# Boeing Alert Requirements Bulletin B787-81205-SB250291-00 RB

## Copies (3)

Copies the FAA filed in AD dockets on regulations.gov, newest revision first. A newer revision may exist.

- Revision 002, part 1 of 1 ("B787-81205-SB250291-00 RB Issue 002_Part 1"), 66 pages: PDF https://openairdocs.org/files/sha256/32/28/3228222342875c18b7aee79ef23cce37a6bdc2bc605cd15a98805da6ac3ad65a; text https://openairdocs.org/service-documents/boeing/b787-81205-sb250291-00-rb/file/322822234287.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1103; AD 2026-02-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Revision 002, part 1 of 1 ("B787-81205-SB250291-00 RB Issue 002_Part1"), 65 pages: PDF https://openairdocs.org/files/sha256/21/e3/21e30148a2b11962cdc818e74970f8c96feb6c87ceb70189ae7bd53734cc93ce; text https://openairdocs.org/service-documents/boeing/b787-81205-sb250291-00-rb/file/21e30148a2b1.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1103; AD 2026-02-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.
- Revision 002, part 2 of 2 ("B787-81205-SB250291-00 RB Issue 002 - Part2"), 13 pages: PDF https://openairdocs.org/files/sha256/8a/d9/8ad902ab4e4f9d9930892c3ddcf88d10a0014777bb44431b006d4cef159b2f3c; text https://openairdocs.org/service-documents/boeing/b787-81205-sb250291-00-rb/file/8ad902ab4e4f.md. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1103; AD 2026-02-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication.

## Details

- Manufacturer: [Boeing](https://openairdocs.org/service-documents/boeing.md)
- Type: Service bulletin (Alert Requirements Bulletin)
- Number: B787-81205-SB250291-00 RB
- Latest revision known: B787-81205-SB250291-00 RB, Issue 002, dated November 22, 2024 (OpenAirDocs)
- Page: https://openairdocs.org/service-documents/boeing/b787-81205-sb250291-00-rb

## ADs that cite it (1) (OpenAirDocs)

Newest first, with the revision each names, as OpenAirDocs read it from the AD's text.

- [AD 2026-02-10](https://openairdocs.org/ad/2026-02-10.md), effective Mar 9, 2026: Revisions 001 and 002

Also cited in [1 proposed AD](https://openairdocs.org/service-documents/boeing/b787-81205-sb250291-00-rb/proposed.md).

## Text (66 pages)

Revision 002, part 1 of 1, the newest copy. Rights: © The Boeing Company. Filed by the FAA in regulations.gov docket FAA-2025-1103; AD 2026-02-10 incorporates this document by reference. Not covered by OpenAirDocs’ CC0 dedication. Some pages are OCR from a scan. OCR can misread letters and numbers. Each page's text from the PDF; open the PDF at a page with #page=N.

### Page 1

ALERT
Alert Requirements Bulletin B787-81205-SB250291-00 RB EQUIPMENT
AND FURNISHINGS - Lavatory - Lavatory Faucet Control Module
Replacement
Copyright © 2024 The Boeing Company
Treatment of this data module and its content is governed by contract with Boeing. Rights to use this data module are licensed on a per
aircraft basis and such rights may not be transferable. For more information, contact The Boeing Company. Boeing, the Boeing signature,
the Boeing symbol, 707, 717, 727, 737, 747, 757, 767, 777, 787, Dreamliner, BBJ, DC-8, DC-9, DC-10, KC-10, KC-46, KDC-10, MD-10,
MD-11, MD-80, MD-88, MD-90, P-8, Poseidon and Boeing liveries are all trademarks owned by The Boeing Company; and no trademark
license is granted in connection with this document unless provided in writing by Boeing.
EXPORT CONTROLLED
This technology or software is subject to the U.S. Export Administration Regulations (EAR), (15 C.F.R. Parts 730-774). No authorization
from the U.S. Department of Commerce is required for export, re-export, in-country transfer, or access EXCEPT to country group E:1 or
E:2 countries/persons per Supp.1 to Part 740 of the EAR.
ECCN: 9E991
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 1 of 79
Export Controlled ECCN: 9E991
See page 1 for details
4.0
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 2

Table of Contents
Page
Revision Transmittal Information  . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
A. EFFECTIVITY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
1. Airplanes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
2. Spares Affected . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
B. CONCURRENT REQUIREMENTS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
C. COMPLIANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
D. APPROVAL . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
E. ACCOMPLISHMENT INSTRUCTIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
1. General Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
2. Work Instructions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
TASK 1 – P200 PANEL FOREIGN OBJECT DEBRIS (FOD) DEFLECTOR MOISTURE MANAGEMENT
DEVICES - INSTALLATION [Group 1-5, Configuration 2] . . . . . . . . . . . . . . . . . . . . . 25
TASK 2 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION [Group 1, Configuration 2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
TASK 3 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION [Group 2, 6, Configuration 2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
TASK 4 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION  [Group 3, Configuration 2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
TASK 5 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION [Group 4, Configuration 2-3]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
TASK 6 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION [Group 5, Configuration 2]
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
TASK 7 – P200 PANEL FOREIGN OBJECT DEBRIS (FOD) DEFLECTOR MOISTURE MANAGEMENT
DEVICES - INSTALLATION [Group 6, Configuration 2] . . . . . . . . . . . . . . . . . . . . . . 62
TASK 8 – P200 PANEL FOREIGN OBJECT DEBRIS (FOD) DEFLECTOR MOISTURE MANAGEMENT
DEVICES - INSPECTION [Group 4, Configuration 3] . . . . . . . . . . . . . . . . . . . . . . . 72
TASK 9 – P200 PANEL FOREIGN OBJECT DEBRIS (FOD) DEFLECTOR MOISTURE MANAGEMENT DEVICE
REMOVAL [Group 4, Configuration 3] . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 2 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 3

