AFFECTED PSU
OXYGEN PANEL
ASSEMBLY ID LA-
BEL DMF IS BE-
FORE 062020 OR
NOT IDENTIFIED.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 6 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Table 6  Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
---No further action re-
quired.
CONDITION 2.2.1:
SUPPLIER SB
MODIFICATION LA-
BEL IS FOUND AND
MARKED WITH
SUPPLIER SB
NUMBER 4572105-
25-001 OR 4572175-
25-001 OR 4572185-
25-001.
--Before further flight.Do a general visual
inspection of the
PSU oxygen panel
assembly for correct
oxygen supply tube
and initiator cable
assembly installation.
CONDITION 2.2.2:
SUPPLIER SB
MODIFICATION LA-
BEL IS FOUND AND
NOT MARKED WITH
SUPPLIER SB
NUMBER 4572105-
25-001 OR 4572175-
25-001 OR 4572185-
25-001 or NO SUP-
PLIER SB MODIFI-
CATION LABEL IS
FOUND.
--Before further flight.Apply the supplier
SB modification label
and part mark the
supplier SB number
and date. *[1]
CONDITION 2.2.2.1:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY INSTALLED
CORRECTLY.
--Before further flight.Do a general visual
inspection of the
oxygen supply tube
for contamination,
corrosion, and dam-
age. *[2]
CONDITION 2.2.2.2:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY NOT IN-
STALLED COR-
RECTLY.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 7 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Table 6  Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
--Before further flight.ACTION 1: Reroute
oxygen supply tube
and initiator cable
assembly. *[3]
CONDITION
2.2.2.2.1: NO CON-
TAMINATION AND
NO CORROSION
AND NO DAMAGE
FOUND ON THE
OXYGEN SUPPLY
TUBE.
ACTION 2: Apply the
supplier SB modifica-
tion label and part
mark the supplier SB
number and date. *[1]
--Before further flight.ACTION 1: Replace
and route oxygen
supply tube and
reroute initiator cable
assembly correctly.
*[3]
CONDITION
2.2.2.2.2: ANY CON-
TAMINATION OR
ANY CORROSION
OR ANY DAMAGE
FOUND ON THE
OXYGEN SUPPLY
TUBE. ACTION 2: Apply the
supplier SB modifica-
tion label and part
mark the supplier SB
number and date. *[1]
--Before further flight.Do a general visual
inspection of the
PSU oxygen panel
assembly for correct
oxygen supply tube
and initiator cable
assembly installation.
CONDITION 3: PSU
OXYGEN PANEL
ASSEMBLY PART
NUMBER CANNOT
BE DETERMINED.
--Before further flight.Apply the supplier
SB modification label
and part mark the
supplier SB number
and date. *[1]
CONDITION 3.1:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY INSTALLED
CORRECTLY.
--Before further flight.Do a general visual
inspection of the
oxygen supply tube
for contamination,
corrosion, and dam-
age. *[2]
CONDITION 3.2:
OXYGEN SUPPLY
TUBE AND INITIA-
TOR CABLE ASSEM-
BLY NOT IN-
STALLED COR-
RECTLY.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 8 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

Table 6  Passenger Service Unit (PSU) Oxygen Panel Assembly Inspection
Repeat Interval (Not
to Exceed)
Compliance Time (Whichever Occurs
Later)
ActionCondition
--Before further flight.ACTION 1: Reroute
oxygen supply tube
and initiator cable
assembly. *[3]
CONDITION 3.2.1:
NO CONTAMINA-
TION AND NO COR-
ROSION AND NO
DAMAGE FOUND
ON THE OXYGEN
SUPPLY TUBE.
ACTION 2: Apply the
supplier SB modifica-
tion label and part
mark the supplier SB
number and date. *[1]
--Before further flight.ACTION 1: Replace
and route oxygen
supply tube and
reroute initiator cable
assembly correctly.