Alert Requirements Bulletin B787-81205-SB250291-00 RB EQUIPMENT
AND FURNISHINGS - Lavatory - Lavatory Faucet Control Module
Replacement
Revision Transmittal Information
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
This revision includes all pages of the requirements bulletin.
1. COMPLIANCE INFORMATION RELATED TO THIS REVISION
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Require-
ments Bulletin B787-81205-SB250291-00 RB. The Airworthiness Directive will make the compliance tasks
and times given in Requirements Bulletin B787-81205-SB250291-00 RB mandatory.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM AD-2022-01351-T, is related
to Requirements Bulletin B787-81205-SB250291-00 RB.
Federal Aviation Administration (FAA) Airworthiness Directive AD 2024-01-01, is related to Requirements
Bulletin B787-81205-SB250291-00 RB.
Effects of this Issue on airplanes on which Issue 001 was previously done:
Table 1  
ActionConditionGroup
Get access to area above the P200
panel and do a General Visual In-
spection (GVI) of the area to deter-
mine the presence and locations of
moisture management devices. Do
all applicable on-condition corrective
actions.
Airplanes that have incorporated the
P200 Moisture Management Device
Changes (Work Package 2, Task 5)
in Requirements Bulletin B787-
81205-SB250291 RB Issue 001.
Group 4, Configuration 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 3 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 4

2. REASON FOR REVISION
This issue is sent to add an illustration for Group 4, Configuration 2 airplanes for moisture management
device installation, add an inspection for Group 4 airplanes that have accomplished Issue 001 of this service
bulletin and to update the revision level of the Jamco supplier service bulletin.
These sections were changed:
In Concurrent Requirements, updated Jamco Supplier SB reference.
In Compliance, added Notice of Proposed Rulemaking reference, added a related AD and added a table
for more work condition.
In Approval, updated approval statement to add EASA/JAA approval and added an Alternative Method of
Compliance statement.
In General Notes, added note for definition of inspection.
In Work Instructions, added Jamco Supplier SB revision 2 reference.
In Work Instructions, added work instructions table for more work condition.
In Task 1, changed incorrect identification and part number.
In Task 3 and 4, added alternative tape specification.
In Task 5, corrected illustration and added alternative tape specification.
In Task 8, added new task for more work condition.
In Task 9, added new task for more work condition.
The data given in Information Notice 787-81250-SB250291-00 IN01, IN02, IN03, and IN04 is included in
this issue.
Footnotes in tables may be renumbered if footnotes are moved, added or deleted. Change marks will only
be added at locations where changes were made to the content; Footnotes that were only renumbered will
not have change marks added.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 4 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 5

Change marks are added, except in Planning Information - Paragraph 1.A., Airplanes and format changes,
to show the location of all content changes.
3. REVISION HISTORY
Table 2  
Service BulletinService BulletinRequirement BulletinRequirement Bulletin
787-25A0291787-25A0291787-25A0291 RB787-25A0291 RB
Issue DateIssue Date
August 30, 2023Issue 1:August 30, 2023Issue 1:
November 22, 2024Issue 2:November 22, 2024Issue 2:
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 5 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 6

THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
A. EFFECTIVITY
1. Airplanes
This bulletin is applicable to 787-8, 787-9, 787-10 Airplane(s), line number(s) 6-687, 689-954, 956-
970, 972-982, 984-989, 991-996, 999, 1001-1008, 1012-1013, 1016-1019, 1021-1022, 1024-1026,
1029-1032, 1038, 1040-1041, 1044-1045, 1047-1048, 1054-1062, 1071-1072, 1074-1075, 1082,
1085, 1087, 1091, 1094-1095, 1098-1099, 1103, 1109, 1112-1114, 1117-1118, 1121-1122, 1125-
1126, 1128-1134, 1136-1145, 1147-1148, 1151, 1161, 1167 in 7 Group(s). Where the effectivity
is presented with hyphens between line numbers, the airplane applicability means "through" and
"inclusive", e.g. line numbers 1-9 means line numbers 1 through 9 inclusive.
Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 Airplanes with FCMs Part Number AFUT000200A0001 or
AFUT000200A0002 installed and have different FOD deflector and
drip shield configuration.
-1
Airplanes that have incorporated the P200 panel moisture management
device changes in service bulletin B787-81205-SB250249-00.
1
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00.
2
787-8 Airplanes with FCMs Part Number AFUT000200A0001 or
AFUT000200A0002 installed and have different FOD deflector and
drip shield configuration.
-2
Airplanes that have incorporated the P200 panel moisture management
device changes in service bulletin B787-81205-SB250249-00.
1
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00.
2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 6 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 7

Table 1  
DESCRIPTIONCONFIGURATIONGROUP
787-8 Airplanes with FCMs Part Number AFUT000200A0001 or
AFUT000200A0002 installed and have different FOD deflector and
drip shield configurations.
-3
Airplanes that have incorporated the P200 panel moisture management
device changes in service bulletin B787-81205-SB250249-00.
1
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00.
2
787-8 Airplanes with FCMs Part Number AFUT000200A0001 or
AFUT000200A0002 installed and have different FOD deflector and
drip shield configuration.
-4
Airplanes that have incorporated the P200 panel moisture management
device changes in service bulletin B787-81205-SB250249-00.
1
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00
and have not incorporated B787-81205-SB250291-00 Issue 001.
2
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00
and have incorporated B787-81205-SB250291-00 Issue 001.
3
787-9 and 787-10 Airplanes with FCMs Part Number
AFUT000200A0001 or AFUT000200A0002 installed and have different
FOD deflector and drip shield configuration.
-5
Airplanes that have incorporated the P200 panel moisture management
device changes in service bulletin B787-81205-SB250249-00.
1
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00.
2
787-8 Airplanes with FCMs Part Number AFUT000200A0001 or
AFUT000200A0002 installed and have different FOD deflector and
drip shield configuration.
-6
Airplanes that have incorporated the P200 panel moisture management
device changes in service bulletin B787-81205-SB250249-00.
1
Airplanes that have not incorporated the P200 panel moisture manage-
ment device changes in service bulletin B787-81205-SB250249-00.
2
787-8, 787-9 and 787-10 Airplanes with FCMs Part Number
AFUT000200A0001 or AFUT000200A0002 installed and had the intent
of service bulletin B787-81205-SB250249-00 incorporated during
production.
-7
Airplane Models: 787-10, 787-8, 787-9
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 7 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 8

Table 2
GroupVariable Number
1ZA006
1ZA100 - ZA103
2ZA104 - ZA105
1ZA116
2ZA117 - ZA122
6ZA123 - ZA124
2ZA135
3ZA136 - ZA143
4ZA144
3ZA152 - ZA153
4ZA154 - ZA156
1ZA175 - ZA179
2ZA180 - ZA187
6ZA188
3ZA189
3ZA195 - ZA201
4ZA202 - ZA204
2ZA215
6ZA216 - ZA217
3ZA218 - ZA225
1ZA230 - ZA235
2ZA236 - ZA243
3ZA244 - ZA250
4ZA251 - ZA256
2ZA260 - ZA264
3ZA265 - ZA269
2ZA270 - ZA274
3ZA275
4ZA276 - ZA277
GroupVariable Number
2ZA285 - ZA292
6ZA293 - ZA294
3ZA295 - ZA296
2ZA317 - ZA320
3ZA321 - ZA324
6ZA327
3ZA334 - ZA335
3ZA341 - ZA342
2ZA380 - ZA387
6ZA388
3ZA389
2ZA430 - ZA434
6ZA435 - ZA436
3ZA437 - ZA439
6ZA445 - ZA446
2ZA447
3ZA448
4ZA449
2ZA450 - ZA453
3ZA454 - ZA457
4ZA458 - ZA459
2ZA460 - ZA468
6ZA469 - ZA472
3ZA473 - ZA484
4ZA485 - ZA489
2ZA506 - ZA514
6ZA515 - ZA516
2ZA536 - ZA540
3ZA541 - ZA545
GroupVariable Number
6ZA560
2ZA561 - ZA562
6ZA563
2ZA564
3ZA565 - ZA567
2ZA576 - ZA577
6ZA578
3ZA579 - ZA580
6ZA586
3ZA588 - ZA593
3ZA610 - ZA617
6ZA650
3ZA651 - ZA652
2ZA655
3ZA656 - ZA663
3ZA665 - ZA671
4ZA672 - ZA677
3ZA680 - ZA685
3ZA695
4ZA696 - ZA698
3ZA715 - ZA716
3ZA718 - ZA719
3ZA740 - ZA741
3ZA768
4ZA769
6ZA778
3ZA779
3ZA783 - ZA784
3ZA817 - ZA828
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 8 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 9

GroupVariable Number
4ZA829 - ZA831
3ZA839
1ZA841
3ZA842
3ZA846 - ZA848
3ZA853 - ZA855
4ZA856 - ZA862
4ZA873 - ZA876
4ZA881 - ZA888
4ZA916 - ZA920
4ZA949 - ZA950
4ZA954 - ZA959
4ZA963 - ZA966
4ZA968 - ZA972
4ZA990
5ZB001 - ZB012
5ZB021 - ZB043
5ZB047 - ZB060
5ZB077 - ZB081
5ZB097 - ZB121
5ZB127 - ZB136
5ZB167 - ZB191
5ZB197 - ZB198
5ZB217
5ZB219 - ZB220
5ZB224 - ZB229
5ZB234 - ZB242
5ZB246 - ZB248
5ZB251 - ZB258
5ZB261 - ZB262
5ZB265 - ZB280
GroupVariable Number
5ZB299
5ZB302 - ZB305
5ZB332 - ZB338
5ZB362 - ZB379
5ZB407 - ZB435
5ZB446 - ZB467
5ZB536 - ZB543
5ZB545 - ZB547
5ZB558 - ZB586
7ZB587
5ZB603 - ZB618
5ZB646 - ZB649
5ZB656 - ZB665
5ZB676 - ZB681
5ZB688 - ZB707
5ZB733 - ZB735
5ZB738 - ZB740
5ZB742 - ZB745
5ZB749 - ZB750
5ZB753 - ZB757
5ZB763 - ZB768
5ZB771 - ZB775
5ZB778 - ZB821
5ZB828 - ZB841
5ZB858 - ZB863
5ZB874 - ZB876
5ZB887
5ZB890
5ZB893 - ZB902
5ZB908 - ZB918
5ZB922
GroupVariable Number
5ZB924
5ZB926 - ZB927
5ZB934 - ZB946
5ZB951
5ZB967 - ZB971
5ZB977 - ZB978
5ZB980 - ZB986
5ZB990 - ZB991
5ZB993 - ZB997
5ZC001 - ZC015
7ZC019 - ZC020
5ZC036 - ZC054
7ZC055 - ZC056
5ZC061 - ZC069
5ZC101 - ZC107
5ZC116 - ZC118
5ZC126 - ZC129
5ZC151 - ZC152
5ZC155 - ZC158
5ZC165
5ZC211 - ZC219
5ZC221 - ZC225
7ZC239 - ZC240
1ZD001 - ZD009
1ZD012
4ZD013 - ZD024
7ZD027 - ZD028
7ZD048
5ZE001 - ZE006
5ZE008
5ZE013
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 9 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 10

GroupVariable Number
5ZE016 - ZE017
5ZE031 - ZE032
5ZE040 - ZE045
5ZE048
5ZE085 - ZE086
5ZE090 - ZE091
5ZE095 - ZE096
5ZE100
5ZE105 - ZE106
5ZE110 - ZE112
5ZE115
GroupVariable Number
5ZE150
5ZE165 - ZE166
5ZE170 - ZE171
5ZE195 - ZE198
5ZE220 - ZE236
7ZE237 - ZE241
5ZE270
5ZE273
5ZE310 - ZE311
5ZE340 - ZE341
5ZE350 - ZE362
GroupVariable Number
5ZE375
5ZE380 - ZE381
5ZE415 - ZE416
7ZE420
5ZE425 - ZE426
5ZE435 - ZE437
5ZE455 - ZE456
5ZE481
5ZE486 - ZE488
5ZE581
--
2. Spares Affected
None.
B. CONCURRENT REQUIREMENTS
Certain actions in the service bulletin specified below must be done as specified in Compliance and the
Accomplishment Instructions.
Table 3  
DescriptionService BulletinCompany
Replacement of Faucet Control
Module for Jamco Lavatory Modules
on Boeing 787 Aircraft
B80-25-4041 Rev 1, Dated June
20/23 or B80-25-4041 Rev 2, Dated
March 15/24
Jamco Corporation
C. COMPLIANCE
The Federal Aviation Administration (FAA) will possibly release an Airworthiness Directive related to Re-
quirements Bulletin B787-81205-SB250291-00 RB. The Airworthiness Directive will make the compliance
tasks and times given in Requirements Bulletin B787-81205-SB250291-00 RB mandatory.
Federal Aviation Administration (FAA) Notice of Proposed Rule Making NPRM AD-2022-01351-T, is related
to Requirements Bulletin B787-81205-SB250291-00 RB
Federal Aviation Administration (FAA) Airworthiness Directive AD 2024-01-01 is related to Requirements
Bulletin B787-81205-SB250291-00 RB.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 10 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 11