*[3]
CONDITION 3.2.2:
ANY CONTAMINA-
TION OR ANY COR-
ROSION OR ANY
DAMAGE FOUND
ON THE OXYGEN
SUPPLY TUBE.
ACTION 2: Apply the
supplier SB modifica-
tion label and part
mark the supplier SB
number and date. *[1]
*[1]  Apply next to any existing modification label.
*[2]  Oxygen supply tube damage is defined as a supply tube with any cracks, nicks, deterioration or deformation.
*[3]  Where the Collins service bulletins refer to item 7 and Figures 2 and 3, item 7 can be found in Figure 4 of the Collins service bulletins.
D. APPROVAL
This service bulletin was examined by the Federal Aviation Administration (FAA). The changes specified
in this service bulletin comply with the applicable regulations and are FAA approved for all airplanes listed
in the service bulletin effectivity. This service bulletin and its approval were based on the airplane in its
original Boeing delivery configuration or as modified by other approved Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this service bulletin, the operator is responsible for obtaining appropriate regulatory agency approval before
incorporating this service bulletin.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 9 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. For the related SB, some locations are marked RC Start and RC End to identify
the requirements that are restated from the RB. For the related SB, the areas between
RC Start and RC End, including sub-steps and any figures identified between RC Start
and RC End, must be done to comply with the AD. Therefore, an Alternative Method of
Compliance (AMOC) is required for any deviations to steps between RC Start and RC
End, including substeps and identified figures. For the related SB, the steps not between
RC Start and RC End may be deviated from using accepted methods in accordance with
the operator's maintenance or inspection program without obtaining approval of an AMOC;
this is provided that the steps between RC Start and RC End, including sub-steps and
identified figures, can still be done as specified, and the airplane can be put back in an
airworthy condition. Figures not required for compliance are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS in Compliance.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 10 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6. Use the approved fastener, process and material substitutions in accordance with SRM
Chapter 51.
7. If the length of any fastener specified in this service bulletin does not meet the installation
standards in SRM Chapter 51, then a fastener of the same specification, or an approved
substitute, with a length which meets the installation standards in SRM Chapter 51 may
be used. In addition, washers may be installed for fastener grip length in accordance with
SRM Chapter 51. Refer to SOPM 20-50-01 for alternate full threaded fasteners (screws)
needed for installation in this service bulletin.
8. A General Visual Inspection is defined as: A visual examination of an interior or exterior
area, installation or assembly to detect obvious damage, failure or irregularity. This level
of inspection is made from within touching distance unless otherwise specified. A mirror
may be necessary to ensure visual access to all surfaces in the inspection area. This
level of inspection is made under normal available lighting conditions such as daylight,
hangar lighting, flashlight or drop-light and may require removal or opening of access
panels or doors. Stands, ladders or platforms may be required to gain proximity to the
area being checked.
9. If it is necessary to remove more parts for access, you can remove those parts. If you
can get access without removing identified parts, it is not necessary to remove all of the
identified parts. Jacking and shoring limitations must be observed.
10. Where the work instructions include installation of a kept part, a new or serviceable part
with the same part number can be installed as an alternative to the kept part.
11. When more than one OPTION is given for a CONDITION, do only one of the OPTION
numbers. When more than one ACTION is given for a CONDITION number or an OPTION
number, do all of the ACTION numbers for that CONDITION number or OPTION number.
12. The CONDITIONS, ACTIONS and OPTIONS shown apply to each affected Passenger
Service Unit (PSU) oxygen panel assembly independently.
13. The "XXX" in the affected Passenger Service Unit (PSU) oxygen panel assembly part
numbers is any combination of numerals.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 11 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Table 1  
Refer to the listed proce-
dures in SB B787-81205-
SB2500277-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
PART 1: OPEN ACCESS--All Airplanes
-FOR THE INSPECTION:
PARAGRAPH 3.B.(1)
STEP (a) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do an inspection or a
maintenance records
check of all Passenger
Service Unit (PSU) oxygen
panel assemblies installed
on center stowage bins for
the affected part numbers
4572105-XXX-0D0 or
4572175-XXX-0D0 or
4572185-XXX-0D0.