When more than one OPTION is given for a CONDITION, do only one of the OPTION numbers. When
more than one ACTION is given for a CONDITION number or an OPTION number, do all of the ACTION
numbers for that CONDITION number or OPTION number.
Accomplish the required action, based on the applicable condition in Table 8, 9, 10, and 11 in accordance
with the Accomplishment Instructions.
Group 1-6, Configuration 1; Group 7:
Table 8  LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - REPLACEMENT
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 42 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB250291-00 RB,
ACTION 1: At all lavatory
washbasins, replace FCM
part number
AFUT000200A0001 or
AFUT000200A0002 with
FCM part number
AFUT000200A0004.*[1]
All airplanes
or
Within 42 months after the
date of issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness,
-ACTION 2: At all lavatory
washbasins, do a leak test.
If a leak is found, do the
applicable corrective ac-
tion. Repeat the leak test
and make sure no leak is
found.
whichever occurs later.
-ACTION 3: Record the
service bulletin number
"B80-25-4041" and comple-
tion date on the modifica-
tion placard.
*[1]  The replacement of the FCM P/N AFUT000200A0001 or AFUT000200A0002 with FCM P/N AFUT000200A0004 is the terminating
action for the repeat inspections in B787-81205-SB250290-00 RB.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 11 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 12

Group 1-6, Configuration 2:
Table 9  LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - INSTALLATION
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 42 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB250291-00 RB,
ACTION 1: At all lavatory
washbasins, replace FCM
part number
AFUT000200A0001 or
AFUT000200A0002 with
FCM part number
AFUT000200A0004.*[1]
All airplanes
or
Within 42 months after the
date of issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness,
-ACTION 2: At all lavatory
washbasins, do a leak test.
If a leak is found, do the
applicable corrective ac-
tion. Repeat the leak test
and make sure no leak is
found.
whichever occurs later.
-ACTION 3: Record the
service bulletin number
"B80-25-4041" and comple-
tion date on the modifica-
tion placard.
-ACTION 4: Install moisture
management devices for
the P200 panel.
*[1]  The replacement of the FCM P/N AFUT000200A0001 or AFUT000200A0002 with FCM P/N AFUT000200A0004 is the terminating
action for the repeat inspections in B787-81205-SB250290-00 RB.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 12 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 13

Group 1-7:
Table 10  MAINTENANCE PROGRAM DOCUMENTATION
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 42 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB250291-00 RB
Review the maintenance
program documentation to
verify that it includes the
Maintenance Review
Board Report (MRBR) item
number 38-025-00 Task -
inspect (general visual) for
the Faucet Control Module
(FCM) for degradation and
leakage when pressurized
at intervals not to exceed
15000 flight hours.
All airplanes
or
Within 42 months after the
date of issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness,
whichever occurs later.
-Update the maintenance
program documentation to
include Maintenance Re-
view Board Report (MR-
BR) item number 38-025-
00 Task - inspect (general
visual) for the Faucet Con-
trol Module (FCM) for
degradation and leakage
when pressurized at inter-
vals not to exceed 15000
flight hours.
CONDITION 1: Mainte-
nance program documen-
tation does not include
Maintenance Review
Board Report (MRBR) item
number 38-025-00 Task -
inspect (general visual) for
the Faucet Control Module
(FCM) for degradation and
leakage when pressurized
at intervals not to exceed
15000 flight hours.
--No further action required.CONDITION 2: Mainte-
nance program documen-
tation does include Mainte-
nance Review Board Re-
port (MRBR) item number
38-025-00 Task - inspect
(general visual) for the
Faucet Control Module
(FCM) for degradation and
leakage when pressurized
at intervals not to exceed
15000 flight hours.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 13 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 14

Group 4, Configuration 3:
Table 11  MORE WORK: MOISTURE MANAGEMENT DEVICES INSPECTION
Repeat Interval (Not to
Exceed)
Boeing Recommended
Compliance Time
ActionCondition
-Within 42 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB250291-00 RB,
Do a General Visual In-
spection (GVI) of the area
above the P200 panel to
determine the presence
and locations of moisture
management devices to
make sure moisture man-
agement devices are in-
stalled in the correct loca-
tions.
All Airplanes
or
Within 42 months after the
date of issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness,
whichever occurs later.
--No further action required.CONDITION 3: Moisture
management devices are
installed in the correct loca-
tions on the dripshield and
area above the P200 pan-
el.
-Within 42 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB250291-00 RB,
Install affected moisture
management devices in
the correct locations on the
dripshield and area above
the P200 panel.
CONDITION 4: Any mois-
ture management devices
are not installed on the
drispshield and area above
the P200 panel. or
Within 42 months after the
date of issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness,
whichever occurs later.
-Within 42 months after the
Issue 001 date of Require-
ments Bulletin B787-
81205-SB250291-00 RB,
CONDITION 5 (ACTION
1): Remove any moisture
management device in-
stalled in the incorrect loca-
tion.
CONDITION 5: Any mois-
ture management devices
are not installed in the cor-
rect locations on the drisp-
shield and area above the
P200 panel.
or
Within 42 months after the
date of issuance of the
original standard certificate
of airworthiness or the
original export certificate
of airworthiness,
CONDITION 5 (ACTION
2): Install affected moisture
management devices in
the correct location on the
dripshield and area above
the P200 panel. whichever occurs later.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 14 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 15

D. APPROVAL
This Requirements Bulletin was examined by the Federal Aviation Administration (FAA). The changes
specified in this document comply with the applicable regulations and are FAA approved, as well as European
Union Aviation Safety Agency (EASA)/Joint Aviation Authorities (JAA) approved for all EASA/JAA approved
airplanes listed in this Requirements Bulletin effectivity. This document and its approval were based on the
airplane in its original Boeing delivery configuration or as modified by other Boeing changes.
If an airplane has a non-Boeing modification or repair that affects a component or system also affected by
this Requirements Bulletin, the operator is responsible for obtaining appropriate regulatory agency approval
before incorporating this Requirements Bulletin.
In addition, the Manager of the FAA Continued Operational Safety Branch approves accomplishment of
the actions defined in Requirements Bulletin B787-81205-SB250291-00 RB Issue 002 Work Package 1
Lavatory Unit Faucet Control Module (FCM) Replacement as an alternative method of compliance to the
accomplishment of actions in Requirements Bulletin B787-81205-SB250290-00 RB Issue 001 as required
by paragraph (g) of AD 2024-01-01. All provisions of AD 2024-01-01 that are not specifically referenced in
the above statement remain fully applicable and must be complied with.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 15 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 16

E.    ACCOMPLISHMENT INSTRUCTIONS
1. GENERAL INFORMATION
NOTE: 1. This is an Enhanced Required for Compliance document. There will be a separate Service
Bulletin (SB) and a separate Requirements Bulletin (RB). If an RB is mandated by an
Airworthiness Directive (AD), then all applicable requirements specified in the RB must
be done. In the RB, the "Refer to the listed procedures..." column of the table(s) in the
Work Instructions is for reference only. The procedures in that column are not required
by the AD and are for guidance only. For the related SB, some locations are marked RC
Start and RC End to identify the requirements that are restated from the RB. For the re-
lated SB, the areas between RC Start and RC End, including sub-steps and any figures
identified between RC Start and RC End, must be done to comply with the AD. Therefore,
an Alternative Method of Compliance (AMOC) is required for any deviations to steps be-
tween RC Start and RC End, including substeps and identified figures. For the related
SB, the steps not between RC Start and RC End may be deviated from using accepted
methods in accordance with the operator's maintenance or inspection program without
obtaining approval of an AMOC; this is provided that the steps between RC Start and RC
End, including sub-steps and identified figures, can still be done as specified, and the
airplane can be put back in an airworthy condition. Figures not required for compliance
are omitted from the RB.
2. This is an Enhanced Required for Compliance document. The Boeing processes used
to create the Service Bulletin (SB) and the Requirements Bulletin (RB) ensure that the
information between "RC Start" and "RC End" in the SB are identical to the information
in the same sections (Compliance, Work Instructions...) of the RB which the SB refers to
as the related document.
3. These work instructions refer to procedures included in other Boeing documents. When
the words "refer to" are used and the operator has an accepted alternative procedure,
the accepted alternative procedure can be used. When the words "in accordance with"
are included in the instruction, the procedure in the Boeing document must be used.
4. The compliance times for the actions in WORK INSTRUCTIONS are in Compliance.
5. Unless shown differently, these dimensions and tolerances are used:
– Linear dimensions are in inches
– Tolerance on linear dimensions, other than rivet and bolt edge margins, is plus or
minus 0.03 inch
– Tolerance on rivet and bolt edge margin is plus or minus 0.05 inch
– Angular tolerance is plus or minus 2 degrees
– Hole dimensions for standard solid rivets and fasteners are in SRM Chapter 51
– Torque Values:
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 16 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 17

– Values for structural fasteners are given in 787 Structural Repair Manual, Chapter
51.
– Values for airframe maintenance tasks are included in Chapter 20 of 787 Aircraft
Maintenance Manual (AMM).
– Values for electrical maintenance tasks are included in Chapter 20 of Standard
Wiring Practices Manual (SWPM).
– Values for engine maintenance tasks are included in Chapter 70 of 787 Aircraft
Maintenance Manual (AMM).
– Non-standard torque values for maintenance tasks are included in the applicable
installation step.
6. A General Visual Inspection (GVI) is defined as: A visual examination of an interior or
exterior area, installation or assembly to detect obvious damage, failure or irregularity.
This level of inspection is made from within touching distance unless otherwise specified.
A mirror may be necessary to ensure visual access to all surfaces in the inspection area.
This level of inspection is made under normal available lighting conditions such as daylight,
hangar lighting, flashlight or drop-light and may require removal or opening of access
panels or doors. Stands, ladders or platforms may be required to gain proximity to the
area being checked.
2. WORK INSTRUCTIONS
A. Actions Required for Compliance
(1) Requirements:
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 17 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 18

Table 1   WORK PACKAGE 1: LAVATORY UNIT FAUCET CONTROL MODULE (FCM) - REPLACEMENT
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 1: GET ACCESS
TO FCMS IN ALL LAVATO-
RIES
-ACTION 1: At all lavatory
washbasins, replace FCM
part number
AFUT000200A0001 or
AFUT000200A0002 with
FCM part number
AFUT000200A0004.*[1]
All airplanes
-Para 3.A of Jamco Suppli-
er Service Bulletin B80-25-
4041 Rev 1, dated June
20/23 or Para 3.A of Jam-
co Supplier Service Bul-
letin B80-25-4041 Rev 2,
dated March 15/24
PART 2: LEAK TEST-ACTION 2: At all lavatory
washbasins, do a leak test.
If a leak is found, do the
applicable corrective ac-
tion. Repeat the leak test
and make sure no leak is
found.
PART 3: MARK MODIFI-
CATION RECORD PLAC-
ARD
-ACTION 3: Record the
service bulletin number
"B80-25-4041" and comple-
tion date on the modifica-
tion record placard. PART 4: CLOSE ACCESSTO FCMS IN ALL LAVATO-
RIES
-
*[1]  The replacement of the FCM P/N AFUT000200A0001 or AFUT000200A0002 with FCM P/N AFUT000200A0004 is the terminating
action for the repeat inspections in B787-81205-SB250290-00 RB.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 18 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 19