--No further action required.CONDITION 1: NO AF-
FECTED PSU OXYGEN
PANEL ASSEMBLY PART
NUMBER FOUND.
PART 4: CLOSE ACCESS--
-PARAGRAPH 3.B.(1)
STEP (a) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do an inspection of the af-
fected PSU oxygen panel
assembly ID label to find
the Date of Manufacture
(DMF).
CONDITION 2: ANY AF-
FECTED PSU OXYGEN
PANEL ASSEMBLY PART
NUMBER FOUND.
--No further action required.CONDITION 2.1: AFFECT-
ED PSU OXYGEN PANEL
ASSEMBLY ID LABEL
DMF IS 062020 OR LAT-
ER.
PART 4: CLOSE ACCESS--
-PARAGRAPH 3.B.(1)
STEP (c) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do an inspection to find
the supplier SB modifica-
tion label adjacent to the
PSU oxygen panel assem-
bly ID label.
CONDITION 2.2: AFFECT-
ED PSU OXYGEN PANEL
ASSEMBLY ID LABEL
DMF IS BEFORE 062020
OR NOT IDENTIFIED.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 12 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Table 1  
Refer to the listed proce-
dures in SB B787-81205-
SB2500277-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
--No further action required.CONDITION 2.2.1: SUP-
PLIER SB MODIFICATION
LABEL IS FOUND AND
MARKED WITH SUPPLI-
ER SB NUMBER
4572105-25-001 OR
4572175-25-001 OR
4572185-25-001.
PART 4: CLOSE ACCESS--
-PARAGRAPH 3.B.(1)
STEP (d) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do a general visual inspec-
tion of the PSU oxygen
panel assembly for correct
oxygen supply tube and
initiator cable assembly in-
stallation.
CONDITION 2.2.2: SUP-
PLIER SB MODIFICATION
LABEL IS FOUND AND
NOT MARKED WITH
SUPPLIER SB NUMBER
4572105-25-001 OR
4572175-25-001 OR
4572185-25-001 or NO
SUPPLIER SB MODIFICA-
TION LABEL IS FOUND.
-PARAGRAPH 3.D.(1)
STEPS (a) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Apply the supplier SB
modification label and part
mark the supplier SB num-
ber and date. *[1]
CONDITION 2.2.2.1:
OXYGEN SUPPLY TUBE
AND INITIATOR CABLE
ASSEMBLY INSTALLED
CORRECTLY.
PART 4: CLOSE ACCESS--
-PARAGRAPH 3.C.(2)
STEPS (b) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do a general visual inspec-
tion of the oxygen supply
tube for contamination,
corrosion, and damage. *[2]
CONDITION 2.2.2.2:
OXYGEN SUPPLY TUBE
AND INITIATOR CABLE
ASSEMBLY NOT IN-
STALLED CORRECTLY.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 13 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Table 1  
Refer to the listed proce-
dures in SB B787-81205-
SB2500277-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
PART 2: CLEAN--CONDITION 2.2.2.2.1: NO
CONTAMINATION AND
NO CORROSION AND
NO DAMAGE FOUND ON
THE OXYGEN SUPPLY
TUBE.
-PARAGRAPH 3.C.(4)
STEPS (a) THRU (f) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 1: Reroute oxy-
gen supply tube and initia-
tor cable assembly. *[3]
-PARAGRAPH 3.D.(1)
STEPS (a) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 2: Apply the sup-
plier SB modification label
and part mark the supplier
SB number and date. *[1]
PART 3: TEST--
PART 4: CLOSE ACCESS--
PART 2: CLEAN--CONDITION 2.2.2.2.2:
ANY CONTAMINATION
OR ANY CORROSION OR
ANY DAMAGE FOUND
ON THE OXYGEN SUP-
PLY TUBE.