Table 2  WORK PACKAGE 1: MAINTENANCE PROGRAM DOCUMENTATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
--Review the maintenance
program documentation to
verify that it includes the
Maintenance Review
Board Report (MRBR) item
number 38-025-00 Task -
inspect (general visual) for
the Faucet Control Module
(FCM) for degradation and
leakage when pressurized
at intervals not to exceed
15000 flight hours.
All airplanes
--Update the maintenance
program documentation to
include Maintenance Re-
view Board Report (MR-
BR) item number 38-025-
00 Task - inspect (general
visual) for the Faucet Con-
trol Module (FCM) for
degradation and leakage
when pressurized at inter-
vals not to exceed 15000
flight hours.
CONDITION 1: Mainte-
nance program documen-
tation does not include
Maintenance Review
Board Report (MRBR) item
number 38-025-00 Task -
inspect (general visual) for
the Faucet Control Module
(FCM) for degradation and
leakage when pressurized
at intervals not to exceed
15000 flight hours.
--No further action required.CONDITION 2: Mainte-
nance program documen-
tation does include Mainte-
nance Review Board Re-
port (MRBR) item number
38-025-00 Task - inspect
(general visual) for the
Faucet Control Module
(FCM) for degradation and
leakage when pressurized
at intervals not to exceed
15000 flight hours.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 19 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 20

Group 1, Configuration 2:
Table 3   WORK PACKAGE 2: MOISTURE MANAGEMENT DEVICES INSTALLATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-ACTION 4: Install moisture
management devices for
the P200 panel
All Airplanes
-Task 1
Task 2
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
Group 2, Configuration 2:
Table 4  WORK PACKAGE 2: MOISTURE MANAGEMENT DEVICES INSTALLATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-ACTION 4: Install moisture
management devices for
the P200 panel.
All Airplanes
-Task 1
Task 3
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 20 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 21

Group 3, Configuration 2:
Table 5  WORK PACKAGE 2: MOISTURE MANAGEMENT DEVICES INSTALLATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-ACTION 4: Install moisture
management devices for
the P200 panel.
All Airplanes
-Task 1
Task 4
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
Group 4, Configuration 2:
Table 6  WORK PACKAGE 2: MOISTURE MANAGEMENT DEVICES INSTALLATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-ACTION 4: Install moisture
management devices for
the P200 panel.
All Airplanes
-Task 1
Task 5
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 21 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 22

Group 5, Configuration 2:
Table 7  WORK PACKAGE 2: MOISTURE MANAGEMENT DEVICES INSTALLATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-ACTION 4: Install moisture
management devices for
the P200 panel.
All Airplanes
-Task 1
Task 6
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
Group 6, Configuration 2:
Table 8  WORK PACKAGE 2: MOISTURE MANAGEMENT DEVICES INSTALLATION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-ACTION 4: Install moisture
management devices for
the P200 panel.
All Airplanes
-Task 7
Task 3
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 22 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 23

Group 4, Configuration 3:
Table 9  MORE WORK: MOISTURE MANAGEMENT DEVICES INSPECTION
Refer to the listed proce-
dures in SB B787-81205-
SB250291-00 Issue 001
or later approved issues
as an accepted proce-
dure.
Method of ComplianceActionCondition
PART 7: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL FROM
THE AFT ELECTRICAL
EQUIPMENT (EE) BAY
-Do a General Visual In-
spection (GVI) of the area
above the P200 panel to
determine the presence
and locations of moisture
management devices to
make sure moisture man-
agement devices are in-
stalled and the devices are
in the correct locations.
All Airplanes
-Task 8
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-No further action required.CONDITION 3: Moisture
management devices are
installed and they are in
the correct locations.
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-Install moisture manage-
ment devices for the P200
panel.
CONDITION 4: Any mois-
ture management devices
are not installed.
-Task 5
PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-
PART 5: GET ACCESS
TO THE AREA ABOVE
THE P200 PANEL
--CONDITION 5: Any mois-
ture management devices
are not installed in the cor-
rect locations. -Task 9CONDITION 5 (ACTION
1):
Remove any moisture
management device not
installed in the correct loca-
tion.
-Task 5CONDITION 5 (ACTION
2): PART 6: CLOSE ACCESS
TO THE AREA ABOVE
THE P200 PANEL
-Install affected moisture
management devices in
the correct locations.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 23 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 24

Task 1 – P200 PANEL FOREIGN OBJECT DEBRIS (FOD) DEFLECTOR
MOISTURE MANAGEMENT DEVICES - INSTALLATION [Group 1-5,
Configuration 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 24 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 25 (OCR)

O BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1-5, Configuration 2.
STA
1256
ICN-B787-A-000061-A-81205-18910-A-01-1
Task 1 Figure 1
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 25 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 26 (OCR)

O BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1256
STA
1232
FOD DEFLECTOR ASSEMBLY
(DRIPSHIELD NOT SHOWN)
ICN-B787-A-000061-A-81205-18911-A-01-1
Task 1 Figure 2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 26 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 27 (OCR)

A BOEING  Issue 002, 22 Nov 2024 12:00:00 AM  B787-81205-SB250291-00 RB
REQUIREMENTS BULLETIN
STA
1232
STA
1256
•
3025303
ICN-B787-A-000061-A-81205-18912-A-01-1
Task 1 Figure 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 27 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 28 (OCR)

_BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1256
STA
3 6  1232
ICN-B787-A-000061-A-81205-18913-A-01-1
Task 1 Figure 4
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 28 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 29

ICN-B787-A-000061-A-81205-18914-A-01-1
Task 1 Figure 5  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
Table 1  
More DataQtyIdentificationNameActionStep
-3BACS38K1ASTRAPRemove1
-2BACS38K12ASTRAPRemove2
-1673Z8180-66FOD DEFLECTOR AS-
SY
Remove / Keep3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 29 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 30

Table 1  
More DataQtyIdentificationNameActionStep
*[1]1673Z8180-66FOD DEFLECTOR AS-
SY
Clean4
*[2]1BMS5-157 TYPE IIINSULATION BLAN-
KET TAPE
Apply
-1673Z8600-176CAPInstall (New)
*[3]2BACS38K12ASTRAPInstall (New)5
-1673Z8180-66FOD DEFLECTOR AS-
SY
Install (Kept)6
*[3]3BACS38K1ASTRAPInstall (New)7
*[1]  Solvent clean the mating surfaces of the FOD deflector assy liner and cap where the insulation blanket tape will be installed. Refer to
SOPM 20-30-03 as an accepted procedure.
*[2]  Apply the insulation blanket tape on the mating surface of the cap. Refer to Data Module Appendix A for application of pressure sen-
sitive tape.
*[3]  The straps must not create part deformation or delamination of the tape bond between the liner and foam parts when tightening the
straps.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 30 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 31

Task 2 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION
[Group 1, Configuration 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 31 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 32 (OCR)

@BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 1, Configuration 2.
STA
1232
STA
1256
ICN-B787-A-000061-A-81205-18915-A-01-1
Task 2 Figure 1
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 32 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 33 (OCR)

@ BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1256
STA
FLOOR BEAM  1232
DRIPSHIELD
6.25
5.75
CURRENT RETURN
NETWORK (CRN) STRAP
ICN-B787-A-000061-A-81205-18916-A-01-1
Task 2 Figure 2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 33 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 34 (OCR)

OBOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1232
1.25
0.75
STABILIZATION STRAP
ICN-B787-A-000061-A-81205-18917-A-01-1
Task 2 Figure 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 34 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 35

ICN-B787-A-000061-A-81205-18918-A-01-1
Task 2 Figure 4  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]4673Z3322-503DIVERTERInstall (New)1
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)2
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)3
*[3]*[5]1BMS5-157 TYPE II
CLASS 3, GRADE E
INSULATION BLAN-
KET TAPE
Apply4
*[6]1679Z3322-1281FOAM WATER DAMInstall (New)
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)5
*[1]  Remove backing from adhesive strip and make sure there are no wrinkles that may allow water to pass through. Adhesive strip can
be cut into segments to fit into sharp corners of brackets or supports.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 35 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 36

Table 1  
*[2]  The recommended dimensions for the diverter is 0.375 inches thick by 0.5 inches wide.
*[3]  Refer to Appendix A, SB B787-A-25-00-0291-0BA-931D-D for application of pressure sensitive tape.
*[4]  The recommended dimension for the felt is 1.00 inch wide.
*[5]  BMS 5-157 Type II, Class 1 Grade A, Form 1 Comp PVF or any adhesive film called out in BMS5-91 Type II Qualified Products List
can be used as an alternative.
*[6]  Make sure all parts have full contact with the tape.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 36 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 37

Task 3 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION
[Group 2, 6, Configuration 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 37 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 38 (OCR)

OBOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 2, 6, Configuration 2.
STA
1232
STA
1256
ICN-B787-A-000061-A-81205-18919-A-01-1
Task 3 Figure 1
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 38 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 39 (OCR)

@ BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1256
STA
FLOOR BEAM  1232
DRIPSHIELD
6.25
' 5.75
CURRENT RETURN
NETWORK (CRN) STRAP
ICN-B787-A-000061-A-81205-18920-A-01-1
Task 3 Figure 2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 39 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 40 (OCR)

OBOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1232
1.25
0.75
STABILIZATION STRAP
ICN-B787-A-000061-A-81205-18921-A-01-1
Task 3 Figure 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 40 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 41

ICN-B787-A-000061-A-81205-18922-A-01-1
Task 3 Figure 4  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]4673Z3322-503DIVERTERInstall (New)1
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)2
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)3
*[3]*[5]1BMS5-157 TYPE II
CLASS 3, GRADE E
INSULATION BLAN-
KET TAPE
Apply4
*[6]1679Z3322-1281FOAM WATER DAMInstall (New)
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)5
*[1]  Remove backing from adhesive strip and make sure there are no wrinkles that may allow water to pass through. Adhesive strip can
be cut into segments to fit into sharp corners of brackets or supports.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 41 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 42

Table 1  
*[2]  The recommended dimensions for the diverter is 0.375 inches thick by 0.5 inches wide.
*[3]  Refer to Appendix A for application of pressure sensitive tape.
*[4]  The recommended dimension for the felt is 1.00 inch wide.
*[5]  BMS 5-157 Type II, Class 1 Grade A, Form 1 Comp PVF or any adhesive film called out in BMS5-91 Type II Qualified Products List
can be used as an alternative.
*[6]  Make sure all parts have full contact with the tape.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 42 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 43

Task 4 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION
[Group 3, Configuration 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 43 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 44 (OCR)

_BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 3, Configuration 2.
STA
1232
STA
1256
ICN-B787-A-000061-A-81205-18923-A-01-1
Task 4 Figure 1
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 44 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 45 (OCR)

@ BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1256
STA
FLOOR BEAM  1232
DRIPSHIELD
6.25
5.75
CURRENT RETURN
NETWORK (CRN) STRAP
ICN-B787-A-000061-A-81205-18924-A-01-1
Task 4 Figure 2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 45 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 46 (OCR)

OBOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1232
1.25
0.75
STABILIZATION STRAP
ICN-B787-A-000061-A-81205-18925-A-01-1
Task 4 Figure 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 46 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 47

ICN-B787-A-000061-A-81205-18926-A-01-1
Task 4 Figure 4  
1.  The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]4673Z3322-503DIVERTERInstall (New)1
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)2
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)3
*[3]*[5]1BMS5-157 TYPE II,
CLASS 3, GRADE E,
FORM 1
INSULATION BLAN-
KET TAPE
Apply4
*[6]1679Z3322-1281FOAM WATER DAMInstall (New)
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)5
*[1]  Remove backing from adhesive strip and make sure there are no wrinkles that may allow water to pass through. Adhesive strip can
be cut into segments to fit into sharp corners of brackets or supports.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 47 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 48