-PARAGRAPH 3.C.(3)
STEPS (a) THRU (j) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 1: Replace and
route oxygen supply tube
and initiator cable assem-
bly. *[3]
-PARAGRAPH 3.D.(1)
STEPS (a) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 2: Apply the sup-
plier SB modification label
and part mark the supplier
SB number and date. *[1]
PART 3: TEST--
PART 4: CLOSE ACCESS--
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 14 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

Table 1  
Refer to the listed proce-
dures in SB B787-81205-
SB2500277-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
-PARAGRAPH 3.B.(1)
STEP (d) OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do a general visual inspec-
tion of the PSU oxygen
panel assembly for correct
oxygen supply tube and
initiator cable assembly in-
stallation.
CONDITION 3: PSU OXY-
GEN PANEL ASSEMBLY
PART NUMBER CANNOT
BE DETERMINED.
-PARAGRAPH 3.D.(1)
STEPS (a) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Apply the supplier SB
modification label and part
mark the supplier SB num-
ber and date. *[1]
CONDITION 3.1: OXY-
GEN SUPPLY TUBE AND
INITIATOR CABLE AS-
SEMBLY INSTALLED
CORRECTLY.
PART 4: CLOSE ACCESS--
-PARAGRAPH 3.C.(2)
STEPS (b) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
Do a general visual inspec-
tion of the oxygen supply
tube for contamination,
corrosion, and damage. *[2]
CONDITION 3.2: OXY-
GEN SUPPLY TUBE AND
INITIATOR CABLE AS-
SEMBLY NOT IN-
STALLED CORRECTLY.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 15 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

Table 1  
Refer to the listed proce-
dures in SB B787-81205-
SB2500277-00 Issue 001
or later approved issues
as an accepted proce-
dure
Method of ComplianceActionCondition
PART 2: CLEAN--CONDITION 3.2.1: NO
CONTAMINATION AND
NO CORROSION AND
NO DAMAGE FOUND ON
THE OXYGEN SUPPLY
TUBE.
-PARAGRAPH 3.C.(4)
STEPS (a) THRU (f) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 1: Reroute oxy-
gen supply tube and initia-
tor cable assembly. *[3]
-PARAGRAPH 3.D.(1)
STEPS (a) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 2: Apply the sup-
plier SB modification label
and part mark the supplier
SB number and date. *[1]
PART 3: TEST--
PART 4: CLOSE ACCESS--
PART 2: CLEAN--CONDITION 3.2.2: ANY
CONTAMINATION OR
ANY CORROSION OR
ANY DAMAGE FOUND
ON THE OXYGEN SUP-
PLY TUBE.
-PARAGRAPH 3.C.(3)
STEPS (a) THRU (j) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 1: Replace and
route oxygen supply tube
and initiator cable assem-
bly. *[3]
-PARAGRAPH 3.D.(1)
STEPS (a) THRU (c) IN-
CLUSIVE OF THE APPLI-
CABLE SERVICE BUL-
LETIN SPECIFIED IN
CONCURRENT REQUIRE-
MENTS.
ACTION 2: Apply the sup-
plier SB modification label
and part mark the supplier
SB number and date. *[1]
PART 3: TEST--
PART 4: CLOSE ACCESS--
*[1]  Apply next to any existing modification label.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 16 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

Table 1  
*[2]  Oxygen supply tube damage is defined as a supply tube with any cracks, nicks, deterioration or deformation.
*[3]  Where the Collins service bulletins refer to item 7 and Figures 2 and 3, item 7 can be found in Figure 4 of the Collins service bulletins.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
Page 17 of 17
EXPORT CONTROLLED ECCN: 9E991
See page 1 for details.
B787-81205-SB250277-00 RB
Issue 001, 15 Feb 2023 12:00:00 AM
REQUIREMENTS BULLETIN

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