Table 1  
*[2]  The recommended dimensions for the diverter is 0.375 inches thick by 0.5 inches wide.
*[3]  Refer to Appendix A for application of pressure sensitive tape.
*[4]  The recommended dimension for the felt is 1.00 inch wide.
*[5]  BMS 5-157 Type II, Class 1 Grade A, Form 1 Comp PVF or any adhesive film called out in BMS5-91 Type II Qualified Products List
can be used as an alternative.
*[6]  Make sure all parts have full contact with the tape.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 48 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 49

Task 5 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION
[Group 4, Configuration 2-3: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 49 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 50 (OCR)

_BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 4, Configuration 2-3.
STA
1232
STA
1256
ICN-B787-A-000061-A-81205-18927-A-01-1
Task 5 Figure 1
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 50 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 51 (OCR)

Q BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1256
STA
FLOOR BEAM  1232
1) DIVERTER
1) DIvERTER
FOAM
WATER
DAM  DRIPSHIELD
4.75"
5.25"
CURRENT RETURN
NETWORK (CRN) STRAP
3069812
ICN-B787-A-000061-A-81205-19691-A-01-1
Task 5 Figure 2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 51 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 52

ICN-B787-A-000061-A-81205-18929-A-01-1
Task 5 Figure 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 52 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 53 (OCR)

@ BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1232
0.72!
).67!
STA
1256
STABILIZATION STRAP
3025536
ICN-B787-A-000061-A-81205-18930-A-01-1
Task 5 Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this Task.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 53 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 54

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]9683Z3322-503DIVERTERInstall (New)1
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)2
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)3
*[3]*[5]1BMS5-157, TYPE II,
CLASS 3, GRADE E,
FORM 1
INSULATION BLAN-
KET TAPE
Apply4
*[6]1679Z3322-1281FOAM WATER DAMInstall (New)
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)5
*[1]  Remove backing from adhesive strip and make sure there are no wrinkles that may allow water to pass through. Adhesive strip can
be cut into segments to fit into sharp corners of brackets or supports.
*[2]  The recommended dimensions for the diverter is 0.375 inches thick by 0.5 inches wide.
*[3]  Refer to Appendix A for application of pressure sensitive tape.
*[4]  The recommended dimension for the felt is 1.00 inch wide.
*[5]  BMS 5-157 Type II, Class 1 Grade A, Form 1 Comp PVF or any adhesive film called out in BMS5-91 Type II Qualified Products List
can be used as an alternative.
*[6]  Make sure all parts have full contact with the tape.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 54 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 55

Task 6 – P200 PANEL MOISTURE MANAGEMENT DEVICE - INSTALLATION
[Group 5, Configuration 2: ]
THIS DOCUMENT IS SENT TO THE OPERATORS OF RECORD OF THE AIRPLANES SHOWN
IN PARAGRAPH 1.A., EFFECTIVITY. IF AN AIRPLANE HAS BEEN LEASED OR SOLD, SEND
Alert:
THIS DOCUMENT TO THE NEW OPERATOR. IF APPLICABLE SPARES HAVE BEEN SOLD,
SEND THIS DOCUMENT TO THE NEW OWNER. THIS IS AN ENHANCED REQUIRED FOR
COMPLIANCE DOCUMENT. THE BOEING PROCESSES USED TO CREATE THE SERVICE
BULLETIN (SB) AND THE REQUIREMENTS BULLETIN (RB) ENSURE THAT THE INFORMATION
BETWEEN "RC START" AND "RC END" IN THE SB ARE IDENTICAL TO THE INFORMATION IN
THE SAME SECTIONS (COMPLIANCE, WORK INSTRUCTIONS...) OF THE RB WHICH THE SB
REFERS TO AS THE RELATED DOCUMENT.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 55 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 56 (OCR)

_BOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
Procedure
This Task applies only to: Group 5, Configuration 2.
STA
1232
STA
1256
ICN-B787-A-000061-A-81205-18931-A-01-1
Task 6 Figure 1
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 56 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 57

ICN-B787-A-000061-A-81205-18932-A-01-1
Task 6 Figure 2
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 57 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

### Page 58 (OCR)

OBOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
STA
1232
0.725
0.675
STABILIZATION STRAP
ICN-B787-A-000061-A-81205-18933-A-01-1
Task 6 Figure 3
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 58 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 59 (OCR)

OBOEING  B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN
DRIPSHIELD
1.25
0.75
INBD
A-A  3025540
ICN-B787-A-000061-A-81205-18934-A-01-1
Task 6 Figure 4
1. The step numbers shown below agree with the numbers shown in the circle symbols in the Task. The QTY
numbers shown below are the number of parts necessary for this task.
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 59 of 79
Export Controlled ECCN: 9E991
See page 1 for details

### Page 60

Table 1  
More DataQtyIdentificationNameActionStep
*[1]*[2]*[3]8673Z3322-503DIVERTERInstall (New)1
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)2
*[3]1BMS5-157 TYPE IIINSULATION BLAN-
KET TAPE
Apply3
*[5]1679Z3322-1281FOAM WATER DAMApply
*[1]*[3]*[4]1673Z3322-501FELTInstall (New)4
*[1]  Remove backing from adhesive strip and make sure there are no wrinkles that may allow water to pass through. Adhesive strip can
be cut into segments to fit into sharp corners of brackets or supports.
*[2]  The recommended dimensions for the diverter is 0.375 inches thick by 0.5 inches wide.
*[3]  Refer to Appendix A for application of pressure sensitive tape.
*[4]  The recommended dimension for the felt is 1.00 inch wide.
*[5]  Make sure all parts have full contact with the tape
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
Page 60 of 79
Export Controlled ECCN: 9E991
See page 1 for details
B787-81205-SB250291-00 RB
Issue 002, 22 Nov 2024 12:00:00 AM
REQUIREMENTS BULLETIN

The text continues at https://openairdocs.org/service-documents/boeing/b787-81205-sb250291-00-rb/file/322822234287.md?from=61

---
OpenAirDocs.org is an independent research project of [Contrail Labs](https://contraillabs.com/). It is not affiliated with the FAA or the NTSB. Source documents are U.S. government works in the public domain, except the copies of manufacturers’ service documents, which belong to their rights holders.
